Pacific Structures Qualifications

Page 1

457 Minna, Suite 200 San Francisco, CA 94103 415.970.5434 pacific-structures.com


Pacific Structures is a concrete construction company known for saving clients time and money. The principals, management and field operations staff possess hands on know-how won over three decades of designing and building some of the most complex concrete structures in California. This substantial expertise means that the company leaders have what it takes to engage the entire project team, and to push to optimize the structure for cost, quality, and schedule. At each stage of design, Pacific Structure’s concrete experts provide the benefit of their valuable input. They continually challenge and evaluate the structure, testing it against hundreds of other buildings in their database for key parameters and details. Each analysis is informed by professionals with years of experience partnering with the best Structural Engineers on the West Coast. Each recommendation made has been tested in the field for quality and constructability by seasoned Superintendents. Out of this crucible comes the right design for each project. Once the design is optimized, Pacific Structure’s veteran field operations team attacks the schedule and the details of the work on a day-by-day, pour-by-pour basis to ensure that every aspect of the project is preplanned and lined out prior to the start of work. When construction starts, the team is executing their plan, striving for even greater improvement and innovation. When the inevitable unknowns come that can derail a project, the Pacific Structures team responds quickly and effectively to keep the project on track and protect the client’s investment.


The Pacific Structures team has worked on a variety of concrete structure projects. Prior to joining Pacific Structures, the team has worked on the following list of projects: ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊ ◊

SOMA Grand, San Francisco Avalon Mission Bay, Phase I & II, San Francisco Avalon Towers, San Francisco 360 Residences, San Jose The Palms, San Francisco The Beacon, San Francisco St. Regis Hotel and Residences, San Francisco One Rincon, San Francisco W Hotel, San Francisco W Hotel and Residences, Hollywood GSA Federal Office Building, San Francisco L.A. Live, Los Angeles The Century, Los Angeles Millennium Towers, San Francisco Infinity Towers, San Francisco City College San Francisco Chinatown Annex, San Francisco 1600 North Vine Luxury Apartments, Los Angeles Hotel Vitale, San Francisco Omni Hotel, San Francisco UCSF Student Housing, San Francisco


DESCRIPTION 495,048 sf of elevated deck 39 story tower 4 levels subterranean parking ARCHITECT HKS Architects CLIENT Build Group, Inc. PROJECT DURATION 18 months

45 LANSING SAN FRANCISCO, CA A 7 foot matt foundation will support the 39 story residential tower. Flyers will be used by the team to quickly set the foundation for each floor pour to achieve a 5 day cycle schedule. The team will also construct four levels of subterranean parking providing future residents 197 parking stalls. Pacific Structures saved the client money by evaluating and finding rebar reductions throughout the structure.


DESCRIPTION 23 stories 340,000 sf High rise residential ARCHITECT Architectonica CLIENT Trinity Properties PROJECT DURATION 8 months

TRINITY TOWERS PHASE II SAN FRANCISCO, CA Working as a collaborative ­partner with the general ­contract and ­design team from the early stages, the ­Pacific ­Structures team has ­successfully r­ esponded to changing owner r­ equirements while keeping the ­project on budget and ­schedule. ­During ­design phase they worked closely with the structural engineer providing ­quantity ­allowances for ­reinforcing in the ­structure. They also made sure that the d ­ rawings were ­completed with the s­ pecific ­structural details necessary to use column hung ­flying forms (an ­innovative method ­developed by the ­Pacific Structures Principals) to achieve an aggressive 6 day cycle per floor. In order to ­execute the work using flying forms the team will perform thorough pre-planning and coordination with all the other s­ ubcontractors, especially the MEPS contractor. For example, they will work out a detailed schedule for the tower crane on half hour basis every day.


DESCRIPTION 349,737 sf of elevated deck 18 floor, 273 apartment units building Ground floor retail ARCHITECT Solomon Cordwell Buenz CLIENT AvalonBay Communities PROJECT DURATION 9 months

55 9TH STREET SAN FRANCISCO, CA 18 story high-rise located in the up-andcoming Central Market District in the heart of downtown San Francisco. Due to the column design of the building and the abut buildings of the surrounding landscape, the team determined that flyers would be inefficient and instead are handsetting forms. The tower crane will be coordinated and provided by the Pacific Structures team. Pacific Structures’ scope also includes Architectural Concrete at elevator lobbies on all floors. The apartment complex will provide 273 units of studios, 1 bedrooms, and 2 bedrooms. Ground floor retail, a state-of-the-art fitness center and outdoor movie screen are also included in the project.


DESCRIPTION 98 unit luxury condominium ARCHITECT Kwan Hemni CLIENT Oyster Development PROJECT DURATION 7 months

1800 VAN NESS SAN FRANCISCO, CA Project consists of 8 story concrete building over a 2 story below grade parking garage. Intricate shoring package 足including Caltrans right way issues and underpinning on North/East sides. Zinc and metal panel exterior skin. Luxury finishes for unit interiors.


DESCRIPTION Concrete structure 6 stories above grade, 1 level below grade 88,500 sf ARCHITECT GouldEvans Baum Thornley Architects, Inc. CLIENT Pacific Union PROJECT DURATION 6 months

SUTTER STREET GARAGE SAN FRANCISCO, CA Parking structure constructed on an extremely tight urban infill site surrounded by existing buildings on three sides and a MUNI line in front of the site. Extremely difficult site logistics. Design/build 1 story below grade, 6 story above grade concrete structure.


DESCRIPTION 57,000 gross sf remodel 86 luxurious hotel rooms and suites

THE EPIPHANY PALO ALTO, CA

ARCHITECT Steinberg Architects and McCartan Interiors

The existing concrete structure originally built in the 70’s has an unusual Post Tensioned (PT) mat slab requiring special care and sequencing procedures during the retrofit. The team will be retrofitting the structure by installing a series of reinforced concrete walls, collector beams, and carbon fiber.

CLIENT Joie de Vivre Hotels PROJECT DURATION 3 months

Once completed the project will feature a refurbished lobby, work lounge, restaurant, bar and 86 luxurious hotel rooms and suites.


DESCRIPTION 3 level wood frame mixed-use building 166 apartment units 14 live/work units Ground level retail ARCHITECT Kava Massih Architects CLIENT Archstone PROJECT DURATION 6 months

ARCHSTONE PARKSIDE EMERYVILLE, CA The project consists of a three level wood frame structure over a parking garage with one level above and one level below ground. The design will include luxury apartments, live/work units, ground-level retail, a pool, fitness center and an off-site public park. Challenges include incorporating an existing brick faรงade into the new development, complicated podium construction and extensive site work.


DESCRIPTION 2 buildings: 46,000 sf & 92,000 sf of elevated deck 4-5 story wood frame apartment buildings 307 total units 1 level subterranean parking each building ARCHITECT BAR Architects CLIENT Build Group PROJECT DURATION 12 months

55 LAGUNA SAN FRANCISCO, CA Pacific Structures is constructing the concrete podium for the two wood frame apartment buildings totaling 307 units. The main challenge of the project is the site conditions. The lot sits on a steep hill and has two varying soil conditions: one side has bedrock and the other has poor soil. The team is currently discussing and evaluating soil GEO piers, piles, and lean fill to determine which will be the best system to accommodate for the poor soil conditions. Site work to allow road access and laydown areas to the buildings will be constructed out of normal sequence to help alleviate site constraints. In addition, Pacific Structures will also be coordinating with the city and MUNI officials to minimalize disruptions to traffic and bus routes surrounding the site.


DESCRIPTION 97, 692 sf mixed-use building 37 condominiums, public market and green roof garden ARCHITECT Cearnal Andrulaitis Architecture & Interior Design CLIENT Victoria Street Partners PROJECT DURATION 6 months

ALMA DEL PUEBLO SANTA BARBARA, CA The Pacific Structures team worked closely with the general contractor to strategic sequence the project. By pouring the mat and basement slabs in segments, the team was able to postpone all excavation to utilize dirt to backfill walls. Simultaneously they shotcrete the walls to keep the quick schedule. All the concrete will be completed in a short five months on this steel-framed building. Once complete the project will have commercial space with a public market, underground storage and parking, 37 condominium units and a green roof garden. The building is currently on track to achieve LEED Platinum designation.


DESCRIPTION Five buildings: 237,948 sf, 241,308 sf, 204,560 sf, 205,930 sf, 192,007 sf Mixed use, luxury rental units ARCHITECT MVE & Partners CLIENT The Irvine Company Apartment Communities PROJECT DURATION 4-6 months each building

CRESCENT VILLAGE

SAN JOSE, CA

Building one is highly articulated podium brought out of the ground during winter of 2011. Mat foundation design 足modified by Pacific Structures to eliminate trade 足moveins and get subgrade covered up significantly earlier than 足standard mats. Buildings two and three were completed simultaneously in under four months with a crew size of 150 union personnel forming and pouring an average of 550 cy every work day for the entire duration of the project. Buildings four and five are interfaced unlike the other three.


DESCRIPTION Three 5 story mixed use buildings 330 residential units 286,000 sf of elevated deck ARCHITECT Ankrom Moisan CLIENT Carmel Partners PROJECT DURATION 6.5 months

SAN ANTONIO CENTER MOUNTAIN VIEW, CA This mixed use three building complex includes luxury residential units, street-level retail and one level below grade parking. The design consists of three levels of suspended concrete with three stories of wood frame structure above. The construction team has completed extensive preplanning of site logistics and scheduling to accommodate for the various grade and elevated changes throughout the buildings.


DESCRIPTION 63,795 sf of elevated deck 2 buildings, 155 luxury apartment units Subterranean garage ARCHITECT Thomas P. Cox Architects, Inc. CLIENT Sares Regis Contractors PROJECT DURATION 3.5 months

888 N. SAN MATEO SAN MATEO, CA Pacific Structures’ scope includes one level podium long with two buildings above and a drive aisle between. Most of the perimeter will be shored. The team will pour some piers at the podium level where the slab cantilevers past the garage below. The 155 luxury apartment unit project will also include a pool and spa in addition to the underground parking.


DESCRIPTION 119,240 sf of elevated deck 2 buildings, 133 luxury apartment units Ground level retail ARCHITECT KTGY Group CLIENT Carmel Partners PROJECT DURATION 5 months

CARMEL LOFTS SUNNYVALE, CA Pacific Structures was brought into this project to pour one and two level podiums for two buildings. The mixed-use residential project will bring 133 luxury apartment units and 7,000 sf of retail opportunities to Sunnyvale.


EL CAMINO APARTMENTS MOUNTAIN VIEW, CA DESCRIPTION 120,000 sf of elevated deck 1 split level subterranean parking Wood frame apartment structure, 193 units ARCHITECT Seidel Architects CLIENT Western National Builders PROJECT DURATION 6 months

The luxurious 193 unit, four story wood frame apartment complex will sit on a 2.91 acre site in Mountain View. The unique split-level design includes a partial subterranean parking level and multiple elevations at grade holding two courtyards and a pool. A concrete staircase spans five different elevations with 45-50 risers over just three floors. A Hetch Hetchy public works site runs across the south side of the project site preventing heavy machinery to operate in the area. This creates minimal laydown space and therefore the team has coordinated with the city of Mountain View to allow partial street closures to accommodate for concrete trucks and pumps.


DESCRIPTION Two 35,000 sf concrete podiums 75,000 sf below level parking Street level offices, parking and commercial Wood frame structures 173 apartment units ARCHITECT Pyatok Architects CLIENT Avalon Bay Communities PROJECT DURATION 7 months

1150 OCEAN AVENUE

SAN FRANCISCO, CA

Challenges include tight site logistics, complicated site terrain, and La Nina weather conditions. The floor to floor heights vary from 8’ to 25’. Project completed on time.


RIVER OAKS SAN JOSE, CA DESCRIPTION 400,000 sf of elevated deck 1 level at grade & 1 level below grade parking Wood frame apartment structure, 438 units ARCHITECT MVE & Partners CLIENT Western National Contractors PROJECT DURATION 8.6 months

This 438 apartment unit, five story wood frame building lies on a 9.5 acre lot. The unusual design of the building consists of a subterranean parking garage with slab on grade extending beyond the garage footprint, a mirrored elevated podium and wood frame structure above. Due to this design, footing supports must be constructed up to 8 feet below the slab on grade to alleviate weight on the subterranean wall. The Pacific Structures team has to carefully sequence construction so that weight is safely distributed throughout the entirety of the project to completion. Other challenges include smoothly coordinating countless trucks for the several concrete pours on the large job.


DESCRIPTION 13,560 sf elevated deck 1 level subterranean parking ARCHITECT Levy Design Partners CLIENT Build Group, Inc. PROJECT DURATION 3 months

35 DOLORES SAN FRANCISCO, CA This 4 story residential wood frame building will include one level of subterranean parking. The team will utilize spread footings for the foundation. Two large pour in place concrete staircases will lead from grade to the basement. The tight urban sloped site leaves little room for laydown area for the project.


RON YEN SUPERINTENDENT 415.260.4299

 ron@pacific-structures.com

Mr. Yen is an accomplished construction professional with a wide range of project types to his credit including high-rise mixed-use, residential and corporate campuses. His specialized expertise lies in structural concrete and steel. With a strong focus on planning and site logistics, Mr. Yen is accomplished at all phases from preconstruction through project completion.

education

PROJECT EXPERIENCE

B.S. Civil Engineering California Polytechnic State University, San Luis Obispo

Trinity Towers, San Francisco 340,000 sf 23 story concrete tower High-rise residential building

credentials

55 9th Street, San Francisco 349,737 sf of elevated deck 18 floor, 273 apartment units building Ground floor retail

Engineer in Training: California License #XE106279

Hollywood & Vine, Los Angeles 6 multi-use residential & hotel buildings 8-16 stories, 1,612,894 sf 5 levels above grade parking 4 levels subterranean parking San Francisco Federal Building, San Francisco 450,000 sf 18 story CIP office building SOMA Grand, San Francisco 2 concrete towers, 17 & 18 stories 246 residential units 5 levels above grade parking 45 Lansing, San Francisco 495,048 sf of elevated deck 39 story tower 4 levels subterranean parking 1800 Van Ness, San Francisco 8 story concrete building 98 luxury condominium units 2 levels subterranean parking

1


RON YEN

Â

SUPERINTENDENT, continued

888 N. San Mateo, San Mateo 2 buildings totaling 63,795 sf of elevated deck 4 story wood frame over podium 155 luxury units 1 level subterranean parking 1150 Ocean Avenue, San Francisco Two 35,000 sf mixed-use buildings Wood frame over concrete podiums 173 apartment units Street level offices, parking and commercial 1 level subterranean parking San Antonio Center, Mountain View Three buildings totaling 286,000 sf of elevated deck Wood frame over suspended concrete 330 residential units, mixed-use building Lucasfilm, San Francisco Four 4 story buildings totaling 893,000 sf 17 acres landscaped plaza 3 levels subterranean parking Broderick Place, San Francisco 3 level wood frame apartment building 70 residential units Ground level retail

2


FADI LAZKANI SUPERINTENDENT 209.581.3310

 fadi@pacific-structures.com

A veteran field operations professional Mr. Lazkaniʼs impressive 19 year career includes building many of the most prominent and challenging projects on the West Coast. In his role as Superintendent he brings the wealth of his experience providing constructability analysis during preconstruction, preplanning complex work, managing difficult logistics, and executing the most stringent quality standards.

PROJECT EXPERIENCE One Rincon Phase I, San Francisco 64 story concrete tower 376 units, 14 townhomes 360 Residences, San Jose 400,000 sf 23 story residential high-rise th

55 9 Street, San Francisco 349,737 sf of elevated deck 18 floor, 273 apartment units building Ground floor retail St. Regis Hotel & Residences, San Francisco 750,000 sf 42 story tower 102 luxury condominiums, 269 guest rooms 4 levels subterranean parking San Francisco Federal Building, San Francisco 450,000 sf 18 story CIP office building Crescent Village, Buildings 1-5, San Jose 5 buildings: 237,948 sf, 241,308 sf, 204,560 sf, 205,930 sf & 192,007 sf Mixed use, luxury rental units One level subterranean parking each building

San Jose State University Student Housing, San Jose 1,100,000 sf 15 story dormitory building W Suites, Newark 126,000 sf 5 story hotel California Academy of Sciences, San Francisco 410,000 sf 5 story exhibition and research facility Structural steel building with concrete floors, walls and roof UC Berkeley Student Athlete High Performance Center, Berkeley 140,000 sf athletic center adjacent to UC Coliseum Electronic Arts Phase II, Redwood Shores 500 seat white concrete auditorium Gilroy Public Library, Gilroy 46,180 sf of elevated deck 3 levels above grade concrete Foothill College, Phase I & II, Los Altos 150,889 sf of elevated structures 2MW on 1 college campus DSA Project

Hilton Hotel, Santa Clara 18 story luxury hotel

1


MIKE MACBEAN SUPERINTENDENT 415.298.5485

 mmacbean@pacific-structures.com

Mr. MacBean has 6 years of hands on construction experience rich in structural concrete projects. His proven ability to construct high-rises that beat schedules while still delivering top notch quality concrete make him an invaluable asset. His attention to detail on projects ensures that crews are adhering to project plans and schedules while maintaining a safe and clean jobsite.

education

PROJECT EXPERIENCE

B.S. Construction Management California State University, Chico

The Infinity, San Francisco 4 concrete buildings totaling 1,025,305 sf 654 residential units 5 levels subterranean parking San Francisco Public Utilities Commission, San Francisco 277,000 sf 13 story concrete office tower 1 level subterranean parking LEED Platinum certification San Antonio Center, Mountain View Three buildings totaling 286,000 sf of elevated deck Wood frame over suspended concrete 330 residential units, mixed-use building Archstone Parkside, Emeryville 3 level wood frame over podium mixed-use building 166 apartment units, 14 live/work units 1 level above grade, 1 level below grade parking Ground level retail UCSD Health Sciences Graduate Student Housing, La Jolla Two 9 story buildings totaling 219,000 sf Class A architectural concrete 452 beds in unfurnished apartment units

1