DATE: 05/29/2015
HOMEOWNER INITIAL __________ HOMEOWNER INITIAL __________
DRA W N B Y :
ALH
REVISION DATES: REV 1: 07/20/15 REV 2: 08/06/15 REV 3: 08/17/15 REV 4: 08/27/15 REV 5: 09/02/15
INTERIOR BEFORE
PROPOSED
INTERIOR BEFORE
SPECIAL NOTES & INFORMATION
This document, plans and specifications are the property of Castle Building & Remodeling, Inc. These plans and specifications are to be used at this customers residence only. Any reproduction of these plans and/or specifications are prohibited without written consent of Castle Building & Remodeling, Inc.
The information, specifications and plans contained on these sheets are a result of job site measurements, subcontractor recomendations, and client consultations. Any unforseen pre-existing conditions after demolition may require change orders and the alteration of the proposed construction practices and procedures. If any such changes occur, Castle Building & Remodeling, Inc. must be notified immediately and a change order must be signed by the customer for work to continue.
The Carpenters and Sub-Contractors will be responsible to inform Castle Building & Remodeling, Inc. of any discrepancies between the plans and actual job site dimensions that will effect the construction or materials.
Ph o n e : 6 1 2 -7 8 9 -8 5 0 9 F a x : 6 1 2 - 7 8 9- 8 5 2 8
PAGE 1
Minneapolis, Minnesota 55418
*ALL DIMENSIONS TO FINISHED DRYWALL UNLESS OTHERWISE NOTED*
2600 Johnson Street NE
COVER PAGE EXISTING / DEMOLITION PLAN & PROPOSED PLAN PROPOSED ELEVATION & 3D
MN B005657
1 2 3
C O N TE N T S
C O N TR A C TO R L IC E N S E :
P AG E
O w ne r :
ELECTRICAL KEY
DATE: 05/29/2015 DRA W N B Y :
D E M O L I TI O N N O T E S
REVISION DATES:
P L A N N O TE S
REV 1: 07/20/15
Remove and keep door knob off closet door (to be stored by owner)
Make header at new opening with double 2x4.
Carefully remove and keep chair rail, base shoe and base molding. Remove closet wall.
Frame down ceiling above new bar area to make flush with existing 91.5" soffit. Do this by mounting 2x4 to back wall. From 2x4 extend framing to double 2x4 header.
Cut sheetrock 4" above what new opening is to be.
LIVING ROOM
Remove and keep hard wood fLoor from closet area (to be stored by owner)
REV 2: 08/06/15 REV 3: 08/17/15 REV 4: 08/27/15 REV 5: 09/02/15
At ceiling make 9" by 18" opening above center cabinet so that owner's can have "secret" storage access above cabinet.
LIVING ROOM
LIVING ROOM LIVING ROOM
Basic interior wall framing: includes making back wall flush with 1.5" bump out. Completing this will allow for back wall of bar to be one flush layer of sheetrock.
Note: there will not be hardwood floors under the wall.
ALH
ADDITIONAL WORK: Adjust entry storm door so that is closes properly.
10 3/4"
10 3/4" 3'-11"
2'-0 3/4"
3'-11"
1'-11 1/4"
5'-2 1/4"
5'-2 1/4"
DINING ROOM
O w ne r :
BASE CABINETS TO BE 26.25" DEEP WITH COUNTERTOP HAVING 1.5" DINING ROOM OVERHANG. UPPER CABINETS TO BE 1' BASE CABINETS TO BE 26.25" DEEP DEEP HALLWAY WITH COUNTERTOP HAVING 1.5" OVERHANG. UPPER CABINETS TO BE 1' DEEP
DINING ROOM
EXISTING / DEMOLITION PLAN - 3/8" = 1' PROPOSED / ELECTRICAL PLAN - 3/8" = 1'
Ph o n e : 6 1 2 -7 8 9 -8 5 0 9 F a x : 6 1 2 - 7 8 9- 8 5 2 8
FRIDGE WALL VENT TO REMAIN AS IS FRIDGE WALL VENT TO REMAIN AS IS
MN B005657
11'-4"
MAKE SOFFIT ABOVE BAR AREA SO THAT THE BOTTOM IS 7'7.5" AFF MAKING FLUSH WITH EXISTINGMAKE SOFFIT IN AREA. SOFFIT ABOVE BAR AREA SO THAT MOUNT 2X4 AT BACK WALL FOR THE BOTTOM IS 7'7.5" AFF MAKING FRAMING TO BE ATTACHED FLUSHTO. WITH EXISTING SOFFIT IN AREA. MOUNT 2X4 AT BACK WALL FOR FRAMING TO BE ATTACHED TO. C O N TR A C TO R L IC E N S E :
4'-9 1/2" 4 3/4"
6"
1'-3"
1'-6 3/8"
SINK & FAUCET. BAR SINK & FAUCET.
2'-0 1/8"
4'-9 1/2"
HALLWAY
10'
PAGE 2
Minneapolis, Minnesota 55418
HALLWAY
BATH
BUILD OUT WALL TO MAKE FLUSH WITH GFCI EXISTING 1.5" BUMP OUT BUILD OUT WALL TO MAKE FLUSH WITH OUTLET TO BE 42" EXISTING 1.5" BUMP OUT AFF OC OUTLET TO BE 42" AFF OC
DINING ROOM
HVAC SUPPLY BAR
2600 Johnson Street NE
HALLWAY
2'-3 3/4" 1 1/2"
9 3/8"
2 1/4"
WALL VENT TO REMAIN IN PLACE
HVAC SUPPLY
BATH
11'-4"
3'-7"
CLOSET BATH
REMOVE AND DISPOSE OF DOOR, DOOR JAMB, CASING 2'-3 3/4" AND TRIM. KEEP AND SAVE DOOR KNOB (TO BE STORED BY OWNER). REMOVE AND DISPOSE OF DOOR, DOOR JAMB, CASING AND TRIM. KEEP AND SAVE DOOR KNOB BE STORED CROWN TO REMAIN AS IS.(TO UNINSTALL ANDBY OWNER). KEEP WOOD BASE, SHOE AND CHAIR CLOSET RAIL. BASE, SHOE AND CHAIR RAIL TO BE CROWN TO REMAIN AS IS. UNINSTALL AND CUT TO SIZE AND REINSTALLED KEEP WOOD BASE, SHOE AND CHAIR RAIL. BASE, SHOE AND CHAIR RAIL TO BE CUT TO SIZE AND REINSTALLED WALL VENT TO REMAIN IN PLACE 3'
BATH
10'
2'
1'-2 1/2"
1 1/2"
1'-7"
HVAC SUPPLY
2'-7 1/4"
1'-7"
HVAC SUPPLY
DATE: 05/29/2015 DRA W N B Y :
ALH
REVISION DATES: REV 1: 07/20/15 REV 2: 08/06/15 REV 3: 08/17/15 REV 4: 08/27/15 REV 5: 09/02/15
10"
FILLER OPAQUE GLASS DOOR
10"
3D NOTE: 3D VISUAL IS NOT AN EXACT REPRESENTATION OF ACTUAL SPACE. RATHER IT IS MEANT TO GIVE AN IDEA OF WHAT SPACE WILL LOOK LIKE.
1"
FILLER OPAQUE GLASS DOOR
4'-9 3/8" 3'
3/8" FILLER
PROPOSED ELEVATION - 1/2" = 1'
Ph o n e : 6 1 2 -7 8 9 -8 5 0 9 F a x : 6 1 2 - 7 8 9- 8 5 2 8
MN B005657
PAGE 3
Minneapolis, Minnesota 55418
1'-6"
2600 Johnson Street NE
1'-3"
C O N TR A C TO R L IC E N S E :
7'-7 1/2" 8'-3"
3'
1'-6 1/2"
2'-8 3/4"
O w ne r :
3 1/4"
2'-1 1/8"
REINSTALL EXITING CHAIR RAIL, BASE AND SHOE