1.2 Structure of the Report

(b) the planning proposal authority must comply with the notice requirements for public exhibition of planning proposals and the specifi cations for material that must be made publicly available along with planning proposals as identifi ed in section 6.5.2 of A guide to preparing local environmental plans (Department of Planning and Environment, 2018). 4. Consultation is required with the following public authorities/organisations under section 3.34(2)(d) of the Act: • Environment, Energy and Science Group • Environmental Protection Agency • Greater Sydney Commission • Department of Education • Ausgrid • Sydney Water • Jemena • Metropolitan LALC and other relevant Aboriginal groups • Roads and Maritime Service • Transport for NSW • Massey Park Golf Club

Each public authority / organisation is to be provided with a copy of the planning proposal and any relevant supporting material and given at least 21 days to comment on the proposal.

Advertisement

5. A public hearing is not required to be held into the matter by any person or body under section 3.34(2)(e) of the Act. This does not discharge Council from any obligation it may otherwise have to conduct a public hearing (for example, if reclassifying land). 6. Given the nature of the planning proposal, Council is not authorised to be the local planmaking authority to make the plan. 7. The time frame for completing the LEP is to be 12 months from the date of the Gateway determination.

This Planning Proposal has responded to items 1 and 2 of the conditions within the Gateway Determination as detailed in the relevant sections of this report.

This report provides updated information, analysis and justifi cation to the previous Planning Proposal and is structured in accordance with Section 3.33 of the Environmental Planning and Assessment Act 1979 (EP&A Act) and the relevant guidelines set out in the NSW Department of Planning and Environment's 'A Guide to Preparing Planning Proposals' (2018). This amended Planning Proposal is set out as follows:

 Executive Summary  Introduction  The Site  Planning Context and Framework  Request for Amended Planning Proposal  Amended Planning Proposal –Part 1 – Objectives and Intended outcomes of the proposed instrument –Part 2 – Explanation of the provisions that are to be included in the proposed instrument