SAN RAFAEL-UNIDO: LIFESTYLE AND CONDITIONS INFORMAL CITY FORMAL CITY
46% 54%
183 INFORMAL CITY
POPULATION BREAKDOWN
1 SQUARE ACRE
1 SQUARE ACRE
.1%
6
30% ma x imum a 60% cceptab exist le ing s lope
FORMAL CITY
SITE GEOGRAPHIC RISK source: “Upgrading San Rafael Unido: Integral Urban Project” p. 3 and http://wapi.isu.edu
CARACAS
3%
50%
SAN RAFAEL-UNIDO
INCOME VS. TOPOGRAPHIC LOCATION- HIGHEST AND LOWEST 20%
CARACAS POPULATION INFORMAL CITY
source: World Bank Data Finder, http://databank.worldbank.org
FORMAL CITY
1
2
3
4
7 days/wk
2.7 million dwellers
1.1 million workers
CURRENT WATER SUPPLY source: “Upgrading San Rafael Unido: Integral Urban Project” p.12
SAN RAFAEL-UNIDO PROJECT AREA
SITE TRAFFIC source: http://www.tradingeconomics.com/venezuela/labor-force-total-wb-data.html BUSINESSES SERVICED BY BARRIO DWELLERS BUSINESSES SERVICED BY FORMAL CITY INHABITANTS
CONDITIONS AND SOLUTIONS
29% SITE VULNERABLE
41 HOMES TO BE MOVED
GEOLOGICAL RISK AREA: 8 HECTARES
MITIGATION OF MOST SUSCEPTIBLE AREAS
30 NEW STAIRWAYS 2775 METERS OF INCREASED ACCESS
3 NEW ROADS 1505 METERS OF CIRCULATION
30 NEW PUBLIC SPACES EMBEDDED WITHIN STAIR NETWORK
5 PUBLIC BUILDINGS 7,000 SQ METERS NEW COMMUNITY SPACE
LOCAL INTERVENTIONS
STAIR NETWORK
ELECTRICAL DRAINAGE POTABLE WATER
BOUNDARY ROADS
SEWAGE
STAIR NETWORK - SITE CONTEXT
PUBLIC SPACE
PUBLIC BUILDINGS
STAIR NETWORK - UTILITY ACCESS
<9)(5 0+,5;0;@ (
7<)30* 73(A(
)
)<: :;67
* 4(92,;73(*, IDENTITY
+ 67,5 :7(*,
CONNECTION
,
;9(5:769;(;065
-
9,:0+,5*,:
. )<:05,::,:
0,/(6 72 &,7< &(17(5
85%$1 (19,5210(17
/ 7<)30* 73(A(
/2&$/ )$&$'(
0
*644<50;@ *,5;,9
85%$1 )5217 35(6(17
85%$1 75$163257$7,21
/2&$/ &20081,7< &(17(5
85%$1 )5217 )8785(
( 0
/
. -
,
+
*
)
PROCESS OF COMMUNICATION PROMOTERS / FUNDERS CONAVI: GOVERNMENT BACKED ORGANIZATION FORMED TO PROVIDE COORDINATION, FUNDING, AND ETHICAL CONTINUITY FOR THE PROJECT WORLD BANK: PROVIDED 40% OF FUNDING FOR THE $150 MILLION PROJECT
TECHNICIANS / NEGOTIATORS FUNDACOMUN: GOVERNMENT BACKED ORGANIZATION FORMED TO HANDLE SOCIAL ISSUES AND NEGOTIATE LEGAL ISSUES WITH ALL PARTIES INVOLVED CAMBEA: GOVERNMENT ORGANIZATION THAT PROVIDED INFORMATION ABOUT THE PROJECT TO THE COMMUNITY SURVEYORS, CONTRACTORS, WATER AND ELECTRIC SERVICE COMPANIES: PROVIDED TECHNICAL SUPPORT IN REALIZING THE PHYSICAL ASPECTS OF THE PROJECT
ARCHITECTS PROYECTOS ARQUI 5: RESPONSIBLE FOR DESIGNING UPGRADES TO THE SAN RAFAEL AND UNIDO NEIGHBORHOODS OF THE LA VEGA BARRIO. THROUGH A WELL-DEVELOPED COMMUNICATION PROCESS, THEY DEVELOPED A PLAN THAT ADDRESSED THE COMMUNITY’S CONCERNS BY FOCUSING ON ACCESS NETWORKS RATHER THAN OPEN SPACES
COMMUNITY SAN RAFAEL AND UNIDO NEIGHBORHOODS: WORKED CLOSELY WITH THE ARCHITECTS AND HAD A SIGNIFICANT EFFECT ON THE PLAN THAT RESULTED. THE PROJECT REQUIRED AND ACHIEVED 75% WRITTEN APPROVAL BY THE COMMUNITY BECAUSE IT ADDRESSED SPECIFIC CONCERNS ABOUT OPEN SPACE AND ACCESS TO UTILITIES
PHYSICAL EFFECTS OF COMMUNICATION: WHAT WAS PROPOSED
PHYSICAL EFFECTS OF COMMUNICATION: WHAT WAS BUILT
.36)(3 ;9(5:-,9()030;@ 9(1(=8(/$ &$5$&$6
/$ 9(*$ 3,673, :0A, <;030;@
:8 403,: 565,
3(5+ :;,,7 /033:0+,
%5$=,/ 5,2 '( -$1(,52
52&,1+$ 3,673, :0A, <;030;@
:8 403,: )(:0*:
3(5+ :;,,7 /033:0+,
.(1<$ 1$,52%,
.,%(5$ 3,673, :0A, <;030;@
:8 403,: 565,
3(5+ -3(; -69,:;
,1',$ 080%$,
'+$5$9, 3,673, :0A, <;030;@
:8 403,: )(:0*:
3(5+ 4(9:/ 3(5+
ì,) , &$1â7 +(/3 :63=, 7+( 352%/(06 2) 7+( 4<3;0;<+, 7+$1 :+< $0 , $1 $5&+,7(&7"ú $548,