Work Portfolio Introduction This work sample portfolio is comprised of a selection of projects that were produced in both work and school context. The selected projects emphasize my different skillsets and experiences gained performing building condition assessments, creating as-built documents, and developing plans for a variety of facility improvement and fit-out projects.
CORNELL UNIVERSITY FINE ARTS LIBRARY S T V I N C O R P O R AT E D
!"#$%&"'() Ithaca, NY *"+,( Construction Administrator -,$.()December 2017 - August 2019 - Received RFI’s ASI’s bulletins and submittals from the General Contractor. - Coordinated responses between disciplines and subcontractors, made revisions to architectural sheets using Revit and organized and logged information using eBuilder and Excel. 225 Park Avenue South
ARCHITECT:
Tel +43 1 526 69 68 - 0 e-Mail office@tschapeller.com
Dietrichgasse 17 A-1030 Vienna, Austria
PROJECT TITLE CORNELL FINE ARTS LIBRARY
CORNELL UNIVERSITY Ithaca, New York 14853
SEALS
Submittal
3 2 1 MARK
10/19/2015 09/21/2015 07/31/2015 DATE
100% DD DRAFT II 100% DD DRAFT Interim Design Development DESCRIPTION
Drawn By Designed By Checked By Approved By Date Issued Scale Drawing Title
BUILDING SECTION
Project No. 3017040 Drawing No.
TWIN CITIES HARBOR STUDY & ART GALLERY S C HO OL WOR K S A M P L E
!"#$%&"'() Benton Harbor, MI *"+,( Master Planner / Designer -,$.()September 2015 - May 2016 - Developed and proposed designs for a comprehensive planning study that evaluated the potential to redesign Benton Harbor, MI, into an urban center with commercial, retail, recreational, and residential options. - Contributed to an extensive public outreach campaign with city officials and local residents to gather public opinion. - Developed detailed renderings of the proposed options for presentation to the public. - Worked as a design-build team for the SWMPC with my class to build an art gallery to display the study to the community.
RELEVANT EXPERIENCE CONT. S T V I N C O R P O R AT E D
/011023415661)12377!)849!:9;<)04637*96-) =/180>)15;97*)164:951)?)MA Surveys and Reports | August 2016 - November 2017 - Reviewed statements of interests (SOI’s), visited schools and drafted reports. - Coordinated with the MSBA team to allocate which schools would be awarded funding. 9@1@)AAB)8*7;C)15D0<5)!50E)F!0-)-0*:)?)BRONX, NY Designer | January 2020- March 2020 - Reviewed building codes and ADA compliance, compared design specifications with the given School Construction Authority (SCA) specifications to select products and manufacturers for a play yard. - Contacted manufacturers for product inquiries and revised bulletins alongside the project manager. 37!-7E5)F48!92)12377!1):916*926)?)Holyoke, MA Planner/Designer | August 2016-October 2016 - Participated in surveys of several of the 11 elementary, middle, and high school facilities in Holyoke, MA. - Studied options to consolidate, demolish or repurpose abandoned and underused facilities. - Worked with a team of architects and engineers to develop alternatives for future school use and improvement. F@1@)GHIE)J);5D)F*9/0*-)12377!)?)Brooklyn, NY Designer | June 2017 - Coordinated with the project architect and lead designer. - Developed and rendered schemes for BID using AutoCAD and Photoshop
F@1@)AKLE)J)0::9697;)D963)<-/067*94/)?)Brooklyn, NY Interior Design | February-March 2018 - Interior finishes study for new classrooms, circulation spaces, cafeteria and gym/ auditorium. :0-67;)0M5;45)20/F41)? Passaic, NJ 209.5 Million LEED Calculations | August-September 2017 Project was in a prior BID submission phase. - Reviewed LEED v4 for BD+C: New Construction and Major Renovation. - Studied indoor environmental quality, sustainable sites, open spaces and location and transportation categories and updated a final score card for LEED credits achieved. :01;-N)17463)85023)F1-23906*92)25;65*)?)Staten Island, NY Construction Administrator | October 2016- January 2017 - Reviewed submittals, shop drawings, RFIs and BID packages. - Coordinated with the owner and sub consultants of the project and kept record of all the approved drawings, dates and contacts using Excel and Submittal Exchange. !9**);-)F5;;)160697;)!716)0;:)O74;:)? New York, NY Designer | September 2016- November 2016 Joined this project during the schematic phase. - Gathered measurements from the site. - Responsible for developing CAD drawings of the existing space, as well as furnishing CAD plans for the proposed fit-out. F063)LL)5C230;<5)F!025N)<*7M5)16*556)0;:);5DF7*6)160697;)P) F5*/0;5;6)O!77:)F*7652697;)?)New York, NY Designer | November 2017- December2017 - Generated phasing plan drawings using AutoCAD and later drafted several conceptual designs of different materials on the facades of the stations using Photoshop.
Cecelia Cameron (516) 376-5460 c.cameron004@gmail.com