About Pacific Structures is a concrete construction company known for saving clients time and money. The principals, management and field operations staff possess hands on know-how won over three decades of designing and building some of the most complex concrete structures in California. This substantial expertise means that the company leaders have what it takes to engage the entire project team, and to push to optimize the structure for cost, quality, and schedule. At each stage of design, Pacific Structure’s concrete experts provide the benefit of their valuable input. They continually challenge and evaluate the structure, testing it against hundreds of other buildings in their database for key parameters and details. Each analysis is informed by professionals with years of experience partnering with the best Structural Engineers on the West Coast. Each recommendation made has been tested in the field for quality and constructability by seasoned Superintendents. Out of this crucible comes the right design for each project. Once the design is optimized, Pacific Structure’s veteran field operations team attacks the schedule and the details of the work on a day-by-day, pour-by-pour basis to ensure that every aspect of the project is preplanned and lined out prior to the start of work. When construction starts, the team is executing their plan, striving for even greater improvement and innovation. When the inevitable unknowns come that can derail a project, the Pacific Structures team responds quickly and effectively to keep the project on track and protect the client’s investment. Pacific Structures was recently recognized as an award recipient in the 2013 ASCC Safety Awards Program for Zero Lost Time.
The Pacific Structures team has worked on a variety of concrete structure projects. Prior to joining Pacific Structures, the team has worked on the following list of projects: • • • • • • • • • • • • • • • • • • • • • • • • • • •
55 9th Street, San Francisco Trinity Towers, San Francisco 45 Lansing, San Francisco 1800 Van Ness, San Francisco 2121 Third Street, San Francisco 1645 Pacific, San Francisco Sutter Street Parking Garage, San Francisco SOMA Grand, San Francisco Avalon Mission Bay, Phase I & II, San Francisco Avalon Towers, San Francisco 360 Residences, San Jose The Palms, San Francisco The Beacon, San Francisco St. Regis Hotel and Residences, San Francisco One Rincon, San Francisco W Hotel, San Francisco W Hotel and Residences, Hollywood GSA Federal Office Building, San Francisco L.A. Live, Los Angeles The Century, Los Angeles Millennium Towers, San Francisco Infinity Towers, San Francisco City College San Francisco Chinatown Annex, San Francisco 1600 North Vine Luxury Apartments, Los Angeles Hotel Vitale, San Francisco Omni Hotel, San Francisco UCSF Student Housing, San Francisco
55 9TH STREET SAN FRANCISCO, CA DESCRIPTION 349,737 sf of elevated deck 18 floor, 273 apartment units building Ground floor retail ARCHITECT Solomon Cordwell Buenz CLIENT AvalonBay Communities PROJECT DURATION 9 months
18 story high-rise located in the up-and-coming Central Market District in the heart of downtown San Francisco. Due to the column design of the building and the abut buildings of the surrounding landscape, the team determined that flyers would be inefficient and instead are handsetting forms. The tower crane will be coordinated and provided by the Pacific Structures team. Pacific Structures’ scope also includes Architectural Concrete at elevator lobbies on all floors. The apartment complex will provide 273 units of studios, 1 bedrooms, and 2 bedrooms. Ground floor retail, a state-of-the-art fitness center and outdoor movie screen are also included in the project.
DESCRIPTION 23 stories 340,000 sf High rise residential ARCHITECT Architectonica CLIENT Trinity Properties PROJECT DURATION 8 months
TRINITY TOWERS PHASE II SAN FRANCISCO, CA Working as a collaborative partner with the general contract and design team from the early stages, the Pacific Structures team has successfully responded to changing owner requirements while keeping the project on budget and schedule. During design phase they worked closely with the structural engineer providing quantity allowances for reinforcing in the structure. They also made sure that the drawings were completed with the s pecific structural details necessary to use column hung flying forms (an innovative method developed by the P acific Structures Principals) to achieve an aggressive 6 day cycle per floor. In order to execute the work using flying forms the team will perform thorough pre-planning and coordination with all the other s ubcontractors, especially the MEPS contractor. For example, they will work out a detailed schedule for the tower crane on half hour basis every day.
45 LANSING SAN FRANCISCO, CA DESCRIPTION 495,048 sf of elevated deck 39 story tower 4 levels subterranean parking ARCHITECT HKS Architects CLIENT Build Group, Inc. PROJECT DURATION 18 months
A 7 foot matt foundation will support the 39 story residential tower. Flyers will be used by the team to quickly set the foundation for each floor pour to achieve a 5 day cycle schedule. The team will also construct four levels of subterranean parking providing future residents 197 parking stalls. Pacific Structures saved the client money by evaluating and finding rebar reductions throughout the structure.
DESCRIPTION 162,127 sf 8 story building 98 unit luxury condominiums 2 levels below grade parking ARCHITECT Kwan Hemni CLIENT Oyster Development PROJECTED DURATION 7 months
1800 VAN NESS SAN FRANCISCO, CA Project consists of 8 story concrete building over a 2 story below grade parking garage. Intricate shoring package 足including Caltrans right way issues and underpinning on North/East sides. Zinc and metal panel exterior skin. Luxury finishes for unit interiors.
2121 THIRD STREET SAN FRANCISCO, CA
DESCRIPTION 7 & 8 story structural concrete building 117,198 sf 105 apartment unit building ARCHITECT Sternberg Benjamin Architects CLIENT Build Group, Inc. PROJECT DURATION 7 months
The 7 and 8 story building provides 105 apartment units in the up and coming Dog Patch neighborhood of San Francisco. A structural concrete building with gauge steel studs, 900 drill displacement columns are being used to stabilize the site that has a water table 10 feet below the ground floor. The team is using a panelized form system to support the decks. Architectural concrete walls will be poured along the street facade.
DESCRIPTION 151,379 sf 8 story mixed-use building 114 condominium units 14,750 sf of ground level retail 1 level subterranean parking ARCHITECT Kwan Henmi Architecture CLIENT Oyster Development PROJECTED DURATION TBD
2558 MISSION SAN FRANCISCO, CA This 8 story building will provide 114 for-sale condominiums to the up and coming colorful Mission neighborhood of San Francisco. The team will excavate one level down to make way for car stackers and bike parking. Ground level retail and roof decks at levels two and seven round out the project. The scope also includes rehabilitation and reuse of the New Mission Theatre next to the site. The theatre will be converted from a one screen to a five screen theatre complete with 900 seats and a bar.
DESCRIPTION 138,512 sf 12 story building 121 units 2 levels subterranean parking ARCHITECT Arquitectonica CLIENT Build Group, Inc. PROJECT DURATION TBD
1401-1415 MISSION SAN FRANCISCO, CA The 12 story residential building will house studio, 1-bedroom and 2-bedroom units. The project includes 2 levels of subterranean parking and 44 bike parking spaces.
DESCRIPTION 80,267 sf of elevated deck 6 story concrete building 1 level subterranean parking ARCHITECT BAR Architects CLIENT Cahill Contractors PROJECT DURATION 5.5 months
1645 PACIFIC SAN FRANCISCO, CA The team will preserve the existing facade at the entrance to this 6 story building. Handset panelized forms will be used throughout the project. Due to the tight space of the site, there is no available lay down space. The team has worked extensively with the city to draw street permits and lessen traffic disruption during pours. Rebar and steel reductions during value engineering provided large savings to the client.
101 POLK SAN FRANCISCO, CA DESCRIPTION 154,196 sf 13 story tower 162 units 1 level subterranean parking ARCHITECT Solomon Cordwell Buenz CLIENT Build Group, Inc. PROJECT DURATION TBD
The 13 story concrete tower will be on a tight site in the heart of downtown San Francisco. The concrete style of the facade was directly inspired by the surrounding buildings. The team will oversee excavation for the one level of subterranean parking.
DESCRIPTION Concrete structure 6 stories above grade, 1 level below grade 88,500 sf ARCHITECT GouldEvans Baum Thornley Architects, Inc. CLIENT Pacific Union PROJECT DURATION 6 months
SUTTER STREET GARAGE SAN FRANCISCO, CA Parking structure constructed on an extremely tight urban infill site surrounded by existing buildings on three sides and a MUNI line in front of the site. Extremely difficult site logistics. Design/build 1 story below grade, 6 story above grade concrete structure.