The Examiners Answers for CIMA Professional Gateway Assessment May 2011

Page 1

The Examiners’ Answers for CIMA Professional Gateway Assessment SECTION A Answer to Question One Requirement (a) Direct material A Direct material B Skilled labour Unskilled labour Supervision labour Machine overhead Other overhead Total cost

$ 115 345 700 420 NIL 280 NIL 1860

Requirement (b) Direct material A This material is in regular use. Therefore, regardless of its original cost or the inventory valuation method, the relevant cost is its replacement cost, i.e. 5 square metres @ $23 per square metre. Direct material B This material must be bought at a cost of $15 per square metre and the minimum order is 25 square metres. This is a total cost of $375. Since only 10 square metres are to be used on this order and no other use is expected, the remaining 15 square metres would be sold as scrap for $30 so the relevant cost is $345. Skilled labour The least cost option is to use EC’s existing labour and to use sub-contractors for the work currently being done by EC’s skilled labour. The relevant cost is therefore 100 hours @ $7. Unskilled labour The unskilled labour is available within EC, but there is an overtime cost that is caused by this work. The cost of the overtime premium is 20 hours @ $3 per hour = $60. Thus the total relevant cost is $420.

May 2011

1

Examiner's Answers CPGA


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
The Examiners Answers for CIMA Professional Gateway Assessment May 2011 by Chartered Institute of Management Accountants - Issuu