Operational Level Paper
P1 –Performance Operations Examiner’s Answers SECTION A Answer to Question One 1.1
The correct answer is A.
1.2
(102 + 67 - 54) = 115 days The correct answer is B.
1.3
$19,615/$219,615 = 8.9% The correct answer is D.
1.4
If the maximin rule is applied, the highest of the worst profit for each of the three projects is $450,000 i.e. project C. The correct answer is C.