STATUS:
NEW ZEALAND SECURITY INTELLIGENCE SERVICE HEADQUARTERS DESIGN ARCHITECT:
ARG
ARCHITECTS
137 TARANAKI ST, TE ARO
DOCUMENTATION ARCHITECT
ARG
ARCHITECTS DESIGN: DRAWN: CHECKED
AG AG AG
CAD REF:
COORDINATED SERVICES AND FACADE SYSTEMS WORKING DRAWINGS
DATE: OCT
13
JOB TITLE:
NZSIS HEADQUARTERS 137 TARANAKI ST, TE ARO
SHEET TITLE:
COVER PAGE
SARC 321 ANTHONY GREEN TUTOR: SALLY
SCALE:
ORIGINAL A3
JOB No:
B SHEET No:
REV
A1 CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
DO NOT SCALE DRAWING
STATUS:
2
1
2091
3 3000
4
5
1200
4200
DESIGN ARCHITECT:
1197
9324
10500
550
A
2114 886
FIRE SPRINKLER PLUMBING
B. B
ARG
ARCHITECTS
10500
DOCUMENTATION ARCHITECT
ARG
DATA RISER
ARCHITECTS
EXIT
C
DESIGN: DRAWN:
EXIT SIGN PLACEMENT
H RT NO
CHECKED
SQUARE FLUORESCENT TUBE FIXTURES @ 1500 & 3000 CRS
10500
CAD REF: DATE: 17/10/13 JOB TITLE:
NZSIS HEADQUARTERS
RETURN CEILING GRILLE @ 3000 CRS
D
SUPPLY CEILING GRILLE @ 3000 CRS SPRINKLER HEADS @ 4000 CRS
137 TARANAKI ST, TE ARO
SHEET TITLE:
10500
EXIT
AG AG AG
REFLECTED CEILING PLAN
1148 EXIT
E
ECOPLUS 600X600 CEILING TILE HUNG 800 FROM FLOOR SLAB
1150
SCALE:
ORIGINAL A3
1 : 200 RETURN & SUPPLY AIR RISER ELECTRICITY RISER 10500
10500
10500
SHEET No:
10500
JOB No:
B REV
A1.01 CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
DO NOT SCALE DRAWING
STATUS:
1
2
3
4 A
DESIGN ARCHITECT:
FIRE SPRINKLER PLUMBING
B. B
ARG
ARCHITECTS DOCUMENTATION ARCHITECT
200MM DATA CABLE TRAY
ARG
DATA RISER
ARCHITECTS DESIGN:
C
SPRINKLER PLUMBING
DRAWN: H RT NO
CHECKED
AG AG AG
CAD REF:
SUPPLY AIR DUCT
DATE: 17/10/13
RETURN AIR DUCT
JOB TITLE:
NZSIS HEADQUARTERS 400 MM ELECTRICAL CABLE TRAY
D RETURN & SUPPLY AIR RISER
137 TARANAKI ST, TE ARO
SHEET TITLE:
COORDINATED SERVICES PLAN
ELECTRICITY RISER
E REFER A1.05 3D DIAGRAM
SCALE:
ORIGINAL A3
1 : 200 SHEET No:
JOB No:
B REV
A1.02 CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
DO NOT SCALE DRAWING
STATUS:
3677
900 2494 900 2529
13115 9726
7929 11323
A
DESIGN ARCHITECT:
RETURN BRUNCH DUCT 300X140 RETURM DUCT 1200X300 UNDER BEAM
B.
ARG
ARCHITECTS
RETURN MAIN DUCT 900X400 DOCUMENTATION ARCHITECT
ARCHITECTS
36068
36438
ARG DESIGN:
C
DRAWN: H RT NO
CHECKED
AG AG AG
CAD REF: DATE: 17/10/13
SUPPLY BRUNCH DUCT 300X140 SUPPLY MAIN DUCT 900X400
D
301
1455
SUPPLY DUCT 1200X300 UNDER BEAM
NZSIS HEADQUARTERS 1039
900 1500
JOB TITLE:
NOTES: . REQUIRES CLARIFICATION WITH THE SERVICES ENGINE ON DUCT SIZING
137 TARANAKI ST, TE ARO
SHEET TITLE:
DUCTWORK CEILING PLAN
.MAIN DUCTS TO RUN CENTRE OF THE BUILDING WITH BRANCHES RUNNING OF THEM
E SCALE:
ORIGINAL A3
1 : 200 SHEET No:
JOB No:
B REV
A1.03
1
2
3
4
5
CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
DO NOT SCALE DRAWING
STATUS:
6900
21371
3229
A
DESIGN ARCHITECT:
4320
ARG B.
ARCHITECTS
4726
DOCUMENTATION ARCHITECT
ARCHITECTS
4394
31501
26771
ARG DESIGN:
C 15 mmø
PERIMETER PIPING 159MM DIAMETER
4600
159 mmø
DRAWN: H RT NO
BRANCH PIPING 15MM DIAMETER
CHECKED
AG AG AG
CAD REF: DATE: 17/10/13 JOB TITLE:
4260
NZSIS HEADQUARTERS
D
2731
NOTES: .SPRINKLER PIPING SIZES TO BE CHECK WITH FIRE ENGINER
137 TARANAKI ST, TE ARO
SHEET TITLE:
2014
2211
PIPE WORK CEILING PLAN
E
SCALE:
ORIGINAL A3
1 : 200 SHEET No:
JOB No:
B REV
A1.04
1
2
3
4
5
CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
DO NOT SCALE DRAWING
STATUS:
SUPPLY AIR DUCT RETURN AIR DUCT
DESIGN ARCHITECT:
ELECTRICAL CABLE TRAY
ARG
ARCHITECTS DOCUMENTATION ARCHITECT
ARG
ARCHITECTS DESIGN: DRAWN: CHECKED
AG AG AG
CAD REF: DATE: 17/10/13
FIRE SPRINKLER PLUMBING
JOB TITLE:
NZSIS HEADQUARTERS 137 TARANAKI ST, TE ARO
SHEET TITLE:
DATA CABLE TRAY
COORDINATED SERVICES DIAGRAM
SCALE:
ORIGINAL A3
As indicated SHEET No:
JOB No:
B REV
A1.05 CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
DO NOT SCALE DRAWING
4503
1500
1500
1500
1500
100MM FLOOR SLAB 50 MM TOPPING
1501
257 210 200
1305
STATUS:
4501
MULLION CONNECTED TO WELDED PLATE WITH SLIDING JOINT
2
1
ECBFS PLAN
STEEL SQUARE SECTION BOLTED TO FLOOR SLAB AND WELDED TO EXPOSED STRUCTURE
A2.02
1 : 50
STEEL CROSS BRACED STRUCTURE
DESIGN ARCHITECT:
ARG
ARCHITECTS
3 A2.01
CEDAR L0UVER SYSTEM CONNECTED TO THREADDED STAINLESS STEEL BOLT
740
645
RL: 7400
ARG
ARCHITECTS
740
DESIGN: DRAWN: CHECKED
740
1840
BACK PAINTED GLASS
DOCUMENTATION ARCHITECT
2
CAD REF:
CURTAIN WALL FIXED 1500CRS
740
645
A2.02
BACK PAINTED GLASS RL: 3700
AG AG AG
. BACK PAINTED GLASS
DATE: 17/10/13 JOB TITLE:
NZSIS HEADQUARTERS 137 TARANAKI ST, TE ARO
1
ECBFS ELEVATION
3
1 : 50
SECTION A 1 : 50
SHEET TITLE:
CROSS BRACED FACADE SYSTEM
SCALE:
2
ORIGINAL A3
1 : 50 SHEET No:
JOB No:
B REV
A2.01 CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
DO NOT SCALE DRAWING
STATUS:
NOTES: . FLOOR SLABE WILL NEED TO BE PROPPED DURING CONSTRUCTION UNTIL THE EXPOSED STRUCTURE IS FIXED TO THE FLOOR SLAB .GLAZING CURTAIN WALL INSTALLED AFTER THE EXPOSED STRUCTE .LOUVER SYSTEM TO BE INSTALLED AFTER THE STUCTURE AND CURTAIN WALL
ALUMINIUM SILL TRANSOM - DOUBLE GLAZED 6MM AIR GAP LOUVER CLEAT SYSTEM THREADED STEEL ROD CEDAR LOUVER
DESIGN ARCHITECT:
ARG
ARCHITECTS
1
ECBGS PLAN DETAIL DOCUMENTATION ARCHITECT
1 : 10 STEEL FLASHING
ARG
ARCHITECTS
268
TRANSOM FIXED TO WIELDED STEEL PLATE
DESIGN: DRAWN:
10MM FIRE PROTECTION LINING
CHECKED
AG AG AG
CAD REF: DATE: 17/10/13
CARPET FLOORING
372
121
80
122
JOB TITLE:
100MM FLOOR SLAB 50MM TOPPING
137 TARANAKI ST, TE ARO
STEEL SQUARE SECTION FIXED TO SLAB TRANSOM FIXED WITH SIESMIC SLIDING JOINT TO STEEL PLATE
NZSIS HEADQUARTERS
SHEET TITLE:
CROSS BRACED FACADE DETAILS
242 325
210
81
573
STEEL THREADED ROD WEILDED TO STRUCTURE SCALE:
ORIGINAL A3
1 : 10 SHEET No:
2
SECTION A DETAIL
JOB No:
B REV
A2.02 CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
1 : 10
DO NOT SCALE DRAWING
STATUS:
CEDAR LOUVERS FIXED TO STEEL TRACKING , TO BE PREFABRICATED ALLUMINIUM SILL WITH 10MM FIRE PROOF LINING
DESIGN ARCHITECT:
WELDED STEEL PLATE FOR CURTAIN WALL FIXING SQUARE SECTION BOLTED TO THE SLAB, CURTAIN WALL FIXED AT 1500CRS
ARG
ARCHITECTS DOCUMENTATION ARCHITECT
STEEL ROD FILLET WELDED TO EXPOSED STRUCTURE. LOUVER CLEAT SYSTEM TO CLIP THE PREFABRICATED LOUVER SYSTEM DURING CONSTRUCTION
ARG
ARCHITECTS DESIGN: DRAWN: CHECKED
100MM CONCRETE FLOOR SLAB 50MM TOPPING 500MM STEEL BEAM WITH 2X13MM GIB FYRELINE
AG AG AG
CAD REF: DATE: 17/10/13 JOB TITLE:
NZSIS HEADQUARTERS 137 TARANAKI ST, TE ARO
SHEET TITLE:
CROSS BRACED FACADE 3D CUTAWAY 2X4MM GLASS WITH 6MM AIR GAP SCALE:
ORIGINAL A3
1 : 10 SHEET No:
JOB No:
B REV
A2.03 CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
DO NOT SCALE DRAWING
STATUS:
DESIGN ARCHITECT:
ARG
ARCHITECTS DOCUMENTATION ARCHITECT
ARG
ARCHITECTS DESIGN: DRAWN: CHECKED
AG AG AG
CAD REF: DATE: 17/10/13 JOB TITLE:
NZSIS HEADQUARTERS 137 TARANAKI ST, TE ARO
SHEET TITLE:
EXPOSED CROSS BRACED FACADE SYSTEM RENDER
CROSS BRACED FACADE RENDER
SCALE:
ORIGINAL A3
JOB No:
B SHEET No:
REV
A2.04 CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
DO NOT SCALE DRAWING
2
3
500MM FIREPROOFED STEEL COLUMN
2X13MM GIB NOISELINE INTERNAL LINING
2200
801
18MM PLY MEMBRANE
2200
841
799
NOTES: . THE CORTEN STEEL SHEET IS FIXED TO A STEEL FRAM WHICH IS BOLTED TO THE FLOOR SLAB .THE GLAZING IS CONNECTED TO THE EDGE OF THE FRAME FOR SIESMIC MOVEMENT, MAKING THE FACADE SYSTEM WORK AS ONE
CORTEN STEEL FACADE
2200
838
800
STATUS:
2200
840 DESIGN ARCHITECT:
ARG
1 A3.02
ARCHITECTS
CORTEN STEEL FACADE 2 PLAN 1 : 50
100MM FLOOR SLAB WITH 50MM CONCRETE TOPPING CARPET FLOORING
DOCUMENTATION ARCHITECT
ARG
ARCHITECTS 75MM AIR GAP
3
BACK PAINTED GLASS .
RL: 7400
A3.01
DESIGN: DRAWN:
2 732
CAD REF: DATE: 17/10/13 JOB TITLE:
NZSIS HEADQUARTERS
3625
1876
DPC UNDER TIMBER FRAME 3730
CHECKED
A3.02
AG AG AG
137 TARANAKI ST, TE ARO
734
SHEET TITLE:
CORTEN STEEL FACADE SYSTEM
RL: 3700
20MM CORTEN STEEL FACADE FIXED TO STELL FRAME 2.2MX3.7M
CORTEN STEEL 1 ELEVATION 1 : 50
CORTEN STEEL TO HIDE THE MULLIONS
STEEL FRAME BOLTED TO SLAB
STEEL FRAME FIXED WITH SEISMIC SLIDING JOINT
SCALE:
ORIGINAL A3
1 : 50 SHEET No:
3
CORTEN STEEL SECTION. 1 : 50
JOB No:
B REV
A3.01 CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
DO NOT SCALE DRAWING
2X13MM GIB NOISELINE
3
1916
STATUS:
18MM H3 TREATED PLY MEMBRANE 50X50 MULLION FIXED TO STEEL FRAME 998
1034
AIR SEAL
136
STEEL JAM FLASHING
30
DESIGN ARCHITECT:
2X4MM GLASS 6MM AIR GAP
ARG
22
CORTEN STEEL FIXED TO STEEL FRAME 300CRS
ARCHITECTS
CORTEN STEEL PLAN 1 DETAIL. 1 : 10
DOCUMENTATION ARCHITECT
2X13MM GIB NOISELINE 18MM H3 PLY MEMBRANE DPC
ARCHITECTS
STEEL FLASHING OVER 20MM SEISMIC GAP
DESIGN: DRAWN: CHECKED
AG AG AG
CAD REF: DATE: 17/10/13 JOB TITLE:
86
NOTES: .STEEL FRAME TO BE FIXED TO THE FLOOR SLAB, THEN THE GLAZZING FIXED TO THE STEEL FRAM AND THEN CORTEN 20MM STEEL PANEL FIXED TO THE FRAME . SIZING OF THE STRUCTURAL FRAME REFER TO STRUCTURAL ENGINER
ARG
SIESMIC SLIDING JOINT FIXED TO SLAB
NZSIS HEADQUARTERS
FIXED JOINT TO SLAB 137 TARANAKI ST, TE ARO
100MM CONCRETE FLOOR SLAB WITH 50MM TOPPING, 20MM CARPET ON UNDERLAY
SHEET TITLE:
CORTEN STEEL DETAILS
SCALE:
ORIGINAL A3
1 : 10
CORTEN STEEL SECTION 2 DETAIL. 1 : 10
SHEET No:
JOB No:
B REV
A3.02 CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
DO NOT SCALE DRAWING
STATUS:
20MM CORTEN STEEL PANNEL
75X20 STEEL FRAME 18MM H3 PLY MEMBRANE
2X13MM GIB NOISE LINE DESIGN ARCHITECT:
ARG
ARCHITECTS
MULLION FIXED TO STEEL FRAME SEISMIC SLIDING JOINT CORTEN STEEL PANEL FIXED TO STEEL FRAME @250MM CRS
DOCUMENTATION ARCHITECT
ARG
ARCHITECTS DESIGN: DRAWN: CHECKED
AG AG AG
CAD REF: DATE: 17/10/13 JOB TITLE:
NZSIS HEADQUARTERS 137 TARANAKI ST, TE ARO
SHEET TITLE:
CORTEN STEEL FACADE 3D CUTAWAY
SCALE:
ORIGINAL A3
1:5 SHEET No:
JOB No:
B REV
A3.03 CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
DO NOT SCALE DRAWING
STATUS:
DESIGN ARCHITECT:
ARG
ARCHITECTS DOCUMENTATION ARCHITECT
ARG
ARCHITECTS DESIGN: DRAWN: CHECKED
AG AG AG
CAD REF: DATE: 17/10/13 JOB TITLE:
NZSIS HEADQUARTERS 137 TARANAKI ST, TE ARO
SHEET TITLE:
CORTEN STEEL RENDER
CORTEN STEEL FACADE SYSTEM RENDER
SCALE:
ORIGINAL A3
JOB No:
B SHEET No:
REV
A3.04 CONTRACTORS MUST VERIFY DIMENSIONS OF THE JOB BEFORE COMMENCING WORK
DO NOT SCALE DRAWING