Downtown Rehabilitation Phase 4 Brochure

Page 5

SEQUENCE OF WORK Mobilization and Set Up • Set up message boards for advance notice of construction and information. • Set up detour signs and temporary traffic signals. • Mobilize equipment and materials to site, set up fencing and walkways. • Install temporary potable water piping system. • Ensure that potable/temporary water is tested and safe for consumption before construction of new water lines commences.

Replacement of Underground Infrastructure in the Roadway • Remove existing asphalt pavement, sidewalks and concrete curbs, trees and existing street furniture. • Replace deep utilities (sanitary, storm and water infrastructure) will be completed in stages. • Conduct pressure testing on the new water line and we will ensure all potable water is safe for consumption before terminating temporary water feeds. • Video inspect sanitary and storm sewer for acceptance. • Begin road and sidewalk construction once underground utilities are tested and accepted.

3


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.