Site Plans Ground Floor Plan First Floor Plan Roofing Plan North Elevation South Elevation West Elevation East Elevation Section AA Section BB Section CC Internal Detailings Window Detailings Special Detailings
A01 A02 A03 A04 A05 A06 A07 A08 A09 A010 A011 A012
001 002 003 004 005 006 007 008 009 010 011 012 013 014
Page
All timber shall be H1.2 treated graded SG8, unless stated otherwise.
The Contractor shall provide the appropriate temporary fencing, hoarding, guardrails and signage as necessary to protect the public and the workers during the construction process and also to meet the requirements of the Local and Territorial Authorities.
The Contractor shall ensure that all rubbish is removed from the siteduring, and at the completion of the contract works.
All work to be undertaken to the highest standard for each respective trade. Any substandard work or building materialdefects shall be the contractors responsibility to resolve, repair or replace at no extra cost to the client.
All work is to be carried out in accordance with drawings and specifications provided.
All work shall comply with the NZBC, all relevant Local Authority bylaws, NZS3604, and other relevant standards.
THE CONTRACTOR WILL HAVE TO VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT OF CONSTRUCTION. ANY DISCREPANCIES WILL HAVE TO TO BE RAISED WITH THE PROJECT ARCHITECT.
PROJECT NOTES:
A013 A014
DRAWING TILE
CODE
E: austindsouza95@gmail.com
Austin D’souza Student ID No. 300327560 Tutored by: Bryce Henden
Morten Gjerde Victoria University of Wellington Wellington
Date 6th May 2015
Designer:
Client:
The D’souza House
Project name:
Documenting a Dwelling
SARC 221 - Building Materials and Construction
DSOUZA ARCHITECTS