Architecture Portfolio Braden Pedersen

Page 1

BRADEN PEDERSEN Architecture Portfolio

University of Sydney Master of Architecture Student Selected Works


BRADEN PEDERSEN

1118/2 Chippendale Way Chippendale, NSW 2008 E | mail@bradenpedersen.com W | bradenpedersen.com M | 0411554020

|2|


Contents 01 Digital Masters Research Studio | Terra-form Eyre 02 Sustainable Masters Research Studio | Student Housing 03 Flinders St Station Design Compertition | Melbourne Opera House 04 Masters Contract Documentation | Maitland Art Gallery


Masters Digital Reserch Studio Terra-form Eyre Semester 2, 2013 Tutor: Alex Jung In partnership with: Emma Mackellar

|4|



Reversing the force of desertification is the primary objective of this proposal. Through this simple act, issues of overpopulation, food production and climate change are drastically reduced globally. Australia is a land of vast plains of desert. Much of this region is lower than sea level- Lake Eyre is at the heart of this basin. Its catchment area is 1,200,000 m2. Lake Eyre flooded in 2010 and lowered the mean global sea level by 10mm because it took over 6 months for water to evaporate and slowly be returned out to sea. Through its capacity to seed clouds the vast structure enables the water within lake eyre to be retained permanently and increased. In doing so it alters the regional climate, terraforming the desert into fertile land.

|6|


Vertical City: Existing modes of urban densiication cause desertiication. Natural vegetation prevents the nutrient rich bio-diverse topsoil from eroding. As demand on agricultural regions increases, this vegetatiation is removed. By concieving the city as vertical rather than horizontal it is possible to mitigate desertiication. Greater efficiency in transort and land usage also result. When urban and agricultural land is integrated, the city unit can become independant of external supply. It can expand limitlessly without affecting its efficiency. =

Structure:

The city is conceived as a singular structure- a physical manifestation of the conceptual ideal of a city that is ‘self supporting.’ The cloud seeding tower must be 600 metres tall in order for the air collumn to affect the troposphere . This height is enabled by percieving the structure like a suspension bridge. The large central pylon is in compresion while cables allow the bridge to be suspended. The entire city acts in tensionits form generated by efficient membrane structures exempliied in Frei- Otto’s Olympic stadium in Munich.


Masters Sustainable Reserch Studio Student Housing Semester 1, 2013 Tutor: Paul Berkemeier In partnership with: Mark Szekely

|8|



There is a desperate need for additional student housing at the University of Sydney. Current housing options are limited and insufficient to match student demand. This project is aimed at maximising the number of students housed whilst minimising the cost of housing to the students. The project is built on a small left over site on campus, the roof of the electrical engineering building, to reduce costs and re-adapt an existing building. The building creates a rich and sustainable living environment for students through passive design principals such as solar access, ventilation, thermal mass, water harvesting and power generation.

| 10 |



Flinders St Station Design Compertition Melbourne Opera House 2012 Tutor: Samantha Donally

| 12 |



Melbourne is known to be the cultural capital of Australia but is missing one important land- mark in the city. The central location of the Flinders Street Station site made it a desirable location for a cultural precinct which included an Opera House. The Opera House has been integrated in to the existing Banana Ally Vaults which are used for performances and events. The site has been linked to the cultural precinct on Southbank creating additional connections over the Yarra River. The landscape has been folded to create a sense of intrigue for the visitors and to form pocket spaces for the train station and performance venues. The forms add to the strong geometries already evident in Melbourne creating a noticeable icon for the city. The form came from a combination of digital and analogue processes exploring spaces with strong geometries to complement the architecture already existing in Melbourne.

| 14 |



Masters Contract Documentation Maitland Art Gallery 2013 Tutor: Peter Armstrong In partnership with: Courtney Owen Vi Le Zoya Kuptsova Kim Lange

| 16 |


B

PROJECT LEGEND

2,920

JAMES STREET

W01

W04

SHOP

1000H METAL HANDRAIL AND BALUSTRADES TO SUIT BCA REQUIREMENTS

CONCRETE FFL 8.9

2,875

D01

HATCH INDICATES EXTENT OF TIMBER FLOOR CONSTRUCTION

FRONT ENTRANCE

2

360 1,925 200 1,950

BIN STORE STAIR

425

380

200 2,090

BIN STORE

3,260

2,665

KITCHEN

KITCHEN STORE

KITCHEN

4,500

110 1,125

KITCHEN

110

380

1,600

200 2,175 200

6,570

WALL CONSTRUCTION AS SPECIFIED NEW WINDOWS

C

EXISTING DOORS NEW DOORS

2,130

ALUMINIUM FRAMED DOUBLE HEIGHT WINDOW AS SPECIFIED

FIRE EXIT

TIMBER FLOOR CONSTRUCTION TO ENGINEERS DETAIL

SELECT STYLE EXTERNAL CLADDING AS SPEC.

EXG BUILDING RETAINED

TIMBER

FFL 8.9

PRECAST CONCRETE WALLS TO ENG. DETAIL

CONCRETE BLOCK WALLS WITH PAINT FINISH AS SPECIFIED

DECK FFL 8.9

TIMBER

WINDOW OVER

D12

D11

W

WINDOW NUMBERS

D

DOOR NUMBERS FINISHED FLOOR LEVELS

FFL

D10 EX STAIR UNCHANGED

W05

CONCRETE

BOX GUTTER COLUMN CONCRETE CHECK ON SITE CEMENT RENDER DOWNPIPE EXISTING FACE BRICK FIBRE CEMENT FINISHED FLOOR LEVEL FLOOR WASH GRATED DRAIN HAND BASIN HAND RAIL METAL ROOF SHEETING NATURAL GROUND LEVEL OVER FLOW PLASTERBOARD REDUCED LEVEL ROOF TILES RETAINING WALL TIMBER URINAL TOILET

DECK

D09

CAFE

DECK

BUILDING OVER

REMOVE EX. WINDOWS TO ALLOW FOR NEW ALUMINIUM FRAMED BIFOLD DOORS. MAKE GOOD EX. AS REQUIRED

AWNING OVER

380

TIMBER FLOORS AND DECKING ALLOW FOR INSULATION INTERNALLY AS SPECIFIED

1,200

STEEL FRAMED EXTERNAL STAIRS AS SPECIFIED AND TO SUIT BCA REQUIREMENTS

W03

5,370

5

D08

FFL 7.4

JOINERY

1,125

3

4

FFL 8.9

ALUMINIUM FRAMED WINDOWS AND DOORS

CAFE

1

2

CONCRETE

C

BIN STORE

JOINERY WINDOW OVER

W02

FRONT ENTRANCE

GRATED DRAINS TO ENG. DETAIL

D07

FFL 7.4

FFL 8.9

CONCRETE

D05

FFL 8.9

RW

CONCRETE

TILES

D04

D02

TILES

BIN STORE

KITCHEN STORE

FFL 8.9

8,860

D03

FEMALE WC

RW

D06

TILES

2,400

FFL 8.9

TILES

TILES

110

FFL 8.9

KITCHEN

3,240

TILES

RL 8.9

MALE WC

MALE

JOINERY

DISABLED WC

1,200

150

TILE FINISH TO EXTERNAL CONCRETE BLOCK WALLS

KITCHEN

RAMP GRADIENT 1:12

STORE

BG COL CONC COS CR DP EX FB FC FFL FW GD HB HR MS NGL OF PB RL RT RW TIM UR WC

1,350

DECK

3,260

BIN STORE

1,800

200

CAFE

378

RL 8.9

KITCHEN STORE

10,220

200

MALE

110

2,550

110

4,970

KITCHEN

380

1,727 110

110

4,210

SHOP

3,300

MALE

B

GARDEN

CONCRETE PATH RL 8.1

ENTRY

110

110

8,860

905

8,840

10,980

ENTRY

MALE

110

TILED FINISH TO BLOCKWORK WALL AS SPECIFIED

6,650

110

5,370

HALL

DISABLED

4,310

RW

CONCRETE STAIRS, NATURAL FINISH

6,750

4,250 7,480

110

WINDOW OVER

110

7,970

STORE

2,590

A

BOUNDARY

RW

5,160

110

HALL

SET DOWN STRUCTURAL FLOOR LEVEL TO WET AREAS TO ENG. DETAIL

1 5,160

FEMALE

1,570

SOFT LANDSCAPING

110 575 900

5,000

2,535

FEMALE

900H CEMENT RENDERED BLOCKWORK RETAINING WALLS TO ENG. DETAIL

110

A 1

D

5,900 14,825

3445

4,270

BOUNDARY

380

1,390

PROVIDE AGG. LINE WITH GEOTECH FABRIC SLEEVE WITHIN AGGREGATE FILL AND DRAINAGE CELL PROTECTION TO W.P.M AS SPECIFIED

C

2,480 380

5,460

A 17,530 13,290

PRECAST CONCRETE WALL WITH POLISHED FINISH

FFL 8.9

FOYER

7,310

7,310

FOYER

FOYER

6,035

EXIT SIGN

FLUORESCENT BATTON SMOKE DETECTOR

200

SWITCH

ex

EXHAUST IN-CEILING SPEAKERS

3,740

SERVICES

AC

C

ES

S

200

EX

CONCRETE

X 200

150

STORE

STORE

STORE

CONCRETE

FIRE EXIT

1,140

EX

2,725

D14

D15

D16 D17

W06

COL

8,290

8,440

SERVICES

12,440

NOTE 1: ALL CEILINGS ARE SET PLASTERBOARD UNLESS NOTED OTHERWISE NOTE 2: OUTDOOR LIGHTING TO BE ADVISED BY LANDSCAPE CONSULTANTS

REMAIN UNCHANGED UNLESS NOTED OTHERWISE

EX

FFL 8.9

CONCRETE FOOT PATH

REAR GARDEN

LIFT INSTALLED TO MANUFACTURERS SPECIFICATION

90

D26

STORE TIMBER

DECK

2,290

SELECT STYLE EXTERNAL CLADDING ALLOW FOR INSULATION AND SARKING IN ACCORDANCE WITH SPECIFICATION

D25

FFL 8.9

NOT FOR CONSTRUCTION

9,250

REGIONAL ART GALLERY EXG. BRICK BUILDING TILED ROOF

GALLERY B/1

No. 230 MAITLAND

27,460

D18

200

INTERNAL PLASTERBOARD LINING WITH PAINT FINISH AS PER SPECIFICATION

LIFT

200 2,160 200

RETAIN EXISTING GROUND LEVELS UNCHANGED

4,400

SOFT LANDSCAPING

LIFT

1340

NOTE 5: ALL LIGHTING SYSTEMS, EXTERNAL LIGHTS, WALL LIGHTS AND MULTILIGHT SYSTEMS ARE TO HAVE REMOTE CONTROL SWITCHES LOCATING IN THE GROUND FLOOR STOREROOM

CONCRETE

STEEL FRAMED STAIRS WITH TIMBER LINING AS SPECIFIED

STORE

NOTE 4: GPO QUANTITY, LOCATION AND TYPE TO BE CONFIRMED BY ELECTRICAL CONSULTANT

1,000

COL

17,735

GALLERY B/1

COL

GALLERY B/1

REINFORCED CONCRETE COLUMNS TO ENG. DETAIL

BRIDGE OVER

D.P. 581007 SITE AREA 5540.18 sqm

3,400

VOID

FFL 8.9

SERVICES

SERVICES

90

PROVIDE NEW FRAMED WALL AS INDICATED TO ALLOW FOR SERVICES PROVIDE PLASTERBOARD AND PAINT FINISH AS SPECIFIED

860

TIMBER

NOTE 3: JOINERY LIGHTING TO BE CONFIRMED BY ELECTRICAL CONSULTANT

D

STORMWATER PIT TO ENG. DETAIL

3,400

GALLERY B/2

RETAIN AND MAKE GOOD EX. OPENINGS

GALLERY B/1

D

90

GALLERY B/2

GALLERY B/2

EX

1,795

EXISTING GALLERY

ACCESS HATCH

NOTES

EX. ENTRY CONCRETE FOOT PATH

90

- ALL INFORMATION CONTAINED ON THIS DRAWING IS COPYRIGHT. NO PART OF THIS DRAWING MAY BE COPIED OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE AUTHOR. - DO NOT SCALE FROM THIS DRAWING - CHECK ALL DIMENSIONS ON SITE - THE AUTHOR ACCEPTS NO LIABILITY FOR ANY LOSS OR DAMAGE ARISING FROM UNAUTHORISED USE OF ANY INFORMATION ON THIS DRAWING REV

NOTES

DATE

A

ISSUE FOR TENDER

10/11/2013

DP

6,200

SIDE GARDEN SOFT LANDSCAPING

BOUNDARY

435

01

PROPOSED GROUND FLOOR PLAN

D21

DP

5,900

90

2,290

1,400

STORE

200

1,200

3,040 LIFT

STAIR

BOLLARD

STOREROOM

LOADING

FFL 8.9

FFL 8.9

CONCRETE

RETAIN EXISTING GROUND LEVELS UNCHANGED

CONNECT DOWNPIPES TO NEW STORMWATER DRAINAGE SYSTEM IN ACCORDANCE WITH ENG. DETAIL

7

D22

ROLLER DOOR TO LOADING DOCK TO MANUFACTURERS DETAIL

D20

CONCRETE

METAL BOLLARDS AS SPECIFIED

COL

SELECT STYLE EXTERNAL CLADDING AS SPECIFIED. ALLOW TO PACK OUT WALL FOR ANGULAR CONSTRUCTION

ANGLED WALL OVER

1,975

8,850

3,750

PROJECT

EXTENSIONS TO THE MAITLAND REGIONAL ART GALLERY MAITLAND TECHNICAL COLLEGE 230 HIGH STREET MAITLAND NSW 2320

ARCHITECT

atelier ямБve

WILKINSON BUILDING 148 CITY ROAD DARLINGTON NSW 2320 ABN: 70 509 392 275 (e) studio@atelierfive.com (p) 02 9559 4595 (f) 02 9558 4582

N

DRAWING TITLE

HALL

A

B

GROUND FLOOR PLAN 8,380

GALLERY B/1

200 5,690

PO BOX 220 MAITLAND NSW 2320

BOLLARD COL

2,080

90

1:100

CLIENT

MAITLAND CITY COUNCIL

725

NEW STEEL GUTTERS AND DOWNPIPES AS SPECIFIED

4,830

COL

520

D19 COL

PICTURE STORE

HR

SETOUT POINT

STEEL FRAMED EXTERNAL STAIRS AS SPECIFIED AND TO SUIT BCA REQUIREMENTS

ALUMINIUM FRAMED SLIDING DOORS TO GALLERY BACK ROOMS TO MANUFACTURERS INSTRUCTIONS

FFL 8.9

17,720

6

CONCRETE

200

CONCRETE FOOT PATH

PICTURE STORE

STORE ROOMS

GATE

HR

5,050

HR

PICTURE STORE

PRECAST CONCRETE WALLS TO ENG. DETAIL

FFL 8.9

STORE

STAIR

1,350

TIMBER

HR

3,675

200

COL

200

COL

200

DECK

D23

5,773

FIRE EXIT

200

D24

4,540

8,850

3,420

STAIR

8,850

90 STORE

1,340

WALL LIGHT

RECESSED MULTILIGHTS

COL

HATCH INDICATES EXTENT OF TIMBER FLOOR CONSTRUCTION

5

4,590

JOINERY DOWNLIGHT

EXIT

REMAIN UNCHANGED UNLESS NOTED OTHERWISE

BRIDGE OVER

3,740

4

ADJUSTABLE DOWNLIGHT FOYER

EXISTING GALLERY

D13

90

3

FFL 8.9

EX

6,100

CONCRETE

6,035

HIGH STR EET

ELECTRICAL LEGEND

ENTRANCE FOYER

4,260

STOREROOM

200

4,220

LOADING

10,940

200

1,350

FIRE EXIT

350

SCALE

1:100 @ A1 DRAWING NO.

CD-03

DRAWN BY

DATE

VL, ZK, CO, BP 15/11/2013 REVISION

A


The aim of this project was to to complete all contract documentation required for tender from a sketch level design. The project was for the all ready existing extension to the Maitland Regional Art Gallery for Maitland City Council. Being the project architect I was responsible for looking after a team of 5 and scheduling the work that needed to be completed in 6 weeks. For this project we produced 24 working drawings,specifications and cost control for the building project showing an ability to communicate this documentation to clients, statutory authorities, consultants, tenderers, contractors and sub-contractors.

| 18 |


A 1

A 1 METAL PARAPET OVER PRECAST CONCRETE PANEL

200mm PRECAST CONCRETE TO ENGINEERS DETAILS

FIX STRAP PACKING AS REQUIRED

CORRUGATED METAL SHEET CLADDING FIXED TO TOP HAT SECTION

INSULATION, SISILATION AND SAFTEY MESH AS SPECIFIED

ACOUSTIC 50mm INSULATION, SISILATION AND SAFTEY MESH TO RUN UNDER ROOF SHEETING

PRECAST CONCRETE PANEL TO ENGINEERS DETAIL

SHS TO ENGINEERS DETAIL

METAL DECK ROOF SHEETING AS SPECIFIED WITH 2DEG PITCH FIXED TO PURLINS

ROOF PURLINS TO ENGINEERS DETAILS

ACOUSTIC 50mm INSULATION, SISILATION AND SAFTEY MESH TO RUN UNDER ROOF SHEETING

THICKENED STEEL PLATE OVER SERVICE DUCT

CONCRETE SLAB TO ENGINEERS DETAILS

SUSPENSION ROD SUPPORTED BY CONCRETE SLAB

30mm TOP HAT SECTIONS ALPOLIC CLADDING PANNEL WIITH SPECIFIED FINISH INSTALLED TO MANUFACTURER'S DETAILS

RONDO SUSPENDED CEILING

MS GIRT SECTION

RONDO SUSPENDED CEILING SYSTEM FROM ROOF PURLINS

200UB BEAM TO ENGINEERS DETAILS UB TO STRUCTURAL ENGINEERS DETAIL

50mm INSULATION BATS AS SPECIFIED

GALVANISED STEEL BOX GUTTER SUPPORTED BY FIBRE CEMENT BOARD FIBRE CEMENT BOARD ON TOP OF DECKING

SPANDEK DECKING AS SPECIFIED BOX GUTTER HANGING SUPORTS AT 600mm CENTRES GLAZING AS SPECIFIED

30mm FURRING CHANNEL

FIBRE CEMENT SHEETING FIXED TO SUSPENDED CEILING SYSTEM

FLASHING OVER GUTTER EDGE FIXED TO PRECAST CONCRETE PANEL

13MM PLASTERBOARD CELING

ROOF SUPPORT STRUCTURE TO ENGINEERS DETAILS

SHADOW GAP ANGLE

ALUMINIUM WINDOW INSTALLED TO ROOF BEAM TO ENGINEERS MANUFACTURER'S DETAILS DETAILS

SHADOW GAP ANGLE

13mm PLASTERBOARD FIXED TO STEEL STUD WORK

FIBRE CEMENT SHEETING TO BE FINISHED ACCORDING TO SPECIFICATION Z PURLIN

INSULATION AS SPECIFIED

GALVANISED STEEL BOX GUTTER SUPPORTED BY FIBRE CEMENT BOARD

477220

477222

150634

13mm PLASTERBOARD FIXED TO STEEL STUD FRAME

INSULATION AS SPEC

13mm PLASTERBOARD STEEL STUD WORK WITH ACOUSTIC INSULATION

13mm PLASTERBOARD CEILING

EXG BUILDING RETAI

CONCRETE DOWNTURNED BEAM SUPPORTING SLAB AND PRECAST TO ENGINEERS DETAILS

METAL DECK ROOF SHEETING AS SPECIFIED WITH 2DEG PITCH FIXED TO PURLINS

CONCRETE BLOCK W WITH PAINT FINISH A SPECIFIED

INSULATION BATS

CORRUGATED SHEET METAL FIXED TO TOP HAT SECTIONS

STEEL PORTAL FRAME BEYOND TO ENGINEERS DETAILS

RONDO SUSPENDED CEILING SYSTEM FROM ROOF PURLINS

SELECT STYLE EXTE CLADDING AS SPEC.

FIXING ANGLE FOR PRECAST TO CONCRETE SLAB

TOP HAT SECTION FIXED TO PRECAST CONCRETE

PRECAST CONCRETE WALLS TO ENG. DETA

100mm STEEL STUD FRAME

125mm TOP HAT SECTIONS

PACKING AS REQUIRED METAL KLIP LOCK ROOF SHEETING FIXED TO PURLINS

PROJECT LEGEND

13mm PLASTERBOARD FIXED TO STEEL STUD FRAME

MARINE PLY

J

CD15

HEAD/ CEILING/ ROOF DETAIL 1:5

100mm STEEL STUD WALL

BIFOLD DOOR HEAD INSTALLED TO MANUFACTURER'S DETAIL AS SPECIFIED FIBRE CEMENT BOARD ON TOP OF DECKING SPANDEK DECKING AS SPECIFIED BOX GUTTER HANGING SUPORTS AT 600mm CENTRES

13mm PLASTERBOARD CEILING FIXED TO TOP HAT SECTIONS

INSULATION

METAL FLASHING AS SPECIFIED METAL DECK ROOF SHEETING AS SPECIFIED WITH 2DEG PITCH FIXED TO CD14 PURLINS 1:5

M BOX GUTTER DETAIL

NOT FOR CONSTRUCTION NO

ACOUSTIC 50mm INSULATION, SISILATION AND SAFTEY MESH TO RUN UNDER ROOF SHEETING

INSULATION AS SPECIFIED

ROOF STRUCTURE TO ENGINEERS DETAILS

ROOF SUPPORT STRUCTURE TO ENGINEERS DETAILS

RONDO SUSPENDED CEILING SYSTEM HUNG FROM ROOF PURLINS

L

CD16

PRECAST PARAPET/ WALL/ ROOF DETAIL 1:5

NOTES

A

ISSUE FOR TENDER

CLIENT

MAITLAND CITY COUNCIL

FIBRE CEMENT SHEETING FIXED TO TOP HAT SECTIONS WITH INSULATION

CORRUGATED METAL CLADDING FIXED TO TOP HAT SECTION

REV

PO BOX 220 MAITLAND NSW 2320

STRUCTURAL UB BEAM TO ENGINEERS DETAILS

PROJECT

EXTENSIONS TO THE MAITLAND REGIONAL ART GALLERY MAITLAND TECHNICAL COLLEGE 230 HIGH STREET MAITLAND NSW 2320

50mm INSULATION BATS AS SPECIFIED

ARCHITECT

13mm PLASTERBOARD CEILING PAINTED

REV A

13mm PLASTERBOARD ON STEEL STUD FRAMING

STEEL STRUCTURE TO ENGINEERS DETAILS

100mm STEEL STUD FRAME

- ALL INFORMATION CONTAINED ON THIS DRAWING IS -COP ALL NO PART OF THIS DRAWING MAY BE COPIED OR REPRODU NO WITHOUT THE WRITTEN CONSENT OF THE AUTHOR. WIT - DO NOT SCALE FROM THIS DRAWING - DO - CHECK ALL DIMENSIONS ON SITE - CHE - THE AUTHOR ACCEPTS NO LIABILITY FOR ANY LOSS -OR D THE ARISING FROM UNAUTHORISED USE OF ANY INFORMATIO ARIS DRAWING DRA

K

CD15

WALL/ WINDOW/ ROOF DETAIL 1:5

atelier ямБve

WILKINSON BUILDING 148 CITY ROAD DARLINGTON NSW 2320 ABN: 70 509 392 275 (e) studio@atelierfive.com (p) 02 9559 4595 (f) 02 9558 4582 DRAWING TITLE

CLIE

MA

PO B MAIT

PROJ

EXT REG

MAIT 230 H

ARC

at

WILK 148 DAR ABN (e) s (p) 0

DRAW


bradenpedersen.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.