AIESEC International AI1516 Q3 Report

Page 1

AIESEC International 1516

Q3 Report


Content 1.  #GEN1516 Summary Q3 ! 2.  AI Projects! 2.1. Leadership Centered AIESEC 2.2. AIESEC 2020 2.3. Customer Centricity for Students 2.4. Customer Centricity for Companies 2.5. Youth Speak Evolution 2.6. Culture of Achievement (Per Regions) ! 3.  AI Subteams! 3.1. Brand Experience 3.2. Partnership Development 3.3. Finance

Subteams

Page 3!

Page 16! Page 20 ! Page 24! Page 28! Page 31! Page 35!

Page 57! Page 68! Page 74!


#gen1516


#gen1516 Logic Strategies Projects Subteams


Logic Our CORE Core viral People Enable

Enable

VIRAL Viral


Strategies Our Organizational Evolution Core Culture of achievement

People Digital Transformation

Enable

Call to Action

Viral


Projects Call to Action

Culture of achievement Organizational Evaluation

YouthSpeak Digital Evolution Transformation


Subteams Brand XP + Partnership Development + Finance

Call to Action

Culture of achievement Organizational Evaluation

YouthSpeak Digital Evolution Transformation




Matched

60k 19% Achieved!

Realized

1415

1516

Growth

1415

1516

Growth

GCDP

3358

4496

33.9%

8916

9754

9.4%

GIP

1330

1599

20.2%

1548

1602

3.5%

Total

4636

6095

31.5%

10469

11356

8.5%





Brand XP + Partnership Development + Finance

Call to Action

Culture of achievement Organizational Evaluation

YouthSpeak Digital Evolution Transformation


Project: Leadership-Centered AIESEC


Milestones Achieved Business Model Revision and Evolution

Network Change Management

Leadership Development Assessment Tool

Education materials were created for the network. !

The assessment tool is completely developed by our partner Pop Corn Academy (Dey Dos). It includes 3 different tests: entry test (beginning of the experience for everyone), test for exchange participants and test for volunteers. !

The scope of change after business model revision:! ! 1. Usage of the open platform. ! 2. Shift of financial models. ! 3. Implementation of quality standards.! 4. Change of organisational structures at all levels. !

Conferences and workshops delivered (International Congress in India, and LATAM Summit in Panama). !

The development of the test in our system has already started by our partner Rebelminds, focusing first in the entry test. !

The customer journey of our interns was adapted and simplified, focusing on the 4 leadership qualities (Value Delivery)!

Selection of 6 local entities in India, Russia, Turkey, Colombia, Argentina and US to run pilots of every needed change. !

A temporal platform is being implemented to run the assessment with the 6 piloting entities. !

The business model of AIESEC was refreshed. The tool used was business model canvas: http://goo.gl/VEObpB!

AIESEC International 1516


Learnings •  Education needs to get faster to all the network. ! •  The 4 areas within the scope of change require stronger strategies, specially for financial models shifts and open platform usage. ! •  A clear change management plan is needed to guide the network on how to implement all the needed changes. It must include rewards and recognition based on it, and sharing the good cases.! •  There is lack of content and tools to implement in the “value delivery” phase of our customer journey. ! •  There is confusion in the network about how to embed the value proposition in our external approach to different stakeholders. ! AIESEC International 1516


Priorities for Next Quarter •  Increase the education materials and change management guides for the network through our internal channels and conferences. ! •  Create a certification program (attached to rewards and recognitions) for entities that manage to implement the changes. ! ! •  Direct observation of piloting entities to document their cases. ! •  Follow-up on the activities and standards needed in the value delivery phase of our customer journey (since a big peak of exchanges is coming). ! •  Increase the scope of piloting entities to make small entities grow while running a fast implementation of changes. !

AIESEC International 1516


Project: AIESEC 2020


Milestones Achieved

2020 statements co-created! @XP Initial Input collected and analyzed!

Agenda created! Logistics in progress!

AIESEC 2020 entity engagement and communication! aiesec2020.org update ! Roadmap and AIESEC XP sessions designed and sent for ! inputs from the network! AIESEC International 1516


Learnings 1. It is possible to co-create a vision with 800 people from more than 100 cultures in 3 days and have 100% approval! ! 2. Clear communication and constant updates for the MCPs are important! ! 3. The best conversations happen outside of the office! !

AIESEC International 1516


Priorities for Next Quarter AIESEC 2020 Roadmap draft ready:! -  Inputs from regional summits & the network & partners, 2020 roadmap con solidation meeting, external inputs and final feedback at “AIESEC Youth ! Action Summit”! ! AIESEC XP draft ready:! -  Inputs from the network, AIESEC XPconsolidation meeting, external inputs and final feedback at Youth Action Summit! -  Hype in the network around AIESEC 2020 with Youth Action Summit! -  Measurements of Success/Measurement of Impact proposals !

AIESEC International 1516


Customer Centricity for Students


Milestones Achieved •  NPS: On staging, missing some minor UI fix! ! •  Matchability: Review of weights done, small progress on Q3.! ! •  NPS Analytics: On staging working on filters, search scope and display of it.! ! •  Advanced Analytics: On staging working on the documentation! ! •  Leadership Development Model: 1/3 Assessments received, working on the implications on the system.! ! •  New OP/EXPA: Both on staging working on the filters and customer statuses! AIESEC International 1516


Support Documents •  Matchability: https://docs.google.com/document/d/ 1WQgX44jyg3G9SUF1Z6oGaGIg05_rAXVk7VIBwBMECPg/edit.! •  NPS Analytics: http://expa2-staging-env-vq7ch7ptra.elasticbeanstalk.com/.! •  Advanced Analytics: http://expa2-staging-env-vq7ch7ptra.elasticbeanstalk.com/.! •  Documentation: https://docs.google.com/document/d/ 1GaNj7rhH9ZUb3M2kRHEwZLkItXQNW9OC_Kn7rBalUvo/edit! •  New OP: http://ai-op-staging.elasticbeanstalk.com/programmes! •  New EXPA: http://expa2-staging-env-vq7ch7ptra.elasticbeanstalk.com/!

AIESEC International 1516


Learnings •  Bigger education needed in order to transform behaviors to support the system! •  Buffer is life! •  There will be always something that could be better, so let it go! •  The small things in the system take much more time to work on than the big ! •  developments ! •  Big developments make people excited, but small issues keep the m frustrated! •  TMP OP needs to be sort out.!

AIESEC International 1516


Customer Centricity for Companies


Milestones Achieved Milestone!

GOAL

ACCOMPLISHED

PROGRESS

MVP testing! Feedback from companies! Merging the platform! Financing platform!

25 companies! 80% “to go”! decision! 40%AI-60%network!

23 companies! 88% said “to go”! Already in progress! 39% AI – 41% network!

92%! Hypothesis verified! 100%! All resources are covered!

!

! Pilot entities:! ! US, UK, Mexico, Brazil, Colombia, Panama, Turkey, Poland, Hungary, Romania, Germany, India, Singapore, Australia, Indonesia!

AIESEC International 1516

AI team responsibilities:! ! Dima – AIVP DM – Landing page relations! Maged – AI IM Manager – Rebel Mind relations! Chiara – AI BD Manager – Partnerships evolution! Marc – AIVP Op WENA – Sales, education! Kasia – AIVP Pr Inn - general management, pilot management!


Learnings •  •  •

Priorities for Next Q

It is very difficult to change culture towards customer being in the center ! Most of network still do not understand the value proposition for enablers! The pilot entities are willing to share responsibilities !

•  Merging the Minimum Viable Product to EXP A and Rebel Mind management! •  Landing page creation! •  B2B strategy creation and implementation! •  Launch of basic platform by AIESEC Youth! •  Actions Summit! !

AIESEC International 1516


Global YouthSpeak Evolution


Milestones Achieved Goal Name!

Planned!

Achieved!

%!

Report!

Media and Launch!

Done!

100%!

YSF IC!

Delivery!

Done!

100%!

Survey Qs!

Survey!

Done!

100%!

YSF Report!

Launch!

In Progress!

90%!

YS Timeline!

Plan!

Done!

100%!

YS Toolkit!

Launch!

Done!

100%!

Survey Campaign!

Plan!

In Progress!

50%!

AIESEC International 1516

Indicators measurement:! •  # Projects: 6 (IC)! •  # People in YSF: 800! •  # Partners: 19! !

!

Main partners:! •  Unilever! •  IE Business School! •  UN Habitat!


Learnings •  Coordination between AI teams for IC YouthSpeak Forum ! (Better communication and definition of responsibilities)! ! •  Better understanding of Survey timeline and Management! •  Connect individual and Sub-team JDs to Project JDs (Good in YS)! •  Better connection with Operations Sub-team to have a better ! •  communication with the network!

AIESEC International 1516


Priorities for Next Quarter

•  YouthSpeak Survey Campaign launch and execution! •  National and Regional YSF support (Agenda and Project)! •  IPM and IC YSF Agendas! •  YouthSpeak Report plan and partners!

AIESEC International 1516


Culture of ACHIEVEMENT


RE Q3 2013

8071

8985

2014

2015

*Data from 1st July to 27th of Sept!

9884

9553

10602

11554

1482 1617 1670 GCDP

GIP

TOTAL


MA Q3 2013

2014

2015

*Data from 1st July to 27th of Sept!

6293

4628 4688

4658 3278 3358 1350 1330

GCDP

GIP

1635

TOTAL


Milestones Achieved •  #LeadersThatAchieve message on IC, entity visits (17) and ! overall internal comms towards the priorities of our generation ! #TransformTheMovement (AIESEC 2020 + Viral) and #AchieveToday (60k)! •  Creation of the ambition of the gen1516: #60k to ensure that everyone is cle ar in delivering the final sprint of AIESEC 2020 and start super focused on AI ESEC 2020.! •  Stories of Achievement Campaign to foster more bottom up! innovation among entities and collaboration.! •  Knowledge Center back and running (AIESEC Hub)! AIESEC International 1516


Learnings •

Do not underestimate the power and importance of internal comms! !

Do not make sense to have a project on culture of achievement without every view possible of the network reality and be able to react on it! !

Message is catchy, but we need to invest more on it. Put more effort on global side.!

AIESEC International 1516

Priorities for Next Q

•  •  •  •

Regional Conferences! Entity Visits! Campaigns Evolution! Focus on the fish peak ! (Customer Flow implementation for massive exponential growth)!


Culture of Achievement

AIESEC International 1516!


Culture of Achievement Matched

60k 19% Achieved! AIESEC International 1516!

Realized

1415

1516

Growth

1415

1516

Growth

GCDP

3358

4496

33.9%

8916

9754

9.4%

GIP

1330

1599

20.2%

1548

1602

3.5%

Total

4636

6095

31.5%

10469

11356

8.5%


Culture of Achievement

Internal Comms

Activites Done:! •  Delayed timeline. ! •  Changed responsible. Restructuring.! •  Knowledge Center Revitalization (aies.ec) + Forum a ddition! ! !

R and R AIESEC International 1516!

! Activites Done:! •  Virtual RR: People-oriented ! (Stories from the network)! •  Highlights of the network back (Organisational)! •  Physical RR to be discussed! !


Culture of Achievement

Regional Focus

AIESEC International 1516!


Regional Analysis AIESEC International 1516!


Quarter 3 – AFRICA Matched

Realized

1415

1516

Growth

1415

1516

Growth

iGCDP

327

389

18.9%

837

523

- 37.5%

oGCDP

210

288

37.1%

257

271

5.4%

iGIP

28

23

- 17.8%

27

20

- 25.9%

oGIP

67

80

19.4%

54

57

5.5%

Total

606

780

28.7%

1175

871

- 25.8%

AIESEC International 1516!


Quarter 3 – AFRICA Physical Touchpoints with the Region:! •  IC, AI Visit to AIESEC in Burkina Faso, Ghana, Togo, Nigeria, Benin, Cote d’Ivoire, Mauritius.! ! Successes:! •  Growth in the small entities! •  Winning the most impactful project at IC’s YouthSpeak! ! Challenges:! •  Misalignment of entitties towards global direction, especially in C4. Mainly regarding AIESEC Way and Business Model! •  Most of entities running unsustainable operations! •  Lack of finance on national and regional level to invest in operations! •  Poor transition, which lead to difficulties in starting the 1516 term in almost every entity of the region! •  Difficulty to combine regional BD and PR with the Operations Management! •  Diversity of the region. Brings a lot of workload in terms of the subregions management (different conferences, e tc)! •  50-70% of the MCPs being non-responsive at all! •  Friction between the relationship of MC-LC in almost all entities! •  Members not understanding the why of AIESEC!

AIESEC International 1516!


Quarter 3 – AP Matched

Realized

1415

1516

Growth

1415

1516

Growth

iGCDP

1002

1104

10.2%

2901

3298

13.7%

oGCDP

582

782

34.4%

2782

2854

2.6%

iGIP

390

590

51.2%

516

545

5.6%

oGIP

131

221

68.7%

209

209

0%

Total

2162

2697

24.7%

6408

6906

7.8%

AIESEC International 1516!


Quarter 3 – AP Physical Touchpoints with the Region:! •  IC, AI Visit to AIESEC in Australia and Taiwan, OST Visits in Nepal, Singapore, Phlippines and Thailand ! ! Successes:! •  Regional Collaboration getting stronger, especially in GIP! •  GE is happening. oGIP side being the most progressive one! •  A lot of potential GIP projects are happening (200 GE in Indonesia, 300 teaching in Taiwan)! •  Small and medium entities are growing in most of the programmes. More initiatives are coming to help C4 entities sponsored by C1 entities! •  Working time during entity visits being a good model for the strategies to take shape and be translated into action.! ! Challenges:! •  iGIP supply challenge, especially for GE, inside the AP Region! •  Financial models hindering entities to grow! •  Entities being super ambitious but without clear strategies on how to achieve it. Not focused.! •  Many entities are still using other registration systems. OP not being used almost at all in some entities. ! •  Lack of collaboration in terms of communication between AP and other regions, especially for this fishpeak! •  Problems with Regional Army management! •  Stuck with oGCDP strategies. Lack of success stories in the region. ! •  Misalignment of iGIP. A lot of opens, but Supply and Demand were not considered.! !

AIESEC International 1516!


Quarter 3 – CEE Matched

Realized

1415

1516

Growth

1415

1516

Growth

iGCDP

770

967

25.6%

1947

2177

11.8%

oGCDP

646

534

- 17.3%

1800

1623

- 9.8%

iGIP

271

325

19.9%

271

289

6.6%

oGIP

374

458

22.5%

433

445

2.7%

Total

2065

2284

10.6%

4451

4534

1.8%

AIESEC International 1516!


Quarter 3 – CEE Physical Touchpoints with the Region:! •  IC, AI Visit to AIESEC in Hungary and Croatia! ! Successes:! •  Growth in 3 out of 4 programmes, both in MA and RE! •  Subregional focus is back. Projects in Balkan, Ukraine-Russia-Poland (recognised at YouthSpeak on IC as the most innovative), ! Calcasus. Subregions started working together in GCDP! •  AIESEC in Ukraine and AIESEC in Russia being top entities globally in oGIP! •  LC Moscow crossing 120 RE in oGIP! •  Bosnia and Albania deliverying more in first quarter of this month than all of last term’s performance! •  C4 driving growth in oGCDP (Azerbaijan, Gergia, Armenia, Bosnia mainly)! •  Virtual engagement through Facebook helping with the culture and identity creation! ! Challenges:! •  Overall GST Management (especially in regards to Time Management after IC)! •  oGCDP drop influencing the overall performance of the region! •  C3 and C4 financial situation (some small entities with very high risk, like Latvia and Slovenia)! •  Disalignment of some entities with the organisational purpose, mainly on the local level ! (not only coming from C4 entities, but also C3 and C2)! •  EXPA Challenges still existing! •  Clustomer Flow not being implemented! •  EuroCo as big point of distraction in terms of workload, especially in September! !

AIESEC International 1516!


Quarter 3 – LatAm Matched

Realized

1415

1516

Growth

1415

1516

Growth

iGCDP

821

1478

80.0%

1820

2357

29.5%

oGCDP

510

1251

145.3%

1024

1214

18.5%

iGIP

358

360

0.6%

398

436

9.5%

oGIP

328

350

6.7%

365

403

10.4%

Total

1997

3439

72.2%

3607

4410

22.3%

AIESEC International 1516!


Quarter 3 – LatAm Physical Touchpoints with the Region:! •  OST GCDP Visit to Argentina, Paraguay, Uruguay, Bolivia, Panama! •  OST GIP Visit to Panama and Chile! •  AI Visit to Chile! •  GIP Summit in July! •  GCDP Summit in July! •  IC! •  LATAM Summit! ! Successes:! •  Every entity understands and is working towards their focus programme! •  Change management for C4 Implemented! •  Regional intiatives and leadership empowered! ! Challenges:! •  MCVP Support for operations! •  Delay in match timeline! •  Implementation of the new customer flow!

AIESEC International 1516!


Quarter 3 – Mena Matched

Realized

1415

1516

Growth

1415

1516

Growth

iGCDP

265

415

56.6%

1196

1268

6.0%

oGCDP

552

910

64.9%

1187

1827

53.9%

iGIP

45

54

20.0%

46

71

54.3%

oGIP

95

138

45.3%

100

120

20.0%

Total

905

1517

67.6%

2529

3286

29.9%

AIESEC International 1516!


Quarter 3 – Mena Physical Touchpoints with the Region:! •  IC, AI Visit to AIESEC in Tunisia! ! Successes:! •  Region still growing in all programmes despite of not growth of Egypt! •  Award on IC with the loudest project in YouthSpeak! •  Initial changes being seen in AIESEC in Tunisia after a long time! •  At least 3 entities could see in the first quarter more results than in the whole past year (good pipeline)! •  More collaboration is seen in the region (ex: 65% of AIESEC in Morocco performance was made ! inside of the region)! ! Challenges:! •  Region still extremely dependable on 4 entities, which bring 94% of the results! •  Entities are dropping in iGCDP, especially Egypt and Tunisia! •  A lot of Cluster 4 entities with big challenges, in some cases decreasing all programmes! •  Personal challenge: Visa for the AIVP, delaying timeline of visits! •  Challenge in GSTs BD and TM: it is still blurry their contribution to the MCVPs! AIESEC International 1516!


Quarter 3 – Wena Matched

Realized

1415

1516

Growth

1415

1516

Growth

iGCDP

173

143

- 17.3%

215

131

- 39.1%

oGCDP

858

731

- 14.8%

1875

1965

4.8%

iGIP

238

247

3.8%

290

241

- 16.9%

oGIP

333

352

5.7%

387

368

- 4.9%

Total

1537

1473

- 4.2%

2767

2705

- 2.2%

AIESEC International 1516!


Quarter 3 – Wena Physical Touchpoints with the Region:! •  IC! •  AI Visit to AIESEC in Portugal, UK and Belgium! ! Challenges:! •  Mindset at MC and LC level. Excuses mindset and lack of sense of urgency and achievement! •  LC structures and timeline with aligned @ operations aligned to the purpose! •  MC Management to move entity forward and strong stand about translating global direction into entity reality! •  Availability of entities for entity visit during the month of September (main priority to drive the change)! •  Driving the achievement regarding the legacy received (lack of local activity during Q3)! •  Lack of communication of challenges faced in the entities to find solutions together with the Regional Support! ! Successes:! •  Clarity of success for the region with entity alignment and connection! •  Mobilisation of entities for a regional project (InteGREAT)! •  Change driven by entities after entity visit with MC and LCPs! •  Pro-activiness and support from Regional Support Team to entities! •  MCP network support and empowerement!

AIESEC International 1516!


Brand eXPerience Team


Milestones Achieved MoU Signed with PvBLIC!

More than 10 Media Releases! Youth Speak Website!

Represented at more ! than 10 events! (including UNGA, Youth for SDGs, Internation al Peace Day Event etc.)!

Social Media Buzz around IC! #Youthspeak & #AIESEC! Blog on Coca-Cola and United Nations’ Youth Envoy!

AIESEC International 1516!

Youth Speak Report Launch! (16M Impressions during the campaign)!

Annual Report 14-15! 2 linked social media! campaigns executed!


Learnings

•  Measuring results of social media engagement on operations! •  Real-time marketing leads to results. Though, we are terribly short on HR.! •  The dire need of aligning the network on customer flows –(lest: not delivering value proposition and creating non-engaged detractors)!

AIESEC International 1516!


Priorities for next Quarter Operational Integration! Youth Speak Survey! Survey Promotion Campaign! YS Website!

Lead Nurturing System! Marketing Summit! Brand Toolkit Upgrade! Network Education!

AIESEC Youth! Action Summit!

Content Strategy Execution!

Strategic Alliances!

Campaigns Execution across! Social Media! Measure Results! Website Update!

JCI MoU! Geneva and Paris : SIGEF 2015 & ! UNESCO Youth Forum! NYC Trip follow up !

AIESEC International 1516!


Reference Slides

AIESEC International 1516!


Global PR Stakeholder Management* Strategic Alliances Management

New*/inactive stakeholders

Conferences/Trips

Junior Chamber International!

OECD*!

JCI Conference in NYC (Ana)!

PVBLIC Foundation!

EU*!

ADB Forum in the Philippines (Ana)!

UN Millennium Campaign!

SDSN Youth*!

Trip to Paris: OECD + UNESCO (Ivana)!

Global Poverty Project + Global Citizen!

ENACTUS*!

Some events from NYC Trip:

Teach for All!

Huffington Post!

UN General Assembly!

UN Youth Envoy’s Office!

Red Cross!

Social Good Summit!

#100happydays!

EBBF!

International Peace Day Event!

Child and Youth Finance International!

World Economic Forum!

Youth for SDGs!

World Blu!

One Young World!

ILO Event!

SIGEF/Horyou!

ICMYO!

Impacto Latino!

Save the Children/Restless Development! International Labor Organization!

Global Citizen Festival!

Alumni of AIESEC International (AAI)!

AIESEC International 1516!

*And many more stakeholders…!


Results FACEBOOK •  •  •  •

JULY

AUGUST

SEPTEMBER

Q3

711 093 (+9 337)

725 042 (+13 949)

739 799 (+14 757)

+38 117

Highest increase in Fans in a quarter in the year. ! However, quarters in 2014 have performed better.! Most viral post of all times! Experimented with Post Boost!

! k o o b e c a f n

o o e d i v p o t

!

Hill

Twitter :! 56859 Followers! Twitter

Engagement Impressions Link Clicks Rate

Retweets

Favourites

Replies

New Followers

Q1

299.4K

1.2%

593

1.1K

884

146

2395

Q2

418.9K

1.2%

736

1.3K

1000

124

2144

Q3

1.3M

1.2%

1.2K

4.2K

3.7K

475

2880

AIESEC International 1516!


Some Social Highlights

AIESEC International 1516!


Other Channels Instagram Account re-established:! 74 posts; 3265 followers!

66K+ views in the Quarter! 700 Subscribers added! In total – 9k subscribers! !

Snapchat account created for an open audience. 300 + followers with about 90 % viewership!

94,121 followers! Last post made 60K impressions! No focus on the platform in this quarter!

New video added! Other accounts include:! International Congress Facebook (69.5K Fans), Twitter (700+ followers), ! Instagram (2400+ followers) and Youtube (700+ Subscribers) !

AIESEC International 1516!


Global Website (Quarter Comparison)

Traffic to! aiesec.org! increased during social media! campaigns!

AIESEC International 1516!


Opportunity Portal (Quarter comparison)

People on OP Conversion

Open

In Progress

Match

Rz

71998

4378

2129

2569

32%

AIESEC International 1516!

6%

48% | 2% | 3.5% | 1.14% 0.9%


Partnership Development team


Milestones Achieved Ra7o 1415-­‐Growth Others:!

FINANCES (1.6.-­‐30.9.)

TOTAL

Accoun7ng Incomes (planned)

€ 165.761,13

100%

Actual Accoun7ng Incomes

€ 121.042,30

73%

Invoices (planned)

€ 384.466,66 € 251.057,00

100% 65%

Actual Invoices

Sales Pipeline! Phases! Prospecting Phase! Offer! Negotiation! Closings! IC Delivery!

Stages! Physical Meetings! Virtual Meetings!

Results! 46! 49!

Creating Proposal! Proposal Sent! Negotiations with Proposal! Negotiations about contract! New Partners! Renewal Partners! Partnership Launch! Youth Speak Forum!

9! 10! 10! 2! 2! 3! 4,89 out of 6! 4,65 out of 6!

AIESEC International 1516

1.  3 BD Summits organized in Sept in Rotterdam, +143% Guangzhou and Panama City! €49.823,67 2.  3 Global BD Newsletters sent! 3.  Large scale partnership with ADB (new partner)! +88%

€133.800,00 Premium Partner Opportunities! 15th of July - 29th of Sept '15!

26!

201!

4!

Realized! Approved ! Open Opp.!


Current Parternships Status Global Partner!

Recent activity!

Current status!

Alcatel-Lucent!

IC + Identifying right contact at Nokia!

Nokia Acquisition!

ADB!

NEW partner + IC !

Positive!

Bacardi!

Renewed partner + IC!

Positive!

DPDHL Group!

IC!

Positive!

EF Education First!

IC!

Positive!

Electrolux!

IC!

Positive!

Euromoney!

Uncertain!!

Very uncertain, not fulfilled contract!!

GMAC!

IC!

Positive!

Husqvarna Group!

IC!

Positive!

IE Business School!

Contract sent + further negotiation!

Positive!

ING!

Contract sent + EuroCo confirmed!

Positive!

International SOS!

IC!

Positive!

Microsoft!

Negotiation!

Negotiation!

Mindvalley!

Renewed partner + IC!

Positive!

Nexans!

Negotiation (14k or 28k)!

Negotiation!

PwC!

IC + contract sent!

Positive!

TCS!

IC + negotiation!

Negotiation!

TOLL Group!

NEW partner!

Positive!

UCB!

Renewed partner!

Positive!

Unilever!

Negotiation!

Negotiation!

Wings onboard!

Opened position!

Positive!

AIESEC International 1516!


Prospect Parternships Status Leads! Apple ASSIST Card BMI Flying Innovators Google Hainan Airline( HNA) Impact Hub LinkedIn McKinsey SpoDfy Sutherland TATA Group Aditya Birla Group GSK Hellofood Hult InternaDonal Business School

Current status! Contract sent Contract sent NegoDaDons NegoDaDons NegoDaDons NegoDaDons NegoDaDons NegoDaDons NegoDaDons NegoDaDons NegoDaDons NegoDaDons Proposal Sent Proposal Sent Proposal Sent

Proposal sent ISB Proposal sent ISIC Proposal sent NonStop Recruitment Proposal sent Reliance Proposal Sent Samsung Proposal sent TransferWise Proposal sent

Leads!

Current status!

UN Habitat Viki Amazon Bloomberg Didi ETEX Group GlaxoSmithKline -­‐ GSK GSMA Hult LinkedIn Morgan Stanley AB InBev ABC Diesel Accenture Acer AEGIS MEDIA BELGIUM Airbnb Alibaba Amazon ASSFALH GmbH AUG Ballestra Group Bayern

Proposal Sent Proposal Sent CreaDng proposal CreaDng proposal CreaDng proposal CreaDng proposal CreaDng proposal CreaDng proposal CreaDng proposal CreaDng proposal CreaDng proposal First contact First contact First contact First contact First contact First contact First contact First contact First contact First Contact First contact First contact

Leads! BBVA BDO Bread Trip Bristol-­‐Myers Squibb Coca Cola Cocacola ConDnental DECATHLON BELGIUM Delhaize Group Ebay Emirates Evernote Group Maes HilD Huawei Hultprize InternaDonal Paper iTQi JDE – Jacobs Douwe Egberts Konka Leo Burned Mastercard Mondelez Opel

Current status! First Contact First contact First contact First contact First Contact First contact First contact First contact First contact First contact First Contact First contact First contact First Contact First contact First contact First contact No First contact First contact First Contact First contact First contact First contact

Prospect List AI 15-16: http://bit.ly/1h6csue!

Leads!

Current status!

Radiant Systems First Contact Randstad First contact Reapra First contact SAP First contact State Street CorporaDon First contact Study Portals First contact Tecent First contact TNT First contact Toyota First contact UC First contact UPS First contact Wavetec First Contact WEG First contact Zalando First contact ZPIN First contact

Current Status!

Total number!

Contract sent! Negotiations! Proposal Sent! Creating Proposal!

2! 10! 12! 9!


Learnings •  CRM system usage is required, right now we started implemening SalesForce! •  Negotiations are taking longer than expected! •  Doing sales in other markets is GREAT! •  Hard to generate Leads from the network due to lack in BD knowledge in network and NOT aligned engagements! •  Need of new more relevant engagements! •  Global Entrepreneur Program (GE) is very attractive!

AIESEC International 1516


Priorities for Next Quarter

•  •  •  •  •  •

Sales visits all over Europe and AP! Account Management! Selling UN event & IPM! Partner Dinner in Hong Kong and Amsterdam! Usage of Salesforce CRM system! Educate the network about BD and Sales!

AIESEC International 1516


Sailor Gene Gardner!

Finance Team


Budget Global budget 14.15 Budget execution Governance € Legal management € Financial management € Head Office € Global Secretariat € Long-term organizational growth and development€ Global Operations € Global Brand € Global Sales and Partnership Management € Information Management € Other -€ Total €

AIESEC International 1516

27,722.87 13,847.73 35,610.10 140,119.91 217,300.61 91,761.69 358,765.67 105,570.93 238,430.19 395,468.11 17,177.17 1,390,120.02

Realized Q1 15.16 Budget € € € € € € € € € € € €

33,520.00 24,500.00 33,800.00 158,314.77 250,134.77 132,389.83 365,660.98 116,866.37 265,579.54 301,256.51 1,431,888.00

€ € € € € € € € € € € €

9,106.62 6,844.00 9,683.24 50,726.89 76,360.75 42,805.51 116,063.08 35,618.21 83,536.32 129,212.51 483,596.39

27% 28% 29% 32% 31% 32% 32% 30% 31% 43% 34%


Budget

AIESEC International 1516


Quarter Balance Sheet Realized

AIESEC International 1516


Quarter P&L Sheet Realized Balance: Type Financial year Compare with

Balance / Profit & Loss Show 2015 Period

2015 Closing balance (Debit) Closing balance (Credit) Profit and loss statement Revenue from external relations Interest Income Exp - Employees Exp - Information Systems and Management Total: Exp - Travel Exp - Communication Exp - AIESEC Conferences Exp - AI team Total: Exp - Governance Total: Exp - Office Expenses Exp - Financial Administration Exp - Legal Total: Exp - Other Information Technology Additional Support Other Result Total: Profit and loss statement

AIESEC International 1516

208,048.02 1,105.83 196,745.79 40,500.00 17,695.43 566.41 22,548.13 6,199.71 9,049.62 13,992.72 17,036.39 6,844.00 4,903.58 2,551.04 608.85

347,185.37

12,506.11 125,525.41 347,185.37


Milestones Achieved AI Financial management! Internal Audit for BD contracts and corporate receivables (invoiced and payed)!

Legality!

Global Trademark contract 14 entities will be covered!

Global Legislation at IC!

Financial lifetime reporting from expenses and incomes and controlling implementatio n!

AIESEC International 1516

Conference management!

AIESEC Way!

Internal claims and payments process updated!

ILM Board Transition & Planning !

Creation of GEC fund!

tracking system for credit cards payments,!

IPM 2016 risk management!

Global Information Systems Fund increased !

Ticket booking agency!

First negotiations for IC2016 contract!

Global Compendium Updated!

contract and invoice tracking tool!

HR legality! Budget updated and legislated!

Process optimization!

legality and registration booklet for foreign employees!

AI Administration! Change of global secretariat, selection and training !

Network! Education framework to change charging stage in customer flow for Students (and cash flow impact and preparation)!

FLB Planning!

Finance track in LatAm conference!


Learnings

•  Need a extra HR for ILM finance back-stage agenda ! •  Cash flow tool is needed for execution tracking- this is a fundamental ! task and it needs HR fully dedicated to this! •  We need legal advise on HR in NL (taxes and work permits need a new! look for 1617)! •  The network needs strong directions from Finance perspectives! •  We need a constant education plan for entities since in most cases, ! basic financial knowledge is not present!

AIESEC International 1516


Priorities for Next Quarter AI Financial management Cash flow tool implementat ion! First semester budget review and scenario planning for second semester!

Legality! !

Global Legislation!

EP insurance initiative!

November Virtual Legislation!

Start AI1617 Work permits!

Follow up on Mandates and work of LSC, LGSC, FSC, ILM and FLB!

CIT Case closing!

1617 budget proposal! Pilot of Internal Financial Audit!

AIESEC International 1516

Review of the Global Compendiu m!

Process optimization! legality and registration booklet for foreign employees!

Conference management! ILM Board Strategic summit! ILM Business model review! ILM CC Calendar creation!

AI Administratio n! AIESEC Youth Action Summit review! AI1617 Structure decision with Managemen t Team!

Network!

Finance tracks for MENACO and WACS! Germany’s finance summit!

IC2015 Closing!

Customer Flow financial implications stage roll out for entities (education and implementation)!

IPM 2016, IPM2017 and IC2017 mandates!

Finance standards, minimum knowledge network should have!

IC 2016 Contract!


Thank You!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.