ABPL30036 Axonometric Drawing

Page 1

SCREEN & CANOPY 46.

CANOPY MADE OF 6mm THICK MILD STEEL

47.

50 X 50 SHS DOWNPIPE TO DRAIN CANOPY WELDED TO C2

48.

LOCKER GROUP 'ATMOSPHERE' PERFORATED METAL SCREEN

27

DOOR AND WINDOW SYSTEM 44. AWS COMMERCIAL 'SERIES 607 FACELINE' 150MM FRAMING SUITE WITH SLOTTED SUB-SILL SECTION FITTED TO ALL WINDOWS, AND HEAD CHANNEL FITTED TO ALL WINDOWS TO ALLOW FOR STRUCTURAL MOVEMENT. LAMINATED CLEAR GLAZED WINDOWS WITH U-VALUE 6.4, SHGC 0.73: WF.03. ALL AWNING WINDOW TO BE FITTED WITH FLYSCREEN.

32

45. PAVEMENT FINISH: 20MM TOPPING OF 7MM HOT MIX ASPHALT ON 130MM OF FINE CRUSHED ROCK AND SUBGRADE FOUNDATION WITH CALIFORNIA BEARING RATIO (CBR) OF MORE THAN 5%

29

FINISHES SUSPENDED CEILING

31

43. RONDO 'KEY LOCK' SUSPENSION SYSTEM FOR SCREW UP CEILINGS.SCREWED TO PURLINS. PERFORATED PLASTERBOARD TO SCREW IN TO FURRING CHANNEL SUSPENDED ON TOP CROSS RAIL SUSPENDED BY SUSPENSION CLIP.

28

FLOOR FINISH 40. ENTRANCE CARPET - Integra Matting: Product: Vantt/ Code: VB70/ Colour: Storm ON GRANOLITHIC CONCRETE SCREED IN 80mm SLAB SETDOWN

34

41. LEVEL 1 CARPET C2A - RC&D_(RUGS CARPETS BY DESIGN) HL 630/ MOD 750 RFM5295C6352_LASER LIGHT_CARPET TILE 42.

STAFF TOILET FLOOR V1B - Armstrong 'Contour' Col: Silver_921-051/ Slip Rating: R9

WALL FRAMING 38. SF1 WALL TYPE = 90mm THK X 90mm HIGH X390 LONG FACE PEARLGREY BLOCKWORK, 50MM GAP, 90mm STUD FRAME WITH SARKING, 13mm PLASTERBOARD (WALL TO ACHIEVE R2.8). BLOCKWORK TO BE STRECHER BOND WITH GREY M3 MORTAR JOINTS 10mm

43

39. CUT CORNER OF BLOCKWORK TO CHECK AROUND STEEL RHS COLUMN. BACKING ROD AND SILICON SEAL TO COLUMN AGAINST WINDOW FRAME (POWDER COAT TO MATCH WINDOW FRAME)

37

30

ROOF AND DRAINAGE

33

27. BLUESCOPE LYSAGHT 'SPANDEK', 0.48 BMT, COLORBOND FINISH ON CSR BRADFORD 'ANTICON 130' ROOFING BLANKET W/ MEDIUM DUTY THERMOFOIL AS SARKING ON AUSMESH 300 GALVANIZED ROOF SAFETY MESH. FIX W/CSR 'ASHGIRD' 110mm METAL SPACERS TO PROVIDE NECESSARY BULK 28.

B8 - 230X75 PFC BOLTED TO 12mm WELDED PLATE BY 2M20 - 8.8/S BOLTS 6mm CFW ALL ROUND

29.

B4A - 310 UB 32 BOLTED TO B8 ON WELDED PLATE BY 2M20 - 8.8/S BOLTS 6mm CFW ALL ROUND

36

AW

21 19

30. WH3 - 150X75 PFC SUPPORTED MIDSPAN. BOLTED TO 12mm THICK CLEAT BY 2M20 - 8.8/S BOLTS 6mm CFW ALL ROUND 31.

RB 2 - ROD BRACING 20mm Dia. ROD. BRACING BRACKET SUPPORT FROM ROOF PURLINS AT MIDSPAN

32.

P2 - C20024 - 1200 MAX CRS. ROOF PURLIN TO BE BOLTED TO 10mm PLATE CFW TO B4

33.

C20024 EAVE PURLIN TO SCREW ON EAVE GUTTER

48 20 25

34. T1 - 75 X 75 X 4.0 SHS GRADE 350 MPa MIN. BOLTED TO C2 ON 10MM PLATE BY 2M20 - 8.8/S BOLTS 6mm 35.

39

WH1 - 150 PFC ON PLATES WELDED TO C2

F

35 21 23

37.

44

F

36. EAVE GUTTER - 0.600MM BMT COLORBON COATED STEEL SHEET. BRACKETS AT 1200 CRS SCREWED TO EAVE PURLIN DOWNPIPE - HDPE 125 DIA. UNPAINTED , CONTAINED BY BRACKET

41 21. 160mm THICK CONCRETE SLAB F'c = 40 MPa ON N12-200 CRS TO FULL PERIMETER OF SLAB ON 1.00mm CONDEK. POST TENSION DISTRIBUTION REFER TO POST TENSION SHOP DRAWING.

26 43

22. BEAM 1B4 = 300 WIDE X 800 DEEP. POST TENSIONED. BOTTOM REINFORCEMENTS = T6 W/ 3N16 TIED. TOP REINFORCEMENT = N12-400

46 47

23. BEAM 1B3 = 300 WIDE X 600 DEEP. REINFORCEMENTS = 3N16 WITH N12 AT 300 CRS CLOSED LIGS BOTTOM REINFORCEMENTS = T6 W/ 3N16 TIED. TOP REINFORCEMENT = DEFORMED N12-400 TO TIE BEAM AND SLAB PREVENTING SHEAR. 24.

LIVE END ANCHORAGE W/ ANTI BURST REINFORCEMENT

25.

ONION DEAD END ANCHORAGE W/ ANTI BURST REINFORCEMENT

26.

GROUTING TUBE TO FILL TENDONS WITH CONCRETE

AW

1ST FLOOR CONCRETE SLAB & POST TENSION

24

10 22

40

F

11 14

PRECAST LIFT AND CLADDING 38

15

F

19. TIMBER VENEER PANEL W/ 5MM EXPRESSED JOINT FIXED TO BATTENS AND PARALLEL TO SUPPORT STRUCTURE. 20. 7570x2630 PRECAST CONCRETE SHAFT WALL (PC11, 12) WITH N20 DOWELS IN 50MM CORRUGATED DUCT 21.

CP1 CAST IN PLATE TO TIE PRECAST WALL TO SLAB

GROUND FLOOR COLUMNS 16. C2 SCREEN COLUMNS=310UB40 GRADE 350 MPa MIN. CONNECT TO SLAB BY M20 HOLD DOWN BOLTS, 400mm EMBEDMENT 100MM COG CAGED. 20MM THICK BASE PLATE 6MM CFW ALL AROUND 20MM NON SHRINK GROUT. BASE PLATE AND BOLT HEAD, ENCASED BY 75MM CONCRETE.

42

17. CC2 = 800 X 200 CONCRETE COLUMN. REINFORCEMENT = 8N24 BARS VERTICALLY, N12 LIGS-200CRS (40CVR). STARTERS TO MATCH COLUMN REINFORCEMENT, 800 LAPS 300 COG 18. STEEL MULLION C5=150X100X9.0 RHS. CONNECT TO SLAB BY PLATE 6MM CFW

38

13

M20 HOLD DOWN BOLT, 10MM

1

9 16

2

GROUND FLOOR CONCRETE SLAB 17

14.

2N12 BARS X 1200 LONG TOP TO ALL RE-ENTRANT CORNERS UNDER MESH (PIERS INCLUDED)

15.

EDGE BEAM (EB1)= (W)300 x (D)600 REINFORCEMENT = 3-L12-TM TOP AND BOTTOM

-

13. 150mm THICK CONCRETE SUSPENDED SLAB F'c = 32 MPa SL92 MESH TOP, SL92 MESH BOTTOM (30 COVER TOP AND BOTTOM) PLUS 2N12 TOP EACH WAY OVER EACH PIER ON 2mm POLYTHENE MEMBRANE ON 100mm THICK POLYSTYRENE LAYER.

15

8 45

LIFT PIT 10. PIT (L)3200 X (W)2050 X D(1600) SURROUNDED BY FORMWORK FILL TO SUPPORT WET CONCRETE WITHOUT SAGGING 11.

200 THICK INSITU CONCRETE WALLS F'C=40MPa REINFORCEMENT= N12-200CRS EACH WAY EACH FACE

12.

N12-200 CRS 600 LAPS TO CONCRETE SLAB

6

FOOTINGS 7

5. PAD FOOTING (F6)= (L)1500 X (W)1500 X (D)600. REINFORCEMENT = N12-200 CRS BOTTOM BOTH DIRECTIONS 6.

PAD FOOTING (F8)= (L)600 X (W)600 X (D)600 REINFORCEMENT = SL81 BOTTOM

7. FOOTINGS TO BE ON TOP OF 200mm WEAK MIX CONCRETE BLINDING F'c= 15MPa FOUNDED TO NATURALLY OCCURING EXTREMELY WEATHERED SILTSTONE 8. 9.

BORED PIER (BP1)= 450 dia. X (D)2000mm REINFORCEMENT= 1N20 BAR CENTRAL

1

2N12BARS X 2000 LONG CONTINUOUS THROUGH BORED PIER

FOUNDATIONS GROUNDWORKS - SITE CLASSIFICATION 'M' - BOREHOLE #1 1. DEPTH= 0-800mm (FILL) CRUSHED ROCK CAPPED BY 30MM ASHPALT, GREY (MOIST, SAND, CEMENT STABILISED) 2.

2

DEPTH= 800-1900mm (CLAY) ORANGE BROWN, STIFF (MOIST, SILTY)

3. DEPTH:1900-3000mm (CLAY/SILTSTONE) ORANGE/BROWN (MOIST, SILTY, EXTREMELY WEATHERED LENSES STIFF)

3

EXTREMELY WEATHERED SILTSTONE BELOW 3000mm

SILTSTONE

SCREEN PERFORATION

4

EARTH

CONCRETE PAVEMENT

CONCRETE

CLASS 2 CRUSHED ROCK 20mm NOMINAL DIA. COMPACTED IN 150 MM LAYERS TO 90% MMDD

1F CARPET

CLASS 3 CRUSHED ROCK 14mm NOMINAL DIA. TO 90% MMDD

LIFT CLADDING

FINE CRUSHED ROCK BEDDING

ABPL 30041 CONSTRUCTION DESIGN SEMESTER 1, 2018

5

2

AXONOMETRIC DRAWING REGION 'D'

PIPE BACKFILLING AND BEDDING UNDER PAVING

-

4.

ARCHITECT : CLARKE HOPKINS CLARKE

SCALE 1:20 @A0

DRAWN BY ARIEL JANSEN BINTANG 851772

PROJECT : BIO21 SCIENCE SUB SCHOOL

PROJECT : BIO21 SCIENCE SUB SCHOOL

TUTOR: ALEKS BALTOVSKY