1 2
WORK EXPERIENCE MODE DESIGN CORP. PTY LTD, SYDNEY SCOTT CARVER PTY LTD, SYDNEY
PROFESSIONAL WORK EXPERIENCE | MODE DESIGN CORP. PTY LTD, SYDNEY
St Vincent De Paul Housing Market: Residential | Stage: Conception to Construction | FSA 2378.5sqm | 36 units on Heritage Listed site | Cost: 20M Client: Amelie Housing and Gledhill Constructions | Location: 6-16 Smarts Crescent, Burraneer, NSW 2230 Role: Project Architect Project Description: A seniors housing development comprising of 36 dwellings including, alterations and refurbishment of Mount St Vincent House (heritage item) to accommodate 3 seniors living units along with communal areas. Being adjacent to a heritage listed item and with much community opposition Land and Environment Court issued the approval of Development Application with some additional conditions. Level of Responsibility: Modify 20% apartments to comply with Adaptable Housing Code AS4299 and confirm compliance with the Accessibility code AS1428 as conditioned by Land and Environmental Court with development application (DA) approval; To ensure design documentation complies with SEPP Seniors, ADG, Silver level Liveable Housing Guide, National Construction Code (NCC) in accordance with BASIX, Acoustic, Heritage reports and design brief from client achieving 7-star NatHERs rating; Managing and leading the team for design development, D&C contract and construction documentation together with attending design and consultants meeting for coordination; Preparing programs and providing services during construction including monthly site inspections, negotiations with consultants, including access, heritage, certifier and services engineers. Level of Participation: Executive levell
Elevations
View from Smarts Crescent PROPOSED BUILDING WHOLLY BELOW 8.5m WITH EXCEPTION OF LIFT OVERRUN MESH@ 8.Sm ABOVE NATURAL GROUND LINE
PROPOSED BUILDING WHOLLY BELOW 8.5m WITH EXCEPTION OF LIFT OVERRUN
MESH@ 8.Sm ABOVE NATURAL GROUND LINE
1H
1A
2A1H
1A1A
----�� 2A
1A
---��-SECTION A 1:200
SECTION A 1:200
-------------
PROPOSED BUILDING WHOLLY BELOW 8 Sm WITH EXCEPTION OF LIFT OVERRUN [
MESH@ 8.5m ABOVE NATURAL GROUND LINE [
PROPOSED BUILDING _ _Bl._30300 __
MESH@ 8.5m ABOVE - - - NATURAL GROUND LINE [
1C
WHOLLY BELOW 8 Sm WITH EXCEPTION OF LIFT OVERRUN [
- - - -
1A
_ _Bl._30300 __
HERITAGE BUILDING
HERITAGE BUILDING
1C
1A SECTION B 1:200
Sections
SECTION B SYDNEY 1:200 Level 5, 111-117 Devonshire St
SECTIONS MOUNT ST VINCENT
Project No:
16649SYD
eS
/
WATER METER & RPZD 0.5x2.9x1m
eS
eS
/ eG
eW
EL AV GR
3
7304 20.0
eT
eW
00 10
9 P0
TOW +20683
ED
eG
PLAN TING
22.0
TWO
STOR BRIC EY DWEL K META LING L ROO F No.4
+20950
PLAN TING NATURAL GROUND LEVEL +21000
eT eT
T17
eT
4 DP 2705
eT
° 90.0
ISSUE
0
2
NORTH
4
/
6
8
10
SYDNEY
2 DP 103355 0
/
3
/
eG
148 9
eG
TELSTRA PIT
eG
NATURAL GROUND LEVEL +22000
204 °
1M
+21350
PLAN TING
OUN DAR Y
UNIT 04
+21650
PLAN TING
RETA WALL INE D
.12
OLD
30˝ 63
ELECTRICAL UNDERGROUND SERVICES REFER TO ELECTRICAL DRAWINGS.
eT
103° 49 ΄
DRAW ING CC -AR-10 12
PLAN TING
eeTW
BOUN DARY
16΄ 40˝ 31.0 6 B
UP +20200
1B
T19
ROOT MAPPING FOR T19 AND T20 TO REQUIRED ROOTS LARGER THAN 50MM
+20200
+20950
UNIT 05
eWTO ROC K BE
1B
+22050
eS eT
6 DP 2705 3
PLAN TING
UNIT 06
+22350
ATIO N
P
R TO
+22840
T20PLAN TING 23.0
SUBST
1:20
eG
PLANTIN G
1B
eS
UNIT 07
REFE
1B
NEW
eG
T14 +21350
1:20
2
7304
C R E S C E N T
+21650
+22050
+23700
RL+20.150
SET
22.0
P
1:20
UNIT 08
3100
+22050
1:20
1M
eT eW
UNIT 09
448 5 BAC K
PROPOSED LANDSCAPE, REFER TO LANDSCAPE DRAWINGS
eT
NG
[No Slop e]
SW P
20.0
BOUN DRY
eG
PLA NTI
/
.0° 90T38
380 0
EL TO
eT
P
PARA LL
SP 47004
+20087
8 194
C
ON-SITE OSD TANK&RWT
T12
+24700
SINGLE STOREY BRICK DWELLIN METAL RO G OF No.5
7 358 325 0
21.0
+22350
NATURAL GROUND LEVEL +23000
KEY PLAN
/
5 1:1
1A
OSD@RWT TO CIVIL AND HYDRAULIC ENGINEERS' DRAWINGS
123 5
EXISTING SINGLE STOREY HERITAGE BUILDING TO BE RENOVATED
P SW
+23750
189° 31΄ 40˝ 14.63
eG
1:42
/
T32
eW
P SW
UNIT 15
COVE 23.0 RED BB Q AREA
/
T33
TOW +20360
+22040
BUILDING ENTRY
+23750
PLAN TING
/
T31
eT
+21750 +21700
17.37
/
T30
UNIT 22
1:31
Site Plan
/
PROPOSED LANDSCAPE, REFER TO LANDSCAPE DRAWINGS
85 35
FL 22060
eG
O ET TU D TA E S CATE ON ST RELO BE
/
T29
eW
+21273
HT
-
Y
BUILDING ENTRY
00
DAR .05 BOUN ˝ 32 ΄ 30 ° 22 154
2 P1
EPS
11 DP 1059 236 /
eW eT
ST
6 WL
CK BA
5 1:3
G TIN AN PL
G TIN AN PL
+21500
P SW
N RT 85 32
T SE
G TIN AN PL
] pe Slo [No
G TIN AN PL
2B
1
1
7304 RETAINING WALL TO BE TERRACED TO MERGE INTO THE LANDSCAPE
T28
TOW +20547 TOW +20547
1D
PATH
7 DP 2705 3
P SW
3 P1
900
EXISTING HERITAGE STONE WALL
P 0 mm SW 700 000 1
5 P1
4 1:5
4 P1
1A
+23650
BOUNDA RY
900
6 P1
RD
+21671
UNIT 11
+24650
99° 30΄ 40 ˝
A LL BO
KERB RAMP
+24700
1:25
00 25
eW
TH
P SW
UNIT 23
+24650
K
1:36
+21750
+24700
ALL GW ININ
RN D TU OUN AR BAY
TOS +20995
+22000
10 55
PA PROPOSED LANDSCAPE, REFER TO LANDSCAPE DRAWINGS
SET BAC
PROPOSED NEW BUILDING
1A
+24700
ER
TA
P SW
TT
RA
UNIT 24
2C - ADPT
T27
AC
BA 1:4
1:33
RR
RD
TOW +20620
T9
eT
TE
A LL BO
eT
00 12
0 01 15
T6
+22000
UNIT 12
T GH HEI
TOW +20512
eG
W
TOW +20683
/
LO
TOS +21190
8 P0
TOS +21650
NEW SANDSTONE BLOCK RETAINING WALL
4965 TWO +21000
19.0
40˝ 50.96 BOUNDA
BIN STORE
eG
1286 5 ING WA LL
70 18
1:22
0 P1
AIN
1
GE
1 P1
6 WL
4 1:5
T5
RET
eW
+21750
G TIN AN PL
BRICK GA RA
m 5 28 0m 12 100 00
N RT
S RK & L WO RS S VE AL EE G RN GIN WIN TE EN RA EX TO E D R P FO FER CA RE NDS LA :23
G TIN AN PL
1A
+24700
+24650
PATH
3395
TOS +21421
HT
00 20
LIGHTS TO ELECTRIC ENGINEER'S DRAWINGS.
L L RA CE H G TIC WIT AS D PL ALE SE
G
UNIT 25
+24650
+24650
CONCRET E GARAG E
/
eG
6 1:2
TIN AN PL
TE
2C - ADPT
+24650
+24250
2 DP 2014 14
21.0
eW eT
/
TH PA
RE NC CO AB SL
UNIT 13
1E
+24700 +24650
115 ° 42 ΄ 20 ˝ 50 BOUNDA .495 RY
7 P0
+21750
UNIT 26
eW
TOW +21000
+22700
DATE
06/07/2018 09/07/2018 01/08/2018 14/12/2018 01/02/2019 20/02/2019 22/02/2019 27/02/2019 27/03/2019
/
EN Y UM W A BIT IVE DR
2A - ADPT
CHK
PO
eG
eT
H WIT
RY
ED AL SE
3 1:2
189° 31΄
LL CE
ING ILD B U T RY EN
1 P0
+21750
UNIT 14
AS AS AS AS AS RN RN RN AS
/
eW
T3
T4
7 1:2
AUTH
22.0
6 P0
G
2A - ADPT
+24050
TH
T2
TIN AN PL
UNIT 21
PA
eW eT
IC ST
0 1:2
+24000
2 P0
SINGLE STOREY BRICK TILE RO OF No.18
1:20
0 1:2
B SLA
5 P0
+23200
A PL
BIN ORE ST TE RE NC CO
P SW
/ eG
Level 5, 111-117 Devonshire St Surry Hills NSW 2010 T +61 2 8396 9500 syd@modedesign.com.au
ABN: 65 112 807 931
/
/
+23510
T26
/ EX IST TO ING B eT R BE RE ICK P eW 24.0 T1 LOCA OSTS TED
eG
BT
/
/
NDARY
+23510
eT
BOX
eW
99° 31΄ 10 ˝ 21.27 +23510 BOU
C
eW eT
4 P0
eW
3 P0
+23918
/
23.0
/
LETTER
eW
DESCRIPTION
FOR DRAFT TENDER UPDATED SITE PLAN FOR TENDER FOR CONSTRUCTION FOR CONSTRUCTION FOR CONSTRUCTION S96 DRAWING FOR REVIEW S96 DRAWING FOR REVIEW S96 FOR REVIEW
/
BRICK BE RELOCAPOSTS TO TED
/
EXISTING
eT
eW
PUMP ROOM 3.6x1.8x2.2h
C D E 1 2 3 F G H
/
S M A R T S
eTPT
eTOP OF KERB 7304
eW
eT
HYDRANT & BOOSTER ROOM 0.8x2.7x1.6m
1 DP 27053
1
REV
/
CLIENT
ST VINCENT DE PAUL HOUSING PROJECT
11 DP 1255
/
12 DP 1255 /
eW
AMENDMENTS
/
eG
eT
/ eG
20.0
eS eHYD
• •
4 DP 6083 57
/ eG
165 0
eW
ELECTRICAL UNDERGROUND SERVICES REFER TO ELECTRICAL DRAWINGS.
325 0
eW eT
GAS REGULATOR 0.3x1x1m
/ eG
These designs and plans are the copyright of MODE DESIGN Corp. Pty Ltd and cannot be reproduced without written permission. Verify all dimensions on site prior to commencement of work. DO NOT scale off these drawings. Report any discrepancies to the architect before carrying out any work.
•
eS
eS
• 2
7304
/
eT eW
/ eG
S M A R T S C R E S C E N T
BRICK GA RAGE
eS
SP 86037
eS
eG
/
PROFESSIONAL WORK EXPERIENCE | MODE DESIGN CORP. PTY LTD, SYDNEY
/
eG
/
ST VINCENT DE PAUL HOUSING
8
6-16 Smarts Crescent,Burraneer NSW
DRAWING TITLE /
/
/
SITE PLAN
8 CHECKED DRAWN Author Checker ISSUE SCALE @ A1 27/03/2019 3:21:06 PM 1 : 200 PROJECT No STAGE DRAWING No
Under Construction Photos 16649SYD SK CC- AR-0002
REVISION
H
•
These DESIG without Verify a of work DO NO Report carryin
•
St Vincent De Paul Housing 1
LEGEND FLOOR PLAN
AA
DD
1201
1201
2
3
4
5
6
41700 8400
• •
8300
8400
8400
UNIT 01 1A
UNIT NUMBER UNIT TYPE
D.01.A
INDICATES DOOR DOOR NUMBER TYPE
W.01.A
INDICATES WINDOWS WINDOW NUMBER TYPE
8200
REV
A
B C D E F G
FLOORS 1
1
1
1
2206
1
2209
2208
2207
CR VN CT
2210
CARPET TILES VINYL CERAMIC TILES
GENERA
CEILING
A
ALL DRAW ARCHITEC
SLAB FOLD
LINE OF ROOF ABOVE AL.26.B
W.54.F
AL.27.B
SLAB FOLD
SLAB FOLD
NBN+DB
FFL+27.750
D.97.E
H
+27.710
HWU+C
W.50.I
UNIT 28
D.94.F
1J
D.96.F
FFL+27.750 D.99.F
CEILING FAN
1K
FFL+27.750
BB
1201
D.98.E
1316
K-02 D.26.A
D.27.A
D.28.A
K-07
D.95.E
H
K-02
+27.710
LIGHT
FLUORESCENT LIGHT
AC
AIR CONDITIONING UNIT WALL MOUNT
HTR
HEATER WALL MOUNT
REFER TO SPECIFICA TYPES, DO EQUIPMEN
REFER TO FOR ALL D
ALL DIMEN WORK COM
SERVICES PLAN ELECTRICAL SWITCH BOARD
FF
1202
F
D.25.A
K-03
REFER TO EQUIPMEN DISCREPA
NOTES: REFER TO SERVICES ENGINEER'S DRAWINGS FOR DETAILED INFORMATION, SYMBOLS DRAWN ARE REPRESENATIONAL ONLY
NBN+DB
+27.710 D.101.E
C
CEILING PLAN
3°
FALL
GUTTER
NBN+DB
UNIT 29
1H
D.100.F
FFL+27.750
REFER TO FOR ALL F APPLIED F ALL ARCH PROPRIET
RETURN AIR GRILL
LINE OF ROOF ABOVE
UNIT 30
W.55.C
1G
D.29.A
K-07
ALUCOBOND SOFFIT PLASTERBOARD
SUPPLY AIR GRILL
D.103.E
H
CL PB
SLAB FOLD
690
UNIT 31
+27.710
NBN+DB
CEILING HEIGHT
W.53.C
704
LINE OF ROOF ABOVE
22580
8900
D.102.F
1F
FFL+27.750
EXISTING SINGLE STOREY HERITAGE BUILDING TO BE RENOVATED
AL.25.B
SLAB FOLD
W.57.C
1201
LINE OF ROOF ABOVE
W.52.F
1500
UNIT 32
BB
HWU+C
LINE OF ROOF ABOVE
W.56.F
BALCONY CT-2
CL-01
CL-01
LINE OF ROOF ABOVE AL.28.B
W.58.F
AL.29.B
BALCONY CT-2
GUTTER
LINE OF ROOF ABOVE
B
BALCONY CT-2
HWU+C
BALCONY CT-2
CL-01
HWU+C
HWU+C
BALCONY CT-2
CL-01
CL-01
3430
LINING CODE
PB-2700
INSTALL A MANUFAC
DOUBLE POWER OUTLET
ALL JOINT SET UNLES
LIGHT SWITCH THERMOSTAT
t°
MOTION DETECTOR
ALL PLAST EDGES TO
EXIT SIGN
CORRIDOR 04
D.30.A D.107.E
D.104.E
D.31.A
NBN+DB
D.106.F
D.32.A
NBN+DB
D.110.F
D.109.E
D.33.A W.60.I
D.108.F
D.111.E
NBN+DB
FALL 3.00°
NBN+DB
W.64.C
CL-01
LINE OF ROOF ABOVE
BALCONY CT-2
D.93.F
K-06
UNIT 27
HWU+C
BALCONY CT-2
1L
HWU+C
CL-01
SCR-1
HWU+C
BALCONY CT-2
CL-01
ER
AL.30.B
W.63.I
AL.31.B
SCR-1
HWU+C
SCR-1
HWU+C
SCR-1
LINE OF ROOF ABOVE
CL-01
W.62.I
L
BALCONY CT-2
AL.32.B
TT GU
SK
W.61.I
E OV
H
FFL+27.150
W.49.I
F AB SL OL D
AL.24.B
BALCONY CT-2 E LIN
OF RO OF
AB
LEGEND FLOOR PLAN
E OV
ET
ER
INDICATES WINDOWS WINDOW NUMBER TYPE
W.01.A
° 15
TT GU
LL FA
FF
1202
P RA
1201
E OV
° 15
AB
LL
AA
PA
FA
OF RO OF
1101
E LIN
F
3
FLOORS CR VN CT
FA LL
9° 18
CARPET TILES VINYL CERAMIC TILES
22
CEILING
° .50
DD
R FE RE
1201
LINING CODE
CC
G IN AW DR
.96 50
TO
40
.63 14 0 ΄4 31
΄ 31 9° 18
Second Floor Plan- North Wing
0΄ °3 99
7 7.3 1 40
8
1202
PB-2700
CEILING HEIGHT
CL PB
ALUCOBOND SOFFIT PLASTERBOARD
22 10 R-A TD
CEILING PLAN
00 97
CEILING FAN
RETURN AIR GRILL SUPPLY AIR GRILL
STAIR 2
UP
COMMS,PDH
F
EXISTING SINGLE STOREY HERITAGE BUILDING TO BE RENOVATED
LINE OF LEVEL ABOVE
LIFT 1
LIGHT
FLUORESCENT LIGHT
AC
AIR CONDITIONING UNIT WALL MOUNT
HTR
HEATER WALL MOUNT
NOTES: REFER TO SERVICES ENGINEER'S DRAWINGS FOR DETAILED INFORMATION, SYMBOLS DRAWN ARE REPRESENATIONAL ONLY
7
SERVICES PLAN ELECTRICAL SWITCH BOARD DOUBLE POWER OUTLET LIGHT SWITCH THERMOSTAT
H
1550
4061
PLANTING
AL.04.A
AL.05.A
TERRACE CT-2
UNIT 06
+21.360
UNIT 05 1B
FFL+21.700
+20950 PLANTING
+21.960
K-02
1M
FFL+21.000 D.40.F
2
5021
CC
1202
W.14.G
LINE OF ROOF ABOVE
PLANTING
W.08.G
AL.03.A
LINE OF ROOF ABOVE
TERRACE CT-2
W.05.G HWU+C
TERRACE CT-2
LINE OF ROOF ABOVE
PLANTING
PLANTING
1
1
1102
EE
1202
2202
AL.01.A
HWU+C
LINE OF ROOF ABOVE
PLANTING
103° 49΄ 30 63.12
Ground Floor Plan- South Wing
UNIT 04
D.40.E
FFL+21.400
H
W.02.E
W.01.D
D.01.A
W.06.D
K-01
K-01
G/W M
W.07.E
1B
D.41.E
LINE OF ROOF ABOVE
PLANTING
LINE OF ROOF ABOVE
1227
+21.660
W.11.G
TERRACE CT-2
5032
W.43.I
D.44.E
D.42.F W.17.G
LINE OF ROOF ABOVE
HWU+C
LINE OF LEVEL ABOVE
I
FIRE EXTINGUISHER
FB
FIRE BLANKET
ABBREVIATIONS INDEX
1
3714
NBN+DB
NBN+DB
D.45.F
FFL+22.100
HWU+C
3
+21350 PLANTING W.10.E
1202
1102
1550
1:20
CONCRETE
+21650 FDT
+22.060
1B
FFL+22.400
FIP / ELEC
W.09.D
UNIT 07
NBN+DB
CC
CONCRETE
W.12.D
K-01
1:20
1500
+22050
1B
D.46.E
1:20
W.13.E
K-01
7933
D.41.F
D.05.A
UNIT 08
+21.360
1550
NBN+DB
W.16.E
5966 1
CONCRETE
LINE OF ROOF ABOVE
+22350
1550
5021
1:20 STAIR 1
3873
D.02.A
5963
HWU+C
1550
D.03.A
4070
1C
FE
NOTES: REFER TO SERVICES ENGINEER'S DRAWINGS FOR DETAILED INFORMATION, SYMBOLS DRAWN ARE REPRESENATIONAL ONLY
NBN+DB
UNIT 10
W.15.D
H
EXIT SIGN
FF
1202
D.43.F
10
5031
MOTION DETECTOR
1202
D.04.A
DEEP SOIL
EE
LINE OF LEVEL ABOVE
REFER TO DRAWING TD-AR-1001
1202
LINE OF LEVEL ABOVE
t°
FF
1
2212
ALLOW FO ITEMS.
ALLOW TO FIXED FFE
TERRACE CT-2
ALL WET A
AIR CONDITIONING UNIT
BARGE CAPPING WASTE BIN BASIN CONDENSER CLOTH LINE CHILLER DOOR DISTRIBUTION BOARD DISPENSER TOILET PAPER DP DISPENSER PAPER TOWEL DISHWASHER EXISTING ELECTRICAL SWITCH BOARD EAVES GUTTER ELECTRICAL CUPBOARD EMERGENCY WARNING CC & INTERCOMMUNICATION SYSTEM 1202 F.EX FIRE EXTINGUISHER H HYDRAULIC RISER FDT COMMS CUPBOARD FIP FIRE INDICATOR PANELS FX FIXED GWM GAS WATER METER HWU HOT WATER UNIT M BENCH TOP MI MIRROR MW MICROWAVE PT PAINT PB PLASTERBOARD NATIONAL BROADBAND NETWORK DEVICE NBN RAG RETURN AIR GRILL RS ROLLER SHUTTER SAG SUPPLY AIR GRILL SD SOAP DISPENSER SDU SANITARY DISPOSAL UNIT SK STAINLESS STEEL SINK SKL SKYLIGHT SWP STORM WATER PIT SU SHELVING UNIT T TABLE TELEPHONE WALL MOUNT TEL TS TOASTER UNIT 01 UNIT NUMBER VP VENT PIPE UNIT TYPE 1A W WINDOW INDICATES DOOR WATER CLOSET WC DOOR NUMBER WT WALL TILES VYL VINYL TYPE D.01.A
AB
0 90
D.92.E
FIRE BLANKET
MINIMUM MAINTAINE
BC BIN BSN C CL CHLR D DB DTP DP DPT DW e ESB EG ELEC EWIS
00 10
D.24.A
SLAB FOLD
AL.33.B
LL FA
EC
+27.710
D.105.F
FFL+27.750
T FD
SLAB FOLD
E
EL
6
FB
AC
2°
T FD
LL F A 5° 1
7850
R AI ST
ER
H
NBN+DB
1
OF RO OF
1D
T LIF
UP
FIRE EXTINGUISHER
ABBREVIATIONS INDEX
E LIN
UNIT 33
1200
FE
NOTES: REFER TO SERVICES ENGINEER'S DRAWINGS FOR DETAILED INFORMATION, SYMBOLS DRAWN ARE REPRESENATIONAL ONLY
0 50
1A
FFL+27.750
E OV
UNIT 34
FFL+27.750
+27.710
40 13
1A
K-04
8 18
UNIT 35
FFL+27.750
H
K-05
4
15
1A
H
AIR ST
05 OR 0 ID .15 RR +27 -1 CO FFL CT 01
UNIT 36
K-05
GWM
+27.710
AB
H
K-05
+27.710
40 19
LINE OF ROOF ABOVE
+27.710
TT GU
F.EX
F.EX
G/W M
OF RO OF
W.65.K
+27.750 CT-1
8 18
STAIR 1
D
E LIN
2400
2574
I
AC
AIR CONDITIONING UNIT
BC BIN BSN C CL CHLR D DB DTP DP DPT DW e ESB EG ELEC EWIS
BARGE CAPPING WASTE BIN BASIN CONDENSER CLOTH LINE CHILLER DOOR DISTRIBUTION BOARD DISPENSER TOILET PAPER DP DISPENSER PAPER TOWEL DISHWASHER EXISTING ELECTRICAL SWITCH BOARD EAVES GUTTER ELECTRICAL CUPBOARD EMERGENCY WARNING & INTERCOMMUNICATION SYSTEM FIRE EXTINGUISHER HYDRAULIC RISER COMMS CUPBOARD FIRE INDICATOR PANELS FIXED GAS WATER METER HOT WATER UNIT BENCH TOP MIRROR MICROWAVE PAINT PLASTERBOARD NATIONAL BROADBAND NETWORK DEVICE RETURN AIR GRILL ROLLER SHUTTER SUPPLY AIR GRILL SOAP DISPENSER SANITARY DISPOSAL UNIT STAINLESS STEEL SINK SKYLIGHT STORM WATER PIT SHELVING UNIT TABLE TELEPHONE WALL MOUNT TOASTER VENT PIPE WINDOW WATER CLOSET WALL TILES VINYL
F.EX H FDT FIP FX GWM HWU M MI MW PT PB NBN RAG RS SAG SD SDU SK SKL SWP SU T TEL TS VP W WC WT VYL
PREL CONS WOR ISSUE WOR WOR PREFOR
KEY PLA
•
These DESIG without Verify a of work DO NO Report carryin
• • •
REV
A PREL ISSUE CONS B WOR C ISSUE D WOR 0 1 E WOR F PREG FOR
GENERA
ALL DRAW CLIENT ARCHITEC
ST V REFER TO FOR ALL F HOU APPLIED F
ALL ARCH PROPRIET
PROJEC REFER TO EQUIPMEN DISCREPA
MT V HOU
REFER TO 6-16 Sma SPECIFICA TYPES, DO DRAWIN EQUIPMEN
SEC REFER TO FOR ALL D WING
ALL DIMEN WORK COM
DRAWN INSTALL A RN MANUFAC ISSUE 06/07/201 ALL JOINT PROJEC SET UNLES
16649
ALL PLAST EDGES TO
ALLOW FO ITEMS.
ALLOW TO FIXED FFE
ALL WET A
MINIMUM MAINTAINE
KEY PLA
ISSUE
0
1
PROFESSIONAL WORK EXPERIENCE | MODE DESIGN CORP. PTY LTD, SYDNEY
A New Public Primary School Market: Education | SSD Application and Schematic Design | FSA 1500sqm | Core 35, 1000 students | Cost: 55M Client: Department of Education and TSA Management | Location: Marsden Park Role: Project Architect Level of Responsibility: Leading a team of 15 people (Graphics, 3D Visualization, Landscaping, Interior, Architecture) from different disciplines across the MODE studios, collaborating with directors internally, liaison with clients, co-ordinating consultants and Project Managers for schematic documentation leading to D&C Tender; Redesigning the scheme to explore potential options and to achieve EFSG sign-off. Weekly workshops with EFSG to present worked-out design options leading to develop a design scheme in agreement; Fortnightly design presentations at Department of Education (DOE) in front of Project Reference Group (PRG) and Technical Support Group (TSG) to achieve the project milestones; Designing the volumetrics and faรงade elevation details; Preparing Design Statements, safety in Design Report, monthly report, invoicing and assisting in internal finance. Level of Participation: The role was primarily of an executive level.
Ground Floor Plan
•
These designs and plans are the copyright of MODE DESIGN Corp. Pty Ltd and cannot be reproduced without written permission. Verify all dimensions on site prior to commencement of work. DO NOT scale off these drawings. Report any discrepancies to the architect before carrying out any work.
•
Y1
Y2
Y8
• •
AMENDMENTS REV DESCRIPTION A FOR PRG MEETING
AUTH CHK RF
DATE 21.09.18
ROOF LEVEL 34.250
LEVEL 02 30.500
LEVEL 01 26.750
GROUND LEVEL 23.000
Elevation ELEVATION
1
2100
WEST - NORTH SIDE
Scale: 1 : 100
KEY PLAN
Y8
Y3
Y4
Y5
ZONE 1
ZONE 2
ZONE 4
ZONE 3
ROOF LEVEL 34.250
ISSUE
NORTH
PRELIMINARY LEVEL 02 30.500
0
1
2
3
4
5
SYDNEY Level 5, 111-117 Devonshire St Surry Hills NSW 2010 T +61 2 8396 9500 syd@modedesign.com.au
ABN: 65 112 807 931 LEVEL 01 26.750
CLIENT
DEPARTMENT OF EDUCATION NSW
X6
X5
Y1
X4
View of the Bridge
A
B
C
D
E
F
G
H
I AMENDMENTS
1
2
1204
1203
REV DESCRIPTION G FOR PRG PRESENTATION H FOR TSG PRESENTATION
1
4001
X3
AUTH CHK YP
DATE 31.10.18
RF
06.11.18
X2 WR7 19 m²
COLA4 17 m²
WR8 19 m²
UP
1
CR4 12 m²
UP UP PAA3 58 m²
HB8 62 m²
HB10 61 m²
HB9 61 m²
HB11 61 m²
M
M
Y1
M F
F M
H
E
Y2
VOID
H
CO
2
LIB1 69 m²
CS-ST
HB12 61 m²
COLOUR LEGEND
UP
8500
X1 1
PROJECTOR
2
M F 2
1201 RL 26750
1
4001
WR6 29 m²
RL 26750
20000
UP
1
1202
Y8
RL 27750
41000
PAA4 92 m²
Y2 F
M H
SA 32 m²
1
SR 104 m²
1201
CONFE
REANCE
MT
ACC
FT
32000
E
Y8 CR6 L1-053 19 m²
LIFT
UP
CS-ST L1-054 11 m²
Communal Hall
Administration
SEU Home Base
Electrical
Services
Fire
Special Programme Room
Garden Store
Staff Toilets
Canteen
Staff Room
Hydraulic
Storage
Kiln Room
Vertical Circulation
Library
Student Toilets
CR5 11 m²
ROOM LEGEND BAL Balcony B-ST Bulk Store CAN Canteen CAN-OFF/ST Canteen Office/Store CH Communal Hall CL/PR Clerical/Printing CD-ST Cleaning Distributed Store COLA Covered Outdoor Learning Area CR Communication Room CS-ST Cleaning Supply Store DB Distribution Board DPR-OFF Deputy Principal Office GAR-ST Garden Store HB Home Base IR Interview Room JU Joinery Unit KLA KLA Resource Room KR Kiln Room LIB Library MCR Main Communication Room MSR Main Switch Room OFF Office OSHC-OFF Out of School Hours Care Office OSHC-ST Out of School Hours Care Store OSHC-K Out of School Hours Care Kitchenette PAA Practical Activities Area PE-ST Personal Equipment Store PER-ST Performance Store PR-OFF Principal Office SA Staff Annexe SB Sick Bay SC Sound Cupboard SE Student Entry SEC-ST Security Store SEHB Special Education Unit Home Base SP-ST Sports Store SPR Special Programs Room SPR-ST Special Programs Room Store SR Staff Room VE Visitor Entry WR Withdrawal Room
WR10 18 m²
3
Y4
UP
18050
UP
UT
HB24 75 m²
WR15 11 m²
Practical Activity Area
Ciculation
HB15 74 m²
RL 27750
Y3
Outdoor Learning Area
W.Room
H
SEC-ST 14 m²
2
1202
Y3
BAL Y UTILIT
F
RL 26750
OSHC
Assembly Court
Mechanical
LIFT
3
Home Base
ISSUE
COLA6 30 m²
E H
Y5
M
NORTH
PRELIMINARY 0
2
4
6
8
10
RL 27750
13500
4
F
HB23 67 m²
HB22 71 m²
Y4 WR14 14 m²
HB19 65 m²
4 UP
HB18 65 m²
CLIENT
PAA5 57 m²
HB17 72 m²
H
HB21 82 m²
H
5
HB20 66 m²
F
M
PAA6 17 m²
PPA7 17 m²
M
6500
13500
14000
WR12 22 m²
WR13 21 m²
DEPARTMENT OF EDUCATION NSW
10500
PROFESSIONAL WORK EXPERIENCE | MODE DESIGN CORP. PTY LTD, SYDNEY
A New Public Primary School
X5
5 X6
PROJECT
NEW PUBLIC SCHOOL AT MARSDEN PARK NORTHBOURNE DRIVE, MARSDEN PARK NSW 2765
DRAWING TITLE
LEVEL 1 PLAN
X4 Y5
Upper Floor Plan
8500
8500 7600
10400
X1
A
X2
8500
8500
8500
2
1204
7700
2500
8500
X3 B
C
D
E
F
G
H
I
DRAWN CHECKED RF YP ISSUE SCALE @ A1 06/11/2018 4:55:55 PM 1 : 200 PROJECT No STAGE DRAWING No
17574
SD
AR- 1011
REVISION
H
•
These designs and plans are the copyrigh DESIGN Corp. Pty Ltd and cannot be repr without written permission. Verify all dimensions on site prior to comm of work. DO NOT scale off these drawings. Report any discrepancies to the architect b carrying out any work.
• • •
X6
X5
X4
AMENDMENTS REV
•
View of the Courtyard X6
X5
AUTH CHK
These designs and plans are the copyright of MODE DESIGN Corp. Pty Ltd and cannot be reproduced without written permission. Verify all dimensions on site prior to commencement of work. DO NOT scale off these drawings. Report any discrepancies to the architect before carrying out any work.
• • •
ROOF LEVEL 34.250
DESCRIPTION
X4
AMENDMENTS REV
DESCRIPTION
AUTH CHK
DATE
LEVEL 02 30.500
ROOF LEVEL 34.250
LEVEL 01 26.750
LEVEL 02 30.500
GROUND LEVEL 23.000
LEVEL 01 26.750
SECTION B - EAST
1
2011
Scale: 1 : 100
GROUND LEVEL 23.000
X3
X2
X1
Elevation 1
KEY PLAN
SECTION B - EAST
2011
ZONE 1
ZONE 2
ZONE 4
ZONE 3
Scale: 1 : 100
ROOF LEVEL 34.250
X3
X2
X1 KEY PLAN ISSUE
ZONE 2 PRELIMINARY
ZONE 1
LEVEL 02 30.500
0
1
2
3
4
5
SYDNEY
ROOF LEVEL 34.250
ZONE 4
LEVEL 01 26.750
ZONE 3
ABN: 65 112 807 93 CLIENT
DEPARTMENT OF EDUCATION NSW
ISSUE
LEVEL 02 30.500
1
2
3
4
SYDNEY
Elevation 2 SECTION Scale: 1 : 100
PROJECT
5
NEW PUBLIC SCHOO MARSDEN PARK
Level 5, 111-117 Devonshire St NORTHBOURNE DRIVE, MARSDEN PARK Surry Hills NSW 2010 T +61 2 8396 9500 TITLE DRAWING syd@modedesign.com.au
BUILDING SECTION
B - WEST
2011
NORTH
PRELIMINARY
GROUND LEVEL 23.000
0
LEVEL 01 26.750
Level 5, 111-117 Devo Surry Hills NSW 201 T +61 2 8396 9500 syd@modedesign.c
ABN: 65 112 807 931 CLIENT
DEPARTMENT OF DRAWN EDUCATION NSW
CHECKED
PROFESSIONAL WORK EXPERIENCE | MODE DESIGN CORP. PTY LTD, SYDNEY
Consolidation of Terraced House Market: Residential| Concept Design, CDC & DA Documentation | FSA 800 sqm | Cost: 4M Client: BKH Group | Location: 138-140 Oxford Street, Woollahra, NSW 2025 Role: Project Architect Project Description: The project is for the consolidation of two adjacent terrace houses into one single dwelling. The terrace house at 138 Oxford Street has been renovated recently, the adjoining terrace at 140 has been recently purchased and will be renovated as part of this project. The terrace houses are within a Heritage Conservation Area, which forms a key consideration for council in assessing any Development Application. Level of Responsibility: Preparing design options to Client’s satisfactions, site Inspections, assessing site constraints, preparation of conceptual volume studies, CDC & DA applications for approvals. A
Level of Participation: The role was primarily of an executive level.
B
C
ROOF LEVEL 37.650
BEDROOM
BEDROOM
20 m²
CORRIDOR
13 m²
7 m²
2680
SECOND FLOOR LEVEL 34.650
LIVING 61 m²
FIRST FLOOR LEVEL 31.770
A
B
•
C
These designs and plans are the copyright of MODE DESIGN Corp. Pty Ltd and cannot be reproduced without written permission. Verify all dimensions on site prior to commencement of work. DO NOT scale off these drawings. Report any discrepancies to the architect before C carrying out any work.
•
WALLIS STREET
WALLIS STREET
A
10457 5229
5229
• •
B 10457
9997
28.28
4
5229 REV DESCRIPTION A Concept Design B Concept Design for final VOID review 2 C Updated Concept 1200 D Updated Concept
2
1200 1 1100
1 1100
3
1200
28.150
28.14
4
28.28
4
A
These designs and plans are the copyright of MODE DESIGN Corp. Pty Ltd and cannot be reproduced without written permission. Verify all dimensions on site prior to commencement of work. C WALK-IN CLOSET • DO NOT scale off these drawings. 20 m² • Report any discrepancies to the architect before carrying out any work. •
B
EX. FAMILY ROOM 20 m²
AMENDMENTS
5229
3
1200
•
AMENDMENTS
AUTH CHK
GROUND LEVEL 28.700
DATE 11.07.2018 10.08.2018 17.08.2018 24.08.2018
28.150
REV DESCRIPTION A Concept Design B Concept Design for final review C Updated Concept D Updated Concept
1 1100
4
28.14
BASEMENT
AUTH CHK
DATE 11.07.2018 10.08.2018 17.08.2018 24.08.2018
4
42 m²
4 BASEMENT 26.250
UP
GARAGE
5460
A
6203
5460
55 m²
28.440
6252
1
1000
Section
SECTION Section 1 Scale: 1 : 50
04
TERRACE
3
1800MM HIGH PRIVACY SCREEN SLIDING GATE
BAMBOO PLANT SCREENING
3
3
3
0
0
DEEP SOIL
31.630
UP 12133
EXISTING ENTRY
.0 29
3
.0 29
3
29.050 EX. LAUNDRY
800
VOID
1430
VOID OVER
EX. POWDER RM.
A
KITCHEN BENCH
20500
3 1100
2
01
SLIDING GATE
UP
PLANTER
5930
PLUNGE POOL
1 m²
EXISTING A/C UNITS TO BE MOVED
2
4 m²
2
2
2
BEDROOM 20 m²
06
1
LIVING 61 m²
31.770
1229
4029
900
4
19 m²
NEW DOOR
1
1
0
HIS & HER SHOWER
10
20
30
20 m²
28.700
03
BATHROOM 3581
8 m²
FRIDGE
881
EX. DOOR SEALED
PLAN GROUND LEVEL Scale: 1 : 50
1
012
PLAN FIRST FLOOR LEVEL
OXFORD STREET
B
Scale: 1 : 50
2 1100
Ground Floor Plan
First Floor Plan
DA
CHECKED Checker SCALE @ A1 1 : 50 DRAWING No
DA- AR-1000
EX. BALCONY 4 m²
TERRACE CONSOLIDATION
EX. BALCONY
1700
10 m²
C
18196
ABN: 65 112 807 931
PROJECT
1
84
3145
138-140 Oxford St. Woollahra NSW DRAWING TITLE
3714 GENERAL ARRANGMENT PLAN_GROUND LEVEL
DRAWN Author ISSUE 24/08/2018 4:13:41 PM PROJECT No STAGE
50
Level 5, 111-117 Devonshire St Surry Hills NSW 2010 11 9500 T +61 2 8396 BEDROOM syd@modedesign.com.au 9 m²
3 m²
138-140 Oxford St. Woollahra NSW
1200
A
C
40
SYDNEY
12
2 1200 DRAWING TITLE
2
1200
30
1
1201
CLIENT
3
012
2 1100
20
BATHROOM
1
4 m²
.1 31
1
B
10 NEW DOOR
NORTH
BKH GROUP
EX. BALCONY
7
7
3
13 m²
HEAD 34.26 SILL 32.31
EXTERNAL RL 31.37
5229
1200
OXFORD STREET
0
10
BEDROOM
BKH GROUP
TERRACE31.770 CONSOLIDATION
3
A
ISSUE
FOR APPROVAL
NEW DOOR
PROJECT
UP
1
3
.9 30
UP
.1 31
1
ENTRY FROM OXFORD STREET
UP
L RN TE .4 1 EX L 3 1 R
.1 31
1
.9 30
.1 31
1
NEW DOOR
ABN: 65 112 807 931
10 m²
CLIENT NEW DOOR
EX. BATHROOM
UP
5229
07
STUDY
DW
14 m²
CUSTOMISED INGROUND BATH
UP
50
CORRIDOR
1201
Level 5, 111-117 Devonshire St Surry Hills NSW 2010 T +61 2 8396 9500 syd@modedesign.com.au
6202
EX. FAMILY ROOM
40
NEW DOOR
SYDNEY
DOOR RELOCATED
A
1
34.650
EX. BATHROOM
SINK
HEAD 31.06 SILL 30.34
FOR APPROVAL
NEW SLAB
9110
1201
1201
84
1
1201
NORTH
2665
6784
1
9110
NEW STAIR
ISSUE
09 2
BEDROOM
3
2270
1201
6206
4880
HEAD 33.92
28.790
16 m²
28.700
3300
WET BENCH
EX. DINING
1000
6201
20 m²
1084
1
02
WALK-IN CLOSET
3846
84
08
A
6206
1
EX. BALCONY
6 m²
NEW SLIDING DOOR
28.790
EXISTING FIREPLACE
UP
EX. BALCONY
NEW FIXED GLASS
23 m²
UP
3 1100
POOL AREA
31.630
MASTER BED
NEW DOOR
2
1200
2842
2
05
EXISTING SKYLIGHT
20500
NEW FIREPLACE
SWIMMING POOL ABOVE
3
1200
NEW STAIR
1226
23 m²
28.700
6204
PLUNGE POOL
BBQ
6200
EX. KITCHEN
MONCUR STREET
5930
A
KITCHEN BENCH
3 1100
MONCUR STREET
NEW STONE BENCH OUTDOOR BBQ AND KITCHEN
3
1200
1
012
PLAN SECOND FLOOR LEVEL Scale: 1 : 50
REVISION
D
2 GENERAL ARRANGMENT 2 1200 1100 PLAN_LEVEL 01
DRAWN Author ISSUE 24/08/2018 4:13:43 PM PROJECT No STAGE
18196
Second Floor Plan
DA
CHECKED Checker SCALE @ A1 1 : 50 DRAWING No
DA- AR-1001
REVISION
D
1
EX. DINING 16 m²
EX. FAMILY ROOM 20 m²
EX. KITCHEN
EX. LAUNDRY
23 m²
GARAGE
3 m²
55 m²
BASEMENT 42 m²
SECTION Section 3
3
1000
Scale: 1 : 50
4
ISSUE
10
20
30
40
2
1
NORTH
FOR APPROVAL 0
3
50
SYDNEY
BEDROOM
CORRIDOR
19 m²
7 m²
BEDROOM 9 m²
Level 5, 111-117 Devonshire St Surry Hills NSW 2010 T +61 2 8396 9500 syd@modedesign.com.au ABN: 65 112 807 931
OPERABLE AWNING WINDOW FOR LIGHT AND VENTILATION
CLIENT
BKH GROUP 5000
2700
• OPERABLE LOUVERS BELOW THE GLASS BOTTOM POOL
2100
These designs and plans are the copyright of MODE DESIGN Corp. Pty Ltd and cannot be reproduced without written permission. Verify all dimensions on site prior to commencement of work. LIVING DO NOT scale off these drawings. 61 m² Report any discrepancies to the architect before carrying out any work.
• • •
STUDY 10 m²
900
WTL
PROJECT
1 1064
DRAWING TITLE
0
GROUND LEVEL 28.700
TERRACE BBQ AND POOL LEVEL 01
2700
PLAN ENSUITE - GROUND LEVEL
A
18196
2780
2400
2780
DA
2780
AMENDMENTS ELEVATION SECTION
2
A B
CHECKED AS SCALE @ A1 1 : 50 DRAWING No
C D
DA- AR-6204
Section 2
Scale: REV1 : 50 DESCRIPTION 1000
AUTH CHK
Scale: 1 : 50
Concept Design Concept Design for final review Updated Concept Updated Concept
2330
Scale: 1 : 50
GROUND LEVEL 28.700
55 m²
These designs and plans are the copyright of MODE DESIGN Corp. Pty Ltd and cannot be reproduced without written permission. Verify all dimensions on site prior to commencement of work. DO NOT scale off these drawings. Report any discrepancies to the architect before carrying out any work.
• •
17.08.2018 24.08.2018
D
1400
MASTER BED PRIVATE PATIO
REV DESCRIPTION A Concept Design B Concept Design for final review C Updated Concept D Updated Concept
AUTH CHK
WALK-IN CLOSET
DATE 11.07.2018 10.08.2018 17.08.2018 24.08.2018
20 m²
23 m²
AUTH CHK
BATHROOM 14 m²
Section
DEEP SOIL
AMENDMENTS REV DESCRIPTION A Concept Design B Concept Design for final review C Updated Concept D Updated Concept
REVISION
OPENING TO ENSUITE
ELEVATION
GARAGE
•
DATE • 11.07.2018 10.08.2018
2780
2780
3
DRAWN BS ISSUE 24/08/2018 5000 4:13:55 PM PROJECT No STAGE
2780
2690
2400
WTL
• •
2
Scale: 1 : 50
These designs and plans are the copyright of MODE DESIGN Corp. Pty Ltd and cannot be reproduced without written permission. Verify all dimensions on site prior to commencement of work. DO NOT scale off these drawings. Report any discrepancies to the architect before carrying out any work.
•
GROUND LEVEL 28.700
ELEVATION
1
Scale: 1 : 50
INDOOR COURTYARD
GROUND LEVEL 28.700
•
138-140 Oxford St. Woollahra NSW
2691
FIRST FLOOR LEVEL 5000 31.770
2780
2780
2700
4561
4
GREEN WALL, BAMBOO PLANT SCREEN
916
6202
2780
1450
2
AMENDMENTS
PLUNGE POOL
TERRACE CONSOLIDATION
3
DATE 11.07.2018 10.08.2018 17.08.2018 24.08.2018
•
LEVATION
2
ale: 1 : 50
ELEVATION
GROUND LEVEL 28.700
GROUND LEVEL 28.700
Scale: 1 : 50
ELEVATION
3 4776
POOL EXTRUDED H FIRST FLOOR
236
2700
290
1
Scale: 1 : 50
REV DES A Concept D B Concept D review C Updated C D Updated C
ELEVATION 1400
Scale: 1 : 50
2690
2780
2400
OPENING TO ENSUITE
2330
• •
ELEVATION
FIRST FLOOR LEVEL 31.770
1840
FIRST FLOOR LEVEL 31.770
GLAZING TO COURTYARD
4
2780
5000
Scale: 1 : 50
These desig DESIGN Co without writte Verify all dim of work. DO NOT sca Report any d carrying out
•
GROUND LEVEL 28.700
4
GROUND LEVEL 28.700
ELEVATION
These designs and plans are the copyright of MODE DESIGN Corp. Pty Ltd and cannot be reproduced without written permission. Verify all dimensions on site prior to commencement of work. DO NOT scale off these drawings. Report any discrepancies to the architect before carrying out any work.
•
LEVATION
FIRST FLOOR LEVEL 31.770
4000 2600
700
ale: 1 : 50
•
Scale: 1 : 50
4
700
770
FIRST FLOOR LEVEL 31.770
Scale: 1 : 50
AMENDMENTS REV DESCRIPTION A Concept Design B Concept Design for final review C Updated Concept D Updated Concept
ELEVATION Scale: 1 : 50
AUTH CHK
DATE 11.07.2018 10.08.2018 17.08.2018 24.08.2018
2780
2330
2780
2
2010
• •
ELEVATION
ISSUE
FOR APPROVAL 0
GROUND LEVEL 28.700
10
20
30
40
NORTH
50
SYDNEY
4
ELEVATION
ISSUE
Scale: 1 : 50
NORTH
FOR APPROVAL 0
10
20
30
Level 5, 111-117 Devonshire St Surry Hills NSW 2010 T +61 2 8396 9500 syd@modedesign.com.au
3
OPENING TO ENSUITE
ABN: 65 112 807 931 CLIENT
BKH GROUP
50
SYDNEY
FIRST FLOOR LEVEL 31.770
FIRST FLOOR LEVEL 31.770
40
Level 5, 111-117 Devonshire St Surry Hills NSW 2010 T +61 2 8396 9500 syd@modedesign.com.au
ELEVATION
PROJECT
CLIENT
TERRACE CONSOLIDATION
PROJECT
ENSUITE - GROUND LEVEL
ABN: 65 112 807 931
BKH GROUP
Scale: 1 : 50
138-140 Oxford St. Woollahra NSW
2330 2780
DRAWING TITLE
TERRACE CONSOLIDATION
GROUND LEVEL 28.700
138-140 Oxford St. Woollahra NSW
5
Scale: 1 : 50
DRAWN Author ISSUE 24/08/2018 4:13:53 PM PROJECT No STAGE
DRAWING TITLE
ELEVATION
BEDROOM - GROUND LEVEL
FIRST FLOOR LEVEL 31.770
4
DRAWN CHECKED BS AS ISSUE SCALE @ A1 24/08/2018 4:13:52 PM 1 : 50 PROJECT No STAGE DRAWING No
ELEVATION Scale: 1 : 50
18196
DA
18196
ISSUE
FOR APPROVAL
DA- AR-6200
REVISION
D
0
10
20
30
40
700
SSORY DISPLAY UNIT
BKH GROUP
700
FOR APPROVAL 0
10
20
30
40
50
SYDNEY
4
6203
2
3
0
ABN: 65 112 807 931 CLIENT
BKH GROUP
TERRACE CONSOLIDATION 138-140 Oxford St. Woollahra NSW
CLIENT
BKH GR
DRAWING TITLE
138-140 Oxford St. Woollahra NSW DRAWING TITLE
WALK-IN CLOSET GROUND LEVEL DRAWN BS ISSUE 24/08/2018 4:13:53 PM
20
ENSUITE - GROUND LEVEL
PROJECT
DRAWN Author ISSUE 24/08/2018 4:13:53 PM PROJECT No STAGE
DRAWING TIT
TERRACE CONSOLIDATION
PLAN TERRACE ENTERTAINMENT - LEVEL 01
10
PROJECT
PROJECT
A
ISSUE
NORTH
Level 5, 111-117 Devonshire St Surry Hills NSW 2010 T +61 2 8396 9500 syd@modedesign.com.au
1
D
FOR AP
ABN: 65 112 807 931 CLIENT
ISSUE
REVISION
50
Level 5, 111-117 Devonshire St Surry Hills NSW 2010 T +61 2 8396 9500 syd@modedesign.com.au
700
DA- AR-6202
NORTH
SYDNEY
3799
CUSTOM CLOSET
DA
CHECKED Checker SCALE @ A1 1 : 50 DRAWING No
CHECKED AS SCALE @ A1 1 : 50
TERRA
138-140 Oxfor
18196
DA
CHECKED Checker SCALE @ A1 1 : 50 DRAWING No
DA- AR-6202
REVISION
D
TERRA ENTER 01 DRAWN BS
North Kellyville Square Market: Retail | Status: DA to Completion| GBA 14967 sqm | 26 tenancies Inc. Woolworths | Cost 25M Client: Artazan Property Group & ADCO | Location: 70 Hezlett Road, Kellyville, NSW 2155, Australia Role: Project 2IC, Supervising Architect: Robert Sanderson, NSW 5150 Level of Responsibility: North Kellyville Square represented a significant leap in responsibilities and roles primarily because only two people were working on the project, me and the Project Leader; also, due to the sheer scale of the project and number of stakeholders. My role was to manage the project after design development through construction documentation and construction advice, as project 2IC, continuously liaising directly with project managers, sub-consultants, builders to provide decisions on design and project parameter. Co-ordinating architectural and consultants’ documentations for consistency with the detailed design intent and with quality, cost and time parameters. Also, inspecting construction work in progress and meeting subcontractors and engineers weekly on site, initially supervised by the Project Leader, later on my own; moreover, to ensure compliance with plans, specifications and quality standards. The role also included guidance to the client on establishing Retail Management programs and manuals for leasing purposes; followed by post construction defects inspection. Level of Participation: The role was primarily of an executive level. 35
RFS-501
RFS-501
CAPPING WITH RIGID POLYSTYRENE BACKING
150
50
3° FALL 100
INSERT PACKER TO SUIT
100
"V" FOLD IN FASCIA CAPPING TO PREVENT OIL CANNING
TOP OF WALL LEVEL VARIES
TOP HAT SUPPORT @ 600 mm CRS
20
RFS-511 FOAM CLOSER RFS-101
RFS-505 MAX HEIGHT FLAT BACK SHEETING < 300mm
CRIMPED SHEETING
COLORBOND KLIPLOK HI-TEN STEEL ROOF SHEETING ON 75mm INSULATION, FOIL SARKING & WIRE SAFETY MESH AS PER ARCH. SPECIFICATION
600 NOTE : OUTLETS TO BE SUPPLIED BY SYPHONIC DRAINAGE CONTRACTOR & INSTALLED & SEALED BY ROOFER
RFS-101
200
100
80
INS-301 INS-101
MIN OVERLAP
TOP OF WALL LEVEL VARIES
40
100
20
220
"V" FOLD IN FASCIA CAPPING TO PREVENT OIL CANNING TOP HAT SUPPORT @ 600 mm CRS RFS-505, IF<300MM RFS-506, IF>300MM
HARDWOOD PACKER TO SUIT
3° FALL
220
150
100
50
RFS-511 FOAM CLOSER
50
FLASHING FITTED UNDER GUTTER
80
INS-101 INS-301 SIDE SUPPORT AS REQUIRED INSULATION CONTINUOUS AROUND BOX GUTTER
200
STEEL PURLIN & CLEAT TO ENG DETAIL
RWS-401
STEEL RAFTER TO ENG DETAIL
CON-201 PRE-CAST CONCRETE PANEL TO ENG DETAIL. PAINT FINISH
IWS-101 IWL-102 INS-111 IWS-101 IWL-102 INS-111
11
SECTION - TYPICAL FLASHING AT TILT ROOF TO PARAPET
12
1:5
Construction Details
RWS-101 - TYPICAL BOX GUTTER (SYPHONIC) 1:5
440
MIN CAPP RFS-511
50
150
COLORBOND BAFFLE FLASHING TURN UP AT ONE END, NOTCH OVER RIBS ABD FASTEN TO UNDERLAPPING SHEET
35
3° FALL
RFS-511
TOP OF WALL LEVEL VARIES
FALL
20
RFS-101 TURN UP AT END "V" FOLD IN FASCIA CAPPING TO PREVENT OIL CANNING
100
INS-101 INS-301
RFS-506
80
59
20 30
STEEL STRUCTURE TO ENGINEERS DETAILS
200
PURLINS TO ENG. DETAIL STEEL STRUCTURE TO ENG. DETAILS RAFTER TO ENG'S DETAIL
TYPICAL TILT PANEL PARAPET CAPPING
9
1:5
SECTION - TYPICAL ROOF EXPANSION JOINT
10
1:5
SECTION - TYPICAL RIDGE 1:5
GUTTER RETURN
MAXIMUM 15MM DEEP SAW CUT FOR INSTALLATION OF FOLDED METAL FLASHING RFS-506 ON FURRING CHANNELS AT 600 MAX. CRS.
UNDER FLASHING TO SHEET JOINT
RFS- 511 FOAM CLOSER
BOX GUTTER WIDTH
35
RFS-101
RFS- 502 RFS-101
INS-101 INS-301
40
SMOKE EXHAUST
RFS-501
GUTTER RETURN
RFS-502
80
5
RFS-511 FOAM CLOSER STRIP RFS-501
GUTTER TRAY
RFS-501
RFS-511 FOAM CLOSER INS-101 INS-301 RFS-101
RFS-502
100
RFS-502
GUTTER TRAY
MIN OVERLAP
INS-101 INS-301
150
150
200
8
50
220
100
RFS-501 INSERT PACKER TO SUIT
PLAN - TYPICAL BOX GUT 1:5
4
PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY
North Kellyville Square - Photos on Completion
FOR
Status:
ROB
Nom. Architect
Bs A
B
Cs
Ds
C
Es
D
Fs
E
Gs
F
G
Hs1 Hs2
Is
H
File:
15/04/2
Print Date:
I
J
K
L
M
N
O
P
Q
R
Rev.
Description
E F
North Kellyville Square
TENANCY UPDAT UPDATED TENAN DRAWING UPDATED TENAN DRAWINGS
G
FOOD RETAILS
1
NON-FOOD RET
11
V
12 5 1
2
3
6
7
4 8
NEWSAGENT/ TOBACCONIST
9
10
CAFE (FOOD)
2
T05 115 m²
MASSAGE
T08 201 m²
T07 115 m²
V
2S
NAILS
T09 61 m²
HAIR & BEAUTY
T10 60 m²
RESTAURANT
T11 79 m²
MAJOR
T12 137 m²
LICENSED SEA
3
V
4
BWS 186 m²
5
7
5
M4
MAJOR 4275 m²
1500
CAFE (FOOD)
6
Tenancy Sched
T04 114 m²
Name
20250
4s
PHARMACY
115
TAKE AWAY (FOOD)
7
T02 40 m²
CHICKEN (FOOD) T03 90 m²
8
6
8s
T12 T13 T14 T15 T16
FOOD
T01 150 m²
O
UP
10
Status:
UP
O
UP
A
B
T17
DN
UP
10s
O
9
C
D
E
Occupanc
T01 T02 T03 T04 T05 T07 T08 T09 T10 T11
LICENCED SEATING ZONE
F
Nom. Architect
G
H
I
J
K
L
M
N
O
P
Q
File: T18 Print Date: T19
R
Rev.
D E
11
F
Ground Floor Plan
RESTAURA TAKEAWAY TAKEAWAY TAKEAWAY BAKER/CAF NEWSAGEN PHARMACY MASSAGE NAILS HAIR AND BEAUTY RESTAURA RESTAURA REAL ESTA DRYCLEAN ANCILARY MEDICAL FO MEDICAL CENTRE R GYM 15/04 CARWASH
Description
DA ISSUE UPDATED TENA DRAWING UPDATED TENA DRAWINGS
NOTE: T06 HAS BEEN DISC AND T07 HAVE BEEN MERG TENANCIES, T05 AND T07.
1 T18 451 m²
2
MEDICAL CENTRE T17 201 m²
T16 63 m²
T15 58 m²
T14 72 m²
T13 130 m²
2S 3
4
Scott Carver Pty Ltd
Telephone +61 2 9957 3988
Level One, One Chifley Square
hello@scottcarver.com.au
Sydney NSW 2000 Australia
www.scottcarver.com.au
5
6 CASHIER AND LAUNDRY BY TENANT
7 T19 104 m²
8
9 10
11
Basement Plan
Project Client
NORTH KELLYVILLE RETAIL DEVELOPMENT RG PROPERTY
1:500 @ A3
1:250 @ A1
LEASING PLA Reference No.
0
2.5
5
7.5
10
12.5
17.5
25m
20140074
Discipline
2 ISSU CON CER 3 FOR 4 AS E The final The dep draw
Level - Mezzanine 4500
FFL 81.85 WOOLWORTHS TRADING AREA
Level - Ground 3350
FFL 77.35 Level - Basement
North Kellyville Square
FFL 74.00
SECTION 3 - CD203
3
1 : 200
Bs Bs AA
Cs Cs1 Cs Cs1
BB
Ds Ds
CC
Es Es
DD
Fs Fs
EE
Gs Gs
FF
GG
Hs1 Hs2 Hs2 Hs1
IsIs
HH
II
JJ
KK
LL
MM
NN
OO
PP
RR
GARBAGE & 1 AD-CD210 RECYCLING
T01 147 m²
BLK-102
STAIR 3
73400
SECTION 2 - CD1 CD203 Section 42
3350 3350
Level - Ground Level - Ground FFL 77.35 FFL 77.35 Level - Basement Level - Basement FFL 74.00 FFL 74.00
BIORETENTION SUBSTATION BASIN
CP EXHAUST ROOM
4500 4500
Level - Mezzanine Level - Mezzanine FFL 81.85 FFL 81.85
CON-210 PT-501
ELEC. MTR ROOM 1
1 : 200
Es A
Bs
Fs
B
E
F
C
Cs Cs1
Gs Ds D
G
Es Hs1 Hs2 H
IsFs
E
I
F
Gs J
G
K
Hs1 Hs2 H
Is L
I
M
J
N
K
O
L T10
P
M
N
Q
O
R
P
Q
R
T11
Level - Mezzanine
Level - Mezzanine
FFL 81.85 4500
ENTRY
T09
T12
FFL 77.35 HWU
Level - Ground
Level - Ground T17
73950
VOID
73850 T15/16
Level - Basement
FFL 77.35
3350
WOOLWORTHS TRADING AREA
T08
WOOLWORTHS TRADING AREA
4500
FFL 81.85 WOOLWORTHS TRADING AREA
3350
Ds
Level - Basement FFL 74.00
FFL 74.00
SECTION 31 -- CD203 CD 203 SECTION Section 31 200 11 :: 200
8s C
B
Cs Cs1
Ds D
7 AD-CD513 Scott Carver Pty Ltd Level One, One Chifley Square Sydney NSW 2000 Australia
Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au
Es
Fs
Gs
E F G NORTH KELLYVILLE RETAIL DEVELOPMENT
Hs1 Hs2 H
10
I
Is
10s
J
K
L
M
N
10
10s
O
P
Q
R
Project Client
20140074
GARBAGE & RECYCLING
163
RFS-101 INS-101
Level - Mezzanine
Is
FFL 81.85
J 4500
CON-210 PT-501
Level - Ground
BIORETENTION BASIN LVR-102
FFL 77.35
BLK-102
Level - Basement
73400
STEEL STRUCTURE TO ENGG. DETAILS
2559
FFL 74.00 RFS-101
SECTION 2 - CD203
2
1 : 200
ELEC. MTR ROOM 1 8 AD-CD513
Ds
Es E
INS-101
Fs F
Gs
Hs1 Hs2
G
Is
H
I
J
K STEEL STRUCTURE TO ENGG. DETAILS L
M
N
RWS-111 200MM HALF RD EG DP- RWS-201
12 AD-CD513
O
P
12
Q
RFS-101 INS-101
R
RWS-111 200MM HALF RD EG
AD-CD513
T10
T11
Level - Mezzanine
CON-201 PT-501[C1]
T08
ENTRY
T09
FFL 81.85
T12
PLANT ROOM
VOID
IWS-102 INS-203 IWL-102,WP
FFL 77.35 T17
73950
73850 T15/16
Level - Basement
3350
Level - Ground HWU
INS-111
4500
CLG-101 +2700
WOOLWORTHS TRADING AREA
Level
FFL 85.35
BLK-102
BLK-102
5 AS B The final The dep draw tena infor inclu
Reference No.
RG PROPERTY
3350
Bs
8 A
PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY
WOOLWORTHS TRADING AREA
FFL 74.00
SECTION 1 - CD 203
1
LEVEL - ROOF
LEVEL - ROOF
FFL 83.35
FFL 83.35
D.M05
1 : 200
1500
WWX.2 CON-201 PT-501[C1] BLK-102
Scott Carver Pty Ltd Level One, One Chifley Square Sydney NSW 2000 Australia
Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au
NORTH KELLYVILLE RETAIL DEVELOPMENT
Level - Mezzanine
Project
Level - Mezzanine
FFL 81.85
Client
RG PROPERTY
FFL 81.85
Reference No.
20140074 Ceiling
INS-131 CON-201 PT-501[C1]
CLG-205 +4000
FFL 81.35
STEEL JOIST TO SUPPORT THE SUSPENDED FIBRE CEMENT CEILING
CLG-302 +2700 CLG-101 +2700
8
1200
AD-CD512
VOID BAKERY FRZ 4 m²
BAKERY COOLROOM 6 m²
BLK-101
2100
BAL-102
50mm SETDOWN
Level - Ground
170THK
BOTTOM OF PANEL INS-131
INS-131
LICENCED SEATING AREA
150mm THICK PRECAST
DOOR
WOOLWORTHS TRADING AREA 2924 m²
T03
77.25
BOTTOM OF PANEL
77.25
SFL 77.350
2400
800
SLOPE 1:40
SLOPE 1:20
1:40
FFL 77.35
1:20
Level - Ground FFL 77.35
500X1200 CON-102 INS-131, 25MM BELOW THE BEAMS
LOADING DOCK
500X1200 CON-102
500X1200 CON-102
900X400mm EDGE BEAM
INS-131, 30MM BELOW THE SLAB
400Ø COLUMN
BLK-101
WALL SECTION BETWEEN GRID Ds & E 1 : 25
2
WALL SECTION WW TO LOADING DOCK 1 : 25
Level - Basement
FFL 74.00
FFL 74.00
NOTE: STRUCTURE AS PER ENGINEERS DETAILS
NOTE: STRUCTURE AS PER ENGINEERS DETAILS
1 Construction Details
Level - Basement
3
WALL SECTION WW TO EXIT-LOADING DOCK 1 : 25
4
WALL SECTION BWS TO PARKING 1 : 25
North Kellyville Square - Site Inspection Images
PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY
North Kellyville Square - Site Inspection Images
A
FOR INFORMATION
B
90% DESIGN SUBMISSION ADCO REVIEW
Mixed-Use Public Domain, Rosenthal Market: Mixed-use, Retail | D&C Tender | FSA 6000sqm | Cost: 65M Client: Lane Cove Council & ADCO | Location: Rosenthal Avenue, Lane Cove NSW 2066 Role: Senior Graduate, Supervising Architect: Robert Sanderson, NSW 5150
2
1
TOW 85.610
TOW 85.610 FOLDED COLORBOND PARAPET CAPPING
FOLDED COLORBOND PARAPET CAPPING NOMINAL 1200H MECH PLANT BY LESSEE
RWS-102 GUTTER TO HYD DETAILS
EWS-101 ;EXTERNAL WALL SYSTEM - TYPE 1
CORRUGATED METAL LINING TO INTERNAL FACE OF ALL PARAPETS FIXED HORIZONTALLY
RFS101 + INS-101 INS-301
CORRUGATED METAL LINING TO INTERNAL FACE OF ALL PARAPETS FIXED HORIZONTALLY
PEP-101 ;PLANT EQUIPMENT PLATFORM CONFORM
FLASHING
ROOF LEVEL FFL 84.600
RFS-102 FOLDED COMPOSITE FASCIA
RWS-103 GUTTER TO HYD DETAILS
FOLDED COLORBOND CAPPING OUTRIGGER TO STRUCT ENG DETAIL
RFS-102 FOLDED COLORBOND CAPPING FOLDED COMPOSITE FASCIA
275
Project Description: Design and construct documentation for a new Public Domain and retail development for Lane Cove Council with 30,000 sqm area including 650 carparks over four levels on a 7127sqm site. The project includes two major supermarket (COLES and ALDI) and a few small tenancies on the park level.
FCL 83.350
CLG-401 EXPOSED RAFTER PAINT FINISH+TIMBER INFILL
SYPHONIC DRAINAGE TO HYD DETAILS
FX-111
FCL 83.100
FCL 82.780
FINISHED CEILING LINING BY LESSEE
FCL 82.800
CLG-401
BULKHEAD
EXPOSED RAFTER PAINT FINISH+TIMBER INFILL
EWS-101 ;EXTERNAL WALL SYSTEM - TYPE 1
2700
RETAIL BLOCK 2
REFER TO LANDSCAPE DRAWINGS FOR PAVER DETAILS
CONCRETE PLINTH AT EACH COLUMN TO STRUCT ENG DETAILS
STRUCTURAL VOID FORMER STRUCTURAL SLAB TO ENG DETAIL
PROTECTION BOARD
FINISHED FLOOR BY LESSEE
WPS601 WPS-602
FCL 80.100
REFER TO LANDSCAPE DRAWINGS FOR PAVER DETAILS
LEVEL 02 - PARK
SECTION - BLOCK 2 CROSS SECTION
1
1 : 25
Construction principally concrete framed, with piling walls retaining the large excavation. The building is enclosed with non-load bearing masonry infill and perimeter walls. Wall along the laneways includes brick facades and timber finishes. The major wall to the residential areas is a “naturalistic” stone wall.
[Project]
Level One, One Chifley Square Sydney NSW 2000 Australia www.scottcarver.com.au +61 2 9957 3988
[Client]
THE ROSENTHAL PROJECT
0
ADCO CONSTRUCTIONS PTY LIMITED
0.25
[Scale]
0.5
0.75
1
RETAIL BLOCK 2 - PARK LEVEL SEC
1.25 m
1 : 25 @ A0
[Ref]
20160050
Level of Responsibility: Documentation, design input, ensuring design addresses accessibility standards, National Construction Code (NCC) , Section J and JV3 Energy Modelling Report; contributing to the BIM Revit model in team. Participate in designing the individual buildings and public plaza including façade designing and materials working out the levels to accessibility and slip resistance codes and other standards. FOR INFORMATION
[Status]
Level of Participation: Most part of the experience was of a participant level with some aspects at an executive level. A
8376
B
C
8400
D
8400
8400
E
F
8525
cD
cB
8525
G
H
8525
J
8650
K
8700
8575
L
[Nom. Architect]
[Print Date]
N
8400
P
8400
cF
1
U
1
AR-CD1071
AR-CD1072
T
FSL 78.755 B
FSL B 78.496 B
FSL 78.798 B
B
FSL 78.982
FSL 78.845 B
B
FSL 79.106
FSL 78.931
FSL 79.041
SP-W
FSL 79.411
FSL 79.256
BIRDWOOD LANE FSL 79.184
FSL 79.293
FSL 79.654
B
1:20
8600
B
7
B B
DOWN TO RETAIL
ESCALATOR 2
UP FROM RETAIL
SP-W
1:25
LOW
VOID
PARK RETAIL BLOCK 3
SP
PUBLIC ART
WATER FEATURE
PARENTS RM
FSL 80.500
PARK REFER TO LANDSCAPE ARCHITECTS DRAWINGS FOR LAYOUT AND DETAIL
LIFTS FROM RETAIL AND CARPARK LEVELS BELOW
EXTENT OF VOID BELOW
FSL 81.356
9
SFL 79.850
ANE L L
SP
STAGE
2
FSL 81.244 FFL 80.300
GREEN ROOM
RL 80.700
LP
SP
SP-W
SP
A/V STORE
8
THA
RETAIL ENTRY SFL 79.350
FSL 81.588
FSL 81.703
SEN
SFL 79.350
FSL 79.404
ACC
1 B
ESCALATOR 1
FFL 79.900
FSL 79.440
BIRDWOOD AVE
FSL 82.217
FSL 81.807
RO
SFL 79.350
SFL 79.350
FSL 79.650
B
BE VOID
8700
FSL 80.628
B
NT OF
8700
FSL 80.285
B FSL 81.120
B
EXTE
PARK RETAIL BLOCK 2
1:33
4
FSL 81.851 FSL 81.186
FSL 80.747
B
PARK RETAIL BLOCK 1
3
FSL 79.961
B
R
FFL 79.900
LIFTS FROM CARPARK LEVELS BELOW
HYDRANT BOOSTER SPRINKLER BOOSTER COLD WATER METERS GAS METERS
FSL 80.403
FSL 80.079
FSL 79.772
FSL 79.000
1
2
FSL 82.007
S
FSL 78.890
FSL 78.701
FSL 78.610
3 10
LP
FFL 80.900
SP
4
COMM WOMENS
SP
SFL 79.350
CLNR
MENS
SP
ACC
11
PLENUM LP
SP-W SP-W
17000
5
FSL 80.100 0 1:2
PARK RETAIL BLOCK 4
FSL 81.710 FSL 80.350
SP SP-W
FSL 81.510
6
SFL 81.550
FSL 81.010
SP
cD
cB A
B
C
D
F
G
H
J
ROSENTHAL AVE PROPOSED PEDESTRIAN BRIDGE SUBJECT TO PART 5 APPLICATION
FUTURE DEVELOPMENT
FFL 80.750
6
U
ERL 73.802
cF E
FSL 79.900
SP-W
SFL 81.550
SP
SP
Park Level Plan
5
SP-W
KERB INDICATED 2M FROM BOUNDARY TO BE CONFIRMED BY CIVIL / TRAFFIC ENGINEER
K
L
17/11/2017 5:30:50 PM History
M
8400
Robert Sanderson 5150
[File]
M PROPOSED NEW ROUNDABOUT TO SEPARATE APPLICATION
N
T
P
S R
FSL 80.313
[Rev#]
[Description]
A
FOR INFORMATION
05.05.2017
B
FOR INFORMATION
08.05.2017
C
50% DESIGN REVIEW RESPONSE
09.06.2017
[Date]
D
FOR INFORMATION
E
FOR INFORMATION
05.07.2017 13.07.2017
F
FOR INFORMATION
22.08.2017
G
FOR INFORMATION
08.09.2017
H
RETAIL WALL FRAMING
03.10.2017
I
FOR INFORMATION
06.10.2017
J
FOR INFORMATION
20.10.2017
K
FOR INFORMATION
03.11.2017
L
90% DESIGN SUBMISSION ADCO REVIEW
17.11.2017
[Dwg No]
AR-CD3425
Robert Sanderson 5150
[File]
P
N
M
L
K
[Print Date]
17/11/2017 5:00:54 PM History
[Rev#]
[Description]
A
FOR INFORMATION
05.05.2017
B
FOR INFORMATION
08.05.2017
C
FOR INFORMATION
22.08.2017
D E
EWS-101
F
ROOF LEVEL FFL 84.600
WATER FEATURE MENS PLANT ROOM L2.17
BAL-101
WIN-101
CLEANERS ACCESSIBLE WC L2.16
[Date]
FOR INFORMATION
04.09.2017
FOR INFORMATION
08.09.2017
FOR INFORMATION
06.10.2017
FOR INFORMATION
20.10.2017
G H
90% DESIGN SUBMISSION ADCO REVIEW
17.11.2017
BAL-101
L2.15
L2.14
RETAIL BLOCK 3 & 4 FFL 80.900 LEVEL 02 - PARK
TENANCY 2
8
MEZZANINE LEVEL
TENANCY 2 AMENITIES
TENANCY 2 - (BOH)
L1.A01
AR-CD5150
L1.A03
TENANCY 1A
D103 L1.FS4
L1.A02
FFL 78.000
MEZZANINE PLANT ACCESS STAIR
L1.C01
LEVEL 01 - RETAIL FFL 74.750 ROCK CONTOU R
FAN ROOM
CARPARK
B0.20
ELEC/COMMS B0.19
D62 B0.19
LEVEL B0 - CARPARK / DOCK FFL 71.500
D34 B1.15
ROCK CONTOUR
CARPARK
LEVEL B1 - CARPARK FFL 68.680 D17 B2.FS6
CARPARK LEVEL B2 - CARPARK FFL 65.860
D03 B3.02
CARPARK LEVEL B3 - CARPARK FFL 63.040
2
OVERALL SECTION 02 - PART 2 1 : 100
A
B
C
D
cB
E
F
cD
EWS-101 EWS-101
G
H
J
K
L
cF
EWS-101
EWS-101
EWS-101
ROOF LEVEL
EWS-101
FFL 84.600
STAGE LEVEL FFL 80.700 LEVEL 02 - PARK EXHAUST DUCT
EXHAUST DUCT
TENANCY 1A L1.C01
MEZZANINE LEVEL
LIGHTING ZONE
500
EXHAUST DUCT
FFL 78.000
3200 CLEARANCE
EXHAUST DUCT
TENANCY 1A L1.C01
LEVEL 01 - RETAIL
COLES (BOH) B0.10
ROCK CONTOUR
D47 B0.09
COLES AMENITIES & OFFICE B0.09
FFL 74.750
HYDRAULIC SERVICE PLANT ROOM B0.11
RAINWATER REUSE TANK B0.12
CARPARK
CARPARK
ROCK CONTOUR
LEVEL B0 - CARPARK / DOCK FFL 71.500
COMMS B1.09
RECEPTION B1.08
AIRLOCK
CARPARK
CARPARK
CARPARK
CARPARK
B1.07
LEVEL B1 - CARPARK
BLK-102
FFL 68.680
4
AR-CD5150
D11 B2.02
D12 B2.03
LEVEL B2 - CARPARK
BLK-102
FFL 65.860
5
AR-CD5150
CARPARK
CARPARK
D01 B3.01
LEVEL B3 - CARPARK FFL 63.040
1
AR-CD5150
1
OVERALL SECTION 01 - PART 1 1 : 100
Section [Project]
Level One, One Chifley Square Sydney NSW 2000 Australia www.scottcarver.com.au +61 2 9957 3988
[Client]
THE ROSENTHAL PROJECT ADCO CONSTRUCTIONS PTY LIMITED
0
1
2
3
4
SECTIONS - SHEET 1
5m
1 : 100 @ A0
[Scale]
[Ref]
20160050
[Dwg No]
AR-CD2211
[Rev]
H
PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY
FOR INFORMATION
[Status]
[Nom. Architect]
Veridian & Kogarah RSL CLUB Market: Mixed-use, Residential| Conception to Construction | FSA 20050sqm | Cost: 80M Client: Westbourne Constructions | Location: Kogarah, NSW 2217 Role: Senior Graduate , Supervising Architect: John Ferres, NSW 4955 Level of Responsibility: Documentation, design input, ensuring design addresses accessibility standards and contributing to the BIM Revit model as an active team member. Tender & Construction Stage: Faรงade design, set up systems and strategies for documentation DA Stage: unit layout, master plan, massing concept design, study SEPP 65.
PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY
Veridian & Kogarah RSL CLUB
127-131 BOWDEN STREET 3 STOREY COMMERCIAL BUILDING
8 ANGAS STREET 5 STOREY RESIDENTIAL FLAT BUILDING
ANGAS STR
13 ANGAS STREET INDUSTRIAL BUILDING
UNDERDALE LANE
Rev.
Description
Date
139 Bowden Street, Meadowbank
UNDERDALE LANE
L
.000
17
.325
18
18
21
20
.094
.442
.822
U N D E R D A L E 17
.059
Market: Residential | Status: Section 96, Site Area 750 sqm, FSA 2000 sqm around 22 dwellings, Cost: 11M
.621
Project Role: 2IC Level of Responsibility:
BOWDEN STREET
BIN COLLECTION AREA. 11 x 240L
ROOF
ROOF
GARBAGE COLLECTION AREA
SUBSTATION 2
SUBSTATION 1
DRIVEWAY
PATH
12
.729
13
ENTRY
.101
STAIR 9
ANGAS LANE
14
.223
15-17 ANGAS STREET 8 STOREY RESIDENTIAL FLAT BUILDING
EXISTING TWO STOREY FACTORY BUILDING
PEDESTRIAN RIGHT OF WAY
PEDESTRIAN RIGHT OF WAY
ANG
141 BOWDEN STREET 6 STOREY RESIDENTIAL FLAT BUILDING
AS LAN E
Site Plan
Status:
1:200 @ A1
U.N.O.
0
10
15000
Issue
Rev. C
BALCONY 203
KITCHEN LIFT
PEBBLE ROOF BELOW
4000
1
L5.02 4.2 m3
LDY
BALCONY 202
BATH
BATH
BATH
COMMS
2 BED
UP
2 BED
203 LIVING / DINING
202 LIVING / DINING
ST
ST
Status:
UP
BED 2
L
2
2
2
2
2750
2
2
BUILDING LINE BELOW 3250
8
Typical Floor Plan A
B V
C S
W D R
E T
U F
G O
H P
19/10/2017 2:14:23 PM
Print Date:
201
LIVING/ DINING
BED 1
RODNEY PAESLER 5938
Nominated Architect:
1 BED
ST
ST
BED 2
2. REFER LANDSCAPE PLANS FOR PLANTING DETAILS
BED
LOBBY
9
BATH BED 1
1. REFER BASIX TABLES FOR ENERGY EFFICIENCY REQUIREMENTS.
201
KITCHEN
9
Date 19.10.2017
3.REFER DA REPORTS FOR ADDITIONAL COMPLIANCE ITEMS
LIFT
ST
19/10/2017 4:12:05 PM
Description
S96 ISSUE
GENERAL NOTES:
BALCONY DP
KITCHEN
ST
LOBBY
6
RISER
9705
BATH
L5.01 7.5 m3
LDY
BATH
BED
1 BED
Dwg. No.
AD DA004
17452
1
RISER
204 LIVING / DINING
20170047
20m
COMMS
17452
6
KITCHEN
15
RODNEY PAESLER 5938
Print Date:
APPROVED ADJOINING BUILDING
4000
ST
Discipline
Project
5
APPROVED ADJOINING BUILDING
RL 11.750
SITE PLAN
Title
Client
204
4
2 1
BILLBERGIA
BALCONY
3
4 3
L6.04 5.8 m3
Nominated Architect:
1
5
139 BOWDEN STREET, MEADOWBANK Project
Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au
2
1
L5.11 5.8 m3
Scott Carver Pty. Ltd. Level 8, 71 Macquarie Street Sydney NSW 2000 Australia
LV2
LV1
L5.09 5.8 m3
BOWDEN STREET
19 ANGAS STREET 8 STOREY RESIDENTIAL FLAT BUILDING
ANGAS LANE
Section 96 Changes: • Two bed units modified to have two bathrooms and a laundry cupboard. • Additional window (w1) to second bedrooms and removal of bottom lower light (w2) to all windows. • Additional winter garden to level five • Change roof configuration to suit new winter gardens. INFORMATION ONLY • Change wall cladding from face brick to cementitious cladding • North wall, adjacent to the 133-137 bowden street • building modified to be solid to screen approved building. • Windows relocated • INFORMATION Column ONLY relocated • Storage area increased
14
.842
15
133-137 BOWDEN STREET 3 STOREY FACTORY BUILDING
Q I
Rev. C
Description
Date 19.10.2017
S96 ISSUE
X J
21.5m LEP HEIGHT LIMIT
3000
2 BED
602
601
SFL 23.40
DA LEVEL 5A
No. 141 1 BED 5 STOREY 503 RESIDENTIAL BUILDING
1 BED
3000
ROOF A
504
LEVEL 4B
SFL 22.90 1 BED
1 BED
502
501
DA LEVEL 4A
SFL 20.40
304
SFL 19.90 2 BED
403
1 BED
402
2 BED
401
2 BED
303
1 BED
302
LEVEL 2B
3000
2 BED
301
SFL 14.40 203
2 BED
LEVEL 1B
NATURAL GROUND LINE
SFL 11.40 4000
Scott Carver Pty. Ltd. Level 8, 71 Macquarie Street Sydney NSW 2000 Australia
Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au
DA LEVEL 1A
1:100 @ A1
139 BOWDEN STREET, MEADOWBANK 102 Project
2 BED + STUDY
BILLBERGIA
LOBBY
0
2
3
4
5
HYD SERVICES
3650
PARKING
BASEMENT LEVEL 2 UPPER
20170047
Discipline
Dwg. No.
AD DA112
SFL 6.90
BASEMENT LEVEL 1 LOWER SFL 3.25
PARKING
PARKING
PARKING
3000
2850
SFL 4.10
SFL 1.25
Project
10m
DA GROUND LEVEL A MECH RISER
2400
3300
PARKING
7
LEVEL 1 FLOOR PLAN
Title
DEEP SOIL ZONE
1
SFL 7.40
BASEMENT LEVEL UPPER
SFL 10.90 BOWDEN ST
U.N.O.
2 BED 101
COURTYARD
SFL 13.90
201
Client
LOBBY
GROUND LEVEL B
LEVEL 2A
1 BED
202
1. TWO BED UNITS MODIFIED TO HAVE TWO BATHROOMS AND A LAUNDRY CUPBOARD. 2. ADDITIONAL WINDOW (W1) TO SECOND BEDROOMS AND REMOVAL OF BOTTOM LOWER LIGHT (W2) TO ALL WINDOWS. 3. ADDITIONAL WINTER GARDEN TO LEVEL FIVE. 4. CHANGE ROOF CONFIGURATION TO SUIT NEW WINTER GARDENS. 5. CHANGE WALL CLADDING FROM FACE BRICK TO CEMENTITIOUS CLADDING (WF1). 6. NORTH WALL, ADJACENT TO THE 133-137 BOWDEN STREET BUILDING MODIFIED TO BE SOLID TO SCREEN APPROVED BUILDING. 7. WINDOWS RELOCATED. 8. COLUMN RELOCATED 9. STORAGE AREA INCREASED
3000
204
2 BED
LIST OF CHANGES
SFL 16.90
4000
3000
ANGAS LN
1 BED
LEVEL 3A
3000
1 BED
3000
SFL 17.40
BOUNDARY
LEVEL 3B
404
BOUNDARY
3000
1 BED
SFL 27.20 LEVEL 6A SFL 25.90
BED 1
LEVEL 5B .26 E: 24 RIDG
6
TOW 27.100 TOW 26.200 141 BOWDEN STREET
1300
TOW 26.700
TOW 26.700
SFL 26.40
3000
LEVEL 6B
TOW 27.600
3000
6
DA BASEMENT LEVEL 2 LOWER SFL 0.25
Section
LIST OF CHANGES
1. TWO BED UNITS MODIFIED TO HAVE TWO BATHROOMS AND A LAUNDRY CUPBOARD. 2. ADDITIONAL WINDOW (W1) TO SECOND BEDROOMS AND REMOVAL OF BOTTOM LOWER LIGHT (W2) TO ALL WINDOWS. 3. ADDITIONAL WINTER GARDEN TO LEVEL FIVE. 4. CHANGE ROOF CONFIGURATION TO SUIT NEW WINTER GARDENS. 5. CHANGE WALL CLADDING FROM FACE BRICK TO
Issue
C
Market: Residential | Status: Tender Stage | GBA 6009 sqm | 86 Dwellings | Cost: 35M Client: West Housing Pty Ltd | Location: 84 Wigram Rd Forest Lodge NSW â&#x20AC;&#x201C; 2037, Australia Role: Senior Graduate, Supervising Architect: Peter St Clair, NSW 7325
FOR INFORMATION
[Status]
[Nom. Architect]
PETER ST CLAIR /7325 20150166-DA-DA01
[File]
25/08/2017 12:30:18 PM
[Print Date]
History [Rev#]
[Description]
A B C D E F H G I
FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION FOR INFORMATION
[Date] 02.06.2017 09.06.2017 14.06.2017 23.06.2017 07.07.2017 12.07.2017 09.08.2017 01.08.2017 25.08.2017
Level of Responsibility: Coordination and integration of information and project materials from relevant consultants and specialists, adoption of strategies, program and process of documentation to enable project delivery, incorporation of the project requirements and objectives in accordance with Project Brief and approved detailed design, ensuring design addresses accessibility standards and contributing to the BIM Revit model as an active team member. B2
C2
2500
6950
AD-CD214
G2
H2
4250
I2
4250
J2
4250
K2
4250
L2
4250
M2
4250
2500
1
3
AD-CD221
AD-CD215
AD-CD215
2
AD-CD214
02
6950
1
4
9
AD-CD214
N2
2350
5
9
AD-CD215
AD-CD541
9
AD-CD215
AD-CD541
AD-CD541
2
BL CTF
AD-CD541
D11 U-101
236 1.1
6
1
LDY BED 3
U-101
AD-CD224
D212 FS-?
FH
D37 U-101
S
AD-CD541
D11 U-102
WC
SFL 11.660
D21 U-101
D41 U-101
U-101
D01 U-101
ENTRY
WC
D21 U-102
F
L-101
LIVING
1B U-102
D01 U-102 D01 U-108
U-108
LIVING
ENTRY
KITCHEN WC
5
1B U-110
D11 U-110 BED 1
U-110
D21 U-110
ENTRY
D38 U-110
S
WC
LDY
BED 1
LIVING
LIVING
LIVING
LIVING
LIVING
LIVING
L-101
H
D11 U-103
1720
1B U-103 KITCHEN
LOBBY 1 L-101
RL 11.660 KITCHEN
2B U-019
H
LDY
KITCHEN
D44 U-019 U-019 LDRY
S
D44 U-018 U-018
H
H
2B U-018
2B U-017
LDRY
S
KITCHEN
KITCHEN
D44 U-017 U-017 LDRY
2B U-016
D44 U-016 U-016
H
S
H
2B U-015
LDRY
S
KITCHEN
KITCHEN
D44 U-015 U-015 LDRY
D44 U-014 U-014
H
S
H
2B U-014
2B U-013
LDRY
S
KITCHEN
KITCHEN
D44 U-013 U-013 LDRY
2B U-012
D44 U-012 U-012
H
S
H
LOBBY 2 L-102
D L-102
L-102
L-102
C
5
AD-CD541
LDY
1B U-108
D21 U-019
WC
D21 U-018
WC
D21 U-017
WC
D21 U-016
WC
D21 U-015
D21 U-014
WC
WC
D21 U-013
WC
D44 U-103
1B U-105
D21 U-105
KITCHEN
D45 U-107 D21 U-107
BL CTF
S
FS-?
D01 U-418
250 1.25
2B U-106
ENTRY
KITCHEN
S
U-019 BED 1
D11 U-019
D11 U-018 U-018
U-017
D11 U-017
D11 U-016 U-016
U-015
D11 U-015
D11 U-014 U-014
U-013
D11 U-013
D11 U-012 U-012
BED 1
KITCHEN
1B U-109
281 1.44
LIVING
1501 3575
1
AD-CD541
BL CTF
LDRY
U-109 U-109
S
L-101 D21 U-109
D11 U-109
ENTRY
U-109
1550
252 1.43
261 1.40
WC
BED 1
BL CTF
BED 1
-
---
253 1.42
BED 1
BED 1
BED 1
BED 1
BED 1
BL CTF
8
AD-CD541
W216 1.38
BL CTF MBL4
BL CTF
W216 1.37
W216 1.36
BL CTF
MBL4
MBL4
BL CTF
W216 1.35
MBL4
BL CTF MBL4
W216 1.34
BL CTF MBL4
W216 1.33
BL CTF
W216 1.32
BL CTF
MBL4
W216 1.31
BL CTF
MBL4
MBL4
BL CTF
257 1.30
261 1.29
D45 U-106
S
LDY
MBL4
D47 U-106
LIVING
4s
D11 U-106 U-106 D21 U-106 WC
4
BL CTF
S
BED 1
EX
257 1.39
249 1.41
5635
BED 1
4t
267 1.26
SFL 10.140
LIVING
LIVING
1398
6
3s
D15 U-106
WC
H
AD-CD541
3 3000
BED 2
FH
SFL 11.660
D11 U-107
4u
LIVING
L-102
ENTRY
250 1.27
BED 1
8
5
AD-CD541
COURTYARD BELOW
5
AD-CD541
5
4
AD-CD542
AD-CD216
Level One, One Chifley Square Sydney NSW 2000 Australia www.scottcarver.com.au +61 2 9957 3988
2s
D11 U-105
277 1.24
F
D01 U-107
250 1.23
BED 1
S
D01 U-103
D11 U-107
1B U-107
D21 U-012
WC
ENTRY
WC
D37 U-105
D21 735
ENTRY
H
KITCHEN
KITCHEN
D01 105
729
L-102
S
WC
G
LDRY
S
KITCHEN
LDY
H
LIVING
1
949
LDY
229 1.16
RL 11.660
1B U-104
U-104
U-104 S
940 258 1.15
D11 U-108
H
U-110
S
TER CTF 258 1.14
E
L-101
L-101
D44 U-108
S
D01 U-110
TER CTF 258 1.13
E
D L-101
D45 U-108
1622
236 1.45
AD-CD541
TER CTF 258 1.12
LDY G
S
254 1.46
AD-CD216
TER CTF 258 1.11
LDY
C
270 1.47
BL CTF
MBL5
6
TER CTF 258 1.10
129 1.7
KITCHEN
U-102 ENTRY
D44 U-102
S
U-101
S
BL CTF 258 1.9
D11 U-104
D21 U-104
ENTRY
U-105
3B U-101
KITCHEN
U-101
AD-CD541
S
U-104
275 1.22
2590
BED 2
1
TER CTF 258 1.8
SFL 19.260
1803
AD-CD541
TER CTF
BED 1
D15 U-101
LIVING
D44 U-104
LIVING
BL CTF
BED 1
WC
279 1.19 259 1.18
LIVING
236 1.2
5
MBL4
BL CTF
LIVING BED 1
257 1.17
4
273 1.21
4118
257 1.6
MBL4
259 1.5
AD-CD541
3890
271 1.4
BL CTF
AD-CD541
2075
250 1.3
2
MBL4
9
BL CTF
264 1.20
1885
MBL4 MBL4
BL CTF
BL CTF
1350
390
MBL4
AD-CD541
MBL4
2228
9
F2
4250
AD-CD214
1
AD-CD541
E2
4250
3
3450
AD-CD222
D2
2350
2
MASTER METER/ WATER MET REGULA ER TOR ASS & GAS EMBLY
A2
1
[Project]
[Client]
HAROLD PARK AFFORDABLE HOUSING CITY WEST HOUSING PTY LTD
0
[Scale]
1.5
3
4.5
6
GA LEVEL 1
7.5 m
1 : 100 @ A1
[Ref]
20150166
[Dwg No]
AD-CD124
[Rev]
I
PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY
Harold Park Affordable Housing
Retail Redevelopment Blaxland Road Campbelltown Market: Retail | Status: DA and D&C Tender | GFA 10,870 sqm of retail | Cost: 2.5M Client: Intergen Property Group | Location: 4 Blaxland Road Campbelltown NSW - 2560, Australia Role: Project 2IC, Supervising Architect: Robert Sanderson, NSW 5150 Level of Responsibility: Attending meetings with clients as Project 2IC, discussing brief, feasibility studies, design options, fee agreement, project scopes with clients, analysis and evaluation of project requirements and objectives for DA submission BLAXLAND ROAD A
B 8795
B1 7200
C 7200
C1 7200
D
D1
7200
E
7200
E1
7200
F
7200
F1
7200
G
7200
G1
7200
H
7200
7200
PRELIMINARY
[Status]
H1
I
7200
I1
7200
7200
J
J1
7200
K
7200
Robert Sanderson /5150
[Nom. Architect]
7200
[File]
7/08/2017 2:19:24 PM
[Print Date]
History
3A 1
7200
2
AD-CD202
AD-CD202
3
AD-CD202
3
[Rev#]
[Description]
A B C
Preliminary Preliminary Preliminary
[Date] 26.07.2017 04.08.2017 07.08.2017
NO. 4 PROPOSED LEASEABLE AREAS 5200
4A
2000
AD-CD204
4
Name STAIR (3A) 43 m²
4B
Area
GROUND FLOOR SHOP 1&2 FANTASTIC SHOP 3 SHOP 5 SHOP 6 B1 - MEZZANINE MEZZANINE MEZZANINE TENANCY STORAGE ROOM Grand total
7200
UP
838 m² 115 m² 13 m² 7579 m²
7200
5
2576 m² 355 m² 2488 m² 1193 m²
SHOP 3 355 m²
5A
SHOP 5 2488 m²
NO. 4 PPROPOSED GFA
SHOP 6 1193 m²
Name
7200
SHOP 1&2 FANTASTIC 2576 m²
200
7200
6
AD-CD204
4
1
4070
2
6A
AD-CD204
TOILET 37 m²
4930
7200
200
AD-CD202
200
7
ACC. TOILET 8 m²
200 2950 100 2950 200
7260
7200
13 m² 8054 m²
4050
5600
UP
UP
4000
200
ELECTRIC DISTRIBUTION ROOM 13 m²
The drawings have been produced based on drawings collected from Council by client.
200
FEMALE TOILET 17 m²
GARBAGE DISPOSAL 20 m² TELECOM
200 2770 200
7200
8
215 m² 71 m² 838 m² 115 m²
MALE TOILET 23 m²
TOILET 11 m²
The drawings are,
STAIR 1 16 m²
1200
STAIR 2
A004 - p.r. design co. on June 1990 A007 - p.r. design co. on June 1990 A008 - p.r. design co. on June 1990 A009 - p.r. design co. on June 1990 A010 - p.r. design co. on June 1990 A011 - p.r. design co. on June 1990 A014 - p.r. design co. on June 1990 WD01B - Archworks Architects Pty Ltd produced on March 94 WD01E - Archworks Architects Pty Ltd produced on March 94 WD02A - Archworks Architects Pty Ltd produced on March 94 WD02D - Archworks Architects Pty Ltd produced on March 94 WD02E - Archworks Architects Pty Ltd produced on March 94 WD03A - Archworks Architects Pty Ltd produced on March 94 WD04E - Archworks Architects Pty Ltd produced on March 94
6330
7A
8 m² 13 m² 17 m² 20 m² 3 m² 23 m² 54 m² 2576 m² 355 m² 2488 m² 1193 m² 5 m² 37 m² 11 m²
PARKING REQUIRED 8057/60 = 135 PARKING PROVIDED 186
200
10770
7200
SERVICE BAY 2 54 m²
Area
GROUND FLOOR ACC. TOILET ELECTRIC DISTRIBUTION ROOM FEMALE TOILET GARBAGE DISPOSAL GAS M RM MALE TOILET SERVICE BAY 2 SHOP 1&2 FANTASTIC SHOP 3 SHOP 5 SHOP 6 TELECOM TOILET TOILET B1 - MEZZANINE CORRIDOR 1 CORRIDOR 2 MEZZANINE MEZZANINE TENANCY STORAGE ROOM Grand total
7200
1000
8A
A2 & A3- Produced on May 1989
9
The dimensions are not checked on site and completely based on brief site inspection and photographs. 4
PRELIMINARY
[Status]
AD-CD204
Robert Sanderson /5150
[Nom. Architect]
[File]
4/08/2017 3:29:29 PM
[Print Date]
History
11600 [Rev#]
25500 3000
Level One, One Chifley Square Sydney NSW 2000 Australia www.scottcarver.com.au +61 2 9957 3988
2
M
N
L
O
P
7483
2
M
N
8934
19
2633
4
6
8
O
P
6450
2
[Ref]
AD-CD212
M
N
19
20150148
O
[Dwg No]
Preliminary
AD-CD102
Name GROUND FLOOR GROUND FLOOR LETTABLE AREA B2 - FIRST FLOOR FIRST FLOOR LETTABLE AREA Grand total
18 18 17 17
6300
15 UP
6300 STAIR 2
15
UP
STAIR 1 7 m²
6300
GOODS LIFT 9 m²
13
NEW LIFT 7 m²
NEW LIFT 7 m²
12
UP
11 10
B2 - GROUND FLOOR - PROPOSED 1 : 200
2
M
B2 - MEZZANINE - PROPOSED 1 : 200
NEW LIFT 7 m²
12 12
L
1
PARKING REQUIRED 2186/60 = 36.4 PARKING PROVIDED 37
MEN WC 5 m²
13
1500
11 10
937 m² 5 m² 5 m² 5 m² 3 m² 5 m² 2186 m²
13
6300
12
Area
1227 m²
GOODS LIFT 9 m²
14
UP
GROUND FLOOR GROUND FLOOR LETTABLE AREA B2 - FIRST FLOOR FIRST FLOOR LETTABLE AREA MEN WC MEN WC ROOM ROOM WOMEN WC Grand total
WOMEN WC 5 m²
STAIR 2 7 m²
14
6300
13
FIRST FLOOR LETTABLE AREA 937 m²
STAIR 1 7 m²
STAIR 2 7 m²
GOODS LIFT 9 m²
ROOM 3 m² ROOM 5 m² MEN WC 5 m²
15
14
937 m² 2164 m²
6300
STAIR 1
14
AD-CD212
NO FLO OR
15
1
16
6300
1
AD-CD212
6300
16 6300
1
Area
1227 m²
6300
16
AD-CD212
C
6300
GROUND FLOOR LETTABLE AREA 1227 m²
6870
17
16
[Rev]
NO. 8 PROPOSED GFA Name
17
04.08.2017
NO. 8 PROPOSED LEASEABLE AREAS
P
19
18
[Date]
NO. 4 - GROUND FLOOR PLAN - PROPOSED A
10 m
1 : 200 @ A1 L
6870
18
2
[Scale]
AD-CD212
6300
19
Intergen Property Partners
[Client]
AD-CD212
L
Retail Development Blaxland Road, Campbeltown
[Project]
0
[Description]
N
O
11 10
The drawings have been produced based on drawings collected from Council by client.
11 10
The drawings are,
P
3
B2 - FIRST FLOOR - PROPOSED 1 : 200
A004 - p.r. design co. on June 1990 A007 - p.r. design co. on June 1990 A008 - p.r. design co. on June 1990 A009 - p.r. design co. on June 1990 A010 - p.r. design co. on June 1990 A011 - p.r. design co. on June 1990 A014 - p.r. design co. on June 1990 WD01B - Archworks Architects Pty Ltd produced on March 94 WD01E - Archworks Architects Pty Ltd produced on March 94 WD02A - Archworks Architects Pty Ltd produced on March 94 WD02D - Archworks Architects Pty Ltd produced on March 94 WD02E - Archworks Architects Pty Ltd produced on March 94 WD03A - Archworks Architects Pty Ltd produced on March 94 WD04E - Archworks Architects Pty Ltd produced on March 94 A2 & A3- Produced on May 1989 The dimensions are not checked on site and completely
Market: Retail | Status: Construction Stage | NLA 12,000 sqm | Cost: 35M Client: Billbergia Group | Location: Burroway Road Wentworth Point NSW 2127, Australia Role: Senior Graduate, Supervising Architect: Robert Sanderson, NSW 5150
Project Description: Design development and documentation of a major retail project in Wentworth Point Development. The project included a new retail center, 45 Commercial and Specialty retail tenancies including COLES supermarket and New Shopping Centre. The project includes free form and curved design with 1500 carpark, thus is challenging to document and execute. Construction is concrete framed with masonry external walls, stud partitions internally and concrete slab as roof with residential component above. Level of Responsibility: Documentation, design input, ensuring design addresses accessibility standards, design and presentation drawing production, marketing plans, design brochure, producing detailed section and contributing to the BIM Revit model as an active team member
PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY
Wentworth Point - Block E Marina Square
Wentworth Point - Block C Sirius Construction Phase Market: Mixed use | 770 dwellings | status: under construction, dollar value: 195 million Responsibilities: Door schedule, tagging & annotations, concrete set outs â&#x20AC;&#x153;Sirius is a new foreshore community of 703 residential apartments at Wentworth Point, directly adjacent to the proposed new bridge across Homebush Bay. Combining a strongly articulated tower with linear podium blocks, this development defines the Wentworth Point gateway as approached from the north-east. Wintergardens and angled balconies are orientated to the expansive city and harbour views, whilst capturing winter sun. A generous landscaped rooftop terrace flows from the tower, across the northern podium, providing a strong connection to the water and across to Rhodes. To the west another rooftop landscape space opens to the north, with a more serene and sheltered aspect. This scheme is the fifth in a continuing evolution of the broader Wentworth Point Marinas precinct masterplan with Billbergia Developments.â&#x20AC;?
(Ref: http://www.scottcarver.com.au/cms-ourwork/sirius--wentworth-point.phps)
Proposed Shadow DCP Shadow
33 Henderson Road Alexandria HENDERSON RD
HENDERSON RD
Market: Residential | 28 dwellings | Status: DA stage Responsibilities: BIM Modelling, unit layout, study SEPP 65, shadow study, DA drawings
DA SUBMISSION
Status:
Rodney Paesler 5938
Nom. Architect
16/04/2015 2:13:52 PM
Print Date:
Rev.
PM
2 PM
Description
A
DA Issue
Date
13/04/2015
1 pm
21 June
GARDEN RD
June
PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY
NOTE: DCP Shadows based off maximum allowable building envelope
2 pm
HENDERSON RD
PM
3 pm
June
DA SUBMISSION
Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au
33 Henderson Rd Alexandria
1:1000 @ A3
Project
U.N.O.
Rev.
A B
Client
Woolloomooloo Property Trust 33 Henderson Rd Alexandria
Scott Carver Pty Ltd Level 8, 71 Macquarie Street Sydney NSW 2000 Australia
Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au
Rodney Paesler 5938
0
Project
10
20/04/2015 3:57:15 PM
Print Date:
20
Description
30
40
50m
Neighbouring Building Shadow PHOTOMONTAGE
- HENDERSON LOOKING WEST
Discipline
20140133
Drawing. No.
Rev.
DA-402 B
Title
Discipline
20140133
NOTE: DCP Shadows based off maximum allowable building envelope
HENDERSON RD
Reference No.
Reference No.
DCP Shadow
Woolloomooloo Property Trust
Title
13/04/2015 20/04/2015
Proposed Shadow
Client
SHADOW DIAGRAMS - SHEET 2
Date
DA Issue DA Issue
Drawing. No.
Rev.
DA-302 A
HENDERSON RD
1 PM
2 PM
21 June
1 pm
21 June
DA SUB
Status:
GARDEN RD
Scott Carver Pty Ltd Level 8, 71 Macquarie Street Sydney NSW 2000 Australia
GARDEN RD
GARDEN RD
Status: Nom. Architect
Rodn
Nom. Architect
16/04/2
Print Date:
Rev.
A
Description
DA Issue
2 pm
HENDERSON RD
UP
UP
UP
GROUND FLOOR
3 PM
3 pm
21 June
Scott Carver Pty Ltd Level 8, 71 Macquarie Street Sydney NSW 2000 Australia
Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au
33 Henderson Rd Alexandria Project
1:1000 @ A3
SHADOW DIAGRAMS - SHEET 2
U.N.O.
Title
Client
Woolloomooloo Property Trust
Reference No.
0
10
20
30
40
50m
20140133
Discipline
Drawing. No.
Rev.
DA-402 B
CROSS VENTILATION CROSS VENTILATION CROSS VENTILATION -
CROSS VENTILATION N/A
COUN CROSS VENTILATED 19 N/A
8 TOTAL
27
LEVEL 1 - 3 Scott Carver Pty Ltd Level 8, 71 Macquarie Street Sydney NSW 2000 Australia
Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au
33 Henderson Rd Alexandria
Project
1:250 @ A3
VENTILATION COMPLIANC
U.N.O.
Client
Woolloomooloo Property Trust
Reference No.
0
5
10
20140133
Discipline
D
D
Discovery Point Building 2 - Residential Tower Market: Residential | Built Area:16524 sqm, 200 dwellings | Status: Under Construction Role: Concrete set out, hydraulic plans, steels for awning, dimensioning, construction details, site visit
Market: Public Building | Built Area: 7000 sqm | Status: Under Construction Role: Basement plans, gatehouse, dock office fixed furniture details
PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY
Sydney Opera House VAPS Project
E
F
Wentworth Point Block G
MSC6A WIDTH - REFER TO SCHEDULE
MIN. 20mm GAP BETWEEN SCREEN & WALL
MIN.20mm GAP BETWEEN SCREEN & WALL
MIN. 20mm GAP BETWEEN SCREEN & WALL
11
AD-CD631
1100
Market: Mixed Use | 330 dwellings | Status: Constructed Role: Detail elevations, fixing grids, set down slabs, toilet and kitchen set out 200 CTW2
30
TD
CTW2 TSP
4
TSP
CL
ELEVATION 02
820 10 450 BATHTUB CL ELEVATION 01
200
220
1130 1600
650 230 SCREEN
GLS1
CL
TR
850
1200 C 200 L
BATH
LEVEL 5 450 CL 15.350 RL
TSP
820 10 400 BATHTUB C ELEVATION 01 L
4
SCREEN
310 1850
GLM1
GLM3
TSP
10 2
200
CTW2
TR
820
960
3
ELEVATION 02
STB2
2400
CL
1850
1
CL
C/L OF SUPPORT POSTS HEBIND
4 EQUAL PANELS
CTW2
MDO1
TSP
400
2400
C EQ L EQ
610
1525 70 150 BATHTUB 650 SCREEN
MSC6A- 1 G1- 03
30
TSP
10
AD-CD411
2400 FRAME 830 STUD WALL C CL 750 400 L 450 VANITY
BATH
CTW2
1 : 50
DUCT
TR
850
TD
1130
CL
4
L BATHROOM BA1/T
2
CL
TSP
C
2
13
AD-CD411
1600
10
LEVEL 6 RL 18.350 STB2
GLM3
310
820
2400
3
TR
14
AD-CD411
GLS1
30
MDO1
960
1850
1
650 230 SCREEN
GLM1
7
AD-CD411
1200 C 200 L
VANITY
1850
4 EQUAL PANELS
200
CTW2
220
70 150 1525 BATHTUB 650 SCREEN
DUCT
200
SCREEN
FRAME 830 STUD WALL C CL 750 450 L 400
AD-CD411
2400
C EQ L EQ
2400
MSC6A HEIGHT REFER TO SCHEDULE
400 CL
ELEVATION 01
1 : 50
15
CL
450
TSP
4
AD-CD411
BATHROOM BA1/S
1
CL
TR
SHOWER
TR
2
310
2100 CL
2400
3
SHOWER
STB2
GLM3
1100
MDO2
960
1
1130
GLS2
7
AD-CD411
1850
VANITY
1850 860 SCREEN
GLM1
2100 FIXED SCREEN
200
220
800 70 150 SCREEN
DUCT
LEVEL 7 RL 21.350
2400 4 EQUAL PANELS
C EQ L EQ
2400 STUD WALL FRAME C CL 450 L 400
850
830 750
11
AD-CD411
TSP
ELEVATION 02
SHOWER / TUB
BATHROOM BA1/T2
6
2
TSP
820 10 400 BATHTUB C ELEVATION 01 L
CL
CL
MSC6B- 1 G1- 02
MSC10D- 2 G1- 02
LEVEL 2 RL 5.950
MIN. 20mm GAP BETWEEN SCREEN & WALL
MSC6B WIDTH REFER TO SCHEDULE
5
1 : 50
E
F MSC10B- 1 G1- 04
SUPPORT POSTS AT EQUAL SPACINGS
ELEVATION - MSC10A TO MSC10D - GRID F11 1 : 50
1
2000 WPM
30
1 1 1 1 5 1 2 1 1 1 2 3 STB2 3 1 1 4 1 1 1 2 1 2 2 1 1 1 2 5 2 6 3 7 4 1 2 3
TYPE
WIDTH (mm)
HEIGHT (mm)
MSC3A MSC3B MSC3C MSC3C MSC4A MSC4C MSC4C MSC4D MSC4D MSC5A MSC5A MSC5A MSC5B MSC6A MSC6B MSC6C MSC7A MSC7B MSC8A MSC8B MSC8C MSC8D MSC10A MSC10B MSC10B MSC10C MSC10D MSC10E MSC10E MSC10F MSC10F MSC10G MSC10G MSC10H MSC10J MSC10K
2500 2500 2500 2500 1220 1920 1920 5277 5277 1300 1300 1300 1300 7225 5825 5300 3100 3100 3460 4210 3405 3460 7225 7225 7225 7225 5825 1195 1195 1045 1045 860 860 1195 1045 860
2580 2780 2980 2980 2020 2020 2020 1320 1320 14000 14000 14000 45400 13350 1750 8800 1700 2800 2300 2300 2438 2438 2000 1800 1800 1750 1350 1800 1800 1800 1800 1800 1800 1750 1750 1750
1130 310
GPO LS
LOW HEIGHT RC WALL BELOW MSC10
TR
F
ELEVATION 03 CL
1650 650 SCREEN
GLS3
2700
SHOWER MSC10B- 1 G1- 04
FIXTURES, WHERE REQUIRED.
ELEVATION 04
TR
GPO LS
TSP
MSC6A- 1 G1- 03
ELEVATION 02
8
ELEVATION 03
SUPPORT POSTS AT
SCOTT CARVER PTY LTD SITE IMAGE PTY LTD
STRUCTURAL:
TAYLOR THOMSON WHITTING PTY LTD
CIVIL:
TAYLOR THOMSON WHITTING PTY LTD
HYDRAULIC:
STEVE PAUL & PARTNERS
ELECTRICAL:
HARON ROBSON
TAYLOR THOMS
HYDRAULIC:
STEVE PAUL &
ELECTRICAL:
HARON ROBSO
MECHANICAL:
ZENITH AIR PTY
KEY PLAN
G2
G1
ELEVATION 04
AD-CD631
4
U.N.O. 1:50 @ A1 AD-CD623
MSC6A WIDTH REFER TO SCHEDULE
Scott Carver Pty. Ltd.
G
1
2
3
MIN. 20mm GAP BETWEEN SCREEN & WALL
Telephone +61 2 9957 3988
G4
BATHROOM/ENS. LAYOUTS
Title
Project
0
1 : 50
LANDSCAPE ARCHITECT:
TAYLOR THOMS
CIVIL:
REFER TO SHEET AD-CD001 FOR FULL CONSU CONTACT INFORMATION; GENERAL NOTES, LE
4
11
ARCHITECT:
SITE IMAGE PTY
STRUCTURAL:
CL
3
21
SCOTT CARVER
LANDSCAPE ARCHITECT:
AD-CD623
AD-CD623
LEVEL 7 RL 21.350
ARCHITECT:
TSP
ELEVATION - MSC7A & MSC7B - GRID R21
MSC7A- 1 G2- 07
5
100
1195
WENTWORTH POINT MARINAS - BLOCK G
NOTE FOR MSC SCREEN / LOUVRE DETAILS REFER TO SHEETS CD631 & CD632
MDO3
1650
220
830 SHOWER
SUPPORT POSTS AT EQUAL SPACINGS
TSP
REFER TO DETAIL 4 / AD-CD631
1130
6. FOR INTERIOR FINISHES REFER TO A FINISHES SCHEDULE
7. 19mm MARINE PLYWOOD LOCALISED 1 : 50 TO STUD WORK TO ALLOW FOR INSTAL
TSP
TSP
1195
MSC10A / MSC10B / MSC10C WIDTH REFER TO SCHEDULE 100 300 300 300 300 480 480 480 480
310
5. ALL FLOOR TILES TO BE CTF1
5
100 TR
ELEVATION 02
PROJECTION (mm)
2100 SCREEN
ELEVATION - M
1000
LEVEL INSTANCE
310
1130
150 1000
3. REFER GA FLOOR PLANS FOR DOOR
1130
vv
2100 SCREEN
30
30 850 1000
2100 1130 C L 1100 310
1130 2000 WPM 150
2. ALL FEATURE WALL TILES TO ALIGN IN THE EVENT THAT CUT TILES SIZES D VERTICAL AND HORIZONTAL JOINTS O ALIGN, CTW TO BE OFFSET AGAINST C NOT ALIGN - TBS WITH ARCHITECT ON
1000
1100
1. ALLOW FOR MIRRORED VERSION OF REFER TO GA FLOOR PLANS TO CONFI
ELEVATION 04 1650
310
CL
PLAN - MSC6A - GRID F11
1 : 50
BATHROOM NOTES
220
1130
CL
2100 CL
MIN. 20mm GAP BETWEEN SCREEN & WALL
6
LEVEL 2 RL 5.950
150
830
1130
SHOWER
SCHEDULE - METAL SCREENS / LOUVRES
1100
MSC7A- 1 G2- 07
LEVEL 2 RL 5.950
LS
4. ALL WALL TILES TO BE CTW1 UNLES
310
TR
30
2100 CL
2400
2400
310
HEIGHT REFER TO SCHEDULE
ELEVATION 03
Billbergia Constructions Pty Ltd
5
AD-CD623
960
220 220
2400
21
1B G2-705
MSC10A / MSC10B / MSC10C WIDTH REFER TO SCHEDULE LOW HEIGHT RC WALL BELOW MSC10
WIDTH REFER TO SCHEDULE
MIN. 20mm GAP BETWEEN SCREEN & WALL
TSP
400
G2 05 G2 08 2700 G2 06 C EQ L EQ 4 EQUAL PANELS G2 07 G4 07 200 200 G4 07 G4 07 CTW2 GLM1 G1 07 G1 08 G2 04 G2 04 NOTE : ENSURE G2 04 DOOR CLEARANCE G3 02 GLM3 1 G1 03 SHOWER G1 02 WIDTH G2 04 MIN. 20mm GAP BEWTEEN MIN. 20mM GAP BETWEEN TD REFER TO SCHEDULE 3 SCREEN & WALL SCREEN & WALL G2 07 G2 CTW208 G1 01 TSP 1 G1 450 45001 AD-CD632 G3 02 LEVEL 9 G3 C RL 27.350 CL L 02 G1 03 G1 04 G1 05 ELEVATION 01 G1 06 G1 02 C/L OF MSC7B- 1 G2 04 SUPPORT G2- 08 G2 05 POSTS Telephone +61 2 9957 3988 Scott Carver Pty. Ltd. BEHIND G2 04 CL hello@scottcarver.com.au Level 8, 71 Macquarie Street CL CL G2 05 Project www.scottcarver.com.au Sydney NSW 2000 Australia G2 04 Client G2 05 G2 06 LEVEL 8 RL 24.350 G2 06 G2 06
MIN.20mm GAP BETWEEN SCREEN & WALL
NOTE: SUPPORT POSTS AT EQUAL SPACINGS
MIN. 20mm GAP BETWEEN SCREEN & WALL
ELEVATION - MSC6A & MSC6B - GRID F11
HEIGHT REFER TO SCHEDULE
LEVEL 3 RL 9.150
C/L OF SUPPORT POSTS HEBIND
CL
E
ELEVATION 01
MSC7B HEIGHT REFER TO SCHEDULE
1 : 50
HEIGHT REFER TO SCHEDULE
MSC6B HEIGHT REFER TO SCHEDULE
BATHROOM BA3
LEVEL 3 RL 9.150 CL
MIN.20mm GAP BETWEEN SCREEN & WALL
4
5
4
GPO
CTW2 TSP
LEVEL 4 RL 12.350 TSP
2
TD
MSC7A HEIGHT REFER TO SCHEDULE
LEVEL 4 RL 12.350
VANITY
ELEVATION 02 MSC6B WIDTH 1650 650 REFER TO SCHEDULE SCREEN
SHOWER
450
960
8 AD-CD631
MSC10A- 2 G1- 03
SHOWER / TUB
WPM CONTINUES BELOW BATHTUB
Date 24.03.2015 27.03.2015 13.04.2015 03.06.2015 23.07.2015
STB2
GLM3
BA2/T:G3-706 BATH (INSTEAD OF SHOWER)
1650
AD-CD631
DUCT
1 : 50
3
LEVEL 5 2700 RL 15.350 STUD WALL FRAME C CL 450 L 450
HEIGHT REFER TO SCHEDULE
1
AD-CD623
8
HEIGHT REFER TO SCHEDULE
MDO2
650 70 150 SCREEN
830 750 MSC10B- 1 G1- 04
TSP
610 CL ELEVATION 04
GLM1
TSP
1 : 50
LEVEL 5 RL 15.350
Description For Information Construction Certificate 3 Issue Revisions as clouded Revisions as clouded For Construction
GLS3
4
MDO2
MSC6A- 1 G1- 03
Doug Southwell 7362
ELEVATION - MSC6A & MSC6B - GRID F11
4
1
BATHROOM BA2
4
200
CTW2
LEVEL 6 RL 18.350
2 MSC10B- 1 G1- 05
2400 4 EQUAL PANELS
C EQ L EQ
200
1650
650 70 150 SCREEN
VANITY
CL
C/L OF SUPPORT POSTS HEBIND
LS
850
1100 MSC6A HEIGHT REFER TO SCHEDULE
CL
DUCT
Rev. A B C D 1
ELEVATION 01
LEVEL 7 RL 21.350
2400 FRAME 830 STUD WALL C CL 750 450 L 400
LEVEL 6 RL 18.350
CL
GPO
1195
SHOWER / BATHTUB
2100 SCREEN
MIN. 20mm GAP BETWEEN SCREEN & WALL
11
CL
2100 310 1130 CL 1100
2400 960
1650 1600
TSP
23/07/2015 5:04:43 PM
Print Date:
AD-CD631 LEVEL 7 RL 21.350
FOR CONSTRUCTION
Nominated Architect:
WPM CONTINUES BELOW BATHTUB
MSC10C- 1 G1- 06
Client
TD
ELEVATION 03
2100 SCREEN
AD-CD631
30
2400 SCREEN & WALL
1 : 50
2000 WPM
3
WPM EXTENDS UP TO VANITY
Status:
850
NOTE: SUPPORT POSTS AT EQUAL SPACINGS
C/L OF SUPPORT Billbergia Constructions Pty Ltd POSTS HEBIND 100
150
30
MIN.20mm GAP BETWEEN SCREEN & WALL
WENTWORTH POINT MARINAS - BLOCK G 1850 Project
220
CL
850
MIN. 20mm GAP BETWEEN SCREEN & WALL
11
TYPICAL BATHROOM - WPM MIN.20mm GAP BETWEEN
ELEVATION 02
ELEVATION 04
TR
ELEVATION 02
2000 WPM
MSC6A WIDTH - REFER TO SCHEDULE
MIN. 20mm GAP BETWEEN SCREEN & WALL
ELEVATION 01
Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au
CL
TSP
450
TSP
450
CL LEVEL 3 RL 9.150 TSP
1 : 50
E
MSC10A / MSC10B / MSC10C WIDTH REFER TO SCHEDULE
CL
BATH
CL
SHOWER
CTW2
450
SHOWER / BATH
960
F
F
1195
CL
ELEVATION 03 Scott Carver Pty. Ltd. Level2400 8, 71 Macquarie Street Sydney NSW 2000 Australia 830
SHOWER / TUB
E
100
GPO LS TSP
1
BATHROOM BA1/T2
6
TD
Sim
5
AD-CD411 TSP
TR
SHOWER
8
AD-CD411
AD-CD411
AD-CD411
STB2
GLM3
310
310
TR
850
220
1130 1130 310MDO2
30
850
CL
TSP
4
SHOWER / BATH
1130
GLS1
STB2
CTW2
TR
10
820
TR
CL
650 230 SCREEN
MSC6B- 1 G1- 02
GLM3
3
GLS3
12
AD-CD411
Description Preliminary For Information For Information Construction Certificate 3 Issue For Construction Revisions as clouded Revisions as clouded
1650 650 SCREEN
1850
220
830 NOTE : ENSURE DOOR CLEARANCE
2
GLM1
Dou
31/07/
1000
3
CL
4 EQUAL PANELS GLM1
CL
200 CTW2
1
1 : 50
1850
CL
Print Date:
TSP
TSP
200
BATHROOM BA3
5
ELEVATION 02
200
CTW2
960
MDO1
CL
C EQ L EQ
200
400 CL
2400
30
220
610 CL
1
1850
1525 70 150 BATHTUB 650 SCREEN
VANITY
820 10 450 BATHTUB CL ELEVATION 01
TSP
400
SHOWER
Rev. A B C D ELEVATION 021 2 3
CTW2
1195
2400
4
TR
ELEVATION 04 2700 C EQ L EQ 4 EQUAL PANELS
TSP
2
BATH
850
2400
10
AD-CD411
TR
CTW2 TSP
CL
4
FRAME 830 STUD WALL C CL 400 L 450 750 DUCT
TD
1200 C 200 L
2
BATHROOM BA1/T
2400
10
13
TSP
STB2
GLM3
AD-CD411
MSC6B HEIGHT REFER TO SCHEDULE
820
2400
3
14
AD-CD411
1200 C 200 L
MDO1
960
1
VANITY
LS
TSP
450
1
2700 STUD WALL FRAME C CL 450 L 450
DUCT
7
AD-CD411
1 : 50
650 SCREEN
GLM1
830 750 230
GLS1
220
VANITY
TR
2
4 EQUAL PANELS
200
CTW2
1850
70 150 1525 BATHTUB 650 SCREEN
DUCT
200
1850
1600
C EQ L EQ
2400 FRAME 830 STUD WALL C CL 750 450 L 400
15
AD-CD411
2400
TD GPO
AD-CD411 ELEVATION 01 TSP
ELEVATION 03 CL
1 : 50
650 70 150 SCREEN
1 : 50
100
Sim
5
AD-CD411
AD-CD411
4
BATHROOM BA2
4
ELEVATION 02
8
FOR CONSTR
Status: GLS3 Nominated Architect:
LEVELSTB2 4 RL 12.350
GLM3
AD-CD411 SHOWER
2
2400
TSP
CL
BATHROOM BA1/S
1
TR BA2/T:G3-706 BATH (INSTEAD OF SHOWER)
SCREEN
400 CL
ELEVATION 01
3
SCREEN
450
TSP
4
AD-CD411
1
TSP
2
CTW2 TSP
4
220
GLM1 1850
12
960
30
TR
200
CTW2
830 SHOWER
ELEVATION 02 1650 650 SCREEN
2400 4 EQUAL PANELS
C EQ L EQ
AD-CD411
220
1100
3
SHOWER
STB2
GLM3 SHOWER TD
VANITY
MDO2
2100 CL
2400 960
1
310
220
AD-CD411
TR
2
DUCT
GLS2
1650
GLM1
7
1850
VANITY
MDO2
800 70 150 SCREEN
DUCT
200 CTW2
650 70 150 SCREEN
200
AD-CD623
ELEVATION 01
200 2400
2100 FIXED SCREEN
C EQ L EQ
2400 STUD WALL FRAME C CL 450 L 400
850
WPM CONTINUES BELOW BATHTUB
AD-CD631
2400 FRAME 830 STUD WALL C CL 750 450 L 400
850
830 750
11
AD-CD411
1850 860 SCREEN
SHOWER / BATHTUB
1
1000
1 : 50
8
2400 4 EQUAL PANELS
WPM EXTENDS UP TO VANITY
960
TYPICAL BATHROOM - WPM
3
2000 WPM
2400
1 : 50
5m
20130053
Discipline-Dwg. No.
AD-CD4
Market: Residential | Built Area: NLA 15000sqm, 800 dwellings | Status: DA stage Role: Conceptual 3D model, marketing plans, leasing plans
PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY
Wentworth Point Block E Mixed Use Development
Bong Bong Town Centre Market: Retail Masterplan | Status: Concept Role: Sketch up 3D modelling, area calculation, preparing presentation drawings, report, presentation
Market: Retail Masterplan | Status: Stage 1 DA Role: Sketch up 3D modelling, area calculation, preparing presentation drawings, BIM modelling of master plan to details in Revit, residential detail layouts, sheet layouts and presentation
PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY
Bridge Plaza Batemans Bay Retail
Campbelltown Centre of Excellence Market: Retail Masterplan | Built Area: 330 dwellings | Status: Concept Role: Master plan, block plan, graphic presentation
PROFESSIONAL WORK EXPERIENCE | SCOTT CARVER PTY LTD, SYDNEY
ACADEMIC PROJECTS MASTERS IN ARCHITECTURE, UNSW BACHELOR IN ARCHITECTURE | SPA | INDIA
MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)
Potential Sites
PROJECT Housing in Sydney has illustrated the dilemma of density and the need for creating pleasant places to live in. Within the sector of housing for students, there has been a lack of individual residential living facilities for the students who just arrived in Sydney and wish to cope up to the new urban setting. 60% of the worldâ&#x20AC;&#x2122;s population is expected to be living in cities by 2030. In particular, as Australia is a country of migrants, 54% among them are international students, with the preference of living around universities within the cities. - Any potential site around universities within the radius of 8 min bike rides could be an option for the project.
8 MINS
-The idea is to have this type of housing as model for future opportunities and demands
8 MINS
-The particular site I have chosen to test the proposal is 279 Gardeners Rd, Eastlakes NSW. 8mins bike ride from UNSW.
ISSUES -Scarcity of urban land -Preference for urban living
ew 4
UP UP
12m
20m
UP
Ground Floor Plan
1:250 @ A3
Communal Green Space
Entry/ Vehicular-Pedestrian Circulation 0
5
10
Title Drawing. No.
AD-102
Landscape Planing
Ground Floor Plan
1:250 @ A3
Title Drawing. No.
0
5
AD-102
10
Ground Floor Plan
1:250 @ A3
Title Drawing. No.
0
5
10
AD-102
N PM 12:00
20m UP
ER
M
M
SU
12m
E
W
R
TE
IN
W
S
Aligning Podium to Current Street Scale
Building Separation Creates Courtyard
North South Oriented Block Ground Floor Plan
1:250 @ A3
Title Drawing. No.
0
3D View 4
5
10
AD-102
MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)
First Floor Plan
Second Floor Plan
CLUSTER PLAN - North facing apartments - Screening for the external stair ensures the privacy of the stair facing apartments - Planter on the full glazed sides - Individual and group study areas in communal areas and on the roof under fly roof - Communal functions on the ground extends to the courtyard
Roof Plan
T H E S I S
3
2
Section 21 1 : 50
AD-111
1
Type C 1 : 50
3
3
AD-111
AD-111
Mezzanine 1 FFL 2.550
Ground Fl. FFL 0.300
2
TYPE C 1 : 50 Type C
1:100 @ A3
Title Drawing. No.
0
4
8
0
1
2
3
4
5m
AD-111
ARCHITECTURAL
P L A N T E R
MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)
TYPE PLAN
Extended views through the glazing from the bedding areas on mezzanine.
- Cross ventilated - Common areas on the ground, private areas on the mezzanine. - Private areas stagger with the corridor in section. - Extended views through the glazing from the bedding areas on mezzanine. - The lowest internal area is 22.4 sqm; the highest is 40 sqm with a footprint of 24.47 sqm - Total apartment number: 59 - Accessible unit number: 11 - Car park number: 12 (in BaSement) - Bike parking number: 60 on ground
LANDSCAPE
T Y P E
P L A N T E R
P L A N T E R
Type A
2
1 : 50
TYPE A - M
TYPE A
3
1 : 50
1 : 50
6
Section 20 1 : 50
First Fl.
Fl.
FFL 4.800
4.800
Mezzanine 1
zanine 1
FFL 2.550
2.550
Social Dimension
Ground Fl.
nd Fl.
A
FFL Road0.300 Lvl
d0.300 Lvl
Type A
1
TYPE A - M
2
1 : 50
4
1 : 50
Occupancy : Single
-
Area: 16.64+6.2= 23 sqm
-
FFL 0.000
0.000
-
Section 18
3
1 : 50
Planter SIte Plan = 2 sqm FFL 0.000
TYPE A
Type A
1 : 50
Title Drawing. No.
AD-109
T Y P E
P L A N T E R
P L A N T E R
P L A N T E R
P L A N T E R
First Fl. FFL 4.800
First Fl. FFL 4.800
Mezzanine 1 FFL 2.550
Mezzanine 1 FFL 2.550
B
3
Ground Fl. FFL 0.300
Ground Fl.
1
1
Type B
Type B 1 : 50
2
1 : 50
T Y P E
P L A N T E R
-
Occupancy : Couple
-
Area: 20.48+9= 30 sqm
-
Planter = 2 sqm
Type A Title
AD-110
TYPE B - M
2
TYPE B - M
FFL 0.300
1 : 50
AD-109
TYPE B
3
TYPE B
3
1 : 50
Drawing. No.
1 : 50
1 : 50
P L A N T E R
T H E S I S
3
AD-110
Social Dimension
Mezzanine 1 FFL 2.550
Type B
C Ground Fl.
1 P L A N T E R
1 : 50
T Y P E
3
AD-111
3
AD-112
1
Type C
3
1 : 50
Section 21
Title Drawing. No.
AD-110
2
1 : 50
AD-110
-
Occupancy : Couple
-
Area: 22.4sqm
-
Planter = 2 sqm
TYPE C 1 : 50
P L A N T E R
First Fl. P L A N T E R
P L A N T E R
FFL 4.800
3
AD-111
Mezzanine 1 FFL 2.550
3
First Fl.
Mezzanine 1
AD-112
FFL 4.800
FFL 2.550
2
TYPE C 1 : 50
1 : 50
2
3
4
5m
FFL 2.550
Social Dimension
TYPE D - M
1:100 @ A3
1 : 50
-
TYPE D Type C 3Occupancy : Couple + 1 Child 1 : 50 Title
Drawing. No.
0
Type D
1
Mezzanine 1
Ground Fl. FFL 0.300
2
1
Title Drawing. No.
0
D
Type C
1:100 @ A3
Ground Fl. FFL 0.300
Type D 1 : 50
Title Drawing. No.
FFL 0.300
Type C
Type B
Social Dimension
2
1
2
3
TYPE D - M 1 : 50
4
5m
AD-111
-
Area:Ground 22.69+12.737= 35.5 sqm Fl.
-
Planter = 2 sqm
FFL 0.300
3
TYPE D 1 : 50
AD-111
ARCHITECTURAL
1
1
MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)
4 A101
04.
2
3D View 2
03.
02. 3
3D View 2 Copy 1
As indicated @ A2 0
1
2
3
4
3
Unnamed 2 Section
CONSTRUCTION 5m
1 : 25
Prefabricated Press Box Construction System Delivers a 30% savings. Installation can be accomplished in a nominal time
Better option compared to on-site construction in terms of, - Weather delays, - Security, - Theft of materials, - Delivery costs, and - Most importantly labour costs.
As indicate 0
01.
- -
3D View 2 Copy 1
1
2
3
Frame Structure of Steel Column 150x75mm and I-beam 150x75mm 100x100 Steel T-Beam 1500 c/c 100x50 mm Timber Joist 500 c/c 100x50 mm Timber Joist 500 c/c with 100mm Fibre Glass Insulation 10mm Acoustic Matt Acoustic under Lying 5mm Carpet
10mm External Cladding 8mm Adhesive To Cladding 2mm Water Resistant Sheet 5mm Fibre Cement Sheet 75mm Stud Framing with Fibre Glass Insulation
08
07
06
05
01
02
03
04
ARCHITECTURAL
T H E S I S
5mm Fibre Cement Sheet 2 Layers of 10mm Plaster board
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
People, Power and Bureaucracy National Secretariat Complex, Sher-e-Bangla Nagar,Dhaka INTRODUCTION In contemporary usage, the term ‘Democracy’ refers to a government chosen by the people. The constitution protects the rights of citizens, maintains order, and limits the power of bureaucracy. So the actual power in democracy lies with the people. As stated by Abraham Lincoln, ‘The government – of the people, by the people, for the people’- cultivates a critical relationship between Bureaucracy and democracy using people as the connecting medium. The architectural vocabulary of government buildings are such that it denotes a physical expression of man’s relationship to the bureaucracy. The democratic debates in such environments are activities fostered thus by the architectural design of the space. The democratic imperative, defined as citizens, have the right to participate in political decisions that affect their daily live. Citizens have created some of the most highly respected, resonant and realized statuses in the form of bureaucrats. This in turn has given position and authority to such eminent buildings in the world of architecture. The supreme governing institutes like parliament building, secretariat, courts etc. act as a constant reminder of the aspirations of nations and their values. But unfortunately, people have been kept out of these govt. buildings due to privacy and security issues of late. Through my thesis, I intend to introduce public and cultural amity to such kind of buildings, maximize public participation, and yet take care of the security concerns. The project is the secretariat complex of the master plan done by Louis I Kahn in Sher-e-Bangla Nagar, Dhaka, Bangladesh. Since the master plan has been already dishonoured by govt., there is a need of a design which sits in harmony with the assembly complex and reunites the master plan. This project is an attempt to develop an architectural design that symbolizes democracy against bureaucracy, is deeply rooted in its context and symbolizes the power entrusted with the citizens.
HYPOTHESIS
The thesis is intended to achieve an architectural expression that symbolizes democracy as well as pays heed to a master piece of architecture in closer context.
• Primary Issue: -Philosophy Of Louis I. Kahn • Secondary Issue: -Architecture as an expression of political power -Symbolism in architecture and the role of architecture in the image of the city -Architecture and Democracy -Sustainable Architecture • Tertiary Issues: -Bangladeshi Vernacular Architecture
CASE STUDIES • Palace of Assembly, Chandigarh, India • Assembly complex for Chennai, TN, India • Paliament of Australia • Natonal Secretariat, Thimpu, Bhutan
PROJECT National Secretariat of the People’s Republic of Bangladesh. Client : The project is owned by Government of Bangladesh. Related Ministry: Ministry of Housing & Public Works Total Site Area: 45.46 acres (1,84,654 sq.m.) Site Location: Sher-E- Banglanagar, Dhaka, Bangladesh. Bye-laws Ground Coverage: 50% max Height Restrictions: 35m FAR: 1 bye-laws
ARCHITECTURAL
RESEARCH
T H E S I S
- To achieve an architectural vocabulary that symbolizes democracy by encouraging people’s participation in the democratic process. - To investigate the possibility of attaching a truly “public” image to the complex as opposed to the “closed” environment adopted in recent times. - Organization and the relation of the executive and the legislature. - To search for a design solution accepting the presence of a master piece in architectural history and paying heed to something significant in closer context.
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
OBJECTIVE
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
CONCEPT The basic conceptual framework is drawn on three levels: - Master plan level, - Site plan level and - Macro/module level
MASTER PLAN
SITE PLAN
MODULE PLAN 1
2
1
2
3
4
3
4
Square
Golden Rectangle
Square
Hierarchy: Servant and served spaces in primary level
Hierarchy: Servant and served spaces in secondary level
Linear controlled system
Ministry Organisation
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
FORM
T H E S I S
The whole design has been evolved on basis of two narratives. 1. The people 2. Bureaucracy. ‘Bureaucracy’ has been expressed through the order and the symmetry of the mass, and on contrary, ‘People’ by the asymmetry in design, showing the true power of people in democratic system to break the order of bureaucrats.
ARCHITECTURAL
CONCEPT NARRATIVE
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
View of Single Module
Master Plan
View of Court
View From Public Deck The Crown of Bureaucrats
Section
The Crown of People
South Elevation
Section YY
T H E S I S
North Elevation
Section AA
Section ZZ
ARCHITECTURAL
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
Site Plan
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
Strong seggregation of people and bureaucrats world
Grand Atrium
M O D U LE DETAILS
Spontaneous entry of people yet intact bureaucratsâ&#x20AC;&#x2122; world
Block A Block B Grand Atrium
T H E S I S
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
LIGHTING SYSTEM
ARCHITECTURAL
Typical Floor Plan
MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)
ADAPTIVE REUSE OF ROXY THEATRE Parramatta, Sydney
BOY YOU TURN ME INSIDE OUT , DIANA ROSS (1980) BOY YOU TURN ME INSIDE OUT , DIANA ROSS (1980)
E INSIDE OUT , DIANA ROSS (1980)
Street Pattern: George Street, Parramatta Street Pattern: George Street, Parramatta
Plan:
N ME INSIDE OUT , DIANA ROSS (1980)
amatta
plified
en simplified
Section: Compact Organization Plan: Compact Organization and and Section: Compact Organization Compact Organization Porus organization Porus organization and and Porus organization Porus organization
Pattern of settlement has been simplified Pattern of settlement has been simplified
Plan:
Plan:
Section: Compact Organization and Porus organization
Compact Organization and Porus organization
Compact Organization and Porus organization
Public Roof Terrace
Section: Compact Organization and Porus organization
The heights of OLD and NEW
Site Plan
Day Night Functions
Scale 1:1000
Site Plan
The low sun enters the spaces designed for the day functions from From the plinth level, esThe roof of the volumes are Day Night Functions The heights of OLD and NEW Public Roof Terrace calators lead directly to lowered so only the Roxy Towsides and roof The low sun enters the spaces designed for the day functions from From the plinth level, esThe roof of the volumes are the roof terraces. From er is the highest one calators lead directly to lowered so only the Roxy Towsides and roof their people can enjoy the the roof terraces. From er is the highest one panorama of Parramatta. their people can enjoy the panorama of Parramatta.
Scale 1:1000
Site Plan
ghts of OLD and NEW
roof of the volumes are d so only the Roxy Tower is the he heights of highest OLD and one NEW
Scale 1:1000
Day Night Functions The low sun enters the spaces designed for the day functions from sides and roof Day Night Functions
Site Plan Scale 1:1000
The low sun enters the spaces designed for the day functions from The roof of the volumes are Courtyards and Light wells Old and New Skyline owered so only the Roxy Towsides andskyline roof had been influenced by the The new The distance between the blocks allows natural daylight to enter Courtyards and Light wells Old highest and New er is the oneSkyline old skyline. the intermediate spaces below. The new skyline had been influenced by the The distance between the blocks allows natural daylight to enter old skyline. the intermediate spaces below.
Courtyards and Light wells The distance between blocks allows natural daylight to enter andthe Light wells Courtyards the intermediate spaces below.
luenced by the
d by the
The distance between the blocks allows natural daylight to enter the intermediate spaces below.
Old and New
1
North Elevation
1
ROXY ROXY
1 2 3 4 Anupama Saha, 3447032
y and the Built Masses ined as old heritage.
A Background to CELEBRATE the Old
North Elevation Scale 1:100
A Background to CELEBRATE the Old
Scale 1:100
Scale 1:100
1 2 3 4 Anupama Saha, 3447032
ry lobby and the Built Masses e retained as old heritage.
447032
North Elevation
The old stairs in the main entry lobby and the Built Masses A Background to CELEBRATE the Old around the lobby front courtyard areMasses retained as old heritage. The old stairs in the main entry and the Built A Background to CELEBRATE the Old around the front courtyard are retained as old heritage.
Old and New
ROXY
North Elevation Scale 1:100
Third Floor Plan
Section BB’
Scale 1:200
Scale 1:200
Third Floor Plan Scale 1:200
Second Floor Plan Scale 1:200
Second Floor Plan Scale 1:200
First Floor Plan Scale 1:200
First Floor Plan Scale 1:200
Section BB’ Scale 1:200
MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)
ding)
t ng from
of the
Y
Key plan
Key plan
Section AAâ&#x20AC;&#x2122; Scale 1:100
Section AAâ&#x20AC;&#x2122; Scale 1:100
The Roxy Theatre (Existing Building) The Roxy Theatre (Existing Building)
- Entry: Symmetrical and celebrated - Historic facade-facing Street Entry: George Symmetrical and celebrated - Blank facade separating the building from - Historic facade facing George Street the active street- life Blank facade separating the building from - Levels and multi height main hall - Solid walls hiding the active zone of the - To make the old and historic stand main out hall the active street life - Levels and multi height premise - To turn it inside-out - Solid walls hiding the active zone of the - To make the old and historic stand out premise
- To turn it inside-out
- Various level of intimacy - Private intimate well as united - Variousspaces level of as intimacy unique space - Private intimate spaces as well as united - Tidy up the overall massing unique space - Tidy up the overall massing
Design Development
Design Development
ROXY ROXY
- Levels and multi height main hall - To make the old and historic stand out - To turn it inside-out
- Various level of intimacy - Private intimate spaces as well as united unique space - Tidy up the overall massing
Anupama Saha, 3447032 Anupama Saha, 3447032
4
11 2 23 3 4 4
Anupama Saha, 344703
First Floor Plan Scale 1:200
Plinth Floor Plan
Anupama Saha, 3447032
R O X Y
2
1 2 3 4
T H E A T R E
Scale 1:200
MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)
HOUSE DESIGN
Parramatta, Design Brief
Sydney
Site: Minto, Sydney Area: 30m X 17.5m Climate: Mild Temperate Client: First home buyer To develop a SYSTEM (for the users to design their OWN HOUSE) of structure, space design, shading and ventilation, orientatio and privacy in affordable range. Creates, - An integrated/ intimate house ambience - Distinct/ non- identical formal expression for each different house
Design Brief
Design Brief Site: Minto, Sydney
30m X 17.5m Site: Minto, Sydney Area: Climate: Mild Temperate Area: 30m X 17.5m Client: First home buyer Climate: Mild Temperate To develop a SYSTEM (for the users to design their OWN HOUSE) of structure, space design, shading and ventilation, orientatio and privacy in affordable range. Creates, Client: First home buyer - An integrated/ intimate house ambience - Distinct/ non- identical formal expression for each different house
N
House That Grows
Scale: 1:100
Site Plan Scale: 1:100
N
Anupama Saha | z3447032
H O U S E
Site Plan
D E S I G N
To develop a SYSTEM (for the users to design their OWN HOUSE) of structure, space design, shading and ventilation, orientatio and privacy in affordable range. Creates, - An integrated/ intimate house ambience - Distinct/ non- identical formal expression for each different house
House That Gro
FOUR BEDROOM UNIT
TWO BEDROOM UNIT
PROGRAM
GRID
BEDROOM LIVING KITCHEN + DINING BATHROOM PARKING
3X3 3X4 3X4 2X1
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 3
1 1 1 1
14 20 20 3 57
PROGRAM
GRID
BEDROOM LIVING KITCHEN DINING BATHROOM PARKING
3X3 3X4 3X4 3X4 2X1
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3
2 1 1 1 1
28 20 20 20 3 91
PROGRAM
GRID
BEDROOM LIVING KITCHEN DINING BATHROOM LAUNDRY+ LOUNGE PARKING
3X3 3X4 3X4 3X4 2X1 3X4
Flexibility & Adaptability
Two studios could be rented keeping the integrity of the mother home
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3 20
4 1 1 1 2 1
56 20 20 20 6 20 142
TWO BEDROOM UNIT PROGRAM
GRID
BEDROOM LIVING KITCHEN DINING BATHROOM PARKING
3X3 3X4 3X4 3X4 2X1
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3
2 1 1 1 1
28 20 20 20 3 91
FOUR BEDROOM UNIT PROGRAM
GRID
BEDROOM LIVING KITCHEN DINING BATHROOM LAUNDRY+ LOUNGE PARKING
3X3 3X4 3X4 3X4 2X1 3X4
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3 20
4 1 1 1 2 1
56 20 20 20 6 20 142
FOUR BEDROOM UNIT PROGRAM
GRID
BEDROOM LIVING KITCHEN DINING BATHROOM LAUNDRY+ LOUNGE PARKING
3X3 3X4 3X4 3X4 2X1 3X4
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3 20
4 1 1 1 2 1
56 20 20 20 6 20 142
A
D
C
B
A
C
Orientation and Natural Ventilation
B
Pergola with vertical screen to protect the low angel sun
D
MASTERS IN ARCHITECTURE | UNIVERSITY OF NEW SOUTH WALES (UNSW)
ONE BEDROOM UNIT
Key Plan
Section CC
Section AA
Section BB
Section DD
Anupama Saha | z3447032
N North NorthElevation Elevation Scale Scale1:100 1:100
South SouthElevation Elevation Scale Scale1:100 1:100 75MM 75MM X 150 X 150 MM MM WOODEN WOODEN BEAM BEAM 30MM THICK CORRUGATED 30MM THICK CORRUGATED IRON SHEET IRON SHEET 35MM X 130 MM STEEL 'C''C' BEAM 35MM X 130 MM STEEL BEAM
2° 2° SLOPE SLOPE
80MM 80MM X 80 X 80 MM MM STEEL STEEL BOX BOX SECTION SECTION
FIBRE CEMENT BOARD FIBRE CEMENT BOARD SEALANT SEALANT
15MM FIBRE CEMENT BOARD 15MM FIBRE CEMENT BOARD
METAL GUTTER METAL GUTTER
50MM THICK INSULATION 50MM THICK INSULATION
BOX SECTION BOX SECTION
80MM X 35MM BATTENS 80MM X 35MMWOODEN WOODEN BATTENS C/C 500 MM C/C 500 MM 15MM FIBRE CEMENT BOARD 15MM FIBRE CEMENT BOARD
West WestElevation Elevation Scale Scale1:100 1:100
WOODEN FLOORING WOODEN FLOORING WOODEN FRAME WOODEN FRAME NEAT CEMENT FINISH NEAT CEMENT FINISH 80MM X 80 MM STEEL BOX SECTION 80MM X 80 MM STEEL BOX SECTION SEALANT SEALANT MM CEMENT RENDERING 1515 MM CEMENT RENDERING 150 MM THICK CONCRETE PLINTH 150 MM THICK CONCRETE PLINTH
External ExternalWall WallDetail Detail Scale Scale1:20 1:20
Gutter GutterDetail Detail Scale Scale1:20 1:20
East EastElevation Elevation Scale Scale1:100 1:100
Anupama AnupamaSaha Saha| z3447032 | z3447032
North Elevation Scale 1:100
Scale 1:100 2° SLOPE
80MM X 80 MM STEEL BOX SECTION
FIBRE CEMENT BOARD SEALANT
15MM FIBRE CEMENT BOARD
METAL GUTTER
50MM THICK INSULATION
BOX SECTION
80MM X 35MM WOODEN BATTENS C/C 500 MM 15MM FIBRE CEMENT BOARD
West Elevation Scale 1:100
WOODEN FLOORING WOODEN FRAME NEAT CEMENT FINISH 80MM X 80 MM STEEL BOX SECTION SEALANT 15 MM CEMENT RENDERING 150 MM THICK CONCRETE PLINTH
External Wall Detail
East Elevation
Gutter Detail
Scale 1:20
Scale 1:100
Scale 1:20 ONE BEDROOM UNIT PROGRAM
GRID
BEDROOM LIVING KITCHEN + DINING BATHROOM PARKING
3X3 3X4 3X4 2X1
Anupama Saha | z3447032
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 3
1 1 1 1
D E S I G N
South Elevation 75MM X 150 MM WOODEN BEAM 30MM THICK CORRUGATED IRON SHEET 35MM X 130 MM STEEL 'C' BEAM
14 20 20 3 57
PROGRAM
GRID
BEDROOM LIVING KITCHEN + DINING BATHROOM PARKING
3X3 3X4 3X4 2X1
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 3
1 1 1 1
14 20 20 3
14 20 20 3
1 1 1 1
14 20 20 3 57
PROGRAM BEDROOM LIVING KITCHEN DINING BATHROOM PARKING
Adaptability
Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3
2 1 1 1 1
28 20 20 20 3 91
3X3 3X4 3X4 3X4 2X1
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3
2 1 1 1 1
ONE BEDROOM UNIT
PROGRAM
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)
3X3 3X4 3X4 3X4 2X1
14 20 20 20 3
2 1 1 1 1
PROGRAM
28 20 20 20 3
BEDROOM LIVING KITCHEN + DINING BATHROOM
PROGRAM
GRID PARKING
BEDROOM LIVING KITCHEN DINING BATHROOM LAUNDRY+ LOUNGE PARKING
3X3 3X4 3X4 3X4 TWO BEDROOM UNIT 2X1 3 PROGRAM X4
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)
3X3 3X4 3X4 2X1
14 20 20 3
1 1 1 1
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3 20
4 1 1 1 2 AREA (Sq. 1 M)
14 20 20 3 57
56 20 20 20 6 20(Sq.M) TOTAL AREA
Flexibility & Adaptability BEDROOM
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)PROGRAM
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)
3X3 3X4 3X4 3X4 2X1 3X4
14 20 20 3
1 1 1 1
14 20 20 20 3 20
4 14 1 20 1 20 13 2 57 1
GRID 3X3
14
NUMBER 2
28
PROGRAM
GRID
BEDROOM LIVING KITCHEN DINING BATHROOM PARKING
3X3 3X4 3X4 3X4 2X1
PROGRAM
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3
2 1 1 1 1
28 20 20 20 3 91
ONE BEDROOM UNIT PROGRAM
GRID
BEDROOM 3X3 LIVING 3X4 FOUR +BEDROOM KITCHEN DINING UNIT 3X4 BATHROOM 2X1 PROGRAM GRID PARKING
56BEDROOM LIVING 20KITCHEN 20DINING 20BATHROOM 6PARKING ONE BEDROOM UNIT 20 142
TWO BEDROOM UNIT GRID
GRID 3X3 3X4 3X4 2X1
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 1 14 20 1 20 20 1 20 3 1 3 AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)
GRID 3X3 3X4 3X4 3X4 2X1
14 20 20 3
1 1 1 1
14 20 20 3
Two studios could be rented keeping the integrity of the mother home
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3
2 1 1 1 1
28 20 20 20 3
91
GRID
BEDROOM 3X3 LIVING 3X4 FOUR BEDROOM UNIT KITCHEN + DINING 3X4 BATHROOM 2X1 PROGRAM GRID PARKING BEDROOM LIVING KITCHEN DINING BATHROOM LAUNDRY+ LOUNGE TWO BEDROOM UNIT PARKING
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)
57
TWO BEDROOM UNIT
GRID GRID
BEDROOM BEDROOM 3X3 LIVING LIVING 3X4 KITCHEN KITCHEN + DINING 3X4 DINING BATHROOM 2X1 PARKING BATHROOM LAUNDRY+ LOUNGE PARKING
91
PROGRAM
BEDROOM LIVING
91KITCHEN + DINING
FOUR BEDROOM UNIT
GRID
28 20ONE BEDROOM UNIT 20 20PROGRAM 3 BATHROOM PARKING
ONE BEDROOM UNIT
FOUR BEDROOM UNIT
GRID
BEDROOM LIVING KITCHEN DINING BATHROOM PARKING
57
TWO BEDROOM UNIT
Sq. M) NUMBER TOTAL AREA (Sq.M)
PROGRAM
3X3 3X4 3X4 3X4 2X1 3X4
PROGRAM
GRID
BEDROOM LIVING KITCHEN DINING BATHROOM PARKING
3X3 3X4 3X4 3X4 2X1
AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)
14 1 14 20 1 20 20 1 20 3 1 3 AREA (Sq. M) NUMBER TOTAL AREA (Sq.M) 14 20 20 20 3 20
4 1 1 1 2 1
57 56 20 20 20 6 20
142 AREA (Sq. M) NUMBER TOTAL AREA (Sq.M)
14 20 20 20 3
2 1 1 1 1
28 20 20 20 3
Two studios could be rented keeping the integrity of the mother home
H O U S E
TWO BEDROOM UNIT
ONE BEDROOM UNIT
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
Aerocity Delhi
City Centre of The Future
Y E A R
F I V E : U R B A N
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
• Consideration of edge situation: Green open space and towers of lower height being located towards the edge of the site • Main plaza being located on the road from the metro accentuating the pedestrian axis • Separate entry/ exit for the non-residential functions ensure uninterrupted residential central zone • The highest towers being juxtaposed to the green lawn offers the interactive view to maximum flats • Continuity of green open spaces
CONTEXTUAL RESPONSE AND EDGE RESPECT Entry for EWS block
Entry for community centre and Banquet hall Service entry
Separate entry to the nursing home
Main entry to the complex
Individual entry to `the school Metro station
Connectivity of open green space Entry & Exit to the site Axis maintained from the metro station to main entrance plaza
• CONTINUITY OF GREEN OPEN SPACES • CONSIDERATION OF EDGE SITUATION •GREEN OPEN SPACE OR LOWER HEIGHT TOWERS ARE LOCATED TOWARDS THE EDGE OF THE SITE • THE PLAZA IS BEING LOCATED ON THE ROAD FROM THE METRO AECCENTUATING THE PEDESTRIAN AXIS
GREEN OPEN SPACE
ROAD
YEAR FOUR : HOUSING
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
SITE: ZONNING
COMMUNITY CENTRE: Located just next to the plot where Noida City Centre is proposed
MAIN RESIDENTIAL BLOCKS: Located around the inclusive green open the inclusive green open space undisturbed by vehicular traffic
NOIDA CITY CENTRE COMMUNITY CENTRE
EWS: located aside with their own green open space and separate entry/ exit. p y
NURSING HOME: Located such that such that •Located makes it easily accessible from other adjoining residential plot and vehicular road. • It is isolated by virtue of its location from the main residential area of the complex the complex
SCHOOL: The school is strategically proposed to blend in with the housing but at the same time maintaining its own its own integrity RESIDENTIAL GREEN NURSING HOME NURSING HOME EWS SCHOOL COMMERCIAL
•Peripheral vehicular road makes all the cores accessible •Central pedestrian zone
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
YEAR FOUR : HOUSING
-Each and every spaces are naturally ventilated -Cross ventilation to all the bed rooms -Window protection for sun and rain water -Minimum circulation space -Undivided spaces of dining and living provide large party spaces
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
-To not disturb the pedestrian membrane but take them in a pleasurable journey through the site, thus create connection between the other buildings around the site -Built space around the interactive open space -Individual interacting spaces as well as public meeting place. -Sustainable and suitable for climatic condition of Delhi
YEAR THREE : P U B L I C BUILDING
BACHELOR IN ARCHITECTURE | SCHOOL OF PLANNING AND ARCHITECTURE
Thanks for taking time to go through my journey of Architecture