Arezoo Torabi Portfolio

Page 1

architecture design portfolio

Arezoo Torabi


My

EDUCATION Education and Qualifications

• •

Architectural Experience Program (AXP), NCARB | In Progress Bachelor of Architecture: Minor in Design Management, American University of Shariah, Sharjah UAE | 2010

Professional Memberships

• •

Associate Member: American Institute of Architecture (AIA) | 2012 to Present National Council of Architectural Registration Boards (NCARB), IDP | 2012 to Present

Table of

CONTENTS Concept Design

• • • • • • • • •

2013 . Akoya clubhouse 2013 . JEC masterplan 2012 . National consultative council 2012 . Etihad rail passenger stations 2010 . Aino mina development 2011 . Al seef residential development 2016 . Hatta mountain lodge 2018 . Huafa Hengqin Bay Plaza 2019 . Zhuhai Convention Center

Schematic Design

• • • •

2012 . Chedi khorfakkan 2015 . Courtyad by marriot 2018 . Huafa Hengqin Bay Plaza 2020 . Zhuhai Convention Center

Detailed Design

• • • • • •

2013 . The Garden bay 2014 . Mersa alseef 2015 . Lusail hotel & resort 2019 . Huafa Hengqin Bay Plaza 2020 . Zhuhai Convention Center 2021 . El Camino Mixed Use

Construction Administration

• •

2017 . Mersa alseef 2021 . UCSF Research and academic building

© 2010 - 2012 . AEDAS . ALL RIGHTS RESERVED © 2012 - 2016 . GODWIN AUSTEN JOHNSON . ALL RIGHTS RESERVED © 2018 - PRESENT . SKIDMORE OWINGS & MERRILL . ALL RIGHTS RESERVED


HUAFA HENGQIN BAY PLAZA ZHUHAI, CHINA Set close to the Xi River Santuary and surrounded by expansive bodies of water and landscape with spectacular views, Huafa Hengqin Bay Plaza calls for an imaginative response to the waterfront site. The project is mainly defined as a top-scale complex, with two buildings planned, one as a luxurious international 5-star hotel and the other as an independent business apartment building, plus retail podium and basement.

EL CAMINO MIXED USE SAN FRANCISCO CALIFORNIA, USA

El Camino & Spruce Mixed- Use Redevelopment Project in South San Francisco is situated at the UCSF RESEARCH & ACADEMIC corner of El Camino Real and BUILDING Spruce Avenue. The proposed SAN FRANCISCO redevelopment is proposing CALIFORNIA, USA splitting 11.21 acres into three The five-story building is rising at separate parcels. the corner of 23rd and Vermont Street in the Mission District is The proposed development will the latest addition to the UCSF remove existing vacant buildings Zuckerberg San Francisco General on the site and replace with three Hospital and Trauma Center, or R&D office buildings, three retail buildings, site landscaping and a The total size of the project is ZSFG. parking structure. 97884 sqm. The proposed size of the Luxurious international The new research building will add 5-star flagship hotel is 63625 sqm 175,000 square feet to ZSFG and The new buildings will consist of and High-end sea-view business will include modern research and approximately 750,000 square feet apartment 24471 sqm. It also academic facilities, wet and dry of R&D office space, 30,000 square requires 9788 sqm of retail podium. laboratories, a patient research feet of amenity and 19,500 square center, and additional teaching feet of retail. The R&D and retail Based on the type of area of the and collaboration areas. The buildings will be positioned across Hengqin Financial Island, the educational spaces will consist of a new interior street. All buildings first-rate sea view resources, and a Surgical Training Facility and a in the project will be tied together through landscaping and open the project’s identity as a complex, Biomechanics testing laboratory. space, creating pedestrian and provide a luxurious international 5-star hotel, establish the value Construction is estimated to cost bike friendly connections between of the project as a landmark, and $275 million. The building was the highly amenitized mixed- use create a brand-new image for the approved in late 2019, with work campus. Hengqin gateway. starting in 2020 and completion expected this summer. The building As an alternative, the 19,500 sq ft of is aiming to receive LEED Silver retail center could be interchanged with approximately 100-150 units of certification or higher. multi- family residential.

CONVENTION CENTER ZHUHAI, CHINA Zhuhai International Convention and Exhibition Center Project Exhibition Area is an interior design of the exhibition area, including conceptual design, schematic design, design development. The scope of work includes below programs and areas: - Auditorium 897 sqm - Round table meeting room 1744 sqm - Conference room and VIP room 4607 sqm


AKOYA CLUBHOUSE DUBAI, UAE High quality concept design for 4,600 sqm of Hotel, Spa, and Clubhouse elements. The Concept Design will need to take into consideration the other proposed development designs around the site and decide to compliment or contrast the design narrative accordingly. Akoya has been designed carefully to create a modern and contemporary architectural aesthetic. The high quality designs provide variety and yet harmony across the site. The retail elements must either compliment or contrast with positive effect. The proposed size of the Hotel, 15,000sqft to 18,000sqft, is based upon the principal that the Operator will be the same for the Hotel, Spa and Clubhouse elements.

JEC MASTERPLAN JEDDAH, KSA

THE CHEDI KHORFAKKAN SHARJAH, UAE

Master plan for 5,300,000 square meters, JEC City is a project made up of distinctive districts, which include a commercial core of international businesses, finest lifestyle establishment, unique open spaces, and diverse residential communities. In addition, the JEC City Master Plan has located a magnificent iconic tower as the centerpiece of the development – the JEC Tower.

The Chedi Khorfakkan is a picturesque resort in the north of the traditional town of Khorfakkan. It sits on the edge of a secluded scenic bay and provides uninterrupted views out over the Indian Ocean. A series of terraced elements with landscaped promenades connect across the length of the development with the hotel suites on the lower levels benefitting from direct access to the beach and the lower promenade. Suites on the upper floors are provided with access to the upper promenade via communal lobbies with stair access to the lower promenade and beach.

NATIONAL CONSULTATIVE COUNCIL ABU DHABI, UAE The intension was to construct a new National Consultative Council (NCC) building in alignment with Abu Dhabi Government Vision 2030, where its design should be an important landmark reflecting the cultural and heritage architecture of Abu Dhabi and UAE. The Client’s vision of the new National Consultative Council is to construct an innovative yet traditional building, clearly evoking the architectural heritage and culture of Abu Dhabi in a distinguishable and monumental building.


THE GARDEN BAY LUCKNOW, INDIA Garden Bay is an astonishing 73-acre township, positioned at Sitapur-Hardoi Road, Lucknow, with an incredibly tranquil environment, delivering a wholesome living experience. Our masterful team endeavors to present you a lifestyle that will elevate you above all others. An impressive range of homes that are blessed with pristine nature, sophisticated innovation, opulent facilities and exotic comfort. A luxurious living environment. We know that to be happy is to reconnect with nature and become in tune with its charms. We understand that living in the lush green and clean atmosphere is a blessing to us. At Garden Bay, every home blends in flawlessly with acres of tranquility. We ensure that you compromise neither on luxury nor your peace of mind. Combining the best of construction with creativity, the township will bring together like-minded stratum of the society. Step into your dream home that has been designed to enrich royal living.

MERSA ALSEEF DUBAI, UAE Located along the Dubai Creek waterfront adjacent to the historic Al Fahidi district, one of the oldest and most traditional areas of the city, the ETIHAD RAIL PASSENGER masterplan aims to regenerate the STATIONS Creek waterfront as an iconic, civic UAE destination with a strong focus on The Etihad Railway Network is to the rich local heritage rooted within be built to link the principal centers the spirit of Emirati culture. of population and industry of the approximately nine UAE. It will run from the Saudi Covering Arabian border at Gwheifat in the hectares of built development, west, close to the cities of the Gulf Khor Dubai will be designed as a coast, to the Northern Emirates and cultural city quarter fully integrated the east coast ports. There will also into the existing urban fabric. The be a line running from Abu Dhabi to development will enhance Dubai’s Al Ain, which may be projected, into international status as a world Oman, as well as a branch line to the famous waterfront destination, gas facilities at Shah and Habshan. acting as a catalyst for future Built to international standards, development within the wider area. Etihad Rail’s state of the art network will enable the rapid transport of passengers and freight, opening up new trade corridors and journey opportunities. Once complete, it will redefine logistics and transport in the region, providing as a safe, efficient, sustainable network that links all corners of the UAE, and eventually, the UAE to the wider GCC. This extensive investment will support the Government’s continued mission to build a diversified economy and continued economic growth.

AINO MINA DEVELOPMENT KANDAHAR, AFGHANISTAN The concept is for a peaceful environment where people can experience and appreciate the beauty and tranquility of Nature. A wide central park runs through the masterplan, dividing it in two and linking the retail area at its southern end with the Friday mosque at its northern end. The land rises gently so that the Friday mosque seen against the backdrop of the mountains bordering the Arghandab valley, creates a powerful and beautiful symbol for the entire development.


hatta mountain lodge dubai, UAE

courtyard by marriott riyadh, Saudi Arabia The subject site is strategically located between Central Business District and the airport in close vicinity to King Abdullah Financial District. The site is located in the southern side of Sahafa district, approximately 20 minute drive from Airport. Measuring approximately 11,043 sqm on Takhassusi Road 2.0 km from King Abdul Financial District, The plot is approximately 26 kilometers from King Khaled International Airport. The site area is 11,180sqm allowing 26,500sqm of build useful area. It is 5 star hotel with 200 room, providing restaurants, function rooms, retail spaces.

AL SEEF RESIDENTIAL DEVELOPMENT ABU DHABI, UAE The aim was to design this residential masterplan in Abu Dhabi. Our approach was to design a development, which would offer a unique product in a saturated realestate UAE market. Unique not in terms of luxury and unit sizes, but a human scale experience that people wish to re-enact. To create a private island that will be intimate, but encourage interaction at the same time. To give tenants an opportunity to own a waterfront townhouse with the same feel of owning a Venitian palacco on Grand Canal. We created a variety in product, from villas to waterfront townhouses, garden townhouses and boutique apartments. Special attention was given to detailing the different façade treatments on same massing and planning types and public realm design thus providing character and identity.

The Hatta Desert Resort will be a unique Mountain retreat that will offer a multitude of diverse offerings that currently do not exist in the UAE’s Hospitality landscape. Located on the outskirts of Hatta, this develop-Hatta is located approximately an hour away from Dubai City and enjoys pleasant climate settings, along with unrivalled valley and mountain sceneries including breath-taking views of the Al Hajar Mountains and wadis below. This hotel resort is expected to be positioned within the Luxury segment of the market, targeting clientele seeking tranquillity and privacy along with an exclusive experience in a secluded location. The terrain is naturally sculpted and presents an array of exciting opportunities for the appropriate development. The current proposal seeks to site a one-phase 120-key development, with a mix of standalone luxury tent suites and hotel complex accommodation, serviced through the main hotel complex, that will additionally house a number of the communal facilities such as the F&B dining, signature spa, health club and pool. The development will contain all the elements of a modern, functional and sustainable mixed-use environment and is set to provide another dimension to the evolving hospitality offerings in the UAE.

lusail hotel & resort lusail, qatar The site is located in the Lusail area Qatar. The site is a 150m wide strip of land from the high tide mark at shoreline and is approximately 2.5km long. The site area based on the Concept Design is approximately 410,000sqm. The project is five star Hotel and Resort at Lusail in Qatar consisting of a five star hotel consists of ground floor plus 1st, 2nd and 3rd floors with 150 keys. Included in the Hotel will be standard facilities associated with a five star Hotel. The hotel will have 125 no Standard Rooms, 20 no Business Suites, and 5 no Royal Suites as per the Concept Design that is provided. Resort staff accommodation discreetly located for approximately 300 employees. 50 no Villas for single gender and 50 no Villas will be for families.



HUAFA HENGQIN BAY PLAZA

PROJECT OVERVIEW

PROJECT OVERVIEW Huafa Hengqin Bay Plaza aims to create a premier hotel and residential address for Zhuhai and the greater Macao region, prominently placed on the waterfront, with a variety of hospitable, breathtaking, and inviting spaces within. The design goal is to create a modern and timeless landmark building, with a distinctive silhouette and textured façade from afar, and lush gardens and grand entries up close. The arrival to Hengqin Bay Plaza will place importance on the front door - for hotel guests finally arriving at their destination, permanent residents of the apartments, and visitors with shorter stays in the retail podium or one of the event ballrooms. The site is designed with a porous perimeter that not only maintains a sense of order to the city grid, but also provides concentric layers of enclosure as you enter the more private spaces within. Guests arriving at the lobbies are greeted with tall ceilings, ample daylight, and direct access to private gardens.

The vernacular architecture and urban development of the Pearl River Region and Guangdong province are largely influenced by climate. We find inspiration in many of the traditional structures not through formal mimicry, but through their organization. Colonnades, courtyards, overhangs, and the integration of landscape all create rich, layered urban developments that mediate the often hot and humid climate. Covered passages encourage comfortable pedestrian movement, and courtyards punctuating urban blocks ensure air movement during peaks of heat and humidity. Tree canopies and green spaces provide additional respite from intense sun and act as an extension of interior public spaces spilling into the gardens. All of these climate strategies have been employed with occupant comfort, energy efficiency, and building performance in mind, and to create a hospitable, biophilic experience that blends interior and exterior spaces.

The project is positioned overall as a leading urban bench-mark complex that integrates a luxurious international 5-star hotel, luxurious business apartment, and retail

Huafa Hengqin Bay Plaza Client // Huafa Group Plot Area // 15,213 sqm Project Size // 97,884 sqm Hotel & business apartment for Grand Hyatt

Zhuhai, China


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018


HUAFA HENGQIN BAY PLAZA

ANALYSIS

澳门

MACAU 澳门电视塔

Macau Television Tower

十字门国际会展中心

Shizimen International Convention Center

十字门中央商务区

SHIZIMEN CENTRAL BUSINESS DISTRICT

西湾大桥

Xiwan Bridge

澳凼大桥

Aodang Bridge

横琴大桥

Hengqin Bridge

澳门

MACAU

Site and adjacent major hubs

INTRODUCTION Zhuhai lies along the zigzagging coast of South Eastern China overlooking the vast expanse of blue water and undulating green hills. Located at the heart of Shizimen Central Business District, Hengqin Financial Island is surrounded by water on all four sides. Because of its proximity to Hong Kong, Shenzhen and Macau, Hengqin New Area enjoys a special advantage to be an important hub of the 21st Century Maritime Silk Road into the South China Sea and beyond. A city made up of many islands and historically regarded as the Garden City of China, this project will take advantage of its geographical location, clean air and warm climate to create an iconic residential and hotel living for residents and travelers alike. The open space and landscape context of the project site is influenced by several powerful forces. The natural conditions of the region – steep, forested mountains emerging out of the Sea - have long defined the character of the larger Pearl River Delta. The site is formed by the new reclaimed land along the waterfront. Across the streets to the waterfront and other parcels, there is a healthy collection of commercial, residential and institutional development areas that provide various program uses and activities in this new district. The streetscapes and park system of Zhuhai are lushly treelined and provide cooling shade in the hot and humid months and the waterfront promenade and beach reinforce the traditional connection of the culture to the river and the sea.

建筑场地

Building Site


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018

无遮挡视景

Unobstructed Views

148M

148M

350M

97M

176M 97M

600M-650M

Site and context

SITE AND CONTEXT 建筑红线

Property Line

硬质景观带范围线

Hard Landscape Line

地下建筑红线 Basement Line

多层建筑退让红线

汇通七路

5M

Rongyu

e Blvd

15M 3M

10M

汇通六路

7th Blvd

Tower Setback Line

荣珠道

10M

20M

Huitong

高层建筑退让红线

Rongzh

3M

15M

u Blvd

Podium Setback Line

15M

Huitong

6th Blv d

荣粤道

The site is surrounded by active use from financial services to maritime. On the east is the 334m tall office and apartment tower, Hengqin International Financial Center, and retail podium with conference, commercial and exhibition facilities. On the south is HFC, the South International Financial and Media Tower (HFC), which has retail at the base with a service apartment tower and a 300 meter tall office tower. On the west is Ferretti Asia Pacific Center that will include an upscale sales center, exhibition center, sailing school and a yacht marina. To the immediate north are shorter cultural buildings at the waterfront park. The site is also diagonally linked to one of the waterfront parks which will create convenience for pedestrian to views and surrounding water. The tallest mixed use tower on Shizimen is also to the southeast corner of the project site. Leveraging the diverse program from yacht tourism to financial offices to high-end service apartments, the site will be able to attract visitors and harvest from the energy in the surrounding area.

汇通七路

Huitong

7th Blvd

荣珠道

Rongzh

u Blvd

60M

Huitong

6th Blv d

荣粤道

Rongyu

e Blvd

M

60 汇通六路

1: 2000 0

20

40

60

80m


HUAFA HENGQIN BAY PLAZA

DESIGN PROCESS


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018

While the previous scheme complied with the Planning Criteria, it presented a narrow face towards the waterfront.

Option 01 – Broaden tower frontage towards the water while keeping the tower footprint within the 60m x 60m setback boundary.

Option 02 – Unfold tower frontage to maximize access to water views & establish a stronger presence on the waterfront.


HUAFA HENGQIN BAY PLAZA

DESIGN PROCESS


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018

148M 350M

148M


HUAFA HENGQIN BAY PLAZA

PROJECT MASSING

获得通风和采光 Access to Light & Air

标志性冠顶 Signature Crown

塔楼在60m界线内 Tower within 60m Boundary

景观参与 HLandscape Engagement 分割建筑体块 Break Apart Mass

朝前体块推出 Shear Front Bar

垂直线条统一立面 Facade Unity Through Vertical Grain

功能叠置分布 Program Stack

建筑体块 Building Volume

酒店 Hotel

反射效果 HReflective Quality

公寓 Apartments

业态不同 Program Differentiation


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018


HUAFA HENGQIN BAY PLAZA

PROGRAM SECTION

PROGRAM & AREA Hotel 63,625 m2 Business Apartment 24,471 m2 Retail 9,788 m2 Total Allowable Area (GFA)

97,884 m2

TARGET UNIT / BAY COUNT Hotel 520 Bays Business Apartment 200 Units

6000

CHINESE RESTAURANT SKY LOBBY

LVL 44 6000

GRAND CAFE

LVL 32

LVL 31 LVL 30 LVL 29

LVL 20 LVL 19 LVL 18 LVL 17 LVL 16 LVL 15

LVL 13 LVL 12 LVL 11 LVL 10 LVL 09 LVL 08 LVL 07 LVL 06

3900 3900 3900 3900 3900 3900

HOTEL AMENITIES REFUGE

APARTMENT (13 FLRS)

REFUGE

T.0. ROOF

CLUB

32100

BALLROOMS RETAIL

RETAIL

LVL 01 6300

+0.0M

商业群房

RETAIL PODIUM

LVL B1

3900

LVL B1

3900

LVL B1

4800

LVL B1

-18.9M

+33.4M

LVL 05 LVL 04

+22.7M

9000

MEETING

酒店

HOTEL

商务公寓

BUSINESS APARTMENT

避难层

HOTEL REFUGE FLOOR

机电设备及停车

MEP AND PARKING

LVL 03 5700

50000

LVL 14

+33.4M

3900 3900

LVL 21

3900

LVL 23

3900

LVL 24

HOTEL (9 FLRS)

6000

LVL 25

LVL 22

+83.4M

3900 3900

LVL 26

3900

LVL 27

6000

47100

LVL 28

REFUGE

3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500

+130.5M

5700

LVL 33

5000

LVL 34

HOTEL (10 FLRS)

3900

LVL 35

3900

LVL 36

4500

44500

LVL 37

3900

LVL 38

5500

LVL 39

REFUGE

3900

LVL 40

3900

LVL 41

3900

LVL 42

+175.0M

5500

LVL 43

LVL 02

8000

25000

LVL 45

1500

T.O. PARAPET ROOF

+200.0M

6000

12000

12000

T.O. CROWN

+212.0M

LVL 01

+0.0M


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018


HUAFA HENGQIN BAY PLAZA

ELEVATION & ELEVATOR

T.O. CROWN

12000

12000 1500 3900 3900 3900 3900 3900 3900 3900 3900 5500 3900 3900 3900 3900 3900 3900 3900 3900

5700 5000

LVL 01

LVL 37 LVL 36 LVL 35 LVL 34 LVL 33 LVL 32

LVL 31

+130.5M

LVL 30 LVL 29 LVL 28 LVL 27 LVL 26 LVL 25 LVL 24 LVL 23 LVL 22

LVL 21

LVL 20

+83.4M

LVL 19 LVL 18 LVL 17 LVL 16 LVL 15 LVL 14 LVL 13 LVL 12 LVL 11 LVL 10 LVL 09 LVL 08 LVL 07 LVL 06

+33.4M

RETAIL

RETAIL

1300

5700 8000

+0.0M

LVL 38

32100

LVL 02

LVL 39

MEETING

BALLROOMS

LVL 03

LVL 40

CLUB

9000

LVL 04

+175.0M

LVL 41

50000

LVL 05 +22.7M

REFUGE

T.0. ROOF

4500

+33.4M

3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500

APARTMENT (13 FLRS)

6000

REFUGE

6000

HOTEL AMENITIES

LVL 42

47100

3900

HOTEL (9 FLRS)

LVL 44

44500

3900

REFUGE

LVL 45 25000

3900

HOTEL (10 FLRS)

+200.0M

ROOF

LVL 43 5500

REFUGE

T.O. PARAPET

6000

GRAND CAFE

6000

SKY LOBBY

6000

CHINESE RESTAURANT

+212.0M

+1.3M


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018

6000

LVL 44 6000

LVL 32

LVL 31 LVL 30 LVL 29

LVL 20 LVL 19 LVL 18 LVL 17 LVL 16 LVL 15

LVL 13 LVL 12 LVL 11 LVL 10 LVL 09 LVL 08 LVL 07 LVL 06

3900 3900 3900 3900 3900 3900

3900

HOTEL (9 FLRS)

HOTEL AMENITIES REFUGE

APARTMENT (13 FLRS)

REFUGE

T.0. ROOF

CLUB

32100

BALLROOMS

RETAIL

LVL 01 6300

1300

RETAIL +1.3M

4800

TOWER

PODIUM

F/S (1)

F/S (1)

F/S (2)

F/S (2)

EVE.-S(2)

RT (2)

EVE. (6)

F/S (1)

HT-S (2)

AP (4)

HT (4)

HT (2)

LVL B4

EXP. (4)

LVL B3

3900

LVL B2

3900

18900

LVL B1

-18.9M

+33.4M

LVL 05 LVL 04

+22.7M

9000

MEETING

LVL 03 5700

50000

LVL 14

+33.4M

3900 3900

LVL 21

REFUGE

3900

LVL 23 LVL 22

6000

LVL 25 LVL 24

+83.4M

3900 3900

LVL 26

3900

LVL 27

6000

47100

LVL 28

3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500

+130.5M

5700

LVL 33

5000

LVL 34

HOTEL (10 FLRS)

3900

LVL 35

3900

LVL 36

4500

44500

LVL 37

3900

LVL 38

5500

LVL 39

3900

LVL 40

REFUGE

3900

LVL 41

SKY LOBBY GRAND CAFE

3900

LVL 42

+175.0M

5500

LVL 43

CHINESE RESTAURANT

LVL 02

8000

25000

LVL 45

1500

T.O. PARAPET ROOF

+200.0M

6000

12000

12000

T.O. CROWN

+212.0M

LVL 01

+0.0M


HUAFA HENGQIN BAY PLAZA

CIRCULATION ANALYSIS

机动车

Motor Vehicles 人行

Pedestrian

汇通七路 Huitong 7th Blvd

非机动车

Non-motor Vehicles

落客区

酒店大堂

DROPOFF

HOTEL LOBBY

公寓大堂

APT LOBBY

落客区

DROPOFF

XXXX

宴会厅大堂

荣粤道 Rongyue Blvd

EVENT LOBBY

商业入口

RETAIL ENTRY

荣珠道 Rongzhu Blvd

SERVICE RAMP

商业入口

RETAIL FRONTAGE

汇通六路 Huitong 6th Blvd

Circulation analysis - vehicles & pedestrian

汇通七路 Huitong 7th Blvd

消防扑救面

荣粤道 Rongyue Blvd

5m 5m

5m 5m 10m

荣珠道 Rongzhu Blvd

10m FIRE TRUCK STAGING

消防扑救面

FIRE TRUCK STAGING

汇通六路 Huitong 6th Blvd

1: 800

Circulation analysis - fire truck

0

8

16

24

32m


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018

Garden view & drop hotel off

Prominent retail corner


HUAFA HENGQIN BAY PLAZA

FLOOR PLANS

汇通七路 Huitong 7th Blvd

前塔冠顶 = +212.00 m

T.O. FRONT TOWER CROWN

女儿墙顶 = +200.00 m T.O. PARAPET

后塔冠顶 = +205.50m

T.O. REAR TOWER CROWN

塔楼 TOWER 楼层 = 47 FLOORS

屋顶 = +22.70 m

T.O. MECH. PENTHOUSE

屋顶 = +13.70 m

裙房 PODIUM 楼层 = 5

屋顶 = +27.70 m T.O. ROOF

FLOORS

荣珠道 Rongzhu Blvd

T.O. ROOF

T.O. ROOF

荣粤道 Rongyue Blvd

屋顶 = +204.00 m

屋顶 = +33.40 m T.O. ROOF

汇通六路 Huitong 6th Blvd

Site plan - roof

汇通七路 Huitong 7th Blvd

车库入口

GARAGE ENTRY

自行车库入口

BIKE PARKING ENTRY

商务公寓入口

BUSINESS APT ENTRY

酒店入口

商业入口

HOTEL ENTRY

荣粤道 Rongyue Blvd

荣珠道 Rongzhu Blvd

RETAIL ENTRY

商业入口

RETAIL ENTRY

酒店宴会入口

HOTEL EVENT ENTRY

汇通六路 Huitong 6th Blvd

1: 800

Site plan - ground floor

0

8

16

24

32m


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018

Retail experience concept

Hotel entry view


HUAFA HENGQIN BAY PLAZA

FLOOR PLANS

餐饮

餐饮

F&B

F&B

机电

M.E.P.

餐饮 F&B

餐饮

餐饮

F&B

F&B

L2 - Retail

公寓大堂

APARTMENT LOBBY

酒店大堂

HOTEL LOBBY

餐饮 F&B

宴会大堂

EVENT LOBBY

酒店大堂/交通

HOTEL LOBBY/CIRC

酒店公共

餐饮

HOTEL PUBLIC

公寓大堂/交通

F&B

APARTMENT LOBBY/CIRC

商业-餐饮

机电

RETAIL-F&B

M.E.P.

商业-其他

RETAIL-ALT

餐饮

商业-交通

F&B

RETAIL CIRC

核心筒

服务大堂

CORE

机电

SERVICE LOBBY

M.E.P.

走道交通

CIRCULATION

停车

PARKING

L1 - Ground floor

1: 500 0

5

10

15

20m


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018

会议室

MEETING RM.

厨房仓储

KITCHEN & STOR.

会议室

MEETING RM.

会议室

MEETING RM.

L4 - Meeting room

厨房仓储

KITCHEN & STOR.

屋顶 = +13.70 m T.O. ROOF

小宴会厅

JR. BALLROOM

主宴会厅

酒店-交通

GRAND BALLROOM

HOTEL CIRC

酒店-活动公共

HOTEL EVENT/PUBLIC

商业-交通

RETAIL CIRC

贵宾/婚礼准备 VIP/ BRIDAL

核心筒 CORE

宴会前厅

机电

PRE-FUNCTION

M.E.P.

走道交通

CIRCULATION

屋顶露台

ROOF TERRACE

L3 - Ballroom

1: 500 0

5

10

15

20m


HUAFA HENGQIN BAY PLAZA

FLOOR PLANS

屋顶 = +13.70 m T.O. ROOF

屋顶 = +22.70 m T.O. ROOF

屋顶 = +33.40 m

屋顶 = +27.70 m T.O. ROOF

T.O. ROOF

L6 - Refugee floor

机电

M.E.P.

休闲会所

酒店交通

LEISURE CLUB

HOTEL CIRC

商业-餐饮

RETAIL-F&B

商业-其他

屋顶 = +27.70 m

RETAIL-ALT

T.O. ROOF

商业-交通

RETAIL CIRC

核心筒

机电

CORE

M.E.P.

机电

M.E.P.

走道交通

CIRCULATION

停车

PARKING

L5 - Leisure club

1: 500 0

5

10

15

20m


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018

未来计划通往相邻地块

FUTURE CONNECTION TO ADJACENGT PARCEL

停车-酒店+商业

PARKING - HOTEL+RETAIL

未来计划通往相邻地块

FUTURE CONNECTION TO ADJACENGT PARCEL

LB2 - Parking

停车

PARKING

机电 - 通用

自行车停车

BIKE PARKING

M.E.P. - GENERAL

后勤 - 餐饮

B.O.H. - F&B RELATED

机电 - 通用 M.E.P. - GENERAL

后勤 - 房务

B.O.H. - HOUSEKEEPING

员工设施

EMPLOYEE FACILITY

后勤 - 保安

B.O.H. - SECURITY 后勤服务 B.O.H.

核心筒

机电 - 酒店

CORE

机电

M.E.P. - HOTEL

M.E.P.

走道交通

CIRCULATION

停车

PARKING

LB1 - BOH&MEP&PARKING

1: 500 0

5

10

15

20m


HUAFA HENGQIN BAY PLAZA

FLOOR PLANS

屋顶酒吧

餐厅包厢

休闲沙龙

RF BAR

PRIVATE DINIING

LOBBY LOUNGE

开放式餐饮

OPEN DINIING

餐厅包厢

PRIVATE DINIING

酒店空中大堂 SKY LOBBY

餐厅包厢

餐厅包厢

PRIVATE DINIING

俱乐部酒廊

备用厨房

PRIVATE DINIING

备用厨房

GRAND CLUB LOUNGE

BACKUP KITCHEN

BACKUP KITCHEN

开放式餐饮

俱乐部酒廊

OPEN DINIING

GRAND CLUB LOUNGE

Sky Lobby

餐厅包厢

PRIVATE DINIING

Amenity floor

开放式餐饮

OPEN DINIING

主咖啡厅开放式厨房 GRAND CAFE OPEN KITCHEN

餐厅包厢

餐厅包厢

PRIVATE DINIING

PRIVATE DINIING

备用厨房

BACKUP KITCHEN

开放式餐饮

OPEN DINIING

Hotel typical floor plan

Amenity floor

Apartment floor plan

Apartment floor plan

7层楼建筑面积 L7 FLOOR PLATE GROSS AREA

1,782 SQM

19层楼建筑面积 L19 FLOOR PLATE GROSS AREA

1,773 SQM

(其中酒店建筑面积 HOTEL FLOOR GROSS AREA)

223 SQM

(其中酒店建筑面积 HOTEL FLOOR GROSS AREA)

213 SQM

(其中公寓建筑面积 APARTMENT FLOOR GROSS AREA)

1,559 SQM

(其中公寓建筑面积 APARTMENT FLOOR GROSS AREA)

1,560 SQM

公寓每层面积(14套)UNITS AREA (14 UNITS)

914 SQM + 270 SQM (BALCONY)X 50% = 1,049 SQM

公寓每层面积(14套)UNITS AREA (14 UNITS)

914 SQM + 270 SQM (BALCONY)X 50% = 1,049 SQM

公寓每层使用率 APARTMENT FLOOR EFFICIENCY

1,049 SQM / 1,559 SQM = 67.3%

公寓每层使用率 APARTMENT FLOOR EFFICIENCY

建筑面积 GROSS AREA (SQM)

套数 UNITS

大于两房 2+ BEDROOM

100

7 套 UNITS

两房 2 BEDROOM

酒店-交通

HOTEL CIRC

酒店-客房

HOTEL ROOM

酒店-公共活动

公寓

公寓交通

核心筒

APARTMENT

APARTMENT CIRCULATION

CORE

三房 3 BEDROOM

屋顶露台

HOTEL EVENT/PUBLIC

ROOF TERRACE

总数 TOTAL

1: 300 0

3

6

9

12m

1,049 SQM / 1,560 SQM = 67.2%

每层户型 UNIT TYPE PER FLOOR

总套数 TOTAL UNITS

95

150

3 套 UNITS

4 套 UNITS

14 套 UNITS

14套 X 13层 = 182 套 14 UNITS X 13 FLOORS = 182 UNITS


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018


HUAFA HENGQIN BAY PLAZA

Option one - steel

FACADE STUDIES


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018

Option two - stone


HUAFA HENGQIN BAY PLAZA

FACADE STUDIES


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018


FACADE DETAIL

注解:其它细节典型尺寸、材质及板材未特别注明请参考本图纸 NOTE: REFER TO OTHER DETAILS ON THIS SHEET FOR TYPICAL DIMENSION, MATERIAL AND FINISHES NOT INDICATED

70 100

CL

70

550

801

见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.

ALUM-02

PLAN DETAIL AT VERTICAL FINS ANGLED

倾斜竖向装饰条平面细节 PLAN DETAIL AT VERTICAL FINS ANGLED SCALE:

130

参见平面 RE: SEE PLAN

参见平面 RE: SEE PLAN DIM. PT.

20

15

15 CL

200

1:5

100

50

倾斜中间段竖梃平面细节 PLAN DETAIL AT INTER MULLION ANGLED PLAN DETAIL AT INTER. MULLION ANGLED 50

200

20

1:5

130

14

801

倾斜竖梃平面细节 PLAN DETAIL AT VERTICAL MULLION ANGLED SCALE:

1:5

参见平面 RE: SEE PLAN

ALUM-03

15

CL

100

ALUM-02 ALUM-01, FIN-01

参见平面 RE: SEE PLAN DIM. PT.

SCALE:

参见立面图 RE: SEE ELEV.

850

HUAFA HENGQIN BAY PLAZA

13

PLAN DETAIL AT VERTICAL MULLION ANGLED COL


南北剖面细节 -- 通风头 通风头 南北剖面细节 N/S SECTION DETAIL AT VENT HEAD N/S SECTION DETAIL - AT VENT HEAD

15 15

SCALE: 11: 5: 5 SCALE:

05 05

配合设计人员Local LocalD 配合设计人员

AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018

广 广 G

15 15 70 70 15 15 50 50 10 10 参见立面图 参见立面图 参见立面图 参见立面图 RE: RE: RE: SEE SEE ELEV. ELEV. RE: SEE SEE ELEV. ELEV. DIM. DIM. PT. PT.

参见平面 参见平面 RE: RE: SEE SEE PLAN PLAN DIM. PT. DIM. PT.

中华 中华 证

15 15 CL CL

802 802

参见平面 参见平面 RE: RE: SEE SEE PLAN PLAN

ALUM-01,FIN-01 FIN-01 ALUM-01, ALUM-02 ALUM-02

801 801

南北剖面细节 通风窗台 -- 通风窗台 南北剖面细节 N/S SECTION DETAIL - AT VENT SILL N/S SECTION SECTION DETAIL DETAIL -- AT AT VENT VENT SILL SILL N/S SCALE: 11: 5: 5 SCALE:

802

13 13

N/S 南北剖面细节 SECTION DETAIL- -通风头 AT VENT HEAD

N/S SECTION DETAIL - AT VENT HEAD SCALE:

1:5 COL COL

05

ALUM-02 ALUM-02 建筑 / 结构单位 Architect / Engineer:

801 801

@ 水平竖框 南北剖面细节 @ 水平竖框 南北剖面细节 N/S SECTION DETAIL @ HORIZONTAL MULLION N/S SECTION DETAIL @ HORIZONTAL MULLION MULLION N/S SECTION DETAIL - AT HORIZONTAL SKIDMORE, OWINGS & MERRILL LLP ONE MARITIME PLAZA, SAN FRANCISCO, CA 94111

SCALE: 11: 5: 5 SCALE:

配合设计人员 Local Design Institute:

ALUM-02 ALUM-02

40 40

40 40

70 70

中华人民共和国建筑行业甲级 证 书 编 号: A144007371

1:5

04

900 900

SCALE:

100

参见立面图 RE: SEE ELEV.

15

70

15

ALUM-01, FIN-01

ALUM-02

SCALE:

1:5

300 300

2021.06.18

ALUM-02 ALUM-02

714 714 801 801

索引Key KeyPlan: Plan: 索引

ALUM-01, ALUM-01, FIN-02 FIN-02

745 745

03

961 961 ALUM-02 ALUM-02

ALUM-01, FIN-01

外墙细节 外墙细节

EXTER EXTER DETAI DETAIL TYPE 3 TYPE

ALUM-01,FIN-01 FIN-01 ALUM-01,

DIM. PT.

N/S SECTION DETAIL AT STACK JOINT COLUMN - STRAIGHT @.叠缝, 南北剖面细节 叠缝, 直柱 @ 南北剖面细节 直柱

N/S SECTION SECTION DETAIL DETAIL @ @ STACK STACK JOINT, JOINT, COLUMN COLUMN -- STRAIGHT STRAIGHT N/S 300

SCALE: 11: 5: 5 SCALE:

745

图名Sheet SheetName: Name: 图名

160

70

40

70

参见立面图 RE: SEE ELEV.

ALUM-02

11 11

项目北面 项目北面 Project 北北 Project North True North True North North

50 50

801

南北剖面细节 @ 水平竖框 N/S SECTION DETAIL @ HORIZONTAL MULLION

Date:

50% DESIGN DEVELOPMENT 50% 初初初初

参见立面图 参见立面图 RE: RE: SEE SEE ELEV. ELEV.

304 304 南北剖面细节 - 通风窗台 N/S SECTION DETAIL - AT VENT SILL

用途 Issued For: No.: Description:

850 850

801

745 745

CURTAINWALL WALL CURTAIN ANCHOR ANCHOR

50 50

ALUM-02

200 200

ALL LL

50 50

130 130

ALUM-01, FIN-01

顾问 Consultants:

15 15 70 70 15 15 60 60 55

305 305

15 15 70 70 15 15

15 70 15 50 10 参见立面图 参见立面图 RE: SEE ELEV. RE: SEE ELEV. DIM. PT.

802

参见立面图 RE: SEE ELEV. DIM. PT.

100 100

70 70

DIM. DIM. PT. PT.

03 03

ALUM-01,FIN-01 FIN-01 ALUM-01,

广州市设计院 GUANGZHOU DESIGN

1150 1150

100 100

ALUM-01,FIN-01 FIN-01 ALUM-01,

DIM. DIM. PT. PT.

ALUM-01, FIN-01

04 04

160 160

35 2515

参见平面 参见平面 RE: RE: SEE SEE PLAN PLAN

ALUM-02

华发横琴湾广场工程方案及深化设计 HUAFA HENGQIN BAY PLAZA

15 15 70 70 15 15

15 15

70

15

N-01 01

参见立面图 RE: SEE ELEV.

参见平面 参见平面 RE: RE: SEE SEE PLAN PLAN DIM. PT. DIM. PT.

801 ALUM-01, FIN-02

DIM. PT.

参见立面图 RE: SEE ELEV.

714

50%DESIGN DESIGND 50% 50%初初初初 初初初 50%

参见立面图 参见立面图 参见立面图 参见立面图 RE: RE: RE: SEE SEE ELEV. ELEV.DIM. PT. RE: SEE SEE ELEV. ELEV. DIM. PT.

委托设计方 Client:

用途Issued IssuedFor: For: 用途 No.: Description: Description: No.:

参见立面图 参见立面图 RE: RE: SEE SEE ELEV. ELEV.

14 14

顾问Consultants: Consultants: 顾问

01 01

项目编号Project ProjectNo.: No. 项目编号 218 21826

DrawnBy: By: Au Drawn Auth CheckedBy: By: Check Chec Checked 比例Scale Scale@@A0: A0: 比例

1 1:


ALUM-03

15

15

250

250

20

20

250 130

250 130

A

20 150

AA F

20 150

ALUM-02 ALUM-02 ALUM-01, ALUM-01, FIN-01FIN-01

801 801 ALUM-03 ALUM-03

150 150

150 150100

250 250

15

A

130

801

A F

ALUM-02 ALUM-02 150 100

100 100150

250 250 250

250

150

130

见平面 见平面 见平面 见平面 见平面 见平面 801 801 63 3 63 3 6 63 3 6 RE: SEE RE:PLAN SEE PLANRE: SEE RE:PLAN SEE PLAN RE: SEE PLAN RE: SEE PLAN DIM. PT. DIM. PT. DIM. PT. ALUM-03 ALUM-03

15

ALUM-01, ALUM-01, FIN-01FIN-01

CL

801 801 802 ALUM-03 802 ALUM-03

100 100 15

CL

130

ALUM-03 ALUM-01, FIN-01

CL

A

150

200 130

200 130

802

802 802

15 20

15

CL

50

200

200

2050

2050

801

20

200 20 130

130

130

CL

63 3 6

ALUM-03 ALUM-03 ALUM-01, ALUM-01, FIN-01FIN-01

15

见平面 见平面 66见平面 3 3 6见平面 63 36 NRE: SEE RE:PLAN SEE PLAN RE: SEE PLAN RE: SEE PLAN PT. DIM. PT. DIM. PT.

ALUM-01, FIN-01

130

ALUM-01, FIN-02

200 130

200 130

200 130 15

20

15

801 801 802 802

6 3 3 66 3 3 6

63 36

ALUM-01, ALUM-01, FIN-02FIN-02

CL

CL

802

100

ALUM-01, ALUM-01, FIN-01FIN-01

20

CL

20

6 3 36

200

200

CL

20

CL

ALUM-01, FIN-02

20

ALUM-01, ALUM-01, FIN-02FIN-02

802 802

100 100

CL

200

100

CL

CL

2050

100

CL

20

CL

100

130

CL

100 100

50

100

50

100

FACADE DETAIL

200 130

HUAFA HENGQIN BAY PLAZA

平面细节层间 侧平面细节层间 南北侧平面细节层间 南北侧平面细节通风 南北侧平面细节通风 南北侧平面细节通风 南北面平面细节竖向装饰条通风 南北面平面细节竖向装饰条通风 南北面平面细节竖向装饰条通风 SPANDREL LAN T SPANDREL DETAIL - AT N/S SPANDREL N/S PLAN PLAN DETAIL DETAIL N/S - AT - PLAN AT VENT VENT DETAIL JAMB JAMB - AT VENT N/S N/S PLAN JAMB PLAN DETAIL DETAIL N/S ATAT PLAN INTER. INTER. DETAIL MULLION MULLION AT INTER. VENT VENT JAMB MULLION JAMB VENT JAM

见平面 见平面 NRE: SEE RE:PLAN SEE PLAN PT. DIM. PT.

见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.

25 25

SCALE: SCALE: 1:5 1:5

SCALE:

1:5

见平面 见平面 见平面 见平面 RE: SEE RE:PLAN SEE PLANRE: SEE RE:PLAN SEE PLAN DIM. PT. DIM. PT.

25

见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.

20 20

SCALE: SCALE: 1:5 1:5

SCALE:

1:5

20

100 100

150 150

150 150 100 100 100 150

250 250

250 250

15 15

SCALE: SCALE: 1:5 1:5 150

250

100

SCALE:

250

平面细节层间 侧平面细节层间 南北侧平面细节通风 南北侧平面细节通风 南北面平面细节竖向装饰条通风 南北面平面细节竖向装饰条通风 南北侧平面细节层间 南北侧平面细节通风 南北面平面细节竖向装饰条通 SPANDREL T SPANDREL N/S PLAN PLAN DETAIL DETAIL - AT - PLAN AT VENT VENT JAMB JAMB N/S N/S PLAN PLAN DETAIL DETAIL ATAT INTER. INTER. MULLION MULLION VENT JAMB JAMB LAN DETAIL - ATN/S SPANDREL N/S DETAIL - AT VENT JAMB N/S PLAN DETAIL AT VENT INTER. MULLION VENT JAM N/S PLAN DETAIL AT SPANDREL N/S PLAN DETAIL AT VENT JAMB PLAN DETAIL AT INTER. MULLION VENT JAMB

50 15

15

130

200 130 250 250

150 150100

100 100150

801 801 150

250 250 250

200

200

130 100

80

300

150 150

ALUM 801

71 ALUM

130

100 100

15

50

714 714 15 ALUM-02 ALUM-02

15

300

ALUM-02

15

ALUM

714

ALUM-01, ALUM-01, FIN-01FIN-01 801 801

20

ALUM-03

714 714

300 200 130

2050

15

50

ALUM-01, ALUM-01, FIN-01FIN-01

SCALE:

50

CL

300 200

CL

50

CL

130

200 130 130

130

15

CL

ALUM-01, FIN-01 ALUM-02

20

200 130

15

CL

200

200 2050

2050

ALUM-03

63 36

20

15

CL

ALUM-01, FIN-01

63 36 3 36 63 36 见平面 见平面 见平面 见平面 见平面 见平面 RE: SEE RE:PLAN SEE PLANRE: SEE RE:PLAN SEE PLANALUM-02 RE:ALUM-02 SEE PLAN RE: SEE PLAN DIM. PT. DIM. PT. DIM. PT. 15

SCALE: SCALE: 1:5 1:5

50

50 200

200

130

ALUM-03 ALUM-03

ALUM-03 ALUM-03

15

1515

20

CL

ALUM-01, ALUM-01, FIN-01FIN-01 ALUM-02 ALUM-02

15

1:5

100 ALUM-01, ALUM-01, FIN-01FIN-01

CL

2050

200 130 20

200 130 20

15

CL

CL

63 363 36

6 33 6 见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT. 130

66 3 3 6 见平面 见平面 ANRE: SEE RE:PLAN SEE PLAN PT. DIM. PT.

2050

6 33 6

2050

663 3 6

15

CL

CL

CL

15

100

100 100

CL

SCALE:

100 100

200 130

200

100

130

100

SCALE: SCALE: 1:5 1:5

20

CL

2020

25

50

CL

1:5

200

100

50

100

SCALE:

50

2525

SCALE: SCALE: 1:5 1:5

250 ALUM-02 ALUM-02

ALUM

见平面 见平面 见平面 见平面 见平面 见平面 见平面 见平面 见平面 见平面 平 南北侧平面细节竖梃 南北侧平面细节中间竖梃 南北侧平面细节中间竖梃 南北侧平面细节中间竖梃 北侧平面细节竖向装饰条 北侧平面细节竖向装饰条 北侧平面细节竖向装饰条 AN RE:南北侧平面细节竖梃 SEE RE:PLAN SEE PLAN RE: SEE PLAN 南北侧平面细节竖梃 RE: SEE RE:PLAN SEE PLANRE: SEE RE:PLAN SEE PLAN RE: SEE PLAN RE: SEE PLAN RE: SEE PLAN PT. DIM. PT. DIM. PT. DIM.DETAIL PT. DIM. PT. DIM.MULLION PT. DETAIL AT VERTICAL MULLION N/S PLAN AT INTER. N PLAN DETAIL AT VERTICAL FINS PL LAN ERTICAL VERTICAL DETAIL MULLION MULLION AT VERTICAL N/S N/S MULLION PLAN PLAN DETAIL DETAIL N/S - AT - PLAN AT INTER. INTER. DETAIL MULLION MULLION - AT INTER. MULLION N 100PLAN N 100 PLAN DETAIL DETAIL AT N150AT PLAN VERTICAL VERTICAL FINS FINS AT VERTICAL FIN 150 150 150 100 100DETAIL 100 150 150 100

23 23

SCALE: SCALE: 1:5 1:5

COL

SCALE:

1:5

23

18 18

SCALE: SCALE: 1:5 1:5

SCALE:

18

1:5 250 250

250 250

250

13 13

SCALE: SCALE: 1:5 1:5 250 COL COL

SCALE:

COL


注解:其它细节典型尺寸、材质及板材未特别注明请参考本图纸 NOTE: REFER TO OTHER DETAILS ON THIS SHEET FOR TYPICAL DIMENSION, MATERIAL AND FINISHES NOT INDICATED

50

AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018

15 见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.

100

150

150

250

南北侧平面细节层间 N/S PLAN DETAIL - AT SPANDREL SCALE:

南北侧平面细节通风 SCALE:

100 250

南北面平面细节竖向装饰条通风 N/S PLAN DETAIL AT INTER. MULLION VENT JAMB

25 N/S PLAN DETAIL - AT VENT JAMB 20

1:5

10 0°

ALUM-02

150

15

ALUM-03

130

130

801

ALUM-03

见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.

20

801

63 3 6

63 36

WP

ALUM-01, FIN-01

20

20

ALUM-01, FIN-01

250

802

200

200

802

ALUM-01, FIN-02

1:5

SCALE:

1:5

15

CL

100

100

CL

CL

50

ALUM-01, FIN-01

ALUM-03

注解:其它细节典型尺寸、材质及板材未特别注明请参考本图纸 NOTE: REFER TO OTHER DETAILS ON THIS SHEET FOR TYPICAL DIMENSION, MATERIAL AND FINISHES NOT INDICATED

801

50 ALUM-01, FIN-01

COL

250

SCALE:

1:5

1:5

13

SCALE:

1:5

R=1300 COL @ N/S CORNERS, R=1000 @ E/W CORNERS,

WP

08

SKIDMORE, OWIN ONE MARI SAN FRANCI

714

100

ALUM-02

150

150

1:5

100

150

10 0

730 CL ALUM-01, FIN-01

10 0

15

ALUM-02 ALUM-01, FIN-01

CL

50% DESIGN DEVELOPME 50% 初初初初

15

535

0 13

ALUM-02

50 150

250

50

250 150

300 200

300

100

50

EQ.

1650 from CL. to CL.

ALUM-02

100

SCALE:

250

1:5

平面细节内角 150 200 PLAN DETAIL AT INSIDE CORNER

13

SCALE:

1:5

714

SCALE:

平面细节圆角 PLAN DETAIL AT CURVE CORNER

08

COL

PLAN DETAIL AT CURVE CORNER SCALE:

1:5

平面细节内角 PLAN DETAIL AT INSIDE CORNER

13

301

SCALE:

COL

1:5

100x200 ST. BOX BEAM

21 A8.01

08

平面细节圆角 PLAN DETAIL AT CURVE CORNER SCALE:

714 100x200 ST. BOX BEAM 730 301

50

869

730

869 730

801

522

ALUM-02

500 50

1:5

21 A8.01

ALUM-02

ALUM-01, FIN-01

索引 Key Plan:

150 730 ALUM-02

535 869

522

北 True North

1160

ALUM-03 535 ALUM-02

北 True North

ALUM-02

项目北面 Project North

索引 Key Plan:

150

50

03

200

130

ALUM-01, FIN-01

130 250

03

869

ALUM-03

801 ALUM-02

500

1:5

714

北侧平面细节竖向装饰条 N PLAN DETAIL AT VERTICAL FINS

18

100

1160

100

50

150

1:5

250

ALUM-02 北侧平面细节竖向装饰条 COLUMN COVER N PLAN DETAIL AT VERTICAL FINS

18

714 ALUM-03

360

SCALE:

801

EQ 200

150

20

南北侧平面细节中间竖梃 PLAN DETAIL - AT INTER. MULLION

100

150 见平面 RE: SEE PLAN

200 360

1:5

21

301

130

见平面 RE: SEE PLAN

130 SCALE:

1:5

15

ALUM-02 714

300

15

SCALE:

PLAN DETAIL AT 见平面 南北侧平面细节中间竖梃 见平面 RE: SEE PLAN RE: SEE PLAN PLAN DETAIL -DIM.AT PT. INTER. MULLION

ALUM-02

15 500

100 平面细节柱面 150 150 PLAN DETAIL AT COL. COVER 250

9/9/2021 12:09:01 PM

15

50

200 700

ALUM-02

ALUM-03

130

130

100 ALUM-03

301

801 ALUM-01, FIN-01

15

见平面 6 3 3 6见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.

15

200 300

5020

714

15

200

ALUM-02 ALUM-01, FIN-01

ALUM-02

0 13

CL ALUM-03

50% DESIGN DEVELOPME 50% 初初初初

20

ALUM-01, FIN-01

CL

CL

200

ALUM-01, FIN-01

用途 Issued For: No.: Description:

0 20

50

50

50

ALUM-02

63 36

ALUM-03

50

CL

顾问 用途 Consultants: Issued For: No.: Description:

801

20

130

500

ALUM-03

869

ALUM-03 CL

0 20

500

1:5

ALUM-01, FIN-01 801

广州市 GUANGZH

中华人民共 证 书 编

50

SCALE:

CL

顾问 Consultants:

ALUM-02

801

250

南北面平面细节竖向装饰条通风 N/S PLAN DETAIL AT INTER. MULLION VENT JAMB

20

15

50

SCALE:

100

广州市 GUANGZH

中华人民共 证 书 编

配合设计人员 Local Design Institut

南北面平面细节竖向装饰条通风 N/S PLAN DETAIL AT INTER. MULLION VENT JAMB

20

SKIDMORE, OWIN ONE MARI SAN FRANCI

301

250

100

100

建筑 / 结构单位 Architect / Enginee 配合设计人员 Local Design Institut

100x200 ST. BOX BEAM

10 0°

150

250

1:5

SCALE:

华发横琴湾广场工 HUAFA HENG

20 150 150 250

SCALE:

18

130

130

ALUM-03

100

15

1:5

1:5

建筑 / 结构单位 Architect / Enginee

CL

平面细节内角 PLAN DETAIL AT INSIDE CORNER

801

ALUM-03

SCALE:

SCALE:

ALUM-01, FIN-01

20

801

委托设计方 Client:

200

R=1300 @ N/S CORNERS, R=1000 @ E/W CORNERS,

100

802 ALUM-02

15 见平面 见平面 RE: SEE PLAN RE: SEE PLAN 63 3 6 DIM. PT.

250

北侧平面细节竖向装饰条 N PLAN DETAIL AT VERTICAL FINS

20

23

250 130

802 ALUM-03

250 WP

南北侧平面细节中间竖梃 801 N/S PLAN DETAIL - AT INTER. MULLION ALUM-03

200

63 3 6

130

5020

南北侧平面细节竖梃 801 N/S PLAN DETAIL AT VERTICAL MULLION

华发横琴湾广场工 HUAFA HENG

714

150

注解:其它细节典型尺寸、材质及板材未特别注明请参考本图纸 NOTE: REFER TO OTHER DETAILS ON THIS SHEET 150 FOR TYPICAL 100 100 150 DIMENSION, MATERIAL AND FINISHES NOT INDICATED

ALUM-01, FIN-01

CL

CL

ALUM-02

CL

ALUM-02

见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT. 802

200

ALUM-01, FIN-01

ALUM-03

100

CL

见平面 见平面 RE: SEE PLAN RE: SEE PLAN DIM. PT.

802

100

15

10 0°

CL

委托设计方 Client:

301

100 15

200

714

15

ALUM-02

130

130

63 36

130

6 33 6

20

20

200

200

ALUM-01, FIN-01

300

50

50

CL

南北侧平面细节通风 ETAIL - AT VENT JAMB

N

CL

CL CL

130

100

南北侧平面细节通风 见平面 见平面 SEE PLAN RE: SEE PLAN ETAIL - RE: AT VENT DIM. PT. JAMB

N

100

项目北面 Project North

ALUM-02

50

图名 Sheet Name:

外墙细节(3A

250

ALUM-02

15

EQ

50

100

300

100

50

1650 from CL. to CL.

见平面 RE: SEE PLAN

EXTERIOR DETAILS (W TYPE 3A)

200

EQ. 2200 FROM CL. TO CL.

图名 Sheet Name:

01 PLAN DETAIL AT OUTRIGGER / COLUMN COVER SCALE:

15 见平面 RE: SEE PLAN

外墙细节(3A

平面细节-悬臂/柱面 PLAN DETAIL - AT OUTRIGGER/ COL. COVER

EQ

50

100

300 1650 from CL. to CL.

100

50

EQ.

1:5

200

项目编号 Project No.: 218261

EXTERIOR DETAILSA8 (W TYPE 3A)

Drawn By:

Checked By:

比例 Scale @ A0:

2200 FROM CL. TO CL.

平面细节-悬臂/柱面 PLAN DETAIL - AT OUTRIGGER/ COL. COVER SCALE:

1:5

01

1:5

项目编号 Project No.: 218261

Drawn By: Checked By:

图纸编号

Author

Checker

Author Checker

比例 Scale @ A0:

图纸编号

A8


HUAFA HENGQIN BAY PLAZA

FACADE DETAIL

30

33

STAINLESS STEEL CAP GL-2A

568

T.O.1100

578

511

DIM. PT.

718

185

GLAZING SHOE

50 15

765 451

SEC

900 O.C.

ALUM-02

50

720 716 720 774

630

840

307

305

参见立面图 RE: SEE ELEV.

761

42 15

715

ALUM-02

SE

714

380

801

50

ALUM-01, FIN-02

ALUM-02

SECTION DETAIL AT PODIUM COPING 剖面细节盖板 SECTION DETAIL @ PODIUM COPING SCALE:

1:5

22

S


9/2021 12:09:42 PM

T. 765 451

SCALE:

1:5

GLAZING SHOE

参见立面图 RE: SEE ELEV.

50

801

12

DIM. PT.

剖面细节横挺 SECTION DETAIL @ TYP. PODIUM HORIZONTAL SCALE:

718

1:5

02

511

720 CL

CL

CL

125

50

125

CL

720 307

HSS 125X200 AT 14M HSS 100X200 AT <=9M

305

150

714

150

630

150

840

200

250

200

250

ALUM-01, FIN-01

801

ALUM-01, FIN-01

150

ALUM-01, FIN-01

150

200

774 250

CL

150

716

900 O.C.

AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2018

185

剖面细节扶手 SECTION DETAIL @ GUARD RAIL

ALUM-02

参见立面图 RE: SEE ELEV.

参见立面图 RE: SEE ELEV.

801

SEC 20

ALUM-01, FIN-01

ALUM-02

50 15

参见立面图 RE: SEE ELEV. DIM. PT.

R20

801

350

见平面 RE: SEE PLAN

平面细节竖向金属装饰条 PLAN DETAIL @ VERTICAL METAL SCALE:

PLAN DETAIL AT VERTICAL METAL

1:5

11

见平面 RE: SEE PLAN

ALUM-01, FIN-02

42 15 42

见平面 RE: SEE PLAN DIM. PT.

见平面 RE: SEE PLAN

ALUM-02 平面细节层间 PLAN DETAIL - @ SPANDRAL SCALE:

1:5

PLAN DETAIL AT SPANDRAL

06

剖面细节盖板 SECTION DETAIL @ PODIUM COPING 1:5

PLAN DETAIL AT MULLION

SCALE:

22

801

ALUM-01, FIN-01

01

CL

511

765 774 761

625

744

RATED BARRIER

900

715

745

ALUM-02

ALUM-01, FIN-01 801

参见立面图 RE: SEE ELEV.

150

511

15

302

175

730

DIM. PT.

25

40

55

ALUM-02

1:5

S 参见立面图 RE: SEE ELEV.

SCALE:

见平面 RE: SEE PLAN DIM. PT.

平面细节横挺 PLAN DETAIL @ MULLION

50

350

380

801

42 15 42 见平面 RE: SEE PLAN

50

714

70 200

40 20 40

ALUM-02

SE

ALUM-02

42 15

100 200

ALUM-02

70

ALUM-03

100

50

ALUM-01, FIN-02

100

50

714

715

参见立面图 RE: SEE ELEV.

761

见平面 RE: SEE PLAN

SECTION DETAIL AT STACK JOINT PODIUM

剖面细节叠缝 SECTION DETAIL @ STACK JOINT PODIUM SCALE:

1:5

21

PL


UCSF RESEARCH AND ACADEMIC BUILDING

PROJECT OVERVIEW

PROJECT OVERVIEW The five-story building is rising at the corner of 23rd and Vermont Street in the Mission District is the latest addition to the UCSF Zuckerberg San Francisco General Hospital and Trauma Center, or ZSFG. The five-story building is rising at the corner of 23rd and Vermont Street in the Mission District is the latest addition to the UCSF Zuckerberg San Francisco General Hospital and Trauma Center, or ZSFG. The new research building will add 175,000 square feet to ZSFG and will include modern research and academic facilities, wet and dry laboratories, a patient research center, and additional teaching and collaboration areas. The educational spaces will consist of a Surgical Training Facility and a Biomechanics testing laboratory.

The building is located on the historic hospital campus, which contains buildings from several different architectural periods, the oldest dating from the time of the First World War. The new building will need to respond appropriately to the adjacent historic architecture while establishing its own identity as a UCSF building on the ZSFG campus. Construction is estimated to cost $275 million. The building was approved in late 2019, with work starting in 2020 and completion expected this summer. The building is aiming to receive LEED Silver certification or higher. Copyright: https://sfyimby.com/2022/04/construction-underway-on-ucsfresearch-building-at-s-f-general-hospital.html

The UCSF Research and Academic Building at ZSFG is a seismic replacement project for UCSF research faculty and staff located in buildings on the ZSFG campus


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021

UCSF Research & Academic Building San Francidco, Californina, USA Client // UCSF Zuckerberg San Francisco General Hospital Plot Area // 15,213 sqft Project Size // 97,884 sqft


DESIGNATED ACCESSIBLE WORKSTATIONS

UCSF RES AND ACA BUILDING

1-HR FIRE-RESISTIVE RATING 2-HR FIRE-RESISTIVE RATING

EXTERIOR WALL GENERAL NOTES

SMOKE PARTITION

1. ALL EXTERIOR WALL ASSEMBLIES TO ACHIEVE STC-28, EXCEPT WHERE STC REQUIREMENTS ARE NOTED.

1

BUILDIN 1001 POTRER SAN FRANCISC ASSESSOR BLOCK

CONTRACTOR

UCSF RESEARCH AND ACADEMIC BUILDING

FLOOR PLANS

THE BOLDT COMPANY 375 BEALE STREET, SUITE SAN FRANCISCO, CA 94105

ARCHITECT

SKIDMORE, OWINGS & MER ONE MARITIME PLAZA SAN FRANCISCO, CA 94111

CIVIL FREYER & LAURETA, INC 150 EXECUTIVE PARK BLVD SAN FRANCISCO, CA 94134

STRUCTURAL DEGENKOLB 375 BEALE STREET, SUITE SAN FRANCISCO, CA 94105

MECHANICAL TAYLOR ENGINEERING 1080 MARINA VILLAGE PAR ALAMEDA, CA 94501

02

03

25'-6"

04

28'-0"

05

21'-0"

DN

CIRCULATION 3202

18'-9"

BSL2* GOWNING

30'-4"

3200

3220

BSL2* AUTOCLAVE

TOILETS - MEN

EXTERIOR WALL WINDOW ASSEMBLIES

TO ACHIEVE STC-31

30'-0"

3110

19'-4"

ELECTRICAL SILVERMAN & LIGHT 1201 PARK AVENUE, SUITE EMERYVILLE, CA 94608 LAB PLANNER JACOBS CONSULTANCY 401 B STREET, SUITE 1560 SAN DIEGO, CA 92101

18 A-3102

LANDSCAPE ARCHITECT MANTLE 930 CARLTON STREET, 2ND BERKELEY, CA 94710

TISSUE CULTURE 3308

3E1

D RFI#289

MECH SHAFT

3850

3901

ASSIGNABLE WORKSTATIONS - TYP.

OFFICE 3908

CONFERENCE SMALL

OFFICE

LINEAR EQUIPMENT

3801

ASSIGNABLE WORKSTATIONS - TYP.

OFFICE

STERILE STORAGE 3406

C 3751

OFFICE

3807

OFFICE

3709

3702

ASSIGNABLE WORKSTATIONS - TYP.

OFFICE 3708

3950

MOCK-UP 2 EXTENTS 1 A

EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31

BSL3 PROCEDURE 3521

UCSF RES AND ACA BUILDING

1. ALL EXTERIOR WALL ASSEMBLIES TO ACHIEVE STC-28, EXCEPT WHERE STC REQUIREMENTS 3532A ARE NOTED.

PLUMBING

BSL3 EQUIPMENT

ABSL3 - B PROCEDURE

3M1

3531

3525

UP B

ABSL3 PROCEDURE

ABSL3 HOLDING

3530

3526

BUILDIN 1001 POTRER SAN FRANCISC ASSESSOR BLOCK

CONTRACTOR

CIRCULATION 3650

3704

ARCHITECT

18 A-4201

3S2

3740

3705

THE BOLDT COMPANY 375 BEALE STREET, SUITE SAN FRANCISCO, CA 94105

EXIT STAIR 2

HUDDLE

OFFICE

3870

DN

3660

3703 OFFICE

CIRCULATION

CIRCULATION

3650

SATELLITE SERVICE CENTER

OFFICE

3700

06 A-4302

1 CIRCULATION

3T4

OFFICE

HOTEL OFFICE HOTEL OFFICE OFFICE 3804 3805 3707

3803

3808

SMOKE PARTITION TOILET (GENDER INCL)

SS4

3760

3550

BSL3 AUTOCLAVE DIRTY

3471

BSL3 3534 ELEC RISER PROCEDURE 3404 EMERGENCY RESP CLO 3L2 BSL3 GENERAL NOTES - FLOOR PLANS 3522 INF WASTE STO AUTOCLAVE 3473 CLO CLEAN 1. REFER TO SHEETS A-1103-A FOR TYPICAL EXTERIOR ENCLOSURE DETAIL ACCESSIBLE LABS MECH SHAFT 02 3474 CALLOUTS BSL3 AND DIMENSIONS, UON. S/V ELEV 3533 PROCEDURE SS3 2. REFER TO A-41 SERIES ENLARGED SECTORA-2101 FLOOR PLANS FOR INTERIOR ACCESSIBLE SINKS / FUME HOODS 3E2 TOILET (GENDER DIMENSIONS3523 & ELEVATIONS. BSL3 - COLD INCL) GOWN DESIGNATED ACCESSIBLE WORKSTATIONS 3T3 P/S ELEV CIRCULATION 3532 AIR LOCK 1-HR FIRE-RESISTIVE RATING 3500 3E3 BSL3 - IMAGING 3C5 STORAGE BSL3EXTERIOR - WARM WALL GENERAL NOTES 2-HR FIRE-RESISTIVE RATING 3524 3701 GOWN

PLUMB RISER

3802 OFFICE

3520

B LEGEND

STORAGE

CONFERENCE SMALL

3472

BSL3 - LAB

CIRCULATION

A ENVIRONMENTAL EQUIPMENT ROOM

3403

3750 OFFICE

3809

3904

3903

3906

3F1

3810

3800

3907

CPF

3L1

OFFICE

OFFICE HOTEL OFFICE HOTEL OFFICE

OFFICE

ELEC

NO. DESCRIPTION SCHEMATIC DESIGN 50% DESIGN DEVELOP 100% DESIGN DEVELOP CONSTRUCTION DOCU CONSTRUCTION DOCU 1 BACKCHECK 1 A BULLETIN A B BULLETIN B C BULLETIN C D BULLETIN D

3551

FLEX

CIRCULATION

OFFICE

3860

3902

3900

3407

3F2

3851

OFFICE

STERILIZER ALCOVE

3304

CPF

CIRCULATION STORAGE

3909

FUME HOOD

3305

3800

SS2

3400

3408

TISSUE CULTURE

ASSIGNABLE WORKSTATIONS - WET

BSL3 EMERGENCY EXIT VESTIBULE

3461

LINEAR EQUIPMENT C

3460 EQUIPMENT

OPEN LAB

3409

3303

1

3307

OFFICE

3100

3309

C

1

FLEX

OFFICE

HUDDLE

PLUMBING SOUTHLAND INDUSTRIES 33225 WESTERN AVENUE UNION CITY, CA 94587

17

21'-0"

LINEAR EQUIPMENT

3450 TISSUE CULTURE FUME HOOD 3401 3402

A

TISSUE CULTURE

LINEAR EQUIPMENT

3225

P ELEV

C

3410

3411

3302

C

LINEAR EQUIPMENT

FUME HOOD

3900

3C1

3010

16

22'-8"

CIRCULATION

TISSUE CULTURE

TISSUE CULTURE

MICROSCOPY 1

3300

3226

3910 03 A-4301

TOWN CENTER

TISSUE CULTURE

C

3301

OPEN LAB

TISSUE CULTURE ASSIGNABLE WORKSTATIONS - WET

EQUIPMENT/ DARK D 1

3310

3224

3201

SERVICE CENTER

3312

1

FLEX

BSL2* EQUIPMENT

3T1

3J1

TISSUE CULTURE

3311

LINEAR EQUIPMENT

CIRCULATION

6'-7"

19'-9"

OPEN LAB

EQUIPMENT

3221

SS1

3T2

3'-3"

BSL2* OPEN LAB

PLUMB RISER

JANITOR CLO

C

FLEX 1

1

MECH SHAFT

3203 TOILETS WOMEN

HUDDLE

CIRCULATION

3222

3011

3030

15

21'-0"

03 A-3102

3440

C

1

1

VENDING

CONFERENCE MEDIUM

3020

A

14

21'-0"

A EXTERIOR WALL WINDOW ASSEMBLIES

3250

3240

BSL2* A EQUIPMENT 3204

03 A-3101

B

13

21'-0"

04 A-2101

SKIDMORE, OWINGS & MER ONE MARITIME PLAZA SAN FRANCISCO, CA 94111

01 / A-1103-A 01 / A-1103-B

31'-0"

MOCK-UP 1 EXTENTS

01 A-3101

12

21'-0"

TO ACHIEVE STC-35

BSL2* BSL2* BSL2* TISSUE EQUIPMENT CULTURE EQUIPMENT ALCOVE 3207 3206 3205

3S1

17 A-2101

11

21'-0"

CIRCULATION

CIRCULATION

1

EXIT STAIR 1

UP

10

21'-0"

MOCK-UP 1 EXTENTS

1

A

09

21'-0"

1

E

B

08

21'-0"

01 A-3102 06 A-4201

C

07

21'-0"

5'-6"

D

06

21'-0"

01 / A-1103-A 01 / A-1103-B

01

01 A-2101

CIVIL FREYER & LAURETA, INC 150 EXECUTIVE PARK BLVD SAN FRANCISCO, CA 94134

STRUCTURAL DEGENKOLB 375 BEALE STREET, SUITE SAN FRANCISCO, CA 94105

B

LEVEL THREE FLOOR PLAN 02

03 28'-0"

05

21'-0"

06

21'-0"

07

21'-0"

08

21'-0"

09

21'-0"

21'-0"

11

21'-0"

01 A-3102 06 A-4201

10

12

21'-0"

13

21'-0"

14

21'-0"

15

21'-0"

22'-8"

CIRCULATION

2220

2S1

2203

1

DN

LINEAR EQUIPMENT

CIRCULATION

2209

TOILETS - MEN

2E1 2853

1

ASSIGNABLE WORKSTATIONS - TYP.

OFFICE 2908

2010

STORAGE

2852

2851

A EQUIPMENT

IDF

ELEC

OFFICE

OFFICE

HUDDLE

2907

2903

2100

OFFICE

CIRCULATION

2906

2840

2801 ASSIGNABLE WORKSTATIONS - WET

2808

HOTEL OFFICE HOTEL OFFICE OFFICE 2904 2806 2807

ASSIGNABLE WORKSTATIONS - TYP.

2702

2803

MOCK-UP 2 EXTENTS

2804

B

2701

2805

DN

2600 RATING 2-HR FIRE-RESISTIVE

CIRCULATION

CIRCULATION

2740

2700

UP

B B

DESIGNATED ACCESSIBLE WORKSTATIONS MCC - OPEN LAB & 1-HR FIRE-RESISTIVE RATING WORKSTATIONS

2700

OFFICE HOTEL OFFICE HOTEL OFFICE OFFICE

CIRCULATION CENTRAL MAIL 2651 2650

MCC CYTROMETRY ACCESSIBLE LABS 1 2620 2610 ACCESSIBLE SINKS / FUME HOODS

2700

OFFICE

2760

2802

2800

2703

CONFERENCE SMALL

OFFICE

TOILET (GENDER 04 INCL) A-4302 1 2T4

SS4 ASSIGNABLE WORKSTATIONSLEGEND MCC - CELL - WET SORTER

OFFICE

OFFICE

2809

2E3

2T3

2652 PLUMBING RISER

2751

P/S ELEV

C

A BULLETIN A 218024

B BULLETIN B SHEET NAME C BULLETIN C D BULLETIN D

LEVEL 3 FL PLAN - OV

15 COMPACTOR A-4201 FG +89' - 4 1/4" C (89.35') RFI#157 FG +89' - 5" LOADING DOCK (89.42') 2500 A TRUCK BAY 1 FG +89' - 5" (89.42') A

02 A-2101

SCALE:

3/32" = 1'-0"

2S2

01

SHEET NUMBER

A

+88' - 10 215/256" (88.90') +88' - 9 31/32" (88.83')

A

A FG +89' - 2 1/2" FG +88' - 4 3/8" (89.21') FG +88' - 11 1/2" (88.36') (88.96') TRUCK BAY 2 A LOADING DOCK +87' - 11 1/4" GENERAL NOTES FLOOR PLANS STAGING (87.94') FG +87' - 11 57/256" 2501 1. REFER(87.94') FGEXTERIOR +87' - 10 3/4" TO SHEETS A-1103-A FOR TYPICAL ENCLOSURE DETAIL (87.90') CALLOUTS ELEC AND DIMENSIONS, UON. UTILITY 2. REFER TO A-41 SERIES ENLARGED SECTOR+87' FLOOR - 10" PLANS FOR INTERIOR 2L3 DIMENSIONS & ELEVATIONS. (87.83') C

UCSF RESEARC AND ACADEMI BUILDING AT ZS

FG +89' - 2 1/2" INF WASTE (89.21') A EXTERIOR WALL GENERAL 2553 NOTES FG +88' - 7 1/2" (88.63') 1. ALL EXTERIOR WALL ASSEMBLIES TO ACHIEVE STC-28, EXCEPT WHERE STC REQUIREMENTS ARE NOTED.

EXIT STAIR 2

SMOKE PARTITION

A

+88' - 10 85/128" (88.89') +88' - 11 55/128" (88.95')

TRASH

2E2

TOILET (GENDER INCL)

STORAGE

A

STORAGE

CIRCULATION

SS3

2410

2401

2F1

2L1

ELEC S/V ELEV

2C5

ZSFG

B

A LEVEL 3 FLOOR PLAN - OVERALL

2S3

2450

2M1 FG +89' - 7" (89.58')

+89' - 5 3/4" (89.48')

2550

SERVICE STAIR

AIR LOCK

MECH SHAFT

EQUIPMENT

UP

2451

A C

2402

FUEL PUMP

CIRCULATION

FG +89' - 6 201/256" (89.57') FG +89' - 6 105/256" (89.53') FG +89' - 9" RECYCLING (89.75') COMPACTOR

CIRCULATION

2452

1

EQUIPMENT

2308

2750

OFFICE

2860

2902

STORAGE

OFFICE

CONFERENCE SMALL

OFFICE

FUME HOOD

EQUIPMENT

TISSUE CULTURE 2311

SS2

2900

10'-6"

30'-0"

A

2901

2909

2110 TOWN CENTER

2309

MAINT CLO CIRCULATION 2460 2J2 EMERGENCY RESP CLO

INF WASTE STO CLO

2850

OFFICE

OFFICE

SERVICE CENTER B

TO ACHIEVE STC-31

A

EXTERIOR WALL WINDOW ASSEMBLIES

B

TISSUE CULTURE

2310

MECH SHAFT

CIRCULATION

03 A-4301

2C1

SMALL FLEX

EQUIPMENT 2301

2F2

STORAGE

2T2

2302

D RFI#289 IDF

P ELEV

CIRCULATION

STERILE STORAGE

2303

BUILDING 7 1001 POTRERO AVENU SAN FRANCISCO, CA 941 ASSESSOR'S LOT 1 BLOCK 4154

08 A-4201

B

01 / A-1102-A 01 / A-1102-B

31'-0" 19'-9"

2212

2900

C

2409

2350

STERILIZER ALCOVE

2408

2400

1

CIRCULATION

2304

2210

1

2321

1

1 FUME HOOD

2211

MASS SPECTROMETRY - PREP

2300

C

LINEAR EQUIPMENT

TISSUE CULTURE

TISSUE CULTURE

ASSIGNABLE WORKSTATIONS - WET

2J1

2020

2305

SS1

JANITOR CLO HUDDLE

2208

LINEAR EQUIPMENT

2T1

01 A-3101

MICROSCOPY

MECH SHAFT

TOILETS WOMEN

2030

LARGE FLEX

OPEN LAB CHEMISTRY

2462

2461

FUME HOOD

8% 2.6

18'-9"

2201

2C1

CONFERENCE MEDIUM

2200

2202

1

2320

OPEN LAB

CYLINDER / BULK C02 TANK STORAGE LN2 DISPENSING

2407

C

MASS SPECTROMETRY

NO. DESCRIPTION SCHEMATIC DESIGN 50% DESIGN DEVELOP CAMPUS 100% DESIGN DEVELOP CONSTRUCTION DOCU CONSTRUCTION DOCU 1 BACKCHECK 1 PROJECT NUMBER UC 2 BACKCHECK 2

% 1.87

03 A-3101

11/15/2021 5:27:04 PM

2306

OPEN LAB

MOCK-UP 1 EXTENTS

UP

C

TISSUE CULTURE

2207

LANDSCAPE ARCHITECT MANTLE 930 CARLTON STREET, 2ND BERKELEY, CA 94710

2552

D JUST-IN-TIME CHEMICAL STORAGE 2 2551 FG +89' - 8 3/4" (89.73')

FUME HOOD

2405

LARGE FLEX 1

LARGE FLEX

D

FUME HOOD

2230

C

TISSUE CULTURE

EXIT STAIR 1

LAB PLANNER JACOBS CONSULTANCY 401 B STREET, SUITE 1560 SEAL & SIGNATURE SAN DIEGO, CA 92101

FLAMMABLE CHEMICAL WASTE STORAGE

B

B

CIRCULATION

1

18 A-3102 A

EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31

MOCK-UP 1 EXTENTS

ELECTRICAL SILVERMAN & LIGHT 1201 PARK AVENUE, SUITE EMERYVILLE, CA 94608

19'-4"

03 A-3102

04 A-2101

PLUMBING SOUTHLAND INDUSTRIES KEYPLAN 33225 WESTERN AVENUE UNION CITY, CA 94587

17

21'-0"

1

E

16

1.1 2%

25'-6"

04

01 / A-1102-A 01 / A-1102-B

01

MECHANICAL TAYLOR ENGINEERING 1080 MARINA VILLAGE PAR ALAMEDA, CA 94501

01 A-2101

CONTRACTOR

EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B 5'-6"

THE BOLDT COMPANY 375 BEALE STREET, SUITE 500 SAN FRANCISCO, CA 94105

355'-0"

ARCHITECT

SEE LEVEL 1 FLOOR PLAN FOR BUILDING AT GRADE

SKIDMORE, OWINGS & MERRILL LLP ONE MARITIMEKEYPLAN PLAZA SAN FRANCISCO, CA 94111

CIVIL FREYER & LAURETA, INC 150 EXECUTIVE PARK BLVD., SUITE 4200 SAN FRANCISCO, CA 94134 STRUCTURAL DEGENKOLB 375 BEALE STREET, SUITE 500 SAN FRANCISCO, CA 94105 SEAL & SIGNATURE

LEVEL TWO FLOOR PLAN 01

MECHANICAL TAYLOR ENGINEERING 1080 MARINA VILLAGE PARKWAY, SUITE 50 ALAMEDA, CA 94501

02

25'-6"

03

28'-0"

04

21'-0"

05

21'-0"

06

21'-0"

07

21'-0"

21'-0"

08

09

21'-0"

10

21'-0"

11

21'-0"

12

21'-0"

13

21'-0"

14

21'-0"

15

22'-8"

21'-0"

16

19'-4"

PLUMBING SOUTHLAND INDUSTRIES 33225 WESTERN AVENUE UNION CITY, CA 94587

17

ELECTRICAL CAMPUS SILVERMAN & LIGHT 1201 PARK AVENUE, SUITE 100 EMERYVILLE, CA 94608

315'-2" 10'-2 1/4"

44'-8 1/2" B

18'-2 1/2" B

23'-9 1/2" B

ZSFG

18'-2 1/2" B

194'-6 3/4" B

01 A-3102 FAC SERVICES CHANGE / LOCKERS

2'-2"

1202

EXIT STAIR 1

INTERVIEW

1S1

RECEPTION

1201

1200

31'-0"

CIRCULATIONTOILET INTERVIEW 1206 1207 1204

1'-8"

UP

18'-9"

03 A-3101

A

17 A-2101

103'-10"

INTERVIEW

EXAM

1205

1327

A

ENTRANCE HALL

RECEPTION

1C1

1010

01 A-3101

LACTATION

INTERVIEW

RECEPTIONWAITING AREA ADULT INTERVIEW 1300

1310

1325 INTERVIEW

VITAL SIGN STATION 1324

1326 CLEAN

SOILED

1320

1318

EXAM 1316

EXAM 1314

19'-9"

VENDING

FOCUS GROUP

INTERVIEW

1317

1321

C1

1935

68'-6"

CIRCULATION

B

1950A

LARGE CONFERENCE 1950

TOILET 1312

1C3

PROCESSING LAB

CENTRAL SAMPLE STORAGE

1305

1410

P ELEV

LARGE CONFERENCE

LARGE CONFERENCE

1940

1930

1308

1E1

02 A-4301

1508A

1508

UPS

VIV - SMALL PROCEDURE

VIV - SMALL HOLDING

1480

1507A

1507

C1

C1 SERVER

1

1J1

1505A

STORAGE 1930A

CATERING

EQUIPMENT

ELEC

1420

1L1

C1

C1

CONFERENCE ROOM (LEARNING CTR) 1920

STF - WOMEN'S LOCKER 1805

B STF - SAW BONE LAB

VIV - IRRA 1511

1505

BDF 1F1

1807

SIMULATION LAB

1C2

1T4

B

1800

01 A-2101

DATE 2019 2019 2019 2020 2020 2020 2020 2020 2021 2021 2021

A

B

02 A-2101

LOADING DOCK EXTENT ABOVE

IT WORKROOM 1580

UP 01 A-5002

SIM.

1

1S2 1

1802 B

NO. DESCRIPTION SCHEMATIC DESIGN SHEET NUMBER 50% DESIGN DEVELOPMENT 100% DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONSTRUCTION DOCUMENTS 1 BACKCHECK 1 A BULLETIN A B BULLETIN B C BULLETIN C C1 BULLETIN C RESUBMITTAL D BULLETIN D

01

EXIT STAIR 2

STF DISSECTION

B

3/32" = 1'-0"

1

1700 1801

1803

B

01 A-4302

STF - CTR

STF - LINEAR EQUIPMENT

1804

1910A

1M1

B VIV - GOWNINGVALVE CLOSET INF WASTE STO VIV - ANIMAL WATER CLO 1520 1500 1M2 1560 VIV - CLEAN VIV - SMALL VIV - SMALL CAGE STAGING /VIV - WORK SPACE CIRCULATION PROCEDURE S/V ELEV HOLDING FEED 1501 TOILET (GENDER 1504 1E2 1503 AIR LOCK 1502 INCL) 1C5 1T3 FAC SERVICES P/S ELEV MPOE SHOP / JANITOR / MAINT STORAGE 1E3 1F2 1J2 TOILET (GENDER 1600 INCL)

STF - SURGICAL TRAINING LAB

1808

STF - MEN'S LOCKER

SIM LAB ANTE-ROOM

PLUMBING

BTF - C-ARM WORK SPACE

STF AUTOCLAVE / CLEAN STORAGE

1

B

1550 D VIV - HOLDING/ PROCEDURE VIV - HOUSING VIV - STORAGEVIV - AIR LOCK (TESTING) 1517 1515 1519 1513

B

1910

PERFORATED FOUNDATION DRAIN PIPE AS REQUIRED, (RE: CIVIL)

CIRCULATION

VIV - LARGE PROCEDURE

CIRCULATION C1

LANDSCAPE ARCHITECT MANTLE 930 CARLTON STREET, 2ND FLOOR BERKELEY, CA 94710

1518

1516

UC

LEVEL 2 FL PLAN - OV

1

SCALE:

VIV - SMALL VIV - SMALL PROCEDURE HOLDING 1506A 1506

VIV - HOLDING

1495

1514

01 A-5002

PROJECT NUMBER LAB PLANNER 218024 JACOBS CONSULTANCY 401 B STREET, SUITE 1560 SHEET NAME SAN DIEGO, CA 92101

18 A-3102

2'-6"

LEVEL 2 FLOOR PLAN - OVERALL

PRE-ACTION CLOSET

1306

1930B

EDGE OF BUILDING ABOVE

CUST. EQUIP B

B

A

1 3/8"

CIRCULATION

RES. KIT. STO.

AV CLOSET

A

PHLEBOTOMY

VIV - SMALL HOLDING

1490

PRE-FUNCTION 1011

1461A 1461B

1512

1510

VIV - SMALL PROCEDURE

1309

1C1

STORAGE

1440

1470

1304

RA STATION

PLUMB RISER

TOWN CENTER

BIKE SHOWERS WOMEN

1462

EXAM

03 A-3102 D VIV - HOLDING/ VIV - HOLDING/ VIV - HOLDING/ VIV PROCEDURE PROCEDURE PROCEDURE VIV - DIRTY (TESTING) (TESTING) CAGE STAGING AUTOCLAVE (TESTING)

BIKE STORAGE

1303 C

INTERVIEW INTERVIEW VITAL SIGN TOILET INTERVIEW STATION 1328 1336 1332 1330 1334

1323

1T2

30'-0"

RA STATION

1350

04 A-2101

FAC OFFICE / BMS OFFICE

1302 C

CIRCULATION

RA STATION

1T1

TOILETS - MEN

1012

1301

1333

1329

RA STATION

1020 TOILETS WOMEN

1331

TEAM WORKROOM

01 / A-1101-A 01 / A-1101-B

D

INTERVIEW

WAITING AREA CHILDREN

1203

2'-2"

11/15/2021 5:26:19 PM

15 A-3301

INTERVIEW 01 A-4201

C

FAC TEAM BIKE SHOWERS WORKROOM MEN 1460 1450

1461

E

01 / A-1101-A 01 / A-1101-B

B 3'-6"

PARTIALLY BELOW GRADE: SEE LEVEL 2 FLOOR PLAN FOR GRADE AT EAST SIDE OF THE BUILDING

BTF - MTS BTF - STORAGE WORKSTATIONS 1701 1702

C

B

SWITCHGEAR ENCLOSURE @ GRADE ABOVE

03 A-4201

2'-6"

3'-5 3/8"

2'-2 1/4" 26'-9 1/8"

286'-4 1/4" 313'-1 3/8" KEYPLAN

LEVEL ONE FLOOR PLAN

SEAL & SIGNATURE

CAMPUS

ZSFG PROJECT NUMBER

218024 SHEET NAME

30

UCSF PROJECT N

PR


A

UCSF RE AND AC BUILDING

BUILD 1001 POTRE SAN FRANCIS ASSESSO BLOC

CONTRACTOR

AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021

THE BOLDT COMPANY 375 BEALE STREET, SU SAN FRANCISCO, CA 94

ARCHITECT

SKIDMORE, OWINGS & ONE MARITIME PLAZA SAN FRANCISCO, CA 94

CIVIL FREYER & LAURETA, IN 150 EXECUTIVE PARK B SAN FRANCISCO, CA 94

STRUCTURAL DEGENKOLB 375 BEALE STREET, SU SAN FRANCISCO, CA 94

01

02

03

04

05

07

06

08

09

10

11

12

13

14

15

16

MECHANICAL TAYLOR ENGINEERING 1080 MARINA VILLAGE P ALAMEDA, CA 94501

17

PLUMBING SOUTHLAND INDUSTRI 33225 WESTERN AVENU UNION CITY, CA 94587

A

355'-0"

J

J J

1'-8"

J

J

J

6M2

A

C1

C1

A

1

HP +158' - 3" C1 ELECTRICAL GENERAL NOTES - FLOOR PLANS

C1

6L3

J 1.

REFER TO SHEETS A-1103-A FOR TYPICAL EXTERIOR ENCLOSURE DETAIL 02 CALLOUTS AND DIMENSIONS, UON. 2. REFER TO A-41 SERIES ENLARGED SECTORA-2101 FLOOR PLANS FOR INTERIOR DIMENSIONS & ELEVATIONS.

JJ

TOC +157' -J4"

A

UCSF RE AND AC BUILDING

J

1

EXIT STAIR 2

C1 LP +157' - 5 1/2"

LP +157' - 5 1/2"

RS01; TYP

UP

6S2

HP +158' - 4 1/2" C1

3'-10" A

3'-10 1/8" A

A

1

4'-2" 01 A-2101

A

C1

C1

4'-2"

4'-2"

2'-2"

MOCK-UP 2 EXTENTS 1

HP +158' - 4 1/2"

A

01 / A-1106-B

4-'-0" WINDOW WASHING EQUIPMENT ACCESS PATH, TYP

A

1

C1

6'-6 3/4"

1

1

01 / A-1106-A

HP +158' - 6 1/2"

C1

HP +158' - 3"

LP +157' - 5 1/2"

1

WINDOW WASHING 3'-10" DAVITS, TYP

A

A

LP +157' - 5 1/2" 4'-4"

C1

A

1 A

C1

HP +158' - 2"

ROOF DRAIN, TYP OVERFLOW DRAIN, TYP

A

BUILD 1001 POTRE SAN FRANCIS ASSESSO BLOC

HP +157' - 9" 19'-0 1/2"

C1

DN

C1

1

A

1

DN

C1

HP +158' - 3"

3 7/8"

ROOF SCREEN

SOLAR READY AREA

CONTRACTOR

THE BOLDT COMPANY 375 BEALE STREET, SU SAN FRANCISCO, CA 94

ARCHITECT

SKIDMORE, OWINGS & ONE MARITIME PLAZA SAN FRANCISCO, CA 94

2'-2"

1

1. ALL EXTERIOR WALL ASSEMBLIES TO ACHIEVE STC-28, EXCEPT WHERE STC REQUIREMENTS 1 ARE NOTED.

FSD

10'-11 1/2"

D

B SOLAR READY AREA TOTAL = 9000 SF

5-6

SMOKE PARTITION 1

1

1 C1EXTERIOR WALL GENERAL NOTES

2-HR FIRE-RESISTIVE RATING

C1

7'-0 1/8"

C1

J

19'-9"

J

J

SOLAR READY AREA

18'-6 3/4"

1

J

30'-0"

C1

J

1

HP +158' - 5 1/2" C1

NO. DESCRIPTION SCHEMATIC DESIG 50% DESIGN DEVE 100% DESIGN DEVE CONSTRUCTION DO CONSTRUCTION DO 1 BACKCHECK 1 A BULLETIN A C BULLETIN C C1 BULLETIN C RESUB D BULLETIN D

C1

C ACCESSIBLE LABS C1 C1 1 ACCESSIBLE HP +158'SINKS - 5 1/2"/ FUME HOODS ELEV CONTROL 6L1 C DESIGNATED ACCESSIBLE WORKSTATIONS JJ AIR LOCK 1-HR FIRE-RESISTIVE RATING P/S ELEV 6C5

J J

J

J

J

A

1

LEGEND C1

HP +158' - 5 1/2"

C1

9'-10 1/4"

HP +157' - 9"

6L2

C1

LANDSCAPE ARCHITEC MANTLE 930 CARLTON STREET, BERKELEY, CA 94710

1

1

C1

C1

ELEC

1

MECHANICAL & PLUMBING

ROOF @ TOP OF ELEV HOISTWAY

A

HP +157' - 7"

C

1

A

1

C1

C1 1 HP +157' - 7 1/2"

EPO EPOEMERGENCY

A

6M1

6-'-0" MEP WALKPAD, TYP.

HP +158' - 5 1/2" C1

C1 HP +157' - 11 1/2"

LAB PLANNER JACOBS CONSULTANC 401 B STREET, SUITE 1 SAN DIEGO, CA 92101

C1 LP +157' - 5 1/2"

C

J

MECHANICAL

5'-7 7/8"

18 A-3102

1

ELECTRICAL SILVERMAN & LIGHT 1201 PARK AVENUE, SU EMERYVILLE, CA 94608

A

A

J

01 A-3101

A

03 A-3102

1

A

A

J

SOLAR READY AREA

A

19'-4"

A

J

HP +158' - 7" C1

21'-0"

2'-2"

C1

J

03 A-3101

18'-9"

LP +157' - 5 1/2"

HP +158' - 1 1/2"

22'-8"

A

3'-10"

C1

ROOF SCREEN

C1

A

21'-0"

04 A-2101 1

4-'-0" WINDOW WASHING EQUIPMENT ACCESS PATH, TYP

LP +157' - 5 1/2" 1

21'-0"

4.03%

1

21'-0"

HP +157' - 9 1/2"

C1

17 A-2101

21'-0"

A

MOCK-UP 1 EXTENTS

C

21'-0"

A C1

C1 HP +158' - 5 1/2"

C1

21'-0"

3'-10"

01 A-3102

A

1

D

21'-0"

A

MOCK-UP 1 EXTENTS

HP +158' - 3 1/2" A

21'-0"

4'-2"

21'-0"

OVERFLOW DRAIN, TYP 1

31'-0"

21'-0"

9'-10 1/8"

3'-10"

ROOF DRAIN, TYP

WINDOW WASHING DAVITS, TYP

E

21'-0"

4'-2"

28'-0"

4'-2"

25'-6" A

4'-2"

5'-6" A

A 2'-0"

CIVIL FREYER & LAURETA, IN 150 EXECUTIVE PARK B SAN FRANCISCO, CA 94

A

STRUCTURAL DEGENKOLB 375 BEALE STREET, SU SAN FRANCISCO, CA 94

A

2'-11 3/4"

ROOF LEVEL FLOOR PLAN

MECHANICAL TAYLOR ENGINEERING 1080 MARINA VILLAGE P ALAMEDA, CA 94501

354' - 11"

01

02

03

25'-6"

5'-6"

04

28'-0"

05

21'-0"

06

21'-0"

07

21'-0"

08

21'-0"

09

21'-0"

10"

OFFICE

31'-0"

30'-2 1/16"

DN

A

1'-8"

17 A-2101 01 A-3101

ELECTRICAL SILVERMAN & LIGHT 1201 PARK AVENUE, SU EMERYVILLE, CA 94608

5411 OFFICE

5302

5410

HOTEL OFFICE

5100

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

5103

5216

5203

5316

5303

5409

19'-9"

5104

SS1

5150

5105

PRINT

CIRCULATION

5105A

5212

5250

CIRCULATION

A

CIRCULATION

PLUMB RISER

5960

HUDDLE A

OFFICE

5901

5809

HOTEL OFFICE

OFFICE

OFFICE

ASSIGNABLE WORKSTATIONS - TYP.

5902

5808

OFFICE

OFFICE

5903

5807

HOTEL OFFICE

OFFICE

5906

5904

5900

5907

OFFICE

OFFICE

OFFICE

5210

5209

5208

5207

CPF

5813

5F2

A

EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B

HUDDLE A

OFFICE OFFICE 5312

5313

MECH SHAFT

5311

CIRCULATION

05 A-4201

LANDSCAPE ARCHITEC MANTLE 930 CARLTON STREET, BERKELEY, CA 94710

5709

OFFICE

OFFICE 5708 OFFICE 5707

OFFICE

OFFICE

OFFICE

5806

5804

5706

A

5T3

5680

CIRCULATION

5750

5650

A ASSIGNABLE WORKSTATIONS - TYP.

A

A

5700 A

A A

A

EXTERIOR WALL WINDOW ASSEMBLIES

OFFICE

OFFICE

5701

5609

OFFICE

OFFICE

280'-9"

SS4

1

5608 OFFICE

5703

5607

OFFICE

OFFICE

5704

5606

- TYP. 5600

OFFICE

OFFICE

5503

5502

5501

5J2

DN

UP

CIRCULATION

5551 OFFICE

OFFICE

B

DESIGNATED ACCESSIBLE OFFICE WORKSTATIONS

5534

5603 1-HR FIRE-RESISTIVE RATING EXIT STAIR 2

B

UCSF RE AND AC BUILDING

28 EXTERIOR WALL GENERAL NOTES A-4201

5S2

2-HR FIRE-RESISTIVE RATING OFFICE

5520

GENERAL NOTES - FLOOR PLANS ASSIGNABLE WORKSTATIONS 1. REFER TO SHEETS A-1103-A FOR TYPICAL EXTERIOR ENCLOSURE DETAIL - TYP. CALLOUTSCIRCULATION AND DIMENSIONS, UON. SERIES ENLARGED SECTOR FLOOR PLANS FOR INTERIOR 55302. REFER TO A-415530 DIMENSIONS & ELEVATIONS.

5535

5552

SMOKE PARTITION 5604

1. ALL EXTERIOR WALL ASSEMBLIES TO ACHIEVE STC-28, EXCEPT WHERE STC REQUIREMENTS ARE NOTED.

A

EXTERIOR WALL WINDOW ASSEMBLIES

BUILD 1001 POTRE SAN FRANCIS ASSESSO BLOC

A EXTERIOR WALL WINDOW ASSEMBLIES

A

SHEET NUMBER

5533

CIRCULATION

STORAGE

01

A

5532 5538

5550 STORAGE

5601

TO ACHIEVE STC-31 B

OFFICE

3/32" = 1'-0"

HOTEL OFFICE OFFICE

5536

OFFICE

01 A-2101

5537

HOTEL OFFICE

5E3 MAINT CLO

SCALE:

02 A-2101

5531

HOTEL OFFICE

P/S ELEV

D RFI-288

ACCESSIBLE LABS OFFICE ASSIGNABLE ACCESSIBLE SINKS5602 / FUME HOODS WORKSTATIONS

5702

OFFICE

5T4

LEGEND

OFFICE

EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B A A EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-39

TO ACHIEVE STC-35

D RFI-331

TOILET (GENDER PLUMB RISER INCL)

5500

ROOF LEVEL FLOOR PLAN - OVERALL

OFFICE

5C5

SS3

CIRCULATION

07 A-4302

ELEC RISER

A

ROOF LE FLOOR P OVERALL

HOTEL OFFICE

5L2 D S/V ELEV RFI-288 5E2 AIR LOCK

5555

C

5611

CIRCULATION

5511

5500

5506

MECH SHAFT HUDDLE A

5713 A

5507

5404

LACTATION

CIRCULATION

HOTEL WORKSTATIONS

OFFICE

SERVICE CENTER

HOTEL OFFICE

TOILET (GENDER INCL)

5450

ZSFG

5508

5402

CIRCULATION

5405

A HUDDLE

5711

A

A

27'-10"

5760

STORAGE

5F1

OFFICE

5403

CONFERENCE MEDIUM A

5509

5512

OFFICE

HOTEL OFFICE HOTEL OFFICE 5408 5304

OFFICE PRINT 5307 5308

CPF

5780 OFFICE

5801

5803

EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B

5309

CIRCULATION

OFFICE

5802

TO ACHIEVE STC-35

OFFICE

5310

CONFERENCE SMALL

5400

NO. DESCRIPTION SCHEMATIC DESIG 50% DESIGN DEVE 100% DESIGN DEVE CAMPUS CONSTRUCTION DO CONSTRUCTION DO 1 BACKCHECK 1 A BULLETIN A PROJECT NUMBER B BULLETIN B 218024 C BULLETIN C D BULLETIN SHEET NAME D

OFFICE

5401 OFFICE

ASSIGNABLE WORKSTATIONS - TYP.

CIRCULATION

OFFICE

5800

OFFICE

5L1

5860

5850

OFFICE

5405A

ELEC

5S3

SS2

ASSIGNABLE WORKSTATIONS - TYP.

EXTERIOR WALL WINDOW ASSEMBLIES

2' - 2"

HUDDLE A

5205

CIRCULATION

A

A

STORAGE

CIRCULATION

COMMUNICATING STAIR

D RFI#289 STORAGE

04 A-4301

5880 OFFICE

5909

5908

OFFICE

CIRCULATION

5950 HOTEL OFFICE

HOTEL OFFICE

A

5211

5E1

5811

CIRCULATION

5C1

5300

5350

OFFICE

P ELEV

HUDDLE A

5911

ASSIGNABLE WORKSTATIONS - TYP.

HOTEL OFFICE HOTEL OFFICE 5204 5315

STORAGE A

CONFERENCE MEDIUM

5T2

TO ACHIEVE STC-31

5200

5215

CIRCULATION

TOILETS - MEN

6'-7"

ASSIGNABLE WORKSTATIONS - TYP.

HOTEL OFFICEHOTEL OFFICE

MECH SHAFT

5J1

4'-6"

OFFICE

5301 OFFICE

5317

JANITOR CLO

B

OFFICE

5318 OFFICE

5202

5T1

5010

OFFICE

5201 OFFICE

5217

TOILETS WOMEN

TOWN CENTER

OFFICE

5218 OFFICE

5030

5020

OFFICE

5102

HOTEL OFFICE

LAB PLANNER JACOBS CONSULTANC 401 B STREET, SUITE 1 SAN DIEGO, CA 92101 SEAL & SIGNATURE

18 A-3102

TO ACHIEVE STC-31 B

5101

CONFERENCE MEDIUM

HUDDLE

EXTERIOR WALL WINDOW ASSEMBLIES

19'-4"

A EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-39

EXTERIOR WALL WINDOW ASSEMBLIES

OFFICE

5107

18'-9"

PLUMBING SOUTHLAND INDUSTRI KEYPLAN 33225 WESTERN AVENU UNION CITY, CA 94587

17

21'-0"

A

ASSIGNABLE WORKSTATIONS - TYP.

03 A-3101

2' - 2"

16

22'-8"

03 A-3102

5109

5108

30'-0"

15

21'-0"

A

01 / A-1105-A 01 / A-1105-B

5110 HOTEL OFFICE

5S1

102' - 6"

01 / A-1105-A 01 / A-1105-B

EXTERIOR WALL WINDOW ASSEMBLIES

HOTEL OFFICE

11/15/2021 5:28:26 PM

04 A-2101

TO ACHIEVE STC-31 B

A

14

21'-0"

EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-35 EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B

A

EXIT STAIR 1

A

13

21'-0"

2' - 0"

E

B

12

21'-0"

A

21 A-4201

C

11

21'-0"

01 A-3102

D

10

21'-0"

CONTRACTOR

TO ACHIEVE STC-39

EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-39

1' - 11"

45'-5"

THE BOLDT COMPANY 375 BEALE STREET, SU SAN FRANCISCO, CA 94

ARCHITECT

SKIDMORE, OWINGS & KEYPLAN ONE MARITIME PLAZA SAN FRANCISCO, CA 94

CIVIL FREYER & LAURETA, IN 150 EXECUTIVE PARK B SAN FRANCISCO, CA 94

STRUCTURAL DEGENKOLB 375 BEALE STREET, SU SAN FRANCISCO, CA 94 SEAL & SIGNATURE

LEVEL FIVE FLOOR PLAN 01

MECHANICAL TAYLOR ENGINEERING 1080 MARINA VILLAGE P ALAMEDA, CA 94501

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

PLUMBING SOUTHLAND INDUSTRI 33225 WESTERN AVENU UNION CITY, CA 94587

17

CAMPUS ELECTRICAL SILVERMAN & LIGHT 1201 PARK AVENUE, SU EMERYVILLE, CA 94608

354'-10 3/4" 25'-6"

28'-0"

21'-0"

21'-0"

21'-0"

21'-0"

21'-0"

21'-0"

21'-0"

A

ASSIGNABLE WORKSTATIONS - TYP.

HOTEL OFFICE 4109

4100

HOTEL OFFICE 4108

UP

DN 4107

03 A-3101

1'-8" 18'-9"

33'-7"

C

CIRCULATION 4C1

A

CONFERENCE MEDIUM

TOILETS WOMEN

4030

01 A-3101

HUDDLE

4J1

19'-9"

4960

TOILETS - MEN

4216

CIRCULATION

TOWN CENTER 4010

A

OFFICE

ASSIGNABLE WORKSTATIONS - TYP. 4200

HOTEL OFFICE

OFFICE

4908

ASSIGNABLE WORKSTATIONS - TYP. 4900

HOTEL OFFICE 4906

OFFICE

4902

4808

OFFICE

OFFICE

4903

4807

OFFICE

OFFICE

4904

4806

4317

A EXTERIOR WALL WINDOW ASSEMBLIES

OFFICE

OFFICE

4203

4316

OFFICE

ASSIGNABLE WORKSTATIONS - TYP. 4300

PRINT

P ELEV

4210

OFFICE

4208

4207

HUDDLE A

HVAC SHAFT

4860

4313

COMMUNICATING STAIR

SS2

4F2

HUDDLE A

4205

CIRCULATION

4780

4S3

A

EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-35

JACOBS CONSULTANC SHEET NAME SUITE 1 401 B STREET, SAN DIEGO, CA 92101

LEVEL 5 PLAN - O

ASSIGNABLE WORKSTATIONS - TYP. 4800

OFFICE 4802 OFFICE 4803 OFFICE 4804

A

EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B

4405A

4312

4311

4310

4309

4308

4405

4680

A

CIRCULATION ELEC

IDF

4L1

4F1

4760

4713

ASSIGNABLE WORKSTATIONS - TYP.

A OFFICE

4700

A OFFICE

4702

4707

4703

A OFFICE

A OFFICE

4706

4704

01 A-2101

SS3

4601 OFFICE

ASSIGNABLE WORKSTATIONS - TYP.

4608 OFFICE

4600

4607

OFFICE

OFFICE

4E2

4503

4502

4501

OFFICE

4E3 MAINT CLO

02 A-2101

4531

4532 HOTEL OFFICE HOTEL OFFICE4537 HOTEL OFFICE OFFICE 4536 4538 4533

CIRCULATION

A

4520

4J2 B

STORAGE 4551

DN

UP

OFFICE STORAGE 4552 B

4602

4535 OFFICE

ASSIGNABLE WORKSTATIONS - TYP. 4530

4534

OFFICE 4603 OFFICE

OFFICE

4500

OFFICE

OFFICE

4609 OFFICE

EXIT STAIR 2 4S2

23 A-4201

4604

4606

01

CIRCULATION 07 A-4302

S/V ELEV

P/S ELEV

D RFI-288

OFFICE

4500

OFFICE

4C5

C PLUMB RISER TOILET (GENDER CIRCULATION INCL) SS4 4550 4T4

A

EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B A 326'-0 3/4"

A

4611

4650

4701

4708

A HUDDLE

CIRCULATION

A A OFFICE

A OFFICE

4555

MECH SHAFT HUDDLE A

4L2 D RFI-288 AIR LOCK

OFFICE

3/32" = 1'-0"

4506

ELEC RISER

LACTATION

HOTEL WORKSTATIONS

NO. DESCRIPTION SHEET NUMBER SCHEMATIC DESIG 50% DESIGN DEVE 100% DESIGN DEVE CONSTRUCTION DO CONSTRUCTION DO 1 BACKCHECK 1 A BULLETIN A B BULLETIN B C BULLETIN C D BULLETIN D

HOTEL OFFICE

4511

CIRCULATION TOILET (GENDER INCL) 4450 4T3

4508

4507

SERVICE CENTER

4404

CIRCULATION

A OFFICE

A

4403

A

OFFICE

OFFICE

HOTEL OFFICE

CONFERENCE MEDIUM

4709

TO ACHIEVE STC-35

4409

STORAGE

A OFFICE

EXTERIOR WALL WINDOW ASSEMBLIES

OFFICE

4303

SCALE:

4509

4512

4402

4400

OFFICE

4750

4801

OFFICE

4401 OFFICE

HOTEL OFFICEHOTEL OFFICE 4408 4304

LANDSCAPE ARCHITEC MANTLE 930 CARLTON STREET, BERKELEY, CA 94710

LEVEL 5 FLOOR PLAN - OVERALL

OFFICE

CONFERENCE SMALL

OFFICE

ASSIGNABLE WORKSTATIONS - TYP.

OFFICE

CIRCULATION

OFFICE

4410

OFFICE

4850 04 A-4201

4411 OFFICE

4302

OFFICE

CIRCULATION

MOCK-UP 2 EXTENTS A B EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31

LAB PLANNER 218024

1'-10 3/4"

18 A-3102

A EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-39

OFFICE

4301 OFFICE

OFFICE

CIRCULATION

04 A-4301

A

4350 OFFICE

4209

D RFI#289 IDF

4307

CIRCULATION

4250 OFFICE OFFICE

4809 CIRCULATION OFFICE

4318 OFFICE

4202

CIRCULATION

PRINT OFFICE 4212 4211

4811

4880

4901

OFFICE

4201 OFFICE

HOTEL OFFICE HOTEL OFFICE 4315 4204

CIRCULATION

OFFICE

4909

HOTEL OFFICE

A

HUDDLE A

4950 HOTEL OFFICE

4907

1

OFFICE

4103

4911

A

B

TO ACHIEVE STC-31

EXTERIOR WALL WINDOW ASSEMBLIES

A

OFFICE

HUDDLE A

4T2

6'-7" 37'-6 3/8"

30'-0"

A

4217

CIRCULATION

CIRCULATION 4C1

4218 OFFICE

4102

4105

PLUMB RISER

JANITOR CLO

OFFICE

4101 OFFICE

CONFERENCE MEDIUM

4T1

4020

B

ZSFG

19'-4"

TO ACHIEVE STC-31 B

HOTEL OFFICE HOTEL OFFICE 4104 4215 STORAGE MECH SHAFT CIRCULATION 4105A A 4150 SS1

HOTEL OFFICE

17 A-2101

21'-0"

13'-0 1/4"

4S1

MOCK-UP 1 EXTENTS

A

22'-8"

2'-0 3/4"

2'-2" 31'-6"

31'-0"

11/15/2021 5:27:58 PM

OFFICE

4110 11 A-4201

A EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-35

TO ACHIEVE STC-31 B

HOTEL OFFICE EXIT STAIR 1

D

21'-0"

03 A-3102

A EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B

EXTERIOR WALL WINDOW ASSEMBLIES

MOCK-UP 1 EXTENTS

1

21'-0"

PROJECT NUMBER

04 A-2101

01 / A-1104-A 01 / A-1104-B

01 A-3102 1

E

21'-0"

90'-8 1/2"

10'-2 1/4"

01 / A-1104-A 01 / A-1104-B

5'-6"

21'-0"

339'-2 1/2"

2'-2"

15'-8 1/4"

A EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-39

EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-31 B EXTERIOR WALL WINDOW ASSEMBLIES TO ACHIEVE STC-39

A EXTERIOR WALL WINDOW ASSEMBLIES

TO ACHIEVE STC-39

1'-10 3/4"

KEYPLAN

LEVEL FOUR FLOOR PLAN

SEAL & SIGNATURE

CAMPUS

ZSFG PROJECT NUMBER

218024 SHEET NAME


UCSF RESEARCH AND ACADEMIC BUILDING

DETAILS


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021

RE: PLANS FOR PARTITION TYPE 4 9/16"

CLR HSTWY

LINE OF PLATFORM RUNNING CLEARANCE GWB SOFFIT FASCIA ANGLE STRAP AS REQUIRED CONTINUOUS FIRE SEALANT

ALIGN

LINE OF PLATFORM RUNNING CLEARANCE

HEADER HANGER COVER

B.O. POCKET

1" RUNNING CLEARANCE

3 9/16"

PARTITION BEYOND SEE PLANS

HOLD OPEN DOOR

SIGHT GUARD BEYOND

STAINLESS STEEL HOISTWAY ENTRANCE DOOR FINISH FLOOR RE: PLANS

TRANSITION THRESHOLD

2

CONTINUOUS HINGE AS SCHEDULED 1

NOTCH FRAME TO RECEIVE SILL

TOP OF FINISH FLOOR

BRUSH SEAL

DOOR CLOSER AS SCHEDULED

EQ

6' - 0" A.F.F.

HOLD OPEN DOOR

CONTINUOUS HINGE AS SCHEDULED

DOOR HEIGHT RE: DOOR SCHEDULE

EQ

SIGHT GUARD KEY ACCESS

ELEVATOR DOOR HT RE: SECTIONS

90 MINUTE DOOR AND FRAME ASSEMBLY STAINLESS STEEL ELEVATOR DOOR

WELDED HOISTWAY ENTRANCE DOOR FRAME, PTD

UNDERCUT

4” METAL STUD + 1" LINER BOARD + TWO LAYERS OF 1/2" TYPE X GWB ON EXTERIOR SIDES - TWO HOUR WALL ASSEMBLY AROUND HOIST-WAY DOOR UL U415B

ELEVATOR SILL & SUPPORT, RE: ELEVATOR MFR SILL POCKET GROUT SOLID

FIRE PROOFING OVER STRUCTURAL BEAM. RE: STRUCT.

FASCIA / TOE GUARD

MINERAL WOOL BATT INSULATION FILLED IN THE GAP BETWEEN F.O. GWB AND FIREPROOFING MATERIAL

RE: STRUCTURAL FOR EDGE OF SLAB CONDITION

SEALANT OVER FORMING MATERIAL OVERLAPPING ONTO GWB & FIREPROOFING MATERIAL OF STRUCTURAL BEAM

3" MAX

PARTITION BEYOND SEE PLANS

ELEVATOR SHAFT

WELDED HOISTWAY ENTRANCE DOOR FRAME, PTD

ELEVATOR HOISTWAY HEAD CONDITION

CLR HOISTWAY

4 5/8"

HEAD OF WALL REF. HW-D-0388

PARTITION RE: PLANS

ELEVATOR HOISTWAY SILL SECTION

EDGE OF SLAB / SILL LINE OF PLATFORM RUNNING CLEARANCE SINGLE SPEED ELEVATOR DOOR SILL NOSING

HOISTWAY ENTRANCE DOOR FRAME

4” METAL STUD + 1" LINER BOARD + TWO LAYERS OF 1/2" TYPE X GWB ON EXTERIOR SIDES - TWO HOUR WALL ASSEMBLY AROUND HOIST-WAY DOOR UL U415B ADDITIONAL LAYERS OF GWB AS REQUIRED CONTINUOUS FIRE SEALANT, TYP

ELEVATOR SHAFT

CLEARANCE FOR MAGNETIC HOLD OPEN

VIF

VIF

SCHEDULED PARTITION

1"

ELEVATOR DOOR BUMPER

1" MAGNETIC HOLD OPEN AS SCHEDULED CONTINUOUS HINGE AS SCHEDULED GWB SOFFIT FASCIA ABOVE

ELEVATOR HOISTWAY JAMB PLAN

1" ALIGN

ALIGN EXIT DEVICE AS SCHEDULED

HOLD OPEN DOOR IN OPEN POSITION


UCSF RESEARCH AND ACADEMIC BUILDING

DETAILS

NOTE: FURNITURE SHOWN FOR REFERENCE ONLY

02

A-5810 30

1'-6"

10'-3 1/4" SS-2, MITER EDGE COUNTER TOP

1'-11 3/4"

ACCESS HOLES TO CABLE RACEWAY

36" X 48" CLEAR

2'-9 1/2"

5'-5"

EQ-05

EQ-07

03 A-5811

EQ-08

19

A-5810

04

MTL-2, DIRECT GLUE TO SUBSTRATE

FURNITURE BY OTHERS

29

MTL-5, BASE

EQ-01 EQ-02

FIN. FLR.

1/4"

J

J

2" 4"

8'-0"

EQ-09

EQ-03 EQ-04 EQ-01 EQ-02

6'-11 1/2"

20

9"

5' - 6"

A-5810

OPP

05

4'-9 3/4"

1'-3"

A-5810 28 A-5810

4'-11 1/2"

SS-2, MITER EDGE COUNTER TOP

ADJUSTABLE SHELVING

EQ-11

PL-2A, THRUCOLOR DOOR (6 SIDES)

2' - 8 1/2"

MTL-2, DIRECT GLUE TO SUBSTRATE

8' - 6" 15 A-5810

RECEPTION DESK FLOOR PLAN

BLACK MELAMINE CABINET INTERIOR TYPICAL

SLOTS IN MILLWORK FOR EQUIPMENT VENTS

MTL-5, BASE

AWP-1, ACOUSTICAL WALL PANEL

2" 4"

01 A-5811

10 1/2"

10"

J

C

27 A-5810

PL-2A, THRUCOLOR BASE FIN. FLR.

1/4"

3"

2'-9 1/2"

EQ-12

1'-7" D X 1'-7" H X 2'-10"W MAX EQUIPMENT AREA, BY OFOI

1/4"

EQ-13

2'-4 1/2"

EQ-10

BASE CABINET-DOOR - RECEPTION DESK


RE: ENLARGED PLAN

AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021

1"

RE: ENLARGED PLAN

MIN

1/8"

LED TASK LIGHT ABOVE

PL-2A, THRUCOLOR

1 3/8"

FURNITURE, SIT/STAND DESK COORDINATE WITH VENDOR TO ENSURE CLEARANCE AS REQUIRED

1"

FOLDED CORNER, TYP

MIN

RE: ENLARGED PLAN

SCHEUDLED COUNTERTOP FINISH SIDE PANEL, PL-2A, THRUCOLOR

1"

MIN

LED TASK LIGHT ABOVE MTL-2, DIRECT-GLUE TO SUBSTRATE

MTL-2, DIRECT-GLUE TO SUBSTRATE

RE: ENLARGED PLAN

PL-2A, THRUCOLOR

1" MIN FURNITURE, SIT/STAND DESK COORDINATE WITH VENDOR TO ENSURE CLEARANCE AS REQUIRED

FOLDED CORNER, TYP

PLAN DETAIL AT METAL PANEL END

PLAN DETAIL AT METAL PANEL CORNER

ALIGN

1 3/8"

MTL-2, DIRECT GLUE TO SUBSTRATE

MTL-2 , DIRECT GLUE TO SUBSTRATE

SEE ENLARGED PLAN LED TASK LIGHT

PL-2A THROUCOLOR

MTL-2, DIRECT GLUE TO SUBSTRATE

2 1/16" ALIGN

MTL-2 , DIRECT GLUE TO SUBSTRATE

8 3/8" LED TASK LIGHT

PL-2A THROUCOLOR MTL-2 BEYOND GAP, CABLE RACEWAY

PL-2A THROUCOLOR

MTL-2 BEYOND

SLOT

2"

BLOCKING TO RECEIVE ACCESS PANEL HINGES

1"

BLOCKING AS REQUIRED

HEAVY DUTY FRAMELESS SELFCLOSING CONCEALED HINGE TURNSTILE POWER SUPPLY, SEE SECURITY DRAWINGS

HEAVY-DUTY FRAMELESS SELFCLOSING CONCEALED HINGE

ACCESS PANEL, PL-2A THRUCOLOR ALL 6 SIDES

2'-6"

BLACK MELAMINE INTERIOR FACES

CLEAR CABINET DOOR BUMPER

HEAVY-DUTY FRAMELESS SELFCLOSING CONCEALED HINGE

3"

1/4"

1/4"

SECTION DETAIL - ACCESS PANEL

2"

3" PL-2A THRUCOLOR

MTL-5, BASE

BLOCKING AS REQUIRED

MTL-5, BASE

PL-2A THRUCOLOR CLEAR CABINET DOOR BUMPER

4"

1 1/8"

1/4"

RCKW3 SIMPSON CLIP @ AT EACH W/ (4) SD #10 TO STUD & (1) 1/2" TITEN HD ANCHOR TO SOG

1/4"

5/8"

RCKW3 SIMPSON CLIP @ AT EACH W/ (4) SD #10 TO STUD & (1) 1/2" TITEN HD ANCHOR TO SOG

SECTION DETAIL - TYP RECEPTION DESK


UCSF RESEARCH AND ACADEMIC BUILDING

SITE PHOTOS


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021


EL CAMINO MIXED USE PROJECT

PROJECT OVERVIEW

PROJECT OVERVIEW The El Camino & Spruce Mixed-Use Redevelopment Project is situated at the corner of El Camino Real and South Spruce Avenue in South San Francisco. The proposed development will remove existing vacant buildings and subdivide the site into four parcels with different uses: Grocery/Retail on Lot A, Residential on Lot B, Research/Development (R&D) on Lot C, and Parking on Lot D. All buildings in the project are tied together through landscaping and open space, creating pedestrian and bike-friendly connections throughout the highly-amenitized mixed-use campus. A shared internal road provides vehicular access to the garage, loading areas and access for fire vehicles. The extent of hardscape is minimized to prioritize pedestrian-focused landscape areas through the center of the site, connecting El Camino Real with the nearby San Bruno BART Station.

This portion of the project includes the three six-story R&D buildings with approximately 750,000 square feet of R&D office plus 30,000 square feet of amenity space on Lot C. Typical R&D floors are 16’ floor to floor with a target ceiling height of 11’ for office fit-outs, and 10’ for lab fit-outs to allow for larger ducts and services in the plenum. Ground floors are 18’ floor to floor to allow for higher ceilings for amenities, and mechanical spaces. Higher clearances for generators require a slab opening at L2 of Building 1, and dropped slabs in Buildings 2 and 3. The overall building height limit is measured to the top of mechanical screen.

The project is pursuing LEED certification. The research and development project will target Silver with an aspiration of Gold certification using the LEED v4 BD+C Core and Shell certification system.


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021

EL CAMINO MIXED USE San Francidco, Californina, USA Client // Steelwave Plot Area // 11.21 ac Project Size // 800,000 sqft Residential, R&D Offics, Retail & Amenities


EL CAMINO MIXED USE PROJECT

CONCEPT DESIGN & PLANNING

SITE PROGRAM STRATEGY El Camino & Spruce Mixed- Use Redevelopment Project in South San Francisco is situated at the corner of El Camino Real and Spruce Avenue. The proposed redevelopment is proposing splitting 11.21 acres into three separate parcels. The proposed development will remove existing vacant buildings on the site and replace with three R&D office buildings, three retail buildings, site landscaping and a parking structure. The new buildings will consist of approximately 750,000 square feet

of R&D office space, 30,000 square feet of amenity and 19,500 S: square feet of retail. The R&D and retail buildings will be positioned F EL CAMINO SPRUCE across a&new interior street. All buildings in the project will be tied together through landscaping and open space, creating pedestrian and bike friendly connections between the highly amenitized mixeduse campus. As an alternative, the 19,500 sq ft of retail center could be interchanged with approximately 100-150 units of multi- family residential.

CONTECT VIEW: SW CORNER OF EL CAMINO & SPRUCE

AERIAL VIEW

GARAGE

VE NA

BLDG 03

TO

G TIN

N

HU

BLDG 02 RESIDENTIAL BLDG 01

SAFEWAY

S SPRU

CE AVE

EL EL CAMINO MIXED USE PROJECT SKIDMORE, OWINGS & MERRILL LLP

C

L

EA

OR

IN AM


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021

PODIUMS, PUBLIC REALM & OPEN SPACE SEQUENCE

OPEN SPACE SEQUENCE

RESIDENTIAL

RESIDENTIAL R&D BLDG 01

ON GT

HU

GARAGE

GARAGE

SAFEWAY

S SPR

UCE A VE

INO

AM

C EL

S SPR

AL

SAFEWAY

UCE AV

RE

E

E

L

EA

OR

MIN

A LC

GROUND LEVEL PLAN EL CAMINO MIXED USE PROJECT SKIDMORE, OWINGS & MERRILL LLP

BUILDING ENTRIES & ACCESS CAMPUS AMENITIES E RUC

P

SS

AVE

CE

PRU

SS

AVE

RESIDENTIAL RESIDENTIAL

RESIDENTIAL SAFEWAY SAFEWAY

SAFEWAY

R&D BLDG 01

AVE

REAL

R&D BLDG 03

R&D BLDG 02 BLDG 02 LOBBY

AMENITIES

HUNTINGTON

GARAGE

EL CAMINO

R&D BLDG 02

HUNTINGTON AVE

EL CAMINO

REAL

LOBBY

R&D

GARAGE GARAGE

R&D LOBBY BLDG 01

R&D

LOBBY

R&D BLDG 03 BLDG 03

BLDG 01

EL CAMINO MIXED USE PROJECT SKIDMORE, OWINGS & MERRILL LLP

MIXED USES

GROUND LEVEL PLAN: BUILDING ENTRIES & ACCESS

AND NNECTIONS

VEHICULAR CIRCULATION

PEDESTRIAN AND TRANSIT CONNECTIONS

CE

PRU

SS

AVE

VEHICULAR CIRCULATION

CE

PRU

SS

AVE

RESIDENTIAL

RESIDENTIAL

GARAGE ACCESS

LOADING

EL CAMINO MIXED USE PROJECT SKIDMORE, OWINGS & MERRILL LLP

TO SAN BRUNO BART

R&D BLDG 03

GARAGE

TO SAN

EL CAMINO MIXED USEBRUNO PROJECTBART SKIDMORE, OWINGS & MERRILL LLP

CAL TRAIN

AVE

GARAGE R&D BLDG 01

CE

PRU

SS

AVE

RESIDENTIAL LOADING

SAFEWAY

GARAGE ACCESS

R&D DROP-OFF (STUDY)

LOADING

LOADING

O REAL

PARKING ACCESS

R&D BLDG 03

VEHICULAR CIRCULATION Vehicular Route Vehicular Drop-off Loading / Service

GARAGE ACCESS

HUNTINGTON

R&D BLDG 02

EL CAMIN

EL CAMINO

REAL

R&D DROP-OFF

PARKING ACCESS

CENTENNIAL TRAIL

TO SAN BRUNO BARTEL CAMINO MIXED USE PROJECT SKIDMORE, OWINGS & MERRILL LLP CAL TRAIN

R&D DROP-OFF (STUDY)

HUNTINGTON AVE

SAMTRANS 141

SAMTRA NS ECR

O REAL EL CAMIN

R&D BLDG 01

VehicularR&D Route BLDG 02 Vehicular Drop-off Loading / Service

RESIDENTIAL

SAMTRANS 141

SAFEWAY

PEDESTRIAN AND TRANSIT CONNECTIONS Pedestrian Route Bicycle Route Bus Route Bus Stop

CENTENNIAL TRAIL

GARAGE

AVE

HUNTINGTON AVE

EL CAMINO

R&D BLDG 01 R&D BLDG 03

TO SAN BRUNO BART

CE

PRU

SS

R&D BLDG 02

LOADING

SAFEWAY

REAL

SAFEWAY

SAMTRA NS ECR

P

R&D BLDG 01

TO T R BA

E AV

IN NT

P

Route te

R&D BLDG 03

R&D BLDG 02

R&D BLDG 03

R&D BLDG 02

R&D DROP-OFF

R&D BLDG 02

PARKING ACCESS

GARAGE ACCESS

GARAGE R&D BLDG 01 PARKING ACCESS

R&D BLDG 03 LOADING

GARAGE ACCESS

GARA ACCE


EL CAMINO MIXED USE PROJECT

CONCEPT DESIGN & PLANNING

R&D MASSING AND FACADE COMPONENTS

D MASSING AND FACADE COMPONENTS

MECHANICAL SCREEN

UPPER VOLUME

TERRACE

PODIUM

FROM EL CAMINO REAL

NO MIXED USE PROJECT E, OWINGS & MERRILL LLP

VIEW OF SITE ENTRY FROM EL CAMINO REAL


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021

RESIDENTIAL FACADE MATERIALS

FACADE MATERIALS GREY GFRC PANELS

LIGHT GFRC PANELS WOOD-LOOK CLADDING

INSULATED GLAZING

METAL CLADDING

LDING - APPROVED MATERIALS INSULATED GLAZING

TEXTURED CONCRETE

AND MASSING RESIDENTIAL FACADE AND MASSING: NORTH ELEVATION

Design


EL CAMINO MIXED USE PROJECT

DESIGN DEVELOPMENT

SITE PLAN - GROUND LEVEL

EL C

180 Architect:



SK



S

Consultants:





 







1220 Conc Conc



360 Pine San Fran

6 Oakla

A

130 S San Fra



Vertica



102 E Blit Vall



Issued For: No.: Descrip

PLAN PLAN R&D 5 PLAN 100% 50% D









1900 Emery

  

 

 

Trash



 



  

 



 









 



 













 

 

 





Key Plan:

 

 01





 







Seal & Signat





 

EL CAMINO MIXED USE PROJECT 180 EL CAMINO REAL

EL CAMINO MIXED USE PROJECT 180 EL CAMINO REAL

Architect:

Architect:

SKIDMORE, OWINGS & MERRILL LLP

SKIDMORE, OWINGS & MERRILL LLP

One Maritime Plaza San Francisco, California 94111, USA



















One Maritime Plaza San Francisco, California 94111, USA

Consultants:



Consultants: Code:



Sustainability:



















Code:

Sustainability:

 1220 Concord Ave., Suite 400. Concord, CA 94520



















  



 



         

Surveyor:

MEP:

Surveyor:

MEP:

98 Battery St #500, San Francisco, CA 94111

636 9th St. Oakland, CA 94607

98 Battery St #500, San Francisco, CA 94111

Lighting:

Acoustics:

Lighting:

130 Sutter St., FL 5, San Francisco, CA 94104

389 Clementina St, San Francisco, CA 94103

       

       

SITE PLAN - GROUND LEVEL





Key Plan:

 

  



 









 









 



 

Parking:

560 14th St #300, Oakland, CA 94612

Trash Management:

Traffic:

1900 Powell St #890, Emeryville, CA 94608

4305 Hacienda Dr Suite 550, Pleasanton, CA 94588

 

Date:

100% SCHEMATIC DESIGN 50% DESIGN DEVELOPMENT

2022-04-01 2022-05-27







Key Plan:

  

02



01 03

03

       

Seal & Signature:

 













 

Sheet Name:

BUILDING 3 - LEVEL 02 1

Architect:

 



Drawn By:

Author





One Maritime Plaza San Francisco, California 94111, USA

Consultants:



 

Landscaping:

555 Beach St floor 4, San Francisco, CA 94133



       



 

       

Surveyor:

MEP:

      

389 Clementina St, San Francisco, CA 94103

130 Sutter St., FL 5, San Francisco, CA 94104

389 Clementina St, San Francisco, CA 94103





Key Plan:

 















 

  





 



 



 

02











Traffic:

1900 Powell St #890, Emeryville, CA 94608

4305 Hacienda Dr Suite 550, Pleasanton, CA 94588

 



         

 

  





 

















2022-04-01 2022-05-27







Key Plan:

02

 01 03

 

       

Seal & Signature:

       



 

Date:

100% SCHEMATIC DESIGN 50% DESIGN DEVELOPMENT

 

 



560 14th St #300, Oakland, CA 94612

Trash Management:

Issued For: No.: Description:













2022-02-11 2022-04-01 2022-05-27

Parking:

102 E Blithedale Ave # 1, Mill Valley, CA 94941







Date:

R&D 50% SCHEMATIC DESIGN 100% SCHEMATIC DESIGN 50% DESIGN DEVELOPMENT

 

Vertical Transportation:





4305 Hacienda Dr Suite 550, Pleasanton, CA 94588





1900 Powell St #890, Emeryville, CA 94608

  Traffic:

   

Parking:

560 14th St #300, Oakland, CA 94612

Trash Management:

         

Vertical Transportation:



130 Sutter St., FL 5, San Francisco, CA 94104

102 E Blithedale Ave # 1, Mill Valley, CA 94941



Lighting:

03

          

25 Kearny Street, Suite 500 San Francisco, CA 94108

Civil:

360 Pine Street, 2nd Floor San Francisco, CA 94104

01



Sustainability:

1220 Concord Ave., Suite 400. Concord, CA 94520









 



Code:





98 Battery St #500, San Francisco, CA 94111

Issued For: No.: Description:



 

Acoustics:



 



 









 



 





   

 

636 9th St. Oakland, CA 94607





 

Lighting:





  



 

 

98 Battery St #500, San Francisco, CA 94111





 

Acoustics:









  

MEP:









 

 



636 9th St. Oakland, CA 94607

  

 

 





             







 

  







 







 



 





  



 



 

         

  



 



     



      







 





 

 





















   

      







 

Landscaping:

555 Beach St floor 4, San Francisco, CA 94133

Surveyor:







 





Sustainability:

25 Kearny Street, Suite 500 San Francisco, CA 94108

Civil:

360 Pine Street, 2nd Floor San Francisco, CA 94104



 





A2.3.04

SKIDMORE, OWINGS & MERRILL LLP



          

Author

1/16" = 1'-0"

One Maritime Plaza San Francisco, California 94111, USA

Consultants:



 

220393

Drawn By:

Checked By: Checker Scale:

SKIDMORE, OWINGS & MERRILL LLP



 

1

1/16" = 1'-0"





EL CAMINO MIXED USE PROJECT 180 EL CAMINO REAL Sheet No.:

Project No.: Architect:







BUILDING 3 LEVEL 04 FLOOR PLAN

A2.3.02

Checked By: Checker



                 





Sheet Name:









 

 























1220 Concord Ave., Suite 400. Concord, CA 94520

  



BLDG3 - LEVEL 04







220393

Code:





                             



 



BUILDING 3 - LEVEL 04, 05 & 06

5/27/2022 8:38:14 PM

5/27/2022 8:38:06 PM







EL CAMINO MIXED USE PROJECT 180 EL CAMINO REAL Project No.: Sheet No.:

Scale:





BUILDING 3 LEVEL 02 FLOOR PLAN

BLDG3 - LEVEL 02



Seal & Signature:







       











02



01

       







Seal & Signature:







 











 









Sheet Name:

BUILDING 3 - LEVEL 01

Sheet Name:

BUILDING 3 - LEVEL 03

BUILDING 3 LEVEL 01 FLOOR PLAN

BLDG3 - LEVEL 01

Project No.:

1

5/27/2022 8:40:40 PM

5/27/2022 8:35:14 PM

Sheet Name:

SIT GR

Sheet No.:

Drawn By:

Author

Checked By: Checker Scale:

1/16" = 1'-0"

BUILDING 3 LEVEL 03 FLOOR PLAN

BLDG3 - LEVEL 03

220393

A2.3.01

Project No.:

Drawn By: Checked By: Scale:

Issued For: No.: Description:

 











 



389 Clementina St, San Francisco, CA 94103

Vertical Transportation:

102 E Blithedale Ave # 1, Mill Valley, CA 94941





 









 

 

          



 







2022-04-01 2022-05-27

 





100% SCHEMATIC DESIGN 50% DESIGN DEVELOPMENT



Date:

         

 4305 Hacienda Dr Suite 550, Pleasanton, CA 94588

   

1900 Powell St #890, Emeryville, CA 94608



 



Traffic:

01

130 Sutter St., FL 5, San Francisco, CA 94104







 

 



 

Trash Management:



 









Parking:

560 14th St #300, Oakland, CA 94612

                 





 



Vertical Transportation:

102 E Blithedale Ave # 1, Mill Valley, CA 94941







                          

 





Landscaping:

555 Beach St floor 4, San Francisco, CA 94133

Acoustics:

Issued For: No.: Description:











 





 

 

                





 







 



Civil:

360 Pine Street, 2nd Floor San Francisco, CA 94104

636 9th St. Oakland, CA 94607





 



 

  





 



  





Landscaping:

555 Beach St floor 4, San Francisco, CA 94133

25 Kearny Street, Suite 500 San Francisco, CA 94108











Civil:

360 Pine Street, 2nd Floor San Francisco, CA 94104

1220 Concord Ave., Suite 400. Concord, CA 94520







25 Kearny Street, Suite 500 San Francisco, CA 94108



 

5/27/2022 8:28:55 PM











  















                  























Project No.:

1

Sheet No.: 220393

Drawn By:

Author

Checked By: Checker Scale: 1/16" = 1'-0"

A2.3.03

1"


16'-0

MP-02 HANDSET ALUMINUM PANELS

BLDG3 - LEVEL 03 +77' - 6" 16'-0"

WWS-01 GLASS WINDOW WALL ASSEMBLY

BLDG3 - LEVEL 02 +61' - 6" 13'-5"

GFRC-01 GLASS FIBER REINFORCED CONCRETE

4'-7"

CITY DATUM AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2021 +48' - 0 39/64"

I

BLDG3 - LEVEL 01 +43' - 6" 03 A5.3.11

3-A

3-B

MP-02 HANDSET ALUMINUM PANELS

GFRC-01 GLASS FIBER REINFORCED CONCRETE3-D

3-C

3-E

3-F

BUILDING ELEVATION & SECTON 3-1

3-2

3-3

3-4

3-5

3-6

3-7

3-8

3-9

FAA HEIGHT LIMIT (LOWEST HEIGHT) +164' - 0" BLDG3 - MECH ROOF +156' - 6"

3-10

EL CA

2

BUILDING 03 - WEST ELEVATION

180

Architect:

SKIDM

Consultants:

7'-9"

Co

15'-0"

7'-6"

EXHAUST STACK, SMD LOUVERED MECHANICAL SCREEN WITH GREEN WALL

San

BLDG4 - LEVEL 016 +140' - 0" - ROOF FAA HEIGHT LIMIT (LOWESTBLDG3 HEIGHT) +164'+141' - 0" - 6" LEVEL 06 BLDG3 -BLDG3 MECH -ROOF +156'+125' - 6" - 6" CEILING

01 A5.3.12 SIM

1220 Concord Concord

BLDG3 - LEVEL 05 +109' - 6" BLDG3 - ROOF +141' - 6"

16'-0"

MP-02 HANDSET ALUMINUM PANELS

Ci

K

CWS-01 GLASS CURTAIN WALL ASSEMBLY, SEE BLDG 1 VERTICAL PATTERN, TYP AT THIS LOCATION.

16'-0"

MP-02 HANDSET ALUMINUM PANELS

16'-0"

BLDG3 - LEVEL 06 04 BLDG3 - LEVEL +125' +93' - 6" - 6"

360 Pine Stre San Francisc

Sur

BLDG3 - LEVEL 05 03 BLDG3 - LEVEL +109' +77' - 6" - 6" 16'-0"

636 Oakland

Aco

BLDG3 - LEVEL 04 02 BLDG3 - LEVEL +93' +61' - 6" - 6"

16'-0"

WWS-01 GLASS WINDOW WALL ASSEMBLY

130 Sutt San Francis

CITY DATUM BLDG3 - LEVEL 03 +48' - 0 39/64" BLDG3 - LEVEL +77' - 6" 01 +43' - 6"

Vertical Tr

S

102 E Blithed Valley,

BLDG3 - LEVEL 02 +61' - 6"

Trash Ma

13'-5"

GFRC-01 GLASS FIBER REINFORCED CONCRETE

4'-7"

CITY DATUM +48' - 0 39/64"

1900 Pow Emeryvill

Issued For: No.: Description S

BLDG3 - LEVEL 01 +43' - 6"

SHORT SECTION AT BUILDING 03

WWS-01 GLASS WINDOW WALL ASSEMBLY

3-10

3-9

3-8

3-7

3-6

3-5

3-4

3-3

3-2

100% SC 50% DES

2

3-1

1

BUILDING 03 - SOUTH ELEVATION 









  













 

 



 





 

 

 

 



 







BLDG3 - LEVEL 06 +125' - 6"

SKIDMORE, OWINGS & MERR

One Maritime Plaza San Francisco, California 9411

BLDG3 - LEVEL 05 +109' - 6"





S

Architect:

Consultants:

Key Plan: Code:

Susta

1220 Concord Ave., Suite 400. Concord, CA 94520

 

 

BLDG3 - LEVEL 04 +93' - 6"

25 Kearny San Fran

Civil:

Land



 

 



 



 





 

BLDG3 - LEVEL 02 +61' - 6"

 



  











Issued For: No.: Description:

LONG SECTION AT BUILDING 1 03 

 



 





4305 Hacie Pleasan

Sheet Name:

50% DESIGN DEVELOPMENT



 

560 1 Oaklan

Trash Management:

BUILDING 2 AND 3 - LEVEL 04,05,06 - ENLARGED PLAN - EAST 

P

1900 Powell St #890, Emeryville, CA 94608





Francis

102 E Blithedale Ave # 1, Mill Valley, CA 94941

   



389 Clem & Signature

Vertical Transportation:

BLDG3 - LEVEL 01 +43' - 6"

  

 

 

L

130 Sutter St., FLSeal 5, San Francisco, CA 94104

CITY DATUM +48' - 0 39/64"





  

98 Bat San Fran

Acoustics:

 



01 636 9th St. Oakland, CA 94607



 

555 Beac San Franci

Surveyor:

BLDG3 - LEVEL 03 +77' - 6"

 

 

 

360 Pine Street, 2nd Floor San Francisco, CA 94104











 





 

BLDG3 - ROOF +141' - 6"

 

 

 

C

EL CAMINO MIXE PROJECT 180 EL CAMINO

 



 



CEILING





11'-0"



  



D

BLDG3 - MECH ROOF +156' - 6"

 

P

BUIL SEC

1







 





 

 

  

 



  

 

 

  



 







 

 

Project No.:



Au

Checked By: Ch Scale:

1/16" =





 

 

  

 

 

 

  

Key Plan:





 

















 



 

 



 



 









 



 



 







 

22 Drawn By:





02

 

 

 





   



 

Seal & Signature:









 

 





 

03



 





 





01



 Sheet Name:



 



  







 

 



  







 

 



 





    



    

  

   

    



  

BUILDING 2 & LEVEL 04,05,0 ENLARGED C PLANS





5/27/2022 8:41:23 PM



BUILDING 2 AND 3 - LEVEL 04,05,06 - ENLARGED PLAN - WEST

Project No.:

2

Sheet No.: 220393

Drawn By:

Author

Checked By: Checker Scale: 1/4" = 1'-0"

ENLARGED CORE PLANS

A3


ZHUHAI CONVENTION CENTER

INTRODUCTION

PROJECT OVERVIEW Known as “The Chinese Riviera”, Zhuhai is one of the most romantic, greenest and most livable cities of China. Blessed with beautiful coastline, scenic mountains and hundreds of surrounding islands, Zhuhai is an exceptional city to live for the residents as well as an excellent destination for tourists as the city has been awarded both “The Happiest City in China” and “China’s Excellent Tourism City”. Harmonizing both unique aspects of Zhuhai as being a modern, greenest city and the beautiful setting where the Pearl River flows into the South China Sea, the design schemes draw upon inspirations from the Essense of the Bay and Urban Riviera as both reflect the unique sense of place for Zhuhai.

Zhuhai International Convention and Exhibition Center Project Exhibition Area is an interior design of the exhibition area, including conceptual design, schematic design, design development. The scope of work includes below programs and areas: - Auditorium 897 sqm - Round table meeting room 1744 sqm - Conference room and VIP room 4607 sqm

The design should enhance the buildings’ attraction and maximize the overall value through flexible approaches, including efficient utilization of space, resources, and techniques


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2020

Zhuhai Convention Center Zhuhai, China

Client // Huafa Group Project Size // 7,250 sqm Interior Design scope for auditorium, meeting and VIP rooms


ZHUHAI CONVENTION CENTER

ROUND TABLE ROOM

DESIGN FLOOR PLANS Round table conference hall plan Seat Count: 250 Area: 1606 sqm

Ceiling plan

Floor finish plan

34.7m

Floor plan

35.2m


AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2020 委托设计方

建筑 / 结构单

6

7

8

9

10

11

12

13

63000 9000

9000

9000

18000

9000

配合设计人员

9000

05 I2.03.1

U

204

243

205

3 Tiyu Dong

9000

顾问 Consu

201

94

03 I6.03

203 202

休息室 LOUNGE

14 I9.31

01 I2.03.1

00 31

1350

206

T

9800

9000

219

13 50

16 I2.03.1

贵宾休息室 VIP LOUNGE

892

11 I9.31

1350

I6.03.1

1350

36000

卫生间 RESTROOM

235 234

01 221

S

236

35200

DD 扩扩 100% 100%

卫生间 RESTROOM

49 00

50 13

220

用途 Issued No.: Desc

237

241

00 49

休息室 LOUNGE

238

储藏室 PANTRY

242

13 50

50 13

53 15

239 240

1350

229

232

228

231

227

230

208

R

209

990

212 215

男卫生间 MEN'S RESTROOM

1350

580

224

休息室 LOUNGE 222 223

13 50

13 50

9000

218

213

女卫生间 WOMEN'S RESTROOM

1350

214

216

217

9800

211

01 I6.03

9800

贵宾休息室 VIP LOUNGE

34749

9000

207

4040

989

233

210

I6.03.1 03

226

13 50

13 50

225

49 00

49 00

Q

1350

10221

1350

05 15

20 15 04 I9.31

图名 Sheet

圆桌会

圆桌会议室平面 ROUND TABLE CONFERENCE ROOM - FLOOR PLAN SCALE:

1 : 100

ROU CON - FL

01

项目编号 Pro

Drawn By:

Checked By:

比例 Scale @


87

LEVEL 04 +18.60 m

250 550

550

1350

DOOR TO BOH

EQ

550

550 250

圆桌会议室室内剖面 ROUND TABLE CONFERENCE ROOM INTERIOR SECTION SCALE:

ZHUHAI CONVENTION CENTER

1 : 50

ROUND TABLE ROOM

03

ST-01

卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED PT-01

珠光漆 PEARLESCENT PAINT

ST-01

9

卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED

10

MT-01

抛光铜 POLISHED BRONZE

MT-01

11

抛光铜 POLISHED BRONZE

LEVEL 05 MEZZANINE +29.60 m

LEVEL 05 +24.55 m

MT-01 抛光铜 POLISHED BRONZE

ST-01

卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED

01 I9.33

WD-01

高光泽红木 HIGH GLOSS RED WOOD

LEVEL 04 +18.60 m

DOOR TO CORRIDOR

250 550

550

EQ

DOOR TO NORTH VESTIBUTE

EQ

550

550 250

1910

1718

DOOR TO VIP LOUNGE

图名 Sheet Name:

室内剖面

INTERI

6

7

8

9

10

11

圆桌会议室室内剖面 ROUND 12 TABLE CONFERENCE 13 ROOM INTERIOR SECTION SCALE:

1 : 50

01

项目编号 Project No.: 22004

Drawn By: Checked By:

Autho

Checke

比例 Scale @ A0:

U SE-03 CA-02

x2

CA-03

SE-03

x4

CA-04

x2

SE-04

x2

CP-02

T

SE-05

x2

MR-01

x4

CP-02 CP-03 A-01

CP-02

LF-02

x2

LF-03 SE-02 CA-02

x6 x3

SE-02

x2

CA-02

x3

A-02 CP-01

S

SE-04

x4

LF-02 CP-01

x4

CA-01C SEE SPEC

CA-02

x9

CA-01B

SE-02

x12

CA-01A

LF-03 A-02 LF-01 SE-01

R SE-02 CA-02

x5 x4

x255

AR-01

SE-05 CP-02 MR-01

x3

Q

圆桌会议室家具平面 ROUND TABLE CONFERENCE ROOM - FURNITURE PLAN SCALE:

珠光的涂料 Pearlescent Paint

皮亚特拉灰色大理石 Piatra Grey Marble

1 : 100

01

威尼斯墙漆 Venetian Plaster 吊灯 Chandelier

卡索灰石材 Castle Grey Marble

红木 抛光桃花木 Rosewood High Gloss Mahogany

地毯 Carpet

1:5


500 500

500 500

WC-01 WC-01

WC-01 WC-01

开敞 开敞/ /开口 开口 OPEN OPENTO TOBEYOND BEYOND

EQ EQ

EQ EQ

MT-01 MT-01 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE

800 800

LEVEL LEVEL04 04 +18.60 +18.60mm

LEVEL LEVEL04 04 +18.60 +18.60mm

100 100

100 100

800 800

MT-01 MT-01 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE

A级防火墙纸 A级防火墙纸 FIRE-RATED FIRE-RATEDCLASS CLASSAA WALLCOVERING WALLCOVERING

2100 2100

2100 2100

A级防火墙纸 A级防火墙纸 FIRE-RATED FIRE-RATEDCLASS CLASSAA WALLCOVERING WALLCOVERING

AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2020 1200 1200

圆桌会议室西贵宾室 圆桌会议室西贵宾室 ROUND ROUND TABLE TABLE ROOM ROOM -- WEST WEST VIP VIP ROOM ROOM

SCALE: SCALE: 11: :50 50

RR

2400 2400

1200 1200

CABINET CABINET

13 13

1200 1200

1200 1200

2400 2400

1200 1200

CABINET CABINET

圆桌会议室西贵宾室 圆桌会议室西贵宾室 ROUND ROUND TABLE TABLE ROOM ROOM -- WEST WEST VIP VIP ROOM ROOM

SCALE: SCALE: 11: :50 50

RR

SS

50 50

术 术 ART ART

开敞 开敞/ /开口 开口 OPEN OPENTO TOBEYOND BEYOND

250 250

LEVEL LEVEL04 04 +18.60 +18.60mm

SCALE: SCALE: 11: :50 50

77

抛光白色水洗橡木 抛光白色水洗橡木 HIGH HIGHGLOSS GLOSSWHITE WHITEWASHED WASHEDOAK OAK MT-01 MT-01 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE

800 800

WD-01 WD-01 抛光红木 抛光红木 HIGHGLOSS HIGHGLOSSRED REDWOOD WOOD

圆桌会议室西贵宾室 圆桌会议室西贵宾室 ROUND ROUND TABLE TABLE ROOM ROOM -- WEST WEST VIP VIP ROOM ROOM

WD-03 WD-03

2100 2100

远处玻璃 远处玻璃 GLAZING GLAZING BEYOND BEYOND

艺 艺

1000 1000

1000 1000

EQ EQ

DOOR DOORTO TOVIP VIPLOUNGE LOUNGE

EQ EQ

1000 1000

1000 1000

RESTROOM RESTROOM

1000 1000

EQ EQ DOOR DOORTO TOVIP VIPLOUNGE LOUNGE EQ EQ

1000 1000

LEVEL LEVEL04 04 +18.60 +18.60mm

100 100

180 180 25 60 60 60 60 25

ST-01 ST-01

MT-01 MT-01 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE

卡索灰抛光大理石 卡索灰抛光大理石 CASTLE CASTLEGREY GREYMARBLE MARBLEPOLISHED POLISHED

250 250

远处玻璃 远处玻璃 GLAZING GLAZING BEYOND BEYOND

4100 4100AFF AFF CEILING CEILING

0303 I9.33 I9.33

3500 3500AFF AFF CEILING CEILING

250 250

600 600

300 300

4100 4100AFF AFF 250 250

圆桌会议室西走廊 圆桌会议室西走廊 ROUND ROUND TABLE TABLE ROOM ROOM -- WEST WEST CORRIDOR CORRIDOR

17 17

SCALE: SCALE: 11: :50 50

SS

66

03 03

02 02

RR

委托设计方 Client:

4100 4100AFF AFF

1 : 50

1000 1000

15

1000 1000

1000 1000

1000 1000

LOUNGE LOUNGE

1000 1000

1000 1000

1000 1000

1000 1000

1000 1000

1000 1000

1000 1000

WD-01 WD-01 抛光红木 抛光红木 HIGHGLOSS HIGHGLOSSRED REDWOOD WOOD

建筑 / 结构单位 Architect / Engineer:

LEVEL 04 +18.60 m

1000 1000

+/+/-

1000 1000

1000 1000

圆桌会议室西贵宾男洗手间 圆桌会议室西贵宾女洗手间 圆桌会议室西贵宾室 圆桌会议室西贵宾室 ROUND TABLE ROOM -ROUND WEST VIP MENROOM RESTROOM ROUND TABLE ROOM - WEST VIP MEN RESTROOM TABLE -- WEST ROUND TABLE ROOM WEST VIP VIP ROOM ROOM SCALE:

1 : 50

10

SCALE: SCALE: 11: :50 50

6

16 16

SCALE:

1 : 50

1000 1000

1000 1000

05

1 : 50

14

1 : 50

900

500

450 450

100 900

450 450

100 900

SCALE:

1000 1000

1000 1000

+/+/-

INTERIOR INTERIOR SEC SEC

LEVEL LEVEL04 04 +18.60 +18.60mm

珠海华发城市

圆桌会议室西走廊 圆桌会议室西走廊 ROUND ROUND TABLE TABLE ROOM ROOM -- WEST WEST CORRIDOR CORRIDOR

珠海市香洲区 Zhuhai Hu Investme 1663 Yinwan Ro Xiangzh

01 01

I

Checked CheckedBy: By: Checker Checker 比例 比例Scale Scale@@A0: A0: 1 1: 50 : 50

SKIDMORE, O ONE M SAN FRA

广

用途 Issued For: No.: Description:

Date:

广州市天河体 Guangzh 3 Tiyu Dong Heng Street, Tiyu

22 .5°

顾问 Consultants:

LEVEL 04 +18.60 m

100% DESIGN DEVELOPMENT 100% 扩扩扩扩

SCALE:

1 : 50

EQ

2020.06.19

04

用途 Issued For: No.: Description:

90 °

DD IN-PROGRESS PL 扩扩扩扩扩扩扩扩扩 100% DESIGN DEVEL 100% 扩扩扩扩

EQ

T

13 I9.33

项目编号 图纸编号 项目编号Project ProjectNo.: No.: 图纸编号Sheet SheetNo.: No 220046 220046 建筑 / 结构单位 Architect / Eng Drawn Author DrawnBy: By: Author

配合设计人员 Local Design Ins

7

4100 AFF

250 340

1000 1000

顾问 Consultants:

圆桌会议室西贵宾女洗手间 EQ EQ ROUND TABLE ROOM - WEST VIP WOMEN RESTROOM EQ

09

6

R 200 600

1000 1000

ST-05

4100 AFF

EQ

3500 AFF CEILING

EQ

500

3500 AFF CEILING

开敞 / 开口 OPEN TO BEYOND

MT-01 抛光铜 POLISHED BRONZE LEVEL 04 +18.60 m

10

A级防火墙纸 FIRE-RATED CLASS A WALLCOVERING MT-01 抛光铜 POLISHED BRONZE LEVEL 04 +18.60 m

1200 圆桌会议室放大地面饰面图 ROUND TABLE CONFERENCE ROOM - ENLARGED FLOOR FINISH PLAN 01 圆桌会议室西贵宾室

LE ROOM - WEST VIP ROOM SCALE:

1 : 50

SCALE:

13

1 : 50

2400

02

1200

CABINET

R

1200

1200

2400

SCALE:

45°

S

EQ

1927

EQ

50

4100 AFF CEILING

2100

WD-03

抛光铜 POLISHED BRONZE

800 比亚特灰抛光大理石 PIATRA GREY MARBLE POLISHED 卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED

1000

RESTROOM

1000

ST-02

EQ DOOR TO VIP LOUNGE EQ

1000

ø 560

圆桌会议室西走廊 ROUND TABLE ROOM - WEST CORRIDOR

ST-01

SCALE:

1 : 50

01 I6.02

S

四分之一圆分界线 LINE FOR QUARTER CIRCLE

LEVEL 04 +18.60 m

100

1000

20 mm 金属条 20 mm METAL STRIP

MT-01 抛光铜 POLISHED BRONZE

抛光白色水洗橡木 HIGH GLOSS WHITE WASHED OAK

1289 EQ

卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED

MT-01

ED WOOD

DOOR TO VIP LOUNGE

ST-01

45°

20 mm 金属条 20 mm METAL STRIP

03

22.5°

200

开敞 / 开口 OPEN TO BEYOND

1 : 50

EQ

大理石 MARBLE POLISHED

EQ

比亚特灰抛光大理石 PIATRA GREY MARBLE POLISHED

1200

S

03 I9.33

1000

ST-02

CABINET

圆桌会议室西贵宾室 ROUND TABLE ROOM - WEST VIP ROOM EQ

1000

.5° 22

A级防火墙纸 FIRE-RATED CLASS A WALLCOVERING

EQ

EQ

WC-01

WC-01

800

特灰抛光大理石 A GREY MARBLE POLISHED

40

圆桌会议室西贵宾女洗手间 ROUND TABLE ROOM - WEST VIP WOMEN RESTROOM

ST-02

EQ EQ

象牙抛光大理石 CREMA MARFIL MARBLE POLISHED

100

洗手间 ROOM

LEVEL 04 +18.60 m

40

DOOR DOORTO TOROUND ROUNDTABLE TABLECONFERENCE CONFERENCEHALL HALL

委托设计方 Client:

图名 图名Sheet SheetName: Name:

室内剖面 室内剖面

广州市天河体育东路体育东横街3号 Guangzhou Design Institute 3 Tiyu Dong Heng Street, Tiyu Dong Road, Tianhe District, Guangzhou

2100

U

EQ EQ

MT-01 MT-01 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE

SCALE: SCALE: 11: :50 50

3000 AFF 四分之一圆分界线CEILING LINE FOR QUARTER CIRCLE

900

象牙抛光大理石 CREMA MARFIL MARBLE POLISHED

500

mm 金属条 mm METAL STRIP

CALE:

ST-05

卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED

773

LISHED

1000 1000

SKIDMORE, OWINGS & MERRILL LLP ONE MARITIME PLAZA, SAN FRANCISCO, CA 94111

WD-03 WD-03

抛光白色水洗橡木 抛光白色水洗橡木 HIGH HIGHGLOSS GLOSSWHITE WHITEWASHED WASHEDOAK OAK

广州市设计院

3000 AFF CEILING ST-01

ST-02

1000 1000

配合设计人员 Local Design Institute:

22.5°

石材门槛 STONE THRESHOLD

2100 2100

象牙抛光大理石 CREMA MARFIL MARBLE POLISHED

500

MT-01 MT-01 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE

珠海华发城市运营投资控股有限公司 珠海市香洲区湾仔街道银湾路1663号 Zhuhai Huafa Urban Operation Investment Holdings Co., Ltd. 1663 Yinwan Road, Wanzai Neighborhood, Xiangzhou District, Zhuhai

ST-05

900

450 450

900

洗手间 ROOM

CALE:

600

100

650 650 100 100 +/+/-

3000 AFF CEILING

800 800

3000 AFF CEILING A级防火墙纸 A级防火墙纸 ST-05 FIRE-RATED FIRE-RATEDCLASS CLASSAA 象牙抛光大理石 WALLCOVERING WALLCOVERING 开敞 MT-01 /开 开敞/MARBLE 开 CREMA MARFIL POLISHED MT-01 抛光铜 抛光铜 口 ST-04 口 POLISHED POLISHEDBRONZE BRONZE OPEN OPENTO TO 马赛克抛光石材 BEYOND MT-01 BEYOND MT-01 STONE MASAIC POLISHED 抛光铜 抛光铜 POLISHED POLISHEDBRONZE BRONZE LEVEL LEVEL04 04 LEVEL 04 +18.60 +18.60mm +18.60 m

敞 敞/ /开 开 BLE POLISHED

EN TO PEN TO YOND EYOND

4100 4100AFF AFF CEILING CEILING ST-01 ST-01 卡索灰抛光大理石 卡索灰抛光大理石 CASTLE CASTLEGREY GREYMARBLE MARBLEPOLISHED POLISHED

100 100

EQ

100

EQ

2200 2200

500

3500 3500AFF AFF CEILING CEILING WC-01 WC-01

450 450

6

02

R

80 280

221 260 239

180 640

3922 4100 AFF CEILING

01 大理石 Y MARBLE POLISHED

600

5038

3524

1316

MT-01 抛光铜 POLISHED BRONZE

2100

10

WD-03

MT-01

1000

1000

1000

1000

1000

1000

1000

EQ

DOOR TO ROUND TABLE CONFERENCE HALL

EQ

1000

1000

1000

1000

+/-

100

800

01 红木 GLOSS RED WOOD

11

抛光白色水洗橡木 HIGH GLOSS WHITE WASHED OAK

室内剖面

INTERIOR SECTIONS

LEVEL 04 +18.60 m

圆桌会议室西走廊 ROUND TABLE ROOM - WEST CORRIDOR SCALE:

12 正北 True North

图名 Sheet Name:

抛光铜 POLISHED BRONZE

1 : 50

01

项目编号 Project No.: 220046

Drawn By: Checked By:

Author Checker

比例 Scale @ A0:

图名 Sheet Name:

图纸编号 Sheet No.:

圆桌会议室地

I6.03.2

ROUND T CONFERE FLOOR FI

1 : 50

圆桌会议室放大地面饰面图01 ROUND TABLE CONFERENCE ROOM - ENLARGED FLOOR FINISH PLAN 01 SCALE:

1 : 50

01

项目编号 Project No.: 220046

Drawn By: Checked By:

Author Checker

比例 Scale @ A0:

1 : 50

图纸


ZHUHAI CONVENTION CENTER

REPORT AUDITORIUM

DESIGN FLOOR PLANS Report auditorium Seat Count: 578 Area: 1058 sqm

21.7m

Level 3 44.2m

Level 2


LEVEL 02 +6.90 m

委托设计方 Client:

阶梯报告厅室内剖面

13 REPORT AUDITORIUM INTERIOR SECTION AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 02 2020 SCALE:

1 : 50

65 29

珠海华发城市运营投资控

12 111

2332

9

10

11

16 I6.02.1

12

2800

5600

2800

5600

2800

1539

65 29

6174

建筑 / 结构单位 Architect / Engineer:

13

107 112

5347

珠海市香洲区湾仔街道银 Zhuhai Huafa Urban Investment Holdings 1663 Yinwan Road, Wanza Xiangzhou District,

I6.02.1

2492

11

SKIDMORE, OWINGS & ONE MARITIME P SAN FRANCISCO, C

I6.02.1

R

配合设计人员 Local Design Institute:

LEVEL 04 +18.60 m

1148

500

113

680

广州市设计院

05 I9.21

广州市天河体育东路体育 Guangzhou Design 3 Tiyu Dong Heng Street, Tiyu Dong Roa

390

13000680

680

680

680

1400

02 I6.02

680

16 I9.21

1800

1000

108

顾问 Consultants:

3650

3110

4865

02

03

1173

4068

4370

6680 5883

02 I6.02

5278

9

109

DD IN-PROGRESS PLANS 扩扩扩扩扩扩扩扩扩 100% DESIGN DEVELOPMENT 100% 扩扩扩扩

110

101

900

2150

1120

103 3000

Q

600

114

弱电 LOW VOLTAGE

117

1400 5741

9000

880

6000

102

1568

6500

EQ

1500

6500

105

7150

9110

7699

用途 Issued For: No.: Description:

LEVEL 03 +13.00 m

7093

8495

8

I6.02.1

3650

01 04

LEVEL 02 +6.90 m

115

正北 True 图名 Sheet Name:

MT-05

音频控制室 AV CONTROL ROOM

MT-05

穿孔铝金属板 PERFORATED ALUMINUM METAL PANEL

室内剖面

弱电 LOW VOLTAGE

INTERIOR SECTIO

穿孔铝金属板 PERFORATED ALUMINUM METAL PANEL

6/19/2020 6:56:11 PM

阶梯报告厅室内剖面 REPORT AUDITORIUM INTERIOR SECTION SCALE:

1 : 50

01

项目编号 Project No.: 220046

Drawn By:

图纸编号 Sheet No.:

I6.

Author

Checked By:

Checker

比例 Scale @ A0:

1 : 50

116

阶梯报告厅放大平面01 REPORT AUDITORIUM - ENLARGED PLAN 01 21 I2.02

7391

SCALE:

02 I6.02

9

9000

17483

8

9000

1800

360

03 I9.11

10

11

9000

02 I9.21

9000

12

1 : 50

13

9000

03

36267

1800

S 01 I9.21

101

800

103

102

9000

9000

105

111 I6.02.1

1168

12 01 I6.02

典型 TYP

R

426 974

2346

112

107

108 113

6178

9000

1400

03 I2.02

600

109

EQ

1168

110

104

弱电 LOW VOLTAGE

Q

114

117

106

106

115

音频控制室 AV CONTROL ROOM

104

弱电 LOW VOLTAGE

图名 Sheet Name:

阶梯报告厅平面

3800

REPORT AUDITORIUM FLOOR PLAN

116 03 I9.21

阶梯报告厅放大平面02 REPORT AUDITORIUM - ENLARGED PLAN 02 SCALE:

1 : 50

21

2层 L2

3层 L3

阶梯报告厅平面 REPORT AUDITORIUM - FLOOR PLAN SCALE:

1 : 100

01

项目编号 Project No.: 220046

Drawn By: Checked By:

Author Checker

比例 Scale @ A0: As indicated

图纸编号 Sheet


ZHUHAI CONVENTION CENTER

DESIGN FLOOR PLANS Report auditorium Seat Count: 500 Area: 835 sqm

Level 2

Level 1

CONFERENCE AUDITORIUM


-0.05 m

-0.05 m

24280

WD-02 高光泽蒙多那木或类似 HIGH GLOSS MADRONA OR SIMILAR

WD-02 高光泽蒙多那木或类似 HIGH GLOSS MADRONA OR SIMILAR

AIR RETURN BEHIND THE DOOR TRANSOM 侧门回风口

阶梯会议室-西立面 CONFERENCE AUDITORIUM - WEST SCALE:

1 : 50

PT-01 珠光漆 PEARLESCENT PAINT

阶梯会议室-南立面 CONFERENCE AUDITORIUM - SOUTH

19

SCALE:

03

1 : 50

AREZOO TORABI | ASSOCIATE MEMBER, AIA | SOM 2020 委托设计方 Client:

珠海华发城市运营投资控股有限公司

WD-02 高光泽蒙多那木或类似 HIGH GLOSS MADRONA OR SIMILAR

460

672

623

2740

3700

500 667

2892 4287

AIR SUPPLY AT THE LAST ROWS OF THE AUDIENCE AREA BEHIND THE WALL FIN. 观众区最后几排座位空调

6000

5819

8038

.95.

2020.06.19

室内造型侧送

1 : 10

04

500

100

SCALE:

I9.11

2475

100% DESIGN DEVELOPMENT 100% 扩扩扩扩

参见饰面列表和立面图,余同 SCHEDULED FINISH SEE ELEVATIONS, TYP

002

2250

3200

501 811

1100

2000

5700

Date:

07

14

19

3590 I6.01.1

2800护角条 CORNER BEAD

石门套大样(小) STONE PORTAL DETAIL (SMALL)

22 I9.11

16

1 : 10

FEC

用途 Issued For: No.: Description:

送风,两侧结合

1 : 50

SCALE:

ENTRY FLOOR +6.00M AFF

强电间 ELEC.

02

I6.01.1

4165

4300

550

17

12

2250

H

1200

003

1605

1150

EQ A

11

10MM垫块 10MM SCRIBE

90

04 I9.12

广州市天河体育东路体育东横街3号 Guangzhou Design Institute 3 Tiyu Dong Heng Street, Tiyu Dong Road, Tianhe District, Guangzhou

顾问 Consultants:

2200

205

SCALE:

前厅墙板大样 VESTIBULE WALL PANEL DETAIL

CEILING +9.70M AFF

EQ

355 60 06

16

I6.01.1

石材 - 参见立面图,余同 SCHEDULED STONE SEE ELEVATIONS, TYP

EQ

1027

贵宾休息室 01 VIP LOUNGE

.15. 125

EQ

广州市设计院

EQ

2000

参考门套大样 REFER TO PORTAL DETAIL

配合设计人员 Local Design Institute:

006

330

SKIDMORE, OWINGS & MERRILL LLP ONE MARITIME PLAZA, SAN FRANCISCO, CA 94111

2300

EQ A

470

200

G

470 2070

200

PERFORATED ALUM. METAL PANEL TYP.

阶梯会议室放大平面02 CONFERENCE AUDITORIUM - ENLARGED PLAN 02

2070

L

PERFORATED ALUM. METAL PANEL TYP. MT-03

6毫米MT-01饰条 6MM MT-01 REVEAL

后方有灭火器时,此为可开启门扇 OPERABLE DOOR FOR FIRE EXTINGUISHER BEHIND WHERE OCCURS

珠海市香洲区湾仔街道银湾路1663号 Zhuhai Huafa Urban Operation MT-02 Investment Holdings Co., Ltd. 穿孔铝金属板,典型 1663 Yinwan Road, Wanzai Neighborhood, Xiangzhou District, Zhuhai

K

建筑 / 结构单位 Architect / Engineer: 穿孔铝金属板,典型

WD-02 高光泽蒙多那木或类似 HIGH GLOSS MADRONA OR SIMILAR

金属面板 - 参见立面图,余同 SCHEDULED METAL PANEL SEE ELEVATIONS, TYP

2799

J

ST-01 卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED

ST-01 卡索灰抛光大理石 CASTLE GREY MARBLE POLISHED

6200

H

100 50

G

WD-02 高光泽蒙多那木或类似 HIGH GLOSS MADRONA OR SIMILAR

LEVEL 01 -0.05 m

墙面回风口 AIR RETURN ON WALL 涂漆以匹配WD-02 PAINT TO MATCH WD-02

INTERIOR

阶梯会议室室内剖面 CONFERENCE AUDITORIUM - SECTION SCALE:

200

参考门表 REFER TO DOOR SCHEDULE

60

16 I2.01

03 I6.01

550

180 MAX

15

3435

.55.

2270

15

2820

15

150°

2820

100 EQ

500

EQ

+/- 166

EQ

140

2820

140

2610

110 PERFORATED AREA

2610

24280

04

01

1 : 50

1 : 10

项目编号 Project No.: 220046

Drawn By: Checked By:

Author Checker

图纸编号 Sheet No.:

I9.11

2020.06.05

2020.06.19

Date:

正北 True North

I2.01

广州市天河体育东路体育东横街3号 Guangzhou Design Institute 3 Tiyu Dong Heng Street, Tiyu Dong Road, Tianhe District, Guangzhou

顾问 Consultants:

用途 Issued For: No.: Description:

DD IN-PROGRESS PLANS 扩扩扩扩扩扩扩扩扩 100% DESIGN DEVELOPMENT 100% 扩扩扩扩

图名 Sheet Name:

图纸编号 Sheet No.:

阶梯会议室平面

Author

Checker

CONFERENCE AUDITORIUM FLOOR PLAN

Drawn By:

Checked By:

项目编号 Project No.: 220046

比例 Scale @ A0: As indicated

比例 Scale @ A0: As indicated

SCALE:

SCALE:

INTERIOR DETAILS

2层 L2

1层 L1

01

舞台台阶大样 STAGE STAIR DETAIL

22

1 : 100

T. O. FIN. FLR.

类似 SIM.

正北 True North 图名 Sheet Name:

室内大样

I9.11

参见地板饰面列表 SCHEDULED FLOOR FINISH

弱电 LOW VOLTAGE

类似 SIM.

03 I9.11

WD-02

类似 SIM.

014

R 58330

R 47680

010

008

R 56930 R 46280

I9.11

21

R 55530

型 TYP 50

01 I6.01

R 54130 013

900

300

TYP.典典

典型1 TYP1

001

WDF-02

11

R 52730

R 44880

300 典

05

R 51330

02

R 43480

3435

I6.01.1

音频控制室 AV CONTROL ROOM

1 : 10

7570

100

实木踏步板和踢板 SOLID WOOD TREAD AND RISER

T. O. FIN. FLR.

SCALE:

R 42080

04

阶梯大样 STEP DETAIL R 40680

300

1400

SCALE:

1 : 20

R 49930

1100

典型2 TYP2

1200 650 1500

370

墙翅大样 WALL FIN DETAIL

R 36480

R 39280

钢楼梯底部连接(如有需要) STEEL STAIR BOTTOM CONNECTION AS REQUIRED

参考门套大样 REFER TO PORTAL DETAIL

1000

阶梯会议室放大平面01 CONFERENCE AUDITORIUM - ENLARGED PLAN 01

20

8070

690 140 PERFORATED AREA

3190

参见地板饰面列表 SCHEDULED FLOOR FINISH

I6.01.1

140

19

009

I6.01

11 典型 I9.11 TYP.

19

012

地毯边塞入踢板下端 TACK CARPET UNDER RISER

R 37880

支撑框架(如有需要) FRAMING AS REQUIRED

SCALE:

3080

007

002 03 I9.11

300

2270

210

必要时支撑 SUPPORT AS REQ'D.

5280 15962

12

400

21

1500 650

1:5

金属面板 - 参见立面图,余同 SCHEDULED METAL PANEL SEE ELEVATIONS, TYP

280

2500

T. O. FIN. FLR. 8780

004

阶梯会议室平面 CONFERENCE AUDITORIUM - FLOOR PLAN

SCALE:

1900

1560 REA DA ATE FOR PER

H

005

920

170

图纸 LIGHTING FIXTURE PER CONSULTANT

大样 DETAIL

22

2490

011

55

150°

2820

210

样 IL

1 : 10

厚度由制造商提供 THICKNESS TO BE PROVIDED BY MANUFACTURER

灯具,参见照明顾问

1 : 50

04 I2.01

03

15

1900

1560 REA DA ATE FOR PER

1:5

100

Author Checker

7838

电气室 ELEC ROOM

1 : 10

强电间 ELEC.

006

003

0° 15

170

样 IL

典型 TYP.

300 TYP.典典

1200

Drawn By:

石材 - 参见立面图,余同 SCHEDULED STONE SEE ELEVATIONS, TYP

SCALE:

T. O. FIN. FLR.

项目编号 Project No.: 220046

Checked By:

23765

地毯垫底层 CARPET PAD UNDERLAY

01

比例 Scale @ A0:

石门套大样(大) STONE PORTAL DETAIL (LARGE)

1400

1 : 50

L

100

K

J

H

G

135° 150

I9.11

200

AIR RETURN BEHIND THE DOOR TRANSOM 侧门回风口

100

12 I9.11

图名 Sheet Name:

室内剖面

OBLIQUE 10MM垫块 10MM SCRIBE

100 100

MT-01 抛光青铜饰面 POLISHED BRONZE

AIR RETURN BEHIND THE DOOR TRANSOM 侧门回风口


JEC MASTERPLAN

PROJECT OVERVIEW

JEC MASTERPLAN

Jeddah, KSA

Client // Jeddah Economic Company (JEC) Project Size // 5,300,000 sqm Schematic Masterplan Design

PROJECT OVERVIEW JEC City is envisioned as a world class modern landmark development LQ 6DXGL $UDELD RQ D VLWH ORFDWHG MXVW Rႇ WKH VKRUH RI WKH 5HG 6HD WR the north of the metropolitan region of the City of Jeddah. As a vibrant satellite sub–center on a land area of 5,300,000 square meters, JEC City is a project made up of distinctive districts which include a commercial FRUH RI LQWHUQDWLRQDO EXVLQHVVHV ¿QHVW OLIHVW\OH HVWDEOLVKPHQW XQLTXH open spaces, and diverse residential communities. In addition, the -(& &LW\ 0DVWHU 3ODQ KDV ORFDWHG D PDJQL¿FHQW LFRQLF WRZHU DV WKH center piece of the development – the JEC Tower. The Tower will not only attract local but also foreign visitors to the city and will also be the PRVW VLJQL¿FDQW ODQGPDUN RI WKH GHYHORSPHQW PDUNLQJ -(& &LW\ DV DQ icon within the world’s most important developments. JEC City will create active residential and commercial lifestyles in a form and environment that is unlike any other along the Red Sea coastline, setting an example for a new concept of commercial, retail and mix–use housing that will steer the growth and future development of the area. JEC City is expected to accommodate 213,714 residential population and host 197,541 non–residential populations who will enjoy its world class facilities.


JEC City is envisioned as a world class modern landmark development in Saudi Arabia.


JEC MASTERPLAN

GENERATOR

SITE & CONTEXT Today there is a need to inves gate how similar principles to those explained above can be used to enhance current planning and building practice to make them more responsive to the socio-cultural & religious traditions of Islamic society | The modern built environment in Jeddah lacks the merits of traditional architecture | It is Western in form and style and maintains little continuity with local history.

gateway to the two holy mosques over 1300 years

sea view

direction to Mecca

The layout of Jeddah AI-Qademah was irregular, yet coherent, based on a physical arrangement that evolved over a long period. The important location of the Jeddah Al-Qademah along the shoreline of the Red Sea and its function as a seaport for pilgrims on their way to Mecca contributed greatly to the development of commercial activities. In all walled cities, the location of the gates was extremely important | Jeddah’s ancient gates (bab) included Bab Medina and Bab Al-Jadid to the north, Bab Mecca to the east, and Bab Sharif to the south. Friday midday prayers determined that the Great Mosque of Jeddah AlQademah is located in the center of the city where city’s news could be exchanged and a center for religious education. Also, in case in the layout of many other Islamic cities, its importance and central loca on invited commercial activities (the souk, or market) to be located around it.


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2013

OPPORTUNITIES & CONSTRAINTS

Directions

7UDႈF

Axial relationship of tower

)RU IUHH WUD௻F ÀRZ PLQLPL]H

provide organizing element

number of signalized intersection

axial relationship of tower

N (Medina) Mecca

S (Old Jeddah)

Red sea

Interchanges

Western Bridge

Consider impact of

:HVWHUQ EULGJH WUDI¿F WR EH

physical space required for interchanges

diverted away from site interchanges restriction

need for bridge

Land Value & Water

Fill - Tower & Water Body

the desired central water body

.HHS ¿OO WR D PLQLPXP E\

adds another point of value

concentrating it only around JEC tower and water area

high value land around water

Views

Open Space

View to creek and view to red

Protect open space network

sea provide value

from outside exposure

view to

Creek

view to

Red Sea

Land Value & Corniche

Land Value & Tower

Views to red sea provides

Tower provides value for the

another value opportunity

land, proximity should relate to density

high value land around tower high value land around red sea


JEC MASTERPLAN

ANALYSIS

SITE & CONTEXT

North east road Eastern bridge

Northern road

Eastern road

Obhur road - Creek side

Western bridge

Obhur road - Sea side

Road system

Building heights

Open spaces

Pedestrian network

Mid

View to water from tall buildings

Lans value elements

7UDႈF ÀRZ

land use parcels


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2013

RECOMMENDATION After going through a rigorous process of analysis and after reviewing compliance of the designs with Urban Design Principles and Methodology as well as the Open Space Strategy, we outcome of the design is base on reasons az listed below: 7KH 6LWH 2UJDQL]DWLRQ LV FOHDUO\ LQÀXHQFHG E\ WKH DUFKLWHF WXUH RI the tower and serves to support the tower’s design concept. - The massing of the buildings responds clearly to the value of the land, providing maximum return on investment for the Client - The Lagoon’s potential for enhancing land value and open space is maximized without exceeding the maximum allowable water area.


JEC MASTERPLAN

STAGES

PHASES

Stage one

Stage two

Phase 1

Phase 2A

AREA: 1.2 Million SQM

AREA: 1 Million SQM

GFA: 3.4 Million SQM

GFA: 2.4 Million SQM

Stage three

Stage four

Phase 2B

Phase 2C

AREA: 1 Million SQM

AREA: 1 Million SQM

GFA: 1.7 Million SQM

GFA: 2.3 Million SQM

6WDJH ¿YH Phase 2D AREA: 1 Million SQM GFA: 1.6 Million SQM


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2013

RECOMMENDATION - The subdivision of public space into Public, Semi-Public, and SemiPrivate is clearly enforced by the building massing - There is a clear well shaded and interconnected pedestri-an network tying together the site, and the hierarchy of pedestrian links clearly follows the Public, Semi-Public, and Semi- Private template. 7KH GHVLJQ LV ÀH[LEOH DQG FDQ EH HDVLO\ SKDVHG LQ PXOWLSOH ZD\V ZLWKRXW DႇHFWLQJ WKH SK\VLFDO DQG ¿QDQFLDO LQWHJULW\ RI WKH ZKROH - The use mix can be easily adjusted based on market requirements ZLWKRXW DႇHFWLQJ WKH SK\VLFDO DQG ¿QDQFLDO LQWHJULW\ RI WKH ZKROH - The geometric design is unique among the master plans executed in the Middle East and creates a distinct character for the development


JEC MASTERPLAN

URBAN DSIGN

URBAN DESIGN PRINCIPLES TO BE APPLIED COMMUNITIES

PEDESTRIAN ROUTE HIERARCHY

OPEN SPACE HIERARCHY

Just like the overall scale of the development, Pedestrian routes must be subdivided into various types with varying degrees of accessibility

Open spaces are NOT to be designed in isolation. All open space elements must provide links to other elements of the open space network allowing pedestrian circulation throughout the development. Where major roads create a hazard to pedestrian links, elevated land bridges similar to the High Line in Manhattan allow pedestrians to cross unimpeded in well-shaded landscaped surrounding.

- Public pedestrian routes - Semi-public pedestrian routes - Semi-private pedestrian routes

DEVELOPMENT STRATEGY DRIVERS 7+( 5(' 6($ 9,(: The layout and building height strategy must be arranged so that many parcels as possible can enjoy the Red Sea and its spectacular sunsets. This will help drive high value land from the site periphery further inland. 7+( /$*2216 By creating water body inside the site, it is possible to create another high land value further from the site’s edge. Parcels which have direct views of both the lagoons and Red Sea become very valuable. 6(3$5$7,21 2) 75$)),& 7<3(6 Since the tower, retail and commercial components will be a worldwide attraction drawing many visitors HYHU\ GD\ LW LV LPSRUWDQW WKDW WKLV ÀRZ RI WRXULVWV and sightseers not interfere with the resident population’s ability to circulate into their dwellings and neighborhoods unimpeded.

URBAN DESIGN PRINCIPLES TO BE APPLIED COMMUNITIES The design must simultaneously allow unity of the whole and create unique pockets of identity, which foster the creation of intimate neighborhoods and communities. This means that the entire design must be based on the gradation of 3XEOLF VFDOH 6HPL SXEOLF VFDOH 6HPL SULYDWH VFDOH 3ULYDWH VFDOH


'(6,*1 2) ,1',9,'8$/ %8,/',1*

'(6,*1 2) ,1',9,'8$/ 3/276

'(6,*1 2) 675((7 6(&7,21 $1' %/2&.6

As in traditional planning, each building is to be considered not in isolation but in its surrounding context. The massing must help provide a scaling of space, creating semi-private enclaves to encourage a sense of safety and community. Individual parcel development control regulations must be designed with entire clusters in mind regardless of the ownership structure of any given plot.

Building must NOT be aligned along roads creating dead spaces exposed to sun dust and wind between structures. Taking a cue from the traditional development in the Middle East, a scaled-up courtyard typology will b encouraged. Providing shading and wind protection, creating semi-private community spaces which foster neighborly relations and provide for parcel layout wherein the corners of the semi-private spaces are contained by corner buildings, creating a protected environment for the users of those buildings.

All streets are to be designed with pedestrians in mind. This means the provision of comfortable sidewalks even to the lowest road hierarchy. The building podiums are designed on truly urban standards with zero plot line setback facing the street, allowing the height of the buildings to shade the street. A shaded arcade is required of most buildings, providing a more comfortable walking environment for all. Many streets take on the character of boulevards, making walking to various on-site destinations desirable. This will reduce YHKLFXODU WUDႈF DQG SURYLGH D KHDOWK EHQH¿W WR FRPPXQLW\


COURTYARD BY MARRIOT

PROJECT OVERVIEW

PROJECT OVERVIEW The subject site is strategically located between Central Business District and the airport in close vicinity to King Abdullah Financial District. The site is located in the southern side of Sahafa district, approximately 20 minute drive from Airport. Measuring approximately 11,043 sqm on Takhassusi Road 2.0 km from King Abdul Financial District, The plot is approximately 26 kilometers from King Khaled International Airport. The site area is 11,180sqm allowing 26,500sqm of build useful area. It is 5 star hotel with 200 room, providing restaurants, function rooms, retail spaces.


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2015

COURTYARD BY MARRIOT

Riyadh, KSA

Client // Al Homaidhi Site Area // 11,180 sqm Project Size // 24,000 sqm Schematic design of 4* Hotel


COURTYARD BY MARRIOT

ANALYSIS & DRAWINGS

SITE LOCATION & CONTEXT The site has 65 meters frontage at Al Takhassusi Road and boarder by dual-lane 3meters wide Al Yasmine Street and the 20 meter wide Al Jabal Al Aswad Street.

6m

6m

RETAIL

RO AD

HOTEL PART 2 (1B+G+1)

2m

60m COURTYARD BY MARRIOTT PLOT 11043 m2

2m

2m EXISTING E VILLAS

6m

HOTEL PART 1 AL (1B+G+M+5) JAB AL AL AS 4m WA DS TRE ET

Maximum Plot Coverage: 40% Above Ground Level = 4417m2 60% Landscape and Parking = 6626m2

GARDEN

AL TAK HS SU SI R OA D

AL YAS ME EN

6m 6m 4m 2m

65m

Set Backs: From Takhassusi Road From Al Yasmine Street From Al Jabal Al Aswad Street From neighbors

TO AIRPORT

FUTURE EXPANSION

Allowable Built Useful area: BUA = Total Plot Area Times 2.4 factor 11043m2 x 2.4 = 26503m2 Allowable Height Part 1 (60m Deep) G+M+5 (Main Entrance should be within Part 1) Part 2 G+1

$

%

&

'

(

)

*

+

-

$

%

&

'

TO KAFD

(

$

%

&

'

(

7

7

67$,5

$,5 &5(: /281*(

92,' 72 %(/2:

0((7,1* 5220 Pð

6(59,&( )/225 Pð

92,' 72 %(/2:

$'0,1 Pð

'1

0((7,1* 5220 Pð

;

92,' 72 %(/2:

0((7,1* 5220 Pð

;

0((7,1* 5220 Pð

35()81&7,21 %(/2:

:

&255,'25

%$//5220 %(/2:

0(3 Pð

<

72,/(76 Pð 6725$*( Pð

67$,5

6725$*( Pð

67$,5

<

72,/(76 Pð

0((7,1* 5220 Pð

9

:

%2+ Pð

,7

2)),&( Pð

%5($.287 5(&(37,21 Pð

8

9

35$<(5 5220 Pð

%5,'*( Pð

/2%%< Pð

/8 7,2 1

.,'6 &/8% &/26,1* 5220 Pð

6(59,&( /2%%<

0(3

8

0(3 $'0,1 Pð

67$,5

$%

&255,'25

$

%

&

'

(

)

*

+

-

$

%

&

'

(

)

*

+

-

$

3ODQ /HJHQG

%

&

'

(

)

*

+

-

)2+

&,5&8/$7,21

3ODQ /HJHQG

%2+

Mezzanine level

Service level

0(3

&,5&8/$7,21

%2+

0(3

)

*

+

0

5(-(&7,21 /$1(

-

$

%

&

'

(

$

0(3

67$,5

-

$

%

&

'

(

8

68,7( Pð

67$,5

9(67,%8/( %$// 5220 Pð

35( )81&7,21 Pð

:

%2+

%(// %2<

/8**8*( Pð

&255,'25 0(3 Pð

5(&(37,21 Pð )5217 2)),&( Pð

9$/(7

/,1(1 Pð 0(3

0(3 Pð

68,7( Pð

&21&(,5*(

0(3

%2+

0(3 Pð

/$1'6&$3(

&/2$. 2)),&( Pð

/,)7 /2%%<

6&$11,1*

9(67,%8/(

23(1

0(3

7+( 0$5.(7 Pð

$// '$< ',1,1* Pð

;

83

/$1'6&$3( &$)( %86,1(66 &(17(5

35$<(5 5220

/$1'6&$3( 83

72,/(76 Pð

72,/(76 Pð

67$,5

67$,5 3$175< Pð

<

/$1'6&$3(

6(&85,7<

$

3(',675,$1 (175$1&(

/$1'6&$3(

;

<

72,/(7

/2%%< /281*( Pð

72,/(7

0806 5220

$%/87,21

9

:

6(&85,7< Pð

+

.,7&+(1 Pð

*

6&$1

)

9

63(&,$/7< 5(67$85$17 Pð

/$1'6&$3(

/2%%< Pð

.,7&+(1 Pð

+($/7+ &/8% (175<

9,3 /281*( Pð

(

8

$9 Pð

'

7

.,7&+(1 Pð

6725$*( Pð

&

7

%

6(&85,7<

/$< 29(5 /$1(

(

'

&

%

0

$

%

&

'

(

)

*

+

-

$

%

&

'

(

)

5(-(&7,21 /$1(

*

+

-

$

%

&

'

(

)

*

+

-

$

%

&

'

(

)

*

+

-

3ODQ /HJHQG &$5 3$5.,1*6

3ODQ /HJHQG

)2+

%$6(0(17 63$&(6 &,5&8/$7,21

&,5&8/$7,21

*5281' 63$&(6 727$/ 63$&(6

%2+

%2+

0

0(3

0(3

0

$&&202'$7,21 52206

$&&202'$7,21 68,7(

Ground level

Typical level $ -

$

%

&

'

%8/. 352'8&7,21 $1' 5220 6(59,&(6 Pð

9$/(7 /$81'5< Pð

:

&

'

(

$

%

,7

0(3

/,*+7 :(,*+7 522)

6$81$

322/ '(&.

/,1(1

672

67($0

0(3

0(3

68,7( Pð

*<0 )$&,/,7,(6 Pð

&

'

; /$1'6&$3(

67$)) 81,)250 ,668$1&( Pð

(

0(3

3$157<

*<0 )$&,/,7,(6 Pð

67$,5 7(03 /$81'5< 6725$*( Pð

&&79 Pð

:

/2%%< Pð

67$)) /2&.(56 Pð

67$,5

5$03 83

)(0$/( *<0 Pð

,1'225 322/ Pð

<

9

$'0,1 Pð

6(&85,7< Pð 6&$11,1*

68,7( Pð

322/ 3/$17 Pð

)

*

+

%$5%(5 6+23 Pð

0$/( *<0 Pð

% $

%

8

&255,'25 Pð

0(3

%2+ Pð

$

/$1'6&$3(

;

5(&(,9,1* 385&+86,1* 2)),&( Pð

&

-

)1% 6725$*( Pð /2$',1* 81/2$',1*

(

'

+

N

(1*,1((5,1* $1' 0$,17(1$1&( Pð

/,)7 /2%%<

67$,5

6(59,&(6 Pð

9

0(3 2(0 6725( Pð

*

*

0(3

:$7(5 7$1.6 %(/2:

)

)

:$67( +$1'/,1* Pð

(

8

'

7

67$)) &$17((1 Pð

0(3 Pð

&

7 %$.(5< $1' 3$675< Pð

67$,5

%

(

* +

0(3

)

(

5$03 '1

'

75($70(17 Pð

-

<

&

%

$

$ /$1'6&$3(

67$,5

* 67$,5

&$5 3$5.,1*6 %$6(0(17 63$&(6

3ODQ /HJHQG

&,5&8/$7,21

$

%

&

'

(

)

*

+

-

$

%

&

'

(

)

*

+

*5281' 63$&(6

)

727$/ 63$&(6

%2+

3ODQ /HJHQG

0(3

)2+

$&&202'$7,21 68,7(

&,5&8/$7,21

$&&202'$7,21 52206

( '

%2+

0(3

&

% $

Basement level

First level

-


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2015

SCHEMATIC DESIGN DRAWINGS

H-4

H-5

H-A

H-B

250 H-1

100

600

670

° SOT

100

1400

100

3200

250

1325

100

1650

4000

4575

100

100

2480

SOT

3250

SOT °

1400

H-1

H-C

9570

300 100

280 250

H-2

H-2

1825

250

1525

1425

200

200

1575

H-A

H-B

H-C

Suite 2 H-H

H-W

H-I

64 35

100

4350

100

3309

900

H-X

200

550 1200

550

600

100

1300

100

100

1050

100

1800

100

3560 700

1085

3750

950

100

1250

H-5

250

250

1200

250

750

1085

562

H-H

Facade details

Suite 1

H-Z

H-Y

H-I

H-5


COURTYARD BY MARRIOT

DRAWINGS

N AL YASMEEN ROAD

CC

84 00

H

O

5000

FF

U P

I

C

P

K

42 42 0

HOT STATION

HOT STATION CHILER

D

I

S

D

H

R

O

H-2

8000

O

SERVICE LIFT G-048

GUEST LIFTS G-011 TEA ROOMS RESTAURANT G-013

SERVICE LIFTS G-010

SERVICE LOBBY G-016

LIFT LOBBY G-009

H-V

P

Section 42 ---

STAIR 03 G-018

H-3 H-W

ELEC. G-020 CORRIDOR G-055

E 666,493.984 N 2,742,300.262

FRONT OFFICE G-022

H-5 SECURITY G-003

GUEST VIEWING SAFETY ROOM DEPOSIT

MARKET G-005

VALET G-004

G-080

CLOAK / OFFICE G-073

F-6

HOTEL LOBBY G-006

H-6

Double Height Area

H-Y

STAIR 06 G-035

H-7

F-S

F-8

84 00

CORRIDOR G-046

STAIR 01 G-045

SECURITY 1 G-057

84 00

F-8

50 84 0 25 10 00 18

Double Height Area

F-7 FEMALE RESTROOM G-036

H-X

ALL DAY DINING G-025

H-6

8000

52 20 0

84 00

LOBBY G-072 MALE RESTROOM G-037

AIR IN TAKE G-054

JANITOR G-081

FOM MGR G-078

H-5

ELEC CBD G-065

HOT CART

COLD CART

CORRIDOR G-047

CAFE SUPPORT PANTRY G-076

PANTRY G-008

H-8

E 666,337.353 N 2,742,340.423

H-8

F-T

E 666,399.269 N 2,742,305.326

L20-400

49835

1

75 00

CC

E 666,484.088 N 2,742,275.136

20 42

86998

BB

L20-200

84 00

-1.50 FFL

30 17 5

F-Y

H-7

H-Z

STAIR 02 G-026

4000

F-R

F-W

G-077

4

AA

L20-400

M - RESTROOM G-024

STAIR 05 G-063

ELEC ROOM G-053 CORRIDOR G-068 GARDEN STORE G-067

JAN. LOBBY G-071 G-069 JAN. G-070

L20-201

1100 CLEAR

F - RESTROOM G-023

+0.000 FFL

BALL ROOM G-038

H-4

STORAGE G-021

Double Height Area MAIN RECEPTION G-002

-0.150 FFL

F-5

BALLROOM KITCHEN G-039

84 00

SECURITY LOBBY G-001

Hotel Building Entrance

L20-201

8000 49000

3

6

8000

L20-201

1000 CLEAR

Function Building Entrance

450

84 00

SECURITY LOBBY G-050

+0.000 FFL

+0.000 FFL

L20-201

CORRIDOR G-049

1500

H-4 F-4 PRE FUNCTION AREA G-061

7

F-T

84 00

63 40 0

H

IS

DISH WASH & POT WASH

H-3

+0.000 FFL

84 00

IS

FF

AL TAKHASSUI ROAD

6000

CROCKERY STORE

00 80

42000 6000

D

ALL DAY DINING KITCHEN G-019

BEVERAGE DISPENSE

CHILLER

SERVICE LIFT G-056

Section 42 --F-3

SECURITY G-034

H-U

BEV. CHILLER DRY STORE

SERVICE LOBBY G-015

F-2

VIP / FITNESS CLUB LOBBY G-059 VIP LOUNGE G-033

EA

6000

8425

H-T

COLD KITCHEN CHILLER

D

RECEPTION G-031

F-U

6000

H-I

1800

H-1 CHEF'S OFFICE

TEA ROOM TOILET G-064

H-2

E 666,324.202 N 2,742,367.185

6000

8425

RMU ROOM G-066

STORE G-074

IT RISER G-012

F-X

E 666,480.218 N 2,742,273.453

L20-400

F-U

63 40 0

84 00

55 00

STAIR 08 G-007

4238

AL JABAL AL ASWAD STREET

F-V

9200

5950

8900

8900

8900

9700 95550

55 18 0

84 00

E 666,275.917 N 2,742,340.365

F-N

NEIGHBOUR PLOT with 2 Nos EXISTING VILLAS

F-X 75 00

F-13

55 00

AIR EXHAUST G-062

60 00

F-14

F-K

F-L

F-K

F-J

F-H

9000

3450

8000

8950

8500

6100

5400

8425

1800

8425

7700

7700

8425

1800

8425

52700

F-G

F-F

F-E

F-D

F-C

F-B

F-A

F-Y

F-Z F-15

MATCH LINE - REFER TO DWG. NO.L20-100-2

84 00

27 00 2

5 28 500 50 0

55 00

F-12

F-L E 666,350.627

MATCH LINE - REFER TO DWG. NO.L20-100-2

F-W 60 00

F-M

H-A

H-B H-C

H-D

H-E

H-F

H-G H-H

H-I

N 2,742,313.325

Gas Tanks

MATCH LINE - REFER TO DWG. NO.L20-100-3

55 00

MATCH LINE - REFER TO DWG. NO.L20-100-1

E 666,277.242 N 2,742,344.391

F-11

H-G H-H

7700

2 1 .0 8 4

F-7

F-10

H-F

52700

7700

E 666,476.888 N 2,742,339.084

F-1 STAIR 07 G-030

GUEST LIFTS G-032

CORRIDOR G-044

F-6

F-Z

H-E

8425

COLD KITCHEN

L20-400

F-V

H-D

1800

TRANSFORMER G-051

MEP G-075

F-S

F-5

8425

STAIR 04 G-014

VIP RESTROOM G-060

F-R

AA

H-B H-C

L20-400

5400

-0.50 FFL

H-1

BOH CORRIDOR G-058

F-4

H-A

F-A 6100

TOILET G-028

DN

SERVICE LIFTS G-017

STORAGE G-043

IT G-041

F-B 8500

8000

AUDIO / VIDEO G-040

F-C 8950

109251 AIR INTAKE G-052

0 00 24 000 8

ELEC G-042

F-2 6000

F-D 8000

L2 0-20 1

F-1

6000

F-E 3450

00 80

RAMP TO GROUND LEVEL

F-3

F-F 9000

1060 1400 650 200 RAMP TO BASEMENT LEVEL

9 39 52

F-G

95550 9700

27005

F-H 8900

Q

5

F-J 8900

TARMAC ROAD

BB

2

F-K 8900

E 666,375.229 N 2,742,379.098

L20-200

F-L 5950

3000 300 507

F-M 9200

3000 300

F-N

L20-400

E 666,287.811 N 2,742,316.124

Ground level

CC

F-G L20-400

F-F 9000

F-E

F-D

3450

8000

F-C

F-B

8950

8500

F-A

MSU 449(17/18)

MSU 4415(17/18)

.0 5 2

PLANT ROOM 1 B-098

COLD KITCHEN B-124

DRY STORE B-119

.0 5 2 .0 5 2 0 .0 5 2 .0 5 2 .0 5 2

E

C

C

DRY FLOUR STORE B-128

F-1 H-2

1/1GN

1/1GN

.0 5 2 .0 5 2 .0 5 2 .0 5 2 .0 5 2

MSU 4615(17/18) MSU 4613(17/18)

MSU 469(17/18)

MSU 4613(17/18)

MSU 469(17/18)

STORE B-016

ENGINEERING B-020

-4.900 FFL 100ĚF.T ) 7

FRUIT & VEGGIE SANITIZATION ROOM B-042

AYS B-043

DIRTY LINEN B-133

84 00

52 20 0

84 00

F-W

STAIR 06 B-096

F-S 84 00

CP

84 00

COMBINED RAW DOMESTIC & FIRE WATER TANK 2 B-085

84 00

HR MANAGER B-059

CLEAN LINEN STORE B-132

CORRIDOR B-036

PUMP ROOM B-076

-4.900 FFL

STAIR 01 B-065

FIRE ROOM B-072

TREATED GREYWATER TANK 1 B-075

H-8

IT DIRECTOR B-135

5950

STAFF TOILETS-F B-068

H-Y

HR GENERAL OFFICE B-066

UPS B-090

CBS B-073

8900

GENERAL STORE / MEP B-025 SERVER ROOM B-032

8900

F-14

AIR EXHAUST B-099

60 00

F-Z F-15 E 666,287.811 N 2,742,316.124

Basement level

F-Y

F-K

8900

F-J

9700 95550

F-H

9000

3450

F-F

8000

F-E

8950

F-D

8500

F-C

6100

F-B

5400

F-A

8425

H-A

1800

H-B H-C

E 666,484.088 N 2,742,275.136

E 666,480.218 N 2,742,273.453

8425

7700

7700

8425

1800

8425

52700

F-G

N 2,742,313.325

H-8

20 42

86998

L20-400

MATCH LINE - REFER TO DWG. NO.L20-099-1

75 00

F-X 55 00

F-L E 666,350.627

H-7

H-Z

STAIR 02 B-063

CCTV B-033

GSM B-034

PROPERTY LINE

MATCH LINE - REFER TO DWG. NO.L20-099-2

27 00 2

F-M MATCH LINE - REFER TO DWG. NO.L20-099-2

F-13

55 00

5 28 500 50 0

F-N MATCH LINE - REFER TO DWG. NO.L20-099-3

10 00

84 00

F-W 60 00

F-12

9200

84 00

55 18 0

4238

F-V

STORE B-047

55 00

8000

H-6

FIRST AID ROOM B-031

63 40 0

STAIR 08 B-051

E 666,277.242 N 2,742,344.391

STAFF TOILETS-M B-030

CORRIDOR B-018

HR GENERAL OFFICE B-134

TREATED GREYWATER TANK 2 B-074

BB

E 666,399.269 N 2,742,305.326

ELEC. ROOM B-110

00 18

SGT

WC B-136 NURSE B-035 CORRIDOR B-137

TRAINING ROOM B-091

INTERVIEW ROOM B-093

STAFF UNIFORM ISSUE B-037

SGT

84 00

F-U

CC

L20-400

49835

F-8

CP

GREY WATER TREATMENT PLANTROOM B-077

RAW GREY WATER TANK -2 B-079

COOLED COLD WATER TANK B-081

30 17 5

75 00

RAW GREY WATER TANK -1 B-078

CENTRALIZED HOT WATER CALORIFIER/BOILER PLANTROOM AT 5M CLEAR HT. B-080

SOFT WATER TANK B-082

FIRE PUMP ROOM B-084

WASHER EXTRACTOR 14KG

ASSISTANT HK STORE B-129 B-109 TRAINING MANAGER WORK B-131 STATIONS B-092

H-7

FILTERED WATER TANK B-083

COMBINED RAW DOMESTIC & FIRE WATER TANK 1 B-086

F-T

55 00

METAL DETECTOR

LOSS PREVENTION B-102

E 666,337.353 N 2,742,340.423

F-Y

PURCHASING RECEIVING OFFICE LP DIRECTOR MANAGER B-069 B-070 B-071

THUMBLE DRYER 16KG

ASSIST HK B-130

EXEC. HK B-053

-4.900 FFL

8000

84 00

63 40 0

6000 6000

F-7 -4.900 FFL

CP

DOMESTIC WATER FILTRATION PLANT ROOM B-087

F-8

F-11

SECURITY B-052 DRIVERS TOILET B-106

H-X 50 84 0 25 10

R

4000

C

H-6

F-X

F-10

DEBOXING AREA B-104

F-6

-5.000 FFL

F-R

AA

L20-400

H-5

HOUSEKEEPING B-045

DEBOXING SORTING B-044

A

-4.900 FFL

R

84 00

LAUNDRY B-038

B-107

H-5

F-7

E 666,275.917 N 2,742,340.365

MECHANICAL SHOP B-024

STORE B-022

100ĚF.T 100 F.T

F-5

F-6

F-Z

H-4

CORRIDOR B-028

CHEMICAL LDRY MANAGER STORE COMPRESSOR OFFICE B-048 ROOM B-050 B-046

BOH PASSAGE ROOT STOREB-108

-5.000 FFL

F-U

F-V

E 666,493.984 N 2,742,300.262

PLUMBING SHOP B-023

F

F.D

H-4 F-4 ELEC RM B-088

H-3 H-W

PLANT ROOM 2 CHIEF ENGINEER B-021

ELEC. B-039

100ĚF.T ) 7

5700

LIFT LOBBY MEP B-040 B-097

IT RISER B-041

MSU 4613(17/18)

DIR. ENGINEERING B-019

CORRIDOR B-055

SERVICE LIFTS B-067

KITCHEN PREPARATION B-101 2/1GN

MSU 4615(17/18)

MSU 469(17/18)

MSU 4611(17/18)

MSU 4615(17/18)

MSU 4615(17/18)

MSU 4615(17/18)

F-3 MSU 4613(17/18)

84 00

D

.0 5 2 .0 5 2

MSU 4611(17/18) MSU 469(17/18)

H-3

WASTE HANDLING AREA B-112

MSU 4615(17/18)

84 00

1/1GN

.0 5 2 .0 5 2

6000

MSU 4615(17/18)

GREASE TRAP ROOM B-009

H-V

PAINT SHOP B-017

00 80

6000

H-2

42 42 0

STORE B-058 CARPENTRY STORE B-014

STAIR 03 B-062

SERVICE LIFTS B-064

2/1GN

42000 6000

H-U

STORE B-015

2/1GN

6000

D

SERVICE LIFT B-061

SERVICE LIFT B-060

IV

L20-400

F-5

C

MSU 469(17/18)

-5.000 FFL PARKING B-089

F-T

AA

E

D

1/1GN

.0 5 2 .0 5 2

IV

H-1 C

STAFF CANTEEN B-013

CHEM. STORE B-100

100ĚF.T ) 7

F-2

-5.000 FFL

D

0 00 24 000 8

ELEC. RISER B-103

CB

D

2 1 .0 8 4

1/1GN

2/1 2/1

2/1 2/1 2/1

.0 5 2

100ĚF.T 100 F.T

400X600 TRAY

C

E

CENTRALISED POTWASH B-125

D

100ĚF.T 100 F.T

D

C

2/1GN

400X600 TRAY

1/1

ORDER TAKER B-123

MDB-02

00 80

400X600 TRAY

1/1 1/1

100ĚF.T 100 F.T

C

E

100ĚF.T ) 7

CB

DISH WASH AREA B-012

OES STORE B-111

STAIR 04 B-056

BAKERY & PASTRY AREA B-126

E 666,324.202 N 2,742,367.185

F-4

H-T

.0 5 2

C

1/1 2/1 1/1

D

BULK PRODUCTION B-011

UP

F-S

MDB-06

CB

.0 5 2

MDB-01

H-1 OVEN ROOM B-127

-4.900 FFL

LIFT LOBBY B-095

LV ROOM MDB-04 B-029

CB

100ĚF.T ) 7

ROOM SERVICE B-121

MEP B-003

OIL STORE B-002

MDB-03

.0 5 2

COMPRESSOR RM B-120 DISH WASH B-122

STAIR 07 B-054

-4.900 FFL

SGT

8425

.0 5 2

.0 5 2

MSU 4415(17/18)

-4.900 FFL

H-I

1800

MDB-07

MSU 4415(17/18)

ELEC RM B-004

8425

ATS-2

.0 5 2

MSU 4413(17/18)

GENERATOR SET,60HZ, 400 /230V, 0.8PF 1270 kW(1,588 kW)

I.T ROOM B-008

H-G H-H

7700

ESMDB-OP

CB-OP

CB-LS

.0 5 2

.0 5 2

GUEST LIFTS B-057

SERVICE LIFTS B-049

ESMDB-LS

.0 5 2

.0 5 2

MSU 449(17/18)

F-2

MEP B-001

H-F

52700

7700

E 666,476.888 N 2,742,339.084

.0 5 2

BEVERAGE STORE HYGIENE OFC B-118 SOUS CHEF B-115 OFC B-007 STORE CHIEF KEEPER STEWARD B-117 B-116

BALL ROOM STORE B-006

GENERATOR ROOM B-094

2 1 .0 8 4

F-R

H-E

8425

ATS-1

MDB-05

F-1

F-3

H-D

1800

.0 5 2

.0 5 2

6000

8425

.0 5 2

.0 5 2

MEP SWITCH ROOM B-005

H-B H-C

L20-400

5400

.0 5 2

MSU 4415(17/18)

EX. CHEF SEC EX. CHEF OFC. B-113 B-114

FUEL TANK B-010

9 39 52

BB

H-A

6100

109251

5000

95550 9700

8000

F-H 8900

8000

F-J 8900

8000 49000

8900 E 666,375.229 N 2,742,379.098

EMDB-LSOP

5950

MSU 4615(17/18)

F-M 9200

2/1GN

F-N

H-D

H-E

H-F

H-G H-H

H-I


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2015

CC

F-M

F-L 5950

F-K

F-J

8900

F-H

8900

F-G

95550 9700

8900

L20-400

F-F 9000

F-E 3450

F-D

F-C

8000

8950

F-B 8500

BB

H-A

F-A 6100

H-B H-C

L20-400

5400 L20-200

9200

8425

H-D

1800

H-E

8425

H-F

52700

7700

H-G H-H

7700

8425

H-I

1800

8425

2

F-N

H-T

6000

G

STD TWIN ROOM HT-102

F-7

G

STAIR HT-151

5000

STD TWIN ROOM HT-120

MEP HT-144

+7.500 FFL

STD KING ROOM HT-121

H-7

+7.500 FFL

L20-201

STD KING ROOM HT-132

8000 49000

STD KING ROOM HT-133

H-5

SUITE 01 HT-123 STD TWIN ROOM HT-131

H-X

STD TWIN ROOM HT-130

50 84 0 25 10

STD KING ROOM HT-1240

0 18

STD TWIN ROOM HT-129

H-6

STD TWIN ROOM HT-125

STD KING ROOM HT-128

STD KING ROOM HT-126

STD KING ROOM HT-127

+7.500 FFL

H-Y H-7

H-Z

STAIR 02 HT-149

H-8

CC

5950

8900

F-L

8900

F-K

8900

9700 95550

F-J

F-H

1 9000

3450

8000

8950

8500

6100

5400

L20-400

8425

1800

8425

7700

7700

8425

1800

8425

52700

F-G

F-F

F-E

F-D

F-C

F-B

F-A MATCH LINE - REFER TO DWG. NO.L20-100-2

F-M

BB

H-A

H-B H-C

H-D

H-E

H-F

H-G H-H

H-I

MATCH LINE - REFER TO DWG. NO.L20-101-1

9200

F-N

L20-200

H-8

L20-400

4

AA

L20-400

SERVICE HT-142

STD KING ROOM HT-140

STAIR 01 HT-148

H-4 STD KING ROOM HT-122

STD KING ROOM HT-134

STD TWIN ROOM HT-138

F-8

8000 8000

Y

STD KING ROOM HT-139

STD KING ROOM HT-101

UP

TROLLEKEEPIN

STD KING ROOM HT-137

STD TWIN ROOM HT-103

H-6

+7.900 FFL

F-8

HOUSE

STD KING ROOM HT-136

F-6 BARBER HT-171

MALE GYM HT-174

CIRCULATION HT-181

STD KING ROOM HT-119

G

HOUSEKEEPING TROLLEY

STD KING ROOM HT-135

STORE HT-136

STD KING ROOM HT-104

F-7

5

TROLLEKEEPIN Y

H-3 H-W

HOUSE

HOUSEKEEPING + PANTRY HT-141

STD TWIN ROOM HT-105

H-5

CORRIDOR HT-186

6000

Y

L20-201

MALE CHANGING ROOM HT-170

6000

TROLLEKEEPIN

8000

STD KING ROOM HT-106

3

6

F-5

F-6

HOUSE

CORRIDOR HT-153

H-4 F-4 L20-201

TREATMENT ROOM HT-169

+7.900 FFL

G

HOUSEKEEPING TROLLEY

SAUNA HT-173

L20-400

F-5

TROLLEKEEPIN

SERVICE LIFT LOBBY HT-143

8000

6000 42000 6000

STEAM HT-172

POOL HT-176

LIGHTWEIGHT ROOF

L20-201

STD TWIN ROOM HT-118

HOUSE

Y

H-2

H-V

HOUSEKEEPING TROLLEY

7

AA

LIFT LOBBY HT-168

I.T ROOM HT-147

STD TWIN ROOM HT-107

ELEC CBD HT-175 GYM HT-163

F-4

STD KING ROOM HT-108

F-3

FEMALE CHANGING ROOM HT-177

SERVICE LIFTS HT-145

6000

H-3

CORRIDOR HT-183

STD KING ROOM HT-117

STAIR 03 HT-152

00 80

FEMALE GYM HT-180

STD TWIN ROOM HT-116

+7.500 FFL STD TWIN ROOM HT-109

KIDS CLUB HT-178

4000

+7.900 FFL

F-2

F-3

L2 0-20 1

SOT

RECEPTION HT-179

STD KING ROOM HT-110

GUEST LIFTS HT-146

6000

STAIR HT-164

0 00 24 000 8

BOH PANTRY HT-159

330

BOH CORRIDOR HT-150

0 367

H-2

GUEST LIFTS HT-165

0 400

POOL PLANT HT-166

SOT °

3 7.32 183

+7.900 FFL

ELEC. ROOM HT-167

F-2

H-1

H-U

300

SERVICE LIFTS HT-157

SUITE 02 HT-115

330

IT ROOM HT-187

STD KING ROOM HT-114

STD KING ROOM HT-113

00 80

SOT °

DISABLED ACCESS ROOM HT-111

F-1

3 2.32 163

STD KING ROOM HT-112

H-1

F-1

First level

CC

F-M

F-L 5950

F-K

F-J

8900

8900

F-H 8900

95550 9700

F-G

L20-400

F-F 9000

F-E 3450

F-D

F-C

8000

8950

F-B 8500

H-A

F-A 6100

5400 L20-200

9200

BB

L20-400

H-B H-C

8425

H-D

1800

H-E

8425

H-F

52700

7700

H-G H-H

7700

8425

1800

H-I 8425

2

F-N

H-T H-1 MEP M-016

F-R

+3.900 FFL

F-2

BREAKOUT / RECEPTION M-012

+3.900 FFL

BRIDGE M-017

LIFT LOBBY M-034

H-3

ELEC CBD M-060

6000

+3.900 FFL

42000 6000

84 00

F-4

7

F-T

AA

L20-201

MEETING ROOM 01 M-013

Double Height Area

L20-201

84 00

6000

TOILET M-059

MEETING ROOM 02 M-032

F-U

84 00

63 40 0

6000

MEETING ROOM 05 M-035

MEETING ROOM 03 M-014

84 00 84 00

MEETING ROOM 04 M-036

F-W

FUNCTION BUILDING ADMIN CORRIDOR M-033

5

L20-201

STAIR 05 M-058

DIR. OP. M-042

H-5 H-X

GM. OFC M-043

50 84 0 25 10

Double Height Area

00 18

H-6

BQT.OP.MGR M-041

Double Height Area

F-7 EVENTS M-040

H-Y STAIR 06 M-019

BOH CORRIDOR M-038

H-7 F-8

84 00

84 00

STAIR 01 M-006

CORRIDOR M-054

+3.900 FFL STORE M-037

DIR. EVENTS M-061

H-8

+3.900 FFL

H-8

1

L20-400

F-Y

L20-200

75 00

84 00

F-T

CC

BB

L20-400

63 40 0

84 00

55 00

F-U

F-13

F-X 55 00

F-14

60 00

F-Z F-15

Mezzanine level

F-Y

F-M MATCH LINE - REFER TO DWG. NO.L20-100M-02

84 00

5 28 500 50 0

75 00

F-12

55 00

F-11

MATCH LINE - REFER TO DWG. NO.L20-100M-03

F-W 60 00

8900

F-L

8900

F-K

8900

F-J

9700 95550

F-H

9000

3450

8000

8950

8500

6100

5400

8425

1800

8425

7700

7700

8425

1800

8425

52700

F-G

F-F

F-E

F-D

F-C

F-B

F-A MATCH LINE - REFER TO DWG. NO.L20-100M-01

5950

84 00

9200

F-N

55 00

MATCH LINE - REFER TO DWG. NO.L20-100M-02

F-V

F-10

H-A

H-B H-C

H-D

H-E

H-F

H-7

H-Z

STAIR 02 M-005

STORE M-039

F-X

F-Z

4

AA

L20-400

LDRY CHUTE M-068 EXECUTIVE OFFICES RECEPTION M-053

MEZZANINE GALLERY M-057

+3.900 FFL

F-S

F-8

H-4

H-6

F-R

F-7

+3.900 FFL

TOILET M-076

F-6

6000

ACCOUNTS DEPT. M-001

DIR. SALES / MKT M-062

PR MGR M-063

H-5

Double Height Area

DIR. FINANCE M-069

SALES & MARKETING M-044

F-5

F-6

F-V

Double Height Area

L20-201

L20-400

F-5

TOILET TOILET M-064 M-065

AIRCREW LOUNGE M-047

3

6

H-3 H-W

ASST. CONTROLLER M-074 CHIEF ACCOUNTANT M-075

CASHIER M-073 ELEC M-009

CORRIDOR M-055

H-4 F-4

H-2

H-V

GENERAL CASHIERS M-066

COUNTING ROOM M-072 PANTRY M-048 SERVICE LIFTS M-008

IT M-010

MEETING ROOM LOBBY M-056

F-S

PRAYER ROOM M-003

LIFT LOBBY M-046

F-3 84 00

F-3

SHOE RACK M-049 CORRIDOR M-052 STAIR 03 M-004

GUEST LIFTS M-007

8000

+3.900 FFL

8000

RESTROOM (M) RESTROOM (F) M-029 M-030

CORRIDOR M-015

8000 49000

SERVICE LOBBY M-027

8000

SHOE RACK SHOE RACK M-026 M-025

H-U

8000

BOH CORRIDOR M-024

RESTROOM (M) RESTROOM (F) M-020 M-050

CLOSING ROOM M-002

00 80

6000

AUDIO / VIDEO / STORAGE M-021

STAIR 07 M-018

GUEST LIFTS M-031

4000

6000

ELECTRICAL M-023

F-2

H-2

SERVICE LIFTS M-028

ABLUTIONS M-067

0 00 24 000 8

PRAYER RM (M) PRAYER RM (F) ABLUTION M-071 M-011 M-070

IT M-022

5000

CORRIDOR M-051

+3.900 FFL

00 80

STAIR 04 M-045

F-1

L2 0-20 1

H-1

F-1

H-G H-H

H-I


CHEDI HOTEL & RESORT

PROJECT OVERVIEW

352-(&7 29(59,(: The site is located in the Lusail area Qatar. The site is a 150m wide strip of land from the high tide mark at shoreline and is approximately 2.5km long. The site area based on the Concept Design is approximately 410,000sqm. 7KH SURMHFW LV ¿YH VWDU +RWHO DQG 5HVRUW DW /XVDLO LQ 4DWDU FRQVLVWLQJ RI D ¿YH VWDU KRWHO FRQVLVWV RI JURXQG ÀRRU SOXV VW QG DQG UG ÀRRUV ZLWK 150 keys. Included in the Hotel will be standard facilities associated ZLWK D ¿YH VWDU +RWHO 7KH KRWHO ZLOO KDYH QR 6WDQGDUG 5RRPV 20 no Business Suites, and 5 no Royal Suites as per the Concept 'HVLJQ WKDW LV SURYLGHG 5HVRUW VWDႇ DFFRPPRGDWLRQ GLVFUHHWO\ ORFDWHG for approximately 300 employees. 50 no Villas for single gender (male or female) guests which is to consist of 10 x 1 bedroom villas, 20 x 2 bedroom villas, and 20 x 3 bedrooms villas. Each villa will be used by a single gender party; therefore, privacy from adjacent villas, which may KDYH D GLႇHUHQW JHQGHU SDUW\ LV RI KLJK LPSRUWDQFH QR 9LOODV ZLOO EH for families and will consist of 10 x1 bedroom villas, 20 x 2 bedroom villas, and 20 x 3 bedroom villas. Every villa to have accommodation for one maid/butler. Every villa to have a minimum one car parking space for each 1 bedroom villa and minimum 2 parking spaces for 2 and 3 bedroom villas each. Every villa to have a swimming pool and direct sea view and beach access.


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2012

7KH DHVWKHWLF DSSURDFK KDV EHHQ GH¿QHG DV FRQWHPSRUDU\ ZLWK ORFDO architectural references and features.

CHEDI HOTEL & RESORT

Khorfakkan, Sharjah

Client // Shoroogh Site Area // 266,000 sqm Project Size // 35,000 sqm Masterplaning & Detailed Design


CHEDI HOTEL & RESORT

SPA DRAWINGS

%8,/',1* )22735,17

%8,/',1* )22735,17

0$/( 322/ %(/2:

)(0$/( 322/ %(/2:

:$7(5 /(9(/

%27720 2) 322/

6:,00,1* 322/ '(&.

:$7(5 )($785(

))/

6:,00,1* 322/ '(&.

))/

%($87< 678',2

:$,7,1* $5($

%($87< 678',2

35(3 $5($ &+ 50 &+ 50

),5( (;,7

)+5

)+5

:$7(5 %(/2:

5(/$;$7,21 $5($

),5( (;,7 %8,/',1* )22735,17

0$/( 75($70(17 $5($

)(0$/( 75($70(17 $5($

5(/$;$7,21 $5($

3$175< 0$,1 (175< 2)),&(

67$)) 72,/(7

%8**< '523 $5($

'5,9(:$<

+27 :$7(5 3/$17 $5($

3$57 2) 7+(

3$57 2) 63$ %8,/',1*

P

6SD )LUHVFDSH

6SD )LUHVFDSH

P

P

'1

%8,/',1* )22735,17

%8,/',1* )22735,17

'5,9(:$<

P

+RW :DWHU 3ODQW $UHD

P

P 'ULYHZD\ WR 5R\DO 6XLWH

%8,/',1* )22735,17

P

'URS 2II $UHD 3DUW RI $GXOW 3RRO

P

%8,/',1* )22735,17

P (;,7

(175<

P

68%67$7,21

P %XJJ\ 3DUNLQJ $UHD

P %8,/',1* )22735,17

%8,/',1* )22735,17

%2+

352'8&7 6725(

P

P .LWFKHQ

%8,/',1* )22735,17

%8,/',1* )22735,17

P

3$57 2) $'8/7 322/ %8,/',1*


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2012

%8,/',1* )22735,17 %$/$1&,1* 7$1. %(/2: 7+( 3/$17 5220

6 : , 0 0 , 1 * 3 2 2 /

322/ 3/$17

))/

%27720 2) 322/

6:,00,1* 322/ '(&.

6+2

%27720 2) 322/

6:,00,1* 322/ '(&.

))/

322/ 3$175<

6+2

))/

/,)7,1* 67$77,21 %(/2: %27720 2) 322/

&2/' 3/81*( 322/

&2/' 3/81*( 322/

(175< 72 322/

6+2:(5 $5($

6+2:(5 $5($ 6+2

%27720 2) 322/

+27 3/81*( 322/

+27 3/81*( 322/

<2*$ 678',2

0$/( *<0

+<'52 7+(5$3< $5($ 0$/(

)(0$/( &+$1*,1* 5220

)(0$/( &+$1*,1* 5220 :$50 7+$/662 322/

/2&.(5

/2&.(5 %27720 2) 322/

%27720 2) 322/

0$/( /,)7 /2%%<

)(0$/( /,)7 /2%%< 6+2

72:(/ 6725$*(

72:(/ 672 :,7+ :$7(5 %277/(6

6+2 72,/(7

:&

62/ 67($0 5220

6+2

)(0$/( *<0

:$50 7+$/662 322/

%27720 2) 322/

6+2 6+2

+<'52 7+(5$3< $5($ )(0$/(

%8,/',1* )22735,17

(175< 72 322/

%27720 2) 322/

/,)7,1* 67$7,21 %(/2:

72,/(7

:&

:&

:&

),11,6+ 6$81$

),11,6+ 6$81$ %2+

3803 3,7

,&( )2817$,1

%8,/',1* )22735,17

+<'52 3/$17

+<'52 3/$17

,&( )2817$,1

62/ 67($0 5220

%8,/',1* )22735,17

6 : , 0 0 , 1 * 3 2 2 /


CHEDI HOTEL & RESORT

POOL & VILLAS

118 116 114 112 110 108 106 104 102 100 98 96 94 92 90 88 86 84 82 80 78 76 74

5

72 70 68 64 62 60 58 56 54 52 50 48 46 44

42 40

38

36

115

34

32

C06-05

110

C01-01

C06-06

C01-02

30

28

26

C01-03

24 105

C06-11

C01-04

22

BUILDING

20

3.00 HIST.H.T.

FOOTPRINT

100

18

98 16

90

14

C01-08

C01-09

24

FOOTPRINT BUILDING

SPA

20

22

18

16

14

4

6

8

10

12

2

12 32

88

C06-10

10

C01-06

0 +46.0

S-01 36

82

34

86 84

38

44

42

40

50

46

C01-05

54

0 +08.0

76 74

52

8 78

48

80

TREE

72 FOOTPRINT

EXISTING

70

FOOTPRINT

BUILDING

68 66

BUILDING

6

PARKING

AREA

EXISITIN BUILDIN G G

52 48

AREA

50

58

S-02

+0

C06-03

60

PARKING

6.00

62

56

C06-09

54

C08-03

46

CAR WASH

64

BUILDING FOOTPRINT

44

52 4

50 DRIVEWAY EXISTING TREE

B

42

32

30 28

AREA

38

26

PARKING

36 34

22

C08-02 8

.

3.00 HIST .H.T

1.32

H.A.

T. 18

54

52

2

2

16

C06-07

4

AREA

56

6 20

14

PARKING

AREA

10

22

12

C06-01

58

14

24

16

26

60

18

28

E-01

62

20

30

DRIVEWAY

24

C06-08

32

12

0

C08-01

0

6m WIDE SERVICE ROAD

ROYAL SUITE

34

AREA

36

PARKING

R-01

38 44

C06-02

40

PARKING

POOL

40 48 46

10

+18.5

8

AREA

+38.00

6

4 -1.78 L.A.T.

+34.00

2

+21.50

+4.75

E-01

0

+37.00 +12.00

2

0

+04.35

E-04

62

H-01 62 60

58

56

54

J

+44.00 52 50

48

46

44

42 40

2

38 36 24

22

26

20

28

32

30

34

E-05

0 18

8

10

12

14

16

4

2

6

0

-1.78 L.A.T.

3.00 HIST.H.T.

1.32 H.A.T.

E-06

2 0

%8,/',1* )22735,17

%8,/',1* )22735,17

:DWHU /HYHO 6 : , 0 0 , 1 * 3 2 2 /

6 : , 0 0 , 1 * 3 2 2 /

%RWWRP RI 3RRO

'$< %('

))/

6:,00,1* 322/ '(&.

6:,00,1* 322/ '(&.

))/

))/

))/

6+2:(5

&,5&8/$7,21

322/ 3/$17

))/ 287'225 ',1,1*

287'225 ',1,1*

%8,/',1* )22735,17

'523 2)) .,7&+(1

))/

7 5,1 73 22 * ) ,1 ,/' %8

'5,9(:$<

))/

%8**< 3$5.,1*

))/

%8,/',1* )22735,17

))/

))/

50

48 46

44 42 40 38 36

34

32 30 28 26

24

22 20 18 16

14

12

10

8

3.00 HIST.H.T. 6

4

1.32 H.A.T. 2 0

NO PARKING

+34.0 0

E-02

ADULT

42

E-03

0 -1.78

26

C01-07

C06-04

92

28

94

30

96

E-02 E-02

-1.78 L.A.T.


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2012


ETIHAD RAIL PASSENGER STATIONS

PROJECT OVERVIEW

PROJECT OVERVIEW 7KH (WLKDG 5DLOZD\ 1HWZRUN LV WR EH EXLOW WR OLQN WKH SULQFLSDO FHQWHUV RI SRSXODWLRQ DQG LQGXVWU\ RI WKH 8$( ,W ZLOO UXQ IURP WKH 6DXGL $UDELDQ ERUGHU DW *ZKHLIDW LQ WKH ZHVW FORVH WR WKH FLWLHV RI WKH *XOI FRDVW WR WKH 1RUWKHUQ (PLUDWHV DQG WKH HDVW FRDVW SRUWV 7KHUH ZLOO DOVR EH D OLQH UXQQLQJ IURP $EX 'KDEL WR $O $LQ ZKLFK PD\ EH SURMHFWHG LQWR 2PDQ DV ZHOO DV D EUDQFK OLQH WR WKH JDV IDFLOLWLHV DW 6KDK DQG +DEVKDQ %XLOW to international standards, Etihad Rail’s state of the art network will HQDEOH WKH UDSLG WUDQVSRUW RI SDVVHQJHUV DQG IUHLJKW RSHQLQJ XS QHZ WUDGH FRUULGRUV DQG MRXUQH\ RSSRUWXQLWLHV 2QFH FRPSOHWH LW ZLOO UHGH¿ QH ORJLVWLFV DQG WUDQVSRUW LQ WKH UHJLRQ SURYLGLQJ DV D VDIH HI¿ FLHQW VXVWDLQDEOH QHWZRUN WKDW OLQNV DOO FRUQHUV RI WKH 8$( DQG HYHQWXDOO\ WKH 8$( WR WKH ZLGHU *&& 7KLV H[WHQVLYH LQYHVWPHQW ZLOO VXSSRUW WKH *RYHUQPHQW¶V FRQWLQXHG PLVVLRQ WR EXLOG D GLYHUVL¿ HG HFRQRP\ DQG continued economic growth. Facts and Figures:

7RWDO LQYHVWPHQW LV HVWLPDWHG DW $(' ELOOLRQ 7KH SURMHFW ZLOO EH SKDVHG RYHU D QXPEHU RI \HDUV ZLWK WKH ¿ UVW SKDVH GXH IRU FRPSOHWLRQ E\ 7KH QHWZRUN LV HVWLPDWHG WR H[WHQG XS WR NP 7KH UDLOZD\ ZLOO LQLWLDOO\ RSHUDWH GLHVHO WUDLQV EXW ZLOO EH GHVLJQHG DQG FRQVWUXFWHG WR DFFRPPRGDWH HOHFWUL¿ FDWLRQ LQ WKH IXWXUH )UHLJKW WUDLQV ZLOO UXQ DW VSHHGV RI XS WR NLORPHWUHV SHU KRXU while passenger trains will reach speeds of up to 200 kilometres per hour. (WLKDG 5DLO ZLOO DFFRPPRGDWH KHDY\ IUHLJKW ² URFNV DOXPLQLXP FHPHQW LURQ VWHHO HWF ² LW ZLOO FDWHU IRU DOO RWKHU WUDGH FRPPRGLWLHV DV ZHOO DV WUDQVSRUWLQJ K\GUR FDUERQV DQG RI FRXUVH SDVVHQJHUV $HGDV KDV EHHQ DSSRLQWHG WR GHYHORS WKH PRGXODU VWDWLRQV GHVLJQV IRU VPDOO DQG PHGLXP VXEXUEDQ FRPPXWHU KHDY\ UDLOV VWDWLRQV RQ Stages 2 and 3.

(WLKDG 5DLO¶V VWDWH RI WKH DUW QHWZRUN ZLOO HQDEOH WKH UDSLG WUDQVSRUW RI SDVVHQJHUV DQG IUHLJKW RSHQLQJ XS QHZ WUDGH FRUULGRUV DQG MRXUQH\ RSSRUWXQLWLHV


AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2012

ETIHAD RAIL PASSENGER STATIONS UAE Client // Etihad Rail Project Size // 1,400 sqm Concept Design for passenger stations network


ETIHAD RAIL PASSENGER STATIONS

DESIGN OPTION

OPTION ONE

24 M

BUS WAITING

79 M

Future Bus Station

Flat Roof Easy Maintenance

Reduced Glazing Areas

Efective But Small Glazed Skylight Areas - Reduced Need For Maintenance

Train Track

Pedestrian Shading

Visitors Parking

Auxiliary Building

Main Entrance 6WDWLRQ 'URS Rႇ


AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2012

OPTION TWO TO THE PLATFORM

I WAITING WAITING WAITING

T

TING

T

AT IU

US

26 M

TI

S

T

TAI

T SS I BUS WAITING AI

MAIN ENTRANCE

72 M

Future Bus Station

Pedestrian Shading

Reduced Glazing Areas

Train Track

Visitors Parking Auxiliary Building

6WDWLRQ 'URS Rႇ

Main Entrance


ETIHAD RAIL PASSENGER STATIONS

DESIGN OPTION

OPTION THREE The stations’ kit-of-parts concept lends its very well to integrate LQWHUFKDQJHDEOH HOHPHQWV 6RPH RI WKH SDUWV FDQ EH ¿[HG LQ ORFDWLRQ OLNH WKH WRZHU ZKLOH RWKHU DUH ÀH[LEOH OLNH WKH IHDWXUH ZDOOV DQG WKH entrance. These various options provide an opportunity to weave together a multitude of identity layers to create a unique ‘theme’ for the station. 7KH EXLOGLQJ YHUWLFDO RXWHU HQFORVXUH GH¿QHV WKH VSDFH 7KH FROXPQV echo the desert shelter pole concept and the elegant calligraphy roof is the main feature repetitive element. Underneath the roof as the primary kit of part elements are “loose” smaller parts all bound by the HႈFLHQW [ P JULG WKH ³ÀRDWLQJ´ URRI

Bus Station

Expansion

Clock Tower

central shaded atrium - highlight of the station passenger experience - the info/clock tower - feature entrance - evocative, subconscious memory of traditional station concepts - feature wall - localized identity - the MEP/service block - the support/retail element - vestibules -etc These elements are repetitive and basic to every station medium or small. They help forming a distinct Etihad Rail identity. The concept is H[SDQGDEOH VFDODEOH HႈFLHQW DQG SUHVHQWV XQOLPLWHG RSSRUWXQLWLHV IRU spatial arrangement and interior design.

Reduced Glazing Areas

Flat Surface Easy Maintenance

Signature Roof

EXPA

NSIO

N

Main entrance 6WDWLRQ 'URS Rႇ

Side Access

Train Track

Expansion

Pedestrian Shading

Visitors Parking

Auxiliary Building


AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2012

6M

78 M

6M

TO THE PLATFORM

WAITING ROOM

FIRST CLASS WAITING

RETAIL M.P

M.T

REFUSE

S.M.

ATRIUM T

F.T

BUS WAITING AREA E

TICKETIGN

F.P.

MESS

RAIL

TELECOM

18 M

POLICE TELECOM

RETAIL

STORE

ROOF LINE ABOVE MAIN ENTRANCE

Custom Element - Feature / Wall regional. interchangeable. provides the stations with an additional layer of the cultural feel.

Info / Clock Tower landmark. simple and elegant. etihad rail identity feature.

Floor Pattern welcoming. intricate yet simple. reminds of the traditional rug in bedouin shelters.

Feature / Entrance evocative. subconscious memory of the traditional station concepts.

Floating Roof light. PRGXODU HႈFLHQW UHÀHFWV WKH KHULWDJH FRQFHSW VWRU\


MERSA AL SEET

PROJECT OVERVIEW

PROJECT OVERVIEW Located along the Dubai Creek waterfront adjacent to the historic Al Fahidi district, one of the oldest and most traditional areas of the city, the masterplan aims to regenerate the Creek waterfront as an iconic, civic destination with a strong focus on the rich local heritage rooted within the spirit of Emirati culture. Covering approximately nine hectares of built development, Khor Dubai will be designed as a cultural city quarter fully integrated into the existing urban fabric. The development will enhance Dubai’s international status as a world famous waterfront destination, acting as a catalyst for future development within the wider area. Emphasis is placed on creating strong pedestrian links throughout the development, opening up the waterfront promenade with functions along the entire development. The proposal weaves together a number of civic and commercial land use components responding to aspects of Emirati culture including Arts & Crafts, Trade, Industry and Commerce.

Marsa Al Seef will enrich Dubai’s ever growing tourism industry – complementing while also rejuvenating the bustling trading scene along Dubai Creek in a hospitality, leisure and retail destination that will appeal to residents and tourists alike.


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2014

MERSA AL SEEF

Dubai, UAE

Client // Meraas Holding Plot Area | Phase 2 // 54,473 sqm Project Size | Phase 2 // 15,796 sqm Plot Area | Phase 3 // 70,282 sqm Project Size | Phase 3 // 54,655 sqm Masterplan & Detailed Design of the Buildings


mersa al seet

masterplan

pasterplan Marsa Al Seef is taking shape in the Al Seef area, alongside Al Fahidi Cultural and Historical District, which will also physically connect with the development and evoke the same spirit of nostalgia. The project benefits from proximity to historic and culture attractions, with an excellent supporting multi-mode transport infrastructure. Marsa Al Seef will redefine the tourism experience to of visitors to the Dubai Creek area. The project will provide bustling waterfront spaces, where cafes and restaurants will open up on to the interconnected promenades lining the canal. The project will also offer shoppers an array of options varying from floating markets, art galleries, shops for Emirati handicrafts and other retail concepts.

Marsa Al Seef will comprise three hotels with a combined 550 keys; a 200 key heritage hotel, a 150 key contemporary up-scale hotel, and a 200 key contemporary luxury hotel . The aim of developing a hospitality component within the project is to ensure that visitors to the development can expand and enrich the scope of their experiences by staying in the focal heritage-centric area of Dubai. The most important aspect of this development however, will be the experiences created throughout the space. Marsa Al Seef will host an open air museum and an amphitheater to help tourists discover and absorb the various nuances of the Emirati heritage.


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2014


DETAIL DRAWINGS

1

MERSA AL SEET

6) % 3 )%

6) & 3 )%

/

/

/

/2%%< Pð ))/ 66/

,' 3

,' 3

,' 3

/

/

/

/

,' 3

,' 3

,' 3

,' 3

/

/

/

/

17 5< + (

%2

( 23 (1 ,1 * $ %2 9

'5 $

'5 $

0(3 Pð

3

'5 $

$ '5 $

,&7 Pð

/

/

/

'5 $

3

3

/9 3

*5281' )/225 3/$1

%

)

6758&785( 72 %( &2 25',1$7(' :,7+ $5&+,7(&785(

'5 $

/

/

&$7 /$''(5 Pð

/9 3

))/

'7 . 3 .

'7 % 3

/

:6

&

'7 $ 3

'5 $

/

/

/9 $ 3

'5 , 3

'7 . 3 .

'7 $ 3 .

5 () 63 (5 (& ,) &2 72 ,& 1 6 $7 68 ( ,2 /7 59 1 $1 ,& ' 7 ,1 * 5$ : ,1 *6

/

)25 72,/(7 /$<287 '(7$,/6 5()(5 72 '5$:,1* .+25 *$- 3 '5 ,

'7 & 3

6725(

5:2

.,7&+(1 % Pð

/

%2+ /,)7 Pð

66/

8 6 & 2 /( ) 6 $5 75 +( % ,* ($ +7 0 7 2 75 8& P . P

75 8& .

/( $5

)/ 22 5 7 5( 1& +

/

/

,168/$7(' %/2&.:25.

'7 $ 3

3

3 .

'7 & 3

6,1 .

/

'

.,/ )/< /( 5

+ 5 26 )/ 22 /2$',1* %$< (( ( / 5 Pð 75( ))/ 1& & +

'7 . 3

6758&785( 72 %( &2 25',1$7(' :,7+ $5&+,7(&785(

'7 . 3

6758&785( 72 %( &2 25',1$7(' :,7+ $5&+,7(&785(

3

/2%%< Pð

)/ 22 5 7 5( 1& +

))/

: ( 6& ,*+ $/ ,1* (

3

%2 + ( 17 5<

/

(

) % % Pð ))/ 66/

6(&85,7< Pð

3

/

3 )%

,' 3

[ 23(1,1* ,1 :$//

/

/

* /

))/ 66/

'5 $ ))/

'7 % 3

3

:7 $ 3

/,)7 /2%%< Pð

,' 3

&/ ($ 5

17 5<

)2 + (

))/ 66/

/

:7 ( 3 )%

'5 $

/

0 72,/(76 Pð

.,7&+(1 % Pð ))/ 66/ ,' 3

'7 ' 3

-$1

/

3 '5 $

/

3 ',6$%/(' 72,/(7

3 .

/

'7 % 3

/

'7 % 3

)2 %< + $ & 1' 21 % 75 2+ $& &2 72 5( 5

/

,' 3

'7 $ 3

/

) % & Pð

+ ,&7

3 ) 72,/(76 Pð

17 5<

/

3

3

,' 3

/

)+5

/

3 )%

6) 3 )%

23(1,1* $%29(

)2+ (175<

17 5<

/

/

/

,' 3

))/ 66/

,' 3

'7 . 3

6) ) 3 )%

'5 $

,' 3

'5 ,

/

6) ) 3 )%

))/

) % & Pð ))/ 66/

-

'5,1.,1* )2817$,1

)2+ /,)7 Pð

/

/

'5 $

6) ) 3 )%

:7 ( 3 )%

6) 3 )%

/

3 )%

) % % Pð

/

6) % 3 )%

3 )% 6) % 3 )%

6) & 3 )%

)2 + (

/

'7 % 3 )%

6) % 3 )%

/

)2+ (175<

6) $ 3 )%

/

/

)2 + (

))/

6) $ 3 )%

/

6) & 3 )%

)2+ (175<

6) & 3 )%

'5 $

/,1( ,1',&$7(6 /($6$%/( 7(55$&( $5($

'5 $

3

.,7 &+ (1 . %

))/

)2+ (175<

/,1( ,1',&$7(6 /($6$%/( 7(55$&( $5($

4

P

P

6&$/(

08

09

10

Q

N

06

FOH ENTRY

+3.750

FOH ENTRY

EXIT

05

J

LV FHR

EXIT

ts

m 2.5

D=1

FOH ENTRY

P2-08-04 FB F&B C 54.46 m² FFL +3.900 SSL +3.500

E X IT

P2-08-03 FB 0.4

=2 CE AN M IST 6.8 L D L= NA NA GO GO DIA DIA 1/3

04

F&B B 162.44 m²

M

8.3

OPENING ABOVE

H

P2-08-10 F. TOILETS 33.48 m²

10

ICT

EXIT

FFL +3.900 SSL +3.500

.7

FO

H

EN

TR

Y

11

.6

P2-08-24

TH

=

FOH LIFT 4.73 m²

ID

FFL +3.900 SSL +3.500

KITCHEN B 110.71 m² FFL +3.900 SSL +3.500

9.1

m

ts

E X IT

D= Y

P2-08-02 FB TR EN FO

H

F&B C 60.77 m²

EXIT

G

+3.750

E X IT

FHR LV

F

BO

H

EN

TR

Y

STAIR WIDTH = 1560 mm

P2-08-23

FFL +3.900 SSL +3.500

P2-08-28

FFL +3.900 SSL +3.500

FFL +3.900 SSL +3.500

E X IT

F&B B 166.49 m²

P2-08-01 FB

M. TOILETS 30.16 m²

9.8

P2-08-22 LIFT LOBBY 18.75 m²

FH R LV

E X IT

E X IT

+3.750

DIAGONAL DISTANC E=18.5 M 1/3 DIAGONAL=6.8 M

02

P2-08-11

P2-08-03 K

FOH ENTRY

15

80

m

m

8

ST

03

17

LOBBY 54.26 m²

F LV HR

W

E X IT

P2-08-20

AIR

FO H

E X IT

EN TR

Y

+3.750

BOH LIFT 9.61 m²

AB O

VE

SECURITY 14.52 m²

P2-08-32 LOADING BAY 111.26 m² FFL +3.900 SSL +3.500

LOBBY 28.06 m²

FH

KITCHEN B 110.16 m²

.2 12

UC K TR

E

BO

H

EN

TR

.8 13

FH LV

CAT LADDER 4.55 m²

15

80

m

m

OPENING ABOVE

TH

=

P2-08-25

AIR

W

ID

MEP 8.94 m²

ST

D

.4

15

P2-08-33

R

Y

+3.750

P2-08-02 K

1 U/S C OF LEA ST R H R. EIG BE H AM T T 41 O TR 00 UC m K m 2

LV R

P2-08-27

E X IT

9.1

OP

EN IN

G

2500x400 OPENING IN WALL

GENERAL NOTES:

KITCHEN INDUSTRIAL

FIRE EXIT STAIRCASE

4)ALL EXTERNAL WALLS SHALL BE AT LEAST 6M FROM ANY ADJACENT BUILDINGS,OTHERWISE THE EXTERIOR WALLS MUST BE FIRE RESISTANCE RATED IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 5000. 5)OCCUPANCIES SHALL BE FIRE SEPARATED AS REQUIRED BY THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 5000.

MERCANTILE

EXIT ACCESS CORRIDOR

9)ALL BALCONIES,TERRACES AND WINDOWS SHALL COMPLY WITH THE UAE FIRE AND LIFE SAFETY CODEE ANNEXURE B2. 10)MEANS OF EGRESS SHALL BE IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 5000.

A

11)THE EXIT CAPACITY SHALL BE SUFFICIENT TO ACCOMMODATE THE CALCULATED OCCUPANT LOAD. DOORS SERVING AREAS WITH OCCUPANT LOADS OF 50 OR MORE MUST OPEN IN THE DIRECTION OF EGRESS. DOORS SUBJECT TO LOCKING SHALL BE PROVIDED WITH PANIC HARDWATE OF SERVING OCCUPANT LOADS OF 100 OR MORE. 12)THE EXITS SHAL BE ARRANGED SUCH THAT THE DEAD END CORRIDOR,COMMON PATH AND TRAVEL DISTANCE REQUIREMENTS AND SATISFIED

1

GROUND FLOOR PLAN 6&$/(

FHR LV

ASSEMBLY

3)THE STRUCTURAL FIRE RESISTANCE AND CONSTRUCTION TYPE SHALL BE ACCORDANCE WITH NFPA 5000 TYPE II (111). BUILDINGS WITH ROOFTOP LPG TANK INSTALLATIONS SHALL BE TYPE II (222) CONSTRUCTION TYPE.

7)ALL CURTAIN WALLS AND CLADDING INSULATION,EXTERIOR WALL CLADDING AND ROOFING SYSTEM SHALL BE IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE ANNEXURE A.1.2.1. 8)ALL INTERIOR FINISH SHALL BE IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 5000.

B

FIRE RATED DOORS - COMPARTMENTATION

OCCUPANCY CLASSIFICATION

2) EMERGENCY VEHICULAR ACCESS SHALL BE IN ACCORDANCE WITH THE SITEWIDE FIRE STRATEGY FOR THE DEVELOPMENT.

6)ALL FIRE DOORS AND WINDOWS SHALL BE ACCORDANCE WITH NFPA 80 AND THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE.

C

DR/A/1500

LEGEND:

1) THE DEVELOPMENT SHALL COMPLY WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE (2011 EDITION);NFPA 5000"BUILDING CONSTRUCTION AND SAFETY CODE" (2015 EDITION); AND NFPA 101 "LIFE SAFETY CODE"(2015 EDITION).

13)EACH STOREY SHALL BE PROVIDED WITH AT LEAST 2 EXITS THAT ARE REMOTE FROM EACH OTHER. 14)ALL AREAS SHALL BE PROTECTED WITH AN AUTOMATIC FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 13. 15)ALL AREAS SHALL BE PROVIDED WITH FIRE DETECTION AND ALARM SYSTEM IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 72

STORAGE

EXIT

FIRE HOSE REEL LANDING VALVE

EXIT SIGN

00

1 HOUR FIRE RATED DOOR

TRAVEL DISTANCE REQUIRMENTS DEAD END

TRAVEL DISTANCE

MANUAL CALL POINT

00

OCCUPANCY MAXIMUM TRAVEL DISTANCE TO AN EXIT (M) DEAD END CORRIDOR (M)

00

90 MINS FIRE RATED DOOR

COMMON PATH

BUSINESS MEANS OF EGRESS

00

FD60

FD90

COMMON PATH OF TRAVEL (M)

FIRE RATED WALLS - COMPARTMENTATION

120

2 HOURS FIRE RATED WALL OF PARTITION

60

1 HOUR FIRE RATED WALL OF PARTITION 1 HOURS FIRE RATED WALL (BY TENANT WHERE NO KITCHEN HOOD SUPPRESSION SYSTEM IS PROVIDED)

00

00

6.1m (23m If < 50 persons)

6.1m

76m

MERCANTILE

30m

15m

76m

INDUSTRIAL

30m

15m

122m

STORAGE

30m

30m

122m

ASSEMBLY

16)STANDPIPES AND HOSE REELS SHALL BE PROVIDED THROUGHOUT IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 14. 17)STANDPIPES AND HOSE REELS SHALL BE PROVIDED THROUGHOUT IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 14. 18)PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED THROUGHOUT IN ACCORDANCE WITHTHE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 10. 19)ALL EXIT STAIRS AND INTERNAL CORRIDORS SHALL BE EITHER NATURALLY OR MECHANICALLY VENTILATED AS PER THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE. 20)ANY LPG INSTALLATION SHALL BE IN ACCORDANCE WITH THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE; NFPA 54 AND NFPA 58. 21)FIRE SAFETY DURING CONSTRUCTION SHALL BE AS PER THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE AND NFPA 241.


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2014

3 )% ) % &

$

$

'5 $ 83

$

'5 $

'5 $

'5 $

'5 $

'5 $

'

'

67$,56 /

'

'5 $

(

'5 $

(

67$,56 /

(

))/ P 3 /

))/ P 3 /

$

$

(4 5,6(56

$

))/ P 3 6'3

(4 5,6(56

))/ P 3 6'3

67$,56 6(&

$

%

&

'

(

723 2) :,1' 72:(5

723 2) :,1' 72:(5

$

$

$

66/

)5/

3 . .,7&+(1 %

$

))/

))/

))/

6HFWLRQ 6&$/(

3 3(563(&7,9( 6&$/(

'5 $

6HFWLRQ 6&$/(

))/

66/

6758&785( 72 %( &225',1$7(' :,7+ $5&+,7(&785(

'5 $

3 ) 72,/(76

3 )% ) % %

66/

))/

723 2) 3$5$3(7

))/

$

))/

3 )% ) % %

3 . .,7&+(1 %

3 0(1 35$<(5 5220

3 )% ) % %

723 2) 3$5$3(7

66/

))/ P 3 6'3

) % $

))/

'5 $

3 )%

3 . .,7&+(1 $

))/ P 3 /

))/ P 3 /

522) /$,' 72 )$//6

723 2) 3$5$3(7

522) /$,' 72 )$//6 66/

)5/

66/ P 3 /

723 2) 3$5$3(7 723 2) 3$5$3(7

723 2) 3$5$3(7

723 2) 3$5$3(7


MERSA AL SEEF

SITE PHOTOS


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2014


AINO MINA DEVELOPMENT

PROJECT OVERVIEW

PROJECT OVERVIEW The Aino Mina development aims at providing a peaceful environment where people can experience and appreciate the beauty and tranquility of Nature. A wide central park runs through the masterplan, dividing it in two and linking the retail area at its southern end with the Friday mosque at its northern end. The land rises gently so that the Friday mosque seen against the backdrop of the mountains bordering the Arghandab valley, creates a powerful and beautiful symbol for the entire development. The park is the centre of the Masterplan and can be thought of as the trunk of a tree that structures the entire development. All important Masterplan zones and functions either take place within it or branch Rႇ IURP WKLV FHQWUDO JUHHQ SDUNZD\ :DWHU FDVFDGHV GRZQ WKH VORSH and through the park in a series of relaxing and cooling water features. 7UDႈF LV NHSW WR WKH HGJHV RI WKH VLWH VR SDUN UHPDLQV D SHDFHIXO DQG safe place for pedestrians and families to use and enjoy. The park can accommodate a wide range of activities and attractions for all people to enjoy either together or in the same place. A wide pedestrian pathway crosses the park and links the functional centres formed by the school to the West and the healthcare centre to

the East. Four other wide pathways lead from the central park to local neighbourhood mosques and community centres for each of the four main districts. Each of these community centres provides places for the people in the surrounding villas and townhouses to congregate, socialize and relax. The houses in these neighbourhoods can be accessed by car but, at the same time, it is possible for people to walk across the entire GHYHORSPHQW ZLWKRXW HQFRXQWHULQJ WKH LQWHUUXSWLRQ DQG QRLVH RI WUDႈF Individual houses are designed to respect both the neighbourhood and the street. Private garden courtyards with pools and fountains create pleasant private places for the family but are also important for maintaining comfortable temperatures inside the houses throughout the year. The houses may have a modern design but they make full use of this traditional arrangement that the rest of the world has come to appreciate. Whether it is a private courtyard or a large central park, the garden has a special place in Islamic culture. It is a symbol of the paradise that, from the smallest level to the largest, this masterplan aims to create.


AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2010

AINO MINA DELELOPMENT

Kandahar, Afghanistan

Client // Mohammad Jan Investment (MJIC) Site Area // 2,000,000 sqm Project Size // 898,175 sqm Schematic Masterplan Design

Mixed-use masterplan development with villas, townhouses, community IDFLOLWLHV VFKRRO ¿WQHVV FHQWUH PRVTXH DQG D FRPPHUFLDO FHQWUH


The concept is for a peaceful environment where people can experience and appreciate the beauty and tranquility of Nature. A wide central park runs through the masterplan, dividing it in two and linking the retail area at its southern end with the Friday mosque at its northern end. The land rises gently so that the Friday mosque seen against the backdrop of the mountains bordering the Arghandab valley, creates a powerful and EHDXWLIXO V\PERO IRU WKH HQWLUH GHYHORSPHQW 7KH JUHHQ ¿QJHU LV WKH centre of the Masterplan and can be thought of as the trunk of a tree that structures the entire development. All important Masterplan zones and IXQFWLRQV HLWKHU WDNH SODFH ZLWKLQ LW RU EUDQFK Rႇ IURP WKLV FHQWUDO JUHHQ SDUNZD\ 7UDႈF LV NHSW WR WKH HGJHV RI WKH VLWH VR WKH SDUN UHPDLQV D peaceful and safe place for pedestrians and families to use and enjoy.

neighbourhood

community

district

EVOLUTION OF MASTERPLAN: GROWTH OF CLUSTERS

A

B

C

D

E

Wider 22M sqm masterplan

1

REGIONAL CONTEXT REEG RE G AL AL CONTEX EXTT EXT EX 2

OLD KANDAHAR the site

3

4

Haji Lalak Mosque Srah Jamia Military Hospital Ahmad Shahi School

D-2 A-3 E-3 C-2


afghanistan

rebuilding

friday mosq qu ue “Jumuah”

fitness fitnes esss centre ntre

schooll

c mmer co commerc e cial ia l

complex comple p ex BUILDING TYPOLOGIES

lttaic

ht Skylig

Open

Photovvvoltaic PPanels

n Roof Garde wer Wind to

Light Well

Foldable Canopies Level 3 : Medica lC

enter

ce

Terra

Featu

ree Sta ir

case

Dou b Livin le Heigh t g Ro om Ope

Plo ( 1 t Out 2m line x2 5m )

nC our

tyar

d

ture

Fea

Level 2 Exclu : sive S ho

ase tairc

ps

S

Ope Cou n rtya rd Plo ( 2 t Out 0m line x2 5m )

en nk Su rden a G M Dr ain op -o ff

Photovo Panels

Leve Leve l 1: Sh ops Res l 1: taur ants &C Bas afes e Lev ment el


AINO MINA DEVELOPMENT

MASTERPLAN VIEWS AND VISTAS

LANDSCAPE

The site gradually falls to the south by 13 metres. The descent of the land towards the southern edge gives a cascading view experience from the highest zones running down to the lower areas close to the site boundary. The mountainous terrain that borders the Arghandab valley to the north provide a scenic backdrop to the entire development.

7KH ODQGVFDSH IRUPV EXႇHU ]RQHV for protection from sand storm.

SECURITY MEASURES 'LႇHUHQW PHDVXUHV VKRXOG EH considered with installation of security systems to the site.

WAY FINDING Lush gardens create key points of navigation & enable community spaces to be orientated in sequences across the landscape.

ECO SYSTEMS Natural habitats are formed & optimized for a variety of wild life; birds, mammals and marine life.

PERIMETER BOUNDARY DIVISIONS Strategic thresholds / barriers provide secure environments for residents. Landscape can be carefully arranged to screen and conceal.

A diverse variety of native species of trees, shrubs & plants & existing vegetation create beautiful environments.


AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2010 NETWORK HIERARCHY

WALKABILITY

A fully connected circulation route should unify and integrate respective neighborhood clusters.

Meandering footpaths provide comfortable passages and themed routes across the site.

BIOCLIMATIC INNOVATION

ACCESS

Wild turbines can utilize wind energy to generate power

The site is located on an uninhabited plot on the eastern periphery of the city of Kandahar. Neighbouring building developments are limited in number and are very insular in layout. The site is connected to Kabul by the Kabul-Kandahar Highway and to Heart by the Kandahar-Heart Highway.

The masterplan concept focuses on creating an inward-looking secure community independent from the wider 22 million square metre masterplan. The initiative introduces several nodal community hubs that connect to one larger central urban zone. Each hub is surrounded by clusters of villas and townhouses forming an egg-like neighborhood zone. A public retail core acts as the epicenter of the development. The advantage of several nodal connections within a standalone development means that phasing can be rationalized across the site with minimum disruptions.


AINO MINA DEVELOPMENT

MASTERPLAN

TOWNHOUSES [BOULEVARD SIDE]

COMMUNITY CENTRE

FITNESS CENTRE The concept for the building is to create a fully functional leisure area that operates as a versatile community facility with accessibility being a critical aspect of the design.

The community centre anchors each community cluster. The visual presence of the mosque DV DQ RUQDWH ZD\ ¿QGLQJ GHYLFH MXVWL¿HV WKH LPSOHPHQWDWLRQ of soaring minarets that tower above the community clusters.

The townhouses are located on a compact parcel of land. Each unit design has an amazing sense of spaciousness with copious natural light WKDW ÀRRGV LQ IURP WKH URRI OLJKWV DQG full height glazed windows.

FRIDAY MOSQUE “JUMEH”

GREEN FINGER


AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2010

VILLAS-MEDIUM SPEC

TOWNHOUSES [PARKSIDE]

The overriding goal was to create a series of buildings that made the most of its picturesque location whilst also providing an overwhelming sense of privacy. The result is a building that is composed of varying spaces of privacy. COMMERCIAL CENTRE The commercial centre forms an emblematic gateway into the developPHQW HPSKDVL]LQJ DQG GH¿QLQJ LWV UROH as a central urban node.

LUXURY VILLAS Each 1200 square metre parcel contains a considered mansion-like abode. These monumental developments are located topographically to take advantage of elevated land. SCHOOL

CENTRAL PARK

Investigative analysis into school design revealed that a ‘clusterlike’ development could integrate successfully into the masterplan.


er o ng t fi on n ti ee ec gr onn c

The masterplan aims at the creation of places for people to gather and interact are at the heart of the design. Historically, gatherings have formed where shade and water occurred. The project presents the opportunity to re-interpret this cultural and climatic approach to defining places.

sc

sustainability

PLACES FOR PEOPLE

ho ol

ORIENTATION The orientation of streets are in the east-west direction to control air movement through the site. green barriers are provided to protect against hot winds.

ENERGY STRATEGY The design of buildings, surfaces and the urban landscape can have a significant impact on the micro-climate and outdoor thermal comfort and resource consumption. A carefully designed environment can make outdoor spaces more usable encouraging more sustainable transport, communities and lifestyles.

wayfinding

Low energy LED STREET LIGHTING

The design includes the provision of access to amenity/open space to promote healthy living and wellbeing among residents and visitors, enhance opportunities for social interaction and the enjoyment of nature. Providing security is important to the quality of life of residents, while maintaining connections and cultural interactions.

comfort


TRANSPORT AND MOBILITY The design of the development will seek to encourage increased use of sustainable modes of transport like walking and cycling through establishing an integrated, well connected network of paths and social infrastructure. The urban form will be designed to minimize the need for trips by cars and freight vehicles.

walkability

visual connections

OPTIMISING RESOURCES

PHOTOVOLTAIC CELLS on the roofs of parkside townhouses.

INCREASED LIFE & HABITAT

er o es ng t ti fi on ili n ti ac ee ec f gr nn ts co por s

WIND TURBINES

The natural environment will be seen as an asset that adds to wellbeing and the attractiveness of the development. Maintaining and enhancing natural systems and biodiversity will encourage more sustainable lifestyles and reduce operational costs while supporting social development, pride, wellbeing and support the microclimate adaptation measures. .

Wind can be controlled and used to produce energy or effective work to pump ground water. Section H1

Secure supplies of utilities will lead to improved quality of life & economic growth, will lead to improved local environments and reduced operational costs. Local renewable supplies will be used where possible and the concept of closed-loop resource cycles will be adapted recognising that reuse and recycling of resources is more effective than typical linear consumption and disposal routes.

parks


AL SEEF RESIDENTIAL DEVELOPMENT

PROJECT OVERVIEW

PROJECT OVERVIEW 2XU DSSURDFK ZDV WR GHVLJQ D GHYHORSPHQW ZKLFK ZRXOG RႇHU D unique product in a saturated real- estate UAE market. Unique not in terms of luxury and unit sizes, but a human scale experience that people wish to re-enact. To create a private island that will be intimate, but encourage interaction at the same time. To give tenants an opportunity to own a waterfront townhouse with the same feel of owning a Venitian palacco on Grand Cannal. We created a variety in product, from villas to waterfront townhouses, garden townhouses and boutique apartments. Special attention was given to detailing the GLႇHUHQW IDoDGH WUHDWPHQWV RQ VDPH PDVVLQJ DQG SODQQLQJ W\SHV DQG public realm design thus providing character and identity. Open areas are treated as “tissue” that binds the masterplan together and breaks it into public, semi- public and private spaces introduced in between dynamically positioned townhouses. This is in line with the RUJDQLF JURZWK RI KLVWRULFDO FLWLHV ZKLFK DOVR IHDWXUH GLႇHUHQW WUHDWPHQW WR IURQW DQG EDFN\DUG PXOWLSOH W\SHV RႇHULQJ YDULHW\ DQG IUHVK GZHOOLQJ

qualities. The prevailing architectural typology is that of a multi storey single family dwelling which is organized on a more urbanized planning matrix, which appeals to our sub-conscious perception of what a city should look like. It evokes a sense of belonging, sense of place, dense urban identity, while maintaining tranquility of a green, lush suburban development. 7KH PRVW VLJQL¿FDQW TXDOLW\ RI WKLV FRPSOH[ LV WKH G\QDPLF DQG XQLTXH viewing opportunity the exists from every part of the island. Framing views between buildings and making intense relation between street DQG VROLG PDVVHV FUHDWHV D ÀXLG VSDFH ZLWK DOPRVW HTXDOO\ GLVWULEXWHG residential quality. There is no better or worse part of the island - there are only options - either you prefer greenery or water, street or garden, peace or lively neighborhood. One thing is always certain - variety and sequence of surprising vistas.

7KH PRVW VLJQL¿FDQW TXDOLW\ RI WKLV FRPSOH[ LV WKH G\QDPLF DQG XQLTXH YLHZLQJ RSSRUWXQLW\ WKH H[LVWV IURP HYHU\ SDUW RI WKH LVODQG


AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2011

AL SEEF RESIDENTIAL DEVELOPMENT Abu Dhabi, UAE Client // Matrix Property Middle East (MPME) Site Area // 61,132 sqm Project Size // 62,279 sqm Investigate master planning strategies


AL SEEF RESIDENTIAL DEVELOPMENT

ANALYSIS

SITE AND LOCATION ANALYSIS The location, orientation and adjacencies of the plots have been analysed in order to make the best use of urban and environmental opportunities. The client brief established clear goals to ensure the best revenues: by creating a private island, positioning houses towards the water to utilize sea views, maximizing villas and townhouse numbers, minimiz apartments, and creating a development with a strong identity. The primary agenda was to preserve intimacy and high level residential TXDOLW\ ZKLOH DSSURSULDWHO\ DUUDQJLQJ WUDႈF XWLOL]LQJ WKH ZDWHUIURQW and creat common and green areas. The Island is broken into 3 zones ZLWK D GLႇHUHQW XUEDQ IHHO ZKLOH PDLQWDLQLQJ D QDWXUDO DQG RUJDQLF quality of historic cities:

Family Housing Tourist Zone Recreation Zone

Zone 1 is in the South diractly of facing the mainland/canal with appropriate architectural language – row townhouses creating the densest area of the development,with inner raised pedestrian streets, reminiscent of international and historical waterfront cities. This part of island provides a new and underrepresented typology in UAE. Zone 2 is the common central area bookended with boutique apartments in the East and teraced townhouses on the West and North side. This zone is lush landscaped with trees, water and shrubs providing tranquil contrast to fast Abu Dhabi expat lifestyle. It has a running track on its outer edge separated from private townhouse gardens. Zone 3 is the detached villa row in the North, each one with private gardens, pools, garages and optional jettys. The villas add quality and depth of product to the entire complex - the highest residential level with special dedication to personal comfort and contemporary design.

Villas Townhouses Zone 1 Townhouses Zone 2 Boutique Apartments

SITE AND LOCATION ANALYSIS As part of the initial design process, Aedas team members attended an intensive concept workshop. The purpose of the workshop was to explore and discuss creative responses to the brief. The enquiry followed a structured process whereby critical analysis and examination was carried out in the form of ‘brain storming’ sessions and small charrettes. This dialogue formed an overall examination of the following urban scale issues: Macro - overall Al Raha Beach Meso - overall Al Seef Precinct Micro - Lot PB 401 Macro - We began to identify the key ‘thematic’ characteristics of the overall development, subsequently we created a list of priorities and possibilities: 1. Cityscape/Skyline appearance 2. Holistic Community environment 3. Self-sustained compounds 4. Diversity between districts 5. Waterfront/Beach side living Meso - ‘Al Seef is the lively precinct of Al Raha Beach. Its layout mixes commercial properties, hotels, retail and recreation, with a variety of residences. The Floral Promenade along the canal is the focus of excitement by day and night. This vivacious precinct also hosts venues for entertainment

and civic events, with the local LRT station situated on the main ERXOHYDUG 2ႇVKRUH DUH WKUHH LVODQGV WZR RI ZKLFK LQFOXGH OX[XU\ private developments.’ We dissected the brief to understand how we could optimize the ‘water-side’ conditions of the site location. Our preferences were for the intelligent consideration of water bodies and the proximity of built form to it. Micro - We speculated about how the island could be considered as a stand-alone ‘iconic’ development. We accepted that it would need to possess unique characteristics: 1. Exclusivity: Privacy and Intimacy. 2. Specialised Facilities: Potential Watersports 3. Outstanding Natural Beaty: Potential wildlife and natural landscapes.


AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2011

SITE ORGANIZATION AND OPTION ANALYSIS $ ULJRURXV LQYHVWLJDWLRQ LQWR GLႇHUHQW VLWH RUJDQLVDWLRQ OD\RXWV allowed us to quickly validate concept potential. We quickly began to understand how the density and scale of built and non-built form DႇHFWHG YLHZV DQG RYHUDOO VFDOH RI WKH GHYHORSPHQW :H DVVHVVHG WKH positives of the preferred options. These centered around:- density, hierarchy, security and open space. We assessed the negatives of the SUHIHUUHG RSWLRQV 7KHVH FHQWHUHG DURXQG ODFN RI SULYDF\ LQÀH[LELOLW\ Our assessments lead us to create 4 initial massing and arrangement layouts for the island:Option 1 - A combination of rows of villas on the northern edge of the island each facing outwards to the beach front. To the south a collection of 5-6 storey apartments and townhouses. Option 2 - A wall-like development of villas, townhouses and apartments. Each unit has a beach front location. A large central public park is situated in the centre. Option 3 - A sequence of radial rows of villas and 5-6 storey apartments orientated to facilitated outward looking channels to the sea. Option 4 - A dual arrangement of townhouses and villas split into northern and southern portions of the island, with a large water body in-between.

SUN AND WIND INFLUENCES - LESSONS LEARNED FROM STUDIES OF REGIONAL CITIES OF THE PAST

predominant wind direction ( day) pleasant breeze directed by variety in building massing

winter

summer

green / trees

running track

gardens

covered access street

pedestrian street

roof pool deck optional

townhouses waterfront

views

predominant wind direction (night) pleasant breeze & wind flushes the heat with fresh air

green / trees

running track

gardens

covered access street

pedestrian street

roof pool deck optional

townhouses waterfront

views


AL SEEF RESIDENTIAL DEVELOPMENT

DESIGN PROCESS

VIEWS & ACCESS 7KH PRVW VLJQL¿FDQW TXDOLW\ RI WKLV FRPSOH[ LV WKH G\QDPLF DQG XQLTXH viewing opportunity the exists from every part of the island. Framing views between buildings and making intense relation between street DQG VROLG PDVVHV FUHDWHV D ÀXLG VSDFH ZLWK DOPRVW HTXDOO\ GLVWULEXWHG residential quality. There is no better or worse part of the island - there are only options - either you prefer greenery or water, street or garden, peace or lively neighborhood. One thing is always certain - variety and sequence of surprising vistas.

Sea

Park Sea

Park

Canal

Canal

direct water view indirect water view from second row

Views % 83 buildings with direct water view and partial park view 61%

direct green area view 55 buildings with direct green area view and partial water view 39%

Views diagram

indirect green area view from waterfront

GREEN AREA, PARK

JOGGING TRACK

BREAKOUT SPACE

PEDESTRIAN WALKWAY

The main selling point is that every building has views towards water or green areas at least from one part/level of the house. Therefore, \RX FDQ KDYH D KRXVH ZLWK GLႇHUHQW YLHZV GHSHQGLQJ RQ D URRP \RX are in - starting from entrance to a lively street, levels above opening to the central green area or garden or to water on the opposite side. Every house has a fully utilized roof with both sea and park views that provides vertical and ambient diversity to the houses. By utilizing the entire length of the waterfront and introducing “notches” on east and west sides of the Island, the design team has maximized views and access to water. There are two main orientation points – waterfront and central park/green area. Out of total number of buildings 61% have direct sea views and 39% indirect sea views and direct park views. All villas have sea views and direct waterfront access with corner villa type 3 having dual orientation.Indirect views are maintained through lines of sight over shorter (G+2) houses in front rows.


AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2011

E NE ON ZO EZ S U V HO WN O T

-

BOUTIQUE APARTMENTS

PRIVATE MOORINGS

PARK VIEW TOWNHOUSES

BRIDGE

GATEHOUSE

VILLAS

PRIVATE MOORINGS

WATERFRONT TOWNHOUSES

A ILL

Sea

Park

inner townhouse street and access to green areas central green area and access to the other public areas

vehicle access

Canal

Access to inner pedestrian street Deck

ACCESS 3D DIAGRAM

ACCESS SECTION DIAGRAM


AL SEEF RESIDENTIAL DEVELOPMENT

VISUAL

AL SEEF ISLAND - AERIAL VIEW FROM THE MAINLAND


AREZOO TORABI | ASSOCIATE MEMBER, AIA | AEDAS 2011


HATTA MOUNTAIN LODGE

PROJECT OVERVIEW

PROJECT OVERVIEW The Hatta Desert Resort will be a unique Mountain retreat that will RႇHU D PXOWLWXGH RI GLYHUVH RႇHULQJV WKDW FXUUHQWO\ GR QRW H[LVW LQ WKH UAE’s Hospitality landscape. Located on the outskirts of Hatta, this develop-Hatta is located approximately an hour away from Dubai City and enjoys pleasant climate settings, along with unrivalled valley and mountain sceneries including breathtaking views of the Al Hajar Mountains and wadis below. Hatta is a unique destination within the 8$( WKDW RႇHUV D GLႇHUHQW H[SHULHQFH WR WKDW RI DQ\ RWKHU GHVWLQDWLRQ within the country. It is an untapped market for the hospitality sector FXUUHQWO\ RႇHULQJ RQO\ RQH KRWHO WKH +DWWD )RUW +RWHO ZKLFK LV DQ ageing product and positioned in the midscale segment of the market. This hotel resort is expected to be positioned within the Luxury segment

of the market, targeting clientele seeking tranquillity and privacy along with an exclusive experience in a secluded location.The terrain is naturally sculpted and presents an array of exciting opportunities for the appropriate devel-opment. The current proposal seeks to site a one-phase 120-key development, with a mix of standalone luxury tent suites and hotel complex accommodation, serviced through the main hotel complex, that will additionally house a number of the communal facilities such as the F&B dining, signature spa, health club and pool. The development will contain all the elements of a modern, functional and sustainable mixed-use environment and is set to provide another GLPHQVLRQ WR WKH HYROYLQJ KRVSLWDOLW\ RႇHULQJV LQ WKH 8$(

7KLV KRWHO UHVRUW LV H[SHFWHG WR EH SRVLWLRQHG ZLWKLQ WKH /X[XU\ VHJPHQW RI WKH PDUNHW WDUJHWLQJ FOLHQWHOH VHHNLQJ WUDQTXLOOLW\ DQG SULYDF\ DORQJ ZLWK DQ H[FOXVLYH H[SHULHQFH LQ D VHFOXGHG ORFDWLRQ


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2016

HATTA MOUNTAIN LODGE

Hatta, Dubai

Client // Meraas Holding Project Size // 36,000 sqm Concept Masterplan Design


HATTA MOUNTAIN LODGE

SITE ANALYSIS

ZONING ANALYSIS From a zoning perspective the resort has been spread out within the site to give each guest the impression of seclusion and privacy. Clusters of standard mountain suites have been kept to 2 or three to preserve this sense of privacy and kept to the lower slopes, adjacent the wadis, whilst the deluxe suites have been sited and orientated slightly higher and away from their immediate neighbours. The Presidential Suites have been located at an even higher elevation than the deluxe suites with the Royal Villa located at the highest point. For the location of the All Day Dining, the Fine Dining and Sunset Bar, we have considered the sun path diagrams to identify the best possible locations. These allow for the morning sun to the terrace of the All Day Dining and the setting sun for the Sunset Bar and Fine Dining experience. For the Spa – which will also be an attraction for day visitors - we have proposed a location at the centre of the site, within the proposed oasis plantation. This facilitates easy access in and out without having to WUDYHUVH WKH ZKROH VLWH DQG DႇHFW WKH KRWHO JXHVW H[SHULHQFH /RFDWHG within the oasis it also allows us to fragment the buildings, enhancing the outdoor environmental experience for the spa guests. Individual WUHDWPHQW URRPV ZLOO DOVR EH VSUHDG RXW DURXQG WKH UHVRUW WR RႇHU D unique perspective to the surrounding mountains.

MASTERPLAN As mentioned in the zoning narrative, in order to allow the guests to experience as much of the terrain as possible, the hotel is spread out around the site, primarily along the lower slopes for ease of access but also along the higher intermediate zones in places. Key locations within WKH VLWH KDYH EHHQ LGHQWL¿HG ZKLFK HLWKHU FDSWXUH WKH PRUQLQJ VXQ ± IRU the breakfast experience – or the view to the surrounding mountains JORZLQJ UHG LQ WKH VHWWLQJ VXQ ± IRU WKH ¿QH GLQLQJ DQG VXQVHW EDU H[SHULHQFH 2WKHU LPSRUWDQW ]RQHV IRU WKH SXEOLF DUHDV DUH LGHQWL¿HG as the Spa – which is more inward looking and focused on the Oasis

experience – the Wadi Pool – which also includes a part of the Oasis experience but includes a re-created ’natural wadi’ type pool, complete with waterfalls, grotto’s and running water – and the organic animal and vegetable and fruit farms. Wherever possible, the existing wadi EHGV ZLOO EH HQKDQFHG DQG IRUPDOL]HG WR EH DEOH WR FRQWURO ÀRRG ZDWHUV in the rainy season as well as to create an authentic wadi experience throughout the site. With the introduction of raised cultivated platforms along these water courses we can also introduce additional pockets of RUJDQLF IDUPLQJ WR FRPSOLPHQW WKH KRWHO ) % RႇHULQJV


AREZOO TORABI | ASSOCIATE MEMBER, AIA | GAJ 2016

SPA & WELLNESS The spa experience is designed to take advantage of the natural topography and features of the site and is separated into the oasis experience, the mountain experience and the grotto experience. The spa itself has been separated into the dry treatment areas and the wet treatment areas. For the (dry) treatment rooms, each room is self VXႈFLHQW ZLWK FKDQJHURRP VKRZHU DQG WRLOHW HQDEOLQJ WKH URRPV WR be treated as free standing pavilions, located either within the oasis or as a mountain top pavilion with commanding views out over the site and surrounding mountains. Within the oasis itself, the rooms are either located at the edge of the upper pool which is the source of the mountain stream, or within the palms and shaded courtyards of the oasis. Additional treatment rooms are located at various points around the site, each sited to be accessible by the more remote DFFRPPRGDWLRQ DV ZHOO DV WDNLQJ LQWR FRQVLGHUDWLRQ VSHFL¿F ORFDWLRQV which give the guests a unique sense of place within the mountains. 0XOWLSOH GD\ WUHDWPHQW SDFNDJHV ZLOO EH DYDLODEOH RႇHULQJ XQLTXH treatments such as mud and sand treatments, using regional natural products as well as more exotic chocolate and milk treatments. Seclusion and privacy will be of paramount importance in the approach to planning the spa. The wet areas take the form of an underground grotto, and are located HLWKHU VLGH RI D ODUJH µQDWXUDO¶ XQGHUJURXQG SRRO ZKLFK µÀRZV¶ WRZDUG the circular Jacuzzi located at the edge of the waterfall which tumbles down from above into the grotto pool below. Immediately in front of the arrival lobby, a large circular opening in the ground above allows water to dip down from a pool above into the underground pool, and allows natural light into the lower level. The grotto will be ‘sculpted’ from the rock to form an underground cavern experience.


HATTA MOUNTAIN LODGE

PROGRAM

ALL DAY DINING Set well back into the resort, the all day dining takes advantage of DQ HOHYDWHG ORFDWLRQ WR FDWFK WKH ¿UVW UD\V RI VXQ ZLWKLQ WKH VLWH DQG is designed around an outcrop of natural rock – which cuts through the restaurant, dividing it into two distinct sections. Envisaged as a GHVWLQDWLRQ LQ LWVHOI WKH DUULYDO ZLOO HLWKHU EH E\ IRRW ± IRU WKH ¿W PLQGHG – or by buggy. The emphasis on both dining experiences will be on local UAE cuisine with unique live cooking facilities throughout the resort, from BBQ nights in the oasis to private candle light dinners on the mountain or private dining on your suite terrace.


$5(=22 725$%, _ $662&,$7( 0(0%(5 $,$ _ *$-

DELUXE MOUNTAIN SUITES The deluxe mountain suite is a free standing one bedroom suite with a VOLJKWO\ ÀH[LEOH DUUDQJHPHQW WR VXLW LWV SDUWLFXODU PRXQWDLQ VHWWLQJ 7KH 6XLWH FRPSULVHV DQ RSHQ SODQ OLYLQJ GLQLQJ DUHD ZLWK FHQWUDO ¿UH SODFH D SDQWU\ JXHVW WRLOHW DQG PDVWHU EHGURRP ZLWK HQ VXLWH EDWKURRP 7KH HQ VXLWH EDWKURRP KDV D EDWK DQG VKRZHU ZLWK D YLHZ DV ZHOO DV D WRLOHW DQG ELGHW DQG GRXEOH YDQLW\ 7KHUH LV D ZDON WKURXJK GUHVVLQJ URRP EHWZHHQ WKH EHGURRP DQG WKH EDWKURRP 'LႇHUHQW OHYHOV ZLWKLQ WKH VXLWH DOORZ WKH XQLW WR EH IXUWKHU DGMXVWHG DFFRUGLQJ WR LWV VSHFL¿F ORFDWLRQ RQ WKH VORSHV (DFK XQLW KDV LWV RZQ SOXQJH SRRO DQG KDV D UDLVHG WLPEHU GHFN WR WKH EHGURRP DQG D VWRQH WHUUDFH WR WKH OLYLQJ URRP DQG SRRO DUHD 7KHVH VXLWHV UDQJH IURP ± VTP


+$77$ 02817$,1 /2'*(

352*5$0

ROYAL SUITE 7KH UR\DO YLOOD LV D VWDQG DORQH WKUHH EHGURRP YLOOD DQG LV WKH KLJKHVW EXLOGLQJ RQ WKH VLWH ,W KDV D ODUJH RSHQ SODQ OLYLQJ GLQLQJ DUHD ZLWK D µKDQJLQJ¶ ¿UH SODFH DQG SRRO ZKLFK SLHUFHV WKH VSDFH DQG GLYLGHV WKH WZR VSDFHV 2Q RQH HQG LV D NLWFKHQ DQG VHUYLFH SDQWU\ DQG RQ WKH RWKHU HQG DUH WKH JXHVW WRLOHWV DQG XQGHUFRYHU GHFN (QWHUHG IURP D KLJKHU OHYHO WKH DUULYDO VWHSV HQDEOH HQWUDQFH EHWZHHQ WKH OLYLQJ DQG GLQLQJ URRPV RQ D[LV ZLWK WKH LQ¿QLW\ HGJH SRRO )URP WKH HQWUDQFH OREE\ WKHUH LV D OLJKWZHOO DQG FRXUW\DUG HLWKHU VLGH ZLWK D ÀRDWLQJ VWDLUFDVH XS WR WKH EHGURRP OHYHO 2Q WKH SRRO WHUUDFH WKHUH LV D ¿UH SLW ZLWK VXQNHQ VHDWLQJ DV ZHOO DV D VKDGHG VHDWLQJ DUHD SHUFKHG RQ WKH HGJH RI WKH PRXQWDLQ VORSH 2Q WKH GLQLQJ VLGH RI WKH KRXVH LV D UDLVHG DQG VKDGHG RXWGRRU GHFN VXVSHQGHG DERYH WKH PRXQWDLQ SURYLGLQJ GHJUHH YLHZV RI WKH VLWH DQG VXUURXQGLQJ PRXQWDLQV 2Q WKH XSSHU OHYHO WKH PDVWHU EHGURRP FDQWLOHYHUV RXW IURP WKH OLYLQJ URRP EHORZ DQG DSSHDUV VXVSHQGHG LQ VSDFH ÀRDWLQJ DERYH WKH KRXVH EHORZ DQG WKH PRXQWDLQ 7KH HQ VXLWH EDWKURRP KDV D SDQRUDPLF YLHZ DQG KDV D VKRZHU WRLOHW ELGHW DQG GRXEOH YDQLW\ DQG LV HQWHUHG WKURXJK WKH GUHVVLQJ DUHD ORFDWHG EHKLQG WKH EHG (DFK RI WKH WZR DGGLWLRQDO EHGURRPV KDYH HQ VXLWH EDWKURRPV ZLWK VKRZHUV RQO\ DQG QR EDWKV DQG DUH EDVHG PRUH RQ D VWDQGDUG KRWHO W\SH RI OD\RXW


$5(=22 725$%, _ $662&,$7( 0(0%(5 $,$ _ *$-

STANDARD MOUNTAIN SUITES 7KH VWDQGDUG PRXQWDLQ VXLWHV KDYH EHHQ DUUDQJHG LQ FOXVWHUV UDQJLQJ IURP WZR WKUHH RU IRXU XQLWV GHSHQGLQJ RQ WKH SDUWLFXODU OD\RXW DQG WKH SDUWLFXODU VLWH ORFDWLRQ &XUUHQWO\ ZH KDYH IRXU SRWHQWLDO OD\RXWV HDFK UHVSRQGLQJ WR GLႇ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± VTP


/86$,/ +27(/ $1' 5(6257

352-(&7 29(59,(:

PROJECT OVERVIEW 7KH VLWH LV ORFDWHG LQ WKH /XVDLO DUHD 4DWDU 7KH VLWH LV D P ZLGH VWULS RI ODQG IURP WKH KLJK WLGH PDUN DW VKRUHOLQH DQG LV DSSUR[LPDWHO\ NP ORQJ 7KH VLWH DUHD EDVHG RQ WKH &RQFHSW 'HVLJQ LV DSSUR[LPDWHO\ VTP 7KH SURMHFW LV ¿YH VWDU +RWHO DQG 5HVRUW DW /XVDLO LQ 4DWDU FRQVLVWLQJ RI D ¿YH VWDU KRWHO FRQVLVWV RI JURXQG ÀRRU SOXV VW QG DQG UG ÀRRUV ZLWK NH\V ,QFOXGHG LQ WKH +RWHO ZLOO EH VWDQGDUG IDFLOLWLHV DVVRFLDWHG ZLWK D ¿YH VWDU +RWHO 7KH KRWHO ZLOO KDYH QR 6WDQGDUG 5RRPV QR %XVLQHVV 6XLWHV DQG QR 5R\DO 6XLWHV DV SHU WKH &RQFHSW 'HVLJQ WKDW LV SURYLGHG 5HVRUW VWDႇ DFFRPPRGDWLRQ GLVFUHHWO\ ORFDWHG IRU DSSUR[LPDWHO\ HPSOR\HHV QR 9LOODV IRU VLQJOH JHQGHU PDOH RU IHPDOH JXHVWV ZKLFK LV WR FRQVLVW RI [ EHGURRP YLOODV [ EHGURRP YLOODV DQG [ EHGURRPV YLOODV (DFK YLOOD ZLOO EH XVHG E\ D VLQJOH JHQGHU SDUW\ WKHUHIRUH SULYDF\ IURP DGMDFHQW YLOODV ZKLFK PD\ KDYH D GLႇHUHQW JHQGHU SDUW\ LV RI KLJK LPSRUWDQFH QR 9LOODV ZLOO EH IRU IDPLOLHV DQG ZLOO FRQVLVW RI [ EHGURRP YLOODV [ EHGURRP YLOODV DQG [ EHGURRP YLOODV (YHU\ YLOOD WR KDYH DFFRPPRGDWLRQ IRU RQH PDLG EXWOHU (YHU\ YLOOD WR KDYH D PLQLPXP RQH FDU SDUNLQJ VSDFH IRU HDFK EHGURRP YLOOD DQG PLQLPXP SDUNLQJ VSDFHV IRU DQG EHGURRP YLOODV HDFK (YHU\ YLOOD WR KDYH D VZLPPLQJ SRRO DQG GLUHFW VHD YLHZ DQG EHDFK DFFHVV

7KH DHVWKHWLF DSSURDFK KDV EHHQ GH¿QHG DV FRQWHPSRUDU\ ZLWK ORFDO DUFKLWHFWXUDO UHIHUHQFHV DQG IHDWXUHV


$5(=22 725$%, _ $662&,$7( 0(0%(5 $,$ _ *$-

/86$,/ +27(/ 5(6257

/XVDLO 4DWDU

&OLHQW ,QWHUQDWLRQDO 'HVLJQ &RQVXOWDQW &RUSRUDWLRQ ,'&& 6LWH $UHD VTP 3URMHFW 6L]H VTP 'HWDLOHG 'HVLJ 6FRSH RI VWDU +RWHO DQG 9LOODV


/86$,/ +27(/ $1' 5(6257

9,//$ 7<3( 7+5((

%

/

/

$

$

6:,00,1* 322/

))/

%

%('5220 *

))/

))/

))/

&

&

:& %$7+5220 * ))/

%('5220 * ))/

%$7+5220 * ))/

:&

*

6+2:(5

))/

*

(

6+2:(5

))/

)

0$,' 6 5220 *

60'%

'%

*506

3$66$*(

'

))/

/$81'$5< *

))/ ))/

3$66$*(

)

32:'(5 *

/

':

.,7&+(1 * ))/

))/

(175$1&( +$// * ))/

/

(

))/

))/

/,9,1* 5220 *

(168,7( *

6+2:(5

:&

',1,1* +$// * ))/

/

:,& * ))/

%$7+5220 * ))/

&

/

$

/

'

:&

6+2:(5

'

%('5220 *

%

))/

/


$5(=22 725$%, _ $662&,$7( 0(0%(5 $,$ _ *$-

7 2 3

7 2 3

7 2 3

7 2 3

7 2 3

522) /(9(/ 66/

7 2 :

/(9(/ ))/

/(9$7,21

7 2 3

7 2 3

7 2 3

$

%

7 2 3

522) /(9(/ 66/

%('5220 *

/(9(/ ))/

)25 &217,18$7,21 5()(5 '5$:,1* %(/2:

/(9(/ ))/

522) /(9(/ 66/

7 2 3

'

(

)

*

%('5220 *

%$7+5220 *

:,& *

6(&7,21

7 2 3

7 2 3

7 2 3

%$7+5220 *

%('5220 *

',1,1* +$// *

/,9,1* 5220 *

/(9(/ ))/

522) /(9(/ 66/

/(9(/ ))/

7 2 3

522) /(9(/ 66/

&

6(&7,21

)25 &217,18$7,21 5()(5 '5$:,1* %(/2:

:,& *

(168,7( *


%$ /

+27(/ '5$:,1*6 %$ /& 21 <

%$ /& 21 <

(; (& 52 87,9 20 (

/86$,/ +27(/ $1' 5(6257

0( 3

-

21 < %$ /&

(; (& 52 87 20 ,9(

%$ /& 21<

21 <

%$ /&

/

(; (& 52 87, 20 9(

%$ /& 21<

.

%$ /& 21<

0( 3

%$ /& 21 <

9( 87, (& 20 (; 52

21< /& %$

21< /& %$

'

%( /2:

0$ 5,1 $ ) 287/(% 7

-

7(5 5$&

5()/(&7,1* 322/

0((7,1* 522 0

322 / /,)7

287'225 6($7,1*

322/ '(&.

0((7,1* 5220

7(/

0((7,1* 5220

&21< %$/

21< %$/&

< 21 %$/&

< /&21 %$

( 25 67

< 21 /& %$

,9( 87 (& (; 5220

7 (& (/

/ 7(

,9( 87 (& (; 68,7(

87,9( (;(& ,7( 68

( &87,9 (;( 7( 68,

,9( (;(&87 1*( /28

72,/(772,/(7

6($7,1* $5($

3$175<

1< %$/&2

6($7,1* $5($

0((7,1* 5220

21< %$/&

( ,9

87 (& 20 (; 52

21<

,9( 87 (& (; 5220

5()/(&7,1* 322/

287'225 6($7,1*

(

(/( &

< 21

(

23 (1 72

/& %$

) * +

< 21 /& %$

,1),1,7< ('*( 322/

$

( $* 66 3$

% &

/& %$

(;(&87,9( ',1,1*

6(59 (/( ,&( 9$72 5

&/ 6725($1 $*(

&$3( 72 /$1'6 23(1 '(1 %(/2: *$5

%$1*48 +$// (7 &21 )(5(1& (

%86,1(66 &(175( %$148(7,1 35( )81&7 * ,21 +$//

%$148( 6725$*7,1* (

3$175<

/2%%< /281*(

.,7&+ %$&. (1 +286 2) (

+2 /' &+,// ,1* (5

)(0$/(

( (;(&87,9 (6 2)),&

*8(67 /,)7

$%/87,21

*8(67 /,)7

$',0,1

(175$1&( &2857<$5'

/,)7

3( 6&$ $1' /2: 1 72 / 23( '(1 %( *$5

6(59,&( /2%%<

5220

/$1'6&$3( *$5'(1

$'0,1

$3( /$1'6& 2: 23(1 72'(1 %(/ *$5

6 '5,9(5 :$7,1*

&21&,(5*(

$17(5 220

*60

6(59,&( /,)7

+27(/ /2%%<

35$<(5 5220

5220 1 ',9,6,2 ( 2)),&

5(7$,/

0$/(

5(&(37,21

.

/

/8**$*(

6(&85,7<

+27(/ 3257( &2&+(5(

$

%

&

.,1 5220*

'2 8% 52 /( 20

%$ /&

.,1 52 * 20

%$ /& 21 <

0( 3

-

0( 3

21 <

., 52 1* 20

%$ /& '2 52 8%/( 20

%$ /& 21<

< 21 /& %$

/

., 52 1* 20

%$ /& 21<

.

., 52 1* 20

%$ /& 21<

'2 52 8%/( 20

%$ /& 21<

( 8%/ 0 '2 22 5

21< /& %$

/& %$

$

'

) 35 23 26 28 ) % (' 7/ /2 (7 RU 81 IRU *( 0$ 7+ ( 5,1$

*

287' 225 ' ,1,1

*

287'225 ',1,1

*

)(0$/( *<0

0$/( *<0

$// ' $< ' 5(67$85$,1,1* 17

%$& . 2) +2 )25 86( 52 6(5 20 9,&(6

0$/( &+$1*,1*

287'225 '

1< %$/&2

,1,1* $7( 35,9

0$,1 .,7&+(1

83

0(3

)(0$/(

'( %2; 6$1,7,= ,1* $7,2 1

/9 5220

68%67$7,21

/2$',1* %$<

9$/(7 67$)) 3$5.,1* 6(5 9,&( < $5'

6(&85,7< 2)),&(

/

6(59,&(

/

/

5:

+9 5220

' $3( /$1'6&'(1 *$5 )25 6 (1 &+,/'5 < 3/$

+286(.((3,1* /,1(1

:$ ',63267( 6$/

,'25 55 &2

+& ( 66,%/ $&&( 20 52

*

5$*

)$&,/,7,(6(

*(16( 7

< 21 /& %$ * .,1 20 52

/8% .,' 6 &

( 7(1$1& 0$,1 5,1* (1*,1((

),1,6+,1* (1 .,7&+

5(&(,9,1*

672

< /&21 %$ /( 8% '2 20 52

0$/(

385&+$6,1

8%/( '2 20 52

67$)) )$&,/,7,(6

+& %/( 66, $&&( 20 52

< 21 %$/&

* .,1 20 52

/( 8% '2 20 52

.,1*20 52

.,1*20 52

/,)7 /2%%<

0(3

%<

21< %$/&

$7( 35,9

(' /$1'6&$3 (1 *$5'

/

/2%

&21< %$/

< 21 /& %$

1* ., 20 52

'25 &255,

63(&,$/,7< 5(67$85$17

)(0$/( &+$1*,1*

< 21 /( 8% '2 20 52

3/$175220

-

.

/& %$

(

+

< 21 /& %$

% &

21<

/( 8% '2 20 52

< 21 /& %$

63$&( 3 )25 0(

+

*

.,1 52 * 20

%$ /& 21 <

)

'2 8% 52 /( 20

%$ /& 21 <

(

21 <

'

'2 8% 52 /( 20

%$/& 21 <

675

%$/& 21<

/


$5(=22 725$%, _ $662&,$7( 0(0%(5 $,$ _ *$-

$

%

&

'

(

)

*

+

.

9(/

5$& ( /(

/

7(5

%$/ &21 <

0

.,1 * 5 22 * 5 220

25

%$

&25

5,'

.,1

/&2 1<

* 5 22

0

.,1

%$/ &2 1<

%$/

&21 <

'2 8%/

67$ ,5

( 5 22

0

3

.,1

%

%$/

&21

<

* 5 220

672

522

0

%$/

%$/

%$/&2

%$/&2 1<

%$/&21<

%$/&2 1<

20

.,1* 5 220

/2%% <

&25

5,'2 5

&25

%$/&2

%$/&21<

52<$/ 68,7(

(;(&87,9 ( 68,7(

52<$/ 68,7(

(;(&87,9

5,'2 5

'28

220 .,1* 5

.,1* 5

'28%/( 5220

'28%/

( 68,7(

22 * 5

* 5 22 0 .,1

8% /( 52 20

<

'2

/& 21

52 20

%$

'2 8% /(

/& 21 %$

* 5 22 0

<

.,1

/& 21

/& 21

<

* 5 22 0

52

/( 8%

52

55 ,'2 5

&2

20

0 22 * 5

20

20

0

0 22 * 5 .,1

'2

52 /( 8%

20

5 ,'2 55

&7

7(/

22 * 5 .,1

'28 52 %/( '28

.,1

/( 8%

$,5 67

.,1

52 /( 8%

'2

* 3,1 ((

52 %/(

0

20

67$

'25 55, &2

,5

20

220 * 5

0 522 .,1*

6,%/( &&(6 +& $ 5220

5220 .,1*

%$/&21<

.,1

( . 86 +2

<

<

'2

'2

1<

(/(

< &21

< &21

< &21

21< %$/&

1<

1<

%$/&21<

%$/&21 <

21 /&

< 21 /&

1< /&2

1< /&2

&2

21< %$/&

%$/&2 1<

'28% /( 52

/&2

5(

< &21 %$/ %$/

%$/&2 1<

0

.,1*

67$ ,5

%$

21< %$/&

%$/& 21<

0

5(

522

.,1* 522

%$/& 21< .,1*

0(3 672

5$& (

%$/& 21< .,1 7(5

.,1* 5220

.

%$

%$

%$

%$

* + -

)

& ' (

21 /&

55 ,'2 5

%$

&2

$

&2 55 ,'2 5

0(

%$ /& 21 <

/& 21 < %$

.,1

%$

%$

<

0( 3

* 5 22

0

220 %/( 5

220

&25

5 5,'2

( 5220

,'25 &255

+28 6( .

/

/2%%

((3,1 *

&255,'

<

25

5 67$,

0(3

$75,80 /2%%<

&255,'25

$75,80 /2%%<

$75,80 6725(

522)

6725(

$75,80 /2%%< '(&.

522) '(

*60

&.

67$,5

6725(

/2%%<

+286( .((3,1*

7(/

(/(&7

$

%

&

'

(

)

*

9(/

+

-

7(5

5$& ( /(

.

&21 <

.,1*

522

0

%$/

/

22 0

%$/

&21 <

* 5 22

0

%$/

&21 <

.,1

* 5

%$/ &2 1<

.,1

5

0

&2

%$

55 ,'2

.,1

/&2 1<

* 5 22

0

67$

'2 8%/

,5

( 5 22

%$

0( 3

/& 21 <

0(

.,1

3

* 5 22 0

20 8% /( 52

<

20 52 '2 22

0

<

* 5 .,1

* 52

%$

.,1

,'2 5 55 &2

52 8% /( '2

*

&

%$/ 5$& (

'28 %/(

+

&21

672

%$/

%$/

'28

%/( 52

&21 %$/ %$/& 21<

21< %$/&

20 .,1*

522

%$/&2 1<

0 .,1* 522

%$/&2 1<

6(59 ,&(6

.,1* '28

%/(

52<$/ 68,7(

(;(&87,9

( 68,7(

.,1* 52

20

.,1* 5

52

+2 86 ( .

67 $,5 5 ,'2

0 22 * 5 .,1 52 /( 8%

20

&7 (/(

.,1

67$

,5

20

20

0 522

0 522

220

&25

5 5,'2

0(3

672

< /2%%

0(3

5(

&255,'

/

25

,5 67$

&255,'2 5

(

$75,80 &+$1*,1 * 5220

$75,80 /2%%<

5(/$;$7 ,21 $5(

$

$

6$/21

0(3

+$00$0

522) '(

&. 3$&( 0(3 6

*60 +$// :$ <

6$/21 +$// :$ <

)(0$/( 63$

$75,80 /2%%<

$75,80 /2%%<

75($70( 17 75($70( 17

5(/$;$7 ,21 $5(

%2+

0

0$/( 63 $

&25

17 6 3$&

5,'2 5

0(3 3/$

6758 63$&( )25 &785 23(1 ( $1' 0(3 72 % (/2:

+286( .((3,1*

+$00$

55

0 22 * 5

0 22 ( 5 8%/ '2 52 %/( '28

.,1*

6,%/( &&(6 +& $ 5220 5220 .,1* 5220 .,1*

&255 ,'25

67$ ,5

1< %$/&2

< %$/&21

< %$/&21

< %$/&21

52<$/ 68,7(

,9( 522 0

&2

5$&.

5,'2 5

(;(&87

/8**$*(

&25

%$/&21<

%$/&21<

.,1* 52 20

20

6$)(

.

%$/&21<

%$/&21 <

(6

<

52 /( 8%

20

0

0 ,1, %$5

6(59,&

/2%%

21< %$/&

21< %$/&

%$/&2 1<

7(55 $&( 0

52 /( 8%

( 8,7 * 6

7(/

< &21

<

<

.,1

'2 22 * 5

21 /&

<

'2

1< /&2

1<

.,1

'2

5(

1< &2

< &21 %$/

%$/& 21<

52 20

&2

1<

<

-

&2

%$/ &21 < 7(5

%$/

'

*

%$/

( )

%$

%$

21 /&

< 21 /& %$

0$/(

522) '(

/2%%<

/281*( )(0$/(

&.

7(/

67$,5

(/(&7 75($70( 17 75($70

(17

&+$1*,1 * 5220

522) '(&.

522) '(

&.

(( 3,1 %$

20

/& 21 <

21 /&

20

8% /(

/& 21 %$

%$

$

&2 55 ,'2 5

'2

/& 21 %$ <

%

.,1

%$ /& 21 <

* 5 22

0


Thank you


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.