Enviromental Practice

Page 1

Christopher Kelly K1000740 Environmental Practice Report


rey

Sto Pla

nt

om

Ro

Roa

ice

d

rv /Se Bin a Are

Kit

Ga

t Lif

m

oo

gR

rin the

Ga

1

m

oo

gR

rin the

m roo nti ll/A Ha

2

che

n


N

Site Model Sun Path 11:00 Morning Light


Building Regulations Part A Structure • Part B Fire Safety • Part C Site Preparation • Part D Toxic substances • Part E Resistance to the passage of sound • Part F Ventilation • Part G Hygiene • Part H Drainage • Part J Combustion appliances • Part K Protection from falling • Part L Conservation of fuel and Power • Part M Access • Part N Glazing • Part P Electrical safety Code for Sustainable Homes


Key:

Control Valve

Smoke Detector

S

Socket Outlet One Pole Switch

B

FAN T

Ventillation Fan Thermostat

Condesing Combination Boiler

MA

Manifold

PS

Power Supply

M

Electricity Meter

FB

Distribution Board

T

Rain Water Tank

Enclosed Luminaire

Hot Water Pipe Cold Water Pipe Waste Pipe Electrical Wire Heating Pipe


Heating


Plant Room

MA Hall/Antiroom

Kitchen

B

Bin/Service Area

Gathering Room 2

Gathering Room 1

Lift

Building Regulations: Part L Conservation, Fuel and Power and Part B, Fire Safety Hot-water System Wet underfloor heating systems deliver their heat evenly across rooms improving the buildings thermal mass resulting in less sudden changes in temperature. Underfloor heating uses lower tempertures warming from the ground upwards. This warms your feet and keeps your head cool. This maximises human comfort. A condensing combination boiler works efficiently with these low temperatures. Double glassing will be used on the windows to reduce heat loss, Ground Floor Underfloor Heating, Scale 1:100


Storage

W/C

Terrace

Lift W/C

First Floor Underfloor Heating, Scale 1:100


Water Supply


Plant Room

Hall/Antiroom

Kitchen

Bin/Service Area

Gathering Room 2

Gathering Room 1

Lift

Plant Room

B

Kitchen

Bin/Service Area

Room 2

The thickness of the pipes will be 22mm at the boiler and reduce to 15mm at the taps. Ground Floor Tap Water Supply Scale: 1:50


Storage

W/C

Terrace

Lift W/C

Storage

W/C

W/C

The toilets and sinks are placed back to back with a false wall for the services to run through. Reducing the need for more piping. First Floor Tap Water Supply Scale 1:50


Storage

W/C

Terrace

Lift W/C

Tap Water Supply Section Scale: 1:50


Storage

W/C

Terrace

Lift W/C

Tap Cold Water Supply Section Scale: 1:50


Storage

W/C

Terrace

Lift W/C

Tap Warm Water Supply Section Scale: 1:50


Tap Water Supply Scale: 1:200


Tap Water Supply Scale: 1:100


Rain Water Collection and Re-use


Plant Room

Hall/Antiroom

Kitchen

Bin/Service Area

Gathering Room 2

Gathering Room 1

Lift

Plant Room

P

Kitchen

Bin/Service Area

T

Room 2

This system uses collected rain water to flush the toilets, to reduce water usage. This helps meet the code for sustainable Homes Requirements The rain water is collected from the roof into a storage tank and pumped when needed into the toilets. Re-used Rain Water Ground Floor Scale: 1:50


Storage

W/C

Terrace

Lift W/C

Storage

P

W/C

T

W/C

Re-used Rain Water First Floor Scale: 1:50


Storage

W/C

Terrace

Lift W/C

Re-used Rain Water Section Scale: 1:50


Storage

W/C

Terrace

Lift W/C

Re-used Rain Water Section Scale: 1:50


Drainage


Plant Room

Hall/Antiroom

Kitchen

Bin/Service Area

Gathering Room 2

Gathering Room 1

Lift

Plant Room

Kitchen

Bin/Service Area

T

Room 2

Drainage Ground Floor Plan Scale: 1:50


Storage

W/C

Terrace

Lift W/C

Storage

W/C

W/C

A single stack 150 mm diameter drainage system. Part H - Drainage The drainage pipes are all directed vertically down into the inspection chamber below ground level.. Drainage First Floor Plan Scale: 1:50


Storage

W/C

Terrace

Lift W/C

Drainage Section Scale: 1:50


Storage

W/C

Terrace

Lift W/C

Drainage Section Scale: 1:50


Drainage Section Scale: 200


Electricity


Storage

W/C

Terrace

Lift W/C

Key: Smoke Detector

S

Socket Outlet

Key: Key: Smoke Detector Socket Outlet One Pole Switch B

Condesing Combination Boiler

B

B MA

Key:

Condesing Combination Boiler

MA Manifold Smoke Detector

S

S

One Pole Switch

Smoke Detector

S

Socket Socket Outlet M Outlet Electricity Meter One Pole Switch One Pole Switch FB Distribution Board Condesing Combination Boiler B Condesing Combination Boiler Manifold FAN

Control Valve

Ventillation Fan

MA

Manifold

Manifold

M

Electricity Meter T Thermostat

M

Electricity Meter

M

Electricity Meter

FB

Distribution Board

FB

Distribution Board

FB

Distribution Board

MA

Control Valve FAN T

Ventillation Fan Thermostat

Enclosed Luminaire Control Valve FAN T

Ventillation Fan Hot Water Pipe Thermostat Cold WaterLight, Pipe

Enclosed Luminaire Waste Pipe

Enclosed Luminaire

Electrical Wire Heating Pipe Hot Water Pipe

Control Valve FAN T

Ventillation Fan Thermostat

Plug Socket and Light Switch Positions Section Enclosed Luminaire Scale: 1:100

Hot Water Pipe


Key: Smoke Detector

S

Socket Outlet One Pole Switch B MA

Condesing Combination Boiler Manifold

M

Electricity Meter

FB

Distribution Board Plant Room

Control Valve FAN

Key:

Key:

Ventillation Fan

Hall/Antiroom

Thermostat

T

Smoke Detector

S

Key:

Gathering Room 2

Gathering Room 1

Socket Outlet

Enclosed Luminaire Smoke Detector

S

B

One Pole Switch

MA M FB

Lights 20A

Electric Cooker 30A

Condesing Combination Boiler Cold Water Pipe

Manifold

Waste Pipe

Electrical Electricity MeterWire Heating Pipe

Distribution Board Control Valve

Boiler Appliances 30A 3A

FAN T

Ventillation Fan

Lights 20A

Thermostat Enclosed Luminaire

Socket Outlet

Condesing Combination Boiler

One Pole Switch B

FAN

Hot Water Pipe

B

Smoke Detector

S

One Pole Switch

Lift

Socket Outlet

Bin/Service Area

Kitchen

FB

Electric Cooker 30A

Boiler Appliances 30A 3A

MA

Manifold

M

Electricity Meter

FB

Distribution Board

MA

Condesing Combination Boiler Manifold

M

Electricity Meter

FB

Part P - Electrical Safety Distribution Board

Control Valvebuilding, a disabled lift is mandatory. This requires its As I am proposing a public Control Valve There are four own fuze box connected directly to the mains through the meter. FAN Ventillation Fan more main circuits which go through a distribution board. These are lighting, apFAN Ventillation Fan pliances, electric cooker and boiler. T Thermostat

T Thermostat All electrical wires will run through sleeves which create better access for maintenance and safety. Enclosed Luminaire Enclosed Luminaire Ground Floor. Plug Socket Wiring Scale: 1:100 Hot Water Pipe

Hot Water Pipe

Hot Water Pipe

Cold Water Pipe

Cold Water Pipe


Room 2

M

PS

Plant Room

FB

Hall/Antiroom

Kitchen

Bin/Service Area

Gathering Room 2

Gathering Room 1

Lift

Plant Room

Kitchen

Key:

Bin/Service Area

Smoke Detector

S

Socket Outlet One Pole Switch B MA M

Condesing Combination Boiler Manifold Electricity Meter

FAN

FB

Distribution Board Control Valve

FAN T

Ventillation Fan Thermostat Enclosed Luminaire

Hot Water Pipe

Ground Floor Plug Socket Wiring Scale: 1:50


Key: Terrace

Smoke Detector

S

Storage

W/C

Lift

FAN

Socket Outlet B MA

FAN

One Pole Switch Condesing Combination Boiler

W/C

Manifold

M

Electricity Meter

FB

Distribution Board Control Valve

FAN T

Ventillation Fan Thermostat Enclosed Luminaire

Hot Water Pipe Cold Water Pipe

First Floor Plug Socket Wiring Scale: 1:100


Storage

W/C

Terrace

Lift W/C

Storage

FAN

FAN

W/C

W/C

First Floor Plug Socket Wiring Scale: 1:50


Key: Smoke Detector

S

Socket Outlet One Pole Switch B MA

Condesing Combination Boiler Manifold

M

Electricity Meter

FB

Distribution Board

Key:

FAN

Key:

Ventillation Fan

Hall/Antiroom

T

Plant Room

Key:

Control Valve

Thermostat

Smoke Detector

S

Gathering Room 1

Smoke Enclosed Detector Luminaire Socket Outlet One Pole Switch B

MA

Condesing Combination Boiler Manifold Electricity Meter

Waste Pipe

FB

Distribution Board

FB

Distribution Board

Control Valve

Heating Pipe

Control Valve Ventillation Fan Thermostat Enclosed Luminaire

Hot Water Pipe

One Pole Switch B FAN

M

Electricity MeterWire Electrical

T

B

Cold Water Pipe

M

FAN

Lift

MA

Manifold

Socket Outlet

One Pole Switch

Hot Water Pipe

Condesing Combination Boiler

Smoke Detector

S

Socket Outlet

Gathering Room 2

S

Bin/Service Area

Kitchen

FAN T

Ventillation Fan Thermostat Enclosed Luminaire

Hot Water Pipe Cold Water Pipe

MA

Condesing Combination Boiler Manifold

M

Electricity Meter

FB

Distribution Board Control Valve

FAN T

Ventillation Fan Thermostat

Discharge lamps will be used for the lighting.

Enclosed Luminaire Ground Floor Lighting Wiring Scale: 1:100

Hot Water Pipe

Cold Water Pipe


g Room 2

Plant Room

M

PS

FB

Hall/Antiroom

Kitchen

Bin/Service Area

Gathering Room 2

Gathering Room 1

Lift

Plant Room

Kitchen

Key:

Bin/Service Area

T

Smoke Detector

S

Socket Outlet One Pole Switch Condesing Combination Boiler

B MA

Manifold

M

Electricity Meter

FB

Distribution Board

FAN

Control Valve FAN T

Ventillation Fan Thermostat Enclosed Luminaire

Hot Water Pipe

Ground Floor Lighting Wiring Scale: 1:50


Key: Smoke Detector

S

Terrace

Storage

W/C

Socket Outlet

Lift

B MA

FAN

FAN

One Pole Switch Condesing Combination Boiler Manifold

M

Electricity Meter

FB

Distribution Board

W/C

Control Valve FAN T

Ventillation Fan Thermostat Enclosed Luminaire

Hot Water Pipe Cold Water Pipe Waste Pipe

First Floor Lighting Wiring Scale: 1:100


Storage

W/C

Terrace

Lift W/C

Storage

FAN

FAN

W/C

W/C

First Floor Lighting Wiring Scale: 1:50


PS

M

FB

Plant Room

Hall/Antiroom

Kitchen F

Gathering Room 1

Bin/Service Area

Gathering Room 2

Lift

Ground Floor Appliance Wiring Scale: 1:100


Ventilation


Plant Room

Hall/Antiroom

Gathering Room 1

Kitchen

Bin/Service Area

Lift

Gathering Room 2

Part F - Ventilation It is required in a common space where people gather that 1/50 of the flooring has to have access to rapid ventilation (window opening) Some of the rapid ventilations openings in my proposal are above 1.75m which is above the required height. During direct sunlight the temperature in the main gathering room would increase as a result of the large windows. By opening the windows to allow circulation of air, the room can cool. Ground Floor Ventilation Scale: 1:100


Storage

W/C

Terrace

Lift W/C

First Floor Ventilation Scale: 1:100


Fire


Plant Room

Hall/Antiroom

Gathering Room 1

Kitchen

Bin/Service Area

Lift

Gathering Room 2

There are two exit routes out of the building in case of the event of a fire blocking one of the exits. Ground Floor Fire Escape Routes Scale: 1:100


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.