Lock 15 Learning and Pool Center Lock 15 is located in the small town of Sardis Ohio. I chose this lock because the lock and dam site is currently being used as a park giving me more creative freedom. For my learning center I wanted to have three elements: a pool in the river, an indoor learning center and outdoor classrooms. My design was driven by the curves of the river and the harsh angle of the boat launch on site.
Ann Karaskiewicz
Existing Site Plan
LOCK 15 LEARNING AND POOL CENTER l ANN KARASKIEWICZ PROJECT NAME | JANE SMITH
YOU ARE HERE: FORECASTS FOR THE OHIO RIVER
Existing Site photo of sign
Topography
Precedent Pool Image
Existing Site photo of river access Existing Site photo of road access
Built vs natural diagram Access diagram
Precedent Learning Center Precedent Outdoor Classroom
ARCH4002 BUILDING DESIGN STUDIO
TOPIC: AGING INFRASTRUCTURE
Master Plan Axon
LOCK 15 LEARNING AND POOL CENTER l ANN KARASKIEWICZ PROJECT NAME | JANE SMITH
YOU ARE HERE: FORECASTS FOR THE OHIO RIVER
Master Plan
ARCH4002 BUILDING DESIGN STUDIO
TOPIC: AGING INFRASTRUCTURE
LOCK 15 LEARNING AND POOL CENTER l ANN KARASKIEWICZ PROJECT NAME | JANE SMITH
Indoor Learning Center Floor Plan
YOU ARE HERE: FORECASTS FOR THE OHIO RIVER
Indoor Learning center Section Back of Learning Center Perspective
Front Entry of Learning Center Perspective
ARCH4002 BUILDING DESIGN STUDIO
TOPIC: AGING INFRASTRUCTURE
Pool and Pool House Floor Plan
PROJECT LOCK 15 LEARNING NAME | JANE AND SMITH POOL CENTER l ANN KARASKIEWICZ
YOU ARE HERE: FORECASTS FOR THE OHIO RIVER
Pool House Section Front of Pool House Perspective
ARCH4002 BUILDING DESIGN STUDIO
Top view Perspective Pool Deck Perspective
TOPIC: AGING INFRASTRUCTURE
LOCK 15 LEARNING AND POOL CENTER Topic: AGING INFRASTRUCTURE Ann Karaskiewicz Spring 2021