Can Fu_Portfolio 201705Publish

Page 1

C.F.

ARCHITECTURE PORTFOLIO





ARCHITECTURE

PORTFOLIO

BY CAN FU 2017


1.

1.

2.

2.

3.

3. 4.

4.

3D View 11_ex 12" = 1'-0"

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

1

5.

5.

ARCH 532 Philadelphia Office Building

Project Number Date Drawn By Checked By 2

3D View 12_ex 2 12" = 1'-0"

Scale

A003

532.2014 0425 Can Fu Checker

12" = 1'-0"

5/2/2014 3:44:12 PM

Exterior Renderings

I. PRACTICAL PROJECTS

10 2016

40 2016

56 2017

II. ARCHITECTURE PROJECTS

762013

84 2015 90 2016

102 2015

114 2014

122 2015


6.

1.

7.

2.

8.

9.

III. DIGITAL FABRICATION

128 2014

134 2016

142 2015

IV. ARTWORKS

148 2013

152 2014

156 2015

158 2015



PRACTICAL

PROJECTS 10-51


1

V33 Presentation 2016/08 PRESENTATION&PUBLICATION FILE PREPARATION Residential Building, Tibeca, NYC Archi-Tectonics LLC. V33, a new residential building, is located in Tribeca’s landmark district, originally a warehouse area. The choice not to copy a traditional building, but to focus on the quality of the Tribeca Landmarks, was greatly appreciated by the NYC Landmark Committee. We focused on the proportional systems; extreme ceiling heights, tri-partite stone façade sub-divisions, and street façade alignments were some of the qualities and contextual issues looked at. We call it a “A New Pixelated Façade Pattern, A New Life Style.”

PROJECT TYPE / 9-story residential units, 7 units with underground parking, including two triplex townhouses and one duplex penthouse LOCATION/ Tribeca, NYC AREA/ 32,364 SF PROJECT TEAM/ Archi-Tectonics PRINCIPLE/ Winka Dubbeldam PHOTOGRAPHY/ Floto & Warner / Eric van den Brulle

10 1 V33 PRESENTATION


11


SITE PLAN & NORTH FACADE

12 1

V33 PRESENTATION


13


14 1

V33 PRESENTATION


15


A

B

C

ELEV. [+121'-3"]

ELEV. [+121'-4"]

BULKHEAD H.P. ROOF ELEV. [+119'-0 1/4"] BULKHEAD L.P. ROOF

ELEV. [+112'-0"]

ELEV. [+106'-8"]

ELEV. [+99'-2"]

ELEV. [+93'-8"]

33

ENTRY 179 HUDSON

NORTH FACADE ELEVATION

16 1

V33 PRESENTATION

31-33 VESTRY

35 VESTRY


C

B

A

ELEV. [+121'-3"]

ELEV. [+120'-8"]

BULKHEAD H.P. ROOF ELEV. [+116'-7"] T.O. PARAPET

ELEV. [+111'-2"]

11'-2"

ROOF T.O. PAVERS

ELEV. [+100'-0"]

10'-11"

9TH FLOOR FIN. FL.

ELEV. [+89'-1"]

13'-11"

8TH FLOOR FIN. FL.

ELEV. [+75'-2"]

12'-0"

7TH FLOOR FIN. FL.

ELEV. [+63'-2"] 6TH FLOOR FIN. FL. ADJACENT BUILDING

12'-0"

ADJACENT BUILDING

5TH FL. FIN. FL.

12'-0"

ELEV. [+51'-2"]

4TH FL. FIN. FL.

12'-0"

ELEV. [+39'-2"]

ELEV. [+27'-2"]

13'-11"

3RD FLOOR FIN. FL.

ELEV. [+13'-3"]

13'-3"

2ND FLOOR FIN. FL.

ELEV. [+0'-0"] FLOOR 1 FIN. FL. 35 VESTRY

31-33 VESTRY

179 HUDSON

SOUTH FACADE ELEVATION

17


6

5

4

OSU RE P LA

NE 2. 7:1

7

PROPERTY LINE

30' SETBACK LINE

SKY

EXP

PROPERTY LINE

8

ELEV. [+116'-7"] T.O. PARAPET

ELEV. [+111'-2"] ROOF T.O. PAVERS

ELEV. [+100'-0"] 9TH FLOOR FIN. FL.

9TH

ELEV. [+89'-1"] 8TH FLOOR FIN. FL. 8TH

ELEV. [+75'-2"] 7TH FLOOR FIN. FL.

7TH

ELEV. [+63'-2"] 6TH FLOOR FIN. FL.

6TH

5TH FL. FIN. FL.

5TH

ELEV. [+51'-2"]

4TH 4TH FL. FIN. FL. ELEV. [+39'-2"]

3RD ELEV. [+27'-2"] 3RD FLOOR FIN. FL.

2ND ELEV. [+13'-3"] 2ND FLOOR FIN. FL.

1ST ELEV. [+0'-0"]

ELEV. [+0'-0"]

FLOOR 1 FIN. FL.

FLOOR 1 FIN. FL. ELEV. [-4'-0"] AC ROOM ELEV. [-5'-0"] B.O. ADJACENT BLDG. FOOTING ELEV. [-10'-1"]

CELLAR T.O. SLAB

CELLAR T.O. SLAB

PROPERTY LINE

ELEV. [-10'-1"]

SECTION FACING EAST

18 1

V33 PRESENTATION

STREET


4

5

6

7

8

SKY

T.O. PARAPET ELEV. [+113'-1"] ROOF T.O. PAVERS

3'-6"XABOVE T.O.PPAVERS

30' SETBACK LINE

PROPERTY LINE

2.7:1

PROPERTY LINE

E LAN

P RE OSU

EXP

ELEV. [+116'-7"]

ELEV. [+111'-2"] ROOF T.O. PAVERS

ELEV. [+100'-0"] 9TH FLOOR FIN. FL.

ELEV. [+89'-1"] 8TH FLOOR FIN. FL.

ELEV. [+75'-2"] 7TH FLOOR FIN. FL.

ELEV. [+63'-2"] 6TH FLOOR FIN. FL.

5TH FL. FIN. FL. ELEV. [+51'-2"]

4TH FL. FIN. FL. ELEV. [+39'-2"]

ELEV. [+27'-2"] 3RD FLOOR FIN. FL.

ELEV. [+13'-3"] 2ND FLOOR FIN. FL.

ELEV. [+0'-0"] FLOOR 1 FIN. FL.

ELEV. [+0'-0"] FLOOR 1 FIN. FL.

ELEV. [-4'-0"] AC ROOM ELEV. [-5'-0"] B.O. ADJACENT BLDG. FOOTING ELEV. [-10'-1"] CELLAR T.O. SLAB

ELEV. [-7'-3"] SLAB T.O. RAMP ELEV. [-10'-1"] CELLAR T.O. SLAB ELEV. [-13'-7"] B.O. ELEVATOR PIT SLAB

SECTION FACING WEST

19


20 1

V33 PRESENTATION


21


Time Shifing Frames

22 1

V33 PRESENTATION


23


The contextual texture of the V33 street facade is developed in a random pattern of translucent stone, stone, glass, and translucent glass. The shift in material will allow the faรงade to constantly change over the course of a day; the translucent stone will glow by day in the interior, while by night it is reversed, thus transforming the faรงade over the course of a day and night.

24 1

V33 PRESENTATION


25


26 1

V33 PRESENTATION


6" 1 3/4"

0 1/4"

ALCONY GUARDRAIL @ 9TH FLOOR NORTH FACADE GUARDRAIL

13 14

15

16 17

18

2"

2 1/2"

5 3/4"

3"

19

6"

20

ALIGN

ALCONY GUARDRAIL @ 9TH FLOOR NORTH FACADE GUARDRAIL

ONTAL MULLION/OPENABLE VENT NORTH FACADE

ONTAL MULLION/OPENABLE VENT NORTH FACADE

ONTAL MULLION - @ SLIDING DOORS - NORTH FACADE 1 1/2"

7"

Typical Wall Construction Detail

ONTAL MULLION - NORTH FACADE

SECTION

26

27

FIXED CLEAR INSULATED GLASS UNIT OR STONE/GLASS LAMINATED PANEL IN IGU - SEE ELEVATIONS

9 1/4"

28

30

2 1/4"

31

SECTION

9

1

2

TREATED WD. BLOCKING

2

STRUCTURALLY GLAZED CORNER

3

CL MULLION

3

INSULATED CLEAR GLASS

INSULATED CLEAR GLASS - SLOPE 14":1'-0"

4

ALUMINUM MULLION

4

FIXED INSULATED CLEAR GLASS UNIT

OPERABLE VENT / CLEAR GLASS

5

INSULATED CLEAR GLASS

5

HORIZONTAL ALUMINUM MULLION

ALUMINUM PRESSURE PLATE - T-SHAPED PROFILE

6

LAMINATED CLEAR GLASS

6

T-SHAPED MULLION PRESSURE PLATE PROFILE

7

FIXED CLEAR INSULATED GLASS UNIT OR STONE/GLASS LAMINATED PANEL IN IGU - SEE ELEVATIONS

7

HORIZONTAL MULLION: PRESSURE PLATE: T-SHAPED PROFILE

7

ALUMINUM AND GLASS SLIDING DOOR

8

ST. STL. FLASHING

9

ALUMINUM MULLION

8

ALUMINUM MULLION - T-SHAPED PROFILE

8

INSULATED FACADE INSERT UNIT W/ STONE SPANDREL PANEL - STONE '1'

9

FIXED CLEAR INSULATED GLASS UNIT OR STONE/GLASS LAMINATED PANEL IN IGU - SEE ELEVATIONS

9

CONCRETE SLAB (SEE STRUCT. DWGS.)

10

HORIZONTAL ALUMINUM MULLION

10

FIRE SAFING INSULATION

10

SEALANT AND BACKER ROD

11

T-SHAPED MULLION PRESSURE PLATE PROFILE

11

HORIZONTAL ALUM. MULLION

11

CONC. SLAB: SEE STRUCTURAL DRAWINGS

12

ALUMINUM AND GLASS SLIDING DOOR

12

ALUM. AND GLASS SLIDING DOOR

12

1" STONE CURB - STONE '1'

13

FIXED CLEAR INSULATED GLASS UNIT OR STONE/GLASS LAMINATED PANEL IN IGU - SEE ELEVATIONS

13

SEALANT AND BACKER ROD

13

TREATED WD. BLOCKING

14

FIRE DEPARTMENT CONNECTION: BRUSHED STAINLESS STEEL FACE

14

ALUM. GLAZING PROFILE

14

SEALANT AND BACKER ROD

15

ALUM. GLAZING PROFILE

15

HANOVER PEDESTAL PAVER - CHARCOAL

16

STONE LAMINATED TO ALUM. HONEYCOMB PANEL AT BEDROOM

16

ST. STL. COUNTER FLASHING: SLOPE 14" : 1'-9"

16

MEMBRANE FLASHING

17

STONE LAMINATED TO ALUM. HONEYCOMB PANEL

17

HANOVER PEDESTAL PAVERS CHARCOAL

17

3" 60 PSI RIGID INSULATION

18

STONE TILE IN MORTAR BED: STONE TYPE '5'

18

MONOLITHIC ROOF MEMBRANE; CONTINUE OVER CURB

18

MONOLITHIC WATERPROOF MEMBRANE

19

SS GRILLE

19

ALUM. GLAZING PROFILE

19

SLOPED CONC. FILL

20

WATERPROOF MEMBRANE

20

SLOPED CONCRETE FILL

LAMINATED GLASS/STONE IN IGU AT LOBBY

3"

29

OPERABLE VENT / CLEAR GLASS

8

ALUM. COPING

1

6

4"

4"

ALUMINUM PRESSURE PLATE - T-SHAPED PROFILE

SECTION

5

15

AN

DE

2

4

ONTAL MULLION/OPENABLE VENT NORTH FACADE

- 7

ALUMINUM MULLION - T-SHAPED PROFILE

3

ONTAL MULLION/OPENABLE VENT NORTH FACADE

1

1

21

ROOF DRAIN

22

COMPRESSIBLE FILLER

23

NEW CONC. SIDEWALK

24

DRAINAGE MATT

25

COMPACTED FILL

26

INSULATE CAVITY

27 28 29 30 31

ANODIZED ALUM. COVER PLATE @ BEDROOM (TO COVER FIRE DEPARTMENT CONNECTION) FACE OF VERTICAL MULLION BEYOND CONC. CURB ST. STL. FLASHING RECESSED RADIATOR @ BEDROOM / UNIT T2 ONLY (NOT AT LOBBY/CORRIDOR)

27


North Facade

28 1

V33 PRESENTATION


6TH FL.

STONE

6th Floor Wall Detail Perspective

5th Floor Wall Detail Perspective

INSULATION

1

GLASS

13

11 12 5"

2"

1'-0 3/4"

9

CONCRETE SLAB 5TH FL.

10

METAL FRAME

2 3 4

5

7

6

8 5th Floor Wall Detail_ Transition to Stone Panel at Floor Slab

5th&6th Floor Wall Section Detail

6th Floor Wall Detail Perspective

5th Floor Wall Detail Perspective

1 2 3

1

4 5

6

13

11 12 5"

9

Concrete Drip + Weep Holes

7

B.O. Soffit in Adjacent Bay

8 9 10

Batt Insulation Concrete Slab: See Struct Drawings Vapor Barrier

11

Alum. Closure Match to Mullion

12

SS Radiator Grille: Arden Architectural Ele-Gril 38G Floor Assembly: 5/8” Engineered Hardwood Floor, 1/8” Soundmatt, 1/4” Ardex Leveling Compound

13

2"

1'-0 3/4"

Section Detail 5th Floor_Transition to Stone Panel at Floor Slab Welded Metal Frame Vertical Curtain Wall Mullion 7/8” Fire-Retradant Plywood. W/Metal Face and Edges Stone Panel W/Alum. Honeycomb Backer Board and Concealed Fasterners: Miter Corner Typ.-Stone ‘1’

10

Translucent Stone Panel Facade Construciton Detail

2 3 4

5

7

6

8 5th Floor Wall Detail_ Transition to Stone Panel at Floor Slab

29


F

2

4

1

UP

EMERGENCY EXIT

3

E

2

20 19 18 17 16 15 14 13 12

EMERGENCY EXIT

1

11 10

9

8

7

5

6

UP

4

3

17

D

16 9

8

10 11 12

13

14

15

3

C

SHAFT BELOW

B

UP

20 19 18 17 16

15 14 13 12 11

10

9

8

7

6

5

4

3

2

1

UP UP

30 FOOT SETBA

CK LINE

2

A

EXTERIOR

31-33 Vestry Street

OVERALL EXTERIOR

Floor Plan Level Roof

GRID

1. Swimming Pool 2. Open Roof Terrace 3. Powder Room 4. Skylight

3

4

5

6

7

8

NORTH

2

F

OVERALL EXTERIOR EXTERIOR

OVERALL EXTERIOR

INTERIOR

GRID

INTERIOR

EXTERIOR

INTERIOR

F

UP 1

E

UNIT PH

2

D 1

2

3

C FPSC 1 1/2 Hr

8A

D43

4A

STAIR 1

RD

SHAFT

E DN.

18 17 16 15 14 13 12

10 9

8

7 6

5 4

3 2 1

UP

ROOF TERRACE

D UP

9

DN. 1

2

3 4

5 6

7 8

9

10

13 14 15 16 17 18 19 20 21

C

B

UP 8

7

6

5

4

3

2

1

B

UP

8

5

1

4

2

7

6

A

INTERIOR EXTERIOR

GRID

Floor Plan Level 8

FLOOR PLANS LEVEL 1, 8, ROOF 30 1

V33 PRESENTATION

2

3

4

5

6

7

8

31-33 Vestry S

Floor Plan NORTH

1. Living Room 2. Kitchen 3. Dining Room 4. Bedroom 5. Guest Bedroom 6. Bathroom 7. Guest Bathroom 8. Roof Terrace 9. Den

A

OVERALL EXTERIOR

31-33 Vestry Street

1. Living Room 2. Kitchen 3. Lobby 4. Hydraulic Car 5. MRL Traction 6. Bedroom 7. Corridor 8. Exit Corridor 9. Garden


OVERALL EXTERIOR EXTERIOR

EXTERIOR

INTERIOR

INTERIOR

EXTERIOR

GRID

SITE

OVERALL EXTERIOR

INTERIOR

ADJACENT BUIDLING

SITE

PROPER

PROPERTY LINE

TY LINE

SITE

PROPERTY LINE AP 4

5 6

9 10

8

DW BATH 1

KITCHEN

1

9

2

4 REF

UNIT T1

2 3

4

MAIN ENTRANCE

1

VESTRY STREET

3

CAR ENTRANCE

1 2

ENTRANCE

BATH

15 14 13 12

1

10 9

8

7

2 3

3

5

4 BATH

5 6 7

8 9

10 11 12 12 13 14 15

6 5 GARAGE

3

8

2 1

ENTRANCE

9

1

SECONDARY ENTRANCE TO UNIT B EMERGENCY EXIT STAIR 1

4

MECH.

7

2

6

LINE

UNIT T2

PROPERTY

BATH 1 1

2 3

4 5 6

7 8

9 DW

DW AP

AP

PROPERTY LINE

ADJACENT BUIDLING - 1 STORY

84 ° °Â

.4

INTERIOR EXTERIOR OVERALL EXTERIOR GRID

Street

Level 8

1

SITE

2

3

4

5

6

7

8

NORTH

r Elevator Elevator

31


BATHROOM VIEW

32 1

V33 PRESENTATION


33


KITCHEN & DINING ROOM

34 1

V33 PRESENTATION


35


DUPLEX PENTHOUSE

36 1

V33 PRESENTATION


37


38 1

V33 PRESENTATION


39


2

512 Greenwich Street 2016-2018 7-Story Private Residence Area: 4460 SF Location: Manhattan, New York Archi-Tectonics LLC. New york is a extrmely complex city, not only physicaly, but also psychically. Especially in Manhattan, the most contradictory place in New York. On one side, you aspire to establish a connection to the daily urban live and its history, one the other side, sometimes you want to escape from it to enjoy inner peace and private time. For our client, who is a Psychologist, this private residence project , in some degree, is the extension of his persenalety and his understanding about this city. The project is based on a 100-year old building. The whole idea here is implicit and dubious. We renovate the building and inject vitality but also, we are trying to blur the boundry of time. Ancient bricks are kept, brushed, and become the background of modern appliance; old joists are clearned, reused, and integrated to be apart of brand new decoration; historical structures are well protected, reinforced, and support the whole new idea. Compare to the building itself, the second skin is complete new structure. If the building is the extension of owner’s spirit, the second skin is the way he talks to this world. The second skin is consist of 64 steel structure of 4 different size and 7,844 pieces of Trespa slats. Each floor and each area, coordinate with the activities happened inside, has complete different second skin configurations. This endows a completely fresh experience and participation with the

PROJECT TEAM/ Archi-Tectonics PRINCIPLE/ Winka Dubbeldam PHOTOGRAPHY/ Floto & Warner / Eric van den Brulle

40 21 V33 512 PRESENTATION GREENWICH ST


41


42 2

512 GREENWICH ST


43


44 2 512 GREENWICH ST


T he relationship between old and new

here is no longer a rigid line between existing and new construction. It’s a fusion, both in design language and the way impact the activities inside.

45


UP

DOWN

46 2

512 GREENWICH ST


47


48 2

512 GREENWICH ST


Bedroom

Living Room

Kitchen

49

Guest Room


1

A

B

2

ELEV. [+76'-1"] BULKHEAD STRUCTURE

ELEV. [+66'-2"] ROOF STRUCTURE

ELEV. [+55'-3"] 6TH FLOOR STRUCTURE

ELEV. [+44'-2"] 5TH FLOOR STRUCTURE

ELEV. [+33'-2"] 4TH FLOOR STRUCTURE

ELEV. [+22'-3"] 3RD FLOOR STRUCTURE

ELEV. [+11'-4"] 2ND FLOOR STRUCTURE

ELEV. [+0'-0"] 1ST FLOOR STRUCTURE

EAST FACADE ELEVATION

50 2 512 GREENWICH ST

510 GREENWICH STREET

514 GREENWICH STREET


ELEV. [+76'-1"] BULKHEAD STRUCTURE

ELEV. [+66'-2"] ROOF STRUCTURE

ELEV. [+55'-3"] 6TH FLOOR STRUCTURE

ELEV. [+44'-2"] 5TH FLOOR STRUCTURE

ELEV. [+33'-2"] 4TH FLOOR STRUCTURE

ELEV. [+22'-3"] 3RD FLOOR STRUCTURE

ELEV. [+11'-4"] 2ND FLOOR STRUCTURE

ELEV. [+0'-0"]

EAST ELEVATION

1ST FLOOR STRUCTURE

SOUTH FACADE ELEVATION

51


A

B

C

D

OVERALL GRID

INTERIOR

ROOM

GRID

STAIR CORE

ROOMS

2

6

7

7 5

8

4

9

3

10

2

11

1

12

DOWN

6

11 10 9

5

4

8 7 6 5 4 3

1

3

2

2 ENTRANCE

1

1

GUEST ROOM

2

HALLWAY

3

ELEVATOR

4 5

BATHROOM

2

STORAGE

6

TWINS STROLLER

7

ELECTRICAL RACKS

FLOOR LEVEL 1

A

B

C

D

OVERALL GRID

INTERIOR

STAIR CORE

ELEV. [+76'-1"]

ROOM

GRID

ROOMS

BULKHEAD 10"

2

8

CL.

9 10 11

4

12

3

13

2

4

2

9'-3"

5

14

1

15 16

3

6

ELEV. [+66'-2"]

5

1

1

KIDS BEDROOM

2

KIDS BEDROOM

3

HALLWAY

4

BATHROOM

5 TH NOR

ROOF STRUCTURE

CLOSET

6

WASH&DRYER

7

ELEVATOR

11'-5"

7

3'-6" T.O.F.

1

CL.

FLOOR LEVEL 4

A

B

C

D

OVERALL

ELEV. [+55'-5"]

GRID

INTERIOR

6TH FLOOR

ROOMS

GRID

ROOMS

2 9

10

11

12

13

14

15

1

16 DOWN

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

11'-1"

8

UP

6 5 4 3

2

4

1

ELEV. [+44'-4"]

3

5TH FLOOR

1

TH NOR

1

GUEST ROOM

2

BATHROOM

3

A.C. ABOVE

4

HOME OFFICE

5

ELEVATOR

6

CLOSET

11'-0"

6

5

ELEV. [+33'-4"] A

B

C

84'-1"

FLOOR LEVEL 6

4TH FLOOR

D

OVERALL

GRID

10'-11"

GRID

2

8

9

10

11

12

13

14

15

16

17

ELEV. [+22'-5"] 3RD FLOOR

4

4

5

3

7

6

2 1

2

3

10'-11"

OPEN TO BELOW

1 ENTRANCE

1

PLANTER WITH AUTO IRRIGATION

2

COUNTER

3

1

4 5 TH NOR

GREEN ROOF SLOPING SKYLIGHT

ELEV. [+11'-6"]

MEP.

6

SKYLIGHT ABOVE

7

RADIATOR

2ND FLOOR

FLOOR BULKHEAD

B

C

D

11'-4"

A

OVERALL TRELLIS

TRELLIS

ELEV. [+0'-2"]

2

1ST FLOOR 2

8'-2"

1

ELEV. [-8'-0"] CELLAR

1

TH NOR

1

ROOF

2

SKYLIGHT

FLOOR LEVEL ROOF

FLOOR PLANS LEVEL 1, 4, 6, BULKHEAD, ROOF

52 2 512 GREENWICH ST

SECTION FACING EAST

1


D

C

B

A

ELEV. [+76'-1"] BULKHEAD

ELEV. [+66'-2"] ROOF STRUCTURE

ELEV. [+55'-5"] 6TH FLOOR

ELEV. [+44'-4"] 5TH FLOOR

800021 800022 800023

0.3 -0.6 0.2 -0.2 -0.1 -0.6 MTS6021 MTS6060 MTS6061 800028 800027 800026 800025 on demand

ELEV. [+33'-4"] 4TH FLOOR

800021 800022 800023

0.3 -0.6 0.2 -0.2 -0.1 -0.6 MTS6021 MTS6060 MTS6061 800028 800027 800026 800025 on demand

ELEV. [+22'-5"] 3RD FLOOR

-0.6 -0.1 -0.2 0.2 -0.6 0.3 800025 800026 800027 800028 MTS6061 MTS6060 MTS6021 on demand

800023 800022 800021

0.3 -0.6 0.2 -0.2 -0.1 -0.6

800021 800022 800023

ELEV. [11'-8"]

MTS6021 MTS6061 MTS6060 800028 800026 800027 800025 on demand

ELEV. [+11'-6"] 2ND FLOOR

SOLAR GRILLE -0.6 -0.1 -0.2 0.2 -0.6 0.3 800025 800026 800027 800028 MTS6060 MTS6061 MTS6021 on demand

800023 800022 800021

ELEV. [±0'-0"] 800021 800022 800023

0.3 -0.6 0.2 -0.2 -0.1 -0.6 MTS6021 MTS6061 MTS6060 800028 800027 800026 800025 on demand

GROUND

ELEV. [0'-0"]

ELEV. [+0'-2"]

GROUND

1ST FLOOR

GREENWICH ST

SECTION C ELEV. [-8'-0"] CELLAR

SECTION A

SECTION FACING SOUTH

53


Staircase Veiw _Sunlight Came Streaming Through the Skylights

54 2

512 GREENWICH ST


55


3

AltaView-Live/Move/Grow 2017 SeaView Health Community Competition New York City Economic Development Corporation Location: Staten Island, New York New York City Economic Development Corporation (“NYCEDC”), in partnership with NYC Health + Hospitals (“NYC Health + Hospitals” or “H+H”), in coordination with the New York City Department of Housing Preservation and Development (“HPD”) and on behalf of the City of New York (the “City”), is pleased to release this request for expressions of interest for a leasehold interest to develop a master-planned, mixed-use, mixed-income community at the historic Sea View Hospital campus (“Campus” or the “Context Area”), in Staten Island, New York. Living healthy could be described as a system of concentric circles. It involves a mix of physical, mental, and emotional components that make us who we are. LIVING WITHIN THE GREENBELT [URBAN CONCEPT] Historic Center, Integrated Live/Play Zones [ZONING CONCEPT] NODES+SUBNODES/Integration of restored landmark buildings with new infill creates an organic growth and atmosphere [SMART MOBILITY] Car Free Mobility, New Entrances&Trails [SMART LANDSCAPE] Terraced Housing, Permeable Walkways&Green Parking Lots, Alternative Energy, Low Speed Zones PROJECT TEAM/ Archi-Tectonics Dishan Shah, Tiago Santos, Can Fu, Robin Zhang V+B Architects PRINCIPLE/ Winka Dubbeldam

56 3 SEAVIEW COMPETITION


57


R

J

Q

4 K

M

16

P

H 11 S

L O 9 N

I

3

B

A

58 3 SEAVIEW COMPETITION


12

MASTERPLAN 1 Park Lane Senior Housing 3 Camelot 4 Police Surgeon/ Grace Foundation 7 Colony Hall 9 Community Board 2 11 Meals on Wheels 12 Jewish Community Center 16 Fire Department of New York

F

E 1

D G

A B C D E F G H I J K L M N O P Q R

Terraces on the Green Green View Artist’s residence Park Lane Flats Manor Road Residences AltaView Flats Cottages on the Green Historic Pavilions New Pavilions Benchmark - Assisted living Mixed Use Retail/ Residential Cultural Center/ Retail Interfaith Spiritual Center Wellness Power Hub Gallop NYC - Equine Therapy Brooklyn Grange Greenhouses Hospital Richmond Uni. Medical Ctr School

Offices

Retail

Parking

Electric vehicles

Greenhouses

C

Farmers market

Restaurant

Geothermal Energy

Pedestrian paths

Bike paths

Equine therapy

Parks + playground

59


Introduction Starting from the innermost circle, we literally create our bodies from the inside out with what we eat. We shape and maintain this circle, our physical body, with what we do. But our health does not stop at our own skin. We impact and are nurtured by our context, and our actions reverberate in increasingly larger circles of influence in the world. How we live not only affects ourselves, but everyone we encounter, our community as well as our environment. Our proposal for the AltaView Healthy Living Community incorporates this paradigm into the very core of its design: A balanced, sustainable coexistence of nature and architecture, smart urban design and building typologies that actively promote well-being and a healthy lifestyle, a multi-layered mixed-use program that fosters new forms of living, working and leisure, as well as a sense of community and connectedness. The characteristic radial plan of the historic landmark buildings forms the natural new center of our site; the place where one lives, shops or finds wellness and health related amenities. This center is easily accessible, beautifully paved, park-like and car free. The historic buildings are fully restored and complemented by new structures, all set in luscious green gardens. The newly developed residential areas follow their own distinctive pattern. Balancing the concentric geometries of the center, they create an organic, landscape-like sequence of volumes embedded along the edge of the Greenbelt. These buildings fully embrace their exceptional location and views over the park, with new and extended hiking trails providing prime access to the large expanse of forest landscape, promoting physical activity in a pristine natural setting. The stacked green flats follow the natural incline in the site, allowing for environmentally friendly green roofs and generous outdoor space. Each residential area is equipped with underground parking, and a small sub center with local amenities in the adapted landmark buildings.

NODES+SUBNODES

ZONING CONCEPT

Integration of restored landmark buildings with new infill creates an organic growth and atmosphere.

Commercial entrance

Park Commercial Green

LLE AVE .

Green Housing NEW ENTRANCE

NEW ENTRANCE

Historic Center

Commercial

GREENBELT RECREATION CENTER

Housing

Hospital

NEW

Commercial entrance

Green buffer Housing

Greenhouses

Farm

Housing

90

’-0

’-0

Equine therapy

95

Housing

Park

RO

CK

LA

ND

AV

E.

Existing Trails New Trails

60 3 SEAVIEW COMPETITION

School

BRIE

SERVICE ENTRANCE

THE LANDMARK COLONY


SKETCH OF HISTORIC CENTER

Altaview will benefit from the presence of the Greenbelt as the front Garden for the new healthy living community. New trails are introduced radiating out to connect the existing Greenbelt trails. NEW TRAIL

80/ 180

80 ACRES HISTORIC CENTER NEW TRAIL NEW TRAIL

NEW TRAIL

EXISTING TRAIL

Living within the Greenbelt

JCC

100 ACRES

JCC

SMART MOBILITY Car Free Mobility, New Entrances&Trails

JCC

MANOR RD MANOR RD

Shuttle from Ferry Terminal

MANOR RD

Residential entrance

Residential entrance Internal Shuttle Commercial entrance

Car free zone

Residential entrance

POUCH CAMP POUCH CAMP

POUCH CAMP

Commercial entrance New entrances C2-3 commercial overlay Residential

SEAVIEW CAMPUS SEAVIEW CAMPUS SITE ANALYSIS: ROAD ASSESSMENT SITE ANALYSIS: ROAD ASSESSMENT Shuttle from Ferry terminal, SEAVIEW CAMPUS ROADS TO REMAIN SITE ANALYSIS: ROAD54, ASSESSMENT SEAVIEW CAMPUS bus route 57 ROADS TO REMAIN SITE ANALYSIS: ROAD ASSESSMENT Internal Shuttle ROADS TO REMAIN ROADS TO WIDEN/ ALTER (30’ circa) ROADS TOto REMAIN WIDEN/ ALTER (30’ circa) Roads remain ROADS TOto WIDEN/ ALTER (30’ circa) Roads NEW ROADS widen/ alter ROADS TO WIDEN/ ALTER (30’ circa) NEW ROADS New roads NEW ROADS Roads be removed ROADS TOto BE REMOVED NEW ROADS ROADS TO BE REMOVED ROADS TO BE REMOVED ROADS TO BE REMOVED

61


Living On The Green NEW HOUSING TYPOLOGIES Altaview Community offers a wide range of housing options for all ages and lifestyles, thus catering to a diverse cross section of residents.

This flexibility of housing arrangements allows for co-living of family members, adaptation to different life stages, or live-work arrangements, creating long-term stability and value.

Young families will feel at home in the community just as much as older residents who prefer to live independently, or may require the proximity of medical services.

AltaView thus offers a unique combination of independence and connectedness, equal parts urban and rural, historic and innovative. It organically combines living units in the historic Landmark Pavilions

Residential types range from detached multi-family cottages and terrace houses to loft apartments and full-service condominium residences with extensive amenities.

Living healthy could be described as a system of concentric circles. It involves a mix of physical, mental, and emotional components that make us who we are.

CENTRAL SQUARE HISTORIC SITE

62 3 SEAVIEW COMPETITION


PARK LANE

BR

IEL

LE

AV E

E

G

H

D

C I

A

Architectural Proposal

Manor Road Residences Flanking Historic Building (D)

Benchmark Assisted Living (I)

OVER VIEW THE GREEN BELT

Sea View Flats (E)

Terraces On The Green (A)

Park Lane Flats (C)

New Pavillions On The square (H) 63


64 3 SEAVIEW COMPETITION


TERRACES ON THE GREEN (A) H I S T O R I C C O T TA G E A S M A I N E N T RY B U I L D I N G

65


TERRACES ON THE GREEN ( A ) & ALTVIEW FLATS ( E ) Seaview Community offers a wide range of housing options for all ages and lifestyles, thus catering to a diverse cross section of residents.

Sun light

C C C A A

Elevator Acc

TERRACE HOUSING FOLLOWS THE SITE TOPOGRAPHY, ALLOWING FOR FREE VIEWS FOR ALL

Program

Location

Units

Spots

Sq.ft

Terraces On the Green

A

650

-

575,000

Altaview Flats

E

200

-

180,000

Parking Total

66 3 SEAVIEW COMPETITION

A&E -

E

750(A)+140(E) 850

P

890

755,000

A


UNIT A 3 Bedrooms_1000 sqft

UNIT B 1 Bedrooms_500 sqft A

3 Bedrooms Unit

B

1 Bedroom Unit

C

2 Bedrooms Unit

P

Car Parking

Green Roof Sun light C C

Green Roof B C

B C A

cess

C C

C

A

B B

B

B P

B

C P

P

P

UNIT C 2 Bedrooms_750 sqft

P

Park Lane

Elevator Access 1. Entrance 2. Living Room 3. Kitchen 4. Bathroom 5. Bedroom 6. Bathroom 7. Master bedroom 8. Pantry 9. Terrace

67


Park Lane Flats ( C )

Following the sinuous path of Park Lane, these stacked and staggered apartments are designed to complement the undulating topography of the site, and frame vistas to the surrounding forests.

Program

Location

Floors

Units

Sq.ft

Flat A

C

1st-9th Floor

172

118,800

Flat B

C

1st-9th Floor

172

154,800

Flat C

C

10th-11st Floor

12

26,400

Total

-

350

300,000

68 3 SEAVIEW COMPETITION

C


OVER VIEW GREENBELT

A

A

A

B

B

B

GROUND FLOOR PLAN LAYOUT

A

B

A

A

B

A

TYPICAL PLAN LAYOUT

The geometric stepped volumes provide green balconies and privacy to the occupants, whilst creating the illusion of an uninterrupted landscape by mimicking the steep contours of the surrounding area. The block is comprised of three distinct apartment layouts accommodating one, two and duplex apartments designed to maximize views and access to natural light and ventilation.

C

C

DUPLEX PLAN

A. 2 Bedrooms Unit B. 1 Bedroom Unit C. Penthouse

Sun light

25

11

OVER VIEW GREENBELT 110

14

146

BUILDING ELEVATION

BUILDING SECTION

69


Manor Road Residences ( D )

The new Manor Road Residences flanking Building 3 will create a unique spatial dialog of historic and contemporary architecture at the edge of the Greenbelt. Centered by the circular drop-off of the existing building, the buildings will share a common lobby, underground parking, as well as an impressive list of building amenities. All apartments will feature private green terraces, with spectacular views toward the Greenbelt and beyond.

Program Lobby (Shared) Wellness (Shared) Residences Total

70

3 SEAVIEW COMPETITION

Floor

Units

Sq.ft

Garden Floor

-

3,000

1st Floor

-

16,000

1st-15st Floor

200 units/bldg

185,000/bldg

-

400

370,000

D


ELEVATION PARK LANE

C

NEW BUILDING 1_FLATS

RENOVATED BUILDING 3 AMENITIES WITH CONDOS ABOVE

NEW BUILDING 2_FLATS

A. 1 Bedroom Unit 650 sq.ft -820 sq.ft B. 2 Bedrooms Unit 850 sq.ft - 1050 sq.ft C. 3 Bedrooms Unit 1100 sq.ft- 1415 sq.ft

C

A

B

A B

B B

A

A

A

A

A

A

TYPICAL PLAN LAYOUT

71


Benchmark - Assisted Living ( I )

ASSISTED LIVING IN THE GREEN

Program Residences Parking Total

72 3 SEAVIEW COMPETITION

Floor

Units

Spots

Sq.ft

1st-4th Floor

140

-

150,000

Basement

-

150

-

-

140

150

150,000

I


1

5 3

5

BASEMENT PARKING

GROUND FLOOR LOBBY & ROOMS

1 2

2 6

4TH FLOOR ROOMS

2ND - 3RD FLOOR ROOMS

1. ENTRANCE 2. ROOMS 3. PARKING 4. ROOF DECK 5. PATIO Sun light

3 3

SECTION

73


New Pavillions ( H )

Program Wellness Center Residences Total

74 3 SEAVIEW COMPETITION

Floor

Units

Sq.ft

1st Floor

-

80,000

2nd-4th Floor

45 Units/bldg X 4

166,000

-

180

246,000

H


1

WELLNESS CENTER 3

2

GROUND FLOOR

4

4

4

4

4 3

5

5

4 5

TYPICAL FLOOR

4

4

4

5

1. LOBBY 2. RESIDENCES ENTRANCE 3. ELEVATOR 4. 1 BEDROOM UNIT 5. 2 BEDROOMS UNIT 6. ROOF DECK 7. CAR PARKING

4 6

TOP FLOOR

7

SECTION

75


4

CAMOUFLAGE 2013/08 High-design Bird Blind Heron Pond Avian Observatory in Riverlands Confluence, 301 Riverlands, West Alton, Mo

WashingtonU Sam Fox School of Design/ Digital Fabrication Ken Tracy&Andrew Colopy Studio //Group Work of 20 Students (Design&Construction)

Winner of 2014 Architizer A+Awards (In the Student Design/Build Project category, which is voted on by a jury of professionals.)

This High-design Bird Blind --- Avian Observatory was a collaborating work designed and constructed together by students from Andrew Colopy’s “Studio Confluence” and Ken Tracy’s Digital Fabrication class. The purpose of this digital fabrication project was to design, fabricate, and build an avian observatory at Riverlands in collaboration with the Audubon Center at Riverlands and the Rivers Project Office of the U.S. Army Corps of Engineers. The observatory is a giant brown cocoon with the form inspired from Ghery’s Deconstructive taxonomies. Through lots of research on the birds’ living habits and optesthesia distinguish ability, the panel pattern design is based on the think of Inverse Camouflage, in order to blend the building with surrounding environment and avoid interrupting birds’ behavior. Accord to CRYPSIS theory, we chose the Disruptive/Dazzling Patterning for the panel pattern&color design, which can blend the observers’ opening on installation from the background with Hi-contrast Pattern. Photo Credits to WUSTL Photos

76 4 CAMOUFLAGE

Youtube Video Link of Contruction Process: https://www.youtube.com/watch?v=sHD6hgTQPEk


77


Panel Disruptive Pattern Openings & Color Design

COLOR

LEGEND

Section Cut /Structure Revit Details 3"

1 1/2"

LEGEND

3"

3"

3"

3"

2x3 Aluminum Angle Richilite Exterior Panel 2x2 Blockiung to support Purlin by Gutter 5/8" High Corrugated Panel

2x4 Aluminum Angle

2

0.1"Folded Aluminum Frame

3" High Aluminum Gutter CNC Edged Purlin

A3.01

2x8 Cedar Beam

Branching Taxonomies / Various Form Testing

1

A3.01

Horizontal Plastic Closure Strip 2x8 Cedar Column

LEGEND

2 A4.04

Reference Part A6.02 CLIENT

Reference Part A6.02

CLIENT AUDUBON SOCIETY AUDUBON CENTER AT RIVERLANDS 301 RIVERLANDS WAY

WESTALTON, MO 63386 CROSS SECTION AT CANTILEVER CONTACT: PATRICIA HAGEN, EXECUTIVE DIRECTOR 1/2"=1'-0"

CROSS SECTION 1/2"=1'-0"

AUDUBON SOCIETY AUDUBON CENTER AT RIVERLANDS 301 RIVERLANDS WAY WESTALTON, MO 63386

1 3/4"

US ARMY CORPS OF ENGINEERS RIVERS PROJECTS OFFICE 301 RIVERLANDS WAY WEST ALTON, MO 63386

3"

3"

CONTACT: PATRICIA HAGEN, EXECUTIVE DIRECTOR

DESIGN TEAM

0 3/4"

1/16" Perfoerated Aluminum Panel

1 1/2"

1 3/4" 0 3/4"

2 5/8"

1 1/2" 1 3/4"

3

CONTACT: CHARLIE DEUTSCH, TECHNICAL DIRECTOR

0 1/4"

1 3/4"

0 1/4"

0 3/4"

0 3/4"

4

3"

3"

STUDENTS NIKE CAO, JINA KIM, YU RONG, HAO WU, DAVID ORNDORFF, YAO XIA, WASSEF DABBOUSSI, YILONG WANG, NASH WATERS, YU XIN, HAOSHENG ZHANG

2x4 Long Blocking for Beam Connection

3"

STUDIO CONFLUENCE INSTRUCTORS ANDREW COLOPY, KEN TRACY

2x6Joist

Joist Hanger

2

1

A3.01

A3.01

US ARMY CORPS OF ENGINEERS RIVERS PROJECTS OFFICE 301 RIVERLANDS WAY WEST ALTON, MO 63386

0.1"Horizontal Folded Aluminum Frame

CLIENT SCALE

6"=1'-0"

CROSS SECTION AT CANTILEVER 1/2"=1'-0"

4

DRAWN BY

HAO WU 1/16" Perfoerated Aluminum Panel

3

CROSS SECTION 1/2"=1'-0"

AUDUBON SOCIETY AUDUBON CENTER AT RIVERLANDS 301 RIVERLANDS WAY WESTALTON, MO 63386

PROJECT

AVIAN OBSERVATORY AUDUBON CENTER AT RIVERLANDS WEST ALTON, MO

CONTACT: PATRICIA HAGEN, EXECUTIVE DIRECTOR

TYP. SECTION AT PANEL ATTACHMENT AT ROOF (WEST SIDE) 6"=1'-0"

1

A4.06

TYP. SECTION AT PANEL ATTACHMENT AT ROOF (EAST SIDE) 6"=1'-0"

CONTACT: CHARLIE DEUTSCH, TECHNICAL DIRECTOR

US ARMY CORPS OF ENGINEERS RIVERS PROJECTS OFFICE 301 RIVERLANDS WAY WEST ALTON, MO 63386

Typ. Roof Panel_Section

2

CONTACT: CHARLIE DEUTSCH, TECHNICAL DIRECTOR

DESIGN TEAM

LEGEND

DESIGN TEAM

STUDIO CONFLUENCE

#4 BAR, 12" O.C, (TRANSVERSE) #5 BAR, 10" O.C, (LONGITUDINAL)

STUDENTS NIKE CAO, JINA KIM, YU RONG, HAO WU, DAVID ORNDORFF, YAO XIA, WASSEF DABBOUSSI, YILONG WANG, NASH WATERS, YU XIN, HAOSHENG ZHANG

1 1/2"

6"

2"

#5 BAR, 10" O.C, (LONGITUDINAL)

3"

RETURN #5 BAR, TYP

1 1/2"

INSTRUCTORS ANDREW COLOPY, KEN TRACY

9"

2"

STUDIO CONFLUENCE

INSTRUCTORS ANDREW COLOPY, KEN TRACY

6"

2"

#4 BAR, 12" O.C, (TRANSVERSE)

3"

1 1/2

6 1/8"

CORROSION RESISTANT: COATED REBAR CHAIRS: WHERE UNDERSIDE OF CANTILEVER SLAB IS EXPOSED TO VIEW.

3"

DRAWN BY

"

1 A4.05

YAO XIA, YU XIN PROJECT

9"

3"

STUDENTS NIKE CAO, JINA KIM, YU RONG, HAO WU, DAVID ORNDORFF, YAO XIA, WASSEF DABBOUSSI, YILONG WANG, NASH WATERS, YU XIN, HAOSHENG ZHANG

SCALE

1/2"=1'-0"

#4 BAR, 12" O.C, BOTH DIRECTIONS 3" COVERAGE BELOW

#4 BAR. 12" O.C, #4 BAR, 12" O.C, (BOTH DIRECTION) MAINTAIN 3" CONCRETE COVERAGE LAPPED 12" AT CANTILEVER

3"

CLIENT

3"

AVIAN OBSERVATORY AUDUBON CENTER AT RIVERLANDS WEST ALTON, MO

Concrete Foundation Plan Ancor Layout

"

AUDUBON SOCIETY AUDUBON CENTER AT RIVERLANDS 301 RIVERLANDS WAY WESTALTON, MO 63386

2

#4 BAR. 12" O.C, #4 BAR, 12" O.C, (BOTH DIRECTION) MAINTAIN 3" CONCRETE COVERAGE LAPPED 12" AT CANTILEVER

8'-0 3/16" VARIES

6 1/8

CORROSION RESISTANT: COATED REBAR CHAIRS: WHERE UNDERSIDE OF CANTILEVER SLAB IS EXPOSED TO VIEW.

3"

21'-5 5/16" VARIES

Appox. 48 inches of Strcutural Fill Above Scarified Exst Grade -6 inch lifts compacted o at least 95 percent modified Proctor and 2,000 PSF bearing capacity assumed

9"

2"

2"

1 1/

RETURN #5 BAR, TYP

#4 BAR, 12" O.C, BOTH DIRECTIONS 3" COVERAGE BELOW

SLAB DETAIL SECTION CONTACT: PATRICIA HAGEN, 1/2"=1'-0"

EXECUTIVE DIRECTOR

1

LONGITUDINAL SECTION 1/2"=1'-0"

SCALE

1/2"=1'-0"

A2.01

DRAWN BY 1

US ARMY CORPS OF ENGINEERS RIVERS PROJECTS OFFICE 301 RIVERLANDS WAY WEST ALTON, MO 63386

YAO XIA, YU XIN PROJECT

9"

A4.05

CONTACT: CHARLIE DEUTSCH, TECHNICAL DIRECTOR

3"

21'-5 5/16" VARIES

DESIGN TEAM

8'-0 3/16" VARIES

STUDIO CONFLUENCE INSTRUCTORS ANDREW COLOPY, KEN TRACY STUDENTS NIKE CAO, JINA KIM, YU RONG, HAO WU, DAVID ORNDORFF, YAO XIA, WASSEF DABBOUSSI, YILONG WANG, NASH WATERS, YU XIN, HAOSHENG ZHANG

SCALE

1"=1'-0"

1

ELEVATION 7 1"=1'-0"

DRAWN BY

NIKE CAO PROJECT

Appox. 48 inches of Strcutural Fill Above Scarified Exst Grade -6 inch lifts compacted o at least 95 percent modified Proctor and 2,000 PSF bearing capacity assumed

AVIAN OBSERVATORY AUDUBON CENTER AT RIVERLANDS WEST ALTON, MO

Concrete Foundation Plan Ancor Layout

AVIAN OBSERVATORY AUDUBON CENTER AT RIVERLANDS WEST ALTON, MO

Elevation

2

78 4 CAMOUFLAGE

SLAB DETAIL SECTION 1/2"=1'-0"

A5.03

1

LONGITUDINAL SECTION 1/2"=1'-0"

A2.01


1

5

RICHLITE -1/4” thickness -Weather/UV Resistant -Recycled/Recyclable -Colors:

4

R50 1/4”

Chocolate Glacier 1/4”

Hybrid Sheet A R50

1/32” 1/16”

Chocolate Glacier

1/16”

1/4”

1/16” 1/32” R50

Hybrid Sheet B

CLIENT

Chocolate Glacier

1/32” 1/16”

R50

1/16”

1/4”

1/16”

AUDUBON SOCIETY AUDUBON CENTER AT RIVERLANDS 301 RIVERLANDS WAY WEST ALTON, MO 63386

1/32” Chocolate Glacier

2

ALUMINUM -Alloy 5052 -.100” thickness -Highly water and weather resistant -Light Weight

CONTACT: PATRICIA HAGEN, EXECUTIVE DIRECTOR

US ARMY CORPS OF ENGINEERS RIVERS PROJECTS OFFICE 301 RIVERLANDS WAY WEST ALTON, MO 63386 CONTACT: CHARLIE DEUTSCH, TECHNICAL DIRECTOR DESIGN TEAM

3

PERFORATED ALUMINUM -.06” thickness Ͳϭͬϰ͟ ŚŽůĞƐ͕ ǁŝƚŚ ϯͬϴ͟ Žƌ ϭͬϮ͟ ƐƚĂŐŐĞƌĞĚ ƉĂƩĞƌŶ ͲKďƐĐƵƌĞƐ ĂůƵŵŝŶƵŵ ĨƌĂŵŝŶŐ͕ ŚŝŶƚƐ Ăƚ ƉĂƩĞƌŶ ŽĨ ƌŝĐŚůŝƚĞ -Covers walls and ceiling Ͳ&ŝůƚĞƌƐ ĂŶĚ ƐŽŌĞŶƐ ŝŶƚĞƌŝŽƌ ůŝŐŚƚ

3

STUDIO CONFLUENCE INSTRUCTORS ANDREW COLOPY & KEN TRACY STUDENTS NIKE CAO, JINA KIM, YU RONG, HAO WU, DAVID ORNDORFF, YAO XIA, WASSEF DABBOUSSI, YILONG WANG, NASH WATERS, YU XIN, HAOSHENG ZHANG

1/16” = 1’-0”

4

2

SHEET METAL SCREWS -1/8” diameter -Security headtype preferable -Color matched from Richlite

5

ALUMINUM RIVETS

FINAL: JINA KIM, YU XIN INITIAL: NIKE CAO, HAO WU, WASSEF DABBOUSSI,YILONG WANG

AVIAN OBSERVATORY AUDUBON CENTER AT RIVERLANDS WEST ALTON, MO

1 -3/16” diameter, 1/4” grip range Ͳ&Žƌ ƐĞĐƵƌŝƚLJ ĂŶĚ ĞĂƐĞ ŽĨ ĐŽŶƐƚƌƵĐƟŽŶ

PANEL MOCK UP

A4.07 Panel Structure & Fabrication/Construction Process

79


“Consealment by some means that alters or obscures the appearance: Drab plumage provides the bird with camouflage against predators.” “Disruptive/Dazzling Pattern: Hi-contrast pattern bends from the background in order to obfuscates an object’s size, form, speed and range” Panoroma of Avian Observatory Interior View&Gradual-change of Openings (bottom)

80 4 CAMOUFLAGE


81


Photo Credits to WUSTL Photos

82 4 CAMOUFLAGE


83


PS

REVIT DOCS E

D

C

B

1

A

Revit Construction Drawings for Philadelphia Town Office Building Penn Design Construction

2

3

4

5

ROOF 105' - 0"

ROOF 105' - 0"

Level 10 95' - 0"

Level 10 95' - 0"

Level 9 85' - 0"

Level 2 10' - 0"

Level 9 85' - 0"

Level 8 75' - 0"

Level 1 2 10' 0' - 0"

Level 8 75' - 0"

Level 7 65' - 0"

Level Level 12 0'10' - 0" - 0"

Level 7 65' - 0"

Level 6 55' - 0"

Level 1 0' - 0"

Level 6 55' - 0"

Level 5 45' - 0"

Level 5 45' - 0"

Level 4 35' - 0"

Level 4 35' - 0"

1 A401-1

Level 3 25' - 0"

Level 3 25' - 0"

Level 2-2 19' - 5 3/16" Level 2 15' - 0" Level 1-2 8' - 9" Level 1 0' - 0"

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

F

Level 2 15' - 0" Level 2 10' - 0"

Level 1-2 8' - 9"

Level 1 0' - 0"

Level 1 0' - 0"

B1 -12' - 0"

B1 -12' - 0"

B2 -24' - 0"

B2 -24' - 0"

B3 -36' - 0"

B3 -36' - 0"

ARCH 532

Philadelphia Offic Building Sections-2

2

Section EW-S 3/32" = 1'-0"

1

Section NS-E 3/32" = 1'-0"

532.

Project Number Date

Ca Che

Drawn By Checked By

A202

Scale

A

F

B

3/32" =

A Rectangular Duct

Level 2 9 85' - 0" 10'

W-Wide Flange W18X76

ROOF 105' - 0" Level 4 35' - 0"

10' - 0"

Level 6 55' - 0"

Basic Wall Generic - 8" Masonry

Level 1 8 2 75' 10' 0' - 0"

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

10' - 0"

10' - 0"

Level 5 45' - 0"

Level 2 9 85' - 0" 10'

10' - 0"

Level 4 35' - 0"

10' - 0"

Basic Roof Insulation on Metal Deck-EPDM

Level 1 8 2 75' 10' 0' - 0"

Curtain Wall Storefront

2 A501

5' - 6 13/16"

10' - 0"

Level 3 25' - 0"

Level 2-2 19' - 5 3/16"

Rhomboid east west solar shade

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

10' - 0"

W-Wide Flange W18X76

Level 10 95' - 0"

Basic Roof Insulation on Meta Deck -EPDM

Level 3 25' - 0"

Rhomboid Curatin Panle

Level 1 7 2 65' 10' 0' - 0"

Level 2-2 19' - 5 3/16"

Structural Beam System

Rectangular Mullion 2.5" X 5" rectangular

Level 2 15' - 0"

4' - 5 3/16"

Level 1 7 2 65' 10' 0' - 0"

Rectangular Mullion 2.5" X5" rectangular

10' - 0"

Level 2 15' - 0"

Level 1 6 55' 0' - 0"

6' - 3"

Floor 4" LW Concrete on 2" Metal Deck 2

ARCH 532

Level 1 6 55' 0' - 0"

Level 1-2 8' - 9"

ARCH 5

Philadelphia Buildin

Level 1-2 8' - 9"

Philadelphia Office Building

Partial Wall S

Detailed Sections

Project Number Date Drawn By

Project Number

Drawn By

3

Checked By

Scale

532.2014 0425 Can Fu Checker

Checked By

Callout of Section EW-N with atrium 1/2" = 1'-0"

A402

1/4" = 1'-0"

2

Scale

YIN

6" Grass Geotext Tile Drainage Membrane Layer 1" Sand 3/4" Bitumen high Density Board 3/4" EPDM Membrane Roofing 2" Thermal Barriers Moisture Barriers 3/4" Plywood Sheating 9-1/4" Dimension Lumber 1/2" Gypsum Wall Board

YIN

1' - 4 1/2"

Level 3 Rear 21' - 0" 4" Exterior Brick Masonry 1 1/2" Air Cavity 1 1/2" Rigid Insulation 8" Concrete Masonry Block 6 Mil Vapor Barrier 1/2" Metal Furring 3/4" Interior Finish Gypsum Board

5' - 6" 1' - 9"

SIYUAN

SIYUAN

0' - 9"

1' - 4 1/2"

4" Exterior Brick Masonry 1 1/2" Air Cavity 1 1/2" Rigid Insulation 8" Concrete Masonry Block 6 Mil Vapor Barrier 1/2" Metal Furring 3/4" Interior Finish Gypsum Board

Bond Beam

Level 3 23' - 6"

8"x8"x16" Concrete Bond Beam

Steel Angle

1-1/4" Clapboard Siding 3/4" Wood furring 3/4" Wood Sheating Plywood 5-1/2" Wood Stud Layer 3/4" Gypsum Wall board

L6"x6"x1/2" Steel Angle

PennDesign University of Pennsylvania

PennDesign

1" Anchor Bolt

University of Pennsylvania

Arch531 Construction Technology

Arch531 Construction Technology

2"x10" Nominal Cut Lumber Section

Rowlock Sill 15" Slope

2 1/2" Rigid Insulation

96" x 72" Fixed Window 3

2 A201

Level 1 2' - 0"

0' - 11"

Flasing Drip Edge Under Sill

ADD201

A501

Callout of Detailed Section EW-S with window 1/2" = 1'-0"

6' - 0"

Date

Detailed Callout Section EW-S with window 1/4" = 1'-0"

5/2/2014 3:49:32 PM

2

Metal Wall Ties Vertically Spaced @16" O.C.

5-1/2" Insulation

PennDesign

Project Number Date Drawn By Checked By 2

Callout of Green Roof at Skylight 1 1/2" = 1'-0"

1

Callout of Cantilevered Roof And Floor Framing 1 1/2" = 1'-0"

4" Exterior Brick Masonry Construction 1 1/2" Air Cavity 1 1/2" Rigid Insulation 8" Concrete Masonry Block 6 Mil Vapor Barrier 1/2" Metal Furring 3/4" Interior Finish Gypsum Board Project Number

Issue Date Siyuan Yin Checker

ADD502

1 1/2" = 1'-0"

Wood Blocking 4" Exterior Brick Masonry 1 1/2" Air Cavity 1 1/2" Rigid Insulation 8" Concrete Masonry Block 6 Mil Vapor Barrier 1/2" Metal Furring 3/4" Interior Finish Gypsum Board

6" Grass Geotext Tile Drainage Membrane Layer 1" Sand 3/4" Bitumen high Density Board 3/4" EPDM Membrane Roofing 2" Thermal Barriers Moisture Barriers 3/4" Plywood Sheating 9-1/4" Dimension Lumber 1/2" Gypsum Wall Board

Insulation Filling 2"x10" Roof Framing

Typical Wall Call Out Details

Metal Coping 2"x14" Wood Nailer

Level 3 23' - 6"

PennDesign Construction

Project Number Date Drawn By

Callout of Second Floor Framing and Wall 3 1 1/2" = 1'-0"

Scale

84 PS REVIT DOCS

Level 2 Rear 11' - 0"

9" Insulation 4" Exterior Brick Masonry 1 1/2" Air Cavity 1 1/2" Rigid Insulation 8" Concrete Masonry Block 6 Mil Vapor Barrier 1/2" Metal Furring 3/4" Interior Finish Gypsum Board

Callout ofl Ground and Foundation Wall 1 1/2" = 1'-0"

Level 2 13' - 6"

11/25/2013 11:22:21 AM

0' - 11"

Level 2 13' - 6"

Pine Street Additional House

2

2' - 10"

Callout of Window Head and Sill Detail 1 1/2" = 1'-0"

2' - 0"

1' - 9"

Level 3 23' - 6"

1

1' - 9"

0' - 10"

GROUND 0' - 0"

0' - 11"

8' - 0"

10' - 0"

2x8 Wood Blocking

Typical Wall Call Out Details

6' - 0"

8'x6' Chrome Frame Skyline 1" Insulated Glass

2' - 5"

0' - 10"

6" Grass Geotext Tile Drainage Membrane Layer 1" Sand 3/4" Bitumen high Density Board 3/4" EPDM Membrane Roofing 2" Thermal Barriers Moisture Barriers 3/4" Plywood Sheating 9-1/4" Dimension Lumber 1/2" Gypsum Wall Board

Pine Street Additional House

Flashing w. Weep Hole @ 2' O.C. TYP

Checked By Callout of Parapet Detail 4 1 1/2" = 1'-0" Scale

Project Number Issue Date Siyuan Yin Checker

ADD501

1 1/2" = 1'-0"


1

2

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

1

final inte 12" = 1'-0"

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

2

3D View 11_ex 12" = 1'-0"

Exterior View 1

Exterior View 2

ARCH 532 Philadelphia Office Building

Date Drawn By Checked By

ARCH 532

2

3D View 12_ex 2 12" = 1'-0"

Scale

A003

532.2014 0425 Can Fu Checker

12" = 1'-0"

5/2/2014 3:44:12 PM

Exterior Renderings Project Number

Philadelphia Office Building

Date Drawn By Checked By

Scale

A001

532.2014 0425 Can Fu Checker

5/2/2014 3:40:23 PM

Exterior Views Project Number

P

Projec Date

Drawn

Check

1

3D View 19_1 exfinal 12" = 1'-0"

2

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

Scale

1

Exterior View 1

PRODUCED BY AN AUTODESK STUDENT PRODUCT

Exterior View 2

ARCH 532 Philadelphia Office Building

Drawn By Checked By

A001

Scale Copy (2) of southern facade

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

4

532.2014 0425 Can Fu Checker

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

Date

5/2/2014 3:40:23 PM

Exterior Views Project Number

ARCH 532

Philadelphia Offi Building

ARCH 532 Philadelphia Office Building

Interior Renderin

High Performance Facade Date Drawn By Checked By

3

southern facade Scale

A007

532.2014 0425 Can Fu Checker

12" = 1'-0"

1

53

Project Number Date

5/2/2014 3:44:33 PM

Project Number

Drawn By Checked By

3D View 17_inte pes 12" = 1'-0"

2

3D View 16_1 inte pe 12" = 1'-0" Scale

A004

PRODUCED BY AN AUTODESK STUDENT PRODUCT

ARCH 431/531: Construction Technology 1

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

Philadelphia Rowhome Addition

CANFUDESIGN

110713

Date

Can Fu

Drawn by

12" = 1'-0"

Scale

Interior View

12/15/2013 6:34:42 PM

ADD002

PRODUCED BY AN AUTODESK STUDENT PRODUCT

85

C

12"

PRODUCED BY AN AUTODESK STUDENT PRODUCT


Other Revit Construction Drawing Documents

A

B

C

D

E

F

1

2

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

3

4

5 6

roof plan 1/16" = 1'-0"

A

B

C

D

E

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

2

F

1 2 3

ARCH 532

4

Philadelphia Office Building

5 6

ARCH 532

Perspective Section 2

Philadelphia Office Building Site Plan

Project Number Date

Drawn By Checked By

A100

Scale

F

A

B

D

C

E

A

B

D

C

E

F

A

B

D

C

74' - 0 15/16"

E

F A

3

D

C

E

F

25' - 0"

1 69' - 9 11/16"

2

90' - 0"

90' - 0"

20' - 0"

65' - 0"

2

E

F

20' - 0"

Drawn By Checked By

A101

Scale

F

1

2

2

3

5

6

135' - 0"

ARCH 532

4

5

Philadelphia Office Building

6

Ceiling Plans 532.2014 0425 Can Fu Checker

Project Number Date Drawn By

1/16" = 1'-0"

Checked By

3

Level 1 1/16" = 1'-0"

4

Level 8 1/16" = 1'-0"

A110

Scale

1/16" = 1'-0"

P

D 1

Lobby Plan 1/8" = 1'-0"

D

C

S

D

F 4

3

2

1

A

B

C

D

E

D

C

B

1

A

2

3

4

E

F

E

F

5 ROOF 105' - 0"

F

ROOF 105' - 0"

10' - 0"

5

E

3

4

3

135' - 0"

6

135' - 0"

5/2/2014 3:45:32 PM

Date

E

5

532.2014 0425 Can Fu Checker

Project Number

Copy of Level 7 1/16" = 1'-0"

D

C

1

4

Floor Plans

4

B

135' - 0"

Philadelphia Office Building

6

Copy of Level 1 1/16" = 1'-0"

A

ARCH 532

5

6 135' - 0"

3

D

C

4

5 135' - 0"

B

135' - 0"

3

4

B3 1/16" = 1'-0"

2

A

20' - 0"

3

B1 1/16" = 1'-0"

65' - 0"

20' - 0"

1

1

10' - 0"

B

6

145' - 0"

90' - 0"

A

140' - 0" 27' - 8 3/8"

5

65' - 0"

Copy of B3 1/16" = 1'-0"

F

135' - 0" 22' - 3 21/32"

1 4

5 6

90' - 0"

2

25' - 0"

3

4

2

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

Copy of B1 1/16" = 1'-0"

25' - 0"

F

5 6

145' - 0"

144' - 2"

E

E

2

100' - 2"

4

6

D

74' - 0 15/16"

2 99' - 11 31/32"

3

5

C

D

C

135' - 0" 74' - 0 15/16"

100' - 11 9/16"

3

4

B

B

1

2 101' - 0"

74' - 0 15/16"

2

A

12" = 1'-0"

1 1

1

Scale

144' - 2 1/16"

145' - 0 1/16" 1

145' - 0"

A009

section 2

F

145' - 0 1/16"

145' - 0 1/16"

1

90' - 0"

E

section 2_1 12" = 1'-0"

65' - 0"

D

C

2

5/2/2014 3:47:55 PM

B

As indicated

532.2014 0425 Author Can Fu

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

A

Checked By 5/2/2014 3:45:23 PM

Date

Copy of Site 1" = 30'-0"

Drawn By

532.2014 0425 Can Fu Checker

Project Number

1

5/2/2014 3:45:17 PM

PS

REVIT DOCS

Level 2 10' - 0"

Level 1-2 8' - 9"

Level 1 0' - 0"

Level 1 0' - 0"

Level 2 15' - 0"

Level 1-2 8' - 9" Level 1 0' - 0"

B1 -12' - 0"

ARCH 532

B2 -24' - 0"

B2 -24' - 0"

B3 -36' - 0"

B3 -36' - 0"

Philadelphia Office Building

Level 2 10' - 0"

Level 1 0' - 0"

B1 -12' - 0"

B1 -12' - 0"

B2 -24' - 0"

B2 -24' - 0"

B3 -36' - 0"

B3 -36' - 0"

Section NS-W 3/32" = 1'-0"

2

Section EW-N 3/32" = 1'-0"

Date Drawn By Checked By

A201

Scale

3/32" = 1'-0"

1

10' - 0" 10' - 0" 10' - 0"

10' - 0"

10' - 0"

10' - 0"

10' - 0"

Level 3 25' - 0"

Level 2 15' - 0"

Level 2 15' - 0"

Level 1-2 8' - 9"

Level 1-2 8' - 9"

Level 1 0' - 0"

ARCH 532

Level 1 0' - 0"

B1 -12' - 0"

Philadelphia Office Building

Date Drawn By Checked By

A202

Scale

2

B3 -36' - 0"

Section EW-N with atrium 1/8" = 1'-0"

3/32" = 1'-0"

1

Callout of Section 5 1/8" = 1'-0"

A

F

A

5

4

3

2

1

F

E

D

C

B

B

C

D

E

1

F

2

3

4

5

Sewer

B2 -24' - 0"

B3 -36' - 0"

532.2014 0425 Can Fu Checker

Project Number

Gas Main

B1 -12' - 0"

B2 -24' - 0"

Section NS-E 3/32" = 1'-0"

5/2/2014 3:48:15 PM

1

Section EW-S 3/32" = 1'-0"

Level 4 35' - 0"

Level 3 25' - 0"

Level 1 0' - 0"

Sections-2 2

532.2014 0425 Author Checker

Level 5 45' - 0"

Level 4 35' - 0"

3 A501

Level 2 10' - 0"

Sections Project Number

10' - 0"

10' - 0" 10' - 0"

Level 1-2 8' - 9"

Level 1 0' - 0"

Level 6 55' - 0"

Ducts

Level 5 45' - 0"

10' - 0"

Level 3 25' - 0"

Level 7 65' - 0"

Level 6 55' - 0"

Custom Curtain Wall Panel w/ Low-E Glazing

10' - 0"

Level 3 25' - 0" Level 2-2 19' - 5 3/16" Level 2 15' - 0"

Level 1 0' - 0"

B1 -12' - 0"

Level 4 35' - 0"

1 A401-1

Level 1 0' - 0"

15' - 0"

Level 2 15' - 0"

Level 2 15' - 0" Level 1-2 8' - 9"

Level 6 55' - 0"

Level 5 45' - 0"

Level 4 35' - 0"

Level 8 75' - 0" Vertical Solar Shade

Level 7 65' - 0"

12' - 0"

2 A401

Level 3 25' - 0"

Level 3 25' - 0"

Level 1 0' - 0"

Level 5 45' - 0"

Level 9 85' - 0"

Level 8 75' - 0"

12' - 0"

Level 4 35' - 0"

Level 4 35' - 0"

Level 6 55' - 0"

Level 2 1 10' 0' - 0"

Level Level 2 1 10' - 0' 0"- 0"

12' - 0"

Level 5 45' - 0"

Level 5 45' - 0"

Level 7 65' - 0"

10' - 0"

Level 6 55' - 0"

Level 8 75' - 0"

Level Level 12 0'10' - 0" - 0"

10' - 0"

Level 1 0' - 0"

Level 9 85' - 0"

Level 1 2 10' 0' - 0"

10' - 0"

Level 7 65' - 0"

Level 2 10' - 0"

Level 7 65' - 0"

6' - 3"

Level Level 2 1 10' -0'0"- 0"

Level 9 85' - 0"

Level 8 75' - 0"

8' - 9"

Level 6 55' - 0"

Level 8 75' - 0"

12' - 0"

Level 7 65' - 0"

Level 9 85' - 0"

12' - 0"

Level 8 75' - 0"

Level 2 10' - 0"

Level 2 1 10' 0' - 0"

Level 10 95' - 0"

Level 9 85' - 0"

5/2/2014 3:48:46 PM

Level 9 85' - 0"

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

Level 10 95' - 0"

Level 10 95' - 0"

Level 2 10' - 0"

12' - 0"

ROOF 105' - 0"

Level 10 95' - 0"

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

ROOF 105' - 0"

Level 10 95' - 0"

10' - 0"

Level 10 95' - 0"

ROOF 105' - 0"

ROOF 105' - 0"

Rectangular Duct

A

W-Wide Flan W18X76

Level 4 35' - 0"

ROOF 105' - 0"

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

Level 8 75' - 0"

Level 8 75' - 0"

Level 7 65' - 0"

Level 6 55' - 0"

Level 6 55' - 0"

Level 5 45' - 0"

Level 4 35' - 0"

Level 4 35' - 0"

Level 2 15' - 0" Level 1-2 8' - 9"

Level 1 0' - 0"

Level 1 0' - 0"

B1 -12' - 0"

B1 -12' - 0"

B2 -24' - 0"

B2 -24' - 0"

B3 -36' - 0"

B3 -36' - 0"

ARCH 532

Drawn By

1

Copy of North 3/32" = 1'-0"

Checked By

Scale

86 PS REVIT DOCS

Level 7 65' - 0"

Level 6 55' - 0"

Level 6 55' - 0"

Level 5 45' - 0"

Level 5 45' - 0"

Level 4 35' - 0"

Level 4 35' - 0"

Level 3 25' - 0"

Level 2 15' - 0" Level 1-2 8' - 9"

Level 1 0' - 0"

Level 1 0' - 0"

B1 -12' - 0"

B1 -12' - 0"

B2 -24' - 0"

B2 -24' - 0"

B3 -36' - 0"

B3 -36' - 0"

A301

532.2014 0425 Can Fu Checker

3/32" = 1'-0"

Basic Wall Generic - 8"

Rhomboid east west solar shade

Basic Roof Insulation on

Level 3 25' - 0"

Rhomboid Curatin Panle

Level 2-2 19' - 5 3/16"

Structural Beam System

Rectangular 2.5" X 5" rec

Level 2 15' - 0"

ARCH 532

Floor 4" LW Concrete on 2" Metal Deck 2

Philadelphia Office Building

Elevations N/E Date

Copy of East 3/32" = 1'-0"

Level 7 65' - 0"

Level 2 15' - 0"

Philadelphia Office Building

Project Number

2

Level 8 75' - 0"

Level 3 25' - 0"

Level 1-2 8' - 9"

Elevation S/W 1

Copy of South 3/32" = 1'-0"

2

Copy of West 3/32" = 1'-0"

Project Number Date Drawn By

5/2/2014 3:48:52 PM

Level 2 15' - 0"

Level 9 85' - 0"

Level 8 75' - 0"

Level 1-2 8' - 9"

Level 3 25' - 0"

Level 1-2 8' - 9"

Level 9 85' - 0"

W-Wide Flange W18X76

Checked By

Scale

A302

532.2014 0425 Can Fu Checker

3/32" = 1'-0"

5/2/2014 3:48:56 PM

Level 9 85' - 0"

ROOF 105' - 0"

Level 10 95' - 0"

ARCH532 CONTRUCTION TECHNOLOGY II / 14SP

ROOF 105' - 0"

Level 10 95' - 0"

ROOF 105' - 0"

Level 10 95' - 0"

3

Callout of Section EW-N with atrium 1/2" = 1'-0"

2

Callout of Detailed Section EW-S with window 1/2" = 1'-0"


Philadelphia Rowhome Addition

Checked By

Scale

Project Number 112513 Can Fu Checker

ADD005

Project Number Date Drawn By Checked By

Scale

12" = 1'-0"

DN

DN

Philadelphia Rowhome Addition

UP

UP

CAN FU DESIGN

ARCH 431/531: Construction Technology 1

Philadelphia Rowhome Addition

CAN FU DESIGN

ARCH 431/531: Construction Technology 1

Philadelphia Rowhome Addition

CAN FU DESIGN

Project Number 112513 Can Fu Checker

ADD003

UP

DN

ARCH 431/531: Construction Technology 1

Drawn By

11/26/2013 3:09:47 PM

Date

11/26/2013 3:09:33 PM

Philadelphia Rowhome Addition

ARCH 431/531: Construction Technology 1

East Facade & Curtain Wall

Exploded Axonometrics Project Number

ARCH 431/531: Construction Technology 1

CAN FU DESIGN

CAN FU DESIGN

UP

UP

UP

Drawn By Checked By

ADD004

12" = 1'-0"

Scale

Second Floor & Roof Plan

Floor Plan

Project Number 112513 Can Fu Checker

Project Number Date Drawn By 11/26/2013 3:09:37 PM

Project Number 112513 Can Fu Checker

Date

Checked By

ADD103

3/8" = 1'-0"

Scale

Project Number 112513 Can Fu Checker

Project Number Date Drawn By 11/26/2013 3:10:17 PM

Renderings Project Number

UP

Checked By

Scale

ADD102

3/8" = 1'-0"

11/26/2013 3:10:14 PM

UP

8'X8' Chrome Frame Skylight 1" Insulated Glass 1" X 4" Woold Blooding 3/4 Plywood Sheathing 4 ML Vapor Barrier 4" Metal Stud Wall 4 ML Vapor Barrier 1/2" Gyp Board Roof Drainage

CAN FU DESIGN

CAN FU DESIGN

Level 3 23' - 6"

Level T.O. Roof 34' - 0"

Level T.O. Roof 34' - 0"

6" Grass 4" Top Soil Geotextile Drainage 1" Sand 3/4" Bitumen High Density Board 3/4" EPDM Membrane 2" Rigid Insulation Moisture Barriers 3/4" Plywood Sheathing 9 1/4" Dimentional Lumber 1/2" Gyp Wall Board

C

Wood Blooding for Gyp Bo

Level 2 13' - 6"

Level 2 Rear 11' - 0"

Level 3 23' - 6" ---

Level 3 Rear 21' - 0"

Level 2 13' - 6"

Level 2 13' - 6"

Level 2 Rear 11' - 0"

Level 1 2' - 0" GROUND 0' - 0"

Level Basment -6' - 6"

Level Basment -6' - 6"

Level 3 23' - 6"

Flasing Drip Edge Under Sill

Level 3 Rear 21' - 0"

2 ADD503-2

Level 1 2' - 0" GROUND 0' - 0"

1-1/4" Clapboard Siding 3/4" Wood furring 3/4" Wood Sheating Plywood 5-1/2" Wood Stud Layer 3/4" Gypsum Wall Board

Philadelphia Rowhome Addition

Level 2 13' - 6"

Level 2 Rear 11' - 0"

Level 3 23' - 6"

--1 ADD502

ARCH 431/531: Construction Technology 1

1 ADD503-2

Philadelphia Rowhome Addition

Level 3 23' - 6"

Level 3 Rear 21' - 0"

ARCH 431/531: Construction Technology 1

Level 3 23' - 6"

Level 3 Rear 21' - 0"

Philadelphia Rowhome Addition

Level 3 Rear 21' - 0"

Level 1 2' - 0" GROUND 0' - 0"

Level Basment -6' - 6"

2"X6" Nominal Cut Lumber Section

5'1/2" Insulation

SECTION N-E/E-S 9" Insulation

Project Number 112513 Author Checker

Project Number Date Drawn By

Date Drawn By Checked By

Scale

ADD201

3/8" = 1'-0"

Checked By

11/26/2013 3:10:19 PM

Project Number 112513 Author Checker

Project Number

Scale

3/8" = 1'-0"

Typica

Level 2 13' - 6"

4" Exteriro Brick Masonry 1 1/2" Air Cavity 8" Concrete Masonry Block 3/4" Interior Finish Gypsum Board

Project Number Date Drawn By Checked By

Level 2 Rear 11' - 0"

Scale

4" Exterior Brick Wythe Weathered Mortar Joint 1 1/2" Air Cavity 1 1/2" Rigid Insulation 8"X8"X8" Bearing CMU 6ML Vapor Barrier 1/2" Metal Furring 3/4" Gyp Board Interior

CAN FU DESIGN

ADD202

11/26/2013 3:10:21 PM

Section N-W/E-N

CAN FU DESIGN

CAN FU DESIGN Level 3 23' - 6"

Wood Blocking 2"X10" Wood Joists

1/8" Low-E Tempered Glass 1/4" Argon Fill 1/8" Heat Mirror FIlm R5.6 TC 88 IGU 1/8" Angled Glass

1/8" LOW-E Tempered Glass 1/4" Argon Fill 1/8" Heat Mirror Film R 5.6 TC 88 IGU 1/8" Annealed Glass

1" Custom Solar Shading Device Attached to Ext Brick

2" Custom Solar Shading DEVICE Attached to Ext Brick

Aluminum Curtain Wall Sill 2 1/2" X 5" Rectangular Mullion

ARCH 431/531: Construction Technology 1

3/4" Gypsum Board

ARCH 431/531: Construction Technology 1

Philadelphia Rowhome Addition

ARCH 431/531: Construction Technology 1

Philadelphia Rowhome Addition

L 6"X6"X12" Steel Angle Support

Philadelphia Rowhome Addition

Level 3 Rear 21' - 0"

4"X8"X16"CMU Blocks

1 1/4" Aluminum Plate 1ADD503 ---

Wood Block for Subfloor

GROUND 0' - 0" 2" x 10" Wood Joists

Level 1 2' - 0"

Date Drawn By Checked By

Scale

Project Number 112513 Can FU Checker

ADD301

3/8" = 1'-0"

Project Number Date Drawn By Checked By

Scale

Project Number 112513 Can Fu Checker

ADD302

Typical Wall Call Out Details Project Number Date

16" Foundation Wall

GROUND 0' - 0"

Drawn By Checked By

Scale

Project Number 112513 Can Fu Checker

ADD503-2

1 1/2" = 1'-0"

87

11/26/2013 3:10:37 PM

Project Number

11/26/2013 3:10:23 PM

Level Basment -6' - 6"

Elevation East

11/26/2013 3:10:26 PM

Elavation NS

AD



ARCHITECTURE

PROJECTS 10-51


1

OBJECTS CONTAINERS WORLDS 2016 World Trade Cener Tower In Downtown Los Angeles, CA

Penn Design 704 Tom Wiscombe Studio//Can Fu+Hua Yang This semester we mainly focus on explore architecture as world through radical interiority. Our point of departure will be Machado and el-Khoury’s concept of “hollow monoliths“, where the solidity of a monolith seems to be undermined by its emptiness. Architecture, of course, can never be actually empty, so it will be the task of the studio to use combinations of poche, nested objects, and extrusions from new grounds. Rather than presuming an architectural ontology where buildings exterior expression (posture, shaper, contextural linkages, social function) is primary, we attempt to create architecture which inverts that implied hierarchy. Some of the repercussions of this inversion are that architecture might tend to deflect semiotic readings through exterior muteness, and create its own internal density, language, sacale, and even physics on its interior. Interiors could begin to contain objects and formations that might ordinarily be encoutered on the earthen surface we refer to as ‘land‘, but in strange juxtapositions, awkward orientations, and improbable scales. With the design strategy of applying three entites: Figure, Liner and Shell, to create a interior world totally losing the gravity and normal orientations. Architecture, in this way, becomes a container for a new, nested world, served from land, from World.

90 1 OBJECTS CONTAINERS WORLDS


91


92 1 OBJECTS CONTAINERS WORLDS


Dragon Cut (Left) & Building Section Cut_Major Conference and Trading Space (Right)

93


94 1 OBJECTS CONTAINERS WORLDS


Site Plan & Conference Space Plan

95


96 1 OBJECTS CONTAINERS WORLDS


Circulation & Space Figure Diagram

97


98 1 OBJECTS CONTAINERS WORLDS


Physical Model Photos

99


100 1 OBJECTS CONTAINERS WORLDS


Auditorium_Detail of Physical Model Interior

101


2

BLURING ADJACENT 2015 Auction House and Galleries in Chelsea New York City

Penn Design 602 Hina Jamelle Studio//Angela Huang + Can Fu The concept of the auction houses has changed since the invention of the internet, and use of digital technology. Hence the traditional auction houses are replaced with “cyber auction rooms” that all the bidding and showing are through the web, and the large auditorium type of auction rooms are replaced with smaller auction rooms combined with gallery and rretreat spaces that are specifically for the high-end clients. In this case, auction is not about trading, it becomes a performance and a show. The organic façade pieces continue to the interior and serves as the purpose of circulation, structure, and artificial lighting. Reinventing the traditional organization of an auction house, just like the continuous facade, there are obvious start and end of a program or space. The auction room shifts the program to gallery space through undulated ramps and the smaller gallery spaces fading into an open space and becomes a café with open seatings.

102 2 BLURING ADJACENT


103


34

GALLERY SPACE

16

17

2

AUCTION ROOM

1

GALLERY SPACE

16

GALLERY SPACE

17

BALCONY

OFFICE

2'-7"

18

2

17

SEMINAR ROOMS

13

16

EXHIBITION HALL

12

14

2

OFFICE

2

EXHIBITION HALL

18

20

UNDERGROUND PARKING ENTRY

2

RESTORATION SPACE

104 2 BLURING ADJACENT

13

15

MAINTENANCE

LOBBY


ROOF DRAIN

12” THK CUSTOM MADE GLASS FIBER REINFORCED POLYMER PANEL COATED W/ FIRE RETARDANT RESIN WATERPROOFING MEMBRANE SERVICE ZONE

ROOF DETAIL STEEL LINTEL CAST INTO GFRP RIGID INSULATION BATT INSULATION VENT

ANCHOR BOLT SLIP JOINT SERVICE/ INSTALLATION ACCESS

TYP. FACADE DETAIL LOW IRON DOUBLE GLAZED GLASS

MIN 36” HEIGHT

2% MIN

WATERPROOFING MEMBRANE DRAIN CONCRETE SLAB

BALCONY DETAIL

HANDRAIL INTERIOR FINISH RECESSED LIGHT GYP. CEILING

CONCRETE REBAR

MEZZANINE DETAIL

TWO WAY WAFFLE SLAB 3’X3’ EXPOSED COFFER

3’ 24” THK

TYP, FLOOR DETAIL

Blurring Adjacent // Auction House and Gallry // Can Fu+ Angela Huang // 2015 Spring 105


106 2 BLURING ADJACENT


107


Auditorium Level Floor Plan

Ground Floor Plan

108 2 BLURING ADJACENT


25'-11 1/2"

"

18'-7 1/4

11

18'-

15'-11"

" 1/4

"

'-7

28

'-1 0

1/2

"

20

'-1

1

3/4

"

16

28'-5

1/4"

OPEN TO BELOW

22

40'-0

"

24”THK CONCRETE W/ 3’X3’ WAFFLE SLAB

'-1

01

30

'-0

1/2

"

/4"

26'-5

1/4"

24'-1

0 3/4"

Structure Floor Plan

109


110 2 BLURING ADJACENT


111


112 2 BLURING ADJACENT


Paper Model Photos

113


3

SHIFTING HYBRIDS 2014 Transformation for A New Hotel & Residential Building in Tribeca, NYC

Penn Design 601 Hwina Jamelle Studio//Angela Huang + Can Fu With the use of particular parameter and technique concepts like degree of curvature, crease and shifting, the apartment-hotel hybrid is developed to a series of building systems for both facade and interior, such as window frames, ceilings, stairs, furnishing and partition walls, etc. The hybrid with interesting geometric form and layered facade quality are formed due to the buildings system which reveal the techniques and geometry form derived from parameters set up previously. Similarly, the projects’ units aggregation following the interlocking logic as well, which allows puzzle-like space formed for the interior space, concave and convex layered surface quality happened for the facade. In addition, the puzzle formation create various units type and size, which allow the space be applied for multiple function and programs, such as hotel space, studio and suites and shared central public space, like a system of dining space.

114 3 SHIFTING HYBRIDS


115


--- 5TH FLOOR PLAN

RESTAURANTS

--- GROUND FLOOR PLAN

116 3 SHIFTING HYBRIDS

APARTMENT

APARTMENT


APARTMENT

--- 8TH FLOOR PLAN

HOTEL

APARTMENT

A.

UNITS A + B PARA/

Degree of Curvature Shifting of Program&Structure Crease

SYSTEM/

Windows&Sill Partition Walls Furnishing

B.

117


118 3 SHIFTING HYBRIDS


119


120 3 SHIFTING HYBRIDS


121


4

CELLULAR NESTING 2015 Cultural Complex Center For Golden Orange International Film Festival In Antalya, Turkey

Penn Design 701 Sulan Kolatan Studio//Can Fu + Grace Kim Home to the Golden Orange Film Festival, the annual International event, Antalya is located on active geological formation featuring rich underground ecosystem. Start with the Grasshopper script technique of Minimal Surface Cell Formation to produce the base cell space for the program. In addition, inspired from cave ecosystem, the project explores the duality that exist in the cave formation. Three major categories to focus for the design of the theater are form, mass, and materials. The connectivity of long tunnels and series of chambers observed inside of the cave are translated into the interior of the theater. The outside, inside, and in-between spaces of two different minimal surfaces that are nested together, creating moments of inversions that interweave various programs together. The soft and hard materials not only contribute in functional role such as acoustic control and structural support but also challenges the idea of integration of sustainability into the design. The formation of the theater are populated in various scales throughout the site as landscape, providing inhabitable spaces for both flora and fauna while functioning as public park with strong emphasis on the bike-ride system.

122 4 CELLULAR NESTING


123


TION

THEATER GROUND FLOOR PLAN _Lower Theater VIP Seating Area _Perfromance Stage _Orchestra _500 Seats _Cafe Area

Site Plan with Landscape Design

Nesting Cell Formation and Program Diagram

TUNNEL (CIRCULATION)

TUNNEL (CIRCULATION)

CHAMBER

CHAMBER

POND

ANIMAL HABITATION

CHAMBER (THEATRE)

TUNNEL (CIRCULATION)

ORIGINAL CELL PLAN PROGRAM DIAGRAM

SKYLIGHT

THEATER SECOND FLOOR PLAN

THEATER SECOND FLOOR PLAN

_Upper Theater Seating Area _Perfromance Stage _Orchestra _2000 Seats

_Upper Theater Seating Area _Perfromance Stage _Orchestra _2000 Seats

MODIFIED CELL SECTION PROGRAM DIAGRAM

124 4 CELLULAR NESTING

OUTDOOR THEATRE SEATING

SCREEN

CHAMBER (THEATRE)

STAGE ORCHESTRA

UNDERGROUND BIKE PATH

TUNNEL (CIRCULATION)


125


3D Print Physcial Model Photos with Landscape Design

126 4 CELLULAR NESTING


127


5

CIRCULATION PATTERN 2014 Urban Forces Formation of Automotive Research & Exhibition Center in Philadelphia, PA

Penn Design 502 Eduardo Rega Studio//Can Fu The urban composition developed based on a series of research and mappings of visible and invisible urban forces, which are traffic, residents and wind. Through analyzing the actions performed by these urban forces on the site, including traffic flow, surveillance of residents and wind pollution movement, a functioning combination form and space is finally established. It is really interesting to investigate the transformation of these 3 forces to the actual building form, functional space and circulation. The automotive center was divided into 3 major functional zones based on the space variation created by the circulation path. The basement with large open space of building is divided as the parking and museum zone. Then the upper level is used for research labs and auditorium. And the tower part is for offices and classrooms. As the circulation leading the visitors and cars going through the building, related space with program function is created by these pathways. Different path circulations leading to different functional space.

128 5 CIRCULATION PATTERN


129


130 5 CIRCULATION PATTERN


131



FABRICATION 54-87 DIGITAL


6

PARAFICTIONAL OBJECT 2015 Golden Lamp Inovation Process In Penn Design Upper Gallery

Penn Design Arch 703 Kutan Ayata Studio//Can Fu + Lu Han In Contemporary art, one of the most relevant practices for architecture can be found under the loose heading of Parafiction. Architecture has much in common with parafictional art practices, which is multi-medium and the most “real“ of any art, it is constantly engaged in questions of context, and it is a specific object or scenario that inserts itself into the constantly changing conditions of reality. This representation and innovation process of the object (extracted from the classical still life paintings) is attempt to explore the aesthetics of realism for the objects in a different context. In this project, through redesign the golden bottle taken from Dutch painting Banquet Still Life by Adriaen Can Utrech, 1644 , bring the new relations between objects themselves in certain scenario, aesthetic relations of color, texture, materiality, luminosity, and reflectivity. The “new” golden bottle will seek to blend in, but not to hide. In the meantime, the transformation of the bottle’s form bring new function the “new“ object produced, it become a golden lamp to blend in the original scenario again. The estrangement of context is a crucial aspect of realism, where a shift allows one to see the familiar in new terms as doubt overtakes assumed certainties; doubt which can manifest materially, formally, programmatically, and ultimately architecturally.

134 6 PARAFICTIONAL OBJECT


135


Original Golden Bottle in Dutch Painting

Golden Lamp Design Evolutionary Process

136 6 PARAFICTIONAL OBJECT


137


TOP/Original Painting Banquet Still Life Adriaen Can Utrech, 1644 oil on canvas current location: Rijksmuseum Amsterdam

138 6 PARAFICTIONAL OBJECT

BOTTOM/ Fictional Painting Banquet Still Life 2016 The test of the environmental effect with substituing the innovated golden lamp in the painting


139


140 6 PARAFICTIONAL OBJECT


141


7

MINIMAL SURFACE 2015 Sun Shading Entrance Wall for 2015 International Architecture Biennale in Antalya, Turkey

Penn Design 701 Sulan Kolatan Studio//Can Fu +Grace Kim + Hannibal Newsom (TA) This Parametric Wall was designed as a Sun Shading Device for 2015 Antalya International Architecture Biennale in Turkey. As the topic of this Biennale is the Parametric Modernism, this Sun Shading Wall was assembled at the Entrance of Exhibition to bring people to a world full of digital fabrication applied in the architectural field. Take people to reconsider the role of digital technique in the architectural design. In order to fulfill the sun shading function, we explored the grasshopper script of Minimal Surface to control the opening size of each aggregation cell. In this way, the light going through the wall will be controlled with different intensity at various angle. In addition, the wall was designed as the dual layer of two cell combination to create more interesting shadow pattern when the light going through. In terms of the actual wall fabrication part, as it is fabricated in the state and transferred to Turkey, we chose FDM plastic material to 3d print the single cell and reassembled all the cell modules in Turkey, In this way, the shading wall was light and easily assembled.

142 7 MINIMAL SURFACE


143


CELL VARIATION (TopM, BtmM)

CELL VARIATION (TopLR, BackLR)

2 SURFACE CELL

144 7 MINIMAL SURFACE


Dual-Layer Cell Wall Assembling Process 145


FDM 3D Printing Modules Photos

146 7 MINIMAL SURFACE


147


8

LINE TO SURFACE 2013 Cocooning Simulation Research Arylic Powder Material 3D Printing Test

Penn Design 501 Simon Kim Studio//Can Fu This project start with studying the process of cocooning, to get a better understand of its structure formation, which starts from simple large structure and then developed to a more dense netwroks. Density creates beauty, but always start from simple structure or outline. Second step is to set up a Grasshopper Script based on the geometric relationship between points and lines derived from cocooning process. The code developed a line structure with the randomly growing lines but still connecting among the triangular points. To continue the study of line connection and rotation, but focusing more on the irregular way of line connecting and random trigonometry. Through studying the structure of cocoon, the modules with more irregular form and random structure were derived from the same structure theory. It is called the Structure Hyperplasia. Third step is to develop the line structure space produced from computer coding to the curvature surface space with the application of Maya technique. This step bring the project to a advanced level which derived from cocooning but successfully complete the transformation of the line to the occupied space and explore the possibility of spacial function of lines.

148 8 LINE TO SURFACE



150 8 LINE TO SURFACE


151


8

.1

BRANCHING ELEGANCE 2014 Modular Aggregation Design for Color 3D Pringting Test

152 8.1 BRANCHING ELEGANCE


153



DRAWING&PAINTING 90-95 ARTWORK


1

DIGITAL DRAWING 2015 Real Environment Simulation Maya Animation Scene Clips

Penn Design FNAR366 Advanced Modeling Studio//Can Fu

156 1 DIGITAL DRAWING


157


2

PAINTINGS&DRAWINGS 2009-2011 Oil Painting/ Gouache&Pastel/Water Color/ Pen Drawing/ Charcoal Figure Sketches UWashington Painting Major Projects

158 2 PAINTINGS&DRAWINGS


159



THE END

2017.05




Can Fu MARCH University of Pennsylvania canfu@alumni.design.upenn.edu 3145021308