CASE STUDY (SELECT CITYWALK- SAKET)
T H E S I S TO P I C U R B A N E N T E R TA I N M E N T C E N T R E
PRESENTED BY –
SUMIT KUMAR JHA BARCH/15006/14
Bachelor's of Architecture
Birla institute of technology, Mesra
I N T RO D U C T I O N Select CITYWALK is a 1.3 million sq. ft. air-conditioned, vibrant and upscale destination shopping centre. This is a part of an overall complex of 54 acres that comprises of three floors of office space, India’s first SixScreen, two Gold Class and four Premier Class PVR Cinemas, and approx. 1 lakh sq. ft. of Serviced Apartments. It is centrepiece of 54-acre, well planned business district. It is an interesting hybrid of a European high street and an enclosed shopping mall, with a 240m facade overlooking a 100,000 square foot of outdoor plaza and 4-acre landscaped park.
SELECT CITY WA L K , S A K E T, DELHI LOCATION - Saket District Centre, South Delhi ARCHITECTS- TEVATIA CHAUHAN & SHARMA ARCHITECTS (P) LTD. COMPLETED in 2007 . CLIENT – SELECT INFRASTRUCTURE. . VEGETATION – SHRUB COVER + TROPICAL TREES (>10m) TOPOGRAPHY – 45m ASL / No contours. CLIMATE – HOT AND HUMID / 45deg – 12deg / ppt154cm Site Area: 6 Acres SELECT CITY WALK is mix-use development, at district centre, Saket.
OBJECTIVE OF THE CASE S T U DY To understand the services used in a shopping mall. To understand the planning and zoning of the shopping mall. To understand how a shopping mall attracts more peoples.
To understand the minimum facilities requirement of a shopping mall.
SURROUNDING LAND USE •The surroundings to Saket District Centre is mostly residential, some of commercial, green spaces, and public area. RESIDENTIAL PUBLIC/ SEMI-PUBLIC COMMERCIAL RECREA TIONAL
Source: MPD 2021
ACCESSIBILITY AND ENTRANCES
LEGEND ENTRY /EXIT ROAD CONFLICT AREA TRAFFIC MOVEMENT SELECT CITY MALL MGF MALL DLF MALL GREEN AREA SOUTHERN PARK MALL
AC C E S S I B I LT Y Bust stop- Khirki Village, 100m
30m wide road in front, MANDIR MARG
Malviya nagar metro station – l km
• It is easily accessible through PUBLIC TRANSPORT i.e. DTC buses, Metro rail, Auto rickshaws, and through private vehicles.
IGI airport-15.6 km
• There is problem in crossing of road as no Pedestrian facility like FOB, Subway is provided nearby to it. So, number of modal conflicts are more.
MGF metropolitan mall-100 m
DLF place mall-200 m
Qutub minar-3.7 km
GATHERING SPACES INSIDE THE BUILDING.
ARCHITECT’S OBJECTIVE AND CONCEPT OF DESIGN. PLANNING CONCEPT Select citywalk is spread over 6 acres and includes a multiplex, serviced apartments, offices and public spaces. The planning of the select citywalk mall is divided into 4 categorization1. Family & tradition space 2. Celebration (centre-sage) 3. High-voltage (youth) 4. Open plaza/ Landscaped area (ground floor)
High-voltage (youth) Celebration (centre-sage) Family & tradition space
BUT, the actual planning is different from concept planning. Open plaza
STYLE OF ARCHITECTURE, AESTHETIC QUALITY / VISUAL IMPACT.
ELEMENTS REMINISCENT OF VERNACULAR ARCHITECTURE LIKE THE FREE-STANDING WALLS OF JANTAR- MANTAR,
FOUNTAIN PLAYS A VERY IMPORTANT ROLE IN CATCHING THE EYES OF THE SHOPPERS TO STOP BY IT AND SPEND SOME TIME AROUND IT.
HALF DOME SHAPED STRUCTURE CATHCHES THE ATTRACTION OF VISITORS, WHICH IS VISIBLE FROM THE ROAD.
AT THE UPPER LEVEL ON THE FRONT FACADE, SPACE HAS BEEN PROVIDED FOR ADVERTISEMENTS WHICH ARE VISIBLE FROM A DISTANCE GOVERNING THE EXTERNAL ELEVATION.
DIFFERENT FLOOR PLAN AND FACILITIES GROUND FLOOR PLAN - 11378.81 SQM 4 LIFT LOBBY 2 WASHROOMS I FEEDING & RESTING ROOM 3 ESCALATORS
ATRIUM AT ENTRANCE
Family & tradition Youth
Celebration, centre stage Lift lobby Corridor Balcony
4 DIFFERENT ENTRANCES AT FRONT SIDE. THE PLAZA I ENTRY FROM REAR SIDE 6 STAIRCASES
FIRST FLOOR PLAN - 12816.043 SQ.M
4 LIFT LOBBY 2 WASHROOMS 3 ESCALATORS 6 STAIRCASES
Family & tradition Youth
Celebration, centre stage Lift lobby Corridor Balcony
SECOND FLOOR PLAN - 6568.06 SQ.M
4 LIFT LOBBY 2 WASHROOMS 3 ESCALATORS 6 STAIRCASES EXIT OF CINEMA FROM 2ND FLOOR.
Family & tradition Youth
Celebration, centre stage Lift lobby Corridor Balcony
SPACE ORGANISATION SITE PLAN AND ITS ORGANIZATION • Organization of spaces in a linear fashion along the 20 m wide corridor • Linear organization. • L shaped planning with a public plaza in front which compliment each other
AREA PROGRAM BUILT SPACE : OPEN SPACE Site Area: 6 Acres
It is centrepiece of 54-acre, well planned business district.
OPEN SPACE 35%
Basements =41578.5(3 levels)+6075(3 levels) =47653.5 sq.M Ground floor =9622.345+ 1756.46(multiplex) =11378.81
BUILT SPACE 65%
sqm First floor =10803.323+2012.72 (multiplex) =12816.043
Built-up space/ open space activities ratio = 6 acres/ 2 acres= 3:1
sq.M Second floor =6568.06 sq.M
SPACES RATIO
Third floor =2921.226 sqm Fourth floor =2776.216 sqm Fifth floor =2467.621 sqm
RECREATIOAL SERIVICES SPACE 4% 9% MULTIPLEX 9%
Sixth floor =2268.241 sqm Seventh floor =1948.80 sqm Foyer level area in multiplex= 825.29 sq.M
HOTEL 11%
RETAIL 56%
Total without basements =43970.307 sqm Total with basements =91623.807 sqm
OFFICE 11%
CIRCULATION OUTSIDE THE BUILDINGS • The pedestrian traffic and the vehicular traffic is segregated. • 5m wide, pedestrian along with building
30 m wide road Pedestrian along building Common open space 150 x 130 20 m wide service lane
• Interconnecte d ,vehicular road, within complex Connecting various zone,
30m wide road
Vehicular Circulation
Service Lane Circulation
Plan showing circulation in complex
Pedestrian circulation
MATERIALS FOR CONSTRUCTION Concrete is used for dome and Brickwall is used for straight walls.
SPECIFICA TIONS 1. Type of the Construction : RCC Frame structure 2. External Finish Cladding : Granite, Texture paint, Composite metal 3. Internal Wall Finish : Plaster with desired paint finish, ceramic tiles for the toilet. 4. Flooring : Marble, Granite Slabs,Vitrified Tiles 5. Doors : Shutters of ply with TW frames and fire proof door wherever required. 6. Windows : Aluminium Sections 7. Electrification : Adequate provision for electric outlet, TV and Telephone Points.
MATERIALS FOR CONSTRUCTION TENSILE MEMBRANE Used at • Atrium roof • Corridor shed • Amphitheatre stage • Sitting space • At terrace Corridor shed
Atrium roof Sitting space
Amphitheatre stage
PARKING Parking provided at front for people visiting in mall,
Type of parking provided in complex • Surface parking • Basement parking Ramp
Pedestrian entry
Surface parking
Parking provided for office, Width of ramp 2.5m Slope of ramp -1:10 Size of bay provided on surface 5x2.5m
Plan showing parking in complex Vehicular Circulation
Service Lane Circulation
Pedestrian circulation
each building is provided with its own parking in order to reduce the chaos in complex .
• Saket district can take the load of traffic but its surrounding area, are not. • Complex don't have adequate parking for two wheeler.,
PARKING •
1200 cars can be parked in 3 different floors of basement at one time.
•
Basement 1- Offices, Parking for 370 cars, Loading & unloading area, Garbage disposal area
•
Basement 2- Parking 470 cars
•
Basement 3- Parking 270 cars
•
Basement height- 3.5m
•
Grid 6x6m
•
BASEMENTS = 41578.5 sq.m (3 LVLS)
•
There were two separate entries which were connecting to the parking, from ground floor.
•
One was used for general entry of cars & The other was used by service vehicles.
Parking to mall entry Basement parking
Ramp within basement, connecting one floor of basement to another. 7m wide driveway
Before entering to the mall from basement, security barrier has to be crossed over
BASEMENT •
There were 4 lifts which were connecting basement to upper floors.
•
Toilets and locker rooms Provided for the drivers.
•
Signage are clearly marked in the basement.
•
Throughout the basement, fire fighting equipment 's like sprinklers, Fire hose reel, Fire extinguishers were present Basements are used for car parking
•
Well outlined loading-unloading areas in the basements are provided.
•
Car wash facility is given in basement.
Electronic Boards
BASEMENT SERVICES •
It includes
•
Fire fighting equipment's
•
Loading & unloading area
•
Garbage Collection area
•
HVAC Equipment
•
The waste from restaurants was collected in basement, through shaft.
•
There were 3 separate areas, which were dividing the waste into different categories.
•
After separation, waste is dispose of through garbage trucks.
Service lift, connecting basement to upper floors of mall
Sprinklers were provided all over the basement
Air Extractors in basement. Staff collecting garbage from shaft
LANDSCAPE • Comprises of 4 acres of outdoor open plaza, for art exhibitions & performances. • Landscaped plaza of 8992 sq. meters. • An OAT, with a capacity of 200+ people. • Statues & Sculptures were placed all around the landscaping. • Flooring: Marble, Granite Slabs, Vitrified Tiles . • Sitting spaces is created all over the landscaped area. • Fountains
LANDSCAPING
• • •
More use of pots for plants. And are placed in almost all the floors to be energyefficient building. Terrace garden is being used as outooor seating for the cafe situated on the second floor. Mainly stone wooden, and aluminum furniture is used.
PUBLIC PLAZA PLAN
• •
Public plaza Seating spaces created all around the open spaces • A frontage of over 250m overlooking a public plaza with pedestrian outside the mall pathways extending into 4 acres of green space. This plaza provides a pleasant and sitting for rest, • Special features – open air theatres, water bodies, fountain and relaxation . breathtaking landscaping.
SERVICES SERVICES • 2 entries and 5 fire exits are provided. • 3 level basement parking is provided. • The placement of the entry to the basement is such that it also acts as dropoff without hindering the entry to the basement.
Drainage inside corridor
Elevators
• 3 escalators are provided. • Service corridors are also provided at the rear side of citywalk. • A 20 m wide service lance is provided at the rear side which also acts as surface parking.
Dustbins and fire safety equipment
Signage in corridor
STORES • Area to stores were assigned as per their requirements. • Floor to floor height-4m • Stores equipped with fire fighting equipment's • Internal layouts varies individually. • Shops area ranges form 50 Sq.m- 1500sq.m
WASHROOM There were 2 washrooms present on each floor. Each washroom comprises of • 5 washbasins • 6 urinals
• 6 cubical • Hand dryer • Handicapped washroom Total Area- 5mx8m
MULTIPLEX •
THERE ARE 6 SCREENS.
•
2 OF THE 6, ARE GOLD CLASS.
•
OTHER 4 SCREENS ARE ABOVE THE GOLD CLASS SCREENS.
•
THE MAIN ENTRY IS THROUGH THE BRIDGE ON THE FIRST FLOOR WHICH CONNECTS MALL AND MULTIPLEX BUILDING.
•
THE GROUND FLOOR ENTRY CAN ALSO BE USED FOR GOLD CLASS ENTRY.
•
TICKETS FOR CINEMA CAN BE PURCHASED FROM GROUND FLOOR & FIRST FLOOR.
•
GOOD POINT IS TICKET COUNTOR IS JUST AT THE ENTRANCE OF THE MALL.
•
PARKING FOR CINEMA IS SAME AS FOR MALL.
GROUND FLOOR 2 GOLD CINEMAS
FIRST FLOOR GATHERING SPACE
SECOND FLOOR 4 CINEMAS
THANK YOU SUMIT JHA BACHELOR'S OF ARCHITECTURE
Birla institute of technology, Mesra, Patna campus