Mitchell Krock

Page 1

SHEET INDEX

G-001 - COVER SHEET

G-002 - PROJECT DETAILS

S-001 - STRUCTURAL DIAGRAMS

S-002 - COLUMN GRID

S-003 - STRUCTURAL MASSINGS

D-001 - DEMOLITION PLANS

A-001 - SITE PLAN

A-002 - DIAGRAMMATIC SECTION

A-003 - FIRST AREA PLAN

A-004 - SECOND AREA PLAN

A-005 - THIRD AREA PLAN

A-006 - FOURTH AREA PLAN

A-007 - FIFTH AREA PLAN

A-008 - SIXTH AREA PLAN

A-009 - SEVENTH AREA PLAN

A-101 - PARKING PLAN

A-102 - FIRST FLOOR LANDSCAPE PLAN

A-103 - UNIT A.1 PLAN

A-104 - UNIT A.2 PLAN

A-105 - UNIT B PLAN

A-201 - ELEVATIONS

A-301 - LONG SECTION

A-401 - PERSPECTIVES

A-402 - PERSPECTIVES

A-403 - PERSPECTIVES

BIG WOOD IS BIG GOOD

Last Day of Project 04/17/23

Last Day of DAAP 04/17/23

SYMBOL
COVER SHEET G-001

20 UNITS

6 CONDOMINIUMS & 14 APARTMENTS

24 PARKING SPACES

1.67 PER CONDO & 1 PER APARTMENT

BIG WOOD IS BIG GOOD UNNAMED PROJECT G-002 PROJECT DETAILS

Last Day of DAAP 04/17/23
Last Day of Project 04/17/23

STRUCTURAL DIAGRAMS

BIG WOOD IS BIG GOOD UNNAMED PROJECT

Last Day of DAAP 04/17/23 Last Day of Project 04/17/23
S-001
4 FLOORS - MASS TIMBER
1 1 MATERIAL SECTION EXPLODED STRUCTURE AXON NTS NTS
7 FLOORS - MASS TIMBER
1
FLOOR - CONCRETE

IS BIG GOOD UNNAMED PROJECT S-002

DAAP 04/17/23
A F G H I J A.1 F.1 G.1 H.1 I.1 B.1 C.1 D.1 B C D E 1 2 1.1 3 4 3.1 A F G H I J B C D E 1 2 3 4 2 1 CONCRETE COLUMN GRID WOOD COLUMN GRID NTS NTS
Last Day of
Last Day of Project 04/17/23 BIG WOOD
COLUMN GRIDS
Last Day of DAAP 04/17/23 Last Day of Project 04/17/23
UNNAMED
2 1 BASE MASSING SOLID MASSING NTS NTS
BIG WOOD IS BIG GOOD
PROJECT S-003 STRUCTURAL MASSING
Last Day of DAAP 04/17/23 Last Day of Project 04/17/23 BIG WOOD IS BIG GOOD UNNAMED PROJECT D-001 DEMO PLANS 1 DEMOLITION PLAN NTS
Last Day of DAAP 04/17/23
Day of Project 04/17/23
WOOD IS BIG
UNNAMED PROJECT A-001
PLAN 1 SITE PLAN NTS
Last
BIG
GOOD
SITE

BIG WOOD IS BIG GOOD UNNAMED PROJECT

Last Day of DAAP 04/17/23 Last Day of Project 04/17/23
A-002 DIAGRAMMATIC
CIRCULATION RESIDENTIAL MECHANICAL OUTDOOR AMENITY OUTDOOR AMENITY PARKING 1 DIAGRAMMATIC SECTION NTS
SECTION

BIG WOOD IS BIG GOOD UNNAMED PROJECT A-003 FIRST AREA PLAN

Last Day of DAAP 04/17/23
Day of Project 04/17/23
Last
2-BEDROOM APARTMENT (FLOOR 1 OF 2) 800 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 865 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 430 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 430 sf PERSONAL AMENITY SPACE 170 sf PERSONAL AMENITY SPACE 70 sf PERSONAL AMENITY SPACE 70 sf PERSONAL AMENITY SPACE 70 sf CIRCULATION 250 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 615 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 615 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 430 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 430 sf PERSONAL AMENITY SPACE 170 sf PERSONAL AMENITY SPACE 70 sf COMMON SPACE AND CIRCULATION 640 sf 2 1 FIRST FLOOR- UPPER BUILDING FIRST FLOOR- LOWER BUILDING SCALE: 1/8” = 1’-0” SCALE: 1/8” = 1’-0”

SECOND AREA PLAN

BIG WOOD IS BIG GOOD

UNNAMED PROJECT A-004

Last Day of DAAP 04/17/23
Day of Project 04/17/23
Last
2-BEDROOM APARTMENT (FLOOR 2 OF 2) 800 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 865 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 430 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 430 sf PERSONAL AMENITY SPACE 170 sf PERSONAL AMENITY SPACE 70 sf PERSONAL AMENITY SPACE 70 sf PERSONAL AMENITY SPACE 70 sf CIRCULATION 210 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 615 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 615 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 430 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 430 sf PERSONAL AMENITY SPACE 170 sf PERSONAL AMENITY SPACE 70 sf PERSONAL AMENITY SPACE 70 sf CIRCULATION 210 sf PUBLIC AMENITY 500 sf 2 1 SECOND FLOOR- UPPER BUILDING SECOND FLOOR- LOWER BUILDING SCALE: 1/8” = 1’-0” SCALE: 1/8” = 1’-0”

THIRD AREA PLAN

BIG WOOD IS BIG GOOD

UNNAMED PROJECT A-005

Last Day of DAAP 04/17/23
Day of Project 04/17/23
Last
2 1 THIRD FLOOR- UPPER BUILDING THIRD FLOOR- LOWER BUILDING SCALE: 1/8” = 1’-0” SCALE: 1/8” = 1’-0” 2-BEDROOM APARTMENT 1400 sf 2-BEDROOM APARTMENT 1465 sf PERSONAL AMENITY SPACE 170 sf PERSONAL AMENITY SPACE 70 sf PERSONAL AMENITY SPACE 70 sf PERSONAL AMENITY SPACE 70 sf CIRCULATION 210 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 615 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 615 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 430 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 430 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 430 sf PERSONAL AMENITY SPACE 170 sf PERSONAL AMENITY SPACE 70 sf PERSONAL AMENITY SPACE 70 sf PERSONAL AMENITY SPACE 70 sf CIRCULATION 210 sf

BIG WOOD IS BIG GOOD UNNAMED PROJECT A-006

Last Day of DAAP 04/17/23
of Project 04/17/23
Last Day
UP
2 1 FOURTH FLOOR- UPPER BUILDING FOURTH FLOOR- LOWER BUILDING SCALE: 1/8” = 1’-0” SCALE: 1/8” = 1’-0” 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 615 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 615 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 430 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 430 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 430 sf PERSONAL AMENITY SPACE 170 sf PERSONAL AMENITY SPACE 70 sf PERSONAL AMENITY SPACE 70 sf PERSONAL AMENITY SPACE 70 sf CIRCULATION 210 sf OUTDOOR AMENITY 1470 sf INDOOR AMENITY 1400 sf
FOURTH AREA PLAN
Last Day of DAAP 04/17/23
Day of Project 04/17/23
FIFTH AREA
2 FIFTH FLOOR- UPPER BUILDING SCALE: 1/8” = 1’-0” 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 800 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 865 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 430 sf 2-BEDROOM APARTMENT (FLOOR 1 OF 2) 430 sf PERSONAL AMENITY SPACE 170 sf PERSONAL AMENITY SPACE 70 sf PERSONAL AMENITY SPACE 70 sf PERSONAL AMENITY SPACE 70 sf CIRCULATION 210 sf
Last
BIG WOOD IS BIG GOOD UNNAMED PROJECT A-007
PLAN
Last Day of DAAP 04/17/23 Last Day of Project 04/17/23
2 SIXTH FLOOR- UPPER BUILDING SCALE: 1/8” = 1’-0” 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 800 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 800 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 430 sf 2-BEDROOM APARTMENT (FLOOR 2 OF 2) 365 sf CIRCULATION 210 sf
BIG WOOD IS BIG GOOD UNNAMED PROJECT A-008 SIXTH AREA PLAN
Last Day of DAAP 04/17/23 Last Day of Project 04/17/23 BIG WOOD IS BIG GOOD UNNAMED PROJECT UP A-009 SEVENTH AREA PLAN 2 SEVENTH FLOOR- UPPER BUILDING SCALE:
2-BEDROOM APARTMENT 1400 sf PERSONAL AMENITY 1470 sf
1/8” = 1’-0”
Last Day of DAAP 04/17/23 Last Day of Project 04/17/23 BIG WOOD IS BIG GOOD UNNAMED PROJECT A-101 PARKING PLAN 12'-0" 13'-6" 9'-0" 13'-6" 18'-0" 1 PARKING PLAN SCALE: 1/16” = 1’-0”
Last Day of DAAP 04/17/23 Last Day of Project 04/17/23 BIG WOOD IS BIG GOOD UNNAMED PROJECT 1 FIRST FLOOR COMBINED SCALE: 1/16” = 1’-0” Exterior Terrace Up Up Exterior Terrace W/D A-102 FIRST FLOOR OVERALL
Last Day of DAAP 04/17/23 Last Day of Project 04/17/23 BIG WOOD IS BIG GOOD UNNAMED PROJECT A-103 UNIT A.1 PLAN 1 2 UNIT FLOOR ONE UNIT FLOOR TWO SCALE: 1/8” = 1’-0” SCALE: 1/8” = 1’-0” WIC Exterior Terrace Down Open To Below W/D Up Exterior Terrace Exterior Terrace Up
Last Day of DAAP 04/17/23 Last Day of Project 04/17/23 BIG WOOD IS BIG GOOD UNNAMED PROJECT A-104 UNIT A.2 PLAN 1 2 UNIT FLOOR ONE UNIT FLOOR TWO SCALE: 1/8” = 1’-0” SCALE: 1/8” = 1’-0” Up Exterior Terrace Exterior Terrace W/D WIC Up Exterior Terrace Open To Below Down

BIG WOOD IS BIG GOOD UNNAMED PROJECT

Last Day of DAAP 04/17/23
Day of Project 04/17/23
A-105 UNIT
1 2 UNIT FLOOR ONE UNIT FLOOR TWO SCALE: 1/8” = 1’-0” SCALE: 1/8” = 1’-0” Down Exterior Terrace WIC W/D Up Exterior Terrace Exterior Terrace W/D Up Exterior Terrace
Last
B PLAN
Last Day of DAAP 04/17/23 Last Day of Project 04/17/23 BIG WOOD IS BIG GOOD UNNAMED PROJECT A-201 ELEVATIONS 1 2 FRONT ELEVATION LEFT ELEVATION NTS NTS
Day of DAAP 04/17/23
Day of Project 04/17/23
A-301
Last
Last
BIG WOOD IS BIG GOOD UNNAMED PROJECT
LONG SECTION

BIG WOOD IS BIG GOOD UNNAMED PROJECT A-401 PERSPECTIVES

Last Day of Project 04/17/23

Last Day of DAAP 04/17/23

BIG WOOD IS BIG GOOD UNNAMED PROJECT

Last Day of Project 04/17/23

Last Day of DAAP 04/17/23

A-402 PERSPECTIVES

BIG WOOD IS BIG GOOD UNNAMED PROJECT

Last Day of Project 04/17/23

Last Day of DAAP 04/17/23

A-403 PERSPECTIVES

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.