New Bedford River Walk Feasibility Study Update JUNE 2020
PREPARED FOR THE CITY OF NEW BEDFORD, MA BY: BROWN, RICHARDSON + ROWE STANTEC LEC ENVIRONMENTAL CONSULTING, AND WOODS HOLE GROUP
FUNDED BY:
THE COMMONWEALTH OF MASSACHUSETTS
GATEWAY CITY PARKS PROGRAM EXECUTIVE OFFICE OF ENERGY AND ENVIRONMENTAL AFFAIRS 1
ACKNOWLEDGMENTS CITY OF NEW BEDFORD
BROWN, RICHARDSON + ROWE
Christina R. Connelly
Nina Brown, RLA
Michele Paul, LSP
Althea Northcross
Tabitha Harkin, AICP
Sophie Morrill
Mary S. Rapoza Carlos Fragata Sarah Porter NEW BEDFORD HARBOR TRUSTEE COUNCIL
Steve Block Andy Jones Deborah Marshall-Hewlitt Karen Pelto EXECUTIVE OFFICE OF ENERGY AND ENVIRONMENTAL AFFAIRS GATEWAY CITY PARKS PROGRAM
Kurt Gaertner DEPARTMENT OF ENVIRONMENTAL PROTECTION
Cathy Kiley Carlos Fragata
STANTEC
Michael Paiewonsky, AICP Alison LeFlore, AICP Joe Salvetti, LSP WOODS HOLE GROUP
Kirk Bosma, PE LEC ENVIRONMENTAL CONSULTING
Mark Manganello
TABLE OF CONTENTS 1.0 INTRODUCTION AND VISION 1 1.1 Study Area Overview 4 1.2 Climate Risk and Resiliency Planning 26 1.3 Future Flooding and Storm Surge Conditions 26 1.4 Shoreline Stabilization 32 2.0 PLANNING GOAL 33 3.0 PLANNING CONSIDERATIONS 35 4.0 ENVIRONMENTAL PERMITS AND APPROVALS 37 4.1 State/Local Environmental Permits 37 4.2 Federal Environmental Permits 37 5.0 CONCEPTUAL COST ESTIMATES 39 6.0 RECOMMENDATIONS AND PHASING 41 6.1 Phase 6.2 Phase 6.3 Phase 6.4 Phase 6.5 Phase
1 43 2 45 3 47 4 49 5 51
7.0 RECOMMENDED NEXT STEPS 53 8.0 CONCLUSION 59
APPENDIX Appendix Appendix Appendix Appendix
A: Report Figures 63 B: Conceptual Cost Estimates 101 C: Acushnet River Upland Riparian Restoration Project 145 D: Upper Harbor Remediation Status (2019) 163
FIGURES Figure 1: Overall Concept Plan - River Walk Alignment and Potential Public Amenities 2 Figure 2: Regional Context and Study Aera 4 Figure 3: River Walk Parcels and Year Built 8 Figure 4: Existing Environmental Resources 12 Figure 5: FEMA Floodplain 14 Figure 6: Historic Resources 16 Figure 7: EPA Remediation Zones, Schedules, and Proposed Phasing 18 Figure 8: Hazardous Material Sites - MassDEP Release Tracking Numbers 24 Figure 9: MA-FRM Probability of Inundation (2030, 2050, 2070) 28 Figure 10: MA-FRM Flood Depths for 1% Annual Flood (100-Year Flood Event) (2030, 2050, 2070) 30 Figure 11: Phase 1 Detail Plan 42 Figure 12: Phase 2 Detail Plan 44 Figure 13: Phase 3 Detail Plan 46 Figure 14: Phase 4 Detail Plan 48 Figure 15: Phase 5 Detail Plan 50
TABLES Table 1: River Walk Parcels Ownership 6 Table 2: Hazardous Materials Sites and Release Tracking Numbers 22 Table 3: Tidal Benchmarks for Present Day, 2030, 2050, and 2070 Sea Level Rise Coastal Storms 27 Table 4: Summary of Trail Segments - Opportunities and Challenges - Presented in Sequential Order by Phase 54
1.0 INTRODUCTION AND VISION The City of New Bedford is developing planning and design recommendations for the New Bedford River Walk, a multiuse path adjacent to the west bank of the upper Acushnet River (Figure 1: Overall Concept Plan). This report serves as an update to the 2015 New Bedford Riverwalk Planning and Design feasibility study prepared for the City of New Bedford, Massachusetts Environmental Stewardship, by BSC Group and Shadley Associates. This Feasibility Study Update was also informed by the Acushnet River Upland Riparian Restoration Project (Appendix C).
construction sequence may change in the future. Conceptual cost estimates of each trail segment, and permitting requirements are also provided.
River Walk Development Proponents The New Bedford River Walk is being advanced through the efforts of the City of New Bedford, the Executive Office of Energy and Environmental Affairs and several state agencies. Federal agencies are involved in the remediation of the Superfund site.
Anticipated future completion of the remediation of the Acushnet River and the adjacent intertidal area has led the City of New Bedford to plan for public enhancements to the shoreline area of the upper Acushnet, including the River Walk. The River Walk will serve as the culmination of the City’s efforts to restore the Acushnet River and its adjacent shoreline into a safe and positive community amenity, encouraging passive recreational opportunities along the banks of the Acushnet River for city residents and visitors. The River Walk project is an opportunity to construct a linear park that will offer more access to the City’s waterfront and may offer a short-term benefit in the form of a modest buffer to rising sea levels.
City of New Bedford: Leading the overall River Walk coordination efforts, public engagement, and the acquisition of needed property easements. New Bedford Harbor Trustees Council (NBHTC): Agreed to provide up to $2.9 million of New Bedford Harbor Natural Resource Damage funds, subject to certain conditions being met. The NRD funds must be used for ecological restoration. Resource Damage (NRD) monies designated for the Acushnet River Upland Riparian Restoration Project. The U.S. Department of Commerce (DOC), acting through the National Oceanic and Atmospheric Administration (NOAA), U.S. Department of the Interior (DOI), acting through the U.S. Fish and Wildlife Service (USFWS), and the Commonwealth of Massachusetts, acting through the EOEEA and represented by MassDEP, collectively serve as the NBHTC, and are responsible for addressing the natural resource injuries that resulted from the contamination of the sediments, water column and biota in the New Bedford Harbor from PCBs as a result of industrial discharges to the Harbor.
The intent of this report is to assist the City of New Bedford by providing a more focused River Walk development plan. Included is an updated trail alignment based on observations of existing topographic and structural site constraints and known hazardous materials sites. The proposed trail alignment is also informed by future flooding conditions and coastal storm risk level data gathered for this study. The trail alignment also takes advantage of opportunities to incorporate intertidal and upland restoration areas and passive recreation areas.
U.S Environmental Protection Agency (EPA): Managing the remediation of the New Bedford Harbor Superfund site, responsible for remediation of New Bedford Harbor and the Acushnet River and intertidal area.
As displayed on Figure 1, the River Walk has been previously divided into 12 segments. To maintain continuity with previous studies, this report continues to evaluate the River Walk according to these segments. This report also recommends River Walk phases, i.e., adjacent segments built concurrently, and phased construction sequencing. Based on evolving conditions, the make-up of the River Walk phases and the
Massachusetts Executive Office of Energy and Environmental Affairs (EEA): Funding and participating in the review of this study and, as funds are available, may contribute some funding to the design and construction of the River Walk and associated features.
1
Ave n u e M a d e ir a Ave n u e M a d e ir a
et et mhaitn mSatrne S tr e W h itW
tr e e ttr e e t D a vis D aSvis S
TIE INTO EXISTING enue et Av n h s e Acu PATH NETWORK TIE INTO EXISTING venu net A Alignment h -PATH River Walk s u Ac NETWORK
ad ad N a shN aRsoh R o
tr e e ttr e e t E a rl eE aSrl e S
e ttr e e t S tr e S C o ll eCttoell e tt e
v e n uvee n u e P h il liPphsil liAp s A
nt N o rt h F ro
tr e e ttr e e t D e a nDee aSn e S
tr e e ttr e e t u llSa rd S B u ll aBrd
eet eet N y e NSytre S tr
e ttr e e t S tr e S T a ll m T aa lln m a n
tr e e ttr e e t H o ll yH oSll y S
StrereSt treet SSaw ear tw tryeSeS tryeee t B e e tlBee e tl e
Bentley Bentley Street Street tr e e ttr e e t B e e tlBee eStl e S
Ho wa r S tr e e t H o w a rd
e ttr e e t a mk hSatrme S T in kTh in
e ttr e e t e ttrEeaerlt eE aSrltree S y S trye S H a thHaawtha a w a
Figure 1: Overall Concept Plan and Potential Public A FIGURE 1 Figure 1: Overall Concept Plan - River Walk Alignment and Potential Public A
OVERALL CONCEPT PLAN - RIVER WALK ALIGNMENT AND PO et ro n t S tr e lle Avenue Bellevi
SEGMENT SEGMENT 6 6
2
SEGMENT SEGMENT 7 7
N N
ad ad N a shN aRsoh R o
1,000
SEGMENT SEGMENT 6 6
750
e ttr e e t a mk hSatrme S T in kTh in
PHASE 2 PHASE 2
WEST ZONE 4 Anticipated Completio WEST ZONE Subject to EPA Fun4 Anticipated Completio Subject to EPA Fun
SEGMENT SEGMENT 5 5
500
e ttr e e t S tr e te S o ma ne ot m ManM
1,000
SEGMENT SEGMENT 6 6
250
750
SEGMENT SEGMENT 5 5
SEGMENT SEGMENT 4 4
0
500
SEGMENT SEGMENT 5 5
Anticipated Completion 2024 WEST ZONE 5 Subject to EPA Funding Anticipated Completion 2024 Subject to EPA Funding
WEST ZONE 5 Anticipated Completion 2024 WEST ZONE 5 Subject to EPA Funding Anticipated Completion 2024 Subject to EPA Funding
¸¸
250
e ttr e e t y S trye S H a thHaawtha a w a
e ttr e e t S tr e te S o ma ne ot m ManM
SEGMENT SEGMENT 4 4
BUILDING TO BE REMOVED PHASE 2BUILDING TO BE REMOVED PHASE 2 OVERLOOK + PIER WEST ZONE+5PIER OVERLOOK
LEGEND LEGEND
Feet Feet
RESTORAT
Riverside Avenue BUILDING TO BE REMOVED Whaler’s Care CLIFTEX Corp. Riverside Avenue Whaler’s Place Assisted Living BUILDING TO BE REMOVED Whaler’s Care CLIFTEX Corp. Whaler’s Place PAssisted Living erside PIER American ictoria Riv VP Engineered iverside PIER American Fabrics Victoria R Engineered Fabrics SEGMENT SEGMENT 5 5
SAWYER STREET FACILITY SAWYER OWNED BY CITY OFSTREET NEW BEDFORD Leased to FACILITY EPA until May 2026 OWNED BY CITY OF NEW BEDFORD Leased to EPA until May 2026
SEGMENT SEGMENT 4 4
PHASE 4 PHASE 4
De EXPANDED ECOLOGIC De RESTORATION ZON EXPANDED ECOLOGIC RESTORATION ZON
RESTORATION ZONE
ood /ood / LustiaLnuostFianogF g r Platin tatin Star PSla
SEGMENT SEGMENT 3 3
SEGMENT SEGMENT 3 3
SEGMENT SEGMENT 2 2
SEGMENT SEGMENT 1 1
REMEDIATION SEQUENCE
SEGMENT SEGMENT 2 2
SEGMENT SEGMENT 1 1
SAWYER STREET FACILITY SAWYER OWNED BY CITY OFSTREET NEW BEDFORD Leased to FACILITY EPA until May 2026 OWNED BY CITY OF NEW BEDFORD Leased to EPA until May 2026
Hope Stree t enue v A a ir e d Ma Hope Stree t Ave n u e a ir e d a M
Bell Avenue Riverside evill e Av Whaler’s Care HopeR enuCLIFTEX Corp. Bell Avenue Riverside Whaler’s Place e ev Assisted Living Whaler’s Care ille Ave CLIFTEX Corp. HopeR nue Whaler’s Place Powder Pro PAssisted Living ide AmericanPUBLIC Powder Pro ria Rivers PLAZA, ictoPARKING, VP Engineered e id American rs EXPANDED E AND EXPANDED Fabrics ria Rive ECOLOGICAL PUBLIC PLAZA, VictoPARKING, Engineered RESTORAT RESTORATION ZONE E AND EXPANDED ECOLOGICAL EXPANDED Fabrics
OVERLOOK + OVERLOOK +
EXPANDED ECOLOGICAL RESTORATION ZONE EXPANDED ECOLOGICAL RESTORATION ZONE
CANOE LAUNCH CANOE LAUNCH PHASE 4 PHASE 4
PLANNED EPA REMEDIATION PLANNEDSEQUENCE EPA
SEGMENT SEGMENT 4 4
SEGMENT SEGMENT 3 3
SEGMENT SEGMENT 3 3
SEGMENT SEGMENT 2 2
SEGMENT SEGMENT 1 1
SEGMENT SEGMENT 2 2
7-Eleven
tr e e ttr e e t D a vis D aSvis S
ood /ood / LustiaLnuostFianogF g r Platin tatin Star PSla
Sawyer Street EXPANDED ECOLOGICAL Facility / Jacobs RESTORATION ZONE Sawyer Street EXPANDED Engineering Work Zone ECOLOGICAL Facility / Jacobs ZONE EngineeringRESTORATION Work Zone
7-Eleven SEGMENT SEGMENT 1 1
Street Street shallshall Cogge Cogge
CANOE LAUNCH Taco BellLAUNCH CANOE P Taco Bell P
0
e ttr e e t S tr e S C o ll eCttoell e tt e
e
ue ue inoAffvine nA v e n C o ff C
RIVERSIDE PARK
7-Eleven
REMEDIATION SEQUENCE
v e n uvee n u e P h il liPphsil liAp s A
tr e e ttr e e t D e a nDee aSn e S
tr e e ttr e e t u llSa rd S B u ll aBrd
eet eet N y e NSytre S tr
e ttr e e t S tr e S T a ll m T aa lln m a n
tr e e ttr e e t H o ll yH oSll y S
Street Street shallshall Cogge Cogge
Sawyer Work StreetZone Engineering Taco Bellit c h e ll S tr e e t Facility / Jacobs M The Zone P Engineering RopeWork Taco Bellit c h e ll S tr e e t w et k M s Thorks a P Marketb Rope e works sket etba 7-Eleven Mark
PLANNED EPA REMEDIATION PLANNEDSEQUENCE EPA
Bell
ville TIE INTO EXISTING Ave Bell nue The evill PATH NETWORK e Av Rope TIE INTO EXISTING w enu e Thorks PATH NETWORK Rope e works PUBLIC PARKING, PLAZA, AND EXPANDED ECOLOGICAL PUBLIC PARKING, PLAZA, Belleville Avenue RESTORATION ZONE AND EXPANDED ECOLOGICAL Belleville Avenue Sawyer Street RESTORATION ZONE RIVERSIDE PARK Facility / Jacobs treet treet SawySear wSyer S
S tr e e t M it c h e ll sket etba Mark sket etba Mark
RIVERSIDE PARK RIVERSIDE PARK
N o rt h F n t S tr e e t N o rt h F ro
ue ue inoAffvine nA v e n C o ff C
Belleville Avenue
tr e e ttr e e t B e e tlBee eStl e S
M it c h e
S tr e e t H o w a rd S tr e e t H o w a rd ll S tr e e t
Proposed River Walk Path Proposed River Walk Path River Walk Follows Existing Path Driveway River+Walk Follows Existing Path + Driveway Proposed Onroad River WalkOnroad Extension Proposed River Walk Extension Proposed River Walk Path
Anticip Sub Anticip Sub
Irvi ngt on Co et urt Co nc or d St re Irvi ngtStonre Co et urt Co nc or d
BROOKLAWN PARK BROOKLAWN PARK
Edna Stree t
Sowle Stree t
Brooklawn Brooklawn Court Court
anncStanreeStt ree t Du ncDu
et re et d St or re Cl iff or Cl diffSt et re et St re ll ve ll St Co veCo
ueen ue AvalenAv alntr Ce ntr Ce
R o a dR o a d B e ll eBveillllee v il le
e ttr e e t iae S g eSntr E u g eEnuia
et et mhaitn mSatrne S tr e W h itW
tchreeStt ree t Ha tch HaSt
OTENTIAL PUBLIC AMENITIES M er ril l St re et M er ril l St re et
Brooklawn Brooklawn Street Street
t ee t ree n Str
et re et Stonre St
t re et ee ee t reStS tr et w
e ttr e e t S tr ry rye S Q ueue Q ue ue en AvalenAv alntr Ce ntr Ce
e ttr e e t S e ttr e e t oenn nSotrne S et et B a teBsaStetrse S tr e
R o a dR o a d e ll eBveillllee v il le
e ttr e e t iae S g eSntr E u g eEnuia
Amenities Amenities
Wa l Sowle Stree t Ve rn on St re et Sowle Stree t Ve rn on St re et Co nd ui t St re et eet F e lt o n S tr Co nd ui t St re et S tr e e t Field ing StreeFt e lt o n Stree t Field ing StreeEdna t
Pico Stone Imports and Pico Stone Supply Co. Imports and Supply Co.
SEGMENT 12 12 SEGMENT
WEST ZONE 1 Anticipated Completion 2020 WEST ZONE 1 Anticipated Completion 2020
John’s Auto / SK Machine John’s Auto / SK Machine
Wood Wood Street Street
Sylv Sylv ia Stre ia Stre et et
CTS
Wood Wood Street Street
SEGMENT SEGMENT 12 12
OVERLOOK + PIER OVERLOOK + PIER
WEST ZONE 1 Anticipated Completion 2020 WEST ZONE 1 Anticipated Completion 2020
SEGMENT 12 12 SEGMENT
SEGMENT 11 11 SEGMENT
PHASE 5 PHASE 5
Brooklawn Brooklawn Court Court
Sylv Sylv ia Stre ia Stre et et Howa Howa rd Avenu rd Avenu e e
PerryPerry Street Street
Precix Precix / Acushnet / Acushnet Rubber Rubber
Supply Co.
CTS
AEROVOX SITE NOW OWNED BY SITE CITYAEROVOX OF NEW BEDFORD NOW OWNED BY TBD Anticipated Completion CITY OF NEW BEDFORD Anticipated Completion TBD
Gateways and Promontories Gateways and Promontories Buildings With Highest Flood Risk - 2030 Buildings With Highest Flood Risk - 2030 Buildings With Highest Flood Risk - 2050 Buildings With Highest Flood Risk - 2050 Gateways and Promontories
RiverRiver RoadRoad
WEST ZONE 2 Anticipated Completion 2023 WEST ZONE 2 Subject to EPA Funding Anticipated Completion 2023 Subject to EPA Funding
SEGMENT 11 11 SEGMENT
SEGMENT 10 10 SEGMENT
AEROVOX SITE NOW OWNED BY SITE CITYAEROVOX OF NEW BEDFORD NOW OWNED BY TBD Anticipated Completion CITY OF NEW BEDFORD Anticipated Completion TBD
PHASE 3 PHASE 3
Howa Howa rd Avenu rd Avenu e e
PerryPerry Street Street
Former Aerovox Former Site Aerovox Site
SEGMENT SEGMENT 12 12
SEGMENT SEGMENT 11 11
PHASE 5 PHASE 5
3
Existing Shoreline
SEGMENT SEGMENT 11 11
ny / Titleist ny / Titleist et Compa et Compa Acushn Acushn
SEGMENT 9 SEGMENT 9
SEGMENT 10 10 SEGMENT
WEST ZONE 2 Anticipated Completion 2023 WEST ZONE 2 Subject to EPA Funding Anticipated Completion 2023 Subject to EPA Funding
WEST ZONE 3 Anticipated Completion 2023 WEST ZONE 3 Subject to EPA Funding Anticipated Completion 2023 Subject to EPA Funding
Existing Shoreline Existing Shoreline Municipal Park Municipal Park Building to be Removed Building to be Removed
PHASE 3 PHASE 3
SEGMENT SEGMENT 10 10
SEGMENT SEGMENT 9 9
WEST ZONE 4 pated Completion 2024 WEST ZONE 4 bject to EPA Funding pated Completion 2024 bject to EPA Funding
SEGMENT 9 SEGMENT 9
PHASE 1 PHASE 1
SEGMENT 8 SEGMENT 8
SEGMENT 8 SEGMENT 8
SEGMENT 7 SEGMENT 7
SEGMENT 6 SEGMENT 6
SEGMENT 7 SEGMENT 7
WEST ZONE 3 Anticipated Completion 2023 WEST ZONE 3 Subject to EPA Funding Anticipated Completion 2023 Subject to EPA Funding
SEGMENT SEGMENT 10 10
SEGMENT SEGMENT 9 9
SEGMENT SEGMENT 8 8
SEGMENT SEGMENT 8 8
SEGMENT SEGMENT 7 7
PHASE 1 PHASE 1
Precix Precix / Acushnet / Acushnet Rubber Rubber anncStanreeStt ree t Du ncDu RiverRiver RoadRoad
St ree y Stt ree t Ha dle Haydle
et re et St re t veCo ll ve ll St St ree y Stt reeCo Ha dle Haydle
Mills
Powder Pro
4 on 2024 4 nding on 2024 nding
ny / Titleist ny / Titleist et Compa et Compa Acushn Acushn
Powder Pro
tchreeStt ree t Ha tch HaSt
et et B a teBsaStetrse S tr e
Sowle Stree t RIVER WALK FOLLOWS Irvi ngt on Co urt ee t tr S ly Co nd ui t St re et e aFOLLOWS EXISTING AND H PATH RIVER WALK ONROAD CONNECTIONS TO t e Irvi e ngt on Co urt DRIVEWAY Co nd ui t St re et e a ly S trAND EXISTING H PATH NEIGHBORHOOD AND PARKS ONROAD CONNECTIONS TO TO BROOKLAWN BROOKLAWN PARK Field ing Stree t DRIVEWAY NEIGHBORHOOD AND PARKS TO BROOKLAWN PARK Street Kearsarge BROOKLAWN PARK Field ing Stree t esautels Street CAL PARK Street POSSIBLE PASSIVE Kearsarge esautels Street NE TO RIVERS END CAL RECREATION AREA etPOSSIBLE re St PASSIVE l ril er M PARK END NE TO RIVERS Belleville Avenue RECREATION AREA et re l St M er rilFOLLOWS PARK Party Belleville Avenue t Lofts RIVER WALK US Stree eRiver Darn It! Inc. P Bank Nashawena Company et East e tr S ly Party e aUS EXISTING AND Darn It! Inc. H PATH WALK FOLLOWS Mills ONROAD CONNECTIONS TO t Lofts RIVER Stree eRiver P Bank Nashawena Company et eEast tr S DRIVEWAY ly a e EXISTING PATH AND H Former NEIGHBORHOOD AND PARKS Mills ONROAD CONNECTIONS TO TO BROOKLAWN Aerovox DRIVEWAY NEIGHBORHOODFormer AND PARK Site PARKS TO BROOKLAWN Desautels Street Aerovox Kearsarge Street ECOLOGICAL PARK Site Street POSSIBLE PASSIVE Kearsarge Desautels Street TION ZONE OVERLOOK + TO PIER RIVERS END ECOLOGICAL RECREATION AREA POSSIBLE PASSIVE PARK END TION ZONE OVERLOOK + TO PIER RIVERS Belleville Avenue RECREATION AREA Pico Stone John’s Auto / PARK US Party Belleville Avenue Imports and SK Machine Darn It! Inc. P River Bank Lofts CTS Nashawena Company East Pico Stone Supply Co. John’s Auto / US Party Mills Imports and SK Machine Darn It! Inc. P River Bank Lofts CTS Nashawena Company East
FIGURE 2
Massachusetts Department of Environmental Protection (MassDEP): Providing technical assistance and regulatory compliance approvals (MA Wetlands Protection Act and Chapter 91). MassDEP also serves as a liaison with NBHTC.
REGIONAL CONTEXT AND Figure 2: Regional Context and Study Area
River Walk Development Timeline 44 or The River Walk development will happen in phases, £ ¤ groupings of segments over time. This development will be contingent upon the completion of the EPA’s cleanup efforts, which could be finished in 2026, depending upon the 118 availability of funding. Å õ
õ Å 1 40
õ Å
1 38
6 £ ¤
1.1
Study Area Overview
58 " )
¦ ¨ § ¦ ¨ § 49 5
49 5
79 " )
õ Å
1 36
1 05
1 05
24 " )
6 £ ¤ Although the exact date of EPA’s completion cannot be known 1 36 õ Å in advance, the following construction dates and costs118are Å õ calculated using the above assumption. Some permitting 1 03 79 õ Å 1 38 " ) õ Å efforts may be able to take place in advance.
28 " )
õ Å õ Å
79 " )
18 " )
28 " )
6 £ ¤
25 " ) 28 6 " ) £ ¤
£ ¤
õ Å 1 05
õ Å 1 05
24 " )
õ Å 1 40
¦ ¨ § 19 5
õ Å 1 38
81 " ) 24 " ) 24 " )
The proposed River Walk study area includes approximately two miles along the west bank of the upper Acushnet River in New Bedford, between Coggeshall Street and Wood Street. The Acushnet River forms the eastern municipal boundary of New Bedford and the River Walk study area. To the west, the study area is bounded by (south to north) Sawyer Avenue, Belleville Avenue, Coffin Street, Riverside Avenue, and Belleville Avenue to Wood Street (Figure 2: Regional Context and Study Area). The existing land uses and environmental resources are described below.
CITY OF NEW BEDFORD MAP INSET
¦ ¨ §
" )
19 5
18
õ Å 1 77
õ Å
6 £ ¤ 6 £ ¤ 6 £ ¤
6 £ ¤
1 77
Å õ 2 8A
¸
88 " )
0
5 Miles
88 " )
õ Å 1 40
Source: Esri
4
STUDY AREA WOOD STREET
3A " )
± ³
" )3
BELLEVILLE AVENUE
4
6 £ ¤ 6 28 £ ¤ " )
6 £ ¤
18 " )
6A " )
õ Å 1 30
6 £ ¤
õ Å õ Å 1 32
1 32
õ Å õ Å " ) 1 49
28
1 32
28
1 49
õ Å õ Å 1 51
Acushnet River
RIVERSIDE AVENUE
1 40
hnet f Achus Town o ven f Fairha Town o
COFFIN AVENUE BELLEVILLE AVENUE
" ) 28
õ Å ")
i, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
± ³
COGGESHALL STREET 17
± ³
16
± ³
6 £ ¤
¦ ¨ §
± ³
15
14
19 5
View of the Acushnet River from the proposed River Walk. 5
¸
¦ ¨ § 19 5
0
0.2 Miles
TABLE 1
RIVER WALK PARCELS OWNERSHIP MAP KEY
PARCEL ID
YEAR BUILT
ADDRESS
OWNER
A
93-265
n/a
SS Sawyer Street
USACE
Y
B
93-263
n/a
SS Sawyer Street
The Pierpont Group II LLC
Y
C
93-120
n/a
NS Sawyer Street
City of New Bedford Park Department
D
93-220
n/a
ES Bellville Street
City of New Bedford
E
99-81
n/a
ES Bellville Street
City of New Bedford
F
100-83
n/a
SS Coffin Avenue
City of New Bedford Riverside Playground
G
100-84
n/a
SS Coffin Avenue
City of New Bedford Sewer Department
H
100-140
1896
50, 52 Coffin Avenue
Beira Properties LLC
I
100-85
1896
12 Coffin Avenue
K Seven Realty Trust
J
100-120
1910
1 Coffin Avenue
K Seven Realty Trust
Y
K
100-122
1910
19 Coffin Avenue
K Seven Realty Trust
Y
L
100-117
1904
1 R Coffin Avenue
Beit Medrash of Great Neck Inc DBA Teen Counseling Foundation
Y
M
100-138
1910
90 Riverside Avenue
Riverside Avenue Limited Partnership C/o Marina Kushilovskaya
N
100-82
n/a
ES Riverside Avenue
City of New Bedford
O
100-123
1910
114 Riverside Avenue
Whalers cove Limited Partnership
P
100-118
1919
10 Manomet Street
Victoria Riverside LLC C/o Acorn Inc
Y
Q
105-207
n/a
NS Manomet Street
Mackay Realty LLC
Y
R
105-208
n/a
NS R Manomet Street
City of New Bedford
S
105-135
1903
170 Riverside Avenue
Cliftex Lofts LLC c/o Winn Company
T
105-209
n/a
ES Riverside Avenue
City of New Bedford
U
105-206
1903
ES Riverside Avenue
Riverside Lofts Limited Partnership C/O Winn Company
V
105-183
1925
194 R Riverside Avenue
Salgado’s Riverside LLC
W
105-181
n/a
ES Riverside Avenue
Riverside Lofts Limited Partnership C/O Winn Company
X
105-170
1903
200 Riverside Avenue
Riverbank Lofts LLC C/O Acorn Inc
Y
Y
111-155
n/a
ES Belleville Avenue
Riverbank Lofts LLC C/O Acorn Inc
Y
Z
111-99
1984
618 Belleville Avenue
City of New Bedford Intercepting Sewer
A1
111-160
n/a
ES R Belleville Avenue
City of New Bedford
B1
111-98
1909
620 Belleville Avenue
Nashawena Mills Corp
C1
111-152
n/a
616 Belleville Road
Commonwealth Electric Co C/O Property Tax Department
D1
111-146
1903
630, 686 Belleville Avenue
Darn It Realty LLC
Y
E1
112-133
1903
700 Belleville Avenue
Acushnet Company Co/o Sue Brenner
Y
F1
112-88
n/a
740 Belleville Avenue
740 Belleville Avenue LLC C/o City of New Bedford
G1
112-252
n/a
ES Belleville Avenue
City of New Bedford
H1
116-67
1914
74 Howard Avenue
Acushnet Rubber Company LLC
* Construction access and conservation easements may also be necessary for City Owned Parcels 6
EASEMENT NEEDED*
Y
Y
Land Uses
85-acre city-owned Brooklawn Park features playing fields, walking trails, grassed and wooded lawn areas. Riverside Park, at the southern end of the River Walk corridor, is an approximately 20 acre city-owned park featuring playing fields, walking trails, raised gardens, children’s play area, and grassed areas. Immediately south of Riverside Park is EPA’s fenced Sawyer Street facility which serves as a staging area for the New Bedford Harbor Superfund Site remediation program (See Figure 2: Regional Context and Study Area and Figure 4: Existing Environmental Resources). The Sawyer Street Facility is owned by the City and leased to EPA.
The study area is adjacent to numerous historic mill buildings, with some recently converted to residential apartments and others remaining in industrial or commercial uses or awaiting redevelopment. Existing buildings may be removed in the future. Figure 3: River Walk Parcels and Year Built presents parcel boundaries and year built for selected properties in the study area. Property ownership for these parcels can be found in Table 1. The Table also indicates those properties upon which an easement will be needed for River Walk construction. At the edge of New Bedford’s urban North End sits The Acushnet Sawmill, a 19-acre former industrial lumber yard on the Acushnet River. The Sawmill is part of the growing Acushnet River Reserve, which also includes LaPalme Farm, Hamlin Crossing, and P.J. Keating Woods. Moving southerly from this northern mouth of the river is Rivers End Park, the northern terminus proposed for River Walk. West of the River Walk corridor are large areas of densely developed residential neighborhoods, consisting predominantly of multifamily homes. Approximately 1/3-mile west of the River Walk, the
The study area is rich in Historic Resources and is the home of numerous large textile mills and associated structures constructed in the late 19th and early 20th century. Many of these structures have been individually listed in the National Register of Historic Places and are included in National Register-listed Historic Districts. Further, within the study area, the Manomet Mills and Whitman Mills complexes are designated as National Register-listed Historic Districts (See Figure 6: Historic Resources).
Commercial, industrial, and residential buildings along the River Walk. Bottom Left, Riverside Park 7
S tr e eSt tr e e t m tr ek he at m T in k hTSain T in k h a m
et et t eet S tr e mSaetrnteoSemtr M a n ot M Man o me
et et t eet S tr e mSaetrnteoSemtr M a n ot M Man o me
SEGMENT SEGMENT 6 6 SEGMENT 6 SEGMENT SEGMENT 5 5 SEGMENT 5
PHASE 2
LEGEND LEGEND
Proposed River Walk Path
E
River Walk Follows Existing Proposed River Walk Path Path Driveway River+ Walk Follows Existing Path + Driveway Proposed Onroad RiverWalk WalkExtension Follows Existing River Proposed Onroad Path + Driveway River Walk Extension ProposedProposed Onroad River Walk Path River WalkProposed ExtensionRiver Walk Path River Walk Follows Existing Proposed River Walk Path Path Driveway River+ Walk Follows Existing Path + Driveway
M
LEGEND Proposed River Walk Path
0
250 250
0
250
500 Feet 500
750 750
1,000 1,000
500
750
1,000
Feet Feet
¸¸¸ ¸¸
0
SEGMENT SEGMENT 7 7 SEGMENT 7 SEGMENT SEGMENT 6 6 SEGMENT 6
SEGMENT SEGMENT 6 6 SEGMENT 6 SEGMENT SEGMENT 5 5 SEGMENT 5
SEGMENT SEGMENT 5 5 SEGMENT 5 SEGMENT SEGMENT 4 4 SEGMENT 4
PHASE 2 PHASE 2
PHASE 4
Feet Feet
ad ad daosh R o N a shaNR N a sh R o
et et t aey S tr e a w atryeaSewtr S tr e eSt tr e e t H a thHaawtha yHSa th m tr ek he at m T in k hTSain T in k h a m
t t e eSeaetr trlt eeeS tr e e tr e ae rlt tr tryEeaSaewrlt aEey SStr eE H a th ayHwSaath H a th a w a
SEGMENT SEGMENT 5 5 SEGMENT 5 SEGMENT SEGMENT 4 4 SEGMENT 4
PHASE 4 PHASE 4
Whaler’sRiverside Care Avenue CLIFTEX Corp. Assisted Living Whaler’s Care CLIFTEX Corp. Avenue AssistedRiverside Living P Whaler’sersCare e id CLIFTEX Corp. iv ria R Living Assisted Victo iverside Victoria R
Q T Whaler’s Place J N T American Whaler’s J N Place Q Engineered American P Fabrics J LL Engineered N P Q RR T VV Fabrics American iverside Victoria R Engineered R L Fabrics P V Q T J N Q T J 2 N PHASE PHASE J LL2 N PP Q RR T V PHASE 2 R L P
SEGMENT SEGMENT 4 4 SEGMENT 4 SEGMENT SEGMENT 3 3 SEGMENT 3
SEGMENT SEGMENT 3 3 SEGMENT 3 SEGMENT SEGMENT 2 2 SEGMENT 2
SEGMENT SEGMENT 1 1 SEGMENT 1
SEGMENT SEGMENT 2 2 SEGMENT 2 SEGMENT SEGMENT 1 1 SEGMENT 1
PHASE 4
Fabrics Whaler’s Place
oondo /Food / F/ia Lust FonLooudst o ia tinrgPlating LustianS lata tar PgS Star Platin
PHASE 4
PROVI
Ave n u e M a d e ir a Hope Stree t Ave n u e M a d e ir a Hope Stree t Ave n u e M a d e ir a Hope Stree t
KG KG M O S U DesDeW KG M OB S U ellev ille A M O S U HopeDeS ve Riverside Bell Avenue evill nue eAvenue Whaler’sRiverside Care Ave CLIFTEX Corp. Hope Riv Whaler’s Place nue Assisted Living Bell K evill Whaler’s Care eAvenue Whaler’s Place Ave CLIFTEX Corp. Powder Pro HopeR AssistedRiverside Living nue K Whaler’sersCare R ide American Whaler’s Place M ria Riv Living O CLIFTEX Corp.SPowder ProU Assisted Victo Engineered K e id American ivers Fabrics O SPowder Pro U Victoria R Engineered M Fabrics e id American rs e iv O U Victoria R Riverside Avenue S Engineered M
oondo /Food / F/ia Lust FonLooudst o ia tinrgPlating LustianS lata tar PgS Star Platin
SEGMENT SEGMENT 4 4 SEGMENT 4 SEGMENT SEGMENT 3 3 SEGMENT 3
SEGMENT SEGMENT 3 3 SEGMENT 3 SEGMENT SEGMENT 2 2 SEGMENT 2
SEGMENT SEGMENT 2 2 SEGMENT 2 SEGMENT SEGMENT 1 1 SEGMENT 1
SEGMENT SEGMENT 1 1 SEGMENT 1
StreetStreet shall shall CoggeCogge Cogge shall Street
StreetStreet shall shall CoggeCogge
PARK B e t Sawyer StreetBelleville AvenueRIVERSIDE RIVERSIDE PARK S tr e Facility / Jacobs M it c h e ll B SawyerWork Street T h Engineering Zone e Rope/ Jacobs Taco Bell c h e ll S tr e e t Facility RIVERSIDE PARK wTorks M it ket B asEngineering he Zone b H t Sawyer Street e RopeWork k Taco Bell r a t e works tr e SM sketFacility / Jacobs a b M it c h e ll H t e The Zone Mark Engineering RopeWork Taco Bell w t orks ske 7-Eleven etba IH Mark 7-Eleven I B Sawyer Street Facility / Jacobs 7-Eleven B Engineering SawyerWork Street I Zone Facility / Jacobs A Taco Bell B C Engineering H Sawyer Work StreetZone A Taco Bell C Facility / Jacobs H Engineering Work Zone Taco Bell A C 7-Eleven IH 7-Eleven I 7-Eleven I A C A C A C4 PHASE
e eSt tr e e t isD tvis eSeatr D a vtr D a vis S
Belleville
F F F
llevi lle Bell Avenu e evill e Av enu e Bell evill e Av enu e
v e n u ev e n u e e nAouffein A C o ff in vC C o ff in A
DRIVERSIDE PARKE D E lle Avenue BelleviD E Avenue
v e n u ev e n u e e nAouffein A C o ff in vC C o ff in A tr e e t tr e e t D e a ntreDeeSeatn e S De an e S
RIVERSIDE PARK
S tr e eSt tr e e t B u ll aSrd Btruelleat rd B u ll a rd
t t t yeeeS tr e e N y eeSeNtr N y e S tr
S tr e eSt tr e e t T a ll mSTatranell emta n T a ll m a n
treet treet SawytreSer eaStwyer S Sawyer S
tr e e t tr e e t B e e tltreBeeSeettl e S B e e tl e S
Ho t S tr e e M it c h e ll Th Rope e S tr e e t wTorks et M it c h e ll k s a h et tb Rope e k r a e w M t e tr orks e S k ll s M it c h e etba Th Mark Rope e works sket etba k r a M
tr e e t tr e e t H o lltryeHSeot ll y S H o ll y S
D G E F Ave n u e D G E F t S tr e e t M a d e ir a o rt h F ro n N Figure Parcels and Year Built e t River Walk S tr e3: n t S tr e e t lle Avenue BelleviD H o w a rd FIGURE 3 G E F N o rt h F ro Figure 3: River Walk Parcels and Year Built t e S tr e Belleville Avenue H o w a rd n t S tr e e t N o rt h F ro RIVER WALK PARCELS AND YEAR BUILT (PARCEL INFORMATION RIVERSIDE PARK Figure 3: River Walk Parcels and Year Built t e e Be Belleville Avenue w a rd S tr
S tr e eSt tr e e t mW Satrhnite emta n
ad ad aRsohaNR daosh R o
Ave n u e M a d e ir a Ave n u e M a d e ir a
tr e e t tr e e t Ee aSrltreeESeatrl e S
et et tttee S tr e ll e tt e llSeetr e eSt tr e eCt o ll C e tto e SCtroe isD tvis eSeatr DsaSvtr
A v e n uAev e n u e AipPvshe ilnliupes
nu e nu e il li p s ilAliuvpees A v e S tr e eSt tr e e t P h il liPphs APvhe n eStt Ctreoelleettt e
hnet Acus ue Aven hnet Acus
et et tnee S tr e aSntreDeeSeatr
e eSt tr e e t rd S trrd dll aSBtruelleat
t t t yeeeS tr e e NSytreeSeNtr
et et taen S tr e ll m a nllSemtr maa n STtra e
t t t lleyeS tr e e ll y S tr lyH oS tr eHeo
r Streert Street trSeaewtSytreSeeaetwt ye eaSeewttlyer S
entley StreetStreet et et ttlee S tr e eetB e e tl eBeeSeetr e e tl e S tr
Ho
N N N
N
8
B
Brooklawn oklawn StreetStreet wn Street
et
BROOKLAWN PARK Brooklawn Brooklawn CourtCourt Brooklawn Court
Field ing Stree t Co nd ui t St re et Field ing Stree t
Brooklawn Brooklawn CourtCourt Brooklawn Court Sylv iaSylv iaetStre et Sylv ia StreStre et HowaHowa rd Avenu rd Avenu e e Howa rd Avenu e
Former
Sylv iaSylv iaetStre et Sylv ia StreStre et
SEGMENT 12 SEGMENT 12 SEGMENT 12
SEGMENT 12 SEGMENT 12 SEGMENT 12 SEGMENT 11 SEGMENT 11 SEGMENT 11
PHASE 5 PHASE 5
SEGMENT SEGMENT 12 12 SEGMENT 12
PrecixPrecix / Acushnet / Acushnet RubberRubber Precix / Acushnet Rubber River River Road Road River Road
PHASE 3
SEGMENT SEGMENT 12 12 SEGMENT 12 SEGMENT SEGMENT 11 11 SEGMENT 11
PHASE 3 PHASE 3
SEGMENT 11 SEGMENT 11 SEGMENT 11 SEGMENT 10 SEGMENT 10 SEGMENT 10
Shoreline Building Existing to be Removed Existing Shoreline Municipal Park Existing Shoreline Municipal Park
ny / Titleist ny / Titleist et Compa et Compa AcushnAcushn Acushnet Company / Titleist
Existing Shoreline Existing Shoreline Municipal Park Existing Shoreline Municipal Park Building to be Removed Municipal Park Building to be Removed
SEGMENT 10 SEGMENT 10 SEGMENT 10 SEGMENT 9 SEGMENT 9 SEGMENT 9
PHASE 1
SEGMENT 9 SEGMENT 9 SEGMENT 9 SEGMENT 8 SEGMENT 8 SEGMENT 8
SEGMENT 8 SEGMENT 8 SEGMENT 8 SEGMENT 7 SEGMENT 7 SEGMENT 7
SEGMENT 7 SEGMENT 7 SEGMENT 7 SEGMENT 6 SEGMENT 6 SEGMENT 6
PHASE 1 PHASE 1
SEGMENT SEGMENT 11 11 SEGMENT 11 SEGMENT SEGMENT 10 10 SEGMENT 10
SEGMENT SEGMENT 10 10 SEGMENT 10 SEGMENT SEGMENT 9 9 SEGMENT 9
SEGMENT SEGMENT 9 9 SEGMENT 9 SEGMENT SEGMENT 8 8 SEGMENT 8
SEGMENT SEGMENT 8 8 SEGMENT 8 SEGMENT SEGMENT 7 7 SEGMENT 7
It! Inc. Kearsarge Street Former W Z B1 DarnD1 E1 Aerovox F1 H1 Site Aerovox Kearsarge Street W Z B1 D1 E1 Former F1 H1 Site Street Kearsarge Aerovox Street Desautels Belleville Avenue W Z B1 D1 E1 F1 H1 Site US Party Belleville Avenue Y C1Nashawena Company Darn It! Inc. River Bank Lofts Pico Stone John’s Auto / East US Party Imports and SK Machine Mills Y C1 Darn It! Inc. Belleville Avenue River Bank Lofts CTS Pico Stone Nashawena Company East Supply Co. John’s Auto / Powder Pro Imports and SK Machine Mills Former US Party CTS Y C1 Darn It! Inc. Supply Co. John’s Auto / Aerovox Pico Stone Nashawena Company East Powder Pro River Bank Lofts Former Site Imports and SK Machine Mills Aerovox CTS X A1 Supply Co. Powder Pro Site Former G1 X A1 Aerovox G1 Site X A1 Y C1 Pico Stone John’s Auto / G1 Imports and SK Machine Y C1 CTS Pico Stone Supply Co. John’s Auto / Imports and SK Machine CTS Y C1 Supply Co. John’s Auto / Pico Stone PHASE 1 PHASE 3 PHASE 5 Imports and SK Machine CTS PHASE 3 PHASE 5 V PHASE X 1 A1 Supply Co. G1 V PHASE X1 A1 PHASE 3 G1 PHASE 5 V X A1 G1
WoodWood StreetStreet Wood Street
PrecixPrecix / Acushnet / Acushnet RubberRubber / Acushnet Rubber t ree t reeSt SttPrecix an Du nc an Du nc Du nc an St reeRiver River Road Road River Road
Belleville Avenue
Field ing Stree t
WoodWood StreetStreet Wood Street
PerryPerry StreetStreet HowaHowa rd Avenu rd Avenu e e Perry Street Howa rd Avenu e
t t Stree Sowle Field ing Stree Edna t Stree Sowle Stree t re et nd ui t St CoSowle Stree t Co nd ui t St re et
BROOKLAWN PARK F1 H1 Kearsarge Street F1 H1 Kearsarge Street F1 H1
Kearsarge Street
t ree t y St y St dleree Ha dleHa Ha dle y St ree t
Belleville Avenue
U U U
BROOKLAWN PARK BROOKLAWN PARK
Irvi ngt on Co urt
E1 E1 Belleville Avenue E1
PerryPerry StreetStreet Perry Street
t ree t reeSt Stan Du nc an Du nc Du nc an St ree t
t ree t StverelletSt re et ve llCo St y St y Co dleree Ha dleHa et re St t ll ve Ha dle y St reeCo ny / Titleist ny / Titleist et Compa et Compa AcushnAcushn Acushnet Company / Titleist
Darn It! Inc.
e rn FVe re et nd ui t St CoSowle Stree t et e lt o n S tr e et re Co nd ui t St F Field ing Stree Edna n S trte e t t F e lt oStree Co nd ui t St re et Stree t Field ing StreeEdna t
BROOKLAWN PARK BROOKLAWN PARK
Irvi ngt on Co urt Irvi ngt on Co urt
t ree t reeSt Sttch Ha tchHa Ha tch St ree t
Darn It! Inc.
re et re et Cl iff orCld iffSt etor d St Cl iff or d St reCo ve llCoStverelletSt re et Co ve ll St re et
HMeer ril l St Nashawena Company ee t trEast ly S Party H e aUS Mills River Bank Lofts Nashawena Company East e Stree t tr e e t Mills ly S Party e aUS H River BankDesautels Lofts Nashawena Street Company East Mills Desautels Street
Stree ever Bankt Lofts
ee t
B1 reetD1 er ril l St MB1 D1 M er ril l St re et B1 D1 t tr eree et ly S Party aUS
t ree t reeSt Sttch Ha tchHa Ha tch St ree t
tr e e t H e a ly S
et et te t es S tr e B a te sBSae tr B a te s S tr e
W Z Street esautels W Z esautels Wt Street Z Stree
sautels Street
Av en Av en ue al ntr al ue Ce ntrCe Ce ntr al Av en ue
IDED IN TABLE 1)
e eSt tr e e t tr Q t ry eue eSue trQ Sry ryue ueen ue en Av alQ ntr Ce ueal Av enntr l Av
et
tr e e t et et te t es S tr e B a te sBSae tr ad ad B a te s S tr e ilele dv ilo le R o ollaeR B e ll e vBR B e ll e v il le
tr e e t tr e e t g e n ia u geSent ia S a d a d Eu gE e nu ia SEtr le dv ilo le R o ollaeR
et et taen S tr e mSatrhniteSemtr tr e e t tr e e t W h itWmhaitn W ia u geSe nt ia S tr
M er ril l St re et M er ril l St re et tr e e t a ly ril lSSt re et HMeer tr e e t H e a ly S
Irvi ngt on Coeturt Co nc or d St re Irvi ngt on Co urt et Co nc or d St re Irvi ngt on Co urt
PHASE 5
Parcel Boundary Parcel Boundary City-Owned Parcel Parcel Boundary City-Owned Parcel Parcels Requiring An Easement City-Owned Parcel Parcels Requiring An Easement Parcel Boundary Parcels Requiring An Easement Parcel Boundary City-Owned Parcel Parcel Boundary 9 City-Owned Parcel
Source: City of New Bedford Assessors Database Source: City of New Bedford Assessors Database Source: City of New Bedford Assessors Database
After project boundaries have been negotiated and construction plans are underway, the City of New Bedford will be responsible for obtaining landholder agreements for construction access and permanent easements as necessary to implement the River Walk. The Right-of-Way for the River Walk will vary in width as the path meanders along the shoreline. Some of the required easements will probably end up being wider than the 25-foot wide easement described in the prior Feasibility Study.
Protection Act (310 CMR 10.00), the New Bedford Wetlands Protection Ordinance, and the federal Clean Water Act. The Acushnet River is tidally influenced and relatively saline despite freshwater inputs from upstream and the tidal restriction at the mouth of New Bedford Harbor (Hurricane Barrier). In the River Walk study area, the River is often bordered by narrow bands (25- to 75-feet wide) of vegetated wetlands including salt marsh and Bordering Vegetated Wetlands (BVW) (Figure 4: Existing Environmental Resources). The River Walk study area is also within the FEMA 100-year floodplain of the Acushnet River (Figure 5: FEMA Floodplain), known as Land Subject to Coastal Storm Flowage under the Massachusetts Wetlands Protection Act. Additional Coastal Wetland Resource Areas are located along and beneath the river including Coastal Bank, Land Under the Ocean, and Land Containing Shellfish. The river provides habitat for anadromous fish including river herring. There are no eelgrass beds mapped in the vicinity of the project.
Further development and discussion of construction access easements and conservation easement restriction agreements between the City of New Bedford, the Trustees, and private landholders will be required during the design process for the River Walk. Access, inspection and enforcement rights will be described in these documents and will be reviewed by all parties participating in the project. In order to reach agreement with the landowners, they should be fully informed about the impact to their property as well as their rights of use while the construction project is underway and after the land is encumbered by a conservation easement. The acquisition of conservation restrictions will be beneficial for the long-term protection of the ecological restoration areas.
The segment Acushnet River (MA95-33) adjacent to the River Walk has been designated in the Massachusetts 2016 Integrated List of Waters report as a Category 5 Impaired Waterway. Category 5 designation identifies waters requiring the preparation of a TMDL study. This designation has been assigned due to the presence in the river of various pollutants, including debris, trash, color, dissolved oxygen, enterococcus, fecal coliform, metals total oxygen, nutrients, odor, oil and gasses, and polychlorinated biphenyls (PCBs) .
At this time, the precise number and extent of the ROW easements that will be required for construction of the River Walk segments are not known. New topographical mapping and final design will be needed in order to advance the plans that must accompany these documents.
It is worth noting that the extent of flooding during a 1% storm event (100-year storm), forecast by FEMA as depicted on Figure 5: FEMA Floodplain, differs from the extent of flooding based on analysis using the Massachusetts Coast Flood Risk Model (MC-FRM) for the upper Acushnet River as depicted on Figure 9: MA-FRM Probability of Inundation (2030,2050,2070) because of the different methods used to develop this data.
Environmental Resources The following sections describe the existing natural and social environmental resources in the study area. Environmental Resources in the study area include the Acushnet River and associated Wetland Resource Areas subject to protection under the Massachusetts Wetlands
View of the Acushnet River from the proposed River Walk.
10
The EPA is managing remediation efforts in the area.
Open Space parcels in the study area include Riverside Park. At the southern end of the River Walk corridor, Riverside Park is an approximately 20-acre city owned park featuring playing fields, walking trails, raised gardens, children’s play area, and lawns.
•
The following environmental resource designations are not present in the study area:
•
• Areas of Critical Environmental Concern (ACEC), • Outstanding Resource Waters, and • Priority / Estimated Habitats of Rare Species.
• •
New Bedford Harbor Superfund Site The upper Acushnet River is within the New Bedford Harbor Superfund site, which was historically contaminated with polychlorinated biphenyls (PCBs) and heavy metals. New Bedford Harbor, extending to the Upper Acushnet River, has been the subject of an ongoing remediation effort led by the U.S. Environmental Protection Agency (EPA). Construction of the River Walk cannot proceed until remediation of the Acushnet River and adjacent intertidal areas are complete.
funding. It could be completed in 2023. Segment 10 of the River Walk is in West Zone 2 and passes the Titleist building. The northern part of Segment 9 is also in West Zone 2. West Zone 3 remediation is subject to the availability of EPA funding. It could be completed in 2023. The southern part of Segment 9 and all of Segment 8 are in West Zone 3. West Zone 4 remediation is subject to the availability of EPA funding. It could be completed in 2024. Segment 6 and Segment 7 are in West Zone 4. West Zone 5 remediation is subject to the availability of EPA funding. It could be completed in 2024. Segment 4 and Segment 5 are in West Zone 4. The Sawyer Street Facility is leased to the EPA by the City of New Bedford until 2026. Segment 2 is within the limits of the Sawyer Street Facility property limits.
Hazardous Materials Sites Contaminant Approach Currently the shoreline is undergoing active cleanup in New Bedford’s Upper Harbor. Once the EPA finishes their cleanup efforts, the exposed soil along the shoreline in the footprint of the clean-up effort will be verified to be safe. This approach does not, however, address the possibility of contamination upland of the clean-up effort. Industrial waterfronts commonly present a challenge when being converted to public use. Many of the upland areas on either side of the trail that may not have been remediated and that are intended to be open to public access may need to be capped or remediated.
Remediation of the upper Acushnet River has been on-going for several years and significant progress has been made. Most of the river channel remediation is complete within the study area from the Wood Street Bridge south to Coggeshall Street. However, remediation of much of the intertidal area within the River Walk study area has not yet been completed. Remediation of the intertidal area is scheduled to be completed by 2026. However, that schedule is contingent upon the availability of funding.
In this section of the report, Stantec’s LSP suggests that areas outside of the footprint of the EPA cleanup zone will need to undergo rigorous examination. The typical approach to capping contaminants on industrial sites is outlined below, and in some places may require 2- 3-feet of fill with geotextile fabric and a barrier marker before public use is advisable.
The 12 Riverfront Segments and the five EPA remediation zones (West Zones) are delineated on the Figure 7: EPA Remediation Zones, Schedule and Proposed Phasing. The conceptual schedule for the completion of river and intertidal area remediation is based on the currently proposed potential schedule.
Furthermore, the approach to shoreline stabilization, as will be discussed in Section 1.3, will need to be incorporated into the site-by-site plan for addressing contaminants on site, as the newly capped, clean shoreline is currently at risk of eroding in this dynamic coastal environment.
• West Zone 1 remediation is scheduled for completion in
2020. Segment 12 of the River Walk is in EPA West Zone 1.
• West Zone 2 remediation is subject to the availability of EPA 11
250
1,000 1,000
500
750
1,000
Feet Feet
SEGMENT SEGMENT 7 7 SEGMENT 7 SEGMENT SEGMENT 6 6 SEGMENT 6
0
750 750
¸¸¸ ¸¸
0
500 Feet 500
ad ad N a sh aNRdaosh R o N a sh R o
S tr e eSt tr e e t m trkeheat m T in k hTaSin T in k h a m
Proposed River Walk Path
E
River Walk Follows Existing Proposed River Walk Path Path Driveway River+ Walk Follows Existing Path + Driveway Proposed Onroad River Walk Follows Existing River Walk Extension Proposed Onroad Path + Driveway River Walk Extension ProposedProposed Onroad River Walk Path River WalkProposed ExtensionRiver Walk Path River Walk Follows Existing Proposed River Walk Path Path Driveway River+ Walk Follows Existing Path + Driveway
M
LEGEND Proposed River Walk Path
250 250
De
PHASE 2
LEGEND LEGEND
0
Des
SEGMENT SEGMENT 6 6 SEGMENT 6 SEGMENT SEGMENT 5 5 SEGMENT 5
PHASE 2 PHASE 2
PHASE 4
Feet Feet
SetrtaeneSt tr e e t mW Sahtrnitem
d d aRsoh aNRdaosah R o a
SEGMENT SEGMENT 5 5 SEGMENT 5 SEGMENT SEGMENT 4 4 SEGMENT 4
PHASE 4 PHASE 4
PHASE 2
erside
iv Victoria R
PHASE 2 PHASE 2 SEGMENT SEGMENT 4 4 SEGMENT 4 SEGMENT SEGMENT 3 3 SEGMENT 3
SEGMENT SEGMENT 3 3 SEGMENT 3 SEGMENT SEGMENT 2 2 SEGMENT 2
SEGMENT SEGMENT 1 1 SEGMENT 1
SEGMENT SEGMENT 2 2 SEGMENT 2 SEGMENT SEGMENT 1 1 SEGMENT 1
PHASE 4
Fabrics American Engineered Fabrics
SEGMENT SEGMENT 6 6 SEGMENT 6 SEGMENT SEGMENT 5 5 SEGMENT 5
PHASE 4 PHASE 4
enue A v Hope Stree t
evill De Av Hope S Bell eAvenue Riverside evill enue eAvenue Ave CLIFTEX Corp. Whaler’sRiverside Care Hope Riv nue Whaler’s Place Bell Assisted Living evill Whaler’s Care CLIFTEX Corp. e Whaler’s Place Ave HopeR Avenue AssistedRiverside Living nue Powder Pro Whaler’s Care CLIFTEX Corp. Powder Pro R ide American Whaler’s Place ria Rivers Assisted Living Victo Engineered e id American ivers Fabrics Victoria R Powder Pro Engineered Fabrics e id American rs e iv Victoria R Engineered Riverside Avenue Fabrics Whaler’sRiverside Care Avenue CLIFTEX Corp. Whaler’s Place Assisted Living Whaler’s Care CLIFTEX Corp. Whaler’s Place Avenue AssistedRiverside Living P Whaler’s Care e CLIFTEX Corp. id American rs Whaler’s Place e ria Riv Living Assisted Victo Engineered American iverside Fabrics Victoria R Engineered SEGMENT SEGMENT 5 5 SEGMENT 5 SEGMENT SEGMENT 4 4 SEGMENT 4
SEGMENT SEGMENT 4 4 SEGMENT 4 SEGMENT SEGMENT 3 3 SEGMENT 3
SEGMENT SEGMENT 3 3 SEGMENT 3 SEGMENT SEGMENT 2 2 SEGMENT 2
SEGMENT SEGMENT 1 1 SEGMENT 1
7-Eleven
M a d e ir a
et et mSaetrnt eoSemtrt eet S tr e M a n otM Man o me
7-Eleven
Ave n u e M a d e ir a Hope Stree t Ave n u e M a d e ir a Hope Stree t
Bell
o/ ondo /Food / dFia LustianLoouost tinrgPlating LustianSotaFr PgS lata Star Platin
Taco Bell
Ave n u e
et et mSaetrnt eoSemtrt eet S tr e M a n otM Man o me
o/ ondo /Food / dFia LustianLoouost tinrgPlating LustianSotaFr PgS lata Star Platin
7-Eleven
SEGMENT SEGMENT 2 2 SEGMENT 2 SEGMENT SEGMENT 1 1 SEGMENT 1
StreetStreet shall shall CoggeCogge Cogge shall Street
StreetStreet shall shall CoggeCogge
Engineering Sawyer Work StreetZone Facility / Jacobs Engineering Work Zone
Taco Bell
eet eet a w atry eaSewtrta y S tr S tr e eSt tr e e t H a thHaawtha yH aSth m trkeheat m T in k hTaSin T in k h a m
RIVERSIDE PARK
Belleville Avenue Sawyer Street RIVERSIDE PARK et e tr S Facility / Jacobs ll e SawyerThStreet M it c h Engineering Work Zone e Rop / Jacobs Taco Bell it c h e ll S tr e e t Facility RIVERSIDE PARK M ket SawyerewWork Tohreks Zone sEngineering a b t RopeStreet e Taco Bell k r t a e works tr e SM sketFacility / Jacobs M it c h e ll etba The Zone Mark Engineering RopeWork Taco Bell works sket 7-Eleven etba k r a M 7-Eleven Sawyer Street Facility / Jacobs 7-Eleven Sawyer Street Engineering Zone Taco Bell FacilityWork / Jacobs
evill Bell e Avenu evill e Av e enu e Bell evill e Av enu e
v e n u ev e n u e C o ff in vCeAon ffu ein A C o ff in A
Belleville Avenue Belleville Avenue
Bell
t t e eeSeaetrtrleeeS tr e e tr e ae rlt tr tryEeaSaewrltaEey SStr E H a th ayHwaSath H a th a w a
RIVERSIDE PARK
v e n u ev e n u e C o ff in vCeAon ffu ein A C o ff in A tr e e t tr e e t D e a ntreDeSeatn e S De an e S
RIVERSIDE PARK
S tr e eSt tr e e t B u ll aSrd Btruelleat rd B u ll a rd
eet eet N y e eSeNtrty e S tr N y e S tr
SetrtaeneSt tr e e t T a ll mSTaatrnllem T a ll m a n
treet treet SawytreSer aeSwt yer S Sawyer S
tr e e t tr e e t B e e tltreBeSe ttl e S B e e tl e S
Ho S tr e e t M it c h e ll Th Rope e S tr e e t wTorks t M it c h e ll e k s h Rope e et tba k r a e w t e tr M orks e S k ll s M it c h e etba Th Mark Rope e works sket etba k r a M
tr e e t tr e e t H o lltry eHSeotll y S H o ll y S
Figure Environmental Resources e t Existingle Ave S tr e4: nue Bellevil FIGURE 4 H o w a rd Figure 4: Existing Environmental Resources t e S tr e Belleville Avenue H o w a rd EXISTING ENVIRONMENTAL RESOURCES RIVERSIDE PARK Figure Environmental Resources e t Existingle Ave e4: nue Bellevil w a rd S tr
M a d e ir a
tr e e t tr e e t D a vis trDeSae tvis S D a vis S
n t S tr e e t N o rt h F ro n t S tr e e t N o rt h F ro n t S tr e e t N o rt h F ro
Ave n u e M a d e ir a Ave n u e M a d e ir a
eet eet eSeatrtrl e S tr EeaSrltre E
tr e e t tr e e t o ll e tt eo ellSe ttt e S tr e e t tr e eCt o llCe tt e SCtr DsaSvis trDeSae tvis S
ue ue ipPvsheilAnliuvpeesn A v e n A
nu e nu e il li p s ilAliuvpees A v e S tr e eSt tr e e t P h ilPli hp s APvhe n eStt Ctreo ell e ttt e
hnet Acus ue Aven hnet Acus
et et aSntreDeSeatrtnee S tr e
e eSt tr e e t rd S trrd dll aSBtruelleat
eet eet NSytre eSeNtrty e S tr
eet eet etrta n S tr ll m a nllSm maa n ST atr e
et et ll y Setrtlley S tr e llHy oS tr eH o
r Streert Street trttlSyeeeaerwStSytrtreSeaewtt ye SeSaew
entley StreetStreet e e t e e t eetB e e tltreBeSetrttl e S tr B e e tl e S
Ho
N N N
12
N
B
Brooklawn oklawn StreetStreet wn Street
WoodWood StreetStreet Wood Street
Sylv iaSylv iaetStre et Sylv ia StreStre et
CTS CTS
PHASE 5 PHASE 5
WoodWood StreetStreet Wood Street
PHASE 3
CTS
Pico Stone John’s Auto / Imports and SK Machine Pico Stone John’s Auto / Supply Co. Imports and SK Machine Supply Co. John’s Auto / Pico Stone Imports and SK Machine Supply Co. SEGMENT 12 SEGMENT 12 SEGMENT 12
PHASE 3 PHASE 3
CTS
Brooklawn Brooklawn CourtCourt Brooklawn Court Sylv iaSylv iaetStre et Sylv ia StreStre et HowaHowa rd Avenu rd Avenu e e Howa rd Avenu e
PHASE 5
CTS
Pico Stone John’s Auto / Imports and SK Machine Pico Stone John’s Auto / Supply Co. Imports and SK Machine Supply Co. John’s Auto / Pico Stone Imports and SK Machine Supply Co. SEGMENT SEGMENT 12 12 SEGMENT 12
PHASE 5 PHASE 5
CTS
SEGMENT 12 SEGMENT 12 SEGMENT 12 SEGMENT 11 SEGMENT 11 SEGMENT 11
PHASE 3
Site Former Aerovox Site
SEGMENT SEGMENT 12 12 SEGMENT 12 SEGMENT SEGMENT 11 11 SEGMENT 11
Building Existing to be Removed Shoreline Existing Shoreline Municipal Park Existing Shoreline Municipal Park
PHASE 3 PHASE 3
Former Aerovox Former Site Aerovox
SEGMENT 11 SEGMENT 11 SEGMENT 11 SEGMENT 10 SEGMENT 10 SEGMENT 10
Building to be Removed Municipal Park Building to be Removed
Belleville Avenue
SEGMENT SEGMENT 11 11 SEGMENT 11 SEGMENT SEGMENT 10 10 SEGMENT 10
Existing Shoreline Existing Shoreline Municipal Park Existing Shoreline Municipal Park
Field ing Stree t
Former Kearsarge Street Aerovox Former Site Kearsarge Street Aerovox Site Former Belleville AvenueAerovox Kearsarge Street Site Belleville Avenue
Darn It! Inc.
SEGMENT 10 SEGMENT 10 SEGMENT 10 SEGMENT 9 SEGMENT 9 SEGMENT 9
PHASE 1
Darn It! Inc.
SEGMENT SEGMENT 10 10 SEGMENT 10 SEGMENT SEGMENT 9 9 SEGMENT 9
PHASE 1 PHASE 1
SEGMENT 9 SEGMENT 9 SEGMENT 9 SEGMENT 8 SEGMENT 8 SEGMENT 8
SEGMENT 8 SEGMENT 8 SEGMENT 8 SEGMENT 7 SEGMENT 7 SEGMENT 7
SEGMENT 7 SEGMENT 7 SEGMENT 7 SEGMENT 6 SEGMENT 6 SEGMENT 6
PHASE 1
SEGMENT SEGMENT 9 9 SEGMENT 9 SEGMENT SEGMENT 8 8 SEGMENT 8
SEGMENT SEGMENT 8 8 SEGMENT 8 SEGMENT SEGMENT 7 7 SEGMENT 7
PHASE 1 PHASE 1
Darn It! Inc.
BROOKLAWN PARK
PrecixPrecix / Acushnet / Acushnet RubberRubber Precix / Acushnet Rubber River River Road Road River Road
Powder Pro
US Party Nashawena Company East US Party Mills Nashawena Company East Mills US Party Nashawena Company East Mills
Brooklawn Brooklawn CourtCourt Brooklawn Court
Darn It! Inc.
PerryPerry StreetStreet HowaHowa rd Avenu rd Avenu e e Perry Street Howa rd Avenu e
Belleville Avenue
PerryPerry StreetStreet Perry Street
Darn It! Inc.
re et nd ui t St CoSowle Stree t Co nd ui t St re et
Field ing Stree t Co nd ui t St re et Field ing Stree t
PrecixPrecix / Acushnet / Acushnet RubberRubber Precix / Acushnet Rubber t ree t ree Sttan St Du nc an Du nc Du nc an St ree River River Road Road River Road
Belleville Avenue
Darn It! Inc.
Stree t t Field ing Stree Edna Sowle t Stree Sowle Stree t
BROOKLAWN PARK BROOKLAWN PARK
Kearsarge Street
ny / Titleist ny / Titleist et Compa et Compa AcushnAcushn Acushnet Company / Titleist
Powder Pro River Bank Lofts
Kearsarge Street Kearsarge Street t ree t y St y St dleree Ha dleHa Ha dle y St ree t
Powder Pro
River Bank Lofts
Irvi ngt on Co urt
Belleville Avenue
Desautels Street River Bank Lofts
t ree t reeSt Stan Du nc an Du nc Du nc an St ree t
Irvi ngt on Co urt Irvi ngt on Co urt
t ree t StverelletSt re et ve llCo St y St y Co dleree Ha dleHa et re St t ll ve Ha dle y St reeCo ny / Titleist ny / Titleist et Compa et Compa AcushnAcushn Acushnet Company / Titleist
t tr eree et ly Party St aUS ril lS HMeer Stree ever Bankt Lofts Nashawena Company East e tr e t ly S Party H e aUS Mills River Bank Lofts Nashawena Company East e Stree t tr e e t Mills ly S Party e aUS H River BankDesautels Lofts Nashawena Company East Street Mills Desautels Street
BROOKLAWN PARK BROOKLAWN PARK BROOKLAWN PARK
t ree t reeSt Sttch Ha tchHa Ha tch St ree t
esautels Street Stree t
re et re et Cl iff orCld iffSt etor d St Cl iff or d St reCo ve llCoStverelletSt re et Co ve ll St re et
M er ril l St re et M er ril l St re et
o e ltrn FVe re et nd ui t St CoSowle Stree t t lt o n S tr e e e F et re Co nd ui t St n S trte e t Field ing Stree Edna t F e lt oStree Co nd ui t St re et Stree t Field ing StreeEdna t
et
ee t
t ree t reeSt Sttch Ha tchHa Ha tch St ree t
Av en Av en ue al ntr al ue Ce ntrCe Ce ntr al Av en ue
esautels Street
et et te t es S tr e B a te sBSaetr B a te s S tr e
sautels Street
t tr eree et a ly ril lSSt HMeer e tr e t H e a ly S tr e e t H e a ly S
e eSt tr e e t trt ry QryueSry QeSue eue ueen uetren Av alQ ntr ntr Ce ueal Av en l Av
et
tr e e t et et te t es S tr e B a te sBSaetr oad oad B a te s S tr e oll eaRvdil le R B e ll e vBilRele B e ll e v il le
e eSt tr e e t nt ia g e n iagSeetr o a d o a d E u gEeun ia ESutr e oll eaRvdil le R Rle
eet eet mSahtrniteSm etrta n S tr tr e e t tr e e t W h itWmhaitn W utrgeSeent ia S Sia
M er ril l St re et M er ril l St re et
Irvi ngt on Coeturt Co nc or d St re Irvi ngt on Co urt et Co nc or d St re Irvi ngt on Co urt
PHASE 5
Wetlands Wetlands Beach / Dune Wetlands Beach / Dune Chapter Jurisdiction Beach /91 Dune Chapter 91 Jurisdiction Chapter Wetlands 91 Jurisdiction Source: MassDEP Wetlands GIS Dataset and Tidelands Jurisdiction Datalayer Wetlands Source: MassDEP Wetlands GIS Dataset and Tidelands Jurisdiction Datalayer Beach / Dune 13 Wetlands BeachMassDEP / Dune Wetlands GIS Dataset and Tidelands Jurisdiction Datalayer Source:
SEGMENT SEGMENT 6 6 SEGMENT 6 SEGMENT SEGMENT 5 5 SEGMENT 5
PHASE 2
Proposed River Walk Path
E
River Walk Follows Existing Proposed River Walk Path Path Driveway River+ Walk Follows Existing Path + Driveway Proposed Onroad River Walk Follows Existing River Extension Proposed Onroad PathWalk + Driveway River Walk Extension ProposedProposed Onroad River Walk Path River WalkProposed ExtensionRiver Walk Path River Walk Follows Existing Proposed River Walk Path Path Driveway River+ Walk Follows Existing Path + Driveway
M
LEGEND Proposed River Walk Path
0
250
500 Feet 500
750 750
1,000 1,000
500
750
1,000
Feet Feet
¸¸¸ ¸¸
0
250 250
Des De
SEGMENT SEGMENT 7 7 SEGMENT 7 SEGMENT SEGMENT 6 6 SEGMENT 6
SEGMENT SEGMENT 6 6 SEGMENT 6 SEGMENT SEGMENT 5 5 SEGMENT 5
e et e et mSaetrnt oeSm etrte t S tr M a n otM Man o me
e et e et mSaetrnt oeSm etrte t S tr M a n otM Man o me
PHASE 2 PHASE 2
LEGEND LEGEND
0
oad oad N a sh N aRda sh R N a sh R o
e eSt tr e e t mtrkeShetr at m T in k hTaSin T in k h a m
Ave n u e M a d e ir a Hope Stree t Ave n u e M a d e ir a Hope Stree t Ave n u e M a d e ir a Hope Stree t
SEGMENT SEGMENT 5 5 SEGMENT 5 SEGMENT SEGMENT 4 4 SEGMENT 4
PHASE 2
PHASE 4
Feet Feet
et et mWSahntriteSmetrat en S tr e
oad oad aRsho N aRda sh R
t t a y SetrtaeyeS tr e e H a th aH e eSt tr e e t a th ywaSthtraew mtrkeShetr at m H a wa T in k hTaSin T in k h a m
tr e e t tr e e t D a vistrDeSaevt is S D a vis S
t t e eeSaeetrrlt eeeS tr e e tr e aeSrlt tr a y aeSw ae rltaEey S trE H a th aH ywaSthtrE H a th a w a
S tr e eSt tr e e t Eea rl S etrEeaerlt e
PHASE 4 PHASE 4
SEGMENT SEGMENT 5 5 SEGMENT 5 SEGMENT SEGMENT 4 4 SEGMENT 4
PHASE 2 PHASE 2 SEGMENT SEGMENT 4 4 SEGMENT 4 SEGMENT SEGMENT 3 3 SEGMENT 3
SEGMENT SEGMENT 3 3 SEGMENT 3 SEGMENT SEGMENT 2 2 SEGMENT 2
SEGMENT SEGMENT 1 1 SEGMENT 1
SEGMENT SEGMENT 2 2 SEGMENT 2 SEGMENT SEGMENT 1 1 SEGMENT 1
PHASE 4
Bell evil Bell le Aven evill e Av ue enu e Bell evill e Av enu e
Bell evil De A Hope S Bell leAvenue Riverside evill venue eAvenue Ave CLIFTEX Corp. Hope Whaler’sRiverside Care Riv nue Whaler’s Place Bell Assisted Living evill Whaler’s Care CLIFTEX Corp. e Whaler’s Place Ave HopeR Avenue AssistedRiverside Living nue Powder Pro Whaler’s Care CLIFTEX Corp. Powder Pro R ide Whaler’s Place American Assisted Living ria Rivers to ic V Engineered e id American ivers Fabrics Victoria R Powder Pro Engineered Fabrics e id American rs e iv Victoria R Engineered Riverside Avenue Fabrics Whaler’sRiverside Care Avenue CLIFTEX Corp. Whaler’s Place Assisted Living Whaler’s Care CLIFTEX Corp. Whaler’s Place Avenue AssistedRiverside Living P Whaler’s Care CLIFTEX Corp. e id Whaler’s Place American Assisted Living ria Rivers Victo Engineered American erside iv R a ri Fabrics Victo Engineered Fabrics American iverside Victoria R Engineered Fabrics ood / ood / LustianLoouostdFia/ ngo F g tinr Platin LustianSotaFr PS la gta Star Platin
SEGMENT SEGMENT 4 4 SEGMENT 4 SEGMENT SEGMENT 3 3 SEGMENT 3
SEGMENT SEGMENT 3 3 SEGMENT 3 SEGMENT SEGMENT 2 2 SEGMENT 2
SEGMENT SEGMENT 2 2 SEGMENT 2 SEGMENT SEGMENT 1 1 SEGMENT 1
SEGMENT SEGMENT 1 1 SEGMENT 1
PHASE 4 PHASE 4
tr e e t tr e e t o ll e tt o lleSe ttt e S S etr tr e e t tr e e tC o llCe tt e C Disa vSistrDeSaevt is S
ood / ood / LustianLoouostdFia/ ngo F g tinr Platin LustianSotaFr PS la gta Star Platin
StreetStreet shall shall CoggeCogge Cogge shall Street
StreetStreet shall shall CoggeCogge
7-Eleven 7-Eleven
ue ue li p s Alivpeesn A v e n tr e e t tr e e t P h ilPlihpils APvheiln u e tt o lleSe ttt e S C S etr
RIVERSIDE PARK
Belleville Avenue Sawyer Street RIVERSIDE PARK t e e tr S Facility / Jacobs SawyerT Street M it c h e ll h t e Zone Facility / Jacobs RopWork RIVERSIDE PARK Taco BellM it c h e ll S tr e e Engineering Tohreks Zone ket SawyerewWork sEngineering a Street b t R Taco Bell e o k p r t e e works trae SM sketFacility / Jacobs M it c h e ll etba The Zone Mark Engineering RopeWork Taco Bell works sket 7-Eleven etba k r a M 7-Eleven Sawyer Street 7-Eleven Facility / Jacobs Sawyer Street Engineering Work Zone Facility / Jacobs Taco Bell Engineering Work Zone Sawyer Street Taco Bell Facility / Jacobs Engineering Work Zone Taco Bell
7-Eleven
n t S tr e e t N o rt h F ro n t S tr e e t N o rt h F ro n t S tr e e t N o rt h F ro
Ave n u e M a d e ir a Ave n u e M a d e ir a Ave n u e M a d e ir a
v een uAev e n u e C o ff invCeAonffuin C o ff in A
Belleville Avenue Belleville Avenue
A v e n uAev e n u e ip APvsheilnliupes
RIVERSIDE PARK
v een uAev e n u e C o ff invCeAonffuin C o ff in A tr e e t tr e e t D e a n eD tr eSae nt e S De an e S
RIVERSIDE PARK
S tr e eSt tr e e t B u ll aSrd Btruelleatrd B u ll a rd
et et etrtyee S tr e N y e eSN N y e S tr
S tr e eSt tr e e t T a ll mTSaantrlleme at n T a ll m a n
treet treet SawyetrSreaSewt yer S Sawyer S
S tr e eSt tr e e t B e e tl eB tre e tlt e B e e tl e S
Ho S tr e e t ll e h c it M Th S tr e e t Rope e M it c h e ll wTohrks t e k e as reket tb ket Ropewor a e tr S M ll ks s a b M it c h e t e Th Mark Rope e works sket etba k r a M
eet eet yH eSeotrtll y S tr H o ll tr H o ll y S
Figure e t FEMA Floodplain S tr e5: Belleville Avenue FIGURE 5 H o w a rd Figure 5: e t FEMA Floodplain e tr S rd Belleville Avenue Ho wa FEMA FLOODPLAIN RIVERSIDE PARK Figure e t FEMA Floodplain e5: Belleville Avenue w a rd S tr
hnet Acus ue Aven hnet Acus
tr e e t tr e e t aSn eD tr eSae nt e S
e eSt tr e e t rd S trrd dll aSBtruelleat
et et etrtyee S tr e NSy etr eSN
eet eet ll m a nllSmetrat n S tr maa n TSatr e
et et ll y eSeotrtlley S tr e llHyoS tr H
eet eet awt yer aSwttryer Str wtltSeyeeerSStrtrSeee SeSaetr
entley StreetStreet S tr e eSt tr e e t reetB e e tl eB tre e tlt e B e e tl e S
Ho
N N N
14
N
B
Brooklawn oklawn StreetStreet wn Street
WoodWood StreetStreet Wood Street
Sylv iaSylv iaetStre et Sylv ia StreStre et
CTS CTS CTS
Pico Stone John’s Auto / Imports and SK Machine Pico Stone John’s Auto / Supply ImportsCo. and SK Machine Supply Co. John’s Auto / Pico Stone Imports and SK Machine Supply Co. SEGMENT 12 SEGMENT 12 SEGMENT 12
PHASE 5 PHASE 5
WoodWood StreetStreet Wood Street
Brooklawn Brooklawn CourtCourt Brooklawn Court Sylv iaSylv iaetStre et Sylv ia StreStre et HowaHowa rd Avenu rd Avenu e e Howa rd Avenu e
PHASE 3
CTS
Pico Stone John’s Auto / Imports and SK Machine Pico Stone John’s Auto / Supply ImportsCo. and SK Machine Supply Co. John’s Auto / Pico Stone Imports and SK Machine Supply Co. SEGMENT SEGMENT 12 12 SEGMENT 12
PHASE 3 PHASE 3
CTS CTS
SEGMENT 12 SEGMENT 12 SEGMENT 12 SEGMENT 11 SEGMENT 11 SEGMENT 11
PHASE 5
Brooklawn Brooklawn CourtCourt Brooklawn Court
PHASE 5 PHASE 5
PerryPerry StreetStreet HowaHowa rd Avenu rd Avenu e e Perry Street Howa rd Avenu e
SEGMENT SEGMENT 12 12 SEGMENT 12 SEGMENT SEGMENT 11 11 SEGMENT 11
Building Existing to be Removed Shoreline Existing Shoreline Municipal Park Existing Shoreline Municipal Park
Former Aerovox Former Site Aerovox Site Former Aerovox Site
SEGMENT 11 SEGMENT 11 SEGMENT 11 SEGMENT 10 SEGMENT 10 SEGMENT 10
Building to be Removed Municipal Park Building to be Removed
PHASE 3
SEGMENT SEGMENT 11 11 SEGMENT 11 SEGMENT SEGMENT 10 10 SEGMENT 10
Existing Shoreline Existing Shoreline Municipal Park Existing Shoreline Municipal Park
Belleville Avenue
PHASE 3 PHASE 3 SEGMENT 10 SEGMENT 10 SEGMENT 10 SEGMENT 9 SEGMENT 9 SEGMENT 9
PHASE 1
Field ing Stree t
Former Aerovox Former Kearsarge Street Site Kearsarge Street Aerovox Site Former Kearsarge Street Belleville AvenueAerovox Site Belleville Avenue
Darn It! Inc.
SEGMENT SEGMENT 10 10 SEGMENT 10 SEGMENT SEGMENT 9 9 SEGMENT 9
PHASE 1 PHASE 1
SEGMENT 9 SEGMENT 9 SEGMENT 9 SEGMENT 8 SEGMENT 8 SEGMENT 8
SEGMENT 8 SEGMENT 8 SEGMENT 8 SEGMENT 7 SEGMENT 7 SEGMENT 7
SEGMENT 7 SEGMENT 7 SEGMENT 7 SEGMENT 6 SEGMENT 6 SEGMENT 6
PHASE 1
SEGMENT SEGMENT 9 9 SEGMENT 9 SEGMENT SEGMENT 8 8 SEGMENT 8
SEGMENT SEGMENT 8 8 SEGMENT 8 SEGMENT SEGMENT 7 7 SEGMENT 7
PHASE 1 PHASE 1
BROOKLAWN PARK
PrecixPrecix / Acushnet / Acushnet RubberRubber Precix / Acushnet Rubber River River Road Road River Road
Powder Pro
Darn It! Inc. Darn It! Inc.
PerryPerry StreetStreet Perry Street
Darn It! Inc.
re et nd ui t St CoSowle Stree t Co nd ui t St re et
Fieldnd ing t St retet Co uiStree Field ing Stree t
PrecixPrecix / Acushnet / Acushnet RubberRubber Precix Rubber t / Acushnet t ree Stan Du nc an Du nc t St ree Du nc an St ree River River Road Road River Road
Belleville Avenue
Stree Field ing Stree Edna t t t Stree Sowle Sowle Stree t
BROOKLAWN PARK BROOKLAWN PARK
Kearsarge Street
ny / Titleist ny / Titleist et Compa et Compa AcushnAcushn Acushnet Company / Titleist
Powder Pro Powder Pro River Bank Lofts
Kearsarge Street Kearsarge Street t ree t y St y St dleree Ha dleHa Ha dle y St ree t
Darn It! Inc. Darn It! Inc.
US Party Nashawena Company East US Party Mills Nashawena Company East Mills US Party Nashawena Company East Mills
Irvi ngt on Co urt
Belleville Avenue Belleville Avenue
Desautels Street River Bank Lofts River Bank Lofts
t ree t reeSt Stan Du nc an Du nc Du nc an St ree t
Irvi ngt on Co urt Irvi ngt on Co urt
t ree t StverelletSt re et ve llCo St y St y Co dleree Ha dleHa et re St t ll ve Ha dle y St reeCo ny / Titleist ny / Titleist et Compa et Compa AcushnAcushn Acushnet Company / Titleist
t tr eree et St ly Party ril lS aUS HMeer et Nashawena Company e trEast ly S Party H e aUS Mills River Bank Lofts Nashawena Company East e Stree t tr e e t Mills ly S Party e aUS H River Bank Lofts Nashawena Company East Desautels Street Mills Desautels Street
BROOKLAWN PARK BROOKLAWN PARK BROOKLAWN PARK
t ree t reeSt Sttch Ha tchHa Ha tch St ree t
esautels Street Stree t Stree ever Bankt Lofts
orredetSt re et Cl iff orCld iffStet Cl iff or d St reCo ve llCoStverelletSt re et Co ve ll St re et
M er ril l St re et M er ril l St re et
on e ltrn FVe re et nd ui t St CoSowle Stree t t lt o n S tr e e e F et re Co nd ui t St n S trte e t Fieldnd ing t St reEdna F e lt oStree tet Co uiStree Stree t Field ing StreeEdna t
et
ee t
t ree t reeSt Sttch Ha tchHa Ha tch St ree t
Av en Av en ue al ntr al ue Ce ntrCe Ce ntr al Av en ue
sautels Street esautels Street
tr e e t H e a ly S
tet eseSt tr e e t B a te sBSaetr B a te s S tr e
t tr eree et ril lSSt a ly HMeer e tr e t H e a ly S
eet eet QryueSrytrQeSue etrtry S tr ueen Av Av en ue alQ al ue ntr ntr Ce ue en l Av
et
tr e e t tet eseSt tr e e t B a te sBSaetr oad oad B a te s S tr e lloeaRvdil le R B e ll e vBileRle B e ll e v il le
e eSt tr e e t ntia g e n iagSeetr o a d o a d E u gEeun ia ESutr e lloeaRvdil le R Rle
et et m a n Smetrat en S tr e tr e e t tr e e t W h itWmhaitnWShtrite utrgeSeentia S Sia
M er ril l St re et M er ril l St re et
Irvi ngt on Coeturt Co nc or d St re Irvi ngt on Co urt et Co nc or d St re Irvi ngt on Co urt
PHASE 5
AE: 1% Annual Chance of Flooding, with BFE AE: 1% Annual Chance of Flooding, with BFE X:AE: Reduced Flood Risk due to Levee with BFE 1% Annual Chance of Flooding, X: Reduced Flood Risk due to Levee X: Reduced Flood Risk due to Levee AE: 1% Annual Chance of Flooding, with BFE Source: FEMA National Flood Hazard Layer GIS Dataset AE: 1% Annual Chance of Flooding, with BFE Source: FEMA National Flood Hazard Layer GIS Dataset X:AE: Reduced Flood Risk to Levee with BFE 15 due 1% Annual Chance of Flooding, X: Reduced Flood Risk due Levee Source: to FEMA National Flood Hazard Layer GIS Dataset
enue A v Hope Stree t
250
500
1,000 1,000
750
1,000
Feet Feet
SEGMENT SEGMENT 7 7 SEGMENT 7 SEGMENT SEGMENT 6 6 SEGMENT 6
0
750 750
¸¸¸ ¸¸
0
500 Feet 500
De
PHASE 2
Proposed River Walk Path
E
River Walk Follows Existing Proposed River Walk Path Path + Driveway River Walk Follows Existing Path + Driveway Proposed Onroad RiverWalk WalkExtension Follows Existing River Proposed Onroad Path + Driveway River Walk Extension ProposedProposed Onroad River Walk Path River WalkProposed ExtensionRiver Walk Path River Walk Follows Existing Proposed River Walk Path Path + Driveway River Walk Follows Existing Path + Driveway
M
LEGEND Proposed River Walk Path
250 250
Des
SEGMENT SEGMENT 6 6 SEGMENT 6 SEGMENT SEGMENT 5 5 SEGMENT 5
SEGMENT SEGMENT 5 5 SEGMENT 5 SEGMENT SEGMENT 4 4 SEGMENT 4
PHASE 2 PHASE 2
e et e et mSaetrnteoSemtr t e t S tr M a n ot M Man o me
SEGMENT SEGMENT 6 6 SEGMENT 6 SEGMENT SEGMENT 5 5 SEGMENT 5
PHASE 2 PHASE 2 PHASE 2
erside
iv Victoria R
LEGEND LEGEND
0
oad oad N a shaNR da sh R N a sh R o
M a d e ir a
S tr e eSt tr e e t m T in k hTSain tr ek he at m T in k h a m
Ave n u e M a d e ir a Hope Stree t Ave n u e M a d e ir a Hope Stree t
e et e et mSaetrnteoSemtr t e t S tr M a n ot M Man o me
Fabrics American Engineered Fabrics
PHASE 4
Feet Feet
t t a n S traeneS tr e e mW S trh ite emt
oad oad aRsohaNR da sh R
S tr e eSt tr e e t isD D a vtr e eatvis D a vis S
eet eet a w atryeaSewtr t a y S tr S tr e eSt tr e e t H a thHaawtha yHSa th m T in k hTSain tr ek he at m T in k h a m
eet eet e EeSeaetr trlt e S tr y S trEeyaeSrlt tr trEeaaewrlt ae S tr e H a th ayHwSaath H a th a w a
tr e e t tr e e t Ee aSrltreeESeatrl e S
PHASE 4 PHASE 4
Ave n u e
evill De e Av Hope S Riverside e Bell Avenue evill nue eAvenue Whaler’s Riverside Care AveCLIFTEX Corp. Hope Riv Whaler’s Place nue Assisted Living Bell evill Whaler’s Care eAvenue Whaler’s Place Ave CLIFTEX Corp. Powder Pro HopeR AssistedRiverside Living nue Whaler’s Care CLIFTEX Corp. Powder Pro R American Whaler’s Place ictoAssisted iverside V ria R Living Engineered e id American ivers Fabrics Victoria R Powder Pro Engineered Fabrics e id American rs e iv Victoria R Riverside Avenue Engineered Fabrics Whaler’s Riverside Care Avenue CLIFTEX Corp. Whaler’s Place Assisted Living Whaler’s Care CLIFTEX Corp. Whaler’s Place Avenue AssistedRiverside Living Po Whaler’s Care e id CLIFTEX Corp. American rs e Whaler’s Place ictoAssisted iv V ria R Living Engineered American iverside Fabrics Victoria R Engineered
SEGMENT SEGMENT 4 4 SEGMENT 4 SEGMENT SEGMENT 3 3 SEGMENT 3
SEGMENT SEGMENT 3 3 SEGMENT 3 SEGMENT SEGMENT 2 2 SEGMENT 2
SEGMENT SEGMENT 1 1 SEGMENT 1
SEGMENT SEGMENT 2 2 SEGMENT 2 SEGMENT SEGMENT 1 1 SEGMENT 1
PHASE 4
evill e Bell Avenu e evill e Av enu e Bell evill e Av enu e
SEGMENT SEGMENT 5 5 SEGMENT 5 SEGMENT SEGMENT 4 4 SEGMENT 4
SEGMENT SEGMENT 4 4 SEGMENT 4 SEGMENT SEGMENT 3 3 SEGMENT 3
SEGMENT SEGMENT 3 3 SEGMENT 3 SEGMENT SEGMENT 2 2 SEGMENT 2
SEGMENT SEGMENT 2 2 SEGMENT 2 SEGMENT SEGMENT 1 1 SEGMENT 1
SEGMENT SEGMENT 1 1 SEGMENT 1
PHASE 4 PHASE 4
Bell
M a d e ir a
Bell
oondo /Food / ianoudstF/ia Lust o ForLoP tinrgPlating lata LustianS ta gS Star Platin
7-Eleven
S tr e eSt tr e e t C o ll e tt Ceoelleettt e S tr e eSt tr e eCt o ll e tt e S tr isD DsaSvtr e eatvis
oondo /Food / ianoudstF/ia Lust o ForLoP tinrgPlating lata LustianS ta gS Star Platin
StreetStreet shall shall CoggeCogge Cogge shall Street
StreetStreet shall shall CoggeCogge
7-Eleven
nu e nu e il li p s ilAlivpees A v e S tr e eSt tr e e t P h il liPphs APvhe n u eStt Ctreoelleettt e
RIVERSIDE PARK
Belleville Avenue Sawyer Street RIVERSIDE PARK eet tr S Facility / Jacobs ll e h M it c Sawyer Street T h Engineering Work Zone e Rope/ Jacobs Taco Bell c h e ll S tr e e t RIVERSIDE PARK wTorks et Facility M it askEngineering he Zone b t Sawyer Street e RopeWork k Taco Bell r a t e works SMtr e sketFacility / Jacobs M it c h e ll etba The Zone Mark Engineering RopeWork Taco Bell works sket 7-Eleven etba k r a M 7-Eleven Sawyer Street Facility / Jacobs 7-Eleven Sawyer Street Engineering Work Zone Taco Bell Facility / Jacobs Engineering Sawyer Work StreetZone Taco Bell Facility / Jacobs Engineering Work Zone Taco Bell
7-Eleven
n t S tr e e t N o rt h F ro n t S tr e e t N o rt h F ro n t S tr e e t N o rt h F ro
Ave n u e M a d e ir a Ave n u e M a d e ir a
A v e n uAev e n u e C o ff in e nouffein vC C o ff in A
Belleville Avenue Belleville Avenue
s A vpesn uAev e n u e AipPvhe ilnliu e
RIVERSIDE PARK
A v e n uAev e n u e C o ff in e nouffein vC C o ff in A tr e e t tr e e t D e a ntreDeeSeatn e S De an e S
RIVERSIDE PARK
S tr e eSt tr e e t B u ll aSrd Btruelleat rd B u ll a rd
eet eet t y e S tr N y eeSeNtr N y e S tr
S tr e eSt tr e e t T a ll mSTatranell emta n T a ll m a n
treet treet SawytreSer eaStwyer S Sawyer S
tr e e t tr e e t B e e tltreBeeSeettl e S B e e tl e S
Ho t S tr e e M it c h e ll Th Rope e S tr e e t wTorks et M it c h e ll k s a h ettb Rope e k r a e w M t e tr orks e S k ll s M it c h e etba Th Mark Rope e works sket etba k r a M
tr e e t tr e e t H o lltryeHSeot ll y S H o ll y S
Figure Resources e t Historicle Ave S tr e6: nue Bellevil H o w a rd FIGURE 6 Figure 6: Historic Resources t e e tr S nue Ave rd e Bellevill Ho wa HISTORIC RESOURCES RIVERSIDE PARK Figure Resources e t Historicle Ave e6: nue Bellevil w a rd S tr
hnet Acus ue Aven hnet Acus
ee t ee t aSntreDeeSeatr tn e S tr
e eSt tr e e t a rd Satrrd dll SBtruelle t
eet eet t y e S tr NSytreeSeNtr
tr e e t tr e e t a ll m aanllSemta n S m a n STtr e
eet eet t ll y S tr o ll y Sotr lyH S tr eHe
r Streert Street trSeaewt ytreSeeaetwt ye eaSeewttlyer SS
entley StreetStreet eet eet e e tl eBeeSeetr ttl e S tr eetB e e tl e S tr
Ho
N N N
N
16
B
Brooklawn oklawn StreetStreet wn Street
Field ing Stree t Co nd ui t St re et Field ing Stree t
SEGMENT SEGMENT 12 12 SEGMENT 12
CTS
CTS
WoodWood StreetStreet Wood Street
Pico Stone John’s Auto / Imports and SK Machine Pico Stone Supply Co. John’s Auto / Imports and SK Machine Supply Co. John’s Auto / Pico Stone Imports and SK Machine Supply Co.
CTS
Pico Stone John’s Auto / Imports and SK Machine Pico Stone Supply Co. John’s Auto / Imports and SK Machine Supply Co. John’s Auto / Pico Stone Imports and SK Machine Supply Co. SEGMENT 12 SEGMENT 12 SEGMENT 12
PHASE 5 PHASE 5
Sylv iaSylv iaetStre et Stre Sylv ia Stre et
CTS
WoodWood StreetStreet Wood Street
CTS
Field ing Stree t
Brooklawn Brooklawn CourtCourt Brooklawn Court Sylv iaSylv iaetStre et Stre Sylv ia Stre et HowaHowa rd Avenu rd Avenu e e Howa rd Avenu e
CTS
SEGMENT 12 SEGMENT 12 SEGMENT 12 SEGMENT 11 SEGMENT 11 SEGMENT 11
SEGMENT 11 SEGMENT 11 SEGMENT 11 SEGMENT 10 SEGMENT 10 SEGMENT 10
PHASE 3
PrecixPrecix / Acushnet / Acushnet RubberRubber Precix / Acushnet Rubber River River Road Road River Road
SEGMENT SEGMENT 12 12 SEGMENT 12 SEGMENT SEGMENT 11 11 SEGMENT 11
ny / Titleist ny / Titleist et Compa et Compa AcushnAcushn Acushnet Company / Titleist
PHASE 5
PHASE 3 PHASE 3
Brooklawn Brooklawn CourtCourt Brooklawn Court
t ree t y St y St dleree Ha dleHa Ha dle y St ree t
SEGMENT SEGMENT 11 11 SEGMENT 11 SEGMENT SEGMENT 10 10 SEGMENT 10
SEGMENT 10 SEGMENT 10 SEGMENT 10 SEGMENT 9 SEGMENT 9 SEGMENT 9
PHASE 3
Former Aerovox Former Site Aerovox Site Former Aerovox Site
PHASE 5 PHASE 5
t t Stree Sowle Field ing Stree Edna t Stree Sowle Stree t re et nd ui t St CoSowle Stree t Co nd ui t St re et
BROOKLAWN PARK
PrecixPrecix / Acushnet / Acushnet RubberRubber / Acushnet t ree t Rubber reeSt StPrecix Du nc an Du nc tan Du nc an St reeRiver River Road Road River Road
Kearsarge Street
Belleville Avenue
PerryPerry StreetStreet HowaHowa rd Avenu rd Avenu e e Perry Street Howa rd Avenu e
PerryPerry StreetStreet Perry Street
t ree t StverelletSt re et ve llCo St y St y Co dleree Ha dleHa t ve ll St re et Ha dle y St reeCo ny / Titleist ny / Titleist et Compa et Compa AcushnAcushn Acushnet Company / Titleist t ree t reeSt Sttch Ha tchHa Ha tch St ree t
Shoreline Building Existing to be Removed Existing Shoreline Municipal Park Existing Shoreline Municipal Park
t ree t reeSt Stan Du nc an Du nc Du nc an St ree t
re etSt re et Cl iff orCld iffSt etor d Cl iff or d St reCo ve llCoStverelletSt re et Co ve ll St re et
Existing Shoreline Existing Shoreline Municipal Park Existing Shoreline Municipal Park Building to be Removed Municipal Park Building to be Removed
Kearsarge Street
Former Aerovox Kearsarge Street Former Site Aerovox Kearsarge Street Site Former Belleville AvenueAerovox Kearsarge Street Site Belleville Avenue
PHASE 3 PHASE 3
SEGMENT 9 SEGMENT 9 SEGMENT 9 SEGMENT 8 SEGMENT 8 SEGMENT 8
SEGMENT 8 SEGMENT 8 SEGMENT 8 SEGMENT 7 SEGMENT 7 SEGMENT 7
PHASE 1
Kearsarge Street
Belleville Avenue
SEGMENT SEGMENT 10 10 SEGMENT 10 SEGMENT SEGMENT 9 9 SEGMENT 9
SEGMENT SEGMENT 9 9 SEGMENT 9 SEGMENT SEGMENT 8 8 SEGMENT 8
SEGMENT SEGMENT 8 8 SEGMENT 8 SEGMENT SEGMENT 7 7 SEGMENT 7
SEGMENT 7 SEGMENT 7 SEGMENT 7 SEGMENT 6 SEGMENT 6 SEGMENT 6
PHASE 1 PHASE 1
BROOKLAWN PARK BROOKLAWN PARK
Irvi ngt on Co urt
Belleville Avenue
US Party Darn It! Inc. Nashawena Company East US Party Mills Darn It! Inc. River Bank Lofts Nashawena Company East owder Pro Mills US Party Darn It! Inc. Nashawena Company East Powder Pro River Bank Lofts Mills Powder Pro
PHASE 1
BROOKLAWN PARK
Irvi ngt on Co urt Irvi ngt on Co urt
Desautels Street
PHASE 1 PHASE 1
BROOKLAWN PARK BROOKLAWN PARK
Belleville Avenue
River Bank Lofts
e rn FVe re et nd ui t St CoSowle Stree t et e lt o n S tr e et re Co nd ui t St F Field ing Stree Edna n S trte e t t F e lt oStree Co nd ui t St re et Stree t Field ing StreeEdna t
et
ee t
M er ril l St re et M er ril l St re et esautels Street Stree t e tet tr ere lyrilS Party aUS l St HMeer Darn It! Inc. everStree Bankt Lofts Nashawena CompanyS tr East ee t ly Party e aUS H Mills Darn It! Inc. Bank Nashawena Company East t Lofts Stree eRiver t e e tr Mills ly S Party H e aUS Darn It! Inc. River Bank Lofts Nashawena Street Desautels Company East Mills Desautels Street
esautels Street
t ree t reeSt Sttch Ha tchHa Ha tch St ree t
Av en Av en ue al ntr al ue Ce ntrCe Ce ntr al Av en ue
tr e e t H e a ly S
ee t ee t te B a te sBSae tr t s S tr B a te s S tr e
sautels Street
e e t tr e e t trry Q ueSry QeSue t S eue ry ue ueen Av Avtren alQntr al ntrCe l Av en ue
et
tr e e t ee t ee t te B a te sBSae tr t s S tr Ro a dRo a d ilele B a te s S tr e B e ll e vBR ollaedv il le B e ll e v il le
tr e e t tr e e t u g e n ia u gSent ia S Ro a dRo a d Eu gE e n ia SEtr e le ollaedv il le
eet eet mSatrhniteSemtr ta n S tr tr e e t tr e e t W h itWmhaitn W ia u geSe nt ia S tr
M er ril l St re et M er ril l St re et e tet tr ere a lyrilSl St HMeer tr e e t H e a ly S
Irvi ngt on Coeturt Co nc or d St re Irvi ngt on Co urt et Co nc or d St re Irvi ngt on Co urt
PHASE 5
National Register of Historic Places National Register of Historic Places MHC Inventoried Property National Register of Historic Places MHC Inventoried Property National Register ofProperty Historic Places Historic District MHC Inventoried National Register of Historic Places Historic District National National RegisterRegister of Historic of Places HistoricHistoric Places District National Register of Historic Places MHC Inventoried Property National Register of 17 Historic Places MHC Inventoried Property
Source: MHC GIS Dataset Source: MHC GIS Dataset Source: MHC GIS Dataset
Ave n u e
e
M a d e ir a
enue A v Hope Stree t
Vic
HopeR
Powder Pro R Powder Pro
WEST ZONE 4 Anticipated Completio Subject to EPA Fun4 WEST ZONE Anticipated Completio Subject to EPA Fun
WEST ZONE 5 Anticipated Completion 2024 Subject to EPA Funding WEST ZONE 5 Anticipated Completion 2024 Subject to EPA Funding
1,000
0
250
500
750
1,000
¸¸ ¸
750
N N
18
Feet
SEGMENT SEGMENT 6 6
SEGMENT SEGMENT 6 6
PHASE 2
SEGMENT SEGMENT 5 5
SEGMENT SEGMENT 4 4
SEGMENT SEGMENT 5 5
SEGMENT SEGMENT 4 4
SEGMENT SEGMENT 3 3
SEGMENT SEGMENT 3 3
SEGMENT SEGMENT 2 2
SEGMENT SEGMENT 1 1
SEGMENT SEGMENT 2 2
SEGMENT SEGMENT 1 1
WEST ZONE 5 Anticipated Completion 2024 Subject to EPA Funding WEST ZONE 5 Anticipated Completion 2024 Subject to EPA Funding
LEGEND Proposed River Walk Path
Feet 500
SEGMENT SEGMENT 7 7
SEGMENT SEGMENT 6 6
SEGMENT SEGMENT 5 5
SEGMENT SEGMENT 4 4
et et maent oSmtreet S tr e M a n oM
erside
iv Victoria R
LEGEND
250
Hope
PHASE 2
SAWYER STREET FACILITY OWNED BY CITY OFSTREET NEW BEDFORD SAWYER Leased to FACILITY EPA until May 2026 OWNED BY CITY OF NEW BEDFORD Leased to EPA until May 2026
0
De
PHASE 2
PHASE 4
Feet
De
Riverside Avenue Whaler’s Care CLIFTEX Corp. Avenue AssistedRiverside Living Whaler’s Care CLIFTEX Corp. Assisted Living e id ivers Victoria R
SEGMENT SEGMENT 5 5
ood / ood / LustianLoustFiango F g tinr Platin lata Star PS
Whaler’s Place American Engineered Fabrics American Engineered Fabrics
et et maent oSmtreet S tr e M a n oM
evill e Av Riverside Avenue enu e Bell Whaler’s Careeville CLIFTEX Corp. A v Avenue AssistedRiverside Living enu e Whaler’s Care CLIFTEX Corp. Assisted Living iverside Victoria R rside toria Rive
ad ad N a sh NRaosh R o
enu
enue A v Hope Stree t
e eSt tr e e t mkSh tr am T in k hTain
e Av
PHA
M a d e ir a
y S tr eyeSt tr e e t H a th aHwaath a w a
tr e e t tr e e t D a visDSa vis S
e
Bell
PHASE 4
PLANNED EPA REMEDIATION SEQUENCE PLANNED EPA REMEDIATION SEQUENCE
enu
PHASE 2
PHASE 4
PLANNED EPA REMEDIATION SEQUENCE PLANNED EPA REMEDIATION SEQUENCE
evill
Whaler’s Place American Engineered Fabrics American Engineered Fabrics
SEGMENT SEGMENT 4 4
SEGMENT SEGMENT 3 3
PHASE 4
SAWYER STREET FACILITY OWNED BY CITY OFSTREET NEW BEDFORD SAWYER Leased to FACILITY EPA until May 2026 OWNED BY CITY OF NEW BEDFORD Leased to EPA until May 2026
e Av
Whaler’s Place
SEGMENT SEGMENT 3 3
SEGMENT SEGMENT 2 2
SEGMENT SEGMENT 1 1
SEGMENT SEGMENT 2 2
7-Eleven
evill
Bell
Whaler’s Place
7-Eleven SEGMENT SEGMENT 1 1
StreetStreet shall shall CoggeCogge
Taco Bell
S tr e eSt tr e e t C o ll e tt Ceo ll e tt e
RIVERSIDE PARK
Sawyer Street Facility / Jacobs Engineering Sawyer Work StreetZone Facility / Jacobs Engineering Work Zone
Taco Bell
v e n u ev e n u e P h il li pPsh ilAli p s A
7-Eleven
RIVERSIDE PARK
ood / ood / LustianLoustFiango F g tinr Platin lata Star PS
StreetStreet shall shall CoggeCogge
7-Eleven
Sawyer Street S tr e e t Facility / Jacobs ll e h c it M The Zone Engineering Sawyer Street RopeWork Taco Bell et works t e tr e S Facility / Jacobs k ll e s M it c h etba The Zone Mark Engineering RopeWork Taco Bell works sket etba k r a M
Bell
v e n u ev e n u e C o ff inCAo ff in A
Belleville Avenue
v e n u ev e n u e C o ff inCAo ff in A
Belleville Avenue
tr e e t tr e e t D e a n eD eSa n e S
RIVERSIDE PARK
S tr e eSt tr e e t B u ll a rd B u ll a rd
Th Rope e works Th Rope e works
eet eet N y e SNtry e S tr
S tr e e t asket etb Mark sket etba k r a M
treet treet SawyeSr aSwyer S
M it c h e ll
tr e e t tr e e t B e e tl eB eSe tl e S
S tr e e t M it c h e ll
RIVERSIDE PARK S tr e eSt tr e e t T a ll mTaanll m a n
Ho
tr e e t tr e e t H o ll y HSo ll y S
h F FIGURE 7 N o rtand Figure 7: Zones, Schedule, Proposed Phasing e t EPA Remediation e tr S nue Ave rd e Bellevill Ho wa S tr e e t t n ro F h N o rtand Proposed EPA REMEDIATION ZONES, SCHEDULES, AND PROPOSED Figure Zones, Schedule, Phasing e t EPA Remediation e7: Belleville Avenue w a rd S tr
et et mWahnitSmtraen S tr e
d d a sh NRaosah R o a
M a d e ir a
Ave n u e
e eSt tr e e t mkSh tr am T in k hTain
et ro n t S tr e
M a d e ir a
t t e EeSaetrrlt eeeS tr e e y S trEeyaeSrlt tr H a th aHwaath a w a
tr e e t tr e e t E a rl e ESa rl e S
tr e e t tr e e t D a visDSa vis S
ue ue ipPsh ilAlivpesn A v e n
S tr e eSt tr e e t e tt Ceo ll e tt e
hnet Acus ue Aven hnet Acus
et et a n eD eSatrnee S tr e
S tr e eSt tr e e t ll a rd B u ll a rd
eet eet N y e SNtry e S tr
tr e e t tr e e t a ll mTaanllSm a n S
tr e e t tr e e t H o ll y HSo ll y S
r Streert Street trSeaewt ytreSeaewt ye eSe tl e S
entley StreetStreet tr e e t tr e e t B e e tl eB eSe tl e S
Ho
Proposed River Walk Path River Walk Follows Existing Path + Driveway River Walk Follows Existing Proposed Onroad Path + Driveway River Walk Extension Proposed Onroad River WalkProposed ExtensionRiver Walk Path Proposed River Walk Path River Walk Follows Existing Path + Driveway
Anticip Sub Anticip Sub
Brooklawn oklawn StreetStreet
Brooklawn Brooklawn CourtCourt
HowaHowa rd Avenu rd Avenu e e
PerryPerry StreetStreet
BROOKLAWN PARK
Field ing Stree t
John’s Auto / SK Machine John’s Auto / SK Machine
Pico Stone Imports and Supply Co. Pico Stone Imports and Supply Co.
Existing Shoreline Municipal Park Municipal Park Building to be Removed Building to be Removed Existing Shoreline 19
WEST ZONE 1 Anticipated Completion 2020 WEST ZONE 1 Anticipated Completion 2020
SEGMENT 12 SEGMENT 12
WEST ZONE 2 Anticipated Completion 2023 Subject to EPA Funding WEST ZONE 2 Anticipated Completion 2023 Subject to EPA Funding
PHASE 5
SEGMENT 12 SEGMENT 12
PHASE 3
SEGMENT 11 SEGMENT 11
PHASE 3
SEGMENT 11 SEGMENT 11
AEROVOX SITE NOW OWNED BY CITYAEROVOX OF NEW BEDFORD SITE Anticipated Completion NOW OWNED BY TBD CITY OF NEW BEDFORD Anticipated Completion TBD
PHASE 5
AEROVOX SITE NOW OWNED BY CITYAEROVOX OF NEW BEDFORD SITE Anticipated Completion NOW OWNED BY TBD CITY OF NEW BEDFORD Anticipated Completion TBD
WEST ZONE 1 Anticipated Completion 2020 WEST ZONE 1 Anticipated Completion 2020
John’s Auto / SK Machine John’s Auto / SK Machine
WoodWood StreetStreet
Sylv iaSylv iaetStre et Stre
CTS
WoodWood StreetStreet
CTS
Brooklawn Brooklawn CourtCourt
Pico Stone Imports and Supply Co. Pico Stone Imports and Supply Co. SEGMENT SEGMENT 12 12
PrecixPrecix / Acushnet / Acushnet RubberRubber
CTS
SEGMENT SEGMENT 12 12
SEGMENT SEGMENT 11 11
Former Aerovox Site Former Aerovox Site
Sylv iaSylv iaetStre et Stre HowaHowa rd Avenu rd Avenu e e
River River Road Road
CTS
PerryPerry StreetStreet
PrecixPrecix / Acushnet / Acushnet RubberRubber t ree t reeSt Stan Du nc an Du nc River River Road Road
Kearsarge Street
PHASE 5
Existing Shoreline
Existing Shoreline Municipal Park
Sowle Stree t Co nd ui t St re et Co nd ui t St re et Field ing Stree t
Kearsarge Street
PHASE 5 SEGMENT 10 SEGMENT 10
WEST ZONE 3 Anticipated Completion 2023 Subject to EPA Funding WEST ZONE 3 Anticipated Completion 2023 Subject to EPA Funding
SEGMENT SEGMENT 11 11
PHASE 1
WEST ZONE 4 pated Completion 2024 bject to EPA Funding WEST ZONE 4 pated Completion 2024 bject to EPA Funding
SEGMENT 9 SEGMENT 9
WEST ZONE 2 Anticipated Completion 2023 Subject to EPA Funding WEST ZONE 2 Anticipated Completion 2023 Subject to EPA Funding
SEGMENT SEGMENT 10 10
PHASE 3 SEGMENT 10 SEGMENT 10
SEGMENT 9 SEGMENT 9
SEGMENT 8 SEGMENT 8
SEGMENT 8 SEGMENT 8
SEGMENT 7 SEGMENT 7
SEGMENT 6 SEGMENT 6
SEGMENT 7 SEGMENT 7
PHASE 1
t ree t y St y St dleree Ha dleHa
Darn It! Inc.
Stree t Field ing StreeEdna t Sowle Stree t
BROOKLAWN PARK
Kearsarge Street
Belleville Avenue
PHASE 3
WEST ZONE 3 Anticipated Completion 2023 Subject to EPA Funding WEST ZONE 3 Anticipated Completion 2023 Subject to EPA Funding
t ree t reeSt Stan Du nc an Du nc
Darn It! Inc.
SEGMENT SEGMENT 9 9
PHASE 1
4 on 2024 nding 4 on 2024 nding
Kearsarge Street
Former Aerovox Site Former Aerovox Site Belleville Avenue
SEGMENT SEGMENT 10 10
SEGMENT SEGMENT 9 9
SEGMENT SEGMENT 8 8
SEGMENT SEGMENT 8 8
SEGMENT SEGMENT 7 7
PHASE 1
Irvi ngt on Co urt
ny / Titleist ny / Titleist et Compa et Compa AcushnAcushn
Powder Pro
Irvi ngt on Co urt
Belleville Avenue
Darn It! Inc.
US Party Nashawena Company East Mills US Party Nashawena Company East Mills
Powder Pro River Bank Lofts
BROOKLAWN PARK
t ree t StverelletSt re et ve llCo St y St y Co dleree Ha dleHa ny / Titleist ny / Titleist et Compa et Compa AcushnAcushn
Darn It! Inc.
Desautels Street
River Bank Lofts
BROOKLAWN PARK
Belleville Avenue
e Stree t
Ve rn Sowle Stree t eet F e lt o n S tr re Co nd ui t St et eet F e lt o n S tr Co nd ui t St re et Stree t Field ing StreeEdna t
et
M er ril l St re et tr e e t ly S Party H e aUS River Bank Lofts Nashawena Company East e Stree t tr e e t Mills ly S Party e aUS H River Bank Lofts Nashawena Company East Mills Desautels Street
t ree t reeSt Sttch Ha tchHa
M er ril l St re et
Cl iff orCld iffStorredetSt re et Co ve llCoStverelletSt re et
esautels Street
tr e e t H e a ly S
ee t
esautels Street
teeseSt tr e e t B a te sBSa tr
M er ril l St re et tr e e t H e a ly S
t ree t reeSt Sttch Ha tchHa
M er ril l St re et
Av en Av en ue al ntr al ue Ce ntrCe
tr e e t tr e e t u gSe n ia S E u g e nEia
S tr e eSt tr e e t W h it mWahnit m a n
e eSt tr e e t Q ue ryQSuetrry Av en Av en ue al ntr al ue ntrCe
et
tr e e t teeseSt tr e e t B a te sBSa tr oad oad ll eRv il le R B e ll e vBilele
oad oad le ll eRv il le R
tr e e t tr e e t ia u gSe n ia S
ASING
et Co nc or d St re Irvi ngt on Co urt et Co nc or d St re Irvi ngt on Co urt
Environmental Conditions Associated with Releases of Oil and Hazardous Materials
Portions of the River Walk and ecological restoration construction is planned for areas that are outside of EPA work zones. A focused examination of information related to the presence and type of hazardous materials in those locations would need to be done to determine construction and soil management needs. Given the historic industrial nature of the area and MassDEP and EPA disposal sites, the potential exists for all soil along the River Walk to potentially be impacted by Oil and Hazardous Materials (OHM). As noted above, the known locations of PCB and heavy metals contamination in the Acushnet River and adjacent shoreline are under ongoing remediation (or future remediation is planned).
The following section presents information related to the existing known hazardous materials release sites and information related to management of soils during construction of the River Walk and associated features. The potential exists for contaminants to be present along the entire length of the River Walk due to the area’s history of urbanization and industrial/commercial activities. Contaminants associated with urban fill include petroleum hydrocarbons, polycyclic aromatic hydrocarbons (PAHs) and heavy metals. PAHs are formed during the incomplete burning of organic material historically associated with human activities such as cooking and heating. Coal and wood ash are also historically present which also contain naturally occurring heavy metals.
Soil analytical testing to characterize soils in areas of unknown soil quality should be conducted in anticipation of Health and Safety protocol and potential disposal requirements prior to any significant earth moving activities. It is anticipated that project design will seek to balance cut and fill volumes to minimize the potential for off-site disposal of soil. The implementation of a Health and Safety Plan and a Soil Management Plan is recommended for construction activities.
There are 17 known Release Tracking Numbers (RTN’s) associated with Disposal Sites identified by Massachusetts Department of Environmental Protection (MassDEP) as locations where releases of oil and/or hazardous materials (OHM) have occurred which are proximal to the River Walk. Contaminants include petroleum hydrocarbons, PAHs, polychlorinated biphenyls (PCBs), volatile organic compounds (VOCs) and heavy metals (Figure 8: Hazardous Materials Sites and Table 2: Hazardous Materials Sites, Release Tracking Numbers).
The elevation of the trail is anticipated to be generally 1.0to 2.0-feet higher than the existing ground elevation. To achieve this elevation, it may be possible to utilize a haul road tentatively proposed by EPA to provide a means to remove remediation material from the study area. If a haul road is not implemented, material suitable for a trail subbase would be brought onto the site to create the desired elevation. In either scenario, off-site soil disposal is minimized.
Of the 17 OHM disposal sites listed on Table 2, 13 are closed with 10 of these having closure through a Response Action Outcome (RAO) or Permanent Solution with Conditions (PSC). Two of the remaining sites are continuing under Tier I or Tier 2 compliance, one site had the RAO statement retracted and the compliance status of the final site is unclassified.
Procedures should be implemented to minimize dust generation during construction and stockpiling of soils. Any soils generated for off-Site disposal during construction activities should be properly characterized and disposed of by the contractor.
The River Walk borders the Acushnet River which is included in the New Bedford EPA Superfund Site where sediment has been impacted by PCBs and heavy metals. The U.S. EPA and the U.S. Army Corps of Engineers have been conducting remediation actions in the harbor and along the Acushnet River and its shoreline. Further cleanup along the shoreline is anticipated which would include soil/sediment excavation and backfilling with clean material. The timing of future cleanup activities will depend on EPA project funding each year. Groundwater dewatering or exposures are not considered likely during construction.
Future Risk Management Considerations Future use of the River Walk for recreational activities requires consideration of potential exposures to Oil and Hazardous Materials (OHM) by its users. Pursuant to MassDEP regulations, soils that are present within the top three feet must meet MassDEP risk characterization as ‘posing no significant risk for recreational use’. Soil below pavement is also factored into risk characterization standards.
Project Construction and Soil Management
Although there is no formal MassDEP policy, guidance has been provided regarding construction practices and potential risk mitigation measures to avoid exposure through recreational use where walkways have been constructed on MassDEP disposal sites in other regions. Soil characterization is warranted where soils will remain open and accessible to users of the River Walk. Investigation efforts will determine if soils meet appropriate risk characterization standards.
The River Walk construction schedule is contingent upon the performance and completion of EPA remediation activities at the Acushnet River. It is anticipated that following construction of a haul road and shoreline remediation by EPA, that construction of the River Walk can proceed. At that time, the nature and extent of soil quality will need to be quantified.
MassDEP should be consulted during the planning process about the combined use of clean fill and geotextile fabric. In locations where the River Walk will be constructed of pavement, placement of one (1.0) foot of clean fill overlying a geotextile fabric is recommended. If the River Walk is placed on the EPA haul road, walkway construction may include
Although there are DEP exemptions for background concentrations of urban fill materials associated with coal and wood ash, their presence presents a need for soil management and future exposure concerns.
20
measures consistent with this approach. Ideally, where soils will be exposed for passive recreational activities, three (3.0) feet of clean fill overlying a geotextile fabric is appropriate. If a more sophisticated geotextile fabric with a marker barrier is used, then it may be possible to overlay that barrier with two (2.0) feet of clean fill instead of three (3.0) feet. This process would be most appropriate where OHM is identified and there is a need to manage potential user exposures following completion. This process would not need to be implemented where soil impacts have not been identified. Status A review of MassDEP disposal sites has been performed for the project corridor. Any proposed construction areas should be reviewed in detail relative to existing disposal sites and site history in order to determine an appropriate soil sampling strategy to address soil management and future risk considerations.
Remediation and restoration efforts are in progress.
21
TABLE 2
HAZARDOUS MATERIALS SITES AND RELEASE TRACKING NUM MAP KEY
RTN NO.
CITY
RELEASE ADDRESS
M
4-0021348
New Bedford
744 Belleville Avenue
ACUSHNET RUBBER COMPANY INC
120 DY
06/23/
M
4-0011186
New Bedford
744 Belleville Avenue
NO LOCATION AID
120 DY
03/01/
L
4-0000601
New Bedford
740 Belleville Avenue
AEROVOX INC
72 HR
11/28/
K
4-0027583
New Bedford
700 Belleville Avenue
TITLEIST PROPERTY ACUSHNET COMPANY
120 DY
12/20/
J
4-0014529
New Bedford
686 Belleville Avenue
FIBRE LEATHER CORP
TWO HR
02/12/
I
4-0023093
New Bedford
200 Riverside Avenue
FORMER MANOMET MILL
120 DY
02/25/
H
4-0014112
New Bedford
194 Riverside Avenue
CLIFTEX CORP
72 HR
08/06/
H
4-0014111
New Bedford
194 Riverside Avenue
CLIFTEX CORP
TWO HR
08/06/
G
4-0015213
New Bedford
10 Manomet Street
NO LOCATION AID
120 DY
12/30/
G
4-0019527
New Bedford
10 Manomet Street
NO LOCATION AID
120 DY
12/13/
F
4-0019705
New Bedford
90 Riverside Avenue
WHALER'S PLACE
120 DY
04/06/
E
4-0000437
New Bedford
19 and 41 Coffin Avenue
PROPERTY
NONE
01/15/
D
4-0011675
New Bedford
206-378 Belleville Avenue
NO LOCATION AID
TWO HR
09/19/
C
4-0019924
New Bedford
94 Sawyer Street
FAIRHAVEN MILLS SE CORNER OF MILL 1
72 HR
07/19/
C
4-0014995
New Bedford
94 Sawyer Street
FAIRHAVEN MILLS
72 HR
09/03/
C
4-0000245
New Bedford
85 Coggeshall Street
FAIRHAVEN MILLS
NONE
04/15/
A
4-0017478
New Bedford
45 Coggeshall Street
NO LOCATION AID
120 DY
11/13/
AUL Implemented * = chemistry unknown - 3 RTNs at same site
22
SITE NAME LOCATION AID
REPORTING CATEGORY
NOTIFIC DAT
MBERS
CATION TE
COMPLIANCE STATUS
DATE
PHASE
RAO CLASS
CHEMICAL TYPE
/2008
RTN CLOSED
10/31/2018
/1995
TIER 2
10/31/2018
PHASE II
Pb, Cd, PCBs, cVOCs
/1988
TIER I
08/15/2013
PHASE IV
PCBs and cVOCs in soil (3.5' to depth) and groundwater; PCBs (0-2' down to 12')
/2018
UNCLASSIFIED
12/20/2018
PHASE II
PCBs in soil
/1999
RAO
02/14/2000
A3
No. 6 fuel oil in soil (0-7' below foundation)
/2011
RAO
01/04/2013
B2
Groundwater COCs: cVOCs; Soil COCs: EPH and PAHs
/1998
PSC
12/29/2017
PA
Groundwater COCs: fuel oil; Soil COCs: fuel oil
/1998
RAO
05/04/2012
A1
Bags of asbestos
/1999
RAO
12/30/1999
B1
Pb in soil (0-3')
/2005
RAO
02/01/2006
A2
Petroleum, metals, PAHs, PCBs in soil
/2006
RAO
08/07/2006
A1
Soil COCs: Petroleum, metals
/1988
RAO
07/31/2001
A2
Soil COCs: Pb
/1995
RAO
12/05/2001
B1
No. 4 fuel oil; No. 6 fuel oil
/2006
RTN CLOSED
04/12/2010
/1999
RAO
12/16/2010
/1988
RTN CLOSED
10/01/1993
/2002
STMRET
08/28/2006
PCBs and cVOCs in soil and groundwater; PCBs below RCS-2 from 2-4' bgs
PHASE III
Gasoline PHASE II
A3
No. 2 fuel oil PAHs, Metals, Petroleum (0-8' bgs)*
PHASE II
PAHs, cVOCs, Petroleum (0-8' bgs)
23
traeneSt tr e e t mWahniteSm S tr e t
d d a sh NRdaosah R o a Ro a
y SwtraeyeSt tr e e t H a th ayHwaSath e eSt tr e e t tr ea e t mkSh tr am T in k hTaSin H a th a w a tr e e t T in k h a m
Ave n u e M a d e ir a Ave n u e M a d e ir a
t t e EeSaetrtrlt eeeS tr e e y SwtraEeyaeSrlt tr e H a th ayHwaSath trEeaae rlt e S tr e H a th a w a e eSt tr e e t Satrvis D a vis trDe e t tr e e t tr e e t D a vis S E a rl e ESa trl e S e S tr e e tr e e t tr e e t o ll e tt eo llSe tt e S tr e e t tr e e t o llCe tt e SCtr e e t D a vis DSa vis S C s S tr e e t
ue ue ip sh ilAlivpesn A v e n APv e n u e
94 SAWYER STREET + 85 COGGESHALL ST FAIRHAVEN 94 SAWYER STREET + MILLS 85 COGGESHALL ST RTN: 4-0019924, 4-0014995, FAIRHAVEN MILLS4-0000245 94 SAWYER STREET + 85 COGGESHALL ST RTN: 4-0019924, 4-0014995, 4-0000245 Figure Material Sites e t Hazardous e8: tr S nue Ave rd e l FAIRHAVEN MILLS l evi a Bell FIGURE 8 Ho w Figure 8: Hazardous Material Sites t e e RTN:o4-0019924, 4-0014995, lle Avenue Bellevi4-0000245 w a rd S tr
v e n u ev e n u e h il li p sh ilAli p s A eo llSetrtteeeSt tr e e t P h ilPli p s APv e n u e e tt SCtr e e t
hnet Acus ue Aven hnet Acus
et et a n eDeeSeatrtnee S tr e S tr
S tr e eSt tr e e t ll a rd B u ll a rd d S tr e e t
eet eet N y e eSeNtrty e S tr S tr
tr eneSt tr e e t a ll mTaanllSm e ta m a n S tr e
tr e e t tr e e t H o ll y HSeotll y S ll y S tr e
er Streeert Street S trSeeaewSt ytrtrSeeaeewtt y Seeaeewttlyer S
entley StreetStreet e S tr eeeSt tr e e t eetB e e tltrBeeeettl B e e tl e S
Ho
Ave n u e n t S tr e e t M a d e ir a N o rt h F ro eet 90 RIVERSIDE 194 RIVERSIDE AVENUE n t S trDRIVE N o rt h F ro WHALER’S PLACE FORMER CLIFTEX 90 RIVERSIDE DRIVE 194 RIVERSIDE AVENUE S tr e e t t n ro RTN: 4-0019705 RTN: 4-0014112, 4-0014111 F h PLACE FORMER CLIFTEX rt N oWHALER’S 90RTN: RIVERSIDE DRIVE 1944-0014112, RIVERSIDE AVENUE Bell 4-0019705 RTN: 4-0014111 evill enue WHALER’S PLACE a d e ir a A vCLIFTEX Hope Stree t MFORMER Bell e Avenu nue RTN: 4-0019705 eville A e RTN: 4-0014112, A v e 4-0014111 t Stree M a d e ir a Hope 200 venu RIVER 10 MANOMET STREET e Bell e e u MA ville 4-0019527 200 RIVE A v e n FORMER RTN: 4-0015213, 10 MANOMET AveSTREET M a d e ir a Hope Stree t nue RTN: 4 FORMER RTN: 4-0015213, 4-0019527 200RTN: RIVE 10 MANOMET STREET Desa
PHASE 2
LEGEND LEGEND
Proposed River Walk Path
E
River Walk Follows Existing Proposed River Walk Path Path + Driveway River Walk Follows Existing Path + Driveway Proposed Onroad RiverWalk Walk Follows Existing River Extension Proposed Onroad Path + Driveway River Walk Extension Proposed Onroad River Walk Path Proposed River WalkProposed ExtensionRiver Walk Path River Walk Follows Existing Proposed River Walk Path Path + Driveway River Walk Follows Existing Path + Driveway
M
LEGEND Proposed River Walk Path
0
250 250
0
250
500 Feet 500 500
750 750
1,000 1,000
750
1,000
Feet Feet
¸¸¸ ¸¸
0
Feet Feet
SEGMENT SEGMENT 7 7 SEGMENT 7 SEGMENT SEGMENT 6 6 SEGMENT 6
SEGMENT SEGMENT 6 6 SEGMENT 6 SEGMENT SEGMENT 5 5 SEGMENT 5
G G G
PHASE 2 PHASE 2
PHASE 4
H H H
et et maent eoSemtrt eet S tr e M a n otM S tr Man o me
SEGMENT SEGMENT 6 6 SEGMENT 6 SEGMENT SEGMENT 5 5 SEGMENT 5
PHASE 4 PHASE 4
PHASE 2 PHASE 2 PHASE 2
erside
iv Victoria R
SEGMENT SEGMENT 5 5 SEGMENT 5 SEGMENT SEGMENT 4 4 SEGMENT 4
SEGMENT SEGMENT 4 4 SEGMENT 4 SEGMENT SEGMENT 3 3 SEGMENT 3
SEGMENT SEGMENT 3 3 SEGMENT 3 SEGMENT SEGMENT 2 2 SEGMENT 2
SEGMENT SEGMENT 1 1 SEGMENT 1
SEGMENT SEGMENT 2 2 SEGMENT 2 SEGMENT SEGMENT 1 1 SEGMENT 1
PHASE 4
E E E
et et maent eoSemtrt eet S tr e M a n otM S tr Man o me
PHASE 4 PHASE 4
Fabrics American Engineered Fabrics
SEGMENT SEGMENT 5 5 SEGMENT 5 SEGMENT SEGMENT 4 4 SEGMENT 4
A A A
RTN: 4-0000437 STAR PLATING RTN: 4-0000437
SEGMENT SEGMENT 4 4 SEGMENT 4 SEGMENT SEGMENT 3 3 SEGMENT 3
SEGMENT SEGMENT 2 2 SEGMENT 2 SEGMENT SEGMENT 1 1 SEGMENT 1
SEGMENT SEGMENT 1 1 SEGMENT 1
7-Eleven
F F F
Foondo /Food / LustianLoouost /tingPlating dlaia r ta LustianSotaFr PgS Star Platin
RTN: 4-0011675 Engineering Work Zone RIVERSIDE Sawyer StreetPARK 206 - 378 BELLEVILLE Facility / Jacobs AVENUE RTN: 4-0011675 Engineering WorkPARK Zone RIVERSIDE RTN: 4-0011675
Bell
FORMER De RTN:
evill De Av Hope S Bell eAvenue Riverside evill enue e Av Whaler’s Care Hope Riv Riverside Avenue eCLIFTEX Corp. nue Whaler’s Place Bell Assisted Living evill Whaler’s Care CLIFTEX Corp. e Whaler’s Place Ave HopeR Avenue AssistedRiverside Living nue Powder Pro Whaler’s Care CLIFTEX Corp. Powder Pro R ide AmericanPlace Whaler’s ria RiversLiving VictoAssisted Engineered e id American ivers Fabrics Victoria R Powder Pro Engineered Fabrics e id American rs e iv Victoria R Engineered Riverside Avenue Fabrics Whaler’s Care Riverside Avenue CLIFTEX Corp. Whaler’s Place Assisted Living Whaler’s Care CLIFTEX Corp. Whaler’s Place Avenue AssistedRiverside Living Po 19 + 41 COFFIN AVENUE Whaler’s Care e CLIFTEX Corp. PLATING id AmericanPlace rs 19 STAR + 41 COFFIN AVENUE Whaler’s e ria Riv Living VictoAssisted Engineered RTN: 4-0000437 STAR PLATING American iverside Victoria R 19 + 41 COFFIN AVENUE Fabrics Engineered Foondo /Food / LustianLoouost /tingPlating dlaia r ta LustianSotaFr PgS Star Platin
45 COGGSEHALL STREET Taco Bell 7-ELEVEN STREET 45 COGGSEHALL RTN: 7-ELEVEN 4-0017478 Taco Bell 45 COGGSEHALL STREET 7-Eleven RTN: 4-0017478 7-ELEVEN 7-Eleven RTN: 4-0017478
SEGMENT SEGMENT 3 3 SEGMENT 3 SEGMENT SEGMENT 2 2 SEGMENT 2
StreetStreet shall shall CoggeCogge Cogge shall Street
StreetStreet shall shall CoggeCogge
S tr e e t Facility / Jacobs Sawyer M it c h e ll TheStreet Zone RopeWork Taco Bell it c h e ll S tr e e t Engineering Facility RIVERSIDE PARK w/ oTJacobs t M e r k k s s h e Zone Sawyer Street RopeWork ettba Engineering Taco Bell k r a e works SMtr e sketFacility / Jacobs M it c h e ll etba The Zone Mark Engineering RopeWork Taco Bell works sket 7-Eleven etba k r a M 7-Eleven Sawyer Street 206 - 378 BELLEVILLE AVENUE Facility / Jacobs 7-Eleven Sawyer Street Engineering Work Zone AVENUE PARK 206 -RIVERSIDE 378 BELLEVILLE Taco Bell Facility / Jacobs
RTN: 4-0015213, 4-0019527
ad ad N a sh aNRdaosh R o N a sh R o
RIVERSIDE PARK Sawyer StreetBelleville Avenue RIVERSIDE PARK
A ffv einn uAev e n u e C o ff in vCe on u e C o ff in A
Belleville Avenue Belleville Avenue
e eSt tr e e t mkSh tr am T in k hTaSin tr e e t T in k h a m
D D D
RIVERSIDE PARK
A ffv einn uAev e n u e C o ff in vCe on u e C o ff in A tr e e t tr e e t D e a ntreDeeSeatn e S De an e S
RIVERSIDE PARK
S tr e eSt tr e e t B u ll aSrd Btruelleat rd B u ll a rd
eet eet N y e eSeNtrty e S tr N y e S tr
C C C
S traeneSt tr e e t T a ll mSTaatrnllem et T a ll m a n
treet treet SawytreSer aeSwt yer S Sawyer S
tr e e t tr e e t B e e tltreBeeSeettl e S B e e tl e S
Ho S tr e e t M it c h e ll Th Rope e S tr e e t woTrks t M it c h e ll e k s h Rope e ettba k r a e w t e tr M orks e S k ll s M it c h e etba Th Mark Rope e works sket etba k r a M
tr e e t tr e e t H o lltry eHSeotll y S H o ll y S
MassDEP Release Tracking Numbers - MassDEP Release Tracking Numbers H HAZARDOUS MATERIAL SITES - MASSDEP TRACKING RIVERSIDE PARK Sites Figure Material - MassDEP ReleaseRELEASE Tracking Numbers e t Hazardous e8: Belleville Avenue w a rd S tr
N N N
24
N
B
Brooklawn oklawn StreetStreet wn Street
lt orn F eVe ui t St re et Co nd Sowle Stree t et e lt o n S tr e F et re Co nd ui t St Field ing Stree Edna o n S trt e e t t F e ltStree Co nd ui t St re et Stree t Field ing StreeEdna t
et
ee t
Cl iff orCld iffStorredetSt re et et ve ll StverelletSt re et Cl iff or d St reCo Co Co ve ll St re et
e eSt tr e e t trry Q ue ryQeSue t S treneue Av Av ry ue alQntr al ntrCe ueen l Av en ue
et
tr e e t teeseSt tr e e t B a te sBSa tr a dRo a d t e Rv ilo le B a te s S tr e B e ll e vBilRele oll ea d B e ll e v il le
tr e e t tr e e t utrgeSeent ia S E u g e nESia oad oad le ll eRv il le R E u g e n ia Ro a d
t t ahnitSmtraeneS tr e e W h it mW tr e e t tr e e t S tr e e t ia u gSe n ia S W h it m a n S tr e e t
Irvi ngt on Coet urt Co nc or d St re Irvi ngt on Co urt et Co nc or d St re Irvi ngt on Co urt
BROOKLAWN PARK BROOKLAWN PARK
CTS
PHASE 3
PHASE 5
Pico Stone John’s Auto / Imports and SK Machine Pico Stone John’s Auto / Supply Co. Imports and SK Machine Supply Co. John’s Auto / Pico Stone Imports and SK Machine Supply Co. SEGMENT 12 SEGMENT 12 SEGMENT 12
PHASE 5 PHASE 5
WoodWood StreetStreet Wood Street
CTS
CTS
PHASE 3 PHASE 3
Sylv iaSylv iaetStre et Stre Sylv ia Stre et
CTS
Pico Stone John’s Auto / Imports and SK Machine Pico Stone John’s Auto / Supply Co. Imports and SK Machine Supply Co. John’s Auto / Pico Stone Imports and SK Machine Supply Co. SEGMENT SEGMENT 12 12 SEGMENT 12
PHASE 5
CTS
WoodWood StreetStreet Wood Street
Brooklawn Brooklawn CourtCourt Brooklawn Court Sylv iaSylv iaetStre et Stre Sylv ia Stre et HowaHowa rd Avenu rd Avenu e e Howa rd Avenu e
Brooklawn Brooklawn CourtCourt Brooklawn Court
BuildingExisting to be Removed Shoreline Existing Shoreline Municipal Park Existing Shoreline Municipal Park
PerryPerry StreetStreet HowaHowa rd Avenu rd Avenu e e Perry Street Howa rd Avenu e
PHASE 3
CTS
SEGMENT 12 SEGMENT 12 SEGMENT 12 SEGMENT 11 SEGMENT 11 SEGMENT 11
PHASE 5 PHASE 5
SEGMENT 11 SEGMENT 11 SEGMENT 11 SEGMENT 10 SEGMENT 10 SEGMENT 10
Building to be Removed Municipal Park Building to be Removed
Site Former Aerovox Site
PHASE 3 PHASE 3
PHASE 1
Existing Shoreline Existing Shoreline Municipal Park Existing Shoreline Municipal Park
Former Aerovox Former Site Aerovox
SEGMENT SEGMENT 12 12 SEGMENT 12 SEGMENT SEGMENT 11 11 SEGMENT 11
SEGMENT SEGMENT 11 11 SEGMENT 11 SEGMENT SEGMENT 10 10 SEGMENT 10
PHASE 1 PHASE 1
Kearsarge Street
PrecixPrecix / Acushnet / Acushnet RubberRubber Precix / Acushnet Rubber River River Road Road River Road
Belleville Avenue
SEGMENT 10 SEGMENT 10 SEGMENT 10 SEGMENT 9 SEGMENT 9 SEGMENT 9
SEGMENT 9 SEGMENT 9 SEGMENT 9 SEGMENT 8 SEGMENT 8 SEGMENT 8
SEGMENT 8 SEGMENT 8 SEGMENT 8 SEGMENT 7 SEGMENT 7 SEGMENT 7
SEGMENT 7 SEGMENT 7 SEGMENT 7 SEGMENT 6 SEGMENT 6 SEGMENT 6
PHASE 1
Belleville AvenueAerovox Site Belleville Avenue
SEGMENT SEGMENT 10 10 SEGMENT 10 SEGMENT SEGMENT 9 9 SEGMENT 9
SEGMENT SEGMENT 9 9 SEGMENT 9 SEGMENT SEGMENT 8 8 SEGMENT 8
SEGMENT SEGMENT 8 8 SEGMENT 8 SEGMENT SEGMENT 7 7 SEGMENT 7
PHASE 1 PHASE 1
K Former L M Street KAerovox L M Kearsarge Former Site Aerovox Kearsarge Street K Former L M Site ny / Titleist ny / Titleist et Compa et Compa AcushnAcushn Acushnet Company / Titleist
US Party Darn It! Inc. Nashawena Company East US Party Mills Darn It! Inc. River Bank Lofts Nashawena Company East owder Pro Mills US Party Darn It! Inc. Nashawena Company East Powder Pro River Bank Lofts Mills Powder Pro River Bank Lofts
PerryPerry StreetStreet Perry Street
Desautels Street
Belleville Avenue
PrecixPrecix / Acushnet / Acushnet RubberRubber t ree t ree Stan St Precix / Acushnet Rubber Du nc an Du nc t River River Du nc an St ree Road Road River Road
Belleville Avenue
J J J
I I
Kearsarge Street
Belleville Avenue
t ree t y St y St dleree Ha dleHa Ha dle y St ree t
I
t ree t reeSt Stan Du nc an Du nc Du nc an St ree t
M er ril l St re et et lyrilS US Party l trSte re et Darn It! Inc. e aer HM Nashawena CompanySEast tr e e t ly Party H e aUS Mills Darn It! Inc. River Bank Lofts Nashawena Company East e Stree t t e e tr Mills ly S Party H e aUS Darn It! Inc. River Bank Lofts Nashawena Company East Street Desautels Mills Desautels Street
esautels Street Stree t e Stree ver BanktLofts
t ree t StverelletSt re et ve llCo St y St y Co dleree Ha dleHa t ve ll St re et Ha dle y St reeCo ny / Titleist ny / Titleist et Compa et Compa AcushnAcushn Acushnet Company / Titleist t ree t reeSt Sttch Ha tchHa Ha tch St ree t
eseSt tr e e t te B a te sBSaetr t B a te s S tr e
Av en Av en ue al ntr al ue Ce ntrCe Ce ntr al Av en ue
G NUMBERS (RTNs)
t ree t reeSt Sttch Ha tchHa Ha tch St ree t
740 BELLEVILLE AVENUE 686 BELLEVILLE AVENUE BROOKLAWN PARK AEROVOX FIBRE686 LEATHER CORPORATION Stree t t Field ing Stree Edna Sowle 740 BELLEVILLE AVENUE BELLEVILLE AVENUE t Stree et re St RTN: 4-0000601 RTN: 4-0014529 l ril AEROVOX FIBRE LEATHER CORPORATION M er (PROPERTY INFORMATION PROVIDED IN TABLE 2) Sowle Stree t 740 BELLEVILLE AVENUE 686RTN: BELLEVILLE AVENUE 4-0014529 Irvi ngt onRTN: M er ril l St re et Co urt 4-0000601 ui t St re et Co nd AEROVOX FIBRE LEATHER CORPORATION Sowle Stree t t e Irvi e ngt on tr Co urt RTN: 4-0000601 RTN: 4-0014529 Co nd ui t St re et e a lyrilSl St re et RSIDE AVENUEHM er 700 BELLEVILLE AVENUE 744 BELLEVILLE AVENUE t e e BROOKLAWN PARK ly S tr Field ing Stree Irvi ngt on Co urt t ANOMETAVENUE MILLS H e a TITLEIST AVENUE PRECIX AVENUE Co nd ui t St re et ERSIDE 700 BELLEVILLE 744 BELLEVILLE BROOKLAWN PARK Field t ing Stree e t e 4-0023093 RTN: 4-0027583 RTN: 4-0021348, 4-0011186 tr MANOMET MILLS TITLEIST PRECIX H e a ly S ERSIDE AVENUE 700 BELLEVILLE AVENUE 744 BELLEVILLE AVENUE Street Kearsarge Street autels : 4-0023093 RTN: 4-0027583 RTN: 4-0021348, 4-0011186 BROOKLAWN PARK Field ing Stree t MANOMET MILLS TITLEIST PRECIX Kearsarge Street esautels Street et re St l ril M er : 4-0023093 RTN: 4-0027583 RTN: 4-0021348, 4-0011186
Parcel Boundary Parcel Boundary City-Owned Parcel Parcel Boundary City-Owned Parcel City-Owned Parcel Parcel Boundary Parcel Boundary City-Owned Parcel Parcel Boundary City-Owned Parcel
25
Source: eDEP Source: eDEP Source: eDEP
gainst .
ojected ng, and tailed od risk mended ther to e to
due to pper
or higharate
sessed plans.
aterfront el rise de
flood us park ct to nception fecycle,
1.2 Climate Risk and Resiliency Planning
for many building professionals and government agencies, there are many resources available as references with helpful information on how cities and government agencies are adapting their practices for a changing climate. The resources that have been published by New York City Parks Department post-Hurricane Sandy are of particular relevance in examining regionally appropriate lessons learned from real events for addressing municipal climate preparedness.
Urban coastal construction occurs at a crossroads where many of the most complicated effects of climate change meet: inland flooding converges at the low point of the waterfront, daily tides rise to affect shorelines in new ways, and the coastal edge is subject to storm-related flooding. These forces can interact differently, depending on the nature of each storm event, to create different patterns of effect across the built environment. New Bedford Harbor is currently protected from storm surge because of the Army Corps of Engineer’s Hurricane Barrier which sits about three miles south of the River Walk site at the mouth of the harbor. Modeling from the Woods Hole Group indicates that both sea level rise and coastal storms will begin to affect the Upper Harbor in new and challenging ways in the coming decades, despite the presence of the Hurricane Barrier.
Climate Resilience and Risk Resources NYC Mayor’s Office of Recovery and Resiliency Climate Resiliency Design Guidelines Updated in March 2019, this is the most recent and relevant document for municipal capital planning with consideration for increased heat, precipitation, and sea level rise. Contrary to what the title suggests, this guide is less about design, and more about helping the city decide how to determine when and how to approach construction in climate risk zones.
As many of the following documents attest, the act of creating new construction in the coastal floodplain is now understood to require a specialized planning approach that starts with a close consideration of the risks, continues with a careful consideration of existing resources and shoreline conditions, and ends in a cost-benefit analysis for the funding entities (for example, see the planning process checklist on page 55 of NYC Parks and Recreation’s Design and Planning for Flood Resiliency). When construction is deemed appropriate and feasible, a flood-resistant set of design construction guidelines become crucial for achieving a long-lasting public resource.
https://www1.nyc.gov/site/orr/index.page NYC Parks + Recreation Design and Planning for Flood Resiliency This document is a useful Post Hurricane Sandy reference for planning and building public amenities in high risk, flood prone areas. This resource offers guidelines for first understanding risks, and then designing resources where appropriate and feasible, with these risks in mind.
Though Climate Adaptation is a relatively new consideration
https://www.nycgovparks.org/planning-and-building/planning/ resiliency-plans/flood-resiliency NYC Parks + Recreation High Performance Landscape Guidelines – 21st Century Parks for NYC
PLANNING PROCESS CHECKLIST
New York City’s pre-Sandy approach to addressing Climate Change, focuses mainly on urban heat island effect and stormwater infrastructure overburdened by greater storm intensity and frequency. Although dated in its pre-Sandy climate considerations that do not include storm surge challenges, there are some helpful best practices on inland stormwater management (an often underestimated part of the storm preparation equation) in Part IV, and Restoration Landscape Case Studies in Part V with very valuable lessons learned from built projects.
Assess site-specific flood zones and risk Determine desire public uses
https://www.nycgovparks.org/greening/sustainable-parks/ landscape-guidelines
Review topographic data against future sea level rise projections Conduct a shoreline inspection
1.3 Future Flooding and Storm Surge Conditions
Determine if communities can benefit from park-based coastal protection measures
Future flooding conditions and coastal storm risk level data were gathered for this study based on analysis using the Massachusetts Coast Flood Risk Model (MC-FRM) for the upper Acushnet River area for the years 2030, 2050, and 2070.
Consider conducting a costbenefit analysis
NYC Parks and Recreation’s Planning for Flood Resiliency Planning Process Checklist
26
TABLE 3
TIDAL BENCHMARKS FOR PRESENT DAY, 2030, 2050, AND 2070 SEA LEVEL RISE COASTAL STORMS BENCHMARK/ RETURN PERIOD
PRESENT
2030
PRESENT
PRESENT
(feet, NAVD 88)
(feet, NAVD 88)
(feet, NAVD 88)
(feet, NAVD 88)
MLW
-1.50
-0.26
0.94
2.74
MTL
0.28
1.42
2.72
4.52
MHW
2.06
3.20
4.50
6.29
MHHW
2.31
3.45
4.75
6.54
10-year*
3.11
4.15
5.23
7.07
50-year*
3.38
4.45
5.42
7.28
100-year*
3.50
5.42
5.50
7.36
The tidal benchmarks (MLW, MTL, MHW, MHHW) assume the New Bedford Hurricane Barrier is open under present day and future typical weather conditions. *“Storm (10-yr, 50-yr, 100-yr) return periods values assume the New Bedford Hurricane Barrier would be closed to limit storm surge-based flooding in the Acushnet River estuary. The model also assumes the Hurricane Barrier does not fail and functions as intended. However, some storms will overtop the Hurricane Barrier in 2050, and even more storms will overtop the Hurricane Barrier in 2070. This overtopping is included in the modeling and assessment of the estuary upstream of the Hurricane Barrier. The Hurricane Barrier, while overtopped, does still reduce the peak flood levels in the estuary.” (Woods Hole Group).
In December 2019, the Woods Hole Group provided data (tidal benchmarks and storm return periods) generated by the MC-FRM. This data was developed to enable the City of New Bedford to develop conceptual adaptation strategies and design climate change adaptation plans for the River Walk. These flood risk models are used as the state standard and align with state regulatory requirements consistent with the state-based climate projections.
Based on these future flooding conditions, coastal storm risk level data, desired project life and reliability of projection data, a focus on the 2050 year projections was selected. The uncertainties of flooding conditions beyond 2050 precluded assigning a design life beyond 2050. This data also informed the selection of a trail elevation no lower than 5.0 – 5.5 NAVD881 which may provide the longest feasible design life for the trail considering sea-level rise projections up to 2050 and offer a short-term benefit in the form of a modest buffer to rising sea levels. It is anticipated that at this elevation, the trail may be inundated during certain flood events.
Tidal benchmarks for the Present Day, 2030, 2050 and 2070 sea level rise and coastal storm simulations are shown on Table 3 below and include Mean Low Water (MLW), Mean Tide Level (MTL), Mean High Water (MHW), Mean High High Water (MHHW), 10-year flood, 50-year flood and 100-year flood and are based on the assumption that the New Bedford Hurricane Barrier is open under present day and future non-storm conditions.
After 2050, a re-evaluation of the alignment of the River Walk will likely be required, as a better understanding of harbor conditions, the continued proper functioning of the hurricane barrier, and sea level rise projections for 2070 and 2100 come into sharper relief. While the hurricane barrier is currently functioning properly as a protection against the largest storms and associated wave action, the gates may need to be repaired or replaced by the Army Corps at a future date, as it is currently being closed more often than originally intended due to higher and more frequent high tide conditions. The coastal storm projection numbers depend on the barrier’s presence and proper function, and thus must be considered in future planning exercises.
Figures 9 presents the probability of flood inundation for 2030, 2050, and 2070 and Figure 10 presents flood depths for the 1% annual flood (or 100 year flood event) for 2030, 2050, and 2070. The individual figures included in Figures 9 and 10 are also provided in full-size (11” x 17”) in Appendix A as Figures 9A through 9C and Figures 10A through 10C. This data and mapping demonstrate that in the coming decades, coastal flooding in the study area will become more frequent and more severe.
1
27
NAVD88 The (North American Vertical Datum of 1988) is a commonly used zero elevation point that provides a consistent reference to which other North American elevations can be compared.
et
eet
et
Co nco rd Str eet
Cen tral Ave nue
SEGMENT 5
SEGMENT 4
Clif ford Str eet
t Qu ery Str ee
SEGMENT 4
SEGMENT 3
Eu ge ni a
W hi tm an
Co lle tte
re et De an e St
Be lle vil le
t St re et No rth Fr on
SEGMENT 3
SEGMENT 2
SEGMENT 2
SEGMENTPh1ill ip s Av en ue
St re et
ue Aven
SEGMENT 1
St re et
Ho wa rd
St ree t
Be et le
Bentley Street
FIGURE 9
hnet Acus
tr ee t H ea ly S
Had ley Stre et
Covell Stre et
Hatc h Stre et
e
Irving ton Court
Me rril l Str eet Hope Street
Ave nu
et Ba tes St re
Ro ad
St re et
M
Th Rope e works
St re et
sket
tba arke
St re et
St re et
eville
St re et
en ue Co ffi n Av
M itc he ll
Bell
Ti nk ha m
Belleville Avenue
RIVERSIDE PARK
Av en ue
ad Na sh Ro
Ma de ira
Ha th aw ay
re et Ea rle St
re et Da vi s St
St re et
St re et
Bu lla rd
reet
St re et
et N ye St re
Ta llm an
tr ee t H ol ly S
Sawyer St
re et Be et le St
MA-FRM PROBABILITY OF INUNDATION (2030, 2050, 2070) Figure 9: MA-FRM Probability of Inundation (2030, 2050, 2070) PHASE 4 PHASE 2
K
Desautels Street
Prin cet on Str eet
Sh aw Str eet
SEGMENT 11
SEGMENT 10
Covell Stre et
Had ley Stre et
Hatc h Stre et
K
Acushnet Company / Titleist Irvin gton Stre et
Prin cet on Str eet
Sh aw Str eet
Existing Shoreline Municipal Park
Co nco rd Str eet
Building to be Removed
SEGMENT 11
SEGMENT 10
SEGMENT 9
Cen tral Ave nue
Str eet 10 Clif fordSEGMENT
t Qu ery Str ee
Ro ad
SEGMENT 9 tes St re et SEGMENT 8 Ba
Be lle vil le
SEGMENT 8
SEGMENT 7
St re et
Irving ton Court
PHASE 3
Me rril l Str eet
PH
Had ley Stre et
tr ee t H ea ly S
Covell Stre et
Hatc h Stre et
St re et
e
SEGMENT 9
Cen tral Ave nue
ree t Gl en no n St
Eu ge ni a
W
re et SEGMENT hi tm6an St
PHASE 1
Hope Street
Ave nu
Str eet 10 Clif fordSEGMENT
t Qu ery Str ee
Ro ad
SEGMENT 9 tes St re et SEGMENT 8 Ba
Be lle vil le
SEGMENT 8
St re et
River Walk Follows Existing Path + Driveway
SEGMENT 7
ad Na sh Ro
Ti nk ha m
eville
St re et
Bell
SEGMENT 6
Ha th aw ay
Th Rope e works
SEGMENT 7
Eu ge ni a
Proposed River Walk Path
Av en ue
PH
Belleville Avenue
Proposed Onroad River Walk Extension
Ma de ira
5% 10% 20%
US Party Darn It! Inc. Nashawena Company East Mills Str eet on ngt Arli
River Bank Lofts
100%
SEGMENT 5
St re et
re et Ea rle St
SEGMENT 5 vi s St re et Da
SEGMENT 4
Co lle tte
en ue Ph ill ip s Av
PHASE 2
0.5% 1% 2%
Powder Pro
25% 30% 50%
en ue Co ffi n Av
M
W
Victoria Ri
5% 10% 20%
SEGMENT 4
SEGMENT 3
re et De an e St
St re et
St re et
sket
tba arke
re et SEGMENT hi tm6an St
0.5% enue Av1% hnet Acus 2%
RIVERSIDE PARK St re et
SEGMENT 7
verside
American Engineered Fabrics
Proposed OnroadIrving ton Court River Walk Extension PHASE 3
Me rril l Str eet
Desautels Street
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Belleville Avenue
M itc he ll
ad Na sh Ro
1,000
t St re et No rth Fr on
Bu lla rd
SEGMENT 3
SEGMENT N 2 ye St re et
Ta llm an
reet
Sawyer St
re et Be et le St
tr ee t H ol ly S
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
St re et
1,000
Ti nk ha m
750
SEGMENT 6
500
PHASE 1
River Walk Follows Existing Path + Driveway
tr ee t H ea ly S
St re et
St re et
250
e
Dry Hope Street 0.1% 0.2%
M an om et
Feet
Ave nu
/
Be et le
Bentley Street
Dry 0.1% 0.2%
St re et
eville
od Lustiano Fo g Star Platin
Probability of Inundation
N
Av en ue
Ha th aw ay
Bell
750
7-Eleven
Ma de ira
Probability of Inundation
Whaler’s Place
¸
Coggesha ll Street
Taco Bell
500
re et Ea rle St
PHASE 2
SEGMENT 5
SEGMENT 5 vi s St re et Da
250
Sawyer Street Facility / EPA Work Zone
Proposed River Walk Path nco rd Str eet
100%
SEGMENT 4
St re et
Feet
Th Rope e works
0
2050
Co lle tte
ket tbas
e
Mark
St re et
25% 30% 50%
en ue Co ffi n Av
St re et M itc he ll
Ho wa rd
en ue Ph ill ip s Av
SEGMENT 4
N
RIVERSIDE PARK
0
Co
¸
Belleville Avenue
0
e
t St re et No rth Fr on
SEGMENT 3
5% 10% 20%
re et De an e St
St re et
St re et
PHASE 4
Bu lla rd
SEGMENT 3
SEGMENT N 2 ye St re et
Ta llm an
tr ee t H ol ly S
SEGMENT 1
reet
Sawyer St
re et Be et le St
2030
0.5% 1% 2%
SEGMENT 2
SEGMENT 1
Dry 0.1% St re et Ho wa rd 0.2%
enu et Av
Victoria Ri
ree t Gl en no n St
St re et
1,000
hn Acus
Powder Pro
St re et
Be et le
Bentley Street
Probability of Inundation
verside
American Engineered Fabrics
US Party Darn It! Inc. Nashawena Company East Mills Arli ngt on Str eet
River Bank Lofts
Acushnet Company / Titleist Irvin gton Stre et
Whaler’s Place
7-Eleven
Belleville Avenue
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living M an om et
Taco Bell
od / Lustiano Fo g Star Platin
Coggesha ll Street
Sawyer Street Facility / EPA Work Zone
K
Desautels Street
250
500
750
1,000
Powder Pro
St re et
0
verside
Victoria Ri
/
Dry 0.1% 0.2%
Feet
0.5% 1% 2%
25% 30% 50%
5% 10% 20%
US Party Nashawena Company East Mills
Darn It! Inc.
Proposed River Walk Path
Existing Shoreline
River Walk Follows Existing Path + Driveway
Municipal Park
Proposed Onroad River Walk Extension
Building to be Removed
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 10
SEGMENT 9
PHASE 1
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
28
SEGMENT 6
PHASE 2
100%
SEGMENT 5
SEGMENT 4
PHASE 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
2070
od Lustiano Fo g Star Platin
Probability of Inundation
N
American Engineered Fabrics
River Bank Lofts
Acushnet Company / Titleist
Whaler’s Place
7-Eleven
Belleville Avenue
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living M an om et
Taco Bell
¸
Coggesha ll Street
Sawyer Street Facility / EPA Work Zone
PH
SEGMENT 12
Howard Avenue
Perry Street
unca n Stre et
Had ley Stre et
SEGMENT 12
SEGMENT 11
Precix / Acushnet Rubber
River Road
Acushnet Company / Titleist Irvin gton Stre et
Prin cet on Str eet
P
SEGMENT 12
SEGMENT 11
SEGMENT 11
SEGMENT 10
SEGMENT 9
Str eet 10 Clif fordSEGMENT
Cen tral Ave nue
PHASE 3
R P
PHASE 5
Howard Avenue
Kearsarge Street
Perry Street
Dun can Stre et
Had ley Stre et
Covell Stre et
Hatc h Stre et
St re et
St re et
P R
BROOKLAWN PARK
Desautels Street
Belleville Avenue Darn It! Inc.
River Walk Follows Existing Path + Driveway
Municipal Park
P
Im CTS Buildings S Building to be Removed With Highest Floo
SEGMENT 12
SEGMENT 11
PHASE 3
SEGMENT 11
Buildings With Highest Floo SEGMENT 10
SEGMENT 9
Wood Street
Sylvia Street
Precix / Acushnet Rubber
River Road
PHASE 1
With Highest Buildings WithBuildings Highest Floo
Existing Shoreline
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
Building to be Removed
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
Proposed Onroad River Walk Extension
River Walk Extension
Former Aerovox Site
Precix / Acushnet Rubber
St re et
Proposed River Walk Path Existing Shoreline
River Road
US Party Nashawena Company East Mills
Acushnet Company / Titleist
M an om et
River Bank Lofts
100%
PHASE 2
100% Irving ton Court
Municipal Park Proposed Onroad
PHASE 4
eet
Sh aw Str eet
t Qu ery Str ee
Ro ad
St re et
Ti nk ha m
Ha th aw ay
SEGMENT 9 tes St re et SEGMENT 8 Ba
Be lle vil le
SEGMENT 8
SEGMENT 7
Eu ge ni a
W
re et SEGMENT hi tm6an St
SEGMENT 7
ad Na sh Ro
SEGMENT 6
SEGMENT 5
25% 30% 50%
P Im S
CTS
Building to be Removed
River Walk Follows Existing Path + Driveway
S tr e e t
Buildings With Highes
Municipal Park
tr ee t H ea ly S
Powder Pro
25% 30% 50%
5% 10% 20%
SEGMENT 11
ree t Gl en no n St
St re et
Proposed River Walk Path 0.5% 1% 2%
SEGMENT 10
SEGMENT 10
SEGMENT 9
M an om et
re et Ea rle St
SEGMENT 5 vi s St re et Da
St re et
1,000
verside
Victoria Ri
Existing Shoreline
Me rril l Str eet Hope Street
Assisted Living
American Engineered Fabrics
tree t
et
SEGMENT 9
Co lle tte
SEGMENT 4
750
L a n d ry
SEGMENT 8
500
eville
/
Brooklawn Court
Howard Avenue
Perry Street
Dun can Stre et
250
Dry 0.1% 0.2%
100%
5% 10% PHASE 1 20%
Former Aerovox Site
Co nco rd Str eet
Proposed Onroad River Walk Extension
venu Buildings With Highest AFlood Risk - 2030 e
od Lustiano Fo g Star Platin
¸
Probability of Inundation
Feet
River Walk Follows Existing Path + Driveway
Riverside Avenue Buildings With Highest Flood Risk - 2070 Whaler’s Care CLIFTEX Corp. Whaler’s Place
Fielding Street
N
25% 0 30% 50% Kearsarge Street
Former Aerovox Site
Sawyer Street Street/ EPA SowleFacility Work Zone
Con
7-Eleven
100%
0.5% Av en ue Ma de ira 1% 2%
Bell
PHASE 5
Proposed River Walk Path
25% 30% 50%
PHASE 2
PHASE 3
Powder Pro
Kearsarge Street
Belleville Avenue
US Party Darn It! Inc. Nashawena Company East Mills Arli ngt on Str eet
River Bank Lofts
Buildings With Highest Flood Risk - 2050
Building to be Removed dui t Stre et
BROOKLAWN PARK
en ue Ph ill ip s Av
SEGMENT 12
Coggesha ll Street
SEGMENT 12
SEGMENT 11
HASE 5
verside
en ue Co ffi n Av
Municipal Park Edna Street
SEGMENT 4
Brooklawn Street
Existing Shoreline
RIVERSIDE PARK
Dry 0.1% 0.2%
tr ee t H ea ly S
Desautels Street
5% 10% 20%
2%
750 1,000 et e lle Avenu Bellevi o Stre Wald
Ver non Stre et St re et Pico Stone John’s Auto / M itc he ll he Imports and RSK TMachine CTS opew t Supply rksn St ree t skeCo. Fe olto etba Mark
Taco Bell
0.5%
enue Av1%
SEGMENT 3
re et De an e St
St re et
PHASE 4 ee t
Bu lla rd
SEGMENT 3
S tr
SEGMENT N 2 ye St re et
L a n d ry
hnet Acus LEGEND 0.2%
e
Victoria Ri
Engineered Fabrics
Probability of NoInundation St re et rth Fr on t
St re et Ta llm an Wood Street
Sylvia Street
500
1,000
tr ee t H ol ly S
reet
Sawyer St
re et Be et le St
250
SEGMENT 1
SEGMENT 1
Precix / Acushnet Rubber
River Road
0
Feet
SEGMENT 8
750
SEGMENT 2
Howard Avenue St re et
500
¸ St re et Ho wa rd
Former Aerovox Site
SEGMENT 7
Brooklawn Court
Be et le
250
od / Lustiano Fo g Star Platin
¸
Perry Street Bentley Street
Dun can Stre et
N
Dry 0.1%
Feet
Hope Street
Ave nu
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
PHASE 1American Probability of Inundation
N
eville
Whaler’s Place
Fielding Street
7-Eleven
0
SEGMENT 7
Sawyer Street Street/ EPA SowleFacility Work Zone Con dui t Stre et
BROOKLAWN PARK
Kearsarge Street
Edna Street
Bell
ue ffi n Av en
Th Rope e w rksn St ree t Fe olto
SEGMENT 6
SEGMENT 6
SEGMENT 5
Coggesha ll Street
Taco Bell
Brooklawn Street
t
ske etba
Mark
2
RIVERSIDE PARK
Ver non Stre et
St re et
M itc he ll
PHASE 5
Wald o Stre et
Buildings With Highest Flood Risk - 2030 Brooklawn Street
Ver non Stre et Pico Stone John’s Auto / Imports and SK Machine t Supply Co. Fe lto n St ree
CTS
Edna Street
SEGMENT 12
SEGMENT 12
SEGMENT 11
Sowle Street
Con dui t Stre et
HASE 5
BROOKLAWN PARK
Fielding Street
¸
Probability of Inundation
N
Kearsarge Street
500
750
Buildings With Highest Flood Risk - 2030 Buildings With Highest Flood Risk - 2050 CTS
SEGMENT 12
SEGMENT 12
SEGMENT 11
HASE 5
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
1,000
Wood Street
Sylvia Street
Precix / Acushnet Rubber
River Road
Former Aerovox Site
250
Brooklawn Court
Howard Avenue
Perry Street
Dun can Stre et
0
Feet
Dry 0.1% 0.2%
0.5% 1% 2%
5% 10% 20%
25% 30% 50%
100%
Proposed River Walk Path
Existing Shoreline
River Walk Follows Existing Path + Driveway
Municipal Park
Proposed Onroad River Walk Extension
Building to be Removed
Buildings With Highest
These raster datasets are derived from output of the Massachusetts Coast Flood Risk Model (MC-FRM) for 2030, 2050, and 2070 sea level rise and coastal storm simulations. This public information is furnished by MassDOT and should be accepted and used by the recipient with the understanding that the data received were developed and collected for future flooding analyses purposes only. No liability is assumed as to the accuracy, sufficiency, or suitability of the information contained herein for any other particular use. MassDOT, Woods Hole Group, and UMass Boston assume no liability whatsoever associated with the use or misuse of such data. 29
et
eet
et
Co nco rd Str eet
Cen tral Ave nue
SEGMENT 5
SEGMENT 4
Clif ford Str eet
t Qu ery Str ee
SEGMENT 4
SEGMENT 3
Eu ge ni a
W hi tm an
Co lle tte
re et De an e St
Be lle vil le
t St re et No rth Fr on
SEGMENT 3
SEGMENT 2
SEGMENT 2
SEGMENTPh1ill ip s Av en ue
St re et
ue Aven
SEGMENT 1
St re et
Ho wa rd
St ree t
Be et le
Bentley Street
FIGURE 10
hnet Acus
tr ee t H ea ly S
Had ley Stre et
Covell Stre et
Hatc h Stre et
e
Irving ton Court
Me rril l Str eet Hope Street
Ave nu
et Ba tes St re
Ro ad
St re et
M
Th Rope e works
St re et
sket
tba arke
St re et
St re et
eville
St re et
en ue Co ffi n Av
M itc he ll
Bell
Ti nk ha m
Belleville Avenue
RIVERSIDE PARK
Av en ue
ad Na sh Ro
Ma de ira
Ha th aw ay
re et Ea rle St
re et Da vi s St
St re et
St re et
Bu lla rd
reet
St re et
et N ye St re
Ta llm an
tr ee t H ol ly S
Sawyer St
re et Be et le St
MA-FRM DEPTHS FOR 1% ANNUAL FLOOD (100-YEAR Figure 10: FLOOD MA-FRM Flood Depths for 1% Annual Event)2 PHASE 4 Flood (100-Year Flood PHASE
K
Desautels Street
Prin cet on Str eet
Sh aw Str eet
SEGMENT 11
SEGMENT 10
Covell Stre et
Had ley Stre et
Hatc h Stre et
K
Acushnet Company / Titleist Irvin gton Stre et
Prin cet on Str eet
Sh aw Str eet
Existing Shoreline Municipal Park
Co nco rd Str eet
Building to be Removed
SEGMENT 11
SEGMENT 10
SEGMENT 9
Cen tral Ave nue
Str eet 10 Clif fordSEGMENT
t Qu ery Str ee
Ro ad
SEGMENT 9 tes St re et SEGMENT 8 Ba
Be lle vil le
SEGMENT 8
SEGMENT 7
St re et
Irving ton Court
PHASE 3
Me rril l Str eet
PH
Had ley Stre et
tr ee t H ea ly S
Covell Stre et
Hatc h Stre et
St re et
e
SEGMENT 9
Cen tral Ave nue
ree t Gl en no n St
Eu ge ni a
W
re et SEGMENT hi tm6an St
PHASE 1
Hope Street
Ave nu
Str eet 10 Clif fordSEGMENT
t Qu ery Str ee
Ro ad
SEGMENT 9 tes St re et SEGMENT 8 Ba
Be lle vil le
SEGMENT 8
St re et
River Walk Follows Existing Path + Driveway
SEGMENT 7
ad Na sh Ro
Ti nk ha m
eville
St re et
Bell
SEGMENT 6
Ha th aw ay
Th Rope e works
SEGMENT 7
Eu ge ni a
Proposed River Walk Path
Av en ue
PH
Belleville Avenue
Proposed Onroad River Walk Extension
Ma de ira
5% 10% 20%
US Party Darn It! Inc. Nashawena Company East Mills Str eet on ngt Arli
River Bank Lofts
100%
SEGMENT 5
St re et
re et Ea rle St
SEGMENT 5 vi s St re et Da
SEGMENT 4
Co lle tte
en ue Ph ill ip s Av
PHASE 2
0.5% 1% 2%
Powder Pro
25% 30% 50%
en ue Co ffi n Av
M
W
Victoria Ri
5% 10% 20%
SEGMENT 4
SEGMENT 3
re et De an e St
St re et
St re et
sket
tba arke
re et SEGMENT hi tm6an St
0.5% enue Av1% hnet Acus 2%
RIVERSIDE PARK St re et
SEGMENT 7
verside
American Engineered Fabrics
Proposed OnroadIrving ton Court River Walk Extension PHASE 3
Me rril l Str eet
Desautels Street
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Belleville Avenue
M itc he ll
ad Na sh Ro
1,000
t St re et No rth Fr on
Bu lla rd
SEGMENT 3
SEGMENT N 2 ye St re et
Ta llm an
reet
Sawyer St
re et Be et le St
tr ee t H ol ly S
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
St re et
1,000
Ti nk ha m
750
SEGMENT 6
500
PHASE 1
River Walk Follows Existing Path + Driveway
tr ee t H ea ly S
St re et
St re et
250
e
Dry Hope Street 0.1% 0.2%
M an om et
Feet
Ave nu
/
Be et le
Bentley Street
Dry 0.1% 0.2%
St re et
eville
od Lustiano Fo g Star Platin
Probability of Inundation
N
Av en ue
Ha th aw ay
Bell
750
7-Eleven
Ma de ira
Probability of Inundation
Whaler’s Place
¸
Coggesha ll Street
Taco Bell
500
re et Ea rle St
PHASE 2
SEGMENT 5
SEGMENT 5 vi s St re et Da
250
Sawyer Street Facility / EPA Work Zone
Proposed River Walk Path nco rd Str eet
100%
SEGMENT 4
St re et
Feet
Th Rope e works
0
2050
Co lle tte
ket tbas
e
Mark
St re et
25% 30% 50%
en ue Co ffi n Av
St re et M itc he ll
Ho wa rd
en ue Ph ill ip s Av
SEGMENT 4
N
RIVERSIDE PARK
0
Co
¸
Belleville Avenue
0
e
t St re et No rth Fr on
SEGMENT 3
5% 10% 20%
re et De an e St
St re et
St re et
PHASE 4
Bu lla rd
SEGMENT 3
SEGMENT N 2 ye St re et
Ta llm an
tr ee t H ol ly S
SEGMENT 1
reet
Sawyer St
re et Be et le St
2030
0.5% 1% 2%
SEGMENT 2
SEGMENT 1
Dry 0.1% St re et Ho wa rd 0.2%
enu et Av
Victoria Ri
ree t Gl en no n St
St re et
1,000
hn Acus
Powder Pro
St re et
Be et le
Bentley Street
Probability of Inundation
verside
American Engineered Fabrics
US Party Darn It! Inc. Nashawena Company East Mills Arli ngt on Str eet
River Bank Lofts
Acushnet Company / Titleist Irvin gton Stre et
Whaler’s Place
7-Eleven
Belleville Avenue
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living M an om et
Taco Bell
od / Lustiano Fo g Star Platin
Coggesha ll Street
Sawyer Street Facility / EPA Work Zone
K
Desautels Street
250
500
750
1,000
Powder Pro
St re et
0
verside
Victoria Ri
/
Dry 0.1% 0.2%
Feet
0.5% 1% 2%
25% 30% 50%
5% 10% 20%
US Party Nashawena Company East Mills
Darn It! Inc.
Proposed River Walk Path
Existing Shoreline
River Walk Follows Existing Path + Driveway
Municipal Park
Proposed Onroad River Walk Extension
Building to be Removed
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 10
SEGMENT 9
PHASE 1
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
30
SEGMENT 6
PHASE 2
100%
SEGMENT 5
SEGMENT 4
PHASE 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
2070
od Lustiano Fo g Star Platin
Probability of Inundation
N
American Engineered Fabrics
River Bank Lofts
Acushnet Company / Titleist
Whaler’s Place
7-Eleven
Belleville Avenue
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living M an om et
Taco Bell
¸
Coggesha ll Street
Sawyer Street Facility / EPA Work Zone
PH
SEGMENT 12
Howard Avenue
Perry Street
unca n Stre et
Had ley Stre et
SEGMENT 12
SEGMENT 11
Precix / Acushnet Rubber
River Road
Acushnet Company / Titleist Irvin gton Stre et
Prin cet on Str eet
SEGMENT 12
SEGMENT 11
SEGMENT 11
SEGMENT 9
SEGMENT 10
P
R P
PHASE 5
Howard Avenue
Kearsarge Street
Perry Street
Dun can Stre et
Had ley Stre et
Covell Stre et
Hatc h Stre et
P R
BROOKLAWN PARK
Belleville Avenue Darn It! Inc.
River Walk Follows Existing Path + Driveway
Municipal Park
P
Im CTS Buildings S Building to be Removed With Highest Floo
SEGMENT 12
SEGMENT 11
PHASE 3
SEGMENT 11
Buildings With Highest Floo SEGMENT 10
SEGMENT 9
Wood Street
Sylvia Street
PHASE 1
With Highest Buildings WithBuildings Highest Floo
Existing Shoreline
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
Building to be Removed
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
Proposed Onroad River Walk Extension
River Walk Extension
Former Aerovox Site
Precix / Acushnet Rubber
Proposed River Walk Path Existing Shoreline
River Road
US Party Nashawena Company East Mills
Acushnet Company / Titleist
River Bank Lofts
100%
PHASE 2
Str eet 10 Clif fordSEGMENT
Cen tral Ave nue
PHASE 3
Municipal Park Proposed Onroad
PHASE 4
100% Irving ton Court
River Walk Follows Existing Path + Driveway
S tr e e t
eet
tree t
Sh aw Str eet
t Qu ery Str ee
Ro ad
25% 30% 50%
P Im S
CTS
Building to be Removed
tr ee t H ea ly S
Powder Pro
25% 30% 50%
5% 10% 20%
Buildings With Highest
Municipal Park
Desautels Street
St re et
0.5% 1% 2%
SEGMENT 9 tes St re et SEGMENT 8 Ba
Be lle vil le
M an om et
Proposed River Walk Path
SEGMENT 8
SEGMENT 7
St re et
St re et
St re et
verside
Victoria Ri
SEGMENT 11
ree t Gl en no n St
Eu ge ni a
Ti nk ha m
Ha th aw ay
Assisted Living
American Engineered Fabrics
SEGMENT 10
SEGMENT 10
W
re et SEGMENT hi tm6an St
SEGMENT 7
ad Na sh Ro
SEGMENT 6
SEGMENT 5
re et Ea rle St
SEGMENT 5 vi s St re et Da
1,000
SEGMENT 2
SEGMENT 1
Precix / Acushnet Rubber
River Road
L a n d ry
St re et
750
Co lle tte
500
Hope Street
/
Dry 0.1% 0.2%
100%
Brooklawn Court
Howard Avenue
Perry Street
Dun can Stre et
250
eville
Existing Shoreline
Me rril l Str eet
venu Buildings With Highest AFlood Risk - 2030 e
od Lustiano Fo g Star Platin
¸
Probability of Inundation
Feet
5% 10% PHASE 1 20%
Former Aerovox Site
Co nco rd Str eet
Proposed Onroad River Walk Extension
0.5% Av en ue Ma de ira 1% 2%
Bell
PHASE 5
River Walk Follows Existing Path + Driveway
Riverside Avenue Buildings With Highest Flood Risk - 2070 Whaler’s Care CLIFTEX Corp. Whaler’s Place
Fielding Street
N
25% 0 30% 50% Kearsarge Street
Former Aerovox Site
Sawyer Street Street/ EPA SowleFacility Work Zone
Con
7-Eleven
PHASE 2
100%
Buildings With Highest Flood Risk - 2050
Building to be Removed dui t Stre et
BROOKLAWN PARK
SEGMENT 4
SEGMENT 12
Coggesha ll Street
SEGMENT 12
SEGMENT 11
HASE 5
en ue Ph ill ip s Av
Municipal Park Edna Street
Dry 0.1% 0.2% en ue Co ffi n Av
Brooklawn Street
Existing Shoreline
RIVERSIDE PARK
SEGMENT 4
750 1,000 et e lle Avenu Bellevi o Stre Wald
Ver non Stre et St re et Pico Stone John’s Auto / M itc he ll he Imports and RSK TMachine CTS opew t Supply rksn St ree t skeCo. Fe olto etba Mark
Taco Bell
SEGMENT 3
re et De an e St
St re et
PHASE 4 ee t
Bu lla rd
S tr
SEGMENT 3
L a n d ry
SEGMENT N 2 ye St re et
Probability of NoInundation St re et rth Fr on t
St re et Ta llm an Wood Street
Sylvia Street
500
tr ee t H ol ly S
reet
250
Sawyer St
re et Be et le St
0
Feet
Precix / Acushnet Rubber
River Road
Former Aerovox Site
SEGMENT 1
St re et Ho wa rd
SEGMENT 1
¸ N
Kearsarge Street
1,000
2%
PHASE 3
Powder Pro
Proposed River Walk Path
25% 30% 50%
5% 10% 20%
enue Av1%
SEGMENT 9
750
SEGMENT 2
Howard Avenue St re et
500
0.5%
Victoria Ri
Kearsarge Street
Belleville Avenue
US Party Darn It! Inc. Nashawena Company East Mills Arli ngt on Str eet
River Bank Lofts
St re et
Brooklawn Court
Be et le
250
M an om et
¸
Perry Street Bentley Street
Dun can Stre et
0
hnet Acus LEGEND 0.2%
verside
American Engineered Fabrics
tr ee t H ea ly S
Desautels Street
(2030, 2050, 2070) PHASE 1
Dry 0.1%
Feet
e
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place
Probability of Inundation
N
Hope Street
Ave nu
SEGMENT 9
Fielding Street
7-Eleven
SEGMENT 8
BROOKLAWN PARK
SEGMENT 8
Con dui t Stre et
od / Lustiano Fo g Star Platin
Coggesha ll Street
FLOOD )2R(2030, 2050, EVENT) 2070) Taco Bell
SEGMENT 7
Sawyer Street Street/ EPA SowleFacility Work Zone
SEGMENT 7
Edna Street
eville
et
Th Rope e w rksn St ree t Fe olto
SEGMENT 6
SEGMENT 6
SEGMENT 5
Mark
Brooklawn Street
t
ske etba
Bell
ue ffi n Av en
RIVERSIDE PARK
Ver non Stre et
St re et
M itc he ll
PHASE 5
Wald o Stre et
Buildings With Highest Flood Risk - 2030 Brooklawn Street
Ver non Stre et Pico Stone John’s Auto / Imports and SK Machine t Supply Co. Fe lto n St ree
CTS
Edna Street
SEGMENT 12
SEGMENT 12
SEGMENT 11
Sowle Street
Con dui t Stre et
HASE 5
BROOKLAWN PARK
Fielding Street
¸
Probability of Inundation
N
Kearsarge Street
500
750
Buildings With Highest Flood Risk - 2030 Buildings With Highest Flood Risk - 2050 CTS
SEGMENT 12
SEGMENT 12
SEGMENT 11
HASE 5
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
1,000
Wood Street
Sylvia Street
Precix / Acushnet Rubber
River Road
Former Aerovox Site
250
Brooklawn Court
Howard Avenue
Perry Street
Dun can Stre et
0
Feet
Dry 0.1% 0.2%
0.5% 1% 2%
5% 10% 20%
25% 30% 50%
100%
Proposed River Walk Path
Existing Shoreline
River Walk Follows Existing Path + Driveway
Municipal Park
Proposed Onroad River Walk Extension
Building to be Removed
Buildings With Highest
These raster datasets are derived from output of the Massachusetts Coast Flood Risk Model (MC-FRM) for 2030, 2050, and 2070 sea level rise and coastal storm simulations. This public information is furnished by MassDOT and should be accepted and used by the recipient with the understanding that the data received were developed and collected for future flooding analyses purposes only. No liability is assumed as to the accuracy, sufficiency, or suitability of the information contained herein for any other particular use. MassDOT, Woods Hole Group, and UMass Boston assume no liability whatsoever associated with the use or misuse of such data. 31
PROVIDENCE WATERFRONT PARK 1.4
Shoreline Stabilization
planning process checklist on page 55). In requesting the creation of the flood maps by Woods Hole Group, the New Bedford River Walk planning process engaged in a detailed topographic review of the site against future sea level rise projections. This guide suggests that the next step is shoreline inspection. This step, in concert with a full site survey after the EPA has completed their cleanup efforts, will help determine the site-by-site approach and likely cost for each of the segments. As is explained in the report, this stage of the process is commonly one of the steps that will illuminate the unseen, or “hidden” costs of construction.
The maps and table provided by Woods Hole Group make clear that the New Bedford Estuary will be experiencing an intensifying amount of coastal flooding over the coming years due to more severe and frequent coastal storms and higher daily tides. Although the planning process for the River Walk has not yet included the investigation for shoreline stabilization needs, a key recommendation of this updated feasibility report is to hire a coastal engineer to conduct a shoreline inventory and recommend a design strategy that is based on future flooding conditions (see planning process checklist below on page 55 of NYC Parks and Recreation’s Design and Planning for Flood Resiliency and shown on page 26 of this report).
https://www.nycgovparks.org/planning-and-building/planning/ resiliency-plans/flood-resiliency Massachusetts Department of Conservation and Recreation Waterways Division Hingham, MA Massachusetts Coastal Infrastructure Inventory, Assessment Report Update Project No. P13-2814-D05 (3841S) South Coastal – New Bedford
Shoreline Stabilization Resources Woods Hole Group Flood Map Figures + Tidal and Storm Benchmark Datasets
The Woods Hole Group figures are based on the The State of Massachusetts completed a comprehensive Massachusetts Coast Flood Risk Model (MC-FRM) that was Coastal Infrastructure Inventory and Assessment Report in developed by MassDOT for developing their own planning Park entrance at Ship Street with view to water, Perspective by BRR 2006 and updated it in 2015. The report was prepared for and climate change adaptation strategies, based on a close DCR to help the agency take stock of the state of the privately examination of coastal elevations and possible flood risks. InAlthough November, 2006,against Brown,over Richardson Rowe won the and Providence Waterfront Park Design The publicly owned coastal structures that Competition. are protecting the they caution reliance on+modeled Massachusetts coastline at large. Although this report did not projections, their study strongly suggests that changing park is on the west side of the Providence River on landcapture that became available an overpass was removed the shoreline for theafter New Bedford River Walk, their coastal conditions will intensify and create new challenges to study ended less than a mile south of the River Walk project during I-195 relocation project. This four acre civic space will be connected by a new pedestrian bridge to a the builtthe environment over the coming decades. site and may offer a glimpse into the order of magnitude costs two-acre on the east side of the river. Parades can travel downtypes Dorrance Street and end at the river’s edge for different of shoreline stabilization options that may NYC Parkspark + Recreation be required over time. The rubric that they used to record Design and Planning for Flood Resiliency via the pedestrian promenade that extends this important the citytype street through the park. Native species rain gardens of structure present, as well as its elevation and This document is a useful Post Hurricane Sandy reference for condition, could the be aimpact helpful guide for understanding the State and permeable paving are part of the resiliency planning that will reduce of flood events on stormwater planning and building public amenities in high risk, flood prone precedent for shoreline stabilization. It is important to note infrastructure and enhance the usability of theoffers park. Lawns, up and the river, a riverwalk, spaces areas. Where appropriate and feasible, this resource theviews suggestions for down infrastructure repairs and retrofitting werefor guidelines for first understanding risks, and then designing based on historic storm and flood data, not on our most recent outdoor and arisks plaza a promontory overlooking thedata water will encourage people of all ages to use the parks resourcescafes with these in on mind. suggesting more frequent storms and rising tides.
throughout the day and year. CDR Maguire and BRR completed the bid documents for the Rhode Island DepartIn this guide, they suggest undergoing six planning process https://archives.lib.state.ma.us/handle/2452/724657
steps before engaging in public park The construction ment of Transportation in 2017. bridge is(see under construction. Park construction began in the spring of 2018.
Providence Waterfront Park, Providence, Rhode Island (Perspective by John Latham, Brown, Richardson + Rowe) 32
2.0 PLANNING GOAL The goal for the New Bedford River Walk project is to construct an ADA-compliant multiuse path along the west bank of the upper Acushnet River in New Bedford, between Coggeshall Street north to Wood Street, that will serve as a safe and positive community amenity, encouraging passive recreational opportunities along the banks of the Acushnet River for city residents and visitors.
Quequechan River Rail Trail, Fall River, Massachusetts 33
34
3.0 PLANNING CONSIDERATIONS Numerous factors were taken into consideration during the development of these draft recommendations for the alignment and elevation of the River Walk. These factors were balanced in a manner which best met the overall planning goal of the project. Ecological restoration areas and passive recreation areas will be located adjacent to the River Walk.
required easement will be larger than 25-foot wide easement described in the prior Feasibility Study. • The River Walk and all connections will comply with the Americans with Disabilities Act (ADA). • The River Walk will be a 10-foot wide asphalt surface with 2-foot wide vegetated shoulders and a 6:1 vegetated slope on each side (26-foot wide total cross section). (It is likely that the slope conditions will vary after a new topographic survey is completed and grading plans are developed. The current slope assumptions in this feasibility study update represent a typical slope used for multi-use trails and make it possible to develop costs that will be helpful in future planning and funding efforts.)
Factors The draft recommendations represent a balance of the following factors: • Maximizing restoration of riparian habitat in areas where the • • • • • •
most restoration can be accomplished and in areas that offer the best opportunities for restoration, Minimizing impacts to natural and environmental resources including wetland resources and historic structures/ archaeological sites, Minimizing excavation and transport of soils containing hazardous materials, Avoiding negative impact to existing businesses and residences, Selecting a target trail elevation that will provide the longest feasible design life for the trail considering sea-level rise projections up to 2050 based on MC-FRM data, Understanding costs, and Providing a good quality recreational and transportation amenity.
» 10-feet is the minimum recommended width for a
multi-use trail by the Federal Highway Administration’s (FHWA’s) Shared Use Path Guidance Document. An 8.0-foot width may be used where trail volumes are expected to be low and with consideration of the potential impact to environmental resource.
• The design elevation will be no lower than 5.0-5.5 NAVD88. • The depth of the River Walk subbase and asphalt surface
will be 12-inches.
» The subbase will consist of clean gravel borrow overlying
a geotextile fabric.
» Outside of the paved surface, where OHM soils will be
exposed for recreational activities, three (3.0) feet of clean fill overlying a geotextile fabric is appropriate. Two (2.0) feet of clean fill may be used in combination with a more sophisticated geotextile fabric with a marker barrier.
Based on the consideration of these design factors, the study team also established a series of assumptions to guide the conceptual design of the River Walk.
Planning Assumptions
• Wooden fencing will be installed on the river side of the trail,
• Design elevation recommendations accurate through the
as needed for user safety.
year 2050 (WHG projections). • WHG projections and design elevations will be reviewed upon completion of the EPA cleanup and the establishment of a construction schedule for the River Walk. • The City of New Bedford will acquire the property easements and conservation restrictions needed for the construction and ongoing existence of the River Walk and accompanying ecological and passive recreation areas. The
• Expanded ecological restoration areas and passive
recreation areas will be located adjacent to the River Walk.
• Expanded ecological restoration will be focused on areas
where the most restoration can be accomplished, not only in a linear fashion alongside the trail, but also in areas that will accommodate more restoration and in areas with the best opportunities for restoration.
35
• Resiliency and sustainability techniques will be incorporated
flooding. Bioswales and bio basins will be used to quickly drain paths and surfaces as well as provide natural habitat. • Salt tolerant plants appropriate for their elevation, proximity to salt water, public enjoyment, and biodiversity will be used. Plants must be suitable for their specific location and environmental conditions.
into the River Walk design. The River Walk will be subject to periodic flooding and living shorelines or hybrid methods of sea wall design will be incorporated into the design, as appropriate. • The River Walk will be designed to be easily maintained by the City and quickly returned to use after storm events and
36
4.0 ENVIRONMENTAL PERMITS AND APPROVALS The following sections describe the local, state, and federal environmental permits or approvals that would be required prior to the construction of the River Walk. Conceptual time periods for permit preparation and approval are also provided.
4.1
Mills complexes are designated as National Register-listed Historic Districts. Each River Walk phase will require review by the Massachusetts Historic Commission through a Project Notification Form (PNF). If federal funding is used or approvals are needed, review of Section 106 of the National Historic Preservation Act will be required.
State/Local Environmental Permits
Massachusetts Wetlands Protection Act (310 CMR 10.00) Notice of Intent
Massachusetts Environmental Policy Act – Environmental Notification Form (MEPA ENF)
All segments will require the filing of a Notice of Intent (NOI). The NOI will be required because segments are within the 25-foot Riverfront Area of the Acushnet River and/or within the 100-foot Buffer Zone to Wetland Resource Areas. The Riverfront Area boundary extends 25-feet from the Mean High Water line associated with River. Segments can be combined for permitting or permitted separately.
In compliance with MEPA’s anti-segmentation regulations, all segments of the River Walk must be reviewed as a single project. As a state-funded project and requiring state permits, the project is within MEPA jurisdiction. The project would exceed the MEPA wetlands threshold for the preparation of an ENF (301 CMR 11.01(3)(b) as it would require a Chapter 91 License for a new unlicensed non-water dependent use of waterways or tidelands. ENF preparation and MEPA Certificate issuance period is approximately 3-6 months.
NOI preparation and permit issuance period is approximately 4-5 months.
A Special Review Procedure for MEPA review may be an option and could offer a way to start the process earlier and enable the design team to change/add aspects of the project as it progresses.
New Bedford Wetlands Ordinance Reviewed as part of the Notice of Intent (NOI, the wetlands ordinance has a goal of no work within 25 feet of resource areas. As the Riverfront Area is a wetland resource, the goal would be no work within 50 feet of the riverbank, or within 25 feet of other vegetated wetlands bordering to the River. As this is likely not achievable for some or all segments, the City will need to coordinate early with the Conservation Commission.
Massachusetts Chapter 91 License All River Walk segments would require a Chapter 91 License from the MA Department of Environmental Protection (MassDEP) because they are within Chapter 91 jurisdictional areas. Based on early coordination with MassDEP, review of existing licenses must occur prior to permitting and segments can be combined for licensing. The license application and issuance period is approximately 9-12 months.
4.2
Federal Environmental Permits
U.S. Army Corps of Engineers (USACE)– Section 404 permit Required for direct impact to wetland resources under federal jurisdiction or any work below ordinary high water (OHW). The planning-level goal would be to avoid direct impact to wetland resources. An exception may be needed for Segment 11 at the former Aerovox site where a larger Intertidal zone
Massachusetts Historic Commission (MHC)– Chapter 254 Review The River Walk will occur within the boundaries of properties individually listed in the National Register of Historic Places. Further, within the study area, the Manomet Mills and Whitman
37
could be beneficial. This Segment would require construction period work within federal wetlands. A segment (or groups of segments advanced together as a single project) would qualify for a USACE General Permit #8 – Residential, Commercial, and Institutional Developments, and Recreational Facilities. The permit type required would be either a Self Verification (SV) or Pre-Construction Notification (PCN). The preparation and permit issuance period for a PCN is 3-5 months.
Assuming that there is a ‘federal action (i.e., federal funding or permit), the project will require a ‘federal consistency review’ to ensure the project’s reasonably foreseeable effects on any land or water use or natural resources of the Massachusetts coastal zone is consistent with the MCZM program. MCZM Federal Consistency Review is generally completed as part of the MEPA review process.
Coastal Zone Management Federal Consistency Review The River Walk is located within the jurisdictional area of the Massachusetts Coastal Zone Management (MCZM) Program.
38
5.0 CONCEPTUAL COST ESTIMATES The conceptual cost estimates for the New Bedford River Walk were developed for the purpose of comparing the order-ofmagnitude costs of various segments under consideration. These conceptual cost estimates were developed based on MassDOT’s weighted average bid price application on the MassDOT website; prices for January 2020 were used. An additional 15% of the construction cost was added to account for planning, permitting, and engineering design. All costs were escalated 4.0% annually to the anticipated potential construction year.
relocation, and traffic management. See exclusions for a list of items expressly unaccounted for in these conceptual costs.
Costs Related Hazardous Materials Handling / Disposal As noted Section 1.2, given the historic industrial nature of the area and MassDEP and EPA disposal sites, the potential exists for soil along the River Walk to potentially be impacted by Oil and Hazardous Materials (OHM). Note that the known locations along the River Walk Corridor containing PCB and heavy metal contamination are under ongoing remediation (or future remediation is planned). However, there is the potential to encounter other areas of OHM contamination within the areas planned for the River Walk corridor and ecological restoration.
Gateway Construction Assumptions Costs of the ‘River Walk Gateway’ features were developed for the 2015 New Bedford Riverwalk Planning and Design Feasibility Study. The costs of these gateway feature provided in that study were inflated 4% annually to the 2020 base year.
Prior to completion of a soil characterization program, it is not possible to estimate the volume (and related costs) of OHM material to be removed from the project site. Stantec’s LSP was consulted to gain an understanding of OHM disposal costs. Disposal of OHM contaminated soil (non-PCB) would cost approximately $45 to $85 per Ton. To put this cost in the context of the River Walk, disposal of OHM-contaminated soil for 100 linear feet of trail could cost approximately $13,000 to $24,500. This assumes the removal of OHM soil to a three-foot depth under the entire 26-foot width of the trail and 6:1 embankment. Additionally, until design is completed, the volumes of soil warranting off-site disposal versus on site reuse is unknown. Every effort will be made to minimize any off-site disposal of soil and to reuse soils within the project as appropriate given engineering and environmental requirements.
Trail Construction Assumptions The base cost is for the construction of the trail and side slopes, with 1.0’ increase over the existing grade. Alternate 1 will increase the profile by an additional 0.5 feet and add Alternate 2 will add 1.0’ of height to the profile. It is possible that if the proposed haul road were constructed with the trail in mind, on the intended trail alignment and at the appropriate grade, then a cost savings in clearing, ordinary borrow, and gravel borrow could be realized. Future financial planning would require a more detailed cost estimate based on a higher level of design. For more detail on the information used to generate the costs, please see Appendix B: Conceptual Cost Estimates.
35% Contingency
Exclusions
The 35% contingency added to these conceptual costs is to account for unknown, but not unexpected costs. These could include, but are not limited to: environmental mitigation, utility
These conceptual cost estimates do not include the cost of ancillary features such as a canoe launch, overlook/pier, etc.
39
Before a canoe launch or pier can be designed, permitted or constructed, the City of New Bedford will need to determine whether the Acushnet River can be used safely by the public. Below is a list of other items that are not accounted for at this time:
• Disposal costs of contaminated soil • Fill in capped contamination areas • Shoreline stabilization (Shoreline stabilization needs will
need to be determined on a site by site basis in the site investigation stage with the help of a coastal engineer. In some cases, no stabilization may be required.)
40
6.0 RECOMMENDATIONS AND PHASING Based on consideration of the assumptions, anticipated future flooding conditions, potential environmental permitting requirements, and cost the following draft recommendations were developed to meet the planning goals of the project.
In some cases, the study team suggests moving the River Walk inland, while retaining the locations of the previously proposed ecological restoration zones. By making the ecological restoration zones accessible to maintenance workers and protecting them from the public, maintenance of the plants will be facilitated.
The River Walk has been previously divided into 12 segments. These recommendations are presented as River Walk phases, i.e., adjacent River Walk segments built concurrently. The recommended sequence of the River Walk phases was established based on the EPA intertidal remediation schedule and the perceived ease of permitting and construction. For example, the remediation of the intertidal area encompassing Phase 1 (Segments 6, 7, 8, and 9) is scheduled to complete by 2023/2024 and the area is relatively free of obstructions and may be constructed without direct wetland impacts.
The eight River Walk gateways and seating areas proposed in the previous Feasibility Study have been included in these recommendations. The areas would include enhanced landscaped entrances connecting the River Walk to area roadways and additional landscaped seating areas along the trail to provide users an opportunity to rest and enjoy views of the Acushnet River. The following describes the limits, length, features, permitting requirements, and cost of the recommended River Walk phases. Table 4: Summary of Trail Segments – Opportunities and Challenges provides this data for each River Walk segment. Figures 11 through 15 present Phases 1 through 5, respectively.
The original Acushnet River Restoration Project included a total area of 5.3 acres. The ecological restoration zones proposed in the following pages include the originally conceived 5.3 acres restoration zones by the NBHTC as well as additional land proposed through this Feasibility Study Update . These areas will have multiple functions – to restore the Acushnet River shoreline habitat and to adapt to present and future flooding levels and sea level rise. Water levels are changing and areas currently defined as either high or low marsh will change and migrate with rising water levels. The topography of the sites where the River Walk will be built will also be altered by contaminant removal and filling. For example, the area where contaminants are buried at the Sawyer Street facility will become an upland.
The recommended order of the phases may change depending on several factors including the actual timing of the cleanup, the interests of the adjacent property owners and the availability of public and private funding. The information provided by the Woods Hole Group regarding flood inundation and storm and tidal water levels has implications for public expenditures. Any investment of public money should be a long-lasting one. The River Walk project should be as durable as possible and provide benefits to the City.
41
Hop e Stre et
FIGURE 11
tr ee t He al y S
PHASE 1 DETAIL PLAN Figure 11: Phase 1 Detail Plan B ee tle
0
1,000
N
100
S tr ee t
hn Acus
Municipal Park
ing tonHighest Flood Risk - 2030 ArlWith Buildings
Proposed Onroad River Walk Extension
Building to be Removed
Desautels Street
nue
Co nco rd Str eet POSSIBLE PASSIVE RECREATION AREA
Cen tral Ave nue
Cli ffor d Str eet
t Qu er y St ree
Be lle vi lle
et Ba te s St re
Ro ad
St re et
P
E
Former Aerovox Site
Precix / Acushnet Rubber
River Road
verside
Victoria Ri
Powder Pro
Darn It! Inc.
Acushnet Company / Titleist
American Engineered Fabrics
P
US Party Nashawena Company East Mills
River Bank Lofts
St re et
od / Lustiano Fong Star Plati
en
Belleville Avenue
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place
M an om et
Sawyer Street Facility / Jacobs Engineering Work Zone
Howard Av nue
Kearsarge Street
Desautels Street
Perry Street
Dun can Stre et
D
Had ley Stre et
tr ee t H e al y S
Darn It! Inc. BROOKLAWN PARK Covell Str eet
Me rril l Str eet Hope Street
Belle Irving ton Cour t
Hatc h Stre et
e
Eu ge ni a
C
Ave nu
St re et
St re et
eville
St re et
Ha th aw ay
ve nu e C of fin A
Bell
A
P
Buildings With Highest Flood Risk - 2050
US Party Nashawena Company East Mills
Ti nk ha m
River Bank Lofts
Powder Pro
B
Th Rope e works
Av en ue
W hi tm an
M ad ei ra
ad Na sh Ro
tr ee t E ar le S
St re et
tr ee t D avis S
Co lle tte
St re et
re et De an e St
Bu lla rd
ee t N ye S tr
St re et
Taco Bell
Ta llm an
t aske
etb
Mark
RIVERSIDE PARK
Str eet
RIVER WALK TO FOLLOW EXISTING PATH AND DRIVEWAY
Belleville Avenue
t St re et
re et ch el l St
tr ee t H ol ly S
Man o me
reet Sawyer St
re et Be et le St
side Avenue e CLIFTEX Corp. g
en ue Ph ill ip s Av
EXPANDED ECOLOGICAL St re et rth Fr on t RESTORATION NoZONE
S tr ee t
e
e et Av
River Walk Follows Existing Path + Driveway
Irvin gton Stre et
750
Gateways and Promontories Pri nce ton Str eet
500
Existing Shoreline
Sh aw Str ee t
250
Proposed River Walk Path
re et Gl en no n St
0
¸
Feet
Feet
ch S tr ee t
tre e t
ee t
M e rr il l S tr e e t
CTS
PHASE 5
PHASE 1
0
250
500
750
1,000
¸
Feet
N
PH
Proposed River Walk Path
Existing Shoreline
Gateways and Promontories
River Walk Follows Existing Path + Driveway
Municipal Park
Buildings With Highest Flood Risk - 2030
Proposed Onroad River Walk Extension
Building to be Removed
Buildings With Highest Flood Risk - 2050
Approximate Elevations A: 4.9 ft B: 3.9 ft C: 4.2 ft D: 5.2 ft E: 4.7 ft 42
SEGMENT 10
SEGMENT 9
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 7
SEGMENT 6
SEGMENT 6
SEGMENT 5
New Bedford Riverwalk Conceptual Alignment and Potential Public Amenities
SEGMENT 12
SEGMENT 11
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
PHASE 1
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
PHASE 2
SEGMENT 7
SEGMENT 6
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 2
SEGMENT 1
SEGMENT 1
PHASE 4
P Im S
6.1
Phase 1 Segments Included:
6, 7, 8, 9
Description: (limits, length)
Phase 1 extends 2,680 feet (0.45 miles) from Manomet Street to the southern boundary of the Acushnet Company property. Includes re-use of 590 feet of existing path.
Challenges:
Wetland band at river’s edge. Extended flood area in 2050. Several structures (building and foundations) in shore area.
Opportunities:
Larger areas available for ecological restoration or passive recreation along the river. The smokestack provides an interesting destination with new owner a project proponent.
Permitting Requirements:
ENF, Chapter 91 License, WPA Order of Conditions, Chapter 254 Historic Review, Coastal Zone Management - Federal Consistency Review
Conceptual Cost:
River Walk: Ecological Restoration: Gateways:
$884,000 $1,774,000 $560,000
Total:
$3,218,000
43
evill
PHASE 2 DETAIL PLAN Figure 12: Phase 2 Detail Plan B ee tle
0
1,000
N
Existing Shoreline
Gateways and Promontories
River Walk Follows Existing Path + Driveway
Municipal Park
ing tonHighest Flood Risk - 2030 ArlWith Buildings
Proposed Onroad
Building to be Removed
Walk Extension PLAZARiver AND EXPANDED ECOLOGICAL ue Aven hnet Acus RESTORATION ZONE
100
S tr ee t
Cli ffor d Str eet
Man o me
Cen tral Ave nue
et Ba te s St re
Ro ad
St re et
Powder P
Kearsarge Street
Howard Av nue
D
Desautels Street
Perry Street
Dun can Stre et
Had ley Stre et
Covell Str eet
Hatc h Stre et
t St re et
C
Irving ton Cour t
Belleville Avenue
P Former Aerovox Site
Precix / Acushnet Rubber
River Road
Powder Pro
Darn It! Inc.
Acushnet Company / Titleist
US Party Nashawena Company East Mills
River Bank Lofts
St re et
verside
Be lle vi lle
Eu ge ni a
tr ee t H e al y S
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living Victoria Ri
erside
iv Victoria R
e
P
Me rril l Str eet
Hope Street
Ave nu
M an om et
American Engineered Fabrics
P
St re et
eville
St re et
Ti nk ha m
St re et
American Engineered B Fabrics
Bell
Co nco rd Str eet
Riversi de Avenue Whaler’s Care CLIFTEX Corp. Assisted Living BROOKLAWN PARK
W hi tm an
Av en ue
ad Na sh Ro
M ad ei ra
Ha th aw ay
A
Whaler’s Place
en
tr ee t E ar le S
tr ee t D avis S
Sawyer Street Facility / Jacobs Engineering Work Zone
od / Lustiano Fong Star Plati
P
St re et
Taco Bell
Co lle tte
etb
Mark
Th Rope e works
ve nu e C of fin A
t aske
ood / Lustiano F ng Star Plati
RIVERSIDE PARK
re et ch el l St
en ue Ph ill ip s Av
St re et
re et De an e St
Bu lla rd
St re et
ee t N ye S tr
Ta llm an
tr ee t H ol ly S
reet Sawyer St
re et Be et le St
Belleville Avenue
Whaler’s Place
Buildings With Highest Flood Risk - 2050
t Qu er y St ree
t St re et No rth Fr on
S tr ee t
Str eet
Irvin gton Stre et
750
Proposed River Walk Path
Pri nce ton Str eet
500
e
Sh aw Str ee t
250
Hop e Stre et
enu
re et Gl en no n St
0
¸
Feet
Feet
e Av
t
FIGURE 12
Bell
eet
e nu e o ff in A v
E PARK
CTS
500
750
1,000
Proposed River Walk Path
Existing Shoreline
Gateways and Promontories
River Walk Follows Existing Path + Driveway
Municipal Park
Buildings With Highest Flood Risk - 2030
Proposed Onroad River Walk Extension
Building to be Removed
Buildings With Highest Flood Risk - 2050
Approximate Elevations A: 4.3 ft B: 5.6 ft C: 7.1 ft D: 4.0 ft 44
SEGMENT 6
SEGMENT 6
250
¸
0
N
SEGMENT 12
PHASE 5
PHASE 2 Feet
SEGMENT 11
SEGMENT 11
PHASE 3
SEGMENT 5
SEGMENT 5
SEGMENT 4
SEGMENT 4
SEGMENT 3
New Bedford Riverwalk Conceptual Alignment and Potential Public Amenities
SEGMENT 10
SEGMENT 9
PHASE 1
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
PHASE 2
SEGMENT 7
SEGMENT 6
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
PHASE 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
OVERLOOK AND PIER
P Im S
6.2
Phase 2 Segments Included:
4, 5
Description: (limits, length)
Phase 2 extends 1,270 feet (0.24 miles) from Coffin Avenue to Manomet Street.
Challenges:
Narrow edge between river and American Engineering Fabrics (Sawtooth) Building Victoria Riverside parking area. Extended flood area at Sawtooth Building in 2050.
Opportunities:
Removal of Sawtooth Building creates 2.5 acres available for ecological restoration or passive recreation. City-owned parking area behind Victoria Riverside could be used for parking or other uses. Overlook/Pier at end of Coffin Avenue.
Permitting Requirements:
ENF, Chapter 91 License, WPA Order of Conditions, Chapter 254 Historic Review, USACE General Permit (depending on work proposed at Sawtooth building property), Coastal Zone Management - Federal Consistency Review
Conceptual Cost:
River Walk: Ecological Restoration: Gateways:
$553,000 $355,000 $1,042,000
Total:
$1,950,000
45
N
100
e et Av
Building to be Removed
nue
Cli ffor d Str eet
River Road
Cen tral Ave nue
PHASE 5
Proposed River Walk Path
Existing Shoreline
Gateways and Promontories
River Walk Follows Existing Path + Driveway
Municipal Park
Buildings With Highest Flood Risk - 2030
Proposed Onroad River Walk Extension
Building to be Removed
Buildings With Highest Flood Risk - 2050
Approximate Elevations A: 5.2 ft B: 3.6 ft 46
Howard Av nue
PHASE 5
SEGMENT 12
1,000
CTS SEGMENT 11
750
Former Aerovox Site
SEGMENT 11
500
N
SEGMENT 10
250
¸
Feet
PHASE 3
SEGMENT 12
PHASE 3
SEGMENT 11
New Bedford Riverwalk Conceptual Alignment and Potential Public Amenities
SEGMENT 9
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 10
PHASE 1
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
PHASE 2
SE 1
0
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
Perry Street
B
P
Precix / Acushnet Rubber
verside
Victoria Ri
Darn It! Inc.
River Road
American Engineered Fabrics
Powder Pro
Dun can Stre et
P
Kearsarge Street
Belleville Avenue US Party Nashawena Company East Mills
River Bank Lofts
Acushnet Company / Titleist
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Had ley Stre et
Covell Str eet
Hatc h Stre et
Former Aerovox Site
BROOKLAWN PARK
Precix / Acushnet Rubber
et Ba te s St re tr ee t H e al y S
Irving ton Cour t
St re et
en
Me rril l Str eet
P
Desautels Street
Whaler’s Place
od / Lustiano Fong Star Plati
P
Ro ad
A Sawyer Street Facility / Jacobs Engineering Work Zone
St re et
e
Acushnet Company / Titleist
Hope Street
Ave nu
M an om et
Taco Bell
Eu ge ni a
M
Th Rope e works
eville
St re et
sket
tba arke
Bell
St re et
ve nu e C of fin A
RIVERSIDE PARK
St re et
Ha th aw ay
Belleville Avenue
re et ch el l St
Av en ue
W hi tm an
M ad ei ra
Ti nk ha m
St re et
tr ee t D avis S
tr ee t E ar le S
Darn It! Inc.
ad Na sh Ro
Co lle tte
en ue Ph ill ip s Av
St re et
re et De an e St
Bu lla rd
St re et
ee t N ye S tr
Ta llm an
tr ee t H ol ly S
reet Sawyer St
re et Be et le St
US Party Nashawena Company East Mills
Co nco rd Str eet
Be lle vi lle
Belleville Avenue
t St re et No rth Fr on
Buildings With Highest Risk - 2050 geFloodStreet Kearsar
t Qu er y St ree
hn Acus POSSIBLE PASSIVE RECREATION AREA
S tr ee t
S tr ee t
Proposed Onroad River Walk Extension
How ard Av nue
B ee tle
0
1,000
Str eet
ing tonHighest Flood Risk - 2030 ArlWith Buildings
Irvin gton Stre et
750
Municipal Park
Pri nce ton Str eet
500
River Walk Follows Existing Path + Driveway
Gateways and Promontories
Sh aw Str ee t
250
Existing Shoreline
re et Gl en no n St
0
¸
Feet
Feet
Proposed River Walk Path
Perry Stree t
PHASE 3 DETAIL PLAN Figure 13: Phase 3 Detail Plan
D un ca n S tr ee t
S t r e e t 13 H e a l yFIGURE
H a dl e y S tr e e t
tr e e t
S tr ee t
M e rr il l S t
CTS
P Im S
6.3
Phase 3 Segments Included:
10
Description: (limits, length)
Phase 3 extends 740 feet (0.14 miles) from Hatch Street to Hadley Street.
Challenges:
Large fenced parking lot at Titleist building Extended flood area at south end of phase in 2050. Wetland band at river’s edge.
Opportunities:
Minor relocation of fencing could open up larger area for ecological restoration or passive recreation. Potential canoe launch at boundary of Segment 10 and 11. Future construction depends on safety of the river for public use.
Permitting Requirements:
ENF, Chapter 91 License, WPA Order of Conditions, Chapter 254 Historic Review, Coastal Zone Management - Federal Consistency Review
Conceptual Cost:
River Walk: Ecological Restoration: Gateways:
$335,000 $431,000 $0
Total:
$766,000
47
B ee tle
re e t che l l St
N
100
S tr ee t
Ave hnet Acus
Co nco rd Str eet
Howard Av nue
I
Precix / Acushnet Rubber
River Road
Acushnet Company / Titleist
Former Aerovox Site
Americ Enginee Fabri CTS
P Im S
SEGMENT 12
SEGMENT 11
SEGMENT 11
SEGMENT 10
PHASE 5
SEGMENT 4 SEGMENT 4
SEGMENT 3
Gateways and Promontories
Municipal Park
Buildings With Highest Flood Risk - 2030
Building to be Removed
Buildings With Highest Flood Risk - 2050
Approximate Elevations A: 6.1 ft B: 4.7 ft C: 11.3 ft D: 11.0 ft E: 6.7 ft F: 10.8 ft G: 7.5 ft H: 5.3 ft I: 4.3 ft
Perry Street
Dun can Stre et
Had ley Stre et
P
Existing Shoreline
PHASE 4
48
PHASE 3
SEGMENT 3
Proposed Onroad River Walk Extension
ood / ustiano Food / Lustiano F L g g Star Platin Star Platin
SEGMENT 9
SEGMENT 3
SEGMENT 2
SEGMENT 2
SEGMENT 1
River Walk Follows Existing Path + Driveway
Covell Str eet
H SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
SEGMENT 3
SEGMENT 2
SEGMENT 2
SEGMENT 1
1,000
¸
SEGMENT 1 750
N
Proposed River Walk Path
Americ Enginee Fabri Whaler’s P
Belleville Avenue Darn It! Inc.
PHASE 1
PHASE 4
Whaler’s P
BROOKLAWN PARK
G
Kearsarge Street
EXPANDED ECOLOGICAL RESTORATION ZONE
PHASE 2
SEGMENT 1 500
Hatc h Stre et
US Party Nashawena Company East Mills
River Bank Lofts Powder Pro
SEGMENT 6
SEGMENT 5
SEGMENT 4
CANOE LAUNCH SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
250
Cli ffor d Str eet
et Ba te s St re
Ro ad
Street TIEDesautels INTO EXISTING PATH NETWORK
New Bedford Riverwalk Conceptual Alignment and Potential Public Amenities
0
Cen tral Ave nue
Be lle vi lle
St re et
tr ee t H e al y S
D
PHASE 4
Feet
Irving ton Cour t
St re et
verside
Victoria Ri
Eu ge ni a
M an om et
American Engineered Fabrics
St re et
St re et
e
P
W hi tm an
ad Na sh Ro
Ti nk ha m
St re et
P
Buildings With Highest Flood Risk - 2050
Me rril l Str eet Hope Street
Ave nu
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place
B
en
Av en ue
Ha th aw ay
A
tr ee t E ar le S
en
C
od / Lustiano Fong Star Plati
P
tr ee t D avis S
Taco Bell
Sawyer Street Facility / Jacobs Engineering Work Zone
eville
M ad ei ra
Sawyer Street Facility / Jacobs Engineering Work Zone
Th Rope e works
Taco Bell
St re et
ve nu e C of fin A
M
Co lle tte
en ue Ph ill ip s Av
St re et
en
sket
tba arke
F
E
Bell
Str eet
RIVERSIDE PARK
Th Rope e works Sawyer Street Facility / Jacobs Engineering Work Zone
RIVERSIDE PARK
re et ch el l St
Building to be Removed
nue
re et De an e St
Bu lla rd
P
Belleville Avenue
Proposed Onroad River Walk Extension
t St re et No rth Fr on
ee t N ye S tr
St re et
tr ee t H ol ly S
reet Sawyer St
re et Be et le St
Taco Bell
Ta llm an
Ma
ing tonHighest Flood Risk - 2030 ArlWith Buildings
t Qu er y St ree
ket
as rketb
S tr ee t
Municipal Park
eet
0
1,000
River Walk Follows Existing Path + Driveway
Irvin gton Stre et
750
Gateways and Promontories
Pri nce ton Str eet
500
Existing Shoreline
Sh aw Str ee t
250
Proposed River Walk Path
re et Gl en no n St
0
Feet
¸
Feet
s
e nu e
as
ve nu e o ff in A ve nu e Co ff in A C
T
h ville Avenue Rope eBellePLAN PHASE 4 DETAIL w t Figure k14: Phase 4 Detail Plan ork e etb Mark
ee t
tr ee t
re e t
S tre e t
S tre e t
yer Street
t tl e St re e
t r e e t 14 c h e l l SFIGURE
RIVERSIDE PARK
P
P
6.4
Phase 4 Segments Included:
1, 2, 3
Description: (limits, length)
Phase 4 extends 3,075 feet (0.58 miles) from Veteran’s Memorial Drive to Coffin Avenue. Includes re-use of trails within Riverside Park and 860 feet along Coffin Avenue.
Challenges:
Sawyer Street Facility occupied until at least 2026 Wetland band at river’s edge Extended flood area at Riverside Park and Coffin Avenue in 2050.
Opportunities:
Canoe Ramp at boundary of Segment 1 and 2. Sawyer Street facility, once available, 7.5 acres for ecological restoration or passive recreation. The whole city-owned parcel could become a park that expands Riverside Park or a portion of the parcel could become a park and an amenity for future development. This property has the potential to play a role in serving as part of a modest buffer to rising sea levels.
Permitting Requirements:
ENF, Chapter 91 License, WPA Order of Conditions, Chapter 254 Historic Review, Coastal Zone Management - Federal Consistency Review
Conceptual Cost:
River Walk: Ecological Restoration: Gateways:
$1,064,000 $3,494,000 $674,000
Total:
$5,232,000
49
TO BROOKLAWN Buildings With Highest Flood Risk - 2050 Building to be Removed Kearsar ge Street
N
Proposed Onroad River Walk Extension
100
S tr ee t
Ave hnet Acus
PARK
nue
Woo d Stre et Howard Av nue
Perry Street
Existing Shoreline
Gateways and Promontories
River Walk Follows Existing Path + Driveway
Municipal Park
Buildings With Highest Flood Risk - 2030
Proposed Onroad River Walk Extension
Building to be Removed
Buildings With Highest Flood Risk - 2050
SEGMENT 12
Proposed River Walk Path
50
Precix / Acushnet Rubber
PHASE 5
PHASE 5
Approximate Elevations A: 4.5 ft B: 7.2 ft C: 4.5 ft D: 5.8 ft
SEGMENT 11
PHASE 3
SEGMENT 11
SEGMENT 12
OVERLOOK + PIER
SEGMENT 10
SEGMENT 9
PHASE 1
SEGMENT 10
SEGMENT 12
SEGMENT 11
SEGMENT 11
N
Former Aerovox Site
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
D
P
River Road
Darn It! Inc.
Acushnet Company / Titleist
Powder Pro
SEGMENT 6
C
SEGMENT 5
SEGMENT 4
SEGMENT 5
1,000
Dun can Stre et
Belleville Avenue US Party Nashawena Company East Mills
CTS
SEGMENT 10
750
Had ley Stre et
verside
Victoria Ri
BROOKLAWN PARK
Kearsarge Street
River Bank Lofts
St re et
American Engineered Fabrics
¸
500
Sy lvi a St ree t
P
PHASE 2
SEGMENT 10
SEGMENT 9
250
Covell Str eet
M an om et
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place
PHASE 3
0
Irving ton Cour t
Hatc h Stre et
tr ee t H e al y S
New Bedford Riverwalk Conceptual Alignment and Potential Public Amenities
Feet
Cli ffor d Str eet
Precix / Acushnet Rubber
e
et Ba te s St re
Ro ad
St re et
St re et
Me rril l Str eet
Hope Street
Ave nu
Cen tral Ave nue
Be lle vi lle
Eu ge ni a
W hi tm an
St re et
River Road
ad Na sh Ro
EXPANDED ECOLOGICAL RESTORATION ZONE
Desautels Street
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
Ti nk ha m
A
Former Aerovox Site
eville
St re et
en
Bell
Av en ue
Ha th aw ay
Sawyer Street Facility / Jacobs Engineering Work Zone
od / Lustiano Fong Star Plati
P
Th Rope e works
tr ee t E ar le S
Taco Bell
tr ee t D avis S
M
St re et
sket
tba arke
B
ve nu e C of fin A
RIVERSIDE PARK
re et ch el l St
Co lle tte
en ue Ph ill ip s Av
Acushnet Company / Titleist
St re et
re et De an e St
Bu lla rd
St re et
ee t N ye S tr
Ta llm an
tr ee t H ol ly S
reet Sawyer St
re et Be et le St
Belleville Avenue
P
M ad ei ra
t Qu er y St ree
t St re et No rth Fr on
Darn It! Inc.
Co nco rd Str eet
TO RIVERS END PARK
Belleville Avenue
S tr ee t
Irvin gton Stre et
B ee tle
0
1,000
Str eet
ing tonHighest Flood Risk - 2030 ArlWith Buildings Pri nce ton Str eet
750
Municipal Park
Brooklaw n Court
500
River Walk Follows Existing Path + Driveway
Gateways and Promontories
Sh aw Str ee t
250
Existing Shoreline
re et Gl en no n St
0
¸
Feet
Feet
Proposed River Walk Path
How ard Av nue
PHASE 5 DETAIL PLAN Figure 15: Phase 5 Detail Plan
Perry Stree t
D un ca n S tr ee t
H a dl e y S tr e e t
tr e e t
S tr ee t FIGURE 15
CTS
P Im S
6.5
Phase 5 Segments Included:
11 (the former Aerovox property)
Description: (limits, length)
Phase 5 extends 1,270 (0.24 miles) from Hadley Street to Precix at the former Aerovox site.
Challenges:
Date of availability is unknown as Aerovox site clean-up continues. Site within extended flood area in 2050.
Opportunities:
Once clean-up is complete, the City-owned, approximately 9.0 site presents a substantial opportunity for accessible public ecological/recreational facilities.
Permitting Requirements:
ENF, Chapter 91 License, WPA Order of Conditions, Chapter 254 Historic Review, USACE Section 404 Permit, Coastal Zone Management - Federal Consistency Review
Conceptual Cost:
River Walk: Ecological Restoration: Gateways:
$701,000 $6,037,000 $488,000
Total:
$7,226,000
51
52
7.0 RECOMMENDED NEXT STEPS Recommended tasks to advance the development of the River Walk are presented below. These steps would allow the City to obtain information needed to advance the River Walk into the design and permitting phase.
consultants, including a coastal engineer to design an appropriate approach for the river’s edge. • Develop conceptual level (10%) design of all River Walk segments to support environmental impact analysis required for MEPA planning documents by Consultant team. Update planting list to reflect planting that occurs on the shoreline, as well as in upland areas. • Consultant team LSP conducts hazardous materials review:
• Complete topographic and property line surveys and • • • • •
•
• • • •
delineate wetland resources after the EPA finishes the shoreline cleanup. Update sea level rise and storm surge projections and flood maps from Woods Hole Group if the above step takes 5 years or more from the date of the publishing of this report. Perform a shoreline inventory with the help of a coastal engineer. Choose a coastal stabilization strategy that accounts for the resiliency goals of the entire length of the Riverfront neighborhood. Choose a stormwater infiltration strategy that accounts for the resiliency goals of the entire length of the Riverfront neighborhood. Reach consensus on River Walk alignment, elevation, and width (through coordination with pertinent City Departments, the New Bedford Harbor Trustees Council, MassDEP, and the Executive Office of Energy and Environmental Affairs). Select a target trail elevation that will increase the likelihood of a 30-year design life of trail (or to relevant projection year, as updated projections indicate) and provide additional flood protection for adjacent properties up to 2050 based on MC-FRM data. Increase square footage of ecological restoration areas, as feasible. Engage the Woods Hole Group to evaluate the impact of raising the elevation of the River Walk on future flood inundation. Acquire the right-of-way (temporary and permanent easements). Enlist the help of engineering, design, and permitting
» Complete in-depth review of existing RTNs and other
»
»
»
»
potential hazardous material site conditions. Use EDR report acquired for this study and acquire additional EDR information as needed. Examine information related to the presence and type of hazardous materials in portions of the River Walk outside of EPA work zones to determine construction and soil management needs. Conduct soil analytical testing to characterize soils in areas of unknown soil quality in anticipation of Health and Safety protocol and potential disposal requirements prior to any significant earth moving activities. Establish design requirements that consider future use of the River Walk for recreational activities regarding potential exposures of OHM by its users. Where soils will be exposed for passive recreational activities, place three (3.0) feet’ of clean fill over geotextile fabric. If a more sophisticated geotextile fabric with a marker barrier is used, then it may be possible to overly that with two (2.0) feet of clean fill instead of three (3.0) feet. Review proposed construction areas in detail relative to existing disposal sites and site history in order to determine an appropriate soil sampling strategy to address soil management and future risk considerations.
• Prepare and file MEPA Environmental Notification Form
(ENF) for entire River Walk corridor.
• Identify funding sources for trail design, permitting and
construction.
53
TABLE 4
SUMMARY OF TRAIL SEGMENTS - OPPORTUNITIES AND CHAL
Phase 2
Phase I
PHASE
EXISTING LANDMARKS / FEATURES OF NOTE
STATUS OF RIVER REMEDIATION
TRAIL SEGMENT
TRAIL LIMITS
LENGTH
6
Manomet Street to north end of Cliftex Building property
650
Cliftex and Powder Pro Coatings Buildings
Scheduled for 2024 Completion
• 3 parcels (total foundations an buildings • Extended 2050 • Wetlands at riv
7
North end of Cliftex Bldg property to Belleville Road
160 (plus re-use of 510 feet of existing walkway)
Riverbank Lofts
Scheduled for 2023 Completion
• 0.25 acre found structure • Extended 2050 • Wetlands at riv
8
Belleville Road to Hatch Street St. (270 feet)
240 (plus re-use of 90 feet of existing walkway)
Nashawena Mills. Smokestack
Scheduled for 2023 Completion
• Limited space a smokestack
9
North end of Segment 8 to Hatch Street to Hadley Street (925 feet)
1,030
Darn it!
Scheduled for 2023 Completion
• Larger single-s edge • Extended 2050 • Wetlands at riv
4
Coffin Avenue to Sawtooth Building property northern boundary
591
Sawtooth Building (to be removed by 2022)
Scheduled for 2024 Completion
• Narrow edge be Fabrics building • Extended 2050
5
North end of Segment 4 to Manomet Street (680 feet)
680
Victoria Riverside
Scheduled for 2024 Completion
• Limited space a parking area an
(feet)
CHAL
by funds managed by the New Bedford Harbor Trustees Council. Ecological restoration was calculated at an average of $8/square foot. 4 Costs of the ‘River Walk Gateway’ features were developed for the 2015 New Bedford Riverwalk Planning and Design Feasibility Study. The costs of the gateway features provided in that study were inflated 4% annually to the 2020 base year. An additional 15% of the construction cost was added to account for planning, permitting, and engineering design. 5 Area of ecological restoration as described in the “Acushnet River Upland
1 River Walk costs assume 10-foot trail width, 2-foot of shoulder on each side, 12-inch depth of subbase and asphalt surface (no haul road in place). Costs escalated 4% annually to phase construction year. 2 Phase year indicates one year after the EPA hazardous material remediation of the Acushnet River and intertidal area is scheduled to be complete. This allows one year for the design, permitting, and contractor procurement of the River Walk and associated features. 3 Cost of ecological restoration areas (or portions thereof) may be provided
54
LLENGES - PRESENTED IN SEQUENTIAL ORDER BY PHASE
LLENGES
l 0.6 acres) containing nd single-story
OPPORTUNITIES / POTENTIAL FEATURES
COST1 (PHASE YEAR)2 RIVER WALK
ECOLOGICAL RESOTRATION3 NB Trustees5
Additional Areas
RIVER WALK GATEWAYS4
TOTAL6
• Existing building within mostly undeveloped 2.9 acre parcel east of Cliftex could be combined with adjacent 0.6 acre parcel for recreation or ecological features.
$272,000 (2024)
$301,000
$360,000
$0
$942,000
• 1.2 acres of upland potentially available for recreation or ecological features
$78,000 (2024)
$84,000
$84,000
$0
$246,000
• Existing u-shaped trail can be reused • Smokestack is an interesting destination / feature
$103,000 (2024)
$45,000
$0
$0
$148,000
• 2.0 acres of potential recreation / flood storage
$431,000 (2024)
$891,000
$0
$560,000
$1,882,000
etween American Eng. g and river 0 flood area
• Area of removed Sawtooth Building may be combined with existing City-owned parking area behind the Sawtooth Building and Victoria Riverside (Segment 5)
$257,000 (2025)
$18,000
$193,000
$579,000 (2 locations)
$1,047,000
available between nd river
• Undeveloped land at south end of segment could be combined with Segment 4 area for recreation or ecological features
$296,000 (2025)
$144,000
$0
$463,000
$903,000
0 flood area ver’s edge
dation/flood protection
0 flood area ver’s edge
available in front of
story building at river’s
0 flood area ver’s edge
Restoration” report based on the assumption that the area to be planted is contained within a 25-foot offset from the top of bank throughout the length of the project. 6 Exclusions: These conceptual cost estimates do not include the cost of ancillary features such as a canoe launch, overlook/pier, etc. Before a canoe launch or pier can be designed, permitted or constructed, the City of New Bedford will need to determine whether the Acushnet River can be used safely by the public. Other items that are not accounted for at
this time: disposal costs of contaminated soils, fill in capped contamination areas, and shoreline stabilization (shoreline stabilization needs will need to be determined on a site by site basis in the site investigation stage with the help of a coastal engineer. In some cases, no stabilization may be required.)
55
Table 4: Summary of Trail Segments - Opportunities and Challenges - Presented in Sequential Order by Phase (continued)
n/a
Phase 5
Phase 4
Phase 3
PHASE
EXISTING LANDMARKS / FEATURES OF NOTE
STATUS OF RIVER REMEDIATION
TRAIL SEGMENT
TRAIL LIMITS
LENGTH
10
Hatch Street to Hadley Street (760 feet)
740
Titleist
Scheduled for 2023 Completion
• Large fenced p • Portions of fen require relocati
1
Veteran’s Memorial Way to Sawyer Street
545
Market Basket Parking Lot
Complete
• Wetlands at riv
2
Sawyer Street to Riverside Park
1,120
EPA Sawyer Street Facility
Scheduled for 2026 Completion
• Wetlands at riv
3
Sawyer Street to Coffin Avenue
550 (plus 860 feet of Coffin Avenue)
Riverside Park at Pierce Mill Cove
Complete
• Portions of exis Avenue in exten
11
Hadley Street to Precix
1,490
Former Aerovox Site
Completion TBD
• Date of availab • Extended 2050
12
Precix to Sylvia Street
(feet)
CHAL
Due to site constraints, no River W
by funds managed by the New Bedford Harbor Trustees Council. Ecological restoration was calculated at an average of $8/square foot. 4 Costs of the ‘River Walk Gateway’ features were developed for the 2015 New Bedford Riverwalk Planning and Design Feasibility Study. The costs of the gateway features provided in that study were inflated 4% annually to the 2020 base year. An additional 15% of the construction cost was added to account for planning, permitting, and engineering design. 5 Area of ecological restoration as described in the “Acushnet River Upland
1 River Walk costs assume 10-foot trail width, 2-foot of shoulder on each side, 12-inch depth of subbase and asphalt surface (no haul road in place). Costs escalated 4% annually to phase construction year. 2 Phase year indicates one year after the EPA hazardous material remediation of the Acushnet River and intertidal area is scheduled to be complete. This allows one year for the design, permitting, and contractor procurement of the River Walk and associated features. 3 Cost of ecological restoration areas (or portions thereof) may be provided
56
LLENGES
OPPORTUNITIES / POTENTIAL FEATURES
COST1 (PHASE YEAR)2 RIVER WALK
ECOLOGICAL RESOTRATION3 NB Trustees5
Additional Areas
RIVER WALK GATEWAYS4
TOTAL6
parking lot nced area would likely ion
• Minor loss of paved area (0.1 acre) could open continuous 1.6 acres recreation or ecological features
$335,000 (2026)
$431,000
$0
$0
$766,000
ver’s edge
• Canoe ramp at Segment 1 and 2 boundary (existing boat ramp in place)
$258,000 (2027)
$71,000
$0
$674,000 (2 locations)
$1,003,000
ver’s edge
• Once available, 7.75 acrew potential for redevelopment, recreation, or ecological features
$527,000 (2027)
$761,000
$2,123,000
$0
$3,411,000
sting trail and Coffin nded 2050 flood area
• Coffin Street enhancements • Overlook / pier
$279,000 (2027)
$539,000
$0
$0
$818,000
• 9.0 acre site for recreation or ecological restoration • Overlook / pier
$701,000 (2027)
$41,000
$5,996,000
$488,000
$7,226,000
$8,765,000
$2,764,000
bility unknown 0 flood area
Walk proposed. River Walk would terminate at north end of former Aerovox site (Segment 11)
TOTAL $3,537,000
$3,326,000
Restoration” report based on the assumption that the area to be planted is contained within a 25-foot offset from the top of bank throughout the length of the project. 6 Exclusions: These conceptual cost estimates do not include the cost of ancillary features such as a canoe launch, overlook/pier, etc. Before a canoe launch or pier can be designed, permitted or constructed, the City of New Bedford will need to determine whether the Acushnet River can be used safely by the public. Other items that are not accounted for at
$18,392,000
this time: disposal costs of contaminated soils, fill in capped contamination areas, and shoreline stabilization (shoreline stabilization needs will need to be determined on a site by site basis in the site investigation stage with the help of a coastal engineer. In some cases, no stabilization may be required.)
57
58
8.0 CONCLUSION As described in this Feasibility Study Update, the anticipated future completion of the remediation of the Acushnet River and the adjacent intertidal area has led the City of New Bedford to plan for public enhancements to the shoreline area of the upper Acushnet, including the River Walk. The River Walk will serve as the culmination of the City’s efforts to restore the Acushnet River and its adjacent shoreline into a safe and positive community amenity, encouraging passive recreational opportunities along the banks of the Acushnet River for city residents and visitors. The River Walk project is
an opportunity to construct a linear park that will offer more access to the City’s waterfront and may offer a short-term benefit in the form of a modest buffer to rising sea levels. While substantial work remains to turn this vision into reality, the dedication and long-term vision of the City of New Bedford and their partners, including the New Bedford Harbor Trustees Council, the U.S. EPA, MA EEA, and MassDEP, provides confidence that someday soon, the New Bedford River Walk will be completed and available for everyone to enjoy.
59
60
APPENDIX APPENDIX A
REPORT MAPS
APPENDIX B
CONCEPTUAL COST ESTIMATES
APPENDIX C
ACUSHNET RIVER UPLAND RIPARIAN RESTORATION PROJECT
APPENDIX D
UPPER HARBOR REMEDIATION STATUS (2019)
61
62
APPENDIX A
REPORT FIGURES FIGURE 1
OVERALL CONCEPT PLAN - RIVER WALK ALIGNMENT AND POTENTIAL PUBLIC AMENITIES
FIGURE 2
REGIONAL CONTEXT AND STUDY AREA
FIGURE 3
RIVER WALK PARCELS AND YEAR BUILT
FIGURE 4
EXISTING ENVIRONMENTAL RESOURCES
FIGURE 5
FEMA FLOODPLAIN
FIGURE 6
HISTORIC RESOURCES
FIGURE 7
EPA REMEDIATION ZONES, SCHEDULE, AND PROPOSED PHASING
FIGURE 8
HAZARDOUS MATERIAL SITES - DEP RELEASE TRACKING NUMBERS
FIGURE 9
MA-FRM PROBABILITY OF INUNDATION (2030, 2050, 2070)
FIGURE 9A
MA-FRM PROBABILITY OF INUNDATION 2030
FIGURE 9B
MA-FRM PROBABILITY OF INUNDATION 2050
FIGURE 9C
MA-FRM PROBABILITY OF INUNDATION 2070
FIGURE 10
MA-FRM FLOOD DEPTH FOR 1% ANNUAL FLOOD (100-YEAR FLOOD EVENT) (2030, 2050, 2070)
FIGURE 10A
MA-FRM FLOOD DEPTH FOR 1% ANNUAL FLOOD (100-YEAR FLOOD EVENT) 2030
FIGURE 10B
MA-FRM FLOOD DEPTH FOR 1% ANNUAL FLOOD (100-YEAR FLOOD EVENT) 2050
FIGURE 10C
MA-FRM FLOOD DEPTH FOR 1% ANNUAL FLOOD (100-YEAR FLOOD EVENT) 2070
FIGURE 11
PHASE 1 DETAIL PLAN
FIGURE 12
PHASE 2 DETAIL PLAN
FIGURE 13
PHASE 3 DETAIL PLAN
FIGURE 14
PHASE 4 DETAIL PLAN
FIGURE 15
PHASE 5 DETAIL PLAN
63
W h it m a n
Ave n u e
S tr e e t
M a d e ir a
ad N a sh R o
tr e e t E a rl e S
tr e e t D a vis S
S tr e e t
ue TIE INTO EXISTING Aven hnet s u c A PATH NETWORK
C o ll e tt e
ve nu e P h il li p s A
tr e e t De an e S
B u ll a rd
eet N y e S tr
T a ll m a n
tr e e t H o ll y S
r Street SSaw tryeee t B e e tl e
Bentley Street tr e e t B e e tl e S
Ho
S tr e e t
ad N a sh R o
Hope Stree t Ave n u e
T in k h a m
H a th a w a
y S tr e e t
S tr e e t
De EXPANDED ECOLOGIC RESTORATION ZON
Man o me
t S tr e e t
ood Lustiano F g Star Platin
P
AmericanPUBLIC PARKING, iverside PLAZA, Victoria R Engineered AND EXPANDED ECOLOGICAL Fabrics
/
RESTORATION ZONE
Powder Pro
EXPANDED E RESTORAT
erside
iv Victoria R
OVERLOOK + PIER SEGMENT 6
WEST ZONE 4 Anticipated Completio Subject to EPA Fun
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
WEST ZONE 5 Anticipated Completion 2024 Subject to EPA Funding
PHASE 2
SAWYER STREET FACILITY OWNED BY CITY OF NEW BEDFORD Leased to EPA until May 2026
WEST ZONE 5 Anticipated Completion 2024 Subject to EPA Funding
LEGEND Proposed River Walk Path
250
500
750
1,000
¸
0
SEGMENT 6
BUILDING TO BE REMOVED PHASE 2
SEGMENT 7
SEGMENT 6
SEGMENT 4
SEGMENT 5
Engineered Fabrics
CLIFTEX Corp.
t S tr e e t
P
SEGMENT 5
ood / Lustiano F g Star Platin
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
EXPANDED ECOLOGICAL RESTORATION ZONE
Assisted Living
Man o me
Whaler’s Place
PHASE 4
Feet
HopeR
Riverside Avenue
PHASE 4
PLANNED EPA REMEDIATION SEQUENCE
M a d e ir a
BUILDING TO BE REMOVED Whaler’s Care
7-Eleven
PLANNED EPA REMEDIATION SEQUENCE
e
Bell Avenue Riverside ev Whaler’s Care ille Ave CLIFTEX Corp. nue Assisted Living
Whaler’s Place
SAWYER STREET FACILITY OWNED BY CITY OF NEW BEDFORD Leased to EPA until May 2026
T in k h a m
ve nu e C o ff in A
RIVERSIDE PARK
Sawyer Street EXPANDED ECOLOGICAL Facility / Jacobs RESTORATION ZONE Engineering Work Zone
CANOE LAUNCH
enu
eet y S tr e e t E a rl e S tr
tr e e t D a vis S
S tr e e t
S tr e e t
e Av
OVERLOOK + PIER American
SEGMENT 1
Cogge shall Street
P
evill
PUBLIC PARKING, PLAZA, AND EXPANDED ECOLOGICAL RESTORATION ZONE
7-Eleven
Taco Bell
C o ll e tt e
ve nu e P h il li p s A
ve nu e C o ff in A
tr e e t De an e S
B u ll a rd
eet N y e S tr
Cogge shall Street
Sawyer Street Facility / Jacobs Engineering Work Zone Taco Bellit c h e ll S tr e e t M Th P Rope e works t e k s etba Mark
Bell
TIE INTO EXISTING PATH NETWORK
Belleville Avenue
CANOE LAUNCH
H a th a w a
S tr e e t
S tr e e t
tr e e t H o ll y S
treet Sawyer S
tr e e t B e e tl e S
ket
Th Rope e works
T a ll m a n
RIVERSIDE PARK
tbas
e Mark
n t S tr e e t N o rt h F ro
Belleville Avenue
S tr e e t H o w a rd S tr e e t M it c h e ll
S tr e e t
Figure 1: Overall Concept Plan - River Walk Alignment and Potential Public A
N
64
River Walk Follows Existing Path + Driveway Proposed Onroad River Walk Extension Proposed River Walk Path
Anticip Sub
Brooklawn Street
Wood Street
Brooklawn Court
Sylv ia Stre et Howa rd Avenu e
Perry Street
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
SEGMENT 12
SEGMENT 12
Buildings With Highest Flood Risk - 2030
Building to be Removed
Buildings With Highest Flood Risk - 2050
WEST ZONE 1 Anticipated Completion 2020
Wood Street
Sylv ia Stre et
SEGMENT 12
Precix / Acushnet Rubber
Municipal Park
65
WEST ZONE 1 Anticipated Completion 2020
AEROVOX SITE NOW OWNED BY CITY OF NEW BEDFORD Anticipated Completion TBD
Gateways and Promontories
Gateways and Promontories
OVERLOOK + PIER CTS
SEGMENT 11
WEST ZONE 2 Anticipated Completion 2023 Subject to EPA Funding
END
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
PHASE 5
Existing Shoreline
Existing Shoreline
River Road
AEROVOX SITE NOW OWNED BY CITY OF NEW BEDFORD Anticipated Completion TBD
PHASE 3
WEST ZONE 3 Anticipated Completion 2023 Subject to EPA Funding
SEGMENT 12
WEST ZONE 4 pated Completion 2024 bject to EPA Funding
CTS
Former Aerovox Site
SEGMENT 11
PHASE 1
PARK
PHASE 5
SEGMENT 10
SEGMENT 9
WEST ZONE 2 Anticipated Completion 2023 Subject to EPA Funding SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
WEST ZONE 3 Anticipated Completion 2023 Subject to EPA Funding
OVERLOOK + TO PIER RIVERS
P
SEGMENT 11
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
PHASE 1
4 on 2024 nding
Darn It! Inc.
Acushnet Company / Titleist
Powder Pro
Brooklawn Court
Perry Street
Precix / Acushnet Rubber Du nc an St ree t River Road
Acushnet Company / Titleist
Belleville Avenue
River Bank Lofts
Field ing Stree t
TO BROOKLAWN PARK Kearsarge Street
Aerovox Site
POSSIBLE PASSIVE RECREATION AREA US Party Nashawena Company East Mills
Co nd ui t St re et
TO RIVERS END PARK
P ONROAD CONNECTIONS TO NEIGHBORHOODFormer AND PARKS
DRIVEWAY
Sowle Stree t
TO BROOKLAWN BROOKLAWN PARK PARK Kearsarge Street Ha dle y St ree t
Co ve ll St re et
Party FOLLOWS t Lofts RIVER WALK US Stree eRiver Darn It! Inc. Bank Nashawena Company et tr eEast S ly a e EXISTING AND Mills H PATH
Field ing Stree t Edna Stree t
Howa rd Avenu e
Du nc an St ree t
Ha dle y St ree t
Ha tch St ree t
M er ril l St re etRECREATION AREA Belleville Avenue
Desautels Street ECOLOGICAL TION ZONE
ree t
St re et
Irvi ngt on Co urt
ONROAD CONNECTIONS TO NEIGHBORHOOD AND PARKS
POSSIBLE PASSIVE
NE
Co nd ui t St re et eet F e lt o n S tr
BROOKLAWN PARK
Cl iff or d St re et Co ve ll St re et
esautels Street CAL
Ha tch St ree t
S tr e e t
S tr e e t
Ro a d
RIVER WALK FOLLOWS ee t e a ly S trAND EXISTINGH PATH DRIVEWAY
et B a te s S tr e
W h it m a n
M er ril l St re et
Irvi ngt on Co et urt Co nc or d St re
Ce ntr al Av en ue
E u g e n ia
B e ll e v il le
et Q ue ry S tr e Ce ntr al Av en ue
t ee re et
et
n S tr e e t et B a te s S tr e
oad ll e v il le R
tr e e t u g e n ia S
Amenities
Sowle Stree t Ve rn on St re et
1 38
õ Å 1 40
28 " )
õ Å õ Å 1 05
¦ ¨ § ¦ ¨ §
1 05
3A " )
" )3
49 5
± ³
24 " )
58 " )
49 5
4
" )
6 £ ¤
79
õ Å 1 38
79 " )
18 " )
28 " )
6 £ ¤
25 " )
6 £ 28 ¤ " )
28 6 " ) £ ¤ 6 £ ¤
õ Å
6 £ ¤
6A " )
1 05
õ Å
õ Å ") 1 38 7 9 6 £ ¤
1 05
24 " )
õ Å
õ Å
1 30
1 40
¦ ¨ §
6 £ ¤
19 5
81 " ) 24 " ) 24 " )
CITY OF NEW BEDFORD
õ Å õ Å " )
MAP INSET
¦ ¨ §
18 " )
õ Å 1 77
õ Å
1 49
19 5
6 £ ¤ 6 £ ¤ 6 £ ¤
6 £ ¤
28
28 " )
1 77
1 49
õ Å õ Å 1 51
1 40
Å õ 2 8A
¸
88 " )
0
5 Miles
88 " )
õ Å 1 40
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, US
¦ ¨ § 19 5
66
± ³
õ Å
Figure 2: Regional Context and Study Area
14
BELLEVILLE AVENUE
WOOD STREET
18 " )
õ Å õ Å 1 32
1 32
õ Å ") 1 32
Acushnet River
RIVERSIDE AVENUE
28
hnet f Achus o n w o T ven f Fairha o n w o T
BELLEVILLE AVENUE
COFFIN AVENUE
SGS, AeroGRID, IGN, and the GIS User Community
17
± ³
16
± ³
± ³
COGGESHALL STREET 15
67
¸
¦ ¨ § 19 5
0
0.2 Miles
S tr e e t
Ro a d
T in k h a m
ad N a sh R o
S tr e e t T in k h a m
y S tr e e t
S tr e e t
H a th a w a
Bell evill 105-207 e Av Riverside Avenue enu e Whaler’s Care CLIFTEX Corp. Assisted Living
R
Powder Pro
105-135 1903
t S tr e e t
Whaler’s Care CLIFTEX Corp. Assisted Living 105-209
Man o me
SEGMENT 6
105-208
105-209
100-118 1919
105192 SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 2
LEGEND Proposed River Walk Path
500
750
Feet
1,000
¸ ¸
250
N
68
N
SEGMENT 7
PHASE 2 100-117
105-183 1925
SEGMENT 6
100-82
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
100-120 1910
American100-118 ria Riverside Victo Engineered Fabrics 1919
t S tr e e t
ood / Lustiano F g Star Platin
100-117
PHASE 4
0
De
105 1
100-138 100-123 iverside 1910 1910 Victoria R
Whaler’s Place 100-82
100-120 1910
PHASE 4
Feet
105-1
Hope
Man o me
100-122 1910
American Engineered Fabrics
100-85 1896
93-265
105-135 1903
105-208 Riverside Avenue
100-140 1896
7-Eleven
93-120
ue 105-207d e ir a A v e n105-206 Hope Stree t Ma 1903
/
Cogge shall Street
93-265
93-120 Sawyer Street
Facility / Jacobs Engineering Work Zone
Taco Bell
e
tr e e t y S trEe ae rlt e S
100-85 1896
enu
100-123 1910
Whaler’s Place
ood Lustiano F g Star Platin
Cogge shall Street
100-140 1896
7-Eleven
93-263
ve nu e C o ff in A
RIVERSIDE PARK
Sawyer Street tr e e t S Facility / Jacobs ll e h c M it The Zone Engineering RopeWork Taco Bell works t e k s etba Mark
e Av
Ave n u e
H a th a w a
100-84 100-138 1910
Belleville Avenue
93-263
evill
tr e e t D a vis S
100-83
Bell
S tr e e t
S tr e e t
99-81
ve nu e C o ff in A
tr e e t De an e S
B u ll a rd
S tr e e t
93-220
eet N y e S tr
T a ll m a n
tr e e t H o ll y S
treet Sawyer S
tr e e t B e e tl e S
t
aske
etb Mark
Th Rope e works
100-122 1910
C o ll e tt e
Ho
S tr e e t M it c h e ll
t e S tr e e
et ro n t S tr e ve nu e P h il li p s A
N o rt h F Figure Parcels and Year Built100-84 e t River Walk e3: Belleville Avenue w a rd S tr
RIVERSIDE PARK
t is S tr e e
100-83
S tr e e t
99-81
A ve nu e
S tr e e t
d S tr e e t
t e S tr e e
et m a n S tr e
eet o ll y S tr
treet Seaewt yer S
reet tr e e t B e e tl e S
93-220
M a d e ir a
River Walk Follows Existing Path + Driveway Proposed Onroad River Walk Extension Proposed River Walk Path River Walk Follows Existing Path + Driveway
awn Street
Brooklawn Court
Howa rd Avenu e
Co nd ui t St re et
Wood Street
Brooklawn Court
116-67 1914
Field ing Stree t
Sylv ia Stre et Howa rd Avenu e
Perry Street
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
SEGMENT 12
SEGMENT 12
CTS
Wood Street
Sylv ia Stre et
Former Aerovox Site SEGMENT 11
SEGMENT 11
SEGMENT 10
PHASE 3
111-160
1903
SEGMENT 9
PHASE 105-170 1
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
111-152
111-155 1903
CTS
Precix / Acushnet Rubber
112-252
River Road
111-160
Perry Street
Darn It! Inc.
Acushnet Company / Titleist
US Party Nashawena Company East Mills
Powder Pro
105-170 1903
112-88
Kearsarge Street
Belleville Avenue
111-152
111-155 River Bank Lofts 1903
112-133 Former Aerovox 1903 Site
111-146 1903
116-67 1914
Precix / Acushnet Rubber Du nc an St ree t River Road
111-99 1984
Desautels Street
112-88
Ha dle y St ree t
105-181
Belleville Avenue Darn It! Inc.
Du nc an St ree t
H Nashawena Company East Mills
River Bank Lofts
Stree t Field ing StreeEdna t
BROOKLAWN PARK
Kearsarge Street
Acushnet Company / Titleist
111-98 tr e e t 1909 ly S Party e aUS
Irvi ngt on Co urt
112-133 1903
M er ril l St re et
St
Sowle Stree t
t ve ll St re et Ha dle y St reeCo
5-206 e Stree t 1903
BROOKLAWN PARK
Ha tch St ree t
111-146 1903
esautels Street
Cl iff or d St re et Co ve ll St re et
111-99 1984
Ha tch St ree t
H
et B a te s S tr e
Ro a d
111-98 tr e e t e a ly S1909
S tr e e t
S tr e e t
181
-183 25
Ce ntr al Av en ue
B e ll e v il le
E u g e n ia
W h it m a n
et Q ue ry S tr e al Av en ue
et B a te s S tr e
Ro a d
S tr e e t
M er ril l St re et
F e lt o n Co nd ui t St re et
Irvi ngt on Co urt
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
PHASE 5 112-252
Municipal Park
City-Owned Parcel
Building to be Removed
Parcels Requiring An Easement
Existing Shoreline
Parcel Boundary
Municipal Park
City-Owned Parcel
SEGMENT 12
Parcel Boundary
SEGMENT 12
Existing Shoreline
SEGMENT 11
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
PHASE 1
PHASE 5
Source: City of New Bedford Assessors Database 69
T in k h a m
y S tr e e t
S tr e e t
H a th a w a
Hope
R Powder Pro
t S tr e e t
iverside Victoria R
American Engineered Fabrics
Man o me
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place American Engineered Fabrics
SEGMENT 6
PHASE 2 SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
PHASE 2
LEGEND Proposed River Walk Path
250
500
750
Feet
1,000
¸ ¸
0
N
70
N
River Walk Follows Existing Path + Driveway Proposed Onroad River Walk Extension Proposed River Walk Path River Walk Follows Existing Path + Driveway
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
erside
iv Victoria R
t S tr e e t
ood / Lustiano F g Star Platin
7-Eleven
Feet
De
/
Cogge shall Street
Sawyer Street Facility / Jacobs Engineering Work Zone
Taco Bell
Man o me
7-Eleven
enue A v Hope Stree t
Bell evill e Av Riverside Avenue enu e Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place
ood Lustiano F g Star Platin
Cogge shall Street
ve nu e C o ff in A
RIVERSIDE PARK
ad N a sh R o
M a d e ir a
Belleville Avenue
Sawyer Street tr e e t S Facility / Jacobs ll e h c M it The Zone Engineering RopeWork Taco Bell works t e k s etba Mark
S tr e e t
e
S tr e e t
enu
Ro a d
T in k h a m
e Av
tr e e t y S trEe ae rlt e S
S tr e e t
evill
Ave n u e
H a th a w a
Bell
tr e e t D a vis S
C o ll e tt e
ve nu e P h il li p s A
S tr e e t
ve nu e C o ff in A
tr e e t De an e S
B u ll a rd
S tr e e t
eet N y e S tr
T a ll m a n
Th Rope e works
tr e e t H o ll y S
treet Sawyer S
sket
etba
Mark
tr e e t B e e tl e S
S tr e e t M it c h e ll
t e S tr e e
et ro n t S tr e
Ho
RIVERSIDE PARK
t is S tr e e
S tr e e t
A ve nu e
S tr e e t
d S tr e e t
t e S tr e e
et m a n S tr e
eet o ll y S tr
treet Seaewt yer S
reet tr e e t B e e tl e S
Figure Environmental Resources N o rt h F e t Existingle Ave e4: nue Bellevil w a rd S tr
M a d e ir a
awn Street
Wood Street
Brooklawn Court
Sylv ia Stre et Howa rd Avenu e
Wood Street
Sylv ia Stre et
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
Wetlands
SEGMENT 12
Municipal Park
SEGMENT 12
Existing Shoreline
Brooklawn Court
Chapter 91 Jurisdiction
SEGMENT 12
Building to be Removed
Precix / Acushnet Rubber
Beach / Dune
Field ing Stree t
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
CTS
SEGMENT 11
Municipal Park
SEGMENT 12
Wetlands
SEGMENT 11
SEGMENT 10
SEGMENT 9
PHASE 3
Existing Shoreline
Co nd ui t St re et
PHASE 5
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
PHASE 1
Former Aerovox Site SEGMENT 11
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
PHASE 1
CTS
Perry Street
Kearsarge Street
River Road
Powder Pro
Darn It! Inc.
Acushnet Company / Titleist
US Party Nashawena Company East Mills
Howa rd Avenu e
Former Aerovox Site
Belleville Avenue River Bank Lofts
Perry Street
Desautels Street
Kearsarge Street Precix / Acushnet Rubber Du nc an St ree t River Road
Belleville Avenue Darn It! Inc.
Stree t Field ing StreeEdna t
BROOKLAWN PARK
Ha dle y St ree t
River Bank Lofts
Irvi ngt on Co urt
Acushnet Company / Titleist
tr e e t ly S Party H e aUS Nashawena Company East Mills
Du nc an St ree t
M er ril l St re et
St
Sowle Stree t
Ha tch St ree t
esautels Street
e Stree t
BROOKLAWN PARK
t ve ll St re et Ha dle y St reeCo
Cl iff or d St re et Co ve ll St re et
Ha tch St ree t
et B a te s S tr e
Ro a d
S tr e e t
S tr e e t
H e a ly
S tr e e t
Ce ntr al Av en ue
B e ll e v il le
E u g e n ia
W h it m a n
et Q ue ry S tr e al Av en ue
et B a te s S tr e
Ro a d
S tr e e t
M er ril l St re et
F e lt o n Co nd ui t St re et
Irvi ngt on Co urt
PHASE 5
Source: MassDEP Wetlands GIS Dataset and Tidelands Jurisdiction Datalayer
Beach / Dune
71
T in k h a m
y S tr e e t
S tr e e t
H a th a w a
Hope
R Powder Pro
t S tr e e t
iverside Victoria R
American Engineered Fabrics
Man o me
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place American Engineered Fabrics
SEGMENT 6
PHASE 2 SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
PHASE 2
LEGEND Proposed River Walk Path
250
500
750
Feet
1,000
¸ ¸
0
N
72
N
River Walk Follows Existing Path + Driveway Proposed Onroad River Walk Extension Proposed River Walk Path River Walk Follows Existing Path + Driveway
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
erside
iv Victoria R
t S tr e e t
ood / Lustiano F g Star Platin
7-Eleven
Feet
De
/
Cogge shall Street
Sawyer Street Facility / Jacobs Engineering Work Zone
Taco Bell
Man o me
7-Eleven
enue A v Hope Stree t
Bell evill e Av Riverside Avenue enu e Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place
ood Lustiano F g Star Platin
Cogge shall Street
ve nu e C o ff in A
RIVERSIDE PARK
ad N a sh R o
M a d e ir a
Belleville Avenue
Sawyer Street tr e e t S Facility / Jacobs ll e h c M it The Zone Engineering RopeWork Taco Bell works t e k s etba Mark
S tr e e t
e
S tr e e t
enu
Ro a d
T in k h a m
e Av
tr e e t y S trEe ae rlt e S
S tr e e t
evill
tr e e t D a vis S
C o ll e tt e
Bell
Ave n u e
H a th a w a
t e S tr e e
t is S tr e e
S tr e e t
ve nu e C o ff in A
tr e e t De an e S
B u ll a rd
S tr e e t
eet N y e S tr
T a ll m a n
tr e e t H o ll y S
treet Sawyer S
tr e e t B e e tl e S
sket
etba
Mark
RIVERSIDE PARK
ve nu e P h il li p s A
Ho
Th Rope e works
S tr e e t
A ve nu e
S tr e e t
d S tr e e t
t e S tr e e
et m a n S tr e
eet o ll y S tr
treet Seaewt yer S
reet tr e e t B e e tl e S
n t S tr e e t N o rt h F ro
Figure e t FEMA Floodplain e5: Belleville Avenue w a rd S tr S tr e e t M it c h e ll
M a d e ir a
awn Street
Brooklawn Court
Co nd ui t St re et
Field ing Stree t
Wood Street
Brooklawn Court
Sylv ia Stre et Howa rd Avenu e
CTS
Wood Street
Sylv ia Stre et
SEGMENT 12
SEGMENT 12
Precix / Acushnet Rubber
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
PHASE 5 SEGMENT 12
SEGMENT 12
SEGMENT 11
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
PHASE 1
CTS
Former Aerovox Site SEGMENT 11
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
PHASE 1
Perry Street
Kearsarge Street
River Road
Powder Pro
Darn It! Inc.
Acushnet Company / Titleist
US Party Nashawena Company East Mills
Howa rd Avenu e
Former Aerovox Site
Belleville Avenue River Bank Lofts
Perry Street
Desautels Street
Kearsarge Street Precix / Acushnet Rubber Du nc an St ree t River Road
Belleville Avenue Darn It! Inc.
Stree t Field ing StreeEdna t
BROOKLAWN PARK
Ha dle y St ree t
River Bank Lofts
Irvi ngt on Co urt
Acushnet Company / Titleist
tr e e t ly S Party H e aUS Nashawena Company East Mills
Du nc an St ree t
M er ril l St re et
St
Sowle Stree t
Ha tch St ree t
esautels Street
e Stree t
BROOKLAWN PARK
t ve ll St re et Ha dle y St reeCo
Cl iff or d St re et Co ve ll St re et
Ha tch St ree t
et B a te s S tr e
Ro a d
S tr e e t
S tr e e t
H e a ly
S tr e e t
Ce ntr al Av en ue
B e ll e v il le
E u g e n ia
W h it m a n
et Q ue ry S tr e al Av en ue
et B a te s S tr e
Ro a d
S tr e e t
M er ril l St re et
F e lt o n Co nd ui t St re et
Irvi ngt on Co urt
PHASE 5
Existing Shoreline
AE: 1% Annual Chance of Flooding, with BFE
Municipal Park
X: Reduced Flood Risk due to Levee
Building to be Removed Existing Shoreline
AE: 1% Annual Chance of Flooding, with BFE
Municipal Park
X: Reduced Flood 73 Risk due to Levee
Source: FEMA National Flood Hazard Layer GIS Dataset
T in k h a m
y S tr e e t
S tr e e t
H a th a w a
Hope
R Powder Pro
t S tr e e t
iverside Victoria R
American Engineered Fabrics
Man o me
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place American Engineered Fabrics
SEGMENT 6
PHASE 2 SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
PHASE 2
LEGEND Proposed River Walk Path
250
500
750
Feet
1,000
¸ ¸
0
N
74
N
River Walk Follows Existing Path + Driveway Proposed Onroad River Walk Extension Proposed River Walk Path River Walk Follows Existing Path + Driveway
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
erside
iv Victoria R
t S tr e e t
ood / Lustiano F g Star Platin
7-Eleven
Feet
De
/
Cogge shall Street
Sawyer Street Facility / Jacobs Engineering Work Zone
Taco Bell
Man o me
7-Eleven
enue A v Hope Stree t
Bell evill e Av Riverside Avenue enu e Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place
ood Lustiano F g Star Platin
Cogge shall Street
ve nu e C o ff in A
RIVERSIDE PARK
ad N a sh R o
M a d e ir a
Belleville Avenue
Sawyer Street tr e e t S Facility / Jacobs ll e h c M it The Zone Engineering RopeWork Taco Bell works t e k s etba Mark
S tr e e t
e
S tr e e t
enu
Ro a d
T in k h a m
e Av
tr e e t y S trEe ae rlt e S
S tr e e t
evill
tr e e t D a vis S
C o ll e tt e
Bell
Ave n u e
H a th a w a
t e S tr e e
t is S tr e e
S tr e e t
ve nu e C o ff in A
tr e e t De an e S
B u ll a rd
S tr e e t
eet N y e S tr
T a ll m a n
tr e e t H o ll y S
treet Sawyer S
tr e e t B e e tl e S
sket
etba
Mark
RIVERSIDE PARK
ve nu e P h il li p s A
Ho
Th Rope e works
S tr e e t
A ve nu e
S tr e e t
d S tr e e t
t e S tr e e
et m a n S tr e
eet o ll y S tr
treet Seaewt yer S
reet tr e e t B e e tl e S
n t S tr e e t N o rt h F ro
Figure Resources e t Historicle Ave e6: nue Bellevil w a rd S tr S tr e e t M it c h e ll
M a d e ir a
awn Street
Brooklawn Court
Co nd ui t St re et
Field ing Stree t
Wood Street
Brooklawn Court
Sylv ia Stre et Howa rd Avenu e
CTS
Wood Street
Sylv ia Stre et
SEGMENT 12
SEGMENT 12
Precix / Acushnet Rubber
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
PHASE 5 SEGMENT 12
SEGMENT 12
SEGMENT 11
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
PHASE 1
Former Aerovox Site SEGMENT 11
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
PHASE 1
CTS
Perry Street
Kearsarge Street
River Road
Powder Pro
Darn It! Inc.
Acushnet Company / Titleist
US Party Nashawena Company East Mills
Howa rd Avenu e
Former Aerovox Site
Belleville Avenue River Bank Lofts
Perry Street
Desautels Street
Kearsarge Street Precix / Acushnet Rubber Du nc an St ree t River Road
Belleville Avenue Darn It! Inc.
Stree t Field ing StreeEdna t
BROOKLAWN PARK
Ha dle y St ree t
River Bank Lofts
Irvi ngt on Co urt
Acushnet Company / Titleist
tr e e t ly S Party H e aUS Nashawena Company East Mills
Du nc an St ree t
M er ril l St re et
St
Sowle Stree t
Ha tch St ree t
esautels Street
e Stree t
BROOKLAWN PARK
t ve ll St re et Ha dle y St reeCo
Cl iff or d St re et Co ve ll St re et
Ha tch St ree t
et B a te s S tr e
Ro a d
S tr e e t
S tr e e t
H e a ly
S tr e e t
Ce ntr al Av en ue
B e ll e v il le
E u g e n ia
W h it m a n
et Q ue ry S tr e al Av en ue
et B a te s S tr e
Ro a d
S tr e e t
M er ril l St re et
F e lt o n Co nd ui t St re et
Irvi ngt on Co urt
PHASE 5
Existing Shoreline
National Register of Historic Places
Municipal Park
MHC Inventoried Property
Building to be Removed
National Register of Historic Places Historic District
Existing Shoreline
National Register of Historic Places
Municipal Park
MHC Inventoried Property 75
Source: MHC GIS Dataset
S tr e e t
T in k h a m
et ro n t S tr e
Ro a d
Ave n u e
H a th a w a
t e S tr e e
t is S tr e e
S tr e e t
A ve nu e
S tr e e t
d S tr e e t
t e S tr e e
et m a n S tr e
eet o ll y S tr
treet Seaewt yer S
reet tr e e t B e e tl e S
M a d e ir a
e
M a d e ir a
T in k h a m S tr e e t
y S tr e e t
Hope
R
/
Man o me
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place American Engineered Fabrics
SEGMENT 6
PHASE 2 SEGMENT 6
PHASE 4
SEGMENT 5
SEGMENT 4
WEST ZONE 5 Anticipated Completion 2024 Subject to EPA Funding
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
SAWYER STREET FACILITY OWNED BY CITY OF NEW BEDFORD Leased to EPA until May 2026
WEST ZONE 4 Anticipated Completio Subject to EPA Fun
PHASE 2
SAWYER STREET FACILITY OWNED BY CITY OF NEW BEDFORD Leased to EPA until May 2026
WEST ZONE 5 Anticipated Completion 2024 Subject to EPA Funding
LEGEND Proposed River Walk Path
0
250
500
750
Feet
1,000
¸ ¸
Feet
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
erside
iv Victoria R
t S tr e e t
ood / Lustiano F g Star Platin
Cogge shall Street
Sawyer Street Facility / Jacobs Engineering Work Zone
PLANNED EPA REMEDIATION SEQUENCE
De
Powder Pro
t S tr e e t
iverside Victoria R
American Engineered Fabrics
7-Eleven
PLANNED EPA REMEDIATION SEQUENCE
Man o me
7-Eleven
Taco Bell
Bell evill e Av Riverside Avenue enu e Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place
ood Lustiano F g Star Platin
Cogge shall Street
ve nu e C o ff in A
RIVERSIDE PARK
enue A v Hope Stree t
H a th a w a
Belleville Avenue
Sawyer Street tr e e t S Facility / Jacobs ll e h c M it The Zone Engineering RopeWork Taco Bell works t e k s etba Mark
ad N a sh R o
enu
S tr e e t
e Av
tr e e t y S trEe ae rlt e S
evill
tr e e t D a vis S
Bell
S tr e e t
S tr e e t
ve nu e C o ff in A
tr e e t De an e S
B u ll a rd
S tr e e t
eet N y e S tr
T a ll m a n
Th Rope e works
tr e e t H o ll y S
treet Sawyer S
sket
etba
Mark
tr e e t B e e tl e S
S tr e e t M it c h e ll
RIVERSIDE PARK
ve nu e P h il li p s A
Ho
C o ll e tt e
h F Figure Zones, Schedule,N o rtand Proposed Phasing e t EPA Remediation e7: Belleville Avenue w a rd S tr
N
76
N
River Walk Follows Existing Path + Driveway Proposed Onroad River Walk Extension Proposed River Walk Path River Walk Follows Existing Path + Driveway
Anticip Sub
awn Street
Field ing Stree t
Wood Street
Brooklawn Court
Sylv ia Stre et Howa rd Avenu e
CTS
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
Existing Shoreline 77
SEGMENT 12
Building to be Removed
SEGMENT 12
Municipal Park
SEGMENT 11
WEST ZONE 2 Anticipated Completion 2023 Subject to EPA Funding
WEST ZONE 1 Anticipated Completion 2020
PHASE 5 AEROVOX SITE NOW OWNED BY CITY OF NEW BEDFORD Anticipated Completion TBD
WEST ZONE 1 Anticipated Completion 2020
Wood Street
Sylv ia Stre et
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
SEGMENT 12
Precix / Acushnet Rubber
SEGMENT 12
PHASE 3
SEGMENT 11
AEROVOX SITE NOW OWNED BY CITY OF NEW BEDFORD Anticipated Completion TBD
Existing Shoreline
Municipal Park
CTS
Former Aerovox Site SEGMENT 11
WEST ZONE 3 Anticipated Completion 2023 Subject to EPA Funding
Co nd ui t St re et
PHASE 5 SEGMENT 10
SEGMENT 9
WEST ZONE 2 Anticipated Completion 2023 Subject to EPA Funding
PHASE 1
WEST ZONE 4 pated Completion 2024 bject to EPA Funding
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
WEST ZONE 3 Anticipated Completion 2023 Subject to EPA Funding
SEGMENT 11
SEGMENT 10
SEGMENT 9
PHASE 3 SEGMENT 7
SEGMENT 6
SEGMENT 7
4 on 2024 nding
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
PHASE 1
River Road
Powder Pro
Darn It! Inc.
Acushnet Company / Titleist
US Party Nashawena Company East Mills
Brooklawn Court
Kearsarge Street
Perry Street
Former Aerovox Site
Belleville Avenue River Bank Lofts
Howa rd Avenu e
Desautels Street
Perry Street
Kearsarge Street Precix / Acushnet Rubber Du nc an St ree t River Road
Belleville Avenue Darn It! Inc.
Stree t Field ing StreeEdna t
BROOKLAWN PARK
Ha dle y St ree t
River Bank Lofts
Irvi ngt on Co urt
Acushnet Company / Titleist
tr e e t ly S Party H e aUS Nashawena Company East Mills
Du nc an St ree t
M er ril l St re et
St
Sowle Stree t
Ha tch St ree t
esautels Street
e Stree t
BROOKLAWN PARK
t ve ll St re et Ha dle y St reeCo
Cl iff or d St re et Co ve ll St re et
Ha tch St ree t
et B a te s S tr e
Ro a d
S tr e e t
S tr e e t
H e a ly
S tr e e t
Ce ntr al Av en ue
B e ll e v il le
E u g e n ia
W h it m a n
et Q ue ry S tr e al Av en ue
et B a te s S tr e
Ro a d
S tr e e t
M er ril l St re et
F e lt o n Co nd ui t St re et
Irvi ngt on Co urt
Ave n u e
S tr e e t
T in k h a m
et ro n t S tr e
Ro a d
M a d e ir a
H a th a w a
t e S tr e e
t is S tr e e
S tr e e t
A ve nu e
S tr e e t
d S tr e e t
t e S tr e e
et m a n S tr e
eet o ll y S tr
treet Seaewt yer S
reet tr e e t B e e tl e S
94 SAWYER STREET + 85 COGGESHALL ST FAIRHAVEN MILLS RTN: 4-0019924, 4-0014995, 4-0000245
F N o rt hRelease Figure Material Sites - MassDEP e t Hazardous e8: 90 RIVERSIDE DRIVETracking 194Numbers RIVERSIDE AVENUE Belleville Avenue w a rd S tr
M a d e ir a
ad N a sh R o
e
S tr e e t
enu
enue A v Hope Stree t
H a th a w a
T in k h a m
200 RIVE FORMER 194 RIVERSIDERTN: AVE
y S tr e e t
S tr e e t
De FORMER CLIFTE RTN: 4-0014112, 4-0
Man o me
Bell evill e Av Riverside Avenue enu e Whaler’s Care CLIFTEX Corp. 10 MANOMET STREET Assisted Living
RTN: 4-0015213, 4-0019527
R Powder Pro
t S tr e e t
iverside Victoria R
Hope
/
Sawyer Street
Man o me
7-Eleven
erside
iv Victoria R
SEGMENT 6
19 + 41 COFFIN AVENUE STARPHASE PLATING 2 RTN: 4-0000437
PHASE 4
SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
PHASE 2
LEGEND Proposed River Walk Path
0
250
500
750
Feet
1,000
¸ ¸
Feet
N
78
N
River Walk Follows Existing Path + Driveway Proposed Onroad River Walk Extension Proposed River Walk Path River Walk Follows Existing Path + Driveway
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
206 - 378 BELLEVILLE AVENUE RIVERSIDE PARK RTN: 4-0011675
American Engineered Fabrics
t S tr e e t
ood / Lustiano F g Star Platin
Cogge shall Street
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place
19 + 41 COFFIN AVENUE STAR PLATING RTN: 4-0000437
45 COGGSEHALL STREET 7-ELEVEN RTN: 4-0017478
e Av
FORMER CLIFTEX RTN: 4-0014112, 4-0014111
10 MANOMET STREET RTN: 4-0015213, 4-0019527 90 RIVERSIDE DRIVE WHALER’S PLACE RTN: 4-0019705
American Engineered Fabrics
206 - 378 BELLEVILLE Facility / Jacobs AVENUE Engineering WorkPARK Zone RIVERSIDE RTN: 4-0011675
45 COGGSEHALL STREET 7-ELEVEN RTN: 4-0017478
tr e e t D a vis S
7-Eleven
Taco Bell
evill
Whaler’s Place
ood Lustiano F g Star Platin
Cogge shall Street
ve nu e C o ff in A
RIVERSIDE PARK
Bell
S tr e e t
Belleville Avenue
Sawyer Street tr e e t S Facility / Jacobs ll e h c M it The Zone Engineering RopeWork Taco Bell works t e k s etba Mark
C o ll e tt e
ve nu e P h il li p s A
S tr e e t
ve nu e C o ff in A
tr e e t De an e S
B u ll a rd
S tr e e t
S tr e e t94 SAWYER STREET + 85 COGGESHALL ST M it c h e ll The RoFAIRHAVEN MILLS pewo t e rks ask4-0019924, b RTN: 4-0014995, 4-0000245 t e k Mar
eet N y e S tr
T a ll m a n
treet Sawyer S
tr e e t B e e tl e S
tr e e t H o ll y S
RIVERSIDE PARK
WHALER’S PLACE RTN: 4-0019705
tr e e t y S trEe ae rlt e S
Ho
awn Street
Brooklawn Court
Wood Street
Wood Street
Sylv ia Stre et
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
SEGMENT 12
Precix / Acushnet Rubber
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
SEGMENT 12
SEGMENT 12
City-Owned Parcel
744 BELLEVILLE AVENUE PRECIX RTN: 4-0021348, 4-0011186
CTS
SEGMENT 11
Municipal Park
SEGMENT 12
Parcel Boundary
SEGMENT 11
SEGMENT 10
SEGMENT 9
PHASE 3
Existing Shoreline
Field ing Stree t
PHASE 5
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
PHASE 1
CTS
Former Aerovox Site SEGMENT 11
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
PHASE 1
River Road
Powder Pro
Darn It! Inc.
Acushnet Company / Titleist
US Party Nashawena Company East Mills
Sylv ia Stre et Howa rd Avenu e
Kearsarge Street
Aerovox Site
Belleville Avenue River Bank Lofts
Brooklawn Court
AEROVOX RTN: 4-0000601
Perry Street
Desautels Street
Howa rd Avenu e
Kearsarge Street
700 BELLEVILLE AVENUE TITLEIST RTN: 4-0027583 Former
RTN: 4-0023093
Perry Street
Darn It! Inc.
744 BELLEVILLE AVENUE PRECIX RTN: 4-0021348, 4-0011186 740 BELLEVILLE AVENUE Precix / Acushnet Rubber Du nc an St ree t River Road
Belleville Avenue
Acushnet Company / Titleist
tr e e t ly S Party H e aUS River200 Bank Lofts RIVERSIDE AVENUE Nashawena Company East Mills FORMER MANOMET MILLS
Co nd ui t St re et
BROOKLAWN PARK
Ha dle y St ree t
Ha tch St ree t
FIBRE LEATHER CORPORATION RTN: 4-0014529 M er ril l St re et
e Stree t
Sowle Stree t
Irvi ngt on Co urt
700 BELLEVILLE AVENUE TITLEIST RTN: 4-0027583 686 BELLEVILLE AVENUE
St
Stree t Field ing StreeEdna t
740 BELLEVILLE AVENUE AEROVOX RTN: 4-0000601 Du nc an St ree t
Ha tch St ree t
et B a te s S tr e
Ro a d
S tr e e t
S tr e e t
esautels Street EX 0014111
Ce ntr al Av en ue
B e ll e v il le
E u g e n ia
W h it m a n
e a ly
ERSIDE AVENUEH MANOMET MILLS : 4-0023093 ENUE
BROOKLAWN PARK
t ve ll St re et Ha dle y St reeCo
Cl iff or d St re et Co ve ll St re et
et Q ue ry S tr e al Av en ue
et B a te s S tr e
Ro a d
S tr e e t
686 BELLEVILLE AVENUE FIBRE LEATHER CORPORATION RTN: 4-0014529 M er ril l St re et S tr e e t
F e lt o n Co nd ui t St re et
Irvi ngt on Co urt
PHASE 5
Building to be Removed Existing Shoreline
Parcel Boundary
Municipal Park
City-Owned Parcel
Source: eDEP 79
EGMENT 5
EGMENT 4
Cen tral Ave nue
tr ee t H ea ly S
Ke
Desautels Street
Pri nce ton Str eet
Sh aw Str ee t
SEGMENT 11
SEGMENT 10
SEGMENT 9
Covell Stre et
Had ley Stre et
Hatc h Stre et
Ke
Acushnet Company / Titleist Irvin gton Stre et
Pri nce ton Str eet
F A
Existing Shoreline Municipal Park
Co nco rd Str eet
Building to be Removed
SEGMENT 11
SEGMENT 10
SEGMENT 9
Str eet 10 Clif fordSEGMENT
Cen tral Ave nue
Ro ad
SEGMENT 9 tes St re et SEGMENT 8 Ba
t Qu ery Str ee
Be lle vil le
SEGMENT 8
SEGMENT 7
St re et
Irving ton Cour t
PHASE 3
Me rril l Str eet
PHA
Had ley Stre et
tr ee t H ea ly S
Covell Stre et
Hatc h Stre et
St re et
e
Sh aw Str ee t
re et Gl en no n St
Eu ge ni a
W
re et SEGMENT hi tm6an St
PHASE 1
Hope Street
Ave nu
Str eet 10 Clif fordSEGMENT
Cen tral Ave nue
Ro ad
SEGMENT 9 tes St re et SEGMENT 8 Ba
t Qu ery Str ee
Be lle vil le
River Walk Follows Existing Path + Driveway
SEGMENT 7
ad Na sh Ro
Ti nk ha m
St re et
eville
SEGMENT 6
Ha th aw ay
Bell
SEGMENT 8
Proposed River Walk Path
Av en ue
PHA
Belleville Avenue
Proposed Onroad River Walk Extension
Ma de ira
5% 10% 20%
US Party Darn It! Inc. Nashawena Company East Mills on Arli ngt Str eet
River Bank Lofts
100%
SEGMENT 5
St re et
re et Ea rle St
SEGMENT 5 vi s St re et Da
Co lle tte
SEGMENT 4
en ue Ph ill ip s Av
PHASE 2
0.5% 1% 2%
Powder Pro
25% 30% 50%
en ue C of fin Av
Th Rope e works
SEGMENT 7
St re et
Victoria Ri
5% 10% 20%
SEGMENT 4
SEGMENT 3
re et De an e St
St re et
St re et
t
aske
Eu ge ni a
0.5% enue Av1% hnet s u c A 2%
RIVERSIDE PARK
etb Mark
W
verside
American Engineered Fabrics
Proposed OnroadIrving ton Cour t River Walk Extension PHASE 3
Me rril l Str eet
Desautels Street
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Belleville Avenue
St re et M itc he ll
re et SEGMENT hi tm6an St
1,000
t St re et No rth Fr on
Bu lla rd
SEGMENT 3
SEGMENT N 2 ye St re et
Ta llm an
reet
Sawyer St
re et Be et le St
tr ee t H ol ly S
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
SEGMENT 7
1,000
ad Na sh Ro
750
St re et
500
Ti nk ha m
St re et
250
PHASE 1
River Walk Follows Existing Path + Driveway
tr ee t H ea ly S
St re et
Feet
e
Dry Hope Street 0.1% 0.2%
/
Be et le
Bentley Street
Dry 0.1% 0.2%
Ave nu
M an om et
od Lustiano Fo g Star Platin
Probability of Inundation
N
SEGMENT 6
eville
St re et
Bell
750
7-Eleven
Av en ue
Probability of Inundation
Whaler’s Place
¸
Coggesha ll Street
Taco Bell
500
Ma de ira
Ha th aw ay
250
Sawyer Street Facility / EPA Work Zone
re et Ea rle St
PHASE 2
SEGMENT 5
SEGMENT 5 vi s St re et Da
St re et
0
2050
Co lle tte
Mark
Feet
Th Rope e works
Proposed River Walk Path nco rd Str eet
100%
SEGMENT 4
t
ske etba
St re et
25% 30% 50%
en ue C of fin Av
St re et M itc he ll
H ow ar d
en ue Ph ill ip s Av
SEGMENT 4
N
RIVERSIDE PARK
F
0A
Co
¸
Belleville Avenue
0
e
t St re et No rth Fr on
SEGMENT 3
5% 10% 20%
re et De an e St
St re et
St re et
PHASE 4
Bu lla rd
SEGMENT 3
SEGMENT N 2 ye St re et
Ta llm an
tr ee t H ol ly S
SEGMENT 1
reet
Sawyer St
re et Be et le St
2030
0.5% 1% 2%
SEGMENT 2
SEGMENT 1
Dry 0.1% St re et H ow ar d 0.2%
u Aven
Victoria Ri
re et Gl en no n St
St re et
1,000
hnet Acus
Powder Pro
St re et
Be et le
Bentley Street
Probability of Inundation
verside
American Engineered Fabrics
US Party Darn It! Inc. Nashawena Company East Mills Arli ngt on Str eet
River Bank Lofts
Acushnet Company / Titleist Irvin gton Stre et
Whaler’s Place
7-Eleven
Belleville Avenue
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living M an om et
Taco Bell
od / Lustiano Fo g Star Platin
Coggesha ll Street
Sawyer Street Facility / EPA Work Zone
¸
Had ley Stre et
Covell Stre et
Hatc h Stre et
e
Irving ton Cour t
PHASE 2
Me rril l Str eet Hope Street
Ave nu
et Ba tes St re
Ro ad
St re et
M
Th Rope e works
eville
St re et
sket
tba arke
Bell
St re et
en ue C of fin Av
RIVERSIDE PARK
St re et
Ha th aw ay
Belleville Avenue
St re et M itc he ll
Av en ue
Ti nk ha m
St re et
St re et
St re et
reet Sawyer St
re et Be et le St
Figure 9: MA-FRM Probability of Inundation (2030, 2050, 2070) PHASE 4 Ma de ira
Clif ford Str eet
t Qu ery Str ee
EGMENT 4
EGMENT 3
Be lle vil le
Eu ge ni a
W hi tm an
ad Na sh Ro
re et Ea rle St
re et Da vi s St
Co lle tte
EGMENT 3
EGMENT 2
EGMENTPh1ill ip s Av en ue
t St re et No rth Fr on
re et De an e St
et N ye St re
Ta llm an
tr ee t H ol ly S
Bu lla rd
EGMENT 2
St re et
EGMENT 1
H ow ar d
Ke
Desautels Street
250
500
750
1,000
Powder Pro
St re et
0
verside
Victoria Ri
/
Dry 0.1% 0.2%
Feet
0.5% 1% 2%
25% 30% 50%
5% 10% 20%
US Party Nashawena Company East Mills
Darn It! Inc.
F A
Proposed River Walk Path
Existing Shoreline
River Walk Follows Existing Path + Driveway
Municipal Park
Proposed Onroad River Walk Extension
Building to be Removed
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 10
SEGMENT 9
PHASE 1
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
80
SEGMENT 6
PHASE 2
100%
SEGMENT 5
SEGMENT 4
PHASE 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
2070
od Lustiano Fo g Star Platin
Probability of Inundation
N
American Engineered Fabrics
River Bank Lofts
Acushnet Company / Titleist
Whaler’s Place
7-Eleven
Belleville Avenue
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living M an om et
Taco Bell
¸
Coggesha ll Street
Sawyer Street Facility / EPA Work Zone
PHA
nue
Precix / Acushnet Rubber
River Road
Acushnet Company / Titleist Irvin gton Stre et
Pri nce ton Str eet
SEGMENT 12
SEGMENT 11
SEGMENT 11
SEGMENT 10
PHASE 3
GMENT 12
et
t
GMENT 12
GMENT 11
SEGMENT 9
100% Irving ton Cour t
PHASE 5
BROOKLAWN PARK
Howard Avenue
Perry Street
Dun can Stre et
Had ley Stre et
Covell Stre et
Hatc h Stre et
St re et
St re et
Kearsarge Street
Belleville Avenue Darn It! Inc.
River Walk Follows Existing Path + Driveway
Municipal Park
CTS Flo Buildings With Highest
Building to be Removed
SEGMENT 12
SEGMENT 11
PHASE 3
SEGMENT 11
Buildings With Highest Flo SEGMENT 10
SEGMENT 9
Wood Street
Sylvia Street
PHASE 1
With Highe Buildings WithBuildings Highest Flo
Existing Shoreline
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
Building to be Removed
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
Proposed Onroad River Walk Extension
River Walk Extension
Former Aerovox Site
Precix / Acushnet Rubber
St re et
100%
River Road
US Party Nashawena Company East Mills
Acushnet Company / Titleist
M an om et
River Bank Lofts
Proposed River Walk Path Existing Shoreline
PHASE 2
Str eet 10 Clif fordSEGMENT
Cen tral Ave nue
Ro ad
SEGMENT 9 tes St re et SEGMENT 8 Ba
t Qu ery Str ee
Be lle vil le
St re et
Ti nk ha m
Ha th aw ay
25% 30% 50%
Municipal Park Proposed Onroad
PHASE 4
CTS
Building to be Removed
River Existing 50% 2% Walk Follows 20% Path + Driveway
S tr e e t
Municipal Park
tr ee t H ea ly S
Powder Pro
25% 30%
5% 10%
SEGMENT 8
SEGMENT 7
Eu ge ni a
W
re et SEGMENT hi tm6an St
SEGMENT 7
ad Na sh Ro
SEGMENT 6
SEGMENT 5
Proposed River Walk Path 0.5% 1%
Sh aw Str ee t
re et Gl en no n St
St re et
verside
Victoria Ri
GMENT 11
M an om et
re et Ea rle St
SEGMENT 5 vi s St re et Da
St re et
American Engineered Fabrics
GMENT 10
GMENT 10
EGMENT 9
EGMENT 9
Co lle tte
SEGMENT 4
1,000
SEGMENT 2
SEGMENT 1
Precix / Acushnet Rubber
River Road
L a n d ry
EGMENT 8
750
en ue Ph ill ip s Av
500
Assisted Living
Buildings With Highe
Co nco rd Str eet
Desautels Street
/
Brooklawn Court
Howard Avenue
Perry Street
250
Dry 0.1% 0.2%
100%
Feet
eville
Former Aerovox Site
Existing Shoreline
Me rril l Str eet
Hope Street venu Buildings With Highest AFlood Risk - 2030 e
od Lustiano Fo g Star Platin
Probability of Inundation
¸
Dun can Stre et
25% 0 30% 50% arsarge Street
Former Aerovox Site
Fielding Street
N
5% 10% PHASE 1 20%
Riverside Avenue Buildings With Highest Flood Risk - 2070 Whaler’s Care CLIFTEX Corp. Whaler’s Place
Con
7-Eleven
River Walk Follows Existing Path + Driveway Proposed Onroad River Walk Extension
0.5% Av en ue Ma de ira 1% 2%
Bell
PHASE 5
Proposed River Walk Path 100%
Buildings With Highest Flood Risk - 2050
Sawyer Street Street/ EPA SowleFacility Work Zone
Building to be Removed dui t Stre et
BROOKLAWN PARK
PHASE 2
en ue C of fin Av
SEGMENT 12
Coggesha ll Street
SEGMENT 12
SEGMENT 11
ASE 5
Dry 0.1% 0.2%
PHASE 3
Kearsarge Street
Belleville Avenue
US Party Darn It! Inc. Nashawena Company East Mills Arli ngt on Str eet
River Bank Lofts Powder Pro
25% 30% 50%
5% 10% 20%
SEGMENT 4
pewo rksn St ree t Fe lto
Municipal Park Edna Street Taco Bell
SEGMENT 3
St re et
re et De an e St
Bu lla rd
SEGMENT 3
RIVERSIDE PARK
Brooklawn Street
M
SEGMENT N 2 ye St re et
750 1,000 et e ille Avenu Bellev o Stre Wald
St re et Pico Stone John’s Auto / Existing Shoreline he Imports and RSK TMachine o t Supply keCo. tbas arke
0.5% enue et Av1% n h s Acu 2%
LEGEND
PHASE 4
S tr e e t
Ver non Stre et
M itc he ll CTS
Dry 0.1% 0.2%
verside
Victoria Ri
Engineered Fabrics
Probability of NoInundation St re et rth Fr on t
St re et Ta llm an Wood Street
Sylvia Street
L a n d ry
EGMENT 8
EGMENT 7
1,000
tr ee t H ol ly S
SEGMENT 1
reet Sawyer St
re et Be et le St
500
od / Lustiano Fo g Star Platin
750
SEGMENT 1
St re et
500
SEGMENT 2
Howard Avenue St re et
250
250
EGMENT 7
Brooklawn Court
Be et le
Feet
Feet
Precix / Acushnet Rubber
River Road
Former Aerovox Site
EGMENT 6
¸
Perry Street Bentley Street
Dun can Stre et
H ow ar d
Whaler’s Place
Probability of Inundation
N
Desautels Street
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
PHASE 1American
Fielding Street
7-Eleven
0
N
Sawyer Street Street/ EPA SowleFacility Work Zone Con dui t Stre et
BROOKLAWN PARK
arsarge Street
Street
EGMENT 6
EGMENT 5
Coggesha ll Street
Taco Bell
Edna Street
PHASE 5
Wald o Stre et
Buildings With Highest Flood Risk - 2030 Brooklawn Street
Ver non Stre et Pico Stone John’s Auto / Imports and SK Machine t Supply Co. Fe lto n St ree
CTS
Edna Street
SEGMENT 12
SEGMENT 12
SEGMENT 11
Sowle Street
Con dui t Stre et
ASE 5
BROOKLAWN PARK
Fielding Street
¸
Probability of Inundation
N
arsarge Street
500
750
Buildings With Highest Flood Risk - 2030 Buildings With Highest Flood Risk - 2050 CTS
SEGMENT 12
SEGMENT 12
SEGMENT 11
ASE 5
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
1,000
Wood Street
Sylvia Street
Precix / Acushnet Rubber
River Road
Former Aerovox Site
250
Brooklawn Court
Howard Avenue
Perry Street
Dun can Stre et
0
Feet
Dry 0.1% 0.2%
0.5% 1% 2%
5% 10% 20%
25% 30% 50%
100%
Proposed River Walk Path
Existing Shoreline
River Walk Follows Existing Path + Driveway
Municipal Park
Proposed Onroad River Walk Extension
Building to be Removed
Buildings With Highe
These raster datasets are derived from output of the Massachusetts Coast Flood Risk Model (MC-FRM) for 2030, 2050, and 2070 sea level rise and coastal storm simulations. This public information is furnished by MassDOT and should be accepted and used by the recipient with the understanding that the data received were developed and collected for future flooding analyses purposes only. No liability is assumed as to the accuracy, sufficiency, or suitability of the information contained herein for any other particular use. MassDOT, Woods Hole Group, and UMass Boston assume no liability whatsoever associated with the use or misuse of such data.
81
a da d N aNsahshR oR o
SEGMENT SEGMENT 66
750 750
S trSetreete t T inT kinhkahma m
500 500
SEGMENT SEGMENT 55
250 250
SEGMENT SEGMENT 44
¸ Feet Feet
iversidee Victoririaa R iversid R to ic V
SEGMENT SEGMENT 55
SEGMENT SEGMENT 44
SEGMENT SEGMENT 33
SEGMENT SEGMENT 33
SEGMENT SEGMENT 22
SEGMENT SEGMENT 11
SEGMENT SEGMENT 22
SEGMENT SEGMENT 11
PHASE 4 PHASE 4
Riverside Avenue Avenue Riverside Whaler’s Care CLIFTEX Corp. Whaler’s Care Assisted Living CLIFTEX Corp. Assisted Living
Whaler’s Place Whaler’s Place American American Engineered Engineered Fabrics Fabrics
Hope Hope
t St trSetreete t M aMnaonmo em e
oFoodo/d / LuLstuiastniaonFo tin la g g StaSrtaPrlaPtin
7-Eleven 7-Eleven
e eete t a waawya Sy trS tr H aHtha th
Street shallStreet Cogge shall Cogge
Sawyer Street Sawyer Facility Street / EPA Facility / EPA Work Zone Work Zone
N N
Bell Belleville evill Ave e Av nue enu e
vAevneuneu e
Th RopeThee Ropeworks works
Taco Bell Taco Bell
0 0
tr etreet e t E aErlaerl eS S
C oCffoinff inA
sket etbaasket k r a M rketb Ma
Ave n u e M a d e irir aa A v e n u e e Mad
Belleville Avenue Belleville Avenue
RIVERSIDE PARK RIVERSIDE PARK
S tr e e t M it c h eellll S tr e e t h M it c
tr etreet e t D aDvaisvisS S
vAevneuneu e
trSetreet e t
trSetreet e t
Figure 9A: MA-FRM Probability of Inundation 2030
S trSetreet e t C oClloelltteett e
P hPilhliilplisp As
D eDaenaen eS
e eet e t N yNey eS trS tr
S trSetreet e t T aTllamllamna n
tr etreet e t H oHlloyll Sy S
trSetreet et SaSwayweyr eSr
B eBeetleetl eS
te t a rdS trSetree B uBlluallrd
H o w rd S tr e e t Ho wa
PHASE 2 PHASE 2
Probability of Inundation Probability of Inundation Dry Dry 0.1% 0.1% 0.2% 0.2% 1,000 1,000
82
0.5% 0.5% 1% 1% 2% 2%
5% 5% 10% 10% 20% 20%
25% 25% 30% 30% 50% 50%
100% 100%
ee tret et
Brooklawn BrooklawnCourt Court
Howa rdrdAvenu Howa Avenu ee CTS CTS
Pico Stone John’s Auto / Pico Stone Imports and John’s Auto / SK Machine Imports Supply and Co. SK Machine Supply Co.
SEGMENT 1212 SEGMENT
SEGMENT 1212 SEGMENT
PHASE 5 PHASE 5
LEGEND Proposed River Walk Path Proposed River Walk Path
Existing Shoreline Existing Shoreline
River Walk Follows Existing River Follows Existing Path +Walk Driveway Path + Driveway Proposed Onroad Proposed River WalkOnroad Extension River Walk Extension
Municipal Park Municipal Park Building to be Removed Building to be Removed 83
Buildings With Highest Flood Risk - 2030 Buildings With Highest Flood Risk - 2030
Wood WoodStreet Street
Sylv ia iaStre Sylv etet Stre
Precix / Acushnet Precix Rubber / Acushnet Rubber
SEGMENT 1111 SEGMENT
PHASE 3 PHASE 3
Former Former Aerovox Aerovox Site Site
SEGMENT 1111 SEGMENT
SEGMENT 1010 SEGMENT
SEGMENT 99 SEGMENT
SEGMENT 1010 SEGMENT
SEGMENT 99 SEGMENT
SEGMENT 88 SEGMENT
SEGMENT 88 SEGMENT
SEGMENT 77 SEGMENT
SEGMENT 66 SEGMENT
SEGMENT 77 SEGMENT
% %
PHASE 1 PHASE 1
Darn It! Inc. Darn It! Inc.
River RiverRoad Road
Powder Pro Powder Pro
Field ing Stree t Field ing Stree t
Belleville Avenue Belleville Avenue
/ Titleist nyny / Titleist Compa et et Compa Acushn Acushn
River Bank Lofts River Bank Lofts
Kearsarge Street Kearsarge Street
Perry PerryStreet Street
Desautels Street Desautels Street
t t ree ree ananStSt ncnc DuDu
t t ree ree y St y St dledle HaHa
t t ree ree tchtchStSt HaHa
tr e e tt ly S tr H e a ly ee S a e H
US Party US Party Nashawena Company East Nashawena Company East Mills Mills
Co nd ui t St re et Co nd ui t St re et
BROOKLAWN PARK BROOKLAWN PARK etet rere ll llStSt veve CoCo
s Ss trSetreete t B aBtea te
ueue enen al alAvAv ntrntr CeCe
eet e t
R oRaoda d eBlleellveilvleil le
S trSetreet e t E uEguegneian ia
tr etreet e t h ithmitamna nS S WW
Irvi ngt on Co urt Irvi ngt on Co urt
M er ril l St re et M er ril l St re et
e Stree t e Stree t
Sowle Stree t Sowle Stree t
a da d N aNsahshR oR o
SEGMENT SEGMENT 66
750 750
S trSetreete t T inT kinhkahma m
500 500
SEGMENT SEGMENT 55
250 250
SEGMENT SEGMENT 44
¸ Feet Feet
iversidee Victoririaa R iversid R to ic V
SEGMENT SEGMENT 55
SEGMENT SEGMENT 44
SEGMENT SEGMENT 33
SEGMENT SEGMENT 33
SEGMENT SEGMENT 22
SEGMENT SEGMENT 11
SEGMENT SEGMENT 22
SEGMENT SEGMENT 11
PHASE 4 PHASE 4
Riverside Avenue Avenue Riverside Whaler’s Care CLIFTEX Corp. Whaler’s Care Assisted Living CLIFTEX Corp. Assisted Living
Whaler’s Place Whaler’s Place American American Engineered Engineered Fabrics Fabrics
Hope Hope
t St trSetreete t M aMnaonmo em e
oFoodo/d / LuLstuiastniaonFo tin la g g StaSrtaPrlaPtin
7-Eleven 7-Eleven
e eete t a waawya Sy trS tr H aHtha th
Street shallStreet Cogge shall Cogge
Sawyer Street Sawyer Facility Street / EPA Facility / EPA Work Zone Work Zone
N N
Bell Belleville evill Ave e Av nue enu e
vAevneuneu e
Th RopeThee Ropeworks works
Taco Bell Taco Bell
0 0
tr etreet e t E aErlaerl eS S
C oCffoinff inA
sket etbaasket k r a M rketb Ma
Ave n u e M a d e irir aa A v e n u e e Mad
Belleville Avenue Belleville Avenue
RIVERSIDE PARK RIVERSIDE PARK
S tr e e t M it c h eellll S tr e e t h M it c
tr etreet e t D aDvaisvisS S
vAevneuneu e
trSetreet e t
trSetreet e t
Figure 9B: MA-FRM Probability of Inundation 2050
S trSetreet e t C oClloelltteett e
P hPilhliilplisp As
D eDaenaen eS
e eet e t N yNey eS trS tr
S trSetreet e t T aTllamllamna n
tr etreet e t H oHlloyll Sy S
trSetreet et SaSwayweyr eSr
B eBeetleetl eS
te t a rdS trSetree B uBlluallrd
H o w rd S tr e e t Ho wa
PHASE 2 PHASE 2
Probability of Inundation Probability of Inundation Dry Dry 0.1% 0.1% 0.2% 0.2% 1,000 1,000
84
0.5% 0.5% 1% 1% 2% 2%
5% 5% 10% 10% 20% 20%
25% 25% 30% 30% 50% 50%
100% 100%
ee tret et
Brooklawn BrooklawnCourt Court
Howa rdrdAvenu Howa Avenu ee CTS CTS
Pico Stone John’s Auto / Pico Stone Imports and John’s Auto / SK Machine Imports Supply and Co. SK Machine Supply Co.
SEGMENT 1212 SEGMENT
SEGMENT 1212 SEGMENT
PHASE 5 PHASE 5
LEGEND Proposed River Walk Path Proposed River Walk Path
Existing Shoreline Existing Shoreline
Buildings With Highest Flood Risk - 2030 Buildings With Highest Flood Risk - 2030
River Walk Follows Existing River Follows Existing Path +Walk Driveway Path + Driveway Proposed Onroad Proposed River WalkOnroad Extension River Walk Extension
Municipal Park Municipal Park
Buildings With Highest Flood Risk - 2050 Buildings With Highest Flood Risk - 2050
Building to be Removed Building to be Removed 85
Wood WoodStreet Street
Sylv ia iaStre Sylv etet Stre
Precix / Acushnet Precix Rubber / Acushnet Rubber
SEGMENT 1111 SEGMENT
PHASE 3 PHASE 3
Former Former Aerovox Aerovox Site Site
SEGMENT 1111 SEGMENT
SEGMENT 1010 SEGMENT
SEGMENT 99 SEGMENT
SEGMENT 1010 SEGMENT
SEGMENT 99 SEGMENT
SEGMENT 88 SEGMENT
SEGMENT 88 SEGMENT
SEGMENT 77 SEGMENT
SEGMENT 66 SEGMENT
SEGMENT 77 SEGMENT
% %
PHASE 1 PHASE 1
Darn It! Inc. Darn It! Inc.
River RiverRoad Road
Powder Pro Powder Pro
Field ing Stree t Field ing Stree t
Belleville Avenue Belleville Avenue
/ Titleist nyny / Titleist Compa et et Compa Acushn Acushn
River Bank Lofts River Bank Lofts
Kearsarge Street Kearsarge Street
Perry PerryStreet Street
Desautels Street Desautels Street
t t ree ree ananStSt ncnc DuDu
t t ree ree y St y St dledle HaHa
t t ree ree tchtchStSt HaHa
tr e e tt ly S tr H e a ly ee S a e H
US Party US Party Nashawena Company East Nashawena Company East Mills Mills
Co nd ui t St re et Co nd ui t St re et
BROOKLAWN PARK BROOKLAWN PARK etet rere ll llStSt veve CoCo
s Ss trSetreete t B aBtea te
ueue enen al alAvAv ntrntr CeCe
eet e t
R oRaoda d eBlleellveilvleil le
S trSetreet e t E uEguegneian ia
tr etreet e t h ithmitamna nS S WW
Irvi ngt on Co urt Irvi ngt on Co urt
M er ril l St re et M er ril l St re et
e Stree t e Stree t
Sowle Stree t Sowle Stree t
a da d N aNsahshR oR o
SEGMENT SEGMENT 66
750 750
S trSetreete t T inT kinhkahma m
500 500
SEGMENT SEGMENT 55
250 250
SEGMENT SEGMENT 44
¸ Feet Feet
iversidee Victoririaa R iversid R to ic V
SEGMENT SEGMENT 55
SEGMENT SEGMENT 44
SEGMENT SEGMENT 33
SEGMENT SEGMENT 33
SEGMENT SEGMENT 22
SEGMENT SEGMENT 11
SEGMENT SEGMENT 22
SEGMENT SEGMENT 11
PHASE 4 PHASE 4
Riverside Avenue Avenue Riverside Whaler’s Care CLIFTEX Corp. Whaler’s Care Assisted Living CLIFTEX Corp. Assisted Living
Whaler’s Place Whaler’s Place American American Engineered Engineered Fabrics Fabrics
Hope Hope
t St trSetreete t M aMnaonmo em e
oFoodo/d / LuLstuiastniaonFo tin la g g StaSrtaPrlaPtin
7-Eleven 7-Eleven
e eete t a waawya Sy trS tr H aHtha th
Street shallStreet Cogge shall Cogge
Sawyer Street Sawyer Facility Street / EPA Facility / EPA Work Zone Work Zone
N N
Bell Belleville evill Ave e Av nue enu e
vAevneuneu e
Th RopeThee Ropeworks works
Taco Bell Taco Bell
0 0
tr etreet e t E aErlaerl eS S
C oCffoinff inA
sket etbaasket k r a M rketb Ma
Ave n u e M a d e irir aa A v e n u e e Mad
Belleville Avenue Belleville Avenue
RIVERSIDE PARK RIVERSIDE PARK
S tr e e t M it c h eellll S tr e e t h M it c
tr etreet e t D aDvaisvisS S
vAevneuneu e
trSetreet e t
trSetreet e t
Figure 9C: MA-FRM Probability of Inundation 2070
S trSetreet e t C oClloelltteett e
P hPilhliilplisp As
D eDaenaen eS
e eet e t N yNey eS trS tr
S trSetreet e t T aTllamllamna n
tr etreet e t H oHlloyll Sy S
trSetreet et SaSwayweyr eSr
B eBeetleetl eS
te t a rdS trSetree B uBlluallrd
H o w rd S tr e e t Ho wa
PHASE 2 PHASE 2
Probability of Inundation Probability of Inundation Dry Dry 0.1% 0.1% 0.2% 0.2% 1,000 1,000
86
0.5% 0.5% 1% 1% 2% 2%
5% 5% 10% 10% 20% 20%
25% 25% 30% 30% 50% 50%
100% 100%
ee tret et
Brooklawn BrooklawnCourt Court
Howa rdrdAvenu Howa Avenu ee CTS CTS
Pico Stone John’s Auto / Pico Stone Imports and John’s Auto / SK Machine Imports Supply and Co. SK Machine Supply Co.
SEGMENT 1212 SEGMENT
SEGMENT 1212 SEGMENT
PHASE 5 PHASE 5
LEGEND Proposed River Walk Path Proposed River Walk Path
Existing Shoreline Existing Shoreline
Buildings With Highest Flood Risk - 2030 Buildings With Highest Flood Risk - 2030
River Walk Follows Existing River Follows Existing Path +Walk Driveway Path + Driveway Proposed Onroad Proposed River WalkOnroad Extension River Walk Extension
Municipal Park Municipal Park
Buildings With Highest Flood Risk - 2050 Buildings With Highest Flood Risk - 2050
Building to be Removed Building to be Removed
Buildings With Highest Flood Risk - 2070 Buildings With Highest Flood Risk - 2070
87
Wood WoodStreet Street
Sylv ia iaStre Sylv etet Stre
Precix / Acushnet Precix Rubber / Acushnet Rubber
SEGMENT 1111 SEGMENT
PHASE 3 PHASE 3
Former Former Aerovox Aerovox Site Site
SEGMENT 1111 SEGMENT
SEGMENT 1010 SEGMENT
SEGMENT 99 SEGMENT
SEGMENT 1010 SEGMENT
SEGMENT 99 SEGMENT
SEGMENT 88 SEGMENT
SEGMENT 88 SEGMENT
SEGMENT 77 SEGMENT
SEGMENT 66 SEGMENT
SEGMENT 77 SEGMENT
% %
PHASE 1 PHASE 1
Darn It! Inc. Darn It! Inc.
River RiverRoad Road
Powder Pro Powder Pro
Field ing Stree t Field ing Stree t
Belleville Avenue Belleville Avenue
/ Titleist nyny / Titleist Compa et et Compa Acushn Acushn
River Bank Lofts River Bank Lofts
Kearsarge Street Kearsarge Street
Perry PerryStreet Street
Desautels Street Desautels Street
t t ree ree ananStSt ncnc DuDu
t t ree ree y St y St dledle HaHa
t t ree ree tchtchStSt HaHa
tr e e tt ly S tr H e a ly ee S a e H
US Party US Party Nashawena Company East Nashawena Company East Mills Mills
Co nd ui t St re et Co nd ui t St re et
BROOKLAWN PARK BROOKLAWN PARK etet rere ll llStSt veve CoCo
s Ss trSetreete t B aBtea te
ueue enen al alAvAv ntrntr CeCe
eet e t
R oRaoda d eBlleellveilvleil le
S trSetreet e t E uEguegneian ia
tr etreet e t h ithmitamna nS S WW
Irvi ngt on Co urt Irvi ngt on Co urt
M er ril l St re et M er ril l St re et
e Stree t e Stree t
Sowle Stree t Sowle Stree t
Cen tral Ave nue
EGMENT 5
EGMENT 4
Clif ford Str eet
t Qu ery Str ee
EGMENT 4
EGMENT 3
Be lle vil le
Eu ge ni a
W hi tm an
ad Na sh Ro
re et Ea rle St
re et Da vi s St
Co lle tte
EGMENT 3
EGMENT 2
EGMENTPh1ill ip s Av en ue
t St re et No rth Fr on
re et De an e St
et N ye St re
Ta llm an
tr ee t H ol ly S
Bu lla rd
EGMENT 2
St re et
EGMENT 1
H ow ar d
tr ee t H ea ly S
Ke
Desautels Street
Pri nce ton Str eet
Sh aw Str ee t
SEGMENT 11
SEGMENT 10
SEGMENT 9
Covell Stre et
Had ley Stre et
Hatc h Stre et
Ke
Acushnet Company / Titleist Irvin gton Stre et
Pri nce ton Str eet
F A
Existing Shoreline Municipal Park
Co nco rd Str eet
Building to be Removed
SEGMENT 11
SEGMENT 10
SEGMENT 9
Str eet 10 Clif fordSEGMENT
Cen tral Ave nue
Ro ad
SEGMENT 9 tes St re et SEGMENT 8 Ba
t Qu ery Str ee
Be lle vil le
SEGMENT 8
SEGMENT 7
St re et
Irving ton Cour t
PHASE 3
Me rril l Str eet
PHA
Had ley Stre et
tr ee t H ea ly S
Covell Stre et
Hatc h Stre et
St re et
e
Sh aw Str ee t
re et Gl en no n St
Eu ge ni a
W
re et SEGMENT hi tm6an St
PHASE 1
Hope Street
Ave nu
Str eet 10 Clif fordSEGMENT
Cen tral Ave nue
Ro ad
SEGMENT 9 tes St re et SEGMENT 8 Ba
t Qu ery Str ee
Be lle vil le
River Walk Follows Existing Path + Driveway
SEGMENT 7
ad Na sh Ro
Ti nk ha m
St re et
eville
SEGMENT 6
Ha th aw ay
Bell
SEGMENT 8
Proposed River Walk Path
Av en ue
PHA
Belleville Avenue
Proposed Onroad River Walk Extension
Ma de ira
5% 10% 20%
US Party Darn It! Inc. Nashawena Company East Mills on Arli ngt Str eet
River Bank Lofts
100%
SEGMENT 5
St re et
re et Ea rle St
SEGMENT 5 vi s St re et Da
Co lle tte
SEGMENT 4
en ue Ph ill ip s Av
PHASE 2
0.5% 1% 2%
Powder Pro
25% 30% 50%
en ue C of fin Av
Th Rope e works
SEGMENT 7
St re et
Victoria Ri
5% 10% 20%
SEGMENT 4
SEGMENT 3
re et De an e St
St re et
St re et
t
aske
Eu ge ni a
0.5% enue Av1% hnet s u c A 2%
RIVERSIDE PARK
etb Mark
W
verside
American Engineered Fabrics
Proposed OnroadIrving ton Cour t River Walk Extension PHASE 3
Me rril l Str eet
Desautels Street
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Belleville Avenue
St re et M itc he ll
re et SEGMENT hi tm6an St
1,000
t St re et No rth Fr on
Bu lla rd
SEGMENT 3
SEGMENT N 2 ye St re et
Ta llm an
reet
Sawyer St
re et Be et le St
tr ee t H ol ly S
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
SEGMENT 7
1,000
ad Na sh Ro
750
St re et
500
Ti nk ha m
St re et
250
PHASE 1
River Walk Follows Existing Path + Driveway
tr ee t H ea ly S
St re et
Feet
e
Dry Hope Street 0.1% 0.2%
/
Be et le
Bentley Street
Dry 0.1% 0.2%
Ave nu
M an om et
od Lustiano Fo g Star Platin
Probability of Inundation
N
SEGMENT 6
eville
St re et
Bell
750
7-Eleven
Av en ue
Probability of Inundation
Whaler’s Place
¸
Coggesha ll Street
Taco Bell
500
Ma de ira
Ha th aw ay
250
Sawyer Street Facility / EPA Work Zone
re et Ea rle St
PHASE 2
SEGMENT 5
SEGMENT 5 vi s St re et Da
St re et
0
2050
Co lle tte
Mark
Feet
Th Rope e works
Proposed River Walk Path nco rd Str eet
100%
SEGMENT 4
t
ske etba
St re et
25% 30% 50%
en ue C of fin Av
St re et M itc he ll
H ow ar d
en ue Ph ill ip s Av
SEGMENT 4
N
RIVERSIDE PARK
F
0A
Co
¸
Belleville Avenue
0
e
t St re et No rth Fr on
SEGMENT 3
5% 10% 20%
re et De an e St
St re et
St re et
PHASE 4
Bu lla rd
SEGMENT 3
SEGMENT N 2 ye St re et
Ta llm an
tr ee t H ol ly S
SEGMENT 1
reet
Sawyer St
re et Be et le St
2030
0.5% 1% 2%
SEGMENT 2
SEGMENT 1
Dry 0.1% St re et H ow ar d 0.2%
u Aven
Victoria Ri
re et Gl en no n St
St re et
1,000
hnet Acus
Powder Pro
St re et
Be et le
Bentley Street
Probability of Inundation
verside
American Engineered Fabrics
US Party Darn It! Inc. Nashawena Company East Mills Arli ngt on Str eet
River Bank Lofts
Acushnet Company / Titleist Irvin gton Stre et
Whaler’s Place
7-Eleven
Belleville Avenue
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living M an om et
Taco Bell
od / Lustiano Fo g Star Platin
Coggesha ll Street
Sawyer Street Facility / EPA Work Zone
¸
Had ley Stre et
Covell Stre et
Hatc h Stre et
e
Irving ton Cour t
Me rril l Str eet Hope Street
Ave nu
et Ba tes St re
Ro ad
M
Th Rope e works
eville
St re et
sket
tba arke
Bell
St re et
en ue C of fin Av
RIVERSIDE PARK
St re et
Ha th aw ay
Belleville Avenue
St re et M itc he ll
Av en ue
St re et
Ma de ira
Ti nk ha m
St re et
St re et
St re et
reet Sawyer St
re et Be et le St
Figure 10: MA-FRM Flood Depths for 1% Annual Event)2 PHASE 4 Flood (100-Year Flood PHASE
Ke
Desautels Street
250
500
750
1,000
Powder Pro
St re et
0
verside
Victoria Ri
/
Dry 0.1% 0.2%
Feet
0.5% 1% 2%
25% 30% 50%
5% 10% 20%
US Party Nashawena Company East Mills
Darn It! Inc.
F A
Proposed River Walk Path
Existing Shoreline
River Walk Follows Existing Path + Driveway
Municipal Park
Proposed Onroad River Walk Extension
Building to be Removed
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 10
SEGMENT 9
PHASE 1
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
88
SEGMENT 6
PHASE 2
100%
SEGMENT 5
SEGMENT 4
PHASE 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
2070
od Lustiano Fo g Star Platin
Probability of Inundation
N
American Engineered Fabrics
River Bank Lofts
Acushnet Company / Titleist
Whaler’s Place
7-Eleven
Belleville Avenue
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living M an om et
Taco Bell
¸
Coggesha ll Street
Sawyer Street Facility / EPA Work Zone
PHA
nue
Precix / Acushnet Rubber
River Road SEGMENT 12
SEGMENT 11
SEGMENT 11
SEGMENT 10
PHASE 3
GMENT 12
et
t
Acushnet Company / Titleist Irvin gton Stre et
Pri nce ton Str eet
SEGMENT 9
Str eet 10 Clif fordSEGMENT
Cen tral Ave nue
100% Irving ton Cour t
PHASE 5
BROOKLAWN PARK
Howard Avenue
Perry Street
Dun can Stre et
Had ley Stre et
Covell Stre et
Hatc h Stre et
Kearsarge Street
Belleville Avenue Darn It! Inc.
River Walk Follows Existing Path + Driveway
Municipal Park
CTS Flo Buildings With Highest
Building to be Removed
SEGMENT 12
SEGMENT 11
PHASE 3
SEGMENT 11
Buildings With Highest Flo SEGMENT 10
SEGMENT 9
Wood Street
Sylvia Street
PHASE 1
With Highe Buildings WithBuildings Highest Flo
Existing Shoreline
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
Building to be Removed
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
Proposed Onroad River Walk Extension
River Walk Extension
Former Aerovox Site
Precix / Acushnet Rubber
St re et
100%
River Road
US Party Nashawena Company East Mills
Acushnet Company / Titleist
M an om et
River Bank Lofts
Proposed River Walk Path Existing Shoreline
PHASE 2
GMENT 12
GMENT 11
Sh aw Str ee t
25% 30% 50%
Municipal Park Proposed Onroad
PHASE 4
CTS
Building to be Removed
River Existing 50% 2% Walk Follows 20% Path + Driveway
S tr e e t
Municipal Park
tr ee t H ea ly S
Powder Pro
25% 30%
5% 10%
SEGMENT 9 tes St re et SEGMENT 8 Ba
Ro ad
St re et
St re et
0.5% 1%
t Qu ery Str ee
Be lle vil le
St re et
Ti nk ha m
Ha th aw ay
Proposed River Walk Path
SEGMENT 8
SEGMENT 7
Eu ge ni a
W
re et SEGMENT hi tm6an St
SEGMENT 7
ad Na sh Ro
SEGMENT 6
SEGMENT 5
verside
Victoria Ri
GMENT 11
re et Gl en no n St
St re et
American Engineered Fabrics
GMENT 10
GMENT 10
EGMENT 9
M an om et
St re et
re et Ea rle St
SEGMENT 5 vi s St re et Da
Co lle tte
1,000
SEGMENT 2
SEGMENT 1
Precix / Acushnet Rubber
River Road
L a n d ry
SEGMENT 4
750
en ue Ph ill ip s Av
500
Assisted Living
Buildings With Highe
Co nco rd Str eet
Desautels Street
/
Brooklawn Court
Howard Avenue
Perry Street
250
Dry 0.1% 0.2%
100%
Feet
eville
Former Aerovox Site
Existing Shoreline
Me rril l Str eet
Hope Street venu Buildings With Highest AFlood Risk - 2030 e
od Lustiano Fo g Star Platin
Probability of Inundation
¸
Dun can Stre et
25% 0 30% 50% arsarge Street
Former Aerovox Site
Fielding Street
N
5% 10% PHASE 1 20%
Riverside Avenue Buildings With Highest Flood Risk - 2070 Whaler’s Care CLIFTEX Corp. Whaler’s Place
Con
7-Eleven
River Walk Follows Existing Path + Driveway Proposed Onroad River Walk Extension
0.5% Av en ue Ma de ira 1% 2%
Bell
PHASE 5
Proposed River Walk Path 100%
Buildings With Highest Flood Risk - 2050
Sawyer Street Street/ EPA SowleFacility Work Zone
Building to be Removed dui t Stre et
BROOKLAWN PARK
PHASE 2
en ue C of fin Av
SEGMENT 12
Coggesha ll Street
SEGMENT 12
SEGMENT 11
ASE 5
Dry 0.1% 0.2%
PHASE 3
Kearsarge Street
Belleville Avenue
US Party Darn It! Inc. Nashawena Company East Mills Arli ngt on Str eet
River Bank Lofts Powder Pro
25% 30% 50%
5% 10% 20%
SEGMENT 4
pewo rksn St ree t Fe lto
Municipal Park Edna Street Taco Bell
SEGMENT 3
St re et
re et De an e St
Bu lla rd
SEGMENT 3
RIVERSIDE PARK
Brooklawn Street
M
SEGMENT N 2 ye St re et
750 1,000 et e ille Avenu Bellev o Stre Wald
St re et Pico Stone John’s Auto / Existing Shoreline he Imports and RSK TMachine o t Supply keCo. tbas arke
0.5% enue et Av1% n h s Acu 2%
LEGEND
PHASE 4
S tr e e t
Ver non Stre et
M itc he ll CTS
Dry 0.1% 0.2%
verside
Victoria Ri
Engineered Fabrics
Probability of NoInundation St re et rth Fr on t
St re et Ta llm an Wood Street
Sylvia Street
L a n d ry
EGMENT 9
1,000
tr ee t H ol ly S
SEGMENT 1
500
reet Sawyer St
re et Be et le St
250
750
SEGMENT 1
St re et
500
SEGMENT 2
Howard Avenue St re et
250
Feet
Precix / Acushnet Rubber
River Road
Former Aerovox Site
Brooklawn Court
Be et le
H ow ar d
Feet
EGMENT 8
¸
Perry Street Bentley Street
Dun can Stre et
N
arsarge Street
Probability of Inundation
N
0
PHASE 1American
Fielding Street
7-Eleven
od / Lustiano Fo g Star Platin
Con dui t Stre et
Desautels Street
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place
(2030, 2050, 2070) BROOKLAWN PARK
EGMENT 8
EGMENT 7
Sawyer Street Street/ EPA SowleFacility Work Zone
EGMENT 7
EGMENT 6
Street
EGMENT 6
EGMENT 5
Coggesha ll Street
Taco Bell
Edna Street
PHASE 5
Wald o Stre et
Buildings With Highest Flood Risk - 2030 Brooklawn Street
Ver non Stre et Pico Stone John’s Auto / Imports and SK Machine t Supply Co. Fe lto n St ree
CTS
Edna Street
SEGMENT 12
SEGMENT 12
SEGMENT 11
Sowle Street
Con dui t Stre et
ASE 5
BROOKLAWN PARK
Fielding Street
¸
Probability of Inundation
N
arsarge Street
500
750
Buildings With Highest Flood Risk - 2030 Buildings With Highest Flood Risk - 2050 CTS
SEGMENT 12
SEGMENT 12
SEGMENT 11
ASE 5
Pico Stone John’s Auto / Imports and SK Machine Supply Co.
1,000
Wood Street
Sylvia Street
Precix / Acushnet Rubber
River Road
Former Aerovox Site
250
Brooklawn Court
Howard Avenue
Perry Street
Dun can Stre et
0
Feet
Dry 0.1% 0.2%
0.5% 1% 2%
5% 10% 20%
25% 30% 50%
100%
Proposed River Walk Path
Existing Shoreline
River Walk Follows Existing Path + Driveway
Municipal Park
Proposed Onroad River Walk Extension
Building to be Removed
Buildings With Highe
These raster datasets are derived from output of the Massachusetts Coast Flood Risk Model (MC-FRM) for 2030, 2050, and 2070 sea level rise and coastal storm simulations. This public information is furnished by MassDOT and should be accepted and used by the recipient with the understanding that the data received were developed and collected for future flooding analyses purposes only. No liability is assumed as to the accuracy, sufficiency, or suitability of the information contained herein for any other particular use. MassDOT, Woods Hole Group, and UMass Boston assume no liability whatsoever associated with the use or misuse of such data.
89
Ave n u e M a d e irir aa A v e n u e e Mad
a da d N aNsahshR oR o
tr etreet e t E aErlaerl eS S
tr etreet e t D aDvaisvisS S
S trSetreet e t C oClloelltteett e
P hPilhliilplisp As
D eDaenaen eS
e eet e t N yNey eS trS tr
S trSetreet e t T aTllamllamna n
tr etreet e t H oHlloyll Sy S
trSetreet et SaSwayweyr eSr
B eBeetleetl eS
te t a rdS trSetree B uBlluallrd
H o w rd S tr e e t Ho wa
C oCffoinff inA
RIVERSIDE PARK RIVERSIDE PARK
sket etbaasket k r a M rketb Ma
Th RopeThee Ropeworks works
oFoodo/d / LuLstuiastniaonFo tin la g g StaSrtaPrlaPtin
7-Eleven 7-Eleven
250 250
500 500
750 750
SEGMENT SEGMENT 66
0 0
SEGMENT SEGMENT 55
Feet Feet
SEGMENT SEGMENT 44
¸ N N
iversidee Victoririaa R iversid R to ic V
SEGMENT SEGMENT 55
SEGMENT SEGMENT 44
SEGMENT SEGMENT 33
SEGMENT SEGMENT 33
SEGMENT SEGMENT 22
SEGMENT SEGMENT 11
SEGMENT SEGMENT 22
SEGMENT SEGMENT 11
PHASE 4 PHASE 4
Riverside Avenue Avenue Riverside Whaler’s Care CLIFTEX Corp. Whaler’s Care Assisted Living CLIFTEX Corp. Assisted Living
Whaler’s Place Whaler’s Place American American Engineered Engineered Fabrics Fabrics
Hope Hope
t St trSetreete t M aMnaonmo em e
Street shallStreet Cogge shall Cogge
Sawyer Street Sawyer Facility Street / EPA Facility / EPA Work Zone Work Zone
Taco Bell Taco Bell
Bell Belleville evill Ave e Av nue enu e
vAevneuneu e
S tr e e t M it c h eellll S tr e e t h M it c
S trSetreete t T inT kinhkahma m
Belleville Avenue Belleville Avenue
e eete t a waawya Sy trS tr H aHtha th
vAevneuneu e
trSetreet e t
trSetreet e t
Figure 10A: MA-FRM Flood Depths for 1% Annual Flood (100-Year Flood Event
PHASE 2 PHASE 2
Probability of Inundation Probability of Inundation Dry Dry 0.1% 0.1% 0.2% 0.2% 1,000 1,000
90
0.5% 0.5% 1% 1% 2% 2%
5% 5% 10% 10% 20% 20%
25% 25% 30% 30% 50% 50%
100% 100%
ee tret et
Irvi ngt on Co urt Irvi ngt on Co urt
Brooklawn BrooklawnCourt Court
Howa rdrdAvenu Howa Avenu ee CTS CTS
Pico Stone John’s Auto / Pico Stone Imports and John’s Auto / SK Machine Imports Supply and Co. SK Machine Supply Co.
SEGMENT 1212 SEGMENT
SEGMENT 1212 SEGMENT
PHASE 5 PHASE 5
LEGEND Proposed River Walk Path Proposed River Walk Path
Existing Shoreline Existing Shoreline
River Walk Follows Existing River Follows Existing Path +Walk Driveway Path + Driveway Proposed Onroad Proposed River WalkOnroad Extension River Walk Extension
Municipal Park Municipal Park Building to be Removed Building to be Removed 91
Buildings With Highest Flood Risk - 2030 Buildings With Highest Flood Risk - 2030
Wood WoodStreet Street
Sylv ia iaStre Sylv etet Stre
Precix / Acushnet Precix Rubber / Acushnet Rubber
SEGMENT 1111 SEGMENT
PHASE 3 PHASE 3
Former Former Aerovox Aerovox Site Site
SEGMENT 1111 SEGMENT
SEGMENT 1010 SEGMENT
SEGMENT 99 SEGMENT
SEGMENT 1010 SEGMENT
SEGMENT 99 SEGMENT
SEGMENT 88 SEGMENT
SEGMENT 88 SEGMENT
SEGMENT 77 SEGMENT
SEGMENT 66 SEGMENT
SEGMENT 77 SEGMENT
% %
PHASE 1 PHASE 1
Darn It! Inc. Darn It! Inc.
River RiverRoad Road
Powder Pro Powder Pro
Field ing Stree t Field ing Stree t
Belleville Avenue Belleville Avenue
/ Titleist nyny / Titleist Compa et et Compa Acushn Acushn
River Bank Lofts River Bank Lofts
US Party US Party Nashawena Company East Nashawena Company East Mills Mills
Kearsarge Street Kearsarge Street
Perry PerryStreet Street
Desautels Street Desautels Street
t t ree ree ananStSt ncnc DuDu
tr e e tt ly S tr H e a ly ee S a e H
t t ree ree y St y St dledle HaHa
t t ree ree tchtchStSt HaHa
M er ril l St re et M er ril l St re et
e Stree t e Stree t
Co nd ui t St re et Co nd ui t St re et
BROOKLAWN PARK BROOKLAWN PARK etet rere ll llStSt veve CoCo
s Ss trSetreete t B aBtea te
ueue enen al alAvAv ntrntr CeCe
eet e t
R oRaoda d eBlleellveilvleil le
S trSetreet e t E uEguegneian ia
tr etreet e t h ithmitamna nS S WW
) 2030
Sowle Stree t Sowle Stree t
Ave n u e M a d e irir aa A v e n u e e Mad
a da d N aNsahshR oR o
tr etreet e t E aErlaerl eS S
tr etreet e t D aDvaisvisS S
S trSetreet e t C oClloelltteett e
P hPilhliilplisp As
D eDaenaen eS
e eet e t N yNey eS trS tr
S trSetreet e t T aTllamllamna n
tr etreet e t H oHlloyll Sy S
trSetreet et SaSwayweyr eSr
B eBeetleetl eS
te t a rdS trSetree B uBlluallrd
H o w rd S tr e e t Ho wa
C oCffoinff inA
RIVERSIDE PARK RIVERSIDE PARK
sket etbaasket k r a M rketb Ma
Th RopeThee Ropeworks works
oFoodo/d / LuLstuiastniaonFo tin la g g StaSrtaPrlaPtin
7-Eleven 7-Eleven
250 250
500 500
750 750
SEGMENT SEGMENT 66
0 0
SEGMENT SEGMENT 55
Feet Feet
SEGMENT SEGMENT 44
¸ N N
iversidee Victoririaa R iversid R to ic V
SEGMENT SEGMENT 55
SEGMENT SEGMENT 44
SEGMENT SEGMENT 33
SEGMENT SEGMENT 33
SEGMENT SEGMENT 22
SEGMENT SEGMENT 11
SEGMENT SEGMENT 22
SEGMENT SEGMENT 11
PHASE 4 PHASE 4
Riverside Avenue Avenue Riverside Whaler’s Care CLIFTEX Corp. Whaler’s Care Assisted Living CLIFTEX Corp. Assisted Living
Whaler’s Place Whaler’s Place American American Engineered Engineered Fabrics Fabrics
Hope Hope
t St trSetreete t M aMnaonmo em e
Street shallStreet Cogge shall Cogge
Sawyer Street Sawyer Facility Street / EPA Facility / EPA Work Zone Work Zone
Taco Bell Taco Bell
Bell Belleville evill Ave e Av nue enu e
vAevneuneu e
S tr e e t M it c h eellll S tr e e t h M it c
S trSetreete t T inT kinhkahma m
Belleville Avenue Belleville Avenue
e eete t a waawya Sy trS tr H aHtha th
vAevneuneu e
trSetreet e t
trSetreet e t
Figure 10B: MA-FRM Flood Depths for 1% Annual Flood (100-Year Flood Event)
PHASE 2 PHASE 2
Probability of Inundation Probability of Inundation Dry Dry 0.1% 0.1% 0.2% 0.2% 1,000 1,000
92
0.5% 0.5% 1% 1% 2% 2%
5% 5% 10% 10% 20% 20%
25% 25% 30% 30% 50% 50%
100% 100%
ee tret et
Irvi ngt on Co urt Irvi ngt on Co urt
Brooklawn BrooklawnCourt Court
Howa rdrdAvenu Howa Avenu ee CTS CTS
Pico Stone John’s Auto / Pico Stone Imports and John’s Auto / SK Machine Imports Supply and Co. SK Machine Supply Co.
SEGMENT 1212 SEGMENT
SEGMENT 1212 SEGMENT
PHASE 5 PHASE 5
LEGEND Proposed River Walk Path Proposed River Walk Path
Existing Shoreline Existing Shoreline
Buildings With Highest Flood Risk - 2030 Buildings With Highest Flood Risk - 2030
River Walk Follows Existing River Follows Existing Path +Walk Driveway Path + Driveway Proposed Onroad Proposed River WalkOnroad Extension River Walk Extension
Municipal Park Municipal Park
Buildings With Highest Flood Risk - 2050 Buildings With Highest Flood Risk - 2050
Building to be Removed Building to be Removed 93
Wood WoodStreet Street
Sylv ia iaStre Sylv etet Stre
Precix / Acushnet Precix Rubber / Acushnet Rubber
SEGMENT 1111 SEGMENT
PHASE 3 PHASE 3
Former Former Aerovox Aerovox Site Site
SEGMENT 1111 SEGMENT
SEGMENT 1010 SEGMENT
SEGMENT 99 SEGMENT
SEGMENT 1010 SEGMENT
SEGMENT 99 SEGMENT
SEGMENT 88 SEGMENT
SEGMENT 88 SEGMENT
SEGMENT 77 SEGMENT
SEGMENT 66 SEGMENT
SEGMENT 77 SEGMENT
% %
PHASE 1 PHASE 1
Darn It! Inc. Darn It! Inc.
River RiverRoad Road
Powder Pro Powder Pro
Field ing Stree t Field ing Stree t
Belleville Avenue Belleville Avenue
/ Titleist nyny / Titleist Compa et et Compa Acushn Acushn
River Bank Lofts River Bank Lofts
US Party US Party Nashawena Company East Nashawena Company East Mills Mills
Kearsarge Street Kearsarge Street
Perry PerryStreet Street
Desautels Street Desautels Street
t t ree ree ananStSt ncnc DuDu
tr e e tt ly S tr H e a ly ee S a e H
t t ree ree y St y St dledle HaHa
t t ree ree tchtchStSt HaHa
M er ril l St re et M er ril l St re et
e Stree t e Stree t
Co nd ui t St re et Co nd ui t St re et
BROOKLAWN PARK BROOKLAWN PARK etet rere ll llStSt veve CoCo
s Ss trSetreete t B aBtea te
ueue enen al alAvAv ntrntr CeCe
eet e t
R oRaoda d eBlleellveilvleil le
S trSetreet e t E uEguegneian ia
tr etreet e t h ithmitamna nS S WW
) 2050
Sowle Stree t Sowle Stree t
Ave n u e M a d e irir aa A v e n u e e Mad
a da d N aNsahshR oR o
tr etreet e t E aErlaerl eS S
tr etreet e t D aDvaisvisS S
S trSetreet e t C oClloelltteett e
P hPilhliilplisp As
D eDaenaen eS
e eet e t N yNey eS trS tr
S trSetreet e t T aTllamllamna n
tr etreet e t H oHlloyll Sy S
trSetreet et SaSwayweyr eSr
B eBeetleetl eS
te t a rdS trSetree B uBlluallrd
H o w rd S tr e e t Ho wa
C oCffoinff inA
RIVERSIDE PARK RIVERSIDE PARK
sket etbaasket k r a M rketb Ma
Th RopeThee Ropeworks works
oFoodo/d / LuLstuiastniaonFo tin la g g StaSrtaPrlaPtin
7-Eleven 7-Eleven
250 250
500 500
750 750
SEGMENT SEGMENT 66
0 0
SEGMENT SEGMENT 55
Feet Feet
SEGMENT SEGMENT 44
¸ N N
iversidee Victoririaa R iversid R to ic V
SEGMENT SEGMENT 55
SEGMENT SEGMENT 44
SEGMENT SEGMENT 33
SEGMENT SEGMENT 33
SEGMENT SEGMENT 22
SEGMENT SEGMENT 11
SEGMENT SEGMENT 22
SEGMENT SEGMENT 11
PHASE 4 PHASE 4
Riverside Avenue Avenue Riverside Whaler’s Care CLIFTEX Corp. Whaler’s Care Assisted Living CLIFTEX Corp. Assisted Living
Whaler’s Place Whaler’s Place American American Engineered Engineered Fabrics Fabrics
Hope Hope
t St trSetreete t M aMnaonmo em e
Street shallStreet Cogge shall Cogge
Sawyer Street Sawyer Facility Street / EPA Facility / EPA Work Zone Work Zone
Taco Bell Taco Bell
Bell Belleville evill Ave e Av nue enu e
vAevneuneu e
S tr e e t M it c h eellll S tr e e t h M it c
S trSetreete t T inT kinhkahma m
Belleville Avenue Belleville Avenue
e eete t a waawya Sy trS tr H aHtha th
vAevneuneu e
trSetreet e t
trSetreet e t
Figure 10C: MA-FRM Flood Depths for 1% Annual Flood (100-Year Flood Event
PHASE 2 PHASE 2
Probability of Inundation Probability of Inundation Dry Dry 0.1% 0.1% 0.2% 0.2% 1,000 1,000
94
0.5% 0.5% 1% 1% 2% 2%
5% 5% 10% 10% 20% 20%
25% 25% 30% 30% 50% 50%
100% 100%
ee tret et
Irvi ngt on Co urt Irvi ngt on Co urt
Brooklawn BrooklawnCourt Court
Howa rdrdAvenu Howa Avenu ee CTS CTS
Pico Stone John’s Auto / Pico Stone Imports and John’s Auto / SK Machine Imports Supply and Co. SK Machine Supply Co.
SEGMENT 1212 SEGMENT
SEGMENT 1212 SEGMENT
PHASE 5 PHASE 5
LEGEND Proposed River Walk Path Proposed River Walk Path
Existing Shoreline Existing Shoreline
Buildings With Highest Flood Risk - 2030 Buildings With Highest Flood Risk - 2030
River Walk Follows Existing River Follows Existing Path +Walk Driveway Path + Driveway Proposed Onroad Proposed River WalkOnroad Extension River Walk Extension
Municipal Park Municipal Park
Buildings With Highest Flood Risk - 2050 Buildings With Highest Flood Risk - 2050
Building to be Removed Building to be Removed
Buildings With Highest Flood Risk - 2070 Buildings With Highest Flood Risk - 2070
95
Wood WoodStreet Street
Sylv ia iaStre Sylv etet Stre
Precix / Acushnet Precix Rubber / Acushnet Rubber
SEGMENT 1111 SEGMENT
PHASE 3 PHASE 3
Former Former Aerovox Aerovox Site Site
SEGMENT 1111 SEGMENT
SEGMENT 1010 SEGMENT
SEGMENT 99 SEGMENT
SEGMENT 1010 SEGMENT
SEGMENT 99 SEGMENT
SEGMENT 88 SEGMENT
SEGMENT 88 SEGMENT
SEGMENT 77 SEGMENT
SEGMENT 66 SEGMENT
SEGMENT 77 SEGMENT
% %
PHASE 1 PHASE 1
Darn It! Inc. Darn It! Inc.
River RiverRoad Road
Powder Pro Powder Pro
Field ing Stree t Field ing Stree t
Belleville Avenue Belleville Avenue
/ Titleist nyny / Titleist Compa et et Compa Acushn Acushn
River Bank Lofts River Bank Lofts
US Party US Party Nashawena Company East Nashawena Company East Mills Mills
Kearsarge Street Kearsarge Street
Perry PerryStreet Street
Desautels Street Desautels Street
t t ree ree ananStSt ncnc DuDu
tr e e tt ly S tr H e a ly ee S a e H
t t ree ree y St y St dledle HaHa
t t ree ree tchtchStSt HaHa
M er ril l St re et M er ril l St re et
e Stree t e Stree t
Co nd ui t St re et Co nd ui t St re et
BROOKLAWN PARK BROOKLAWN PARK etet rere ll llStSt veve CoCo
s Ss trSetreete t B aBtea te
ueue enen al alAvAv ntrntr CeCe
eet e t
R oRaoda d eBlleellveilvleil le
S trSetreet e t E uEguegneian ia
tr etreet e t h ithmitamna nS S WW
t) 2070
Sowle Stree t Sowle Stree t
tr ee t He al y S
Figure 11: Phase 1 Detail Plan Proposed River Walk Path N
Ave hnet Acus
Building to be Removed
Desautels Street
nue
t Co nco rd Str ee POSSIBLE PASSIVE RECREATION AREA
Cen tral Ave nue
Cli ffo rd Str eet
et Qu er y St re
Be lle vi lle
et Ba te s St re
Ro ad
Kearsarge Street
Desautels Street
E
Former Aerovox Site
Precix / Acushnet Rubber
Powder Pro
P
River Road
verside
Darn It! Inc.
St re et
od / Lustiano Foing Star Plat
P Victoria Ri
US Party Nashawena Company East Mills
River Bank Lofts
Acushnet Company / Titleist
Whaler’s Place American Engineered Fabrics
Belleville Avenue
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living M an om et
Sawyer Street Facility / Jacobs Engineering Work Zone
Perry Street
D
Dun can Stre et
tr e e t H e a ly S
Had ley Stre et
Hope Street
Darn It! Inc. BROOKLAWN PARK Co vel l Str eet
Me rril l Str ee t
Be Irvin gton Cour t
Hat ch Stre et
e
St re et
Ave nu
Eu ge ni a
C
St re et
St re et
St re et
eville
A
P
Buildings With Highest Flood Risk - 2050
US Party Nashawena Company East Mills
Ti nk ha m
H at ha w ay
ve nu e C of fin A
Bell
W hi tm an
Av en ue
River Bank Lofts
Powder Pro
B
Th Rope e works
d N ash R oa
tr ee t E ar le S
tr ee t D avis S
St re et
M ad ei ra
Belleville Avenue
RIVERSIDE PARK
Str eet
RIVER WALK TO FOLLOW EXISTING PATH AND DRIVEWAY
C ol le tte
en ue Ph ill ip s Av
S tr ee t
tr ee t D ea ne S
Bu lla rd
ee t N ye S tr
Bell
CLIFTEX Corp. St re et
Mark
Ta llm an
e
ket tbas
Proposed Onroad River Walk Extension
EXPANDED ECOLOGICAL St re et rth Fr on t RESTORATION NoZONE
t St re et
re et
tr e e t H o lly S
Man o me
reet Sawyer St
e Avenue
ing tonHighest Flood Risk - 2030 ArlWith Buildings
Irvin gton Stre et
1,000
100
River Walk Follows Existing Path + Driveway
t Pri nce ton Str ee
750
0
Gateways and Promontories
Municipal Park
Sh aw Str ee t
500
Existing Shoreline
re et Gl en no n St
250
¸
Feet
Feet
eet
Hop e Stre et
CTS
PHASE 5
PHASE 1
0
250
500
750
1,000
¸
Feet
N
P
Proposed River Walk Path
Existing Shoreline
Gateways and Promontories
River Walk Follows Existing Path + Driveway
Municipal Park
Buildings With Highest Flood Risk - 2030
Proposed Onroad River Walk Extension
Building to be Removed
Buildings With Highest Flood Risk - 2050
Approximate Elevations A: 4.9 ft B: 3.9 ft C: 4.2 ft D: 5.2 ft E: 4.7 ft 96
SEGMENT 10
SEGMENT 9
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 7
SEGMENT 6
SEGMENT 6
SEGMENT 5
New Bedford Riverwalk Conceptual Alignment and Potential Public Amenities
SEGMENT 12
SEGMENT 11
PHASE 3
SEGMENT 11
SEGMENT 10
SEGMENT 9
PHASE 1
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
PHASE 2
SEGMENT 7
SEGMENT 6
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
A ve nu e
ille A venu
Figure 12: Phase 2 Detail Plan Proposed River Walk Path N
ing tonHighest Flood Risk - 2030 ArlWith Buildings
Proposed Onroad
Building to be Removed
Walk Extension PLAZARiver AND EXPANDED ECOLOGICAL ue Aven hnet Acus RESTORATION ZONE
100
Cli ffo rd Str eet
Man o me
Cen tral Ave nue
et Ba te s St re
Kearsarge Street
Perry Street
Dun can Stre et
Had ley Stre et
Co vel l Str eet
Hat ch Stre et
t St re et
C
Powde
D
Belleville Avenue
P Former Aerovox Site
Precix / Acushnet Rubber
River Road
Powder Pro
Darn It! Inc.
Acushnet Company / Titleist
US Party Nashawena Company East Mills
River Bank Lofts
St re et
verside
Ro ad
P Victoria Ri
Be lle vi lle
St re et
tr e e t H e a ly S
Irvin gton Cour t
Desautels Street
M an om et
American Engineered Fabrics
erside
iv Victoria R
e
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place
od / Lustiano Foing Star Plat
P
Sawyer Street Facility / Jacobs Engineering Work Zone
Me rril l Str ee t
Hope Street
Ave nu
/
Bell
Eu ge ni a
P
St re et
eville
St re et
Ti nk ha m
St re et
American Engineered B Fabrics
Bell
t Co nco rd Str ee
Riversi de Avenue Whaler’s Care CLIFTEX Corp. Assisted Living BROOKLAWN PARK
W hi tm an
Av en ue
H at ha w ay
A
M ad ei ra
d N ash R oa
tr ee t E ar le S
St re et
tr ee t D avis S
C ol le tte
e
Mark
ve nu e C of fin A
ket tbas
Th Rope e works
ood Lustiano F ng Star Plati
RIVERSIDE PARK
re et
en ue Ph ill ip s Av
S tr ee t
tr ee t D ea ne S
Bu lla rd
St re et
ee t N ye S tr
Ta llm an
tr e e t H o lly S
reet Sawyer St
Belleville Avenue
Whaler’s Place
Buildings With Highest Flood Risk - 2050
et Qu er y St re
t St re et No rth Fr on
Str eet
Irvin gton Stre et
1,000
River Walk Follows Existing Path + Driveway
t Pri nce ton Str ee
750
0
Gateways and Promontories
Municipal Park
Sh aw Str ee t
500
Existing Shoreline
re et Gl en no n St
250
¸
Feet
Feet
Hop e Stre e
e
CTS
SEGMENT 6
250
500
750
1,000
¸
0
N
Proposed River Walk Path
Existing Shoreline
Gateways and Promontories
River Walk Follows Existing Path + Driveway
Municipal Park
Buildings With Highest Flood Risk - 2030
Proposed Onroad River Walk Extension
Building to be Removed
Buildings With Highest Flood Risk - 2050
Approximate Elevations A: 4.3 ft B: 5.6 ft C: 7.1 ft D: 4.0 ft 97
SEGMENT 12
PHASE 5
PHASE 2 Feet
SEGMENT 11
SEGMENT 11
PHASE 3
SEGMENT 5
SEGMENT 5
SEGMENT 4
SEGMENT 4
SEGMENT 3
New Bedford Riverwalk Conceptual Alignment and Potential Public Amenities
SEGMENT 10
PHASE 1
SEGMENT 10
SEGMENT 9
SEGMENT 9
SEGMENT 8
SEGMENT 8
PHASE 2
SEGMENT 7
SEGMENT 6
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
PHASE 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
OVERLOOK AND PIER
e et Av
Proposed Onroad River Walk Extension
Building to be Removed
nue
Cli ffo rd Str eet
River Road
Irvin gton Cour t
PHASE 5
Proposed River Walk Path
Existing Shoreline
Gateways and Promontories
River Walk Follows Existing Path + Driveway
Municipal Park
Buildings With Highest Flood Risk - 2030
Proposed Onroad River Walk Extension
Building to be Removed
Buildings With Highest Flood Risk - 2050
Approximate Elevations A: 5.2 ft B: 3.6 ft 98
Perry Street
1,000
PHASE 5
SEGMENT 12
750
Precix / Acushnet Rubber
500
CTS SEGMENT 11
250
N
Former Aerovox Site
SEGMENT 11
0
¸
Feet
SEGMENT 10
PHASE 3
PHASE 3
SEGMENT 12
E1
SEGMENT 11
New Bedford Riverwalk Conceptual Alignment and Potential Public Amenities
SEGMENT 9
SEGMENT 11
SEGMENT 10
SEGMENT 9
SEGMENT 9
SEGMENT 8
SEGMENT 10
PHASE 1
SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
SEGMENT 6
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 2
P
River Road
B
PHASE 4
Dun can Stre et
Powder Pro
Darn It! Inc.
St re et
verside
Victoria Ri
Kearsarge Street
Belleville Avenue US Party Nashawena Company East Mills
River Bank Lofts
Acushnet Company / Titleist
P
American Engineered Fabrics
Had ley Stre et
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
BROOKLAWN PARK
Precix / Acushnet Rubber
Co vel l Str eet
Former Aerovox Site
Hat ch Stre et
tr e e t H e a ly S
Cen tral Ave nue
et Ba te s St re
Me rril l Str ee t
P
Desautels Street
Whaler’s Place
od / Lustiano Foing Star Plat
P
Ro ad
A Sawyer Street Facility / Jacobs Engineering Work Zone
St re et
e
Acushnet Company / Titleist
Hope Street
Ave nu
M an om et
Bell
Eu ge ni a
e
Mark
Th Rope e works
St re et
ket tbas
eville
St re et
ve nu e C of fin A
re et
Bell
St re et
H at ha w ay
Belleville Avenue
RIVERSIDE PARK
Av en ue
W hi tm an
M ad ei ra
Ti nk ha m
St re et
tr ee t D avis S
tr ee t E ar le S
Darn It! Inc.
d N ash R oa
C ol le tte
en ue Ph ill ip s Av
S tr ee t
tr ee t D ea ne S
Bu lla rd
St re et
ee t N ye S tr
Ta llm an
tr e e t H o lly S
reet Sawyer St
US Party Nashawena Company East Mills
t Co nco rd Str ee
Be lle vi lle
Belleville Avenue
t St re et No rth Fr on
geFloodStreet Buildings With Highest Risk - 2050 Kearsar
et Qu er y St re
hn Acus POSSIBLE PASSIVE RECREATION AREA
Perry Stree t
N
Irvin gton Stre et
1,000
100
Str eet
ing tonHighest Flood Risk - 2030 ArlWith Buildings t Pri nce ton Str ee
750
0
Gateways and Promontories
Sh aw Str ee t
500
River Walk Follows Existing Path + Driveway
Municipal Park
re et Gl en no n St
250
¸
Feet
Feet
Existing Shoreline
a n S tr ee t
Figure 13: Phase 3 Detail Plan Proposed River Walk Path
d le y S tr e e t
t
r ee t e al y S t
CTS
N
Proposed Onroad River Walk Extension
t Co nco rd Str ee
SEGMENT 4
Buildings With Highest Flood Risk - 2050
SEGMENT 12
SEGMENT 11
SEGMENT 11
SEGMENT 10
SEGMENT 4
SEGMENT 3
Building to be Removed
Ame Engi Fa CTS
PHASE 5
Buildings With Highest Flood Risk - 2030
Precix / Acushnet Rubber
I
Municipal Park
Approximate Elevations A: 6.1 ft B: 4.7 ft C: 11.3 ft D: 11.0 ft E: 6.7 ft F: 10.8 ft G: 7.5 ft H: 5.3 ft I: 4.3 ft
River Road
Acushnet Company / Titleist
Former Aerovox Site
Gateways and Promontories
Perry Street
Dun can Stre et
Had ley Stre et
P
Existing Shoreline
PHASE 4
99
PHASE 3
SEGMENT 3
Proposed Onroad River Walk Extension
ood / ood / Lustiano F ng Lustiano F ng Star Plati Star Plati
SEGMENT 9
SEGMENT 3
SEGMENT 2
SEGMENT 2
SEGMENT 1
River Walk Follows Existing Path + Driveway
Co vel l Str eet
H SEGMENT 10
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
SEGMENT 3
SEGMENT 2
SEGMENT 2
SEGMENT 1
1,000
¸
SEGMENT 1 750
N
Proposed River Walk Path
Ame Engi Fa Whaler
Belleville Avenue Darn It! Inc.
PHASE 1
PHASE 4
Whaler
BROOKLAWN PARK
G
Kearsarge Street
EXPANDED ECOLOGICAL RESTORATION ZONE
PHASE 2
SEGMENT 1 500
Hat ch Stre et
US Party Nashawena Company East Mills
River Bank Lofts Powder Pro
SEGMENT 6
SEGMENT 5
SEGMENT 4
CANOE LAUNCH SEGMENT 5
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
250
Cli ffo rd Str eet
et Ba te s St re
Ro ad
Street TIEDesautels INTO EXISTING PATH NETWORK
New Bedford Riverwalk Conceptual Alignment and Potential Public Amenities
0
Cen tral Ave nue
Be lle vi lle
tr e e t H e a ly S
D
PHASE 4
Feet
Irvin gton Cour t
St re et
verside
St re et
M an om et
B
e
Victoria Ri
Eu ge ni a
St re et
Hope Street
Ave nu
P
American Engineered Fabrics
Buildings With Highest Flood Risk - 2050
Me rril l Str ee t
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place
St re et
Ti nk ha m
St re et
P
W hi tm an
d N ash R oa
Av en ue
H at ha w ay
A
eville
C
od / Lustiano Foing Star Plat
P
Sawyer Street Facility / Jacobs Engineering Work Zone
tr ee t E ar le S
Bell
Bell
M ad ei ra
Sawyer Street Facility / Jacobs Engineering Work Zone
Th Rope e works
Taco Bell
tr ee t D avis S
e
Mark
St re et
ve nu e C of fin A
ket tbas
C ol le tte
en ue Ph ill ip s Av
S tr ee t
RIVERSIDE PARK
re et
E
ue Aven
tr ee t D ea ne S
Bu lla rd
P
Belleville Avenue
F
t St re et No rth Fr on
ee t N ye S tr
St re et
tr e e t H o lly S
reet Sawyer St
Taco Bell
Ta llm an
Ma
Building to be Removed
et Qu er y St re
ket
as rketb
RIVERSIDE PARK
Th Rope e works Sawyer Street Facility / Jacobs Engineering Work Zone hnet Acus
Str eet
Irvin gton Stre et
t e l l St re e
1,000
100
ing tonHighest Flood Risk - 2030 ArlWith Buildings t Pri nce ton Str ee
750
0
Gateways and Promontories
Municipal Park
Sh aw Str ee t
500
Existing Shoreline
re et Gl en no n St
250
¸
Th Rope eBelleville Avenue Figuresk14: Plan et Phasewo4rksDetail Proposed River Walk Path a b t arke River Walk Follows Existing Feet M Feet Path + Driveway
e e n A ve nu Co ff in A ve nu
et
eet
re e t
t e l l St re e
PARK
Precix / Acushnet Rubber
Existing Shoreline
Gateways and Promontories
River Walk Follows Existing Path + Driveway
Municipal Park
Buildings With Highest Flood Risk - 2030
Proposed Onroad River Walk Extension
Building to be Removed
Buildings With Highest Flood Risk - 2050
SEGMENT 12
SEGMENT 11
PHASE 5
Proposed River Walk Path
100
River Road
PHASE 3
SEGMENT 11
SEGMENT 12
OVERLOOK + PIER
SEGMENT 10
SEGMENT 9
PHASE 1
PHASE 5
Approximate Elevations A: 4.5 ft B: 7.2 ft C: 4.5 ft D: 5.8 ft
Perry Street
Dun can Stre et
Former Aerovox Site
Pico Stone John’s Auto / Imports and SK Machine Supply Co. SEGMENT 10
SEGMENT 12
N
P
Acushnet Company / Titleist
Darn It! Inc.
SEGMENT 9
SEGMENT 8
SEGMENT 8
SEGMENT 7
SEGMENT 6
SEGMENT 7
D SEGMENT 11
SEGMENT 11
1,000
Had ley Stre et
Powder Pro
SEGMENT 6
C
SEGMENT 5
SEGMENT 4
SEGMENT 5
SEGMENT 10
750
Sy lvi a St re et
Belleville Avenue US Party Nashawena Company East Mills
River Bank Lofts
St re et
verside
Victoria Ri
BROOKLAWN PARK
Kearsarge Street
CTS
¸
500
Co vel l Str eet
P
American Engineered Fabrics
PHASE 2
SEGMENT 10
SEGMENT 9
250
Irvin gton Cour t
Hat ch Stre et
M an om et
Riverside Avenue Whaler’s Care CLIFTEX Corp. Assisted Living
Whaler’s Place
PHASE 3
0
Cli ffo rd Str eet
tr e e t H e a ly S
New Bedford Riverwalk Conceptual Alignment and Potential Public Amenities
Feet
Cen tral Ave nue
Precix / Acushnet Rubber
e
et Ba te s St re
Ro ad
St re et
St re et
Me rril l Str ee t
Hope Street
Ave nu
et Qu er y St re
Be lle vi lle
Eu ge ni a
W hi tm an
St re et
River Road
d N ash R oa
Ti nk ha m
EXPANDED ECOLOGICAL RESTORATION ZONE
Desautels Street
SEGMENT 4
SEGMENT 3
SEGMENT 3
SEGMENT 2
SEGMENT 1
SEGMENT 2
SEGMENT 1
PHASE 4
Former Aerovox Site
eville
St re et
Bell
Av en ue
H at ha w ay
A
tr ee t E ar le S
Sawyer Street Facility / Jacobs Engineering Work Zone
od / Lustiano Foing Star Plat
P
tr ee t D avis S
Bell
St re et
e
Th Rope e works
P
M ad ei ra
B
ve nu e C of fin A
RIVERSIDE PARK
Mark
C ol le tte
en ue Ph ill ip s Av
Acushnet Company / Titleist
S tr ee t
tr ee t D ea ne S
Bu lla rd
St re et
ee t N ye S tr
Ta llm an
tr e e t H o lly S
reet Sawyer St
Belleville Avenue
t Co nco rd Str ee
TO RIVERS END PARK
t St re et No rth Fr on
ket tbas
Irvin gton Stre et
Proposed Onroad River Walk Extension
Belleville Avenue
re et
t Pri nce ton Str ee
TO BROOKLAWN Buildings With Highest Flood Risk - 2050 Building to be Removed Kearsar ge Street
N
100
ue Aven hnet Acus
arn It! Inc.
lawn Court
1,000
Str eet
ing tonHighest Flood Risk - 2030 ArlWith Buildings Sh aw Str ee t
750
0
owa rd Av nue
500
Gateways and Promontories
re et Gl en no n St
250
Municipal Park
River Walk Follows Existing Path + Driveway
¸
Feet
Feet
Existing Shoreline
Perry Stree t
a n S tr ee t
d le y S tr e e t
t
Figure 15: Phase 5 Detail Plan Proposed River Walk Path
CTS
APPENDIX B
CONCEPTUAL COST ESTIMATES
101
102
New Bedford Riverwalk Coceptual Cost Estimates Draft February 2020
METHODOLOGY The conceptual cost estimates for the New Bedford Riverwalk were developed for the purpose of comparing the order-of-magnitude costs of various segments under consideration. These conceptual cost estimates were developed based on MassDOT's weighted average bid price application on the MassDOT website. For developing the conceptual estimate, Stantec used the MassDOT weighted average bid price application and used prices for January 2020. Costs fpr planning, permitting, and engineering design were added at 15% of construction. All costs were escalated 4.0% annually to the anticipated construction year. Gateway Construction Assumptions: Costs of the 'Riverwalk Gateway' features were developed for the 2014 New Bedford Riverwalk Planning and Design Feasibility Study. The costs of these gateway feature provided in that study were inflated 4% annually to the 2020 base year. Trail Construction Assumptions: The base cost is for the construction of the trail and side slopes, with 1' increase over the existing grade. Add Alternate 1 will increase the profile by an additional 0.5 feet and add alternate 2 will add 1' of height to the profile. It is possible that if the proposed haul road were constructed with the trail in mind, on the intended trail alignment and at the appropriate grade, then a cost savings in clearing, ordinary borrow, gravel borrow could be realized. Future financial planning would require a more detailed cost estimate based on a higher level of design. 35% Contingency: The 35% contingency added to these conceptual costs is to account for unknown, but not unexpected costs. These could include, but are not limited to: environmental mitigation, hazardous soil management/disposal, utility relocation, and traffic management. See exclusions for a list of items expressly unaccounted for in these conceptual costs. Exclusions: These conceptual cost estimates do not include the cost of ancillary features such as a canoe launch, overlook/pier, etc. Below is a list of other items that are not accounted for at this time. • Disposal costs of contaminated soil • Fill in capped contamination areas • Shoreline Stabilization
103
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES Draft January 2020
ASSUMPTIONS:
UNIT PRICES
- Trail cost per foot is based on the design below and MassDOT District 5 unit prices as listed on the MassDOT Website on 14 January 2020. - Trail is assumed to be 10 feet wide HMA with 12:1 grass shoulders for 2 feet either side and 6:1 grass slopes to existing. Existing terrain apears relitively level throughout. Trail is to be raise 1' above existing ground. - In the base design the trail is placed on existing ground with the only raise in the profile from the pavement box. As alternative, 6 inches and 1 foot of fill will be added to raise the trail by 18" above existing or 24" above existing. - On road protions of the trail will be striped, 8 feet wide with sharrows witin the striped area. TRAIL CONSTRUCTION COST (COST PER FOOT): CLEARING AND GRUBING (ITEM 101.) 26' WIDE X 1' LONG =
GRAVEL BORROW (ITEM 151.) 8" DEEP X 26' WIDE X 1' LONG =
SUPERPAVE INTERMEDIATE COURSE (SIC-19.0) (ITEM 450.32) 2.5" DEEP X 10' WIDE X 1' LONG =
SUPERPAVE SURFACE COURSE (SSC-9.5) (ITEM 450.22) 1.5" DEEP X 10' WIDE X 1' LONG =
26.00 0.0006 $50,000.00 $29.84
SF PER FT AC PER FT $ PER AC $ PER FT
17.33 0.64 $55.00 $35.31
CF PER FT CY PER FT $ PER CY $ PER FT
0.16 TONS $145.00 $ PER TON $22.56 $ PER FT
0.09 TONS $140.00 $ PER TON $13.07 $ PER FT
2 OF 41 104
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES Draft January 2020
UNIT PRICES LOAM BORROW (ITEM 751.) 4" DEEP X 8' WIDE X 2 SIDES X 1' LONG =
SEEDING (ITEM 765.) 8' WIDE X 2 SIDES X 1' LONG =
WOOD RAIL FENCE ON WATER SIDE (ITEM 655.3 ) 1' LONG =
FLUSH GRANITE CURB (ITEM 504.) 1' LONG =
5.33 0.20 $50.00 $9.88
CF PER FT CY PER FT $ PER CY $ PER FT
16.00 1.78 $2.50 $4.44
SF PER FT SY PER FT $ PER SY $ PER FT
1.00 FT PER FT $40.00 $ PER FT $40.00 $ PER FT
1.00 FT PER FT $50.00 $ PER FT $50.00 $ PER FT
TRAIL CONSTRUCTION COST PER FOOT SAY
$205.10 $ PER FOOT $210.00 $ PER FOOT
3 OF 41 105
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES Draft January 2020
UNIT PRICES ADD ALTERNATE 1 - RAISE PROFILE BY 18 INCHES CLEARING AND GRUBING (ITEM 101.) 6' WIDE X 1' LONG =
ORDINARY BORROW (ITEM 150.) 6" DEEP X 32' WIDE X 1' LONG =
GRAVEL BORROW (ITEM 151.) 8" DEEP X 6' WIDE X 1' LONG =
LOAM BORROW (ITEM 751.) 4" DEEP X 6' WIDE X 2 SIDES X 1' LONG =
SEEDING (ITEM 765.) 6' WIDE X 2 SIDES X 1' LONG =
ADDITIONAL TRAIL CONSTRUCTION COST PER FOOT SAY
6.00 0.0001 $50,000.00 $6.89
SF PER FT AC PER FT $ PER AC $ PER FT
16.00 0.59 $30.00 $17.78
CF PER FT CY PER FT $ PER CY $ PER FT
4.00 0.15 $55.00 $8.15
CF PER FT CY PER FT $ PER CY $ PER FT
4.00 0.15 $50.00 $7.41
CF PER FT CY PER FT $ PER CY $ PER FT
12.00 1.33 $2.50 $3.33
SF PER FT SY PER FT $ PER SY $ PER FT
$43.55 $ PER FOOT $50.00 $ PER FOOT
4 OF 41 106
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES Draft January 2020
UNIT PRICES ADD ALTERNATE 2 - RAISE PROFILE BY 24 INCHES CLEARING AND GRUBING (ITEM 101.) 12' WIDE X 1' LONG =
ORDINARY BORROW (ITEM 150.) 6" DEEP X 38' WIDE X 1' LONG =
GRAVEL BORROW (ITEM 151.) 8" DEEP X 12' WIDE X 1' LONG =
LOAM BORROW (ITEM 751.) 4" DEEP X 12' WIDE X 2 SIDES X 1' LONG =
SEEDING (ITEM 765.) 12' WIDE X 2 SIDES X 1' LONG =
ADDITIONAL TRAIL CONSTRUCTION COST PER FOOT SAY
12.00 0.0003 $50,000.00 $13.77
SF PER FT AC PER FT $ PER AC $ PER FT
19.00 0.70 $30.00 $21.11
CF PER FT CY PER FT $ PER CY $ PER FT
8.00 0.30 $55.00 $16.30
CF PER FT CY PER FT $ PER CY $ PER FT
8.00 0.30 $50.00 $14.81
CF PER FT CY PER FT $ PER CY $ PER FT
24.00 2.67 $2.50 $6.67
SF PER FT SY PER FT $ PER SY $ PER FT
$72.66 $ PER FOOT $80.00 $ PER FOOT
5 OF 41 107
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES Draft January 2020
UNIT PRICES ON-ROAD TRAIL CONSTRUCTION COST (COST PER FOOT): 12 INCH REFLECTORIZED WHITE LINE (ITEM 860.112) 2 LINES (ONE ON EACH SIDE) X 1' LONG =
2.00 FT PER FT $2.00 $ PER FT $4.00 $ PER FT
PAVEMENT LEGEND REFLECTORIZED WHITE (PAINTED) (ITEM 864.03) 2 SHARROWS PER 100 FEET 0.12 SF PER FT EACH SHARROW IS 6 SF $5.00 $ PER SF $0.60 $ PER FT
ON-ROAD TRAIL CONSTRUCTION COST PER FOOT SAY
$4.60 $ PER FOOT $10.00 $ PER FOOT
6 OF 41 108
109
MARKET BASKET SITE 2027 JACOBS ENGINEERING WORK ZONE 2027 RIVERSIDE PARK AND STAR PLATING 2027 AMERICAN ENGINEERED FABRICS 2025 VICTORIA RIVERSIDE 2025 CLIFTEX SITE 2024 RIVER BANK LOFTS 2024 NASHAWENA MILLS SITE 2024 DARN IT! INC. SITE 2024 TITLEIST SITE 2026 FORMER AEROVOX SITE 2027
1
11
10
9
8
7
6
5
4
3
2
DESC / PHASE YEAR
SEGMENT
$245,000 $147,000 $1,881,000 $765,000 $7,225,000
$126,000 $1,608,000 $605,000 $5,490,000
$902,000
$742,000
$209,000
$1,045,000
$859,000
$941,000
$817,000
$621,000
$804,000
$3,410,000
$2,591,000
BASE COST 2020 PHASE YEAR $761,000 $1,001,000
$5,617,000
$668,000
$1,696,000
$146,000
$223,000
$860,000
$799,000
$910,000
$668,000
$2,686,000
$7,391,000
$845,000
$1,984,000
$171,000
$261,000
$1,005,000
$973,000
$1,107,000
$878,000
$3,535,000
ADD ALT 1 PHASE YEAR $807,000 $1,062,000
SUMMARY BY SEGMENT
Draft January 2020
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES
$5,692,600
$705,300
$1,747,900
$158,100
$230,600
$892,300
$833,700
$939,200
$695,200
$2,743,200
7 OF 41
$7,491,000
$893,000
$2,045,000
$185,000
$270,000
$1,044,000
$1,015,000
$1,143,000
$915,000
$3,610,000
ADD ALT 2 PHASE YEAR $834,800 $1,099,000
110
TOTAL
PHASE YEAR / SITE 2024 CLIFTEX SITE RIVER BANK LOFTS NASHAWENA MILLS SITE DARN IT! INC. SITE
2026
2027 PHASE 5 FORMER AEROVOX SITE 11
TOTAL
PHASE 4 2027 MARKET BASKET SITE 1 JACOBS ENGINEERING WORK ZONE 2 RIVERSIDE PARK AND STAR PLATING 3
PHASE 3 TITLEIST SITE 10
TOTAL
PHASE 2 2025 AMERICAN ENGINEERED FABRICS 4 VICTORIA RIVERSIDE 5
PHASE 1 6 7 8 9
PHASE / SEGMENT
$5,490,000
$3,973,000
$761,000 $2,591,000 $621,000
$605,000
$1,601,000
$859,000 $742,000
$2,747,000
$804,000 $209,000 $126,000 $1,608,000
$7,225,000
$5,228,000
$1,001,000 $3,410,000 $817,000
$765,000
$1,947,000
$1,045,000 $902,000
$3,214,000
$941,000 $245,000 $147,000 $1,881,000
BASE COST 2020 PHASE YEAR
$5,617,000
$4,161,000
$807,000 $2,686,000 $668,000
$668,000
$1,709,000
$910,000 $799,000
$2,925,000
$7,391,000
$5,475,000
$1,062,000 $3,535,000 $878,000
$845,000
$2,080,000
$1,107,000 $973,000
$3,421,000
$1,005,000 $261,000 $171,000 $1,984,000
ADD ALT 1 PHASE YEAR $860,000 $223,000 $146,000 $1,696,000
SUMMARY BY PHASE
Draft January 2020
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES
$5,692,600
$4,273,200
$834,800 $2,743,200 $695,200
$705,300
$1,772,900
$939,200 $833,700
$3,028,900
$892,300 $230,600 $158,100 $1,747,900
$7,491,000
$5,624,000
$1,099,000 $3,610,000 $915,000
$893,000
$2,158,000
$1,143,000 $1,015,000
$3,544,000
$1,044,000 $270,000 $185,000 $2,045,000
ADD ALT 2 PHASE YEAR
8 OF 41
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 1 - MARKET BASKET SITE FROM SAWYER STREET , OPPOSITE TACO BELL AND MARKET BASKET TO THE JOCOBS ENGINEERING WORK ZONE. TRAIL IS MOSTLY OFF ROAD, WITH A SMALL SECTION ON ROAD AT THE JACOBS SITE. TRAIL CONSTRUCTION 545 foot trail length $210 per foot of length
$114,450.00
ON-ROAD TRAIL CONSTRUCTION 40 foot roadway length $10 per foot of length
$400.00
RIVERWALK GATEWAY (2) South Entrance ($114,500) Southern Promontory ($186,200)
$300,700.00
ECOLOGICAL RESTORATION ZONE (NB HARBOR TRUSTEES) 3,945 size of area in square feet $8 per square foot of area
$31,560.00
SUBTOTAL
$447,110.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST)
$67,070.00
LANDSCAPING (5% of construction cost)
$22,360.00
DRAINAGE (5% of construction cost)
$22,360.00
SIGNAGE (1% of construction cost)
*
Subtotal:
$4,480.00 $563,380.00
Contingencies* (35%):
$197,183.00
Total (2020): $760,563.00 SAY $761,000.00 Total (2027): $1,000,824.85 SAY $1,001,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION - Contingencies may includes resource area mitigation, utility relocation, traffic management, etc.
9 OF 41 111
SEGMENT 1 - ALTERNATIVE 1
$27,250.00
545 foot roadway length $50 per foot of length
SUBTOTAL
$474,360.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST)
$71,160.00
LANDSCAPING (5% of construction cost)
$23,720.00
DRAINAGE (5% of construction cost)
$23,720.00
SIGNAGE (1% of construction cost)
$4,750.00 Subtotal:
$597,710.00
Contingencies* (35%):
$209,198.50
Total (2020): SAY Total (2027): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
$806,908.50 $807,000.00 $1,061,810.90 $1,062,000.00
10 OF 41 112
SEGMENT 1 - ALTERNATIVE 2
$43,600.00
545 foot roadway length $80 per foot of length
SUBTOTAL
$490,710.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST)
$73,610.00
LANDSCAPING (5% of construction cost)
$24,540.00
DRAINAGE (5% of construction cost)
$24,540.00
SIGNAGE (1% of construction cost)
$4,910.00 Subtotal:
$618,310.00
Contingencies* (35%):
$216,408.50
Total (2020): SAY Total (2027): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
$834,718.50 $834,800.00 $1,098,406.07 $1,099,000.00
11 OF 41 113
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 2 - JACOBS ENGINEERING WORK ZONE FROM SAWYER STREET AROUND THE JACOBS WORK ZONE TO RIVERSIDE PARK. TRAIL IS ALL OFF ROAD. TRAIL CONSTRUCTION 1,120 foot roadway length $210 per foot of length
$235,200.00
ON-ROAD TRAIL CONSTRUCTION 0 foot roadway length $10 per foot of length
$0.00
ECOLOGICAL RESTORATION ZONE (NB HARBOR TRUSTEES) 42,443 size of area in square feet $8 per square foot of area
$339,544.00
ECOLOGICAL / RECREATIONAL RESTORATION (CITY OF NEW BED) 118,538 size of area in square feet $8 per square foot of area
$948,304.00
SUBTOTAL
$1,523,048.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST)
*
$228,460.00
LANDSCAPING (5% of construction cost)
$76,160.00
DRAINAGE (5% of construction cost)
$76,160.00
SIGNAGE (1% of construction cost)
$15,240.00 Subtotal:
$1,919,068.00
Contingencies* (35%):
$671,673.80
Total (2020): $2,590,741.80 SAY $2,591,000.00 Total (2027): $3,409,157.13 SAY $3,410,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION - Contingencies may includes resource area mitigation, utility relocation, traffic management, etc.
114
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 2 - JACOBS ENGINEERING WORK ZONE
SEGMENT 2 - ALTERNATIVE 1
$56,000.00
1,120 foot roadway length $50 per foot of length
SUBTOTAL
$1,579,048.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST)
$236,860.00
LANDSCAPING (5% of construction cost)
$78,960.00
DRAINAGE (5% of construction cost)
$78,960.00
SIGNAGE (1% of construction cost)
$15,800.00 Subtotal:
$1,989,628.00
Contingencies* (35%):
$696,369.80
Total (2020): SAY Total (2027): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
115
$2,685,997.80 $2,686,000.00 $3,534,504.51 $3,535,000.00
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 2 - JACOBS ENGINEERING WORK ZONE
SEGMENT 2 - ALTERNATIVE 2
$89,600.00
1,120 foot roadway length $80 per foot of length
SUBTOTAL
$1,612,648.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST)
$241,900.00
LANDSCAPING (5% of construction cost)
$80,640.00
DRAINAGE (5% of construction cost)
$80,640.00
SIGNAGE (1% of construction cost)
$16,130.00 Subtotal:
$2,031,958.00
Contingencies* (35%):
$711,185.30
Total (2020): SAY Total (2027): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
116
$2,743,143.30 $2,743,200.00 $3,609,702.27 $3,610,000.00
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 3 - RIVERSIDE PARK AND STAR PLATING FROM JACOBS WORK ZONE, THROUGH RIVERSIDE PARK TO COFFIN AVENUE TO THE WATER AT STAR PLATING. THE SECTION ALONG COFFIN AVENUE WILL BE ON ROAD. TRAIL CONSTRUCTION 550 foot roadway length $210 per foot of length
$115,500.00
ON-ROAD TRAIL CONSTRUCTION 870 foot roadway length $10 per foot of length
$8,700.00
$240,480.00
ECOLOGICAL RESTORATION ZONE (NB HARBOR TRUSTEES) 30,060 size of area in square feet $8 per square foot of area SUBTOTAL
$364,680.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST)
$54,710.00
LANDSCAPING (5% of construction cost)
$18,240.00
DRAINAGE (5% of construction cost)
$18,240.00
SIGNAGE (1% of construction cost)
*
Subtotal:
$3,650.00 $459,520.00
Contingencies* (35%):
$160,832.00
Total (2020): $620,352.00 SAY $621,000.00 Total (2027): $816,321.20 SAY $817,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION - Contingencies may includes resource area mitigation, utility relocation, traffic management, etc.
117
15 OF 41
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 3 - RIVERSIDE PARK AND STAR PLATING
SEGMENT 3 - ALTERNATIVE 1
$27,500.00
550 foot roadway length $50 per foot of length
SUBTOTAL
$392,180.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST)
$58,830.00
LANDSCAPING (5% of construction cost)
$19,610.00
DRAINAGE (5% of construction cost)
$19,610.00
SIGNAGE (1% of construction cost)
$3,930.00 Subtotal:
$494,160.00
Contingencies* (35%):
$172,956.00
Total (2020): SAY Total (2027): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
118
$667,116.00 $668,000.00 $877,857.94 $878,000.00
16 OF 41
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 3 - RIVERSIDE PARK AND STAR PLATING
SEGMENT 3 - ALTERNATIVE 2
$44,000.00
550 foot roadway length $80 per foot of length SUBTOTAL
$408,680.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST)
$61,310.00
LANDSCAPING (5% of construction cost)
$20,440.00
DRAINAGE (5% of construction cost)
$20,440.00
SIGNAGE (1% of construction cost)
$4,090.00 Subtotal:
$514,960.00
Contingencies* (35%):
$180,236.00
Total (2020): SAY Total (2027): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
119
$695,196.00 $695,200.00 $914,808.42 $915,000.00
17 OF 41
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 4 - AMERICAN ENGINEERED FABRICS FROM COFFIN AVENUE ACROSS AMERICAN ENGINEERED FABRICS SITE. TRAIL IS ALL OFF ROAD. TRAIL CONSTRUCTION 590 foot roadway length $210 per foot of length
$123,900.00
ON-ROAD TRAIL CONSTRUCTION 0 foot roadway length $10 per foot of length
$0.00
ECOLOGICAL RESTORATION ZONE (NB HARBOR TRUSTEES) 1,060 size of area in square feet $8 per square foot of area
$8,480.00
ECOLOGICAL / RECREATIONAL RESTORATION (CITY OF NEW BED) 11,640 size of area in square feet $8 per square foot of area RIVERWALK GATEWAY (2) Gateway 1 Riverside Avenue ($144,500) Gateway 2 Coffin Avenue ($134,900)
$279,400.00
SUBTOTAL
$504,900.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$75,740.00
LANDSCAPING (5% of construction cost)
$25,250.00
DRAINAGE (5% of construction cost)
$25,250.00
SIGNAGE (1% of construction cost)
*
$93,120.00
$5,050.00 Subtotal:
$636,190.00
Contingencies* (35%):
$222,666.50
Total (2020): $858,856.50 SAY $859,000.00 Total (2025): $1,044,970.70 SAY $1,045,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION - Contingencies may includes resource area mitigation, utility relocation, traffic management, 120 etc.
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 4 - AMERICAN ENGINEERED FABRICS
SEGMENT 4 - ALTERNATIVE 1
$29,500.00
590 foot roadway length $50 per foot of length
SUBTOTAL
$534,400.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$80,160.00
LANDSCAPING (5% of construction cost)
$26,720.00
DRAINAGE (5% of construction cost)
$26,720.00
SIGNAGE (1% of construction cost)
$5,350.00 Subtotal:
$673,350.00
Contingencies* (35%):
$235,672.50
Total (2020): $909,022.50 SAY $910,000.00 Total (2025): $1,106,007.68 SAY $1,107,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
121
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 4 - AMERICAN ENGINEERED FABRICS
SEGMENT 4 - ALTERNATIVE 2
$47,200.00
590 foot roadway length $80 per foot of length
SUBTOTAL
$552,100.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$82,820.00
LANDSCAPING (5% of construction cost)
$27,610.00
DRAINAGE (5% of construction cost)
$27,610.00
SIGNAGE (1% of construction cost)
$5,530.00 Subtotal:
$695,670.00
Contingencies* (35%):
$243,484.50
Total (2020): $939,154.50 SAY $939,200.00 Total (2025): $1,142,669.28 SAY $1,143,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
122
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 5 - VICTORIA RIVERSIDE
BETWEEN AMERICAN ENGINEERED FABRICS AND MANOMET STREET. TRAIL IS ALL OFF ROAD. TRAIL CONSTRUCTION 680 foot roadway length $210 per foot of length
$142,800.00
ON-ROAD TRAIL CONSTRUCTION 0 foot roadway length $10 per foot of length
$0.00
ECOLOGICAL RESTORATION ZONE (NB HARBOR TRUSTEES) 8,696 size of area in square feet $8 per square foot of area
$69,568.00
RIVERWALK GATEWAY Gateway 3 Manomet Street
$223,300.00
SUBTOTAL
$435,668.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$65,360.00
LANDSCAPING (5% of construction cost)
$21,790.00
DRAINAGE (5% of construction cost)
$21,790.00
SIGNAGE (1% of construction cost)
*
$4,360.00 Subtotal:
$548,968.00
Contingencies* (35%):
$192,138.80
Total (2020): $741,106.80 SAY $742,000.00 Total (2025): $901,704.64 SAY $902,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION - Contingencies may includes resource area mitigation, utility relocation, traffic management, etc. 21 OF 41 123
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 5 - VICTORIA RIVERSIDE
SEGMENT 5 - ALTERNATIVE 1
$34,000.00
680 foot roadway length $50 per foot of length
SUBTOTAL
$469,668.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$70,460.00
LANDSCAPING (5% of construction cost)
$23,490.00
DRAINAGE (5% of construction cost)
$23,490.00
SIGNAGE (1% of construction cost)
$4,700.00 Subtotal:
$591,808.00
Contingencies* (35%):
$207,132.80
Total (2020): SAY Total (2025): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
$798,940.80 $799,000.00 $972,071.27 $973,000.00
22 OF 41 124
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 5 - VICTORIA RIVERSIDE
SEGMENT 5 - ALTERNATIVE 2
$54,400.00
680 foot roadway length $80 per foot of length
SUBTOTAL
$490,068.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$73,520.00
LANDSCAPING (5% of construction cost)
$24,510.00
DRAINAGE (5% of construction cost)
$24,510.00
SIGNAGE (1% of construction cost)
$4,910.00 Subtotal:
$617,518.00
Contingencies* (35%):
$216,131.30
Total (2020): $833,649.30 SAY $833,700.00 Total (2025): $1,014,301.10 SAY $1,015,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
23 OF 41 125
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 6 - CLIFTEX CORP FROM MANOMET STREET TO POWDER PRO SITE. TRAIL IS ALL OFF ROAD. TRAIL CONSTRUCTION 650 foot roadway length $210 per foot of length
$136,500.00
ON-ROAD TRAIL CONSTRUCTION 0 foot roadway length $10 per foot of length
$0.00
ECOLOGICAL RESTORATION ZONE (NB HARBOR TRUSTEES) 18,857 size of area in square feet $8 per square foot of area
$150,856.00
ECOLOGICAL / RECREATIONAL RESTORATION (CITY OF NEW BED) 23,143 size of area in square feet $8 per square foot of area
$185,144.00
SUBTOTAL
$472,500.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$70,880.00
LANDSCAPING (5% of construction cost)
$23,630.00
DRAINAGE (5% of construction cost)
$23,630.00
SIGNAGE (1% of construction cost)
*
$4,730.00 Subtotal:
$595,370.00
Contingencies* (35%):
$208,379.50
Total (2020): $803,749.50 SAY $804,000.00 Total (2024): $940,306.54 SAY $941,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION - Contingencies may includes resource area mitigation, utility relocation, traffic management, etc.
24 OF 41 126
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 6 - CLIFTEX CORP
SEGMENT 6 - ALTERNATIVE 1
$32,500.00
650 foot roadway length $50 per foot of length
SUBTOTAL
$505,000.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$75,750.00
LANDSCAPING (5% of construction cost)
$25,250.00
DRAINAGE (5% of construction cost)
$25,250.00
SIGNAGE (1% of construction cost)
$5,050.00 Subtotal:
$636,300.00
Contingencies* (35%):
$222,705.00
Total (2020): $859,005.00 SAY $860,000.00 Total (2024): $1,004,949.95 SAY $1,005,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
25 OF 41 127
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 6 - CLIFTEX CORP
SEGMENT 6 - ALTERNATIVE 2
$52,000.00
650 foot roadway length $80 per foot of length
SUBTOTAL
$524,500.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$78,680.00
LANDSCAPING (5% of construction cost)
$26,230.00
DRAINAGE (5% of construction cost)
$26,230.00
SIGNAGE (1% of construction cost)
$5,250.00 Subtotal:
$660,890.00
Contingencies* (35%):
$231,311.50
Total (2020): $892,201.50 SAY $892,300.00 Total (2024): $1,043,786.53 SAY $1,044,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
26 OF 41 128
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 7 - RIVER BANK LOFTS ACROSS THE RIVER BANK LOFTS SITE. TRAIL IS PART ON AND PART OFF ROAD. TRAIL CONSTRUCTION 160 foot roadway length $210 per foot of length
$33,600.00
ON-ROAD TRAIL CONSTRUCTION 510 foot roadway length $10 per foot of length
$5,100.00
ECOLOGICAL RESTORATION ZONE (NB HARBOR TRUSTEES) 5,273 size of area in square feet $8 per square foot of area
$42,184.00
ECOLOGICAL / RECREATIONAL RESTORATION (CITY OF NEW BED) 5,227 size of area in square feet $8 per square foot of area
$41,816.00
SUBTOTAL
$122,700.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
*
$18,410.00
LANDSCAPING (5% of construction cost)
$6,140.00
DRAINAGE (5% of construction cost)
$6,140.00
SIGNAGE (1% of construction cost)
$1,230.00 Subtotal:
$154,620.00
Contingencies* (35%):
$54,117.00
Total (2020): $208,737.00 SAY $209,000.00 Total (2024): $244,201.42 SAY $245,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION - Contingencies may includes resource area mitigation, utility relocation, traffic management, etc.
27 OF 41 129
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 7 - RIVER BANK LOFTS
SEGMENT 7 - ALTERNATIVE 1
$8,000.00
160 foot roadway length $50 per foot of length
SUBTOTAL
$130,700.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$19,610.00
LANDSCAPING (5% of construction cost)
$6,540.00
DRAINAGE (5% of construction cost)
$6,540.00
SIGNAGE (1% of construction cost)
$1,310.00 Subtotal:
$164,700.00
Contingencies* (35%):
$57,645.00
Total (2020): SAY Total (2024): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
$222,345.00 $223,000.00 $260,121.42 $261,000.00
28 OF 41 130
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 7 - RIVER BANK LOFTS
SEGMENT 7 - ALTERNATIVE 2
$12,800.00
160 foot roadway length $80 per foot of length
SUBTOTAL
$135,500.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$20,330.00
LANDSCAPING (5% of construction cost)
$6,780.00
DRAINAGE (5% of construction cost)
$6,780.00
SIGNAGE (1% of construction cost)
$1,360.00 Subtotal:
$170,750.00
Contingencies* (35%):
$59,762.50
Total (2020): SAY Total (2024): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
$230,512.50 $230,600.00 $269,676.57 $270,000.00
29 OF 41 131
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 8 - NASHAWENA MILL ACROSS THE NASHAWENA MILLS SITE. TRAIL IS PART OFF ROAD AND PART ON ROAD. TRAIL CONSTRUCTION 240 foot roadway length $210 per foot of length
$50,400.00
ON-ROAD TRAIL CONSTRUCTION 90 foot roadway length $10 per foot of length
$900.00
ECOLOGICAL RESTORATION ZONE (NB HARBOR TRUSTEES) 2,800 size of area in square feet $8 per square foot of area
$22,400.00
SUBTOTAL
$73,700.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST LANDSCAPING (5% of construction cost)
$3,690.00
DRAINAGE (5% of construction cost)
$3,690.00
SIGNAGE (1% of construction cost)
*
$11,060.00
$740.00 Subtotal:
$92,880.00
Contingencies* (35%):
$32,508.00
Total (2020): $125,388.00 SAY $126,000.00 Total (2024): $146,691.42 SAY $147,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION - Contingencies may includes resource area mitigation, utility relocation, traffic management, etc.
30 OF 41 132
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 8 - NASHAWENA MILL
SEGMENT 8 - ALTERNATIVE 1
$12,000.00
240 foot roadway length $50 per foot of length
SUBTOTAL
$85,700.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$12,860.00
LANDSCAPING (5% of construction cost)
$4,290.00
DRAINAGE (5% of construction cost)
$4,290.00
SIGNAGE (1% of construction cost)
$860.00 Subtotal:
$108,000.00
Contingencies* (35%):
$37,800.00
Total (2020): SAY Total (2024): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
$145,800.00 $146,000.00 $170,571.42 $171,000.00
31 OF 41 133
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 8 - NASHAWENA MILL
SEGMENT 8 - ALTERNATIVE 2
$19,200.00
240 foot roadway length $80 per foot of length
SUBTOTAL
$92,900.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$13,940.00
LANDSCAPING (5% of construction cost)
$4,650.00
DRAINAGE (5% of construction cost)
$4,650.00
SIGNAGE (1% of construction cost)
$930.00 Subtotal:
$117,070.00
Contingencies* (35%):
$40,974.50
Total (2020): SAY Total (2024): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
$158,044.50 $158,100.00 $184,896.26 $185,000.00
32 OF 41 134
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 9 - DARN IT! INC ACROSS THE US PARTY COMPANY EAST AND DARN IT! INC. SITE. TRAIL IS OFF ROAD. TRAIL CONSTRUCTION 1,030 foot roadway length $210 per foot of length
$216,300.00
ON-ROAD TRAIL CONSTRUCTION 0 foot roadway length $10 per foot of length
$0.00
ECOLOGICAL RESTORATION ZONE (NB HARBOR TRUSTEES) 55,963 size of area in square feet $8 per square foot of area
$447,704.00
RIVERWALK GATEWAY Northern Promontory
$281,100.00
SUBTOTAL
$945,104.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST LANDSCAPING (5% of construction cost)
$47,260.00
DRAINAGE (5% of construction cost)
$47,260.00
SIGNAGE (1% of construction cost)
*
$141,770.00
$9,460.00 Subtotal:
$1,190,854.00
Contingencies* (35%):
$416,798.90
Total (2020): $1,607,652.90 SAY $1,608,000.00 Total (2024): $1,880,793.13 SAY $1,881,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION - Contingencies may includes resource area mitigation, utility relocation, traffic management, etc.
33 OF 41 135
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 9 - DARN IT! INC
SEGMENT 9 - ALTERNATIVE 1
$51,500.00
1,030 foot roadway length $50 per foot of length
SUBTOTAL
$996,604.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$149,500.00
LANDSCAPING (5% of construction cost)
$49,840.00
DRAINAGE (5% of construction cost)
$49,840.00
SIGNAGE (1% of construction cost)
$9,970.00 Subtotal:
$1,255,754.00
Contingencies* (35%):
$439,513.90
Total (2020): SAY Total (2024): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
$1,695,267.90 $1,696,000.00 $1,983,293.92 $1,984,000.00
34 OF 41 136
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 9 - DARN IT! INC
SEGMENT 9 - ALTERNATIVE 2
$82,400.00
1,030 foot roadway length $80 per foot of length
SUBTOTAL
$1,027,504.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$154,130.00
LANDSCAPING (5% of construction cost)
$51,380.00
DRAINAGE (5% of construction cost)
$51,380.00
SIGNAGE (1% of construction cost)
$10,280.00 Subtotal:
$1,294,674.00
Contingencies* (35%):
$453,135.90
Total (2020): SAY Total (2024): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
$1,747,809.90 $1,747,900.00 $2,044,762.80 $2,045,000.00
35 OF 41 137
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 10 TITLEIST SITE ACROSS THE TITLEIST SITE. TRAIL IS OFF ROAD. TRAIL CONSTRUCTION 740 foot roadway length $210 per foot of length
$155,400.00
ON-ROAD TRAIL CONSTRUCTION 0 foot roadway length $10 per foot of length
$0.00
ECOLOGICAL RESTORATION ZONE (NB HARBOR TRUSTEES) 25,000 size of area in square feet $8 per square foot of area
$200,000.00
SUBTOTAL
$355,400.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$53,310.00
LANDSCAPING (5% of construction cost)
$17,770.00
DRAINAGE (5% of construction cost)
$17,770.00
SIGNAGE (1% of construction cost)
*
$3,560.00 Subtotal:
$447,810.00
Contingencies* (35%):
$156,733.50
Total (2020): $604,543.50 SAY $605,000.00 Total (2026): $764,928.89 SAY $765,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION - Contingencies may includes resource area mitigation, utility relocation, traffic management, etc.
36 OF 41 138
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 10 TITLEIST SITE
SEGMENT 10 - ALTERNATIVE 1
$37,000.00
740 foot roadway length $50 per foot of length
SUBTOTAL
$392,400.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$58,860.00
LANDSCAPING (5% of construction cost)
$19,620.00
DRAINAGE (5% of construction cost)
$19,620.00
SIGNAGE (1% of construction cost)
$3,930.00 Subtotal:
$494,430.00
Contingencies* (35%):
$173,050.50
Total (2020): SAY Total (2026): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
$667,480.50 $668,000.00 $844,563.08 $845,000.00
37 OF 41 139
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 10 TITLEIST SITE
SEGMENT 10 - ALTERNATIVE 2
$59,200.00
740 foot roadway length $80 per foot of length
SUBTOTAL
$414,600.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$62,190.00
LANDSCAPING (5% of construction cost)
$20,730.00
DRAINAGE (5% of construction cost)
$20,730.00
SIGNAGE (1% of construction cost)
$4,150.00 Subtotal:
$522,400.00
Contingencies* (35%):
$182,840.00
Total (2020): SAY Total (2026): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
$705,240.00 $705,300.00 $892,340.17 $893,000.00
38 OF 41 140
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 11 - FORMER AEROVOX SITE ACROSS THE FORMER AEROVOX SITE. TRAIL IS OFF ROAD. TRAIL CONSTRUCTION 1,490 foot roadway length $210 per foot of length
$312,900.00
ON-ROAD TRAIL CONSTRUCTION 0 foot roadway length $10 per foot of length
$0.00
ECOLOGICAL RESTORATION ZONE (NB HARBOR TRUSTEES) 2,285 size of area in square feet $8 per square foot of area
$18,280.00
ECOLOGICAL / RECREATIONAL RESTORATION (CITY OF NEW BED) 334,789 size of area in square feet $8 per square foot of area RIVERWALK GATEWAY (2) Gateway 4 Hadley Street ($95,400) North Entrance - River Road ($122,500)
$217,900.00
SUBTOTAL
$3,227,392.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$484,110.00
LANDSCAPING (5% of construction cost)
$161,370.00
DRAINAGE (5% of construction cost)
$161,370.00
SIGNAGE (1% of construction cost)
*
$2,678,312.00
$32,280.00 Subtotal:
$4,066,522.00
Contingencies* (35%):
$1,423,282.70
Total (2020): $5,489,804.70 SAY $5,490,000.00 Total (2027): $7,224,034.00 SAY $7,225,000.00 FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION - Contingencies may includes resource area mitigation, utility relocation, traffic management, etc. 141
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 11 - FORMER AEROVOX SITE ACROSS THE FORMER AEROVOX SITE. TRAIL IS OFF ROAD. TRAIL CONSTRUCTION
$312,900.00
SEGMENT 11 - ALTERNATIVE 1
$74,500.00
1,490 foot roadway length $50 per foot of length
SUBTOTAL
$3,301,892.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$495,290.00
LANDSCAPING (5% of construction cost)
$165,100.00
DRAINAGE (5% of construction cost)
$165,100.00
SIGNAGE (1% of construction cost)
$33,020.00 Subtotal:
$4,160,402.00
Contingencies* (35%):
$1,456,140.70
Total (2020): SAY Total (2027): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
142
$5,616,542.70 $5,617,000.00 $7,390,808.54 $7,391,000.00
NEW BEDFORD RIVERWALK CONCEPTUAL ESTIMATES SEGMENT 11 - FORMER AEROVOX SITE ACROSS THE FORMER AEROVOX SITE. TRAIL IS OFF ROAD. TRAIL CONSTRUCTION
$312,900.00
SEGMENT 11 - ALTERNATIVE 2
$119,200.00
1,490 foot roadway length $80 per foot of length
SUBTOTAL
$3,346,592.00
OTHER ITEMS: PLANNING/PERMITTING/ENGINEERING (15% OF CONSTRUCTION COST
$501,990.00
LANDSCAPING (5% of construction cost)
$167,330.00
DRAINAGE (5% of construction cost)
$167,330.00
SIGNAGE (1% of construction cost)
$33,470.00 Subtotal:
$4,216,712.00
Contingencies* (35%):
$1,475,849.20
Total (2020): SAY Total (2027): SAY FUTURE YEARS ASSUME A 4% ANNUAL COST ESCALATION
143
$5,692,561.20 $5,692,600.00 $7,490,841.28 $7,491,000.00
144
APPENDIX C
ACUSHNET RIVER UPLAND RIPARIAN RESTORATION PROJECT
145
146
Acushnet River Upland Riparian Restoration Project
Background
New Bedford Harbor Trustee Council Round IV Environmental Assessment The New Bedford Harbor Trustees selected the Acushnet River Upland Riparian Restoration Project as a preferred habitat restoration alternative in the Council’s Round IV Environmental Assessment (EA). In that EA, $2.9 million was specified to complete design, permitting, and restoration of native vegetation within the upland riparian zone, defined as 25 feet landward of the top of the Coastal Bank of the Acushnet River, including construction of a pedestrian walkway and post-construction monitoring of vegetation. As documented in the EA, the project area extends approximately 11,600 feet along the shoreline for a total of just over 6.6 acres of land. Of this, restoration of the vegetation will total approximately 5.3 acres. In July 2011, through Trustee Council Resolution 136 and Court Order 66, funds to implement all projects approved in the Final Round IV EA were transferred to the U.S. Department of the Interior (DOI) Restoration Fund. In November 2011, $2,908,339.61 was transferred, per Resolution 144, from the DOI Fund to the National Oceanic and Atmospheric Administration (NOAA) for the purpose of entering into a Cooperative Agreement with the City of New Bedford to implement the project.
First Cooperative Agreement with NOAA In March 2012, NOAA and the City entered into a three-year Cooperative Agreement to implement the Acushnet River Upland Riparian Restoration Project. As described in the ’11 Scope of Work (SOW), the goals of the Acushnet River Riparian Restoration are: • to restore the 25 foot upland riparian zone of the Acushnet River/ New Bedford Harbor from Coggeshall Street to Tarkiln Hill Road utilizing native plant species; • to improve water quality in Acushnet River/ New Bedford Harbor by providing filtration of overland stormwater from adjacent developed lands; and • to provide opportunities for enhanced public access to the riparian zone. One of the most significant impacts to the project, and in particular to the schedule since the approval of the ’11 SOW has been the historic $256M settlement agreement reached by the EPA, MassDEP, and AVX finalized in 2013. Before this settlement, EPA and the City planned on a 40-year long cleanup of the harbor and intertidal areas. The City deemed 40-years too long for its residents to be separated from one of their most valuable resources and decided to construct Acushnet River Upland Riparian Restoration Project prior to the cleanup, after which EPA would be obligated to restore the restored habitat and associated pathways to original conditions. Once the settlement was reached however, EPA estimated the duration of the cleanup to be five to ten years. The City therefore concluded that it was
New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 1 147
fiscally responsible to systematically coordinate the Acushnet River Upland Riparian Restoration Project with the Superfund cleanup in order to maximize outcomes through a complimentary process. The City and EPA have met regularly to discuss schedule and scope of the cleanup and identify means and methods that would serve both projects.
NOAA Cooperative Agreement Extension The City documented its revised approach to the project in September 2014 and submitted a cooperative agreement extension request based upon the accelerated EPA cleanup schedule. At that time, the City also provided an updated schedule, budget, and a narrative outlining proposed modifications to the ’11 SOW (’14 SOW-Mod), based on the best available information. The Trustee Council approved the revised approach in Resolution 150 and the Cooperative Agreement was extended an additional year and expired on September 20, 2016.
Leveraged Concept Plan From 2014 to 2015, the City completed a Concept Plan for the Acushnet River Upland Riparian Restoration Project through an EPA grant, that identified physical constraints and provided more detail based on existing conditions. This Plan included a 6-foot wide path. In March 2015, the City and its consultant presented the draft Concept Plan to the Trustee Council and solicited feedback. In May 2015, the City held a public meeting to present a draft of the plan and seek public comment. MassDEP attended this meeting. The Concept Plan, the link to which is provided to the right, has been used to continue conversations with private property owners, provide visualization, and to demonstrate project progress.
http://3t848o30ike21 1t7x11nzgxi.wpengine. netdnacdn.com/environment al-stewardship/wpcontent/uploads/sites /39/New-BedfordRiverwalk-Report.pdf
Figure 1 – Acushnet River Upland Riparian Restoration Project Path The Concept Plan provided the opportunity to identify areas where the typical 25’-wide project path may not be feasible, as well as areas that might support additional restoration areas. The ’11 SOW described the project area as that area 25’ landward of the top of the coastal bank of the Acushnet River and extending 11,600 linear feet from Coggeshall Street north to Tarkiln Hill Road, providing about 5.3
New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 2 148
acres of habitat restoration. Some areas do not lend themselves to provide more than a pedestrian way based on physical configuration and/or existing industrial use. The Concept Plan allows the flexibility to establish additional restoration in other areas to meet overall goals. Also, elevation constraints and Americans with Disabilities Act (ADA) requirements will likely necessitate Acushnet River Upland Riparian Restoration Project’s tying in to River Road south of Wood Street. The Concept Plan provided for an evaluation of the entire project area to ensure that the overall area requirements for habitat restoration (232,000 square feet) will be met.
Project Progress to Date In addition to the Concept Plan described above, the City’s Team made effective use of the time available during the original Cooperative Agreement as well as the Extension, and has expended $219,632 to for the engineering, permitting, and legal efforts described in this section. The City Team completed an existing conditions survey in the field, as described as Task 1 in the ’14 SOW-Mod. The City’s Conservation Agent identified and marked the inland edge of the Coastal Resources areas: which were either Local, State and/or Federal protected Coastal Wetlands or Local and State protected Top of Coastal Bank within 100’ of the Project Area. Physical access was limited in a few areas, including the EPA de-sanding and staging facility (the Sawyer Street Facility), where the project engineer obtained LIDAR elevation data to augment field information. The project engineer also collected data including property monuments and markers, site culture, water’s edge, top of bank, and land-side topographic data to create the existing conditions plan using one-foot contours. The City Team completed the title research and documentation process for each of the properties along the Riparian Restoration Project path. The City’s Solicitor’s office worked with the Trustees to finalize easement language. With the exception of the four properties at the northernmost project terminus, the City met with all private property owners to apprise them of the project status and estimated schedule, and to identify any questions or concerns so that we could address them in the planning stage. Without exception, private property owners were supportive of the project. The owner of Star Plating, located on either side of the eastern portion of Coffin Avenue expressed concern regarding the proposed path around the southern the southern property boundary. The City Team suggested a shortterm alternative extending the path east down Coffin Avenue at the boundary between the City-owned parcel east of Riverside Park and Star Plating. This alternative will provide for the improvement of the pedestrian amenities on Coffin Avenue (not to be funded through this Riparian Restoration Project) and provide a benefit to Star Plating. The owner of Star Plating agreed to ongoing consideration of the originally-planned extension along the waterway upon evaluation of the safety and security of the initial short-term alternative. City anticipates that the increased visibility and traffic in the area will demonstrably enhance area security. The City’s engineer has completed draft easement plans, which will be executed following EPA’s intertidal cleanup in each area and documentation of final conditions. Since 2013, the City has been actively pursuing demolition of the derelict building located at 1R Coffin Avenue. This former textile mill has a failing saw-tooth roof structure and has been deemed unfit for workers’ use by OSHA. The current owner, a non-profit organization for at-risk youth, acquired the property as a “gift” in about 2015 and had hoped to rehabilitate the building and use the proceeds of New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 3 149
subsequent sale to continue programming. After several conference calls with the City and potential investors, the new owner has found the prospect of redevelopment and resale infeasible. The owner is very supportive of the Riparian Restoration Project and wants the property to provide a benefit to the community. The City sought a determination of eligibility for funding through EPA’s brownfields program. EPA determined that the City can spend a portion of its brownfield assessment funding on evaluating hazardous material impact at 1R Coffin Avenue, however the property boundary mirrors the building footprint, requiring the demolition of the building prior to assessment. The City continues to seek funding to safely demolish the building and holds monthly calls with the property owner. During Concept Planning, the City hosted two public meetings at Victoria Riverside, a residential mill redevelopment along the project path adjacent to the northern face of the 1R Coffin Ave building. Many of the attendees were residents of Victoria Riverside and are anxious to see the project get underway. Parking for Victoria Riverside currently exists within some of the proposed habitat restoration area. The City owns a large paved open area west of the building and anticipates providing parking in this area to facilitate the final easement along the river bank. The City sought a brownfields determination of eligibility for this property and received approval. The City has entered into a contract with one of its environmental professionals to complete an ASTM Phase I/Phase II site assessment during the summer of 2017. Just north of Victoria Riverside is another residential mill redevelopment – Manomet Place. Prior to conversion of Cliftex Mills to Manoment Place, the developer transferred a portion of the property to the City. This property, located in the habitat restoration area between the former mill and the Acushnet River, contained two partially-full 75,000-gallon #6 oil fuel tanks. The City agreed to the property transfer because the developer’s retaining ownership of the tanks would have made the project infeasible. The City applied twice to the EPA for Brownfields cleanup funding to close out the tanks and achieve a permanent remedial solution. In 2015, EPA granted the City $400,000 in cleanup funding, which the City has nearly expended and is in the process of documenting site closure (pending EPA’s providing detail regarding their approach to the intertidal area at the embankment). The city incorporated River Walk outreach into community engagement activity, both of which were widely supported. During the above-described tank cleanup process, the City coordinated with the owner of property adjacent to and north and east of the City-owned tank lots. This property, which extends along the waterfront along the length of Manoment Place, has historically been used for industrial purposes. To facilitate harbor cleanup, EPA has leased the vacant shoreline area for pump station use. The property owner intends to rehabilitate the lot for mixed commercial and residential use after the EPA lease expires (currently 2019 but it could be extended pending EPA cleanup status). Using the existing conditions survey and concept plans, the City Team met with the property owner to discuss complimentary area redevelopment. We are working on easement alternatives that include providing the former tank lots for future access, making the shoreline area available for riparian restoration.
New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 4 150
Nashawena Mill, a former Cotton mill at 689 Belleville Avenue has been used as office space, but has recently drawn interest for commercial redevelopment. The City team will continue to follow these developments as the property provides a key opportunity for Upper Harbor habitat restoration following EPA’s intertidal cleanup. The City met with the owners of Darn It! and the Acushnet Company to ensure their continued support of the project and to identify elements that will maximize project benefits such as fencing, security, and lighting so that we can include these in the design and target supplemental funding sources. The AVX disposal site, originating at 740 Belleville Avenue was the major source of PCBs that resulted in the Superfund designation for New Bedford Harbor. Although planning and implementing cleanup of the site has been underway for about 20 years, response actions have reached a significant milestone with AVX proposing final cleanup alternatives to MassDEP for approval. The response action schedule continues to drive the critical path for EPA’s Superfund cleanup, and by transference, of this Acushnet River Riparian Restoration project. AVX has established four operable units (OUs) on the site – each of which will impact the design and construction of the habitat restoration and walkway. The City, as the owner of the former AVX property, has been an active partner in response action planning. The riparian area of the Acushnet Company property, immediately south of the former AVX facility, is part of the AVX disposal site, designated as OU1. AVX has proposed replacing all soil in OU1 with clean fill, resulting in no substantial engineering or construction issues relative to public exposure. AVX has not finalized its proposed remedial alternative on the former facility property itself, but it will likely require an engineered barrier over the River Walk area. This will prevent exposure to residual contaminants on the site, but will present challenges to project design and engineering. The City continues to have regular conversations (weekly in most cases) with AVX’s consultant regarding planning and coordination. EPA completed its cleanup of the Upper Harbor intertidal area adjacent to the southernmost portion of the project in 2016. EPA’s work included clearing, grubbing, construction of a temporary access road, and area restoration upon completion. The City provided EPA with draft project plans in order for EPA to collocate work areas to the extent practical. For example, EPA located its access road along the project path, which necessitated EPA’s cutting invasive phragmites that the City would have had to eradicate using project funding. Upon completion of cleanup, EPA removed the gravel access road, removed phragmites roots, restored the marsh area with grasses, and planted native seed mix along the edge of the coastal bank. In addition to the benefits that EPA’s efforts will provide to the riparian restoration project, the initial intertidal cleanup along the project path has also underscored the complexity of project coordination and the need to thoroughly plan prior to expending resources. EPA’s 2016 cleanup changed the previously existing conditions that had been surveyed and documented. To minimize duplicative costs, EPA transmitted as-built drawings to the City and its engineer to provide existing conditions for permitting and construction. The city’s initial intention was to complete a single comprehensive project permit set for each requisite permit. The recognition that “existing conditions” for the project area on the whole cannot be fully documented until EPA’s Superfund cleanup completion leads to the realization that even the permitting task of the riparian restoration project schedule depends on the ultimate New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 5 151
cleanup schedule. The City team has prepared a draft Notice of Intent for this initial project phase, submitted to the Trustees concurrent with this revised SOW. The City has also assembled a Chapter 91 Permit application, a final draft of which will be transmitted to the Trustees upon receipt of the Order of Conditions.
Proposed Scope Approach The vast majority of the PCB contamination driving the Superfund cleanup originated from the former Aerovox manufacturing site located at 740 Belleville Avenue, along the riparian restoration project path. AVX, successor to the responsible party Aerovox, is currently developing a site cleanup strategy for the significant source area that remains at the former facility property. EPA has consistently taken the position that they will not extend the Superfund cleanup of the intertidal area north of Riverside Park /Pierce Mill Cove until AVX has controlled the source of ongoing contamination. Also, EPA recently renewed their lease with the City of New Bedford to extend use of the Sawyer Street facility, located along the riparian restoration project path between Sawyer Street and Pierce Mill Cove, until May, 2026. In order to complete other portions of the riparian restoration project prior to this May 2026 date, the City has determined it to be necessary to break the project up into segments and phase final design, permitting, and construction of these segments based on cleanup schedules and other logistics. Phase 1 includes Segments 1, 3, 5, 7, and 8 and can be completed either following cleanup that has been or will be completed in 2017. Segment 1/Phase 1A will be completed first and a SOW and Budget are included in Table 1. Phase II includes Segments 4 and 6 and are not subject to cleanup, however, they have other site constraints that put them on a longer trajectory for implementation. Phase III includes segments 2, 9, 10, 11, and 12 which will need to be designed, permitted, and constructed as cleanup on those segments is completed. Although EPA will complete a substantial amount of riparian restoration following their intertidal cleanup, the City is committed to complete at least 232,000 square feet of habitat beyond EPA’s work. The estimated restoration area, beyond EPA’s anticipated work, is included in each area description below. Phase I Phase IA – Segment 1: This segment includes Map 93/265 and runs from Coggeshall Street northward to Sawyer Street. Segment 1 will include about 652 feet of walkway. EPA has completed their intertidal cleanup and 53,079 square feet of restoration along this parcel and has provided asbuilt plans for use in documenting existing conditions. The City intends to restore an additional 3,945 square feet of habitat area in this segment. EPA currently owns the property and is working to convey the parcel to the City of New Bedford. The project engineer has prepared a draft NOI for Segment 1/Phase IA and will submit to the Conservation Commission following Trustee review. Upon receipt of an Order of Conditions, the engineer will submit the Chapter 91 permit application. Phase IB – Segment 5: This segment includes Map 100/118 (Victoria Riverside) northward to Manomet Street along about 667 feet of the Acushnet River. The EPA cleanup is not anticipated to disturb the top of bank on this parcel. Segment 5, to include about 8,696 square feet of riparian restoration, can therefore be permitted and constructed prior to cleanup. We anticipate
New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 6 152
submitting an NOI during the summer of 2017. Upon receipt of an Order of Conditions, the engineer will submit the Chapter 91 permit application. Phase IC – Segment 7: This segment includes about 181 feet along the Acushnet River at Riverbank Lofts on Map 105/170 with about 5,273 square feet of restored habitat. EPA’s cleanup is not anticipated to disturb the top of bank. We anticipate filing an NOI and executing the property easement with the owner during the summer of 2017. Upon receipt of an Order of Conditions, the engineer will submit the Chapter 91 permit application. Phase ID – Segment 8: This segment includes about 270 feet of walkway and 2,800 square feet of restoration along the Acushnet River on Map 111/& 111/155 behind parking for Riverbank Lofts and the former Nashowena Mill. This area’s top of bank is not anticipated to be disturbed by EPA’s cleanup and can therefore be permitted and constructed prior to EPA activities. We anticipate submitting an NOI for Segment 8 and executing the property easement with the owners during the summer of 2017. A Chapter 91 license application will be filed upon receipt of the Order of Conditions. Phase IE – Segment 3: This segment includes Pierce Mill Cove/Riverside Park and a portion of Coffin Avenue. The pathway will begin on the north side of the Sawyer Street facility and continue west to join 820 feet of existing pathway in Riverside Park, which will be improved to match the new pathway. The path will then extend to the east along the southern shoreline of Pierce Mill Cove and terminate at the intersection of Coffin and Riverside Avenues. This segment will provide about 1,111 feet of new walkway. EPA has completed the clearing and grubbing for the intertidal cleanup in this Segment 3 area, and has located the temporary access road along the project pathway. Cleanup will be completed through the winter and early spring of 2017 and as-built plans are anticipated to be provided to the city by the summer of 2017 to document existing conditions for the Segment 3 NOI. Using the existing pathway area provides for about 30,060 square feet of additional habitat restoration area, creating a greater buffer between the walking path and habitat area. Upon receipt of the as-builts, the project engineer will submit the draft Segment 3 NOI, anticipated in early fall 2017. Concurrently with Segment 3, the City will plan and design streetscape upgrades for a 580- foot length of Coffin Avenue extending from the Segment 3 pathway’s northern terminus eastward to the Acushnet River. This will be an interim path connection as the city anticipates the eventual continuation of the pathway from the northern terminus along the shoreline connecting at the end of Coffin Avenue. Site constraints make the short-term completion of the long-term configuration in this area cost prohibitive at this time. The 580-foot roadway connection is not included in the overall project length. The eventual configuration however, will add 980 feet to the project path. Phase II Phase IIA – Segment 4: This segment begins at the southern terminus of Segment 3 and extends 400 feet northward along the Acushnet River on Map 100/117, referred to as 1R Coffin Avenue. There is presently a derelict mill structure on the property that extends to 10-20 feet from the top of coastal bank. The city is currently working with the property owner to demolish the building, which will be necessary to construct the project without an elevated walkway and to provide sufficient area for riparian habitat restoration. We anticipate demolition of the building New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 7 153
in 2018, at which time existing conditions will be reevaluated and engineering and permitting completed. The property owner has agreed to execute an easement with the City which will be pursued following demolition. About 1,060 square feet of habitat restoration is planned for the length of this segment. Phase IIB – Segment 6: This segment includes about 830 feet of shoreline on Map 105/183: currently industrial property, planned for mixed reuse. As with Segment 5, EPA cleanup is not anticipated to disturb the top of bank on this parcel, and Segment 6 can be permitted prior to cleanup. EPA currently has a lease with the property owner to stage and operate a temporary pump station on a portion of this parcel, and is looking to extend the lease for two additional years. We anticipate submitting an NOI for Segment 6, including riparian restoration during the summer of 2017. A Chapter 91 license application will be filed upon receipt of the Order of Conditions. The execution of the easement can occur following EPA’s use of the property and termination of the lease. Segment 6 is anticipated to provide an 18,857 square foot habitat restoration area. Phase III Phase IIIA – Segment 2: This segment includes City-owned property on Map 93/120 referred to as the Sawyer Street Facility. This parcel is currently under lease agreement with EPA for use in their Superfund cleanup operations until May 2026. EPA has agreed to vacate the facility following Superfund cleanup and to leave the parcel ready for River Walk construction. We intend to include about 1,117 feet of walkway and 42,443 square feet of riparian habitat restoration. We will utilize EPA-provided as-built plans to document existing conditions for work on this parcel. Permitting Segment 2 (NOI and Chapter 91) will occur following EPA’s close-out. Phase IIIB – Segment 9: This segment includes about 925 feet of shoreline behind Darn It! on Map 111/146. The area does not have an elevated coastal bank as with Segments 5 through 8. Progress on Segment 9 will be dependent on EPA’s Superfund cleanup based on the lower profile of the project area and the proximity to the contamination source area. We anticipate that this segment will provide for about 55,963 square feet of restoration area. EPA will provide as-built plans following cleanup at which time the city will prepare and submit the NOI and subsequent Chapter 91 application, and execute the property easement with the owner Phase IIIC – Segment 10: This segment includes about 757 feet of shoreline behind Acushnet Rubber Co. on Map 112/133. This property is adjacent to and partially within the contamination source area and as such, will undergo substantial remediation in both intertidal and upland areas by EPA and AVX respectively. Once both remedial actions are complete and as-built conditions documented, the city will prepare and submit the NOI and subsequent Chapter 91 application, and execute the property easement with the owner. We anticipate that this segment will provide for about 25,500 square feet of restoration area. Phase IIID – Segment 11: This segment includes about 511 feet along the eastern property boundary of the former AVX facility and 2,285 square feet of riparian restoration area. This property, now owned by the city, is the source area of the Superfund site, and remediation is currently being planned for the riparian restoration project area. Once remedial actions are complete and asbuilt conditions documented, the city will prepare and submit the NOI and subsequent Chapter 91 application. New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 8 154
Phase IIIE – Segment 12: The final 1,252 length of the riparian restoration to Wood Street will be referred to as Segment 12, but may later be further parsed into smaller areas, as five properties are included in this segment. A total of 35,119 square feet of habitat restoration is planned from the Precix property on Map 116/67 northward to Wood Street following EPA’s completion of intertidal Superfund cleanup. Physical constraints will prevent the extension of the walkway to Wood Street however, and the city proposes to connect the walkway to the intersection of River Road and Howard Avenue. This will require agreements with three property owners: o o o
The city had obtained verbal agreement for the project from Precix’s Chief Operating Officer in 2013. Since then, there has been a change in management requiring that we approach the new management team about the project. Coyne Laundry, formerly operating north of Precix at Map 116/94 entered into bankruptcy. Coyne transferred the property to new ownership in October 2016. The city must initiate discussion with the new property owner about the project. Map 116/91 is currently used for landscaping material storage. The city will work with the property owner to connect the walkway to River Road on the northern property boundary.
1.4 Existing Conditions Plan Finalization The project engineer developed an existing Conditions Plan using “AutoCAD” during the conceptual planning stage. Following EPA’s intertidal cleanup at the southern end of the riparian restoration area on Map 93/265, the project team determined that much of the existing conditions documented will, by necessity, require refinement in concert with EPA’s cleanup activity. As described in Section 1.3 above, we do not expect the project areas in Segments 5, 6, 7, and 8 to be substantially impacted by the Superfund activities. As remedial work is completed outside of these Segments, the project team will take as-built information and work to identify discrepancies between field data and available property, deed, previous plans and imagery data. We have already completed this exercise for the Segment 1/Phase 1A work which is included in the revised Draft NOI and detailed in Table 1.
2. Easement Acquisition and Conservation Restriction 2.1 Private Property Approach The City will acquire easements for public access along privately-owned parcels. We have had numerous discussions with most of these property owners who are supportive of the project. As described in Section 1.3 above, there have been changes in ownership/management north of the former AVX facility in the area identified herein as Segment 12. We are currently seeking to identify the new contacts to reinitiate project discussions in these areas. The ’11 SOW described the City’s intentions to conduct environmental site assessments on privatelyowned properties. Realizing property owners’ anticipated reluctance to participate in this process, the City has refined its strategy. The City proposes to work with MassDEP to develop an appropriate design approach that would limit direct contact with site media. The City already has substantial environmental
New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 9 155
information for properties along the project path on which to base realistic assumptions of typical existing conditions and mitigation measures. 2.2 Easement Development The Concept Plan identified the preferred configuration to enable discussion with private stakeholders and to reach general agreement regarding granting easements. The New Bedford solicitor’s office has drafted easement language, and has worked with the Trustees on changes. The City has run the title to each of the properties along the Acushnet River Upland Riparian Restoration Project from Coggeshall Street to River Road and obtained copies of all outstanding encumbrances and existing mortgages and liens as of mid-2016. The City has developed draft easement language and is in the process of obtaining a third party to hold the Conservation Restriction(s) that will be applied to each easement. We will work with private property owners to reach easement agreements concurrently with permitting on each property, so that the easements can be executed immediately upon respective permit approvals.
3. Design and Permitting 3.1 Proposed Riparian Restoration Approach The project will restore the Upland Riparian Zone to native coastal riparian shrub and meadow habitat intended to increase avian, mammalian, reptilian, and insect diversity. The proposal includes planting native coastal grasses along the top of the coastal bank to provide bank stability as well as food for birds and small mammals Vegetation planted within the Upland Riparian Zone will also provide filtration of overland stormwater from adjacent developed lands thereby improving the water quality in the Acushnet River. Improved water quality will benefit the living resources within the Acushnet River damaged as a result of the release of hazardous substances, including PCBs, in the New Bedford Harbor Environment. The Conceptual Plan identified vegetative species that would provide the most sustainable sources of food, cover, nesting, and resting habitat for a variety of native birds, small mammals, reptiles, amphibians, and beneficial insects such as monarch butterflies and praying mantis. The plant schedule, presented in Table 1 on the following page, includes proposed plant species and benefit of each species to different groups of native fauna. Figures 2 and 3 provide cross sections of the proposed project planting plan. These plans were designed to mimic natural coastal upland plant communities typical of the Buzzards Bay watershed. Coastal grasses along the entire length of the top of bank will provide natural stability to the edge of the river bank. Landward of this, a mixture of native forbs (broad-leaved plants) composed of wildflowers and other hardy low-growing coastal vegetation are proposed. West of the pedestrian pathway, the City proposes to establish a diverse mixture of native coastal shrubs. This riparian restoration of 232,000 square feet of native shrubs, wildflowers, and grasses along the riverfront which will provide filtration of overland flow from adjacent developed lands and improve the water quality of the Acushnet River. The vegetation will also mitigate storm damage to adjacent uplands.
New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 10 156
Please note that the accessible pathway will be six feet wide rather than the four feet indicated in the original conceptual cross sections shown here.
New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 11 157
Table 1: Plant List SHORELINE PLANTING: Grasses Andropogon gerardii Bouteloua curtipendula Eragrostis trichodes Panicum virgatum Sorghastrum nutans
Big Bluestem Side Oats Grama Sand Lovegrass Switchgrass Indian Grass
Perennials and Groundcover Achillea millefolium Arctostaphylos uva-ursi Coreopsis lanceolata Lathyrus japonicus Liatris spicata Solidago sempervirens
Yarrow Bearberry Lance-leaved Coreopsis Beach Pea Blazing Star Seaside Goldenrod
Seeds are food source for songbirds, small mammals and waterfowl. Provide cover and rest area for small mammals, birds and insects. Seed heads are food source for songbirds in the fall; source of nectar for butterflies and other insects; berries (Bearberry) are food source for birds and mammals; leaves provide cover.
SHORELINE/UPLAND PLANTING: Shrubs Aronia melanocarpa Baccharis halimifolia Clethra alnifolia Gaylussacia baccata Ilex glabra Ilex verticillata Myrica pensylvanica Prunus maritima Rosa virginiana Vaccinium angustifolium
Black Chokeberry Groundsell Summersweet Clethra Huckleberry Inkberry Winterberry Bayberry Beach Plum Virginia Rose Lowbush Blueberry
Berries are food source for birds; shelter, resting and nesting sites for songbirds and small mammals; source of nectar for insects during flowering season (Beach Plum, Virginia Rose).
UPLAND PLANTING: Trees Acer rubrum Amelanchier canadensis Betula populifolia Ilex opaca Juniperus virginiana Nyssa sylvatica Quercus alba
Red Maple Shadbush Gray Birch American Holly Eastern Red Cedar Black Gum White Oak
Berries are food source for birds; shelter, resting and nesting site for songbirds; protection for birds and small mammals.
3.2 Permitting As stated above, the project engineer will develop permitting plans upon EPA cleanup and the finalization of existing conditions where applicable. Where remedial activity is not expected to substantially impact the work area, existing conditions as documented will be used. Final drawings will be prepared for the following submissions:
New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 12 158
•
•
Notice of Intent to the New Bedford Conservation Commission pursuant to M.G.L c. 131 Section 40 the MA Wetlands Protection Act and Regulations (310 CMR 10.00 et seq.) and the City of New Bedford Wetlands Ordinance (Sections 15-101 through 15-112); and Chapter 91 Waterways permit application which will include the following reviews o Local Zoning Board of Appeals Section G o Local Planning Board Section H o Wampanoag Tribal Preservation Officer o Army Corps of Engineers o Massachusetts Coastal Zone Management Consistency o Massachusetts Historical Commission •
•
Notice of Intent to the New Bedford Conservation Commission pursuant to M.G.L c. 131 Section 40 the MA Wetlands Protection Act and Regulations (310 CMR 10.00 et seq.) and the City of New Bedford Wetlands Ordinance (Sections 15-101 through 15-112); and Chapter 91 Waterways permit application which will include the following reviews o Local Zoning Board of Appeals Section G o Local Planning Board Section H o Wampanoag Tribal Preservation Officer o Army Corps of Engineers o Massachusetts Coastal Zone Management Consistency o Massachusetts Historical Commission
The City met with the Commonwealth’s MEPA office regarding the necessity to file an ENF. After discussion of proposed Acushnet River Upland Riparian Restoration Project impacts, alterations, and disturbance, it was concluded that the project would not exceed any of the thresholds requiring an ENF. The City will obtain requisite signatures from all private property owners as necessary for each permit and/or authorization to sign on the owners’ behalf. These signatures may be obtained prior to the execution and recording of easements. In an effort to fast track the implementation of the section of Acushnet River Upland Riparian Restoration Project where EPA has completed their cleanup of the intertidal zone of the Acushnet Harbor Superfund Site, the City proposes to file permits for Acushnet River Upland Riparian Restoration Project, from the entrance at Veterans’ Memorial Way northward to Sawyer Street prior to the remainder of the project. The City will then complete the permits for the remainder of the project. 3.3 Final Design The City and its engineer will make any necessary changes to engineering drawings upon receipt of permits, in consultation with the New Bedford Harbor Trustees. The City will develop specifications for internal use and to facilitate procurement where appropriate.
4. CONSTRUCTION The City’s Department of Public Infrastructure (DPI) will serve in the role as “general contractor” during construction phase. Where DPI possesses the in-house expertise to complete construction, these activities will be self-performed with in-kind labor to maximize the impact of Trustees’ funding. The City will augment construction with procurement of outside contractors as appropriate. EPA has utilized concept planning outputs in the development of their approach to intertidal cleanup. EPA’s actual schedule depends largely on the upstream source area cleanup by AVX. EPA has only committed to initiating cleanup of the intertidal area adjacent to and north of Coffin Avenue after migration of PCBs from the source area has been controlled. Although cleanup planning continues at the AVX site and the Harbor, there is no established schedule. To begin construction of a portion of the Acushnet River Upland Riparian Restoration Project, the city intends to complete Segment 1/Phase IA immediately upon Chapter 91 approval, weather permitting. New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 13
The City met with the Commonwealth’s MEPA office regarding the necessity to file an ENF. After discussion of proposed Acushnet River Upland Riparian Restoration Project impacts, alterations, and disturbance, it was concluded that the project would not exceed any of the thresholds requiring an ENF. The City will obtain requisite signatures from all private property owners as necessary for each permit and/or authorization to sign on the owners’ behalf. These signatures may be obtained prior to the execution and recording of easements. In an effort to fast track the implementation of the section of Acushnet River Upland Riparian Restoration Project where EPA has completed their cleanup of the intertidal zone of the Acushnet Harbor Superfund Site, the City proposes to file permits for Acushnet River Upland Riparian Restoration Project, from the entrance at Veterans’ Memorial Way northward to Sawyer Street prior to the remainder of the project. The City will then complete the permits for the remainder of the project. 3.3 Final Design The City and its engineer will make any necessary changes to engineering drawings upon receipt of permits, in consultation with the New Bedford Harbor Trustees. The City will develop specifications for internal use and to facilitate procurement where appropriate.
4. CONSTRUCTION The City’s Department of Public Infrastructure (DPI) will serve in the role as “general contractor” during construction phase. Where DPI possesses the in-house expertise to complete construction, these activities will be self-performed with in-kind labor to maximize the impact of Trustees’ funding. The City will augment construction with procurement of outside contractors as appropriate. EPA has utilized concept planning outputs in the development of their approach to intertidal cleanup. EPA’s actual schedule depends largely on the upstream source area cleanup by AVX. EPA has only committed to initiating cleanup of the intertidal area adjacent to and north of Coffin Avenue after migration of PCBs from the source area has been controlled. Although cleanup planning continues at the AVX site and the Harbor, there is no established schedule. To begin construction of a portion of the Acushnet River Upland Riparian Restoration Project, the city intends to complete Segment 1/Phase IA immediately upon Chapter 91 approval, weather permitting. New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 13 159
5. MONITORING/MAINTENANCE 5.1 Monitoring The City’s Environmental Stewardship Department will be responsible for riparian habitat monitoring to ensure success of the restored area. The Department will establish an Upland Riparian Zone Restoration monitoring protocol. Monitoring will begin for each segment upon completion of that segment. In the first 5 years, this protocol will include establishing a minimum of 20 west-to-east transects through the Upland Riparian Zone and randomly establishing vegetation monitoring plots in each restoration habitat (shrub, forbs & grasses). The presence of soil or bank erosion will be documented and photographed with restoration methods recommended. We expect that some invasive plants will colonize the Upland Riparian Zone immediately following the completion of the project. Invasive plants will be managed according to accepted protocol such as digging up the plants, cutting them down at critical times during their life cycle, or if required utilize herbicide treatment. The City will submit semi-annual reports during the first 5 years to document findings and recommending any maintenance required to ensure successful achievement of restoration outcomes. Following the first 5 years, the City will compile an annual report of collected data and analyze the results. The following will demonstrate successful implementation: • a minimum of 75% coverage of native species in the Upland Riparian Zone demonstrated by vegetation plot data; • long term stabilization of the top of the Coastal Bank demonstrated by native vegetation coverage • lack of soil erosion, which is a measure of how well the vegetation is stabilizing the soil. If the area is well vegetated, and constructed as described above, it can be reasonably assumed that any overland flow from adjacent developed lands is being intercepted and infiltrated into the soil underlying the Upland Riparian Zone. This is a means by which to measure improvement to the water quality of the Acushnet River which currently receives pollution from non point sources from development or disturbance within and beyond the Upland Riparian Zone • establishment of densely vegetated Upland Riparian Zone to provide storm damage prevention by buffering adjacent developed lands from coastal river winds and wave action. Storm damage prevention can be measured using the vegetation plot data on height and vegetation coverage and the soil and bank erosion data described above. • recording wildlife species seen during each monitoring event to provide a general idea of the increase in the diversity of wildlife utilizing the habitat. The vegetation data collected at each transect will determine if we have successfully provided the habitat that supports the diversity of wildlife Table 2 describes. Well-established vegetation will also indicate that any overland flow from adjacent developed lands is being intercepted and infiltrated into the soil underlying the Upland Riparian Zone. This demonstrates improvement to the water quality of the Acushnet River, which currently receives pollution from nonpoint sources from development or disturbance within and beyond the Upland Riparian Zone. Successful
New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 14 160
establishment of densely vegetated Upland Riparian Zone will mitigate storm damage by buffering adjacent developed lands from coastal river winds and wave action. These annual reports, submitted to MassDEP and the Harbor Trustees Council, will provide recommendations for routine and non-routine maintenance issues.
5.2 Maintenance The City and its consultants developed the concept plan to create low-maintenance sustainable coastal habitats once firmly established. The City’s Department of Public Facilities, in close coordination with the Department of Environmental Stewardship, will oversee and largely self-perform Acushnet River Upland Riparian Restoration Project maintenance. This will include: • Annual (October) mowing of coastal herbaceous community; • Keep pathway clear of vegetation; and • Implement recommendations made in annual monitoring reports.
New Bedford Harbor Riparian Restoration Project Status and Scope of Work
Page 15 161