POLITECNICO DI MILANO | Architettura, Urbanistica, Ingegneria delle Costruzioni FINAL STUDIO | A.Y. 2019-20 PROFESSORS | Laura Cipriani | Mina Akhavan | Alisia Tognon COLLABORATORS | Matteo Puglisi | Eleftheria Exarchou | Irene Manzini Ceinar | Francesca Suaria GROUP 03 | Ekin Olcay | Ilaria Pugliese | Shannon Leigh Tribe| Camilla Vertua
DYNAMIC THRESHOLD
DYNAMIC THRESHOLD Index
1. The location of the project: Piacenza 2. Toward the strategy of the project: between flood prevention and reconnection 3. Dynamic Threshold: canale Diversivo as an infrastructure of sociality 4. Conclusions
1. THE LOCATION OF THE PROJECT: PIACENZA A city surrounded by water but disconnected from it.
A deep research on water quantities lead us to select Piacenza as the territory to develop a project which is related to flood risk and prevention. Piacenza is in fact a dense city located inbetween three different water courses: the main one, the Po river, and the two tributaries, Nure and Trebbia. Moreover, it presents an elaborated system of artificial canals used for irrigation.
1.
2.
3.
WhyPO Piacenza PIACENZA: A CITY ON THE RIVER?
Flood risk management plan AdbPo - 02/08/18 Data: PianoData: Assetto Idrologico (PAI) Piano Assetto Idrologico Base: Open Street (PAI) Map Base : OpenStreet Map
Area C Area B Area A Piacenza Main 2 Tributaries around Piacenza River Enbankment Po River
0
5 km
20 km
a
bi
eb Tr
re Nu
DENSE URBAN SETTLEMENT
TWO TRIBUTARIES: RIVER TREBBIA AND NURE
RISK AREAS (ABC)
ELEMENTS OF INTEREST Local peculiarities Data: Piano Assetto Idrologico (PAI) Base: Open Street Map
POPULATION OF PIACENZA (2017)
102 355 111,1 inh/km²
PEOPLE/km² IN PIACENZA
LAST IMPORTANT FLOODING EVENT HAPPENED IN
2000
a
bi
eb Tr
re Nu
NATURAL WATER NETWORK A city in between the Po, Trebbia and Nure River. All of them are related to area of risk A, B and C.
ARTIFICIAL WATER NETWORK The city is surrounded by canals of irrigation. Four of them were introduced in the ‘30s, whenand theysuperficial were usedcanals. to redirect Underground Four water into the main ones builtrivers. in the 1940s
WATER MANAGEMENT A golena is located on the other side of the river Po in case of flooding events.
A CITY SURROUNDED BY WATER Piacenza and its water network Data: Piano Assetto Idrologico (PAI) Base: Open Street Map
CAPACITY OF TREBBIA RIVER
40 m3/s CAPACITY OF NURE RIVER 15 m3/s
PRESENCE OF VIOLENT STORMS (AVERAGE 1.5 h) CAUSING A WATER INCREASE OF
70-90 mm/h
Piacenza is surrounded by several water systems. The natural one, comprising of the Po river towards the North, Trebbia on the West and Nure on the East side. Moreover, artificial canals especially affects the territory: in fact they have been constructed in the ‘30s of the last century as a tool to reclaim the land for agriculture purposes. Piacenza acquired also a strategic nodal role of exchange along the Peninsula, as it faces the Po and it’s a sort of bridge between the North and the Middle of Italy. This factor lead to two main consequences: it had been used as a national military headquarter, (the city still presents some significant built traces of its military past), and the construction of a system of infrastructure that didn’t really considered the surrounding context. In fact, even if water, as mentioned before, has a relevant role in the territory, urbanity seems not to relate with it.
1865
1935
The city of Piacenza, even if protected by its walls, has always represented a node between the North and the South of Italy. For this reason, in the 2nd half of the 19th century they constructed the railway: a strong connection between territories but the first element of interruption between the city and the river.
After a big flood happened in 1926, Piacenza became an object of a big operation of bonification, aimed both to reclaim the surroundings and to protect the city from flooding risk. They construct Canale Diversivo Ovest: a way to redirect water into the Po water coming from the fields.
AN INTERRUPTED RELATION OVER TIME
Infrastructures stopping the connection between the urban and natural system of the city.
1954
1984
The city expands toward the agricultural fields. A new street ring is built: a new connection between scattered urban developments, a barrier between the nucleus and its productive surroundings.
Highways occupies the little strip between the river and the urban settlement which as a result, interrupts the connection between the city and the Po. On the other side, the city expands until the Canale Diversivo, firslty conceived to be at the outskirts of the city. For this reason, it remains a sort of dividing system, barely visible.
TERRITORIAL SYMBIOSIS The vision of the project
Our vision is an integrated proposal that combines water issues with environmental, recreational, accessibility and educational advantages. Piacenza shall become a clean, attractive and enjoyable place embraced by its dynamic water and environmental resources. A unique system combining natural and urban features.
2. TOWARD THE STRATEGY OF THE PROJECT Strategic analysis and elaboration of a coherent strategy between flood prevention and reconnection
Given the above, we went through a strategic analysis in order to understand the overall strategy of the project. We especially focused on the flooding risk of Piacenza. The city was hit in fact by floods in the recent past and is in need of an efficient strategy for flood protection. With this in mind, we discovered that floodings was particularly frequent along the Trebbia, so that, before proposing measures to protect Piacenza from floods we should consider preventing floods from the start. This is the reason why we propose some interventions about water management also on the Trebbia embankments. Moreover, we also discovered that recent floodings depend on violent storm hitting the city: they in fact cause the overflow of the surrounding irrigation canals. Canale Diversivo, especially, is affected by this phenomenon and consequently puts at risk a relevant area of the city. Moreover, while studying this canal, we became aware of the pollution of its water, probably caused by the discharge of some industries along it.
0
1,5 km
7.5 km
runoff canals irrigation canals detention basin water pumps flooding area of canale Diversivo area C area B area A
PROTECTING PIACENZA FROM FLOOD RISK Strategic analysis: the water system of the city
Direction of the water flow of Trebbia river
Direction of the water flow of Po river
HIERARCHY OF CANALS The Rio Comune on the right takes its water from Trebbia and it distributes it to other transversal channels. It discharges then into the Direttivo Ovest, the other big canal of the system. Water in this way flows again into the Trebbia.
FROM THE WEST TO THE EAST Due to the flow of Po coming from the West and to the one of Trebbia, coming from Appennine, we can state that the risk of flooding for the city of Piacenza comes mainly from this side of the city.
PUNCTUAL FLOODINGS Due to extreme rain events happened over recent years, canals can flood punctually. The problem particularly affects the Canale Diversivo Ovest.
Ca’ Buschi. Photo: Consorzio di bonifica di Piacenza.
Bikelane along Rio Comune di Destra Photo: Consorzio di Bonifica di Piacenza
Bike
t ves me) o O Fa siv lla ver de Di anale (C
0
1,5 km
7.5 km suspected source of pollution
CLEANING WATER Strategic analysis: water pollution of Canale Diversivo
SINCE THE WATER FROM THE RIVER AND ITS TRIBUTARIES IS
POLLUTED
STILL BEING BY HOUSEHOLDS, INDUSTRIES, AGRICULTURE OR ROADS, SEVERAL TOOLS HELP TO PURIFY THE NATURAL STREAMS.
Construction of Diversivo Ovest, 1932. Photo: Movio BeniCulturali..
Diversivo Ovest (“ canale della fame�) construction, 1932 Data: Movio BeniCulturali
Polluted water of Diversivo Ovest nowadays. Photo: Liberta.it
0
1,5 km
7.5 km
THE STRATEGY Strategic analysis: water pollution of Canale Diversivo
FLOOD PREVENTION Extention of the Regional Park of Trebbia along the Po waterfront and reconnection between the slow mobility infrastructure and the city. We provide a reconnection between sites along Canale Diversivo through their urban regeneration. In this way it becomes an infrastractural tool for the creation of an inhabitable and dynamic threshold.
FLOOD PREVENTION renaturalization of soil reforestation systems of retention
reuse of the quarries + A B
RECONNECTION water purification redefinition of an urban system regional park extention
RECONNECTION Flood prevention involves an area much bigger than the city itself. Due to the topography of the area, the Trebbia river becomes an important the tributary to focus on. Moreover, today Canale Diversivo is an old infrastructure in need of an intervention, that eventually extends to the purification of its water.
basin for retention along Diversivo C
Wetland Riparian Forestry continuation of the existing bikelane + waterfront becoming a protected area water treatment plant + constructed surface wetland system military site’s redefinition + two parks’ redefinition + waterfront’s redefinition
+ reconversion of the hydroelectric power plant
3. DYNAMIC THRESHOLD canale Diversivo as an infrastructure of sociality
Our project develops along Canale Diversivo and shapes it as a green threshold between the city and the surrounding agriculture. A new front for the city and not a backyard, where the course of the water becomes the way to provide a new linear infrastructure of sociality. It especially compries the redefinition of three main sites, characterising each of them. Following the flow of the water: the park of Galleana, the park of Montecucco and the abandoned military site of Pertite.
WATER: FROM THREAT TO RESOURCE Violent storms can cause the overflow of the Diversivo. Our project aims to take it as an opportunity, so that water becomes an element of interaction.
FROM BARRIER TO THRESHOLD Canale Diversivo over time has marked a separation between the city and agriculture. Our project aims to shape it as a threshold between urbanity and agriculture.
DEFINITION OF AN URBAN SYSTEM The canal becomes an element to reconnect two parks and the former military site, developing in this way a continuous system based on the use of water.
DYNAMIC THRESHOLD Principles
THE CANAL AS AN
infrastructural tool FOR THE regeneration OF THE TWO GREEN AREAS AND OF AN ABANDONED MILITARY SITE. AS A RESULT, IT BECOMES A MORE INHABITABLE AND
dynamic
threshold BETWEEN THE TERRITORY OF THE CITY AND THAT OF THE AGRICULTURAL LANDSCAPE.
m 500
11. 10.
7.
9. 8.
m 500
6.
5.
m 500
2.
1.
3.
0
0.37 km
1.5 km
bikelane canal (minor) canal agriculture sports grass parks crops trees
4.
THE ACTUAL CONDITION OF THE AREA
FORMER MILITARY SITE TOTAL SURFACE
281.487 m2
PRESENCE OF SOME BUILDINGS IN RUIN, SOME OTHERS ARE PART OF HERITAGE THE MONTECUCCO PARK TOTAL SURFACE
232.952 m2 THE GALLEANA PARK TOTAL SURFACE
277.840 m2
1 2 3 4 5 6 7 8 9 10 11
oratorio S. Corrado Confalonieri baseball field stadium L. Garilli rugby stadium W. Beltrametti public orchards sport center G. Siboni military barracks of Pertite middle school I. Calvino cover skating ring gym A. De Gasperi primary school
The three site are located along the canal, in the South limit of the city. From South to North, the Galleana Park is conceived today as an urban park and it has an interesting historic past: in the 18th century it was the scene of the battle between Austria and France-Spain. Traces of the defense structure are still present in the area. In recent past the area of the park has been fostered to host an expansion tank for retention in case of flooding of the canal. Going ahead, the Montecucco park is characterised by the fact that here all new borns get a tree. It doesn’t present an organic design: several scattered tree clusters seem to replicate the shape of cascinas. Last, the former military site of Pertite presents clusters of buildings, some of them relevant in term of heritage, and a considerable vegetation. In this respect, citizens have already espressed their will to redefine it as an urban forest for the city.
)
0
0.37 km
1.5 km
bikelane canal (minor) canal agriculture sports grass parks crops trees
THE MASTERPLAN
Water enters the military site and it’s used in the park for vegetation and agriculture
THE DIDACTIC PARK
Purified water is used for agriculture and for leisure
THE URBAN PARK
THE RETENTION PARK
Water retaining and purification of the purified canal
WATER MANAGEMENT
1 2 3 4 5 6 7 8 9 10 11
oratorio S. Corrado Confalonieri baseball field stadium L. Garilli rugby stadium W. Beltrametti public orchards sport center G. Siboni military barracks of Pertite middle school I. Calvino cover skating ring gym A. De Gasperi primary school
CONNECTION
SECTION D-D’ Between urban blocks
SECTION C-C’ Bikelane crossing
SECTION B-B’ Activation of the embankments
SECT U
TION A-A’ Urban crops
INHABITABLE INFRASTRUCTURE The linear use of the canal’s embankments according to the surrounding context
D-D’ C-C’ B-B’
A-A’
blic ops
ear est
Public Crops
Flowered Prairies
Fruit tree Orhcards
Public Crops Fruit tree Orhcards
Flowered Agricultural Prairies Park
Paths Linear Forest
Agricultural Constructed Park Wetland
Fruit tree Orhcards
Flowered Paths Prairies
Agricultural Darsena Park Agricultural Park
Fruit tree Orhcards Fruit tree Orhcards
Constructed Wetland
Paths
Follies Urban Publicforests
Flowered Prairies
Darsena
D
Public Crops Linear Forest
Linear Forest
Follies
Crops
Darsena an flood zone Constructed Flowered Agricultural Agricultural park Fruit trees orchards Darsena sts Agricultural Fruit tree Darsena Prairies Wetland Fruit tree Flowered Park Park Orhcards Orhcards Prairies
Public Constructed wetland Constructed Crops Public Docks Wetland Crops Constructed
Agricu Park
Urban forests Flood zone
flood zone
Wetland
Follies
Paths Trails Docks
arsena vatedDarsena menade
pier
Docks
Pier
Constructed Constructed Wetland Wetland
Flowered prairies Flowered Prairies
Follies
Bicycle sharing Public Bicycle Crops Sharing
Urban Linear Elevated Darsena forests Forest Promenade Paths Trails Paths Elevated promenade Elevated LinearLinear forest Paths Promenade flood zone Forest Linear flood zone Docks Forest pie flood zone Docks
Urban forest
Urban forests Follies Follies
flood zone flood zone
Docks Docks
Flowered Trails Prairies
Trails
Bicycle Urban Sharing forests pier Urban forests
Public crops Agricultural Public Elevated Park Crops Promenade
pier pier
Paths
Paths Trails
Linear Forest
Elevated Promenade Trails Trails
pier Follies Bicycle Sharing
Urban forests
Linear Darsena Forest
Bicycle Sharing Elevated Promenade Elevated Promenade
pier Follies
reconnection toolkit water management toolkit
Urban forests
Docks
INHABITABLE INFRASTRUCTURE General toolkit
The gate
THE RETENTION PARK
CanalTHE as Canal aCanal polluted barrier barrier asasAS a apolluted barrier CANAL Apolluted THRESHOLD
Nowadays Diversivo is recognised as a polluted boundary of the park, dividing it from the agricultural area beside it.
THE CANAL AS PART OF THE PARK inThe order to clean order towe clean involwe involininorder to clean it,it,we involagriculture area it, beside the park becomes part veof also veother also side theother other of the sideofof the it. Thethe existing paths extend cutting the area ve also the side the on the other side of the canal mainly in three. canal canal canal Their crossing identifies nodes.
THE WETLAND The three areas define three wetland systems andwe weitdefined defined asAsamuch unity, unity, and ititas a aunity, that and purifywe anddefined retain water. asas water is made of made amade system asystem system voids voids ofofaof voids purified as more inhabitable the space of itof occupies and mass, and given mass, bygiven the given the is. The existing wooded area are extended and and mass, bybythe embrace the whole site. vegetation existing vegetation existing vegetation existing
THE DESIGN PROCESS
the main connection inside the park
LANDMARKS coherently it gives Theworks nodes defined by the and crossing of the rise mainto some interesting connections paths are defined by two visual landmarks, visually connected: the gateanche and theconnessione observatory. alla (fare vedere
bikelane esistente)
Pers p
ectiv e sec
tion
0
100 m
400 m
Paths Flowered Prairies Agricultural Park
Constructed Wetland
Agricultural Park Fruit tree Orhcards
Fruit tree Orhcards
Darsena
Linear Forest
Agricultural PLAN AND SECTION
Public Crops Paths
Flowered Prairies
Public Crops Fruit tree Orhcards
flood zone
Follies Linear Forest
Park
Urban forests
Section 1:2000
Constructed Wetland
Paths Linear Forest
Public Crops Darsena
Follies
Constructed Wetland Pier Docks pier
Constructed wetland
Constructed Wetland Follies
Urban forests
Linear Forest Docks
Docks
Trails
Trails
flood zone
Urban forest Trails Urban forests
Elevated promenade
Elevated Promenade Bicycle Sharing pier
Bicycle Sharing Elevated Promenade
The intervention on Galleana Park aims Darsena to retain and purify the water of canale fact to design a AgriculturalDiversivo. We decided inFruit tree constructed surface wetland system, that can Park Orhcards Urban be experienced by the community through Trails a series of primary and secondary paths. Elevated forests The wetland is located especially into an Promenade Flood zone agricultural area that divides the park from a highway. It is specifically divided into flood zone three sector, depending on the size of the basins and on the level of inhabitability and of purification of the water. When water is finally purified, the park is more inhabitable. The paths passing trhough it follow the Darsena direction of the existing ones, so that the Docks wetland becomes completely integrated to Constructed the portion of the park nowadays in use. Bicycle sharing Bicycle Wetland The existing vegetation is preserved and Elevated flood Sharing zone it is integrated by a further area of trees Promenade that embraces the wetland, isolating it pier from the highway at its back. The park is finally characterised by the presence of two elements: the gate, the building marking the entrance to the park, and the observatory, a sort of arrival point, from which the wetland can be completely read.
Docks
pier
flood
Perspective section of the park, 1:200
The observatory
THE URBAN PARK
CONNECTION The urban park is nestled between a ccritical insertion which connects to the city centre, the Regional Park of Trebbia and also has a strong connection to the new Retention and Didactic Park along the canal.
INTEGRATED LANDSCAPE The canal and new integrated ‘Darsena’ allows for a more inhabitable space and also facilitates the connection to the surrounding landscapes through a system of public crops.
RESILIANCE THROUGH TIME The trees within the urban park are planted in accordance to every new born in Piacenza and are curated in a way which transforms the park into an urban forest over time.
THE DESIGN PROCESS
0
100 m
400 m
Paths Linear Forest
PLAN AND SECTION Follies Flowered Prairies
Public Crops Agricultural Flowered Park Prairies
Urban forests
Section 1:2000
Agricultural Park
Fruit tree Public Orhcards Crops
Paths
Flowered Agricultural park Agricultural Prairies Park
Follies Paths
Paths
Darsena
Linear Forest Paths Public Darsena Darsena Crops Fruit tree Orhcards
Urban forest
Urban forests Linear Follies Forest
Constructed Docks Wetland
Follies Trails
Elevated Urban Promenade forests Trails
Docks
Bicycle Sharing Trails
Elevated Bicycle Promenade Sharing
Trails
Linear Linear forest Forest Constructed Wetland
Bicycle sharing Bicycle Sharing
Urban forests
Elevated flood zone Promenade
pier
The aim of theDarsena intervention on Parco Elevated Montecucco was to provide its better Promenade Agricultural
connection to the main city, in this way Park residential integrating more the isolated area at its South side. We decided to follow the current development of the park, based on the quantity of new borns of the city according to that trees are planted. For this reason the design of the park was quite soft, as a sort of rearrangement of the spaces, while we focused more on the connection with the canal. Here, in fact, facing public orchard on the other side of the canal and as a continuation of the bikelane coming Darsena Docksfrom Galleana, there’s the Darsena. It becomes a gathering point, mainly served by the presence of a building, providing both a flood zone place to stay, trhough stairs, and services. Agriculture becomes part of the park, so that it results more integrated to its agricultural surroundings.
Docks
pier
THE DARSENA
The Darsena strengthens the relation between the park , the existing public orchards and the canal. A structure especially defines its borders and separate it from the existing huge building at its back. It is both a service space and a gathering point. A long porch in fact is defined by voids and full volumes, containing functions. The voids mark the passage from the bottom part of the Darsena to the upper one, permitted by stairs, eventually used also as sitting points. This structure is also a buffer between the square at the entrance of the park and the agricultural fields. Here especially it could be used as a market of local products.
Under the porchards
THE DIDACTIC PARK
ia
b Treb
ia
b Treb
Via Emilia / Via Francigena Via Emilia / Via Francige na
City centre
PERMEABILITY The military is the mediator between will ofsitereconnection between the canal and via emilia (via will of reconnection the Canale Diversivo between and Via Emilia. Its canal walls and via emilia (via francigena) here also For the breaking walls, through bikelafrancigena) alsomore thepermeability. breaking walls, WHAT REMAINS breakhere to provide the through bikelane and water The damaged buildings are demolished, whilene theand water same reason, the fences of the entrances draw ones that are part of heritage are mantained. back shaping two hybric public/private spaces.
City centre
THE DESIGN PROCESS
CONNECTIONS The connection between the canal and via Emilia is provided by two main axis that permit the access to the main core of the military site and to its gathering spaces.
urban vs. veg.urban watervs. veg. water
EXISTING VEGETATION. The design considers the existing vegetation as a rule for the development of the project. Moreover, some trees cultivation are introducted.
will of mantaining of the most of the will ofmost mantaining existing vegetation existing vegetation
0
100 m
400 m focus 1:500
Paths Linear Forest
PLAN AND SECTION Follies Flowered Prairies
Urban forests
Public Crops
Paths
Flowered Agricultural park Agricultural Agricultural Prairies ParkPark
Follies Paths
Paths
Darsena Darsena
Linear Forest Public Fruit trees orchards FruitCrops treetree Fruit Orhcards Orhcards
Urban forest
Urban forests Linear Forest
Constructed Constructed Wetland Wetland Public Public crops Crops Follies Trails
We envisioned the military site of Pertite to become an urban didactic park, gathering children, young researchers and the community in general. In order to provide the connection to the urban slow mobility system, the width of Trails the street reducesDarsena and the pavimentation Elevated changes. We decided in fact to avoid strong Promenade Agricultural Flowered prairies infrastructure interventions that would have Public Flowered been maybe too strongPark for the area. The Crops Prairies embankments of the canal become here more inhabitable by widening and softening the edge. In the site, the existing buildings are reused and, depending on their function, their roof is respectively cut in different ways to provide different types of lighting and several place to stay. The connection Bicycle sharing Bicycle Paths between them is provided by two Sharing Darsena main paths and some secondary Linear Docksones, perpendicular to them. On the side of Via Forest Emilia, instead, the entrance at the corner is marked by the presence of a market and of a sort of slow-mobility station, especially thought for pilgrims coming from Via Francigena. Vegetation is mostly mantained of productions are Agricultural and some new type Fruit tree introduced. Park
Elevated Urban Promenade forests
Follies Urban forests
flood zonezone flood
Linear Forest
Urban forests
Agricultural Park
Orhcards
Docks Docks
Bicycle Sharing Trails
Section 1:2000
Docks
Darsena Constructed Wetland Elevated Promenade
Trails
pierpier
Elevated Promenade
Docks
flood z
Hostel
Slow
Urban forest
Local product market
Museum
Social node
Flower arena Cafè Cycle repair
Skatepark
Info point
Herbs garden Research Laboratory
km0 restaurant
Post-production
Plant nursery Didactic greenhouse
Wineyard
Library
Workspace Auditorium
Agricultural fields Sensory park
SOCIAL AND FUNCTIONAL DYNAMICS
w mobility station
Market Cafeteria
Public crops
Connection between via Francigena and the military site. Plan, 1:500
Central cluster. Plan, 1:500
Connection between the canal and the military site. Plan, 1:500
The entrance from Via Francigena
3. CONCLUSIONS
Dynamic threshold gives Piacenza the opportunity to rediscover its relation both with its agricultural and military past, with the lenses of contemporaneity. Canale Diversivo, an importnat infrastructure of the past nowadays completely forgotten, acquires again a role in the city, a social one, fostering a system of sociality that becomes a new waterfront from the city. The fragmentation given by the expansion of the urban settlement over time is glued by this system of ductile voids that are especially defined by flows of people.We imagine Piacenza to become more attractive not just for it inhabitants but also for slow- tourists, passing along via Francigena. A welcoming city, able to integrate as a whole all its parts.
SEPTEMBER 2023
SEPTEMBER 2025
TIMELINE
SEPTEMBER 2028
The linear bikel ane and the Urban park are the first accomplished parts of the project. In this way, the network between the different areas is provided and the park becomes the junction between the social infrastructure of the canal and the existing bike lane. Moreover, the front of the military site facing Via Francigena is activated with some services for pilgrims, while the space before entering the site from the canal provides some services for people. Thus Via Primo Maggio is narrowed. Given the urgency to purify and retain water of the canal, also the project of the retention park begins immediately and it’s finally completed in 2025. In the meanwhile, the Military site continues its way to full activation: the fields in its Southern part are used for didactic purposes by schools and the main entrance from the canal is opened so that it’s now also possible to reach the new Hostel at the North of the site. In September 2028 the Military site is finally completed with the activation of all its clusters.
2021
THE LINEAR NETWORK
2022
2023
Construction of the lane: it starts from Montecucco park
2024
Preparation of the soil and plantation alo
The bikelane Arrangement of public orchards Green area between the Urban park and the Didactic one
Green area: preparation of the soil. Plantation Banks expansion: leveling and preparation of the soil. Plantation
URBAN PARK Trees plantation The darsena
Re-arrangement of the park
The plantation of the trees starts and increases over time
Refurbishment of the existing building Construction of the upper Darsena Construction of the new building Construction of the lower Darsena
The fields
Preparation of the soil Seeding
RETENTION PARK The former agriculture field
Leveling and re-arrangement of the canal Plantation of the surrounding wood
The basins
Construction of its South part
Preparation of the soil. Plantation Construction of its middle part
Prepara
Constru The landmarks
Construction of the gate
Constru
DIDACTIC PARK Gates
Narrowing of Via Primo Maggio
Construction of the ne Public square facing the canal
Public square facing via Francigena Refurbishment of the buildings facing Via Francigena Opening of the coffee Low mobility station The clusters
Buildings demolition and soil remediation
Market of local product
Plantation at the North of the cluster
Hostel refurbishmen
Cafè refurbishm Seeding of the fields
Refurbishment o
2025
2026
2027
2028
ong the bikelane
ation of the soil. Plantation
uction of its North part
Preparation of the soil. Plantation
uction of the observatory
ew building
r
nt Flower, herbs and wineyard plantation into the ruins
ment
Refurbishment of the post-production complex
of the Southern cluster as a center for research/greenhouses Refurbishment of the market of local product Refurbishment of the museum Refurbishment of the library and co-working space
2029