Un/productive Landscapes
THE HANGAR
Ariane Daher and Rombout Peeters
Un/productive Landscapes
Location map — 1/2500 Location of the project site, in relation to the larger area of Forus NÌringspark AS.
The Hangar
Un/productive Landscapes
The Hangar
1.
2.
3.
4.
5.
6.
2
3 6 4
5
1
Site impressions
Site impressions
Aerial image showing the project site. Source: Gule Sider
Photos of the project site (d.d. 08/11/2017), showing different facades, colours and finish materials.
The Hangar
Un/productive Landscapes
1937
1973
1960
1999
Historical overview
Historical overview
Aerial images showing the emergence of the main hangar and the development over time. Source: Norge i bilder
Aerial images showing the emergence of the main hangar and the development over time. Source: Norge i bilder
Un/productive Landscapes
The Hangar
Building diagrams
Building anatomy
Top: historical tranformation of the building, as it has been adapted for different uses over time. Bottom: concept diagram showing the basic elements of our intervention.
Isometric perspective drawing, watched from below, showing the existing building structure, which has a strong visual appearance.
v
Un/productive Landscapes
The Hangar
Scale diagram
Working models — 1/1250 and 1/200
Comparison in scale between Miljøgartneriet (Nærbø, NO), Lufa Farms (Montreal, CA) and the building on our site (Forus, NO).
Models used as a tool in the design process, to test both concepts and design options.
Un/productive Landscapes
The Hangar
ADJACENT STORAGE BUILDING
ES
PED
IDGE
N BR TRIA
A B’ IN MASK VEIEN
13
CONSTRUCTION MATERIAL COMPANY
B
12
E39
8
10
10 11
WAY
HIGH
8
9
7 6
3 5
6
1 4
15
5
14
15
15
2
A’
Plan ground floor — 1/500 MASKINVEIEN
1. entrance/ reception 2. vegetable store 3. circulation 4. dry corridor 5. changing rooms 6. showers 7. wet corridor 8. saunas 9. staff room/ first aid 10. storage 11. changing room staff 12. small pool (25 x 18 m) 13. olympic pool (50 x 25 m) 14. greenhouse circulation 15. technical rooms
Un/productive Landscapes
The Hangar
ADJACENT STORAGE BUILDING
ES
PED
IDGE
N BR TRIA
A B’ IN MASK VEIEN
CONSTRUCTION MATERIAL COMPANY
B
E39 HIGH
4
WAY
3
1
5
3 3 2
A’
Plan cafeteria — 1/500 MASKINVEIEN
1. cafeteria 2. open air patio 3. storage 4. kitchen 5. office area
Un/productive Landscapes
The Hangar
ADJACENT STORAGE BUILDING
ES
PED
IDGE
N BR TRIA
A B’ IN MASK VEIEN
CONSTRUCTION MATERIAL COMPANY
B
6
E39 HIGH
5
5
3 2
WAY
2
1 7 4
A’
Plan greenhouse — 1/500 MASKINVEIEN
1. reception/ waiting area 2. changing rooms 3. kitchen 4. void 5. desinfection rooms 6. food growing area 7. cleaning/ packaging
Un/productive Landscapes
FACADE SE
FACADE NW
FACADE SW
FACADE NE
SECTION AA’
Elevations — 1/500
The Hangar
Un/productive Landscapes
Perspective section AA’ — 1/100
The Hangar
Un/productive Landscapes
Perspective section AA’ — close-up
The Hangar
Un/productive Landscapes
Perspective section BB’ — 1/100
The Hangar
Un/productive Landscapes
The Hangar
Facade
Facade
Photograph showing materials and aesthetics of the original Southwest facade.
Image showing materials and aesthetics of the Southwest facade after the intervention.
Un/productive Landscapes
Exterior collage View from the parking lot towards the public entrance.
The Hangar
Un/productive Landscapes
Interior collage View inside of the entrance/ reception building, showing the main entrance on the far left and the doors towards the swimming area on the right side of the reception desk.
The Hangar
Un/productive Landscapes
Interior collage Swimmer’s view as seen from the olympic pool, showing the large windows of the cafeteria in the back.
The Hangar
Un/productive Landscapes
Interior collage View inside of the cafeteria, looking towards the large window to the pool, and the office area in the back.
The Hangar
Un/productive Landscapes
Overview Isometric view on the site, showing the new programme in the existing context.
The Hangar