architecture design portfolio
Arezoo Torabi
My
EDUCATION Education and Qualifications
• •
Architectural Experience Program (AXP), NCARB | In Progress Bachelor of Architecture: Minor in Design Management, American University of Shariah, Sharjah UAE | 2010
Professional Memberships
• •
Associate Member: American Institute of Architecture (AIA) | 2012 to Present National Council of Architectural Registration Boards (NCARB), IDP | 2012 to Present
Table of
CONTENTS Concept Design
• • • • • • • • •
2013 . Akoya clubhouse 2013 . JEC masterplan 2012 . National consultative council 2012 . Etihad rail passenger stations 2010 . Aino mina development 2011 . Al seef residential development 2016 . Hatta mountain lodge 2018 . Huafa Hengqin Bay Plaza 2019 . Zhuhai Convention Center
Schematic Design
• • • •
2012 . Chedi khorfakkan 2015 . Courtyad by marriot 2018 . Huafa Hengqin Bay Plaza 2020 . Zhuhai Convention Center
Detailed Design
• • • • • •
2013 . The Garden bay 2014 . Mersa alseef 2015 . Lusail hotel & resort 2019 . Huafa Hengqin Bay Plaza 2020 . Zhuhai Convention Center 2021 . El Camino Mixed Use
Construction Administration
• •
2017 . Mersa alseef 2021 . UCSF Research and academic building
© 2010 - 2012 . AEDAS . ALL RIGHTS RESERVED © 2012 - 2016 . GODWIN AUSTEN JOHNSON . ALL RIGHTS RESERVED © 2018 - PRESENT . SKIDMORE OWINGS & MERRILL . ALL RIGHTS RESERVED
HUAFA HENGQIN BAY PLAZA ZHUHAI, CHINA Set close to the Xi River Santuary and surrounded by expansive bodies of water and landscape with spectacular views, Huafa Hengqin Bay Plaza calls for an imaginative response to the waterfront site. The project is mainly defined as a top-scale complex, with two buildings planned, one as a luxurious international 5-star hotel and the other as an independent business apartment building, plus retail podium and basement.
EL CAMINO MIXED USE SAN FRANCISCO CALIFORNIA, USA
El Camino & Spruce Mixed- Use Redevelopment Project in South San Francisco is situated at the UCSF RESEARCH & ACADEMIC corner of El Camino Real and BUILDING Spruce Avenue. The proposed SAN FRANCISCO redevelopment is proposing CALIFORNIA, USA splitting 11.21 acres into three The five-story building is rising at separate parcels. the corner of 23rd and Vermont Street in the Mission District is The proposed development will the latest addition to the UCSF remove existing vacant buildings Zuckerberg San Francisco General on the site and replace with three Hospital and Trauma Center, or R&D office buildings, three retail buildings, site landscaping and a The total size of the project is ZSFG. parking structure. 97884 sqm. The proposed size of the Luxurious international The new research building will add 5-star flagship hotel is 63625 sqm 175,000 square feet to ZSFG and The new buildings will consist of and High-end sea-view business will include modern research and approximately 750,000 square feet apartment 24471 sqm. It also academic facilities, wet and dry of R&D office space, 30,000 square requires 9788 sqm of retail podium. laboratories, a patient research feet of amenity and 19,500 square center, and additional teaching feet of retail. The R&D and retail Based on the type of area of the and collaboration areas. The buildings will be positioned across Hengqin Financial Island, the educational spaces will consist of a new interior street. All buildings first-rate sea view resources, and a Surgical Training Facility and a in the project will be tied together through landscaping and open the project’s identity as a complex, Biomechanics testing laboratory. space, creating pedestrian and provide a luxurious international 5-star hotel, establish the value Construction is estimated to cost bike friendly connections between of the project as a landmark, and $275 million. The building was the highly amenitized mixed- use create a brand-new image for the approved in late 2019, with work campus. Hengqin gateway. starting in 2020 and completion expected this summer. The building As an alternative, the 19,500 sq ft of is aiming to receive LEED Silver retail center could be interchanged with approximately 100-150 units of certification or higher. multi- family residential.
CONVENTION CENTER ZHUHAI, CHINA Zhuhai International Convention and Exhibition Center Project Exhibition Area is an interior design of the exhibition area, including conceptual design, schematic design, design development. The scope of work includes below programs and areas: - Auditorium 897 sqm - Round table meeting room 1744 sqm - Conference room and VIP room 4607 sqm
AKOYA CLUBHOUSE DUBAI, UAE High quality concept design for 4,600 sqm of Hotel, Spa, and Clubhouse elements. The Concept Design will need to take into consideration the other proposed development designs around the site and decide to compliment or contrast the design narrative accordingly. Akoya has been designed carefully to create a modern and contemporary architectural aesthetic. The high quality designs provide variety and yet harmony across the site. The retail elements must either compliment or contrast with positive effect. The proposed size of the Hotel, 15,000sqft to 18,000sqft, is based upon the principal that the Operator will be the same for the Hotel, Spa and Clubhouse elements.
JEC MASTERPLAN JEDDAH, KSA
THE CHEDI KHORFAKKAN SHARJAH, UAE
Master plan for 5,300,000 square meters, JEC City is a project made up of distinctive districts, which include a commercial core of international businesses, finest lifestyle establishment, unique open spaces, and diverse residential communities. In addition, the JEC City Master Plan has located a magnificent iconic tower as the centerpiece of the development – the JEC Tower.
The Chedi Khorfakkan is a picturesque resort in the north of the traditional town of Khorfakkan. It sits on the edge of a secluded scenic bay and provides uninterrupted views out over the Indian Ocean. A series of terraced elements with landscaped promenades connect across the length of the development with the hotel suites on the lower levels benefitting from direct access to the beach and the lower promenade. Suites on the upper floors are provided with access to the upper promenade via communal lobbies with stair access to the lower promenade and beach.
NATIONAL CONSULTATIVE COUNCIL ABU DHABI, UAE The intension was to construct a new National Consultative Council (NCC) building in alignment with Abu Dhabi Government Vision 2030, where its design should be an important landmark reflecting the cultural and heritage architecture of Abu Dhabi and UAE. The Client’s vision of the new National Consultative Council is to construct an innovative yet traditional building, clearly evoking the architectural heritage and culture of Abu Dhabi in a distinguishable and monumental building.
THE GARDEN BAY LUCKNOW, INDIA Garden Bay is an astonishing 73-acre township, positioned at Sitapur-Hardoi Road, Lucknow, with an incredibly tranquil environment, delivering a wholesome living experience. Our masterful team endeavors to present you a lifestyle that will elevate you above all others. An impressive range of homes that are blessed with pristine nature, sophisticated innovation, opulent facilities and exotic comfort. A luxurious living environment. We know that to be happy is to reconnect with nature and become in tune with its charms. We understand that living in the lush green and clean atmosphere is a blessing to us. At Garden Bay, every home blends in flawlessly with acres of tranquility. We ensure that you compromise neither on luxury nor your peace of mind. Combining the best of construction with creativity, the township will bring together like-minded stratum of the society. Step into your dream home that has been designed to enrich royal living.
MERSA ALSEEF DUBAI, UAE Located along the Dubai Creek waterfront adjacent to the historic Al Fahidi district, one of the oldest and most traditional areas of the city, the ETIHAD RAIL PASSENGER masterplan aims to regenerate the STATIONS Creek waterfront as an iconic, civic UAE destination with a strong focus on The Etihad Railway Network is to the rich local heritage rooted within be built to link the principal centers the spirit of Emirati culture. of population and industry of the approximately nine UAE. It will run from the Saudi Covering Arabian border at Gwheifat in the hectares of built development, west, close to the cities of the Gulf Khor Dubai will be designed as a coast, to the Northern Emirates and cultural city quarter fully integrated the east coast ports. There will also into the existing urban fabric. The be a line running from Abu Dhabi to development will enhance Dubai’s Al Ain, which may be projected, into international status as a world Oman, as well as a branch line to the famous waterfront destination, gas facilities at Shah and Habshan. acting as a catalyst for future Built to international standards, development within the wider area. Etihad Rail’s state of the art network will enable the rapid transport of passengers and freight, opening up new trade corridors and journey opportunities. Once complete, it will redefine logistics and transport in the region, providing as a safe, efficient, sustainable network that links all corners of the UAE, and eventually, the UAE to the wider GCC. This extensive investment will support the Government’s continued mission to build a diversified economy and continued economic growth.
AINO MINA DEVELOPMENT KANDAHAR, AFGHANISTAN The concept is for a peaceful environment where people can experience and appreciate the beauty and tranquility of Nature. A wide central park runs through the masterplan, dividing it in two and linking the retail area at its southern end with the Friday mosque at its northern end. The land rises gently so that the Friday mosque seen against the backdrop of the mountains bordering the Arghandab valley, creates a powerful and beautiful symbol for the entire development.
hatta mountain lodge dubai, UAE
courtyard by marriott riyadh, Saudi Arabia The subject site is strategically located between Central Business District and the airport in close vicinity to King Abdullah Financial District. The site is located in the southern side of Sahafa district, approximately 20 minute drive from Airport. Measuring approximately 11,043 sqm on Takhassusi Road 2.0 km from King Abdul Financial District, The plot is approximately 26 kilometers from King Khaled International Airport. The site area is 11,180sqm allowing 26,500sqm of build useful area. It is 5 star hotel with 200 room, providing restaurants, function rooms, retail spaces.
AL SEEF RESIDENTIAL DEVELOPMENT ABU DHABI, UAE The aim was to design this residential masterplan in Abu Dhabi. Our approach was to design a development, which would offer a unique product in a saturated realestate UAE market. Unique not in terms of luxury and unit sizes, but a human scale experience that people wish to re-enact. To create a private island that will be intimate, but encourage interaction at the same time. To give tenants an opportunity to own a waterfront townhouse with the same feel of owning a Venitian palacco on Grand Canal. We created a variety in product, from villas to waterfront townhouses, garden townhouses and boutique apartments. Special attention was given to detailing the different façade treatments on same massing and planning types and public realm design thus providing character and identity.
The Hatta Desert Resort will be a unique Mountain retreat that will offer a multitude of diverse offerings that currently do not exist in the UAE’s Hospitality landscape. Located on the outskirts of Hatta, this develop-Hatta is located approximately an hour away from Dubai City and enjoys pleasant climate settings, along with unrivalled valley and mountain sceneries including breath-taking views of the Al Hajar Mountains and wadis below. This hotel resort is expected to be positioned within the Luxury segment of the market, targeting clientele seeking tranquillity and privacy along with an exclusive experience in a secluded location. The terrain is naturally sculpted and presents an array of exciting opportunities for the appropriate development. The current proposal seeks to site a one-phase 120-key development, with a mix of standalone luxury tent suites and hotel complex accommodation, serviced through the main hotel complex, that will additionally house a number of the communal facilities such as the F&B dining, signature spa, health club and pool. The development will contain all the elements of a modern, functional and sustainable mixed-use environment and is set to provide another dimension to the evolving hospitality offerings in the UAE.
lusail hotel & resort lusail, qatar The site is located in the Lusail area Qatar. The site is a 150m wide strip of land from the high tide mark at shoreline and is approximately 2.5km long. The site area based on the Concept Design is approximately 410,000sqm. The project is five star Hotel and Resort at Lusail in Qatar consisting of a five star hotel consists of ground floor plus 1st, 2nd and 3rd floors with 150 keys. Included in the Hotel will be standard facilities associated with a five star Hotel. The hotel will have 125 no Standard Rooms, 20 no Business Suites, and 5 no Royal Suites as per the Concept Design that is provided. Resort staff accommodation discreetly located for approximately 300 employees. 50 no Villas for single gender and 50 no Villas will be for families.
HUAFA HENGQIN BAY PLAZA
PROJECT OVERVIEW
PROJECT OVERVIEW Huafa Hengqin Bay Plaza aims to create a premier hotel and residential address for Zhuhai and the greater Macao region, prominently placed on the waterfront, with a variety of hospitable, breathtaking, and inviting spaces within. The design goal is to create a modern and timeless landmark building, with a distinctive silhouette and textured façade from afar, and lush gardens and grand entries up close. The arrival to Hengqin Bay Plaza will place importance on the front door - for hotel guests finally arriving at their destination, permanent residents of the apartments, and visitors with shorter stays in the retail podium or one of the event ballrooms. The site is designed with a porous perimeter that not only maintains a sense of order to the city grid, but also provides concentric layers of enclosure as you enter the more private spaces within. Guests arriving at the lobbies are greeted with tall ceilings, ample daylight, and direct access to private gardens.
“
The vernacular architecture and urban development of the Pearl River Region and Guangdong province are largely influenced by climate. We find inspiration in many of the traditional structures not through formal mimicry, but through their organization. Colonnades, courtyards, overhangs, and the integration of landscape all create rich, layered urban developments that mediate the often hot and humid climate. Covered passages encourage comfortable pedestrian movement, and courtyards punctuating urban blocks ensure air movement during peaks of heat and humidity. Tree canopies and green spaces provide additional respite from intense sun and act as an extension of interior public spaces spilling into the gardens. All of these climate strategies have been employed with occupant comfort, energy efficiency, and building performance in mind, and to create a hospitable, biophilic experience that blends interior and exterior spaces.
The project is positioned overall as a leading urban bench-mark complex that integrates a luxurious international 5-star hotel, luxurious business apartment, and retail
Huafa Hengqin Bay Plaza Client // Huafa Group Plot Area // 15,213 sqm Project Size // 97,884 sqm Hotel & business apartment for Grand Hyatt
Zhuhai, China
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
HUAFA HENGQIN BAY PLAZA
ANALYSIS
澳门
MACAU 澳门电视塔
Macau Television Tower
十字门国际会展中心
Shizimen International Convention Center
十字门中央商务区
SHIZIMEN CENTRAL BUSINESS DISTRICT
西湾大桥
Xiwan Bridge
澳凼大桥
Aodang Bridge
横琴大桥
Hengqin Bridge
澳门
MACAU
Site and adjacent major hubs
INTRODUCTION Zhuhai lies along the zigzagging coast of South Eastern China overlooking the vast expanse of blue water and undulating green hills. Located at the heart of Shizimen Central Business District, Hengqin Financial Island is surrounded by water on all four sides. Because of its proximity to Hong Kong, Shenzhen and Macau, Hengqin New Area enjoys a special advantage to be an important hub of the 21st Century Maritime Silk Road into the South China Sea and beyond. A city made up of many islands and historically regarded as the Garden City of China, this project will take advantage of its geographical location, clean air and warm climate to create an iconic residential and hotel living for residents and travelers alike. The open space and landscape context of the project site is influenced by several powerful forces. The natural conditions of the region – steep, forested mountains emerging out of the Sea - have long defined the character of the larger Pearl River Delta. The site is formed by the new reclaimed land along the waterfront. Across the streets to the waterfront and other parcels, there is a healthy collection of commercial, residential and institutional development areas that provide various program uses and activities in this new district. The streetscapes and park system of Zhuhai are lushly treelined and provide cooling shade in the hot and humid months and the waterfront promenade and beach reinforce the traditional connection of the culture to the river and the sea.
建筑场地
Building Site
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
无遮挡视景
Unobstructed Views
148M
148M
350M
97M
176M 97M
600M-650M
Site and context
SITE AND CONTEXT 建筑红线
Property Line
硬质景观带范围线
Hard Landscape Line
地下建筑红线 Basement Line
多层建筑退让红线
汇通七路
5M
Rongyu
e Blvd
15M 3M
10M
汇通六路
7th Blvd
Tower Setback Line
荣珠道
10M
20M
Huitong
高层建筑退让红线
Rongzh
3M
15M
u Blvd
Podium Setback Line
15M
Huitong
6th Blv d
荣粤道
The site is surrounded by active use from financial services to maritime. On the east is the 334m tall office and apartment tower, Hengqin International Financial Center, and retail podium with conference, commercial and exhibition facilities. On the south is HFC, the South International Financial and Media Tower (HFC), which has retail at the base with a service apartment tower and a 300 meter tall office tower. On the west is Ferretti Asia Pacific Center that will include an upscale sales center, exhibition center, sailing school and a yacht marina. To the immediate north are shorter cultural buildings at the waterfront park. The site is also diagonally linked to one of the waterfront parks which will create convenience for pedestrian to views and surrounding water. The tallest mixed use tower on Shizimen is also to the southeast corner of the project site. Leveraging the diverse program from yacht tourism to financial offices to high-end service apartments, the site will be able to attract visitors and harvest from the energy in the surrounding area.
汇通七路
Huitong
7th Blvd
荣珠道
Rongzh
u Blvd
60M
Huitong
6th Blv d
荣粤道
Rongyu
e Blvd
M
60 汇通六路
1: 2000 0
20
40
60
80m
HUAFA HENGQIN BAY PLAZA
DESIGN PROCESS
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
While the previous scheme complied with the Planning Criteria, it presented a narrow face towards the waterfront.
Option 01 – Broaden tower frontage towards the water while keeping the tower footprint within the 60m x 60m setback boundary.
Option 02 – Unfold tower frontage to maximize access to water views & establish a stronger presence on the waterfront.
HUAFA HENGQIN BAY PLAZA
DESIGN PROCESS
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
148M 350M
148M
HUAFA HENGQIN BAY PLAZA
PROJECT MASSING
获得通风和采光 Access to Light & Air
标志性冠顶 Signature Crown
塔楼在60m界线内 Tower within 60m Boundary
景观参与 HLandscape Engagement 分割建筑体块 Break Apart Mass
朝前体块推出 Shear Front Bar
垂直线条统一立面 Facade Unity Through Vertical Grain
功能叠置分布 Program Stack
建筑体块 Building Volume
酒店 Hotel
反射效果 HReflective Quality
公寓 Apartments
业态不同 Program Differentiation
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
HUAFA HENGQIN BAY PLAZA
PROGRAM SECTION
PROGRAM & AREA Hotel 63,625 m2 Business Apartment 24,471 m2 Retail 9,788 m2 Total Allowable Area (GFA)
97,884 m2
TARGET UNIT / BAY COUNT Hotel 520 Bays Business Apartment 200 Units
6000
CHINESE RESTAURANT SKY LOBBY
LVL 44 6000
GRAND CAFE
LVL 32
LVL 31 LVL 30 LVL 29
LVL 20 LVL 19 LVL 18 LVL 17 LVL 16 LVL 15
LVL 13 LVL 12 LVL 11 LVL 10 LVL 09 LVL 08 LVL 07 LVL 06
3900 3900 3900 3900 3900 3900
HOTEL AMENITIES REFUGE
APARTMENT (13 FLRS)
REFUGE
T.0. ROOF
CLUB
32100
BALLROOMS RETAIL
RETAIL
LVL 01 6300
+0.0M
商业群房
RETAIL PODIUM
LVL B1
3900
LVL B1
3900
LVL B1
4800
LVL B1
-18.9M
+33.4M
LVL 05 LVL 04
+22.7M
9000
MEETING
酒店
HOTEL
商务公寓
BUSINESS APARTMENT
避难层
HOTEL REFUGE FLOOR
机电设备及停车
MEP AND PARKING
LVL 03 5700
50000
LVL 14
+33.4M
3900 3900
LVL 21
3900
LVL 23
3900
LVL 24
HOTEL (9 FLRS)
6000
LVL 25
LVL 22
+83.4M
3900 3900
LVL 26
3900
LVL 27
6000
47100
LVL 28
REFUGE
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500
+130.5M
5700
LVL 33
5000
LVL 34
HOTEL (10 FLRS)
3900
LVL 35
3900
LVL 36
4500
44500
LVL 37
3900
LVL 38
5500
LVL 39
REFUGE
3900
LVL 40
3900
LVL 41
3900
LVL 42
+175.0M
5500
LVL 43
LVL 02
8000
25000
LVL 45
1500
T.O. PARAPET ROOF
+200.0M
6000
12000
12000
T.O. CROWN
+212.0M
LVL 01
+0.0M
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
HUAFA HENGQIN BAY PLAZA
ELEVATION & ELEVATOR
T.O. CROWN
12000
12000 1500 3900 3900 3900 3900 3900 3900 3900 3900 5500 3900 3900 3900 3900 3900 3900 3900 3900
5700 5000
LVL 01
LVL 37 LVL 36 LVL 35 LVL 34 LVL 33 LVL 32
LVL 31
+130.5M
LVL 30 LVL 29 LVL 28 LVL 27 LVL 26 LVL 25 LVL 24 LVL 23 LVL 22
LVL 21
LVL 20
+83.4M
LVL 19 LVL 18 LVL 17 LVL 16 LVL 15 LVL 14 LVL 13 LVL 12 LVL 11 LVL 10 LVL 09 LVL 08 LVL 07 LVL 06
+33.4M
RETAIL
RETAIL
1300
5700 8000
+0.0M
LVL 38
32100
LVL 02
LVL 39
MEETING
BALLROOMS
LVL 03
LVL 40
CLUB
9000
LVL 04
+175.0M
LVL 41
50000
LVL 05 +22.7M
REFUGE
T.0. ROOF
4500
+33.4M
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500
APARTMENT (13 FLRS)
6000
REFUGE
6000
HOTEL AMENITIES
LVL 42
47100
3900
HOTEL (9 FLRS)
LVL 44
44500
3900
REFUGE
LVL 45 25000
3900
HOTEL (10 FLRS)
+200.0M
ROOF
LVL 43 5500
REFUGE
T.O. PARAPET
6000
GRAND CAFE
6000
SKY LOBBY
6000
CHINESE RESTAURANT
+212.0M
+1.3M
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
6000
LVL 44 6000
LVL 32
LVL 31 LVL 30 LVL 29
LVL 20 LVL 19 LVL 18 LVL 17 LVL 16 LVL 15
LVL 13 LVL 12 LVL 11 LVL 10 LVL 09 LVL 08 LVL 07 LVL 06
3900 3900 3900 3900 3900 3900
3900
HOTEL (9 FLRS)
HOTEL AMENITIES REFUGE
APARTMENT (13 FLRS)
REFUGE
T.0. ROOF
CLUB
32100
BALLROOMS
RETAIL
LVL 01 6300
1300
RETAIL +1.3M
4800
TOWER
PODIUM
F/S (1)
F/S (1)
F/S (2)
F/S (2)
EVE.-S(2)
RT (2)
EVE. (6)
F/S (1)
HT-S (2)
AP (4)
HT (4)
HT (2)
LVL B4
EXP. (4)
LVL B3
3900
LVL B2
3900
18900
LVL B1
-18.9M
+33.4M
LVL 05 LVL 04
+22.7M
9000
MEETING
LVL 03 5700
50000
LVL 14
+33.4M
3900 3900
LVL 21
REFUGE
3900
LVL 23 LVL 22
6000
LVL 25 LVL 24
+83.4M
3900 3900
LVL 26
3900
LVL 27
6000
47100
LVL 28
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500
+130.5M
5700
LVL 33
5000
LVL 34
HOTEL (10 FLRS)
3900
LVL 35
3900
LVL 36
4500
44500
LVL 37
3900
LVL 38
5500
LVL 39
3900
LVL 40
REFUGE
3900
LVL 41
SKY LOBBY GRAND CAFE
3900
LVL 42
+175.0M
5500
LVL 43
CHINESE RESTAURANT
LVL 02
8000
25000
LVL 45
1500
T.O. PARAPET ROOF
+200.0M
6000
12000
12000
T.O. CROWN
+212.0M
LVL 01
+0.0M
HUAFA HENGQIN BAY PLAZA
CIRCULATION ANALYSIS
机动车
Motor Vehicles 人行
Pedestrian
汇通七路 Huitong 7th Blvd
非机动车
Non-motor Vehicles
落客区
酒店大堂
DROPOFF
HOTEL LOBBY
公寓大堂
APT LOBBY
落客区
DROPOFF
XXXX
宴会厅大堂
荣粤道 Rongyue Blvd
EVENT LOBBY
商业入口
RETAIL ENTRY
荣珠道 Rongzhu Blvd
SERVICE RAMP
商业入口
RETAIL FRONTAGE
汇通六路 Huitong 6th Blvd
Circulation analysis - vehicles & pedestrian
汇通七路 Huitong 7th Blvd
消防扑救面
荣粤道 Rongyue Blvd
5m 5m
5m 5m 10m
荣珠道 Rongzhu Blvd
10m FIRE TRUCK STAGING
消防扑救面
FIRE TRUCK STAGING
汇通六路 Huitong 6th Blvd
1: 800
Circulation analysis - fire truck
0
8
16
24
32m
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
Garden view & drop hotel off
Prominent retail corner
HUAFA HENGQIN BAY PLAZA
FLOOR PLANS
汇通七路 Huitong 7th Blvd
前塔冠顶 = +212.00 m
T.O. FRONT TOWER CROWN
女儿墙顶 = +200.00 m T.O. PARAPET
后塔冠顶 = +205.50m
T.O. REAR TOWER CROWN
塔楼 TOWER 楼层 = 47 FLOORS
屋顶 = +22.70 m
T.O. MECH. PENTHOUSE
屋顶 = +13.70 m
裙房 PODIUM 楼层 = 5
屋顶 = +27.70 m T.O. ROOF
FLOORS
荣珠道 Rongzhu Blvd
T.O. ROOF
T.O. ROOF
荣粤道 Rongyue Blvd
屋顶 = +204.00 m
屋顶 = +33.40 m T.O. ROOF
汇通六路 Huitong 6th Blvd
Site plan - roof
汇通七路 Huitong 7th Blvd
车库入口
GARAGE ENTRY
自行车库入口
BIKE PARKING ENTRY
商务公寓入口
BUSINESS APT ENTRY
酒店入口
商业入口
HOTEL ENTRY
荣粤道 Rongyue Blvd
荣珠道 Rongzhu Blvd
RETAIL ENTRY
商业入口
RETAIL ENTRY
酒店宴会入口
HOTEL EVENT ENTRY
汇通六路 Huitong 6th Blvd
1: 800
Site plan - ground floor
0
8
16
24
32m
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
Retail experience concept
Hotel entry view
HUAFA HENGQIN BAY PLAZA
FLOOR PLANS
餐饮
餐饮
F&B
F&B
机电
M.E.P.
餐饮 F&B
餐饮
餐饮
F&B
F&B
L2 - Retail
公寓大堂
APARTMENT LOBBY
酒店大堂
HOTEL LOBBY
餐饮 F&B
宴会大堂
EVENT LOBBY
酒店大堂/交通
HOTEL LOBBY/CIRC
酒店公共
餐饮
HOTEL PUBLIC
公寓大堂/交通
F&B
APARTMENT LOBBY/CIRC
商业-餐饮
机电
RETAIL-F&B
M.E.P.
商业-其他
RETAIL-ALT
餐饮
商业-交通
F&B
RETAIL CIRC
核心筒
服务大堂
CORE
机电
SERVICE LOBBY
M.E.P.
走道交通
CIRCULATION
停车
PARKING
L1 - Ground floor
1: 500 0
5
10
15
20m
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
会议室
MEETING RM.
厨房仓储
KITCHEN & STOR.
会议室
MEETING RM.
会议室
MEETING RM.
L4 - Meeting room
厨房仓储
KITCHEN & STOR.
屋顶 = +13.70 m T.O. ROOF
小宴会厅
JR. BALLROOM
主宴会厅
酒店-交通
GRAND BALLROOM
HOTEL CIRC
酒店-活动公共
HOTEL EVENT/PUBLIC
商业-交通
RETAIL CIRC
贵宾/婚礼准备 VIP/ BRIDAL
核心筒 CORE
宴会前厅
机电
PRE-FUNCTION
M.E.P.
走道交通
CIRCULATION
屋顶露台
ROOF TERRACE
L3 - Ballroom
1: 500 0
5
10
15
20m
HUAFA HENGQIN BAY PLAZA
FLOOR PLANS
屋顶 = +13.70 m T.O. ROOF
屋顶 = +22.70 m T.O. ROOF
屋顶 = +33.40 m
屋顶 = +27.70 m T.O. ROOF
T.O. ROOF
L6 - Refugee floor
机电
M.E.P.
休闲会所
酒店交通
LEISURE CLUB
HOTEL CIRC
商业-餐饮
RETAIL-F&B
商业-其他
屋顶 = +27.70 m
RETAIL-ALT
T.O. ROOF
商业-交通
RETAIL CIRC
核心筒
机电
CORE
M.E.P.
机电
M.E.P.
走道交通
CIRCULATION
停车
PARKING
L5 - Leisure club
1: 500 0
5
10
15
20m
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
未来计划通往相邻地块
FUTURE CONNECTION TO ADJACENGT PARCEL
停车-酒店+商业
PARKING - HOTEL+RETAIL
未来计划通往相邻地块
FUTURE CONNECTION TO ADJACENGT PARCEL
LB2 - Parking
停车
PARKING
机电 - 通用
自行车停车
BIKE PARKING
M.E.P. - GENERAL
后勤 - 餐饮
B.O.H. - F&B RELATED
机电 - 通用 M.E.P. - GENERAL
后勤 - 房务
B.O.H. - HOUSEKEEPING
员工设施
EMPLOYEE FACILITY
后勤 - 保安
B.O.H. - SECURITY 后勤服务 B.O.H.
核心筒
机电 - 酒店
CORE
机电
M.E.P. - HOTEL
M.E.P.
走道交通
CIRCULATION
停车
PARKING
LB1 - BOH&MEP&PARKING
1: 500 0
5
10
15
20m
HUAFA HENGQIN BAY PLAZA
FLOOR PLANS
屋顶酒吧
餐厅包厢
休闲沙龙
RF BAR
PRIVATE DINIING
LOBBY LOUNGE
开放式餐饮
OPEN DINIING
餐厅包厢
PRIVATE DINIING
酒店空中大堂 SKY LOBBY
餐厅包厢
餐厅包厢
PRIVATE DINIING
俱乐部酒廊
备用厨房
PRIVATE DINIING
备用厨房
GRAND CLUB LOUNGE
BACKUP KITCHEN
BACKUP KITCHEN
开放式餐饮
俱乐部酒廊
OPEN DINIING
GRAND CLUB LOUNGE
Sky Lobby
餐厅包厢
PRIVATE DINIING
Amenity floor
开放式餐饮
OPEN DINIING
主咖啡厅开放式厨房 GRAND CAFE OPEN KITCHEN
餐厅包厢
餐厅包厢
PRIVATE DINIING
PRIVATE DINIING
备用厨房
BACKUP KITCHEN
开放式餐饮
OPEN DINIING
Hotel typical floor plan
Amenity floor
Apartment floor plan
Apartment floor plan
7层楼建筑面积 L7 FLOOR PLATE GROSS AREA
1,782 SQM
19层楼建筑面积 L19 FLOOR PLATE GROSS AREA
1,773 SQM
(其中酒店建筑面积 HOTEL FLOOR GROSS AREA)
223 SQM
(其中酒店建筑面积 HOTEL FLOOR GROSS AREA)
213 SQM
(其中公寓建筑面积 APARTMENT FLOOR GROSS AREA)
1,559 SQM
(其中公寓建筑面积 APARTMENT FLOOR GROSS AREA)
1,560 SQM
公寓每层面积(14套)UNITS AREA (14 UNITS)
914 SQM + 270 SQM (BALCONY)X 50% = 1,049 SQM
公寓每层面积(14套)UNITS AREA (14 UNITS)
914 SQM + 270 SQM (BALCONY)X 50% = 1,049 SQM
公寓每层使用率 APARTMENT FLOOR EFFICIENCY
1,049 SQM / 1,559 SQM = 67.3%
公寓每层使用率 APARTMENT FLOOR EFFICIENCY
建筑面积 GROSS AREA (SQM)
套数 UNITS
大于两房 2+ BEDROOM
100
7 套 UNITS
两房 2 BEDROOM
酒店-交通
HOTEL CIRC
酒店-客房
HOTEL ROOM
酒店-公共活动
公寓
公寓交通
核心筒
APARTMENT
APARTMENT CIRCULATION
CORE
三房 3 BEDROOM
屋顶露台
HOTEL EVENT/PUBLIC
ROOF TERRACE
总数 TOTAL
1: 300 0
3
6
9
12m
1,049 SQM / 1,560 SQM = 67.2%
每层户型 UNIT TYPE PER FLOOR
总套数 TOTAL UNITS
95
150
3 套 UNITS
4 套 UNITS
14 套 UNITS
14套 X 13层 = 182 套 14 UNITS X 13 FLOORS = 182 UNITS
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
HUAFA HENGQIN BAY PLAZA
Option one - steel
FACADE STUDIES
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
Option two - stone
HUAFA HENGQIN BAY PLAZA
FACADE STUDIES
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
FACADE DETAIL
注解:其它细节典型尺寸、材质及板材未特别注明请参考本图纸 NOTE: REFER TO OTHER DETAILS ON THIS SHEET FOR TYPICAL DIMENSION, MATERIAL AND FINISHES NOT INDICATED
70 100
CL
70
550
801
见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.
ALUM-02
PLAN DETAIL AT VERTICAL FINS ANGLED
倾斜竖向装饰条平面细节 PLAN DETAIL AT VERTICAL FINS ANGLED SCALE:
130
参见平面 RE: SEE PLAN
参见平面 RE: SEE PLAN DIM. PT.
20
15
15 CL
200
1:5
100
50
倾斜中间段竖梃平面细节 PLAN DETAIL AT INTER MULLION ANGLED PLAN DETAIL AT INTER. MULLION ANGLED 50
200
20
1:5
130
14
801
倾斜竖梃平面细节 PLAN DETAIL AT VERTICAL MULLION ANGLED SCALE:
1:5
参见平面 RE: SEE PLAN
ALUM-03
15
CL
100
ALUM-02 ALUM-01, FIN-01
参见平面 RE: SEE PLAN DIM. PT.
SCALE:
参见立面图 RE: SEE ELEV.
850
HUAFA HENGQIN BAY PLAZA
13
PLAN DETAIL AT VERTICAL MULLION ANGLED COL
南北剖面细节 -- 通风头 通风头 南北剖面细节 N/S SECTION DETAIL AT VENT HEAD N/S SECTION DETAIL - AT VENT HEAD
15 15
SCALE: 11: 5: 5 SCALE:
05 05
配合设计人员Local LocalD 配合设计人员
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
广 广 G
15 15 70 70 15 15 50 50 10 10 参见立面图 参见立面图 参见立面图 参见立面图 RE: RE: RE: SEE SEE ELEV. ELEV. RE: SEE SEE ELEV. ELEV. DIM. DIM. PT. PT.
参见平面 参见平面 RE: RE: SEE SEE PLAN PLAN DIM. PT. DIM. PT.
中华 中华 证
15 15 CL CL
802 802
参见平面 参见平面 RE: RE: SEE SEE PLAN PLAN
ALUM-01,FIN-01 FIN-01 ALUM-01, ALUM-02 ALUM-02
801 801
南北剖面细节 通风窗台 -- 通风窗台 南北剖面细节 N/S SECTION DETAIL - AT VENT SILL N/S SECTION SECTION DETAIL DETAIL -- AT AT VENT VENT SILL SILL N/S SCALE: 11: 5: 5 SCALE:
802
13 13
N/S 南北剖面细节 SECTION DETAIL- -通风头 AT VENT HEAD
N/S SECTION DETAIL - AT VENT HEAD SCALE:
1:5 COL COL
05
ALUM-02 ALUM-02 建筑 / 结构单位 Architect / Engineer:
801 801
@ 水平竖框 南北剖面细节 @ 水平竖框 南北剖面细节 N/S SECTION DETAIL @ HORIZONTAL MULLION N/S SECTION DETAIL @ HORIZONTAL MULLION MULLION N/S SECTION DETAIL - AT HORIZONTAL SKIDMORE, OWINGS & MERRILL LLP ONE MARITIME PLAZA, SAN FRANCISCO, CA 94111
SCALE: 11: 5: 5 SCALE:
配合设计人员 Local Design Institute:
ALUM-02 ALUM-02
40 40
40 40
70 70
中华人民共和国建筑行业甲级 证 书 编 号: A144007371
1:5
04
900 900
SCALE:
100
参见立面图 RE: SEE ELEV.
15
70
15
ALUM-01, FIN-01
ALUM-02
SCALE:
1:5
300 300
2021.06.18
ALUM-02 ALUM-02
714 714 801 801
索引Key KeyPlan: Plan: 索引
ALUM-01, ALUM-01, FIN-02 FIN-02
745 745
03
961 961 ALUM-02 ALUM-02
ALUM-01, FIN-01
外墙细节 外墙细节
EXTER EXTER DETAI DETAIL TYPE 3 TYPE
ALUM-01,FIN-01 FIN-01 ALUM-01,
DIM. PT.
N/S SECTION DETAIL AT STACK JOINT COLUMN - STRAIGHT @.叠缝, 南北剖面细节 叠缝, 直柱 @ 南北剖面细节 直柱
N/S SECTION SECTION DETAIL DETAIL @ @ STACK STACK JOINT, JOINT, COLUMN COLUMN -- STRAIGHT STRAIGHT N/S 300
SCALE: 11: 5: 5 SCALE:
745
图名Sheet SheetName: Name: 图名
160
70
40
70
参见立面图 RE: SEE ELEV.
ALUM-02
11 11
项目北面 项目北面 Project 北北 Project North True North True North North
50 50
801
南北剖面细节 @ 水平竖框 N/S SECTION DETAIL @ HORIZONTAL MULLION
Date:
50% DESIGN DEVELOPMENT 50% 初初初初
参见立面图 参见立面图 RE: RE: SEE SEE ELEV. ELEV.
304 304 南北剖面细节 - 通风窗台 N/S SECTION DETAIL - AT VENT SILL
用途 Issued For: No.: Description:
850 850
801
745 745
CURTAINWALL WALL CURTAIN ANCHOR ANCHOR
50 50
ALUM-02
200 200
ALL LL
50 50
130 130
ALUM-01, FIN-01
顾问 Consultants:
15 15 70 70 15 15 60 60 55
305 305
15 15 70 70 15 15
15 70 15 50 10 参见立面图 参见立面图 RE: SEE ELEV. RE: SEE ELEV. DIM. PT.
802
参见立面图 RE: SEE ELEV. DIM. PT.
100 100
70 70
DIM. DIM. PT. PT.
03 03
ALUM-01,FIN-01 FIN-01 ALUM-01,
广州市设计院 GUANGZHOU DESIGN
1150 1150
100 100
ALUM-01,FIN-01 FIN-01 ALUM-01,
DIM. DIM. PT. PT.
ALUM-01, FIN-01
04 04
160 160
35 2515
参见平面 参见平面 RE: RE: SEE SEE PLAN PLAN
ALUM-02
华发横琴湾广场工程方案及深化设计 HUAFA HENGQIN BAY PLAZA
15 15 70 70 15 15
15 15
70
15
N-01 01
参见立面图 RE: SEE ELEV.
参见平面 参见平面 RE: RE: SEE SEE PLAN PLAN DIM. PT. DIM. PT.
801 ALUM-01, FIN-02
DIM. PT.
参见立面图 RE: SEE ELEV.
714
50%DESIGN DESIGND 50% 50%初初初初 初初初 50%
参见立面图 参见立面图 参见立面图 参见立面图 RE: RE: RE: SEE SEE ELEV. ELEV.DIM. PT. RE: SEE SEE ELEV. ELEV. DIM. PT.
委托设计方 Client:
用途Issued IssuedFor: For: 用途 No.: Description: Description: No.:
参见立面图 参见立面图 RE: RE: SEE SEE ELEV. ELEV.
14 14
顾问Consultants: Consultants: 顾问
01 01
项目编号Project ProjectNo.: No. 项目编号 218 21826
DrawnBy: By: Au Drawn Auth CheckedBy: By: Check Chec Checked 比例Scale Scale@@A0: A0: 比例
1 1:
ALUM-03
15
15
250
250
20
20
250 130
250 130
A
20 150
AA F
20 150
ALUM-02 ALUM-02 ALUM-01, ALUM-01, FIN-01FIN-01
801 801 ALUM-03 ALUM-03
150 150
150 150100
250 250
15
A
130
801
A F
ALUM-02 ALUM-02 150 100
100 100150
250 250 250
250
150
130
见平面 见平面 见平面 见平面 见平面 见平面 801 801 63 3 63 3 6 63 3 6 RE: SEE RE:PLAN SEE PLANRE: SEE RE:PLAN SEE PLAN RE: SEE PLAN RE: SEE PLAN DIM. PT. DIM. PT. DIM. PT. ALUM-03 ALUM-03
15
ALUM-01, ALUM-01, FIN-01FIN-01
CL
801 801 802 ALUM-03 802 ALUM-03
100 100 15
CL
130
ALUM-03 ALUM-01, FIN-01
CL
A
150
200 130
200 130
802
802 802
15 20
15
CL
50
200
200
2050
2050
801
20
200 20 130
130
130
CL
63 3 6
ALUM-03 ALUM-03 ALUM-01, ALUM-01, FIN-01FIN-01
15
见平面 见平面 66见平面 3 3 6见平面 63 36 NRE: SEE RE:PLAN SEE PLAN RE: SEE PLAN RE: SEE PLAN PT. DIM. PT. DIM. PT.
ALUM-01, FIN-01
130
ALUM-01, FIN-02
200 130
200 130
200 130 15
20
15
801 801 802 802
6 3 3 66 3 3 6
63 36
ALUM-01, ALUM-01, FIN-02FIN-02
CL
CL
802
100
ALUM-01, ALUM-01, FIN-01FIN-01
20
CL
20
6 3 36
200
200
CL
20
CL
ALUM-01, FIN-02
20
ALUM-01, ALUM-01, FIN-02FIN-02
802 802
100 100
CL
200
100
CL
CL
2050
100
CL
20
CL
100
130
CL
100 100
50
100
50
100
FACADE DETAIL
200 130
HUAFA HENGQIN BAY PLAZA
平面细节层间 侧平面细节层间 南北侧平面细节层间 南北侧平面细节通风 南北侧平面细节通风 南北侧平面细节通风 南北面平面细节竖向装饰条通风 南北面平面细节竖向装饰条通风 南北面平面细节竖向装饰条通风 SPANDREL LAN T SPANDREL DETAIL - AT N/S SPANDREL N/S PLAN PLAN DETAIL DETAIL N/S - AT - PLAN AT VENT VENT DETAIL JAMB JAMB - AT VENT N/S N/S PLAN JAMB PLAN DETAIL DETAIL N/S ATAT PLAN INTER. INTER. DETAIL MULLION MULLION AT INTER. VENT VENT JAMB MULLION JAMB VENT JAM
见平面 见平面 NRE: SEE RE:PLAN SEE PLAN PT. DIM. PT.
见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.
25 25
SCALE: SCALE: 1:5 1:5
SCALE:
1:5
见平面 见平面 见平面 见平面 RE: SEE RE:PLAN SEE PLANRE: SEE RE:PLAN SEE PLAN DIM. PT. DIM. PT.
25
见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.
20 20
SCALE: SCALE: 1:5 1:5
SCALE:
1:5
20
100 100
150 150
150 150 100 100 100 150
250 250
250 250
15 15
SCALE: SCALE: 1:5 1:5 150
250
100
SCALE:
250
平面细节层间 侧平面细节层间 南北侧平面细节通风 南北侧平面细节通风 南北面平面细节竖向装饰条通风 南北面平面细节竖向装饰条通风 南北侧平面细节层间 南北侧平面细节通风 南北面平面细节竖向装饰条通 SPANDREL T SPANDREL N/S PLAN PLAN DETAIL DETAIL - AT - PLAN AT VENT VENT JAMB JAMB N/S N/S PLAN PLAN DETAIL DETAIL ATAT INTER. INTER. MULLION MULLION VENT JAMB JAMB LAN DETAIL - ATN/S SPANDREL N/S DETAIL - AT VENT JAMB N/S PLAN DETAIL AT VENT INTER. MULLION VENT JAM N/S PLAN DETAIL AT SPANDREL N/S PLAN DETAIL AT VENT JAMB PLAN DETAIL AT INTER. MULLION VENT JAMB
50 15
15
130
200 130 250 250
150 150100
100 100150
801 801 150
250 250 250
200
200
130 100
80
300
150 150
ALUM 801
71 ALUM
130
100 100
15
50
714 714 15 ALUM-02 ALUM-02
15
300
ALUM-02
15
ALUM
714
ALUM-01, ALUM-01, FIN-01FIN-01 801 801
20
ALUM-03
714 714
300 200 130
2050
15
50
ALUM-01, ALUM-01, FIN-01FIN-01
SCALE:
50
CL
300 200
CL
50
CL
130
200 130 130
130
15
CL
ALUM-01, FIN-01 ALUM-02
20
200 130
15
CL
200
200 2050
2050
ALUM-03
63 36
20
15
CL
ALUM-01, FIN-01
63 36 3 36 63 36 见平面 见平面 见平面 见平面 见平面 见平面 RE: SEE RE:PLAN SEE PLANRE: SEE RE:PLAN SEE PLANALUM-02 RE:ALUM-02 SEE PLAN RE: SEE PLAN DIM. PT. DIM. PT. DIM. PT. 15
SCALE: SCALE: 1:5 1:5
50
50 200
200
130
ALUM-03 ALUM-03
ALUM-03 ALUM-03
15
1515
20
CL
ALUM-01, ALUM-01, FIN-01FIN-01 ALUM-02 ALUM-02
15
1:5
100 ALUM-01, ALUM-01, FIN-01FIN-01
CL
2050
200 130 20
200 130 20
15
CL
CL
63 363 36
6 33 6 见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT. 130
66 3 3 6 见平面 见平面 ANRE: SEE RE:PLAN SEE PLAN PT. DIM. PT.
2050
6 33 6
2050
663 3 6
15
CL
CL
CL
15
100
100 100
CL
SCALE:
100 100
200 130
200
100
130
100
SCALE: SCALE: 1:5 1:5
20
CL
2020
25
50
CL
1:5
200
100
50
100
SCALE:
50
2525
SCALE: SCALE: 1:5 1:5
250 ALUM-02 ALUM-02
ALUM
见平面 见平面 见平面 见平面 见平面 见平面 见平面 见平面 见平面 见平面 平 南北侧平面细节竖梃 南北侧平面细节中间竖梃 南北侧平面细节中间竖梃 南北侧平面细节中间竖梃 北侧平面细节竖向装饰条 北侧平面细节竖向装饰条 北侧平面细节竖向装饰条 AN RE:南北侧平面细节竖梃 SEE RE:PLAN SEE PLAN RE: SEE PLAN 南北侧平面细节竖梃 RE: SEE RE:PLAN SEE PLANRE: SEE RE:PLAN SEE PLAN RE: SEE PLAN RE: SEE PLAN RE: SEE PLAN PT. DIM. PT. DIM. PT. DIM.DETAIL PT. DIM. PT. DIM.MULLION PT. DETAIL AT VERTICAL MULLION N/S PLAN AT INTER. N PLAN DETAIL AT VERTICAL FINS PL LAN ERTICAL VERTICAL DETAIL MULLION MULLION AT VERTICAL N/S N/S MULLION PLAN PLAN DETAIL DETAIL N/S - AT - PLAN AT INTER. INTER. DETAIL MULLION MULLION - AT INTER. MULLION N 100PLAN N 100 PLAN DETAIL DETAIL AT N150AT PLAN VERTICAL VERTICAL FINS FINS AT VERTICAL FIN 150 150 150 100 100DETAIL 100 150 150 100
23 23
SCALE: SCALE: 1:5 1:5
COL
SCALE:
1:5
23
18 18
SCALE: SCALE: 1:5 1:5
SCALE:
18
1:5 250 250
250 250
250
13 13
SCALE: SCALE: 1:5 1:5 250 COL COL
SCALE:
COL
注解:其它细节典型尺寸、材质及板材未特别注明请参考本图纸 NOTE: REFER TO OTHER DETAILS ON THIS SHEET FOR TYPICAL DIMENSION, MATERIAL AND FINISHES NOT INDICATED
50
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
15 见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.
100
150
150
250
南北侧平面细节层间 N/S PLAN DETAIL - AT SPANDREL SCALE:
南北侧平面细节通风 SCALE:
100 250
南北面平面细节竖向装饰条通风 N/S PLAN DETAIL AT INTER. MULLION VENT JAMB
25 N/S PLAN DETAIL - AT VENT JAMB 20
1:5
10 0°
ALUM-02
150
15
ALUM-03
130
130
801
ALUM-03
见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.
20
801
63 3 6
63 36
WP
ALUM-01, FIN-01
20
20
ALUM-01, FIN-01
250
802
200
200
802
ALUM-01, FIN-02
1:5
SCALE:
1:5
15
CL
100
100
CL
CL
50
ALUM-01, FIN-01
ALUM-03
注解:其它细节典型尺寸、材质及板材未特别注明请参考本图纸 NOTE: REFER TO OTHER DETAILS ON THIS SHEET FOR TYPICAL DIMENSION, MATERIAL AND FINISHES NOT INDICATED
801
50 ALUM-01, FIN-01
COL
250
SCALE:
1:5
1:5
13
SCALE:
1:5
R=1300 COL @ N/S CORNERS, R=1000 @ E/W CORNERS,
WP
08
SKIDMORE, OWIN ONE MARI SAN FRANCI
714
100
ALUM-02
150
150
1:5
100
150
10 0
730 CL ALUM-01, FIN-01
10 0
15
ALUM-02 ALUM-01, FIN-01
CL
50% DESIGN DEVELOPME 50% 初初初初
15
535
0 13
ALUM-02
50 150
250
50
250 150
300 200
300
100
50
EQ.
1650 from CL. to CL.
ALUM-02
100
SCALE:
250
1:5
平面细节内角 150 200 PLAN DETAIL AT INSIDE CORNER
13
SCALE:
1:5
714
SCALE:
平面细节圆角 PLAN DETAIL AT CURVE CORNER
08
COL
PLAN DETAIL AT CURVE CORNER SCALE:
1:5
平面细节内角 PLAN DETAIL AT INSIDE CORNER
13
301
SCALE:
COL
1:5
100x200 ST. BOX BEAM
21 A8.01
08
平面细节圆角 PLAN DETAIL AT CURVE CORNER SCALE:
714 100x200 ST. BOX BEAM 730 301
50
869
730
869 730
801
522
ALUM-02
500 50
1:5
21 A8.01
ALUM-02
ALUM-01, FIN-01
索引 Key Plan:
150 730 ALUM-02
535 869
522
北 True North
1160
ALUM-03 535 ALUM-02
北 True North
ALUM-02
项目北面 Project North
索引 Key Plan:
150
50
03
200
130
ALUM-01, FIN-01
130 250
03
869
ALUM-03
801 ALUM-02
500
1:5
714
北侧平面细节竖向装饰条 N PLAN DETAIL AT VERTICAL FINS
18
100
1160
100
50
150
1:5
250
ALUM-02 北侧平面细节竖向装饰条 COLUMN COVER N PLAN DETAIL AT VERTICAL FINS
18
714 ALUM-03
360
SCALE:
801
EQ 200
150
20
南北侧平面细节中间竖梃 PLAN DETAIL - AT INTER. MULLION
100
150 见平面 RE: SEE PLAN
200 360
1:5
21
301
130
见平面 RE: SEE PLAN
130 SCALE:
1:5
15
ALUM-02 714
300
15
SCALE:
PLAN DETAIL AT 见平面 南北侧平面细节中间竖梃 见平面 RE: SEE PLAN RE: SEE PLAN PLAN DETAIL -DIM.AT PT. INTER. MULLION
ALUM-02
15 500
100 平面细节柱面 150 150 PLAN DETAIL AT COL. COVER 250
9/9/2021 12:09:01 PM
15
50
200 700
ALUM-02
ALUM-03
130
130
100 ALUM-03
301
801 ALUM-01, FIN-01
15
见平面 6 3 3 6见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.
15
200 300
5020
714
15
200
ALUM-02 ALUM-01, FIN-01
ALUM-02
0 13
CL ALUM-03
50% DESIGN DEVELOPME 50% 初初初初
20
ALUM-01, FIN-01
CL
CL
200
ALUM-01, FIN-01
用途 Issued For: No.: Description:
0 20
50
50
50
ALUM-02
63 36
ALUM-03
50
CL
顾问 用途 Consultants: Issued For: No.: Description:
801
20
130
500
ALUM-03
869
ALUM-03 CL
0 20
500
1:5
ALUM-01, FIN-01 801
广州市 GUANGZH
中华人民共 证 书 编
50
SCALE:
CL
顾问 Consultants:
ALUM-02
801
250
南北面平面细节竖向装饰条通风 N/S PLAN DETAIL AT INTER. MULLION VENT JAMB
20
15
50
SCALE:
100
广州市 GUANGZH
中华人民共 证 书 编
配合设计人员 Local Design Institut
南北面平面细节竖向装饰条通风 N/S PLAN DETAIL AT INTER. MULLION VENT JAMB
20
SKIDMORE, OWIN ONE MARI SAN FRANCI
301
250
100
100
建筑 / 结构单位 Architect / Enginee 配合设计人员 Local Design Institut
100x200 ST. BOX BEAM
10 0°
150
250
1:5
SCALE:
华发横琴湾广场工 HUAFA HENG
20 150 150 250
SCALE:
18
130
130
ALUM-03
100
15
1:5
1:5
建筑 / 结构单位 Architect / Enginee
CL
平面细节内角 PLAN DETAIL AT INSIDE CORNER
801
ALUM-03
SCALE:
SCALE:
ALUM-01, FIN-01
20
801
委托设计方 Client:
200
R=1300 @ N/S CORNERS, R=1000 @ E/W CORNERS,
100
802 ALUM-02
15 见平面 见平面 RE: SEE PLAN RE: SEE PLAN 63 3 6 DIM. PT.
250
北侧平面细节竖向装饰条 N PLAN DETAIL AT VERTICAL FINS
20
23
250 130
802 ALUM-03
250 WP
南北侧平面细节中间竖梃 801 N/S PLAN DETAIL - AT INTER. MULLION ALUM-03
200
63 3 6
130
5020
南北侧平面细节竖梃 801 N/S PLAN DETAIL AT VERTICAL MULLION
华发横琴湾广场工 HUAFA HENG
714
150
注解:其它细节典型尺寸、材质及板材未特别注明请参考本图纸 NOTE: REFER TO OTHER DETAILS ON THIS SHEET 150 FOR TYPICAL 100 100 150 DIMENSION, MATERIAL AND FINISHES NOT INDICATED
ALUM-01, FIN-01
CL
CL
ALUM-02
CL
ALUM-02
见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT. 802
200
ALUM-01, FIN-01
ALUM-03
100
CL
见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.
802
100
15
10 0°
CL
委托设计方 Client:
301
100 15
200
714
15
ALUM-02
130
130
63 36
130
6 33 6
20
20
200
200
ALUM-01, FIN-01
300
50
50
CL
南北侧平面细节通风 ETAIL - AT VENT JAMB
N
CL
CL CL
130
100
南北侧平面细节通风 见平面 见平面 SEE PLAN RE: SEE PLAN ETAIL - RE: AT VENT DIM. PT. JAMB
N
100
项目北面 Project North
ALUM-02
50
图名 Sheet Name:
外墙细节(3A
250
ALUM-02
15
EQ
50
100
300
100
50
1650 from CL. to CL.
见平面 RE: SEE PLAN
EXTERIOR DETAILS (W TYPE 3A)
200
EQ. 2200 FROM CL. TO CL.
图名 Sheet Name:
01 PLAN DETAIL AT OUTRIGGER / COLUMN COVER SCALE:
15 见平面 RE: SEE PLAN
外墙细节(3A
平面细节-悬臂/柱面 PLAN DETAIL - AT OUTRIGGER/ COL. COVER
EQ
50
100
300 1650 from CL. to CL.
100
50
EQ.
1:5
200
项目编号 Project No.: 218261
EXTERIOR DETAILSA8 (W TYPE 3A)
Drawn By:
Checked By:
比例 Scale @ A0:
2200 FROM CL. TO CL.
平面细节-悬臂/柱面 PLAN DETAIL - AT OUTRIGGER/ COL. COVER SCALE:
1:5
01
1:5
项目编号 Project No.: 218261
Drawn By: Checked By:
图纸编号
Author
Checker
Author Checker
比例 Scale @ A0:
图纸编号
A8
HUAFA HENGQIN BAY PLAZA
FACADE DETAIL
30
33
STAINLESS STEEL CAP GL-2A
568
T.O.1100
578
511
DIM. PT.
718
185
GLAZING SHOE
50 15
765 451
SEC
900 O.C.
ALUM-02
50
720 716 720 774
630
840
307
305
参见立面图 RE: SEE ELEV.
761
42 15
715
ALUM-02
SE
714
380
801
50
ALUM-01, FIN-02
ALUM-02
SECTION DETAIL AT PODIUM COPING 剖面细节盖板 SECTION DETAIL @ PODIUM COPING SCALE:
1:5
22
S
9/2021 12:09:42 PM
T. 765 451
SCALE:
1:5
GLAZING SHOE
参见立面图 RE: SEE ELEV.
50
801
12
DIM. PT.
剖面细节横挺 SECTION DETAIL @ TYP. PODIUM HORIZONTAL SCALE:
718
1:5
02
511
720 CL
CL
CL
125
50
125
CL
720 307
HSS 125X200 AT 14M HSS 100X200 AT <=9M
305
150
714
150
630
150
840
200
250
200
250
ALUM-01, FIN-01
801
ALUM-01, FIN-01
150
ALUM-01, FIN-01
150
200
774 250
CL
150
716
900 O.C.
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018
185
剖面细节扶手 SECTION DETAIL @ GUARD RAIL
ALUM-02
参见立面图 RE: SEE ELEV.
参见立面图 RE: SEE ELEV.
801
SEC 20
ALUM-01, FIN-01
ALUM-02
50 15
参见立面图 RE: SEE ELEV. DIM. PT.
R20
801
350
见平面 RE: SEE PLAN
平面细节竖向金属装饰条 PLAN DETAIL @ VERTICAL METAL SCALE:
PLAN DETAIL AT VERTICAL METAL
1:5
11
见平面 RE: SEE PLAN
ALUM-01, FIN-02
42 15 42
见平面 RE: SEE PLAN DIM. PT.
见平面 RE: SEE PLAN
ALUM-02 平面细节层间 PLAN DETAIL - @ SPANDRAL SCALE:
1:5
PLAN DETAIL AT SPANDRAL
06
剖面细节盖板 SECTION DETAIL @ PODIUM COPING 1:5
PLAN DETAIL AT MULLION
SCALE:
22
801
ALUM-01, FIN-01
01
CL
511
765 774 761
625
744
RATED BARRIER
900
715
745
ALUM-02
ALUM-01, FIN-01 801
参见立面图 RE: SEE ELEV.
150
511
15
302
175
730
DIM. PT.
25
40
55
ALUM-02
1:5
S 参见立面图 RE: SEE ELEV.
SCALE:
见平面 RE: SEE PLAN DIM. PT.
平面细节横挺 PLAN DETAIL @ MULLION
50
350
380
801
42 15 42 见平面 RE: SEE PLAN
50
714
70 200
40 20 40
ALUM-02
SE
ALUM-02
42 15
100 200
ALUM-02
70
ALUM-03
100
50
ALUM-01, FIN-02
100
50
714
715
参见立面图 RE: SEE ELEV.
761
见平面 RE: SEE PLAN
SECTION DETAIL AT STACK JOINT PODIUM
剖面细节叠缝 SECTION DETAIL @ STACK JOINT PODIUM SCALE:
1:5
21
PL
UCSF RESEARCH AND ACADEMIC BUILDING
PROJECT OVERVIEW
PROJECT OVERVIEW The five-story building is rising at the corner of 23rd and Vermont Street in the Mission District is the latest addition to the UCSF Zuckerberg San Francisco General Hospital and Trauma Center, or ZSFG. The five-story building is rising at the corner of 23rd and Vermont Street in the Mission District is the latest addition to the UCSF Zuckerberg San Francisco General Hospital and Trauma Center, or ZSFG. The new research building will add 175,000 square feet to ZSFG and will include modern research and academic facilities, wet and dry laboratories, a patient research center, and additional teaching and collaboration areas. The educational spaces will consist of a Surgical Training Facility and a Biomechanics testing laboratory.
“
The building is located on the historic hospital campus, which contains buildings from several different architectural periods, the oldest dating from the time of the First World War. The new building will need to respond appropriately to the adjacent historic architecture while establishing its own identity as a UCSF building on the ZSFG campus. Construction is estimated to cost $275 million. The building was approved in late 2019, with work starting in 2020 and completion expected this summer. The building is aiming to receive LEED Silver certification or higher. Copyright: https://sfyimby.com/2022/04/construction-underway-on-ucsfresearch-building-at-s-f-general-hospital.html
The UCSF Research and Academic Building at ZSFG is a seismic replacement project for UCSF research faculty and staff located in buildings on the ZSFG campus
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021
UCSF Research & Academic Building San Francidco, Californina, USA Client // UCSF Zuckerberg San Francisco General Hospital Plot Area // 15,213 sqft Project Size // 97,884 sqft
DESIGNATED ACCESSIBLE WORKSTATIONS
UCSF RES AND ACA BUILDING
1-HR FIRE-RESISTIVE RATING 2-HR FIRE-RESISTIVE RATING
EXTERIOR WALL GENERAL NOTES
SMOKE PARTITION
1. ALL EXTERIOR WALL ASSEMBLIES TO ACHIEVE STC-28, EXCEPT WHERE STC REQUIREMENTS ARE NOTED.
1
BUILDIN 1001 POTRER SAN FRANCISC ASSESSOR BLOCK
CONTRACTOR
UCSF RESEARCH AND ACADEMIC BUILDING
FLOOR PLANS
THE BOLDT COMPANY 375 BEALE STREET, SUITE SAN FRANCISCO, CA 94105
ARCHITECT
SKIDMORE, OWINGS & MER ONE MARITIME PLAZA SAN FRANCISCO, CA 94111
CIVIL FREYER & LAURETA, INC 150 EXECUTIVE PARK BLVD SAN FRANCISCO, CA 94134
STRUCTURAL DEGENKOLB 375 BEALE STREET, SUITE SAN FRANCISCO, CA 94105
MECHANICAL TAYLOR ENGINEERING 1080 MARINA VILLAGE PAR ALAMEDA, CA 94501
02
03
25'-6"
04
28'-0"
05
21'-0"
DN
CIRCULATION 3202
18'-9"
BSL2* GOWNING
30'-4"
3200
3220
BSL2* AUTOCLAVE
TOILETS - MEN
EXTERIOR WALL WINDOW ASSEMBLIES
TO ACHIEVE STC-31
30'-0"
3110
19'-4"
ELECTRICAL SILVERMAN & LIGHT 1201 PARK AVENUE, SUITE EMERYVILLE, CA 94608 LAB PLANNER JACOBS CONSULTANCY 401 B STREET, SUITE 1560 SAN DIEGO, CA 92101
18 A-3102
LANDSCAPE ARCHITECT MANTLE 930 CARLTON STREET, 2ND BERKELEY, CA 94710
TISSUE CULTURE 3308
3E1
D RFI#289
MECH SHAFT
3850
3901
ASSIGNABLE WORKSTATIONS - TYP.
OFFICE 3908
CONFERENCE SMALL
OFFICE
LINEAR EQUIPMENT
3801
ASSIGNABLE WORKSTATIONS - TYP.
OFFICE
STERILE STORAGE 3406
C 3751
OFFICE
3807
OFFICE
3709
3702
ASSIGNABLE WORKSTATIONS - TYP.
OFFICE 3708
3950
MOCK-UP 2 EXTENTS 1 A
EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31
BSL3 PROCEDURE 3521
UCSF RES AND ACA BUILDING
1. ALL EXTERIOR WALL ASSEMBLIES TO ACHIEVE STC-28, EXCEPT WHERE STC REQUIREMENTS 3532A ARE NOTED.
PLUMBING
BSL3 EQUIPMENT
ABSL3 - B PROCEDURE
3M1
3531
3525
UP B
ABSL3 PROCEDURE
ABSL3 HOLDING
3530
3526
BUILDIN 1001 POTRER SAN FRANCISC ASSESSOR BLOCK
CONTRACTOR
CIRCULATION 3650
3704
ARCHITECT
18 A-4201
3S2
3740
3705
THE BOLDT COMPANY 375 BEALE STREET, SUITE SAN FRANCISCO, CA 94105
EXIT STAIR 2
HUDDLE
OFFICE
3870
DN
3660
3703 OFFICE
CIRCULATION
CIRCULATION
3650
SATELLITE SERVICE CENTER
OFFICE
3700
06 A-4302
1 CIRCULATION
3T4
OFFICE
HOTEL OFFICE HOTEL OFFICE OFFICE 3804 3805 3707
3803
3808
SMOKE PARTITION TOILET (GENDER INCL)
SS4
3760
3550
BSL3 AUTOCLAVE DIRTY
3471
BSL3 3534 ELEC RISER PROCEDURE 3404 EMERGENCY RESP CLO 3L2 BSL3 GENERAL NOTES - FLOOR PLANS 3522 INF WASTE STO AUTOCLAVE 3473 CLO CLEAN 1. REFER TO SHEETS A-1103-A FOR TYPICAL EXTERIOR ENCLOSURE DETAIL ACCESSIBLE LABS MECH SHAFT 02 3474 CALLOUTS BSL3 AND DIMENSIONS, UON. S/V ELEV 3533 PROCEDURE SS3 2. REFER TO A-41 SERIES ENLARGED SECTORA-2101 FLOOR PLANS FOR INTERIOR ACCESSIBLE SINKS / FUME HOODS 3E2 TOILET (GENDER DIMENSIONS3523 & ELEVATIONS. BSL3 - COLD INCL) GOWN DESIGNATED ACCESSIBLE WORKSTATIONS 3T3 P/S ELEV CIRCULATION 3532 AIR LOCK 1-HR FIRE-RESISTIVE RATING 3500 3E3 BSL3 - IMAGING 3C5 STORAGE BSL3EXTERIOR - WARM WALL GENERAL NOTES 2-HR FIRE-RESISTIVE RATING 3524 3701 GOWN
PLUMB RISER
3802 OFFICE
3520
B LEGEND
STORAGE
CONFERENCE SMALL
3472
BSL3 - LAB
CIRCULATION
A ENVIRONMENTAL EQUIPMENT ROOM
3403
3750 OFFICE
3809
3904
3903
3906
3F1
3810
3800
3907
CPF
3L1
OFFICE
OFFICE HOTEL OFFICE HOTEL OFFICE
OFFICE
ELEC
NO. DESCRIPTION SCHEMATIC DESIGN 50% DESIGN DEVELOP 100% DESIGN DEVELOP CONSTRUCTION DOCU CONSTRUCTION DOCU 1 BACKCHECK 1 A BULLETIN A B BULLETIN B C BULLETIN C D BULLETIN D
3551
FLEX
CIRCULATION
OFFICE
3860
3902
3900
3407
3F2
3851
OFFICE
STERILIZER ALCOVE
3304
CPF
CIRCULATION STORAGE
3909
FUME HOOD
3305
3800
SS2
3400
3408
TISSUE CULTURE
ASSIGNABLE WORKSTATIONS - WET
BSL3 EMERGENCY EXIT VESTIBULE
3461
LINEAR EQUIPMENT C
3460 EQUIPMENT
OPEN LAB
3409
3303
1
3307
OFFICE
3100
3309
C
1
FLEX
OFFICE
HUDDLE
PLUMBING SOUTHLAND INDUSTRIES 33225 WESTERN AVENUE UNION CITY, CA 94587
17
21'-0"
LINEAR EQUIPMENT
3450 TISSUE CULTURE FUME HOOD 3401 3402
A
TISSUE CULTURE
LINEAR EQUIPMENT
3225
P ELEV
C
3410
3411
3302
C
LINEAR EQUIPMENT
FUME HOOD
3900
3C1
3010
16
22'-8"
CIRCULATION
TISSUE CULTURE
TISSUE CULTURE
MICROSCOPY 1
3300
3226
3910 03 A-4301
TOWN CENTER
TISSUE CULTURE
C
3301
OPEN LAB
TISSUE CULTURE ASSIGNABLE WORKSTATIONS - WET
EQUIPMENT/ DARK D 1
3310
3224
3201
SERVICE CENTER
3312
1
FLEX
BSL2* EQUIPMENT
3T1
3J1
TISSUE CULTURE
3311
LINEAR EQUIPMENT
CIRCULATION
6'-7"
19'-9"
OPEN LAB
EQUIPMENT
3221
SS1
3T2
3'-3"
BSL2* OPEN LAB
PLUMB RISER
JANITOR CLO
C
FLEX 1
1
MECH SHAFT
3203 TOILETS WOMEN
HUDDLE
CIRCULATION
3222
3011
3030
15
21'-0"
03 A-3102
3440
C
1
1
VENDING
CONFERENCE MEDIUM
3020
A
14
21'-0"
A EXTERIOR WALL WINDOW ASSEMBLIES
3250
3240
BSL2* A EQUIPMENT 3204
03 A-3101
B
13
21'-0"
04 A-2101
SKIDMORE, OWINGS & MER ONE MARITIME PLAZA SAN FRANCISCO, CA 94111
01 / A-1103-A 01 / A-1103-B
31'-0"
MOCK-UP 1 EXTENTS
01 A-3101
12
21'-0"
TO ACHIEVE STC-35
BSL2* BSL2* BSL2* TISSUE EQUIPMENT CULTURE EQUIPMENT ALCOVE 3207 3206 3205
3S1
17 A-2101
11
21'-0"
CIRCULATION
CIRCULATION
1
EXIT STAIR 1
UP
10
21'-0"
MOCK-UP 1 EXTENTS
1
A
09
21'-0"
1
E
B
08
21'-0"
01 A-3102 06 A-4201
C
07
21'-0"
5'-6"
D
06
21'-0"
01 / A-1103-A 01 / A-1103-B
01
01 A-2101
CIVIL FREYER & LAURETA, INC 150 EXECUTIVE PARK BLVD SAN FRANCISCO, CA 94134
STRUCTURAL DEGENKOLB 375 BEALE STREET, SUITE SAN FRANCISCO, CA 94105
B
LEVEL THREE FLOOR PLAN 02
03 28'-0"
05
21'-0"
06
21'-0"
07
21'-0"
08
21'-0"
09
21'-0"
21'-0"
11
21'-0"
01 A-3102 06 A-4201
10
12
21'-0"
13
21'-0"
14
21'-0"
15
21'-0"
22'-8"
CIRCULATION
2220
2S1
2203
1
DN
LINEAR EQUIPMENT
CIRCULATION
2209
TOILETS - MEN
2E1 2853
1
ASSIGNABLE WORKSTATIONS - TYP.
OFFICE 2908
2010
STORAGE
2852
2851
A EQUIPMENT
IDF
ELEC
OFFICE
OFFICE
HUDDLE
2907
2903
2100
OFFICE
CIRCULATION
2906
2840
2801 ASSIGNABLE WORKSTATIONS - WET
2808
HOTEL OFFICE HOTEL OFFICE OFFICE 2904 2806 2807
ASSIGNABLE WORKSTATIONS - TYP.
2702
2803
MOCK-UP 2 EXTENTS
2804
B
2701
2805
DN
2600 RATING 2-HR FIRE-RESISTIVE
CIRCULATION
CIRCULATION
2740
2700
UP
B B
DESIGNATED ACCESSIBLE WORKSTATIONS MCC - OPEN LAB & 1-HR FIRE-RESISTIVE RATING WORKSTATIONS
2700
OFFICE HOTEL OFFICE HOTEL OFFICE OFFICE
CIRCULATION CENTRAL MAIL 2651 2650
MCC CYTROMETRY ACCESSIBLE LABS 1 2620 2610 ACCESSIBLE SINKS / FUME HOODS
2700
OFFICE
2760
2802
2800
2703
CONFERENCE SMALL
OFFICE
TOILET (GENDER 04 INCL) A-4302 1 2T4
SS4 ASSIGNABLE WORKSTATIONSLEGEND MCC - CELL - WET SORTER
OFFICE
OFFICE
2809
2E3
2T3
2652 PLUMBING RISER
2751
P/S ELEV
C
A BULLETIN A 218024
B BULLETIN B SHEET NAME C BULLETIN C D BULLETIN D
LEVEL 3 FL PLAN - OV
15 COMPACTOR A-4201 FG +89' - 4 1/4" C (89.35') RFI#157 FG +89' - 5" LOADING DOCK (89.42') 2500 A TRUCK BAY 1 FG +89' - 5" (89.42') A
02 A-2101
SCALE:
3/32" = 1'-0"
2S2
01
SHEET NUMBER
A
+88' - 10 215/256" (88.90') +88' - 9 31/32" (88.83')
A
A FG +89' - 2 1/2" FG +88' - 4 3/8" (89.21') FG +88' - 11 1/2" (88.36') (88.96') TRUCK BAY 2 A LOADING DOCK +87' - 11 1/4" GENERAL NOTES FLOOR PLANS STAGING (87.94') FG +87' - 11 57/256" 2501 1. REFER(87.94') FGEXTERIOR +87' - 10 3/4" TO SHEETS A-1103-A FOR TYPICAL ENCLOSURE DETAIL (87.90') CALLOUTS ELEC AND DIMENSIONS, UON. UTILITY 2. REFER TO A-41 SERIES ENLARGED SECTOR+87' FLOOR - 10" PLANS FOR INTERIOR 2L3 DIMENSIONS & ELEVATIONS. (87.83') C
UCSF RESEARC AND ACADEMI BUILDING AT ZS
FG +89' - 2 1/2" INF WASTE (89.21') A EXTERIOR WALL GENERAL 2553 NOTES FG +88' - 7 1/2" (88.63') 1. ALL EXTERIOR WALL ASSEMBLIES TO ACHIEVE STC-28, EXCEPT WHERE STC REQUIREMENTS ARE NOTED.
EXIT STAIR 2
SMOKE PARTITION
A
+88' - 10 85/128" (88.89') +88' - 11 55/128" (88.95')
TRASH
2E2
TOILET (GENDER INCL)
STORAGE
A
STORAGE
CIRCULATION
SS3
2410
2401
2F1
2L1
ELEC S/V ELEV
2C5
ZSFG
B
A LEVEL 3 FLOOR PLAN - OVERALL
2S3
2450
2M1 FG +89' - 7" (89.58')
+89' - 5 3/4" (89.48')
2550
SERVICE STAIR
AIR LOCK
MECH SHAFT
EQUIPMENT
UP
2451
A C
2402
FUEL PUMP
CIRCULATION
FG +89' - 6 201/256" (89.57') FG +89' - 6 105/256" (89.53') FG +89' - 9" RECYCLING (89.75') COMPACTOR
CIRCULATION
2452
1
EQUIPMENT
2308
2750
OFFICE
2860
2902
STORAGE
OFFICE
CONFERENCE SMALL
OFFICE
FUME HOOD
EQUIPMENT
TISSUE CULTURE 2311
SS2
2900
10'-6"
30'-0"
A
2901
2909
2110 TOWN CENTER
2309
MAINT CLO CIRCULATION 2460 2J2 EMERGENCY RESP CLO
INF WASTE STO CLO
2850
OFFICE
OFFICE
SERVICE CENTER B
TO ACHIEVE STC-31
A
EXTERIOR WALL WINDOW ASSEMBLIES
B
TISSUE CULTURE
2310
MECH SHAFT
CIRCULATION
03 A-4301
2C1
SMALL FLEX
EQUIPMENT 2301
2F2
STORAGE
2T2
2302
D RFI#289 IDF
P ELEV
CIRCULATION
STERILE STORAGE
2303
BUILDING 7 1001 POTRERO AVENU SAN FRANCISCO, CA 941 ASSESSOR'S LOT 1 BLOCK 4154
08 A-4201
B
01 / A-1102-A 01 / A-1102-B
31'-0" 19'-9"
2212
2900
C
2409
2350
STERILIZER ALCOVE
2408
2400
1
CIRCULATION
2304
2210
1
2321
1
1 FUME HOOD
2211
MASS SPECTROMETRY - PREP
2300
C
LINEAR EQUIPMENT
TISSUE CULTURE
TISSUE CULTURE
ASSIGNABLE WORKSTATIONS - WET
2J1
2020
2305
SS1
JANITOR CLO HUDDLE
2208
LINEAR EQUIPMENT
2T1
01 A-3101
MICROSCOPY
MECH SHAFT
TOILETS WOMEN
2030
LARGE FLEX
OPEN LAB CHEMISTRY
2462
2461
FUME HOOD
8% 2.6
18'-9"
2201
2C1
CONFERENCE MEDIUM
2200
2202
1
2320
OPEN LAB
CYLINDER / BULK C02 TANK STORAGE LN2 DISPENSING
2407
C
MASS SPECTROMETRY
NO. DESCRIPTION SCHEMATIC DESIGN 50% DESIGN DEVELOP CAMPUS 100% DESIGN DEVELOP CONSTRUCTION DOCU CONSTRUCTION DOCU 1 BACKCHECK 1 PROJECT NUMBER UC 2 BACKCHECK 2
% 1.87
03 A-3101
11/15/2021 5:27:04 PM
2306
OPEN LAB
MOCK-UP 1 EXTENTS
UP
C
TISSUE CULTURE
2207
LANDSCAPE ARCHITECT MANTLE 930 CARLTON STREET, 2ND BERKELEY, CA 94710
2552
D JUST-IN-TIME CHEMICAL STORAGE 2 2551 FG +89' - 8 3/4" (89.73')
FUME HOOD
2405
LARGE FLEX 1
LARGE FLEX
D
FUME HOOD
2230
C
TISSUE CULTURE
EXIT STAIR 1
LAB PLANNER JACOBS CONSULTANCY 401 B STREET, SUITE 1560 SEAL & SIGNATURE SAN DIEGO, CA 92101
FLAMMABLE CHEMICAL WASTE STORAGE
B
B
CIRCULATION
1
18 A-3102 A
EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31
MOCK-UP 1 EXTENTS
ELECTRICAL SILVERMAN & LIGHT 1201 PARK AVENUE, SUITE EMERYVILLE, CA 94608
19'-4"
03 A-3102
04 A-2101
PLUMBING SOUTHLAND INDUSTRIES KEYPLAN 33225 WESTERN AVENUE UNION CITY, CA 94587
17
21'-0"
1
E
16
1.1 2%
25'-6"
04
01 / A-1102-A 01 / A-1102-B
01
MECHANICAL TAYLOR ENGINEERING 1080 MARINA VILLAGE PAR ALAMEDA, CA 94501
01 A-2101
CONTRACTOR
EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B 5'-6"
THE BOLDT COMPANY 375 BEALE STREET, SUITE 500 SAN FRANCISCO, CA 94105
355'-0"
ARCHITECT
SEE LEVEL 1 FLOOR PLAN FOR BUILDING AT GRADE
SKIDMORE, OWINGS & MERRILL LLP ONE MARITIMEKEYPLAN PLAZA SAN FRANCISCO, CA 94111
CIVIL FREYER & LAURETA, INC 150 EXECUTIVE PARK BLVD., SUITE 4200 SAN FRANCISCO, CA 94134 STRUCTURAL DEGENKOLB 375 BEALE STREET, SUITE 500 SAN FRANCISCO, CA 94105 SEAL & SIGNATURE
LEVEL TWO FLOOR PLAN 01
MECHANICAL TAYLOR ENGINEERING 1080 MARINA VILLAGE PARKWAY, SUITE 50 ALAMEDA, CA 94501
02
25'-6"
03
28'-0"
04
21'-0"
05
21'-0"
06
21'-0"
07
21'-0"
21'-0"
08
09
21'-0"
10
21'-0"
11
21'-0"
12
21'-0"
13
21'-0"
14
21'-0"
15
22'-8"
21'-0"
16
19'-4"
PLUMBING SOUTHLAND INDUSTRIES 33225 WESTERN AVENUE UNION CITY, CA 94587
17
ELECTRICAL CAMPUS SILVERMAN & LIGHT 1201 PARK AVENUE, SUITE 100 EMERYVILLE, CA 94608
315'-2" 10'-2 1/4"
44'-8 1/2" B
18'-2 1/2" B
23'-9 1/2" B
ZSFG
18'-2 1/2" B
194'-6 3/4" B
01 A-3102 FAC SERVICES CHANGE / LOCKERS
2'-2"
1202
EXIT STAIR 1
INTERVIEW
1S1
RECEPTION
1201
1200
31'-0"
CIRCULATIONTOILET INTERVIEW 1206 1207 1204
1'-8"
UP
18'-9"
03 A-3101
A
17 A-2101
103'-10"
INTERVIEW
EXAM
1205
1327
A
ENTRANCE HALL
RECEPTION
1C1
1010
01 A-3101
LACTATION
INTERVIEW
RECEPTIONWAITING AREA ADULT INTERVIEW 1300
1310
1325 INTERVIEW
VITAL SIGN STATION 1324
1326 CLEAN
SOILED
1320
1318
EXAM 1316
EXAM 1314
19'-9"
VENDING
FOCUS GROUP
INTERVIEW
1317
1321
C1
1935
68'-6"
CIRCULATION
B
1950A
LARGE CONFERENCE 1950
TOILET 1312
1C3
PROCESSING LAB
CENTRAL SAMPLE STORAGE
1305
1410
P ELEV
LARGE CONFERENCE
LARGE CONFERENCE
1940
1930
1308
1E1
02 A-4301
1508A
1508
UPS
VIV - SMALL PROCEDURE
VIV - SMALL HOLDING
1480
1507A
1507
C1
C1 SERVER
1
1J1
1505A
STORAGE 1930A
CATERING
EQUIPMENT
ELEC
1420
1L1
C1
C1
CONFERENCE ROOM (LEARNING CTR) 1920
STF - WOMEN'S LOCKER 1805
B STF - SAW BONE LAB
VIV - IRRA 1511
1505
BDF 1F1
1807
SIMULATION LAB
1C2
1T4
B
1800
01 A-2101
DATE 2019 2019 2019 2020 2020 2020 2020 2020 2021 2021 2021
A
B
02 A-2101
LOADING DOCK EXTENT ABOVE
IT WORKROOM 1580
UP 01 A-5002
SIM.
1
1S2 1
1802 B
NO. DESCRIPTION SCHEMATIC DESIGN SHEET NUMBER 50% DESIGN DEVELOPMENT 100% DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONSTRUCTION DOCUMENTS 1 BACKCHECK 1 A BULLETIN A B BULLETIN B C BULLETIN C C1 BULLETIN C RESUBMITTAL D BULLETIN D
01
EXIT STAIR 2
STF DISSECTION
B
3/32" = 1'-0"
1
1700 1801
1803
B
01 A-4302
STF - CTR
STF - LINEAR EQUIPMENT
1804
1910A
1M1
B VIV - GOWNINGVALVE CLOSET INF WASTE STO VIV - ANIMAL WATER CLO 1520 1500 1M2 1560 VIV - CLEAN VIV - SMALL VIV - SMALL CAGE STAGING /VIV - WORK SPACE CIRCULATION PROCEDURE S/V ELEV HOLDING FEED 1501 TOILET (GENDER 1504 1E2 1503 AIR LOCK 1502 INCL) 1C5 1T3 FAC SERVICES P/S ELEV MPOE SHOP / JANITOR / MAINT STORAGE 1E3 1F2 1J2 TOILET (GENDER 1600 INCL)
STF - SURGICAL TRAINING LAB
1808
STF - MEN'S LOCKER
SIM LAB ANTE-ROOM
PLUMBING
BTF - C-ARM WORK SPACE
STF AUTOCLAVE / CLEAN STORAGE
1
B
1550 D VIV - HOLDING/ PROCEDURE VIV - HOUSING VIV - STORAGEVIV - AIR LOCK (TESTING) 1517 1515 1519 1513
B
1910
PERFORATED FOUNDATION DRAIN PIPE AS REQUIRED, (RE: CIVIL)
CIRCULATION
VIV - LARGE PROCEDURE
CIRCULATION C1
LANDSCAPE ARCHITECT MANTLE 930 CARLTON STREET, 2ND FLOOR BERKELEY, CA 94710
1518
1516
UC
LEVEL 2 FL PLAN - OV
1
SCALE:
VIV - SMALL VIV - SMALL PROCEDURE HOLDING 1506A 1506
VIV - HOLDING
1495
1514
01 A-5002
PROJECT NUMBER LAB PLANNER 218024 JACOBS CONSULTANCY 401 B STREET, SUITE 1560 SHEET NAME SAN DIEGO, CA 92101
18 A-3102
2'-6"
LEVEL 2 FLOOR PLAN - OVERALL
PRE-ACTION CLOSET
1306
1930B
EDGE OF BUILDING ABOVE
CUST. EQUIP B
B
A
1 3/8"
CIRCULATION
RES. KIT. STO.
AV CLOSET
A
PHLEBOTOMY
VIV - SMALL HOLDING
1490
PRE-FUNCTION 1011
1461A 1461B
1512
1510
VIV - SMALL PROCEDURE
1309
1C1
STORAGE
1440
1470
1304
RA STATION
PLUMB RISER
TOWN CENTER
BIKE SHOWERS WOMEN
1462
EXAM
03 A-3102 D VIV - HOLDING/ VIV - HOLDING/ VIV - HOLDING/ VIV PROCEDURE PROCEDURE PROCEDURE VIV - DIRTY (TESTING) (TESTING) CAGE STAGING AUTOCLAVE (TESTING)
BIKE STORAGE
1303 C
INTERVIEW INTERVIEW VITAL SIGN TOILET INTERVIEW STATION 1328 1336 1332 1330 1334
1323
1T2
30'-0"
RA STATION
1350
04 A-2101
FAC OFFICE / BMS OFFICE
1302 C
CIRCULATION
RA STATION
1T1
TOILETS - MEN
1012
1301
1333
1329
RA STATION
1020 TOILETS WOMEN
1331
TEAM WORKROOM
01 / A-1101-A 01 / A-1101-B
D
INTERVIEW
WAITING AREA CHILDREN
1203
2'-2"
11/15/2021 5:26:19 PM
15 A-3301
INTERVIEW 01 A-4201
C
FAC TEAM BIKE SHOWERS WORKROOM MEN 1460 1450
1461
E
01 / A-1101-A 01 / A-1101-B
B 3'-6"
PARTIALLY BELOW GRADE: SEE LEVEL 2 FLOOR PLAN FOR GRADE AT EAST SIDE OF THE BUILDING
BTF - MTS BTF - STORAGE WORKSTATIONS 1701 1702
C
B
SWITCHGEAR ENCLOSURE @ GRADE ABOVE
03 A-4201
2'-6"
3'-5 3/8"
2'-2 1/4" 26'-9 1/8"
286'-4 1/4" 313'-1 3/8" KEYPLAN
LEVEL ONE FLOOR PLAN
SEAL & SIGNATURE
CAMPUS
ZSFG PROJECT NUMBER
218024 SHEET NAME
30
UCSF PROJECT N
PR
A
UCSF RE AND AC BUILDING
BUILD 1001 POTRE SAN FRANCIS ASSESSO BLOC
CONTRACTOR
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021
THE BOLDT COMPANY 375 BEALE STREET, SU SAN FRANCISCO, CA 94
ARCHITECT
SKIDMORE, OWINGS & ONE MARITIME PLAZA SAN FRANCISCO, CA 94
CIVIL FREYER & LAURETA, IN 150 EXECUTIVE PARK B SAN FRANCISCO, CA 94
STRUCTURAL DEGENKOLB 375 BEALE STREET, SU SAN FRANCISCO, CA 94
01
02
03
04
05
07
06
08
09
10
11
12
13
14
15
16
MECHANICAL TAYLOR ENGINEERING 1080 MARINA VILLAGE P ALAMEDA, CA 94501
17
PLUMBING SOUTHLAND INDUSTRI 33225 WESTERN AVENU UNION CITY, CA 94587
A
355'-0"
J
J J
1'-8"
J
J
J
6M2
A
C1
C1
A
1
HP +158' - 3" C1 ELECTRICAL GENERAL NOTES - FLOOR PLANS
C1
6L3
J 1.
REFER TO SHEETS A-1103-A FOR TYPICAL EXTERIOR ENCLOSURE DETAIL 02 CALLOUTS AND DIMENSIONS, UON. 2. REFER TO A-41 SERIES ENLARGED SECTORA-2101 FLOOR PLANS FOR INTERIOR DIMENSIONS & ELEVATIONS.
JJ
TOC +157' -J4"
A
UCSF RE AND AC BUILDING
J
1
EXIT STAIR 2
C1 LP +157' - 5 1/2"
LP +157' - 5 1/2"
RS01; TYP
UP
6S2
HP +158' - 4 1/2" C1
3'-10" A
3'-10 1/8" A
A
1
4'-2" 01 A-2101
A
C1
C1
4'-2"
4'-2"
2'-2"
MOCK-UP 2 EXTENTS 1
HP +158' - 4 1/2"
A
01 / A-1106-B
4-'-0" WINDOW WASHING EQUIPMENT ACCESS PATH, TYP
A
1
C1
6'-6 3/4"
1
1
01 / A-1106-A
HP +158' - 6 1/2"
C1
HP +158' - 3"
LP +157' - 5 1/2"
1
WINDOW WASHING 3'-10" DAVITS, TYP
A
A
LP +157' - 5 1/2" 4'-4"
C1
A
1 A
C1
HP +158' - 2"
ROOF DRAIN, TYP OVERFLOW DRAIN, TYP
A
BUILD 1001 POTRE SAN FRANCIS ASSESSO BLOC
HP +157' - 9" 19'-0 1/2"
C1
DN
C1
1
A
1
DN
C1
HP +158' - 3"
3 7/8"
ROOF SCREEN
SOLAR READY AREA
CONTRACTOR
THE BOLDT COMPANY 375 BEALE STREET, SU SAN FRANCISCO, CA 94
ARCHITECT
SKIDMORE, OWINGS & ONE MARITIME PLAZA SAN FRANCISCO, CA 94
2'-2"
1
1. ALL EXTERIOR WALL ASSEMBLIES TO ACHIEVE STC-28, EXCEPT WHERE STC REQUIREMENTS 1 ARE NOTED.
FSD
10'-11 1/2"
D
B SOLAR READY AREA TOTAL = 9000 SF
5-6
SMOKE PARTITION 1
1
1 C1EXTERIOR WALL GENERAL NOTES
2-HR FIRE-RESISTIVE RATING
C1
7'-0 1/8"
C1
J
19'-9"
J
J
SOLAR READY AREA
18'-6 3/4"
1
J
30'-0"
C1
J
1
HP +158' - 5 1/2" C1
NO. DESCRIPTION SCHEMATIC DESIG 50% DESIGN DEVE 100% DESIGN DEVE CONSTRUCTION DO CONSTRUCTION DO 1 BACKCHECK 1 A BULLETIN A C BULLETIN C C1 BULLETIN C RESUB D BULLETIN D
C1
C ACCESSIBLE LABS C1 C1 1 ACCESSIBLE HP +158'SINKS - 5 1/2"/ FUME HOODS ELEV CONTROL 6L1 C DESIGNATED ACCESSIBLE WORKSTATIONS JJ AIR LOCK 1-HR FIRE-RESISTIVE RATING P/S ELEV 6C5
J J
J
J
J
A
1
LEGEND C1
HP +158' - 5 1/2"
C1
9'-10 1/4"
HP +157' - 9"
6L2
C1
LANDSCAPE ARCHITEC MANTLE 930 CARLTON STREET, BERKELEY, CA 94710
1
1
C1
C1
ELEC
1
MECHANICAL & PLUMBING
ROOF @ TOP OF ELEV HOISTWAY
A
HP +157' - 7"
C
1
A
1
C1
C1 1 HP +157' - 7 1/2"
EPO EPOEMERGENCY
A
6M1
6-'-0" MEP WALKPAD, TYP.
HP +158' - 5 1/2" C1
C1 HP +157' - 11 1/2"
LAB PLANNER JACOBS CONSULTANC 401 B STREET, SUITE 1 SAN DIEGO, CA 92101
C1 LP +157' - 5 1/2"
C
J
MECHANICAL
5'-7 7/8"
18 A-3102
1
ELECTRICAL SILVERMAN & LIGHT 1201 PARK AVENUE, SU EMERYVILLE, CA 94608
A
A
J
01 A-3101
A
03 A-3102
1
A
A
J
SOLAR READY AREA
A
19'-4"
A
J
HP +158' - 7" C1
21'-0"
2'-2"
C1
J
03 A-3101
18'-9"
LP +157' - 5 1/2"
HP +158' - 1 1/2"
22'-8"
A
3'-10"
C1
ROOF SCREEN
C1
A
21'-0"
04 A-2101 1
4-'-0" WINDOW WASHING EQUIPMENT ACCESS PATH, TYP
LP +157' - 5 1/2" 1
21'-0"
4.03%
1
21'-0"
HP +157' - 9 1/2"
C1
17 A-2101
21'-0"
A
MOCK-UP 1 EXTENTS
C
21'-0"
A C1
C1 HP +158' - 5 1/2"
C1
21'-0"
3'-10"
01 A-3102
A
1
D
21'-0"
A
MOCK-UP 1 EXTENTS
HP +158' - 3 1/2" A
21'-0"
4'-2"
21'-0"
OVERFLOW DRAIN, TYP 1
31'-0"
21'-0"
9'-10 1/8"
3'-10"
ROOF DRAIN, TYP
WINDOW WASHING DAVITS, TYP
E
21'-0"
4'-2"
28'-0"
4'-2"
25'-6" A
4'-2"
5'-6" A
A 2'-0"
CIVIL FREYER & LAURETA, IN 150 EXECUTIVE PARK B SAN FRANCISCO, CA 94
A
STRUCTURAL DEGENKOLB 375 BEALE STREET, SU SAN FRANCISCO, CA 94
A
2'-11 3/4"
ROOF LEVEL FLOOR PLAN
MECHANICAL TAYLOR ENGINEERING 1080 MARINA VILLAGE P ALAMEDA, CA 94501
354' - 11"
01
02
03
25'-6"
5'-6"
04
28'-0"
05
21'-0"
06
21'-0"
07
21'-0"
08
21'-0"
09
21'-0"
10"
OFFICE
31'-0"
30'-2 1/16"
DN
A
1'-8"
17 A-2101 01 A-3101
ELECTRICAL SILVERMAN & LIGHT 1201 PARK AVENUE, SU EMERYVILLE, CA 94608
5411 OFFICE
5302
5410
HOTEL OFFICE
5100
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
5103
5216
5203
5316
5303
5409
19'-9"
5104
SS1
5150
5105
CIRCULATION
5105A
5212
5250
CIRCULATION
A
CIRCULATION
PLUMB RISER
5960
HUDDLE A
OFFICE
5901
5809
HOTEL OFFICE
OFFICE
OFFICE
ASSIGNABLE WORKSTATIONS - TYP.
5902
5808
OFFICE
OFFICE
5903
5807
HOTEL OFFICE
OFFICE
5906
5904
5900
5907
OFFICE
OFFICE
OFFICE
5210
5209
5208
5207
CPF
5813
5F2
A
EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B
HUDDLE A
OFFICE OFFICE 5312
5313
MECH SHAFT
5311
CIRCULATION
05 A-4201
LANDSCAPE ARCHITEC MANTLE 930 CARLTON STREET, BERKELEY, CA 94710
5709
OFFICE
OFFICE 5708 OFFICE 5707
OFFICE
OFFICE
OFFICE
5806
5804
5706
A
5T3
5680
CIRCULATION
5750
5650
A ASSIGNABLE WORKSTATIONS - TYP.
A
A
5700 A
A A
A
EXTERIOR WALL WINDOW ASSEMBLIES
OFFICE
OFFICE
5701
5609
OFFICE
OFFICE
280'-9"
SS4
1
5608 OFFICE
5703
5607
OFFICE
OFFICE
5704
5606
- TYP. 5600
OFFICE
OFFICE
5503
5502
5501
5J2
DN
UP
CIRCULATION
5551 OFFICE
OFFICE
B
DESIGNATED ACCESSIBLE OFFICE WORKSTATIONS
5534
5603 1-HR FIRE-RESISTIVE RATING EXIT STAIR 2
B
UCSF RE AND AC BUILDING
28 EXTERIOR WALL GENERAL NOTES A-4201
5S2
2-HR FIRE-RESISTIVE RATING OFFICE
5520
GENERAL NOTES - FLOOR PLANS ASSIGNABLE WORKSTATIONS 1. REFER TO SHEETS A-1103-A FOR TYPICAL EXTERIOR ENCLOSURE DETAIL - TYP. CALLOUTSCIRCULATION AND DIMENSIONS, UON. SERIES ENLARGED SECTOR FLOOR PLANS FOR INTERIOR 55302. REFER TO A-415530 DIMENSIONS & ELEVATIONS.
5535
5552
SMOKE PARTITION 5604
1. ALL EXTERIOR WALL ASSEMBLIES TO ACHIEVE STC-28, EXCEPT WHERE STC REQUIREMENTS ARE NOTED.
A
EXTERIOR WALL WINDOW ASSEMBLIES
BUILD 1001 POTRE SAN FRANCIS ASSESSO BLOC
A EXTERIOR WALL WINDOW ASSEMBLIES
A
SHEET NUMBER
5533
CIRCULATION
STORAGE
01
A
5532 5538
5550 STORAGE
5601
TO ACHIEVE STC-31 B
OFFICE
3/32" = 1'-0"
HOTEL OFFICE OFFICE
5536
OFFICE
01 A-2101
5537
HOTEL OFFICE
5E3 MAINT CLO
SCALE:
02 A-2101
5531
HOTEL OFFICE
P/S ELEV
D RFI-288
ACCESSIBLE LABS OFFICE ASSIGNABLE ACCESSIBLE SINKS5602 / FUME HOODS WORKSTATIONS
5702
OFFICE
5T4
LEGEND
OFFICE
EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B A A EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-39
TO ACHIEVE STC-35
D RFI-331
TOILET (GENDER PLUMB RISER INCL)
5500
ROOF LEVEL FLOOR PLAN - OVERALL
OFFICE
5C5
SS3
CIRCULATION
07 A-4302
ELEC RISER
A
ROOF LE FLOOR P OVERALL
HOTEL OFFICE
5L2 D S/V ELEV RFI-288 5E2 AIR LOCK
5555
C
5611
CIRCULATION
5511
5500
5506
MECH SHAFT HUDDLE A
5713 A
5507
5404
LACTATION
CIRCULATION
HOTEL WORKSTATIONS
OFFICE
SERVICE CENTER
HOTEL OFFICE
TOILET (GENDER INCL)
5450
ZSFG
5508
5402
CIRCULATION
5405
A HUDDLE
5711
A
A
27'-10"
5760
STORAGE
5F1
OFFICE
5403
CONFERENCE MEDIUM A
5509
5512
OFFICE
HOTEL OFFICE HOTEL OFFICE 5408 5304
OFFICE PRINT 5307 5308
CPF
5780 OFFICE
5801
5803
EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B
5309
CIRCULATION
OFFICE
5802
TO ACHIEVE STC-35
OFFICE
5310
CONFERENCE SMALL
5400
NO. DESCRIPTION SCHEMATIC DESIG 50% DESIGN DEVE 100% DESIGN DEVE CAMPUS CONSTRUCTION DO CONSTRUCTION DO 1 BACKCHECK 1 A BULLETIN A PROJECT NUMBER B BULLETIN B 218024 C BULLETIN C D BULLETIN SHEET NAME D
OFFICE
5401 OFFICE
ASSIGNABLE WORKSTATIONS - TYP.
CIRCULATION
OFFICE
5800
OFFICE
5L1
5860
5850
OFFICE
5405A
ELEC
5S3
SS2
ASSIGNABLE WORKSTATIONS - TYP.
EXTERIOR WALL WINDOW ASSEMBLIES
2' - 2"
HUDDLE A
5205
CIRCULATION
A
A
STORAGE
CIRCULATION
COMMUNICATING STAIR
D RFI#289 STORAGE
04 A-4301
5880 OFFICE
5909
5908
OFFICE
CIRCULATION
5950 HOTEL OFFICE
HOTEL OFFICE
A
5211
5E1
5811
CIRCULATION
5C1
5300
5350
OFFICE
P ELEV
HUDDLE A
5911
ASSIGNABLE WORKSTATIONS - TYP.
HOTEL OFFICE HOTEL OFFICE 5204 5315
STORAGE A
CONFERENCE MEDIUM
5T2
TO ACHIEVE STC-31
5200
5215
CIRCULATION
TOILETS - MEN
6'-7"
ASSIGNABLE WORKSTATIONS - TYP.
HOTEL OFFICEHOTEL OFFICE
MECH SHAFT
5J1
4'-6"
OFFICE
5301 OFFICE
5317
JANITOR CLO
B
OFFICE
5318 OFFICE
5202
5T1
5010
OFFICE
5201 OFFICE
5217
TOILETS WOMEN
TOWN CENTER
OFFICE
5218 OFFICE
5030
5020
OFFICE
5102
HOTEL OFFICE
LAB PLANNER JACOBS CONSULTANC 401 B STREET, SUITE 1 SAN DIEGO, CA 92101 SEAL & SIGNATURE
18 A-3102
TO ACHIEVE STC-31 B
5101
CONFERENCE MEDIUM
HUDDLE
EXTERIOR WALL WINDOW ASSEMBLIES
19'-4"
A EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-39
EXTERIOR WALL WINDOW ASSEMBLIES
OFFICE
5107
18'-9"
PLUMBING SOUTHLAND INDUSTRI KEYPLAN 33225 WESTERN AVENU UNION CITY, CA 94587
17
21'-0"
A
ASSIGNABLE WORKSTATIONS - TYP.
03 A-3101
2' - 2"
16
22'-8"
03 A-3102
5109
5108
30'-0"
15
21'-0"
A
01 / A-1105-A 01 / A-1105-B
5110 HOTEL OFFICE
5S1
102' - 6"
01 / A-1105-A 01 / A-1105-B
EXTERIOR WALL WINDOW ASSEMBLIES
HOTEL OFFICE
11/15/2021 5:28:26 PM
04 A-2101
TO ACHIEVE STC-31 B
A
14
21'-0"
EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-35 EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B
A
EXIT STAIR 1
A
13
21'-0"
2' - 0"
E
B
12
21'-0"
A
21 A-4201
C
11
21'-0"
01 A-3102
D
10
21'-0"
CONTRACTOR
TO ACHIEVE STC-39
EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-39
1' - 11"
45'-5"
THE BOLDT COMPANY 375 BEALE STREET, SU SAN FRANCISCO, CA 94
ARCHITECT
SKIDMORE, OWINGS & KEYPLAN ONE MARITIME PLAZA SAN FRANCISCO, CA 94
CIVIL FREYER & LAURETA, IN 150 EXECUTIVE PARK B SAN FRANCISCO, CA 94
STRUCTURAL DEGENKOLB 375 BEALE STREET, SU SAN FRANCISCO, CA 94 SEAL & SIGNATURE
LEVEL FIVE FLOOR PLAN 01
MECHANICAL TAYLOR ENGINEERING 1080 MARINA VILLAGE P ALAMEDA, CA 94501
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
PLUMBING SOUTHLAND INDUSTRI 33225 WESTERN AVENU UNION CITY, CA 94587
17
CAMPUS ELECTRICAL SILVERMAN & LIGHT 1201 PARK AVENUE, SU EMERYVILLE, CA 94608
354'-10 3/4" 25'-6"
28'-0"
21'-0"
21'-0"
21'-0"
21'-0"
21'-0"
21'-0"
21'-0"
A
ASSIGNABLE WORKSTATIONS - TYP.
HOTEL OFFICE 4109
4100
HOTEL OFFICE 4108
UP
DN 4107
03 A-3101
1'-8" 18'-9"
33'-7"
C
CIRCULATION 4C1
A
CONFERENCE MEDIUM
TOILETS WOMEN
4030
01 A-3101
HUDDLE
4J1
19'-9"
4960
TOILETS - MEN
4216
CIRCULATION
TOWN CENTER 4010
A
OFFICE
ASSIGNABLE WORKSTATIONS - TYP. 4200
HOTEL OFFICE
OFFICE
4908
ASSIGNABLE WORKSTATIONS - TYP. 4900
HOTEL OFFICE 4906
OFFICE
4902
4808
OFFICE
OFFICE
4903
4807
OFFICE
OFFICE
4904
4806
4317
A EXTERIOR WALL WINDOW ASSEMBLIES
OFFICE
OFFICE
4203
4316
OFFICE
ASSIGNABLE WORKSTATIONS - TYP. 4300
P ELEV
4210
OFFICE
4208
4207
HUDDLE A
HVAC SHAFT
4860
4313
COMMUNICATING STAIR
SS2
4F2
HUDDLE A
4205
CIRCULATION
4780
4S3
A
EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-35
JACOBS CONSULTANC SHEET NAME SUITE 1 401 B STREET, SAN DIEGO, CA 92101
LEVEL 5 PLAN - O
ASSIGNABLE WORKSTATIONS - TYP. 4800
OFFICE 4802 OFFICE 4803 OFFICE 4804
A
EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B
4405A
4312
4311
4310
4309
4308
4405
4680
A
CIRCULATION ELEC
IDF
4L1
4F1
4760
4713
ASSIGNABLE WORKSTATIONS - TYP.
A OFFICE
4700
A OFFICE
4702
4707
4703
A OFFICE
A OFFICE
4706
4704
01 A-2101
SS3
4601 OFFICE
ASSIGNABLE WORKSTATIONS - TYP.
4608 OFFICE
4600
4607
OFFICE
OFFICE
4E2
4503
4502
4501
OFFICE
4E3 MAINT CLO
02 A-2101
4531
4532 HOTEL OFFICE HOTEL OFFICE4537 HOTEL OFFICE OFFICE 4536 4538 4533
CIRCULATION
A
4520
4J2 B
STORAGE 4551
DN
UP
OFFICE STORAGE 4552 B
4602
4535 OFFICE
ASSIGNABLE WORKSTATIONS - TYP. 4530
4534
OFFICE 4603 OFFICE
OFFICE
4500
OFFICE
OFFICE
4609 OFFICE
EXIT STAIR 2 4S2
23 A-4201
4604
4606
01
CIRCULATION 07 A-4302
S/V ELEV
P/S ELEV
D RFI-288
OFFICE
4500
OFFICE
4C5
C PLUMB RISER TOILET (GENDER CIRCULATION INCL) SS4 4550 4T4
A
EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B A 326'-0 3/4"
A
4611
4650
4701
4708
A HUDDLE
CIRCULATION
A A OFFICE
A OFFICE
4555
MECH SHAFT HUDDLE A
4L2 D RFI-288 AIR LOCK
OFFICE
3/32" = 1'-0"
4506
ELEC RISER
LACTATION
HOTEL WORKSTATIONS
NO. DESCRIPTION SHEET NUMBER SCHEMATIC DESIG 50% DESIGN DEVE 100% DESIGN DEVE CONSTRUCTION DO CONSTRUCTION DO 1 BACKCHECK 1 A BULLETIN A B BULLETIN B C BULLETIN C D BULLETIN D
HOTEL OFFICE
4511
CIRCULATION TOILET (GENDER INCL) 4450 4T3
4508
4507
SERVICE CENTER
4404
CIRCULATION
A OFFICE
A
4403
A
OFFICE
OFFICE
HOTEL OFFICE
CONFERENCE MEDIUM
4709
TO ACHIEVE STC-35
4409
STORAGE
A OFFICE
EXTERIOR WALL WINDOW ASSEMBLIES
OFFICE
4303
SCALE:
4509
4512
4402
4400
OFFICE
4750
4801
OFFICE
4401 OFFICE
HOTEL OFFICEHOTEL OFFICE 4408 4304
LANDSCAPE ARCHITEC MANTLE 930 CARLTON STREET, BERKELEY, CA 94710
LEVEL 5 FLOOR PLAN - OVERALL
OFFICE
CONFERENCE SMALL
OFFICE
ASSIGNABLE WORKSTATIONS - TYP.
OFFICE
CIRCULATION
OFFICE
4410
OFFICE
4850 04 A-4201
4411 OFFICE
4302
OFFICE
CIRCULATION
MOCK-UP 2 EXTENTS A B EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31
LAB PLANNER 218024
1'-10 3/4"
18 A-3102
A EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-39
OFFICE
4301 OFFICE
OFFICE
CIRCULATION
04 A-4301
A
4350 OFFICE
4209
D RFI#289 IDF
4307
CIRCULATION
4250 OFFICE OFFICE
4809 CIRCULATION OFFICE
4318 OFFICE
4202
CIRCULATION
PRINT OFFICE 4212 4211
4811
4880
4901
OFFICE
4201 OFFICE
HOTEL OFFICE HOTEL OFFICE 4315 4204
CIRCULATION
OFFICE
4909
HOTEL OFFICE
A
HUDDLE A
4950 HOTEL OFFICE
4907
1
OFFICE
4103
4911
A
B
TO ACHIEVE STC-31
EXTERIOR WALL WINDOW ASSEMBLIES
A
OFFICE
HUDDLE A
4T2
6'-7" 37'-6 3/8"
30'-0"
A
4217
CIRCULATION
CIRCULATION 4C1
4218 OFFICE
4102
4105
PLUMB RISER
JANITOR CLO
OFFICE
4101 OFFICE
CONFERENCE MEDIUM
4T1
4020
B
ZSFG
19'-4"
TO ACHIEVE STC-31 B
HOTEL OFFICE HOTEL OFFICE 4104 4215 STORAGE MECH SHAFT CIRCULATION 4105A A 4150 SS1
HOTEL OFFICE
17 A-2101
21'-0"
13'-0 1/4"
4S1
MOCK-UP 1 EXTENTS
A
22'-8"
2'-0 3/4"
2'-2" 31'-6"
31'-0"
11/15/2021 5:27:58 PM
OFFICE
4110 11 A-4201
A EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-35
TO ACHIEVE STC-31 B
HOTEL OFFICE EXIT STAIR 1
D
21'-0"
03 A-3102
A EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B
EXTERIOR WALL WINDOW ASSEMBLIES
MOCK-UP 1 EXTENTS
1
21'-0"
PROJECT NUMBER
04 A-2101
01 / A-1104-A 01 / A-1104-B
01 A-3102 1
E
21'-0"
90'-8 1/2"
10'-2 1/4"
01 / A-1104-A 01 / A-1104-B
5'-6"
21'-0"
339'-2 1/2"
2'-2"
15'-8 1/4"
A EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-39
EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-39
A EXTERIOR WALL WINDOW ASSEMBLIES
TO ACHIEVE STC-39
1'-10 3/4"
KEYPLAN
LEVEL FOUR FLOOR PLAN
SEAL & SIGNATURE
CAMPUS
ZSFG PROJECT NUMBER
218024 SHEET NAME
UCSF RESEARCH AND ACADEMIC BUILDING
DETAILS
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021
RE: PLANS FOR PARTITION TYPE 4 9/16"
CLR HSTWY
LINE OF PLATFORM RUNNING CLEARANCE GWB SOFFIT FASCIA ANGLE STRAP AS REQUIRED CONTINUOUS FIRE SEALANT
ALIGN
LINE OF PLATFORM RUNNING CLEARANCE
HEADER HANGER COVER
B.O. POCKET
1" RUNNING CLEARANCE
3 9/16"
PARTITION BEYOND SEE PLANS
HOLD OPEN DOOR
SIGHT GUARD BEYOND
STAINLESS STEEL HOISTWAY ENTRANCE DOOR FINISH FLOOR RE: PLANS
TRANSITION THRESHOLD
2
CONTINUOUS HINGE AS SCHEDULED 1
NOTCH FRAME TO RECEIVE SILL
TOP OF FINISH FLOOR
BRUSH SEAL
DOOR CLOSER AS SCHEDULED
EQ
6' - 0" A.F.F.
HOLD OPEN DOOR
CONTINUOUS HINGE AS SCHEDULED
DOOR HEIGHT RE: DOOR SCHEDULE
EQ
SIGHT GUARD KEY ACCESS
ELEVATOR DOOR HT RE: SECTIONS
90 MINUTE DOOR AND FRAME ASSEMBLY STAINLESS STEEL ELEVATOR DOOR
WELDED HOISTWAY ENTRANCE DOOR FRAME, PTD
UNDERCUT
4” METAL STUD + 1" LINER BOARD + TWO LAYERS OF 1/2" TYPE X GWB ON EXTERIOR SIDES - TWO HOUR WALL ASSEMBLY AROUND HOIST-WAY DOOR UL U415B
ELEVATOR SILL & SUPPORT, RE: ELEVATOR MFR SILL POCKET GROUT SOLID
FIRE PROOFING OVER STRUCTURAL BEAM. RE: STRUCT.
FASCIA / TOE GUARD
MINERAL WOOL BATT INSULATION FILLED IN THE GAP BETWEEN F.O. GWB AND FIREPROOFING MATERIAL
RE: STRUCTURAL FOR EDGE OF SLAB CONDITION
SEALANT OVER FORMING MATERIAL OVERLAPPING ONTO GWB & FIREPROOFING MATERIAL OF STRUCTURAL BEAM
3" MAX
PARTITION BEYOND SEE PLANS
ELEVATOR SHAFT
WELDED HOISTWAY ENTRANCE DOOR FRAME, PTD
ELEVATOR HOISTWAY HEAD CONDITION
CLR HOISTWAY
4 5/8"
HEAD OF WALL REF. HW-D-0388
PARTITION RE: PLANS
ELEVATOR HOISTWAY SILL SECTION
EDGE OF SLAB / SILL LINE OF PLATFORM RUNNING CLEARANCE SINGLE SPEED ELEVATOR DOOR SILL NOSING
HOISTWAY ENTRANCE DOOR FRAME
4” METAL STUD + 1" LINER BOARD + TWO LAYERS OF 1/2" TYPE X GWB ON EXTERIOR SIDES - TWO HOUR WALL ASSEMBLY AROUND HOIST-WAY DOOR UL U415B ADDITIONAL LAYERS OF GWB AS REQUIRED CONTINUOUS FIRE SEALANT, TYP
ELEVATOR SHAFT
CLEARANCE FOR MAGNETIC HOLD OPEN
VIF
VIF
SCHEDULED PARTITION
1"
ELEVATOR DOOR BUMPER
1" MAGNETIC HOLD OPEN AS SCHEDULED CONTINUOUS HINGE AS SCHEDULED GWB SOFFIT FASCIA ABOVE
ELEVATOR HOISTWAY JAMB PLAN
1" ALIGN
ALIGN EXIT DEVICE AS SCHEDULED
HOLD OPEN DOOR IN OPEN POSITION
UCSF RESEARCH AND ACADEMIC BUILDING
DETAILS
NOTE: FURNITURE SHOWN FOR REFERENCE ONLY
02
A-5810 30
1'-6"
10'-3 1/4" SS-2, MITER EDGE COUNTER TOP
1'-11 3/4"
ACCESS HOLES TO CABLE RACEWAY
36" X 48" CLEAR
2'-9 1/2"
5'-5"
EQ-05
EQ-07
03 A-5811
EQ-08
19
A-5810
04
MTL-2, DIRECT GLUE TO SUBSTRATE
FURNITURE BY OTHERS
29
MTL-5, BASE
EQ-01 EQ-02
FIN. FLR.
1/4"
J
J
2" 4"
8'-0"
EQ-09
EQ-03 EQ-04 EQ-01 EQ-02
6'-11 1/2"
20
9"
5' - 6"
A-5810
OPP
05
4'-9 3/4"
1'-3"
A-5810 28 A-5810
4'-11 1/2"
SS-2, MITER EDGE COUNTER TOP
ADJUSTABLE SHELVING
EQ-11
PL-2A, THRUCOLOR DOOR (6 SIDES)
2' - 8 1/2"
MTL-2, DIRECT GLUE TO SUBSTRATE
8' - 6" 15 A-5810
RECEPTION DESK FLOOR PLAN
BLACK MELAMINE CABINET INTERIOR TYPICAL
SLOTS IN MILLWORK FOR EQUIPMENT VENTS
MTL-5, BASE
AWP-1, ACOUSTICAL WALL PANEL
2" 4"
01 A-5811
10 1/2"
10"
J
C
27 A-5810
PL-2A, THRUCOLOR BASE FIN. FLR.
1/4"
3"
2'-9 1/2"
EQ-12
1'-7" D X 1'-7" H X 2'-10"W MAX EQUIPMENT AREA, BY OFOI
1/4"
EQ-13
2'-4 1/2"
EQ-10
BASE CABINET-DOOR - RECEPTION DESK
RE: ENLARGED PLAN
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021
1"
RE: ENLARGED PLAN
MIN
1/8"
LED TASK LIGHT ABOVE
PL-2A, THRUCOLOR
1 3/8"
FURNITURE, SIT/STAND DESK COORDINATE WITH VENDOR TO ENSURE CLEARANCE AS REQUIRED
1"
FOLDED CORNER, TYP
MIN
RE: ENLARGED PLAN
SCHEUDLED COUNTERTOP FINISH SIDE PANEL, PL-2A, THRUCOLOR
1"
MIN
LED TASK LIGHT ABOVE MTL-2, DIRECT-GLUE TO SUBSTRATE
MTL-2, DIRECT-GLUE TO SUBSTRATE
RE: ENLARGED PLAN
PL-2A, THRUCOLOR
1" MIN FURNITURE, SIT/STAND DESK COORDINATE WITH VENDOR TO ENSURE CLEARANCE AS REQUIRED
FOLDED CORNER, TYP
PLAN DETAIL AT METAL PANEL END
PLAN DETAIL AT METAL PANEL CORNER
ALIGN
1 3/8"
MTL-2, DIRECT GLUE TO SUBSTRATE
MTL-2 , DIRECT GLUE TO SUBSTRATE
SEE ENLARGED PLAN LED TASK LIGHT
PL-2A THROUCOLOR
MTL-2, DIRECT GLUE TO SUBSTRATE
2 1/16" ALIGN
MTL-2 , DIRECT GLUE TO SUBSTRATE
8 3/8" LED TASK LIGHT
PL-2A THROUCOLOR MTL-2 BEYOND GAP, CABLE RACEWAY
PL-2A THROUCOLOR
MTL-2 BEYOND
SLOT
2"
BLOCKING TO RECEIVE ACCESS PANEL HINGES
1"
BLOCKING AS REQUIRED
HEAVY DUTY FRAMELESS SELFCLOSING CONCEALED HINGE TURNSTILE POWER SUPPLY, SEE SECURITY DRAWINGS
HEAVY-DUTY FRAMELESS SELFCLOSING CONCEALED HINGE
ACCESS PANEL, PL-2A THRUCOLOR ALL 6 SIDES
2'-6"
BLACK MELAMINE INTERIOR FACES
CLEAR CABINET DOOR BUMPER
HEAVY-DUTY FRAMELESS SELFCLOSING CONCEALED HINGE
3"
1/4"
1/4"
SECTION DETAIL - ACCESS PANEL
2"
3" PL-2A THRUCOLOR
MTL-5, BASE
BLOCKING AS REQUIRED
MTL-5, BASE
PL-2A THRUCOLOR CLEAR CABINET DOOR BUMPER
4"
1 1/8"
1/4"
RCKW3 SIMPSON CLIP @ AT EACH W/ (4) SD #10 TO STUD & (1) 1/2" TITEN HD ANCHOR TO SOG
1/4"
5/8"
RCKW3 SIMPSON CLIP @ AT EACH W/ (4) SD #10 TO STUD & (1) 1/2" TITEN HD ANCHOR TO SOG
SECTION DETAIL - TYP RECEPTION DESK
UCSF RESEARCH AND ACADEMIC BUILDING
SITE PHOTOS
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021
EL CAMINO MIXED USE PROJECT
PROJECT OVERVIEW
PROJECT OVERVIEW The El Camino & Spruce Mixed-Use Redevelopment Project is situated at the corner of El Camino Real and South Spruce Avenue in South San Francisco. The proposed development will remove existing vacant buildings and subdivide the site into four parcels with different uses: Grocery/Retail on Lot A, Residential on Lot B, Research/Development (R&D) on Lot C, and Parking on Lot D. All buildings in the project are tied together through landscaping and open space, creating pedestrian and bike-friendly connections throughout the highly-amenitized mixed-use campus. A shared internal road provides vehicular access to the garage, loading areas and access for fire vehicles. The extent of hardscape is minimized to prioritize pedestrian-focused landscape areas through the center of the site, connecting El Camino Real with the nearby San Bruno BART Station.
“
This portion of the project includes the three six-story R&D buildings with approximately 750,000 square feet of R&D office plus 30,000 square feet of amenity space on Lot C. Typical R&D floors are 16’ floor to floor with a target ceiling height of 11’ for office fit-outs, and 10’ for lab fit-outs to allow for larger ducts and services in the plenum. Ground floors are 18’ floor to floor to allow for higher ceilings for amenities, and mechanical spaces. Higher clearances for generators require a slab opening at L2 of Building 1, and dropped slabs in Buildings 2 and 3. The overall building height limit is measured to the top of mechanical screen.
The project is pursuing LEED certification. The research and development project will target Silver with an aspiration of Gold certification using the LEED v4 BD+C Core and Shell certification system.
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021
EL CAMINO MIXED USE San Francidco, Californina, USA Client // Steelwave Plot Area // 11.21 ac Project Size // 800,000 sqft Residential, R&D Offics, Retail & Amenities
EL CAMINO MIXED USE PROJECT
CONCEPT DESIGN & PLANNING
SITE PROGRAM STRATEGY El Camino & Spruce Mixed- Use Redevelopment Project in South San Francisco is situated at the corner of El Camino Real and Spruce Avenue. The proposed redevelopment is proposing splitting 11.21 acres into three separate parcels. The proposed development will remove existing vacant buildings on the site and replace with three R&D office buildings, three retail buildings, site landscaping and a parking structure. The new buildings will consist of approximately 750,000 square feet
of R&D office space, 30,000 square feet of amenity and 19,500 S: square feet of retail. The R&D and retail buildings will be positioned F EL CAMINO SPRUCE across a&new interior street. All buildings in the project will be tied together through landscaping and open space, creating pedestrian and bike friendly connections between the highly amenitized mixeduse campus. As an alternative, the 19,500 sq ft of retail center could be interchanged with approximately 100-150 units of multi- family residential.
CONTECT VIEW: SW CORNER OF EL CAMINO & SPRUCE
AERIAL VIEW
GARAGE
VE NA
BLDG 03
TO
G TIN
N
HU
BLDG 02 RESIDENTIAL BLDG 01
SAFEWAY
S SPRU
CE AVE
EL EL CAMINO MIXED USE PROJECT SKIDMORE, OWINGS & MERRILL LLP
C
L
EA
OR
IN AM
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021
PODIUMS, PUBLIC REALM & OPEN SPACE SEQUENCE
OPEN SPACE SEQUENCE
RESIDENTIAL
RESIDENTIAL R&D BLDG 01
ON GT
HU
GARAGE
GARAGE
SAFEWAY
S SPR
UCE A VE
INO
AM
C EL
S SPR
AL
SAFEWAY
UCE AV
RE
E
E
L
EA
OR
MIN
A LC
GROUND LEVEL PLAN EL CAMINO MIXED USE PROJECT SKIDMORE, OWINGS & MERRILL LLP
BUILDING ENTRIES & ACCESS CAMPUS AMENITIES E RUC
P
SS
AVE
CE
PRU
SS
AVE
RESIDENTIAL RESIDENTIAL
RESIDENTIAL SAFEWAY SAFEWAY
SAFEWAY
R&D BLDG 01
AVE
REAL
R&D BLDG 03
R&D BLDG 02 BLDG 02 LOBBY
AMENITIES
HUNTINGTON
GARAGE
EL CAMINO
R&D BLDG 02
HUNTINGTON AVE
EL CAMINO
REAL
LOBBY
R&D
GARAGE GARAGE
R&D LOBBY BLDG 01
R&D
LOBBY
R&D BLDG 03 BLDG 03
BLDG 01
EL CAMINO MIXED USE PROJECT SKIDMORE, OWINGS & MERRILL LLP
MIXED USES
GROUND LEVEL PLAN: BUILDING ENTRIES & ACCESS
AND NNECTIONS
VEHICULAR CIRCULATION
PEDESTRIAN AND TRANSIT CONNECTIONS
CE
PRU
SS
AVE
VEHICULAR CIRCULATION
CE
PRU
SS
AVE
RESIDENTIAL
RESIDENTIAL
GARAGE ACCESS
LOADING
EL CAMINO MIXED USE PROJECT SKIDMORE, OWINGS & MERRILL LLP
TO SAN BRUNO BART
R&D BLDG 03
GARAGE
TO SAN
EL CAMINO MIXED USEBRUNO PROJECTBART SKIDMORE, OWINGS & MERRILL LLP
CAL TRAIN
AVE
GARAGE R&D BLDG 01
CE
PRU
SS
AVE
RESIDENTIAL LOADING
SAFEWAY
GARAGE ACCESS
R&D DROP-OFF (STUDY)
LOADING
LOADING
O REAL
PARKING ACCESS
R&D BLDG 03
VEHICULAR CIRCULATION Vehicular Route Vehicular Drop-off Loading / Service
GARAGE ACCESS
HUNTINGTON
R&D BLDG 02
EL CAMIN
EL CAMINO
REAL
R&D DROP-OFF
PARKING ACCESS
CENTENNIAL TRAIL
TO SAN BRUNO BARTEL CAMINO MIXED USE PROJECT SKIDMORE, OWINGS & MERRILL LLP CAL TRAIN
R&D DROP-OFF (STUDY)
HUNTINGTON AVE
SAMTRANS 141
SAMTRA NS ECR
O REAL EL CAMIN
R&D BLDG 01
VehicularR&D Route BLDG 02 Vehicular Drop-off Loading / Service
RESIDENTIAL
SAMTRANS 141
SAFEWAY
PEDESTRIAN AND TRANSIT CONNECTIONS Pedestrian Route Bicycle Route Bus Route Bus Stop
CENTENNIAL TRAIL
GARAGE
AVE
HUNTINGTON AVE
EL CAMINO
R&D BLDG 01 R&D BLDG 03
TO SAN BRUNO BART
CE
PRU
SS
R&D BLDG 02
LOADING
SAFEWAY
REAL
SAFEWAY
SAMTRA NS ECR
P
R&D BLDG 01
TO T R BA
E AV
IN NT
P
Route te
R&D BLDG 03
R&D BLDG 02
R&D BLDG 03
R&D BLDG 02
R&D DROP-OFF
R&D BLDG 02
PARKING ACCESS
GARAGE ACCESS
GARAGE R&D BLDG 01 PARKING ACCESS
R&D BLDG 03 LOADING
GARAGE ACCESS
GARA ACCE
EL CAMINO MIXED USE PROJECT
CONCEPT DESIGN & PLANNING
R&D MASSING AND FACADE COMPONENTS
D MASSING AND FACADE COMPONENTS
MECHANICAL SCREEN
UPPER VOLUME
TERRACE
PODIUM
FROM EL CAMINO REAL
NO MIXED USE PROJECT E, OWINGS & MERRILL LLP
VIEW OF SITE ENTRY FROM EL CAMINO REAL
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021
RESIDENTIAL FACADE MATERIALS
FACADE MATERIALS GREY GFRC PANELS
LIGHT GFRC PANELS WOOD-LOOK CLADDING
INSULATED GLAZING
METAL CLADDING
LDING - APPROVED MATERIALS INSULATED GLAZING
TEXTURED CONCRETE
AND MASSING RESIDENTIAL FACADE AND MASSING: NORTH ELEVATION
Design
EL CAMINO MIXED USE PROJECT
DESIGN DEVELOPMENT
SITE PLAN - GROUND LEVEL
EL C
180 Architect:
SK
S
Consultants:
1220 Conc Conc
360 Pine San Fran
6 Oakla
A
130 S San Fra
Vertica
102 E Blit Vall
Issued For: No.: Descrip
PLAN PLAN R&D 5 PLAN 100% 50% D
1900 Emery
Trash
Key Plan:
01
Seal & Signat
EL CAMINO MIXED USE PROJECT 180 EL CAMINO REAL
EL CAMINO MIXED USE PROJECT 180 EL CAMINO REAL
Architect:
Architect:
SKIDMORE, OWINGS & MERRILL LLP
SKIDMORE, OWINGS & MERRILL LLP
One Maritime Plaza San Francisco, California 94111, USA
One Maritime Plaza San Francisco, California 94111, USA
Consultants:
Consultants: Code:
Sustainability:
Code:
Sustainability:
1220 Concord Ave., Suite 400. Concord, CA 94520
Surveyor:
MEP:
Surveyor:
MEP:
98 Battery St #500, San Francisco, CA 94111
636 9th St. Oakland, CA 94607
98 Battery St #500, San Francisco, CA 94111
Lighting:
Acoustics:
Lighting:
130 Sutter St., FL 5, San Francisco, CA 94104
389 Clementina St, San Francisco, CA 94103
SITE PLAN - GROUND LEVEL
Key Plan:
Parking:
560 14th St #300, Oakland, CA 94612
Trash Management:
Traffic:
1900 Powell St #890, Emeryville, CA 94608
4305 Hacienda Dr Suite 550, Pleasanton, CA 94588
Date:
100% SCHEMATIC DESIGN 50% DESIGN DEVELOPMENT
2022-04-01 2022-05-27
Key Plan:
02
01 03
03
Seal & Signature:
Sheet Name:
BUILDING 3 - LEVEL 02 1
Architect:
Drawn By:
Author
One Maritime Plaza San Francisco, California 94111, USA
Consultants:
Landscaping:
555 Beach St floor 4, San Francisco, CA 94133
Surveyor:
MEP:
389 Clementina St, San Francisco, CA 94103
130 Sutter St., FL 5, San Francisco, CA 94104
389 Clementina St, San Francisco, CA 94103
Key Plan:
02
Traffic:
1900 Powell St #890, Emeryville, CA 94608
4305 Hacienda Dr Suite 550, Pleasanton, CA 94588
2022-04-01 2022-05-27
Key Plan:
02
01 03
Seal & Signature:
Date:
100% SCHEMATIC DESIGN 50% DESIGN DEVELOPMENT
560 14th St #300, Oakland, CA 94612
Trash Management:
Issued For: No.: Description:
2022-02-11 2022-04-01 2022-05-27
Parking:
102 E Blithedale Ave # 1, Mill Valley, CA 94941
Date:
R&D 50% SCHEMATIC DESIGN 100% SCHEMATIC DESIGN 50% DESIGN DEVELOPMENT
Vertical Transportation:
4305 Hacienda Dr Suite 550, Pleasanton, CA 94588
1900 Powell St #890, Emeryville, CA 94608
Traffic:
Parking:
560 14th St #300, Oakland, CA 94612
Trash Management:
Vertical Transportation:
130 Sutter St., FL 5, San Francisco, CA 94104
102 E Blithedale Ave # 1, Mill Valley, CA 94941
Lighting:
03
25 Kearny Street, Suite 500 San Francisco, CA 94108
Civil:
360 Pine Street, 2nd Floor San Francisco, CA 94104
01
Sustainability:
1220 Concord Ave., Suite 400. Concord, CA 94520
Code:
98 Battery St #500, San Francisco, CA 94111
Issued For: No.: Description:
Acoustics:
636 9th St. Oakland, CA 94607
Lighting:
98 Battery St #500, San Francisco, CA 94111
Acoustics:
MEP:
636 9th St. Oakland, CA 94607
Landscaping:
555 Beach St floor 4, San Francisco, CA 94133
Surveyor:
Sustainability:
25 Kearny Street, Suite 500 San Francisco, CA 94108
Civil:
360 Pine Street, 2nd Floor San Francisco, CA 94104
A2.3.04
SKIDMORE, OWINGS & MERRILL LLP
Author
1/16" = 1'-0"
One Maritime Plaza San Francisco, California 94111, USA
Consultants:
220393
Drawn By:
Checked By: Checker Scale:
SKIDMORE, OWINGS & MERRILL LLP
1
1/16" = 1'-0"
EL CAMINO MIXED USE PROJECT 180 EL CAMINO REAL Sheet No.:
Project No.: Architect:
BUILDING 3 LEVEL 04 FLOOR PLAN
A2.3.02
Checked By: Checker
Sheet Name:
1220 Concord Ave., Suite 400. Concord, CA 94520
BLDG3 - LEVEL 04
220393
Code:
BUILDING 3 - LEVEL 04, 05 & 06
5/27/2022 8:38:14 PM
5/27/2022 8:38:06 PM
EL CAMINO MIXED USE PROJECT 180 EL CAMINO REAL Project No.: Sheet No.:
Scale:
BUILDING 3 LEVEL 02 FLOOR PLAN
BLDG3 - LEVEL 02
Seal & Signature:
02
01
Seal & Signature:
Sheet Name:
BUILDING 3 - LEVEL 01
Sheet Name:
BUILDING 3 - LEVEL 03
BUILDING 3 LEVEL 01 FLOOR PLAN
BLDG3 - LEVEL 01
Project No.:
1
5/27/2022 8:40:40 PM
5/27/2022 8:35:14 PM
Sheet Name:
SIT GR
Sheet No.:
Drawn By:
Author
Checked By: Checker Scale:
1/16" = 1'-0"
BUILDING 3 LEVEL 03 FLOOR PLAN
BLDG3 - LEVEL 03
220393
A2.3.01
Project No.:
Drawn By: Checked By: Scale:
Issued For: No.: Description:
389 Clementina St, San Francisco, CA 94103
Vertical Transportation:
102 E Blithedale Ave # 1, Mill Valley, CA 94941
2022-04-01 2022-05-27
100% SCHEMATIC DESIGN 50% DESIGN DEVELOPMENT
Date:
4305 Hacienda Dr Suite 550, Pleasanton, CA 94588
1900 Powell St #890, Emeryville, CA 94608
Traffic:
01
130 Sutter St., FL 5, San Francisco, CA 94104
Trash Management:
Parking:
560 14th St #300, Oakland, CA 94612
Vertical Transportation:
102 E Blithedale Ave # 1, Mill Valley, CA 94941
Landscaping:
555 Beach St floor 4, San Francisco, CA 94133
Acoustics:
Issued For: No.: Description:
Civil:
360 Pine Street, 2nd Floor San Francisco, CA 94104
636 9th St. Oakland, CA 94607
Landscaping:
555 Beach St floor 4, San Francisco, CA 94133
25 Kearny Street, Suite 500 San Francisco, CA 94108
Civil:
360 Pine Street, 2nd Floor San Francisco, CA 94104
1220 Concord Ave., Suite 400. Concord, CA 94520
25 Kearny Street, Suite 500 San Francisco, CA 94108
5/27/2022 8:28:55 PM
Project No.:
1
Sheet No.: 220393
Drawn By:
Author
Checked By: Checker Scale: 1/16" = 1'-0"
A2.3.03
1"
16'-0
MP-02 HANDSET ALUMINUM PANELS
BLDG3 - LEVEL 03 +77' - 6" 16'-0"
WWS-01 GLASS WINDOW WALL ASSEMBLY
BLDG3 - LEVEL 02 +61' - 6" 13'-5"
GFRC-01 GLASS FIBER REINFORCED CONCRETE
4'-7"
CITY DATUM AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021 +48' - 0 39/64"
I
BLDG3 - LEVEL 01 +43' - 6" 03 A5.3.11
3-A
3-B
MP-02 HANDSET ALUMINUM PANELS
GFRC-01 GLASS FIBER REINFORCED CONCRETE3-D
3-C
3-E
3-F
BUILDING ELEVATION & SECTON 3-1
3-2
3-3
3-4
3-5
3-6
3-7
3-8
3-9
FAA HEIGHT LIMIT (LOWEST HEIGHT) +164' - 0" BLDG3 - MECH ROOF +156' - 6"
3-10
EL CA
2
BUILDING 03 - WEST ELEVATION
180
Architect:
SKIDM
Consultants:
7'-9"
Co
15'-0"
7'-6"
EXHAUST STACK, SMD LOUVERED MECHANICAL SCREEN WITH GREEN WALL
San
BLDG4 - LEVEL 016 +140' - 0" - ROOF FAA HEIGHT LIMIT (LOWESTBLDG3 HEIGHT) +164'+141' - 0" - 6" LEVEL 06 BLDG3 -BLDG3 MECH -ROOF +156'+125' - 6" - 6" CEILING
01 A5.3.12 SIM
1220 Concord Concord
BLDG3 - LEVEL 05 +109' - 6" BLDG3 - ROOF +141' - 6"
16'-0"
MP-02 HANDSET ALUMINUM PANELS
Ci
K
CWS-01 GLASS CURTAIN WALL ASSEMBLY, SEE BLDG 1 VERTICAL PATTERN, TYP AT THIS LOCATION.
16'-0"
MP-02 HANDSET ALUMINUM PANELS
16'-0"
BLDG3 - LEVEL 06 04 BLDG3 - LEVEL +125' +93' - 6" - 6"
360 Pine Stre San Francisc
Sur
BLDG3 - LEVEL 05 03 BLDG3 - LEVEL +109' +77' - 6" - 6" 16'-0"
636 Oakland
Aco
BLDG3 - LEVEL 04 02 BLDG3 - LEVEL +93' +61' - 6" - 6"
16'-0"
WWS-01 GLASS WINDOW WALL ASSEMBLY
130 Sutt San Francis
CITY DATUM BLDG3 - LEVEL 03 +48' - 0 39/64" BLDG3 - LEVEL +77' - 6" 01 +43' - 6"
Vertical Tr
S
102 E Blithed Valley,
BLDG3 - LEVEL 02 +61' - 6"
Trash Ma
13'-5"
GFRC-01 GLASS FIBER REINFORCED CONCRETE
4'-7"
CITY DATUM +48' - 0 39/64"
1900 Pow Emeryvill
Issued For: No.: Description S
BLDG3 - LEVEL 01 +43' - 6"
SHORT SECTION AT BUILDING 03
WWS-01 GLASS WINDOW WALL ASSEMBLY
3-10
3-9
3-8
3-7
3-6
3-5
3-4
3-3
3-2
100% SC 50% DES
2
3-1
1
BUILDING 03 - SOUTH ELEVATION
BLDG3 - LEVEL 06 +125' - 6"
SKIDMORE, OWINGS & MERR
One Maritime Plaza San Francisco, California 9411
BLDG3 - LEVEL 05 +109' - 6"
S
Architect:
Consultants:
Key Plan: Code:
Susta
1220 Concord Ave., Suite 400. Concord, CA 94520
BLDG3 - LEVEL 04 +93' - 6"
25 Kearny San Fran
Civil:
Land
BLDG3 - LEVEL 02 +61' - 6"
Issued For: No.: Description:
LONG SECTION AT BUILDING 1 03
4305 Hacie Pleasan
Sheet Name:
50% DESIGN DEVELOPMENT
560 1 Oaklan
Trash Management:
BUILDING 2 AND 3 - LEVEL 04,05,06 - ENLARGED PLAN - EAST
P
1900 Powell St #890, Emeryville, CA 94608
Francis
102 E Blithedale Ave # 1, Mill Valley, CA 94941
389 Clem & Signature
Vertical Transportation:
BLDG3 - LEVEL 01 +43' - 6"
L
130 Sutter St., FLSeal 5, San Francisco, CA 94104
CITY DATUM +48' - 0 39/64"
98 Bat San Fran
Acoustics:
01 636 9th St. Oakland, CA 94607
555 Beac San Franci
Surveyor:
BLDG3 - LEVEL 03 +77' - 6"
360 Pine Street, 2nd Floor San Francisco, CA 94104
BLDG3 - ROOF +141' - 6"
C
EL CAMINO MIXE PROJECT 180 EL CAMINO
CEILING
11'-0"
D
BLDG3 - MECH ROOF +156' - 6"
P
BUIL SEC
1
Project No.:
Au
Checked By: Ch Scale:
1/16" =
Key Plan:
22 Drawn By:
02
Seal & Signature:
03
01
Sheet Name:
BUILDING 2 & LEVEL 04,05,0 ENLARGED C PLANS
5/27/2022 8:41:23 PM
BUILDING 2 AND 3 - LEVEL 04,05,06 - ENLARGED PLAN - WEST
Project No.:
2
Sheet No.: 220393
Drawn By:
Author
Checked By: Checker Scale: 1/4" = 1'-0"
ENLARGED CORE PLANS
A3
ZHUHAI CONVENTION CENTER
INTRODUCTION
PROJECT OVERVIEW Known as “The Chinese Riviera”, Zhuhai is one of the most romantic, greenest and most livable cities of China. Blessed with beautiful coastline, scenic mountains and hundreds of surrounding islands, Zhuhai is an exceptional city to live for the residents as well as an excellent destination for tourists as the city has been awarded both “The Happiest City in China” and “China’s Excellent Tourism City”. Harmonizing both unique aspects of Zhuhai as being a modern, greenest city and the beautiful setting where the Pearl River flows into the South China Sea, the design schemes draw upon inspirations from the Essense of the Bay and Urban Riviera as both reflect the unique sense of place for Zhuhai.
“
Zhuhai International Convention and Exhibition Center Project Exhibition Area is an interior design of the exhibition area, including conceptual design, schematic design, design development. The scope of work includes below programs and areas: - Auditorium 897 sqm - Round table meeting room 1744 sqm - Conference room and VIP room 4607 sqm
The design should enhance the buildings’ attraction and maximize the overall value through flexible approaches, including efficient utilization of space, resources, and techniques
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2020
Zhuhai Convention Center Zhuhai, China
Client // Huafa Group Project Size // 7,250 sqm Interior Design scope for auditorium, meeting and VIP rooms
ZHUHAI CONVENTION CENTER
ROUND TABLE ROOM
DESIGN FLOOR PLANS Round table conference hall plan Seat Count: 250 Area: 1606 sqm
Ceiling plan
Floor finish plan
34.7m
Floor plan
35.2m
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2020 委托设计方
建筑 / 结构单
6
7
8
9
10
11
12
13
63000 9000
9000
9000
18000
9000
配合设计人员
9000
05 I2.03.1
U
204
243
205
3 Tiyu Dong
9000
顾问 Consu
201
94
03 I6.03
203 202
休息室 LOUNGE
14 I9.31
01 I2.03.1
00 31
1350
206
T
9800
9000
219
13 50
16 I2.03.1
贵宾休息室 VIP LOUNGE
892
11 I9.31
1350
I6.03.1
1350
36000
卫生间 RESTROOM
235 234
01 221
S
236
35200
DD 扩扩 100% 100%
卫生间 RESTROOM
49 00
50 13
220
用途 Issued No.: Desc
237
241
00 49
休息室 LOUNGE
238
储藏室 PANTRY
242
13 50
50 13
53 15
239 240
1350
229
232
228
231
227
230
208
R
209
990
212 215
男卫生间 MEN'S RESTROOM
1350
580
224
休息室 LOUNGE 222 223
13 50
13 50
9000
218
213
女卫生间 WOMEN'S RESTROOM
1350
214
216
217
9800
211
01 I6.03
9800
贵宾休息室 VIP LOUNGE
34749
9000
207
4040
989
233
210
I6.03.1 03
226
13 50
13 50
225
49 00
49 00
Q
1350
10221
1350
05 15
20 15 04 I9.31
图名 Sheet
圆桌会
圆桌会议室平面 ROUND TABLE CONFERENCE ROOM - FLOOR PLAN SCALE:
1 : 100
ROU CON - FL
01
项目编号 Pro
Drawn By:
Checked By:
比例 Scale @
87
LEVEL 04 +18.60 m
250 550
550
1350
DOOR TO BOH
EQ
550
550 250
圆桌会议室室内剖面 ROUND TABLE CONFERENCE ROOM INTERIOR SECTION SCALE:
ZHUHAI CONVENTION CENTER
1 : 50
ROUND TABLE ROOM
03
ST-01
卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED PT-01
珠光漆 PEARLESCENT PAINT
ST-01
9
卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED
10
MT-01
抛光铜 POLISHED BRONZE
MT-01
11
抛光铜 POLISHED BRONZE
LEVEL 05 MEZZANINE +29.60 m
LEVEL 05 +24.55 m
MT-01 抛光铜 POLISHED BRONZE
ST-01
卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED
01 I9.33
WD-01
高光泽红木 HIGH GLOSS RED WOOD
LEVEL 04 +18.60 m
DOOR TO CORRIDOR
250 550
550
EQ
DOOR TO NORTH VESTIBUTE
EQ
550
550 250
1910
1718
DOOR TO VIP LOUNGE
图名 Sheet Name:
室内剖面
INTERI
6
7
8
9
10
11
圆桌会议室室内剖面 ROUND 12 TABLE CONFERENCE 13 ROOM INTERIOR SECTION SCALE:
1 : 50
01
项目编号 Project No.: 22004
Drawn By: Checked By:
Autho
Checke
比例 Scale @ A0:
U SE-03 CA-02
x2
CA-03
SE-03
x4
CA-04
x2
SE-04
x2
CP-02
T
SE-05
x2
MR-01
x4
CP-02 CP-03 A-01
CP-02
LF-02
x2
LF-03 SE-02 CA-02
x6 x3
SE-02
x2
CA-02
x3
A-02 CP-01
S
SE-04
x4
LF-02 CP-01
x4
CA-01C SEE SPEC
CA-02
x9
CA-01B
SE-02
x12
CA-01A
LF-03 A-02 LF-01 SE-01
R SE-02 CA-02
x5 x4
x255
AR-01
SE-05 CP-02 MR-01
x3
Q
圆桌会议室家具平面 ROUND TABLE CONFERENCE ROOM - FURNITURE PLAN SCALE:
珠光的涂料 Pearlescent Paint
皮亚特拉灰色大理石 Piatra Grey Marble
1 : 100
01
威尼斯墙漆 Venetian Plaster 吊灯 Chandelier
卡索灰石材 Castle Grey Marble
红木 抛光桃花木 Rosewood High Gloss Mahogany
地毯 Carpet
1:5
500 500
500 500
WC-01 WC-01
WC-01 WC-01
开敞 开敞/ /开口 开口 OPEN OPENTO TOBEYOND BEYOND
EQ EQ
EQ EQ
MT-01 MT-01 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE
800 800
LEVEL LEVEL04 04 +18.60 +18.60mm
LEVEL LEVEL04 04 +18.60 +18.60mm
100 100
100 100
800 800
MT-01 MT-01 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE
A级防火墙纸 A级防火墙纸 FIRE-RATED FIRE-RATEDCLASS CLASSAA WALLCOVERING WALLCOVERING
2100 2100
2100 2100
A级防火墙纸 A级防火墙纸 FIRE-RATED FIRE-RATEDCLASS CLASSAA WALLCOVERING WALLCOVERING
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2020 1200 1200
圆桌会议室西贵宾室 圆桌会议室西贵宾室 ROUND ROUND TABLE TABLE ROOM ROOM -- WEST WEST VIP VIP ROOM ROOM
SCALE: SCALE: 11: :50 50
RR
2400 2400
1200 1200
CABINET CABINET
13 13
1200 1200
1200 1200
2400 2400
1200 1200
CABINET CABINET
圆桌会议室西贵宾室 圆桌会议室西贵宾室 ROUND ROUND TABLE TABLE ROOM ROOM -- WEST WEST VIP VIP ROOM ROOM
SCALE: SCALE: 11: :50 50
RR
SS
50 50
术 术 ART ART
开敞 开敞/ /开口 开口 OPEN OPENTO TOBEYOND BEYOND
250 250
LEVEL LEVEL04 04 +18.60 +18.60mm
SCALE: SCALE: 11: :50 50
77
抛光白色水洗橡木 抛光白色水洗橡木 HIGH HIGHGLOSS GLOSSWHITE WHITEWASHED WASHEDOAK OAK MT-01 MT-01 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE
800 800
WD-01 WD-01 抛光红木 抛光红木 HIGHGLOSS HIGHGLOSSRED REDWOOD WOOD
圆桌会议室西贵宾室 圆桌会议室西贵宾室 ROUND ROUND TABLE TABLE ROOM ROOM -- WEST WEST VIP VIP ROOM ROOM
WD-03 WD-03
2100 2100
远处玻璃 远处玻璃 GLAZING GLAZING BEYOND BEYOND
艺 艺
1000 1000
1000 1000
EQ EQ
DOOR DOORTO TOVIP VIPLOUNGE LOUNGE
EQ EQ
1000 1000
1000 1000
RESTROOM RESTROOM
1000 1000
EQ EQ DOOR DOORTO TOVIP VIPLOUNGE LOUNGE EQ EQ
1000 1000
LEVEL LEVEL04 04 +18.60 +18.60mm
100 100
180 180 25 60 60 60 60 25
ST-01 ST-01
MT-01 MT-01 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE
卡索灰抛光大理石 卡索灰抛光大理石 CASTLE CASTLEGREY GREYMARBLE MARBLEPOLISHED POLISHED
250 250
远处玻璃 远处玻璃 GLAZING GLAZING BEYOND BEYOND
4100 4100AFF AFF CEILING CEILING
0303 I9.33 I9.33
3500 3500AFF AFF CEILING CEILING
250 250
600 600
300 300
4100 4100AFF AFF 250 250
圆桌会议室西走廊 圆桌会议室西走廊 ROUND ROUND TABLE TABLE ROOM ROOM -- WEST WEST CORRIDOR CORRIDOR
17 17
SCALE: SCALE: 11: :50 50
SS
66
03 03
02 02
RR
委托设计方 Client:
4100 4100AFF AFF
1 : 50
1000 1000
15
1000 1000
1000 1000
1000 1000
LOUNGE LOUNGE
1000 1000
1000 1000
1000 1000
1000 1000
1000 1000
1000 1000
1000 1000
WD-01 WD-01 抛光红木 抛光红木 HIGHGLOSS HIGHGLOSSRED REDWOOD WOOD
建筑 / 结构单位 Architect / Engineer:
LEVEL 04 +18.60 m
1000 1000
+/+/-
1000 1000
1000 1000
圆桌会议室西贵宾男洗手间 圆桌会议室西贵宾女洗手间 圆桌会议室西贵宾室 圆桌会议室西贵宾室 ROUND TABLE ROOM -ROUND WEST VIP MENROOM RESTROOM ROUND TABLE ROOM - WEST VIP MEN RESTROOM TABLE -- WEST ROUND TABLE ROOM WEST VIP VIP ROOM ROOM SCALE:
1 : 50
10
SCALE: SCALE: 11: :50 50
6
16 16
SCALE:
1 : 50
1000 1000
1000 1000
05
1 : 50
14
1 : 50
900
500
450 450
100 900
450 450
100 900
SCALE:
1000 1000
1000 1000
+/+/-
INTERIOR INTERIOR SEC SEC
LEVEL LEVEL04 04 +18.60 +18.60mm
珠海华发城市
圆桌会议室西走廊 圆桌会议室西走廊 ROUND ROUND TABLE TABLE ROOM ROOM -- WEST WEST CORRIDOR CORRIDOR
珠海市香洲区 Zhuhai Hu Investme 1663 Yinwan Ro Xiangzh
01 01
I
Checked CheckedBy: By: Checker Checker 比例 比例Scale Scale@@A0: A0: 1 1: 50 : 50
SKIDMORE, O ONE M SAN FRA
广
用途 Issued For: No.: Description:
Date:
广州市天河体 Guangzh 3 Tiyu Dong Heng Street, Tiyu
22 .5°
顾问 Consultants:
LEVEL 04 +18.60 m
100% DESIGN DEVELOPMENT 100% 扩扩扩扩
SCALE:
1 : 50
EQ
2020.06.19
04
用途 Issued For: No.: Description:
90 °
DD IN-PROGRESS PL 扩扩扩扩扩扩扩扩扩 100% DESIGN DEVEL 100% 扩扩扩扩
EQ
T
13 I9.33
项目编号 图纸编号 项目编号Project ProjectNo.: No.: 图纸编号Sheet SheetNo.: No 220046 220046 建筑 / 结构单位 Architect / Eng Drawn Author DrawnBy: By: Author
配合设计人员 Local Design Ins
7
4100 AFF
250 340
1000 1000
顾问 Consultants:
圆桌会议室西贵宾女洗手间 EQ EQ ROUND TABLE ROOM - WEST VIP WOMEN RESTROOM EQ
09
6
R 200 600
1000 1000
ST-05
4100 AFF
EQ
3500 AFF CEILING
EQ
500
3500 AFF CEILING
开敞 / 开口 OPEN TO BEYOND
MT-01 抛光铜 POLISHED BRONZE LEVEL 04 +18.60 m
10
A级防火墙纸 FIRE-RATED CLASS A WALLCOVERING MT-01 抛光铜 POLISHED BRONZE LEVEL 04 +18.60 m
1200 圆桌会议室放大地面饰面图 ROUND TABLE CONFERENCE ROOM - ENLARGED FLOOR FINISH PLAN 01 圆桌会议室西贵宾室
LE ROOM - WEST VIP ROOM SCALE:
1 : 50
SCALE:
13
1 : 50
2400
02
1200
CABINET
R
1200
1200
2400
SCALE:
45°
S
EQ
1927
EQ
50
4100 AFF CEILING
2100
WD-03
抛光铜 POLISHED BRONZE
800 比亚特灰抛光大理石 PIATRA GREY MARBLE POLISHED 卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED
1000
RESTROOM
1000
ST-02
EQ DOOR TO VIP LOUNGE EQ
1000
ø 560
圆桌会议室西走廊 ROUND TABLE ROOM - WEST CORRIDOR
ST-01
SCALE:
1 : 50
01 I6.02
S
四分之一圆分界线 LINE FOR QUARTER CIRCLE
LEVEL 04 +18.60 m
100
1000
20 mm 金属条 20 mm METAL STRIP
MT-01 抛光铜 POLISHED BRONZE
抛光白色水洗橡木 HIGH GLOSS WHITE WASHED OAK
1289 EQ
卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED
MT-01
ED WOOD
DOOR TO VIP LOUNGE
ST-01
45°
20 mm 金属条 20 mm METAL STRIP
03
22.5°
200
开敞 / 开口 OPEN TO BEYOND
1 : 50
EQ
大理石 MARBLE POLISHED
EQ
比亚特灰抛光大理石 PIATRA GREY MARBLE POLISHED
1200
S
03 I9.33
1000
ST-02
CABINET
圆桌会议室西贵宾室 ROUND TABLE ROOM - WEST VIP ROOM EQ
1000
.5° 22
A级防火墙纸 FIRE-RATED CLASS A WALLCOVERING
EQ
EQ
WC-01
WC-01
800
特灰抛光大理石 A GREY MARBLE POLISHED
40
圆桌会议室西贵宾女洗手间 ROUND TABLE ROOM - WEST VIP WOMEN RESTROOM
ST-02
EQ EQ
象牙抛光大理石 CREMA MARFIL MARBLE POLISHED
100
洗手间 ROOM
LEVEL 04 +18.60 m
40
DOOR DOORTO TOROUND ROUNDTABLE TABLECONFERENCE CONFERENCEHALL HALL
委托设计方 Client:
图名 图名Sheet SheetName: Name:
室内剖面 室内剖面
广州市天河体育东路体育东横街3号 Guangzhou Design Institute 3 Tiyu Dong Heng Street, Tiyu Dong Road, Tianhe District, Guangzhou
2100
U
EQ EQ
MT-01 MT-01 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE
SCALE: SCALE: 11: :50 50
3000 AFF 四分之一圆分界线CEILING LINE FOR QUARTER CIRCLE
900
象牙抛光大理石 CREMA MARFIL MARBLE POLISHED
500
mm 金属条 mm METAL STRIP
CALE:
ST-05
卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED
773
LISHED
1000 1000
SKIDMORE, OWINGS & MERRILL LLP ONE MARITIME PLAZA, SAN FRANCISCO, CA 94111
WD-03 WD-03
抛光白色水洗橡木 抛光白色水洗橡木 HIGH HIGHGLOSS GLOSSWHITE WHITEWASHED WASHEDOAK OAK
广州市设计院
3000 AFF CEILING ST-01
ST-02
1000 1000
配合设计人员 Local Design Institute:
22.5°
石材门槛 STONE THRESHOLD
2100 2100
象牙抛光大理石 CREMA MARFIL MARBLE POLISHED
500
MT-01 MT-01 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE
珠海华发城市运营投资控股有限公司 珠海市香洲区湾仔街道银湾路1663号 Zhuhai Huafa Urban Operation Investment Holdings Co., Ltd. 1663 Yinwan Road, Wanzai Neighborhood, Xiangzhou District, Zhuhai
ST-05
900
450 450
900
洗手间 ROOM
CALE:
600
100
650 650 100 100 +/+/-
3000 AFF CEILING
800 800
3000 AFF CEILING A级防火墙纸 A级防火墙纸 ST-05 FIRE-RATED FIRE-RATEDCLASS CLASSAA 象牙抛光大理石 WALLCOVERING WALLCOVERING 开敞 MT-01 /开 开敞/MARBLE 开 CREMA MARFIL POLISHED MT-01 抛光铜 抛光铜 口 ST-04 口 POLISHED POLISHEDBRONZE BRONZE OPEN OPENTO TO 马赛克抛光石材 BEYOND MT-01 BEYOND MT-01 STONE MASAIC POLISHED 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE LEVEL LEVEL04 04 LEVEL 04 +18.60 +18.60mm +18.60 m
敞 敞/ /开 开 BLE POLISHED
EN TO PEN TO YOND EYOND
4100 4100AFF AFF CEILING CEILING ST-01 ST-01 卡索灰抛光大理石 卡索灰抛光大理石 CASTLE CASTLEGREY GREYMARBLE MARBLEPOLISHED POLISHED
100 100
EQ
100
EQ
2200 2200
500
3500 3500AFF AFF CEILING CEILING WC-01 WC-01
450 450
6
02
R
80 280
221 260 239
180 640
3922 4100 AFF CEILING
01 大理石 Y MARBLE POLISHED
600
5038
3524
1316
MT-01 抛光铜 POLISHED BRONZE
2100
10
WD-03
MT-01
1000
1000
1000
1000
1000
1000
1000
EQ
DOOR TO ROUND TABLE CONFERENCE HALL
EQ
1000
1000
1000
1000
+/-
100
800
01 红木 GLOSS RED WOOD
11
抛光白色水洗橡木 HIGH GLOSS WHITE WASHED OAK
室内剖面
INTERIOR SECTIONS
LEVEL 04 +18.60 m
圆桌会议室西走廊 ROUND TABLE ROOM - WEST CORRIDOR SCALE:
12 正北 True North
图名 Sheet Name:
抛光铜 POLISHED BRONZE
1 : 50
01
项目编号 Project No.: 220046
Drawn By: Checked By:
Author Checker
比例 Scale @ A0:
图名 Sheet Name:
图纸编号 Sheet No.:
圆桌会议室地
I6.03.2
ROUND T CONFERE FLOOR FI
1 : 50
圆桌会议室放大地面饰面图01 ROUND TABLE CONFERENCE ROOM - ENLARGED FLOOR FINISH PLAN 01 SCALE:
1 : 50
01
项目编号 Project No.: 220046
Drawn By: Checked By:
Author Checker
比例 Scale @ A0:
1 : 50
图纸
ZHUHAI CONVENTION CENTER
REPORT AUDITORIUM
DESIGN FLOOR PLANS Report auditorium Seat Count: 578 Area: 1058 sqm
21.7m
Level 3 44.2m
Level 2
LEVEL 02 +6.90 m
委托设计方 Client:
阶梯报告厅室内剖面
13 REPORT AUDITORIUM INTERIOR SECTION AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 02 2020 SCALE:
1 : 50
65 29
珠海华发城市运营投资控
12 111
2332
9
10
11
16 I6.02.1
12
2800
5600
2800
5600
2800
1539
65 29
6174
建筑 / 结构单位 Architect / Engineer:
13
107 112
5347
珠海市香洲区湾仔街道银 Zhuhai Huafa Urban Investment Holdings 1663 Yinwan Road, Wanza Xiangzhou District,
I6.02.1
2492
11
SKIDMORE, OWINGS & ONE MARITIME P SAN FRANCISCO, C
I6.02.1
R
配合设计人员 Local Design Institute:
LEVEL 04 +18.60 m
1148
500
113
680
广州市设计院
05 I9.21
广州市天河体育东路体育 Guangzhou Design 3 Tiyu Dong Heng Street, Tiyu Dong Roa
390
13000680
680
680
680
1400
02 I6.02
680
16 I9.21
1800
1000
108
顾问 Consultants:
3650
3110
4865
02
03
1173
4068
4370
6680 5883
02 I6.02
5278
9
109
DD IN-PROGRESS PLANS 扩扩扩扩扩扩扩扩扩 100% DESIGN DEVELOPMENT 100% 扩扩扩扩
110
101
900
2150
1120
103 3000
Q
600
114
弱电 LOW VOLTAGE
117
1400 5741
9000
880
6000
102
1568
6500
EQ
1500
6500
105
7150
9110
7699
用途 Issued For: No.: Description:
LEVEL 03 +13.00 m
7093
8495
8
I6.02.1
3650
01 04
LEVEL 02 +6.90 m
115
正北 True 图名 Sheet Name:
MT-05
音频控制室 AV CONTROL ROOM
MT-05
穿孔铝金属板 PERFORATED ALUMINUM METAL PANEL
室内剖面
弱电 LOW VOLTAGE
INTERIOR SECTIO
穿孔铝金属板 PERFORATED ALUMINUM METAL PANEL
6/19/2020 6:56:11 PM
阶梯报告厅室内剖面 REPORT AUDITORIUM INTERIOR SECTION SCALE:
1 : 50
01
项目编号 Project No.: 220046
Drawn By:
图纸编号 Sheet No.:
I6.
Author
Checked By:
Checker
比例 Scale @ A0:
1 : 50
116
阶梯报告厅放大平面01 REPORT AUDITORIUM - ENLARGED PLAN 01 21 I2.02
7391
SCALE:
02 I6.02
9
9000
17483
8
9000
1800
360
03 I9.11
10
11
9000
02 I9.21
9000
12
1 : 50
13
9000
03
36267
1800
S 01 I9.21
101
800
103
102
9000
9000
105
111 I6.02.1
1168
12 01 I6.02
典型 TYP
R
426 974
2346
112
107
108 113
6178
9000
1400
03 I2.02
600
109
EQ
1168
110
104
弱电 LOW VOLTAGE
Q
114
117
106
106
115
音频控制室 AV CONTROL ROOM
104
弱电 LOW VOLTAGE
图名 Sheet Name:
阶梯报告厅平面
3800
REPORT AUDITORIUM FLOOR PLAN
116 03 I9.21
阶梯报告厅放大平面02 REPORT AUDITORIUM - ENLARGED PLAN 02 SCALE:
1 : 50
21
2层 L2
3层 L3
阶梯报告厅平面 REPORT AUDITORIUM - FLOOR PLAN SCALE:
1 : 100
01
项目编号 Project No.: 220046
Drawn By: Checked By:
Author Checker
比例 Scale @ A0: As indicated
图纸编号 Sheet
ZHUHAI CONVENTION CENTER
DESIGN FLOOR PLANS Report auditorium Seat Count: 500 Area: 835 sqm
Level 2
Level 1
CONFERENCE AUDITORIUM
-0.05 m
-0.05 m
24280
WD-02 高光泽蒙多那木或类似 HIGH GLOSS MADRONA OR SIMILAR
WD-02 高光泽蒙多那木或类似 HIGH GLOSS MADRONA OR SIMILAR
AIR RETURN BEHIND THE DOOR TRANSOM 侧门回风口
阶梯会议室-西立面 CONFERENCE AUDITORIUM - WEST SCALE:
1 : 50
PT-01 珠光漆 PEARLESCENT PAINT
阶梯会议室-南立面 CONFERENCE AUDITORIUM - SOUTH
19
SCALE:
03
1 : 50
AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2020 委托设计方 Client:
珠海华发城市运营投资控股有限公司
WD-02 高光泽蒙多那木或类似 HIGH GLOSS MADRONA OR SIMILAR
460
672
623
2740
3700
500 667
2892 4287
AIR SUPPLY AT THE LAST ROWS OF THE AUDIENCE AREA BEHIND THE WALL FIN. 观众区最后几排座位空调
6000
5819
8038
.95.
2020.06.19
室内造型侧送
1 : 10
04
500
100
SCALE:
I9.11
2475
100% DESIGN DEVELOPMENT 100% 扩扩扩扩
参见饰面列表和立面图,余同 SCHEDULED FINISH SEE ELEVATIONS, TYP
002
2250
3200
501 811
1100
2000
5700
Date:
07
14
19
3590 I6.01.1
2800护角条 CORNER BEAD
石门套大样(小) STONE PORTAL DETAIL (SMALL)
22 I9.11
16
1 : 10
FEC
用途 Issued For: No.: Description:
送风,两侧结合
1 : 50
SCALE:
ENTRY FLOOR +6.00M AFF
强电间 ELEC.
02
I6.01.1
4165
4300
550
17
12
2250
H
1200
003
1605
1150
EQ A
11
10MM垫块 10MM SCRIBE
90
04 I9.12
广州市天河体育东路体育东横街3号 Guangzhou Design Institute 3 Tiyu Dong Heng Street, Tiyu Dong Road, Tianhe District, Guangzhou
顾问 Consultants:
2200
205
SCALE:
前厅墙板大样 VESTIBULE WALL PANEL DETAIL
CEILING +9.70M AFF
EQ
355 60 06
16
I6.01.1
石材 - 参见立面图,余同 SCHEDULED STONE SEE ELEVATIONS, TYP
EQ
1027
贵宾休息室 01 VIP LOUNGE
.15. 125
EQ
广州市设计院
EQ
2000
参考门套大样 REFER TO PORTAL DETAIL
配合设计人员 Local Design Institute:
006
330
SKIDMORE, OWINGS & MERRILL LLP ONE MARITIME PLAZA, SAN FRANCISCO, CA 94111
2300
EQ A
470
200
G
470 2070
200
PERFORATED ALUM. METAL PANEL TYP.
阶梯会议室放大平面02 CONFERENCE AUDITORIUM - ENLARGED PLAN 02
2070
L
PERFORATED ALUM. METAL PANEL TYP. MT-03
6毫米MT-01饰条 6MM MT-01 REVEAL
后方有灭火器时,此为可开启门扇 OPERABLE DOOR FOR FIRE EXTINGUISHER BEHIND WHERE OCCURS
珠海市香洲区湾仔街道银湾路1663号 Zhuhai Huafa Urban Operation MT-02 Investment Holdings Co., Ltd. 穿孔铝金属板,典型 1663 Yinwan Road, Wanzai Neighborhood, Xiangzhou District, Zhuhai
K
建筑 / 结构单位 Architect / Engineer: 穿孔铝金属板,典型
WD-02 高光泽蒙多那木或类似 HIGH GLOSS MADRONA OR SIMILAR
金属面板 - 参见立面图,余同 SCHEDULED METAL PANEL SEE ELEVATIONS, TYP
2799
J
ST-01 卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED
ST-01 卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED
6200
H
100 50
G
WD-02 高光泽蒙多那木或类似 HIGH GLOSS MADRONA OR SIMILAR
LEVEL 01 -0.05 m
墙面回风口 AIR RETURN ON WALL 涂漆以匹配WD-02 PAINT TO MATCH WD-02
INTERIOR
阶梯会议室室内剖面 CONFERENCE AUDITORIUM - SECTION SCALE:
200
参考门表 REFER TO DOOR SCHEDULE
60
16 I2.01
03 I6.01
550
180 MAX
15
3435
.55.
2270
15
2820
15
150°
2820
100 EQ
500
EQ
+/- 166
EQ
140
2820
140
2610
110 PERFORATED AREA
2610
24280
04
01
1 : 50
1 : 10
项目编号 Project No.: 220046
Drawn By: Checked By:
Author Checker
图纸编号 Sheet No.:
I9.11
2020.06.05
2020.06.19
Date:
正北 True North
I2.01
广州市天河体育东路体育东横街3号 Guangzhou Design Institute 3 Tiyu Dong Heng Street, Tiyu Dong Road, Tianhe District, Guangzhou
顾问 Consultants:
用途 Issued For: No.: Description:
DD IN-PROGRESS PLANS 扩扩扩扩扩扩扩扩扩 100% DESIGN DEVELOPMENT 100% 扩扩扩扩
图名 Sheet Name:
图纸编号 Sheet No.:
阶梯会议室平面
Author
Checker
CONFERENCE AUDITORIUM FLOOR PLAN
Drawn By:
Checked By:
项目编号 Project No.: 220046
比例 Scale @ A0: As indicated
比例 Scale @ A0: As indicated
SCALE:
SCALE:
INTERIOR DETAILS
2层 L2
1层 L1
01
舞台台阶大样 STAGE STAIR DETAIL
22
1 : 100
T. O. FIN. FLR.
类似 SIM.
正北 True North 图名 Sheet Name:
室内大样
I9.11
参见地板饰面列表 SCHEDULED FLOOR FINISH
弱电 LOW VOLTAGE
类似 SIM.
03 I9.11
WD-02
类似 SIM.
014
R 58330
R 47680
010
008
R 56930 R 46280
I9.11
21
R 55530
型 TYP 50
01 I6.01
R 54130 013
900
300
TYP.典典
典型1 TYP1
001
WDF-02
11
R 52730
R 44880
300 典
05
R 51330
02
R 43480
3435
I6.01.1
音频控制室 AV CONTROL ROOM
1 : 10
7570
100
实木踏步板和踢板 SOLID WOOD TREAD AND RISER
T. O. FIN. FLR.
SCALE:
R 42080
04
阶梯大样 STEP DETAIL R 40680
300
1400
SCALE:
1 : 20
R 49930
1100
典型2 TYP2
1200 650 1500
370
墙翅大样 WALL FIN DETAIL
R 36480
R 39280
钢楼梯底部连接(如有需要) STEEL STAIR BOTTOM CONNECTION AS REQUIRED
参考门套大样 REFER TO PORTAL DETAIL
1000
阶梯会议室放大平面01 CONFERENCE AUDITORIUM - ENLARGED PLAN 01
20
8070
690 140 PERFORATED AREA
3190
参见地板饰面列表 SCHEDULED FLOOR FINISH
I6.01.1
140
19
009
I6.01
11 典型 I9.11 TYP.
19
012
地毯边塞入踢板下端 TACK CARPET UNDER RISER
R 37880
支撑框架(如有需要) FRAMING AS REQUIRED
SCALE:
3080
007
002 03 I9.11
300
2270
210
必要时支撑 SUPPORT AS REQ'D.
5280 15962
12
400
21
1500 650
1:5
金属面板 - 参见立面图,余同 SCHEDULED METAL PANEL SEE ELEVATIONS, TYP
280
2500
T. O. FIN. FLR. 8780
004
阶梯会议室平面 CONFERENCE AUDITORIUM - FLOOR PLAN
SCALE:
1900
1560 REA DA ATE FOR PER
H
005
920
170
图纸 LIGHTING FIXTURE PER CONSULTANT
大样 DETAIL
22
2490
011
55
150°
2820
210
样 IL
1 : 10
厚度由制造商提供 THICKNESS TO BE PROVIDED BY MANUFACTURER
灯具,参见照明顾问
1 : 50
04 I2.01
03
15
1900
1560 REA DA ATE FOR PER
1:5
100
图
Author Checker
7838
电气室 ELEC ROOM
1 : 10
强电间 ELEC.
006
003
0° 15
170
样 IL
典型 TYP.
300 TYP.典典
1200
Drawn By:
石材 - 参见立面图,余同 SCHEDULED STONE SEE ELEVATIONS, TYP
SCALE:
T. O. FIN. FLR.
项目编号 Project No.: 220046
Checked By:
23765
地毯垫底层 CARPET PAD UNDERLAY
01
比例 Scale @ A0:
石门套大样(大) STONE PORTAL DETAIL (LARGE)
1400
1 : 50
L
100
K
J
H
G
135° 150
I9.11
200
AIR RETURN BEHIND THE DOOR TRANSOM 侧门回风口
100
12 I9.11
图名 Sheet Name:
室内剖面
OBLIQUE 10MM垫块 10MM SCRIBE
100 100
MT-01 抛光青铜饰面 POLISHED BRONZE
AIR RETURN BEHIND THE DOOR TRANSOM 侧门回风口
JEC MASTERPLAN
PROJECT OVERVIEW
JEC MASTERPLAN
Jeddah, KSA
Client // Jeddah Economic Company (JEC) Project Size // 5,300,000 sqm Schematic Masterplan Design
PROJECT OVERVIEW JEC City is envisioned as a world class modern landmark development LQ 6DXGL $UDELD RQ D VLWH ORFDWHG MXVW Rႇ WKH VKRUH RI WKH 5HG 6HD WR the north of the metropolitan region of the City of Jeddah. As a vibrant satellite sub–center on a land area of 5,300,000 square meters, JEC City is a project made up of distinctive districts which include a commercial FRUH RI LQWHUQDWLRQDO EXVLQHVVHV ¿QHVW OLIHVW\OH HVWDEOLVKPHQW XQLTXH open spaces, and diverse residential communities. In addition, the -(& &LW\ 0DVWHU 3ODQ KDV ORFDWHG D PDJQL¿FHQW LFRQLF WRZHU DV WKH center piece of the development – the JEC Tower. The Tower will not only attract local but also foreign visitors to the city and will also be the PRVW VLJQL¿FDQW ODQGPDUN RI WKH GHYHORSPHQW PDUNLQJ -(& &LW\ DV DQ icon within the world’s most important developments. JEC City will create active residential and commercial lifestyles in a form and environment that is unlike any other along the Red Sea coastline, setting an example for a new concept of commercial, retail and mix–use housing that will steer the growth and future development of the area. JEC City is expected to accommodate 213,714 residential population and host 197,541 non–residential populations who will enjoy its world class facilities.
“
JEC City is envisioned as a world class modern landmark development in Saudi Arabia.
JEC MASTERPLAN
GENERATOR
SITE & CONTEXT Today there is a need to inves gate how similar principles to those explained above can be used to enhance current planning and building practice to make them more responsive to the socio-cultural & religious traditions of Islamic society | The modern built environment in Jeddah lacks the merits of traditional architecture | It is Western in form and style and maintains little continuity with local history.
gateway to the two holy mosques over 1300 years
sea view
direction to Mecca
The layout of Jeddah AI-Qademah was irregular, yet coherent, based on a physical arrangement that evolved over a long period. The important location of the Jeddah Al-Qademah along the shoreline of the Red Sea and its function as a seaport for pilgrims on their way to Mecca contributed greatly to the development of commercial activities. In all walled cities, the location of the gates was extremely important | Jeddah’s ancient gates (bab) included Bab Medina and Bab Al-Jadid to the north, Bab Mecca to the east, and Bab Sharif to the south. Friday midday prayers determined that the Great Mosque of Jeddah AlQademah is located in the center of the city where city’s news could be exchanged and a center for religious education. Also, in case in the layout of many other Islamic cities, its importance and central loca on invited commercial activities (the souk, or market) to be located around it.
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2013
OPPORTUNITIES & CONSTRAINTS
Directions
7UDႈF
Axial relationship of tower
)RU IUHH WUDF ÀRZ PLQLPL]H
provide organizing element
number of signalized intersection
axial relationship of tower
N (Medina) Mecca
S (Old Jeddah)
Red sea
Interchanges
Western Bridge
Consider impact of
:HVWHUQ EULGJH WUDI¿F WR EH
physical space required for interchanges
diverted away from site interchanges restriction
need for bridge
Land Value & Water
Fill - Tower & Water Body
the desired central water body
.HHS ¿OO WR D PLQLPXP E\
adds another point of value
concentrating it only around JEC tower and water area
high value land around water
Views
Open Space
View to creek and view to red
Protect open space network
sea provide value
from outside exposure
view to
Creek
view to
Red Sea
Land Value & Corniche
Land Value & Tower
Views to red sea provides
Tower provides value for the
another value opportunity
land, proximity should relate to density
high value land around tower high value land around red sea
JEC MASTERPLAN
ANALYSIS
SITE & CONTEXT
North east road Eastern bridge
Northern road
Eastern road
Obhur road - Creek side
Western bridge
Obhur road - Sea side
Road system
Building heights
Open spaces
Pedestrian network
Mid
View to water from tall buildings
Lans value elements
7UDႈF ÀRZ
land use parcels
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2013
RECOMMENDATION After going through a rigorous process of analysis and after reviewing compliance of the designs with Urban Design Principles and Methodology as well as the Open Space Strategy, we outcome of the design is base on reasons az listed below: 7KH 6LWH 2UJDQL]DWLRQ LV FOHDUO\ LQÀXHQFHG E\ WKH DUFKLWHF WXUH RI the tower and serves to support the tower’s design concept. - The massing of the buildings responds clearly to the value of the land, providing maximum return on investment for the Client - The Lagoon’s potential for enhancing land value and open space is maximized without exceeding the maximum allowable water area.
JEC MASTERPLAN
STAGES
PHASES
Stage one
Stage two
Phase 1
Phase 2A
AREA: 1.2 Million SQM
AREA: 1 Million SQM
GFA: 3.4 Million SQM
GFA: 2.4 Million SQM
Stage three
Stage four
Phase 2B
Phase 2C
AREA: 1 Million SQM
AREA: 1 Million SQM
GFA: 1.7 Million SQM
GFA: 2.3 Million SQM
6WDJH ¿YH Phase 2D AREA: 1 Million SQM GFA: 1.6 Million SQM
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2013
RECOMMENDATION - The subdivision of public space into Public, Semi-Public, and SemiPrivate is clearly enforced by the building massing - There is a clear well shaded and interconnected pedestri-an network tying together the site, and the hierarchy of pedestrian links clearly follows the Public, Semi-Public, and Semi- Private template. 7KH GHVLJQ LV ÀH[LEOH DQG FDQ EH HDVLO\ SKDVHG LQ PXOWLSOH ZD\V ZLWKRXW DႇHFWLQJ WKH SK\VLFDO DQG ¿QDQFLDO LQWHJULW\ RI WKH ZKROH - The use mix can be easily adjusted based on market requirements ZLWKRXW DႇHFWLQJ WKH SK\VLFDO DQG ¿QDQFLDO LQWHJULW\ RI WKH ZKROH - The geometric design is unique among the master plans executed in the Middle East and creates a distinct character for the development
JEC MASTERPLAN
URBAN DSIGN
URBAN DESIGN PRINCIPLES TO BE APPLIED COMMUNITIES
PEDESTRIAN ROUTE HIERARCHY
OPEN SPACE HIERARCHY
Just like the overall scale of the development, Pedestrian routes must be subdivided into various types with varying degrees of accessibility
Open spaces are NOT to be designed in isolation. All open space elements must provide links to other elements of the open space network allowing pedestrian circulation throughout the development. Where major roads create a hazard to pedestrian links, elevated land bridges similar to the High Line in Manhattan allow pedestrians to cross unimpeded in well-shaded landscaped surrounding.
- Public pedestrian routes - Semi-public pedestrian routes - Semi-private pedestrian routes
DEVELOPMENT STRATEGY DRIVERS 7+( 5(' 6($ 9,(: The layout and building height strategy must be arranged so that many parcels as possible can enjoy the Red Sea and its spectacular sunsets. This will help drive high value land from the site periphery further inland. 7+( /$*2216 By creating water body inside the site, it is possible to create another high land value further from the site’s edge. Parcels which have direct views of both the lagoons and Red Sea become very valuable. 6(3$5$7,21 2) 75$)),& 7<3(6 Since the tower, retail and commercial components will be a worldwide attraction drawing many visitors HYHU\ GD\ LW LV LPSRUWDQW WKDW WKLV ÀRZ RI WRXULVWV and sightseers not interfere with the resident population’s ability to circulate into their dwellings and neighborhoods unimpeded.
URBAN DESIGN PRINCIPLES TO BE APPLIED COMMUNITIES The design must simultaneously allow unity of the whole and create unique pockets of identity, which foster the creation of intimate neighborhoods and communities. This means that the entire design must be based on the gradation of 3XEOLF VFDOH 6HPL SXEOLF VFDOH 6HPL SULYDWH VFDOH 3ULYDWH VFDOH
'(6,*1 2) ,1',9,'8$/ %8,/',1*
'(6,*1 2) ,1',9,'8$/ 3/276
'(6,*1 2) 675((7 6(&7,21 $1' %/2&.6
As in traditional planning, each building is to be considered not in isolation but in its surrounding context. The massing must help provide a scaling of space, creating semi-private enclaves to encourage a sense of safety and community. Individual parcel development control regulations must be designed with entire clusters in mind regardless of the ownership structure of any given plot.
Building must NOT be aligned along roads creating dead spaces exposed to sun dust and wind between structures. Taking a cue from the traditional development in the Middle East, a scaled-up courtyard typology will b encouraged. Providing shading and wind protection, creating semi-private community spaces which foster neighborly relations and provide for parcel layout wherein the corners of the semi-private spaces are contained by corner buildings, creating a protected environment for the users of those buildings.
All streets are to be designed with pedestrians in mind. This means the provision of comfortable sidewalks even to the lowest road hierarchy. The building podiums are designed on truly urban standards with zero plot line setback facing the street, allowing the height of the buildings to shade the street. A shaded arcade is required of most buildings, providing a more comfortable walking environment for all. Many streets take on the character of boulevards, making walking to various on-site destinations desirable. This will reduce YHKLFXODU WUDႈF DQG SURYLGH D KHDOWK EHQH¿W WR FRPPXQLW\
COURTYARD BY MARRIOT
PROJECT OVERVIEW
PROJECT OVERVIEW The subject site is strategically located between Central Business District and the airport in close vicinity to King Abdullah Financial District. The site is located in the southern side of Sahafa district, approximately 20 minute drive from Airport. Measuring approximately 11,043 sqm on Takhassusi Road 2.0 km from King Abdul Financial District, The plot is approximately 26 kilometers from King Khaled International Airport. The site area is 11,180sqm allowing 26,500sqm of build useful area. It is 5 star hotel with 200 room, providing restaurants, function rooms, retail spaces.
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2015
COURTYARD BY MARRIOT
Riyadh, KSA
Client // Al Homaidhi Site Area // 11,180 sqm Project Size // 24,000 sqm Schematic design of 4* Hotel
COURTYARD BY MARRIOT
ANALYSIS & DRAWINGS
SITE LOCATION & CONTEXT The site has 65 meters frontage at Al Takhassusi Road and boarder by dual-lane 3meters wide Al Yasmine Street and the 20 meter wide Al Jabal Al Aswad Street.
6m
6m
RETAIL
RO AD
HOTEL PART 2 (1B+G+1)
2m
60m COURTYARD BY MARRIOTT PLOT 11043 m2
2m
2m EXISTING E VILLAS
6m
HOTEL PART 1 AL (1B+G+M+5) JAB AL AL AS 4m WA DS TRE ET
Maximum Plot Coverage: 40% Above Ground Level = 4417m2 60% Landscape and Parking = 6626m2
GARDEN
AL TAK HS SU SI R OA D
AL YAS ME EN
6m 6m 4m 2m
65m
Set Backs: From Takhassusi Road From Al Yasmine Street From Al Jabal Al Aswad Street From neighbors
TO AIRPORT
FUTURE EXPANSION
Allowable Built Useful area: BUA = Total Plot Area Times 2.4 factor 11043m2 x 2.4 = 26503m2 Allowable Height Part 1 (60m Deep) G+M+5 (Main Entrance should be within Part 1) Part 2 G+1
$
%
&
'
(
)
*
+
-
$
%
&
'
TO KAFD
(
$
%
&
'
(
7
7
67$,5
$,5 &5(: /281*(
92,' 72 %(/2:
0((7,1* 5220 Pð
6(59,&( )/225 Pð
92,' 72 %(/2:
$'0,1 Pð
'1
0((7,1* 5220 Pð
;
92,' 72 %(/2:
0((7,1* 5220 Pð
;
0((7,1* 5220 Pð
35()81&7,21 %(/2:
:
&255,'25
%$//5220 %(/2:
0(3 Pð
<
72,/(76 Pð 6725$*( Pð
67$,5
6725$*( Pð
67$,5
<
72,/(76 Pð
0((7,1* 5220 Pð
9
:
%2+ Pð
,7
2)),&( Pð
%5($.287 5(&(37,21 Pð
8
9
35$<(5 5220 Pð
%5,'*( Pð
/2%%< Pð
/8 7,2 1
.,'6 &/8% &/26,1* 5220 Pð
6(59,&( /2%%<
0(3
8
0(3 $'0,1 Pð
67$,5
$%
&255,'25
$
%
&
'
(
)
*
+
-
$
%
&
'
(
)
*
+
-
$
3ODQ /HJHQG
%
&
'
(
)
*
+
-
)2+
&,5&8/$7,21
3ODQ /HJHQG
%2+
Mezzanine level
Service level
0(3
&,5&8/$7,21
%2+
0(3
)
*
+
0
5(-(&7,21 /$1(
-
$
%
&
'
(
$
0(3
67$,5
-
$
%
&
'
(
8
68,7( Pð
67$,5
9(67,%8/( %$// 5220 Pð
35( )81&7,21 Pð
:
%2+
%(// %2<
/8**8*( Pð
&255,'25 0(3 Pð
5(&(37,21 Pð )5217 2)),&( Pð
9$/(7
/,1(1 Pð 0(3
0(3 Pð
68,7( Pð
&21&(,5*(
0(3
%2+
0(3 Pð
/$1'6&$3(
&/2$. 2)),&( Pð
/,)7 /2%%<
6&$11,1*
9(67,%8/(
23(1
0(3
7+( 0$5.(7 Pð
$// '$< ',1,1* Pð
;
83
/$1'6&$3( &$)( %86,1(66 &(17(5
35$<(5 5220
/$1'6&$3( 83
72,/(76 Pð
72,/(76 Pð
67$,5
67$,5 3$175< Pð
<
/$1'6&$3(
6(&85,7<
$
3(',675,$1 (175$1&(
/$1'6&$3(
;
<
72,/(7
/2%%< /281*( Pð
72,/(7
0806 5220
$%/87,21
9
:
6(&85,7< Pð
+
.,7&+(1 Pð
*
6&$1
)
9
63(&,$/7< 5(67$85$17 Pð
/$1'6&$3(
/2%%< Pð
.,7&+(1 Pð
+($/7+ &/8% (175<
9,3 /281*( Pð
(
8
$9 Pð
'
7
.,7&+(1 Pð
6725$*( Pð
&
7
%
6(&85,7<
/$< 29(5 /$1(
(
'
&
%
0
$
%
&
'
(
)
*
+
-
$
%
&
'
(
)
5(-(&7,21 /$1(
*
+
-
$
%
&
'
(
)
*
+
-
$
%
&
'
(
)
*
+
-
3ODQ /HJHQG &$5 3$5.,1*6
3ODQ /HJHQG
)2+
%$6(0(17 63$&(6 &,5&8/$7,21
&,5&8/$7,21
*5281' 63$&(6 727$/ 63$&(6
%2+
%2+
0
0(3
0(3
0
$&&202'$7,21 52206
$&&202'$7,21 68,7(
Ground level
Typical level $ -
$
%
&
'
%8/. 352'8&7,21 $1' 5220 6(59,&(6 Pð
9$/(7 /$81'5< Pð
:
&
'
(
$
%
,7
0(3
/,*+7 :(,*+7 522)
6$81$
322/ '(&.
/,1(1
672
67($0
0(3
0(3
68,7( Pð
*<0 )$&,/,7,(6 Pð
&
'
; /$1'6&$3(
67$)) 81,)250 ,668$1&( Pð
(
0(3
3$157<
*<0 )$&,/,7,(6 Pð
67$,5 7(03 /$81'5< 6725$*( Pð
&&79 Pð
:
/2%%< Pð
67$)) /2&.(56 Pð
67$,5
5$03 83
)(0$/( *<0 Pð
,1'225 322/ Pð
<
9
$'0,1 Pð
6(&85,7< Pð 6&$11,1*
68,7( Pð
322/ 3/$17 Pð
)
*
+
%$5%(5 6+23 Pð
0$/( *<0 Pð
% $
%
8
&255,'25 Pð
0(3
%2+ Pð
$
/$1'6&$3(
;
5(&(,9,1* 385&+86,1* 2)),&( Pð
&
-
)1% 6725$*( Pð /2$',1* 81/2$',1*
(
'
+
N
(1*,1((5,1* $1' 0$,17(1$1&( Pð
/,)7 /2%%<
67$,5
6(59,&(6 Pð
9
0(3 2(0 6725( Pð
*
*
0(3
:$7(5 7$1.6 %(/2:
)
)
:$67( +$1'/,1* Pð
(
8
'
7
67$)) &$17((1 Pð
0(3 Pð
&
7 %$.(5< $1' 3$675< Pð
67$,5
%
(
* +
0(3
)
(
5$03 '1
'
75($70(17 Pð
-
<
&
%
$
$ /$1'6&$3(
67$,5
* 67$,5
&$5 3$5.,1*6 %$6(0(17 63$&(6
3ODQ /HJHQG
&,5&8/$7,21
$
%
&
'
(
)
*
+
-
$
%
&
'
(
)
*
+
*5281' 63$&(6
)
727$/ 63$&(6
%2+
3ODQ /HJHQG
0(3
)2+
$&&202'$7,21 68,7(
&,5&8/$7,21
$&&202'$7,21 52206
( '
%2+
0(3
&
% $
Basement level
First level
-
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2015
SCHEMATIC DESIGN DRAWINGS
H-4
H-5
H-A
H-B
250 H-1
100
600
670
° SOT
100
1400
100
3200
250
1325
100
1650
4000
4575
100
100
2480
SOT
3250
SOT °
1400
H-1
H-C
9570
300 100
280 250
H-2
H-2
1825
250
1525
1425
200
200
1575
H-A
H-B
H-C
Suite 2 H-H
H-W
H-I
64 35
100
4350
100
3309
900
H-X
200
550 1200
550
600
100
1300
100
100
1050
100
1800
100
3560 700
1085
3750
950
100
1250
H-5
250
250
1200
250
750
1085
562
H-H
Facade details
Suite 1
H-Z
H-Y
H-I
H-5
COURTYARD BY MARRIOT
DRAWINGS
N AL YASMEEN ROAD
CC
84 00
H
O
5000
FF
U P
I
C
P
K
42 42 0
HOT STATION
HOT STATION CHILER
D
I
S
D
H
R
O
H-2
8000
O
SERVICE LIFT G-048
GUEST LIFTS G-011 TEA ROOMS RESTAURANT G-013
SERVICE LIFTS G-010
SERVICE LOBBY G-016
LIFT LOBBY G-009
H-V
P
Section 42 ---
STAIR 03 G-018
H-3 H-W
ELEC. G-020 CORRIDOR G-055
E 666,493.984 N 2,742,300.262
FRONT OFFICE G-022
H-5 SECURITY G-003
GUEST VIEWING SAFETY ROOM DEPOSIT
MARKET G-005
VALET G-004
G-080
CLOAK / OFFICE G-073
F-6
HOTEL LOBBY G-006
H-6
Double Height Area
H-Y
STAIR 06 G-035
H-7
F-S
F-8
84 00
CORRIDOR G-046
STAIR 01 G-045
SECURITY 1 G-057
84 00
F-8
50 84 0 25 10 00 18
Double Height Area
F-7 FEMALE RESTROOM G-036
H-X
ALL DAY DINING G-025
H-6
8000
52 20 0
84 00
LOBBY G-072 MALE RESTROOM G-037
AIR IN TAKE G-054
JANITOR G-081
FOM MGR G-078
H-5
ELEC CBD G-065
HOT CART
COLD CART
CORRIDOR G-047
CAFE SUPPORT PANTRY G-076
PANTRY G-008
H-8
E 666,337.353 N 2,742,340.423
H-8
F-T
E 666,399.269 N 2,742,305.326
L20-400
49835
1
75 00
CC
E 666,484.088 N 2,742,275.136
20 42
86998
BB
L20-200
84 00
-1.50 FFL
30 17 5
F-Y
H-7
H-Z
STAIR 02 G-026
4000
F-R
F-W
G-077
4
AA
L20-400
M - RESTROOM G-024
STAIR 05 G-063
ELEC ROOM G-053 CORRIDOR G-068 GARDEN STORE G-067
JAN. LOBBY G-071 G-069 JAN. G-070
L20-201
1100 CLEAR
F - RESTROOM G-023
+0.000 FFL
BALL ROOM G-038
H-4
STORAGE G-021
Double Height Area MAIN RECEPTION G-002
-0.150 FFL
F-5
BALLROOM KITCHEN G-039
84 00
SECURITY LOBBY G-001
Hotel Building Entrance
L20-201
8000 49000
3
6
8000
L20-201
1000 CLEAR
Function Building Entrance
450
84 00
SECURITY LOBBY G-050
+0.000 FFL
+0.000 FFL
L20-201
CORRIDOR G-049
1500
H-4 F-4 PRE FUNCTION AREA G-061
7
F-T
84 00
63 40 0
H
IS
DISH WASH & POT WASH
H-3
+0.000 FFL
84 00
IS
FF
AL TAKHASSUI ROAD
6000
CROCKERY STORE
00 80
42000 6000
D
ALL DAY DINING KITCHEN G-019
BEVERAGE DISPENSE
CHILLER
SERVICE LIFT G-056
Section 42 --F-3
SECURITY G-034
H-U
BEV. CHILLER DRY STORE
SERVICE LOBBY G-015
F-2
VIP / FITNESS CLUB LOBBY G-059 VIP LOUNGE G-033
EA
6000
8425
H-T
COLD KITCHEN CHILLER
D
RECEPTION G-031
F-U
6000
H-I
1800
H-1 CHEF'S OFFICE
TEA ROOM TOILET G-064
H-2
E 666,324.202 N 2,742,367.185
6000
8425
RMU ROOM G-066
STORE G-074
IT RISER G-012
F-X
E 666,480.218 N 2,742,273.453
L20-400
F-U
63 40 0
84 00
55 00
STAIR 08 G-007
4238
AL JABAL AL ASWAD STREET
F-V
9200
5950
8900
8900
8900
9700 95550
55 18 0
84 00
E 666,275.917 N 2,742,340.365
F-N
NEIGHBOUR PLOT with 2 Nos EXISTING VILLAS
F-X 75 00
F-13
55 00
AIR EXHAUST G-062
60 00
F-14
F-K
F-L
F-K
F-J
F-H
9000
3450
8000
8950
8500
6100
5400
8425
1800
8425
7700
7700
8425
1800
8425
52700
F-G
F-F
F-E
F-D
F-C
F-B
F-A
F-Y
F-Z F-15
MATCH LINE - REFER TO DWG. NO.L20-100-2
84 00
27 00 2
5 28 500 50 0
55 00
F-12
F-L E 666,350.627
MATCH LINE - REFER TO DWG. NO.L20-100-2
F-W 60 00
F-M
H-A
H-B H-C
H-D
H-E
H-F
H-G H-H
H-I
N 2,742,313.325
Gas Tanks
MATCH LINE - REFER TO DWG. NO.L20-100-3
55 00
MATCH LINE - REFER TO DWG. NO.L20-100-1
E 666,277.242 N 2,742,344.391
F-11
H-G H-H
7700
2 1 .0 8 4
F-7
F-10
H-F
52700
7700
E 666,476.888 N 2,742,339.084
F-1 STAIR 07 G-030
GUEST LIFTS G-032
CORRIDOR G-044
F-6
F-Z
H-E
8425
COLD KITCHEN
L20-400
F-V
H-D
1800
TRANSFORMER G-051
MEP G-075
F-S
F-5
8425
STAIR 04 G-014
VIP RESTROOM G-060
F-R
AA
H-B H-C
L20-400
5400
-0.50 FFL
H-1
BOH CORRIDOR G-058
F-4
H-A
F-A 6100
TOILET G-028
DN
SERVICE LIFTS G-017
STORAGE G-043
IT G-041
F-B 8500
8000
AUDIO / VIDEO G-040
F-C 8950
109251 AIR INTAKE G-052
0 00 24 000 8
ELEC G-042
F-2 6000
F-D 8000
L2 0-20 1
F-1
6000
F-E 3450
00 80
RAMP TO GROUND LEVEL
F-3
F-F 9000
1060 1400 650 200 RAMP TO BASEMENT LEVEL
9 39 52
F-G
95550 9700
27005
F-H 8900
Q
5
F-J 8900
TARMAC ROAD
BB
2
F-K 8900
E 666,375.229 N 2,742,379.098
L20-200
F-L 5950
3000 300 507
F-M 9200
3000 300
F-N
L20-400
E 666,287.811 N 2,742,316.124
Ground level
CC
F-G L20-400
F-F 9000
F-E
F-D
3450
8000
F-C
F-B
8950
8500
F-A
MSU 449(17/18)
MSU 4415(17/18)
.0 5 2
PLANT ROOM 1 B-098
COLD KITCHEN B-124
DRY STORE B-119
.0 5 2 .0 5 2 0 .0 5 2 .0 5 2 .0 5 2
E
C
C
DRY FLOUR STORE B-128
F-1 H-2
1/1GN
1/1GN
.0 5 2 .0 5 2 .0 5 2 .0 5 2 .0 5 2
MSU 4615(17/18) MSU 4613(17/18)
MSU 469(17/18)
MSU 4613(17/18)
MSU 469(17/18)
STORE B-016
ENGINEERING B-020
-4.900 FFL 100ĚF.T ) 7
FRUIT & VEGGIE SANITIZATION ROOM B-042
AYS B-043
DIRTY LINEN B-133
84 00
52 20 0
84 00
F-W
STAIR 06 B-096
F-S 84 00
CP
84 00
COMBINED RAW DOMESTIC & FIRE WATER TANK 2 B-085
84 00
HR MANAGER B-059
CLEAN LINEN STORE B-132
CORRIDOR B-036
PUMP ROOM B-076
-4.900 FFL
STAIR 01 B-065
FIRE ROOM B-072
TREATED GREYWATER TANK 1 B-075
H-8
IT DIRECTOR B-135
5950
STAFF TOILETS-F B-068
H-Y
HR GENERAL OFFICE B-066
UPS B-090
CBS B-073
8900
GENERAL STORE / MEP B-025 SERVER ROOM B-032
8900
F-14
AIR EXHAUST B-099
60 00
F-Z F-15 E 666,287.811 N 2,742,316.124
Basement level
F-Y
F-K
8900
F-J
9700 95550
F-H
9000
3450
F-F
8000
F-E
8950
F-D
8500
F-C
6100
F-B
5400
F-A
8425
H-A
1800
H-B H-C
E 666,484.088 N 2,742,275.136
E 666,480.218 N 2,742,273.453
8425
7700
7700
8425
1800
8425
52700
F-G
N 2,742,313.325
H-8
20 42
86998
L20-400
MATCH LINE - REFER TO DWG. NO.L20-099-1
75 00
F-X 55 00
F-L E 666,350.627
H-7
H-Z
STAIR 02 B-063
CCTV B-033
GSM B-034
PROPERTY LINE
MATCH LINE - REFER TO DWG. NO.L20-099-2
27 00 2
F-M MATCH LINE - REFER TO DWG. NO.L20-099-2
F-13
55 00
5 28 500 50 0
F-N MATCH LINE - REFER TO DWG. NO.L20-099-3
10 00
84 00
F-W 60 00
F-12
9200
84 00
55 18 0
4238
F-V
STORE B-047
55 00
8000
H-6
FIRST AID ROOM B-031
63 40 0
STAIR 08 B-051
E 666,277.242 N 2,742,344.391
STAFF TOILETS-M B-030
CORRIDOR B-018
HR GENERAL OFFICE B-134
TREATED GREYWATER TANK 2 B-074
BB
E 666,399.269 N 2,742,305.326
ELEC. ROOM B-110
00 18
SGT
WC B-136 NURSE B-035 CORRIDOR B-137
TRAINING ROOM B-091
INTERVIEW ROOM B-093
STAFF UNIFORM ISSUE B-037
SGT
84 00
F-U
CC
L20-400
49835
F-8
CP
GREY WATER TREATMENT PLANTROOM B-077
RAW GREY WATER TANK -2 B-079
COOLED COLD WATER TANK B-081
30 17 5
75 00
RAW GREY WATER TANK -1 B-078
CENTRALIZED HOT WATER CALORIFIER/BOILER PLANTROOM AT 5M CLEAR HT. B-080
SOFT WATER TANK B-082
FIRE PUMP ROOM B-084
WASHER EXTRACTOR 14KG
ASSISTANT HK STORE B-129 B-109 TRAINING MANAGER WORK B-131 STATIONS B-092
H-7
FILTERED WATER TANK B-083
COMBINED RAW DOMESTIC & FIRE WATER TANK 1 B-086
F-T
55 00
METAL DETECTOR
LOSS PREVENTION B-102
E 666,337.353 N 2,742,340.423
F-Y
PURCHASING RECEIVING OFFICE LP DIRECTOR MANAGER B-069 B-070 B-071
THUMBLE DRYER 16KG
ASSIST HK B-130
EXEC. HK B-053
-4.900 FFL
8000
84 00
63 40 0
6000 6000
F-7 -4.900 FFL
CP
DOMESTIC WATER FILTRATION PLANT ROOM B-087
F-8
F-11
SECURITY B-052 DRIVERS TOILET B-106
H-X 50 84 0 25 10
R
4000
C
H-6
F-X
F-10
DEBOXING AREA B-104
F-6
-5.000 FFL
F-R
AA
L20-400
H-5
HOUSEKEEPING B-045
DEBOXING SORTING B-044
A
-4.900 FFL
R
84 00
LAUNDRY B-038
B-107
H-5
F-7
E 666,275.917 N 2,742,340.365
MECHANICAL SHOP B-024
STORE B-022
100ĚF.T 100 F.T
F-5
F-6
F-Z
H-4
CORRIDOR B-028
CHEMICAL LDRY MANAGER STORE COMPRESSOR OFFICE B-048 ROOM B-050 B-046
BOH PASSAGE ROOT STOREB-108
-5.000 FFL
F-U
F-V
E 666,493.984 N 2,742,300.262
PLUMBING SHOP B-023
F
F.D
H-4 F-4 ELEC RM B-088
H-3 H-W
PLANT ROOM 2 CHIEF ENGINEER B-021
ELEC. B-039
100ĚF.T ) 7
5700
LIFT LOBBY MEP B-040 B-097
IT RISER B-041
MSU 4613(17/18)
DIR. ENGINEERING B-019
CORRIDOR B-055
SERVICE LIFTS B-067
KITCHEN PREPARATION B-101 2/1GN
MSU 4615(17/18)
MSU 469(17/18)
MSU 4611(17/18)
MSU 4615(17/18)
MSU 4615(17/18)
MSU 4615(17/18)
F-3 MSU 4613(17/18)
84 00
D
.0 5 2 .0 5 2
MSU 4611(17/18) MSU 469(17/18)
H-3
WASTE HANDLING AREA B-112
MSU 4615(17/18)
84 00
1/1GN
.0 5 2 .0 5 2
6000
MSU 4615(17/18)
GREASE TRAP ROOM B-009
H-V
PAINT SHOP B-017
00 80
6000
H-2
42 42 0
STORE B-058 CARPENTRY STORE B-014
STAIR 03 B-062
SERVICE LIFTS B-064
2/1GN
42000 6000
H-U
STORE B-015
2/1GN
6000
D
SERVICE LIFT B-061
SERVICE LIFT B-060
IV
L20-400
F-5
C
MSU 469(17/18)
-5.000 FFL PARKING B-089
F-T
AA
E
D
1/1GN
.0 5 2 .0 5 2
IV
H-1 C
STAFF CANTEEN B-013
CHEM. STORE B-100
100ĚF.T ) 7
F-2
-5.000 FFL
D
0 00 24 000 8
ELEC. RISER B-103
CB
D
2 1 .0 8 4
1/1GN
2/1 2/1
2/1 2/1 2/1
.0 5 2
100ĚF.T 100 F.T
400X600 TRAY
C
E
CENTRALISED POTWASH B-125
D
100ĚF.T 100 F.T
D
C
2/1GN
400X600 TRAY
1/1
ORDER TAKER B-123
MDB-02
00 80
400X600 TRAY
1/1 1/1
100ĚF.T 100 F.T
C
E
100ĚF.T ) 7
CB
DISH WASH AREA B-012
OES STORE B-111
STAIR 04 B-056
BAKERY & PASTRY AREA B-126
E 666,324.202 N 2,742,367.185
F-4
H-T
.0 5 2
C
1/1 2/1 1/1
D
BULK PRODUCTION B-011
UP
F-S
MDB-06
CB
.0 5 2
MDB-01
H-1 OVEN ROOM B-127
-4.900 FFL
LIFT LOBBY B-095
LV ROOM MDB-04 B-029
CB
100ĚF.T ) 7
ROOM SERVICE B-121
MEP B-003
OIL STORE B-002
MDB-03
.0 5 2
COMPRESSOR RM B-120 DISH WASH B-122
STAIR 07 B-054
-4.900 FFL
SGT
8425
.0 5 2
.0 5 2
MSU 4415(17/18)
-4.900 FFL
H-I
1800
MDB-07
MSU 4415(17/18)
ELEC RM B-004
8425
ATS-2
.0 5 2
MSU 4413(17/18)
GENERATOR SET,60HZ, 400 /230V, 0.8PF 1270 kW(1,588 kW)
I.T ROOM B-008
H-G H-H
7700
ESMDB-OP
CB-OP
CB-LS
.0 5 2
.0 5 2
GUEST LIFTS B-057
SERVICE LIFTS B-049
ESMDB-LS
.0 5 2
.0 5 2
MSU 449(17/18)
F-2
MEP B-001
H-F
52700
7700
E 666,476.888 N 2,742,339.084
.0 5 2
BEVERAGE STORE HYGIENE OFC B-118 SOUS CHEF B-115 OFC B-007 STORE CHIEF KEEPER STEWARD B-117 B-116
BALL ROOM STORE B-006
GENERATOR ROOM B-094
2 1 .0 8 4
F-R
H-E
8425
ATS-1
MDB-05
F-1
F-3
H-D
1800
.0 5 2
.0 5 2
6000
8425
.0 5 2
.0 5 2
MEP SWITCH ROOM B-005
H-B H-C
L20-400
5400
.0 5 2
MSU 4415(17/18)
EX. CHEF SEC EX. CHEF OFC. B-113 B-114
FUEL TANK B-010
9 39 52
BB
H-A
6100
109251
5000
95550 9700
8000
F-H 8900
8000
F-J 8900
8000 49000
8900 E 666,375.229 N 2,742,379.098
EMDB-LSOP
5950
MSU 4615(17/18)
F-M 9200
2/1GN
F-N
H-D
H-E
H-F
H-G H-H
H-I
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2015
CC
F-M
F-L 5950
F-K
F-J
8900
F-H
8900
F-G
95550 9700
8900
L20-400
F-F 9000
F-E 3450
F-D
F-C
8000
8950
F-B 8500
BB
H-A
F-A 6100
H-B H-C
L20-400
5400 L20-200
9200
8425
H-D
1800
H-E
8425
H-F
52700
7700
H-G H-H
7700
8425
H-I
1800
8425
2
F-N
H-T
6000
G
STD TWIN ROOM HT-102
F-7
G
STAIR HT-151
5000
STD TWIN ROOM HT-120
MEP HT-144
+7.500 FFL
STD KING ROOM HT-121
H-7
+7.500 FFL
L20-201
STD KING ROOM HT-132
8000 49000
STD KING ROOM HT-133
H-5
SUITE 01 HT-123 STD TWIN ROOM HT-131
H-X
STD TWIN ROOM HT-130
50 84 0 25 10
STD KING ROOM HT-1240
0 18
STD TWIN ROOM HT-129
H-6
STD TWIN ROOM HT-125
STD KING ROOM HT-128
STD KING ROOM HT-126
STD KING ROOM HT-127
+7.500 FFL
H-Y H-7
H-Z
STAIR 02 HT-149
H-8
CC
5950
8900
F-L
8900
F-K
8900
9700 95550
F-J
F-H
1 9000
3450
8000
8950
8500
6100
5400
L20-400
8425
1800
8425
7700
7700
8425
1800
8425
52700
F-G
F-F
F-E
F-D
F-C
F-B
F-A MATCH LINE - REFER TO DWG. NO.L20-100-2
F-M
BB
H-A
H-B H-C
H-D
H-E
H-F
H-G H-H
H-I
MATCH LINE - REFER TO DWG. NO.L20-101-1
9200
F-N
L20-200
H-8
L20-400
4
AA
L20-400
SERVICE HT-142
STD KING ROOM HT-140
STAIR 01 HT-148
H-4 STD KING ROOM HT-122
STD KING ROOM HT-134
STD TWIN ROOM HT-138
F-8
8000 8000
Y
STD KING ROOM HT-139
STD KING ROOM HT-101
UP
TROLLEKEEPIN
STD KING ROOM HT-137
STD TWIN ROOM HT-103
H-6
+7.900 FFL
F-8
HOUSE
STD KING ROOM HT-136
F-6 BARBER HT-171
MALE GYM HT-174
CIRCULATION HT-181
STD KING ROOM HT-119
G
HOUSEKEEPING TROLLEY
STD KING ROOM HT-135
STORE HT-136
STD KING ROOM HT-104
F-7
5
TROLLEKEEPIN Y
H-3 H-W
HOUSE
HOUSEKEEPING + PANTRY HT-141
STD TWIN ROOM HT-105
H-5
CORRIDOR HT-186
6000
Y
L20-201
MALE CHANGING ROOM HT-170
6000
TROLLEKEEPIN
8000
STD KING ROOM HT-106
3
6
F-5
F-6
HOUSE
CORRIDOR HT-153
H-4 F-4 L20-201
TREATMENT ROOM HT-169
+7.900 FFL
G
HOUSEKEEPING TROLLEY
SAUNA HT-173
L20-400
F-5
TROLLEKEEPIN
SERVICE LIFT LOBBY HT-143
8000
6000 42000 6000
STEAM HT-172
POOL HT-176
LIGHTWEIGHT ROOF
L20-201
STD TWIN ROOM HT-118
HOUSE
Y
H-2
H-V
HOUSEKEEPING TROLLEY
7
AA
LIFT LOBBY HT-168
I.T ROOM HT-147
STD TWIN ROOM HT-107
ELEC CBD HT-175 GYM HT-163
F-4
STD KING ROOM HT-108
F-3
FEMALE CHANGING ROOM HT-177
SERVICE LIFTS HT-145
6000
H-3
CORRIDOR HT-183
STD KING ROOM HT-117
STAIR 03 HT-152
00 80
FEMALE GYM HT-180
STD TWIN ROOM HT-116
+7.500 FFL STD TWIN ROOM HT-109
KIDS CLUB HT-178
4000
+7.900 FFL
F-2
F-3
L2 0-20 1
SOT
RECEPTION HT-179
STD KING ROOM HT-110
GUEST LIFTS HT-146
6000
STAIR HT-164
0 00 24 000 8
BOH PANTRY HT-159
330
BOH CORRIDOR HT-150
0 367
H-2
GUEST LIFTS HT-165
0 400
POOL PLANT HT-166
SOT °
3 7.32 183
+7.900 FFL
ELEC. ROOM HT-167
F-2
H-1
H-U
300
SERVICE LIFTS HT-157
SUITE 02 HT-115
330
IT ROOM HT-187
STD KING ROOM HT-114
STD KING ROOM HT-113
00 80
SOT °
DISABLED ACCESS ROOM HT-111
F-1
3 2.32 163
STD KING ROOM HT-112
H-1
F-1
First level
CC
F-M
F-L 5950
F-K
F-J
8900
8900
F-H 8900
95550 9700
F-G
L20-400
F-F 9000
F-E 3450
F-D
F-C
8000
8950
F-B 8500
H-A
F-A 6100
5400 L20-200
9200
BB
L20-400
H-B H-C
8425
H-D
1800
H-E
8425
H-F
52700
7700
H-G H-H
7700
8425
1800
H-I 8425
2
F-N
H-T H-1 MEP M-016
F-R
+3.900 FFL
F-2
BREAKOUT / RECEPTION M-012
+3.900 FFL
BRIDGE M-017
LIFT LOBBY M-034
H-3
ELEC CBD M-060
6000
+3.900 FFL
42000 6000
84 00
F-4
7
F-T
AA
L20-201
MEETING ROOM 01 M-013
Double Height Area
L20-201
84 00
6000
TOILET M-059
MEETING ROOM 02 M-032
F-U
84 00
63 40 0
6000
MEETING ROOM 05 M-035
MEETING ROOM 03 M-014
84 00 84 00
MEETING ROOM 04 M-036
F-W
FUNCTION BUILDING ADMIN CORRIDOR M-033
5
L20-201
STAIR 05 M-058
DIR. OP. M-042
H-5 H-X
GM. OFC M-043
50 84 0 25 10
Double Height Area
00 18
H-6
BQT.OP.MGR M-041
Double Height Area
F-7 EVENTS M-040
H-Y STAIR 06 M-019
BOH CORRIDOR M-038
H-7 F-8
84 00
84 00
STAIR 01 M-006
CORRIDOR M-054
+3.900 FFL STORE M-037
DIR. EVENTS M-061
H-8
+3.900 FFL
H-8
1
L20-400
F-Y
L20-200
75 00
84 00
F-T
CC
BB
L20-400
63 40 0
84 00
55 00
F-U
F-13
F-X 55 00
F-14
60 00
F-Z F-15
Mezzanine level
F-Y
F-M MATCH LINE - REFER TO DWG. NO.L20-100M-02
84 00
5 28 500 50 0
75 00
F-12
55 00
F-11
MATCH LINE - REFER TO DWG. NO.L20-100M-03
F-W 60 00
8900
F-L
8900
F-K
8900
F-J
9700 95550
F-H
9000
3450
8000
8950
8500
6100
5400
8425
1800
8425
7700
7700
8425
1800
8425
52700
F-G
F-F
F-E
F-D
F-C
F-B
F-A MATCH LINE - REFER TO DWG. NO.L20-100M-01
5950
84 00
9200
F-N
55 00
MATCH LINE - REFER TO DWG. NO.L20-100M-02
F-V
F-10
H-A
H-B H-C
H-D
H-E
H-F
H-7
H-Z
STAIR 02 M-005
STORE M-039
F-X
F-Z
4
AA
L20-400
LDRY CHUTE M-068 EXECUTIVE OFFICES RECEPTION M-053
MEZZANINE GALLERY M-057
+3.900 FFL
F-S
F-8
H-4
H-6
F-R
F-7
+3.900 FFL
TOILET M-076
F-6
6000
ACCOUNTS DEPT. M-001
DIR. SALES / MKT M-062
PR MGR M-063
H-5
Double Height Area
DIR. FINANCE M-069
SALES & MARKETING M-044
F-5
F-6
F-V
Double Height Area
L20-201
L20-400
F-5
TOILET TOILET M-064 M-065
AIRCREW LOUNGE M-047
3
6
H-3 H-W
ASST. CONTROLLER M-074 CHIEF ACCOUNTANT M-075
CASHIER M-073 ELEC M-009
CORRIDOR M-055
H-4 F-4
H-2
H-V
GENERAL CASHIERS M-066
COUNTING ROOM M-072 PANTRY M-048 SERVICE LIFTS M-008
IT M-010
MEETING ROOM LOBBY M-056
F-S
PRAYER ROOM M-003
LIFT LOBBY M-046
F-3 84 00
F-3
SHOE RACK M-049 CORRIDOR M-052 STAIR 03 M-004
GUEST LIFTS M-007
8000
+3.900 FFL
8000
RESTROOM (M) RESTROOM (F) M-029 M-030
CORRIDOR M-015
8000 49000
SERVICE LOBBY M-027
8000
SHOE RACK SHOE RACK M-026 M-025
H-U
8000
BOH CORRIDOR M-024
RESTROOM (M) RESTROOM (F) M-020 M-050
CLOSING ROOM M-002
00 80
6000
AUDIO / VIDEO / STORAGE M-021
STAIR 07 M-018
GUEST LIFTS M-031
4000
6000
ELECTRICAL M-023
F-2
H-2
SERVICE LIFTS M-028
ABLUTIONS M-067
0 00 24 000 8
PRAYER RM (M) PRAYER RM (F) ABLUTION M-071 M-011 M-070
IT M-022
5000
CORRIDOR M-051
+3.900 FFL
00 80
STAIR 04 M-045
F-1
L2 0-20 1
H-1
F-1
H-G H-H
H-I
CHEDI HOTEL & RESORT
PROJECT OVERVIEW
352-(&7 29(59,(: The site is located in the Lusail area Qatar. The site is a 150m wide strip of land from the high tide mark at shoreline and is approximately 2.5km long. The site area based on the Concept Design is approximately 410,000sqm. 7KH SURMHFW LV ¿YH VWDU +RWHO DQG 5HVRUW DW /XVDLO LQ 4DWDU FRQVLVWLQJ RI D ¿YH VWDU KRWHO FRQVLVWV RI JURXQG ÀRRU SOXV VW QG DQG UG ÀRRUV ZLWK 150 keys. Included in the Hotel will be standard facilities associated ZLWK D ¿YH VWDU +RWHO 7KH KRWHO ZLOO KDYH QR 6WDQGDUG 5RRPV 20 no Business Suites, and 5 no Royal Suites as per the Concept 'HVLJQ WKDW LV SURYLGHG 5HVRUW VWDႇ DFFRPPRGDWLRQ GLVFUHHWO\ ORFDWHG for approximately 300 employees. 50 no Villas for single gender (male or female) guests which is to consist of 10 x 1 bedroom villas, 20 x 2 bedroom villas, and 20 x 3 bedrooms villas. Each villa will be used by a single gender party; therefore, privacy from adjacent villas, which may KDYH D GLႇHUHQW JHQGHU SDUW\ LV RI KLJK LPSRUWDQFH QR 9LOODV ZLOO EH for families and will consist of 10 x1 bedroom villas, 20 x 2 bedroom villas, and 20 x 3 bedroom villas. Every villa to have accommodation for one maid/butler. Every villa to have a minimum one car parking space for each 1 bedroom villa and minimum 2 parking spaces for 2 and 3 bedroom villas each. Every villa to have a swimming pool and direct sea view and beach access.
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2012
“
7KH DHVWKHWLF DSSURDFK KDV EHHQ GH¿QHG DV FRQWHPSRUDU\ ZLWK ORFDO architectural references and features.
CHEDI HOTEL & RESORT
Khorfakkan, Sharjah
Client // Shoroogh Site Area // 266,000 sqm Project Size // 35,000 sqm Masterplaning & Detailed Design
CHEDI HOTEL & RESORT
SPA DRAWINGS
%8,/',1* )22735,17
%8,/',1* )22735,17
0$/( 322/ %(/2:
)(0$/( 322/ %(/2:
:$7(5 /(9(/
%27720 2) 322/
6:,00,1* 322/ '(&.
:$7(5 )($785(
))/
6:,00,1* 322/ '(&.
))/
%($87< 678',2
:$,7,1* $5($
%($87< 678',2
35(3 $5($ &+ 50 &+ 50
),5( (;,7
)+5
)+5
:$7(5 %(/2:
5(/$;$7,21 $5($
),5( (;,7 %8,/',1* )22735,17
0$/( 75($70(17 $5($
)(0$/( 75($70(17 $5($
5(/$;$7,21 $5($
3$175< 0$,1 (175< 2)),&(
67$)) 72,/(7
%8**< '523 $5($
'5,9(:$<
+27 :$7(5 3/$17 $5($
3$57 2) 7+(
3$57 2) 63$ %8,/',1*
P
6SD )LUHVFDSH
6SD )LUHVFDSH
P
P
'1
%8,/',1* )22735,17
%8,/',1* )22735,17
'5,9(:$<
P
+RW :DWHU 3ODQW $UHD
P
P 'ULYHZD\ WR 5R\DO 6XLWH
%8,/',1* )22735,17
P
'URS 2II $UHD 3DUW RI $GXOW 3RRO
P
%8,/',1* )22735,17
P (;,7
(175<
P
68%67$7,21
P %XJJ\ 3DUNLQJ $UHD
P %8,/',1* )22735,17
%8,/',1* )22735,17
%2+
352'8&7 6725(
P
P .LWFKHQ
%8,/',1* )22735,17
%8,/',1* )22735,17
P
3$57 2) $'8/7 322/ %8,/',1*
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2012
%8,/',1* )22735,17 %$/$1&,1* 7$1. %(/2: 7+( 3/$17 5220
6 : , 0 0 , 1 * 3 2 2 /
322/ 3/$17
))/
%27720 2) 322/
6:,00,1* 322/ '(&.
6+2
%27720 2) 322/
6:,00,1* 322/ '(&.
))/
322/ 3$175<
6+2
))/
/,)7,1* 67$77,21 %(/2: %27720 2) 322/
&2/' 3/81*( 322/
&2/' 3/81*( 322/
(175< 72 322/
6+2:(5 $5($
6+2:(5 $5($ 6+2
%27720 2) 322/
+27 3/81*( 322/
+27 3/81*( 322/
<2*$ 678',2
0$/( *<0
+<'52 7+(5$3< $5($ 0$/(
)(0$/( &+$1*,1* 5220
)(0$/( &+$1*,1* 5220 :$50 7+$/662 322/
/2&.(5
/2&.(5 %27720 2) 322/
%27720 2) 322/
0$/( /,)7 /2%%<
)(0$/( /,)7 /2%%< 6+2
72:(/ 6725$*(
72:(/ 672 :,7+ :$7(5 %277/(6
6+2 72,/(7
:&
62/ 67($0 5220
6+2
)(0$/( *<0
:$50 7+$/662 322/
%27720 2) 322/
6+2 6+2
+<'52 7+(5$3< $5($ )(0$/(
%8,/',1* )22735,17
(175< 72 322/
%27720 2) 322/
/,)7,1* 67$7,21 %(/2:
72,/(7
:&
:&
:&
),11,6+ 6$81$
),11,6+ 6$81$ %2+
3803 3,7
,&( )2817$,1
%8,/',1* )22735,17
+<'52 3/$17
+<'52 3/$17
,&( )2817$,1
62/ 67($0 5220
%8,/',1* )22735,17
6 : , 0 0 , 1 * 3 2 2 /
CHEDI HOTEL & RESORT
POOL & VILLAS
118 116 114 112 110 108 106 104 102 100 98 96 94 92 90 88 86 84 82 80 78 76 74
5
72 70 68 64 62 60 58 56 54 52 50 48 46 44
42 40
38
36
115
34
32
C06-05
110
C01-01
C06-06
C01-02
30
28
26
C01-03
24 105
C06-11
C01-04
22
BUILDING
20
3.00 HIST.H.T.
FOOTPRINT
100
18
98 16
90
14
C01-08
C01-09
24
FOOTPRINT BUILDING
SPA
20
22
18
16
14
4
6
8
10
12
2
12 32
88
C06-10
10
C01-06
0 +46.0
S-01 36
82
34
86 84
38
44
42
40
50
46
C01-05
54
0 +08.0
76 74
52
8 78
48
80
TREE
72 FOOTPRINT
EXISTING
70
FOOTPRINT
BUILDING
68 66
BUILDING
6
PARKING
AREA
EXISITIN BUILDIN G G
52 48
AREA
50
58
S-02
+0
C06-03
60
PARKING
6.00
62
56
C06-09
54
C08-03
46
CAR WASH
64
BUILDING FOOTPRINT
44
52 4
50 DRIVEWAY EXISTING TREE
B
42
32
30 28
AREA
38
26
PARKING
36 34
22
C08-02 8
.
3.00 HIST .H.T
1.32
H.A.
T. 18
54
52
2
2
16
C06-07
4
AREA
56
6 20
14
PARKING
AREA
10
22
12
C06-01
58
14
24
16
26
60
18
28
E-01
62
20
30
DRIVEWAY
24
C06-08
32
12
0
C08-01
0
6m WIDE SERVICE ROAD
ROYAL SUITE
34
AREA
36
PARKING
R-01
38 44
C06-02
40
PARKING
POOL
40 48 46
10
+18.5
8
AREA
+38.00
6
4 -1.78 L.A.T.
+34.00
2
+21.50
+4.75
E-01
0
+37.00 +12.00
2
0
+04.35
E-04
62
H-01 62 60
58
56
54
J
+44.00 52 50
48
46
44
42 40
2
38 36 24
22
26
20
28
32
30
34
E-05
0 18
8
10
12
14
16
4
2
6
0
-1.78 L.A.T.
3.00 HIST.H.T.
1.32 H.A.T.
E-06
2 0
%8,/',1* )22735,17
%8,/',1* )22735,17
:DWHU /HYHO 6 : , 0 0 , 1 * 3 2 2 /
6 : , 0 0 , 1 * 3 2 2 /
%RWWRP RI 3RRO
'$< %('
))/
6:,00,1* 322/ '(&.
6:,00,1* 322/ '(&.
))/
))/
))/
6+2:(5
&,5&8/$7,21
322/ 3/$17
))/ 287'225 ',1,1*
287'225 ',1,1*
%8,/',1* )22735,17
'523 2)) .,7&+(1
))/
7 5,1 73 22 * ) ,1 ,/' %8
'5,9(:$<
))/
%8**< 3$5.,1*
))/
%8,/',1* )22735,17
))/
))/
50
48 46
44 42 40 38 36
34
32 30 28 26
24
22 20 18 16
14
12
10
8
3.00 HIST.H.T. 6
4
1.32 H.A.T. 2 0
NO PARKING
+34.0 0
E-02
ADULT
42
E-03
0 -1.78
26
C01-07
C06-04
92
28
94
30
96
E-02 E-02
-1.78 L.A.T.
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2012
ETIHAD RAIL PASSENGER STATIONS
PROJECT OVERVIEW
PROJECT OVERVIEW 7KH (WLKDG 5DLOZD\ 1HWZRUN LV WR EH EXLOW WR OLQN WKH SULQFLSDO FHQWHUV RI SRSXODWLRQ DQG LQGXVWU\ RI WKH 8$( ,W ZLOO UXQ IURP WKH 6DXGL $UDELDQ ERUGHU DW *ZKHLIDW LQ WKH ZHVW FORVH WR WKH FLWLHV RI WKH *XOI FRDVW WR WKH 1RUWKHUQ (PLUDWHV DQG WKH HDVW FRDVW SRUWV 7KHUH ZLOO DOVR EH D OLQH UXQQLQJ IURP $EX 'KDEL WR $O $LQ ZKLFK PD\ EH SURMHFWHG LQWR 2PDQ DV ZHOO DV D EUDQFK OLQH WR WKH JDV IDFLOLWLHV DW 6KDK DQG +DEVKDQ %XLOW to international standards, Etihad Rail’s state of the art network will HQDEOH WKH UDSLG WUDQVSRUW RI SDVVHQJHUV DQG IUHLJKW RSHQLQJ XS QHZ WUDGH FRUULGRUV DQG MRXUQH\ RSSRUWXQLWLHV 2QFH FRPSOHWH LW ZLOO UHGH¿ QH ORJLVWLFV DQG WUDQVSRUW LQ WKH UHJLRQ SURYLGLQJ DV D VDIH HI¿ FLHQW VXVWDLQDEOH QHWZRUN WKDW OLQNV DOO FRUQHUV RI WKH 8$( DQG HYHQWXDOO\ WKH 8$( WR WKH ZLGHU *&& 7KLV H[WHQVLYH LQYHVWPHQW ZLOO VXSSRUW WKH *RYHUQPHQW¶V FRQWLQXHG PLVVLRQ WR EXLOG D GLYHUVL¿ HG HFRQRP\ DQG continued economic growth. Facts and Figures:
“
7RWDO LQYHVWPHQW LV HVWLPDWHG DW $(' ELOOLRQ 7KH SURMHFW ZLOO EH SKDVHG RYHU D QXPEHU RI \HDUV ZLWK WKH ¿ UVW SKDVH GXH IRU FRPSOHWLRQ E\ 7KH QHWZRUN LV HVWLPDWHG WR H[WHQG XS WR NP 7KH UDLOZD\ ZLOO LQLWLDOO\ RSHUDWH GLHVHO WUDLQV EXW ZLOO EH GHVLJQHG DQG FRQVWUXFWHG WR DFFRPPRGDWH HOHFWUL¿ FDWLRQ LQ WKH IXWXUH )UHLJKW WUDLQV ZLOO UXQ DW VSHHGV RI XS WR NLORPHWUHV SHU KRXU while passenger trains will reach speeds of up to 200 kilometres per hour. (WLKDG 5DLO ZLOO DFFRPPRGDWH KHDY\ IUHLJKW ² URFNV DOXPLQLXP FHPHQW LURQ VWHHO HWF ² LW ZLOO FDWHU IRU DOO RWKHU WUDGH FRPPRGLWLHV DV ZHOO DV WUDQVSRUWLQJ K\GUR FDUERQV DQG RI FRXUVH SDVVHQJHUV $HGDV KDV EHHQ DSSRLQWHG WR GHYHORS WKH PRGXODU VWDWLRQV GHVLJQV IRU VPDOO DQG PHGLXP VXEXUEDQ FRPPXWHU KHDY\ UDLOV VWDWLRQV RQ Stages 2 and 3.
(WLKDG 5DLO¶V VWDWH RI WKH DUW QHWZRUN ZLOO HQDEOH WKH UDSLG WUDQVSRUW RI SDVVHQJHUV DQG IUHLJKW RSHQLQJ XS QHZ WUDGH FRUULGRUV DQG MRXUQH\ RSSRUWXQLWLHV
AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2012
ETIHAD RAIL PASSENGER STATIONS UAE Client // Etihad Rail Project Size // 1,400 sqm Concept Design for passenger stations network
ETIHAD RAIL PASSENGER STATIONS
DESIGN OPTION
OPTION ONE
24 M
BUS WAITING
79 M
Future Bus Station
Flat Roof Easy Maintenance
Reduced Glazing Areas
Efective But Small Glazed Skylight Areas - Reduced Need For Maintenance
Train Track
Pedestrian Shading
Visitors Parking
Auxiliary Building
Main Entrance 6WDWLRQ 'URS Rႇ
AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2012
OPTION TWO TO THE PLATFORM
I WAITING WAITING WAITING
T
TING
T
AT IU
US
26 M
TI
S
T
TAI
T SS I BUS WAITING AI
MAIN ENTRANCE
72 M
Future Bus Station
Pedestrian Shading
Reduced Glazing Areas
Train Track
Visitors Parking Auxiliary Building
6WDWLRQ 'URS Rႇ
Main Entrance
ETIHAD RAIL PASSENGER STATIONS
DESIGN OPTION
OPTION THREE The stations’ kit-of-parts concept lends its very well to integrate LQWHUFKDQJHDEOH HOHPHQWV 6RPH RI WKH SDUWV FDQ EH ¿[HG LQ ORFDWLRQ OLNH WKH WRZHU ZKLOH RWKHU DUH ÀH[LEOH OLNH WKH IHDWXUH ZDOOV DQG WKH entrance. These various options provide an opportunity to weave together a multitude of identity layers to create a unique ‘theme’ for the station. 7KH EXLOGLQJ YHUWLFDO RXWHU HQFORVXUH GH¿QHV WKH VSDFH 7KH FROXPQV echo the desert shelter pole concept and the elegant calligraphy roof is the main feature repetitive element. Underneath the roof as the primary kit of part elements are “loose” smaller parts all bound by the HႈFLHQW [ P JULG WKH ³ÀRDWLQJ´ URRI
Bus Station
Expansion
Clock Tower
central shaded atrium - highlight of the station passenger experience - the info/clock tower - feature entrance - evocative, subconscious memory of traditional station concepts - feature wall - localized identity - the MEP/service block - the support/retail element - vestibules -etc These elements are repetitive and basic to every station medium or small. They help forming a distinct Etihad Rail identity. The concept is H[SDQGDEOH VFDODEOH HႈFLHQW DQG SUHVHQWV XQOLPLWHG RSSRUWXQLWLHV IRU spatial arrangement and interior design.
Reduced Glazing Areas
Flat Surface Easy Maintenance
Signature Roof
EXPA
NSIO
N
Main entrance 6WDWLRQ 'URS Rႇ
Side Access
Train Track
Expansion
Pedestrian Shading
Visitors Parking
Auxiliary Building
AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2012
6M
78 M
6M
TO THE PLATFORM
WAITING ROOM
FIRST CLASS WAITING
RETAIL M.P
M.T
REFUSE
S.M.
ATRIUM T
F.T
BUS WAITING AREA E
TICKETIGN
F.P.
MESS
RAIL
TELECOM
18 M
POLICE TELECOM
RETAIL
STORE
ROOF LINE ABOVE MAIN ENTRANCE
Custom Element - Feature / Wall regional. interchangeable. provides the stations with an additional layer of the cultural feel.
Info / Clock Tower landmark. simple and elegant. etihad rail identity feature.
Floor Pattern welcoming. intricate yet simple. reminds of the traditional rug in bedouin shelters.
Feature / Entrance evocative. subconscious memory of the traditional station concepts.
Floating Roof light. PRGXODU HႈFLHQW UHÀHFWV WKH KHULWDJH FRQFHSW VWRU\
MERSA AL SEET
PROJECT OVERVIEW
PROJECT OVERVIEW Located along the Dubai Creek waterfront adjacent to the historic Al Fahidi district, one of the oldest and most traditional areas of the city, the masterplan aims to regenerate the Creek waterfront as an iconic, civic destination with a strong focus on the rich local heritage rooted within the spirit of Emirati culture. Covering approximately nine hectares of built development, Khor Dubai will be designed as a cultural city quarter fully integrated into the existing urban fabric. The development will enhance Dubai’s international status as a world famous waterfront destination, acting as a catalyst for future development within the wider area. Emphasis is placed on creating strong pedestrian links throughout the development, opening up the waterfront promenade with functions along the entire development. The proposal weaves together a number of civic and commercial land use components responding to aspects of Emirati culture including Arts & Crafts, Trade, Industry and Commerce.
“
Marsa Al Seef will enrich Dubai’s ever growing tourism industry – complementing while also rejuvenating the bustling trading scene along Dubai Creek in a hospitality, leisure and retail destination that will appeal to residents and tourists alike.
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2014
MERSA AL SEEF
Dubai, UAE
Client // Meraas Holding Plot Area | Phase 2 // 54,473 sqm Project Size | Phase 2 // 15,796 sqm Plot Area | Phase 3 // 70,282 sqm Project Size | Phase 3 // 54,655 sqm Masterplan & Detailed Design of the Buildings
mersa al seet
masterplan
pasterplan Marsa Al Seef is taking shape in the Al Seef area, alongside Al Fahidi Cultural and Historical District, which will also physically connect with the development and evoke the same spirit of nostalgia. The project benefits from proximity to historic and culture attractions, with an excellent supporting multi-mode transport infrastructure. Marsa Al Seef will redefine the tourism experience to of visitors to the Dubai Creek area. The project will provide bustling waterfront spaces, where cafes and restaurants will open up on to the interconnected promenades lining the canal. The project will also offer shoppers an array of options varying from floating markets, art galleries, shops for Emirati handicrafts and other retail concepts.
Marsa Al Seef will comprise three hotels with a combined 550 keys; a 200 key heritage hotel, a 150 key contemporary up-scale hotel, and a 200 key contemporary luxury hotel . The aim of developing a hospitality component within the project is to ensure that visitors to the development can expand and enrich the scope of their experiences by staying in the focal heritage-centric area of Dubai. The most important aspect of this development however, will be the experiences created throughout the space. Marsa Al Seef will host an open air museum and an amphitheater to help tourists discover and absorb the various nuances of the Emirati heritage.
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2014
DETAIL DRAWINGS
1
MERSA AL SEET
6) % 3 )%
6) & 3 )%
/
/
/
/2%%< Pð ))/ 66/
,' 3
,' 3
,' 3
/
/
/
/
,' 3
,' 3
,' 3
,' 3
/
/
/
/
17 5< + (
%2
( 23 (1 ,1 * $ %2 9
'5 $
'5 $
0(3 Pð
3
'5 $
$ '5 $
,&7 Pð
/
/
/
'5 $
3
3
/9 3
*5281' )/225 3/$1
%
)
6758&785( 72 %( &2 25',1$7(' :,7+ $5&+,7(&785(
'5 $
/
/
&$7 /$''(5 Pð
/9 3
))/
'7 . 3 .
'7 % 3
/
:6
&
'7 $ 3
'5 $
/
/
/9 $ 3
'5 , 3
'7 . 3 .
'7 $ 3 .
5 () 63 (5 (& ,) &2 72 ,& 1 6 $7 68 ( ,2 /7 59 1 $1 ,& ' 7 ,1 * 5$ : ,1 *6
/
)25 72,/(7 /$<287 '(7$,/6 5()(5 72 '5$:,1* .+25 *$- 3 '5 ,
'7 & 3
6725(
5:2
.,7&+(1 % Pð
/
%2+ /,)7 Pð
66/
8 6 & 2 /( ) 6 $5 75 +( % ,* ($ +7 0 7 2 75 8& P . P
75 8& .
/( $5
)/ 22 5 7 5( 1& +
/
/
,168/$7(' %/2&.:25.
'7 $ 3
3
3 .
'7 & 3
6,1 .
/
'
.,/ )/< /( 5
+ 5 26 )/ 22 /2$',1* %$< (( ( / 5 Pð 75( ))/ 1& & +
'7 . 3
6758&785( 72 %( &2 25',1$7(' :,7+ $5&+,7(&785(
'7 . 3
6758&785( 72 %( &2 25',1$7(' :,7+ $5&+,7(&785(
3
/2%%< Pð
)/ 22 5 7 5( 1& +
))/
: ( 6& ,*+ $/ ,1* (
3
%2 + ( 17 5<
/
(
) % % Pð ))/ 66/
6(&85,7< Pð
3
/
3 )%
,' 3
[ 23(1,1* ,1 :$//
/
/
* /
))/ 66/
'5 $ ))/
'7 % 3
Pð
3
:7 $ 3
/,)7 /2%%< Pð
,' 3
&/ ($ 5
17 5<
)2 + (
))/ 66/
/
:7 ( 3 )%
'5 $
/
0 72,/(76 Pð
.,7&+(1 % Pð ))/ 66/ ,' 3
'7 ' 3
-$1
/
3 '5 $
/
3 ',6$%/(' 72,/(7
3 .
/
'7 % 3
/
'7 % 3
)2 %< + $ & 1' 21 % 75 2+ $& &2 72 5( 5
/
,' 3
'7 $ 3
/
) % & Pð
+ ,&7
3 ) 72,/(76 Pð
17 5<
/
3
3
,' 3
/
)+5
/
3 )%
6) 3 )%
23(1,1* $%29(
)2+ (175<
17 5<
/
/
/
,' 3
))/ 66/
,' 3
'7 . 3
6) ) 3 )%
'5 $
,' 3
'5 ,
/
6) ) 3 )%
))/
) % & Pð ))/ 66/
-
'5,1.,1* )2817$,1
)2+ /,)7 Pð
/
/
'5 $
6) ) 3 )%
:7 ( 3 )%
6) 3 )%
/
3 )%
) % % Pð
/
6) % 3 )%
3 )% 6) % 3 )%
6) & 3 )%
)2 + (
/
'7 % 3 )%
6) % 3 )%
/
)2+ (175<
6) $ 3 )%
/
/
)2 + (
))/
6) $ 3 )%
/
6) & 3 )%
)2+ (175<
6) & 3 )%
'5 $
/,1( ,1',&$7(6 /($6$%/( 7(55$&( $5($
'5 $
3
.,7 &+ (1 . %
))/
)2+ (175<
/,1( ,1',&$7(6 /($6$%/( 7(55$&( $5($
4
P
P
6&$/(
08
09
10
Q
N
06
FOH ENTRY
+3.750
FOH ENTRY
EXIT
05
J
LV FHR
EXIT
ts
m 2.5
D=1
FOH ENTRY
P2-08-04 FB F&B C 54.46 m² FFL +3.900 SSL +3.500
E X IT
P2-08-03 FB 0.4
=2 CE AN M IST 6.8 L D L= NA NA GO GO DIA DIA 1/3
04
F&B B 162.44 m²
M
8.3
OPENING ABOVE
H
P2-08-10 F. TOILETS 33.48 m²
10
ICT
EXIT
FFL +3.900 SSL +3.500
.7
FO
H
EN
TR
Y
11
.6
P2-08-24
TH
=
FOH LIFT 4.73 m²
ID
FFL +3.900 SSL +3.500
KITCHEN B 110.71 m² FFL +3.900 SSL +3.500
9.1
m
ts
E X IT
D= Y
P2-08-02 FB TR EN FO
H
F&B C 60.77 m²
EXIT
G
+3.750
E X IT
FHR LV
F
BO
H
EN
TR
Y
STAIR WIDTH = 1560 mm
P2-08-23
FFL +3.900 SSL +3.500
P2-08-28
FFL +3.900 SSL +3.500
FFL +3.900 SSL +3.500
E X IT
F&B B 166.49 m²
P2-08-01 FB
M. TOILETS 30.16 m²
9.8
P2-08-22 LIFT LOBBY 18.75 m²
FH R LV
E X IT
E X IT
+3.750
DIAGONAL DISTANC E=18.5 M 1/3 DIAGONAL=6.8 M
02
P2-08-11
P2-08-03 K
FOH ENTRY
15
80
m
m
8
ST
03
17
LOBBY 54.26 m²
F LV HR
W
E X IT
P2-08-20
AIR
FO H
E X IT
EN TR
Y
+3.750
BOH LIFT 9.61 m²
AB O
VE
SECURITY 14.52 m²
P2-08-32 LOADING BAY 111.26 m² FFL +3.900 SSL +3.500
LOBBY 28.06 m²
FH
KITCHEN B 110.16 m²
.2 12
UC K TR
E
BO
H
EN
TR
.8 13
FH LV
CAT LADDER 4.55 m²
15
80
m
m
OPENING ABOVE
TH
=
P2-08-25
AIR
W
ID
MEP 8.94 m²
ST
D
.4
15
P2-08-33
R
Y
+3.750
P2-08-02 K
1 U/S C OF LEA ST R H R. EIG BE H AM T T 41 O TR 00 UC m K m 2
LV R
P2-08-27
E X IT
9.1
OP
EN IN
G
2500x400 OPENING IN WALL
GENERAL NOTES:
KITCHEN INDUSTRIAL
FIRE EXIT STAIRCASE
4)ALL EXTERNAL WALLS SHALL BE AT LEAST 6M FROM ANY ADJACENT BUILDINGS,OTHERWISE THE EXTERIOR WALLS MUST BE FIRE RESISTANCE RATED IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 5000. 5)OCCUPANCIES SHALL BE FIRE SEPARATED AS REQUIRED BY THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 5000.
MERCANTILE
EXIT ACCESS CORRIDOR
9)ALL BALCONIES,TERRACES AND WINDOWS SHALL COMPLY WITH THE UAE FIRE AND LIFE SAFETY CODEE ANNEXURE B2. 10)MEANS OF EGRESS SHALL BE IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 5000.
A
11)THE EXIT CAPACITY SHALL BE SUFFICIENT TO ACCOMMODATE THE CALCULATED OCCUPANT LOAD. DOORS SERVING AREAS WITH OCCUPANT LOADS OF 50 OR MORE MUST OPEN IN THE DIRECTION OF EGRESS. DOORS SUBJECT TO LOCKING SHALL BE PROVIDED WITH PANIC HARDWATE OF SERVING OCCUPANT LOADS OF 100 OR MORE. 12)THE EXITS SHAL BE ARRANGED SUCH THAT THE DEAD END CORRIDOR,COMMON PATH AND TRAVEL DISTANCE REQUIREMENTS AND SATISFIED
1
GROUND FLOOR PLAN 6&$/(
FHR LV
ASSEMBLY
3)THE STRUCTURAL FIRE RESISTANCE AND CONSTRUCTION TYPE SHALL BE ACCORDANCE WITH NFPA 5000 TYPE II (111). BUILDINGS WITH ROOFTOP LPG TANK INSTALLATIONS SHALL BE TYPE II (222) CONSTRUCTION TYPE.
7)ALL CURTAIN WALLS AND CLADDING INSULATION,EXTERIOR WALL CLADDING AND ROOFING SYSTEM SHALL BE IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE ANNEXURE A.1.2.1. 8)ALL INTERIOR FINISH SHALL BE IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 5000.
B
FIRE RATED DOORS - COMPARTMENTATION
OCCUPANCY CLASSIFICATION
2) EMERGENCY VEHICULAR ACCESS SHALL BE IN ACCORDANCE WITH THE SITEWIDE FIRE STRATEGY FOR THE DEVELOPMENT.
6)ALL FIRE DOORS AND WINDOWS SHALL BE ACCORDANCE WITH NFPA 80 AND THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE.
C
DR/A/1500
LEGEND:
1) THE DEVELOPMENT SHALL COMPLY WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE (2011 EDITION);NFPA 5000"BUILDING CONSTRUCTION AND SAFETY CODE" (2015 EDITION); AND NFPA 101 "LIFE SAFETY CODE"(2015 EDITION).
13)EACH STOREY SHALL BE PROVIDED WITH AT LEAST 2 EXITS THAT ARE REMOTE FROM EACH OTHER. 14)ALL AREAS SHALL BE PROTECTED WITH AN AUTOMATIC FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 13. 15)ALL AREAS SHALL BE PROVIDED WITH FIRE DETECTION AND ALARM SYSTEM IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 72
STORAGE
EXIT
FIRE HOSE REEL LANDING VALVE
EXIT SIGN
00
1 HOUR FIRE RATED DOOR
TRAVEL DISTANCE REQUIRMENTS DEAD END
TRAVEL DISTANCE
MANUAL CALL POINT
00
OCCUPANCY MAXIMUM TRAVEL DISTANCE TO AN EXIT (M) DEAD END CORRIDOR (M)
00
90 MINS FIRE RATED DOOR
COMMON PATH
BUSINESS MEANS OF EGRESS
00
FD60
FD90
COMMON PATH OF TRAVEL (M)
FIRE RATED WALLS - COMPARTMENTATION
120
2 HOURS FIRE RATED WALL OF PARTITION
60
1 HOUR FIRE RATED WALL OF PARTITION 1 HOURS FIRE RATED WALL (BY TENANT WHERE NO KITCHEN HOOD SUPPRESSION SYSTEM IS PROVIDED)
00
00
6.1m (23m If < 50 persons)
6.1m
76m
MERCANTILE
30m
15m
76m
INDUSTRIAL
30m
15m
122m
STORAGE
30m
30m
122m
ASSEMBLY
16)STANDPIPES AND HOSE REELS SHALL BE PROVIDED THROUGHOUT IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 14. 17)STANDPIPES AND HOSE REELS SHALL BE PROVIDED THROUGHOUT IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 14. 18)PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED THROUGHOUT IN ACCORDANCE WITHTHE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 10. 19)ALL EXIT STAIRS AND INTERNAL CORRIDORS SHALL BE EITHER NATURALLY OR MECHANICALLY VENTILATED AS PER THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE. 20)ANY LPG INSTALLATION SHALL BE IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE; NFPA 54 AND NFPA 58. 21)FIRE SAFETY DURING CONSTRUCTION SHALL BE AS PER THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 241.
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2014
3 )% ) % &
Pð
$
$
'5 $ 83
$
'5 $
'5 $
'5 $
'5 $
'5 $
'
'
67$,56 /
'
'5 $
(
'5 $
(
67$,56 /
(
))/ P 3 /
))/ P 3 /
$
$
(4 5,6(56
$
))/ P 3 6'3
(4 5,6(56
))/ P 3 6'3
67$,56 6(&
$
%
&
'
(
723 2) :,1' 72:(5
723 2) :,1' 72:(5
$
$
$
66/
)5/
3 . .,7&+(1 %
$
))/
))/
))/
6HFWLRQ 6&$/(
3 3(563(&7,9( 6&$/(
'5 $
6HFWLRQ 6&$/(
))/
66/
6758&785( 72 %( &225',1$7(' :,7+ $5&+,7(&785(
'5 $
3 ) 72,/(76
3 )% ) % %
66/
))/
723 2) 3$5$3(7
))/
$
))/
3 )% ) % %
3 . .,7&+(1 %
3 0(1 35$<(5 5220
3 )% ) % %
723 2) 3$5$3(7
66/
))/ P 3 6'3
) % $
))/
'5 $
3 )%
3 . .,7&+(1 $
))/ P 3 /
))/ P 3 /
522) /$,' 72 )$//6
723 2) 3$5$3(7
522) /$,' 72 )$//6 66/
)5/
66/ P 3 /
723 2) 3$5$3(7 723 2) 3$5$3(7
723 2) 3$5$3(7
723 2) 3$5$3(7
MERSA AL SEEF
SITE PHOTOS
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2014
AINO MINA DEVELOPMENT
PROJECT OVERVIEW
PROJECT OVERVIEW The Aino Mina development aims at providing a peaceful environment where people can experience and appreciate the beauty and tranquility of Nature. A wide central park runs through the masterplan, dividing it in two and linking the retail area at its southern end with the Friday mosque at its northern end. The land rises gently so that the Friday mosque seen against the backdrop of the mountains bordering the Arghandab valley, creates a powerful and beautiful symbol for the entire development. The park is the centre of the Masterplan and can be thought of as the trunk of a tree that structures the entire development. All important Masterplan zones and functions either take place within it or branch Rႇ IURP WKLV FHQWUDO JUHHQ SDUNZD\ :DWHU FDVFDGHV GRZQ WKH VORSH and through the park in a series of relaxing and cooling water features. 7UDႈF LV NHSW WR WKH HGJHV RI WKH VLWH VR SDUN UHPDLQV D SHDFHIXO DQG safe place for pedestrians and families to use and enjoy. The park can accommodate a wide range of activities and attractions for all people to enjoy either together or in the same place. A wide pedestrian pathway crosses the park and links the functional centres formed by the school to the West and the healthcare centre to
the East. Four other wide pathways lead from the central park to local neighbourhood mosques and community centres for each of the four main districts. Each of these community centres provides places for the people in the surrounding villas and townhouses to congregate, socialize and relax. The houses in these neighbourhoods can be accessed by car but, at the same time, it is possible for people to walk across the entire GHYHORSPHQW ZLWKRXW HQFRXQWHULQJ WKH LQWHUUXSWLRQ DQG QRLVH RI WUDႈF Individual houses are designed to respect both the neighbourhood and the street. Private garden courtyards with pools and fountains create pleasant private places for the family but are also important for maintaining comfortable temperatures inside the houses throughout the year. The houses may have a modern design but they make full use of this traditional arrangement that the rest of the world has come to appreciate. Whether it is a private courtyard or a large central park, the garden has a special place in Islamic culture. It is a symbol of the paradise that, from the smallest level to the largest, this masterplan aims to create.
AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2010
AINO MINA DELELOPMENT
Kandahar, Afghanistan
Client // Mohammad Jan Investment (MJIC) Site Area // 2,000,000 sqm Project Size // 898,175 sqm Schematic Masterplan Design
“
Mixed-use masterplan development with villas, townhouses, community IDFLOLWLHV VFKRRO ¿WQHVV FHQWUH PRVTXH DQG D FRPPHUFLDO FHQWUH
The concept is for a peaceful environment where people can experience and appreciate the beauty and tranquility of Nature. A wide central park runs through the masterplan, dividing it in two and linking the retail area at its southern end with the Friday mosque at its northern end. The land rises gently so that the Friday mosque seen against the backdrop of the mountains bordering the Arghandab valley, creates a powerful and EHDXWLIXO V\PERO IRU WKH HQWLUH GHYHORSPHQW 7KH JUHHQ ¿QJHU LV WKH centre of the Masterplan and can be thought of as the trunk of a tree that structures the entire development. All important Masterplan zones and IXQFWLRQV HLWKHU WDNH SODFH ZLWKLQ LW RU EUDQFK Rႇ IURP WKLV FHQWUDO JUHHQ SDUNZD\ 7UDႈF LV NHSW WR WKH HGJHV RI WKH VLWH VR WKH SDUN UHPDLQV D peaceful and safe place for pedestrians and families to use and enjoy.
neighbourhood
community
district
EVOLUTION OF MASTERPLAN: GROWTH OF CLUSTERS
A
B
C
D
E
Wider 22M sqm masterplan
1
REGIONAL CONTEXT REEG RE G AL AL CONTEX EXTT EXT EX 2
OLD KANDAHAR the site
3
4
Haji Lalak Mosque Srah Jamia Military Hospital Ahmad Shahi School
D-2 A-3 E-3 C-2
afghanistan
rebuilding
friday mosq qu ue “Jumuah”
fitness fitnes esss centre ntre
schooll
c mmer co commerc e cial ia l
complex comple p ex BUILDING TYPOLOGIES
lttaic
ht Skylig
Open
Photovvvoltaic PPanels
n Roof Garde wer Wind to
Light Well
Foldable Canopies Level 3 : Medica lC
enter
ce
Terra
Featu
ree Sta ir
case
Dou b Livin le Heigh t g Ro om Ope
Plo ( 1 t Out 2m line x2 5m )
nC our
tyar
d
ture
Fea
Level 2 Exclu : sive S ho
ase tairc
ps
S
Ope Cou n rtya rd Plo ( 2 t Out 0m line x2 5m )
en nk Su rden a G M Dr ain op -o ff
Photovo Panels
Leve Leve l 1: Sh ops Res l 1: taur ants &C Bas afes e Lev ment el
AINO MINA DEVELOPMENT
MASTERPLAN VIEWS AND VISTAS
LANDSCAPE
The site gradually falls to the south by 13 metres. The descent of the land towards the southern edge gives a cascading view experience from the highest zones running down to the lower areas close to the site boundary. The mountainous terrain that borders the Arghandab valley to the north provide a scenic backdrop to the entire development.
7KH ODQGVFDSH IRUPV EXႇHU ]RQHV for protection from sand storm.
SECURITY MEASURES 'LႇHUHQW PHDVXUHV VKRXOG EH considered with installation of security systems to the site.
WAY FINDING Lush gardens create key points of navigation & enable community spaces to be orientated in sequences across the landscape.
ECO SYSTEMS Natural habitats are formed & optimized for a variety of wild life; birds, mammals and marine life.
PERIMETER BOUNDARY DIVISIONS Strategic thresholds / barriers provide secure environments for residents. Landscape can be carefully arranged to screen and conceal.
A diverse variety of native species of trees, shrubs & plants & existing vegetation create beautiful environments.
AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2010 NETWORK HIERARCHY
WALKABILITY
A fully connected circulation route should unify and integrate respective neighborhood clusters.
Meandering footpaths provide comfortable passages and themed routes across the site.
BIOCLIMATIC INNOVATION
ACCESS
Wild turbines can utilize wind energy to generate power
The site is located on an uninhabited plot on the eastern periphery of the city of Kandahar. Neighbouring building developments are limited in number and are very insular in layout. The site is connected to Kabul by the Kabul-Kandahar Highway and to Heart by the Kandahar-Heart Highway.
The masterplan concept focuses on creating an inward-looking secure community independent from the wider 22 million square metre masterplan. The initiative introduces several nodal community hubs that connect to one larger central urban zone. Each hub is surrounded by clusters of villas and townhouses forming an egg-like neighborhood zone. A public retail core acts as the epicenter of the development. The advantage of several nodal connections within a standalone development means that phasing can be rationalized across the site with minimum disruptions.
AINO MINA DEVELOPMENT
MASTERPLAN
TOWNHOUSES [BOULEVARD SIDE]
COMMUNITY CENTRE
FITNESS CENTRE The concept for the building is to create a fully functional leisure area that operates as a versatile community facility with accessibility being a critical aspect of the design.
The community centre anchors each community cluster. The visual presence of the mosque DV DQ RUQDWH ZD\ ¿QGLQJ GHYLFH MXVWL¿HV WKH LPSOHPHQWDWLRQ of soaring minarets that tower above the community clusters.
The townhouses are located on a compact parcel of land. Each unit design has an amazing sense of spaciousness with copious natural light WKDW ÀRRGV LQ IURP WKH URRI OLJKWV DQG full height glazed windows.
FRIDAY MOSQUE “JUMEH”
GREEN FINGER
AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2010
VILLAS-MEDIUM SPEC
TOWNHOUSES [PARKSIDE]
The overriding goal was to create a series of buildings that made the most of its picturesque location whilst also providing an overwhelming sense of privacy. The result is a building that is composed of varying spaces of privacy. COMMERCIAL CENTRE The commercial centre forms an emblematic gateway into the developPHQW HPSKDVL]LQJ DQG GH¿QLQJ LWV UROH as a central urban node.
LUXURY VILLAS Each 1200 square metre parcel contains a considered mansion-like abode. These monumental developments are located topographically to take advantage of elevated land. SCHOOL
CENTRAL PARK
Investigative analysis into school design revealed that a ‘clusterlike’ development could integrate successfully into the masterplan.
er o ng t fi on n ti ee ec gr onn c
The masterplan aims at the creation of places for people to gather and interact are at the heart of the design. Historically, gatherings have formed where shade and water occurred. The project presents the opportunity to re-interpret this cultural and climatic approach to defining places.
sc
sustainability
PLACES FOR PEOPLE
ho ol
ORIENTATION The orientation of streets are in the east-west direction to control air movement through the site. green barriers are provided to protect against hot winds.
ENERGY STRATEGY The design of buildings, surfaces and the urban landscape can have a significant impact on the micro-climate and outdoor thermal comfort and resource consumption. A carefully designed environment can make outdoor spaces more usable encouraging more sustainable transport, communities and lifestyles.
wayfinding
Low energy LED STREET LIGHTING
The design includes the provision of access to amenity/open space to promote healthy living and wellbeing among residents and visitors, enhance opportunities for social interaction and the enjoyment of nature. Providing security is important to the quality of life of residents, while maintaining connections and cultural interactions.
comfort
TRANSPORT AND MOBILITY The design of the development will seek to encourage increased use of sustainable modes of transport like walking and cycling through establishing an integrated, well connected network of paths and social infrastructure. The urban form will be designed to minimize the need for trips by cars and freight vehicles.
walkability
visual connections
OPTIMISING RESOURCES
PHOTOVOLTAIC CELLS on the roofs of parkside townhouses.
INCREASED LIFE & HABITAT
er o es ng t ti fi on ili n ti ac ee ec f gr nn ts co por s
WIND TURBINES
The natural environment will be seen as an asset that adds to wellbeing and the attractiveness of the development. Maintaining and enhancing natural systems and biodiversity will encourage more sustainable lifestyles and reduce operational costs while supporting social development, pride, wellbeing and support the microclimate adaptation measures. .
Wind can be controlled and used to produce energy or effective work to pump ground water. Section H1
Secure supplies of utilities will lead to improved quality of life & economic growth, will lead to improved local environments and reduced operational costs. Local renewable supplies will be used where possible and the concept of closed-loop resource cycles will be adapted recognising that reuse and recycling of resources is more effective than typical linear consumption and disposal routes.
parks
AL SEEF RESIDENTIAL DEVELOPMENT
PROJECT OVERVIEW
PROJECT OVERVIEW 2XU DSSURDFK ZDV WR GHVLJQ D GHYHORSPHQW ZKLFK ZRXOG RႇHU D unique product in a saturated real- estate UAE market. Unique not in terms of luxury and unit sizes, but a human scale experience that people wish to re-enact. To create a private island that will be intimate, but encourage interaction at the same time. To give tenants an opportunity to own a waterfront townhouse with the same feel of owning a Venitian palacco on Grand Cannal. We created a variety in product, from villas to waterfront townhouses, garden townhouses and boutique apartments. Special attention was given to detailing the GLႇHUHQW IDoDGH WUHDWPHQWV RQ VDPH PDVVLQJ DQG SODQQLQJ W\SHV DQG public realm design thus providing character and identity. Open areas are treated as “tissue” that binds the masterplan together and breaks it into public, semi- public and private spaces introduced in between dynamically positioned townhouses. This is in line with the RUJDQLF JURZWK RI KLVWRULFDO FLWLHV ZKLFK DOVR IHDWXUH GLႇHUHQW WUHDWPHQW WR IURQW DQG EDFN\DUG PXOWLSOH W\SHV RႇHULQJ YDULHW\ DQG IUHVK GZHOOLQJ
“
qualities. The prevailing architectural typology is that of a multi storey single family dwelling which is organized on a more urbanized planning matrix, which appeals to our sub-conscious perception of what a city should look like. It evokes a sense of belonging, sense of place, dense urban identity, while maintaining tranquility of a green, lush suburban development. 7KH PRVW VLJQL¿FDQW TXDOLW\ RI WKLV FRPSOH[ LV WKH G\QDPLF DQG XQLTXH viewing opportunity the exists from every part of the island. Framing views between buildings and making intense relation between street DQG VROLG PDVVHV FUHDWHV D ÀXLG VSDFH ZLWK DOPRVW HTXDOO\ GLVWULEXWHG residential quality. There is no better or worse part of the island - there are only options - either you prefer greenery or water, street or garden, peace or lively neighborhood. One thing is always certain - variety and sequence of surprising vistas.
7KH PRVW VLJQL¿FDQW TXDOLW\ RI WKLV FRPSOH[ LV WKH G\QDPLF DQG XQLTXH YLHZLQJ RSSRUWXQLW\ WKH H[LVWV IURP HYHU\ SDUW RI WKH LVODQG
AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2011
AL SEEF RESIDENTIAL DEVELOPMENT Abu Dhabi, UAE Client // Matrix Property Middle East (MPME) Site Area // 61,132 sqm Project Size // 62,279 sqm Investigate master planning strategies
AL SEEF RESIDENTIAL DEVELOPMENT
ANALYSIS
SITE AND LOCATION ANALYSIS The location, orientation and adjacencies of the plots have been analysed in order to make the best use of urban and environmental opportunities. The client brief established clear goals to ensure the best revenues: by creating a private island, positioning houses towards the water to utilize sea views, maximizing villas and townhouse numbers, minimiz apartments, and creating a development with a strong identity. The primary agenda was to preserve intimacy and high level residential TXDOLW\ ZKLOH DSSURSULDWHO\ DUUDQJLQJ WUDႈF XWLOL]LQJ WKH ZDWHUIURQW and creat common and green areas. The Island is broken into 3 zones ZLWK D GLႇHUHQW XUEDQ IHHO ZKLOH PDLQWDLQLQJ D QDWXUDO DQG RUJDQLF quality of historic cities:
Family Housing Tourist Zone Recreation Zone
Zone 1 is in the South diractly of facing the mainland/canal with appropriate architectural language – row townhouses creating the densest area of the development,with inner raised pedestrian streets, reminiscent of international and historical waterfront cities. This part of island provides a new and underrepresented typology in UAE. Zone 2 is the common central area bookended with boutique apartments in the East and teraced townhouses on the West and North side. This zone is lush landscaped with trees, water and shrubs providing tranquil contrast to fast Abu Dhabi expat lifestyle. It has a running track on its outer edge separated from private townhouse gardens. Zone 3 is the detached villa row in the North, each one with private gardens, pools, garages and optional jettys. The villas add quality and depth of product to the entire complex - the highest residential level with special dedication to personal comfort and contemporary design.
Villas Townhouses Zone 1 Townhouses Zone 2 Boutique Apartments
SITE AND LOCATION ANALYSIS As part of the initial design process, Aedas team members attended an intensive concept workshop. The purpose of the workshop was to explore and discuss creative responses to the brief. The enquiry followed a structured process whereby critical analysis and examination was carried out in the form of ‘brain storming’ sessions and small charrettes. This dialogue formed an overall examination of the following urban scale issues: Macro - overall Al Raha Beach Meso - overall Al Seef Precinct Micro - Lot PB 401 Macro - We began to identify the key ‘thematic’ characteristics of the overall development, subsequently we created a list of priorities and possibilities: 1. Cityscape/Skyline appearance 2. Holistic Community environment 3. Self-sustained compounds 4. Diversity between districts 5. Waterfront/Beach side living Meso - ‘Al Seef is the lively precinct of Al Raha Beach. Its layout mixes commercial properties, hotels, retail and recreation, with a variety of residences. The Floral Promenade along the canal is the focus of excitement by day and night. This vivacious precinct also hosts venues for entertainment
and civic events, with the local LRT station situated on the main ERXOHYDUG 2ႇVKRUH DUH WKUHH LVODQGV WZR RI ZKLFK LQFOXGH OX[XU\ private developments.’ We dissected the brief to understand how we could optimize the ‘water-side’ conditions of the site location. Our preferences were for the intelligent consideration of water bodies and the proximity of built form to it. Micro - We speculated about how the island could be considered as a stand-alone ‘iconic’ development. We accepted that it would need to possess unique characteristics: 1. Exclusivity: Privacy and Intimacy. 2. Specialised Facilities: Potential Watersports 3. Outstanding Natural Beaty: Potential wildlife and natural landscapes.
AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2011
SITE ORGANIZATION AND OPTION ANALYSIS $ ULJRURXV LQYHVWLJDWLRQ LQWR GLႇHUHQW VLWH RUJDQLVDWLRQ OD\RXWV allowed us to quickly validate concept potential. We quickly began to understand how the density and scale of built and non-built form DႇHFWHG YLHZV DQG RYHUDOO VFDOH RI WKH GHYHORSPHQW :H DVVHVVHG WKH positives of the preferred options. These centered around:- density, hierarchy, security and open space. We assessed the negatives of the SUHIHUUHG RSWLRQV 7KHVH FHQWHUHG DURXQG ODFN RI SULYDF\ LQÀH[LELOLW\ Our assessments lead us to create 4 initial massing and arrangement layouts for the island:Option 1 - A combination of rows of villas on the northern edge of the island each facing outwards to the beach front. To the south a collection of 5-6 storey apartments and townhouses. Option 2 - A wall-like development of villas, townhouses and apartments. Each unit has a beach front location. A large central public park is situated in the centre. Option 3 - A sequence of radial rows of villas and 5-6 storey apartments orientated to facilitated outward looking channels to the sea. Option 4 - A dual arrangement of townhouses and villas split into northern and southern portions of the island, with a large water body in-between.
SUN AND WIND INFLUENCES - LESSONS LEARNED FROM STUDIES OF REGIONAL CITIES OF THE PAST
predominant wind direction ( day) pleasant breeze directed by variety in building massing
winter
summer
green / trees
running track
gardens
covered access street
pedestrian street
roof pool deck optional
townhouses waterfront
views
predominant wind direction (night) pleasant breeze & wind flushes the heat with fresh air
green / trees
running track
gardens
covered access street
pedestrian street
roof pool deck optional
townhouses waterfront
views
AL SEEF RESIDENTIAL DEVELOPMENT
DESIGN PROCESS
VIEWS & ACCESS 7KH PRVW VLJQL¿FDQW TXDOLW\ RI WKLV FRPSOH[ LV WKH G\QDPLF DQG XQLTXH viewing opportunity the exists from every part of the island. Framing views between buildings and making intense relation between street DQG VROLG PDVVHV FUHDWHV D ÀXLG VSDFH ZLWK DOPRVW HTXDOO\ GLVWULEXWHG residential quality. There is no better or worse part of the island - there are only options - either you prefer greenery or water, street or garden, peace or lively neighborhood. One thing is always certain - variety and sequence of surprising vistas.
Sea
Park Sea
Park
Canal
Canal
direct water view indirect water view from second row
Views % 83 buildings with direct water view and partial park view 61%
direct green area view 55 buildings with direct green area view and partial water view 39%
Views diagram
indirect green area view from waterfront
GREEN AREA, PARK
JOGGING TRACK
BREAKOUT SPACE
PEDESTRIAN WALKWAY
The main selling point is that every building has views towards water or green areas at least from one part/level of the house. Therefore, \RX FDQ KDYH D KRXVH ZLWK GLႇHUHQW YLHZV GHSHQGLQJ RQ D URRP \RX are in - starting from entrance to a lively street, levels above opening to the central green area or garden or to water on the opposite side. Every house has a fully utilized roof with both sea and park views that provides vertical and ambient diversity to the houses. By utilizing the entire length of the waterfront and introducing “notches” on east and west sides of the Island, the design team has maximized views and access to water. There are two main orientation points – waterfront and central park/green area. Out of total number of buildings 61% have direct sea views and 39% indirect sea views and direct park views. All villas have sea views and direct waterfront access with corner villa type 3 having dual orientation.Indirect views are maintained through lines of sight over shorter (G+2) houses in front rows.
AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2011
E NE ON ZO EZ S U V HO WN O T
-
BOUTIQUE APARTMENTS
PRIVATE MOORINGS
PARK VIEW TOWNHOUSES
BRIDGE
GATEHOUSE
VILLAS
PRIVATE MOORINGS
WATERFRONT TOWNHOUSES
A ILL
Sea
Park
inner townhouse street and access to green areas central green area and access to the other public areas
vehicle access
Canal
Access to inner pedestrian street Deck
ACCESS 3D DIAGRAM
ACCESS SECTION DIAGRAM
AL SEEF RESIDENTIAL DEVELOPMENT
VISUAL
AL SEEF ISLAND - AERIAL VIEW FROM THE MAINLAND
AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2011
HATTA MOUNTAIN LODGE
PROJECT OVERVIEW
PROJECT OVERVIEW The Hatta Desert Resort will be a unique Mountain retreat that will RႇHU D PXOWLWXGH RI GLYHUVH RႇHULQJV WKDW FXUUHQWO\ GR QRW H[LVW LQ WKH UAE’s Hospitality landscape. Located on the outskirts of Hatta, this develop-Hatta is located approximately an hour away from Dubai City and enjoys pleasant climate settings, along with unrivalled valley and mountain sceneries including breathtaking views of the Al Hajar Mountains and wadis below. Hatta is a unique destination within the 8$( WKDW RႇHUV D GLႇHUHQW H[SHULHQFH WR WKDW RI DQ\ RWKHU GHVWLQDWLRQ within the country. It is an untapped market for the hospitality sector FXUUHQWO\ RႇHULQJ RQO\ RQH KRWHO WKH +DWWD )RUW +RWHO ZKLFK LV DQ ageing product and positioned in the midscale segment of the market. This hotel resort is expected to be positioned within the Luxury segment
“
of the market, targeting clientele seeking tranquillity and privacy along with an exclusive experience in a secluded location.The terrain is naturally sculpted and presents an array of exciting opportunities for the appropriate devel-opment. The current proposal seeks to site a one-phase 120-key development, with a mix of standalone luxury tent suites and hotel complex accommodation, serviced through the main hotel complex, that will additionally house a number of the communal facilities such as the F&B dining, signature spa, health club and pool. The development will contain all the elements of a modern, functional and sustainable mixed-use environment and is set to provide another GLPHQVLRQ WR WKH HYROYLQJ KRVSLWDOLW\ RႇHULQJV LQ WKH 8$(
7KLV KRWHO UHVRUW LV H[SHFWHG WR EH SRVLWLRQHG ZLWKLQ WKH /X[XU\ VHJPHQW RI WKH PDUNHW WDUJHWLQJ FOLHQWHOH VHHNLQJ WUDQTXLOOLW\ DQG SULYDF\ DORQJ ZLWK DQ H[FOXVLYH H[SHULHQFH LQ D VHFOXGHG ORFDWLRQ
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2016
HATTA MOUNTAIN LODGE
Hatta, Dubai
Client // Meraas Holding Project Size // 36,000 sqm Concept Masterplan Design
HATTA MOUNTAIN LODGE
SITE ANALYSIS
ZONING ANALYSIS From a zoning perspective the resort has been spread out within the site to give each guest the impression of seclusion and privacy. Clusters of standard mountain suites have been kept to 2 or three to preserve this sense of privacy and kept to the lower slopes, adjacent the wadis, whilst the deluxe suites have been sited and orientated slightly higher and away from their immediate neighbours. The Presidential Suites have been located at an even higher elevation than the deluxe suites with the Royal Villa located at the highest point. For the location of the All Day Dining, the Fine Dining and Sunset Bar, we have considered the sun path diagrams to identify the best possible locations. These allow for the morning sun to the terrace of the All Day Dining and the setting sun for the Sunset Bar and Fine Dining experience. For the Spa – which will also be an attraction for day visitors - we have proposed a location at the centre of the site, within the proposed oasis plantation. This facilitates easy access in and out without having to WUDYHUVH WKH ZKROH VLWH DQG DႇHFW WKH KRWHO JXHVW H[SHULHQFH /RFDWHG within the oasis it also allows us to fragment the buildings, enhancing the outdoor environmental experience for the spa guests. Individual WUHDWPHQW URRPV ZLOO DOVR EH VSUHDG RXW DURXQG WKH UHVRUW WR RႇHU D unique perspective to the surrounding mountains.
MASTERPLAN As mentioned in the zoning narrative, in order to allow the guests to experience as much of the terrain as possible, the hotel is spread out around the site, primarily along the lower slopes for ease of access but also along the higher intermediate zones in places. Key locations within WKH VLWH KDYH EHHQ LGHQWL¿HG ZKLFK HLWKHU FDSWXUH WKH PRUQLQJ VXQ ± IRU the breakfast experience – or the view to the surrounding mountains JORZLQJ UHG LQ WKH VHWWLQJ VXQ ± IRU WKH ¿QH GLQLQJ DQG VXQVHW EDU H[SHULHQFH 2WKHU LPSRUWDQW ]RQHV IRU WKH SXEOLF DUHDV DUH LGHQWL¿HG as the Spa – which is more inward looking and focused on the Oasis
experience – the Wadi Pool – which also includes a part of the Oasis experience but includes a re-created ’natural wadi’ type pool, complete with waterfalls, grotto’s and running water – and the organic animal and vegetable and fruit farms. Wherever possible, the existing wadi EHGV ZLOO EH HQKDQFHG DQG IRUPDOL]HG WR EH DEOH WR FRQWURO ÀRRG ZDWHUV in the rainy season as well as to create an authentic wadi experience throughout the site. With the introduction of raised cultivated platforms along these water courses we can also introduce additional pockets of RUJDQLF IDUPLQJ WR FRPSOLPHQW WKH KRWHO ) % RႇHULQJV
AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2016
SPA & WELLNESS The spa experience is designed to take advantage of the natural topography and features of the site and is separated into the oasis experience, the mountain experience and the grotto experience. The spa itself has been separated into the dry treatment areas and the wet treatment areas. For the (dry) treatment rooms, each room is self VXႈFLHQW ZLWK FKDQJHURRP VKRZHU DQG WRLOHW HQDEOLQJ WKH URRPV WR be treated as free standing pavilions, located either within the oasis or as a mountain top pavilion with commanding views out over the site and surrounding mountains. Within the oasis itself, the rooms are either located at the edge of the upper pool which is the source of the mountain stream, or within the palms and shaded courtyards of the oasis. Additional treatment rooms are located at various points around the site, each sited to be accessible by the more remote DFFRPPRGDWLRQ DV ZHOO DV WDNLQJ LQWR FRQVLGHUDWLRQ VSHFL¿F ORFDWLRQV which give the guests a unique sense of place within the mountains. 0XOWLSOH GD\ WUHDWPHQW SDFNDJHV ZLOO EH DYDLODEOH RႇHULQJ XQLTXH treatments such as mud and sand treatments, using regional natural products as well as more exotic chocolate and milk treatments. Seclusion and privacy will be of paramount importance in the approach to planning the spa. The wet areas take the form of an underground grotto, and are located HLWKHU VLGH RI D ODUJH µQDWXUDO¶ XQGHUJURXQG SRRO ZKLFK µÀRZV¶ WRZDUG the circular Jacuzzi located at the edge of the waterfall which tumbles down from above into the grotto pool below. Immediately in front of the arrival lobby, a large circular opening in the ground above allows water to dip down from a pool above into the underground pool, and allows natural light into the lower level. The grotto will be ‘sculpted’ from the rock to form an underground cavern experience.
HATTA MOUNTAIN LODGE
PROGRAM
ALL DAY DINING Set well back into the resort, the all day dining takes advantage of DQ HOHYDWHG ORFDWLRQ WR FDWFK WKH ¿UVW UD\V RI VXQ ZLWKLQ WKH VLWH DQG is designed around an outcrop of natural rock – which cuts through the restaurant, dividing it into two distinct sections. Envisaged as a GHVWLQDWLRQ LQ LWVHOI WKH DUULYDO ZLOO HLWKHU EH E\ IRRW ± IRU WKH ¿W PLQGHG – or by buggy. The emphasis on both dining experiences will be on local UAE cuisine with unique live cooking facilities throughout the resort, from BBQ nights in the oasis to private candle light dinners on the mountain or private dining on your suite terrace.
$5(=22 725$%, _ $662&,$7( 0(0%(5 $,$ _ *$-
DELUXE MOUNTAIN SUITES The deluxe mountain suite is a free standing one bedroom suite with a VOLJKWO\ ÀH[LEOH DUUDQJHPHQW WR VXLW LWV SDUWLFXODU PRXQWDLQ VHWWLQJ 7KH 6XLWH FRPSULVHV DQ RSHQ SODQ OLYLQJ GLQLQJ DUHD ZLWK FHQWUDO ¿UH SODFH D SDQWU\ JXHVW WRLOHW DQG PDVWHU EHGURRP ZLWK HQ VXLWH EDWKURRP 7KH HQ VXLWH EDWKURRP KDV D EDWK DQG VKRZHU ZLWK D YLHZ DV ZHOO DV D WRLOHW DQG ELGHW DQG GRXEOH YDQLW\ 7KHUH LV D ZDON WKURXJK GUHVVLQJ URRP EHWZHHQ WKH EHGURRP DQG WKH EDWKURRP 'LႇHUHQW OHYHOV ZLWKLQ WKH VXLWH DOORZ WKH XQLW WR EH IXUWKHU DGMXVWHG DFFRUGLQJ WR LWV VSHFL¿F ORFDWLRQ RQ WKH VORSHV (DFK XQLW KDV LWV RZQ SOXQJH SRRO DQG KDV D UDLVHG WLPEHU GHFN WR WKH EHGURRP DQG D VWRQH WHUUDFH WR WKH OLYLQJ URRP DQG SRRO DUHD 7KHVH VXLWHV UDQJH IURP ± VTP
+$77$ 02817$,1 /2'*(
352*5$0
ROYAL SUITE 7KH UR\DO YLOOD LV D VWDQG DORQH WKUHH EHGURRP YLOOD DQG LV WKH KLJKHVW EXLOGLQJ RQ WKH VLWH ,W KDV D ODUJH RSHQ SODQ OLYLQJ GLQLQJ DUHD ZLWK D µKDQJLQJ¶ ¿UH SODFH DQG SRRO ZKLFK SLHUFHV WKH VSDFH DQG GLYLGHV WKH WZR VSDFHV 2Q RQH HQG LV D NLWFKHQ DQG VHUYLFH SDQWU\ DQG RQ WKH RWKHU HQG DUH WKH JXHVW WRLOHWV DQG XQGHUFRYHU GHFN (QWHUHG IURP D KLJKHU OHYHO WKH DUULYDO VWHSV HQDEOH HQWUDQFH EHWZHHQ WKH OLYLQJ DQG GLQLQJ URRPV RQ D[LV ZLWK WKH LQ¿QLW\ HGJH SRRO )URP WKH HQWUDQFH OREE\ WKHUH LV D OLJKWZHOO DQG FRXUW\DUG HLWKHU VLGH ZLWK D ÀRDWLQJ VWDLUFDVH XS WR WKH EHGURRP OHYHO 2Q WKH SRRO WHUUDFH WKHUH LV D ¿UH SLW ZLWK VXQNHQ VHDWLQJ DV ZHOO DV D VKDGHG VHDWLQJ DUHD SHUFKHG RQ WKH HGJH RI WKH PRXQWDLQ VORSH 2Q WKH GLQLQJ VLGH RI WKH KRXVH LV D UDLVHG DQG VKDGHG RXWGRRU GHFN VXVSHQGHG DERYH WKH PRXQWDLQ SURYLGLQJ GHJUHH YLHZV RI WKH VLWH DQG VXUURXQGLQJ PRXQWDLQV 2Q WKH XSSHU OHYHO WKH PDVWHU EHGURRP FDQWLOHYHUV RXW IURP WKH OLYLQJ URRP EHORZ DQG DSSHDUV VXVSHQGHG LQ VSDFH ÀRDWLQJ DERYH WKH KRXVH EHORZ DQG WKH PRXQWDLQ 7KH HQ VXLWH EDWKURRP KDV D SDQRUDPLF YLHZ DQG KDV D VKRZHU WRLOHW ELGHW DQG GRXEOH YDQLW\ DQG LV HQWHUHG WKURXJK WKH GUHVVLQJ DUHD ORFDWHG EHKLQG WKH EHG (DFK RI WKH WZR DGGLWLRQDO EHGURRPV KDYH HQ VXLWH EDWKURRPV ZLWK VKRZHUV RQO\ DQG QR EDWKV DQG DUH EDVHG PRUH RQ D VWDQGDUG KRWHO W\SH RI OD\RXW
$5(=22 725$%, _ $662&,$7( 0(0%(5 $,$ _ *$-
STANDARD MOUNTAIN SUITES 7KH VWDQGDUG PRXQWDLQ VXLWHV KDYH EHHQ DUUDQJHG LQ FOXVWHUV UDQJLQJ IURP WZR WKUHH RU IRXU XQLWV GHSHQGLQJ RQ WKH SDUWLFXODU OD\RXW DQG WKH SDUWLFXODU VLWH ORFDWLRQ &XUUHQWO\ ZH KDYH IRXU SRWHQWLDO OD\RXWV HDFK UHVSRQGLQJ WR GLႇ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± VTP
/86$,/ +27(/ $1' 5(6257
352-(&7 29(59,(:
PROJECT OVERVIEW 7KH VLWH LV ORFDWHG LQ WKH /XVDLO DUHD 4DWDU 7KH VLWH LV D P ZLGH VWULS RI ODQG IURP WKH KLJK WLGH PDUN DW VKRUHOLQH DQG LV DSSUR[LPDWHO\ NP ORQJ 7KH VLWH DUHD EDVHG RQ WKH &RQFHSW 'HVLJQ LV DSSUR[LPDWHO\ VTP 7KH SURMHFW LV ¿YH VWDU +RWHO DQG 5HVRUW DW /XVDLO LQ 4DWDU FRQVLVWLQJ RI D ¿YH VWDU KRWHO FRQVLVWV RI JURXQG ÀRRU SOXV VW QG DQG UG ÀRRUV ZLWK NH\V ,QFOXGHG LQ WKH +RWHO ZLOO EH VWDQGDUG IDFLOLWLHV DVVRFLDWHG ZLWK D ¿YH VWDU +RWHO 7KH KRWHO ZLOO KDYH QR 6WDQGDUG 5RRPV QR %XVLQHVV 6XLWHV DQG QR 5R\DO 6XLWHV DV SHU WKH &RQFHSW 'HVLJQ WKDW LV SURYLGHG 5HVRUW VWDႇ DFFRPPRGDWLRQ GLVFUHHWO\ ORFDWHG IRU DSSUR[LPDWHO\ HPSOR\HHV QR 9LOODV IRU VLQJOH JHQGHU PDOH RU IHPDOH JXHVWV ZKLFK LV WR FRQVLVW RI [ EHGURRP YLOODV [ EHGURRP YLOODV DQG [ EHGURRPV YLOODV (DFK YLOOD ZLOO EH XVHG E\ D VLQJOH JHQGHU SDUW\ WKHUHIRUH SULYDF\ IURP DGMDFHQW YLOODV ZKLFK PD\ KDYH D GLႇHUHQW JHQGHU SDUW\ LV RI KLJK LPSRUWDQFH QR 9LOODV ZLOO EH IRU IDPLOLHV DQG ZLOO FRQVLVW RI [ EHGURRP YLOODV [ EHGURRP YLOODV DQG [ EHGURRP YLOODV (YHU\ YLOOD WR KDYH DFFRPPRGDWLRQ IRU RQH PDLG EXWOHU (YHU\ YLOOD WR KDYH D PLQLPXP RQH FDU SDUNLQJ VSDFH IRU HDFK EHGURRP YLOOD DQG PLQLPXP SDUNLQJ VSDFHV IRU DQG EHGURRP YLOODV HDFK (YHU\ YLOOD WR KDYH D VZLPPLQJ SRRO DQG GLUHFW VHD YLHZ DQG EHDFK DFFHVV
“
7KH DHVWKHWLF DSSURDFK KDV EHHQ GH¿QHG DV FRQWHPSRUDU\ ZLWK ORFDO DUFKLWHFWXUDO UHIHUHQFHV DQG IHDWXUHV
$5(=22 725$%, _ $662&,$7( 0(0%(5 $,$ _ *$-
/86$,/ +27(/ 5(6257
/XVDLO 4DWDU
&OLHQW ,QWHUQDWLRQDO 'HVLJQ &RQVXOWDQW &RUSRUDWLRQ ,'&& 6LWH $UHD VTP 3URMHFW 6L]H VTP 'HWDLOHG 'HVLJ 6FRSH RI VWDU +RWHO DQG 9LOODV
/86$,/ +27(/ $1' 5(6257
9,//$ 7<3( 7+5((
%
/
/
$
$
6:,00,1* 322/
))/
%
%('5220 *
))/
))/
))/
&
&
:& %$7+5220 * ))/
%('5220 * ))/
%$7+5220 * ))/
:&
*
6+2:(5
))/
*
(
6+2:(5
))/
)
0$,' 6 5220 *
60'%
'%
*506
3$66$*(
'
))/
/$81'$5< *
))/ ))/
3$66$*(
)
32:'(5 *
/
':
.,7&+(1 * ))/
))/
(175$1&( +$// * ))/
/
(
))/
))/
/,9,1* 5220 *
(168,7( *
6+2:(5
:&
',1,1* +$// * ))/
/
:,& * ))/
%$7+5220 * ))/
&
/
$
/
'
:&
6+2:(5
'
%('5220 *
%
))/
/
$5(=22 725$%, _ $662&,$7( 0(0%(5 $,$ _ *$-
7 2 3
7 2 3
7 2 3
7 2 3
7 2 3
522) /(9(/ 66/
7 2 :
/(9(/ ))/
/(9$7,21
7 2 3
7 2 3
7 2 3
$
%
7 2 3
522) /(9(/ 66/
%('5220 *
/(9(/ ))/
)25 &217,18$7,21 5()(5 '5$:,1* %(/2:
/(9(/ ))/
522) /(9(/ 66/
7 2 3
'
(
)
*
%('5220 *
%$7+5220 *
:,& *
6(&7,21
7 2 3
7 2 3
7 2 3
%$7+5220 *
%('5220 *
',1,1* +$// *
/,9,1* 5220 *
/(9(/ ))/
522) /(9(/ 66/
/(9(/ ))/
7 2 3
522) /(9(/ 66/
&
6(&7,21
)25 &217,18$7,21 5()(5 '5$:,1* %(/2:
:,& *
(168,7( *
%$ /
+27(/ '5$:,1*6 %$ /& 21 <
%$ /& 21 <
(; (& 52 87,9 20 (
/86$,/ +27(/ $1' 5(6257
0( 3
-
21 < %$ /&
(; (& 52 87 20 ,9(
%$ /& 21<
21 <
%$ /&
/
(; (& 52 87, 20 9(
%$ /& 21<
.
%$ /& 21<
0( 3
%$ /& 21 <
9( 87, (& 20 (; 52
21< /& %$
21< /& %$
'
%( /2:
0$ 5,1 $ ) 287/(% 7
-
7(5 5$&
5()/(&7,1* 322/
0((7,1* 522 0
322 / /,)7
287'225 6($7,1*
322/ '(&.
0((7,1* 5220
7(/
0((7,1* 5220
&21< %$/
21< %$/&
< 21 %$/&
< /&21 %$
( 25 67
< 21 /& %$
,9( 87 (& (; 5220
7 (& (/
/ 7(
,9( 87 (& (; 68,7(
87,9( (;(& ,7( 68
( &87,9 (;( 7( 68,
,9( (;(&87 1*( /28
72,/(772,/(7
6($7,1* $5($
3$175<
1< %$/&2
6($7,1* $5($
0((7,1* 5220
21< %$/&
( ,9
87 (& 20 (; 52
21<
,9( 87 (& (; 5220
5()/(&7,1* 322/
287'225 6($7,1*
(
(/( &
< 21
(
23 (1 72
/& %$
) * +
< 21 /& %$
,1),1,7< ('*( 322/
$
( $* 66 3$
% &
/& %$
(;(&87,9( ',1,1*
6(59 (/( ,&( 9$72 5
&/ 6725($1 $*(
&$3( 72 /$1'6 23(1 '(1 %(/2: *$5
%$1*48 +$// (7 &21 )(5(1& (
%86,1(66 &(175( %$148(7,1 35( )81&7 * ,21 +$//
%$148( 6725$*7,1* (
3$175<
/2%%< /281*(
.,7&+ %$&. (1 +286 2) (
+2 /' &+,// ,1* (5
)(0$/(
( (;(&87,9 (6 2)),&
*8(67 /,)7
$%/87,21
*8(67 /,)7
$',0,1
(175$1&( &2857<$5'
/,)7
3( 6&$ $1' /2: 1 72 / 23( '(1 %( *$5
6(59,&( /2%%<
5220
/$1'6&$3( *$5'(1
$'0,1
$3( /$1'6& 2: 23(1 72'(1 %(/ *$5
6 '5,9(5 :$7,1*
&21&,(5*(
$17(5 220
*60
6(59,&( /,)7
+27(/ /2%%<
35$<(5 5220
5220 1 ',9,6,2 ( 2)),&
5(7$,/
0$/(
5(&(37,21
.
/
/8**$*(
6(&85,7<
+27(/ 3257( &2&+(5(
$
%
&
.,1 5220*
'2 8% 52 /( 20
%$ /&
.,1 52 * 20
%$ /& 21 <
0( 3
-
0( 3
21 <
., 52 1* 20
%$ /& '2 52 8%/( 20
%$ /& 21<
< 21 /& %$
/
., 52 1* 20
%$ /& 21<
.
., 52 1* 20
%$ /& 21<
'2 52 8%/( 20
%$ /& 21<
( 8%/ 0 '2 22 5
21< /& %$
/& %$
$
'
) 35 23 26 28 ) % (' 7/ /2 (7 RU 81 IRU *( 0$ 7+ ( 5,1$
*
287' 225 ' ,1,1
*
287'225 ',1,1
*
)(0$/( *<0
0$/( *<0
$// ' $< ' 5(67$85$,1,1* 17
%$& . 2) +2 )25 86( 52 6(5 20 9,&(6
0$/( &+$1*,1*
287'225 '
1< %$/&2
,1,1* $7( 35,9
0$,1 .,7&+(1
83
0(3
)(0$/(
'( %2; 6$1,7,= ,1* $7,2 1
/9 5220
68%67$7,21
/2$',1* %$<
9$/(7 67$)) 3$5.,1* 6(5 9,&( < $5'
6(&85,7< 2)),&(
/
6(59,&(
/
/
5:
+9 5220
' $3( /$1'6&'(1 *$5 )25 6 (1 &+,/'5 < 3/$
+286(.((3,1* /,1(1
:$ ',63267( 6$/
,'25 55 &2
+& ( 66,%/ $&&( 20 52
*
5$*
)$&,/,7,(6(
*(16( 7
< 21 /& %$ * .,1 20 52
/8% .,' 6 &
( 7(1$1& 0$,1 5,1* (1*,1((
),1,6+,1* (1 .,7&+
5(&(,9,1*
672
< /&21 %$ /( 8% '2 20 52
0$/(
385&+$6,1
8%/( '2 20 52
67$)) )$&,/,7,(6
+& %/( 66, $&&( 20 52
< 21 %$/&
* .,1 20 52
/( 8% '2 20 52
.,1*20 52
.,1*20 52
/,)7 /2%%<
0(3
%<
21< %$/&
$7( 35,9
(' /$1'6&$3 (1 *$5'
/
/2%
&21< %$/
< 21 /& %$
1* ., 20 52
'25 &255,
63(&,$/,7< 5(67$85$17
)(0$/( &+$1*,1*
< 21 /( 8% '2 20 52
3/$175220
-
.
/& %$
(
+
< 21 /& %$
% &
21<
/( 8% '2 20 52
< 21 /& %$
63$&( 3 )25 0(
+
*
.,1 52 * 20
%$ /& 21 <
)
'2 8% 52 /( 20
%$ /& 21 <
(
21 <
'
'2 8% 52 /( 20
%$/& 21 <
675
%$/& 21<
/
$5(=22 725$%, _ $662&,$7( 0(0%(5 $,$ _ *$-
$
%
&
'
(
)
*
+
.
9(/
5$& ( /(
/
7(5
%$/ &21 <
0
.,1 * 5 22 * 5 220
25
%$
&25
5,'
.,1
/&2 1<
* 5 22
0
.,1
%$/ &2 1<
%$/
&21 <
'2 8%/
67$ ,5
( 5 22
0
3
.,1
%
%$/
&21
<
* 5 220
672
522
0
%$/
%$/
%$/&2
%$/&2 1<
%$/&21<
%$/&2 1<
20
.,1* 5 220
/2%% <
&25
5,'2 5
&25
%$/&2
%$/&21<
52<$/ 68,7(
(;(&87,9 ( 68,7(
52<$/ 68,7(
(;(&87,9
5,'2 5
'28
220 .,1* 5
.,1* 5
'28%/( 5220
'28%/
( 68,7(
22 * 5
* 5 22 0 .,1
8% /( 52 20
<
'2
/& 21
52 20
%$
'2 8% /(
/& 21 %$
* 5 22 0
<
.,1
/& 21
/& 21
<
* 5 22 0
52
/( 8%
52
55 ,'2 5
&2
20
0 22 * 5
20
20
0
0 22 * 5 .,1
'2
52 /( 8%
20
5 ,'2 55
&7
7(/
22 * 5 .,1
'28 52 %/( '28
.,1
/( 8%
$,5 67
.,1
52 /( 8%
'2
* 3,1 ((
52 %/(
0
20
67$
'25 55, &2
,5
20
220 * 5
0 522 .,1*
6,%/( &&(6 +& $ 5220
5220 .,1*
%$/&21<
.,1
( . 86 +2
<
<
'2
'2
1<
(/(
< &21
< &21
< &21
21< %$/&
1<
1<
%$/&21<
%$/&21 <
21 /&
< 21 /&
1< /&2
1< /&2
&2
21< %$/&
%$/&2 1<
'28% /( 52
/&2
5(
< &21 %$/ %$/
%$/&2 1<
0
.,1*
67$ ,5
%$
21< %$/&
%$/& 21<
0
5(
522
.,1* 522
%$/& 21< .,1*
0(3 672
5$& (
%$/& 21< .,1 7(5
.,1* 5220
.
%$
%$
%$
%$
* + -
)
& ' (
21 /&
55 ,'2 5
%$
&2
$
&2 55 ,'2 5
0(
%$ /& 21 <
/& 21 < %$
.,1
%$
%$
<
0( 3
* 5 22
0
220 %/( 5
220
&25
5 5,'2
( 5220
,'25 &255
+28 6( .
/
/2%%
((3,1 *
&255,'
<
25
5 67$,
0(3
$75,80 /2%%<
&255,'25
$75,80 /2%%<
$75,80 6725(
522)
6725(
$75,80 /2%%< '(&.
522) '(
*60
&.
67$,5
6725(
/2%%<
+286( .((3,1*
7(/
(/(&7
$
%
&
'
(
)
*
9(/
+
-
7(5
5$& ( /(
.
&21 <
.,1*
522
0
%$/
/
22 0
%$/
&21 <
* 5 22
0
%$/
&21 <
.,1
* 5
%$/ &2 1<
.,1
5
0
&2
%$
55 ,'2
.,1
/&2 1<
* 5 22
0
67$
'2 8%/
,5
( 5 22
%$
0( 3
/& 21 <
0(
.,1
3
* 5 22 0
20 8% /( 52
<
20 52 '2 22
0
<
* 5 .,1
* 52
%$
.,1
,'2 5 55 &2
52 8% /( '2
*
&
%$/ 5$& (
'28 %/(
+
&21
672
%$/
%$/
'28
%/( 52
&21 %$/ %$/& 21<
21< %$/&
20 .,1*
522
%$/&2 1<
0 .,1* 522
%$/&2 1<
6(59 ,&(6
.,1* '28
%/(
52<$/ 68,7(
(;(&87,9
( 68,7(
.,1* 52
20
.,1* 5
52
+2 86 ( .
67 $,5 5 ,'2
0 22 * 5 .,1 52 /( 8%
20
&7 (/(
.,1
67$
,5
20
20
0 522
0 522
220
&25
5 5,'2
0(3
672
< /2%%
0(3
5(
&255,'
/
25
,5 67$
&255,'2 5
(
$75,80 &+$1*,1 * 5220
$75,80 /2%%<
5(/$;$7 ,21 $5(
$
$
6$/21
0(3
+$00$0
522) '(
&. 3$&( 0(3 6
*60 +$// :$ <
6$/21 +$// :$ <
)(0$/( 63$
$75,80 /2%%<
$75,80 /2%%<
75($70( 17 75($70( 17
5(/$;$7 ,21 $5(
%2+
0
0$/( 63 $
&25
17 6 3$&
5,'2 5
0(3 3/$
6758 63$&( )25 &785 23(1 ( $1' 0(3 72 % (/2:
+286( .((3,1*
+$00$
55
0 22 * 5
0 22 ( 5 8%/ '2 52 %/( '28
.,1*
6,%/( &&(6 +& $ 5220 5220 .,1* 5220 .,1*
&255 ,'25
67$ ,5
1< %$/&2
< %$/&21
< %$/&21
< %$/&21
52<$/ 68,7(
,9( 522 0
&2
5$&.
5,'2 5
(;(&87
/8**$*(
&25
%$/&21<
%$/&21<
.,1* 52 20
20
6$)(
.
%$/&21<
%$/&21 <
(6
<
52 /( 8%
20
0
0 ,1, %$5
6(59,&
/2%%
21< %$/&
21< %$/&
%$/&2 1<
7(55 $&( 0
52 /( 8%
( 8,7 * 6
7(/
< &21
<
<
.,1
'2 22 * 5
21 /&
<
'2
1< /&2
1<
.,1
'2
5(
1< &2
< &21 %$/
%$/& 21<
52 20
&2
1<
<
-
&2
%$/ &21 < 7(5
%$/
'
*
%$/
( )
%$
%$
21 /&
< 21 /& %$
0$/(
522) '(
/2%%<
/281*( )(0$/(
&.
7(/
67$,5
(/(&7 75($70( 17 75($70
(17
&+$1*,1 * 5220
522) '(&.
522) '(
&.
(( 3,1 %$
20
/& 21 <
21 /&
20
8% /(
/& 21 %$
%$
$
&2 55 ,'2 5
'2
/& 21 %$ <
%
.,1
%$ /& 21 <
* 5 22
0
Thank you