Architecture Portfolio 2015

Page 1

BRADEN PEDERSEN

Graduate Architect Selected Works 2015


Contents 1 | Macleay Museum | Graduation Studio 2 | 5 Matin Place | Johnson Pilton Walker 3 | Maitland Art Gallery | Masters Contract Documentation 4 | WesTrac Tomago | Abigroup 5 | Terra-form Eyre | Digital Masters Research Studio


Macleay Museum Graduation Studio

Tutor | Genevieve Murray 2015 Adaptive reuse of the existing Macleay Museum proposing a large canopy intersecting the building and landscape. The canopy cantilevers over the entry plane reflecting the movement of people through the museum. The spiral ramp sweeps visitors to the galleries above and archive below winding back and forth through the museum. Large curtains divide the gallery and exhibition spaces to provide flexibility and porosity throughout the museum. The archive animates a clash of people and objects in a forest of columns that pierce through the landscape in to the public domain.

|1|


5 Martin Place

Johnson Pilton Walker | Architectural Assistant Director | Peter Blome 2014 High-rise in Sydney CBD completed July 2015. Worked on construction documentation throughout the building phase. Detailed design of through site link. All material copyright of JPW

|2|


Maitland Art Gallery Masters Contract Documentation Tutor | Peter Armstrong 2013 The project was for the all ready existing extension to the Maitland Regional Art Gallery. For this project we produced 24 construction drawings, specifications, schedules and cost control for the building project showing an ability to communicate this documentation to clients, statutory authorities, consultants, tenderers, contractors and sub-contractors. In collaboration with Courtney Owen, Vi Lee, Zoya Kuptsova and Kim Lange

B

8,840

SHOP FFL 8.9

ALUMINIUM FRAMED DOUBLE HEIGHT WINDOW AS SPECIFIED

2,875

D01

2

METAL DECK ROOF SHEETING AS SPECIFIED WITH 2DEG PITCH FIXED TO PURLINS

HATCH INDICATES EXTENT OF TIMBER FLOOR CONSTRUCTION

WINDOW OVER

D12

D11

EX

6,100

STORE

STORE

CONCRETE

SERVICES

3,740

D25

DECK

200

360

2,090

BIN STORE

1,925

3,260

KITCHEN STORE

KITCHEN

200 1,950

BIN STORE

200 2,175 200

110 1,125

STAIR

1,200

425

380

380

380

2,665

1,600

MALE

KITCHEN

4,500

110

KITCHEN

3,260

1,800

110

3,240 GALLERY B/2

8,440

6,570

DECK

5,370

DECK

8,290 3,400

27,460 477220

D.P. 581007 SITE AREA 5540.18 sqm

477222

BOUNDARY

435

01

PROPOSED GROUND FLOOR PLAN

DP

5,900

90

2,290

1,400

STORE

200

1,200

3,040 LIFT

STAIR

LOADING

FFL 8.9

FFL 8.9

1:100

NOTES ISSUE FOR TENDER

200

200

200

3,750

4,830 200

METAL BOLLARDS AS SPECIFIED

SELECT STYLE EXTERNAL CLADDING AS SPECIFIED. ALLOW TO PACK OUT WALL FOR ANGULAR CONSTRUCTION

ANGLED WALL OVER

1,975

BIFOLD DOOR HEADDATE INSTALLED TO 10/11/2013 MANUFACTURER'S DETAIL AS SPECIFIED

MAITLAND CITY COUNCIL

PROJECT

B

MAITLAND TECHNICAL COLLEGE 230 HIGH STREET MAITLAND NSW 2320

4,260

STOREROOM

8,380

200

4,220

LOADING

200

1,350

FIRE EXIT

DRAWING NO.

10,940

CD-03

|3|

REV

NOTES

A

ISSUE FOR TENDER

CLIENT

MAITLAND CITY COUNCIL

ARCHITECT

SCALE

- ALL INFORMATION CONTAINED ON THIS DRAW NO PART OF THIS DRAWING MAY BE COPIED O WITHOUT THE WRITTEN CONSENT OF THE AU - DO NOT SCALE FROM THIS DRAWING - CHECK ALL DIMENSIONS ON SITE - THE AUTHOR ACCEPTS NO LIABILITY FOR ANY ARISING FROM UNAUTHORISED USE OF ANY IN DRAWING

13mm PLASTERBOARD ON STEEL STUD FRAMING

atelier five

1:100 @ A1

350

INSULATION AS SPECIFIED

WILKINSON BUILDING 148 CITY ROAD DARLINGTON NSW 2320 ABN: 70 509 392 275 (e) studio@atelierfive.com (p) 02 9559 4595 (f) 02 9558 4582

STRUCTURAL UB BEAM TO ENGINEERS DETAILS

N

GROUND FLOOR PLAN

GALLERY B/1

200

NOT FOR CONSTRUCTIO

ACOUSTIC 50mm INSULATION, SISILATION AND SAFTEY MESH TO RUN UNDER ROOF SHEETING

RONDO SUSPENDED CEILING SYSTEM HUNG FROM ROOF PURLINS

EXTENSIONS TO THE MAITLAND REGIONAL ART GALLERY

DRAWING TITLE

HALL

METAL FLASHING AS SPECIFIED METAL DECK ROOF SHEETING AS SPECIFIED WITH 2DEG PITCH FIXED TO PURLINS

ROOF STRUCTURE TO ENGINEERS DETAILS

CLIENT

PO BOX 220 MAITLAND NSW 2320

BOLLARD COL

A 5,690

PICTURE STORE

PICTURE STORE

1:5

ROLLER DOOR TO LOADING DOCK TO MANUFACTURERS DETAIL

D20

CONCRETE

COL

2,080

90

HEAD/ CEILING/ ROOF DETAIL

BOLLARD

STOREROOM CONCRETE

RETAIN EXISTING GROUND LEVELS UNCHANGED

J

CD15

COL

D21

200

D19

6,200

SOFT LANDSCAPING

ALUMINIUM FRAMED SLIDING DOORS TO GALLERY BACK ROOMS TO MANUFACTURERS INSTRUCTIONS

FFL 8.9

D22

17,720

HR

CONCRETE

DP

STORE ROOMS

PICTURE STORE

COL

520

GATE

HR

5,050

HR

SETOUT POINT

STORE

STAIR

1,350

PRECAST CONCRETE WALLS TO ENG. DETAIL

HR

REV A

8,850

COL

5,773

D23

FFL 8.9

3,675

COL

TIMBER

STEEL FRAMED EXTERNAL STAIRS AS SPECIFIED AND TO SUIT BCA REQUIREMENTS

- ALL INFORMATION CONTAINED ON THIS DRAWING IS COPYRIGHT. STEEL STUD WALL NO PART OF THIS DRAWING MAY100mm BE COPIED OR REPRODUCED WITHOUT THE WRITTEN CONSENT OF THE AUTHOR. - DO NOT SCALE FROM THIS DRAWING - CHECK ALL DIMENSIONS ON SITE - THE AUTHOR ACCEPTS NO LIABILITY FOR ANY LOSS OR DAMAGE ARISING FROM UNAUTHORISED USE OF ANY INFORMATION ON THIS DRAWING

150634

FIRE EXIT

DECK

SIDE GARDEN

ALUMINIUM WINDOW INSTALLED TO MANUFACTURER'S DETAILS

NOT FOR CONSTRUCTION

9,250

REGIONAL ART GALLERY EXG. BRICK BUILDING TILED ROOF

D24

5

CONNECT DOWNPIPES TO NEW STORMWATER DRAINAGE SYSTEM IN ACCORDANCE WITH ENG. DETAIL

SHADOW GAP ANGLE

13mm PLASTERBOARD FIXED TO STEEL STUD WORK

4,400

No. 230

4,540

8,850

90

1340

FFL 8.9

2,290

SELECT STYLE EXTERNAL CLADDING ALLOW FOR INSULATION AND SARKING IN ACCORDANCE WITH SPECIFICATION

GALLERY B/1

INTERNAL PLASTERBOARD LINING WITH PAINT FINISH AS PER SPECIFICATION D18

D26

FIBRE CEMENT SHEETING TO BE FINISHED ACCORDING TO MAITLANDSPECIFICATION

200

RETAIN EXISTING GROUND LEVELS UNCHANGED

TIMBER

7

GLAZING AS SPECIFIED

NOTE 4: GPO QUANTITY, CELINGLOCATION AND TYPE TO BE CONFIRMED BY ELECTRICAL CONSULTANT

NOTE 5: ALL LIGHTING SYSTEMS, EXTERNAL LIGHTS, WALL LIGHTS AND MULTILIGHT SYSTEMS ARE TO HAVE REMOTE CONTROL SWITCHES LOCATING IN THE GROUND FLOOR STOREROOM

3,400

SOFT LANDSCAPING

NEW STEEL GUTTERS AND DOWNPIPES AS SPECIFIED

50mm INSULATION BATS AS SPECIFIED

NOTE 3: JOINERY LIGHTING TO BE CONFIRMED BY 13MM ELECTRICAL CONSULTANT PLASTERBOARD

D 17,735

EX

REAR GARDEN

STORE

6

ACCESS HATCH

NOTE 1: ALL CEILINGS ARE SET PLASTERBOARD UNLESS NOTED OTHERWISE

CONCRETE FOOT PATH

LIFT

CONCRETE FOOT PATH

FROM EXHAUST

IN-CEILING SPEAKERS

1,000

SERVICES

COL

RONDO SUSPENDED SYSTEM ROOF PURLINS

SWITCHCEILING

CONCRETE FFL 8.9

LIFT INSTALLED TO MANUFACTURERS SPECIFICATION

STORE

STORE

ex

GALLERY B/1

3,740

GALLERY B/1

COL

90

1,340

SMOKE DETECTOR X

NOTE 2: OUTDOOR LIGHTING TO BE ADVISED BY LANDSCAPE CONSULTANTS

FIBRE CEMENT SHEETING FIXED TO SUSPENDED CEILING SYSTEM

REINFORCED CONCRETE COLUMNS TO ENG. DETAIL

BRIDGE OVER

LIFT

STAIR

FFL 8.9

STEEL FRAMED STAIRS WITH TIMBER LINING AS SPECIFIED

200 2,160 200

3,420

VOID

860

90

PROVIDE NEW FRAMED WALL AS INDICATED TO ALLOW FOR SERVICES PROVIDE PLASTERBOARD AND PAINT FINISH AS SPECIFIED

STORMWATER PIT TO ENG. DETAIL

TIMBER

SERVICES

90

SERVICES

4

30mm FURRING CHANNEL

GALLERY B/2

13mm PLASTERBOARD

EXIT SIGN

NOTES

GALLERY B/1

GALLERY B/2

8,850

12,440

90 EX

1,795

EXISTING GALLERY

RETAIN AND MAKE GOOD EX. OPENINGS

RONDO SUSPENDED CEILING

WALL LIGHT

EX. ENTRY

REMAIN UNCHANGED UNLESS NOTED OTHERWISE

ALPOLIC CLADDING PANNEL WIITH SPECIFIED FINISH INSTALLED TO MANUFACTURER'S DETAILS

ADJUSTABLE DOWNLIGHT TO ENGINEERS JOINERY DOWNLIGHT DETAILS

FLUORESCENT BATTON

200UB BEAM TO ENGINEERS DETAILS

CONCRETE

SUSPENSION ROD SUPPORTED BY CONCRETE SLAB

FINISHED FLOOR LEVELS

RECESSED MULTILIGHTS

CONCRETE FOOT PATH

D

DOOR NUMBERS

30mm TOP HAT SECTIONS

200

FIRE EXIT

EX

90

D17

D14

WINDOW NUMBERS

D

EXIT

W06

COL

D15

D16

W

FFL

STEEL STUD WORK WITH ACOUSTIC INSULATION 150

EX

2,725

COL

CONCRETE SLAB TO ENGINEERS DETAILS

CONCRETE DOWNTURNED BEAM SUPPORTING SLAB AND PRECAST TO ENGINEERS DETAILS

ROOF PURLINS

7,310 REMAIN UNCHANGED UNLESS NOTED OTHERWISE

BRIDGE OVER

HATCH INDICATES EXTENT OF TIMBER FLOOR CONSTRUCTION

EXISTING DOORS

ELECTRICAL LEGEND

EXISTING GALLERY

D13

CORRUGATED SHEET METAL FIXED TO TOP HAT SECTIONS

NEW WINDOWS

EX STAIR UNCHANGED

FOYER

FFL 8.9

INSULATION

THICKENED STEEL PLATE OVER SERVICE DUCT

WALL CONSTRUCTION AS SPECIFIED

NEW DOORS

725

HIGH STR EET

ENTRANCE FOYER CONCRETE

SELECT STYLE EXTERNAL CLADDING AS SPEC.

C

ACOUSTIC 50mm INSULATION, SISILATION AND SAFTEY MESH TO RUN UNDER ROOF SHEETING

FFL 8.9

CONCRETE WITH PAINT SPECIFIED

INSULATION BATS

FIXING ANGLE FOR PRECAST TO CONCRETE SLAB

D10

W05

CONCRETE

SELECT ST CLADDING

EXG BUILD

EXG BUILDING RETAINED

1000H METAL HANDRAIL AND BALUSTRADES TO SUIT BCA REQUIREMENTS

PRECAST C WALLS TO E

100mm STEEL STUD FRAME

125mm TOP HAT SECTIONS

CONCRETE BLOCK WALLS WITH PAINT FINISH AS SPECIFIED

SS

AWNING OVER

MALE

2,400

TIMBER FLOOR CONSTRUCTION TO ENGINEERS DETAIL

FFL 8.9

CONCRETE

FIRE EXIT

1,125

110

FFL 8.9

TIMBER

200mm PRECAST CONCRETE TO ENGINEERS DETAILS

PRECAST CONCRETE WALLS TO ENG. DETAIL

AC CE

W04

TIMBER

2,130

W01

DECK

PROJECT LEGEND

13mm PLASTERBOARD FIXED TO STEEL STUD FRAME

BOX GUTTER COLUMN CONCRETE CHECK ON SITE CEMENT RENDER DOWNPIPE EXISTING FACE BRICK FIBRE CEMENT FINISHED FLOOR LEVEL FLOOR WASH GRATED DRAIN HAND BASIN HAND RAIL METAL ROOF SHEETING NATURAL GROUND LEVEL OVER FLOW PLASTERBOARD REDUCED LEVEL ROOF TILES RETAINING WALL TIMBER URINAL TOILET

378

TIMBER FLOORS AND DECKING ALLOW FOR INSULATION INTERNALLY AS SPECIFIED D09

CAFE

1,727 110

W03

SHOP

BUILDING OVER

C

STEEL FRAMED EXTERNAL STAIRS AS SPECIFIED AND TO SUIT BCA REQUIREMENTS

WINDOW OVER

REMOVE EX. WINDOWS TO ALLOW FOR NEW ALUMINIUM FRAMED BIFOLD DOORS. MAKE GOOD EX. AS REQUIRED

8,860

4

5

FFL 8.9

JOINERY

ENTRY

1

2

3

JOINERY

W02

FFL 8.9

CONCRETE

D08

FFL 7.4

D05

FRONT ENTRANCE

BIN STORE CONCRETE

D02

TILES

RW RW

FFL 8.9

D04

5,370

FEMALE WC

TILES FFL 8.9

TILES

5,460

D03

KITCHEN

7,310

FFL 8.9

TILES

FOYER

MALE WC

FFL 8.9

TILES

FOYER

DISABLED WC

D07

FFL 7.4

6,035

TILES

RL 8.9

CONCRETE

ALUMINIUM FRAMED WINDOWS AND DOORS

1,200

150

TILE FINISH TO EXTERNAL CONCRETE BLOCK WALLS

BIN STORE

KITCHEN STORE

BG COL CONC COS CR DP EX FB FC FFL FW GD HB HR MS NGL OF PB RL RT RW TIM UR WC

1,350

DECK

STORE

STORE

GARDEN

D06

A 1 PROJECT LEGEND

200

2,920

JOINERY

FRONT ENTRANCE

4,590

2,550

BIN STORE

JAMES STREET

RAMP GRADIENT 1:12

CONCRETE PATH RL 8.1

3

380 200

CAFE

KITCHEN

4,210

KITCHEN STORE

10,220

CAFE

110

110

FOYER

4,970

KITCHEN

8,860

10,980

110

6,035

3,300

MALE

1,140

RL 8.9

GRATED DRAINS TO ENG. DETAIL

ENTRY

110

B

TILED FINISH TO BLOCKWORK WALL AS SPECIFIED

6,650

110

MALE

905

200

4,310

110

RW

CONCRETE STAIRS, NATURAL FINISH

6,750

4,250 7,480

110

WINDOW OVER

HALL

2,590

DISABLED

A

BOUNDARY

RW

5,160

110

STORE

HALL

BOUNDARY

1,390 380 110

7,970

1,570

4,270

SET DOWN STRUCTURAL FLOOR LEVEL TO WET AREAS TO ENG. DETAIL

1 5,160

110

A 1

D

5,900 14,825

3445

FEMALE

SOFT LANDSCAPING

110 575 900

5,000

2,535

FEMALE

900H CEMENT RENDERED BLOCKWORK RETAINING WALLS TO ENG. DETAIL

C

2,480 380

PROVIDE AGG. LINE WITH GEOTECH FABRIC SLEEVE WITHIN AGGREGATE FILL AND DRAINAGE CELL PROTECTION TO W.P.M AS SPECIFIED

200

A 17,530 13,290

PRECAST CONCRETE WALL WITH POLISHED FINISH

DRAWN BY

50mm INSULATION BATS AS SPECIFIED

REVISION

A

PROJECT

EXTENSIONS TO THE MAITLAND REGIONAL ART GALLERY MAITLAND TECHNICAL COLLEGE 230 HIGH STREET MAITLAND NSW 2320

ARCHITECT

DATE

VL, ZK, CO, BP 15/11/2013

PO BOX 220 MAITLAND NSW 2320

13mm PLASTERBOARD CEILING PAINTED

K

CD15

WALL/ WINDOW/ ROOF DETAIL 1:5

atelier five

WILKINSON BUILDING 148 CITY ROAD DARLINGTON NSW 2320 ABN: 70 509 392 275 (e) studio@atelierfive.com (p) 02 9559 4595 (f) 02 9558 4582 DRAWING TITLE

DETAILS (3) SCALE

1:5 @ A1 DRAWING NO.

CD-19

DRAWN BY

VL, ZK, CO, BP


WesTrac Tomago

Abigroup | Document Controller Project Manager | Robert Lindquist 2013 WesTrac Facility with EJE Architects and ARUP on 24 hectare sie. Worked in the site office assisting the Project Manager and Project Engineer. Document Controller and Administration Assistant. All material copyright of EJE Architects

|4|


Terra-Form Eyre

Masters Digital Research Studio Tutor | Alex Jung 2013 This project was entered as part of the Evolo Skyscraper competition and proposed the terraformation of infertile land in central Australia. Through its capacity to seed clouds the vast structure enables the water within lake eyre to be retained permanently. Digital tools including rhino and grasshopper where used to develop the tensile structure. In partnership with Emma Mackeller

Vertical City: Existing modes of urban densiication cause desertiication. Natural vegetation prevents the nutrient rich bio-diverse topsoil from eroding. As demand on agricultural regions increases, this vegetatiation is removed. By concieving the city as vertical rather than horizontal it is possible to mitigate desertiication. Greater efficiency in transort and land usage also result. When urban and agricultural land is integrated, the city unit can become independant of external supply. It can expand limitlessly without affecting its efficiency. =

|5|

Structure:

The city is conceived as a singular structure- a physical manifestation of the conceptual ideal of a city that is ‘self supporting.’ The cloud seeding tower must be 600 metres tall in order for the air collumn to affect the troposphere . This height is enabled by percieving the structure like a suspension bridge. The large central pylon is in compresion while cables allow the bridge to be suspended. The entire city acts in tensionits form generated by efficient membrane structures exempliied in Frei- Otto’s Olympic stadium in Munich.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.