FINANCIAL PLAN Kelowna, BC Canada Preliminary Budget
2024 Volume 1
2024 FINANCIAL PLAN
Navigating the
CITY OF KELOWNA
Financial Plan
Navigating the Financial Plan This document has been hyperlinked for your convenience. You will be able to navigate to the necessary information using one of the options below.
If reviewing online Table of Contents The table of contents is hyperlinked to each listed section within the Financial Plan. Guide your mouse cursor over the section title and click to be redirected. To return to the table of contents, click on the City of Kelowna text at the top right of all pages.
If reviewing as a downloaded PDF Bookmarks (option ) Select the bookmark icon located on the left‐hand side menu. A list of bookmarked pages will appear. Click on the topic of interest to be taken directly to that selection. Table of Contents (option ) The table of contents is hyperlinked to each listed section within the Financial Plan. Guide your mouse cursor over the section title and click to be redirected. To return to the table of contents, click on the City of Kelowna text at the top right of all pages.
PAGE 2
2024 FINANCIAL PLAN
CITY OF KELOWNA
TABLE OF CONTENTS About this document ....................................... 5 2024 Council Changes ...................................... 6
INTRODUCTION & OVERVIEW Territory Acknowledgement ............................ 9 Message from the City Manager..................... 10 Award for Financial Reporting ........................ 12 Our Community ............................................. 13 Our City ......................................................... 14 Our Citizens ................................................... 15 Imagine Kelowna ........................................... 17 Council Priorities ............................................ 19 Budget highlights ........................................... 22 Budget at a glance .................................... 22 Budgeting for Community Priorities ......... 24 Property taxation & major contracts ......... 29
STRONG FINANCIAL MANAGEMENT The City & its divisions ................................... 31 Budget process .............................................. 32 Public Input ............................................... 32 Budget development ................................ 32 Budget cycle & timeline ............................ 32 Basis of accounting/budgeting ...................... 35 Policies........................................................... 36 Financial planning policies ........................ 36 Revenue & expenditure policies ................ 36 Investment & cash management policies . 37 Capital strategies ..................................... 38 Funds & departmental relationship ............... 39 Municipal funds ........................................ 39 Reserve & fund equity ................................... 41 Debt management ........................................ 44 Operating full‐time equivalent (FTE) positions summary ........................................ 53
FINANCIAL SUMMARIES Financial Plan Summary ................................ 60
OPERATING BUDGET Operating budget summary .......................... 70 Airport .......................................................... 79 Community Safety & Bylaw .......................... 89 Police Services & RCMP ................................ 97 Fire Safety .................................................. 108 Wastewater Utility ....................................... 117 Stormwater & Flood Protection ................... 127 Water Utility ................................................ 137 Solid Waste & Landfill .................................. 147 Transportation ............................................. 155 Transit ........................................................ 166 Parks ............................................................ 175 Sport & Recreation ...................................... 185 Arts & Culture ............................................. 198 Community Development ........................... 207 Development Services ……… ....................... 223 Development Planning ................................231 Parking ....................................................... 238 Partnerships Office ..................................... 245 Governance & Leadership ........................... 252 Enabling Services ........................................ 261
CAPITAL BUDGET Capital budget summary ............................. 287 Information Services ................................... 297 Real Estate & Parking .................................. 302 Building ....................................................... 307 Parks ............................................................ 315 Vehicle & Mobile Equipment ........................ 327 Transportation .............................................330 Wastewater ................................................. 347 Storm Drainage. .......................................... 356 Water .......................................................... 360 Solid Waste .................................................. 370 Airport ......................................................... 377 Fire ...............................................................383
PAGE 3
2024 FINANCIAL PLAN
CITY OF KELOWNA
CARRYOVER BUDGET Report to Council ......................................... 388 Carryover request three-year comparison .... 390 Summary of multi-year requests .................. 392 Summary of program requests ..................... 394 Operating budget ........................................ 396 Summary of operating budgets .............. 397 Operating request details ...................... 401 Capital budget ............................................. 432 Summary of capital budgets .................. 433 Capital request details ............................ 439
FINAL BUDGET Report to Council ........................................ 491 Financial summaries ..................................... 493 Analysis of tax demand ............................... 493 Analysis of total revenues ............................ 494 Analysis of total expenditures ...................... 495 Use of tax dollar by service area ................... 496 Ongoing budget impacts ............................. 497 Operating budgets ...................................... 498 Summary of Operating budgets .................. 499 Operating request details ............................ 500 Capital budgets ........................................... 503 Summary of capital budgets ........................ 504 Capital request details ................................. 505
FIVE-YEAR FINANCIAL PLAN Financial Plan ............................................... 508 Revenue sources & trends ............................ 509 Five-Year Financial Plan summary ................ 514 Operating summaries – General fund ........... 516 Operating summary – Utility funds............... 535 Capital summaries – General fund ............... 539 Capital summary – Utility funds ................... 550
APPENDIX Supplemental information ............................... II Statistics ......................................................... V Glossary .......................................................... X Acronyms & Abbreviations ........................... XIII
PAGE 4
2024 FINANCIAL PLAN
CITY OF KELOWNA
About this Document About this document is intended to provide a basic understanding of the Financial Plan and briefly describe the contents of each major section of this document. The Financial Plan provides detailed funding requirements over the next five years and serves as a policy document, operations guide, and communications tool. 2024 Council changes The Financial Plan Volumes are presented to Council as a recommendation from the City Manager. During budget deliberations, Council may choose to make changes to the presented budget resulting in a revised gross taxation demand and property owner impact for the year. This page summarizes all changes made by Council. Introduction & overview This section provides an introductory message from the City Manager outlining the priorities and challenges considered in the development of the 2024 Financial Plan. An overview of Our Community, Our City, and Our Citizens tells the story of what makes Kelowna a desirable place to live. Budget highlights provide a summary of how we budget for and deliver on Council and Corporate priorities. Strong financial management This section discusses the City of Kelowna’s organizational structure, funds, debt, strategies and policies, and goes into detail about the budget process. Financial summaries This section provides financial analysis of the tax demand, revenues and expenditures. The Financial Plan is made up of three main parts; Service Area operating budgets which represent the total cost of services offset by direct revenues, Enabling Services operating budgets which represent the support costs of proviing services to the community, and Capital Budgets which include capital requirements for the year summarized by infrastructure group and funding source. Operating budget This section starts with an overview of the City’s operating program and a full summary of all operating requests, followed by individual Service Area sections that include service descriptions; activities planned for the budget year; performance metrics and a budget overview presenting information for the completed 2022 year, the estimated/revised 2023 year and the proposed/Preliminary 2024 year. This is followed by Priority One budget requests, included in budget totals, and then Priority Two, not included in budget totals, if applicable. Requests are shown in maintain and enhance categories and contain a justification and the one- to three-year financial impact.
Operating requests related to capital are presented in the associated capital request in the capital section. Capital budget This section starts with financial analysis of the capital program including a list of operating impacts and a full summary of all capital requests. This is followed by individual capital infrastructure groups that include detailed Priority One requests, and a summary of Priority Two requests if applicable. Capital requests are presented in the order of the Capital Plan reference number and marked as one of three types: renew, growth and new. Any operating impacts are included as part of the capital request and are marked with an “O&M” on the summary sheet. Carryovers & Final Budget Multi-year and unfinished projects that require budget to be moved to the next fiscal year are presented to Council in March, as part of the Carryover Budget–Volume 2. Final Budget – Volume 3 is presented in April and includes final adjustments to the Financial Plan and the requisition amounts from other taxing jurisdictions. This plan is mandated by the Community Charter to be approved by bylaw annually before May 15 prior to the annual property tax bylaw adoption. Five-Year Financial Plan The Five-Year Financial Plan is mandated by the Community Charter to include a planning period of five years, the first being the year in which the plan is specified to come into force and the following 4 years. Appendix Supplemental information including the City’s Citizen Survey results, Official Community Plan and Indicators Report, Community Trends report and various statistical information are provided for the reader. All reports are also available on kelowna.ca. For clarity of terms throughout the Financial Plan, a glossary and acronyms list is provided.
PAGE 5
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Council Changes The Financial Plan Volumes are presented to Council as a recommendation from the City Manager. During budget deliberations, Council may choose to make changes to the presented budget resulting in a revised gross taxation demand and property owner impact for the year. This page summarizes all changes made by Council in the three budget volumes. This page will be updated after each Financial Plan Volume is approved by Council.
Analysis of tax demand (% thousands)
2024 Taxation demand New construction tax revenue Net property owner impact Municipal Impact Public Safety Levy Impact
Proposed Preliminary Budget
Approved Preliminary Budget
Proposed Carryover Budget
Approved Carryover Budget
Proposed Final Budget
Approved Final Budget
$190,015 (4,980) 4.76% 3.76% 1.00%
$189,997 (4,980) 4.75% 3.75% 1.00%
$189,997 (4,980) 4.75% 3.75% 1.00%
$189,997 (4,980) 4.75% 3.75% 1.00%
$191,220 (6,260) 4.72% 3.72% 1.00%
$191,220 (6,260) 4.72% 3.72% 1.00%
Items added/deleted by Council – Preliminary Budget – Volume + Service Area Operating requests Development Services Governance & Leadership Police Services & RCMP Police Services & RCMP Fire Safety
Capital requests Building Water
Increase/ (Decrease)
Tax Demand
ON-GOING/ ONE-TIME
Late to P1 N/A P2 to P1 260 P2 to P1 107 P2 to P1 107 P2 to P1 116 Operating total
(300,000) 50,000 117,100 117,100 114,500 98,700
(300,000) 50,000 117,100 0 114,500 (18,400)
ON-GOING ONE-TIME ON-GOING ON-GOING ON-GOING
314 Community Activity Centres, Child Care - P2 to P1 Construction UV Treatment Systems Control Upgrade P1 to P2 366 Capital total
2,015,400 (500,000) 1,515,400
0 0 0
Total operating & capital changes 1,614,100
(18,400)
Title
Change
Permit & Inspection Revenue Increase Crane Memorial RCMP Regular Members (2) RCMP Regular Members (2) Firefighters - Two Positions
Pg
ONE-TIME ONE-TIME
Items added/deleted by Council – Carryover Budget – Volume , No change to proposed budget volume by Council.
Items added/deleted by Council – Final Budget – Volume . No change to proposed budget volume by Council.
PAGE 6
2024 FINANCIAL PLAN
CITY OF KELOWNA
INTRODUCTION & OVERVIEW
PAGE 7
2024 FINANCIAL PLAN
CITY OF KELOWNA
THIS PAGE INTENTIONALLY LEFT BLANK
PAGE 8
2024 FINANCIAL PLAN
CITY OF KELOWNA
territory acknowledgment We acknowledge that our community is located on the traditional, ancestral, unceded territory of the syilx/Okanagan people.
PAGE 9
2024 FINANCIAL PLAN
CITY OF KELOWNA
a message from the city manager As the City of Kelowna continues to grow and evolve, it is my privilege to introduce the proposed 2024 Financial Plan, which introduces service-based budgeting for the first time for the City of Kelowna. This transformative process will enhance our financial planning and better serve Council as they make the decisions that shape Kelowna as a City of the Future. The new approach is a paradigm shift that helps more clearly align the budget with community priorities, needs and goals, and it will allocate resources more effectively and efficiently. Service-based budgeting organizes the City’s Financial Plan around delivering the services that are needed to meet the needs of our growing community, resulting in a more complete picture of the costs involved for each service area. This model aims to enhance transparency and accountability by making it easier to see, understand, and measure the outcomes of where tax dollars and other revenues are being invested. For Council this means greater clarity on complete service offerings and their associated costs, which translates to more informed decision making. This not only facilitates more thoughtful discussion and review of service levels and performance impact, but also provides a better understanding of how, where and when the City may be able to deploy finite resources to areas of need. Residents, community partners, and staff will also now be able to visualize the budget and City services more holistically and concretely, enhancing the ability to work together to identify areas of improvement, innovation, and collaboration. Budget priorities for the year continue to be shaped and guided by Council Priorities, the Imagine Kelowna vision, the citizen survey, the Official Community Plan, the 2030 Infrastructure and 10-Year Capital Plan, and our annual public progress reporting. Through these guiding documents, the Budget prioritizes investments in capital delivery to meet growth in the community. This budget sets out to support the essential services that contribute to everyday quality of life and maintain the City’s growth, as well as key objectives of this Council, as stated in the Council Priorities (2023-2026). These include Crime and Safety, Affordable Housing, Homelessness, Transportation, Agriculture, and Climate and the Environment.
PAGE 10
2024 FINANCIAL PLAN
CITY OF KELOWNA
The 2024 Financial Plan prioritizes: • •
• •
•
A focus on Community Safety through additional and enhanced resourcing for RCMP, Bylaw & Fire. Addressing Homelessness head on through meaningful investments in Community Programing and Social Development and internalizing the delivery of the Journey Home Strategy. Keeping Kelowna moving by investing in more transit infrastructure and prioritizing sustainable transportation and shared mobility. A focus on impacts of climate change by investing in proactive ways to tackle wildfire and flood mitigation, and providing financial incentives to residents and businesses that participate in renewable and efficiency programs. Improve how citizens do business with the city through Digital Transformation strategies that leverage technology to create more access and efficiency for residents and businesses.
As City Manager, I am confident that o ur s trategic a bility t o make s ound financial decisions for the collective good is one of our greatest strengths. It is also our greatest responsibility. Some key highlights of this year’s Financial Plan include; the creation of a new social services function, in part, to help deliver on Council Homelessness priority, as well as execution of the Journey Home Strategy, keeping Community Safety top of mind by adding increased funding for new positions in RCMP, Bylaw, and Fire, as well as commencement of some of the most ambitious capital and infrastructure projects to date, such as the Building a Stronger Kelowna suite of recreational facilities. Our city also continues to be at the forefront of provincial advocacy. We actively engage with both federal and provincial governments to ensure our community's interests are represented. The 2024 City Budget reflects this unwavering commitment to leading the way in public policy advocacy, development, and implementation. We are taking proactive steps to address the changing policy landscape, working in close collaboration with our provincial partners. This approach allows us to influence legislative decisions and secure the resources necessary to support our city's growth and well-being. As a fiscally responsible municipality, we are proud to continue to generate 75 per cent of the City’s annual total revenue through sources other than annual taxation. This commitment is realized through mechanisms such as ‘user-pay principles,’ leveraging reserves, and innovative approaches to revenue generation though grants, partnerships, and business unit investments. I am excited about the move to a Service-Based Budget for our city, and I am confident that it will help us target investments that will improve the quality of life for all residents. I am pleased to present Council with the proposed City of Kelowna preliminary budget for 2024 and would like to convey my sincere appreciation to all City Staff who have embodied our corporate priority of Strong Financial Management in preparation of the budget that will be considered by City Council.
– Doug Gilchrist, City Manager
PAGE 11
2024 FINANCIAL PLAN
CITY OF KELOWNA
Award for Financial Reporting Government Finance Officers Association of the United States and Canada (GFOA) presented a Distinguished Budget Presentation Award to City of Kelowna, British Columbia, for its 2023 Annual Budget for the fiscal year beginning January 01, 2023. In order to receive this award, a governmental unit must publish a budget document that meets program criteria as a policy document, as a financial plan, as an operations guide, and as a communications device. This award is valid for a period of one year only. We believe our 2024 budget continues to conform to program requirements, and we are submitting it to GFOA to determine its eligibility for another award. The City of Kelowna has received the GFOA Distinguished Budget Presentation Award for 22 consecutive years.
PAGE 12
2024 FINANCIAL PLAN
CITY OF KELOWNA
Our Community Lifestyle Located along the sandy shores of the Okanagan Lake, in the heart of the Okanagan Valley, Kelowna is a fourseason playground welcoming over two million visitors annually from around the world. With its proximity to water, beaches, hiking trails, ski hills, golf courses and the Okanagan Rail Trail, it’s a city that embraces outdoor adventure and an active lifestyle all year long. With over 40 wineries within a 20-minute drive, Kelowna is at the centre of the world-renowned Okanagan wine country and fruit growing industry. It is home to award-winning microbreweries, distilleries, and cideries deeply rooted in the local agricultural history, and its bustling urban centre offers a passionate farm to table network, outdoor markets, live music scene, galleries, theatre and unique shopping boutiques. Nearly all citizens (90 per cent) rate the quality of life in Kelowna as good or very good thanks to active/recreational opportunities, safety, its accessible location, job opportunities, and great weather. Growth Kelowna is rapidly evolving. Between 2016 and 2021, Kelowna’s population increased by 13.5 per cent making it the fastest growing city in B.C., while having the third-fastest growing downtown in Canada. As the twentieth largest metropolitan area in the country, it is becoming a more urban and dynamic city. By 2040, Kelowna is expected to be home to another 45,000 people. In 2021, for the first time, building permit values exceeded $1 billion. Jobs Kelowna is an economic powerhouse, home to robust traditional sectors like agriculture and construction, and burgeoning new sectors such as information technology. It is homebase for over 650 technology companies with over $1.67 billion in economic, according to Accelerate Okanagan. The city boasts a diverse economy that also includes manufacturing, tourism, aviation and health care. Airport Kelowna International Airport (YLW) is the largest municipally owned and operated airport in Canada. YLW does not utilize municipal taxes as it is self-funded through user fees and charges. The aviation sector is essential for Canada’s post-pandemic recovery of revenue generation for local businesses, maintaining and creating jobs for residents, and encouraging investment in the local community. Each year YLW pays a portion of revenue to the City of Kelowna which helps to reduce taxes paid by residents. Education Kelowna is a hub of academic and trades training excellence. It is home to the Okanagan campus of the University of British Columbia, one of the world top public universities, and Okanagan College’s largest campus. Together, the two post-secondary schools welcome nearly 30,000 students a year. Health Kelowna offers world-class, state-of-the-art medical facilities offering the highest quality patient care. Interior Health Authority, headquartered in downtown Kelowna, and the Kelowna General Hospital serve as the leading health centre for the B.C. Interior, and a teaching hub for the UBC Okanagan medical school.
PAGE 13
2024 FINANCIAL PLAN
CITY OF KELOWNA
Our City The City of Kelowna is a city of the future. It is open to new opportunities, business and new ideas from diverse residents. The organization is led by Mayor and Council, our dedicated City Manager. More than 1,000 employees deliver quality services to ensure our city is safe, vibrant and sustainable. As a fiscally responsible municipality, the City provides core services, maintains existing infrastructure and builds new amenities when needed. The public is kept informed of City projects and progress through an array of publications including the monthly City Views digital newsletter and the Annual Report, as well as news releases and social media. In addition, the user friendly and mobile responsive kelowna.ca website allows residents to place service requests online and stay informed. Mayor and Council The City of Kelowna is governed by an elected Mayor and eight Councillors for a four-year term (2022-2026). Led by Mayor Tom Dyas, Kelowna City Council is committed to building on the momentum of past Councils and being open for opportunity through community engagement and partnerships. It is consistent and transparent in decisions, creating a favourable environment for customer service, development and business in Kelowna. Top row: Councillors Luke Stack and Mohini Singh, Mayor Tom Dyas, Councillors Maxine DeHart and Charlie Hodge. Seated: Councillors Ron Cannan, Loyal Wooldridge, Gord Lovegrove and Rick Webber.
PAGE 14
2024 FINANCIAL PLAN
CITY OF KELOWNA
Our Citizens
The 2022 City of Kelowna Citizen Survey helped gauge public satisfaction with municipal programs and services, providing insights into citizens’ priorities. For information see Appendix A.
PAGE 15
2024 FINANCIAL PLAN
CITY OF KELOWNA
Kelowna on the Map
PAGE 16
2024 FINANCIAL PLAN
CITY OF KELOWNA
The Vision At-a-glance
In 2018, we are a city in transition and Imagine Kelowna is the community’s vision for how to thrive in the face of unprecedented growth and change. The result of almost 4,000 resident contributions, this is a vision created by our community, for our community. We need to be agile, resilient and unafraid to do things differently. The community has made it clear that as we grow, we need to look out for one another and protect the stunning environment that sustains us. In 2040, Kelowna is a thriving mid-sized city that welcomes people from all backgrounds. We want to build a successful community that honours our rich heritage and also respects the natural wonders that contribute to our identity. As a place with deep agricultural roots, Kelowna understands the need to protect our environment, manage growth and be resilient as our future unfolds. We want a community that: •
puts people first: We try to balance the needs of everybody in our decision making. We recognize that inclusivity and diversity makes us a stronger and more innovative community.
•
values its history: We celebrate our heritage, and learn from our past to reconcile it with a better, more inclusive future we see for ourselves.
•
encourages curiosity and creativity: We learn continuously to respond and adapt to rapid change. We ffind innovative ways to meet social, economic and environmental challenges and opportunities.
•
recognizes the changing roles of individuals, businesses, governments and community organizations: The well-being of our city is a shared responsibility and everyone needs to do their part to seize opportunities for improvement.
Principles
Principles and goals The following principles and goals work together as a system to help the community achieve its vision. Principle 1 – Collaborative: A community where people of all backgrounds work together to meet collective challenges. Goal: Engage with the Okanagan’s traditional past and heritage as foundations for building a fair and equitable community. We will honour our rich heritage while also following the lead of our local Indigenous communities towards a path of reconciliation. Goal: Nurture a culture of entrepreneurship and collaboration. Entrepreneurship is weaved into Kelowna’s cultural fabric, making our community more creative, collaborative and better able to meet the challenges of the future. Goal: Foster resident-driven solutions. We unleash our community’s hidden talents to solve the tough challenges of the future.
PAGE 17
2024 FINANCIAL PLAN
Draft principles and goals Principle 2 – Smarter: A community willing to learn, adapt and grow so we can thrive amid rapid change. Goal: Support innovation that helps drive inclusive prosperity. We are building a nimble and resilient economy that doesn’t leave anyone behind. Goal: Take action and be resilient in the face of climate change. We will seize the opportunity to face climate change headon for a hopeful and sustainable future. Goal: Build healthy neighbourhoods that support a variety of households, income levels and life stages. Everyone in our community should be able to find stable and appropriate housing.
Principle 3 – Connected: A community where residents are connected to their neighbours, their city and the wider world. Goal: Embrace diverse transportation options to shift away from our car-centric culture. Making it easy for people to choose non-driving options protects the beauty of Kelowna and makes getting around more enjoyable. Goal: Create great public spaces that bring people together. We need great public gathering places like parks, plazas and community centres where people can meet and connect with others. Goal: Provide opportunities for people of all ages, abilities and identities. We all benefit when everyone in the community has access to economic, recreational and social opportunities. Goal: Cultivate an accessible and engaging arts and culture scene. Everyone can find something that interests them to engage in, from grassroots initiatives to professional endeavours.
CITY OF KELOWNA
Principle 4 – Responsible: A community where decisions are made ethically and where social and environmental concerns are prioritized. Goal: Concentrate on growing vibrant urban centres and limit urban sprawl. Denser neighbourhoods make our city healthier, more sustainable and easier to get around. They make more financial sense, too. Goal: Preserve Okanagan Lake as a shared resource. Okanagan Lake is the jewel that makes Kelowna sparkle. Goal: Strengthen the protection of our land, water and air resources. Our stunning environment is the foundation that all of our other aspirations stand on. Goal: Protect agricultural land and promote sustainable farming. Supporting agriculture helps ensure food security while preserving vital green infrastructure.
Now what? Under the banner of Imagine Next, the City will use Imagine Kelowna to help shape its priorities and provide the foundation for future strategies and projects such as the Official Community Plan (Our City as we Grow), the Transportation Master Plan (Our City as we Move), Intelligent City Strategy, and many others The Imagine Kelowna goals are also aligned with the United Nation’s Sustainable Development Goals, linking what we are doing locally with larger global efforts to shift the world onto a more equitable, sustainable and resilient path. However, Imagine Next doesn’t only involve the City. It also provides direction to our entire community to change the way we work together, how we make decisions, and how we engage with residents. Ultimately, Imagine Kelowna is the community’s vision to ensure a vibrant and resilient future. It is up to all of us to imagine what’s next and help make Imagine Kelowna a reality. Stay informed about Imagine Kelowna by subscribing to e-updates or get involved by visiting imagine.kelowna.ca.
PAGE 18
2024 FINANCIAL PLAN
CITY OF KELOWNA
COUNCIL PRIORITIES The 2023-2026 Council Priorities identify the strategic shifts, improvements and changes that are important to Council, the community, and the organization. The approach is designed to take immediate action on what is important to residents and guide the City’s business planning and investment decisions. It outlines six priority areas and 22 actions to increase citizens’ quality of life. Council receives a public progress report on the priorities every six, 12 and 18 months. To see the progress on the 22 result areas, visit kelowna.ca/councilpriorities. Agriculture Crime and Safety Council Priority Actions • • • •
Strategy to address property crime; including break and enters and theft. Provide local Business Improvement Areas support for urban center safety issues (e.g. ‘Red Shirts’ program). Establish a safety task force with stakeholders. Partner with Provincial ministries responsible for mental health and problematic substance use on initiatives (i.e. Community Safety Plan) that improve local conditions.
Affordable Housing Council Priority Actions • • •
Acquire city owned land to build affordable housing. Increase number of rental units with below market rents. Partner on the creation of a low-cost affordable housing pilot project.
Homelessness Council Priority Actions • • •
•
Advocate for additional Complex Care Centre (e.g. Red Fish Healing Center). Explore partnership opportunities for alternative forms of sheltering. Advocate for purpose-built permanent shelter with ‘wrap-around’ supports and graduated housing options. Develop an emergency winter shelter program.
Transportation Council Priority Actions • • • • •
Explore alternative modes of transportation between UBCO/YLW and downtown. Improve transit service including expanding the transit pass program. Improve traffic flow and capacity on major road networks (e.g. Lakeshore Road). Complete the functional design of Hwy 33 multi-modal traffic corridor. Enhance safety presence.
Agriculture Council Priority Actions • • •
Facilitate the creation of a permanent home for the farmer's market. Review the Agriculture Plan with respect to secondary uses. Expand Enforcement/Bylaw Officers.
Climate and Environment Council Priority Actions • • •
Include ‘Climate Lens’ in decision making to assess mitigation and adaptation. Increase urban tree canopy (e.g. tree-lined medians). Pilot energy concierge program to enable retrofits in buildings.
PAGE 19
2024 FINANCIAL PLAN
CITY OF KELOWNA
Plans & Strategies
How City Plans Work Together
Plans that Influence the Budget
PAGE 20
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measurement
Performance Measurement City of Kelowna has a corporate-wide performance measurement program that is integrated into the annual Financial Plan and Annual Report in accordance with the Community Charter. Corporate performance management is inherent in good governance and management. It is both an integral part of how we work and key to achieving our desired results. Performance measures provide us the evidence of results that informs our management decisions and actions.
Performance measures are important for both external and internal stakeholders. Measuring our corporate performance allows us to evaluate our programs, services and processes to ensure that we are providing quality programs and services that best serve our citizens. Performance measures tell the story of results, improving visibility, transparency, and accountability. They build trust as they help citizens understand the difference the City is making and provides them with a tool to track and understand costs per service level.
Performance measurement is also used by City staff as a tool for continuous improvement. Internal performance measures assist staff to better understand City priorities enabling quicker, wellreasoned decisions that will improve the value the City provides to the community. Reporting divisional corporate performance measures is a part of the City’s financial planning process and is included in the City of Kelowna Annual Financial Plan. The performance measures are directly linked to operational goals and/or Council priorities. To view the annual interactive progress report, visit https://opendata.kelowna.ca/pages/progress-reports
PAGE 21
2024 FINANCIAL PLAN
CITY OF KELOWNA
BUDGET HIGHLIGHTS Budget at a glance The City of Kelowna acts as a steward of public funds on behalf of our residents and makes the right choices to protect our city and community. We do this by having a clear set of priorities based on our community led Imagine Kelowna vision, solid master plans and a firm dedication to active financial management. This is supported through continuous and consistent progress reporting, showing how the City is implementing priority Imagine Kelowna actions. Public reporting not only invites useful feedback and input from the community, it shows Council’s commitment to transparency, accountability and providing value to residents. The City of Kelowna has traditionally used an organizational approach to presenting the annual budget whereby each division or department budget was presented to Council based on the organizational structure of the day. This sometimescaused confusion when departments were moved between the different divisions or new divisions were set up as part of reorganizations. It also made it difficult to present the cost of services that are delivered across multiple divisions. Further, the connection between the service levels observed by citizens was not necessarily tied to the budget presentation in a meaningful way. With citizens increasingly holding municipalities accountable for the cost of services provided, the 2024 Financial Plan will be presented under a Service Based Budgeting methodology, with services and associated service levels being determined through Council’s priorities, and the City’s strategic plan. Under this approach, budget is created and presented around the service being delivered to the community, rather than departments and divisions under which the organization is structured. Service Based Budgeting has many benefits for Council and the Community including: • • • •
Enhanced accountability and transparency Better communication of where tax dollars are being spent and for what outcome. Greater clarity of services offered to the community & their associated costs. Council establishes the endorsed level of service & associated investment.
2024 priorities An investment in Community Safety Additional and enhanced resourcing for RCMP, Bylaw & Fire Public safety continues to be a top priority for the City and residents. In 2023 Council approved the introduction of an annual one per cent public safety levy indexed to the greater of growth and inflation or one per cent of the previous years’ taxation demand. The levy provides a dedicated and predictable ongoing funding source for one of our highest community priorities and will allow for improved financial planning and forecasting for the future. The allocation recommendation is informed by an RCMP resource deficit highlighted in the Griffiths' 2019 Report and their strategic plan; community service growth needs identified by Bylaw Services and the Fire Department 2030 Strategic Plan and 10-year Capital Plan. As this continues to be a priority investment area, the levy will be used in the 2024 budget to provide funding for: • • •
12 RCMP Members (5 out of 12 members funded through the Public Safety Levy) 2 Senior Bylaw Officers 4 Fire Fighters
Additional investments include: • • •
Enhancements in Bike Valet and Theft Prevention Expanded coverage for Orchard Park Exchange Security Initiating the Neighbourhood Association Pilot Program
PAGE 22
2024 FINANCIAL PLAN
CITY OF KELOWNA
In addition to the essential services that contribute to everyday quality of life and maintain the City’s growth, the 2024 City Budget focuses on Council Priorities. Working alongside other pivotal City Strategies – such as the Official Community Plan, 10-Year Capital Plan, 20-Year Servicing Plan, and Imagine Kelowna – the 2023-2026 Council Priorities guide the City’s business planning and investment decisions. They include Crime and Safety, Affordable Housing, Homelessness, Transportation, Agriculture, and Climate and the Environment. Some highlights in 2024 investments include: • • • •
Addressing Homelessness head on by providing over $650,000 in funding to renew the Journey Home Strategy. Community Development Investments at over $700,000 for 2024 Focusing on Kelowna moving through increased and enhanced Transit options with a $725,000 capital investment. A $4.7 million investment in enhancing, maintaining, and expanding Active Transportation to prioritize sustainable transportation and shared mobility as Kelowna continues to grow.
Strong Financial Management Once budget carryovers are approved, and the Financial Plan is finalized in April, only approximately 25 per cent of the City’s 2024 operating and capital costs will come from annual taxation. Revenue generated from sources such as selffunding business units, including Kelowna International Airport, the City’s water utility and solid waste operations, as well as grants and user fees contribute significantly to service delivery and our citizens’ quality of life. This, and the ability to utilize reserve funding to offset some of the impacts of inflation, and other economic pressures, including significant increases in service contracts, is helping to keep taxes as low as possible. Development Cost Charge revenue ($34.9M) will fund over 30 projects, including the following: • • • • •
Parkland acquisition Rail Trail to Greenway, ATC Manhattan Point Park Road Safety Improvements Stewart 3 DCC (Crawford – Swamp), Road
A focus on impacts of climate change Kelowna has experienced the havoc that climate change can cause to a community, including an unprecedented Grouse Complex wildfire this summer. Climate projections show that as greenhouse gas (GHG) emissions continue to grow, events like fires, floods and extreme weather will become more common in the next three decades. To help combat these impacts the 2024 Financial Plan proposes Investing in proactive ways to tackle wildfire and flood mitigation, and providing financial incentives to residents and businesses that participate in renewable and efficiency programs. • • •
Wildfire and Flood mitigation Investments Proactive Wildfire and Flood mitigation Investments totalling to over $8 million in capital and operating enhancements. Over $1.5 million in Financial Incentives for residents and businesses to encourage participation in renewable and efficiency energy programs.
PAGE 23
2024 FINANCIAL PLAN
CITY OF KELOWNA
Budgeting for community priorities Each budget request must indicate the Council or Corporate priority that it is best aligned with. Council priorities identify where residents and City Council want to see a difference in our community. Corporate priorities identify what is needed to be a high-performance organization and be able to deliver services and value to residents. Listed below by Council and Corporate Priority, are some of the exciting programs and projects being requested in 2024. Crime and Safety Council Priority Actions: 1. Strategy to address property crime; including break and enters and theft 2. Provide local Business Improvement Areas support for urban center safety issues (e.g. ‘Red Shirts’ program) 3. Establish a safety task force with stakeholders 4. Partner with Provincial ministries responsible for mental health and problematic substance use on initiatives (i.e. Community Safety Plan) that improve local conditions Operating requests: Operating requests aimed at decreasing break & enters and theft include the continuation of the Bike Valet program and to develop a comprehensive approach to provide secure bike parking throughout the City, including downtown, urban centres, major events, and transit-exchanges. The Wastewater Treatment facility houses critical infrastructure and is an industrial operation, budget is requested to enhance security of the site for the safety of the public and workers as the site has experienced an increase in security incidents recently. Public safety continues to be a top priority for the City and residents. The 2023 preliminary budget included the introduction of an annual one per cent public safety levy indexed to the greater of growth and inflation or one per cent of the previous years’ taxation demand. This provides a dedicated and predictable ongoing funding source for one of our highest community priorities and allows for improved financial planning and forecasting for the future. Requests in 2024 to support public safety resources keeping pace with growth and to help residents feel safe include additional Bylaw, RCMP and police support positions, as well as the expansion of the security coverage at the Orchard Park transit exchange. A pilot program is also requested to grow the capacity of Kelowna’s Neighbourhood Associations which are uniquely poised to bring neighbours together, host celebrations, organize projects, and ultimately, build community with the neighbours where they live.
Affordable Housing Council Priority Actions: 1. Acquire city owned land to build affordable housing 2. Increase number of rental units with below market rents 3. Partner on the creation of a low-cost affordable housing pilot project Operating requests: An update to the Healthy Housing Strategy is legislatively required to be completed every five years. Budget is being requested in 2024 to craft a comprehensive five-year housing strategy that will create actionable activities to diversify housing forms and tenure for current and future residents.
PAGE 24
2024 FINANCIAL PLAN
CITY OF KELOWNA
Homelessness Council Priority Actions: 1. Advocate for additional Complex Care Centre (e.g. Red Fish Healing Center) 2. Explore partnership opportunities for alternative forms of sheltering 3. Advocate for purpose-built permanent shelter with ‘wrap-around’ supports and graduated housing options 4. Develop an emergency winter shelter program Operating requests: Social Development Services has assumed the role of 'backbone entity' for the re-set of the Journey Home Strategy (JHS) with the expanded mandate to provide strategic leadership in the implementation of the Strategy, specifically, leading the coordination of and collaboration among community groups, agencies and other levels of government to collectively address homelessness. Transportation Council Priority Actions: 1. Explore alternative modes of transportation between UBCO/YLW and downtown. 2. Improve transit service including expanding the transit pass program. 3. Improve traffic flow and capacity on major road networks (e.g. Lakeshore Road) 4. Complete the functional design of the Hwy 33 multi-modal traffic corridor 5. Enhance traffic safety presence Operating requests: To enhance capacity and traffic flow on major road corridors, budget is requested for phase one of the update of the Travel Demand Model. This critical tool estimates network effects of transportation projects, and requires coordination with regional partners, the Province, and updated inputs from the Household Trip Diary. Phase I will establish a coordinated process, timeline and budget for updating the Travel Demand Model and the Household Trip Diary. To reduce congestion during rush hour and improve traffic flow, budget is requested to continue the 2023 Employer Commute Trip Reduction program. Next steps in 2024 are to develop the recommended materials and launch the three-year pilot, which would include KPIs and performance monitoring to ensure the program is delivering on the desired benefits and providing value for money. The 2040 Transportation Master Plan and City's Community for All Action Plan recommended City staff work directly with the community to identify needed transportation accessibility improvements to improve traffic safety. Budget is requested to create accessibility design guidelines with priority areas for retrofits to be identified to ensure sidewalks, crossings and intersections meet the needs of people with disabilities (e.g. people in wheelchairs, mobility scooters or with limited vision and hearing). This work will align with the new Accessibility Advisory Committee established in accordance with the Accessible British Columbia Act. Capital requests: To enhance capacity and traffic flow on major road corridors, several capital projects are planned for 2024 including: • Traffic Signals and Roundabouts at Rio Drive and Clifton Road • Stewart Road alignment, intersection, and cross-section improvements • Rutland Network Restructure - to upgrade transit stops/infrastructure at several locations To increase trips by alternative transportation modes, 2024 planned projects include: • Rail Trail to Greenway active transportation corridor (ATC) construction • Park & Ride, Mobility Hub, Operations Facility at the Rutland transit exchange • Detailed design for the Bertram 1 ATC, north-south through downtown from the Cawston to the Sutherland ATC Other capital programs like the Pedestrian Network and the Road Safety Improvements, will continue to increase traffic safety.
PAGE 25
2024 FINANCIAL PLAN
CITY OF KELOWNA
Agriculture Council Priority Actions: 1. Facilitate the creation of a permanent home for the farmer's market 2. Review the Agriculture Plan with respect to secondary uses 3. Expand Enforcement/Bylaw Officers Capital requests: Increased support for the agriculture industry is recommended through the Irrigation Mainline Renewal that will help increase and improve non-potable water supply and fire protection in southeast Kelowna, and the upgrade of two Pressure Reducing Valves (PRV) for the Non-Potable Water with better mechanical components, safety conditions and operability. Climate and Environment Council Priority Actions: 1. Include ‘Climate Lens’ in decision making to assess mitigation and adaptation 2. Increase urban tree canopy (e.g. tree-lined medians) 3. Pilot energy concierge program to enable retrofits in buildings Operating requests: In effort to protect and restore natural areas, budget is requested to support the implementation of the Sustainable Urban Forestry Strategy and to increase the urban tree canopy. This initiative includes three major components, analysis of tree canopy coverage to give a baseline inventory of city-wide tree canopy coverage, including species diversity; developing a street tree planting design as well as identifying planting locations in low equity and other priority areas; and expanding bareroot nursery to permit additional annual tree planting. Budget is also requested to implement substantial tree planting at the Kelowna Memorial Park Cemetery, to follow the Tree Planting Masterplan in areas lacking tree canopy coverage. Various projects and bylaw changes will be delivered in 2024 to contribute to Council Priority areas of Agriculture and Tree Protection. Budget for Electric Mobility Incentives are being requested to help to reduce corporate and community greenhouse gas (GHG) emissions. This project includes the creation of EV Ready Plans for multi-unit residential buildings, and incentives to help qualified households to purchase e-bikes. Capital requests: Enhance climate emergency planning is part of the continued Mill Creek Flood Protection project that is partially funded by the $22 million Disaster Mitigation and Adaptation Fund (DMAF) federal grant. Work in 2024 include completion of outlet works for the diversion to Mission Creek, purchase of debris removal machinery, creek improvements at Parkinson Recreation Park, older crossing removals, and continued airport and industrial corridor investigations. Reducing corporate and community GHG emissions is a priority in the City of Kelowna. Budget is requested for Carbon Neutral Initiatives at the Airport, which are aligned with the Airport's goal of being carbon neutral by 2030, including phase 2 of the Airport's conversion from HID to LED lighting in the terminal building. Budget is also requested to continue expanding the Electric Vehicle Infrastructure and Strategic Initiatives. This could include an increase in the quantity of level 1 & 2 chargers in existing facilities or the addition of new locations as identified in the electric vehicle infrastructure gap analysis. To reduce energy use in City owned facilities, budget is requested for Facility Energy Modernization Renewal including various energy loss retrofits and ability to leverage rebate and grant opportunities. This work will keep buildings operational while lowering operating costs over the life of the facilities.
PAGE 26
2024 FINANCIAL PLAN
CITY OF KELOWNA
Our People Corporate Priority: Leadership everywhere Leadership and management are two different things. Leadership is about seeing opportunities to make things better, influencing how we approach work and deliver our services, and supporting our colleagues along the way. Leaders motivate others to achieve something new or make something better. Our people take charge of their learning and growth, and are well-supported by their managers and the organization. Operating requests: To support people taking charge of their learning and growth, additional funding is being requested for the Employee Development Scholarship program. This program is designed to encourage and provide partial funding to staff closing education gaps required for career path and succession planning positions. The City completed a Diversity, Equity and Inclusion (DEI) Strategic plan in 2022 that included 28 projects suggested to be implemented over 5 years. This DEI Strategic Plan will help to ensure the City is able to attract and retain a diverse workforce that is representative of the citizens we serve. Digital Transformation Corporate Priority: Making it easier to do business with the City, and within the City It should be convenient and easy for residents to do business with the city online. Internal business processes and systems should be efficient, and we strive to automate services where we can so staff can work on higher value activities. In-person service will remain an important part of our customer service experience. Operating requests: The recently implemented corporate Asset Management Program, which provides data to inform decision making for 28 business areas and 700 users to manage the City's infrastructure assets worth $5B, is requesting additional resources to further increase use. Coordinators will assist business areas with creating dashboards and system enhancements that will improve operational efficiency and enable budgeting based on service and data driven decisions. To further support the use of data to inform decision making, additional budget is requested to further expand the waste sensor program to be used throughout beach and community parks. In an effort to better understand waste accumulation in parks, staff trialed realtime waste sensors during the summer of 2022, and expanded in 2023 where the results illustrated a rise in waste from year to year. Digital tools like the Artificial Intelligence (AI) Program make it easier to do business with and at the City. AI will boost the City's efficiency with faster and smarter data analysis and decision-making. This program fosters agility, accelerates digital transformation, and ensures the city remains at the forefront of technological advancements, driving positive outcomes for stakeholders. Also, the replacement of Legacy Applications will improve cyber security and increase performance, integration, and user experience. Cyber Security and Disaster Recovery are crucial to ensure the digital tools can be used. These securities shield against data breaches, and malicious attacks, ensuring the integrity, confidentiality, and availability of digital assets. Budget is requested to adopt a service model for backup and disaster recovery that will provide expert guidance, access to cutting-edge technologies, and round-the-clock support from experienced professionals. Capital requests: Budget is requested for Major Systems Projects including data analytics solutions and dashboards to assist with better decision-making. This request will also fund the continued effort to automate and digitize processes with the goal of providing a better staff and citizen experience. Digital tools make it easier to do business with the City, therefore budget is requested for Communications Networks Upgrades to deploy and upgrade cyber security infrastructure, the City's phone system, call center platforms, and new equipment to manage IoT (Internet of Things) networks.
PAGE 27
2024 FINANCIAL PLAN
CITY OF KELOWNA
Active Financial Management Corporate Priority: Minimize reliance on taxes Residents expect good value from their tax dollars. All staff have a responsibility to be efficient in delivering services and reducing lower value activities where possible. We also strive grow our non-tax revenue in specific areas through mechanisms like the ‘user-pay principle’, grants, partnerships, or business unit investment. Operating requests: The Box Office successfully piloted the ticketing of several events in 2023 and is optimistic a broader and more established program will further increase non-tax revenues. Budget is requested in 2024 to expand this service to the community by providing ticketing services for entertainment venues outside of the Kelowna Community Theatre (KCT), allowing the City to fill service gaps in the current ticket seller environment. Capital requests: Budget is requested for the continuation of the Fibre Optic Service Lines capital program that installs fibre optic lines for new customers each year. New customers pay all costs associated with the installation and then pay the City a monthly rate to use the lines increasing non-tax revenue. Other Corporate Priority: Deliver core services to residents Many requests for budget are directly aligned with Corporate and Council priorities but some are requested to continue to maintain service levels in core programs, services, and infrastructure. Operating requests: To maintain current programs and service levels, various operating requests have been submitted, including: • Increased budget to support anticipated changes in Transit Base Operating Costs for management/labour, fuel, maintenance and lease fees and expansion • The spring sweep program will increase to an annual estimated eight-week delivery • Contract increases for the Guarding of Prisoner Contract, and Security • Three Parks term positions are requested to be converted into fulltime labourer II positions to support the irrigation replacement program adding an extra four to six weeks of construction resourcing and reducing construction costs • Additional budget is being requested for increased cost of operations and maintenance: o Building Routine Maintenance Materials & Supplies Increase o Public Art Maintenance o Wastewater Treatment Facility Operations and Maintenance o Water Supply Operations and Maintenance Renewal o Water Distribution Operations and Maintenance Renewal o Stormwater Facility and Dam Operations and Maintenance o Parks Maintenance Cost Increase - New Waterfront Parks Capital requests: Capital projects that have been requested include: • The Building Stronger Kelowna projects kick off in 2024 including: o Parkinson Rec Centre Redevelopment o Parkinson Rec Park Field Realignment o Rutland Recreation Field Realignment o Transportation Upgrades o Community Activity Centres • Airport Air Terminal Building Capital Replacement and Improvements will improve operations at the Airport • Critical & Core Building Infrastructure Renewal (Level 3) to renew various end of life building system as identified through condition assessments, energy studies, and accommodation studies
PAGE 28
2024 FINANCIAL PLAN
•
• • • •
CITY OF KELOWNA
Annual renewal of: o Wastewater Mains and Facilities o Roads o Park Infrastructure o Front Office Equipment o Lift Stations o Irrigation o Transportation Systems o Water Network and Facilities o Vehicles and Equipment Installation of impermeable Landfill Liner and associated leachate management infrastructure, as well as a new Lift Station force main in area 3 at the Landfill Replacement of the Wastewater Treatment Facility’s Fermenter and Centrifuge The start of North Glenmore Fire Hall (Stn #5) Construction Construction of Burne Park in coordination with Mill Creek Linear Park design and flood mitigation works
Property taxation and major contracts Property taxation The annual property taxation demand is the difference between net operating and capital expenditure requirements and the revenues generated by the City. It is the amount of money the City needs to collect from property owners for the operations, maintenance and capital improvements planned for the fiscal year. The net property owner impact is the annual property taxation demand less additional tax revenue generated through new construction. Taxation Revenue from new construction is based on Preliminary Assessment Roll information from BC Assessment net new general construction operating (BCA). New construction revenues are used to reduce the overall revenue revenue & capital net property owner impact. In 2024, the new construction revenue is estimated to be $4.98 million. The finalized new construction assessment value will be available from BCA in the second quarter of 2024 and will be reflected in the Final Budget volume of the Financial Plan. net property owner impact
It is important to note that while it is possible to project the average property tax increase using the overall assessment base and the revenues required to operate the City, the impact on each individual property owner will vary depending on the relationship of their assessment change to the average. Further analysis will be required when BCA provides the Revised Assessment Roll in the second quarter of 2024. For 2024, the overall taxation demand has increased from $176.6 million to $190.0 million, which includes general revenue, net operating and capital. Taking into consideration the revenue generated from new construction, the average impact on existing property owners is 4.76 per cent.
Salaries, wages and fringe benefits
A significant portion of the annual operating budget is for staffing. The City of Kelowna has four collective agreements for municipal staff: • CUPE Local 338 – collective agreement ratified in 2023 for the term 2024 to 2025 • IAFF Local 953 – collective agreement was renewed in 2022 for 2020 to 2024 • CUPE Local 338 - Airport – collective agreement was ratified in 2022 for the term 2020 to 2026 • IBEW Local 213 – collective agreement ratified in 2021 for the term 2020 to 2024 Fringe benefit load factors are reviewed annually and are reflected throughout the divisional operating budgets.
RCMP contract
The current RCMP collective agreement expired on March 31, 2023. The 2024 General Fund Police contract staffing is at 240 members with a budgeted vacancy factor for 15 members. The average cost per member is estimated at $214.2k for 2024.
PAGE 29
2024 FINANCIAL PLAN
CITY OF KELOWNA
STRONG FINANCIAL MANAGEMENT
PAGE 30
2024 FINANCIAL PLAN
CITY OF KELOWNA
STRONG FINANCIAL MANAGEMENT THE CITY & ITS DIVISIONS The City of Kelowna is governed by an elected Mayor and eight Councillors for a four-year term (2022 – 2026). City Council, which represents the City at large and our residents, has one employee – the City Manager – who administers City operations. A nine-member Senior Leadership Team reports to the City Manager, representing all lines of business for the City and, by extension, all contracted services.
PAGE 31
2024 FINANCIAL PLAN
BUDGET PROCESS City plans that influence the budget include: Council Priorities Official Community Plan 10‐Year Capital Plan 2030 Infrastructure Plan 20-Year Servicing Plan Imagine Kelowna ‐ Community Vision Community Trends report
CITY OF KELOWNA
The City strives to balance the needs of all citizens in decision making and offers engagement opportunities to our communities to gather feedback and ideas on everything from community vision to park design. Engagement activities include surveys, focus groups, online discussion forums, information sessions and virtual panels.
Budget development
Public input
The City of Kelowna’s annual budget aims for a balance between setting a reasonable tax rate and delivering services expected by residents and businesses. As the City is limited by the amount of resources available, the budget helps in determining which objectives have the highest priority and will produce the greatest positive impact in our community.
Public input is gathered in a variety of ways. Citizens are able to provide input through Imagine Kelowna, citizen surveys, the elected mayor and council members, and public council meetings. All of which allow for the public to engage in the decision‐making process for their city, voicing concerns and recommendations for their community.
Every year City Council, the City Manager and City staff work together to develop the annual budget. Several plans are used as the basis for the development of the Financial Plan, including the Official Community Plan (OCP), 2030 Infrastructure Plan, 20‐year Servicing Plan, 10‐year Capital Plan and Council Priorities.
Input from City staff, City Council, outside agencies funded by the City, citizens, various City committees, and guidance from the Imagine Kelowna community vision, all helps to build a solid annual and five‐year financial plan that meets the needs of our growing community.
Imagine Kelowna is the result of an 18‐month long conversation with over 4,000 resident contributions about the future of our City. It is the vision, principles and goals created by our community, for our community. The principles and goals of Imagine Kelowna guide the development of plans such as the Official Community Plan, the Transportation Master Plan and other initiatives, and draw on the rich data of public input and research that was compiled through the extensive engagement process. The vision of Imagine Kelowna will unify strategies and projects that already exist or are underway to make sure they work together to build the kind of community Kelowna residents want. The Citizen Survey is conducted to determine how satisfied the public is with municipal programs and services, and to learn citizens’ service priorities. Responses are weighted by age, gender, and city‐wide distribution to accurately reflect Kelowna’s population. Results are benchmarked against other local governments. Insights gained by this research help us make important decisions regarding planning, budgeting, and service improvements.
Linking to strategic plans All operating and capital requests strive to support Council and Corporate Priorities and therefore, have been specifically linked to a Strategic Direction and Result Statement. Divisional Directors have outlined the activities that will be undertaken in the current year to support the Council and Corporate Priorities. These activities can be found in the first few pages of each service area’s operating section and are tied back to a specific priority. Through the use of service work plans, the City will embark on a purposeful effort to effectively coordinate human and financial resources to achieve the priorities as set by Council and the community.
Budget cycle & timeline The City uses a line item approach to budgeting within Service Areas. Base budgets are subject to annual review and scrutiny to identify need in relation to approved service level requirements.
PAGE 32
2024 FINANCIAL PLAN
CITY OF KELOWNA
A year‐round process The City’s budget cycle is a near year‐round process with the fiscal year beginning January 1 and ending December 31, guided by the requirements of the Community Charter as described in Section 165 and Section 166. The City Manager and Council meet in June each year to determine priority areas for the following budget year. This information is shared with all service areas to assist with the preparation of goals and objectives, and the review and analysis of budget requirements to ensure they align with Council priorities. In October, each budget request is reviewed and prioritized carefully and critically with an eye to human resources, financial impacts, and digital transformation opportunities. After this review, the City Manager and Finance team meet with each service area to discuss prioritization. The service‐based information and budget requests are then consolidated into the Preliminary Budget ‐ Volume 1 and prepared for deliberation and adoption by Council in mid‐December. Projects not completed in the previous year are presented to Council, as part of the Carryover Budget – Volume 2, in March after accounts are finalized through the year‐end process. Final adjustments to the Financial Plan, including requisition amounts from other taxing jurisdictions, are presented to Council in late April as part of the Final Budget – Volume 3. These three volumes combined make up the annual Financial Plan and is the first year of the City’s Five‐Year Financial Plan. The Five‐Year Financial Plan and the associated Tax Rate Bylaws must be adopted by May 15 each year.
Budget transfers & amendments As per section 165 (2) of the Community Charter, the Financial Plan may be amended by bylaw at any time. A bylaw amendment is planned for April 2025 for changes to the Financial Plan for all year‐end requirements. Council Policies 261 & 262 cover budget transfer and amendment procedures. These policies ensure that the City’s overall internal control objectives are maintained and that there are no material changes to the original budget approved by Council. Appropriate approvals and back‐up documentation are required for all transfer or amendment requests.
Budget transfers involve the re‐allocation of existing approved budget and do not change the overall budget
PAGE 33
2024 FINANCIAL PLAN
CITY OF KELOWNA
total. Council approval is required to cancel an approved project or to add a new program or project. Budget amendments do increase the City’s budget total and all changes greater than 200k must be approved by Council prior to entry.
2024 budget calendar Description
Required Date
2023 Prepare capital requests for 2024 Financial Plan
June
Establish City priorities for the 2024 budget year, based on discussion with Council & City Manager
June
City Manager meets with each service area to review prioritization of all capital and operating requests
Oct. 10-12
Council receives overview presentation of the 2024 Preliminary Budget
Dec. 4
2024
Dec. 7
Council reviews and adopts Preliminary Budget – Volume 1
the
2024 Council reviews and adopts Carryover Budget – Volume 2
March 18
Council reviews and adopts Final Budget – Volume 3 and the Five‐Year Financial Plan 20242028
April 22
Prioritization There are two priority levels used for operating requests: Priority 1 (P1) items have been added to the budget and are typically required to introduce new programs, maintain a current level or standard of service, or support existing programs experiencing growth. Priority 2 (P2) items are the same types of requests as P1; however, they have been omitted from the budget totals in order to present an acceptable level of general taxation demand/utility user rate. P1 requests are included in the service area totals but the P2 requests are not. The priority of each operating request is included in the top right‐hand corner of the page. Operating requests are shown as one‐, two‐ or three‐year financial impacts and are marked as ongoing or one‐time costs. Changes in years two or three of ongoing requests are automatically made to the base budget of those years. Capital requests are also marked as P1 or P2. There are no ongoing capital requests. Multi‐year capital projects may be budgeted in their entirety or in phases.
PAGE 34
2024 FINANCIAL PLAN
CITY OF KELOWNA
BASIS OF ACCOUNTING/BUDGETING Basis of accounting Definition The basis of accounting refers to the methodology under which revenues and expenditures are recorded and reported in the financial statements. Specifically, as it relates to the timing of measuring and recording of transactions, regardless of the measurement focus applied. The focus within the budget process is that all interfund transactions are budgeted, but in the financial statements all material interfund transactions and balances are eliminated in preparation of the consolidated financial statements.
Accrual basis of accounting City of Kelowna revenues and expenditures are recognized on an accrual basis of accounting. Revenues are recognized in the accounting period in which the transaction or event occurred that gave rise to the revenue. Expenses are recognized in the accounting period in which the goods or services were acquired, or a liability was incurred.
Inventory is valued at the lower of cost, determined principally on a weighted average and specific item basis, or replacement cost Portfolio investments are recorded at cost Tangible capital assets on the consolidated statement of financial position will be shown at the net book value (cost, less amortization, less disposal) Tangible capital assets will be impaired if required Amortization, gain or loss on disposal, and write‐ downs of tangible capital assets will be a charge against annual income
Basis of budgeting The basis of budgeting is on the modified accrual basis. The acquisition of capital assets and the repayment of long‐term debt are considered as expenditures in Municipal Fund Accounting and are required to be included in the Financial Plan. Revenues are budgeted in the year they become measurable and available to finance expenditures. Proceeds from borrowing are considered to be revenues. Proceeds from the sale of assets are considered to be revenues and the related gain or loss is not.
PAGE 35
2024 FINANCIAL PLAN
POLICIES The City of Kelowna is committed to a regular review and updating of the following Council & Corporate policies that guide the preparation of the Financial Plan.
Financial planning policies Balanced Budget | The Financial Plan is developed for the City of Kelowna to operate within its means. Each department is expected to operate within the limits of the financial resources identified, maintaining a balanced budget for the year. The Utility Funds will have planned deficits some years based on large capital projects in that year. When over-expenditures are known, the department must first investigate transfer of budget from other sources within their area. Use of surplus or reserve accounts is available under special circumstances to cover budget shortfalls. Long Range Planning | The Community Charter mandates that a Five-Year Financial Plan is prepared. The plan contains current year operating and capital costs along with projected future costs. It includes estimated operating costs and revenues from future capital improvements. The plan is adopted by bylaw in May after Final Budget requests are approved by Council. The 20-Year Servicing Plan and the 2030 Infrastructure Plan sets the direction for infrastructure investment to 2030. The Council endorsed 10-Year Capital Plan is guided by these plans but is updated annually to respond to emerging issues and priority changes. Ten-year models are developed for the utilities to ensure that rates and fees are set at a level that allows the funds to be selfsupporting (without taxation assistance). There is a strong link between the various plans as they flow from the future, into the current year requirements. Asset Inventory | Civic facilities are reviewed on an annual basis to determine the requirements for maintaining the asset. Funding is included in the base operating budget in Building Services which supports maintenance projects. The amount included in the base is reviewed annually to ensure it is adequate to address the facilities requirements. A portion of the road network is assessed each year under the Pavement Management Program. The condition assessment is updated and a listing of
CITY OF KELOWNA
priority road improvements for the next five years is prepared. Works are coordinated with the various utilities to provide the most cost-effective service with the least disruption on the community. Water, wastewater and storm drainage systems are reviewed annually to determine the priority for replacement of the older infrastructure. Heritage Building Tax Incentive Program | The City of Kelowna is committed to the ongoing restoration, rehabilitation and maintenance of buildings on its “Heritage Register.” It is acknowledged that the restoration, rehabilitation and structural maintenance of heritage buildings and particularly agricultural, commercial, industrial and institutional buildings can be costly and cost prohibitive for some property owners. The Heritage Building Tax Incentive policy has been created in order to encourage the restoration and rehabilitation of agricultural, commercial, industrial and institutional buildings listed on the City’s Heritage Register Tangible Capital Asset | The PSAB (Public Sector Accounting Board) Section PS 3150 outlines standards on how to account for and report tangible capital assets in government financial statements. The Tangible Capital Asset Policy promotes sound corporate management of capital assets and complies with the Public Sector Accounting Board (PSAB). Department requests are measured against Tangible Asset Criteria and where they do not meet the criteria, are reported as operating expenses of the current year.
Revenue & expenditure policies Revenue | A diversity of revenue sources is encouraged, and appropriate recovery levels should be established for municipal services. The level of community resources that the City dedicates toward municipal services should be directly related to the extent of benefit to the community and the City’s ability to pay. Higher rates of cost recovery for certain services will be achieved by charging fair market value for services when it is appropriate to do so and by using prudent cost control measures. Fees and charges should be reviewed annually for the level of cost recovery and reasons for not recovering full costs should be identified and explained.
PAGE 36
2024 FINANCIAL PLAN
One-time revenues should not be used for ongoing costs except in the case of startup costs for a new program. These programs should be carefully reviewed and justified through the budget process. Expenditure | Regular monthly, quarterly and annual financial reports are prepared that compare the actual revenues and expenditures to budgeted amounts. These reports are distributed to management at various times of the year. Budget must be in place for all expenditures at the Division level for operating costs and at the program level for capital projects. An expenditure may be made for an emergency that was not contemplated in the financial plan, but the plan must be amended, as soon as practical, to include the expenditure and the funding source. Debt | All borrowing, debt, or liabilities must adhere to legislative requirements and comply with the relevant Community Charter regulations. Debt must only be undertaken if it balances sustainability, flexibility and will not be used to fund current operating expenses. Debt is one component of the capital financing structure and must be integrated into realistic long-term financial plans. For capital financing, it is preferred that the debt term be less than the probable life of the asset, if it is affordable. The maximum debt servicing should not exceed 15 per cent of City own source revenues or eight per cent of annual tax demand and cannot exceed debt servicing limits established by the Province. Reserves | Council Policy 384 provides guidance for the responsibility of reserve oversight and the use of reserves to support the goal of providing adequate infrastructure, services, and resources to meet community requirements, and to aid in the financial sustainability of the City. Both statutory and nonstatutory reserves will be maintained to achieve policy objectives to acquire, replace, and renew major capital assets; to ensure stable, predictable tax and utility levies; to minimize the financial impact of unusual and unexpected events; to achieve longterm financial stability; to balance the costs of maintaining sufficient reserve levels to current and future taxpayers and to fund asset retirement obligations. Surplus Allocation | Any surplus generated in a year will be allocated to reserves as recommended by the City’s Audit Committee. Consideration is given to the requirements identified in the 2030 Infrastructure Plan, the area where the surplus was generated,
CITY OF KELOWNA
future capital requirements, or to offset funding shortfalls from other anticipated funding sources. The City will maintain an accumulated surplus account within the general fund of three per cent of the previous year’s taxation requirement to assist with the expenses of unforeseen emergencies and to ensure a continued strong financial position. Tax Exemption | The Community Charter states that a council may exempt land or improvements, or both, from taxation. The City of Kelowna recognizes the significant value of volunteers, volunteer groups and agencies to the spiritual, educational, social, cultural, and physical well-being of the community. A permissive tax exemption is a means for Council to support organizations within the community that further Council’s objective to enhance the quality of life while delivering services economically to the citizens of Kelowna. The Permissive Tax Exemption Policy is intended to provide clarity, consistency and certainty to the municipality, the public and prospective applicants. Tax Distribution | The Community Charter states that the financial plan must set out the objectives and policies of the municipality in relation to the distribution of property value taxes among the property classes that may be subject to the taxes. The Tax Distribution Policy establishes the methodology for the distribution of taxation demand among property classes to reflect the assessment changes in property market values.
Investment & cash management policies The City will maintain sufficient short term liquid assets to enable it to meet its annual operating budget as required. Due to the uncertain nature of future expenses, the portfolio will focus on high quality, liquid securities. The goal is to maximize the investment return on the fund, while ensuring that the liquidity, quality and diversification requirements are satisfied. The primary performance objective is to achieve a rate of return greater than the Canada Consumer Price Index for all items. Additionally, the fund’s performance should match or exceed the Municipal Finance Authority of BC Short-term Bond Fund and Money Market Fund for the same period. Permitted investments in the fund are eligible securities defined in Section 183 of the Community Charter and investments in internally financed City of Kelowna projects. The portfolio of invested funds will be diversified into AAA, AA, or A rating investments and is restricted to a maximum of 60% A rated
PAGE 37
2024 FINANCIAL PLAN
CITY OF KELOWNA
investments. Maximum exposure to a single government (Government of Canada, BC MFA, Provincial, and Municipal) or corporation, as a per cent of the total portfolio will be as follows: Rating AAA AA A
Government 70% 50% 30%
Corporation 40% 30% 20%
In addition, the maximum exposure for a single internally financed project is 15 per cent of the total portfolio and the maximum exposure for all internally financed projects is 30 per cent of the total portfolio. Funds will also not be borrowed to acquire securities or otherwise deal in margin trading. Reports on the fund’s performance will be provided annually to Council in the first quarter of the following year and will include investment information on: cash assets relating to cash flow demands of the City, the City Cemetery Care Maintenance Funds and the Legacy Fund.
Capital strategies
Major Recreational Facilities Strategy | Major recreational/cultural facilities are budgeted with substantial emphasis on funding from public private partnerships, public sector partnering and other contributions. Pay-as-you-go capital and reserve funding will be required to minimize long-term debt financing.
Civic Buildings Strategy | Buildings will be planned and constructed as required, subject to funding availability, with a focus on Public Private Partnerships in the development of these future civic buildings.
Pavement Management Strategy | Annual general revenue contributions are to increase from the baseline of $1.9M over the 10-year program to achieve an overall roads condition of 73 out of 100.
Storm Drainage Retrofit Strategy | Annual general revenue contribution of $1.6M to this program over the 10-year plan.
Generation/Disposition of Surplus Strategy | $1.0M is to be allocated to reserves each year from annual surplus in order to mitigate the need for abnormal tax increases or incurring of new debt and to provide for capital expenditure opportunities which might otherwise require an alternative approval and/or referendum process.
Capital Pay-As-You-Go Strategy | 40 per cent of new construction taxation revenue each year is to be allocated to capital, increasing the percentage of capital to Municipal Taxation to a maximum of 30 per cent.
Debt Management Strategy | The existing strategy of using alternative funding for discretionary expenditures, capitalizing on debt reduction opportunities and using short term borrowing has been maintained. Maximum debt servicing should not exceed 15 per cent of City own source revenues or eight per cent of annual tax demand.
Previous Councils approved the following 10 major corporate strategies to provide direction for long term capital plans.
Park Acquisition Strategy | This plan provides for the park land acquisition standard of 2.2 hectares per thousand of population and the acquisition of natural space by means other than cash outlay.
Parks Development Strategy | Parks development costs will be a function of the capital allocation deemed reasonable annually and are to be shared by the community rather than through increased development cost charge fees.
Waterfront Amenities Strategy | An annual allocation is provided for some waterfront land acquisitions, but the emphasis is on private enterprise or community contributions to develop other amenities.
PAGE 38
2024 FINANCIAL PLAN
CITY OF KELOWNA
FUNDS & DEPARTMENTAL RELATIONSHIP Municipal funds The City’s resources and operations are separated into various funds. Each fund is a separate fiscal and accounting entity organized by their intended purpose. They are segregated to comply with finance related legal and contractual provisions. The use of these funds is restricted by the Community Charter and associated municipal bylaws. The following funds are used for accounting and financial reporting purposes: General Fund | This is the largest fund and covers all municipal operations aside from the utilities and airport funds. This fund is not allowed to operate at a deficit. The difference between annual expenditures and other revenues generated by the fund forms the annual property tax levy. Water Fund | This fund provides for the capital construction, operation, and maintenance of a water utility within specific areas of the City not served by water districts. Revenues within this fund, or prior years’ surplus, must be sufficient to cover all operating and capital costs of this utility on an annual basis.
Wastewater Fund | This fund provides for the capital construction, operation, and maintenance of wastewater treatment including sewer mains, lift stations and treatment facilities. Revenues generated in this fund, or prior years’ surplus, must be sufficient to offset all operating and capital costs of this utility on an annual basis. Airport Fund | The Kelowna International Airport operates within this fund, and is responsible for capital construction and ongoing administration, operation, and maintenance. This fund is required to be self‐sufficient so that revenues generated must offset all operating and capital expenditures.
The following table lists the City’s service areas and the funds they use:
Airport Arts & Culture Community Development Community Safety & Bylaw Development Planning Development Services Fire Safety Governance & Leadership Parking Parks Partnerships Office Police Services & RCMP Solid Waste & Landfill Sport & Recreation Stormwater & Flood Protection Transit Transportation Wastewater Utility Water Utility Enabling Services
General Fund
Water Fund
Wastewater Fund
Airport Fund
PAGE 39
2024 FINANCIAL PLAN
CITY OF KELOWNA
Revenues used for projects in these funds may also come from the City’s Statutory Reserve Funds: Land Sales Reserve Fund | This fund was established in accordance with Provincial Legislation. Sales proceeds from all properties disposed of by the City are required to be placed in this reserve fund. Council may, by bylaw, use this fund to purchase land for general municipal or utility purposes. Parking Reserve Fund | This fund was established to provide funds to purchase land for parking lots, develop on‐street parking and to construct parking lots or parkades. The General Fund contributes net revenues from the operations of parking lots, parkades and parking meters to the Parking Reserve Fund. Both the revenues and expenditures relating to the collection and use of these funds will be found in the General Fund Financial Plan. Capital Works, Machinery and Equipment Reserve Fund | This reserve fund was established by the City to provide funds for such items as the purchase of replacement equipment, retirement of capital debt and replacement of cemetery property. Revenue for this reserve is provided from various sources within the General and Utility Funds. The estimated amounts of the revenue to be contributed may be found in the General or Utilities Funds Financial Plans along with the budgeted use of these funds. Density Bonusing for Public Amenities and Streetscape Reserve Fund | This fund was established to hold payments associated with the density bonus provisions of Zoning Bylaw . These funds will be utilized for urbanization and streetscape amenities, including sidewalks, curb and gutter, drainage, landscaping, street furniture, bus pullouts, improved on‐street parking design and other boulevard streetscape components. Septic Removal Specified Area Reserve Fund | This fund is to hold and manage the funds collected for the design and construction of sanitary sewer connection area projects, which are identified in Sewer . Connection Area Prioritization Bylaw No. Non‐statutory reserves | The City of Kelowna also maintains reserves for future expenditures. These are non‐statutory reserves (reserve funds are ‘statutory’ reserves) which represent a contribution of surplus for specific purposes. In the financial plan the use of these reserves for future expenditures is shown under ‘Accumulated Surplus’ for either revenues or expenditures. Deferred Development Cost Charges | Development Cost Charge revenues are collected to provide funding for required expansion of parkland acquisition and development, roads, water works, sewer works, and wastewater treatment facilities resulting from new development. Monies collected may only be used for the specific purpose and in the specific area for which the funds were collected. The financial plan budget for the use of these funds will be reflected in the appropriate fund.
PAGE 40
2024 FINANCIAL PLAN
CITY OF KELOWNA
RESERVES & FUND EQUITY Council Policy No. 384, Financial Reserves, was adopted in July 2021. This policy provides guidance for the responsibility of reserve oversight and the use of reserves to support the goal of providing adequate infrastructure, services, and resources to meet community requirements, and to aid in the financial sustainability of the City. Both statutory and non‐statutory reserves will be maintained to achieve policy objectives to acquire, replace, and renew major capital assets; to ensure stable, predictable tax and utility levies; to minimize the financial impact of unusual and unexpected events; to achieve long‐term financial stability; to balance the costs of maintaining sufficient reserve levels to current and future taxpayers; and to fund asset retirement obligations. The following are audited reserve and fund equity balances as at Dec. 31, 2022 and projected balances to the end of 2024. The 2024 projected balances assume all 2023 budgeted projects will be completed and funded in that year, however, some of the larger projects may take several years to complete and the actual reserve balance at the end of 2023 and 2024 may be higher than indicated. ($ thousands)
Actual Balance 2022
Projected Balance 2023
Projected Balance 2024
5,029 110,543 138,991 116,150
5,029 108,893 120,399 76,634
5,029 107,243 108,107 66,411
370,713
310,955
286,790
49,169 18,692 15,672
50,244 8,758 13,010
48,133 8,758 12,539
General Fund Fund Equity Legacy Reserve Reserves for Future Expenditures Statutory Reserve Fund Wastewater Fund Fund Equity Reserves for Future Expenditures Statutory Reserve Fund
83,533
72,012
69,430
Water Fund Fund Equity Reserves for Future Expenditures
12,351 27,403
12,933 21,383
12,730 24,601
Statutory Reserve Fund
168
168
168
39,922
34,484
37,499
2,407 45,582
2,407 37,747
2,407 52,067
47,989
40,154
54,474
Total Reserves & Fund equity
542,158
457,606
448,193
Development Cost Charges *Fund equity is also referred to as accumulated surplus Note: Totals may not add due to rounding.
148,141
188,028
188,583
Airport Fund Fund Equity Reserves for Future Expenditures
PAGE 41
2024 FINANCIAL PLAN
CITY OF KELOWNA
Reserve & fund equity summary by type The Development Cost Charges (DCC) are shown separately from other reserves and fund equity as they are revenues received for specific projects and cannot be used for any other expenditures. Some of the deferred DCC balances include a receivable portion which is not available for use at Dec. 31, 2024. Major projects being funded by DCC reserves in the 2024 Preliminary Budget include DCC Parkland Acquisition, connecting the Rail Trail to the Greenway, and various road developments and improvements. Fund equity, also referred to as accumulated surplus, is made up of annual surplus funds. For Preliminary Budget, . M is requested for the Water St Lift Station from the Wastewater accumulated surplus; k for the Installation of a Bulk Fill Station, k for electrical upgrades to the Poplar Point Station, k for the conversion to chlorine at the Eldorado Pump Station, and k for a UV Treatment system Control Upgrades, are requested to be funded from the Water accumulated surplus. Statutory Reserve Funds are reserves earmarked for a specified purpose by Council pursuant to section 188(2) of the Community Charter. Reserve Funds are established through Council bylaw and use must align with the established purpose. Major projects included in the 2024 Preliminary Budget consist of Mill creek flood protection, funded for a total of 3.0M between the Infrastructure Levy reserve and the Future Capital project reserves; Vehicle replacements, with emphasis on electric or zero emission replacements where possible, funded for 4.1M from the Vehicle and Equipment replacement reserve; Construction of a new impervious membrane liner and leachate management infrastructure in the Landfill, consistent with the approved Design, Operations and Closure Plan, funded for 8.6M from the Sanitary Landfill reserve. General Reserves, or reserves for future expenditures, have more flexibility of use. The 2024 Preliminary Budget is requesting to use these reserves to fund various 2024 budget requests such as Cyber Security and Disaster Recovery, funded k from the Major Systems Software reserve; and the implementation of a Home Energy Retrofit Concierge program, funded k from the Council Strategic Fund reserve.
PAGE 42
2024 FINANCIAL PLAN
CITY OF KELOWNA
The table below presents the same reserves and fund equity balances and projected balances at a reserve type and category level, detailing the budgeted contributions and expenditures based on Priority one budget requests ($ thousands)
Actual Balance 2022
Projected balance 2023
Contribution to reserve
Budget expend
Projected balance 2024
5,029
5,029
0
0
5,029
General Reserves Planning Initiatives - Corporate Major Facilities Misc. Recreation Facilities Park Development/Other Land Upgrades/Mntc. Existing Assets Operating Exp. Equalization Operating Rev. Equalization Transportation & Drainage Capital Multipurpose Facility Investment* Unspent Budget Reserve General Reserves subtotal
17,080 21,167 4,326 4,690 13,223 32,047 7,593 12,258 7,283 19,324 138,991
39,015 16,589 3,873 4,082 7,864 21,611 6,151 7,233 7,399 6,583 120,399
1,146 1,032 272 1,721 919 69 143 307 116 0 5,724
(3,684) (3,863) (50) (2,380) (3,483) (2,715) (214) (1,629) 0 0 (18,016)
36,478 13,758 4,095 3,423 5,300 18,965 6,080 5,911 7,515 6,583 108,107
Statutory Legacy Reserves Wastewater Reserve/Fund Equity Water Reserve/Fund Equity Airport Reserve/Fund Equity Total Reserves & Fund equity
131,990 110,543 67,861 39,754 47,989 542,158
89,811 108,893 59,003 34,316 40,154 457,606
32,348 0 377 4,050 106,771 149,270
(43,042) (1,650) (2,488) (1,035) (92,451) (158,682)
79,118 107,243 56,891 37,331 54,474 448,193
General Fund Equity
Development Cost Charges 148,141 188,028 36,300 (35,745) 188,583 *The Multipurpose Facility Investment reserves contain the funds committed by the City for investment into the downtown multi‐purpose facility (Prospera Place). Note: Totals may not add due to rounding.
PAGE 43
2024 FINANCIAL PLAN
CITY OF KELOWNA
DEBT MANAGEMENT The City of Kelowna has various options available to obtain, through borrowing, funds necessary to acquire assets. Debt financing will only be undertaken in compliance with the relevant sections of the Community Charter and related regulations. Policy has been established to ensure that debt financing is used strategically to maintain the City’s financial strength and stability and aligns with the principles laid out in the Council adopted Principles & Strategies for Financial Strength and Stability document. The following section describes each borrowing option, the City’s legal limits, and the estimated outstanding debt balances at Dec. 31, 2024. Under the Community Charter (C.C.) legislation, the provincial regulations establish a limit based on the cost of servicing the aggregate liabilities of the municipality. The cost of servicing the liabilities cannot exceed per cent of the total revenues for the previous year (excluding revenue received for another taxing jurisdiction, tax sharing revenues paid to another municipality, revenue from the disposition of assets, Federal or conditional grants such as water/sewer infrastructure grants and Municipal Finance Authority actuarial adjustments). To further ensure debt affordability and sustainability, the City of Kelowna debt policy also includes internal municipal debt limits of 15 per cent of City own source revenues and 8 per cent of annual tax levy revenues for tax supported debt. The City of Kelowna does not issue bonds. Borrowings are done through the Municipal Finance Authority which has a triple A rating.
General Fund debt servicing costs Net Debt Servicing Costs are budgeted at 4.9M in 2024. The current net general debt (including internal financing) as a percentage of taxation demand is 2.6 per cent in 2024, as compared to 2.7 per cent of taxation demand in 2023.
Long Term Debenture (C.C. Section 174 & 179) Long Term Debenture borrowing involves the repayment of both principal and interest over a period not to exceed 30 years. Debenture borrowing for most long‐term needs requires the assent of electors through an alternative approval process and/or the passing of a referendum. The outstanding debenture borrowing for all funds at January 1st of each year ( thousands) is: 2022 Balance 2023 Balance 2024 Est. Bal. General Capital Fund 56,770 52,270 47,909 Water Utility Capital Fund 4,725 4,617 4,030 Wastewater Utility Capital Fund 5,459 4,307 3,115 Airport Fund 11,904 9,675 7,373 Total debenture debt $78,858 $70,868 $62,427
Liabilities Beyond the Current Year (C.C. Section 175) Under an agreement, Council may incur a liability payable after the current year as long as it is not a debenture debt and the liability does not exceed the life expectancy of the activity. If the agreement is for longer than five years or contains a right of renewal that could exceed five years, an alternative approval process must be provided. This borrowing method is used by the City of Kelowna to secure the purchase of land from a vendor.
Short Term Borrowing (C.C. Section 178) Short Term Borrowing is used to undertake minor capital works programs and must be repaid over a period not to exceed five years. The City of Kelowna's short‐term borrowing legal capacity is approximately 7.4M based on 50 per capita and a 2024 population estimate of 148,340. The City uses this borrowing method for the upgrade or construction of facilities and the purchase and development of parks. There are no projects currently funded through short term borrowing.
PAGE 44
2024 FINANCIAL PLAN
CITY OF KELOWNA
Revenue Anticipation Borrowing (C.C. Section 177) Operating loans may be required to meet current expenditures pending receipt of taxation revenue. This most often occurs in the few months prior to the annual July due date for tax payment and is repaid once tax revenue is received. To transact operating loans, a Revenue Anticipation Borrowing By‐Law must be approved by Council and is limited to 75 per cent of all property taxes imposed for all purposes in the preceding year.
Loan Guarantees & Commitments (C.C. Section 179) The City of Kelowna has a loan guarantee in place with the YMCA of Southern Interior BC for the Kelowna Family Y Centre. The remainder of the debt under guarantee is k as of January .
Internal financing The City of Kelowna may borrow funds from its own general reserves with repayment of principal and interest in order to finance capital projects. This may relate to projects that are pending debenture issues and require interim financing or to projects that make use of reserve funds not required in the near future. There is no statutory limit to this borrowing as it is offset by existing reserve balances. Use of statutory reserves is more restricted and is not designed for lending from one reserve fund to another. There are currently two capital projects that are being internally financed. The estimated balances at the end of 2024 are: • •
South Perimeter Road ‐ . M West Campus Lands ‐ $ . M
Internal financing is also used in the Development Cost Charge program where a deficit in one reserve can be temporarily offset by a surplus in another reserve. Repayment to the reserve includes any interest charge. Borrowing over the next five years will be determined by the 10 Year Capital Plan. Further detailed debt repayment information for 2024 and future years is illustrated on the following pages.
PAGE 45
2024 FINANCIAL PLAN
CITY OF KELOWNA
Year Debt Repayment Schedule ( thousands) 2024
2025
3,142 2,742 5,884 (1,032) 4,852
3,330 3,181 6,511 (1,032) 5,478
Water Fund Debenture Principal Interest Total Expenditures Recoveries Net Debenture Debt
358 385 743 (59) 683
Wastewater Fund Debenture Principal Interest Total Expenditures Recoveries Net Debenture Debt
General Fund Debenture Principal Interest Total Expenditures Recoveries TOTAL NET DEBT (General)
2026
2027
2028
2029
2030
2031
2032
2033
Remaining
5,924 9,191 15,114 (5,860) 9,254
8,069 14,201 22,270 (5,860) 16,409
8,115 15,830 23,945 (5,793) 18,152
8,630 16,581 25,211 (5,793) 19,418
9,176 17,366 26,542 (5,793) 20,749
9,286 17,524 26,810 (5,793) 21,017
9,388 17,670 27,058 (5,793) 21,265
9,388 17,670 27,058 (5,793) 21,265
147,985 334,549 482,534 (116,364) 366,170
357 384 741 (58) 683
357 384 741 (58) 683
357 384 741 (58) 683
357 384 741 (58) 683
93 46 138 (35) 103
93 46 138 (35) 103
93 46 138 (35) 103
19 16 35 (35) 0
19 16 35 (35) 0
164 134 298 (298) 0
706 320 1,026 (1,188) (162)
599 241 840 (953) (113)
295 173 468 (475) (6)
91 117 209 (215) (6)
588 830 1,418 (1,424) (6)
938 1,349 2,287 (2,287) 0
2,674 3,845 6,519 (6,519) 0
2,674 3,845 6,519 (6,519) 0
2,674 3,845 6,519 (6,519) 0
2,674 3,845 6,519 (6,519) 0
41,354 59,451 100,805 (100,805) 0
Airport Fund Debenture Principal Interest Total Expenditures Recoveries (AIF Revenue) Net Debenture Debt
1,897 584 2,481
2,666 1,006 3,672
5,359 2,584 7,943
4,799 2,363 7,162
4,101 2,251 6,352
4,101 2,251 6,352
4,101 2,251 6,352
4,101 2,251 6,352
4,443 2,439 6,882
4,443 2,439 6,882
10,167 5,581 15,748
(2,481) 0
(3,672) 0
(7,943) 0
(7,162) 0
(6,352) 0
(6,352) 0
(6,352) 0
(6,352) 0
(6,882) 0
(6,882) 0
(15,748) 0
Total net debt payment
5,373
6,048
9,930
17,086
18,829
19,521
20,852
21,120
21,265
21,265
366,170
Note: Totals may not add due to rounding
PAGE 46
2024 FINANCIAL PLAN
CITY OF KELOWNA
Five‐year net debt repayment ( thousands) Over the next five years, the City of Kelowna's net debt in the general fund is expected to increase, primarily due to the "Building Stronger Kelowna" initiative. This plan encompasses the redevelopment of the Parkinson Recreation Centre, the establishment of new activity centres in Glenmore and Mission, and the optimization of Rutland sports fields. These projects, as part of the city's broader effort to enhance community recreational and wellness facilities, are detailed in City of Kelowna's ‐Year Capital Plan.
Total net debt ($ thousands)
20,000
15,000
10,000
5,000
0 2024
2025
2026
2027
2028
(5,000) General Fund
Water Fund
Wastewater Fund
Taxation funded debt ( Millions) Council policy has set internal debt limits based on debt servicing costs at 15 per cent of City own source revenues, and 8 per cent of annual tax levy revenues for tax supported debt. Net debt repayment for 2024 will be 2.6 per cent and is anticipated to reach a maximum of 8.3 per cent over the next seven years; decreasing to 7.7 per cent by 2033.
8.3%
$24 $22 $20 $18 $16 $14 $12 $10 $8 $6 $4 $2 $0
7.7%
2024
2025
2026
2027
2028
Cost of debt repayment
2029
Year
2030
2031
2032
2033
9.0% 8.0% 7.0% 6.0% 5.0% 4.0% 3.0% 2.0% 1.0% 0.0%
Debt as a percentage of tax supported debt
Debt serviceing cost ($ millions)
The following chart illustrates the annual debt repayment and the percent of taxation for the next 10 years:
Debt payment as % of tax demand
PAGE 47
2024 FINANCIAL PLAN
CITY OF KELOWNA
Existing debt – all funds
Debt ($ millions)
The maximum debt that can be undertaken by the City in a given year is based on 25 per cent of previous year revenues. Using 2022 revenues, the current liability servicing limit is . M of which . M of this capacity has been used, leaving an available capacity of 56.9M. While 35.2M represents approved debt capacity, the total debt servicing cost payable (principal and interest) is 12.3M. The balance of 22.9M represents guarantees and commitments as well as approved borrowings which have not been issued. Using current Municipal Finance Authority (MFA) lending rates and a 15‐year repayment term the unused borrowing capacity of 56.9M for 2024 is approximately M. The following chart shows the borrowing by various funds and the maximum borrowing limit by the solid line.
Max Capacity $720M – $920M
1,200 1,100 1,000 900 800 700 600 500 400 300 200 100 0 2024
2025
General Fund
2026
2027
Water Fund
2028
2029
2030
2031
Wastewater Fund
2032
2033 Airport
Based on current estimated borrowing rates Note: Totals may not add due to rounding.
PAGE 48
2024 FINANCIAL PLAN
CITY OF KELOWNA
Debt charges analysis – General Fund ( thousands) Debentures Parkade Extension & Memorial Parkade MFA 133 Local Improvements - MFA 130 Okanagan Gymnastics - MFA 102 Mission Aquatic Centre - MFA 102&104 Police Facilities Debenture recoveries Local Improvement Levies Okanagan Gymnastics Parking Reserve Net debenture debt Net debt - General
Revised 2023
Preliminary 2024
943 22 61 2,230 2,600
943 22 61 2,258 2,600
(22) (59) (943)
5,856
(1,024) 4,833 4,833
Change Internal borrowing South perimeter road West Campus Lands
Internal borrowing - recovery DCC Contributions Reserves Net internal borrowing Total including internal financing
935
(935)
935
(935) 0 4,833
(22) (68) (943)
5,884
(1,032) 4,852 4,852
19
0.4%
3,643 935
4,578
(3,643) (935)
(4,578) 0 4,852
Note: Totals may not add due to rounding.
PAGE 49
2024 FINANCIAL PLAN
CITY OF KELOWNA
Debt charges analysis – Water Fund ( thousands) Debentures Specified Area 16 - Byrns Rd - MFA 80 Specified Area 18 - Lakeshore Rd - MFA 85 Specified Area 26 - Fisher Rd - MFA 104 Cedar Creek Pump Station - MFA 104 Poplar Point Pump Station - MFA 117 Local Service Area - Aspen Rd - MFA 146 Local Service Area - SOMID - MFA 157
Revised 2023
Provisional 2024
2 1 19 474 103 3 32
0 1 23 580 103 3 32 635
Debenture recoveries Specified Areas Local Service Areas Net debenture debt Net debt - Water
743
(25) (32)
(27) (32) (58) 577 577
Change
(59) 683 683
106
18.4%
Internal borrowing Southeast Kelowna LAS
764
764
Internal borrowing - recovery Southeast Kelowna LAS
(764)
(764)
0
0
577
683
Net internal borrowing Total including internal financing
Note: Totals may not add due to rounding.
PAGE 50
2024 FINANCIAL PLAN
CITY OF KELOWNA
Debt charges analysis – Wastewater Fund ( thousands) Debentures Specified Area 20 - North Rutland - MFA 95 Specified Area 21A - McKenzie Bench - MFA 85 Specified Area 22B - Vista Rd - MFA 85 Specified Area 22C - Hein Rd - MFA 85 Specified Area 22D - Elwyn Rd - MFA 85 Specified Area 22E - Dease Rd - MFA 85 Specified Area 22F - Mills Rd - MFA 85 Specified Area 26 - Fisher Rd - MFA 104 Specified Area 28A - Okaview - MFA 95 Specified Area 29 - Campion Cambro - MFA 85 Specified Area 30 - Ackland - MFA 85 Specified Area 34 - Country Rhodes - MFA 104 Specified Area 36 - Clifton - MFA 104 Brandt's Creek Tradewaste Treatment - MFA 117
Revised 2023
Provisional 2024
340 71 4 14 8 5 18 126 32 46 19 27 17 260
340 71 4 14 8 5 18 155 32 46 19 33 20 260 988
Debenture recoveries Specified Areas Okanagan Basin Water Board Net debenture debt Net debt - Wastewater
(988) (162)
1,026 (1,026) (162)
(1,150) (162)
(1,188) (162)
(162)
(162)
Change
0
0.0%
Internal borrowing Local Area Service - Rutland
252
252
Internal borrowing - recovery Local Area Service - Rutland
(252)
(252)
0
0
(162)
(162)
Net internal borrowing Total including internal financing Note: Totals may not add due to rounding
PAGE 51
2024 FINANCIAL PLAN
CITY OF KELOWNA
Debt charges analysis – Airport Fund ( thousands)
Debentures Airport Expansion - MFA 133 Airport Expansion - MFA 137 Airport Expansion - MFA 139 Airport Expansion - MFA 141
Revised 2023
Provisional 2024
846 389 325 922
846 389 325 922 2,481
Debenture recoveries AIF Revenue
(2,481)
2,481
(2,481) (2,481) 0
Net debenture debt
(2,481) 0
Short term borrowing 0 Net short term debt Net debt - Airport
0 0 0
Change
0 0
0
0.0%
Internal borrowing *Municipal Services Administration Fee *Enterprise Rental Car Kiosk Net internal borrowing
342 8 350
0 8 8
Total including internal financing
350
8
*Not included in budget Note: Totals may not add due to rounding
PAGE 52
2024 FINANCIAL PLAN
CITY OF KELOWNA
OPERATING FULL-TIME EQUIVALENT (FTE) POSITION SUMMARY The City of Kelowna requires that all new positions and changes to existing salaried or wage personnel, both permanent and temporary, be supported by a business case. The business case must include the reason for the request, a cost/benefit analysis, the recommended funding source, other alternatives considered and the organizational impact. Below is a visual representation of all 2024 operating budgeted FTEs for the City of Kelowna by Service area, if all priority one position requests included in this budget volume are approved by City Council. Airport
58.0
Arts & Culture
14.5
Community Development
19.7
Community Safety & Bylaw
41.3
Development Planning
21.2
Development Services
50.5
Enabling Services
261.5
Fire Safety
154.2
Governance & Leadership
27.0
Parking
11.0
Parks
48.6
Partnerships Office
6.8
Police Services & RCMP
102.8
Solid Waste & Landfill
32.9
Sport & Recreation
75.2
Stormwater & Flood Protection
11.2
Transit
0.5
Transportation
68.5
Wastewater Utility
55.5
Water Utility
48.3
PAGE 53
2024 FINANCIAL PLAN
CITY OF KELOWNA
The following table provides operating FTE counts for the 2022 budget, 2022 actuals, 2023 revised budget and the proposed 2024 preliminary budget. It further details these positions by separating them into the payroll groups of mayor and council, management, union hourly and union salary.
Full-time Equivalent (FTE) Summary
Airport
Management Union Hourly Union Salary
Arts & Culture Management Union Hourly Union Salary Community Development Management Union Hourly Union Salary Community Safety & Bylaw Management Union Hourly Union Salary Development Planning Management Union Hourly Union Salary Development Services Management Union Hourly Union Salary Enabling Services Management Union Hourly Union Salary
Budget
Actual
Revised
Preliminary
2022
2022
2023
2024
17.0 2.5 29.5 49.0
16.2 11.3 27.9 55.4
21.0 2.0 31.0 54.0
24.5 2.0 31.5 58.0
3.0 7.6 0.0 10.6
2.8 7.8 0.5 11.1
3.0 9.0 1.0 13.0
3.0 10.5 1.0 14.5
5.0 1.3 6.0 12.3
4.8 1.5 7.2 13.5
5.5 2.7 6.0 14.2
8.0 4.7 7.0 19.7
4.0 23.5 7.0 34.5
5.7 27.7 8.8 42.2
4.0 25.3 7.2 36.5
4.5 29.1 7.7 41.3
3.0 2.2 16.8 22.0
2.4 5.4 15.8 23.6
3.0 1.2 17.0 21.2
3.0 1.2 17.0 21.2
5.0 0.0 44.5 49.5
4.8 3.5 39.6 47.9
5.0 0.0 44.5 49.5
5.5 0.0 45.0 50.5
80.4 38.9 123.8 243.1
80.4 42.9 118.0 241.3
84.7 39.9 129.7 254.3
88.0 39.8 133.7 261.5
PAGE 54
2024 FINANCIAL PLAN
CITY OF KELOWNA
Budget
Actual
Revised
Preliminary
2022
2022
2023
2024
5.2 1.8 140.0 147.0
5.6 1.6 151.3 158.5
7.0 1.7 141.0 149.7
7.0 1.7 145.5 154.2
9.5 9.0 0.5 5.0 24.0
9.9 9.0 1.7 4.4 25.0
10.0 9.0 0.5 5.5 25.0
11.0 9.0 0.5 6.5 27.0
Management Union Hourly Union Salary
1.0 5.3 4.0 10.3
1.1 5.2 2.7 9.0
1.0 5.5 4.0 10.5
1.5 5.5 4.0 11.0
Management Union Hourly Union Salary
4.0 17.4 1.0 22.4
4.4 19.5 1.3 25.2
5.0 41.7 1.0 47.7
5.0 42.6 1.0 48.6
5.0 1.0 0.0 6.0
4.9 0.0 0.6 5.5
5.0 1.0 0.0 6.0
5.0 0.0 1.8 6.8
22.5 4.8 69.5 96.8
17.1 7.3 59.8 84.2
23.5 4.3 72.5 100.3
24.5 4.3 74.0 102.8
3.9 24.5 4.3 32.7
3.6 24.7 3.9 32.2
3.9 24.7 4.3 32.9
3.9 24.7 4.3 32.9
continued
Fire Safety
Management Union Hourly Union Salary
Governance & Leadership Management Mayor & Council Union Hourly Union Salary Parking
Parks
Partnerships Office Management Union Hourly Union Salary Police Services & RCMP Management Union Hourly Union Salary Solid Waste & Landfill Management Union Hourly Union Salary
PAGE 55
2024 FINANCIAL PLAN
CITY OF KELOWNA
continued
Sport & Recreation Management Union Hourly Union Salary Stormwater & Flood Protection Management Union Hourly Union Salary Transit
Management Union Hourly Union Salary
Transportation Management Union Hourly Union Salary Wastewater Utility Management Union Hourly Union Salary Water Utility
Management Union Hourly Union Salary
Total full-time equivalent positions (all funds)
Budget
Actual
Revised
Preliminary
2022
2022
2023
2024
5.0 93.0 0.0 98.0
5.9 95.6 0.0 101.5
4.0 68.9 0.0 72.9
4.0 71.2 0.0 75.2
1.6 8.3 1.4 11.3
1.9 7.7 1.8 11.4
1.6 8.3 1.4 11.3
1.6 8.2 1.4 11.2
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0
0.0 0.0 0.5 0.5
10.2 41.3 8.4 59.9
8.5 50.7 9.4 68.6
10.7 45.1 8.4 64.2
11.7 48.4 8.4 68.5
4.7 46.3 7.4 58.4
5.4 39.2 5.2 49.8
5.2 42.4 7.4 55.0
5.2 42.9 7.4 55.5
4.3 38.2 4.5 47.0
5.1 37.9 5.2 48.2
4.3 38.1 4.5 46.9
4.3 39.5 4.5 48.3
1,034.8
1,054.1
1,065.1
1,109.2
Note: Totals may not add due to rounding
PAGE 56
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating full-time equivalent (FTE) position changes Each year position counts change with the addition, reduction, or movement of positions. The narrative below explains the changes that have been made, or are being requested, for 2024 by each division/department.
Full Time Equivalents Summary Airport Addition 2.5 FTE for annualization of 2023 operating requests Addition 1.5 FTE for the Airport - Four Management Positions operating request Arts & Culture Addition 1.0 FTE for the Hospitality Coordinator Position Addition 0.5 FTE for the Box Office Expansion operating request Community Development Addition 0.5 FTE for annualization of 2023 operating requests Addition 5 FTE for the Social Development Services operating request Community Safety & Bylaw Addition 0.5 FTE for annualization of 2023 operating requests Addition 0.8 FTE for the Bike Valet & Theft Prevention operating request Addition 0.5 FTE for the Bylaw Services - ALC Bylaw Officer Position operating request Addition 3.0 FTE for the Bylaw Services Positions - Public Safety Levy operating request Development Services Addition 0.5 FTE for annualization of 2023 operating requests Addition 0.5 FTE for the Development Engineer Position operating request Enabling Services Addition 2.0 FTE for annualization of 2023 operating requests Addition 1.0 FTE for the Social Development Services operating request Addition 0.4 FTE for the Infrastructure Delivery operating request Addition 0.8 FTE for the Asset Management Program operating request Addition 0.5 FTE for the City Protection Office Ongoing Full-Time Position operating request Addition 0.5 FTE for the Administrative Clerk Position Change PT to FT operating request Addition 0.5 FTE for the Term Position to Full-Time Health & Wellness Advisor operating request Addition 0.5 FTE for the Term Position to Full-Time Safety Advisor operating request Addition 0.5 FTE for the Strategic Land Development Manager Position operating request Addition 0.5 FTE for the Building Planning Manager Position operating request Fire Safety Addition 2.0 FTE for annualization of 2023 operating requests Addition 0.5 FTE for the Fire Mitigation Specialist Position operating request Addition 2.0 FTE for the Firefighters - Four Positions - Public Safety Levy operating request Governance & Leadership Addition 0.5 FTE for annualization of 2023 operating requests Addition 1.0 FTE for the Executive Office Enhancements operating request Addition 0.5 FTE for the Deputy City Clerk Position (Records, Information & Privacy) operating request Parking Addition 0.5 FTE for the Parking Services Supervisor Position operating request Parks
PAGE 57
2024 FINANCIAL PLAN
CITY OF KELOWNA
Addition 0.3 FTE for annualization of 2023 operating requests Addition 0.1 FTE for the Parks Waste Sensors operating request Addition 0.2 FTE for the Parks Safety and Aesthetic Improvements operating request Addition 0.2 FTE for the Urban Centers Beautification Initiative operating request Addition 0.1 FTE for the Greenhouse Expansion operating request Partnerships Office Reduction 1.0 FTE Removal Grants Coordinator 2-year Term Addition 0.8 FTE for the Partnerships Coordinator, Grants & Special Projects Position operating request Addition 1.0 FTE for the Partnerships Program Enhancements operating request Police Services & RCMP Addition 1.0 FTE for annualization of 2023 operating requests Addition 0.5 FTE for the Police Services - Crime Review Officer Position (CRO) operating request Addition 0.5 FTE for the Police Services - Auxiliary Coordinator Position operating request Addition 0.5 FTE for the Police Services Clerk Position - Community Safety Unit (CSU) operating request Sport & Recreation Addition 0.7 FTE for annualization of 2023 operating requests Addition 0.6 FTE for annualization of 2022 operating requests Addition 0.3 FTE for Recreation Technician - Outdoor Events Addition 0.4 FTE for Sport Leagues and Tournaments Position Addition 0.3 FTE for the Irrigation Serviceperson Positions operating request Stormwater & Flood Protection Reduction 0.1 FTE for annualization of 2023 operating requests Transit Addition 0.5 FTE for the Transit Infrastructure Coordinator Position operating request Transportation Addition 1.3 FTE for annualization of 2023 operating requests Addition 0.4 FTE for annualization of 2022 operating requests Addition 0.6 FTE for the Senior Transportation Engineer Position Addition 1.9 FTE for the Spring Sweep operating request Addition 0.1 FTE for the Strategic Transportation Partnership of Central Okanagan 2024 Transition operating request Wastewater Utility Addition 0.5 FTE for annualization of 2023 operating requests Water Utility Addition 0.5 FTE for annualization of 2023 operating requests Addition 0.1 FTE for Water System Growth Reduction 0.2 FTE for the Water Meter Data Collection operating request Addition 1.0 FTE for the Water Supply Succession Management Position operating request
PAGE 58
2024 FINANCIAL PLAN
CITY OF KELOWNA
FINANCIAL SUMMARIES
PAGE 59
2024 FINANCIAL PLAN
CITY OF KELOWNA
FINANCIAL SUMMARIES FINANCIAL PLAN SUMMARY The City of Kelowna’s proposed total annual budget is million when including all funds. The following table reports the actual results for the year ending , the revised budget as of October , and the proposed preliminary budget for the Financial Plan year.
$ thousands Revenue Property tax Parcel tax Fees and charges Grant Other revenue Transfer from reserve Special (Stat reserve) funds Development cost charges Accumulated surplus Total revenue Expenditure Salaries and wages Material and other Contract services Debt service Capital expenditure Transfer to reserve Special (Stat reserve) funds Development cost charges Accumulated surplus Total expenditure Total surplus (deficit) surplus breakdown General fund Utility fund
Actual
Revised
Preliminary
2022
2023
2024
167,107 7,051 166,774 27,943 41,768
176,624 4,198 167,482 44,962 50,674
190,015 4,441 179,633 19,507 51,675
32,930 16,775 50,160 510,509
69,526 55,192 204,118 772,776
41,049 35,745 38,820 560,884
109,549 84,712 85,628 12,326 121,890
114,759 95,695 108,260 10,774 367,208
125,007 97,876 109,227 11,180 140,111
41,086 0 51,984 507,175
31,887 0 44,193 772,776
31,624 0 45,860 560,884
3,334
0
0
177 3,157
Note: Totals may not add due to rounding
PAGE 60
2024 FINANCIAL PLAN
CITY OF KELOWNA
Revenue by fund The City operates under four funds. The table below presents the dollar value of the revenue budget for each fund, separating the operating and capital information for the proposed Financial Plan year. The graph illustrates the revenues for each fund, visually depicting the comparison between each one. Actual 2022
Revised 2023
Preliminary 2024 $ thousands Operating Capital General 380,866 498,895 323,057 100,990 Airport 68,205 195,956 62,759 9,805 Wastewater 34,868 49,486 17,291 20,688 Water 26,570 28,439 17,665 8,628 Subtotal 420,773 140,111 Total 510,509 772,776 560,884 Note: Totals may not add due to rounding
General 75% Airport 13% Wastewater 7% Water 5% Total $560.9M
Revenue by source The City of Kelowna has multiple revenue sources including property taxes that are levied on property owners based on the municipal taxation demand; parcel taxes which are levied through bylaw on properties receiving a specific service; fees & charges for public services like water, parking, and building permits and fines for things like bylaw infractions; grants are funds awarded to the City by various grantors to be used for a specific purpose; transfers from reserve which are predominately made up of previous years’ surplus funds , and other revenues that includes interest revenue, provincial gaming funds, and service revenue from other governments. The graph below presents the same operating and capital revenue information as above at the revenue source detail level.
Revenue by sources $350 $300
Millions
$250 $200 $150 $100 $50 $0 Property tax
Parcel tax
Fees and charges
Grant
Other revenue Transfer from reserve
Actual 2022
Revised 2023
Preliminary 2024
PAGE 61
2024 FINANCIAL PLAN
CITY OF KELOWNA
Expenditures by fund BC municipalities are mandated to have a balanced budget by provincial legislation. The table below reports the dollar value of the expenditure budget for each fund, separating the operating and capital information for the proposed Financial Plan year matching the revenues presented in the previous section. The graph below , matching the revenue graph. illustrates the comparison between funds of the expenditure budget for Actual 2022
Revised 2023
Preliminary 2024 $ thousands Operating Capital General 380,689 498,895 323,057 100,990 Airport 68,205 195,956 62,759 9,805 Wastewater 32,332 49,486 17,291 20,688 Water 25,949 28,439 17,665 8,628 Subtotal 420,773 140,111 Total 507,175 772,776 560,884 Note: Totals may not add due to rounding
General 75% Airport 13% Wastewater 7% Water 5%
Total $560.9M
Expenditures by type The City’s expenditures can be grouped in the following categories: salaries & wages, materials & other, contract services, debt servicing, capital expenditures, and transfers to reserve which are primarily made up of expected profits generated by profit centres operating within the City to be used for things like future capital requirements and to fund emergent events. The table below presents the same total operating and capital expenditures information as above for each expenditure type.
Expenditure by type $400 $350
Millions
$300 $250 $200 $150 $100 $50 $0 Salaries and wages
Material and other
Contract services
Actual 2022
Revised 2023
Debt service
Capital expenditure
Transfer to reserve
Preliminary 2024
PAGE 62
2024 FINANCIAL PLAN
CITY OF KELOWNA
Analysis of operating and capital expenditures The table below lists the various operating service areas and capital groups of the City and presents their individual budgets by expenditure and revenue. In cases where the reserve use is in a credit position, service area surpluses are expected and are being recommended to be contributed to reserve for future use. When the reserve use is in a debit position, reserve funds from previous years are being recommended to be used to fund projects in the 2024 budget. The result is the taxation requirement for each operating service area and capital group. Expenditure
Revenue
Reserve use
Taxation
Taxation %
Operating Airport Arts & Culture Community Development Community Safety & Bylaw Development Planning Development Services Enabling Services Fire Safety Governance & Leadership Parking Parks Partnerships Office Police Services & RCMP Solid Waste & Landfill Sport & Recreation Stormwater & Flood Protection Transit Transportation Wastewater Utility Water Utility Operating sub-total
29,666 4,073 4,252 6,461 2,591 6,532 73,989 27,856 3,961 4,937 13,212 1,323 59,278 16,878 14,341 2,669 31,516 16,513 16,357 13,615 350,020
55,125 1,577 454 234 818 12,303 53,164 3,248 65 8,511 1,505 244 6,706 26,376 4,588 178 22,031 2,205 27,068 24,030 250,429
(25,459) (320) 235 0 30 20 (15,994) (1,586) 0 (2,424) (209) 138 0 (9,298) (694) 390 347 (8) (934) (3,915) (59,681)
0 2,816 3,563 6,227 1,743 (5,790) 36,819 26,194 3,896 (1,150) 11,915 941 52,572 (200) 10,447 2,101 9,138 14,317 0 0 175,548
0% 1% 2% 3% 1% (3%) 19% 14% 2% (1%) 6% 0% 28% 0% 5% 1% 5% 8% 0% 0% 91%
Capital Airport Building Fire Information Services Parks Real Estate & Parking Solid Waste Storm Drainage Transportation Vehicle & Mobile Equipment Wastewater Water Capital sub-total
9,805 20,245 631 1,133 27,849 3,146 12,450 8,020 20,199 7,317 20,688 8,628 140,111
0 3,878 0 (1,340) 1,481 0 0 2,680 944 241 184 150 8,219
9,805 12,803 631 1,390 22,826 1,896 12,450 4,021 15,547 7,076 10,728 1,978 101,149
0 3,564 0 1,083 3,542 1,250 0 1,319 3,709 0 0 0 14,467
0% 2% 0% 1% 2% 1% 0% 1% 2% 0% 0% 0% 9%
Total operating and capital
490,131
258,648
41,469
190,015
100%
$ thousands
Note: Totals may not add due to rounding
PAGE 63
2024 FINANCIAL PLAN
CITY OF KELOWNA
Analysis of taxation demand The result of the taxation requirement detailed above is an increase to the net taxation demand of $13.39 million, a 7.58 per cent increase over 2023. This is reduced by the expected new construction tax revenue estimated to be $4.98 million in 2024 to bring the total net property owner impact to 4.76 per cent. This increase includes $1.77 million, a 1 per cent increase over 2023, for the 2023 Council approved Public Safety Levy.
Preliminary 2024
Change
% change
$ thousands
Revised 2023
Taxation demand New construction tax revenue Net property owner impact Municipal impact Public Safety Levy impact
176,624 (3,200) 3.78% 2.78% 1.00%
190,015 (4,980) 4.76% 3.76% 1.00%
13,390 (1,780)
7.58% 55.63% 0.98%
Note: Totals may not add due to rounding
Tax-supported operations by Service Area The Financial Plan uses service‐based reporting. There are two types of service areas in the City of Kelowna, community services and enabling services. A community service is a service that is provided directly to the community, and an enabling service is a support service provided internally that enables the community services to be provided. As the community services could not be provided without internal support, the enabling services net operating budget has been allocated to each community service. Not all service areas require taxation funding. The graph and table below shows the community service areas that do require taxation funding, and the amount of taxation used in 2022, budgeted to use in 2023, and is recommended to be budgeted for 2024.
Net tax-supported operations by Service Area $70,000 $60,000
Thousands
$50,000 $40,000 $30,000 $20,000 $10,000 $0 ($10,000)
Actual 2022
Revised 2023
Preliminary 2024
PAGE 64
2024 FINANCIAL PLAN
CITY OF KELOWNA
Actual 2022
Revised 2023
Preliminary 2024
3,217 3,286 6,264 2,529 (7,055) 28,998 3,708 (150) 4,424 1,110 51,334 (199) 20,660 2,469 14,799 17,611 153,006
3,360 4,035 6,329 2,072 (2,786) 27,186 4,378 (150) 13,139 1,146 59,644 (200) 11,941 2,496 13,042 15,860 161,493
3,587 4,367 7,449 2,234 (4,554) 31,465 4,645 (1,150) 14,415 1,191 63,788 (200) 13,161 2,606 15,102 17,441 175,548
$ thousands
Arts & Culture (A & C) Community Development (CD) Community Safety & Bylaw (CS & B) Development Planning (DP) Development Services (DS) Fire Safety (FS) Governance & Leadership (G & L) Parking (Parking) Parks (Parks) Partnerships Office (PO) Police Services & RCMP (PS & RCMP) Solid Waste & Landfill (SW & L) Sport & Recreation (S & R) Stormwater & Flood Protection (S & FP) Transit (Transit) Transportation (Transport.) Total service area net operating expenditures Note: Totals may not add due to rounding
Tax-supported Enabling Services excluding General Revenue All enabling service areas require taxation funding. The graph and table below illustrate the taxation used in 2022, budgeted to use in 2023, and is recommended to be budgeted for 2024 for the enabling service areas. These amounts are included in the community services information above.
Net tax-supported enabling services $12,000
Thousands
$10,000 $8,000 $6,000 $4,000 $2,000 $0
Actual 2022
Revised 2023
Preliminary 2024
* 2022 surplus allocation has been removed
PAGE 65
2024 FINANCIAL PLAN
CITY OF KELOWNA
$ thousands
Actual 2022
Revised 2023
Preliminary 2024
Administration Building Services Communications Debt and Other Financial Services Fleet Services Human Resources Information & Technology Services Internal Construction Delivery Legislated Services Real Estate Risk Management Senior Leadership Strategy & Performance Total Enabling Services net operating expenditures
2,591 8,066 1,500 21,389 5,775 23 3,462 6,779 1,182 732 847 3,230 1,626 535 57,738
3,542 8,113 1,611 9,560 7,173 51 3,744 7,787 1,251 492 886 3,881 1,670 635 50,395
3,847 9,067 1,707 8,997 7,783 50 4,662 9,366 1,429 555 999 4,153 1,754 663 55,033
Note: Totals may not add due to rounding
General Revenue General Revenues are revenues that are not specifically attributable to or generated by any particular City of Kelowna Service Area. The graph and the table following summarizes the City’s general revenues by type for amounts received in 2022, budgeted to use in 2023, and is recommended to be budgeted for 2024.
General Revenues $13,000 $11,000
Thousands
$9,000 $7,000 $5,000 $3,000 $1,000 ($1,000)
Licences
Franchise fee
Actual 2022
Interest & penalties
Miscellaneous Federal Provincial Taxes - private revenues contributions contributions utilities (1% in (Inc. traffic Lieu) fine revenue)
Revised 2023
Preliminary 2024
PAGE 66
2024 FINANCIAL PLAN
CITY OF KELOWNA
The table below details the dollar value of City’s general revenues (by type) and includes property taxation revenue.
$ thousands Licences Franchise fee Interest & penalties Miscellaneous revenues Federal contributions Provincial contributions (Inc. traffic fine revenue) Taxes - private utilities (1% in Lieu)
Actual 2022 1 1,685 5,734 149 150 2,027 2,299
Revised 2023 3 2,157 9,113 (109) 150 2,027 2,461
Preliminary 2024 3 2,418 10,787 22 150 2,153 2,680
Total general revenues
12,045
15,803
18,214
Property taxation
167,107
176,624
190,015
Total general revenues & taxation
179,152
192,427
208,229
Note: Totals may not add due to rounding
Tax supported capital summary As with the operating service areas, not all infrastructure cost centres require taxation funding. The graph and table below illustrate the taxation requirements of the seven infrastructure cost centres that do require taxation funding , and what is in . They report the amount of taxation that was used in , budgeted to be used in recommended to be budgeted for .
Net pay-as-you-go capital expenditures $7,000 $6,000
Thousands
$5,000 $4,000 $3,000 $2,000 $1,000 $0 Building
Information Services Actual 2022
Parks
Real Estate & Parking
Revised 2023
Storm Drainage
Transportation
Vehicle & Mobile Equipment
Preliminary 2024
PAGE 67
2024 FINANCIAL PLAN
CITY OF KELOWNA
$ thousands Building Information Services Parks Real Estate & Parking Storm Drainage Transportation Vehicle & Mobile Equipment Total taxation capital Note: Totals may not add due to rounding
Actual 2022 759 504 3,862 2,702 1,729 4,113 255 13,925
Revised 2023 2,891 785 5,981 984 1,000 3,382 109 15,132
Preliminary 2024 3,564 1,083 3,542 1,250 1,319 3,709 0 14,467
Ongoing impacts ‐ general fund Below is a projection of the net property owner impacts over the next five years using the best information available at the time of preparation of the Preliminary Budget volume. This projection will be updated for the Final Budget volume in April of and additional details on projections will be provided. As with any planning exercise, the level of certainty and detail is most appropriately found in the current year. For the years after , budgets have been adjusted for current one‐time projects, changes in operating budgets from previously approved requests, new capital projects included in the Council endorsed ‐Year Capital Plan, growth and/or inflationary rates, and other key assumptions. Although this forward‐looking information is based on what is believed to be reasonable assumptions, there can be no assurance that this information will prove to be accurate as actual results and future events could differ materially from the anticipated information contained in this forecast. $ thousands
Taxation demand New construction tax revenue Net property owner impact Municipal Impact Public Safety Levy Impact
2024 190,015 (4,980) 4.76% 3.76% 1.00%
2025 201,695 (3,021) 4.56% 3.56% 1.00%
2026 214,072 (2,965) 4.67% 3.67% 1.00%
2027 226,135 (3,147) 4.17% 3.17% 1.00%
2028 237,275 (3,324) 3.46% 2.46% 1.00%
Note: Totals may not add due to rounding
PAGE 68
2024 FINANCIAL PLAN
CITY OF KELOWNA
OPERATING BUDGET
PAGE 69
2024 FINANCIAL PLAN
CITY OF KELOWNA
OPERATING BUDGET OPERATING BUDGET SUMMARY The City’s operating program is influenced and guided by strategic direction provided by City Council, the Community and Corporate leadership. This direction is communicated through plans and priorities such as master plans and strategies, Council and Corporate priorities, the annual action plan, and service area, department and divisional plans. This year’s budget is a shift from traditional budget to service-based budgeting. Service-based budgeting is organized by the service area, rather than departments and divisions, showing exactly what services our City provides, how much it costs to deliver the service, and what the tradeoffs are if other services are prioritized. This methodology provides a higher level of transparency, accountability, and fiscal agility, providing a better understanding of how, where and when the City can redeploy finite resources to areas of need. It allows for better reporting, and communication of where tax dollars and other revenue sources are being spent, and facilitates more thoughtful discussion and review of service levels. Each operating request is categorized into two categories; maintain and enhance. Maintain requests are the budgets requested to maintain current programs that cost more to deliver due to inflation or growth of the community. Enhance requests are the budgets requested to increase or improve the service level that is currently being provided. This category can be found at the top right-hand side of each operating budget request. Over 78 per cent of the 2024 operating request expenditures are to maintain the current service levels. Enhanced service requests expenditures makes up $3.8 million and 22 per cent of the operating program.
Operating request type Enhance 22% Maintain 78%
Total $17.3M
PAGE 70
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating requests by service area The following table provides a summary of the priority one and priority two operating request highlighting the amount coming from taxation versus other funding sources. Other funding sources could include reserves, user fees, grants, or community/developer contributions.
Funded from
Airport Arts & Culture Community Development Community Safety & Bylaw Development Planning Development Services Enabling Services Fire Safety Governance & Leadership Parking Parks Partnerships Office Police Services & RCMP Solid Waste & Landfill Sport & Recreation Stormwater & Flood Protection Transit Transportation Wastewater Utility Water Utility Total operating requests
Taxation
Note: Totals may not add due to rounding
0 0 395 269 0 0 2,018 95 156 0 379 76 320 0 315 49 925 383 0 0 5,379
Priority 1 Other Sources
3,587 61 635 0 30 67 1,817 0 0 114 40 138 0 283 420 378 2,451 749 746 363 11,880
Total
3,587 61 1,030 269 30 67 3,834 95 156 114 418 214 320 283 735 427 3,376 1,132 746 363 17,259
Priority 2 Other Sources
Taxation
0 0 59 1,070 0 0 127 115 50 0 0 0 348 0 0 0 0 0 0 0 1,768
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total
0 0 59 1,070 0 0 127 115 50 0 0 0 348 0 0 0 0 0 0 0 1,768
The following graphic provides a visual summary of the funding strategy being proposed for the priority one operating requests including taxation, reserves, grant funding, revenues and utility funds (user fees).
Funding Strategy - Priority 1 operating requests Property taxation $5.4M Reserve $4.6M Grant $3.8M Revenue $2.5M Utility $1M
Total $17.3M
PAGE 71
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating requests by fund The 2024 Financial Plan includes 117 Priority one (P1) operating requests that total $17.3 million, of which $5.4 million is requested to be funded from taxation, $969k from utility revenues, $2.5 million from revenues such as fees from transit fares and recreation fees, $3.8 million is expected to be received through grants, and $4.6 million is being recommended to come from reserves. General Fund The general fund has 82 P1 operating requests totalling $12.2 million. These requests aim to enhance community safety through RCMP, Bylaw & Fire resourcing, continuing the commitment to addressing homelessness through investment in community programs, supporting sustainable transportation, investing in preventive measures for wildfire and flood mitigation and continue to apply digital strategies. There are 16 operating requests that are the operating impacts linked to capital requests totalling $392k. These requests are presented with the associated capital request in the capital section. In addition to the P1 operating requests, there are 7 Priority two (P2) requests that are included for Council’s consideration totaling $1.8 million. The P2 requests are not included in the summary totals. Airport Fund The Kelowna International Airport has requested six P1 operating requests that amount to $3.6 million in program enhancements and $926k in revenue increases that support investment in important areas of the Airport’s business and address inflationary pressures. These budgeted enhancements are based on the projection that the Airport will receive 2.1 million passengers in 2024. Wastewater Fund The Wastewater Utility has six P1 operating requests totaling $746k. The 2024 operating requests focus on operations management and safety and security, as well as data enhancement. Wastewater utility revenue budgets have been adjusted for Council approved rate changes of three per cent and growth and have been completed through divisional adjustments. Water Fund The City of Kelowna’s Water Utility is requesting to spend $363k over seven P1 operating requests. The operating requests will help the utility to maintain current programs. This request is presented with the associated capital request in the capital section.
PAGE 72
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - All Funds Page Type Description Airport - Priority 1 86 Maintain Airport Improvement Fee 86 Maintain Airport Airside 87 Maintain Airport Terminal 87 Maintain Airport Groundside 88 Maintain Airport Finance & Corporate Services 88 Enhance Airport - Four Management Positions Service Area Priority 1 Total Community Safety & Bylaw - Priority 1 95 Enhance Bylaw Services Positions - Public Safety Levy 95
Enhance
Bylaw Services - ALC Bylaw Officer Position
Cat.
Cost
OG OG OG OG OG OG
0 1,495,000 510,200 (431,400) 619,200 (493,100) 981,000 366,700 1,366,900 (1,238,900) 109,600 (109,600) 3,586,900 (411,300)
Fire Safety - Priority 1 115 Maintain
Firefighters - Four Positions - Public Safety Levy 115 Enhance Fire Mitigation Specialist Position Service Area Priority 1 Total
Wastewater - Priority 1 124 Maintain 124
Maintain
125
Maintain
Wastewater Collection Smart Cover Real Time Data Wastewater Treatment Facility Operations and Maintenance Wastewater Treatment Facility Security
125 126 126
Maintain Enhance Enhance
Commonage - Leachate Reuse Commonage - Fire Protection Service Time Series Data Extraction from SCADA
Grant
Revenue
Utility
Taxation
0 (2,250,000) 755,000 0 0 (78,800) 0 0 (126,100) 0 0 (1,347,700) 0 0 (128,000) 0 0 0 0 (2,250,000) (925,600)
0 0 0 0 0 0 0
0 0 0 0 0 0 0
203,800
0
0
0
0
0
(203,800)
OG
65,100
0
0
0
0
0
(65,100)
268,900
0
0
0
0
0
(268,900)
OG
41,500
0
0
0
0
0
(41,500)
OG
204,300
0
0
0
0
0
(204,300)
OG
0
0
0
0
0
0
0
OG
35,400
0
0
0
0
0
(35,400)
OG
38,700
0
0
0
0
0
(38,700)
319,900
0
0
0
0
0
(319,900)
OG
0
0
0
0
0
0
0
OG
95,300 95,300
0 0
0 0
0 0
0 0
0 0
(95,300) (95,300)
OG
76,000
0
0
0
0
(76,000)
0
OG
400,000
0
0
0
0 (400,000)
0
OT
115,000
0
0
0
0 (115,000)
0
OT OG OG
90,000 20,000 45,000
0 0 0
0 0 0
0 0 0
(30,000) (6,700) 0
(60,000) (13,300) (45,000)
0 0 0
746,000
0
0
0
(36,700) (709,300)
0
OG
30,500
0
0
0
0
0
(30,500)
Service Area Priority 1 Total Stormwater & Flood Protection - Priority 1 134 Maintain Stormwater Facility and Dam Operations and Maintenance
Borrow
OG
Service Area Priority 1 Total Police Services & RCMP - Priority 1 104 Maintain Police Services - Crime Review Officer Position (CRO) 104 Maintain Police Services - Guarding of Prisoner Contract 2023-2026 105 Enhance RCMP Regular Members (12) - Public Safety Levy 105 Enhance Police Services Clerk Position - Community Safety Unit (CSU) 106 Enhance Police Services - Auxiliary Coordinator Position Service Area Priority 1 Total
Reserve
134
Maintain
Construction Yard Gate Improvements
OT
56,700
0
0
0
0
(37,800)
(18,900)
135
Enhance
Stormwater Utility Business Case - Phase 2
OT
300,000
(300,000)
0
0
0
0
0
OT OG
30,000 10,000 427,200
(30,000) (10,000) (340,000)
0 0 0
0 0 0
0 0 0
0 0 (37,800)
0 0 (49,400)
135 Enhance Clifton Rd Stormwater Pond Study 136 Enhance Woodhaven Research Project - UBCO Service Area Priority 1 Total
PAGE 73
2024 FINANCIAL PLAN
CITY OF KELOWNA
Page Type Water - Priority 1 143 Maintain 143
Maintain
144
Maintain
144
Maintain
145 145
Maintain Maintain
Description
Cat.
Pump Station & Reservoir Improvements
OT
0
0
0
0
0
0
0
Water Supply Operations and Maintenance Renewal Water Distribution Operations and Maintenance Renewal Water Supply Succession Management Position Non-Potable Improvements HVAC Improvements - Water Supply Shop
OG
85,000
0
0
0
0
(85,000)
0
OG
70,000
0
0
0
(18,400)
(51,600)
0
OG
0
0
0
0
0
0
0
OT OT
135,000 50,000
(135,000) 0
0 0
0 0
0 0
0 (50,000)
0 0
OG
15,000 355,000
0 (135,000)
0 0
0 0
0 (15,000) (18,400) (201,600)
0 0
146 Maintain Water Meter Data Collection Service Area Priority 1 Total
Cost
Reserve
Borrow
Grant
Revenue
Utility
Taxation
The operating requests listed below are operating impacts linked to a capital request, and are presented with the associated capital request in the capital section.
Operating linked to capital Priority 1 Page Type Description 329 Maintain Growth Vehicles Operating linked to capital Priority 1 Total Solid Waste & Landfill - Priority 1 155 Maintain Landfill - Landscaping Replacement 155 Enhance Landfill - Concrete Crusher Operations
Cat. OG
Cost 8,400 8,400
Reserve 0 0
Borrow 0 0
OG OG
25,000 250,000
(25,000) (250,000)
275,000
(275,000)
Service Area Priority 1 Total
Grant 0 0
Revenue 0 0
Utility (8,400) (8,400)
Taxation
0 0
0 0
0 0
0 0
0 0
0
0
0
0
0
0 0
The operating requests listed below are operating impacts linked to a capital request, and are presented with the associated capital request in the capital section.
Operating linked to capital Priority 1 Page Type Description 329 Maintain Growth Vehicles Operating linked to capital Priority 1 Total Transportation - Priority 1 162 Maintain Strategic Transportation Partnership of Central Okanagan 2024 Transition 162 Maintain Travel Demand Model Update - Phase I 163 163
Maintain Maintain
164
Maintain
Spring Sweep Senior Transportation Engineer Position Development Review / 0.6FTE
Transportation Data Collection Equipment Replacement 164 Maintain Employer Commute Trip Reduction Program Pilot Implementation 165 Enhance Transportation Accessibility Strategy 165 Enhance Bike Valet & Theft Prevention Service Area Priority 1 Total
Reserve Borrow (8,400) 0 (8,400) 0
Cat. OG
Cost 8,400 8,400
OT
94,300
(59,400)
OT
365,000
OG OG
Grant
Revenue
Utility
Taxation
0 0
0 0
0 0
0 0
0
(7,000)
(27,900)
0
0
(145,000)
0
0
(220,000)
0
0
250,000 48,900
0 0
0 0
0 0
0 0
0 0
(250,000) (48,900)
OG
40,000
(40,000)
0
0
0
0
0
OG
100,000
(100,000)
0
0
0
0
0
OT
100,000 110,100 1,108,300
(100,000) (50,000) (494,400)
0 0 0
0 0 (7,000)
0 0 (247,900)
0 0 0
0 (60,100) (359,000)
OG
The operating requests listed below are operating impacts linked to a capital request, and are presented with the associated capital request in the capital section.
Operating linked to capital Priority 1 Page Type Description 340 Maintain Local Street Urbanization Program Maintain Pedestrian Network 343 340 Maintain Roadway Urbanization 343 Maintain Rutland Park & Ride, Mobility Hub, Operations Facility Maintain Traffic Signals and Roundabouts DCC 335
Cat. OG OG OG OG OG
800 9,300 600 0
0 0 0 0
Borrow 0 0 0 0
6,100
0
0
Cost
Reserve
Grant 0 0 0 0
Revenue 0 0 0 0
Utility 0 0 0 0
Taxation (800) (9,300) (600) 0
0
0
0
(6,100)
PAGE 74
2024 FINANCIAL PLAN
CITY OF KELOWNA
Page 345
Type Maintain
Cat. OG
Enhance
Description Transit - Bus Stop and Amenity Improvements Bicycle Network Improvement Program
342 344
Enhance
Safety and Operational Improvements
500
0
Borrow 0
0
0
0
Taxation (500)
OG
1,700
0
0
0
0
0
(1,700)
OG
4,500
0
0
0
0
0
(4,500)
23,500
0
0
0
0
0
(23,500)
OG
76,000
0
0
0
0
0
(76,000)
OG OG
3,245,000 54,600
(320,100) 0
0 (1,458,200) 0 0
(645,200) (27,300)
0 0
(821,500) (27,300)
3,375,600
(320,100)
0 (1,458,200)
(672,500)
0
(924,800)
OT OT OG
6,500 33,000 169,500
(6,500) (33,000) 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 (169,500)
OG OG
48,500 25,000
0 0
0 0
0 0
0 0
0 0
(48,500) (25,000)
282,500
(39,500)
0
0
0
0
(243,000)
Operating linked to capital Priority 1 Total Transit - Priority 1 173 Maintain 173 174
Maintain Maintain
Orchard Park Exchange Security Coverage Expansion Transit Base Operating Cost Transit Infrastructure Coordinator Position
Service Area Priority 1 Total Parks - Priority 1 182 Maintain 182 Maintain 183 Maintain 183 184
Maintain Maintain
Cemetery Tree Planting Greenhouse Expansion Parks Maintenance Cost Increase - New Waterfront Parks Parks Waste Sensors Parks Safety and Aesthetic Improvements
Service Area Priority 1 Total
Cost
Reserve
Grant
Revenue
Utility
The operating requests listed below are operating impacts linked to a capital request, and are presented with the associated capital request in the capital section.
Operating linked to capital Priority 1 Page Type Description Maintain Burne Park 318 318 Maintain DCC Parkland Acquisition Maintain Glenmore Recreation Park - Phases 4, 5 320
Cat. OG OG OG
322 325
OG OG
Maintain Maintain
Knox Mountain Park - Improvements Urban Centers Beautification Initiative
Enhance Park Infrastructure Renewal 323 Operating linked to capital Priority 1 Total Sport & Recreation - Priority 1 194 Maintain Irrigation Serviceperson Positions 194 Maintain Recreation Ave Fencing 195 Maintain Arenas and Stadiums - Operational Adjustments 195 Maintain Recreation Financial Assistance 196 Maintain Rutland Community Program Space 196 Maintain Major Events Program 197 Enhance Apple Race Series 197 Enhance Neighbourhood Associations Pilot Program
0 59,000
0 0
Borrow 0 0
0 33,500 38,200
0 0
Cost
Reserve
Grant
Revenue
Utility
Taxation
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 (59,000) 0 (33,500) (38,200)
OG
4,900 135,600
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
(4,900) (135,600)
OG OT OG
222,100 56,000 205,000
0 (56,000) 0
0 0 0
0 0 0
0 0 (248,100)
0 0 0
(222,100) 0 43,100
OG OG OG OG OG
(25,000) 115,800 50,000 25,000 78,400
0 (77,900) 0 (25,000) 0
0 0 0 0 0
0 0 0 0 0
25,000 (37,900) 0 0 0
0 0 0 0 0
0 0 (50,000) 0 (78,400)
727,300
(158,900)
0
0
(261,000)
0
(307,400)
Service Area Priority 1 Total
The operating requests listed below are operating impacts linked to a capital request, and are presented with the associated capital request in the capital section.
Operating linked to capital Priority 1 Page Type Description Maintain Rail Trail to Greenway DCC, ATC 338 Operating linked to capital Priority 1 Total Arts & Culture - Priority 1 206 Enhance Box Office Expansion Service Area Priority 1 Total
Cat. OG
Cost 7,700 7,700
OT
60,600 60,600
Reserve 0 0
Borrow 0 0
0
0
Grant 0 0
Revenue 0 0
Utility 0 0
Taxation (7,700) (7,700)
0
(60,900) (60,900)
0
300 300
PAGE 75
2024 FINANCIAL PLAN
CITY OF KELOWNA
Page Type Description Community Development - Priority 1 219 Maintain Community Energy Specialist Position (3Year Extension) 219 Maintain Housing Strategy Update 220 Enhance Social Development Services 220 Enhance Urban Tree Canopy Assessment and Expansion 221 Enhance Electric Mobility Incentives 221 Enhance Home Energy Retrofit Concierge and Incentives Service Area Priority 1 Total Development Services - Priority 1 230 Maintain Development Engineer Position Service Area Priority 1 Total Development Planning - Priority 1 237 Maintain Agriculture and Tree Protection Bylaw Changes Service Area Priority 1 Total Parking - Priority 1 244 Maintain 244 Maintain
Parking Services Supervisor Position Parking Study for Recreation Parks and Facilities Service Area Priority 1 Total
Partnerships Office - Priority 1 251 Maintain Partnerships Coordinator, Grants & Special Projects Position 251 Enhance Partnerships Program Enhancements Service Area Priority 1 Total Governance & Leadership - Priority 1 259 Enhance Executive Office Enhancements 259 Enhance Deputy City Clerk Position (Records, Information & Privacy) Service Area Priority 1 Total Enabling Services - Priority 1 Strategic Land Development Projects 271 Maintain 271
Maintain
272
Maintain
272 273
Maintain Maintain
273 274
Maintain Maintain
274 275 275
Maintain Maintain Maintain
276
Maintain
276 277 277
Building Routine Maintenance Materials & Supplies Increase Furniture & Equipment - City Hall & Police Services Building Public Art Maintenance Fleet Repair Garage - Hardy St. Facility Upgrades Asset Management Program Term Position to Full-Time Safety Advisor
Cat.
Cost
OG
111,700
0
0
(100,000)
0
0
(11,700)
OT OG OT
35,000 383,400 100,000
(35,000) 0 (100,000)
0 0 0
0 0 0
0 0 0
0 0 0
0 (383,400) 0
OT OT
200,000 200,000
(200,000) (200,000)
0 0
0 0
0 0
0 0
0 0
1,030,100
(535,000)
0
(100,000)
0
0
(395,100)
OG
67,100 67,100
0 0
0 0
0 0
(67,100) (67,100)
0 0
0 0
OT
30,000
(30,000)
0
0
0
0
0
30,000
(30,000)
0
0
0
0
0
54,400 60,000
(54,400) (60,000)
0 0
0 0
0 0
0 0
0 0
114,400
(114,400)
0
0
0
0
0
OG
75,700
0
0
0
0
0
(75,700)
OG
138,400 214,100
(138,400) (138,400)
0 0
0 0
0 0
0 0
0 (75,700)
OG OG
88,400 68,000
0 0
0 0
0 0
0 0
0 0
(88,400) (68,000)
156,400
0
0
0
0
0
(156,400)
OT
100,000
(100,000)
0
0
0
0
0
OG
300,000
0
0
0
0
0
(300,000)
OT
113,000
(73,000)
0
0
0
0
(40,000)
OG OG
50,000 50,000
0 (50,000)
0 0
0 0
0 0
0 0
(50,000) 0
OG OG
328,300 60,800
(268,300) 0
0 0
0 0
0 0
(11,400) 0
(48,600) (60,800)
OG OG OG
66,400 55,800 51,600
(66,400) 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 (55,800) (51,600)
OG OT
Reserve
Borrow
Grant
Revenue
Utility
Taxation
OG
32,300
0
0
0
0
0
(32,300)
Maintain Maintain Maintain
Financial Services Internal Audit Infrastructure Delivery Term Position to Full-Time Health & Wellness Advisor Administrative Clerk Position Change PT to FT Bridge Rehabilitation and Inspections Microsoft Solutions Security Contract Increases & Inflation
OG OG OG
22,000 195,000 200,000
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
(22,000) (195,000) (200,000)
278 278
Maintain Maintain
Cyber Security and Disaster Recovery Employee Development Scholarship Program
OG OG
561,000 20,000
(350,000) 0
0 0
0 0
0 0
0 0
(211,000) (20,000)
279 279
Maintain Enhance
Artificial Intelligence (AI) Program Strategic Land Development Manager Position
OG OG
360,000 68,000
(320,000) 0
0 0
0 0
0 0
0 0
(40,000) (68,000)
PAGE 76
2024 FINANCIAL PLAN
CITY OF KELOWNA
Page 280 280 281 281 282 282
Type Enhance Enhance Enhance Enhance Enhance Enhance
283
Enhance
283 284
Enhance Enhance
Description Legacy Application Replacement UBC Centre of Excellence Partnership Cook Rd Boat Launch Dredging Building Planning Manager Position Parks Masterplan Front Line Service Staff - Trauma Informed/De-escalation Training City Protection Officer Ongoing Full-Time Position Diversity, Equity & Inclusion Voice and Chatbot Testing and Integrations
Cat. OG OG OG OG OT OG
Cost 220,000 175,000 150,000 71,100 75,000 10,000
Reserve Borrow (100,000) 0 0 0 (150,000) 0 0 0 (75,000) 0 0 0
OG
127,800
(127,800)
OG OT
100,000 55,000
Service Area Priority 1 Total
Grant 0 0 0 0 0 0
Revenue 0 0 0 0 0 0
Utility 0 0 0 0 0 0
Taxation (120,000) (175,000) 0 (71,100) 0 (10,000)
0
0
0
0
0
(70,000) (55,000)
0 0
0 0
0 0
0 0
(30,000) 0
3,618,100 (1,805,500)
0
0
0
(11,400) (1,801,200)
The operating requests listed below are operating impacts linked to a capital request, and are presented with the associated capital request in the capital section.
Operating linked to capital Priority 1 Page Type Description Maintain Growth Vehicles 329 Operating linked to capital Priority 1 Total Total Priority 1 Operating
Cat. OG
Cost 216,300 216,300
Reserve 0 0
17,258,600 (4,805,900)
Borrow 0 0
Grant
Revenue 0 0
Utility 0 0
0 0
Taxation (216,300) (216,300)
0 (3,815,200) (2,290,100) (968,500) (5,378,900)
PAGE 77
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - All Funds Type
Description
Community Safety & Bylaw - Priority 2 Enhance Community Safety Plan - Action 1.2 Implementation Service Area Priority 2 Total Police Services & RCMP - Priority 2 Enhance RCMP Regular Members (4) Enhance Police Services - Watch Support Officers (WSO) - (2) Positions Service Area Priority 2 Total
Cat.
Cost
OG
OG OG
Reserve
Borrow
Grant
Revenue
Utility
Taxation
1,070,000
0
0
0
0
0 (1,070,000)
1,070,000
0
0
0
0
0 (1,070,000)
234,200 114,200
0 0
0 0
0 0
0 0
0 0
(234,200) (114,200)
348,400
0
0
0
0
0
(348,400)
Fire Safety - Priority 2 Enhance Firefighters - Two Positions Service Area Priority 2 Total
OG
114,500 114,500
0 0
0 0
0 0
0 0
0 0
(114,500) (114,500)
Community Development - Priority 2 Enhance Climate Action Specialist Position Service Area Priority 2 Total
OG
58,500 58,500
0 0
0 0
0 0
0 0
0 0
(58,500) (58,500)
Governance & Leadership - Priority 2 Enhance Crane Memorial Service Area Priority 2 Total
OG
50,000 50,000
0 0
0 0
0 0
0 0
0 0
(50,000) (50,000)
Enabling Services - Priority 2 Enhance Building Operator Position Service Area Priority 2 Total
OG
126,900 126,900
0 0
0 0
0 0
0 0
0 0
(126,900) (126,900)
1,768,300
0
0
0
0
0 (1,768,300)
Total Priority 2
PAGE 78
2024 FINANCIAL PLAN
CITY OF KELOWNA
AIRPORT LED BY: AIRPORT CHIEF EXECUTIVE OFFICER
Our goal & community benefit: Our goal is to serve communities within the Okanagan Valley by being the economic engine for the region and providing high‐ quality facilities in a safe and cost‐effective manner while also ensuring the capability and flexibility to meet future changes in air transportation, technology, and operations.
Our customers: Our customers are the passengers who choose to fly through the Airport. In 2022, 1,718,059 passengers moved through the Airport and numbers are forecasted to continue to grow towards the all‐time high of 2,059,030 passengers and beyond.
Our partners: We partner with airlines, car rental agencies, food and beverage providers and other Airport campus tenants to offer the best travel experience for our passengers. There are nearly 50 companies operating at the Airport, generating over 1,400 full‐time jobs. Our partners also include our federal regulatory partners Transport Canada, Nav Canada, the Canadian Air Transport Security Authority, and the Canada Border Services Agency, as well as organizations which provide contracted services critical to the operation, maintenance, and development of the Airport.
What we deliver: We are forecasting that we will serve over million passengers in and currently offer more than daily non‐stop commercial flights with nine airlines (Air Canada, Air North ‐ Yukon’s Airline, Alaska Airlines, Central Mountain Air, Flair Airlines, Pacific Coastal Airlines, Sunwing Airlines and WestJet). As the th busiest and the largest municipally‐owned airport in Canada, YLW’s total economic impact in was , jobs and million in total economic output to the province of British Columbia.
Our key objectives: Our key objectives include:
Improve and innovate the way we plan and operate our business Lead and foster economic prosperity within the region Act in a financially sustainable & resilient manner Lead in the areas of safety, security, social responsibility, governance and the environment
Our guiding plans:
Airport Master Plan
PAGE 79
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 1
Performance Measure 3
Optimization and Transformation Improve and innovate the way we plan and operate our business
Financially responsible Act in a financially sustainable resilient manner
and
Transformation
Non‐aeronautical revenues as a percentage of total Revenues
PM#1: Optimization and transformation
PM#3: Financially responsible (non‐aero revenue as percentage of total revenue)
9
10 5
1
2
2022 Actuals
2023 Estimate
0 2024 Forecast
% of total revenue
Number of projects
Number of Optimization initiatives/programs
88% 86% 84% 82%
86% 84%
2022 Actuals
2023 Estimate
84%
2024 Forecast
Performance Measure 2
Performance Measure 4
Financially responsible Act in a financially sustainable & resilient manner
Driver of regional economic development Lead and foster economic prosperity within the region
Aeronautical revenues per landed air carrier seat
Annual number of passengers
$20
$18.11
$17.99
$17.99
$15
$12.98
$13.59
$13.59
$6.20
$6.07
$10
$7.04
YLW Tier 1 and 2 Tier 2
$5 2022 2023 2024 Actuals Estimate Forecast
Number of passengers in millions
Aero revenues per landed seat
PM#2: Financially responsible
PM#4: Regional economic development (number of passengers) 3.0 2.10 2.5 2.00 1.70 2.0 1.5 1.0 2022 2023 2024 Actuals Estimate Forecast
PAGE 80
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 5 Driver of regional economic development Lead and foster economic prosperity within the region Total economic output to the Province of BC
Economic output in millions
PM#5: Driver of regional economic development (total economic output to BC) $1,000
$789
$789
$789
2022 Actuals
2023 Estimate
2024 Forecast
$500 $‐
Performance Measure 6 Accountable leadership Lead in the areas of safety, security, social responsibility and the environment
Carbon accreditation level
Airport Carbon Accreditation Level maintained
3 2 1 0
PM#6: Accountable leadership (airport carbon accreditation level) 2
2
2
2022 Actuals
2023 Estimate
2024 Forecast
Performance Measure 7 Accountable leadership Lead in the areas of safety, security, social responsibility and the environment Percentage of safety reports that are proactive
% of safety reports that are productive
PM#7: Accountable leadership (% of safety reports that are proactive) 85% 80% 75% 70%
81%
2022 Actuals
78%
2023 Estimate
82%
2024 Forecast
PAGE 81
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Service activities: Crime & Safety
# or % of residents who feel safe in Kelowna increases o Rehabilitation of Airside aprons and taxiways to further improve the safety of aircraft and passengers o Development of new instrument approaches to facilitate better access by more aircraft o Use of AI and machine learning to improve efficiency and safety for aircraft operations
Transportation
Capacity and traffic flow is enhanced on major road corridors: o Continue to engage with partners and stakeholders on potential road improvements leading to the Airport o Continue to undertake innovative initiatives to make the flow of traffic within and out of the Airport more efficient (e.g., ReserTrac Virtual Queuing for ground transportation providers) More trips by alternative transportation modes o Continue to engage with partners and stakeholders on a potential off‐campus shuttle service for those who work at the Airport
Climate & Environment
Include a Climate Lens in City decision making, ensuring we always consider climate impacts: o Continued commitment to the Airport’s environmental goal of carbon neutrality by and carbon net zero by o Airport Carbon Accreditation Level II maintained o Carbon neutral initiatives implemented to advance sustainable operations and practices o Development of sustainable building guidelines
Our People
The opportunity for all employees, regardless of position or role, to learn and grow their leadership competencies is increasing: o Develop an innovation bank
Digital Transformation
Digital tools are used to improve the online service experience and make processes more efficient: o Conversion to common use software and infrastructure to enhance flexibility Data is used to inform decision making: o New software implementation for enhanced data‐driven Airport operations, building management, gate scheduling and check in counter allocation
Active Financial Management
Targeted projects to increase non‐tax revenue are minimizing the City’s reliance on tax revenue: o Continue to pursue commercial development opportunities to increase revenues o Review and compare aeronautical fees and charges with International Civil Aviation Organization guidelines
Base Business
Continue to raise the service level of all elements of the Airport Continue construction work for the expansion of the Airport Terminal Building Renewal of certain infrastructure in the Air Terminal Building to extend the useful life of the infrastructure Design and commence construction on a new Combined Operations Building
PAGE 82
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments:
Completion of the YLW Campus Child Care Facility Commencement of construction of the terminal building expansion Completion of the runway end safety area to further improve the safety of aircraft and passengers Increased frequency and destinations available to the travelling public
Continuous improvements:
Renewal of certain infrastructure in the Air Terminal Building to extend the useful life of the infrastructure Rehabilitation of airside pavement to further improve the safety of aircraft and passengers Development of air service routes and destinations Implementation of carbon reduction initiatives Commencement of construction of the combined operations building Commencement of enabling works for preparation of the Airport hotel and parkade Continued investment in people Purchase of airside equipment
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Airport, $62.8M Airport Finance & Corporate Services $9.3M
Airport Improvement Fees $26.7M
Airport Policing $0.2M
Airside $5.3M
Groundside $14.6M
Terminal $6.6M
Budget overview:
PAGE 83
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revised Annualized Maintaining 2023 Budget Service
Enhancing Preliminary Service 2024
Revenue budget: Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
42,520 96 1,164 4,837 48,617
50,940 116 132 5,704 56,891
5,529 12,059 1,061 2,489 26,716 763 48,617
6,732 13,968 1,142 2,490 31,735 825 56,891
16.2 11.3 27.9 55.4
21.0 2.0 31.0 54.0
(21) (21)
912 2,250 776 1,878 5,816
73 73
51,851 2,366 908 7,634 62,759
Expenditure budget: Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
(1) (30)
199 (89)
(21)
1,044 2,523 568 0 1,385 296 5,816
1.0
1.0
1.5
0.5 1.5
1.0
1.5
10
(37) 73
7,974 16,371 1,710 2,490 33,094 1,121 62,759
Operating FTE positions: Management Union hourly Union salary Total operating FTE positions
24.5 2.0 31.5 58.0
Note: Totals may not add due to rounding
Funding strategy
Expenditure by type Salaries and wages $8M
Fees and charges $51.9M Material and other $16.4M Grant $2.4M Contract services $1.7M Other revenue $0.9M Transfers from reserve $7.6M
Debt service $2.5M Transfers to reserve $33.1M Enabling allocation $1.1M
Total $62.8M Total $62.8M Note: Totals may not add due to rounding
PAGE 84
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - Airport Fund Page
Type
Description
Cat.
Airport - Priority 1 86 Maintain 86 Maintain 87 Maintain 87 Maintain 88 Maintain
Airport Improvement Fee Airport Airside Airport Terminal Airport Groundside Airport Finance & Corporate Services
OG OG OG OG OG
88
Airport - Four Management Positions
OG
Enhance
Service Area Priority 1 Total
Cost
Reserve
0 1,495,000 510,200 (431,400) 619,200 (493,100) 981,000 366,700 1,366,900 (1,238,900)
Borrow
Grant
Revenue
Utility
Taxation
0 (2,250,000) 755,000 0 0 (78,800) 0 0 (126,100) 0 0 (1,347,700) 0 0 (128,000)
0 0 0 0 0
0 0 0 0 0
109,600
(109,600)
0
0
0
0
0
3,586,900
(411,300)
0 (2,250,000)
(925,600)
0
0
PAGE 85
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Airport
Maintain
Priority: 1
ON-GOING Title:
Airport Improvement Fee
PRELIMINARY
Justification: The increase in budgeted Airport Improvement Fee revenues is due to the Federal Airport Capital Infrastructure Program grants anticipated to be earned in 2024. Airport Improvement Fee revenues is based on the forecast that the Airport will recover to 2.1M passengers in 2024. The 2023 budget was based on passenger numbers of 2.1M. Revenues are contributed to the Airport Improvement Fee Reserve. 2024 Base Budget: $24.4M.
Expected Completion: Dec 2024 Strategic Direction: 2024 2025 2026
Cost 0 0 0
Service Area:
Airport
Other - Supports Base Business Reserve 1,495,000 1,495,000 1,495,000
Borrow 0 0 0
Grant (2,250,000) (2,250,000) (2,250,000)
Other 0 0 0
Revenue 755,000 755,000 755,000
Utility 0 0 0 Maintain
Priority: 1
ON-GOING Title:
Airport Airside
PRELIMINARY
Justification: The increase in budgeted Airport Airside revenues and expenditures is based on the forecast that the Airport will have 2.1M passengers in 2024, as was 2023. The budgeted increase in Airside expenditures is expected to be larger than the budgeted increase in Airside revenues for the year due to investment in key aspects of the Airport's business combined with inflationary pressures. Total Airside revenues are budgeted to exceed total Airside expenditures by 0.7M in 2024. Revenues are contributed to, and expenditures are appropriated from, the Airport Airside Reserve.
Expected Completion: Dec 2024 Strategic Direction: 2024 2025 2026
Cost 510,200 510,200 510,200
Other - Supports Base Business Reserve (431,400) (431,400) (431,400)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue (78,800) (78,800) (78,800)
Utility 0 0 0 PAGE 86
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Airport
Maintain
Priority: 1
ON-GOING Title:
Airport Terminal
PRELIMINARY
Justification: The increase in budgeted Airport Terminal revenues and expenditures is based on the forecast that the Airport will have 2.1M passengers in 2024, as was 2023. The budgeted increase in Terminal expenditures is expected to be larger than the budgeted increase in Terminal revenues for the year due to investment in key aspects of the Airport's business combined with inflationary pressures. Total terminal expenditures are budgeted to exceed Total terminal revenues by 0.8M in 2024. This deficit will be funded from the Airport reserves with no impact on taxation. Revenues are contributed to, and expenditures are appropriated from, the Airport Terminal Reserve.
Expected Completion: Dec 2024 Strategic Direction: 2024 2025 2026
Cost 619,200 619,200 619,200
Service Area:
Other - Supports Base Business Reserve (493,100) (493,100) (493,100)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Airport
Revenue (126,100) (126,100) (126,100)
Utility 0 0 0 Maintain
Priority: 1
ON-GOING Title:
Airport Groundside
PRELIMINARY
Justification: The increase in budgeted Airport Groundside revenues and expenditures is based on the forecast that the Airport will have 2.1M passengers in 2024, as was 2023. The budgeted increase in Groundside revenues is expected to be larger than the budgeted increase in Groundside expenditures for the year despite investment in key aspects of the Airport's business and inflationary pressures. Total Groundside revenues are budgeted to exceed total Groundside expenditures by 5.5M in 2024. Revenues are contributed to, and expenditures are appropriated from, the Airport Groundside Reserve.
Expected Completion: Dec 2024 Strategic Direction: 2024 2025 2026
Cost 981,000 981,000 981,000
Other - Supports Base Business Reserve 366,700 366,700 366,700
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue (1,347,700) (1,347,700) (1,347,700)
Utility 0 0 0 PAGE 87
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Airport
Maintain
Priority: 1
ON-GOING Title:
Airport Finance & Corporate Services
PRELIMINARY
Justification: The increase in budgeted Airport Finance and Corporate Services (AFCS) revenues and expenditures is based on the forecast that the Airport will have 2.1M passengers in 2024. The budgeted increase in AFCS expenditures is expected to be larger than the budgeted increase in AFCS revenues for the year due to investment in key aspects of the Airport's business combined with inflationary pressures. AFCS expenditures are budgeted to exceed AFCS revenues by 5.9M in 2024. This deficit will be funded from the Airport reserves with no impact on taxation. Revenues are contributed to, and expenditures are appropriated from, the Airport Airside, Groundside and Terminal Reserves, evenly. Expected Completion: Dec 2024 Strategic Direction: 2024 2025 2026
Other - Supports Base Business
Cost Reserve 1,366,900 (1,238,900) 1,033,100 (905,100) 1,033,100 (905,100)
Service Area:
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Airport
Revenue (128,000) (128,000) (128,000)
Utility 0 0 0 Enhance
Priority: 1
ON-GOING Title:
Airport - Four Management Positions
PRELIMINARY
Justification: This request is for the hiring of a Senior Manager, Commercial and Business Development, Environment Manager, Manager of Human Resources and Occupational Health, and conversion of the term Duty Manager position to permanent. These positions will provide the necessary education and experience to meet current and future requirements for: commercial development, business and community relations, environmental regulations and initiatives, passenger and aviation partner service levels, passenger growth and flight scheduling, strategic guidance and recommendations, industry best practices, social equity initiatives, and attraction and retention of talent. These four positions align with the Airport's 5-Year Human Resources Plan and would be funded from the Airside, Expected Completion: Dec 2024 Strategic Direction: 2024 2025 2026
Cost 109,600 304,200 304,200
Other - Supports Base Business Reserve (109,600) (304,200) (304,200)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0 PAGE 88
2024 FINANCIAL PLAN
CITY OF KELOWNA
COMMUNITY SAFETY & BYLAW LED BY: DIVISIONAL DIRECTOR, CORPORATE & PROTECTIVE SERVICES
Our goal & community benefit: Our goal is to enhance community safety for all through education, engagement, coordination, compliance and collaboration. With an increasing focus on innovation and evidence‐based approaches, we work to uphold community bylaws, respond to crime and social issues in our community today while leading multi‐disciplinary initiatives (i.e., Community Safety Plan) to reduce criminality and victimization in the future.
Our customers:
Residents and Commercial businesses Visitors (est. ~2M annually) Other stakeholders and community partners
Our partners: We are a convener of community / governmental partners and stakeholders who are integral to community safety.
What we deliver: We deliver a balanced approach of education, prevention, intervention and enforcement to preserve and enhance safety – and sense of safety – in our community. We aim to drive collaborative and multi‐disciplinary strategies to reduce criminality, crime and victimization. Services provided include a General Duty Section to investigate complaints, a Community Response Unit providing visibility and response with partnering agencies for priority areas and issues, and the Community Safety Services Branch focused on crime prevention, crime reduction, and improving sense of safety for all who live, work and play in Kelowna.
Our key objectives:
Preserve and enhance safety – and sense of safety – in our community; Foster a predictable and respectful community for all citizens through Bylaw education and compliance; and Enhance enforcement visibility, proactivity and responsiveness in priority areas, based on available data.
Our guiding plans:
Community Safety Plan
PAGE 89
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 3
Citizen Satisfaction with Bylaw Service
Average number of days to close a Bylaw Service Request
Data for this metric is collected through the Citizen Survey that is conducted every two years. This new measure will help to gauge the level of community satisfaction with the type and level of service being provided by Bylaw Services. Expectations are that the satisfaction levels will increase commensurate with efforts to further resource, recruit, train and professionalize Bylaw Services.
Most bylaw services investigations are initiated after a service request is generated. Monitoring the number of days to close a service request indicates the responsiveness and efficiency of service being provided to our citizens. Through resourcing, new technologies and continuous improvement toward operational excellence, this current trend is expected to continue.
PM#1: Citizen satisfaction with bylaw service
PM#3: Average number of days to close a bylaw service request Average days
Performance Measure 1
5.5 4.5 3.5 2.5
5.1 3
3
2022 Actuals 2023 Estimate 2024 Forecast
Performance Measure 2
Performance Measure 4
Number of files actioned by the Property Standards Compliance Team
Number of Bylaw Service Requests generated annually
The property standards compliance team brings together the RCMP, Kelowna Fire Department, Building Planning and Development, Bylaw Services, and other agencies to address the most problematic (unsafe and/or illegal) properties in our community. Measuring the number of files actioned by the Team reports the level of service being provided to the community. Expectations are that the number of files will continue to increase with city growth.
Most bylaw services investigations are initiated after a service request is generated. Tracking the number of service requests generated annually helps the service see trends that will help determine future resourcing requirements. Expectations are that the number of service requests will continue to increase as the city grows.
PM#4: # of bylaw service requests generated annually
PM#2: # of files actioned by the property standards compliance team
# of Files
20
18 13
10 2022 Actuals 2023 Estimate 2024 Forecast
17,500 17,000 16,500 16,000 15,500
# of Requests
25
30
17,500 16,700 15,912
2022 Actuals 2023 Estimate 2024 Forecast
PAGE 90
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Crime & Safety
Continued implementation of Kelowna’s first Community Safety Plan of prevention‐focused strategies and actionable initiatives to reduce crime and vulnerability in our community Continued participation in, and support for actions arising from, the Mayor’s Task Force on Crime Reduction Support for local Business Improvement Areas to reduce crime and improve sense of safety Development and implementation of a strategy to address property crime Continued leadership to advocate for system‐ based solutions to address underlying crime drivers (i.e., repeat offenders) Continued improvement in bylaw‐based strategies to mediate the public impacts of social issues while maintaining base business Development and implementation of initiatives that respond to issues uncovered through the Community Safety Survey
Our People
Increase individual and departmental capacity through targeted engagement strategies and enhanced training/professional leadership development Development of initiatives that advance the physical and psychological health, safety and wellness of all CSD staff
Active Financial Management
Optimize efficiency and effectiveness resources both human and financial
of
Base Business
Further develop and monitor performance metrics for all branches to drive actions and deliver impactful and meaningful results
Homelessness
Continue to support a multi‐agency effort to enable successful inclusion of housing with supports
PAGE 91
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments: • • • • • • •
Launched seven Community Safety Plan (CSP) ‐ Actions Teams and presented Kelowna’s 1st CSP Annual Report to Council Developed and launched a loan‐a‐lock program and a bike valet to augment pre‐existing bike theft prevention strategies Developed and published Business and Community Safety Toolkits to advance crime prevention through environmental design (CPTED) and other Reviewed and adopted new outdoor sheltering management strategies Expanded connectedness and coordination with service providers responding to the impacts of rising outdoor sheltering Launched a pilot initiative pairing Bylaw Services and a peer navigator Adopted a Fire & Life Safety Bylaw to improve property standards and compliance
Continuous improvements: • • • • •
Enhanced training and professional development Innovation and effectiveness through research and “best practices” Increasing agility and resilience to address emergent issues Recruiting for the needs of today and tomorrow Refining organizational structures and processes
Budget Overview
2024 Total Expenditure Budget Breakdown
2024 Total Expenditure Budget, $560.9M
Community Safety & Bylaw, $7.7M Bylaw Services $5.6M Community Safety $0.8M Community Safety Services $1.3M
PAGE 92
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revised Annualized Maintaining Enhancing Preliminary 2023 Budget Service Service 2024
Revenue budget: Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
6,264 134 1,846
6,329 300 1,601
389
189 (66)
543
(1,601)
452 8,696
923 9,153
(923) (2,135)
123
543
4,057 2,405 50
4,530 3,151 68
45 (2,250)
313 54 4
489 57
344 1,840 8,696
1,403 9,153
69 (2,135)
(248) 123
(2) 543
5.7 27.7 8.8 42.2
4.0 25.3 7.2 36.5
7,449 234 0 0 0 7,683
Expenditure budget: Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
5,377 1,012 72 0 0 1,223 7,683
Operating FTE positions: Management Union hourly Union salary Total operating FTE positions
0.5 3.8 0.0
0.5 0.5
4.3
4.5 29.1 7.7 41.3
Note: Totals may not add due to rounding
Funding strategy
Expenditure by type Salaries and wages $5.4M
Property tax $7.4M Material and other $1M Fees and charges $0.2M
Contract services $0.1M
Enabling allocation $1.2M
Total $7.7M
Total $7.7M
Note: Totals may not add due to rounding
PAGE 93
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Cat.
Community Safety & Bylaw - Priority 1 95 Enhance Bylaw Services Positions - Public Safety OG Levy 95 Enhance Bylaw Services - ALC Bylaw Officer OG Position Service Area Priority 1 Total
Cost
Reserve
Borrow
Grant
Revenue
Utility
Taxation
203,800
0
0
0
0
0 (203,800)
65,100
0
0
0
0
0
268,900
0
0
0
0
0 (268,900)
(65,100)
PAGE 94
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Community Safety & Bylaw
Enhance
Priority: 1
ON-GOING Title:
Bylaw Services Positions - Public Safety Levy
PRELIMINARY
Justification: Due to increasing demand on Bylaw Services operations in support of Council's Crime & Safety and Homelessness priorities, budget is requested for several Community Response Unit (CRU) positions. This includes a property compliance supervisor, two bylaw officers and two senior bylaw officers. The senior bylaw officers are funded from the public safety levy.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 203,800 359,200 359,200
Crime & Safety - Residents feel safe Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Community Safety & Bylaw
Utility 0 0 0
Taxation (203,800) (359,200) (359,200) Enhance
Priority: 1
ON-GOING Title:
Bylaw Services - ALC Bylaw Officer Position
PRELIMINARY
Justification: Budget is requested for one dedicated Agricultural Land Commission (ALC) Bylaw Officer position. The nature of ALC compliance and enforcement operations requires consistent and frequent attendance to yield results. While there are Provincial ALC Compliance Officers, there are less than 10 officers province-wide resulting in high file loads. As such, these Provincial Officers leverage the capacity of local enforcement officers to provide continuity and support in file management and lead the investigative efforts while providing provincial jurisdiction support and advice as required for direct enforcement.
Strategic Direction: 2024 2025 2026
Cost 65,100 117,700 117,700
Crime & Safety - Public safety resources keep pace with growth Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (65,100) (117,700) (117,700)
PAGE 95
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Type
Description
Community Safety & Bylaw - Priority 2 Enhance Community Safety Plan - Action 1.2 Implementation Service Area Priority 2 Total
Cat.
Cost
Reserve
Borrow
OG
Grant
Revenue
Utility
Taxation
1,070,000
0
0
0
0
0 (1,070,000)
1,070,000
0
0
0
0
0 (1,070,000)
PAGE 96
2024 FINANCIAL PLAN
CITY OF KELOWNA
POLICE SERVICES & RCMP LED BY: DIVISIONAL DIRECTOR, CORPORATE & PROTECTIVE SERVICES
Our goal & community benefit: Our goal is to preserve and enhance safety – and sense of safety – in our community. We deliver 24/7 operational support services to the Royal Canadian Mounted Police (RCMP).
Our customers: • •
Community residents, commercial businesses and visitors Other stakeholders and community partners
Our partners: We work with community/governmental partners and stakeholders who are integral to community safety to support the provision of efficient and effective police services.
What we deliver: Police Services provides 24/7 operational support to the RCMP as part of its mandate to ensure public safety in our community. Services include information management, frontline supports, facility operations, quality assurance and all other administrative facets necessary for effective, efficient, and responsive policing in Kelowna.
Our key objectives: • • •
Support the preservation and enhancement of public safety – and sense of safety – in our community. Support longer-term evidence-based initiatives to appropriately address upstream demands on police. Initiate and implement innovative strategies to continuously improve the overall efficiency and effectiveness of the RCMP.
Our guiding plans: • •
RCMP Strategic Plan Community Safety Plan
PAGE 97
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 1
Performance Measure 2
Citizen Satisfaction with Police Services Data for this metric is collected through the Citizen Survey that is conducted every two years. This measure will help to gauge the level of community satisfaction with the type and level of services being provided by the City’s contracted police agency. Expectations are that the satisfaction levels will increase commensurate with RCMP recruitment, resourcing, efficiency, investigative effectiveness, communications, accountability, and transparency toward public trust, as well as outreach / community policing efforts.
Police Priority 1,2 & 3 Response Times (mins) The timeliness of RCMP responses to priority 1, 2, 3 calls is an important metric to monitor police service delivery. Priority 1 calls are very urgent and typically involve risk / loss of life and account for about 5 percent of all citizens calls for police service. Continued resourcing commensurate with growth in population, service demand and emergent case law will enable maintenance of existing response times.
Mins
8.3
8.2
8.2
8.1
8.1
8.0
8.0 2022 Actuals
2023 Estimate 2024 Forecast
PM#2b: Police Priority 2 Response Times (mins) Mins
10.4
10.3
10.3
10.2
10.2 10.1
10.0
10.0 2022 Actuals 2023 Estimate 2024 Forecast
PM#2c: Police Priority 3 Response Times (mins) 66.0 Mins
PM#1: Citizen satisfaction with police services
PM#2a: Police Priority 1 Response Times (mins)
65.8
64.0
62.0
62.0
60.0
60.0 2022 Actuals
2023 Estimate 2024 Forecast
PAGE 98
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 3
Performance Measure 5
Perception of Safety Collected annually through the alternating Citizen Survey and the Community Safety Survey, measuring citizen perceptions of crime city-wide, sense of safety in their daily lives (i.e., walking alone at night), and supporting behaviors (i.e., reporting victimization to police) are important measures of the overall effectiveness of police and city efforts to maintain a safe city for all who live and work in Kelowna.
Traffic Safety: Police Enforcement Interactions (#) Evidence indicates that visible policing - including traffic checks - can reduce crime and crashes. Police Enforcement Interactions includes the total number of warnings, violation tickets as well as notices / orders issued. Collected and reported routinely by RCMP through Council reports, this measure reflects Council's priority for traffic safety management.
PM#5: Traffic Safety Management
83% 82%
82% 81%
81%
80%
80%
3,200 # Interactions
Perception of Crime
PM#3: Perception of Safety
2022 Actuals 2023 Estimate 2024 Forecast
3,200 3,000 2,800 2,600 2,400 2,200 2,000
2,800
2,062 2022 Actuals 2023 Estimate 2024 Forecast
Performance Measure 4
Performance Measure 6
Citizen Callbacks for Police Service Calls (%)
Reports to Crown - Property Offences (%)
RCMP Communication with complainants to follow up on service provided. False alarms, abandoned calls for service, traffic and online reports, assistance outside of public safety and failure to appear are not indicated for follow up calls.
Citizens have identified property crimes / B&Es as the "most important crime related problem" in the City of Kelowna (2022 Community Safety Survey). Collected and reported routinely by RCMP, this metric reflects the corresponding Council Priority and captures the percentage of all Reports to Crown Counsel by police in which a property offence was included. This metric is collected and reported routinely by RCMP.
80%
68%
72%
60% 43% 40% 2022 Actuals 2023 Estimate 2024 Forecast
% of Property Offences
% of Callbacks
PM#4: Citizen Callbacks for Police Service Calls (%)
PM#6: Reports to Crown - Property Offences (%) 32% 30%
31%
30% 29%
28% 2022 Actuals 2023 Estimate 2024 Forecast
PAGE 99
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Crime & Safety • • • • •
• •
•
Advance longer-term evidence-based initiatives to appropriately address upstream demands on police Continue to support implementation of the Community Safety Plan Support relevant actions arising from the Mayor’s Task Force on Crime Reduction Maintain current service levels, responsiveness, and visibility in priority areas (i.e., downtown and Rutland) Support efforts, as feasible, to enhance prevention and community-policing based initiatives, particularly in Business Improvement Areas In partnership with the City and stakeholders, co-develop and implement a property crime reduction strategy Continue to develop, implement, measure and provide provincial leadership in respect to strategies to reduce the impacts of repeat offenders in our community Continue to implement education and prevention-focused communications to increase public prevention and reporting of criminal activity
Our People •
•
Increase individual and departmental capacity through targeted engagement strategies and enhanced training/professional leadership development Development of initiatives that advance the physical and psychological health, safety and wellness of staff
Active Financial Management • •
Develop and implement a quarterly RCMP contract performance dashboard Optimize efficiency and effectiveness of support services for Police Services
Base Business •
Further develop and monitor performance metrics for all Police Services’ units to drive actions and deliver impactful and meaningful results
PAGE 100
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments: • • • • • • •
Restabilized and resumed specialized policing units (i.e., Traffic) Launched and provincially leading the Repeat Violent Offending Intervention Initiative Commenced transition to newly-adopted national Auxiliary Police Program Improved resource deployment through “PinPoint” data-based analytics Developed and adopted enhanced reporting framework Re-structured the Police Services Management Team Improved cost recovery for Regional RCMP and Police resources
Continuous improvements: • • • • • • • •
Enhance recruitment and retention efforts to increase staff occupancy rates Increase use of “operational excellence” and technology to improve the efficiency and effectiveness of internal operations and processes Increase use of data-driven hotspot policing, including traffic enforcement Lean into community safety concerns of diverse communities Be a provincial leader in best practices for repeat offender management Further adopt proven crime prevention approaches in business improvement areas Promote and support the right providers for mental health, addiction care, and housing needs Advance the national RCMP Auxiliary Program in Kelowna
Budget overview:
2024 Total Expenditure Budget, $560.9M
2024 Total Expenditure Budget Breakdown Police Services & RCMP, $70.5M
Police Client Services $1.6M Police Facility Operations $0.9M Police Information Management $2.2M Police Investigative Services $2M Police Operations Support $4.1M Police Quality Assurance $2M Police Services Corporate & Strategic $57.4M Police Services Operations $0.2M
PAGE 101
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands):
Revenue budget:
Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
Expenditure budget:
Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Actual 2022
Revised Annualized Maintaining Service 2023 Budget
51,334 699
59,644 635
5,441 57,474
5,801 8,250 74,330
(8,250) (6,689)
2,470
382
7,376 398 37,038
7,462 511 54,962
(232) (51) (7,042)
653 34 2,577
(301) 61 643
12,663 57,474
11,395 74,330
636 (6,689)
(795) 2,470
(20) 382
7,582 555 51,141 0 0 11,217 70,494
17.1 7.3 59.8 84.2
23.5 4.3 72.5 100.3
0.5
0.5 1.0 1.0
24.5 4.3 74.0 102.8
Operating FTE positions:
Management Union hourly Union salary Total operating FTE positions
1,561
0.5 1.0
2,201 4
Enhancing Preliminary Service 2024 382
266
0.5
63,788 639 0 6,067 0 70,494
Note: Totals may not add due to rounding
Funding strategy
Property tax $63.8M Fees and charges $0.6M Other revenue $6.1M
Expenditure by type Salaries and wages $7.6M Material and other $0.6M Contract services $51.1M Enabling allocation $11.2M
Total $70.5M
Total $70.5M
Note: Totals may not add due to rounding
PAGE 102
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page
Type
Description
Police Services & RCMP - Priority 1 104 Maintain Police Services - Crime Review Officer Position (CRO) 104 Maintain Police Services - Guarding of Prisoner Contract 2023-2026 105 Enhance RCMP Regular Members (12) - Public Safety Levy 105 Enhance Police Services Clerk Position Community Safety Unit (CSU) 106 Enhance Police Services - Auxiliary Coordinator Position Service Area Priority 1 Total
Cat.
Cost
Reserve
Borrow
OG
Grant
Revenue
Utility
Taxation
41,500
0
0
0
0
0
OG
204,300
0
0
0
0
0 (204,300)
OG
0
0
0
0
0
0
0
OG
35,400
0
0
0
0
0
(35,400)
OG
38,700
0
0
0
0
0
(38,700)
319,900
0
0
0
0
0 (319,900)
(41,500)
PAGE 103
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Police Services & RCMP
Maintain
Priority: 1
ON-GOING Title:
Police Services - Crime Review Officer Position (CRO)
PRELIMINARY
Justification: The 2019 Griffiths' Report recommended one additional CRO for which budget is requested to adequately process investigational files. As Kelowna's population and tourism increase, the City is producing more files; from 2017 to 2022 file count per CRO has increased by 28.6%. In 2017, each CRO reviewed upwards of 15 thousand files, which has increased to 19 thousand files in 2022. The increased workload has led to significant and sustained backlogs in file review, resulting in inaccurate crime data reporting to: Statistics Canada, the RCMP Officer in Charge and City of Kelowna. Accurate and timely crime data is essential for operational deployments, resource reviews, and accountable reporting purposes.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 41,500 82,000 82,000
Crime & Safety - Public safety resources keep pace with growth Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Police Services & RCMP
Revenue 0 0 0
Utility 0 0 0
Taxation (41,500) (82,000) (82,000) Maintain
Priority: 1
ON-GOING Title:
Police Services - Guarding of Prisoner Contract 2023-2026
PRELIMINARY
Justification: Police Services contracts the guarding of prisoners within the cell block. Budget is requested to accommodate cost increases for the new Guarding of Prisoner contract for the term from October 1, 2023 to September 30, 2026. The contract includes the option of negotiating two additional one-year extensions. The City of Kelowna takes on costs associated with keeping provincial prisoners and is partially reimbursed by the province, in 2022 it is estimated that total costs to keep provincial prisoners were only reimbursed at 65%. Base Budget: $980k
Strategic Direction: 2024 2025 2026
Cost 204,300 239,900 239,900
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (204,300) (239,900) (239,900)
PAGE 104
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Police Services & RCMP
Enhance
Priority: 1
ON-GOING Title:
RCMP Regular Members (12) - Public Safety Levy
PRELIMINARY
Justification: Consistent with Council Priorities and the RCMP's multiyear resource and strategic plans, budget is requested to support population growth (seven officers) and enable some enhanced enforcement (i.e., boat, bike, and foot patrols) in priority areas, as well as traffic enforcement. This request is for $327.8k in 2023 and $1.07M ongoing, funded from the Public Safety Levy and surplus due to vacancies.
Strategic Direction: 2024 2025 2026 Service Area:
Other - Supports Base Business
Cost 0 0 0
Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Police Services & RCMP
Revenue 0 0 0
Utility 0 0 0
Taxation 0 0 0 Enhance
Priority: 1
ON-GOING Title:
Police Services Clerk Position - Community Safety Unit (CSU)
PRELIMINARY
Justification: CSU is comprised of 28 Regular Members responsible for bike and foot patrol, downtown enforcement, proactive patrols, community youth safety, police and crisis team, integrated community policing, bait bike program and restorative justice. The Unit requires one administrative support position to alleviate tasks such as human resources, file management, scheduling and disclosure. The lack of admin support reduces the unit's operational efficiency and time spent to focus on their mandate supporting the RCMP's 2021-2024 Strategic Plan of managing and mitigating social disorder as it relates to individuals experiencing homelessness, addiction, and mental health disorders. With a focus on operational excellence and efficiencies, a Police Services Clerk will enable CSU police officers to focus on proactive policing in the community. Strategic Direction: 2024 2025 2026
Cost 35,400 70,400 70,400
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (35,400) (70,400) (70,400)
PAGE 105
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Police Services & RCMP
Enhance
Priority: 1
ON-GOING Title:
Police Services - Auxiliary Coordinator Position
PRELIMINARY
Justification: An Auxiliary Coordinator is requested to launch and maintain the new RCMP Auxiliary Program, with secondary duties focused on enhanced policing, special event liquor licences, and managing / supporting special community events (i.e., Canada Day) in collaboration with City and community leads. Since 1963, the provincial Auxiliary Program existed to enhance community policing and crime prevention initiatives with local, trained, volunteers. Over the years, the Program evolved. With rollout of a national Auxiliary Program to begin in 2023/24, a new team of Auxiliary Constables will be recruited, trained and dedicate a minimum of 180 hours each annually. Auxiliary Constables are involved with community policing, community education and events, general duty and traffic, among other duties.
Strategic Direction: 2024 2025 2026
Cost 38,700 77,100 77,100
Crime & Safety - Residents feel safe Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (38,700) (77,100) (77,100)
PAGE 106
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Type
Description
Police Services & RCMP - Priority 2 Enhance RCMP Regular Members (4) Enhance Police Services - Watch Support Officers (WSO) - (2) Positions Service Area Priority 2 Total
Cat.
Cost
Reserve
Borrow
OG OG
Grant
Revenue
Utility
Taxation
234,200 114,200
0 0
0 0
0 0
0 0
0 (234,200) 0 (114,200)
348,400
0
0
0
0
0 (348,400)
PAGE 107
2024 FINANCIAL PLAN
CITY OF KELOWNA
FIRE SAFETY LED BY: DIVISIONAL DIRECTOR, CORPORATE & PROTECTIVE SERVICES
Our goal & community benefit: Our goal is to provide effective fire protection and public safety services to all areas of the City of Kelowna. This includes fire suppression and rescue, fire prevention, fire safety inspections, public education, fire training, first medical responses, hazardous material response, specialty rescue, pre-incident planning, dispatch and emergency management.
Our customers: • • •
Residents of Kelowna and visitors to the community (Suppression Branch) Commercial and multi-family development proposals (Fire Prevention Branch) Fire departments across 5 regional districts (Dispatch)
Our partners: We work with local government, community groups, citizens and volunteers to provide public safety services.
What we deliver: Kelowna Fire Department (KFD) provides a number of services to the City of Kelowna and to the region. Along with fire suppression and rescue, we provide inspection services and input into new developments. Our dispatch centre serves over 70 fire departments across six regional districts. KFD specialty teams provide technical rescue, including high angle, tower crane, swift water, marine rescue and hazmat response across the Central Okanagan. In addition, KFD oversees the regional Emergency Program and hosts the region’s Emergency Operations Centre.
Our key objectives Provide for the life safety for the residents of the City of Kelowna through fire suppression, rescue, dispatch, training, inspections and public education.
Our guiding plans 2016-2030 KFD Strategic Plan
PAGE 108
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 1
Performance Measure 3
# of Fire Inspections Performed per Year vs Inspectable Properties
Drive Time Target 6m10s for 90% of calls
As the City continues to grow, so does the number of inspectable properties. Measured against inspectable properties, the Prevention Branch is working to achieve the highest percentage of completed inspections possible. Work to create efficiencies are being made, while still focused on ensuring the highest level of public safety.
PM#1: # of Fire Inspections Performed vs Inspectable Properties
In the 2016-2030 Strategic Plan, a goal was set to achieve 7m40s response time within the Permanent Growth Boundary. With 90 seconds allowed for turnout, this requires a drive time of 6m10s 90% of the time. This response time is a key factor due to the rate growth of fires. Key impacts to this are staff availability (# units working) and proximity to the incident (station location). The new location for the station 5 replacement will positively impact this statistic. Future station locations, being considered in the Master Plan (under development), will also directly impact this statistic.
Inspectable Properties
2023 Estimate
Inspections Performed
2022 Actual
Target 4,000
6,000
8,000
PM#3: Drive Time Target 6m10s for 90% of calls 84.00% 90% Target
2024 Forecast
82.00%
82.40%
82.00%
80.15%
80.00% 78.00% 2022 Actuals 2023 Estimate 2024 Forecast
Performance Measure 2 # of Dispatch Incidents
Performance Measure 4
Dispatch incidents reflect the total number across all KFD Dispatch customers. KFD Dispatch provides a revenuebased model to offset costs to the City of Kelowna, and the high number of calls relates directly to our growth in customers over the past 5 years.
# of KFD Suppression Calls per Year Calls per year is one reflection of the City’s growth. The increase in service calls relates to several factors including resource availability. This number provides context to the changing and growing needs of the community.
52,800
53,000 48,000 48,000 43,428 43,000
2022 Actuals 2023 Estimate 2024 Forecast
# of Calls Per Year
# of Incidents
PM#2: # of Dispatch Incidents
PM#4: # of KFD Suppression Calls per Year 25,000 20,000
19,764
21,500
16,498
15,000 2022 Actuals 2023 Estimate 2024 Forecast
PAGE 109
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 5 KFD Training Hours per Year Statistics from 2023 as well as forecast training hours for 2024 are a reflection of a return to normalcy, post COVID. The Training Branch continues to maintain a full calendar with development and delivery of new training programs, as well as delivery of recurring maintenance training for firefighters and officers.
Training Hours Yearly
PM#5: KFD Training Hours per Year 20,881
21,500
21,000
20,500 19,500
18,591
18,500 2022 Actuals 2023 Estimate 2024 Forecast
PAGE 110
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Crime & Safety
Continued participation in the Property Safety Compliance Team and other opportunities to integrate with partnering agencies such as police and bylaw
Our People
Digital Transformation
Homelessness
Engage with other stakeholders on safety for those experiencing homelessness, including fire safety education
Continued focus on wellness initiatives to ensure a safe and healthy working environment
Working with GIS to improve mapping for major events, including interactive tools to share information real time Implementation of drones to support response Use recommendations of Master Plan to better use data to make informed decisions and set benchmarks
Climate & Environment
Continued focus on Wildland Urban Interface (WUI) response, including education around FireSmart
Active Financial Management
Continue to review long term capital plans including fleet to ensure we have the best use of capital for the mid to long term needs
PAGE 111
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments: • • • • •
Implementation of updated fire inspection standards, to create efficiencies while maintaining the highest level of public safety Investment in training and equipment specifically for wildland urban interface events, including Engine Boss, Task Force Leader and hands on crew training Continued implementation within Dispatch of NG911 Support for internal wellness programs including physical and mental health related initiatives Implementation of new software for crew scheduling and time management, reducing administrative requirements
Continuous improvements: • • • •
Completion of the KFD Master Plan (Q2 2024) providing a benchmark for the department across all services Continued focus on specialized training with a highlight on responder safety Development of long- term strategy specific to Fire Dispatch that includes the impacts of NG911 Continue to build on our Wildfire Training and Mitigation in the face of growing interface risks and public engagement
\ Budget overview:
2024 Total Expenditure Budget Breakdown Fire Safety, $34.7M 2024 Total Expenditure Budget, $560.9M
Fire Communications & Emergency Management $3.5M Fire Department $3.8M Fire Mitigation $1.5M Fire Operations $25.8M Wildfire Deployments and Other $0M
PAGE 112
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands):
Revenue budget:
Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
Expenditure budget:
Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Operating FTE positions:
Management Union hourly Union salary Total operating FTE positions
Actual 2022
Revised Annualized Maintaining 2023 Budget Service
28,998 2,980 9 435 1,781 34,203
27,186 2,798 9 444 150 30,587
23,590 1,763 223
22,518 1,747 201
1,399 7,228 34,203
1,691 4,430 30,587
5.6 1.6 151.3 158.5
7.0 1.7 141.0 149.7
303
Enhancing Preliminary Service 2024
3,889 (3)
86
3,887
86
132 (172)
464 90 6
83 12
(105) 299 153
2,775 552 3,887
(150) 153
2.0 2.0
2.0 2.0
31,465 2,795 9 444 0 34,713
(9) 86
23,197 1,677 206 0 4,361 5,271 34,713
0.5 0.5
7.0 1.7 145.5 154.2
Note: Totals may not add due to rounding
Funding strategy
Expenditure by type
Property tax $31.5M
Salaries and wages $23.2M
Fees and charges $2.8M
Material and other $1.7M
Grant $0M
Contract services $0.2M
Other revenue $0.4M
Transfers to reserve $4.4M Enabling allocation $5.3M
Total $34.7M
Total $34.7M
Note: Totals may not add due to rounding
PAGE 113
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Fire Safety - Priority 1 115 Maintain Firefighters - Four Positions - Public Safety Levy 115 Enhance Fire Mitigation Specialist Position Service Area Priority 1 Total
Cat.
Cost
Reserve
Borrow
Grant
Revenue
Utility
Taxation
OG
0
0
0
0
0
0
0
OG
95,300
0
0
0
0
0
(95,300)
95,300
0
0
0
0
0
(95,300)
PAGE 114
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Fire Safety
Maintain
Priority: 1
ON-GOING Title:
Firefighters - Four Positions - Public Safety Levy
PRELIMINARY
Justification Budget is requested to hire four firefighters, including incidental costs for these staff positions. The calls at Station 2 (downtown) increased 28% from 2021 to 2022 and are projected to increase significantly again in 2023 based on Q2 data. These positions will help establish a new Station 2 rescue squad. This request is for $321.5k in 2023, $421.9k in 2024, and $461.5k ongoing, with funding from the Public Safety Levy.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 0 0 0
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Fire Safety
Revenue 0 0 0
Utility 0 0 0
Taxation 0 0 0 Enhance
Priority: 1
ON-GOING Title:
Fire Mitigation Specialist Position
PRELIMINARY
Justification: Kelowna Fire Department is already seeing a significant increase in Fire Smart and Fuel Mitigation interest based on the 2023 wildfire season. This is an opportune time to invest in enhanced public education and residential home assessment programs. Funding is requested to create a position for a Fire Mitigation Specialist to oversee the Fire Smart Program and enhance community engagement. This position will oversee the deployment plans for the Structural Protection Unit requested in the 2024 Capital Budget.
Strategic Direction: 2024 2025 2026
Cost 95,300 169,900 169,900
Crime & Safety - Residents feel safe Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (95,300) (169,900) (169,900)
PAGE 115
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Type
Description
Cat.
Cost
Fire Safety - Priority 2 Enhance Firefighters - Two Positions Service Area Priority 2 Total
OG
114,500 114,500
Reserve
Borrow
0 0
0 0
Grant
Revenue 0 0
0 0
Utility
Taxation 0 (114,500) 0 (114,500)
PAGE 116
2024 FINANCIAL PLAN
CITY OF KELOWNA
WASTEWATER UTILITY LED BY: GENERAL MANAGER, INFRASTRUCTURE
Our goal & community benefit: Our goal is to protect Okanagan Lake, human health and our environment through efficient collection and effective treatment of wastewater. If wastewater is not treated, it would flow directly into our freshwater sources - where we get our drinking water from. This would threaten public health, wildlife habitats, fisheries, tourism, and recreation opportunities. The utility creates a class A compost marketed as OgoGrow from our wastewater solids, to return nutrients to the land. The utility ensures the necessary investments are made in treatment facilities, piping network, lift stations and staff to keep pace with the needs of a growing population and ensure that this service is reliable 24 hours per day/365 days per year.
Our customers: •
All citizens of Kelowna o Residential o Commercial (e.g., restaurants, hotels) o Industrial (e.g., breweries, wineries, food producers) o Institutional (e.g., hospitals, schools)
Our partners: • • • •
Research partners o University of British Columbia, Engineering Firms, National Benchmarking Government agencies o Ministry of Environment and Climate Change, Environment Canada, BC Center for Disease Control Biosolids recipients o Ogogrow Composting Facility, Ingerbelle Compost Facility Engineering firms, contractors, government agencies, and other municipalities to optimize, maintain and develop our wastewater collection and treatment infrastructure.
What we deliver The City of Kelowna’s Wastewater collection and treatment infrastructure serves approximately 95% of Kelowna’s population (including residents, businesses, and industries) and is being expanded to reach unserved areas and to accommodate the City's growth. The utility delivers a high level of wastewater collection and treatment discharging approximately 37 million liters per day back to the environment, this discharge meets or exceeds Ministry of Environment requirements. This means an average removal of. • 96.5% total phosphorus • 90.4% total nitrogen • 98.7% biological oxygen demand • 99.5% suspended solids.
PAGE 117
2024 FINANCIAL PLAN
CITY OF KELOWNA
The collection system consists of 43 sanitary lift stations which convey wastewater through over 650 km of pipe to the wastewater treatment facility. Current influent flow at the biological nutrient removal treatment facility averages 37 million liters per day, almost the same volume as 15 Olympic sized swimming pools. With expansion completed in 2010 the Wastewater Treatment Facility has been able to increase its capacity to treat wastewater from 40 to 70 million litres a day. This will accommodate the City’s sewer servicing needs beyond 2040. We will continue to address biosolids capacity and treatment, possibly through the development of a solids digestion plant which is currently under review.
Our key objectives: • • • • •
Reliably manage wastewater collection from homes and businesses. Sustainable and effective treatment of wastewater ensuring the protection of public health and the environment. 100% of treatment effluent returned to the environment consistently meets or exceeds all regulatory requirements. Continually optimize treatment processes to ensure public health and the environment are protected now and for the future. Promote effluent reuse.
Our guiding plans: • • • •
2040 Official Community Plan 20-year servicing plan 10 Year Capital Plan Kelowna’s Water Security Plan
PAGE 118
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 1
Performance Measure 2
Protect Okanagan Lake by Effectively Treating Wastewater
Wastewater Utility is Sustainably Funded
The City’s Wastewater Treatment Performance is a collective result of the four regulated parameters: Nitrogen, Phosphorous, Biological Oxygen Demand, and Suspended Solids in plant effluent.
Identifies the ratio of capital reinvestment (renewal) divided by the current year estimated replacement value of infrastructure. Measure is in per cent. 0.8% implies renewal rate would take 125 years to renew existing infrastructure.
Effluent annual average Total Phosphorous 2021 2022 2023 Forecast
Effluent annual average Total Nitrogen 2021 2022 2023 Forecast
Effluent annual average Biological Oxygen Demand 2021 2022 2023 Forecast
Effluent annual average Total Suspended Solids 2021 2022 2023 Forecast
Performance Measure 3 Residential rates communities.
are
competitive
with
other
"Green" - zero exceeds annual permit limits. "Orange" - one reading exceeds annual permit limit. "Red" - More than one parameter exceeds annual limit, or one parameter exceeded the annual limit by more than 10%.
PAGE 119
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Crime & Safety
Digital Transformation
•
•
Increased security measures at utility infrastructure to protect citizens utility investment.
Affordable Housing •
Efficient and affordable wastewater contributes to overall housing affordability.
• service
Climate & Environment •
•
Ongoing involvement with Provincial and Federal bodies, gathering and evaluating data for facility effluent and its effects on public health and the environment. Continued teamwork with other Municipalities reviewing facility operations and discussing optimization of similar facilities.
Active Financial Management •
•
Our People •
• •
Every 3 years there is a confidential online employee engagement survey which is the first step in creating and fostering a workplace that offers purpose and inspires staff to achieve their best. Utility leaders actively pursue and support staff training and development. Ensure that all certified staff receive adequate training to maintain Provincial required certifications.
The team is working towards the creation of online forms and data sheets which will streamline data entry and allow for easier information transfer for operational optimization. Working with other groups within the city the utility is supporting development of a central data warehouse which will allow users to have easier access to data for operations, modeling, and development.
Continued work on alignment of utility operational budgets between different utility work groups allowing for a clearer view of operational spending and increased transparency for financial reporting. Planned development of dashboards linking operational and financial information to provide easy one stop for utility updates and information.
Base Business •
Efficient, effective wastewater collection and treatment, protecting the public health and the environment and increasing effluent reuse.
PAGE 120
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments: • • • • •
Continued community outreach and educational opportunities to inform customers about wastewater collection and treatment and the direct impact actions have on the utility, public health, and the environment Operational projects will be completed or are on track for completion Environmental Operator Certified staff met all their continuing education required for Provincial Certification Completion of a multi-year supervisor control and data acquisition (SCADA) project, replacement of end-of-life equipment Completion of lift station communications project (from line of sight to cell network), increased stability and accessibility of data/communications with the 43 wastewater lift stations
Continuous improvements: • • •
Utility staff are continually increasing levels of knowledge and using outreach opportunities to help keep them in tune with the latest treatment, collection and disposal of wastewater liquid and solids We are future focused and closely monitor our developing community and impacts of climate change and how those can affect the utility Increased nutrient loading at the treatment facility is still under review, this situation is not isolated to Kelowna and is being experienced at many other locations. Discussions and further exploration to address this issue are planned for 2024
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Wastewater Utility, $17.3M
Biosolids $3.1M Infrastructure Delivery Wastewater $0.1M Utility Planning - Wastewater $0.2M Wastewater Collection $5.8M Wastewater Construction $0.4M Wastewater Treatment $7M Water Quality & Customer Care - Wastewater $0.6M
Budget overview:
PAGE 121
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands):
Revenue budget:
Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
Expenditure budget:
Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Operating FTE positions:
Management Union hourly Union salary Total operating FTE positions
Actual 2022
Revised Annualized Maintaining Service 2023 Budget
21,230 163 3,956 492 25,840
21,588 162 3,379 501 25,630
4,627 7,828 499 989 720 778 15,440
5,611 7,299 669 988 2,911 788 18,266
5.4 39.2 5.2 49.8
5.2 42.4 7.4 55.0
Enhancing Preliminary Service 2024
1,845 (50) (142) (192)
136 (359) 1,623
54 (173)
388 498 46 38 (1,986) 86 (930)
8 (111)
7 7
23,433 162 3,472 0 27,068
65
6,054 7,669 735 1,026 934 874 17,291
0
5.2 42.9 7.4 55.5
45 20
0.5 0.5
0
Note: Totals may not add due to rounding
Funding strategy
Expenditure by type Salaries and wages $6.1M
Fees and charges $23.5M
Grant $0.2M
Material and other $7.7M Contract services $0.7M Debt service $1M
Other revenue $3.5M
Transfers to reserve $0.9M Enabling allocation $0.9M
Total $27.1M
Total $17.3M
Note: Totals may not add due to rounding
PAGE 122
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - Wastewater Fund Page Type
Description
Wastewater - Priority 1 124 Maintain Wastewater Collection Smart Cover Real Time Data 124 Maintain Wastewater Treatment Facility Operations and Maintenance 125 Maintain Wastewater Treatment Facility Security 125 Maintain Commonage - Leachate Reuse 126 Enhance Commonage - Fire Protection Service 126
Enhance
Time Series Data Extraction from SCADA Service Area Priority 1 Total
Cat.
Cost
Reserve
Borrow
OG
Grant
Revenue
Utility
Taxation
76,000
0
0
0
0
(76,000)
0
OG
400,000
0
0
0
0 (400,000)
0
OT
115,000
0
0
0
0 (115,000)
0
OT OG
90,000 20,000
0 0
0 0
0 0
(30,000) (6,700)
(60,000) (13,300)
0 0
OG
45,000
0
0
0
0
(45,000)
0
746,000
0
0
0
(36,700) (709,300)
0
PAGE 123
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Wastewater Utility
Maintain
Priority: 1
ON-GOING Title:
Wastewater Collection Smart Cover Real Time Data
PRELIMINARY
Justification: Budget is requested to acquire five additional Smartcovers, a special manhole cover able to measure and transmit flow measurement and hydrogen sulfide levels. The scope includes funding the ongoing operating cost of a total of 24 units at key locations in the collection system. These units have become an important asset to help address unexpected odor issues, network operation and analytics.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 76,000 41,500 42,000
Crime & Safety - Residents feel safe Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Wastewater Utility
Revenue 0 0 0
Utility (76,000) (41,500) (42,000) Maintain
Priority: 1
ON-GOING Title:
Wastewater Treatment Facility Operations and Maintenance
PRELIMINARY
Justification: Additional budget is requested to maintain current service levels through the repair or replacement of equipment which has met the useful service life as well as to increase contract services budget to meet escalating costs for chemicals and heating ventilation. Base budget: $886k
Strategic Direction: 2024 2025 2026
Cost 400,000 150,000 150,000
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility (400,000) (150,000) (150,000)
PAGE 124
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Wastewater Utility
Maintain
Priority: 1
ONE-TIME Title:
Wastewater Treatment Facility Security
PRELIMINARY
Justification: The Waste Water Treatment facility houses critical infrastructure and is an industrial operation. Security of the site is vital for the safety of the public and workers. The site has experienced an increase in security incidents recently requiring renewal and upgrade of alarms and controls.
Expected Completion: Dec 2024 Strategic Direction: 2024 Service Area:
Cost 115,000
Crime & Safety - Decrease business break & enters, thefts Reserve 0
Borrow 0
Grant 0
Other 0
Wastewater Utility
Revenue 0
Utility (115,000) Maintain
Priority: 1
ONE-TIME Title:
Commonage - Leachate Reuse
PRELIMINARY
Justification: Budget is requested to allow the municipally shared Regional Biosolids Commonage facility to beneficially re-use leachate produced by re-introducing it back into the start of the composting process. Currently clean water is added to the initial compost mixing process. By connecting the leachate system to the mixers, leachate can offset the amount of clean water used. This reduces the use of clean water and also minimizes the amount of leachate that would be sent to the Vernon Waste Water Treatment Plant.
Expected Completion: Dec 2024 Strategic Direction: 2024
Cost 90,000
Climate & Environment - Protect and restore natural areas Reserve 0
Borrow 0
Grant 0
Other 0
Revenue (30,000)
Utility (60,000)
PAGE 125
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Wastewater Utility
Enhance
Priority: 1
ON-GOING Title:
Commonage - Fire Protection Service
PRELIMINARY
Justification: Budget is requested to pay the City of Vernon's Fire Department for fire protection services at the Regional Biosolids Compost Facility. Annual compensation for fire protection is included in the facility agreement. Although the facility is outside Vernon city-limits, it is partly funded and critical to the City of Vernon. Fire protection services are being offered at an annual flat rate of $20k in 2024, increasing three per cent every year. 2024 Base Budget: $580k
Strategic Direction: 2024 2025 2026 Service Area:
Cost 20,000 20,600 21,200
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue (6,700) (6,900) (7,100)
Wastewater Utility
Utility (13,300) (13,700) (14,100) Enhance
Priority: 1
ON-GOING Title:
Time Series Data Extraction from SCADA
PRELIMINARY
Justification: Budget is requested for a two-year program to re-direct time series data, such as rainfall, temperature, creek flow, lake levels and other non-critical data series, for availability for public consumption and use in other projects outside the regulated and protected wastewater operation. The project includes internal Information Services processes needed to house the information to be extracted from the SCADA server located at the Wastewater Treatment Facility. Work on this project is expected to be complete by end of 2025.
Expected Completion: Dec 2025 Strategic Direction: 2024 2025 2026
Cost 45,000 45,000 0
Digital Transformation - Data is used to inform decision making Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility (45,000) (45,000) 0
PAGE 126
2024 FINANCIAL PLAN
CITY OF KELOWNA
STORMWATER AND FLOOD PROTECTION LED BY: GENERAL MANAGER, INFRASTRUCTURE
Our goals & community benefit: .
Stormwater is effectively managed without negatively impacting riparian areas, infrastructure, property or Okanagan Lake, The community is resilient and resistant to lake and creek flooding.
.
Our customers:
Residents Businesses Fish & Wildlife
Our partners:
Developers Okanagan Basin Water Board Okanagan Nation Alliance Regulators Private landowners
What we try to deliver: We operate and maintain the infrastructure installed to route rain and snow safely to the natural environment. We also oversee the planning, design, and construction of citywide drainage systems to ensure the health of our waterways, the surrounding areas, and health of wildlife and fish that rely on it all. Adapting our legacy infrastructure to climate change is a huge challenge and requires longer term planning.
Stormwater system capacity and resiliency o Kelowna manages its stormwater by routing runoff through constructed minor and major systems towards the natural environment. o We operate and maintain our storm infrastructure to protect the public, infrastructure and the environment. Stormwater quality o We strive to incorporate engineered solutions within development planning to reduce pollutants and fine sediment from entering the natural systems (ie. Okanagan Lake). o We conduct research on public stormwater ponds to further understand nutrient management and natural habitat development. o We measure water quality throughout the City. Flood protection o We plan and construct measures for flood protection and adaptation by improving infrastructure and natural systems to be more resilient to climate change. o We remove debris and operate systems to reduce flood risks in the City.
Our key objectives: The key objectives of this service are: Safe routing of stormwater to natural systems. Improved stormwater quality entering natural systems, including ponds, creeks and lakes.
PAGE 127
2024 FINANCIAL PLAN
CITY OF KELOWNA
Reduced impacts from freshet events and lake flooding. Assure stormwater asset renewal and operating budgets together are sustainable.
Our guiding plans:
Kelowna Water Security Plan Stormwater/Drainage Master Plans. Kelowna Official Community Plan
PAGE 128
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 1
Performance Measure 3
Stormwater Infrastructure is Sustainably Funded
Catch‐Basin Servicing
Identifies the ratio of capital reinvestment (renewal) divided by the current year estimated replacement value of "grey" stormwater infrastructure. Measure is in percent. . % implies renewal rate would take years to renew existing infrastructure.
There are over , catch‐basins across the City that provide primary stormwater quality protection to natural systems. Catch‐basins collect sediment and road pollutants but are ineffective once full. The current strategy is to assure each catch‐basin is serviced once annually.
Performance Measure 2 Protect Okanagan Lake by minimizing contaminants in creeks. Summary weighted average of stormwater quality in creeks sampled at locations. Over water quality samples per year. Quality compared to recreational water quality guidelines for dissolved oxygen, E. Coli and turbidity using weighted averages based on size of creek.
Performance Measure 4 Oil‐Grit Separator (OGS) Servicing We have OGS units across the City. OGS units are larger buried infrastructure used to prevent oils, sediment and road pollutants from entering natural systems (creeks or lake). They require regular cleanout to be effective. The current objective is to assure each OGS is serviced using a Vac‐Truck and crew once annually.
PM#2: Protect Okanagan Lake by minimizing contaminants in creeks Stormwater quality impact rating 37 36 35 34 33 2022 2023 2024 Actuals Estimate Forecast
Green – Good Yellow – Moderate Red – Poor
PAGE 129
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Base Business
Climate & Environment
Stormwater Dam Safety Program – Creating an inventory, condition assessment program and recommendations for future improvements and retrofit upgrades for dams and stormwater ponds Linear Asset Renewal Projects – o Renewal component of the Frost and Frazer Lake Stormwater Improvement Project, o Renew functionality of the Southridge stormwater pond system r o Replacing culverts under Findlay Rd downstream of Chichester Wetland, and funding minor elements of the Miscellaneous Drainage Program Frost and Frazer Lake Stormwater Improvements Design and construct storm network upgrades along Killdeer Road and Frost Road Containment Devices Construction of a baseflow bypass at Chichester Wetland to facilitate unit cleaning and maintenance New hydro‐excavation (Vac‐Truck effluent) dewatering facility Stormwater Facility and Dam Operations and Maintenance ‐ New O&M needs for the Mill Creek diversion Stormwater Genset Operations and Maintenance O&M and parts for new genset at Avonlea storm lift station Stormwater Lift Station Resiliency Improve resiliency and O&M for four stormwater lift stations Stormwater Operations Resiliency and Reliability Additional manpower & training costs Clifton Rd stormwater pond study Investigation to reconfigure two stormwater ponds on Clifton Rd Stormwater Utility Business Case Phase works include a public engagement process and detailed rate structure analysis
Mill Creek Flood Protection – Year of the DMAF funded plan Diversion outlet works, Parkinson Park upgrades and design of works are included Woodhaven Research Project – UBCO: A commitment to support the ‐year Woodhaven Nature Conservancy Regional Park Community Research Project
PAGE 130
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments:
Stormwater Operations o Annual Storm outfall inspections on track o Storm dam inspections completed, recommendations under review o Dyke inspections and Ministry report – Complete Infrastructure Delivery o Miscellaneous Drainage Program ‐ Drainage complaints are managed effectively Utility Planning ‐ Stormwater o Downtown Stormwater Basing Plan ‐ Complete o Rain Gauges transferred from Water and Wastewater SCADA Systems as part developing public facing data. ‐ o New data warehouse construction ‐ Complete o Phase Stormwater Utility Business Case and Implementation Plan – Complete Water Quality and Customer Care o Collected stormwater quality data from over sites across the City. Stormwater Capital Works o Mill Creek Flood Protection Stage Diversion Works Completed Stage Diversion Works – Complete by November Preliminary Designs Complete for Lindahl Road/Marshall St/Parkinson Rec/Burne Ave Operations inspections and maintenance ‐ Complete o Lynrick Rd Culvert Replacement – Complete o Knox Mountain Slope Stability ‐ Complete o Redlich Pond Treatment Islands – Installed, Monitoring continues o Stormwater Modeling – HEC‐RAS and PCSWMM
Continuous improvements:
Phase ‐ Stormwater Utility Business Case and Implementation Plan – On‐going Development stormwater management plans – Process improvement with Development Services Stormwater planning for Transportation planning Stormwater quality reporting in
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Stormwater & Flood Protection, $3.2M
Pumpstations - Stormwater $0M Utilities Construction $0.3M Utility - Stormwater $1.4M Utility Planning $1M Water Quality & Customer Care General $0.5M
PAGE 131
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revised Annualized Maintaining 2023 Budgets Service
Enhancing Preliminary Service 2024
Revenue budget: Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
2,469 35 16 183 186 2,889
2,496 1
29
83
(1)
2,606 1 0 177 390 3,174
551 490 3,538
(412) (490) (874)
38 50 170
340 339
1,123 1,056 15
1,108 1,813 75
(13) (890)
76 160
340
75 620 2,889
542 3,538
29 (874)
(65) 170
(1) 339
1,171 1,423 75 0 0 505 3,174
1.9 7.7 1.8 11.4
1.6 8.3 1.4 11.3
0
1.6 8.2 1.4 11.2
Expenditure budget: Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Operating FTE positions: Management Union hourly Union salary Total operating FTE positions
(0.1) (0.1)
0
Note: Totals may not add due to rounding
Funding strategy
Expenditure by type
Property tax $2.6M
Salaries and wages $1.2M
Fees and charges $0M
Material and other $1.4M
Other revenue $0.2M
Contract services $0.1M
Transfers from reserve $0.4M
Enabling allocation $0.5M
Total $3.2M
Total $3.2M
Note: Totals may not add due to rounding
PAGE 132
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Stormwater & Flood Protection - Priority 1 134 Maintain Stormwater Facility and Dam Operations and Maintenance 134 Maintain Construction Yard Gate Improvements 135
Enhance
135 136
Cat.
Cost
Reserve
Borrow
OG
Grant
Revenue
Utility
Taxation
30,500
0
0
0
0
0
(30,500)
OT
56,700
0
0
0
0
(37,800)
(18,900)
OT
300,000 (300,000)
0
0
0
0
0
Enhance
Stormwater Utility Business Case Phase 2 Clifton Rd Stormwater Pond Study
OT
30,000
(30,000)
0
0
0
0
0
Enhance
Woodhaven Research Project - UBCO
OG
10,000
(10,000)
0
0
0
0
0
427,200 (340,000)
0
0
0
(37,800)
(49,400)
Service Area Priority 1 Total
PAGE 133
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Stormwater & Flood Protection
Maintain
Priority: 1
ON-GOING Title:
Stormwater Facility and Dam Operations and Maintenance
PRELIMINARY
Justification: Budget is requested for the operations, maintenance and regulatory requirements for the new Mill Creek diversion facility, creeks and dam. Budget will allow for electrical charges, equipment repairs, security, and annual dam inspections.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 30,500 30,500 30,500
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Stormwater & Flood Protection
Revenue 0 0 0
Utility 0 0 0
Taxation (30,500) (30,500) (30,500) Maintain
Priority: 1
ONE-TIME Title:
Construction Yard Gate Improvements
PRELIMINARY
Justification: Budget is requested for gate improvements to be completed at the Gulley Construction Yard. The modifications to the gate would increase site security and better protect City assets including equipment and materials.
Strategic Direction: 2024
Cost 56,700
Crime & Safety - Decrease business break & enters, thefts Reserve 0
Borrow 0
Grant 0
Other 0
Revenue 0
Utility (37,800)
Taxation (18,900)
PAGE 134
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Stormwater & Flood Protection
Enhance
Priority: 1
ONE-TIME Title:
Stormwater Utility Business Case - Phase 2
PRELIMINARY
Justification: Budget is requested to continue with the stormwater utility business case and implementation plan. Phase 2 (alignment with community values) builds on the work of phase 1 completed in 2023. Phase 2 works include a public engagement process and a detailed rate structure analysis by a consultant team and the City's financial team. In Q3 of 2023, Council directed staff to include this budget request in the provisional 2024 Financial Plan.
Expected Completion: Dec 2024 Strategic Direction: 2024 Service Area:
Cost 300,000
Active Financial Management - Increase non-tax revenues to minimize the reliance on taxes Reserve (300,000)
Borrow 0
Grant 0
Other 0
Stormwater & Flood Protection
Revenue 0
Utility 0
Taxation 0 Enhance
Priority: 1
ONE-TIME Title:
Clifton Rd Stormwater Pond Study
PRELIMINARY
Justification: Budget is requested to investigate the possibility of reconfiguring two stormwater ponds at the intersection of Clifton Rd and Highpointe Dr. These two ponds were originally designed and constructed to manage runoff from major storm events. There is potential to reconfigure the ponds' control structures to attenuate flows from minor storm events and address downstream capacity issues due to the loss of a stormwater pond at 780 Clifton Rd in 2021. A future capital budget request will be required to construct any proposed reconfiguration.
Expected Completion: Dec 2024 Strategic Direction: 2024
Cost 30,000
Other - Supports Base Business Reserve (30,000)
Borrow 0
Grant 0
Other 0
Revenue 0
Utility 0
Taxation 0
PAGE 135
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Stormwater & Flood Protection
Enhance
Priority: 1
ON-GOING Title:
Woodhaven Research Project - UBCO
PRELIMINARY
Justification: Budget is requested to support the City's commitment to the UBCO School of Engineering's "Woodhaven Nature Conservancy Regional Park Community Research Project". The research is a four year (2023-2026) partnership with local governments and First Nations to provide long-term research into hydrology, groundwater patterns and the associated risks resulting from a changing climate.
Expected Completion: Dec 2026 Strategic Direction: 2024 2025 2026
Cost 10,000 10,000 10,000
Climate & Environment - Include climate impact lens in City decision making Reserve (10,000) (10,000) (10,000)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation 0 0 0
PAGE 136
2024 FINANCIAL PLAN
CITY OF KELOWNA
WATER UTILITY LED BY: GENERAL MANAGER, INFRASTRUCTURE
Our goal & community benefit: Our goal is that all residents and water users in the City have a safe, affordable, resilient and sustainable supply of high‐quality drinking water and a reliable supply of water for agriculture.
Our customers (in our service area):
Residents, businesses and visitors Agricultural Community Fire Department other departments and organizations (including Interior Health Authority)
Our partners:
Research partners o University of British Columbia, Engineering Firms, National Benchmarking Government agencies o Interior Health, Ministry of Environment and Climate Change, Environment Canada Improvement Districts o Black Mountain Irrigation District; Glenmore Ellison Improvement District; Rutland Waterworks Engineering firms, contractors, government agencies, and other municipalities to optimize, maintain and develop our systems.
What we deliver: The City Water Utility sources its drinking water from Okanagan Lake and provides water to just over half of the Kelowna population. The Utility: Serves approximately 90,000 customers and provides non‐potable water for irrigation in Southeast Kelowna from Hydraulic Creek. Can deliver up to 139 million litres of water per day and requires over 549 km of pipes, 5 treatment & water pump stations, 20 booster stations, 25 potable reservoirs, 4 non‐potable reservoirs, 53 potable pressure reducing stations and 33 non‐potable pressure reducing stations to support water delivery. Owns and maintains dams and diversions in the upper Hydraulic Creek Watershed.
Our key objectives:
Protect public health Provide clean safe and reliable drinking water to customers Provide a reliable supply of non‐potable water for agricultural producers Provide a reliable, adequate supply of water for fire fighting.
Our guiding plans:
Kelowna’s Official Community Plan ‐year servicing plan Year Capital Plan Kelowna’s Water Security Plan (under Development) Water Supply Policy # Water System Integration Policy #
PAGE 137
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 1
Performance Measure 4
Water supplied by the Kelowna utility is safe.
Potable system renewal is sustainably funded.
Number of water quality advisory days for the Kelowna water utility service area. This is also a key performance measure for Interior Health.
Capital reinvestment (renewal) / replacement value of Potable System (%). . % implies renewal rate would take years to renew existing infrastructure.
100
% of Renewal
Number of Days
PM#1: Number of water quality advisory days (annual) 60
50
6
0
0
2022
2023
PM#4: Annual renewal for potable water system 1.0%
0.56%
0.66%
0.74%
0.62%
2021
2022
2023
2024
0.5% 0.0%
2024
Performance Measure 2 Performance Measure 5
Per capita potable water production. Annual water produced divided by the population served.
litres/cap/day
PM#2: Per capita potable water production (litres/cap/day) 600
576
569
550
541
558 493
487
2022
2023
500
474
450 2018
2019
2020
2021
2024
Non‐Potable systems are sustainably funded. Capital reinvestment (renewal) / replacement value of non‐Potable System (%) . . % implies renewal rate would take years to renew existing infrastructure.
% of Renewal
We conserve our drinking water resource.
PM#5: Annual renewal for non‐potable water system 0.64% 0.64% 1.0% 0.41% 0.23% 0.5% 0.0% 2021
2022
2023
2024
Performance Measure 3 Our water system is reliable. Main breaks per year. Number of watermain breaks repaired each year. Totals include potable and non‐potable systems.
# of Breaks
PM#3: Watermain breaks per year 25 20 15 10 5
20
17 9
7 2018
2019
2020
2021
11
10
10
2022
2023
2024
PAGE 138
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Base Business
Transportation
Water Supply and Treatment: o Upgrade computer controlling systems to all effective operation of the systems o Ultraviolet Light Disinfection Isolation valves at the three remaining pump stations o Major Equipment Renewal: Install Variable Frequency Drive motors at Pump Stations o Chlorine System Conversion from chlorine gas to hypochlorite – environmental safety o Operational Improvements: Drainage improvements at reservoirs o Renewal of Pressure Reducing Valve stations to renew the asset and eliminate confined space requirements for staff o Non‐Potable Supply: Improvements to Hydraulic Creek and McCulloch Spillway o Tuttle Lake Remediation: Improvement to both dams to return them to an acceptable functional level Water Distribution: o Hydrant Maintenance and Improvement o Air Valve Replacement Program; Annually replace valves on a prioritized basis o Flushing Program Improvements to optimize program, water quality and service delivery
Agriculture
Support agriculture producers with a reliable and cost‐effective supply system
Climate & Environment
Protect the environment and be good environmental stewards
Our People
Utility leaders actively pursue and support staff training and development. Ensure that all certified staff receive adequate training to maintain Provincial required certifications
Digital Transformation
Crime & Safety
Coordinate infrastructure renewal effectively with transportation upgrades
Ensure water is available for firefighting.
Use technology as a tool to improve service delivery: o Cityworks is an Asset Management tool that uses software to track time and resources to maintain assets o A non‐potable irrigation system dashboard was developed to permit real time access to storage and irrigation use
Affordable Housing
Active Financial Management
Maintain affordable water rates
Homelessness
Maintain a financially viable water utility through effective budgeting, expenditures and service delivery
Support drinking water facilities for all
PAGE 139
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments:
Ultraviolet Light Disinfection Facilities: A significant accomplishment was achieved within the Poplar Point UV facility to mitigate impacts from a UV lamp failure. The work was particularly challenging as the system had to remain functional during construction . The lake was safely Turtle Lake Dams: Assessment and mitigation of a potential dam failure was completed in lowered to reduce the risk of failure and a project to remediate the dam is being planned Skyline Pump Station: This key pumping station was upgraded to ensure reliability and preservation of the asset and continued service to our customers Redevelopment of the Water Emergency Response Plan and a Chlorine Incident Field Exercise was completed
Continuous improvements:
Staff are committed to continuous improvement and assess our systems and infrastructure to look for improvement opportunities. o PRV Condition Assessment and Program Development o Non‐Potable System Assessment o Operator Training EOCP, BCWW o Asset Management training o Cityworks development and implementation o Risk Assessment and contingency planning for critical assets and systems (telemetry and communications) o Council approval and implementation of a holistic Water Security and Responsibility Plan o Interconnectivity planning with Improvement Districts
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Water Utility, $17.7M
Infrastructure Delivery - Water $0.1M Pumpstations - Water $6.3M Utility - Water $1.7M Utility Planning - Water $0.3M Water Construction $1.2M Water Operations $6.7M Water Quality & Customer Care Water $1.4M
Budget overview:
PAGE 140
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revised 2023
Annualized Maintaining Budget Service
Enhancing Preliminary Service 2024
16,953
17,619
3,097
6,491 251 23,696
3,482 1,198 22,298
(69) (791) (860)
(99) (271) 2,727
0
20,716 0 3,314 135 24,165
4,248 5,509 76 610 6,737 765 17,944
4,870 8,043 156 635 3,497 738 17,938
49 (950)
(893)
419 (481) 35 108 545 (6) 620
0
5,339 6,612 191 743 4,050 732 17,665
5.1 37.9 5.2 48.2
4.3 38.1 4.5 46.9
0.5
0.9
0.5
0.9
0
4.3 39.5 4.5 48.3
Revenue budget: Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
Expenditure budget: Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
8
Operating FTE positions: Management Union hourly Union salary Total operating FTE positions Note: Totals may not add due to rounding
Funding strategy
Expenditure by type Salaries and wages $5.3M
Fees and charges $20.7M
Other revenue $3.3M
Material and other $6.7M Contract services $0.2M Debt service $0.7M
Transfers from reserve $0.1M Transfers to reserve $4M Enabling allocation $0.7M
Total $24.2M
Total $17.7M
Note: Totals may not add due to rounding
PAGE 141
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - Water Fund Page Type
Description
Water - Priority 1 143 Maintain Pump Station & Reservoir Improvements 143 Maintain Water Supply Operations and Maintenance Renewal 144 Maintain Water Distribution Operations and Maintenance Renewal 144 Maintain Water Supply Succession Management Position 145 Maintain Non-Potable Improvements 145 Maintain HVAC Improvements - Water Supply Shop 146 Maintain Water Meter Data Collection Service Area Priority 1 Total
Cat.
Cost
Reserve
Borrow
Grant
Revenue
Utility
Taxation
OT
0
0
0
0
0
0
0
OG
85,000
0
0
0
0
(85,000)
0
OG
70,000
0
0
0
(18,400)
(51,600)
0
OG
0
0
0
0
0
0
0
OT OT
135,000 (135,000) 50,000 0
0 0
0 0
0 0
0 (50,000)
0 0
OG
15,000 0 355,000 (135,000)
0 0
0 0
0 (15,000) (18,400) (201,600)
0 0
The operating requests listed below are operating impacts linked to a capital request, and are presented with the associated capital request in the capital section.
Operating linked to capital Priority 1 Page Type Description 328 Maintain Growth Vehicles Operating linked to capital Priority 1 Total
Cat.
Cost
OG
8,400 8,400
Reserve
Borrow
0 0
0 0
Grant
Revenue 0 0
0 0
Utility (8,400) (8,400)
Taxation 0 0
PAGE 142
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Water Utility
Maintain
Priority: 1
ONE-TIME Title:
Pump Station & Reservoir Improvements
PRELIMINARY
Justification: Redeployment of budget is requested, one-time, to reconfigure the drain at Knox Reservoir helping to ensure reliable operation, upgrading the Grainger Reservoir and the armour reservoir drain to protect Blair Pond, and finally, upgrading electrical power feeds to industry standards for Frost, Timberline & Rio reservoirs.
Expected Completion: Dec 2024 Strategic Direction: 2024 Service Area:
Cost 0
Other - Supports Base Business Reserve 0
Borrow 0
Grant 0
Other 0
Water Utility
Revenue 0
Utility 0 Maintain
Priority: 1
ON-GOING Title:
Water Supply Operations and Maintenance Renewal
PRELIMINARY
Justification: Budget is requested for ongoing control computer renewal at City water facilities, as well as two years to complete wildfire fuel reduction work around water infrastructure in potential wildfire interface zones. 2024 Base Budget: $160k
Strategic Direction: 2024 2025 2026
Cost 85,000 85,000 35,000
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility (85,000) (85,000) (35,000)
PAGE 143
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Water Utility
Maintain
Priority: 1
ON-GOING Title:
Water Distribution Operations and Maintenance Renewal
PRELIMINARY
Justification: Budget is requested to maintain and paint fire hydrants, renew air valves and water blow offs to ensure water quality, and renew and expand aging inventory of hydrant carts. 2024 Base Budget: $102k
Strategic Direction: 2024 2025 2026 Service Area:
Cost 70,000 70,000 70,000
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Water Utility
Revenue (18,400) (18,400) (18,400)
Utility (51,600) (51,600) (51,600) Maintain
Priority: 1
ON-GOING Title:
Water Supply Succession Management Position
PRELIMINARY
Justification: Budget is requested for a two-year term position ending in 2025 to provide overlap to allow for effective knowledge transfer and training for succession planning and retirement. The two-year term ($97.1k in 2023 and $95.9k in 2024) will be funded from a reallocation of existing operations.
Strategic Direction: 2024 2025 2026
Cost 0 0 0
Our People - Employees in all positions have more opportunities to improve their leadership Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
PAGE 144
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Water Utility
Maintain
Priority: 1
ONE-TIME Title:
Non-Potable Improvements
PRELIMINARY
Justification: Budget is requested for consulting services to help increase efficiency of water released from McCullough lake and ensure that the McCullough spillway is appropriately restored.
Expected Completion: Dec 2024 Strategic Direction: 2024 Service Area:
Cost 135,000
Other - Supports Base Business Reserve (135,000)
Borrow 0
Grant 0
Other 0
Water Utility
Revenue 0
Utility 0 Maintain
Priority: 1
ONE-TIME Title:
HVAC Improvements - Water Supply Shop
PRELIMINARY
Justification: Budget is requested for the purchase and installation of HVAC equipment to ensure proper cooling of the Water Supply Shop to ensure a proper working environment for staff and potential for flexible workspaces.
Expected Completion: Dec 2024 Strategic Direction: 2024
Cost 50,000
Other - Supports Base Business Reserve 0
Borrow 0
Grant 0
Other 0
Revenue 0
Utility (50,000)
PAGE 145
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Water Utility
Maintain
Priority: 1
ON-GOING Title:
Water Meter Data Collection
PRELIMINARY
Justification: Budget is requested to cover the net cost of additional water meter endpoint installations. Manual water meter reading is being phased out and replaced with cellular endpoints that have monthly data collection charges. Manual reading staff resources are diminishing with implementation of the program. This program provides an increased level of service in quickly detecting leaks and assisting with water conservation efforts.
Strategic Direction: 2024 2025 2026
Cost 15,000 54,000 74,000
Digital Transformation - Data is used to inform decision making Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility (15,000) (54,000) (74,000)
PAGE 146
2024 FINANCIAL PLAN
CITY OF KELOWNA
SOLID WASTE & LANDFILL LED BY: GENERAL MANAGER, INFRASTRUCTURE
Our goal & community benefit: Our goal is to plan, design, manage, operate, and maintain the essential services of the Glenmore landfill as well as deliver efficient, cost effective waste collection services for over 40,000 homes in the City. Collection and safe disposal of recyclables, compostables, and solid waste is critical in our community. For disposal services, we proudly serve the communities in the Regional District of Central Okanagan and Big White. The current fill plan allows us to extend the life of the Landfill rather than looking at new landfill locations or shipping waste out of the region for disposal – costly alternatives – and provides flexibility for the future.
Our customers:
Residents and citizens Commercial haulers Construction companies Private developers Other City departments Other Municipal Governments
Our partners: We work with the BC Ministry of Environment and Climate Change Strategy, WorksafeBC, the University of British Columbia, the Regional District of Central Okanagan and member Municipalities, utility companies, our collection contractor, and waste reduction officers to provide sustainable services.
What we deliver: We provide garbage, recycling and yard waste collection services to over
,
households in the City.
At the landfill, we offer a variety of disposal options on site including recycling, organic materials, and household/commercial waste in our solid waste disposal facility for residents within the Central Okanagan Regional District. We sell OgoGrow and GlenGrow compost as soil amendments. We also manage landfill gas as landfills are being recognized as a source of valuable energy, providing renewable natural gas for homes through FortisBC. Facility operations are days per week, on their preferred schedules.
days per year, to allow for residents and haulers to access waste management
Our key objectives:
Protect the environment through delivery of safe and efficient waste processing and disposal services at the City’s waste management facilities by complying with regulatory requirements and continually improving assets and operations in response to service demand. Provide safe and reliable collection services for residential curbside programs by adjusting to demand, continually improving service performance, and investing in technology and responding to growth.
PAGE 147
2024 FINANCIAL PLAN
CITY OF KELOWNA
Continue supporting The City and community to reduce and manage their waste responsibly by working with Regional Partners and providing community‐wide waste management programs. Enable Kelowna to move towards zero waste and a more circular economy by improving access to and participation in waste reduction and diversion through communications, education, enforcement and engagement with customers.
Our guiding plans:
Regional District of Central Okanagan Solid Waste Management Plan Glenmore Landfill Design, Operations and Closure Plan ‐Year Capital Plan
Measuring performance: Performance Measure 1 Performance Measure 3
Regional per capita waste landfilled.
Reduce GHG by using or destroying landfill gas. The landfill services the Central Okanagan Regional District. The goal is to minimize waste disposed of, the measure is the tonnage of waste buried divided by the population of the RDCO and Big White (total service area)
Volume of landfill gas managed by landfill flare or converted to Renewable Natural Gas by Fortis (Millions m ).
PM#1: Regional per capita waste landfilled (kg/person)
PM#3: Reduce GHG by using or destroying landfill gas (Millions m3)
716
700
672
652
673
673
700
650
600 2019
2020
2021
2022
2023 2024 Estimate Forecast
6
Millions m3
kg/person
750
3.83
3.26
3.85
3.14
3.00
3.40
3 0 2019
2020
2021
2022
Axis Title
2023 2024 EstimateForecast
Performance Measure 2
Performance Measure 4
Minimize garbage collected in Kelowna curbside collection program.
Organic diversion.
Curbside waste collected in kg/number of Kelowna households serviced (residential curbside cart program).
Tonnage of organic material including yard waste, branches, clean wood, logs and stumps managed at the landfill (tonnes).
530
506
470 450
466
55000
511
510 490
PM#4: Organics Diversion (tonnes)
479
490 476
Tonnes
kg/ number of housholds serviced
PM#2: Minimize garbage collected in Kelowna curbside collection program
50117
49482
50000
47000
46728
48500
42795
45000 40000 2019
2020
2021
2022
2023 2024 Estimate Forecast
PAGE 148
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 5
Performance Measure 6
Curbside program is cost effective.
Garbage tipping fee per tonne.
Cost per property serviced for residential garbage, yard waste and recycling collection and management.
Garbage tipping fee ( per tonne).
PM#6: Garbage tipping fee per tonne $192
$195 $190 $185
$180
$180
$181
$181
$181
$180 $175 2019
2020
2021
2022
2023 2024 Estimate Forecast
Tipping fee per tonne
cost per service
PM#5: Curbside program is cost effective
$110 $105 $100
$100
$100
2020
2021
$102
$104
$104
$95
$95 $90 2019
2022
2023 2024 Estimate Forecast
PAGE 149
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Crime & Safety
Public and staff safety is a paramount concern of all waste management sites
Our People
Affordable Housing
Efficient and cost‐effective waste management allows for lower costs, site preparation and building costs
Homelessness
Continue to mitigate public unsightliness by providing waste and debris disposal from City operated camps
Digital Transformation
Compost operations continue to provide soil amendments and organic matter back to agriculture to offset chemical fertilizers
Provide continued environmental stewardship and minimize GHG emissions Managing water, air, and land‐based pollution with proactive and sound waste management techniques
Implement the recommendations of the Value for Money audit Reviews of rates and costs ensure that waste management is sustainably funded for possible rate adjustment in
Base Business
Climate & Environment
Refine “Oscar”, the online chatbot assistant
Active Financial Management
Agriculture
Continue to promote staff development and opportunities to learn Working as One Team by assisting other City departments
Adapt for the increase in traffic and material to be landfilled coming from the fires. This is estimated to be approximately , tonnes in addition to our regular , tonnes disposed of annually Complete Area Liner installation Continue ancillary work around new Aerated Static Pile composting facility
PAGE 150
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments:
Collaborated with Finance on a “Value for Money” assessment of landfill operations Updated the Design, Operations and Closure Plan and associated studies in preparation for submission to the Ministry of Environment & Climate Change Strategy Updated the landfill Operational Certificate (permit) with BC Ministry of Environment & Climate Change Strategy Landfill staff worked as “One Team” with roads, parks, KFD, YLW, and hired contractors to fight the Clifton Wildfire and return to normal operations when the landfill site caught fire Completed the first phase of construction for the Aerated Static Pile compost system for Glengrow operations Performed earthworks in preparation for Area landfill liner construction projects and planned filling expansions in
Continuous improvements:
Planning underway for end‐of‐life flare replacement Studies for leachate pre‐treatment and potential facility construction in Working with FortisBC to expand and better integrate their renewable natural gas system into landfill operations Planning for next phases of the Aerated Static Pile system
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Solid Waste & Landfill, $26.2M Solid Waste $25.7M
Solid Waste Management $0.5M
Budget overview:
PAGE 151
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revised Annualized Maintaining 2023 Budget Service
Enhancing Preliminary Service 2024
(199) 24,577
(200) 24,742
0
0 76
1,082 59 25,519
1,705 333 26,580
(150) (333) (483)
3 8 87
0
3,015 6,560 6,560
3,175 7,293 6,317
(1,200)
215 58
250
8,680 704 25,519
9,052 743 26,580
3.6 24.7 3.9 32.2
3.9 24.7 4.3 32.9
Revenue budget: Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
0
(200) 24,818 0 1,558 8 26,184
Expenditure budget: Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
718 (483)
(213) 28 87
0
3,390 6,401 6,317 0 9,306 770 26,184
0
3.9 24.7 4.3 32.9
(250)
Operating FTE positions: Management Union hourly Union salary Total operating FTE positions
0
0
Note: Totals may not add due to rounding The difference between the two graphs below is the k surplus earned by this service area that is used to offset taxation funds required for other community services areas and infrastructure such as Transportation, Transit, and Parks.
Funding strategy
Expenditure by type Salaries and wages $3.4M
Fees and charges $24.8M
Material and other $6.4M Contract services $6.3M
Other revenue $1.6M
Transfers from reserve $0M
Total $26.4M
Transfers to reserve $9.3M Enabling allocation $0.8M
Total $26.2M
Note: Totals may not add due to rounding
PAGE 152
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Cat.
Cost
Reserve
Borrow
Solid Waste & Landfill - Priority 1 155 Maintain Landfill - Landscaping Replacement
OG
25,000
(25,000)
0
0
0
0
0
155
OG
250,000 (250,000)
0
0
0
0
0
275,000 (275,000)
0
0
0
0
0
Enhance
Description
Landfill - Concrete Crusher Operations
Service Area Priority 1 Total
Grant
Revenue
Utility
Taxation
The operating requests listed below are operating impacts linked to a capital request, and are presented with the associated capital request in the capital section.
Operating linked to capital Priority 1 Page Type Description 328 Maintain Growth Vehicles Operating linked to capital Priority 1 Total
Cat.
Cost
OG
8,400 8,400
Reserve
Borrow
(8,400) (8,400)
0 0
Grant
Revenue 0 0
0 0
Utility
Taxation 0 0
0 0
PAGE 153
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Solid Waste & Landfill
Maintain
Priority: 1
ON-GOING Title:
Landfill - Landscaping Replacement
PRELIMINARY
Justification: Budget is requested to renovate and maintain the landscaping boundary around the Glenmore facility for proactive fire mitigation and improved appearance. 2024 Base Budget: $0
Strategic Direction: 2024 2025 2026 Service Area:
Cost 25,000 25,000 25,000
Climate & Environment - Reduce corporate and community GHG emissions Reserve (25,000) (25,000) (25,000)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Solid Waste & Landfill
Revenue 0 0 0
Utility 0 0 0
Taxation 0 0 0 Enhance
Priority: 1
ON-GOING Title:
Landfill - Concrete Crusher Operations
PRELIMINARY
Justification: Budget is requested for contracted services to complete concrete crushing operations, onsite, at the Landfill. Crushing of concrete into smaller pieces allows for greater reuse of the concrete material.
Strategic Direction: 2024 2025 2026
Cost 250,000 250,000 250,000
Other - Supports Base Business Reserve (250,000) (250,000) (250,000)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation 0 0 0
PAGE 154
2024 FINANCIAL PLAN
CITY OF KELOWNA
TRANSPORTATION LED BY: GENERAL MANAGER, INFRASTURCTURE
Our goal & community benefit: Kelowna aims to become a city where people and places are conveniently connected by diverse transportation options, which is the vision in Kelowna’s 2040 Transportation Master Plan (TMP). We are working to keep Kelowna moving, as our community grows by doubling transit ridership, quadrupling trips by bike, and reducing per capita vehicle kilometres travelled 20 per cent by 2040. Recognizing that transportation impacts many aspects of life in Kelowna, the TMP identified the following 12 goals: improving travel choices, optimize travel times, enhance travel affordability, foster a growing economy, enhance urban centres, be innovative and flexible, improve safety, protect the environment, ensure value for public investment, improve health, promote inclusive transportation, and support liable communities.
Our customers: Our customers are all who live, work, and play in Kelowna.
Our partners: We work with our residents, community organizations, and other levels of government to ensure our transportation network keeps up with our growing community.
What we deliver: We help prepare transportation projects across all modes for delivery, from strategic planning through final design. We develop transportation plans, policies, corridor studies, and design capital projects to help develop our multi-modal transportation system. We also maintain over 800 kilometres of streets that accommodate over 300,000 trips per day, operate & maintain the transportation network, deliver traffic calming, transportation demand management, regional transportation education and encouragement programs, and our shared micromobility program. We monitor our progress toward meeting our transportation targets and goals and report out annually.
Our key objectives: •
Deliver and maintain a high-quality transportation system that keeps Kelowna moving, as we grow.
Our guiding plans: • • • • •
Imagine Kelowna 2040 Official Community Plan 2040 Transportation Master Plan Central Okanagan Regional Transportation Plan Pedestrian/Bicycle Master Plan
PAGE 155
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 1
Performance Measure 3
Traffic safety Traffic collisions have significant impacts on people’s lives. The estimated societal cost of traffic collisions in Kelowna each year ($600m) is greater than the cost of traffic delays. In 2022, there were 1,650 serious collisions (i.e. causing an injury or fatality) in Kelowna. This equates to 10.7 serious collisions per thousand residents. The rate of serious collisions fell in 2022 compared to 2021. Data for 2023 is not yet available.
Goods movement Reliable travel times are important for goods movement and our economy. In 2020, we started a pilot to track travel times on 85 routes between key destinations. Just under 70 per cent of routes we tracked had minimal or light delays during midday, which is the busiest time for goods movement. We defined a light delay as less than 50 per cent longer than the overnight travel time. For most routes, this meant an extra 1 to 3 minutes. The share of routes with light or minimal delays fell from 74 per cent in 2022 to 69 per cent in 2023. The data shows increasing travel times as demand recovers from the pandemic.
10.70
10.69
PM #3: Goods Movement 10.56
10.60 10.50
10.42
10.40 2022 Actuals
2023 Estimate
2024 Forecast
% of routes with light delay
Per 1,000 residents
PM#1: Traffic Safety
75% 73% 71% 69% 67% 65%
PM#4: Travel Choices 50%
45% 35% 2022 Actuals
2023 Estimate
2024 Forecast
Travel choices Making it easier to walk, bike and take transit will slow the growth of traffic congestion, reduce greenhouse gas emissions, and improve public health. We estimate that 27.3 million trips will be made by walking, biking, and transit in 2023, up from 26.3 million in 2022. The recovery of transit ridership from the pandemic contributed significantly to this increase.
2024 Forecast
Number of trips in millions
% traffic delay in afternoon peak
47%
49%
2023 Estimate
67%
Performance Measure 4
PM#2: Traffic Delays
55%
69%
2022 Actuals
Performance Measure 2 Traffic delays Reliable travel times are important for our quality of life. In 2020, we started a pilot to track travel times on 85 routes between key destinations. Just under half of the routes we tracked had moderate or significant delays in the afternoon peak. What counts as a “moderate” or “significant” delay varies between people. We defined a moderate delay as 50 per cent longer than the overnight travel time. For most routes, this meant an extra 3 to 6 minutes.
74%
28.0 27.5 27.0 26.5 26.0
27.9 27.3 26.3 2022 Actuals
2023 Estimate
2024 Forecast
PAGE 156
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 5
Performance Measure 7
Access to sidewalks Many streets in the Core Area were built without sidewalks. A lack of safe and accessible sidewalks prevents people from walking. Our target is sidewalk on one side of quieter neighborhood streets. Major roads should have sidewalks on both sides. By this standard, the sidewalk completeness in the Core Area is 62 per cent. Filling all the sidewalk gaps in the Core Area will take decades. In the meantime, we are prioritizing locations on busy roads, near parks, and around schools.
Pavement quality Keeping roads in good condition is important for safety and goods movement. Timely preventative maintenance can avoid more costly repairs in the future. The pavement condition index (PCI) is a score between 0 and 100 indicating the general condition of roads in Kelowna. The estimated PCI for 2023 is 68, up from 67 in 2022. PM#7: Pavement quality 69
62.5% 62.0%
61.8%
61.9%
Index
% of core area streets with sidewalks
PM #5: Access to sidewalks
62.1%
2023 Estimate
2024 Forecast
PM #6: Access to bike routes 40% 40% 35%
37%
2024 Forecast
Winter maintenance Clearing snow and ice from roads, pathways, and bus stops keeps them functional and safe. Standards for snow clearing are set by Council Policy #332. These timelines were met 93 per cent of the time in 2022. The estimated performance in 2023 is 91.6%.
PM#8: Winter maintenance 93.0% 93.0% 92.0%
91.6%
91.6%
2023 Estimate
2024 Forecast
91.0% 90.0%
2022 Actuals
31%
2023 Estimate
67
Performance Measure 8
Index
Access to bike routes Biking is an affordable alternative to driving. Being close to primary bike routes makes it easier for households to live car-free or car-light. Roughly 37 per cent of lowincome residents are within 400m of the primary bike network. This is an increase from 31 per cent the previous year.
68
66
61.5% 2022 Actuals
68
67 2022 Actuals
Performance Measure 6
Within 400m of bike routes
68
30% 2022 Actuals
2023 Estimate
2024 Forecast
PAGE 157
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priorities: Crime & Safety •
Development of Bike Parking & Theft Prevention Program
Transportation • •
• • • •
Continue planning and design for key road projects (Clement/Highway 33 extension, Commonwealth Rd, Burtch Rd, and Frost Rd) Highway 97 Strategic Corridor Review with the Ministry of transportation and Infrastructure (MoTI) to begin the next steps of planning and protecting for the long-term goal of dedicated transit lanes on Highway 97 in Kelowna Expanding the bike network with active transportation corridors (ATC) such as Sutherland and Rail Trail to Greenway Construction of the Bertram Multiuse Overpass of Highway 97 Development of a Transportation Safety Strategy Development of a Transportation Accessibility Strategy
Our People •
Enhanced focus on training and professional development in order to provide opportunities to learn and grow
Digital Transformation • •
Initiate Phase 1 of the Travel Demand Model Update to allow for enhanced decision making Continued tracking of travel time using cloudbased data
Active Financial Management • • •
On-going review of the 10-Year Capital Plan to ensure alignment of financial resources with corporate priorities Continue delivering select projects with City resources to control time, cost, and quality where feasible Continued pursuit of grants to minimize reliance on tax revenue
Climate & Environment •
Implementation of Employer Commute Trip Reduction Program Pilot
PAGE 158
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments: • • • • • • • • • • •
New manager in place for Integrated Transportation Opened South Perimeter Way Extended the bike network with the Houghton ATC (Hollywood to Rutland) and Casorso ATC (KLO – Barrera) Supported the delivery of MoTI’s Central Integrated Transportation Strategy Delivered the Regional Goods Movement Study (joint partnership with MoTI) Delivered the Transportation Citizen Survey Published the new 2023 Kelowna Bike Map Completed the Neighbourhood Bikeways Study Doubled ridership of the Micromobility Program and reached milestone of 1M trips since 2011 Installed 5 new crosswalk rectangular rapid flashing beacons (RRFBs) and completed designs for 5 more Managed 10 traffic calming projects, 2 delivered, 5 designs ready for construction
Continuous improvements: • • • • •
Revised schedule for spring street cleaning program from 12 weeks to 8 weeks Introducing new types of equipment to improve maintenance of sidewalks and bike routes Improved monitoring and enforcement for the Micromobility Program to achieve a 94% reduction in the rate of service requests from 2021 Delivered select projects with City resources to control time, cost and quality Continued tracking of travel times using cloud-based data
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Transportation, $20.2M 3%
Integrated Transportation $1.2M Roads $9.3M Roadways Operations $0.2M Strategic Transportation Planning $0.7M Traffic Operations $2.6M Traffic Signals & Systems $3.9M Transit and Programs $0.2M Transportation Engineering $1.4M Westside Gravel Pit $0.7M
Budget overview:
PAGE 159
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands):
Revenue budget:
Property tax Fees and charges Grants Other revenues Transfers from reserve Total revenue budget
Expenditure budget:
Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Operating FTE positions:
Management Union hourly Union salary Total operating FTE positions
Actual 2022
Revised Annualized Maintaining Service 2023 Budget
17,611 1,391 7 521 154 19,684
15,860 1,491 5 458 639 18,453
(5) (38) (639) (57)
957 (53) 7 340 344 1,595
6,755 6,992 992
7,056 7,279 817
204 (399) (40)
707 738 (5)
779 4,165 19,684
557 2,744 18,453
177 (57)
(54) 210 1,595
8.5 50.7 9.4 68.6
10.7 45.1 8.4 64.2
0.4 1.3
0.6 2.0
1.7
2.6
625
Enhancing Preliminary Service 2024 (0)
150 150
1 154
17,441 1,438 7 760 494 20,141
(5) 150
7,969 7,773 772 0 503 3,125 20,141
0
11.7 48.4 8.4 68.5
Note: Totals may not add due to rounding
Funding strategy
Expenditure by type
Property tax $17.4M Salaries and wages $8M Fees and charges $1.4M Material and other $7.8M Grant $0M Contract services $0.8M Other revenue $0.8M Transfers to reserve $0.5M Transfers from reserve $0.5M
Total $20.1M
Enabling allocation $3.1M
Total $20.1M
Note: Totals may not add due to rounding
PAGE 160
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Cat.
Cost
Reserve
Borrow
Transportation - Priority 1 162 Maintain Strategic Transportation Partnership of Central Okanagan 2024 Transition
OT
94,300
(59,400)
0
162
Maintain
Travel Demand Model Update - Phase I
OT
365,000 (145,000)
163 163
Maintain Maintain
OG OG
250,000 48,900
164
Maintain
OG
40,000
164
Maintain
Spring Sweep Senior Transportation Engineer Position Transportation Data Collection Equipment Replacement Employer Commute Trip Reduction Program - Pilot Implementation
165
Enhance
Transportation Accessibility Strategy
165 Enhance Bike Valet & Theft Prevention Service Area Priority 1 Total
Grant
Revenue
Utility
(7,000)
(27,900)
0
0
0
0 (220,000)
0
0
0 0
0 0
0 0
0 0
0 (250,000) 0 (48,900)
(40,000)
0
0
0
0
0
OG
100,000 (100,000)
0
0
0
0
0
OT
100,000 (100,000)
0
0
0
0
0
OG
110,100 (50,000) 1,108,300 (494,400)
0 0
0 0 (7,000) (247,900)
Taxation
0 (60,100) 0 (359,000)
The operating requests listed below are operating impacts linked to a capital request, and are presented with the associated capital request in the capital section.
Operating linked to capital Priority 1 Page Type Description
Cat.
339
Maintain
Local Street Urbanization Program
OG
342 339 343
Maintain Maintain Maintain
334
Maintain
Pedestrian Network Roadway Urbanization Rutland Park & Ride, Mobility Hub, Operations Facility Traffic Signals and Roundabouts DCC
344
Maintain
341
Enhance
343
Enhance
Transit - Bus Stop and Amenity Improvements Bicycle Network Improvement Program Safety and Operational Improvements
Operating linked to capital Priority 1 Total
Cost
Reserve
Borrow
Grant
Revenue
Utility
Taxation
800
0
0
0
0
0
(800)
OG OG OG
9,300 600 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
(9,300) (600) 0
OG
6,100
0
0
0
0
0
(6,100)
OG
500
0
0
0
0
0
(500)
OG
1,700
0
0
0
0
0
(1,700)
OG
4,500
0
0
0
0
0
(4,500)
23,500
0
0
0
0
0
(23,500)
PAGE 161
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Transportation
Maintain
Priority: 1
ONE-TIME Title:
Strategic Transportation Partnership of Central Okanagan 2024 Transition
PRELIMINARY
Justification: Budget is requested for the City's portion of the regional transportation programs run on behalf of the Strategic Transportation Partnership of the Central Okanagan (STPCO). The STPCO dissolved at the end of 2020 and per agreements, the City is providing transitional services while the Regional District of Central Okanagan (RDCO) adjusts their structure after which a new contract will be developed.
Strategic Direction: 2024 Service Area:
Cost 94,300
Transportation - More trips by alternative transportation modes Reserve (59,400)
Borrow 0
Grant (7,000)
Other 0
Transportation
Revenue (27,900)
Utility 0
Taxation 0 Maintain
Priority: 1
ONE-TIME Title:
Travel Demand Model Update - Phase I
PRELIMINARY
Justification: The Travel Demand Model is a critical tool that estimates network effects of transportation projects (such as Highway 33 extension). The last update was 2016 and needs to be updated. This requires coordination with regional partners and the Province and updated inputs from the Household Trip Diary. Phase I will establish a coordinated process, timeline and budget for updating the Travel Demand Model and the Household Trip Diary (last completed in 2018). Additional budget for Phase II will be requested 2025. Kelowna's phase I estimated cost sharing with the Province and regional partners is $145k.
Expected Completion: Jun 2025 Strategic Direction: 2024
Cost 365,000
Transportation - Capacity and traffic flow is enhanced on major road corridors Reserve (145,000)
Borrow 0
Grant 0
Other 0
Revenue (220,000)
Utility 0
Taxation 0
PAGE 162
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Transportation
Maintain
Priority: 1
ON-GOING Title:
Spring Sweep
PRELIMINARY
Justification: Budget is requested to support the spring sweep program to help align with residents' expectations of an estimated eight week delivery, annually. In 2022, the spring sweep was delivered within budget but the 13-week completion time did not meet the anticipated service level. However, in 2023, the operations team successfully implemented new equipment and techniques that significantly reduced the program duration, achieving the desired eight week timeframe. This improvement came at an additional cost of $250k. Securing funding through this request will ensure the maintenance of this improved service level, guaranteeing timely and efficient delivery of the spring sweep and enhancing resident satisfaction and cost-effectiveness in the long term.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 250,000 250,000 250,000
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Transportation
Revenue 0 0 0
Utility 0 0 0
Taxation (250,000) (250,000) (250,000) Maintain
Priority: 1
ON-GOING Title:
Senior Transportation Engineer Position
PRELIMINARY
Justification: Budget is requested to address continued rapid growth and development through a part-time position focusing on development proposal review and providing mitigation recommendations to Planning and Development Services. Development impacts the transportation network by increasing demand for travel, impacting the capacity of existing transportation facilities, and limiting options for improvements in the future. Integrated Transportation provides feedback to Planning and Development Services to mitigate these impacts when requested. This position will reduce turnaround time for development review responses and free up existing resources within Transportation Engineering to focus on optimizing the capacity, safety and reliability of existing infrastructure and the larger transportation network.
Strategic Direction: 2024 2025 2026
Cost 48,900 93,400 93,400
Transportation - Capacity and traffic flow is enhanced on major road corridors Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (48,900) (93,400) (93,400)
PAGE 163
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Transportation
Maintain
Priority: 1
ON-GOING Title:
Transportation Data Collection Equipment Replacement
PRELIMINARY
Justification: Equipment used to collect data on vehicles, intersections, active transportation and traffic calming has failed or is reaching the end of its expected life. Failed active transportation counters are resulting in data gaps, failed traffic calming counters are impacting our ability to respond to resident service requests and while intersection traffic counters are functioning, they are no longer supported by the manufacturer and will require replacement over the coming years. The current equipment is over 20 years old. Budget is requested to replace data collection equipment over three years. Failed equipment with direct program impacts will be prioritized. 2024 Base Budget: $0 Strategic Direction: 2024 2025 2026 Service Area:
Cost 40,000 50,000 60,000
Transportation - Capacity and traffic flow is enhanced on major road corridors Reserve (40,000) (50,000) (60,000)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Transportation
Utility 0 0 0
Taxation 0 0 0 Maintain
Priority: 1
ON-GOING Title:
Employer Commute Trip Reduction Program - Pilot Implementation
PRELIMINARY
Justification: To reduce congestion during rush hour and improve traffic flow, projects are important, as well as programs that help commuters avoid driving alone during rush hour. Examples include employer policies for staggered or flexible workhours, parking management, incentives for alternative modes, and trip-planning resources. In 2023, the City worked with local employers and a consultant to develop an Employer Commute Trip Reduction Program tailored to the needs of Kelowna. Budget is requested to fund the next steps to develop the recommended materials and launch the three year pilot, which would include KPIs and performance monitoring to ensure the program is delivering on the desired benefits and providing value for money.
Expected Completion: Oct 2026 Strategic Direction: 2024 2025 2026
Cost 100,000 25,000 25,000
Transportation - Capacity and traffic flow is enhanced on major road corridors Reserve (100,000) (25,000) (25,000)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation 0 0 0
PAGE 164
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Transportation
Enhance
Priority: 1
ONE-TIME Title:
Transportation Accessibility Strategy
PRELIMINARY
Justification: As recommended in the 2040 Transportation Master Plan and City's Community for All Action Plan, this project involves working directly with the community to identify needed transportation accessibility improvements. Budget is requested to create accessibility design guidelines. Priority areas for retrofits will be identified to ensure sidewalks, crossings and intersections meet the needs of people with disabilities (e.g. people in wheelchairs, mobility scooters or with limited vision and hearing). This work will align with the new Accessibility Advisory Committee established in accordance with the Accessible British Columbia Act.
Expected Completion: Jun 2025 Strategic Direction: 2024 Service Area:
Cost 100,000
Transportation - Traffic safety management is increasing Reserve (100,000)
Borrow 0
Grant 0
Other 0
Transportation
Revenue 0
Utility 0
Taxation 0 Enhance
Priority: 1
ON-GOING Title:
Bike Valet & Theft Prevention
PRELIMINARY
Justification: The Kelowna Transportation Master Plan set a target of quadrupling trips made by bicycle. One of the key challenges for people is knowing that they have a safe, secure place to park at their destination. Budget is requested to fund the successful downtown Bike Valet Program. Staff will undertake a review of bike theft data to inform targeted actions to reduce bike theft. A comprehensive approach to provide secure bike parking throughout the City will also be developed, including downtown, urban centres, major events, and transit-exchanges. Four Community Safety Services Summer Student Positions will be funded from this request to enable expansion of the Bike Valet program hours, as well as other community engagement and crime prevention work during the high demand summer months.
Strategic Direction: 2024 2025 2026
Cost 110,100 60,100 60,100
Crime & Safety - Decrease business break & enters, thefts Reserve (50,000) 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (60,100) (60,100) (60,100)
PAGE 165
2024 FINANCIAL PLAN
CITY OF KELOWNA
TRANSIT LED BY: GENERAL MANAGER, INFRASTRUCTURE
Our goal & community benefit: Our goal is to provide fast and reliable transit service to our community. Transit provides numerous benefits to the community including an affordable transportation option that helps reduce congestion and emissions, as our community grows.
Our customers: Our customers are all transit patrons who live, work and play in Kelowna.
Our partners: We work with BC Transit and our regional government partners (West Kelowna, Westbank First Nation, Peachland, and Lake Country) to deliver affordable transit service, including HandyDart.
What we deliver: We provide service annually with routes, buses and over , hours in the Central Okanagan. We work in liaison with BC Transit on contract administration, service planning, and also provide a variety of transit pass options to enable access to transit for everyone in our community.
Our key objectives:
Attract new riders Deliver operational excellence Improve transit sustainability Improve custom transit utilization
Our guiding plans:
Imagine Kelowna Regional Transportation Plan Transportation Master Plan Central Okanagan Transit Future Plan Transit Future Action Plan
PAGE 166
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 1
Performance Measure 3
Transit ridership
On‐time performance
Transit is the way to move the most people in our limited road space. It is also the best alternative to driving for longer trips. Ridership has fully recovered from the pandemic, increasing from . M to . M in .
Improving the punctuality of transit service will make it easier for people to rely on it. The estimated on‐time performance for is . per cent. Data for is not available. This metric considers the share of timed arrivals less than minutes late, or not more than minute early.
PM#1: Transit ridership 5.80M
5.90M PM#3: On‐time performance
Million
5.80 5.60 5.40
5.31M
5.20 2022 Actuals
2023 Estimate
2024 Forecast
Arrival time less than 3 minutes
6.00
63%
62%
62%
61%
61%
2022 Actuals
2023 Estimate
61% 60% 2024 Forecast
Performance Measure 2 Resident Satisfaction This measure captures the overall perception of transit through our Citizen Surveys. Resident satisfaction with public transit decreased from per cent in to per cent in . Rebounding travel demand and transit ridership from the pandemic likely contributed to this decrease. Improving the quality of service will attract more ridership and reduce the growth of congestion.
Performance Measure 4 Transit service Investing in new transit service will be key for Kelowna to grow without gridlock. In 2023, there were roughly 170 thousand annual hours of service in Kelowna. In per capita terms, the amount of transit service is forecast to increase from 1.07 to 1.12 in 2024.
PM#2: Satisfaction with transit service 56%
56%
55%
55%
54%
54% 53% 2022 Actuals
2023 Estimate
2024 Forecast
PM#4: Transit service hours per capita Hours per resident
% of satisfaction
57%
1.12
1.15 1.10
1.05
1.07
1.05 1.00 2022 Actuals
2023 Estimate
2024 Forecast
PAGE 167
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 5 Access to frequent transit
% of low‐income access
Being close to frequent transit makes it easier for households to live car‐free or car‐light. Roughly half of low‐income residents are within a five‐minute walk of frequent transit. This is unchanged from .
PM #5: Access to frequent transit
52% 51%
50%
50%
50%
2022 Actuals
2023 Estimate
2024 Forecast
50%
49%
PAGE 168
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priorities: Crime & Safety
Expansion of security coverage at Orchard Park Exchange to align with mall business hours
Transportation
Hardy St Operations Centre refurbishment design and construction Transit Operation and Maintenance Facility at Hollywood Rd (continued master planning and completion of ALC exclusion) Implementing transit service improvements (on‐time performance improvements and off‐peak service expansions) Transit exchange detailed design (Okanagan College, Rutland, and Mission transit exchanges)
Climate & Environment
Participating in BC Transit’s first pilot of on‐ demand service in Crawford
Our People
Enhanced focus on training and professional development in order to provide opportunities to learn and grow
Digital Transformation
Implementation of electronic fare system (Umo)
Active Financial Management
On‐going review of the ‐year capital plan to ensure alignment of financial resources with corporate priorities Continued pursuit of grants to minimize reliance on tax revenue
PAGE 169
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments:
Transit ridership recovered to pre‐pandemic levels Constructed 4 new bus stops, upgraded 9 existing stops, added 4 new shelters Completed Rutland Local Area Transit Plan Completed Mission Transit Network Restructuring Plan Continued project development for the new Hollywood Transit Centre Started expansion plan and lease extension at the Hardy Transit Centre for interim capacity
Continuous improvements:
Focus on maximizing capacity from existing resources while we build for the future New Transit on Demand initiative to launch in Spring 2024 Pursue grants to help fund major capital improvements at 3 exchanges Pending introduction of electronic fare payment Preparing for introduction of battery electric buses Continual investment in bus stop infrastructure – capacity, accessibility, and amenities
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Transit, $37.8M
Kelowna Regional Transit $37.8M
Budget
PAGE 170
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revised Annualized Maintaining 2023 Budget Service
Enhancing Preliminary Service 2024
14,799 7,342 10,826
13,042 7,345 12,555
706
1,364 673 1,458
1,653 34,619
1,266 34,208
(932) (226)
320 3,815
9 663 25,920
0 1,066 27,638
(429) (135)
54 29 3,293
513 7,515 34,619
307 5,197 34,208
338 (226)
439 3,815
Revenue budget: Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
(10)
(10)
15,102 8,018 14,013 0 654 37,786
(10) (10)
54 665 30,797 0 307 5,964 37,786
0
0 0 0.5 0.5
Expenditure budget: Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Operating FTE positions: Management Union hourly Union salary Total operating FTE positions
0
0
0
0.5 0.5
Note: Totals may not add due to rounding
Funding strategy
Expenditure by type Salaries and wages $0.1M
Property tax $15.1M Material and other $0.7M Fees and charges $8M Contract services $30.8M Grant $14M Transfers to reserve $0.3M Transfers from reserve $0.7M Enabling allocation $6M
Total $37.8M
Total $37.8M
Note: Totals may not add due to rounding
PAGE 171
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Transit - Priority 1 173 Maintain Orchard Park Exchange Security Coverage Expansion 173 Maintain Transit Base Operating Cost 174 Maintain Transit Infrastructure Coordinator Position Service Area Priority 1 Total
Cat.
Cost
OG
76,000
OG OG
Reserve
Borrow
0
0
Grant
Revenue 0
0
Utility
Taxation 0
(76,000)
3,245,000 (320,100) 54,600 0
0 (1,458,200) (645,200) 0 0 (27,300)
0 (821,500) 0 (27,300)
3,375,600 (320,100)
0 (1,458,200) (672,500)
0 (924,800)
PAGE 172
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Transit
Maintain
Priority: 1
ON-GOING Title:
Orchard Park Exchange Security Coverage Expansion
PRELIMINARY
Justification: Violence is increasing on public transit systems across the country, including the Kelowna Regional Transit System. The City of Kelowna and Orchard Park Shopping Centre partner on the provision of security under their contract with Paladin Security. The safety and security of transit riders is paramount to sustaining and growing ridership. Current security coverage is focused on the afternoon and evening periods resulting in coverage gaps in other periods. Budget is requested to increase existing coverage to align with mall business hours with a dedicated guard at the transit exchange. 2024 Base Budget: $303k
Strategic Direction:
Crime & Safety - Public safety resources keep pace with growth
Cost 76,000 76,000 76,000
2024 2025 2026 Service Area:
Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Transit
Revenue 0 0 0
Utility 0 0 0
Taxation (76,000) (76,000) (76,000) Maintain
Priority: 1
ON-GOING Title:
Transit Base Operating Cost
PRELIMINARY
Justification: Budget is requested to reflect the anticipated changes in transit operation including revenue, management/labour, fuel, maintenance and lease fees and expansion. Ridership has increased back to pre-pandemic levels however cost inflation is driving an increase in the operating cost of transit. 2024 Base Budget: $27.2M
Strategic Direction: 2024 2025 2026
Cost 3,245,000 3,245,000 3,245,000
Other - Supports Base Business Reserve (320,100) (320,100) (320,100)
Borrow 0 0 0
Grant (1,458,200) (1,458,200) (1,458,200)
Other 0 0 0
Revenue (645,200) (645,200) (645,200)
Utility 0 0 0
Taxation (821,500) (821,500) (821,500)
PAGE 173
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Transit
Maintain
Priority: 1
ON-GOING Title:
Transit Infrastructure Coordinator Position
PRELIMINARY
Justification: The Council approved Transportation Master Plan requires a significant expansion of transit services in the city, from the current $31M annual operating budget and 209,000 service hours (system wide) to 325,000 by 2040, an increase of 65% over 2020 levels. Budget is requested for this new position to ensure that current needs are met while also allowing for increased expansion. The existing Transit Service Coordinator position will be restructured, resulting in two distinct functions: Transit Infrastructure and Transit Service.
Strategic Direction: 2024 2025 2026
Cost 54,600 108,600 108,600
Transportation - More trips by alternative transportation modes Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue (27,300) (54,300) (54,300)
Utility 0 0 0
Taxation (27,300) (54,300) (54,300)
PAGE 174
2024 FINANCIAL PLAN
CITY OF KELOWNA
PARKS LED BY: GENERAL MANAGER, INFRASTRUCTURE
Our goal & community benefit: Our goal is to manage, operate and maintain the City's parks in a sustainable manner meeting community need. Currently, parks is creating a master plan which will guild the expansion, development, and operations of its parks system as the City grows. Our parks support a resilient and active city by providing equitable access to a diverse recreational and cultural experiences.
Our customers:
Residents, tourists and visitors People of all ages and abilities User groups, sports members Athletes at all ages and stages of development
Our partners: We work with our citizens, professionals to create and maintain the recreational and cultural activities in the community.
What we deliver: We provide the guide in making both long‐range and short‐term decisions about the parks system. We also provide the financial strategy needed to support and sustain the City’s portfolios of parks, open spaces and natural areas. Provide a phased implementation strategy for improving existing parks and public shorelines, unfunded but Council‐approved parks as well as the acquisition, location, and/or development of future parks.
Our key objectives: •
• •
A vibrant community • Public parks are clean and safe spaces for the public. • Ensure parks, beaches, playgrounds and A healthy community • Well maintain trails and natural areas • Gowing a healthy tree canopy An engaged team • Staff are connected and informed. • Resources and training are available.
Our guiding plans:
Imagine Kelowna Parks Master Plan (under development) Community for all – Healthy city Strategy Kelowna Community Sport Plan (2019) Kelowna Event Strategy (2022) Council and Corporate Priorities
PAGE 175
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 3
Park user satisfaction with Parks This metric helps determine whether or not the department is fulfilling its mandate to provide high‐ quality recreation programs and spaces for its citizens and users. Measured by: Annual online survey. OCP 2040 Objective 10.3. Ensure parks reflect their unique natural and cultural context. OCP 2040 Objective 1.14. Provide safe, walkable, Core Area neighbourhoods that are connected to key designations. OCP2040 Objective 14.2 Preserve and enhance biodiversity and landscape diversity, integrating and connecting ecological networks throughout the city.
Service Requests (SR) specific to inquiries regarding service Tracking the number of Service Requests that relate to service levels within existing parks and city road right of way. Annual tracking of requests relating to level of service. Measured by: Analyzing Cityworks SR on types of requests, locations, time to close. OCP Objective . . Ensure fiscally responsible management of existing and proposed infrastructure.
PM#1: Park user satisfaction with Parks
Service Requests
Performance Measure 1
PM#3: Service Requests specific to inquiries regarding service. 4,100
3,800
3,850
3,600 3,163 3,100 2022 Actuals 2023 Estimate 2024 Forecast
Performance Measure 4
Total area of public parkland Park land grows or decreases in area over time. Park classification types and programing also evolve as development is realized. Measuring the annual acreage of usable park space is valuable in tracking long‐term availability of the different types of Parks uses. Specifying area of park types over the years. Measured by: GIS mapping data of: A) Total land designated as PARKS. of that: B) Maintained, landscaped, programed Parks such as playgrounds, recreation fields, beaches. C) Natural Areas such as linear trails, natural trails and Knox Mountain. OCP Objective . . Acquire new parks to enhance livability throughout the city. OCP Objective . . Ensure parks reflect their unique natural and cultural context. OCP Objective . Design the community to be more resilient to a changing climate. (Policy . . increasing park space and tree canopy coverage)
Sports and Special Event accommodations Track number of sporting events and special events Parks Services is able to accommodate. Each sport requires different field maintenance and accommodations. Each special event also has unique requirements. The ability to track the number of events Parks Services accommodates, as well as which fields accommodate different types of events identifies capacity of Park Land. Measured by booked fields, events, parks throughout City of Kelowna, Sport Kelowna, Recreation Kelowna, all other departments booking fields and Parks. OCP 2040 Objective 9.3 Develop diverse partnerships to advance complex social planning issues and increase community well‐being. Policy 9.3.5. Coordination of Services. OCP 2040 Objective 10.5. Encourage partnerships to acquire and deliver parks and public spaces. Policy 10.5.1 School district, Regional District, Sport Kelowna, Recreation Kelowna.
PM#2Total area of public parkland
PM#4: Sports and Special Event accommodations
260 242
245
246
240 220 2022 Actuals 2023 Estimate 2024 Forecast
# of Events Accommodation
Acreage of usable park space
Performance Measure 2
176
180 170
167 161
160 150 2022 Actuals 2023 Estimate 2024 Forecast
PAGE 176
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 5 Urban Forest Canopy Annual inventory of street trees within the City. Measured by: GIS Mapping or database within Cityworks. Measured by: Implementation of requirements for the specific needs of trees in urban streetscape regarding soil volumes, root, trunk and canopy. Measured by increase of urban forest canopy within Core Area. OCP Objectives . and . Protect and increase greenery in Policy . . . Urban Centres and the Core Area. OCP Urban Forest Canopy. Protect existing mature trees where possible and encourage the installation of Street Trees in Urban Centre development and streetscape improvement projects. Implement requirements for the specific needs of trees in urban streetscape, to protect soil volume, roots, trunk and canopy over the long term. OCP Objective . Increase resilience to extreme weather events. OCP Objective . Protect and expand a healthy and viable urban forest.
PM#5: Urban Forest Canopy Annual Inventory
24,500 24,000 23,753
24,000 23,500
23,161
23,000 2022 Actuals 2023 Estimate 2024 Forecast
infrastructure
PAGE 177
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Crime & Safety
Continue building the Block Connector network to enhance sense of safety and connectedness among neighbours Develop staff safety protocols and documentation for community‐based program/service delivery
Homelessness
Help to reduce impact by continuing to provide clean safe public spaces
Climate & Environment
Protect and restore natural areas (riparian areas and forests) Continue to grow healthy urban canopy Provide safe natural areas for the public to enjoy Develop and maintain green infrastructure throughout the city
Our People
Develop a long‐term Divisional staffing model and succession plan Promote and deliver staff engagement and growth initiatives
Digital Transformation
Using data to make informed decisions. Embrace innovation to increase turf maintenance practices Continue integration and implementation of the City Works program into Parks Operations, providing greater clarity of responsibilities and assets
Active Financial Management
Implementation of a new service‐based budget to ensure that the associated infrastructure, maintenance, and operating costs are explained Continue to provide financially responsible public‐maintained parks
PAGE 178
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments:
Successfully provided sports fields and sports courts for many tournaments and recreational play Parks greenhouse staff grew 54,000 plants for hanging baskets, planters, and annual beds throughout the City of Kelowna Establishment of large capacity waste containers at City Park, waste increased 2X in 2023 with 4.5X reduction in service due to increased capacity One of the first municipalities in BC/ Canada to employ an autonomous sports field line painter
Continuous improvements:
Cost avoidance achieved by installing large capacity waste containers in city park. Parks Services received less service requests and was able to redeploy services throughout the downtown area to provide better service levels Started using autonomous sports field line painter to achieve high quality service while allowing staff to keep up to high demand for service in sports fields
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Parks Services, $16.1M
Cemetery $1.5M Parks & Beaches $9.8M Parks Services $1M Urban Forestry $3.8M
Budget overview:
PAGE 179
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revised Annualized Maintaining 2023 Budget Service
Enhancing Preliminary Service 2024
4,424 1,224 99 122 159 6,027
13,139 1,210 220 236 14,805
(76) 119
0 40 1,196
1
2,138 1,120 965
4,450 2,436 5,287
7 19 (50)
383 304 368
3 2 1
610 1,194 6,027
427 2,204 14,805
142 119
(18) 158 1,196
(4) 1
4,843 2,762 5,606 0 409 2,500 16,121
4.4 19.5 1.3 25.2
5.0 41.7 1.0 47.7
0
5.0 42.6 1.0 48.6
Revenue budget: Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
194
1,081 76
1
14,415 1,286 0 220 200 16,121
Expenditure budget: Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Operating FTE positions: Management Union hourly Union salary Total operating FTE positions
0.9 0
0.9
Note: Totals may not add due to rounding
Funding strategy
Expenditure by type
Property tax $14.4M
Salaries and wages $4.8M
Fees and charges $1.3M
Material and other $2.8M
Other revenue $0.2M
Contract services $5.6M
Transfers from reserve $0.2M
Total $16.1M
Transfers to reserve $0.4M Enabling allocation $2.5M
Total $16.1M Note: Totals may not add due to rounding
PAGE 180
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Parks - Priority 1 182 Maintain Cemetery Tree Planting 182 Maintain Greenhouse Expansion 183 Maintain Parks Maintenance Cost Increase New Waterfront Parks 183 Maintain Parks Waste Sensors 184 Maintain Parks Safety and Aesthetic Improvements Service Area Priority 1 Total
Cat.
Cost
Reserve
Borrow
Grant
Revenue
Utility
Taxation
OT OT OG
6,500 33,000 169,500
(6,500) (33,000) 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 (169,500)
OG OG
48,500 25,000
0 0
0 0
0 0
0 0
0 0
282,500
(39,500)
0
0
0
0 (243,000)
(48,500) (25,000)
The operating requests listed below are operating impacts linked to a capital request, and are presented with the associated capital request in the capital section.
Operating linked to capital Priority 1 Page Type Description
Cat.
Cost
317 317 319
Maintain Maintain Maintain
OG OG OG
321
Maintain
324
Maintain
Burne Park DCC Parkland Acquisition Glenmore Recreation Park - Phases 4, 5 Knox Mountain Park - Improvements Urban Centers Beautification Initiative
322 Enhance Park Infrastructure Renewal Operating linked to capital Priority 1 Total
OG OG OG
Reserve
Borrow
Grant
Revenue
0 59,000
0 0
0 0
0 0
0 0
0 0
0 33,500
0
0
0
0
0
0
0
0
0
0
Taxation
0 0 0
0 0 0
0 0 0
0 0 0
(38,200) 0 0 (4,900) 0 (135,600)
0 (59,000) 0 (33,500)
38,200 4,900 135,600
Utility
PAGE 181
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Parks
Maintain
Priority: 1
ONE-TIME Title:
Cemetery Tree Planting
PRELIMINARY
Justification: With Cemetery Irrigation Improvements project substantially complete, Cemetery is now able to implement substantial tree planting to follow the Tree Planting Masterplan in areas lacking tree canopy coverage. Budget is requested for sustainable practices and beautification of newer sections of Cemetery with the purchase and planting of material. Request will be fully funded through the Cemetery reserve.
Expected Completion: Nov 2024 Strategic Direction: 2024
Cost 6,500
Service Area:
Parks
Climate & Environment - Protect and restore natural areas Reserve (6,500)
Borrow 0
Grant 0
Other 0
Revenue 0
Utility 0
Taxation 0 Maintain
Priority: 1
ONE-TIME Title:
Greenhouse Expansion
PRELIMINARY
Justification: Greenhouse operations supply City parks, road right of ways, and urban centers with annual seasonal planters and hanging baskets. Forecasted expansion of the program has identified the Parks yards location will be over capacity and moving the assembly of planters off-site to a city owned property will help to meet safety standards in the Parks yard. Budget is requested to cover the cost to install temporary fencing and a water service in efforts to expand staging and assembly areas outside of the parks yard.
Expected Completion: Jan 2024 Strategic Direction: 2024
Cost 33,000
Other - Supports Base Business Reserve (33,000)
Borrow 0
Grant 0
Other 0
Revenue 0
Utility 0
Taxation 0
PAGE 182
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Parks
Maintain
Priority: 1
ON-GOING Title:
Parks Maintenance Cost Increase – New Waterfront Parks
PRELIMINARY
Justification: Budget is requested for the increase in complexities, new features, and new maintenance work to be performed as a result of the completion of Pandosy Waterfront Park. Additionally, the new Paddle Center requires maintenance budget for landscaping, irrigation, and additional security, with work starting in 2025 at this premier park. 2024 Base Budget: $3.1M
Strategic Direction: 2024 2025 2026 Service Area:
Cost 169,500 192,800 214,300
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Parks
Utility 0 0 0
Taxation (169,500) (192,800) (214,300) Maintain
Priority: 1
ON-GOING Title:
Parks Waste Sensors
PRELIMINARY
Justification: Post COVID, visitors in Kelowna Parks, especially beach parks increased dramatically. Many were bringing meals to enjoy with family and friends. In turn, this created an increase in waste collection to keep our parks clean. In an effort to better understand waste accumulation in parks, staff trialed real-time waste sensors during the 2022 summer in park waste receptacles. The trial was expanded in 2023 and results illustrated a rise in waste from year to year. Budget is requested to further expand the waste sensor use throughout beach and community parks. 2024 Base Budget: $0
Strategic Direction: 2024 2025 2026
Cost 48,500 61,500 75,000
Digital Transformation - Data is used to inform decision making Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (48,500) (61,500) (75,000)
PAGE 183
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Parks
Maintain
Priority: 1
ON-GOING Title:
Parks Safety and Aesthetic Improvements
PRELIMINARY
Justification: The City maintains over eight km of medians throughout the city that are exposed to harsh climates such as extreme heat and road salt. Budget is requested to update hard surfacing, replace plant material and growing medium composition to match environmental conditions where required. Additionally, aesthetic improvements are recommended at the bike skills parks. Budget is requested to increase the use for both passive and active users of the parks through additional shade, seating, and alternative activities for those too young to ride. 2024 Base Budget: $36k
Strategic Direction: 2024 2025 2026
Cost 25,000 35,000 35,000
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (25,000) (35,000) (35,000)
PAGE 184
2024 FINANCIAL PLAN
CITY OF KELOWNA
SPORT & RECREATION LED BY: DIVISIONAL DIRECTOR, ACTIVE LIVING & CULTURE
Our goal & community benefit: Our goal is to increase sport, recreation and active living opportunities for all, improve the health and wellbeing of our citizens and enhance the overall quality of life within our community. The benefits of sport and recreation initiatives cannot be overstated. They can enhance mental, physical and social wellbeing, help build strong families and healthy communities, improve quality of life, provide significant economic stimulus and contribute to community growth and development. High quality, accessible sport and recreation opportunities are a fundamental human need in all ages and stages of life and integral to a well‐functioning society.
Our customers: We serve a variety of individuals and organizations to ensure that sport and recreation programs and services are available and accessible to all. Residents of Kelowna and across the Central Okanagan People of all ages and abilities Equity‐deserving groups School boards and educational institutions, Social, community and sport organizations Visitors to the region Athletes at all ages and stages of development Neighbourhoods Other City of Kelowna business units
Our partners: We work with various local organizations, other levels of government and the public/ private sector to develop mutually beneficial relationships. Recreation facility and program partners Not‐for‐profit service organizations (e.g., BGC Okanagan, KCR) Recreation providers (e.g., YMCA, Sport organizations, accessibility advocates) Public institutions (e.g., SD , UBC Okanagan, Interior Health Authority) Regional, provincial, and national governing bodies (e.g., BCRPA, ViaSport, Childcare Advocacy groups) Private service delivery organizations (e.g., Daycare organizations, health & wellness) Other City of Kelowna business units
What we deliver: We provide a wide range of programs and services that enrich the lives of people in our community. The delivery model involves the direct provision, support and facilitation of community‐based programs, activities and events that engage, activate and connect people. Our key focus areas include promoting a healthy, active and inclusive community; reducing barriers to participation in sport & recreation; building neighbourhood connections; animating parks and public spaces; supporting an integrated sport system; maintaining sports fields, courts and related infrastructure; and developing a vibrant events sector.
PAGE 185
2024 FINANCIAL PLAN
CITY OF KELOWNA
Our key objectives:
A vibrant community o Public spaces are animated. o Strong program delivery model that leverages strategic partnerships A healthy community o Systems and services are aligned. o Residents are thriving and resilient. An equitable and inclusive community o Practices and processes prioritize equity and inclusion. An engaged team o Staff are connected and informed. o Resources and training are available. An exceptional Infrastructure program. o Infrastructure is available and well‐maintained. o Innovative approaches and eco‐friendly practices are explored and/or implemented.
Our guiding plans:
Imagine Kelowna Official Community Plan (2040) Kelowna Community Sport Plan (2019) Kelowna Event Strategy (2022) Indoor Recreation Facility Strategy (2023) Community for All – Healthy City Strategy Conditions of Use and Allocation Guidelines Parks Master Plan (under development)
PAGE 186
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 3
Sport Park Area per 100 Residents
Sport & Recreation Participation
Provides a measure of the accessibility and availability of recreational space for residents. This data helps evaluate whether there are enough sports parks and facilities to accommodate the local population. Access to sports parks encourages physical activity and promotes a healthy lifestyle. Monitoring the ratio of sport park area per 100 residents can help gauge the potential impact on the community's overall health and well‐being. The availability of sports parks contributes to the overall quality of life in a community.
Participation in sport and recreation programs provides multiple pathways to better health for individuals and leads to a healthier, more connected, and resilient community. By offering a diverse range of programs that are responsive to resident interests and needs, participation numbers increase as does community health and vibrancy. The goal is to have Kelowna residents participating in City of Kelowna sport & recreation programs each year.
PM#3: Sport & Recreation Participation
PM#1: Sport Park Area per 100 residents 55 50
48
49
48
45 2022 Actuals 2023 Estimate 2024 Forecast
Annual Participation #
Sport Space Per 100 Residents
Performance Measure 1
28,000 26,000
26,500 24,507
25,457
24,000 22,000 2022 Actuals 2023 Estimate 2024 Forecast
Sport & Recreation Resident Satisfaction
Facility Capacity
The Citizen Survey is conducted every second year to determine how satisfied the public is with municipal programs and services. It is important for residents to have places where they can participate in sport and recreation opportunities. Measuring resident satisfaction with City provided sport and recreation facilities and programs helps guide decision making around planning, budgeting, and service levels. The goal is for Kelowna residents to be satisfied with the sport and recreation facilities and programs provided by the City of Kelowna
Sport and recreation facilities are vitally important to establishing and maintaining the quality of life in a community, ensuring the health of residents, and contributing to the economic and environmental well‐ being of a community. It is essential that these important amenities are provided and available for the public to access. The goal is to maximize facility utilization, maintain acceptable public access levels and inform future need. Currently we are operating at or above capacity levels in sportsfields, stadiums and arenas.
PM#2: Sport & Recreation Resident Satisfaction
PM#4: Facility Capacity
95% 90% 85%
88%
90%
84%
80% 2022 Actuals 2023 Estimate 2024 Forecast
Capacity Level
Performance Measure 4
Satisfaction Rate
Performance Measure 2
119%
120% 115%
115%
110%
110% 105% 2022 Actuals 2023 Estimate 2024 Forecast
PAGE 187
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 6
Tournaments & Events Tournaments and Events play several important roles in the function of a city. Not only do they serve as a mechanism to animate and bring vibrancy to a community but also, they act as a tool to advance a city’s priorities and affect the way its citizens think and feel about the place they live. Tournament/event hosting benefits are many, and include creating vibrant and safe spaces, stimulating economic activity, showcasing natural assets, encouraging active lifestyles, and promoting return visits. The city strives to take a proactive approach to event hosting by procuring tournaments/events; supporting the development of existing tournaments/events; and ensuring that well‐ maintained outdoor event spaces and tournament‐ready sports fields are available. Rising costs in the event industry and everyday life has limited the hosting opportunities of event organizers and reduced the # of people attending events, as evidenced in . The goal is to facilitate a dynamic and balanced portfolio of tournaments and events that support local participation and tourist visitation.
Reducing Financial Barriers to Participation Providing financial assistance to City offered programs and services removes a barrier for people who may not otherwise be able to afford these opportunities. Funding is provided through Recreation Opportunity Coupons (drop‐in access), JumpStart funding for children and youth, as well as City funded financial assistance. This is important to provide equitable access to recreation. This performance measure examines the number of people who rely on financial assistance to participate in comparison to the total number of participants. This number is expected to follow the trends of the local and global economies. The goal is to ensure that appropriate resources are in place to support access to sport and recreation opportunities for all. % of population Access Program
Performance Measure 5
PM#6: Reducing Financial Barriers to Participation 2.90%
2.75%
2.75%
2.74%
2.70% 2.50%
PM#5: Tournaments & Events 300
285
280 260
Performance Measure 7 266
241
240 2022 Actuals 2023 Estimate 2024 Forecast
Neighbourhood Connection Great cities are made up of strong neighbourhoods. In turn, it takes citizens that are inspired, involved, connected, and empowered to create strong neighbourhoods. The Strong Neighbourhoods team has been a catalyst for resident connection with the understanding that the more neighbours feel connected, the more they will contribute to a culture of care, increase sense of belonging and inclusion, enhance safety, and ultimately will lead to a more inclusive and livable city. This measure shows the percentage of people who felt better connected to their neighbours through the Strong Neighbourhoods program. The goal is that the Strong Neighbourhood program facilitates opportunities to PM#7: Growing Neighbourhood Connection % of Residents
# of Outdoor Event
2022 Actuals 2023 Estimate2024 Forecast
100% 90% 80% 70%
96%
98%
70% 2022 Actuals
2023 Estimate 2024 Forecast
deepen the connection between neighbours.
PAGE 188
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Crime & Safety
Continue building the Block Connector network to enhance sense of safety and connectedness among neighbours Develop staff safety protocols and documentation for community‐based program/service delivery
Our People
Develop a long‐term Divisional staffing model and succession plan Promote and deliver staff engagement and growth initiatives
Base Business
Digital Transformation
Implement a digital first strategy for our Activity & Program Guide to replace our pre‐ COVID‐ hardcopy standard with a robust, easy‐to‐use, customer focused online solution Embrace innovation to increase turf maintenance practices Continue integration and implementation of the City Works program into Recreation Facility Operations, providing greater clarity of responsibilities and assets Further integration of Sport League app and other technological advancements (i.e., Chatbots) to improve customer service and program delivery efficiencies
Develop a pilot program for Neighbourhood Associations that defines the community development role Neighbourhood Associations can play and how the City can support those initiatives Establish Board of Directors and select Race Director to implement Apple Race Series (Triathlon/Marathon) Build out a Civic Event framework and portfolio of events that are funded and/or produced by the City Refine and update the ‐year Major Events Procurement plan Work with Strategic Recreation Facility partners to renew lease agreements, fulfill all associated terms and conditions, and support operations and program delivery Explore partnership development opportunities with UBCO and Okanagan College Conduct a ‐year review and Impact Report of the Kelowna Community Sport Plan, and develop performance indicators/measures for both the Sport Plan and Kelowna Event Strategy Continue development of Volunteer program that supports divisional needs
Active Financial Management
Continue development of a new benefits‐ based approach model for fees and charges to ensure that the associated infrastructure, maintenance, and operating costs associated with the City’s recreation and cultural programs and services are fairly allocated to all customers
PAGE 189
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments:
Continued strengthening the Block Connector program to enhance neighbourhood connections, safety, and emergency preparedness Responded to the Child Care Needs assessment and the federal/provincial priorities, complete a review of the City’s licensed child care operations to increase the sustainability and quality of the program Enhanced value of PRC memberships to improve customer satisfaction and increase membership sales through the addition of fitness classes, workshops, and expanded gymnasium drop‐in programs Introduced the Rec & Ride pass, in partnership with BC Transit which saw almost 900 children and youth gain access to Parkinson Recreation Centre and the Kelowna Regional Transit System during July and August Conducted a review of the Financial Assistance opportunities for recreation to reduce financial barriers, increase equity, accessibility, and financial transparency Completed registration software updates to allow for online client account setup, multiple user fees functionality and reporting enhancements Advanced discussions with School District No. 23 (SD23) towards a community‐wide reciprocal use agreement which considers a broad range of both City and SD23 facilities with the objective of expanding facility use and reach into all areas of the City Advanced plans to reestablish the Apple Triathlon and Okanagan International Marathon Added a web‐based microsite to support Sport Leagues marketing, promotions, and enhanced customer service Completed the Indoor Recreation Facility Strategy, including a facility needs assessment and prioritization process Completed functional planning for Parkinson Recreation Centre and commenced functional planning for GAC and MAC Procured two major events (Break Out West ‐2023 /Brier ‐ 2025) and numerous smaller tournaments/events Facilitated the participation of local non‐profit organizations in the ‘Future Adaptability and Sustainability Program’ and ‘Rebound Conference’
Continuous improvements:
Develop training opportunities, recruitment campaigns, employment incentives, celebrations, and recognition programs to recruit, retain and improve the Recreation Contract Instructor Review and update current policies and practice related to the contribution to facility‐based and program reserve accounts funded through fees and charges to ensure alignment with corporate financial strategies and best practice Create a digital program and activity guide model for implementation in 2024 Enhance customer service through implementation of a Chatbot for the City’s recreational activities. Advance new partnership opportunities while continually refining management of existing facility, operating and program agreements Continue work with provincial partners and key stakeholders on a Quality Sport Program in Kelowna Continue the ongoing implementation of the Kelowna Community Sport Plan and Event Strategy Review and revise the facility‐based Advisory Committee structure to reflect up‐to‐date practices with a continued focus on effective support and advocacy for Sport Continue development of the benefits‐based approach to setting fees and charges for services offered through Active Living & Culture. The approach would expand on the current model to setting fees but also examine the cost to delivery the service, its relationship to public benefit and a corresponding recovery target for each activity.
PAGE 190
2024 FINANCIAL PLAN
CITY OF KELOWNA
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Sport & Recreation, $17.9M
Community & Neighbourhood Services $4.7M Sport & Event Services $8.2M Sportsfield & Irrigation $5M
Operating budget needed to achieve results ($ thousands): Actual 2022
Revised 2023
Annualized Maintaining Budget Service
Enhancing Preliminary Service 2024
20,660 4,169 136 266 243 25,474
11,941 4,029 110 75 790 16,945
(790) (330)
3 134 1,194
8,055 4,854 5,958
6,563 4,250 2,817
120 (627) 23
530 549 13
29 75
1,276 5,332 25,474
847 2,468 16,945
154 (330)
6 97 1,194
(5) 99
7,213 4,200 2,928 0 853 2,714 17,908
5.9 95.6
4.0 68.9
1.4
0.9
101.5
72.9
1.4
0.9
0.0
4.0 71.2 0.0 75.2
Revenue budget: Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
460
686 371
74
25 99
13,161 4,400 110 78 159 17,908
Expenditure budget: Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Operating FTE positions: Management Union hourly Union salary Total operating FTE positions Note: Totals may not add due to rounding
PAGE 191
2024 FINANCIAL PLAN
CITY OF KELOWNA
Funding strategy
Expenditure by type Salaries and wages $7.2M
Property tax $13.2M Material and other $4.2M Fees and charges $4.4M Grant $0.1M Other revenue $0.1M
Contract services $2.9M Transfers to reserve $0.9M
Transfers from reserve $0.2M Enabling allocation $2.7M
Total $17.9M
Total $17.9M
Note: Totals may not add due to rounding
PAGE 192
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Cat.
Cost
Sport & Recreation - Priority 1 194 Maintain Irrigation Serviceperson Positions
OG
194 195
Maintain Maintain
195 196
Maintain Maintain
196 197 197
Maintain Enhance Enhance
Recreation Ave Fencing Arenas and Stadiums - Operational Adjustments Recreation Financial Assistance Rutland Community Program Space
Major Events Program Apple Race Series Neighbourhood Associations Pilot Program Service Area Priority 1 Total
Reserve
Borrow
Grant
Revenue
Utility
222,100
0
0
0
OT OG
56,000 205,000
(56,000) 0
0 0
0 0 0 (248,100)
0 0
0 43,100
OG OG
(25,000) 115,800
0 (77,900)
0 0
0 0
25,000 (37,900)
0 0
0 0
OG OG OG
50,000 25,000 78,400
0 (25,000) 0
0 0 0
0 0 0
0 0 0
0 0 0
(50,000) 0 (78,400)
727,300 (158,900)
0
0 (261,000)
0
Taxation 0 (222,100)
0 (307,400)
The operating requests listed below are operating impacts linked to a capital request, and are presented with the associated capital request in the capital section.
Operating linked to capital Priority 1 Page Type Description 337 Maintain Rail Trail to Greenway DCC, ATC Operating linked to capital Priority 1 Total
Cat.
Cost
OG
7,700 7,700
Reserve
Borrow
0 0
0 0
Grant
Revenue 0 0
0 0
Utility
Taxation 0 0
(7,700) (7,700)
PAGE 193
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Sport & Recreation
Maintain
Priority: 1
ON-GOING Title:
Irrigation Serviceperson Positions
PRELIMINARY
Justification: Budget is requested to convert three Parks term positions into fulltime Labourer II's to support the irrigation replacement program. The capital irrigation replacement program has a successful track record of cost savings by completing the work in house. Converting these positions will add an extra four to six weeks of construction resourcing. A forecast of 80% of wages will be allocated to the capital program with the remaining 20% being funded by taxation for irrigation maintenance or snow removal. Three vehicles are required for these positions, purchase budget is included in this request and will be transferred to the capital program upon Council approval 2024.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 222,100 68,400 68,400
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Sport & Recreation
Revenue 0 0 0
Utility 0 0 0
Taxation (222,100) (68,400) (68,400) Maintain
Priority: 1
ONE-TIME Title:
Recreation Ave Fencing
PRELIMINARY
Justification: Budget is requested to install permanent fencing around three ball diamonds and the surrounding greenspace due to vandalism and damage occurring causing the sites to be unavailable for sports groups during the day. Gates and locks will be installed for user groups to have proper access as required.
Expected Completion: Mar 2024 Strategic Direction: 2024
Cost 56,000
Other - Supports Base Business Reserve (56,000)
Borrow 0
Grant 0
Other 0
Revenue 0
Utility 0
Taxation 0
PAGE 194
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Sport & Recreation
Maintain
Priority: 1
ON-GOING Title:
Arenas and Stadiums - Operational Adjustments
PRELIMINARY
Justification: Over the past few years, utilization of arenas and stadiums has grown to near capacity levels, resulting in increased revenues, facility maintenance, and operational expense. Materials, supplies, and contractor services have steadily risen and an increase in the expenses budgets is required in order to maintain the current level of service. Additionally, each year the recreation facilities operations team has a number of small equipment requirements, minor maintenance issues, and facility planning work. Budget is requested to direct a portion of the increased revenues in arenas and stadiums to the increased facility maintenance, operations and equipment expenses associated with these recreation facilities.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 205,000 180,000 180,000
Active Financial Management - Increase non-tax revenues to minimize the reliance on taxes Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Sport & Recreation
Revenue (248,100) (248,100) (248,100)
Utility 0 0 0
Taxation 43,100 68,100 68,100 Maintain
Priority: 1
ON-GOING Title:
Recreation Financial Assistance
PRELIMINARY
Justification: The City currently provides financial assistance towards City offered recreation programs and memberships to reduce barriers for those with a financial need. In recent years, many internal and external factors have led to this program being over-subscribed. Financial Assistance that is readily available provides a safety net to ensure recreation is accessible to all. Budget is requested to recognize the increased financial need in the community and to accurately capture the amount of financial support being provided. The City's funding supplements other programs such as the Recreation Opportunities Coupons, JumpStart, Family Connections Centres and Canadian Mental Health Association funding which provide an additional $15k in financial supports. 2024 Base Budget: $19k Strategic Direction: 2024 2025 2026
Cost (25,000) (25,000) (25,000)
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 25,000 25,000 25,000
Utility 0 0 0
Taxation 0 0 0
PAGE 195
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Sport & Recreation
Maintain
Priority: 1
ON-GOING Title:
Rutland Community Program Space
PRELIMINARY
Justification: The Rutland neighbourhood currently has limited indoor program space available for City programs and community use as the Rutland Activity Centre is almost exclusively used by the Seniors Society. Recently, two opportunities to convert existing space to program space have been identified. The Kelowna District Safety Council has announced their closure as of Sep 30, 2023 and the Ben Lee Park Concession is no longer operational. There is an opportunity to provide community programs in these spaces with some upgrades to flooring, minor structural changes, paint and lighting. This budget request will provide over 4000 additional usable hours in Rutland for general programs like art, fitness, marital arts, language, camps and instructional workshops. It also provides much needed secure space for trailers, equipment and event related storage. Strategic Direction: 2024 2025 2026 Service Area:
Cost 115,800 75,660 75,660
Other - Supports Base Business Reserve (77,900) 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Sport & Recreation
Revenue (37,900) (75,760) (75,760)
Utility 0 0 0
Taxation 0 100 100 Maintain
Priority: 1
ON-GOING Title:
Major Events Program
PRELIMINARY
Justification: The Major Events Program (MEP) is intended to assist with the procurement and development of new large-scale participant-based or spectator events. Procuring these events is often a strategic, competitive process that is accompanied by a sizeable bid/hosting fee. Since the pandemic, the event landscape has seen significant rises in costs making major events even more expensive to procure in an already competitive field. In addition, the size and/or lack of local venues or amenities often results in the need to seek additional funding from external sources to secure major events. The current annual MEP allocation has proven to be extremely valuable in procurement efforts however increased funding is required to remain competitive in the dynamic domain of event hosting. 2024 Base Budget: $119k Strategic Direction: 2024 2025 2026
Cost 50,000 75,000 100,000
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (50,000) (75,000) (100,000)
PAGE 196
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Sport & Recreation
Enhance
Priority: 1
ON-GOING Title:
Apple Race Series
PRELIMINARY
Justification: The Apple Triathlon and Okanagan Marathon are two longstanding events that add unique elements to Kelowna's event calendar and are highly valued and anticipated by residents and visitors alike. Both events however, have been unable to recover post-pandemic and are in need of a greater level of support to ensure successful ongoing delivery. Council recently approved a one-time budget transfer of $50k to assist with reestablishing these two iconic races, repackaged together as the Apple Race Series, with an anticipated start-up in 2024. Budget is requested to support the delivery of the Apple Race Series for the next three years after which, staff will review outcomes for program continuation and funding consideration.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 25,000 75,000 75,000
Other - Supports Base Business Reserve (25,000) (75,000) (75,000)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Sport & Recreation
Revenue 0 0 0
Utility 0 0 0
Taxation 0 0 0 Enhance
Priority: 1
ON-GOING Title:
Neighbourhood Associations Pilot Program
PRELIMINARY
Justification: Neighbourhood Associations (NAs) are uniquely poised to bring neighbours together, host celebrations, organize projects, and ultimately, build community with the neighbours where they live. This pilot program aims to grow the capacity of Kelowna's NAs to help deepen community relationships. Select Neighbourhood Associations will commit to build community engagement within their neighbourhoods by attending workshops, implementing neighbourhoodbased events, projects, and programs. Budget is requested for two years to resource the administration of the Neighborhood Association program, while supporting five NAs with funding for year one, and support ten NAs with funding in year two.
Expected Completion: Oct 2025 Strategic Direction: 2024 2025 2026
Cost 78,400 93,400 0
Crime & Safety - Residents feel safe Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (78,400) (93,400) 0
PAGE 197
2024 FINANCIAL PLAN
CITY OF KELOWNA
ARTS & CULTURE LED BY: DIVISIONAL DIRECTOR, ACTIVE LIVING & CULTURE
Our goal & community benefit: Our goal is a community with a rich variety of high-quality arts, culture and heritage experiences that embraces and celebrates diversity and is open and welcoming to all. We foster innovation, attract and retain people in our workforce and proactively encourage the discovery of new experiences and art forms. We showcase our histories through our people, activities, buildings, landscapes and stories while tackling challenges critically and creatively. We are leaders in building collaborations and increasing quality of life for future generations. We do this by investing in infrastructure, artists and non-profit organizations.
Our customers: • • • • • • • •
Residents of Kelowna and across the Central Okanagan Visitors to the region Emerging, aspiring, and established artists and artist collectives Local arts, culture, and heritage organizations Promoters, presenters, and touring artists audiences Cultural grants program applicants and recipients Other City of Kelowna business units
Our partners: We work with various local organizations, other levels of government and the public/ private sector to develop mutually beneficial relationships. • Local arts, culture and heritage organizations • syilx/ Okanagan, Metis and urban Indigenous elders, community leaders, organizations, and artists • Strategic facility partners (Rotary Centre for the Arts, Kelowna Art Gallery, Kelowna Museums Society) • Intercultural community groups and members • Local post secondary institutions • Funders, business sector and community capacity builders • Regional, provincial, and national arts service organizations • Cultural grant program recipients • Kelowna Community Theatre volunteers • Other City of Kelowna business units
What we deliver: We facilitate the delivery of programs and services that support cultural development in the community. This includes oversight of cultural policies and plans, organizing special events and convenings, maintaining healthy partnerships with cultural facility operators, community organizations and professional and emerging artists, administering grant programs, and operating the Kelowna Community Theatre (KCT). We create a welcoming and inclusive destination for cultural tourism and art exhibition within Kelowna’s Cultural District. We work collaboratively with our partners and other City business units on advancing action on Truth and Reconciliation and transforming systems that create barriers to equitable, diverse, and inclusive participation in our community.
PAGE 198
2024 FINANCIAL PLAN
CITY OF KELOWNA
Our key objectives: • • • • •
Foster deliberate investments of time, money and people into demonstrated outcomes. Use new and traditional approaches for enhancing the availability, affordability, and accessibility of spaces for culture. Animate the community with a blend of programs, services and events that promote artistic excellence and share Kelowna’s history. Build on the creative sector’s ability to respond to changing demands and new opportunities. Promote ongoing interactions between people, sectors and disciplines.
Our guiding plans: • • • • • •
Imagine Kelowna Official Community Plan 2040 2020-2025 Cultural Plan Weaving our Collective Threads: Offering a pathway for syilx creativity within the City of Kelowna Cultural Facilities Master Plan Council and Corporate Priorities
PAGE 199
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: optimistic it will increase again with initiatives that support a return to the arts.
PM#1: Arts & Culture Investment Per Capita $30.00 $25.15 $24.43 $25.00 $22.12 $20.00 2022 Actuals
2023 Estimate
2024 Forecast
Performance Measure 2
Leverage $ Invest
Leveraged investment in Arts & Culture Local non-profit arts & culture organizations leverage each $ invested by the City to generate alternative sources of revenue including other grants, sponsorships, funding from other levels of government and earned revenue. This indicator demonstrates the importance of the initial investment in sector sustainability and increased funding diversity within organizations. The goal is to achieve an ongoing increase in the leverage dollars while continuing to grow the direct economic impact of the creative sector of Kelowna. The significant impact of COVID-19 on the creative sector has resulted in a higher reliance on government funding sources. As a result, we have seen a rapid decrease in this indicator. We are PM#2: Leveraged investment in Arts & Culture $4.50 $4.32 $4.13
$4.25
$4.21
$4.00 2022 Actuals
2023 Estimate
2024 Forecast
Performance Measure 3 Average Arts & Culture Community Event and Program Attendance Per Resident This indicator provides an average number of City grants supporting arts & culture events and programs a resident would participate in annually. This rate helps to understand whether participation in the creative sector of Kelowna is changing over time. Using an average attendance per resident reduces the impact of population growth bias often seen in total participation numbers. The target would be to see a continuous increase in the number of activities the average resident attends in Kelowna.
Average Attendance Per Resident
Dollar Invest Per Capita
Arts & Culture Investment Per Capita The per capita investment in arts & culture demonstrates the City’s commitment and investment in advancing the cultural vision of the community as articulated in the Cultural Plan. The goal is to achieve $25 per capita investment in arts and culture programs and services. We continue to make steady progress in achieving this goal and predict it will be achieved in 2024.As our population continues to increase, investment will need to keep pace to see continued progress. The $25 per capita investment has been a long-established industry target for municipal investment in arts & culture.
PM#3: Average Arts & Culture Community Event and Program Attendance Per Resident 3.7
3.8
2023 Estimate
2024 Forecast
2.4
4 2 0
2022 Actuals
Performance Measure 4 Arts & Culture Funding Per Attendee The funding per attendee describes the amount of investment per participant at City grant supporting community events and programs hosted by local arts and culture organizations. This investment demonstrates our commitment to supporting events that meet the interests of residents. The goal would be to see the investment per attendee decrease because of increased participation at funded activities. This target should be balanced with our goal for diversity in cultural offerings and ensuring that events that serve smaller distinctive markets continue to be supported. PM#4: Arts & Culture Funding per Attendee Funding Per Attendee
Performance Measure 1
$6.00
$5.17
$4.00
$3.61
$3.68
2023 Estimate
2024 Forecast
$2.00 2022 Actuals
PAGE 200
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance:
Participation in Learning Opportunities related to Truth and Reconciliation The total number of participants taking part in a variety of learning opportunities intended to expand knowledge and action on advancing the Truth and Reconciliation Commission’s 94 Calls to Action. Truth and Reconciliation education plays a vital role in addressing historical injustices, promoting healing, preserving cultural heritage and traditions, and building a more inclusive and just society. The goal is for all staff, at all levels of the organization, to participate in and continue to learn.
Kelowna Community Theatre Facility Capacity The Kelowna Community Theatre Facility Capacity considers the total number of days available for mainstage theatre rentals compared with the number of days rented. The rate provides an indicator of the current usage of the facility and our capacity to increase non-taxbased rental revenue in future years. The theatre is considered to be operating at or near capacity. The goal would be to maximize theatre rentals and eventually achieve closer to 100% of available rental days.
PM#5: Participation in Learning Opportunities related to Truth and Reconciliation 500 1000 270 94 500 0 2022 2023 2024 Actuals Estimate Forecast
Facility Capacity
Performance Measure 7
Number Participant
Performance Measure 5
PM#7: Kelowna Community Theatre Facility Capacity 67.3% 67.2% 65.2% 70.0% 65.0% 60.0% 2022 2023 2024 Actuals Estimate Forecast
Performance Measure 6
Averate Fill Rate
Kelowna Community Theatre Average Fill Rate The fill rate at Kelowna Community Theatre refers to the percentage of tickets sold to mainstage performances compared with the capacity available for audiences at Kelowna Community Theatre. The rate provides one indicator that the shows being offered are of interest to community members and that shows are right sized for the venue type. Additionally, increased fill rates will typically mean increased non-taxed based revenues for theatre operations are increasing. The goal would be to maximize the average fill rate while balancing our goal for cultural development by supporting less popular genres and emerging performers. PM#6: Kelowna Community Theatre Average Fill Rate 80.0% 60.0% 40.0%
60.3%
65.0%
67.3%
2022 Actuals
2023 Estimate
2024 Forecast
PAGE 201
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Climate & Environment •
Modification of the Artist in Residence Program to bring attention to and to start a thoughtful dialogue on the issues of climate & environment
Our People •
• • •
Development of the Kelowna Community Theatre Centre of Excellence partnership for the advancement of Theatre Technician recruitment and training Development of the education pathway for City of Kelowna employees working to advance Truth and Reconciliation (multi-year) Development of a long-term staffing model and succession plan Enhance customer service at Kelowna Community Theatre Box Office through implementation of ChatBot features
Active Financial Management •
Expansion of Kelowna Community Theatre Box Office to include community ticketing component
Base Business • • •
Future Adaptability and Sustainability Program Annual capacity building conference for capacity building of local non-profit organizations (2024 – Reimagine) Continued collaborations and partnerships with local Indigenous communities, leaders, and organizations toward meaningful reconciliation actions
PAGE 202
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments: • • • • •
Completed a 10-year long-term plan for the investment of the Capital Improvement Fee Reserve at Kelowna Community Theatre Implemented the Kelowna Community Theatre Box Office and Front of House operations which has resulted in increased non-tax-based revenue and a more seamless customer experience while visiting events at the venue Hosted a delegation of visitors from our Sister City in Kasugai, Japan Hosted the REBOUND conference, a local non-profit governance learning opportunity, intended to build sector capacity and assist local leaders to learn and connect with subject matter experts on issues impacting future sustainability Provided opportunities for City staff and community members to engage in learning about the Truth and Reconciliation Commission’s 94 Calls to Action, UNDRIP Legislation and local syilx/ Okanagan history, culture and practices through museum and land tours
Continuous improvements: • • • • •
Supporting economic recovery of the creative sector, post COVID-19 restrictions and wildfire season, to restore and grow attendance at programs, events and services offered in the community Ongoing implementation of the 2020-2025 Cultural Plan and Cultural Facilities Master Plan Continuous evaluation for the enhancement of the customer experience at Kelowna Community Theatre including improvements to the KCT Volunteer Program Continuing to support staff to build knowledge and act on key principles of equity, diversity and inclusion and Truth & Reconciliation. Utilize arts and culture as a conduit to reflect, respond and drive systems level change Provide support to the Mayor’s Task Force on a new Performing Arts Centre
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Arts & Culture, $5.2M
Community Theatre $2M Cultural Services $3.2M
PAGE 203
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revenue budget:
Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
Expenditure budget:
Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Revised Annualized Maintaining 2023 Budget Service
Enhancing Preliminary Service 2024
3,217 789
3,360 1,379
35 10
194 128
(2) 61
287 4,294
225 4,964
(215) (170)
(10) 311
59
941 1,457 766
1,208 933 1,779
(0) (201) 0
173 48 72
46 1 13
236 894 4,294
334 710 4,964
(14) 44 (170)
19 311
(1) 59
2.8 7.8 0.5 11.1
3.0 9.0 1.0 13.0
1.0
0.5
1.0
0.5
Operating FTE positions:
Management Union hourly Union salary Total operating FTE positions
0.0
3,587 1,577 0 0 0 5,164
1,427 781 1,865 0 320 771 5,164
3.0 10.5 1.0 14.5
Note: Totals may not add due to rounding
Funding strategy
Expenditure by type Salaries and wages $1.4M
Property tax $3.6M
Material and other $0.8M Contract services $1.9M
Fees and charges $1.6M Transfers to reserve $0.3M Enabling allocation $0.8M
Total $5.2M
Total $5.2M
Note: Totals may not add due to rounding
PAGE 204
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Arts & Culture - Priority 1 206 Enhance Box Office Expansion Service Area Priority 1 Total
Cat.
Cost
OT
60,600 60,600
Reserve
Borrow
0 0
0 0
Grant
Revenue 0 0
(60,900) (60,900)
Utility
Taxation 0 0
300 300
PAGE 205
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Arts & Culture
Enhance
Priority: 1
ON-GOING Title:
Box Office Expansion
PRELIMINARY
Justification: Budget is requested to increase service to the community to help generate additional revenues at the Box Office by providing ticketing services for entertainment venues outside of the Kelowna Community Theatre (KCT). Over the last year, the Box Office has successfully piloted the ticketing of several events and is optimistic a broader and more established program will increase non-tax revenues. In addition, this program will allow the City to fill service gaps in the current ticket seller environment. Process development occurred during the KCT Box Office implementation in 2022/23 and therefore this is a natural expansion with far less investment required. The planned expansion of ticketing will take place over a three-year period and by year three will generate positive revenue.
Strategic Direction: 2024 2025 2026
Cost 60,600 161,800 216,300
Active Financial Management - Increase non-tax revenues to minimize the reliance on taxes Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue (60,900) (145,000) (230,000)
Utility 0 0 0
Taxation 300 (16,800) 13,700
PAGE 206
2024 FINANCIAL PLAN
CITY OF KELOWNA
COMMUNITY DEVELOPMENT LED BY: DIVISIONAL DIRECTOR, PLANNING & DEVELOPMENT SERVICES
Our goal & community benefit: Our goal is to provide long‐term planning and development‐related planning and services to our community. By 2040, the community vision is to be a thriving mid‐sized city that welcomes people from all backgrounds. We want to build a successful community that honors our rich heritage and also respects the natural wonders that contribute to our identity. As a place with deep agricultural roots, Kelowna understands the need to protect our environment, manage growth and be resilient as our future unfolds. The 2040 Official Community Plan (OCP) is a foundational plan to help realize this vision by leveraging growth to make our community more resilient and inclusive and to enhance the quality of life for all Kelowna citizens.
Our customers:
All of our community, both current and future generations Vulnerable populations, including lived & living experience, individuals experiencing homelessness, Indigenous community Business owners Social serving sector Industry members and investors Other City departments Council
Our partners: We work with our citizens, various local organizations, other levels of government and the private sector to build our community.
What we deliver: We develop leading‐edge planning policies based on extensive research in land use, housing, built and natural environments, heritage, and data analytics to build a foundation for strong and diverse neighbourhoods. We set the course for Kelowna’s future by anticipating trends, understanding best practices and shaping innovative policies for short and long‐term community goals. Our team works to balance development with considerations of climate change and protection of the natural environment. To do so, we develop and implement policies and programs to reduce community greenhouse gas (GHG) emissions, build climate resilience, protect and restore the city’s natural assets, and shift to a circular economy. We also work with other departments at the City to embed climate and environmental considerations into corporate initiatives. Social Development closely monitors social issue trends and provides strategic advice and to respond to unmet and emerging social issues. This group also aims to increase the capacity of various community organizations to contribute to a whole‐systems social approach that responds to emerging community need.
PAGE 207
2024 FINANCIAL PLAN
CITY OF KELOWNA
Our key growth management objectives:
Strategically monitor the City’s growth strategy to measure progress towards achieving long‐term goals and objectives. Update Urban Center Plans and other local area plans to ensure that growth and development is being guided at multiple scales to enhance current and future aspects of quality of life for our residents. Create a favorable policy environment to ensure that housing needs of all Kelowna residents are met through affordable, accessible and diverse housing options.
Our key social development objectives:
Support and connect local change makers to facilitate collective action among diverse leaders to solve major community challenges, i.e., homelessness. Advance opportunities and advocacy for upstream initiatives and investments within the City, the sector and the broader community.
Our key climate and environment objectives:
Lead efforts to reduce community greenhouse gas emissions as established by community targets. Develop policies and programs that build resilience to local climate hazards (e.g., floods, wildfires, extreme heat). Develop policies and programs to ensure growth is balanced with protection and restoration of the city's natural assets.
Our guiding plans:
Imagine Kelowna Official Community Plan Transportation Master Plan Healthy Housing Strategy Community Climate Action Plan Sustainable Urban Forestry Strategy Agriculture Plan Urban Center and Local Area Plans Journey Home Strategy Community Safety Plan Clean Air Strategy
PAGE 208
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 1
Performance Measure 3
Delivering housing supply
Provide diverse housing options
Imagine Kelowna focuses on limiting urban sprawl and growing in a way that is more environmentally and financially sustainable. Additionally, the OCP aims to increase housing diversity. In recognition of these goals, more housing variety is being delivered. Continued diversification of our housing types is a key component of our growth strategy.
A resilient community has a wide variety of housing options available to meet the needs of residents at different price points and different life stages. Recent years have seen a more significant shift towards multi‐ unit housing, particularly in the form of low‐rise apartments, providing a more balanced offering. This moves the City towards the OCP target of % multi‐unit housing types.
4,000 3,500 3,000 2,500 2,000
PM#3: Provide Diverse Housing Options
3,700 3,192 2,500
2022 Actuals
2023 Estimate
2024 Forecast
% of Multi housing type
# of Various Hose
PM#1 Delivering Housing Supply
90% 85% 80% 75% 70%
85% 80%
78%
2022 Actuals
2023 Estimate
2024 Forecast
Focusing investment in urban centers
Community greenhouse gas emissions
The OCP targets % of new residential growth in Urban Centers, and we are moving in the right direction. Since the OCP was adopted, the Urban Centres have been growing quickly, with Pandosy growing the fastest and already approaching the OCP's targets. Midtown and Downtown are also growing, but not reaching the building permit stage as quickly suggesting a longer timeframe for sustained growth in future years.
Community greenhouse gas emissions are decreasing in line with Council endorsed targets ‐ % below levels by and net‐zero by . Data is always lagging so we will always be a couple of years behind on reporting progress.
PM#2: Focusing Investment in Urban Centers 2,200 2,000 1,800 1,600 1,400
2,094
1,500
1,452 2022 Actuals
2023 Estimate
2024 Forecast
Overall and per capita
Performance Measure 4
# of Houses in Urban
Performance Measure 2
1 0.8 0.6 0.4 0.2 0
PM#4: Community Greenhouse Gas Emissions
N/A
N/A
N/A
2022 Actuals
2023 Estimate
2024 Forecast
PAGE 209
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 5
Performance Measure 7
Corporate greenhouse gas emissions Greenhouse gas emissions from City of Kelowna operations (e.g., fleet, City facilities) are decreasing in line with the Strategic Energy Management Plan.
Urban tree canopy Tree canopy targets were established for each district in the OCP. Completed Light Detection and Ranging (LiDAR) and data analysis from will provide an initial baseline of tree canopy coverage, and we hope to track progress through periodic LiDAR and data analysis moving forward.
7500
PM#5: Corporate Greenhouse Gas Emissions 7033
PM#7: Urban Tree Canopy 1
5000 2500
N/A
N/A
0
0.5
N/A
N/A
N/A
2022 Actuals
2023 Estimate
2024 Forecast
0 2022 Actuals
2023 Estimate
2024 Forecast
Performance Measure 6
Performance Measure 8
Protection and restoration of sensitive ecosystems OCP policies . . and . . require land use and development projects to have “no net loss” of natural terrestrial and aquatic ecosystem’s function and productivity. While a no net loss policy has been applied for over a decade, understanding its success is challenging. It is recommended a strategy be developed to identify a path forward for ensuring changes to sensitive ecosystems can be adequately monitored. No quantitative metric yet.
Number of burning permits issued A new provincial OBSCR is effective September , , a reduction in the number of burning permits issued is expected over time. A reduction of % has been already achieved from to . The data source is the Regional Air Quality Program through the Fire Departments.
PM#8: Number of burning permits issued PM#6: Protection and Restoration of Sensitive Ecosystems
1000
1
600
0.5
400 N/A
N/A
N/A
0 2022 Actuals
2023 Estimate
2024 Forecast
788
800
200
N/A
N/A
2023 Estimate
2024 Forecast
0 2022 Actuals
PAGE 210
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance:
Performance Measure 10‐B
Performance Measure 9 Pollutants reduced through alternatives to burning The free agricultural chipping program and the Mow/chip/rent‐buy‐it rebate program are available to help residents and farmers manage their wood waste. The Mow it Chip rebate program helps with the rental/purchase cost to chip/flail mow small volumes of wood waste on their property. The baseline data for the Free chipping is from 2004 and the Mow‐ Chip‐ Rent it Rebate started in 2018.
96
99
100
N/A 2022 Actuals
2023 Estimate
2024 Forecast
Performance Measure 10‐A Achievement of the Canadian Ambient Air Quality Standards (CAAQS) – Annual PM . or fine particulate matter refers to solid particles and liquid droplets suspended in air that are smaller than or equal to . micrometers (µm) in diameter. These particles when inhaled, travel deep into the lungs and the bloodstream, and can cause adverse health effects like cardiovascular and respiratory diseases. PM . is considered a non‐threshold pollutant, there are no safe limits for exposure. PM . annual metric are based on the annual average of ‐hour values, averaged over three years ( ‐ ). CAAQS is . µg/m for the annual PM . metric. According to the Air Quality Management system goals for PM . , we are in the yellow level (Prevent Air Quality Deterioration)
Annual µg/m3
PM#10‐A: Achievement of the Canadian Ambient Air Quality Standards (CAAQS) ‐ Annual 10
6.1
5
N/A
N/A
0 2022 Actuals
2023 Estimate
2024 Forecast
24 Hour µg/m3
0
PM#10‐B: Achievement of the Canadian Ambient Air Quality Standards (CAAQS) ‐ 24‐Hour 17 20
N/A
N/A
2023 Estimate
2024 Forecast
0 2022 Actuals
Performance Measure 10‐C Achievement of the Canadian Ambient Air Quality Standards (CAAQS)‐ Ozone Metric (ppb) Ground‐level ozone is a colorless and irritating gaseous pollutant. It forms just above the earth’s surface through chemical reactions between “ozone precursor” emissions. Unlike naturally occurring ozone in the ozone layer, ground‐level ozone can be harmful to people, animals, and plants. Ozone ‐hour metric are based on the th highest daily ‐hour maximum, averaged over ‐ ). CAAQS for ozone is three years ( ppb. According to the Air Quality Management system goals for Ozone, we are in the yellow level (Prevent Air Quality Deterioration)
Ozone Metric (ppb)
Tons/Year
200
PM#9: Pollutants reduced through Alternatives to burning
Achievement of the Canadian Ambient Air Quality Standards (CAAQS) ‐ ‐Hour PM . or fine particulate matter refers to solid particles and liquid droplets suspended in air that are smaller than or equal to . micrometers (µm) in diameter. These particles when inhaled, travel deep into the lungs and the bloodstream, and can cause adverse health effects like cardiovascular and respiratory diseases. PM . is considered a non‐threshold pollutant, there are no safe limits for exposure.PM . ‐hour metric are based on the annual th percentile of the ‐hour value, averaged over three years. CAAQS of µg/m for the PM . ‐hour. According to the Air Quality Management system goals for PM . , we are in the yellow level (Prevent Air Quality Deterioration)
PM#10‐C: Achievement of the Canadian Ambient Air Quality Standards (CAAQS)‐ ozone metric (ppb) 100
51 50
N/A
N/A
2023 Estimate
2024 Forecast
0 2022 Actuals
PAGE 211
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 12
# of people experiencing unsheltered homelessness Housing is a fundamental social determinant of health, which can prevent ill health and support well‐being and community inclusion. The experience of homelessness impacts not only one’s individual health, but also community functioning and the wellness of all. Understanding the inflows and outflows of homelessness in Kelowna is key to informing appropriate policy development, advocacy efforts and a coordinated response. As we work towards achieving real time, person‐specific data, Bylaw Services continues to conduct a daily count of the number of people sheltering outside in key locations across the community. While this information does not reflect a point‐in‐time count for the City as a whole, it provides an opportunity to monitor trends and changes in community needs. When comparing the average number of people sheltering outside in October 2022 (167) and October 2023 (238), the result is a 43% increase.
# of social development grants distributed in community Community Social Development grants are available to registered non‐profit, Kelowna‐based organizations that make an impact on the social well‐being and resiliency of the community. The goal is to make funding available to organizations offering services or programs with the goal of generating, promoting or accelerating socially beneficial services or programs in Kelowna. Strategic investments in diverse, equity seeking agencies and programs help to build a strong and resilient community.
# of Supposed People
Performance Measure 11
# of Grants
PM#12: # of Social Development Grants distributed in community
200
238
N/A
0 2022 Actuals
2023 Estimate
18
13
15 10
2023 Estimate
2024 Forecast
Performance Measure 13
167
100
16
2022 Actuals
PM#11: # of people experiencing unsheltered homelessness 300
20
2024 Forecast
Systems collaboration Increased systems collaboration based on trust and mutual understanding is required to advance collective impact, ensure shared accountability (i.e., move away from siloed approaches), drive timelier identification of issues, and expedite response options to complex issues. By working collaboratively across the social serving sector to advance a shared action plan (i.e., to address homelessness), we seek to enhance service delivery and address gaps and duplication of services among agencies. Further, tracking data on the initiative’s outcomes and process, including the engagement and perceptions of key decision makers, will help to inform continual improvements to address homelessness in our community. This measurement is under development. PM#13: Systems Collaboration 1 0.5 0
N/A
N/A
N/A
2022 Actuals
2023 Estimate
2024 Forecast
PAGE 212
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Crime & Safety
Participate in the implementation of the Community Safety Plan
Agriculture
Update the Agricultural Land Use Inventory (ALUI) dataset Complete an agricultural signage program
Affordable Housing
Update the Healthy Housing Strategy Partner to deliver affordable housing on City lands Explore a Below Market Housing Program Develop a housing data dashboard for more robust monitoring and analytics Implement the Infill Housing Options program
Homelessness
Lead the Journey Home Strategy reset, including the formation of a new Systems Leadership Table Support the development of new, temporary shelter sites Lead the development of the Extreme Cold Weather Response Plan Support the introduction of a second Complex Care site in community Advance opportunities & advocacy for upstream initiatives & investments within the City, the sector & broader community
Climate & Environment
Develop and implement a pilot home energy coordinator program to support residential energy efficiency and low‐carbon retrofits Develop criteria and process to apply a climate lens to development applications and capital planning Complete and lead the implementation of the Climate Resilient Kelowna Strategy Support the completion and implementation of the Sustainable Urban Forestry Strategy Develop a strategy outlining Kelowna’s approach to adopt the higher steps of Energy Step Code and Zero Carbon Step Code In collaboration with the Regional District of Central Okanagan, complete an update to the Sensitive Ecosystem Inventory (SEI) and identify a strategy to monitor changes Investigate options for EV charging requirements for new industrial, commercial, and institutional developments
Base Business
Advance the Urban Centers Framework to guide and prioritize urban center planning efforts Finalize the North End Neighborhood Plan alongside the Mill Site Area Redevelopment Plan Expand on growth strategy data for more robust data analytics
PAGE 213
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments: Growth Management
Completed the CMHC Housing Accelerator Fund application, a billion federal grant program that was released to drive transformation change to unlock housing supply Endorsement of the ‐ Housing Needs Assessment, a robust quantitative and qualitative analysis of housing needs now and into the future for our residents Completed a Revitalization Tax Exemption program update, aimed to target tax incentives for development and housing projects that fulfill our growth strategy goals Completed the Community Housing Fund application, and provincial grant program aimed to provide , more affordable rental homes for people with low to moderate incomes across BC Advanced the Infill Options Program which aims to diversify and incentivize ‘missing middle’ housing forms in select areas of the City A multi‐year project to update Bylaw was completed Multiple zoning regulations were updated
Climate and Environment
Completed a Climate Vulnerability and Risk Assessment (CVRA) to model the natural and built hazard risks and vulnerabilities to existing buildings, infrastructure and people, and planned growth, out to . The CVRA is being used as the technical basis for the adaptation component of the Climate Resilient Kelowna Strategy, expected to be complete in early‐ Completed a Construction & Demolition Debris Recycling Feasibility Study in partnership with the Regional District of Central Okanagan. The project included a pilot to perform building deconstruction rather than demolition on several City owned houses. The study assessed waste reduction options for demolition debris as a waste diversion initiative which leads to reduced lifecycle GHG emissions Continued to offer top‐up rebates to existing provincial programs to those that switch from a fossil fuel heating system to a heat pump and to those that install EV chargers in multi‐unit residential buildings Developed a strategy for EV charging requirements in new residential buildings as part of the implementation of the Community EV and E‐Bike Strategy Collaborated with Parking Services to expand our network of public EV chargers, using the EV Infrastructure Gap Analysis to plan for optimal locations. We added Level charging stations at City Hall, Museum Parking Lot, and the Memorial Parkade Completed Light Detection and Ranging (LiDAR) analysis and imagery to provide a basis for spatial analysis of key environmental indicators such as urban tree canopy, natural assets, and impervious vs. pervious areas Established a new Climate Action & Environmental Stewardship Department to guide the climate/environment priority at the City Reduced % of burning permits issued in the region compared to . The decrease is more significant compared to data, with a reduction in burning permits Increased participation in the Clean Air and Safe Route 4 School Program (Bellevue and Quigley). The program has supported nine schools in Kelowna Secured grant funding from Health Canada and Take Action on Radon to provide awareness and free radon test kits to residents and workplaces in Fall 2023. Initially, 395 detectors were available, but due to overwhelming residents' responses, additional funding was obtained through BCCDC, which provided 415 more detectors. Total available: 810 free radon test kits Provided idling awareness. More than 200 idling signage installed at schools, parking stations and parkades, signage, postcards, stickers, decals and school packages are available upon request‐ Online request. An Idling Behavioral Study is underway Participated in collaboration with local governments, interior Health and some local residents, on a Small, Low‐ Cost Air Quality PM Sensor Pilot Project. Ten PurpleAir sensors were installed to provide air quality PM2.5 information at a neighborhood level, see AQmap (EN) (unbc.ca)
PAGE 214
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments: Social Development
Improved communication of available shelter beds through the introduction of the Shelter dashboard Advanced Indigenous PEER Navigator Program and Indigenous Harm Reduction Team in partnership with community agencies Supported the delivery of services for people sheltering outdoors through Kelowna’s Outdoor Sheltering Strategy, including funds for community partners to manage these services Complex care beds opened as a result of advocacy Received funding from UBCM to deliver the Kelowna Food Innovation Project, a key action identified in the Central Okanagan Poverty Reduction Strategy Advanced HEART and HEARTH projects to address immediate impacts of encampments
PAGE 215
2024 FINANCIAL PLAN
CITY OF KELOWNA
Continuous improvements:
Staff has developed Strategies to Reduce PM2.5 and is preparing an updated Smoke Control Bylaw (773), which applies to the City of Kelowna, for Regional Board consideration Complete the transition of the leadership role (‘Back bone entity’) to address homelessness from an external agency to in‐house, including the resetting the community strategy to address homelessness Improve data quality and data sources to establish better measurement of needs and progress related to housing and homelessness Complete review of the City’s Social Development Grants to ensure alignment with Council priorities and community needs Expand the capacity of the Social Development department to create opportunities to lead, partner or support initiatives which enhance opportunities for youth and reduce their risk factors to experiencing homelessness, poverty, social disconnection, and many other negative elements that can impact ones journey to wellness Enhance proactive planning as it relates to extreme weather responses, with a line of sight on the needs of community, early detection of the trends in homelessness, movement patterns for outdoor sheltering, gaps and / or overlaps in services, and funding requirements and sources Key Performance Indicators: seeking to establish KPIs that can be used to inform decision making and track progress on environmental initiatives (e.g., KPIs related to climate resilience and adaptation) Communication and Awareness: as a new department we want to ensure others in the organization and in the community are aware we exist and what our purpose is. While most of this is somewhat informal, we will be establishing an interdepartmental Climate Action Team to ensure implementation of climate‐related initiatives across the organization Applying a Climate Lens: We want to better leverage City data to drive evidence based decision making. In the same way Model City has been applied to inform decision around land use planning and infrastructure, we hope to initiate the development of 'Model City Climate' that can determine environmental/climate impacts in our community at a more granular level Examining new tools and technology to gather data and development statistics that will allow us to improve processes, systems, and monitoring. A housing dashboard is an example of this Improving data inputs into Model City, so that staff across numerous business units have access to future growth scenarios to make evidence‐based decisions/recommendations Modernizing the City's traditional planning processes to be nimbler and more responsive to a changing and evolving context around us. The Urban Centers Framework is an example of proactively examining future growth needs across all Urban Centers that will streamline and condense the individual Urban Center plans in future years Innovative AI use to improve development applications
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Community Development, $5.4M
Climate Action & Environmental Stewardship $1.1M Long Range Policy Planning $0.5M Policy & Planning $1.9M Social Development $1.6M Regional Programs $0.3M
PAGE 216
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revised Annualized Maintaining 2023 Budget Service
Enhancing Preliminary Service 2024
Revenue budget: Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
3,286 97
4,035 10
156
(398)
574
4,367 10 0 444 535 5,356
1,161 540 5,085
1,395 1,510 6,950
(1,051) (1,510) (2,405)
100 35 (263)
500 1,074
1,575 1,273 665
1,664 3,377 589
(17) (1,994) (440)
212 (215) (1)
388 608 80
579 993 5,085
300 1,019 6,950
46 (2,405)
(259) (263)
(1) 1,074
2,247,256 1,776,123 228,235 300,000 804,508 5,356
4.8 1.5 7.2 13.5
5.5 2.7 6.0 14.2
0.0
2.0 2.0 1.0 5.0
8.0 4.7 7.0 19.7
Expenditure budget: Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Operating FTE positions: Management Union hourly Union salary Total operating FTE positions
0.5
0.5
Note: Totals may not add due to rounding
Expenditure by type
Funding strategy Property tax $4.4M
Salaries and wages $2.2M Material and other $1.8M
Fees and charges $0M Contract services $0.2M Other revenue $0.4M Transfers to reserve $0.3M Transfers from reserve $0.5M
Total $5.4M
Enabling allocation $0.8M
Total $5.4M
Note: Totals may not add due to rounding
PAGE 217
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Community Development - Priority 1 219 Maintain Community Energy Specialist Position (3-Year Extension) 219 Maintain Housing Strategy Update 220 Enhance Social Development Services 220 Enhance Urban Tree Canopy Assessment and Expansion 221 Enhance Electric Mobility Incentives 221 Enhance Home Energy Retrofit Concierge and Incentives Service Area Priority 1 Total
Cat.
Cost
OG
111,700
OT OG OT OT OT
Reserve
Borrow Grant 0
Revenue
Utility
Taxation
0 (100,000)
0
0
35,000 (35,000) 383,400 0 100,000 (100,000)
0 0 0
0 0 0
0 0 0
0 0 0 (383,400) 0 0
200,000 (200,000) 200,000 (200,000)
0 0
0 0
0 0
0 0
0 (100,000)
0
0 (395,100)
1,030,100 (535,000)
(11,700)
0 0
PAGE 218
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Community Development
Maintain
Priority: 1
ON-GOING Title:
Community Energy Specialist Position (3-Year Extension)
PRELIMINARY
Justification: FortisBC has offered the City of Kelowna a grant of up to $100k annually for three years to extend the Community Energy Specialist (CES) Position (August 2023 to August 2026), with an opportunity for further extension. With a costof-living increase and fringe benefits, the $100k grant will not be sufficient to cover the cost of the entire position, and therefore budget is requested for the City to fund the amount over $100k. The CES position will continue to lead the development and implementation of policies and programs that advance many of the City's climate action objectives, primarily those that result in a reduction in energy usage and greenhouse gas (GHG) emissions in the community. The CES position is vital in advancing the City's Climate & Environment Council Priority.
Expected Completion: Aug 2026 Strategic Direction: 2024 2025 2026 Service Area:
Cost 111,700 111,700 111,700
Climate & Environment - Reduce corporate and community GHG emissions Reserve 0 0 0
Borrow 0 0 0
Grant (100,000) (100,000) (100,000)
Other 0 0 0
Community Development
Revenue 0 0 0
Utility 0 0 0
Taxation (11,700) (11,700) (11,700) Maintain
Priority: 1
ONE-TIME Title:
Housing Strategy Update
PRELIMINARY
Justification: The Healthy Housing Strategy was endorsed by Council in 2018, and is now due for an update (as per legislative requirements to be completed every five years). A Housing Needs Assessment has just been completed, which sets in motion the next step. Budget is requested to craft a comprehensive five year housing strategy that will create actionable activities to diversity housing forms and tenure for current and future residents. This aligns with Council's priorities to address homelessness and housing diversity.
Expected Completion: Dec 2024 Strategic Direction: 2024
Cost 35,000
Affordable Housing - Improved housing supply meets community needs Reserve (35,000)
Borrow 0
Grant 0
Other 0
Revenue 0
Utility 0
Taxation 0
PAGE 219
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Community Development
Enhance
Priority: 1
ON-GOING Title:
Social Development Services
PRELIMINARY
Justification: Social Development has assumed the role of 'backbone entity' for the reset of the Journey Home Strategy (JHS) including future implementation and related work. As the backbone, Social Development has an expanded mandate to provide strategic leadership in the implementation of the Strategy, specifically, leading the coordination of and collaboration among community groups, agencies and other levels of government to collectively address homelessness. The new governance model, comprised of the requested staff over a three-year period will facilitate reengagement of key community groups, stakeholders and systems leaders through, strategic, facilitated consultations, working groups, and communications strategies, and an increased focus on intergovernmental and systems advocacy efforts to address complex social issues impacting our community. Expected Completion: Dec 2026 Strategic Direction: 2024 2025 2026 Service Area:
Cost 383,400 545,300 731,100
Homelessness - Fewer people living on streets with mental health and/or addictions Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Community Development
Revenue 0 0 0
Utility 0 0 0
Taxation (383,400) (545,300) (731,100) Enhance
Priority: 1
ONE-TIME Title:
Urban Tree Canopy Assessment and Expansion
PRELIMINARY
Justification: Budget is requested to support the implementation of the Sustainable Urban Forestry Strategy and to deliver on the Council Priority Action to increase the urban tree canopy. The initiative includes three major components, analysis of tree canopy coverage to give a baseline inventory of city-wide tree canopy coverage, including species diversity; developing a street tree planting design as well as identifying planting locations in low equity and other priority areas; and expanding bareroot nursery to permit additional annual tree planting.
Expected Completion: Dec 2024 Strategic Direction: 2024
Cost 100,000
Climate & Environment - Protect and restore natural areas Reserve (100,000)
Borrow 0
Grant 0
Other 0
Revenue 0
Utility 0
Taxation 0
PAGE 220
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Community Development
Enhance
Priority: 1
ONE-TIME Title:
Electric Mobility Incentives
PRELIMINARY
Justification: Electric mobility (e.g., electric vehicles, electric bikes) is a critical component of reducing community greenhouse gas emissions; however, there are still many barriers preventing widespread adoption. Installing electric vehicle (EV) charging in existing multi-unit residential buildings (MURBs) is particularly challenging because of cost and complexity. Therefore, budget is requested for MURBs to create EV Ready Plans - which could include a professional engineering assessment and additional infrastructure to ensure parking spaces are EV Ready. Additionally, as cost remains a major barrier to e-bike purchases for many Kelowna residents, budget is requested to offer e-bike incentives for income qualified households.
Expected Completion: Dec 2024 Strategic Direction: 2024 Service Area:
Cost 200,000
Climate & Environment - Reduce corporate and community GHG emissions Reserve (200,000)
Borrow 0
Grant 0
Other 0
Community Development
Revenue 0
Utility 0
Taxation 0 Enhance
Priority: 1
ONE-TIME Title:
Home Energy Retrofit Concierge and Incentives
PRELIMINARY
Justification: Retrofitting existing homes presents one of the biggest opportunities to reduce community greenhouse gas emissions, however, the complicated retrofit journey can be a barrier for many homeowners. Budget is requested for this initiative which aims to support the delivery of a home energy concierge program, and for incentives towards low-carbon home energy retrofit technologies.
Expected Completion: Dec 2025 Strategic Direction: 2024
Cost 200,000
Climate & Environment - Reduce corporate and community GHG emissions Reserve (200,000)
Borrow 0
Grant 0
Other 0
Revenue 0
Utility 0
Taxation 0
PAGE 221
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Type
Description
Community Development - Priority 2 Enhance Climate Action Specialist Position Service Area Priority 2 Total
Cat.
Cost
OG
58,500 58,500
Reserve
Borrow
0 0
0 0
Grant
Revenue 0 0
0 0
Utility
Taxation 0 0
(58,500) (58,500)
PAGE 222
2024 FINANCIAL PLAN
CITY OF KELOWNA
DEVELOPMENT SERVICES LED BY: DIVISIONAL DIRECTOR, PLANNING & DEVELOPMENT SERVICES
Our goal & community benefit: Our purpose is to provide compliance reviews on building and civil infrastructure plans, permits, and business licences, as well as provide inspection oversight during the construction/development process.
Our customers:
Builders, plumbers, and contractors Business owners Architects, engineers, and building designers Realtors, lawyers, and other registered professionals Property owners
Our partners: We work with our citizens, licenced builders, engineers, third party service and utility agencies, industry associations, and other levels of government.
What we deliver: We develop and implement operational policies, processes, and practice to ensure compliance with bylaws, codes, regulations, and Council policies with respect to building/development approvals and business licensing in the City. These rules govern the development process for road construction, utilities installation, building construction, and the licensing of businesses in buildings through to completion and occupancy.
Our key objectives:
Provide excellence in customer service Inspect permitted activities for compliance with approved plans Review applications for civil infrastructure design and construction for compliance Promote new business and contribute to our vibrant community Review business licence applications for compliance with the zoning bylaw and other relevant bylaws
Our guiding plans:
Municipal Bylaws: Building, Subdivision and Development Servicing, Zoning & Business Licensing Area Structure Plans Urban Centre Plans Official Community Plan
PAGE 223
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 1
Performance Measure 3
% of inspections completed within 24 hours
% of engineering drawings approved within 2 submissions
The Development Services Department completes % of building, plumbing, and gas inspections within hours of booking. This ensures that projects can progress without unnecessary delays between stages of construction.
95.5%
95% 90% 2023 Estimate
2024 Forecast
Performance Measure 2 % of utility and building permit (BP) drawings reviewed within 2 weeks of submission
% of reviewed drawings
Drawings reviewed by Development Engineering correlate with higher value, complex projects with on‐site engineering requirements. These add value by giving confidence in the systems that support citizens’ dwellings and workplaces in meeting established engineering standards. These reviews vary significantly in complexity, however, we target to have 80% of all projects reviewed within 2 weeks of submission. PM#2: % of utility and BP drawings reviewed within 2 weeks of submission 85% 80% 75% 70%
PM#3: % of engineering drawings approved within 2 submissions % of approved engineering drawings
2022 Actuals
60%
2022 Actuals
74%
2023 Estimate
2024 Forecast
56%
51%
50% 2022 Actuals
2023 Estimate
2024 Forecast
% of 1‐2 dwelling unit BPs approved for issuance within 10 days Development Services completes % of BP packages for single family or family dwelling units within business days of completion of application. These stats are monitored through a rd party to help achieve exemplary customer service. PM#4: % of 1‐2 dwelling unit BPs approved for issuance within 10 days
80% 73%
70%
70%
Performance Measure 4
% of BPs approved
% of completion
PM#1: % of inspections completed within 24 hours 100% 96.5% 96.0%
Reduced number of submissions required to achieve design approval indicates that the Development Engineering branch has set clear requirements and provides high‐quality, comprehensive, and accurate reviews early in the process. This gives cost certainty for developers and results in fast approval and reduced costs for development. In 2022 and 2023, Development Engineering approved 85% and 94% of drawings within 3 submissions (1 initial + 2 resubmissions) and aims to have 75% of all submissions approved with only a single resubmission, for a total of only 2 submissions required.
100% 99%
99% 98%
98%
98% 97% 96% 2022 Actuals
2023 Estimate
2024 Forecast
PAGE 224
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance:
Performance Measure 6 % of business licences issued within 2 weeks
% BPs for small projects issued within 2 days or less
% of issued BPs for small projects
Smaller BP subtypes (e.g., garage, secondary suite, small additions) that do not require a lot of in‐depth review are issued within business days of completed application. These stats are monitored through a rd party to help achieve exemplary customer service.
PM#5: % of BPs for small projects issued within 2 days or less 99% 98%
98%
98% 97%
97% 96% 2022 Actuals
2023 Estimate
2024 Forecast
The Business Licensing branch is focused on continuing to provide excellent customer service to the growing business community in Kelowna. One way we demonstrate this commitment is to turn business licence applications around in weeks or less. Over the past three years, the business licensing team has seen year‐over‐ year increases in the number of business licences issued in under weeks.
% of busintess licences issued
Performance Measure 5
PM#6: % of business licences issued within 2 weeks 90% 80% 70%
78.5%
80.0%
2023 Estimate
2024 Forecast
62.5%
60% 2022 Actuals
PAGE 225
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Crime & Safety
Support the operations of the Property Standards & Compliance team Collaborate to prepare a comprehensive approach on Community Fire Safety
Affordable Housing
Expedite permit process and approval times for affordable housing Develop additional tools to facilitate predictable and lower development costs for affordable housing
Homelessness
Work with rd party agencies to expedite and find solutions for permitting temporary housing
Digital Transformation
Active Financial Management
Update Bylaw 7900 Transportation Design Standards to help ensure transportation networks are efficient, accessible, safe, and costeffective as the City grows
Climate & Environment
Provide incentives for mid stage blower door testing New software and processes to further reduce our carbon footprint Collaborate with other divisions to identify climate change risks to infrastructure with an aim to review and improve design standards
Team members received training on accounting and procurement policies with the Finance and Purchasing departments
Base Business
Transportation
Replace legacy software with City Works PLL. Digital Plan review process with / service delivery Support for AI chat bot
Host developer and consultant workshops to convey process efficiencies and recent bylaw changes for transportation design standards Work with Long‐Range Planning to address infrastructure priorities in conjunction with the Infill Challenge to help support responsible densification Update internal templates to improve standardization and automation through our workflow to increase efficiency and improve consistency and quality of work As the first community in all of Canada to be accredited by the International Accreditation Service, we will continue to maintain accreditation status for the building permitting branch.
Our People
Delivering action plans as result of employee engagement survey Formalized monthly training sessions to help staff stay current on best practice and meet regulatory requirements for continuing education
PAGE 226
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments:
Obtained the annual renewal of permitting branch accreditation from International Accreditation Service Replacement of Business Licence (BL) Bylaw No. 7878. The result is a new streamlined BL Bylaw that is more modern and user‐friendly Improvement to the online business licence application process to drive more online applications and support 24/7 service delivery Adopted a permitting process for excessive construction noise and vibration to help ensure developers are notifying neighbours and setting/monitoring safe thresholds for work activities generating noise and vibration Issued permitting for community construction value of greater than B Launched Artificial Intelligence (AI) Chatbot
Continuous improvements:
Building Bylaw Update Continued development of the new permitting software (Cityworks PLL) Transitioning to digital plan review Continued automation of internal business processes. Advancing efforts to integrate AI and automation into engineering memo composition to reduce staff time in identifying and compiling data on existing conditions and development requirements Continuing to work on standardizing engineering drawing and submission requirements to reduce intake and review time
\ Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Development Services, $7.7M
Building & Permitting $2.5M Building Inspections $2.2M Business Licence $1.2M Development Engineering $1.3M Development Services $0.5M
PAGE 227
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revised Annualized Maintaining 2023 Budget Service
(7,055) 13,883
(2,786) 9,836
190
6,828
81 7,131
4,583 361 78
5,273 703 62
387 1,419 6,828
0 1,093 7,131
4.8 3.5 39.6 47.9
5.0
Enhancing Preliminary Service 2024
Revenue budget: Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
(1,956) 2,467
(2)
(61) 129
511
(2)
(4,554) 12,303 0 0 20 7,768
56 3
427 8
70 129
75 511
(2) (2)
5,756 714 62 0 0 1,236 7,768
0
5.5 0 45.0 50.5
Expenditure budget: Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Operating FTE positions: Management Union hourly Union salary Total operating FTE positions
44.5 49.5
0.5 0.5 0.5
0.5
Note: Totals may not add due to rounding The difference between the two graphs below is the . million surplus earned by this service area that is used to offset taxation funds required for other community services areas and infrastructure such as Buildings, Transportation, and Community Development.
Funding strategy
Expenditure by type Salaries and wages $5.8M
Fees and charges $12.3M Transfers from reserve $0M
Material and other $0.7M
Contract services $0.1M
Enabling allocation $1.2M
Total $12.3M
Total $7.8M
Note: Totals may not add due to rounding
PAGE 228
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Cat.
Cost
Development Services - Priority 1 230 Maintain Development Engineer Position Service Area Priority 1 Total
OG
67,100 67,100
Reserve
Borrow
0 0
0 0
Grant
Revenue 0 0
(67,100) (67,100)
Utility
Taxation 0 0
0 0
PAGE 229
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Development Services
Maintain
Priority: 1
ON-GOING Title:
Development Engineer Position
PRELIMINARY
Justification: The Development Engineering branch is responsible to assess engineering requirements for a variety of development applications. Primarily supporting the Planning Department and Building Permitting branch with assessing and reviewing Subdivision and Building Permit applications to ensure the applications meet technical engineering requirements and are serviceable by the City's water, sanitary sewer, drainage, and transportation networks. Budget is requested for one Development Engineer position, which will be funded from new revenues.
Strategic Direction: 2024 2025 2026
Cost 67,100 131,300 131,300
Our People - Employees in all positions have more opportunities to improve their leadership Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue (67,100) (131,300) (131,300)
Utility 0 0 0
Taxation 0 0 0
PAGE 230
2024 FINANCIAL PLAN
CITY OF KELOWNA
DEVELOPMENT PLANNING LED BY: DIVISIONAL DIRECTOR, PLANNING & DEVELOPMENT SERVICES
Our goal & community benefit: Our goal is to provide land use planning and growth-related direction to our community. The Official Community Plan (OCP) focuses on slowing the outward growth of suburban neighbourhoods, this protects our rural/agricultural lands and environmentally sensitive areas while reducing the amount of new infrastructure that is needed to service growth. Urban centres are prioritized for residential and mixed-use growth.
Our customers: • • • •
Developers, architects, engineers, and planners Builders and contractors Property owners Residents
Our partners: We partner with internal City departments including Development Services, Real Estate Services and Parks Planning. We partner with external partners including the Urban Development Institute, Canadian Home Builders Associations, Utility Providers, and residents’ associations.
What we deliver: We review and process land use and development permit applications and provide advice and information on planning processes to Council and the public. We also promote, implement, and advocate for change that moves the City towards the Kelowna envisioned by Imagine Kelowna and the policy direction of the OCP.
Our key objectives: • • •
Review various applications related to land use change and form and character analysis against Council endorsed regulations and policies Maintain and update regulations, policies, and processes to ensure a streamlined and efficient development application process Prioritize Council, corporate and divisional priorities, such as affordable housing, protecting agriculture and climate/environment
Our guiding plans: • • • • • •
Official Community Plan Zoning Bylaw Subdivision and Development Servicing Bylaw Development Cost Charge Bylaw Development Application Fees Bylaw Development Application and Heritage Procedures Bylaw
PAGE 231
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance:
% of development permit (DP) applications that utilized the existing zone The planning, permitting, and construction of buildings require us to balance efficient process and growth management. Development planning pre-zones areas of the City which decreases the process for applicants and directs growth and higher density to areas that support the vision in the Official Community Plan.
% residential building permits in growth districts While the OCP provides growth estimates in different areas of the City, development can take place faster or slower than expected based on market trends. Monitoring this rate of growth in our urban center helps to make informed decisions about investments in things like transportation and utility servicing, as well as when to initiate urban centre plans.
PM#1: % of DP applications that utilized the existing zone
PM#3: % residential building permits in growth districts 73% 80%
80% 70%
69%
75% 65%
60% 2022 Actuals
2023 Estimate
% building permits in growth area
Performance Measure 3
% of DP in existing zone
Performance Measure 1
70%
70%
61%
60% 2022 Actuals
2024 Forecast
2023 Estimate
2024 Forecast
Performance Measure 4
% issued
PM#2:% of DPs, HAPs and DVP issued at a staff level 68% 70% 55% 54% 60% 50% 2022 2023 2024 Actuals Estimate Forecast
% multi vs. single development
% of development permits (DPs), heritage application permits (HAPs) and development variance permits (DVPs) issued at a staff level To promote efficient operations and timely permit issuance, we regularly review that decisions are made at the appropriate level. Permits issued at a staff level are made for more routine and less complex decisions so that higher complexity and impact decisions can be scheduled for Council decisions more quickly.
% multi-family vs. single family development A resilient community has a wide variety of housing options available to meet the needs of residents at different price points and different life stages. PM#4: % multi-family vs single family development 85% 80% 75% 70%
80%
78%
70%
2022 Actuals
2023 Estimate
2024 Forecast
Performance Measure 5 # applications per urban planner/file manager yearly The City must balance efficient processes with outcomes that are important such as alignment with growth plans, building codes, and safety. Urban planning applications per planner provides insight into our ability to balance speed, quality of review, and support to the applicant.
# of Application per planner
Performance Measure 2
PM#5: # of applications per urban planner/file manager yearly 50
47
49
2022 Actuals
2023 Estimate
42
40 2024 Forecast
PAGE 232
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities: by priority Affordable Housing • •
Implement Infill Options housing program Implement provincial legislation related to housing
Homelessness •
Support the review of transit supportive corridors for additional land use density
Agriculture • •
Prioritize enforcement efforts for non-farm uses on agricultural lands Explore opportunities to support and house farm labor
Climate & Environment • •
•
Implement electric vehicle charging regulations Support the development of a “Climate Lens” to review land use change applications
Implement projects related to Divisional Strategic Plan and Council/Corporate Priorities
Digital Transformation •
Support City/community sheltering initiatives
Transportation •
Our People
•
Continue implementation and expansion of KAI chatbot to applications Implement Cityworks LLP
business planning
Active Financial Management • • •
Monitor Development Application Fee bylaw to ensure updated bylaw is functioning as intended Monitor density bonus programs and fine tune as necessary Review financial impact of Business License Bylaw update
Base Business •
Continue to identify and act on opportunities to streamline the development application process for housing delivery
PAGE 233
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments: • • • • • • •
Housing approvals met or exceeded projected housing needs for gross number of units Reviewed and updated Development Application Fees Bylaw Completed Zoning Bylaw amendment package aimed at fine-tuning Zoning Bylaw Reduced number of amendments to Official Community Plan Implemented density bonus program leading to significant contributions to both the Housing Opportunities Reserve Fund and the Streetscape Improvement Fund Supported work on the Infill Options project Implemented Development Variance Permit delegation process
Continuous improvements: • • • • •
Updated/streamlined Council reporting template Implemented a delegated development variance permit program to speed up some development application types Supported the creation of the Kelowna AI chatbot Supported work on Cityworks LLP project Improved/updated landscape enhancement standards
Budget overview: et Overview
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Development Planning, $3.1M
Development Planning $0.7M
Suburban and Rural Planning $1.1M
Urban Planning Management $1.3M
PAGE 234
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revenue budget:
Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
Expenditure budget:
Revised Annualized Maintaining 2023 Budget Service
2,529 589
2,072 818
28
135
(1)
27 29 3,173
221 3,111
(221) (193)
30 165
(1)
2,234 818 0 0 30 3,082
(1) (1)
2,375 217 0 0 0 490 3,082
0
3.0 1.2 17.0 21.2
Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
2,324 150
2,447 187
(221)
148 30
699 3,173
477 3,111
28 (193)
(14) 165
Management Union hourly Union salary Total operating FTE positions
2.4 5.4 15.8 23.6
3.0 1.2 17.0 21.2
Operating FTE positions:
Enhancing Preliminary Service 2024
0
0
Note: Totals may not add due to rounding
Funding Strategy
Expenditure by type
Property tax $2.2M
Salaries and wages $2.4M
Fees and charges $0.8M
Material and other $0.2M
Transfers from reserve $0M
Enabling allocation $0.5M
Total $3.1M
Total $3.1M
Note: Totals may not add due to rounding
PAGE 235
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Development Planning - Priority 1 237 Maintain Agriculture and Tree Protection Bylaw Changes Service Area Priority 1 Total
Cat.
Cost
Reserve
Borrow
Grant
Revenue
Utility
Taxation
OT
30,000
(30,000)
0
0
0
0
0
30,000
(30,000)
0
0
0
0
0
PAGE 236
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Development Planning
Maintain
Priority: 1
ONE-TIME Title:
Agriculture and Tree Protection Bylaw Changes
PRELIMINARY
Justification: One-time budget is requested to contribute to Council Priority areas of Agriculture and Tree Protection through various projects and bylaw changes that will be delivered in 2024. 2024 Base Budget: $31k
Expected Completion: Dec 2024 Strategic Direction: 2024
Cost 30,000
Climate & Environment - Protect and restore natural areas Reserve (30,000)
Borrow 0
Grant 0
Other 0
Revenue 0
Utility 0
Taxation 0
PAGE 237
2024 FINANCIAL PLAN
CITY OF KELOWNA
PARKING LED BY: DIVISIONAL DIRECTOR, PARTNERSHIPS & INVESTMENTS
Our goal & community benefit: Our goal is to support Kelowna as a safe, vibrant, and sustainable community. Parking management is a key consideration when trying to strike a balance between convenience for citizens and visitors and providing a self‐funded system that improves the availability of short‐term parking space.
Our customers:
Community members Local businesses & employees Visitors & tourists
Our partners: We work with institutions, businesses, developers, contractors, equipment vendors, and other city departments to create, operate, adjust, and maintain our parking facilities, equipment, policies, rates, and bylaws.
What we deliver: Parking Services manages over , on‐street pay parking spaces to create or maintain turnover in commercial areas, ensuring customer access to support businesses. In residential areas adjacent to commercial/institutional areas, we manage more than two hundred on‐street blocks where time limits or residential restrictions are in effect to maintain the integrity of neighborhoods. Parking Services also operates the majority of off‐street parking facilities in the city, including three parkades and twenty‐three surface parking lots (approximately , spaces), that provide longer term employee and resident parking options. Our team also supports public access to electric vehicle charging through city‐owned EV charging facilities, leads future parking planning, and manages the capital plan and related projects for facilities we operate.
Our key objectives: The City‐wide parking management strategy, endorsed by Council, is guided by a set of principles to ensure our parking system:
Improves the availability of short‐term parking spaces Continues to pay for itself so that general taxation is not impacted Offers customer service options for better customer interaction Provides a balanced transportation network for residents Works with institutions, businesses, and developers
Our guiding plans:
Imagine Kelowna Official Community Plan Transportation Master Plan Downtown Area Parking Plan Hospital Area On‐Street Parking Plan South Pandosy Area Parking Plan Parking Management Strategy
PAGE 238
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 3
Revenue to Cost Ratio: Operation of Parking System The ratio of parking fees and fines over the cost of operating the parking system, including on‐street parking, lots, and parkades – The Canadian municipal median was ͭ.ͮͮ in ͮͬͮͬ and dropped to ͭ.ͭͳ for ͮͬͮͭ – Kelowna continues to outperform these benchmarks, providing funding for debt servicing and capital projects.
Bylaw Offence Notices Issued (#) Total number of bylaw offence notices issued by Parking Services. This includes notices issued by City and contracted staff.
2.00
1.95 1.84
1.80
1.77
70,000 66,300
70,000 65,000
62,356
60,000 2022 Actuals
2023 Estimate
2024 Forecast
1.60 2023 Estimate
2024 Forecast
Peak Capacity of Pay Parking Stalls (%) Peak capacity of pay parking stalls under management – on and off street combined. Ͳͬ% or lower suggests there is excess capacity available and over ʹͱ% indicates the parking system is reaching capacity. PM#2: Peak capacity of pay parking stalls (%) 81.5% 81.0% 80.5% 80.0% 79.5% 79.0%
81% 79.8%
2022 Actuals
Performance Measure 4 Blocks with Time Limits or Residential Restrictions (#) The number of blocks (a section of road between two intersecting streets) with time restrictions or residential restrictions in effect. Once a restriction is implemented, active management/enforcement is required. As our town centres densify, this number will continue to grow.
# of blocks With Time Limits
2022 Actuals
Performance Measure 2
% of peak capacity of stalls
# of norices issued
PM#1: Revenue to cost ratio: operation of parking system
PM#3: Bylaw offence notices issued (#)
PM#4: Blocks with time limits or residential restrictions (#) 240 220 200 180
2023 Estimate
230
2024 Forecast
207
194
2022 Actuals
80.3%
2023 Estimate
2024 Forecast
Performance Measure 5 Number of Service Requests per Staff Member (#) The number of customer inquiries/service requests per staff member. As this number grows, response times will increase due to the larger workload and/or increased complexity of requests received. PM#5: Number of service requests per staff member (#) 275 280 260.9
# of service requests
Revenue to cost ratio
Performance Measure 1
260
249.2
240 2022 Actuals
2023 Estimate
2024 Forecast
PAGE 239
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Crime & Safety
Focus on providing a safe, clean parking experience for our customers Expand support for the corporate security function and Kelowna Security Operations Center (KSOC) Continue renewal of older security cameras to enhance real‐time monitoring capabilities and improve security for customers and their vehicles Continue to utilize licence plate recognition technology to aid in recovering stolen vehicles
Affordable Housing
Increase the active management of on‐street parking in residential areas to support densification within town centres while maintaining the character of neighborhoods
Digital Transformation
Active Financial Management
Optimize and align parking rates to promote use of transit and other alternative modes of transportation Complete development of a parking plan for the Capri‐Landmark area Begin development of a curb space management strategy to facilitate alternative uses, such as loading/pickup zones
Leverage the new Parking Supervisor to improve operational oversight and identify unrealized revenue opportunities Review and compare parking rates and fines to other municipalities, private operators, and institutions to maximize effectiveness
Base Business
Transportation
Replace the legacy Residential Parking Permit system to add online capabilities and support a shift to virtual, licence plate‐based permits. Develop an interactive parking map to share real‐time parking occupancy to improve the customer experience
Incorporate updated parkade condition assessment into asset renewal program and capital program for city parkades and surface parking lots Review and reallocate existing staff to ensure the most efficient and effective use of resources
Climate & Environment
Continue to expand the public Electric Vehicle (EV) charging network operated by the city to support the purchase of EV’s Improve sharing of occupancy information to decrease emissions by reducing the amount of traffic circling looking for available parking
Our People
Create a new Parking Supervisor position to improve customer service by expanding oversight of day‐to‐day operations and supporting development of front‐line staff
PAGE 240
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments:
Selected and onboarded a new parking management contractor, Indigo Park Canada Completed pay station hardware upgrades to support the new EMV credit card processing standard ahead of industry deadline Installed additional public (Level 2) EV chargers Completed a condition assessment of city‐owned parkades to support capital planning Invested over $500k in parkade restoration projects, including masonry and flashing repairs, replacement of HVAC systems in two Commercial Retail Units (CRU’s), modernization of the elevator at the Chapman Parkade, and the installation of rooftop security gates
Continuous improvements:
Ongoing enhancement of parking data collected to support analysis and sharing Continued exploration and testing of curbspace and loading zone management strategies With the addition of an additional staff position, combined with re‐allocation of existing resources, improved response times to service requests and petitions Continuous re‐distribution of limited enforcement resources to focus on areas where issues have been identified or public complaints are received
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Parking, $7.4M
Parking Services $7.4M
PAGE 241
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revised Annualized Maintaining 2023 Budget Service
Enhancing Preliminary Service 2024
Revenue budget: Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
(150) 8,335
(150) 7,600
36 8,221
60 7,510
855 1,129 1,313
987 1,341 1,602
4,733 192 8,221
3,365 214 7,510
1.1 5.2 2.7 9.0
1.0 5.5 4.0 10.5
0
(60) (60)
(1,000) 901 10 60 (29)
0
0
(1,150) 8,500 0 10 60 7,421
0
1,105 1,628 1,997 0 2,484 207 7,421
0.0
1.5 5.5 4.0 11.0
Expenditure budget: Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
(60)
(60)
118 347 394 (881) (7) (29)
Operating FTE positions: Management Union hourly Union salary Total operating FTE positions
0.5
0.0
0.5
Note: Totals may not add due to rounding The difference between the two graphs below is the . million surplus earned by this service area that is used to offset taxation funds required for other community services areas and infrastructure such as Parks, Sports & Recreation, and Community Safety.
Funding strategy
Expenditure by type Salaries and wages $1.1M
Fees and charges $8.5M Material and other $1.6M Other revenue $0M
Transfers from reserve $0.1M
Contract services $2M Transfers to reserve $2.5M Enabling allocation $0.2M
Total $8.6M Total $7.4M Note: Totals may not add due to rounding
PAGE 242
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Cat.
Cost
Reserve
Borrow
Parking - Priority 1 244 Maintain Parking Services Supervisor Position
OG
54,400
(54,400)
0
0
0
0
0
244
OT
60,000
(60,000)
0
0
0
0
0
114,400 (114,400)
0
0
0
0
0
Maintain
Description
Parking Study for Recreation Parks and Facilities Service Area Priority 1 Total
Grant
Revenue
Utility
Taxation
PAGE 243
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Parking
Maintain
Priority: 1
ON-GOING Title:
Parking Services Supervisor Position
PRELIMINARY
Justification: Budget is requested to create a Parking Services Supervisor position, necessitated by exponential growth in the branch, which has reached a point where it is essential to restore and uphold acceptable customer service levels. Over the past 10 years, parking-related service requests have increased by 481%, from 413 in 2013 to 2,400 in 2023. Concurrently, revenues grew by 251% ($2.4M to $8.5M), while staffing levels have risen by only 39%. Presently, there is only one manager overseeing a staff compliment (city and contract) of 21. This supervisor position would be tasked with overseeing daily operations, enhancing customer service, and supervising staff. The added capacity would support the return to a proactive business model and allow for a quicker response to emerging issues and unplanned events.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 54,400 104,700 104,700
Other - Supports Base Business Reserve (54,400) (104,700) (104,700)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Parking
Utility 0 0 0
Taxation 0 0 0 Maintain
Priority: 1
ONE-TIME Title:
Parking Study for Recreation Parks and Facilities
PRELIMINARY
Justification: Demand for parking in City recreation parks is seasonal and increasing due to multiple factors. Budget is requested for a parking study to accurately predict parking demand, assess increased demand as a result of the Building a Stronger Kelowna projects, and introduce methods to manage that demand, particularly at peak periods. Thereby, maximizing the use of our capital assets and protecting valuable parkland for other amenities. The work will be carried out in association with the existing parking study for the Capri-Landmark area.
Expected Completion: Dec 2024 Strategic Direction: 2024
Cost 60,000
Transportation - More trips by alternative transportation modes Reserve (60,000)
Borrow 0
Grant 0
Other 0
Revenue 0
Utility 0
Taxation 0
PAGE 244
2024 FINANCIAL PLAN
CITY OF KELOWNA
PARTNERSHIPS OFFICE LED BY: DIVISIONAL DIRECTOR, PARTNERSHIPS & INVESTMENTS
Our goal & community benefit: Our goal is to facilitate partnerships that challenge the status quo of how civic services and capital are delivered. We provide economic and social benefits by mobilizing Civic resources in a financially supportive way to our partners.
Our customers: • • •
Citizens who benefit from our partnered projects Existing partners and potential partner organizations including institutions/non-profits/private sector Other levels of government
Our partners: We work with other levels of government, businesses, and non-profits to support Council priorities and community goals.
What we deliver: We create partnerships with private, non-profit, and public agencies to advance Council and Corporate priorities. We target grant programs and seek-out sponsorship and advertising opportunities that align with the City's values and priorities. We advise across divisions on innovative and entrepreneurial service delivery. Everything we do is aimed at diversifying the City's revenue sources beyond property taxes.
Our key objectives: •
• •
•
Partnerships – We identify and respond to partnership opportunities with businesses, service groups, non-profit organizations and public agencies. Some of our partnerships enhance the facilities, programs, and services enjoyed by the community; others engage outside agencies in operating and maintaining City owned lands and buildings, or in administering City funding. Sponsorships & Advertising – We explore, identify, and advise on opportunities for corporations and philanthropists to sponsor City facilities, programs, and services. Grants – We strategically identify grant opportunities for City projects and initiatives. We work across the organization to help develop funding applications that highlight the alignment of the City's priorities and values with those of our targeted granting agencies, including other orders of government. We are driven to leverage the financial contributions of Kelowna's taxpayers. Intergovernmental Relations – We develop, manage and nurture relationships with First Nations, federal and provincial governments, and local governments to advance the City's interests and priorities. We work to enhance the City's reputation as a valuable partner focused on identifying shared benefits and pursuing joint priorities that ultimately attract additional investment in our City.
Our guiding plans: • • • • •
Imagine Kelowna Council Advocacy Priorities Grant Strategy Policy for Unsolicited Proposals Partnerships Reporting Framework
PAGE 245
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 1
Performance Measure 3
Leveraged $ investment from Opportunities Fund:
% Success rate on grant applications based on 20 applications submitted per year (50% target)
PM#1: $ leveraged investments from opportunities fund
PM#3: % success rate on grant applications based on 20 application submitted per year (50% target)
$1,000
$1,000 $500
Grants minimize the city's reliance on tax revenues and allow us to complete larger scale projects. The success rate of grant applications is an indication of the submission quality, our ongoing grant management practices, and intergovernmental relations program effectiveness in targeting available funding.
$250
$-
$2022 Actuals
2023 Estimate
2024 Forecast
% success rate
$ Investment in thousands
To minimize reliance on tax revenue, the City allocates $1.0M annually to fund emerging opportunities where partnership dollars are leveraged to deliver services and capital construction at a substantial saving to the City.
80% 70% 60% 50%
73%
73%
2022 Actuals
2023 Estimate
65%
2024 Forecast
Performance Measure 2 % strategic category partnerships reporting through reporting framework The City works with partner organizations, mostly nonprofit organizations, to deliver services that benefit residents. Regular reporting enables the City to assess the value it receives on behalf of residents and how to best support our partners to deliver services.
% of reporting
PM#2: % strategic category partnerships reporting through reporting framework 100%
100%
100%
2022 Actuals
2023 Estimate
2024 Forecast
100% 75% 50%
PAGE 246
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Crime & Safety •
Continued advocacy for addressing repeat property offenders.
Affordable Housing •
Complex Care advocacy. New purpose-built shelters advocacy. Heart & Hearth advocacy.
Transportation •
New transit operations centre advocacy.
Agriculture •
• • •
Coordinated activity with securing the Housing Accelerator Fund.
Homelessness • • •
Digital Transformation
Supported a new Farmers Market location.
Active Financial Management • • • •
• •
Focused on Provincial and Federal grant applications supporting Climate and Environment initiatives.
Leverage new Grants staff to increase our ability to respond to a higher percentage of grant requests and increase revenue/win percentages. Monitor success rates with grants and methodologies to sustain/increase success rates. Identify and address major sponsorship opportunities. Identify Partnership opportunities that have significant supportive revenue opportunities.
Base Business
Climate & Environment •
Determine business/financial value of Dark Fiber network. Establish a CRM platform for Senior Leadership and area managers. Examine potential for AI assistance with Grant preparation.
•
Establish a City wide Alternative Revenue Steering Committee to promote, encourage support and monitor new revenue sources. Actively promote opportunities with the private sector for Partnership Opportunities. Established a new focus and strategy for Sponsorship and Advertising.
Our People • •
Look towards team expansion to increase team impact particularly in Grants and Intergovernmental relations. Support partnerships staff for increased effectiveness through negotiation training.
PAGE 247
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments: • • • • • • •
• • •
Grant Strategy developed and endorsed by Council with the portfolio of current contracts in excess of $80 million Kelowna shown as a leader through grant-funded programs including winning the Gold Quill Award (funded by the Strengthening Communities' Services Fund) and People PEER Navigator and Indigenous Harm Reduction Programs Newest Waterfront Park was completed, in part from Provincial and Federal grant investments advanced $1.1million Updated the Advocacy Priority Framework and set Council’s top four advocacy priorities for their term Advocated and secured commitment for the first 20 complex care spaces to be established in Kelowna Led the strategic advocacy for increased consequences for repeat offenders contributing to the adoption of the Federal Bill C-48 Managed the strategic approach to the Kelowna delegation attendance at the 2023 UBCM convention, resulting in meetings for Mayor and Council with six Provincial Cabinet Ministers, a workshop panel spotlight on Kelowna’s vision for digital transformations in public service including AI innovation and receiving a Climate & Energy Action award for the FireSmart Chipping program Advocated for Heart & Hearth support from the province leading to an MOU and financial contribution commitment Further refined the Partnership reporting framework for priority relationships Driving municipal alternative revenue framework that defines potential opportunities to responsibly increase civic revenues to minimize taxation impacts
Continuous improvements: • • • • • •
Unsolicited Proposal Program has yielded opportunities related to potential partnerships with Heritage and Recreation facilities UBCO Research committee continues to leverage collaboration and research grant opportunities that benefit our city Utilization of Council tours where firsthand viewpoints are beneficial to decision making Continued refinement of approach and impact at UBCM and FCM from a relationship-based perspective Execution of Council’s revised advocacy priorities for 2023-2026 with evidence-based background materials Customer Relationship Management system recommendations are being finalized
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Partnerships Office, $1.6M
Partnerships Office $1.4M
Sponsorship & Advertising $0.2M
Budget o verview:
PAGE 248
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revenue budget:
Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
Expenditure budget:
Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Operating FTE positions:
Management Union hourly Union salary Total operating FTE positions
Revised Annualized Maintaining 2023 Budget Service
1,110 10
1,146 104
18 1,137
140 83 1,472
714 173
31
(0)
(83) (69)
31
138 138
810 437
(83)
10 10
85 53
251 1,137
226 1,472
14 (69)
11 31
(0) 138
906 417 0 0 0 250 1,573
4.9
5.0 1.0 0.0
(1.0) 0.8 (0.2)
1.0 1.0
5.0 0.0 1.8 6.8
0.6 5.5
6.0
14
Enhancing Preliminary Service 2024 1,191 104 0 140 138 1,573
Note: Totals may not add due to rounding
Expenditure by type
Funding strategy
Property tax $1.2M
Salaries and wages $0.9M
Fees and charges $0.1M Material and other $0.4M Other revenue $0.1M Transfers from reserve $0.1M
Total $1.6M
Enabling allocation $0.3M
Total $1.6M
Note: Totals may not add due to rounding
PAGE 249
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Partnerships Office - Priority 1 251 Maintain Partnerships Coordinator, Grants & Special Projects Position 251 Enhance Partnerships Program Enhancements Service Area Priority 1 Total
Cat.
Cost
Reserve
Borrow
OG
75,700
OG
Grant
Revenue
Utility
Taxation
0
0
0
0
0
(75,700)
138,400 (138,400)
0
0
0
0
0
214,100 (138,400)
0
0
0
0
(75,700)
PAGE 250
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Partnerships Office
Maintain
Priority: 1
ON-GOING Title:
Partnerships Coordinator, Grants & Special Projects Position
PRELIMINARY
Justification: Budget is requested to formalize the current two-year term Grants and Special Projects Coordinator into a permanent position to support the grants business operations and significant growth in grant management. The role oversees large volume of grants and is actively expanding the corporate-wide Grant Management Program. Key responsibilities includes researching funding sources that align with Council and corporate priorities, writing applications, maintaining schedules, collaborating with staff, reviewing project and financial information, and liaising with funding partners. Grant management for the City of Kelowna has had substantial growth with $26M in grants awarded and $67M in contract management in 2022. This is anticipated to rise in 2023.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 75,700 100,800 100,800
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Partnerships Office
Revenue 0 0 0
Utility 0 0 0
Taxation (75,700) (100,800) (100,800) Enhance
Priority: 1
ON-GOING Title:
Partnerships Program Enhancements
PRELIMINARY
Justification: The City's Partnership's Office is an important and evolving function supporting both the City's Intergovernmental branch and the City's Grants department. The addition of one Administrative Clerk position and one Coordinator will help to advance advocacy, policy, and investment opportunities between the City, municipalities, the provincial government, and the federal government. Budget is requested to fund two positions, including consulting, for a threeyear term.
Strategic Direction: 2024 2025 2026
Cost 138,400 223,100 223,100
Other - Supports Base Business Reserve (138,400) (223,100) (223,100)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation 0 0 0
PAGE 251
2024 FINANCIAL PLAN
CITY OF KELOWNA
GOVERNANCE & LEADERSHIP LED BY: CITY CLERK
Our goal & community benefit: Our goal is to foster a culture of open government in the provision of corporate administrative services to Council, their committees, and the organization. We communicate opportunities for the public to engage with Council and learn about City governance, ensure public access to information and protection of privacy in accordance with provincial legislation and City policies.
Our customers: • • • •
Council Senior Leadership Team City of Kelowna employees Community members
Our partners: We partner with Council, divisions within the City, and various provincial ministries and agencies.
What we deliver: We provide council meeting management, corporate access to legal services, the management of corporate records and information, public access to records and protection of privacy, elector approval processes and general local elections as well as training for new and existing employees on governance. We are responsible for delivering the right infrastructure, skills, services, and processes to meet Council priorities and community goals.
Our key objectives: • • • • •
To advise on Council procedures and meet legislative requirements. To promote good governance, clear direction, and legislative compliance through Council and corporate policy frameworks. To manage physical and electronic records in accordance with the records and information management program. To share information in timely and transparent ways through routine release and formal request processes. To protect privacy and personal information with up to date plans, policies, procedures, and training.
Our guiding plans: • •
Imagine Kelowna Provincial legislation
PAGE 252
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance:
Performance Measure 3
Performance Measure 1 # of Council meetings & public hearings (days) Council makes decisions about City plans, policies, and programs at Council meetings. The public may attend open meetings in-person or watch online and may participate in public hearings in-person or online. Meeting recordings are posted to the City's website. Council meetings were held on 44 days in 2023 and it is expected meetings will be held on 48 days in 2024.
days
PM#1: # of council meetings & public hearings (days)
Average # of hours to respond to Mayor & Council Correspondence Council receives over 2,500 pieces of correspondence annually. As Council spokesperson, the mayor responds to correspondence submitted to Mayor & Council, with support from staff. Some correspondence is submitted for information only. Measuring this metric began in 2023 with the use of a new reporting system.
PM#3: # of hours to address Mayor & Council correspondence
55 50 45 40 2022 Actuals
2023 Estimate
2024 Forecast
Performance Measure 2
Performance Measure 4
# of Council policies reviewed or created
# of informational memos to Council The City Manager occasionally shares information with Council through memos to ensure factual information is provided in a comprehensive, transparent, and timely manner. Measuring this metric began in 2023.
PM#2: # of Council policies reviewed or created
PM#4: # of informational memos to Council
# of policies
Relevant and current Council policies support good governance and provide clear direction for decisionmaking. An initiative is underway to review Council's 129 policies. It is expected 12 policies will be reviewed or created in 2023, increasing to 22 policies in 2024 through the Council policy review process.
30 20 10 0
5 2022 Actuals
12 2023 Estimate
22
2024 Forecast
PAGE 253
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 5
Performance Measure 7
# of Senior Leadership Team and Committee meetings
% of eligible paper records processed for disposition
PM#5: # of Senior Leadership Team and Committee meetings
% of Records
The Senior Leadership Team (SLT) meets regularly to review and discuss Council and corporate priorities and direction. SLT committees focus on Council agendas, policy, finance, strategy, and intergovernmental relations. Measuring this metric began in 2023.
Records are retained or disposed of according to their retention through the records and information management program. Each year the City processes records eligible for disposition. In 2023, 96% of eligible records were processed for disposition. PM#7: % of eligible paper records processed for disposition 96% 97% 95%
95%
93%
93% 2022 Actuals
2023 Estimate
2024 Forecast
Performance Measure 8 # of staff receiving governance training
% of FOI requests responded to on-time
% on-time
The public may request access to information under the Freedom of Information and Protection of Privacy Act. Most requests are responded to within the initial required 30 days. The response timeline may be extended to 60 days or longer when needed. An estimated 99% of requests will be responded to within the legislated timeline in 2023, with a target of 100% in 2024. PM#6: % of FOI requests responded to ontime 100% 99% 97% 100% 95% 90% 2022 2023 2024 Actuals Estimate Forecast
Training is available for new and existing employees on governance and Council reports and procedures. This builds a common understanding of local government governance, Council's role, and preparing for Council meetings. New perfomance measure – data not yet available. PM#8: # of staff receiving training on governance, procedures & information # of Training
Performance Measure 6
202
240 140
150
43
40 2022 Actuals
2023 Estimate
2024 Forecast
PAGE 254
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Affordable Housing •
Interpret and implement changes to provincial land use legislation to establish policies and procedures that support the creation of more affordable housing
Base Business •
•
Our People •
Provide training for new and existing employees on governance, Council reports and procedures, access to information and protection of privacy, and records management
• • •
Digital Transformation • •
Support digital transformation and AI initiatives through oversight of privacy measures and guidance on responsible use Enhance the privacy management program to reflect the data management strategy and online services and systems
•
Provide governance and meeting management to Council and their Committees and Task Forces, including agenda preparation, minutes, and statutory notices Draft regulatory bylaws for and provide policy and procedural advice to City departments Implement the Corporate Administrative Policy Framework and lead the review of Council policies Conduct annual archiving and disposition of records across City business areas Implement records management function in SharePoint Online to ensure compliance with information and privacy legislation and to manage electronic records and information from creation to disposition Ensure public access to information and protection of privacy in accordance with provincial legislation and City policies
PAGE 255
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments: • • • • • • •
Held Council orientation following the 2022 election Supported Council priority setting, action plan, and reporting for the 2022-2026 Council term Developed and implemented the Council Code of Conduct and Lobbyist Registry Updated the Council Procedure Bylaw to reflect Council direction, including publishing Council agendas earlier to give Council and the public more time to review reports Initiated a corporate administrative policy framework that guides how administrative policies are structured, developed, approved, and maintained Held the alternative approval process for the Recreation and Activity Centres Loan Authorization Bylaw Moved older electronic records into SharePoint Online to support collaboration and compliance and to manage electronic records and information through their lifecycle
Continuous improvements: • • • • • •
Provide input on provincial policy development with Ministry partners Advocate on Council priorities and key initiatives with the federal and provincial governments Provide governance and meeting management to new committees and task forces Coordinate guidance on bylaw and policy development through expanded policy function Advise business areas on privacy assessments for digital transformation initiatives Implement electronic records management in new system to ensure compliance with legislation and manage corporate electronic records and information
Budget overview:
2024 total expenditure budget, $560.9M
2024 Total expenditure budget breakdown Governance and Leadership, $4.7M
City Manager $1.8M Council $1M Legislative Service $1.3M Mayor $0.2M Records & Information $0.4M
PAGE 256
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Actual 2022
Revenue budget:
Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
Expenditure budget:
Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Operating FTE positions:
Mayor and Council Management Union hourly Union salary Total operating FTE positions
Revised Annualized Maintaining 2023 Budget Service
3,708 5
4,378 10
55 241 4,010
55 15 4,457
2,146 556 413
Enhancing Preliminary Service 2024
98
212
(43)
(15) 84
212
(43)
2,263 1,069 442
56 (15)
148 39
151 (192)
15 880 4,010
683 4,457
42 84
25 212
(1) (43)
9 9.9 1.7 4.4 25.0
9 10.0 0.5 5.5 25.0
1.0 0.5 0.5
0.5 1.5
4,645 10 0 55 0 4,710
2,618 901 442 0 0 750 4,710
9.0 11.0 0.5 6.5 27.0
Note: Totals may not add due to rounding
Funding strategy
Property tax $4.6M Other revenue $0.1M
Expenditure by type Salaries and wages $2.7M Material and other $0.9M Contract services $0.4M Enabling allocation $0.7M
Total $4.7M
Total $4.7M
Note: Totals may not add due to rounding
PAGE 257
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Governance & Leadership - Priority 1 259 Enhance Executive Office Enhancements 259 Enhance Deputy City Clerk Position (Records, Information & Privacy) Service Area Priority 1 Total
Cat.
Cost
Reserve
Borrow
OG OG
Grant
Revenue
Utility
Taxation
88,400 68,000
0 0
0 0
0 0
0 0
0 0
156,400
0
0
0
0
0 (156,400)
(88,400) (68,000)
PAGE 258
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Governance & Leadership
Enhance
Priority: 1
ON-GOING Title:
Executive Office Enhancements
PRELIMINARY
Justification: The City's Executive Office is an important and evolving function supporting the Senior Leadership Team, Mayor, and Council. The addition of one Administrative Clerk position and one Communications Consultant position will help to improve citizen connection to Mayor and Council, public engagement, advocacy, information sharing, and increase capacity for Council and corporate priorities. With the stated interest of City Council to be more transparent and communicative, there is a need for particular forms of communication, such as newsletters, public addresses, improved responses to key correspondence matters and enhancing connections with other levels of government. These added resources will help enhance the delivery of Council's priorities, furthering connections and communication with citizens and provide a greater level of service. Strategic Direction: 2024 2025 2026 Service Area:
Cost 88,400 173,700 173,700
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Governance & Leadership
Utility 0 0 0
Taxation (88,400) (173,700) (173,700) Enhance
Priority: 1
ON-GOING Title:
Deputy City Clerk Position (Records, Information & Privacy)
PRELIMINARY
Justification: Budget is requested to fund the Deputy City Clerk Position (Records, Information & Privacy) who will oversee the City's corporate records management, access to information, and privacy functions. The City's Digital Transformation Strategy and partnership initiatives present emerging opportunities and privacy considerations, while Provincial legislation has increased the City's obligations around protection of privacy. A dedicated manager overseeing these areas advances City strategies and partnerships, supports legislative compliance, and responds to public expectations for access to information. The position will lead staff responsible for the records and information management program, freedom of information requests, and privacy management program and provide corporate direction on these matters. Strategic Direction: 2024 2025 2026
Cost 68,000 132,400 132,400
Digital Transformation - Data is used to inform decision making Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (68,000) (132,400) (132,400)
PAGE 259
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Type
Description
Cat.
Cost
Governance & Leadership - Priority 2 Enhance Crane Memorial Service Area Priority 2 Total
OG
50,000 50,000
Reserve
Borrow
0 0
0 0
Grant
Revenue 0 0
0 0
Utility
Taxation 0 0
(50,000) (50,000)
PAGE 260
2024 FINANCIAL PLAN
CITY OF KELOWNA
ENABLING SERVICES LED BY: DIVISIONAL DIRECTOR, FINANCIAL SERVICES
Our goal & community benefit: Our goal is to assist City staff in providing municipal services to the community. We achieve this by offering leadership, guidance, systems, tools, and standards that support the delivery of services that help shape our community.
Our customers:
Council Senior Leadership Team City of Kelowna employees
Our partners: We work collaboratively with all internal divisions, as well with members of the public, council, and external agencies, to support the delivery of the City's services.
What we deliver: We deliver by ensuring the City attracts, retains, and develops the best quality public servants through training and development programs; providing convenient, accurate and timely access to City services and information through advanced communications, technology, and financial accountability; and fostering a culture of open government in the provision of corporate administrative services.
Our key objectives: Enabling Services provide support to the City's Community Service Areas by helping them to carry out their duties effectively. These support services include administrative support, building services, communications, financial services, fleet services, human resources, information & technology services, infrastructure delivery, real estate & property management, risk management, senior leadership, and strategy & performance. Building services provide safe, clean and well‐maintained facilities, through a focus on asset and energy management best practices. Communications provides strategic planning to inform, consult, involve, collaborate and empower internal and external audiences, as well as support those who are designated spokespeople for the City. Financial services are responsible for managing the City's finances and asset replacement, including budgeting, accounting, and financial reporting. Fleet services are responsible for the procurement, management and maintenance of the vehicles and equipment used for various municipal services. Human resources are responsible for managing the City's human resources, including hiring, training, and employee relations, as well as the development and implementation of the City’s corporate safety program. Information services provide direction, support and maintenance of the City’s information systems and technology infrastructure. Infrastructure delivery manages the delivery of City infrastructure projects while ensuring compliance with Council approved policies and applicable Acts and regulations. Property management is responsible for managing the City's land acquisition activities, including acquiring land for public use, such as parks and roads, as well as maintaining leases, licenses, contracts and agreements for the use of important City assets, and providing property management services for City‐owned properties.
PAGE 261
2024 FINANCIAL PLAN
CITY OF KELOWNA
Risk management is responsible for the development, implementation, and administration of the City’s risk management and security programs. Senior leadership provides direction, oversight, support, and accountability for the various municipal departments and functions, and fosters a culture of collaboration, innovation, and excellence. Strategy & performance provides internal advisory services and facilitates the process to set corporate level strategy, monitor strategies and key projects and track and improve performance.
Our guiding plans:
Communications Strategy Digital Transformation Strategy HR Strategic Plan Safety Program Official Community Plan Strategic Energy Management Plan Five Year Financial Plan Ten Year Capital Plan Corporate Fleet Sustainability Policy Green Fleet Strategy
PAGE 262
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 1
Performance Measure 3
Facility energy use intensity This measure tracks the energy efficiency of our buildings and significant contribution to total facility energy consumption. Also known as Energy Use Intensity (EUI). EUI was an identified KPI in the Strategic Energy Management Plan (SEMP). The purpose of this measure is to mimic the SEMP's identified measure.
Time to fill The ability to attract people to our organization is measured by the time it takes us to fill vacant positions. Timely recruitment of qualified candidates ensures the organization can deliver services to our citizens. Several initiatives have been implemented in 2023 that are expected to reduce the recruitment days in 2024.
PM#1: Facility energy use intensity
PM#3: Time to fill 65
ekWh/m2
544
544
544
500 0 2022 Actuals
2023 Estimate
2024 Forecast
External candidate
1,000
60
60
2023 Estimate
2024 Forecast
60 55 55 50 2022 Actuals
Performance Measure 2
Performance Measure 4
Facilities in poor & critical Condition Facilities are assessed through the building condition assessment (BCA) program. Tracking the assets in poor and critical condition enables data driven decisions to reduce facility risk. We forecast the percentage of facilities in poor and critical condition will increase as our assets age. To prevent this percentage from increasing, we plan to strategically target capital investment in life safety and critical building systems to minimize service disruptions.
Turnover rate The ability to retain staff is measured by analyzing our total turnover rates. Multiple initiatives have been implemented in , as well as a new CUPE collective agreement, which should result in reduced staff turnover in .
PM#4: Turnover rate 10.50%
10% 8% 6% 4% 2% 0%
10.00% 5%
2022 Actuals
5%
2023 Estimate
5%
2024 Forecast
Yearly rate
% in Poor ondition
PM#2: Facilites in poor & critical condition
10.50% 9.10%
9.50% 9.00%
8.60%
8.50% 2022 Actuals
2023 Estimate
2024 Forecast
PAGE 263
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 5
Performance Measure 7
WorkSafeBC experience rating Experience rating is an adjusting percentage applied to the WorkSafeBC insurance base rate of the classification unit (CU) the City of Kelowna belongs to, Local Government and Related Operations. Each year WorkSafeBC calculates a base rate, which reflects the historical cost of injuries in your industry. An experience rating discount or surcharge, based on your firm’s health and safety record, is then applied to determine your net rate. Maintaining a negative experience rating means the corporation receives a deduction to the assessable amount. It also reflects that minimizing time loss injury claims and ensuring our employees return home each day healthy and safe is a corporate priority.
Existing utility damage Our internal construction crew completes all work as safely as possible, with respect to avoiding damage to existing utilities.
# of damaged utilities
PM#7: Existing utility damage 4
5
2
0
0 2022 Actuals
2023 Estimate
2024 Forecast
Performance Measure 8 WorkSafeBC experience rating 3.09 2024 Forecast
3.83
Net rate
2.71
2023 Estimate
3.19 2.35
2
2.5
3
3.5
4
Base rate/Net rate
Performance Measure 6 Workplace injuries Our internal construction crew completes all work as safely as possible, with respect to preventing workplace injuries. Additional precautions and messaging are implemented after reviewing incidents that occur. Our goal always is to have zero workplace injuries. PM#6: Workplace Injuries
160,000 140,000 120,000 100,000 80,000 60,000 40,000 20,000 ‐
0
0 2023 Estimate
14,783 2022…
2023…
PM#9: Digital Assistant
2
2022 Actuals
95,676
2024 Forecast
2024…
Automated hours The number of hours automated on processes that are completed by employees. This is part of our Digital Transformation strategy and assessment digital transformation strategy focuses on automating processes to find optimal efficiency.
4
2
140,000
Performance Measure 9
Hours
# of Injuries
6
PM#8: Digital assistant
Base rate
2.92
# of questions asked to voice and chat assistants
2022 Actual
4
Digital assistant The City invests in technology such as chat bots and voice assistants to improve customer service, for example allowing residents to access information / . Reducing the staff time spent answering routine information requests creates efficiencies in City operations.
15,000 10,000 5,000 ‐
15,000
9,180 N/A 2022 Actuals
2023 Estimate
2024 Forecast
PAGE 264
2024 FINANCIAL PLAN
CITY OF KELOWNA
Measuring performance: Performance Measure 10 Communication Channels Communications delivers strategy and tactics to help citizens learn about City programs, services and initiatives. The growth of the City’s communication channels signals that citizens and interested parties value the information provided by the City and the City invests in the optimal channels to reach its audiences.
Performance Measure 11 Financial Indicators Key annual financial health indicators compare to benchmarks as well as other municipalities throughout the province, specifically those with populations over K as well as within the Okanagan. The comparative data is provided by the province and is updated to . . The The ratios presented for Kelowna are also from Key annual financial health indicators used are: Tax burden per capital: Measures property taxation revenue collected per City of Kelowna citizen. Debt level per capita: Measures how much debt the City of Kelowna has per citizen. Annual surplus per capita: Measures the City’s annual surplus per citizen. This metric indicates opportunity to add service capacity within existing taxation levels. Financial Services Performance Measures
Kelowna
Comparators
Pop> 100k Okanagan Tax Burden Per Capita
$2,681
$2,902
$2,340
Debt Level Per Capita
$474
$669
$630
Annual Surplus Per Capita
$606
$836
$478
PAGE 265
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Activities by priority: Affordable Housing
Land acquisition for affordable housing projects. Develop and implement a new below market housing model.
Homelessness
Work with partners to identify a site that is suitably located and zoned for Kelowna’s first purpose‐built shelters.
Climate & Environment
Annual energy modernization program to identify inefficient systems within facilities and modernized them with GHG and energy reduction projects. High performance building policy development to ensure all new buildings and major renovations are energy efficient.
Our People
Active Financial Management
Continued development of KPIs, focus on benchmarking, and public‐facing services dashboard Presenting capital as part of Service Areas for Implementation of multi‐year budgeting in operating & capital Formalize process & strategy for budget redeployment Enhanced quarterly financial reporting for internal use More rigorous fee review
Base Business
Business continuity plan updates Cybersecurity Engagement on neighborhood plans Facilities preventative maintenance program Facility capital renewal planning software Parkland acquisition and planning Utilities facilities capital renewal plan
Diversity Equity and Inclusion Strategy implementation Review and update annual performance review procedures.
Digital Transformation
Expansion of chat bots to improve external customer service. Replacement of legacy planning and development software system to improve external customer service and streamline process. Single sign‐on that provides users a one‐stop‐ shop to access all their city accounts. Use AI to streamline internal processes.
PAGE 266
2024 FINANCIAL PLAN
CITY OF KELOWNA
2023 Key accomplishments:
Implementation of Service Based Budgeting Expanded use of Chatbots for increased efficiency and service levels 2023 GFOA Budget Award Recipient Public reporting dashboards on community priorities and major plans 2023 IABC Gold Quill Award Recipient for Communications Excellence Supported numerous functions at the Emergency Operations Centre during a significant month‐long activation Approval to move the Building a Stronger Kelowna initiative forward Acquisition of DCC Park properties in excess of $28M Submitted application for 68 affordable housing units on city land via Provincially led Community Housing Fund Coordinated implementation of an innovative housing model (Tiny Home village) on City lands
Continuous improvements:
Continued development of KPIs & focus on benchmarking Implementation of multi‐year budgeting in operating & capital Formalize process & strategy for budget redeployment Enhanced quarterly financial reporting for internal use More rigorous fee review Aligning asset renewal and energy management for capital planning Advocate for development of purpose‐built Complex Needs facility on city lands Identify site for the delivery of a new purpose‐built shelter in conjunction with BC Housing Develop and implement strategy to deliver additional market and non‐market housing units on City lands with support from the federal government’s Housing Accelerator Fund Continue to pursue effective and collaborative procurement strategies for delivering capital projects to ensure the best value for the City
Budget overview:
2024 Total Expenditure Budget Breakdown 2024 Total Expenditure Budget, $560.9M
Enabling Services, $95.5M
Administration $4.6M Building Services $12.2M Communications $1.8M Financial Services $41.4M Fleet Services $9.9M Human Resources $4.9M Information & Technology Services $10.4M Risk Management $4.7M Senior Leadership $1.8M Other $3.8M
PAGE 267
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating budget needed to achieve results ($ thousands): Note: Totals may not add due to rounding
Actual 2022
Revised Annualized Maintaining 2023 Budget Service
45,693 16,538 5,345 32,495 12,471 112,541
34,593 14,265 4,513 31,878 7,233 92,482
25,888 33,734 3,038 8,238 41,643
26,031 33,037 3,637 6,662 23,116
150 (3,587)
112,541
80.4 42.9 118.0 241.3
Enhancing Preliminary Service 2024
Revenue budget: Property tax Fees and charges Grant Other revenue Transfers from reserve Total revenue budget
2,086
204 2,834
(64)
(33) 1,304 4,309
105 578 618
283 879
232 1,307
1,947 3,143 447 28 (1,256)
(544)
92,482
(1,898)
4,309
618
28,411 33,473 4,083 6,922 22,622 0 95,511
84.7 39.9 129.7 254.3
1.1 0.5 1.0 2.6
1.2 (1.1) 2.0 2.1
1.0 0.5 1.0 2.5
88.0 39.8 133.7 261.5
(82) (315) (3,587) (1,898)
36,819 17,099 4,431 31,634 5,528 95,511
Expenditure budget: Salaries and wages Material and other Contract services Debt service Transfers to reserve Enabling allocation Total Expenditure budget
Operating FTE positions: Management Union hourly Union salary Total operating FTE positions
Expenditure by type
Funding strategy Property tax $36.8M
Salaries and wages $28.4M
Fees and charges $17.1M
Material and other $33.5M
Grant $4.4M
Contract services $4.1M
Other revenue $31.6M
Debt service $6.9M
Transfers from reserve $5.5M
Transfers to reserve $22.6M
Total $95.5M
Total $95.5M
Note: Totals may not add due to rounding
PAGE 268
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Page Type
Description
Cat.
Cost
Reserve
Borrow
Grant
Revenue
Utility
Taxation
Enabling Services - Priority 1 271 Maintain Strategic Land Development Projects
OT
100,000
(100,000)
0
0
0
0
0
271
Maintain
OG
300,000
0
0
0
0
0
(300,000)
272
Maintain
OT
113,000
(73,000)
0
0
0
0
(40,000)
272 273
Maintain Maintain
OG OG
50,000 50,000
0 (50,000)
0 0
0 0
0 0
0 0
(50,000) 0
273 274
Maintain Maintain
OG OG
328,300 60,800
(268,300) 0
0 0
0 0
0 0
(11,400) 0
(48,600) (60,800)
274 275 275
Maintain Maintain Maintain
OG OG OG
66,400 55,800 51,600
(66,400) 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 (55,800) (51,600)
276
Maintain
276
OG
32,300
0
0
0
0
0
(32,300)
Maintain
Building Routine Maintenance Materials & Supplies Increase Furniture & Equipment - City Hall & Police Services Building Public Art Maintenance Fleet Repair Garage - Hardy St. Facility Upgrades Asset Management Program Term Position to Full-Time Safety Advisor Financial Services Internal Audit Infrastructure Delivery Term Position to Full-Time Health & Wellness Advisor Administrative Clerk Position Change PT to FT Bridge Rehabilitation and Inspections
OG
22,000
0
0
0
0
0
(22,000)
277 277
Maintain Maintain
Microsoft Solutions Security Contract Increases & Inflation
OG OG
195,000 200,000
0 0
0 0
0 0
0 0
0 0
(195,000) (200,000)
278
Maintain
Cyber Security and Disaster Recovery
OG
561,000
(350,000)
0
0
0
0
(211,000)
278
Maintain
OG
20,000
0
0
0
0
0
(20,000)
279
Maintain
Employee Development Scholarship Program Artificial Intelligence (AI) Program
OG
360,000
(320,000)
0
0
0
0
(40,000)
279
Enhance
280 280
OG
68,000
0
0
0
0
0
(68,000)
Enhance Enhance
Strategic Land Development Manager Position Legacy Application Replacement UBC Centre of Excellence Partnership
OG OG
220,000 175,000
(100,000)
0 0
0 0
0 0
0 0
(120,000) (175,000)
281 281
Enhance Enhance
Cook Rd Boat Launch Dredging Building Planning Manager Position
OG OG
150,000 71,100
(150,000)
0 0
0 0
0 0
0 0
0 (71,100)
282 282
Enhance Enhance
Parks Masterplan Front Line Service Staff - Trauma Informed/De-escalation Training 283 Enhance City Protection Officer Ongoing FullTime Position 283 Enhance Diversity, Equity & Inclusion 284 Enhance Voice and Chatbot Testing and Integrations Service Area Priority 1 Total
OT OG
75,000 10,000
(75,000)
0 0
0 0
0 0
0 0
0 (10,000)
OG
127,800
(127,800)
0
0
0
0
0
OG OT
100,000 55,000
(70,000) (55,000)
0 0
0 0
0 0
0 0
(30,000) 0
3,618,100 (1,805,500)
0
0
0
(11,400) (1,801,200)
PAGE 269
2024 FINANCIAL PLAN
CITY OF KELOWNA
The operating requests listed below are operating impacts linked to a capital request, and are presented with the associated capital request in the capital section.
Operating linked to capital Priority 1 Page Type Description 328 Maintain Growth Vehicles Operating linked to capital Priority 1 Total
Cat.
Cost
OG
216,300 216,300
Reserve
Borrow 0 0
0 0
Grant
Revenue 0 0
Utility 0 0
Taxation 0 0
(216,300) (216,300)
PAGE 270
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Maintain
Priority: 1
ONE-TIME Title:
Strategic Land Development Projects
PRELIMINARY
Justification: The realization of the Official Community Plan and corporate objectives through creative real estate strategies encompass the mandate of this branch. Several initiatives have been identified that have the potential of returning social, economic, environmental, and cultural benefits to the City. To deliver many of these projects, budget is requested to cover expenditures on legal advice, property appraisal, urban design, surveying, and other professional services. These costs will often be recovered through redevelopment and disposition. Key projects undertaken with this funding will include the Harvey Avenue redevelopment sites and planning for future civic facilities.
Expected Completion: Dec 2024 Strategic Direction: 2024 Service Area:
Cost 100,000
Other - Supports Base Business Reserve (100,000)
Borrow 0
Grant 0
Other 0
Enabling Services
Revenue 0
Utility 0
Taxation 0 Maintain
Priority: 1
ON-GOING Title:
Building Routine Maintenance Materials & Supplies Increase
PRELIMINARY
Justification: Additional budget is requested to better meet preventative maintenance objectives, reduce deferred maintenance, avoid costly renewals, and maintain service levels. The National Research Council recommends 1%-2% budget allocation for materials and supplies for ongoing routine maintenance and repair for public facilities. 2024 Base Budget: $1.038M
Strategic Direction: 2024 2025 2026
Cost 300,000 300,000 300,000
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (300,000) (300,000) (300,000)
PAGE 271
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Maintain
Priority: 1
ONE-TIME Title:
Furniture & Equipment - City Hall & Police Services Building
PRELIMINARY
Justification: Budget is requested for workstations and other furniture to support new staff positions in City Hall and Kelowna Police Services Building. With recent increases in RCMP officers and City support staff, the Kelowna Police Services Building has reached its current maximum capacity. A design study has identified additional workstations that can be achieved over the next five years in the existing building through minor reconfigurations, and this will meet the predicted growth demand over that period. A subsequent expansion of the Police Services Building is identified (as a P2) in the Ten-year Capital Plan. Budget is also requested to design a solution to some major operational, safety and ergonomic issues associated with the front counter in accordance with Police standards.
Expected Completion: Dec 2024 Strategic Direction: 2024 Service Area:
Cost 113,000
Other - Supports Base Business Reserve (73,000)
Borrow 0
Grant 0
Other 0
Enabling Services
Revenue 0
Utility 0
Taxation (40,000) Maintain
Priority: 1
ON-GOING Title:
Public Art Maintenance
PRELIMINARY
Justification: The Public Art permanent collection contains 70 pieces across the City in a wide variety of media. The portfolio however does not have an annual maintenance budget, and has relied on other maintenance budgets. Budget is requested to establish a regular maintenance regime in order to protect the value of these assets.
Strategic Direction: 2024 2025 2026
Cost 50,000 50,000 50,000
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (50,000) (50,000) (50,000)
PAGE 272
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Maintain
Priority: 1
ON-GOING Title:
Fleet Repair Garage - Hardy St. Facility Upgrades
PRELIMINARY
Justification: Budget is requested to fund facility upgrades to the aging Fleet Repair shop space. Upgrades will consist of safety and technology improvements, including shop lighting and ventilation systems. $150,000 is requested over three years (2024-2026).
Expected Completion: Dec 2026 Strategic Direction: 2024 2025 2026 Service Area:
Cost 50,000 50,000 50,000
Other - Supports Base Business Reserve (50,000) (50,000) (50,000)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Enabling Services
Utility 0 0 0
Taxation 0 0 0 Maintain
Priority: 1
ON-GOING Title:
Asset Management Program
PRELIMINARY
Justification: The recently implemented corporate asset management system (Cityworks) has approximately 700 users from 28 business areas across the City who maintain the City's infrastructure assets valued at $5B. Budget is requested for two Asset Management Coordinators and three-years of increased consulting services to enhance the use of this system. Coordinators will work with business areas to develop dashboards and system improvements that will improve operational efficiency and support data driven decisions and service-based budgeting. Costs will be shared between the Water and Wastewater Utilities, Solid Waste, the capital program, and the future redeployment of an existing position.
Strategic Direction: 2024 2025 2026
Cost 328,300 402,600 402,600
Digital Transformation - Data is used to inform decision making Reserve (268,300) (286,300) (286,300)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility (11,400) (22,400) (22,400)
Taxation (48,600) (93,900) (93,900)
PAGE 273
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Maintain
Priority: 1
ON-GOING Title:
Term Position to Full-Time Safety Advisor
PRELIMINARY
Justification: Budget is requested for a full-time Safety Advisor. This existing position has been funded for the last two years from the COR reserve and is essential to meet complex regulated occupational safety requirements and support the city management team in their efforts to reduce workplace injuries and occupational disease.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 60,800 115,500 115,500
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Enabling Services
Revenue 0 0 0
Utility 0 0 0
Taxation (60,800) (115,500) (115,500) Maintain
Priority: 1
ON-GOING Title:
Financial Services Internal Audit
PRELIMINARY
Justification: The Financial Services Internal Audit branch delivers the value for money and continuous monitoring programs, both of which reduce financial risk and the potential for misappropriation of City assets. Increased investment in these programs is expected to provide significant value to the City of Kelowna. Budget is requested to add a two-year term Financial Analyst Internal Auditor position, and one-year increased training budget for internal audit staff to gain certification, to demonstrate this value. Staff will return to Council at the end of this trial to present results so Council can have confidence before approving the investment ongoing.
Strategic Direction: 2024 2025 2026
Cost 66,400 115,600 0
Other - Supports Base Business Reserve (66,400) (115,600) 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation 0 0 0
PAGE 274
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Maintain
Priority: 1
ON-GOING Title:
Infrastructure Delivery
PRELIMINARY
Justification: Increased delivery of capital projects is a priority of Council and the Corporation, and the 10-Year Capital Plan is indicating a significant increase in building construction, replacement, renovation, retrofit and repair projects over the next ten years. To enable the successful delivery of these projects, budget is requested for the addition of one Senior Project Manager and one Project Technician for the Infrastructure Delivery team. The positions will be funded 80 per cent from capital projects and 20 per cent from operating projects.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 55,800 54,800 54,800
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Enabling Services
Revenue 0 0 0
Utility 0 0 0
Taxation (55,800) (54,800) (54,800) Maintain
Priority: 1
ON-GOING Title:
Term Position to Full-Time Health & Wellness Advisor
PRELIMINARY
Justification: Budget is requested for full-time a Health & Wellness Advisor. This existing position has been funded for the last two years from our CoR funding and has proved to be a necessity in supporting managers and staff with occupational and non-occupational absences. This position supports staff with workplace accommodations, return to work after illness/injury, and is our key liaison for claim adjudication for our staff, managers, and benefit providers.
Strategic Direction: 2024 2025 2026
Cost 51,600 102,400 102,400
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (51,600) (102,400) (102,400)
PAGE 275
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Maintain
Priority: 1
ON-GOING Title:
Administrative Clerk Position Change PT to FT
PRELIMINARY
Justification: Increases in scope of base operations and more support for team members require more clerical hours. Examples include: -Increased Security demand, CCTV review and export, Security Card Access requests, etc. -Increased incident/claim demands -Increase in time-sensitive tasks (such as development and collaboration of Extreme Weather Response plans) Budget is requested to change the position from current Part-Time Permanent to Full-Time Permanent.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 32,300 32,300 32,300
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Enabling Services
Revenue 0 0 0
Utility 0 0 0
Taxation (32,300) (32,300) (32,300) Maintain
Priority: 1
ON-GOING Title:
Bridge Rehabilitation and Inspections
PRELIMINARY
Justification: Additional funds are requested to ensure the safety and longevity of the City's 40 vehicle bridges and 69 pedestrian bridges. Many of these bridges are showing signs of age and decay. The most efficient way to reduce repair and replacement costs is to identify and remedy issues before they become serious. The recommended bridge inspection program provides inspections annually with detailed inspections every five years. For some bridges nearing end of life, detailed inspections are required more often. 2024 Base Budget: $68k
Strategic Direction: 2024 2025 2026
Cost 22,000 22,000 22,000
Transportation - Traffic safety management is increasing Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (22,000) (22,000) (22,000)
PAGE 276
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Maintain
Priority: 1
ON-GOING Title:
Microsoft Solutions
PRELIMINARY
Justification: The City is progressing in its efforts to use technology to find efficiencies and use data to make better more informed decisions, as well as expanding mobile offerings. Microsoft offers solutions to support these efforts. Safeguarding digital assets and information outside the physical office environment requires robust technology. To ensure compliance with regulations, records management, and to safeguard sensitive data, budget is requested for Microsoft specific licenses for security features that protect digital transformation. As the new digital world is cloud-based in its offering, budget is also requested to move to the Microsoft Cloud Data Centre. This change will reduce future hardware costs while continuing to provide IT infrastructure services as a required.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 195,000 235,000 235,000
Digital Transformation - Digital tools make it easier to do business with the City Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Enabling Services
Revenue 0 0 0
Utility 0 0 0
Taxation (195,000) (235,000) (235,000) Maintain
Priority: 1
ON-GOING Title:
Security Contract Increases & Inflation
PRELIMINARY
Justification: Local labour market for security personnel has changed resulting in increased staffing costs. Additionally, the City of Kelowna is continuing to require higher level of service from our Security contractors resulting in more training and additional contract costs. 2024 Base Budget: $1.1M
Strategic Direction: 2024 2025 2026
Cost 200,000 200,000 200,000
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (200,000) (200,000) (200,000)
PAGE 277
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Maintain
Priority: 1
ON-GOING Title:
Cyber Security and Disaster Recovery
PRELIMINARY
Justification: Cyber security and backup and disaster recovery are crucial for the City as they ensure the preservation and continuity of essential data and operations, as well as safeguarding web domains, databases, and cloud systems. These securities shields against data breaches, and malicious attacks, ensuring the integrity, confidentiality, and availability of digital assets. Budget is requested to adopt a service model for backup and disaster recovery that will provide expert guidance, access to cutting-edge technologies, and round-the-clock support from experienced professionals, ensuring that data is protected against unforeseen events. Budget is further requested for investment in cyber security software that provides proactive defense, vulnerability assessments, and encryption protocols to combat evolving cyber threats.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 561,000 480,000 480,000
Digital Transformation - Digital tools make it easier to do business with the City Reserve (350,000) 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Enabling Services
Revenue 0 0 0
Utility 0 0 0
Taxation (211,000) (480,000) (480,000) Maintain
Priority: 1
ON-GOING Title:
Employee Development Scholarship Program
PRELIMINARY
Justification: The Employee Scholarship program is designed to encourage and provide partial funding to staff closing education gaps required for career path and succession planning positions. This program supports the City's engagement and succession planning practices while increasing staff retention. Since 2021 an average of 44 staff applies annually, and the annual funding amount requested is more than double the annual budget, which funds 50% or 75% of tuition costs. Education providers have increased costs in the past 5 years. This program aligns with our Corporate priority of Leadership Everywhere by supporting staff development on a wide variety of city business related education. Highly engaged staff service citizens better as indicated by engagement research.
Strategic Direction: 2024 2025 2026
Cost 20,000 20,000 20,000
Our People - Employees in all positions have more opportunities to improve their leadership Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (20,000) (20,000) (20,000)
PAGE 278
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Maintain
Priority: 1
ON-GOING Title:
Artificial Intelligence (AI) Program
PRELIMINARY
Justification: Automating the City's understanding process with AI is crucial for accelerated efficiency gains. Next-generation technologies like machine learning and data analytics enable swift analysis of vast amounts of data. Real-time data integration allows rapid decision-making, enhancing emergency response and public services. Budget is requested for implementation and organizational change management, as well as AI prompt training to empower staff to effectively collaborate with AI systems and utilize the capabilities. Training in these technologies will equip superusers with advanced artificial intelligence and cloud computing skills. This program fosters agility, accelerates digital transformation, and ensures the city remains at the forefront of technological advancements, driving positive outcomes for stakeholders. Expected Completion: Dec 2024 Strategic Direction: 2024 2025 2026 Service Area:
Cost 360,000 40,000 0
Digital Transformation - Digital tools make it easier to do business with the City Reserve (320,000) 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Enabling Services
Revenue 0 0 0
Utility 0 0 0
Taxation (40,000) (40,000) 0 Enhance
Priority: 1
ON-GOING Title:
Strategic Land Development Manager Position
PRELIMINARY
Justification: Staff actively pursue federal and provincial grants, including the Housing Accelerator Fund via CMHC. The fund is earmarked for $15M to aid Kelowna in acquiring land for affordable housing. To manage increased work from this, budget is requested for a second Strategic Land Development Manager. This aids in land acquisition, leasing, and partnership management with housing operators.
Strategic Direction: 2024 2025 2026
Cost 68,000 132,700 132,700
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (68,000) (132,700) (132,700)
PAGE 279
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Enhance
Priority: 1
ON-GOING Title:
Legacy Application Replacement
PRELIMINARY
Justification: Retiring legacy applications and replacing them with modern legacy apps enhances cyber security by addressing outdated vulnerabilities, implementing current best practices, and ensuring compatibility with contemporary security tools. Modern applications leverage next-generation technologies, enabling seamless integration, increased security, improved performance, and enhanced user experiences. They enhance citizen services, streamline operations, and foster digital transformation. Projects in 2024 include the replacement of the Bylaw Records Management System to optimize City operations, enhance public service delivery, and contribute to a well-organized and secure urban environment.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 220,000 120,000 120,000
Digital Transformation - Digital tools make it easier to do business with the City Reserve (100,000) 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Enabling Services
Utility 0 0 0
Taxation (120,000) (120,000) (120,000) Enhance
Priority: 1
ON-GOING Title:
UBC Centre of Excellence Partnership
PRELIMINARY
Justification: Budget is requested to further leverage the City's partnership with the University of British Columbia Okanagan (UBCO) by delivering on a greater number of applied research projects, which will help achieve Council and Corporate Priorities. The existing City-UBCO Collaboration Committee has shown success with its existing model (5 current projects underway), and both parties wish to grow this opportunity by creating a Center for Excellence to achieve even greater success. Innovation, in four strategic theme areas will govern the work: (1) Waste Reduction/Management (2) Sustainable Urban Living (3) Climate Resiliency (4) Homelessness. This opportunity will be jointly funded and resourced with UBCO and funds will be further leveraged through external partnerships and grants.
Strategic Direction: 2024 2025 2026
Cost 175,000 175,000 175,000
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (175,000) (175,000) (175,000)
PAGE 280
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Enhance
Priority: 1
ON-GOING Title:
Cook Rd Boat Launch Dredging
PRELIMINARY
Justification: Budget is requested for the dredging of the Cook Road boat launch. Costs have been submitted which reflect the actual contracted costs of the 2022/2023 dredging operations.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 150,000 150,000 150,000
Climate & Environment - Protect and restore natural areas Reserve (150,000) (150,000) (150,000)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Enabling Services
Revenue 0 0 0
Utility 0 0 0
Taxation 0 0 0 Enhance
Priority: 1
ON-GOING Title:
Building Planning Manager Position
PRELIMINARY
Justification: The Building Planning department is responsible for directing the physical spaces of the organization and ensures they support its strategic goals. The department conducts long-term and short-term planning for the facilities, based on the current and projected needs of the organization. The department evaluates the feasibility, cost, and impact of various projects, and prioritizes them according to the available budget and resources. The department also coordinates with other departments and stakeholders to ensure that the facilities meet their requirements and expectations. The tenyear capital plan identifies a number of significant building projects that require greater attention of a dedicated manager to this area.
Strategic Direction: 2024 2025 2026
Cost 71,100 137,500 137,500
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (71,100) (137,500) (137,500)
PAGE 281
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Enhance
Priority: 1
ONE-TIME Title:
Parks Masterplan
PRELIMINARY
Justification: The Parks Masterplan is a multi-stage document prepared over several years, to plan the growth and development of a diverse parks portfolio to meet the needs of our growing community. An additional budget of $75k is requested for the final phase, to cover increased costs incurred during that time. The final stage will be the implementation plan, costing and funding sources.
Expected Completion: Dec 2024 Strategic Direction: 2024 Service Area:
Cost 75,000
Other - Supports Base Business Reserve (75,000)
Borrow 0
Grant 0
Other 0
Revenue 0
Enabling Services
Utility 0
Taxation 0 Enhance
Priority: 1
ON-GOING Title:
Front Line Service Staff - Trauma Informed/De-escalation Training
PRELIMINARY
Justification: Budget is requested for frontline staff who are subject to dealing with difficult and sensitive situations involving members of the public that are dealing with substance abuse or mental health conditions. This is a formal extension of the Supporting Frontline Staff project.
Strategic Direction: 2024 2025 2026
Cost 10,000 10,000 10,000
Homelessness - Reduce social impacts from poverty, substance use and mental health Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (10,000) (10,000) (10,000)
PAGE 282
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Enhance
Priority: 1
ON-GOING Title:
City Protection Officer Ongoing Full-Time Position
PRELIMINARY
Justification: The City has piloted an in-house security resource to support staff safety and protection of assets. This position has already proven highly valuable, enabling staff to better perform their work in the field in a safer manner, as well as responding to security incidents involving City assets and property. Budget is requested to change the position to FullTime Permanent. One vehicle is required for this position, purchase budget is included in this request and will be transferred to the capital program upon Council approval 2024.
Strategic Direction: 2024 2025 2026 Service Area:
Cost 127,800 97,100 97,100
Other - Supports Base Business Reserve (127,800) 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Enabling Services
Revenue 0 0 0
Utility 0 0 0
Taxation 0 (97,100) (97,100) Enhance
Priority: 1
ON-GOING Title:
Diversity, Equity & Inclusion
PRELIMINARY
Justification: The City completed a Diversity, Equity and Inclusion Strategic plan in 2022. The plan includes 28 projects to be implemented over 5 years which will ensure the City has an equitable and inclusive work environment. The DEI Strategic Plan will help to ensure the City is able to attract and retain a diverse workforce that is representative of the citizens we serve. This budget is to fund Action Plan items including Policy Updates, communication, the development of an Employee Assistance Line and changes to the Corporate Training Strategy.
Strategic Direction: 2024 2025 2026
Cost 100,000 30,000 30,000
Our People - Employees in all positions have more opportunities to improve their leadership Reserve (70,000) 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (30,000) (30,000) (30,000)
PAGE 283
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Enhance
Priority: 1
ONE-TIME Title:
Voice and Chatbot Testing and Integrations
PRELIMINARY
Justification: Testing the artificial intelligence powered 311 service for the City is crucial. Rigorous testing ensures the solution's reliability, accuracy, and performance. Thoroughly examining different scenarios, data inputs, and user interactions helps identify and rectify potential issues. Integration testing validates seamless connectivity with existing systems and infrastructure. User acceptance testing ensures a smooth and intuitive experience for citizens. Load testing evaluates the solution's scalability and response times under heavy usage. By prioritizing comprehensive testing, the City can confidently deploy a robust and efficient 311 service, delivering accurate and timely assistance to its residents.
Expected Completion: Dec 2024 Strategic Direction: 2024
Cost 55,000
Digital Transformation - Digital tools make it easier to do business with the City Reserve (55,000)
Borrow 0
Grant 0
Other 0
Revenue 0
Utility 0
Taxation 0
PAGE 284
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Preliminary Budget Summary - General Fund Type
Description
Cat.
Cost
Enabling Services - Priority 2 Enhance Building Operator Position Service Area Priority 2 Total
OG
126,900 126,900
Reserve
Borrow 0 0
0 0
Grant
Revenue 0 0
Utility 0 0
Taxation 0 0
(126,900) (126,900)
PAGE 285
2024 FINANCIAL PLAN
CITY OF KELOWNA
CAPITAL BUDGET
PAGE 286
2024 FINANCIAL PLAN
CITY OF KELOWNA
CAPITAL BUDGET CAPITAL BUDGET SUMMARY The 10‐Year Capital Plan and the annual capital program are coordinated by the Capital Planning department with the integral involvement of all divisions with capital needs. The Capital Planning team uses a long‐term, multiple bottom line approach for capital planning that strikes a balance between renewing existing infrastructure and investing in new infrastructure to support growth and improved services. In April 2016, Council endorsed the 2030 Infrastructure Plan, which set the direction for infrastructure investment until 2030, including a funding strategy. The Council endorsed 10‐Year Capital Plan is guided by the direction set in the 2030 Infrastructure Plan and is updated annually to be responsive and practical. The annual capital program is directed by the 10‐Year Capital Plan but is responsive to emerging issues and priorities. The planning horizon for the 10‐Year Capital Plan referenced in this document is 2023 – 2032. The City of Kelowna’s capital structure includes twelve capital cost centres: Airport, Fire Equipment, Information Services, Real Estate & Parking, Buildings, Parks, Vehicles & Equipment, Transportation, Water, Wastewater, Solid Waste and Storm Drainage. Funding for projects within these cost centres could come from a variety of sources including utility revenues, financial reserves, borrowing, grants or taxation. At the top right‐hand side of each 2024 capital request, readers will find the capital reference and the year the project was included in the Council endorsed 10‐Year Capital Plan, along with the corresponding dollar amount. All capital submissions from departments have been evaluated to ensure alignment with Council Policy No. 342 Tangible Capital Assets. The evaluation is based on the minimum cost threshold and the useful life threshold as seen in the table below. Asset Category Land Land Improvement Parks Infrastructure Buildings Building Improvement Machinery and Equipment IT Infrastructure Infrastructure
Useful Life (in years) No Amortization 15-60 15-60 40-75 10-40 5-15 4-10 20-100
Minimum Threshold ($) Capitalize 50,000 50,000 100,000 100,000 10,000 10,000 100,000
PAGE 287
2024 FINANCIAL PLAN
CITY OF KELOWNA
Where submissions were deemed to not meet the Tangible Capital Asset thresholds, requests were included in the operating program. Operating and maintenance costs are included in the related capital request when applicable. Capital requests that have operating impacts are marked with O&M on the capital summary sheet. When a vehicle or equipment is required as part of a new position, the capital cost is presented in the operating request and will be transferred to the capital program upon Council approval. Capital investment focuses on renewing existing assets, meeting the needs of a growing community, and new infrastructure to support enhanced or improved services. Capital requests are divided into three categories: Renewal, Growth and New. The category assigned to each capital request can be found in the upper right corner of its justification. The capital requests total million. Of this, growth‐related projects total million or per cent, asset renewal projects total million or per cent, and new infrastructure projects total million or per cent.
Capital by Infrastructure Cost Centre Many times, Capital projects span multiple years as the project is planned, designed, and constructed. For , the Capital Program is being presented including the expected future budget commitments in the following four years related to the projects as presented in the Council endorsed ‐Year Capital Plan. Changes to future year budgets may occur as part of the ‐Year Capital Plan update that is completed each year. This presentation gives the reader a better understanding of full project costs and the anticipated delivery schedule. The Capital Program is a all funds.
. million dollar plan of which
. million is being requested for in
$ thousands
2024
2025
Airport
9,805
3,410
Building
20,245 631
Fire
2026
. This includes
2027
2028
Total
0
0
0
13,215
91,630
80,830
43,200
0
235,905
0
0
0
0
631
Information Services
1,133
0
0
0
0
1,133
Parks
27,849
33,950
22,200
8,200
0
92,199
Real Estate and Parking
3,146
0
0
0
0
3,146
Solid Waste
12,450
11,250
0
5,000
3,750
32,450
Storm Drainage
8,020
7,382
8,371
1,538
0
25,311
Transportation
20,199
31,997
18,294
4,200
0
74,691
Vehicle & Mobile Equipment
7,317
0
0
0
0
7,317
Wastewater
20,688
8,118
3,179
5,786
0
37,771
Water
8,628
6,859
0
0
0
15,487
Total priority 1 requests
140,111
194,596
132,874
67,924
3,750
539,255
Building
10,235
10,080
8,060
0
0
28,375
Parks
500
0
0
0
0
500
10,735
10,080
8,060
0
0
28,875
Total priority 2 requests
PAGE 288
2024 FINANCIAL PLAN
CITY OF KELOWNA
The following table provides a summary of the priority one and priority two 2024 capital requests by infrastructure cost centre, along with the funding sources, including taxation, reserves, borrowing, grant funding, external contributions and utility funds (user fees). $ thousands
Asset
Reserve
Borrow
Fed/Prov
Contribution
Utility
Taxation
Priority 1 Airport Building Fire Information Services Parks Real Estate & Parking Solid Waste Storm Drainage Transportation Vehicle & Mobile Equipment Wastewater Water Total Priority 1 Priority 2
9,805 20,245 631 1,133 27,849 3,146 12,450 8,020 20,199 7,317 20,688 8,628 140,111
9,805 12,803 631 0 22,826 1,896 12,450 4,021 15,547 7,076 10,856 1,978 99,889
0 3,878 0 0 1,481 0.0 0.0 0.0 553.0 0.0 0.0 0.0 5,912
0 0 0 0 0 0 0 2,680 0 0 0 0 2,680
0 0 0 50 0 0 0 0 391 0 56 150 647
0 0 0 0 0 0 0 0 0 241 9,777 6,500 16,518
0 3,564 0 1,083 3,542 1250 0 1319 3709 0 0 0 14,467
Building Parks Total Priority 2 Total Requests
10,235 500 10,735 150,846
0 0 0 99,889
0 0 0 5,912
2,015 0 2,015 4,695
0 0 0 647
0 0 0 16,518
8,220 500 8,720 23,187
Note: Totals may not add due to rounding
General Fund The 2024 Financial Plan includes 80 General Fund Priority one (P1) requests that total 101M of which 14.5M is requested to be funded from taxation. Priority one requests focus on growth through cultivating vibrant neighbourhoods with a commitment to environmental sustainability while maintaining essential services. In addition to the P1 capital requests, there are 4 Priority two (P2) General Fund requests that are included for Council’s consideration totaling 10.7M of which 8.7M is requested from taxation. P2 requests are not included in summary totals. Airport Fund The number of passengers that fly through Kelowna International Airport is continuing to grow with an estimated million . The 2024 Airport capital ask totals 9.8M and focuses on growth. There are no P2 capital requests for passengers in the Airport. Water Fund The City of Kelowna’s Water Utility provides water to just over half of the Kelowna population. The 2024 capital program focuses on infrastructure renewal and growth and includes 14 requests for a total of 8.6M funded by 6.5M of utility revenue. There are no P2 capital requests for the Water Utility. Wastewater Fund The Wastewater Utility has 13 capital requests using 20.7M of utility revenues to fund 9.8M worth of projects, with the balance of funding from reserves. These projects focus on growth through various sewer connection projects and infrastructure renewal at mains, trunks and lift stations. There are no P2 capital requests for the Wastewater Utility.
PAGE 289
2024 FINANCIAL PLAN
CITY OF KELOWNA
All funds expenditures – priority 1 ($ millions) The City’s total expenditure budget is $560.9 million of which $140.1 million, or 25 per cent, is for the 2024 Capital Program. This pie chart provides a visual illustration of the capital portion of the City’s total expenditure budget, and further breaks down the information by the capital infrastructure cost centres.
Note: Totals may not add due to rounding
10‐Year Capital Plan alignment ($ millions) The following table provides a comparison of priority one requests included in 2024 capital program versus the Council endorsed 10-Year Capital Plan. As the plan is updated each year, it is expected that there are only minor differences.
*The Building cost centre’s ‐Year Capital Plan amount for the Parkinson Recreation Centre redevelopment has been reduced to reflect the amount asked for in at . M across Buildings, Parks and Transportation to reflect the new annual capital plan presentation.
PAGE 290
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating Impact of capital investments – priority 1 The City of Kelowna considers operational impacts when making capital investment decisions. This is important as the operating impacts can amount to 70 – 80 per cent of an asset’s life cycle cost. The operating and maintenance impacts in the table below are included in the related capital request to present the full budget cost of the capital asset. All operating requests are ongoing. $ actuals Parks Burne Park: area maintenance (turf, beach, vegetation control) DCC Parkland Acquisition: area maintenance (beach, vegetation control) Glenmore Recreation Park ‐ Phases 4, 5: maintenance (playground, furniture, parking lot) Knox Mountain Park ‐ Improvements: area maintenance (washroom, security, weed control) Park Infrastructure Renewal: area maintenance (general, litter control) Urban Centers Beautification Initiative: area maintenance (tree, litter control, event support) Total Parks Transportation Bicycle Network Improvement Program: maintenance (sweeping, road marking) Local Street Urbanization Program: maintenance (sweeping, weed control) Pedestrian Network: maintenance (snow and ice control, sweeping, traffic signals) Rail Trail to Greenway DCC, ATC: area maintenance (turf, road markings, snow and ice control) Roadway Urbanization: maintenance (sweeping) Rutland Park & Ride, Mobility Hub, Operations Facility: maintenance (snow and ice, road marking) Safety and Operational Improvements: maintenance (weed control, sweeping, road marking) Traffic Signals and Roundabouts DCC: maintenance (sweeping, road marking, lighting) Transit ‐ Bus Stop and Amenity Improvements: maintenance (bus stop repair) Total Transportation Vehicle & Mobile Equipment Growth Vehicles: internal equipment costs for infrastructure delivery, maintenance, and safety Total Vehicle & Mobile Equipment Total Total operating impacts from Capital Investment
2024
2025
2026
0 59,000
29,700 69,000
52,800 69,000
0
3,800
20,600
33,500 4,900
42,500 10,000
43,500 10,000
38,200
32,200
32,200
135,600
187,200
228,100
1,700
3,500
3,500
800
1,500
1,500
9,300
11,800
11,800
7,700 600
28,000 1,200
28,000 1,200
0
800
1,700
4,500
9,000
9,000
6,100
22,900
22,900
500
1,000
1,000
31,200
79,700
80,600
233,100
466,200
466,200
233,100
466,200
466,200
399,900
733,100
774,900
PAGE 291
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - General Fund Page Type Description Information Services Capital - Priority 1 299 Renew Front Office Equipment I1 - Front Office Equipment 299 Renew Server and Data Storage Equipment I2 - Server & Data Storage 300 Renew Major Systems Projects I3 - Major System Projects 300 Renew Communications Networks Upgrades 301 New Fibre Optic Service Line I4 - Communications Systems Cost Center Total
Cost
Reserve
Borrow
Grant
Other
Utility
Taxation
454,800 454,800 60,000 60,000 431,900 431,900 136,500 50,000 186,500 1,133,200
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 (50,000) (50,000) (50,000)
0 0 0 0 0 0 0 0 0 0
(454,800) (454,800) (60,000) (60,000) (431,900) (431,900) (136,500) 0 (136,500) (1,083,200)
2,107,400 2,107,400 142,600 142,600 291,000 205,000
(1,000,000) (1,000,000) 0 0 (291,000) (205,000)
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
(1,107,400) (1,107,400) (142,600) (142,600) 0 0
150,000
(150,000)
0
0
0
0
0
646,000 250,000 250,000 3,146,000
(646,000) (250,000) (250,000) (1,896,000)
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 (1,250,000)
9,000,000
(6,922,000)
(2,078,000)
0
0
0
0
9,000,000 1,800,000
(6,922,000) 0
(2,078,000) (1,800,000)
0 0
0 0
0 0
0 0
1,800,000 3,000,000
0 (3,000,000)
(1,800,000) 0
0 0
0 0
0 0
0 0
3,000,000 500,000
(3,000,000) 0
0 0
0 0
0 0
0 0
0 (500,000)
B6 - Capital Opportunities and Partnerships
500,000
0
0
0
0
0
(500,000)
Critical & Core Building Infrastructure Renewal (Level 3) 312 Renew Facility Energy Modernization Renewal 313 Renew Kelowna Community Theatre - Equipment Improvements B7 - Renewal, Rehabilitation & Infra. Cost Center Total
5,000,000
(1,935,600)
0
0
0
0
(3,064,400)
250,000 695,000
(250,000) (695,000)
0 0
0 0
0 0
0 0
0 0
5,945,000 (2,880,600) 20,245,000 (12,802,600)
0 (3,878,000)
0 0
0 0
0 0
(3,064,400) (3,564,400)
18,386,600 (18,386,600) 18,386,600 (18,386,600) 2,738,500 (1,708,900) 2,738,500 (1,708,900) 2,062,000 (1,031,000)
0 0 0 0 (1,031,000)
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 O&M 0 (1,029,600) O & M (1,029,600) 0
Real Estate & Parking Capital - Priority 1 304 New General Land, Acquisition 304
New
305 305
Renew Renew
306
New
L1 - General Land Road & Sidewalk, Land Acquisition L2 - Road and Sidewalk Land Acquisition Parking Equipment and Facilities Downtown Parkades-Major Maintenance
Electric Vehicle Infrastructure and Strategic Initiatives L3 - Parking Infrastructure 306 New Strategic Land Servicing Requirements L4 - Strategic Land Redevelopment Cost Center Total
Buildings Capital - Priority 1 310 Renew Building Stronger Kelowna - Parkinson Rec Centre Redevelopment B1 - Parks and Recreation Buildings 310 Growth Building Stronger Kelowna - Community Activity Centres B2 - Community and Cultural Buildings 311 Growth North Glenmore Fire Hall (Stn #5) Construction B3 - Civic/Protective Service Buildings 311 New Capital Opportunities & Partnership Fund
312
Renew
Parks Capital - Priority 1 318 Growth DCC Parkland Acquisition P1 - DCC Parkland Acquisition 318 Growth Burne Park P3 - Neighbourhood Park Development 319 Growth Building Stronger Kelowna - Parkinson Rec Park Field Realignment 319 Growth Building Stronger Kelowna - Rutland Recreation Field Realignment 320 Renew Elks Stadium Batter's Eye 320 Growth Glenmore Recreation Park - Phases 4, 5 321 Growth Mission Recreation - Youth Park, Plaza, & Trail System P5 - Recreation Park Development 321 Renew City Park - Improvements, Waterfront Promenade Phase 3 322 Growth Manhattan Point Park DCC P6 - City-wide Park Development
450,000
0
(450,000)
0
0
0
0
50,000 1,200,000 215,500
(50,000) (1,200,000) (127,900)
0 0 0
0 0 0
0 0 0
0 0 0
0 0 O&M (87,600)
3,977,500 400,000
(2,408,900) 0
(1,481,000) 0
0 0
0 0
0 0
(87,600) (400,000)
100,000 500,000
(21,400) (21,400)
0 0
0 0
0 0
0 0
(78,600) (478,600)
PAGE 292
2024 FINANCIAL PLAN
CITY OF KELOWNA
322
Renew
Knox Mountain Park - Improvements P7 - Linear/Natural Area Park Development
402,700 402,700
0 0
0 0
0 0
0 0
0 0
(402,700) O & M (402,700)
323 323 324
Renew New New
708,500 218,000 137,000
0 (163,500) (137,000)
0 0 0
0 0 0
0 0 0
0 0 0
(708,500) (54,500) O & M 0
324
New
Irrigation Renewal Park Infrastructure Renewal Kelowna Memorial Cemetery Improvements P8 - Renewal, Rehabilitation & Infra Capital Opportunities & Partnership Fund
1,063,500 500,000
(300,500) 0
0 0
0 0
0 0
0 0
(763,000) (500,000)
500,000 130,000
0 0
0 0
0 0
0 0
0 0
(500,000) (130,000)
150,000 280,000
0 0
0 0
0 0
0 0
0 0
(150,000) O & M (280,000)
27,848,800 (22,826,300)
(1,481,000)
0
0
0
P9 - Capital Opportunities Partnership Art Walk Furniture and Paver Surfaces Replacement 325 New Urban Centers Beautification Initiative P10 - Urban Streetscape, Centres Dev, Renewal Cost Center Total
325
Renew
Vehicles Capital - Priority 1 329 Growth Growth Vehicles V1 - Additional Vehicles / Equipment 329 Renew Vehicle/Equipment Renewal V2 - Vehicle / Equipment Renewal Cost Center Total
(3,541,500)
2,327,000 2,327,000 4,990,000 4,990,000 7,317,000
(2,085,900) (2,085,900) (4,990,000) (4,990,000) (7,075,900)
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
(241,100) (241,100) 0 0 (241,100)
1,038,000
(485,000)
(553,000)
0
0
0
0
465,000 240,000
(353,400) (126,100)
0 0
0 0
0 0
0 0
(111,600) (113,900)
436,300
(318,900)
0
0
0
0
(117,400)
Road Safety Improvements DCC Traffic Signals and Roundabouts DCC Lakeshore 5 DCC (Richter - Cook), RD Stewart 3 DCC (Crawford-Swamp), Road Gordon 1 DCC (Frost - South Perimeter) Frost DCC (Killdeer - Chute Lake) T1 - DCC Roads Growth Rail Trail to Greenway DCC, ATC Growth Abbott DCC (Rose - Gyro), ATC Growth Bertram 1 DCC (Sutherland - Cawston), ATC
500,000 750,000 300,000 930,000 200,000 437,400 5,296,700 3,950,000 75,000 543,700
(456,000) (696,000) (214,400) (820,000) (200,000) (437,400) (4,107,200) (3,717,400) (26,200) (535,900)
0 0 0 0 0 0 (553,000) 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 (30,000) 0 0 0 (30,000) 0 0 (6,900)
0 0 0 0 0 0 0 0 0 0
(44,000) (54,000) O & M (55,600) (110,000) 0 0 (606,500) (232,600) O & M (48,800) (900)
130,000
(95,600)
0
0
(4,000)
0
(30,400)
341
Growth Lakeshore 3 DCC (Lexington - Old Meadows), ATC T2 - DCC Roads - Active Transportation Growth Local Street Urbanization Program Growth Roadway Urbanization T3 - Non-DCC Roads Renew KLO Rd Mission Creek Bridge Replacement
4,698,700 180,000 350,000 530,000 1,224,100
(4,375,100) (90,000) 0 (90,000) (1,224,100)
0 0 0 0 0
0 0 0 0 0
(10,900) 0 (350,000) (350,000) 0
0 0 0 0 0
(312,700) (90,000) O & M 0 O&M (90,000) 0
341 342
Renew Renew
Transportation System Renewal Road Renewal Program T4 - Transportation System Renewal Growth Bicycle Network Improvement Program Growth Neighbourhood Bikeway Program T5 - Bicycle Network Growth Pedestrian Network T6 - Sidewalk Network Renew Safety and Operational Improvements T7 - Safety and Operational Improvements
1,241,900 4,928,900 7,394,900 500,000 120,000 620,000 460,000 460,000 474,000 474,000
(725,000) (4,189,200) (6,138,300) (250,000) 0 (250,000) (230,000) (230,000) (135,000) (135,000)
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
(516,900) (739,700) (1,256,600) (250,000) O & M (120,000) (370,000) (230,000) O & M (230,000) (339,000) O & M (339,000)
Growth Rutland Park & Ride, Mobility Hub, Operations Facility Growth Transit - Bus Stop and Amenity Improvements Growth Rutland Network Restructure - Infrastructure
380,000
(35,000)
0
0
0
0
(345,000) O & M
150,000
(75,000)
0
0
0
0
(75,000) O & M
105,000
(41,300)
0
0
0
0
(63,700)
Growth Transit - Land Acquisition Growth YLW Transit Hub T9 - Transit Facilities
45,000 45,000 725,000
(45,000) (25,000) (221,300)
0 0 0
0 0 0
0 0 0
0 0 0
0 (20,000) (503,700)
Transportation Capital - Priority 1 333 Growth Building Stronger Kelowna - Transportation Upgrades 333 Growth McCulloch Area DCC (KLO/Hall/Spiers) 334 Growth Major Intersection Capacity Improvements DCC 334 Growth Burtch 3 DCC (Glenmore - Springfield), RD 335 335 336 336 337 337 338 338 339
339
340 340
342 343 343 344
344 345 345 346 346
Growth Growth Growth Growth Growth Growth
0 O&M 0 0 0 0
PAGE 293
2024 FINANCIAL PLAN
CITY OF KELOWNA
Cost Center Total Wastewater Capital - Priority 1 349 Growth Glenmore Connection - Glenmore Rd from Cross Rd to Scenic Rd 349 Growth Byrns Baron Trunk Phase 2 350 Growth Lakeshore Trunk - (Cook - Gyro) WW1 - DCC Pipes (Mains) 350 New Water St Lift Station 351 Growth Gyro Lift Station WW2 - DCC Lift Stations 351 New Offsite & Oversize - Wastewater WW4 - DCC Oversize 352 Renew WWTF Fermenter & Centrifuge Replacement
20,199,300 (15,546,900)
(553,000)
0
(390,900)
0
(3,708,500)
5,703,100
(5,172,700)
0
0
0
(530,400)
0
1,059,600 500,000 7,262,700 4,000,000 287,600 4,287,600 200,000 200,000 2,000,000
(880,500) (320,100) (6,373,300) (4,000,000) (254,200) (4,254,200) (100,000) (100,000) 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
(179,100) (179,900) (889,400) 0 (33,400) (33,400) (100,000) (100,000) (2,000,000)
0 0 0 0 0 0 0 0 0
352 353 353
Renew Renew Renew
Burtch Trunk Lift Station Renewal Renewal - Wastewater mains and facilities
1,250,000 1,040,000 4,210,000
0 0 0
0 0 0
0 0 0
0 0 0
(1,250,000) (1,040,000) (4,210,000)
0 0 0
354
Renew
354 355
New New
Commonage - Renewal Projects WW5 - Network and Facility Renewal Belcarra Sewer Connection Area Emerging Issues WW6 - Network and Facility Improvements
170,000 8,670,000 128,000 140,000 268,000
0 0 (128,000) 0 (128,000)
0 0 0 0 0
0 0 0 0 0
(56,100) (56,100) 0 0 0
(113,900) (8,613,900) 0 (140,000) (140,000)
0 0 0 0 0
20,688,300 (10,855,500)
0
0
(56,100)
(9,776,700)
0
6,701,000 750,000
(4,020,600) 0
0 0
(2,680,400) 0
0 0
0 0
0 (750,000)
7,451,000 349,100 349,100 220,000 220,000 8,020,100
(4,020,600) 0 0 0 0 (4,020,600)
0 0 0 0 0 0
(2,680,400) 0 0 0 0 (2,680,400)
0 0 0 0 0 0
0 0 0 0 0 0
(750,000) (349,100) (349,100) (220,000) (220,000) (1,319,100)
733,100
(427,200)
0
0
0
(305,900)
0
365
W1 - DCC Pipes (Mains) Growth Summit Reservoir DCC W4 - DCC Reservoirs & Filling Stations New Offsite & Oversize - Water W5 - DCC Offsite & Oversize Renew Water Network and Facility Renewal Renew Water Meter Replacement Program W6 - Network and Facility Renewal Renew Eldorado Pump Station Chlorine Conversion
733,100 1,900,000 1,900,000 200,000 200,000 1,400,000 800,000 2,200,000 200,000
(427,200) (551,000) (551,000) (100,000) (100,000) 0 0 0 (200,000)
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
(305,900) (1,349,000) (1,349,000) (100,000) (100,000) (1,400,000) (800,000) (2,200,000) 0
0 0 0 0 0 0 0 0 0
366 366 367 367
New Renew Renew Renew
100,000 500,000 100,000 1,000,000
(100,000) (500,000) (100,000) 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 (1,000,000)
0 0 0 0
368
New
Bulk Fill Station UV Treatment Systems Control Upgrade Poplar Pump Station Electrical Upgrade Existing Fireflow Upgrades and Infill Development Improvements Water Meter - New Installations W7 - Network and Facility Improvements
150,000 2,050,000
0 (900,000)
0 0
0 0
(150,000) (150,000)
0 (1,000,000)
0 0
368 369 369
Renew New New
Irrigation Mainline Renewal PRV Upgrades - Non Potable Hydrants W8 - Irrigation Network Improvements Cost Center Total
1,000,000 500,000 45,000 1,545,000 8,628,100
0 0 0 0 (1,978,200)
0 0 0 0 0
0 0 0 0 0
0 0 0 0 (150,000)
(1,000,000) (500,000) (45,000) (1,545,000) (6,499,900)
0 0 0 0 0
450,000 450,000 8,600,000
(450,000) (450,000) (8,600,000)
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
100,000 8,700,000
(100,000) (8,700,000)
0 0
0 0
0 0
0 0
0 0
Cost Center Total Storm Drainage Capital - Priority 1 358 New Mill Creek Flood Protection 358 Renew Frost and Frazer Lake Stormwater Improvements D1 - Hydraulic Upgrading Program 359 Growth Containment Devices D2 - Storm Drainage Quality Program 359 Renew Linear Asset Renewal Projects D3 - Storm Water Renewal Cost Center Total Water Capital - Priority 1 363 Growth Royal View Transmission Main Upgrades
363 364 364 365
Solid Waste Capital - Priority 1 373 Growth Automated Collection Curbside Carts SW1 - Equipment 373 Growth Landfill Liner and Lift Station Design and Construction - Area 3 374 Growth General Site Works and Investigations SW2 - Site Improvement
PAGE 294
2024 FINANCIAL PLAN
374 375
Growth Landfill Gas & Leachate Recirculation Laterals Growth Landfill - East Gas Subheader Connections
SW3 - Gas Management Growth Stormwater Bypass System SW5 - Drainage & Groundwater Management 376 Growth Stockpiles and Reprocessing Areas Relocation SW7 - Landfill Area Development 376 Growth Progressive Closure SW8 - Closure & Reclamation Cost Center Total
375
Airport Capital - Priority 1 379 Renew Security System Upgrades 379 Renew Small Capital Projects 380
A1 - Airside Growth Groundside Infrastructure and Equipment
380
Growth Mill Creek Realignment
A2 - Groundside 381 Renew Airport Air Terminal Building Capital Replacement & Improvement 381 Renew Carbon Neutral Initiatives A3 - Terminal 382 Growth Airport Soaring Beyond 2.5 Million Passengers AIF Program A4 - Growth Cost Center Total
Fire Capital - Priority 1 385 Renew Self-Contained Breathing Apparatus & Cylinders 385 New Fire Sprinkler Protection Unit 386 New Digital Fire Training System - Additional Screen F2 - Additional Vehicles / Equipment 386 Renew Fire Department Management Software Replacement F3 - Communications Systems Cost Center Total Total Priority 1
CITY OF KELOWNA
550,000
(550,000)
0
0
0
0
0
450,000
(450,000)
0
0
0
0
0
1,000,000 250,000 250,000
(1,000,000) (250,000) (250,000)
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
1,800,000
(1,800,000)
0
0
0
0
0
1,800,000 (1,800,000) 250,000 (250,000) 250,000 (250,000) 12,450,000 (12,450,000)
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
245,000 180,000 425,000 1,185,000
(245,000) (180,000) (425,000) (1,185,000)
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
215,000 1,400,000 1,665,000
(215,000) (1,400,000) (1,665,000)
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
870,000 2,535,000 5,445,000
(870,000) (2,535,000) (5,445,000)
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
5,445,000 9,805,000
(5,445,000) (9,805,000)
0 0
0 0
0 0
0 0
0 0
154,500
(154,500)
0
0
0
0
0
200,000 26,100
(200,000) (26,100)
0 0
0 0
0 0
0 0
0 0
380,600 250,000
(380,600) (250,000)
0 0
0 0
0 0
0 0
0 0
250,000 630,600
(250,000) (630,600)
0 0
0 0
0 0
0 0
0 0
140,111,400 (99,887,600)
(5,912,000)
(2,680,400)
(647,000) (16,517,700) (14,466,700)
*O & M denotes capital request has operating & maintenance impacts included in the request
PAGE 295
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - General Fund Type Description Building Capital - Priority 2 Growth Community Activity Centres, Child Care B2 - Community and Cultural Buildings Growth Capital Opportunities & Partnership Fund
Cost
Reserve
Borrow
Grant
Other
Utility
Taxation
2,015,400 2,015,400 500,000 500,000
0 0 0 0
0 0 0 0
(2,015,400) (2,015,400) 0 0
0 0 0 0
0 0 0 0
0 0 (500,000) (500,000)
B6 - Capital Opportunities and Partnerships Critical & Core Building Infrastructure Renewal (Renewal Service Level 1 & 2) B7 - Renewal, Rehabilitation & Infra. Cost Center Total
7,720,000
0
0
0
0
0
(7,720,000)
7,720,000 10,235,400
0 0
0 0
0 (2,015,400)
0 0
0 0
(7,720,000) (8,220,000)
Parks Capital - Priority 2 New Capital Opportunities & Partnership Fund P9 - Capital Opportunities Partnership Cost Center Total
500,000 500,000 500,000
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
(500,000) (500,000) (500,000)
10,735,400
0
0
(2,015,400)
0
0
(8,720,000)
Renew
Total Priority 2
PAGE 296
2024 FINANCIAL PLAN
CITY OF KELOWNA
INFORMATION SERVICES CAPITAL LED BY: DIVISIONAL DIRECTOR, CORPORATE STRATEGIC SERVICES The information services capital infrastructure group is made up of four sections. I1 – Front Office Equipment Information Services have been utilizing a 5 year replacement cycle for desktop equipment which includes computers, printers, monitors, scanners and software. It also includes work group equipment such as large format plotters and copiers. I2 ‐ Server & Data Storage To provide equipment and software in City Hall data centre to support the various systems in place for staff and includes equipment for the Fire Hall data centre. Included are servers, disk storage, tape backups and the related software. I3 ‐ Major System Projects Major systems projects include Class Registration Software Replacement and Online Platform Redevelopment. I4 ‐ Communications Systems To provide a networking environment that interconnects the various places and spaces used by City staff, this budget will support the expansion of the City's fibre optic ring which will reduce need for leased communication lines. Network components that have reached the end of their serviceable life will also be replaced.
2024 Program The 2024 priority one budget investment for Information Services Capital totals $1.1M, representing 0.8% of the total 2024 capital program. The table below lists the individual capital budget requests and the expected future budget commitments in the following four years related to the 2024 projects as projected in the Council endorsed 10‐Year Capital Plan. Changes to future year budgets may occur as part of the 10‐Year Capital Plan update that is completed each year.
$ thousands Front Office Equipment Server and Data Storage Equipment Major Systems Projects Communications Networks Upgrades Fibre Optic Service Line Total priority 1 requests
I1 I2 I3 I4 I4
2024 455 60 432 137 50 1,133
2025
2026 0 0 0 0 0 0
2027 0 0 0 0 0 0
2028 0 0 0 0 0 0
Project Total 0 455 0 60 0 432 0 137 0 50 0 1,133
PAGE 297
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - General Fund Page
Type
Description
Cost
Reserve
Borrow
Grant
Other
Utility
Taxation
Information Services Capital - Priority 1 Renew Front Office Equipment 299 I1 - Front Office Equipment Renew 299 Server and Data Storage Equipment
454,800 454,800 60,000
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
(454,800) (454,800) (60,000)
I2 - Server & Data Storage Major Systems Projects I3 - Major System Projects Communications Networks Upgrades
60,000 431,900 431,900 136,500
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
(60,000) (431,900) (431,900) (136,500)
Fibre Optic Service Line I4 - Communications Systems
50,000 186,500 1,133,200
0 0 0
0 0 0
0 0 0
(50,000) (50,000) (50,000)
0 0 0
0 (136,500) (1,083,200)
300
Renew
300
Renew
301
New
Cost Center Total
PAGE 298
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Information Services Capital
Title:
Front Office Equipment
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 I1 - $454k PRELIMINARY
Justification: This capital program supports staff computers, devices, and meeting systems, ensuring smooth operations. As work patterns shift, a mobile-friendly setting for information workers is vital. This budget request includes software, Microsoft licensing, and cybersecurity. Old/out of date workstations can result in more incidents and lower service levels.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 454,800
Reserve 0
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Information Services Capital
Title:
Server and Data Storage Equipment
Dev/Com 0
Utility 0
Taxation (454,800)
Priority: 1 10 Yr Cap Plan Ref: 2024 I2 - $60k
Renew
PRELIMINARY
Justification: The Server and Data Storage initiative funds data centre capital investments. Budget is requested to advance the implementation of disaster recovery infrastructure. This project also aids the cyber security program in safeguarding the City's digital assets.
Expected Completion: Dec 2024 Strategic Direction: Digital Transformation - Digital tools make it easier to do business with the City Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 60,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (60,000)
PAGE 299
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Information Services Capital
Title:
Major Systems Projects
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 I3 - $431k PRELIMINARY
Justification: Budget is requested for data analytics solutions and dashboards to assist with better decision-making. This request will also fund the continued effort to automate and digitize processes with the goal of providing a better staff and citizen experience. Projects will include the enabled of AI technologies to enable efficiencies.
Expected Completion: Dec 2024 Strategic Direction: Digital Transformation - Data is used to inform decision making Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 431,900
Reserve 0
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Information Services Capital
Title:
Communications Networks Upgrades
Dev/Com 0
Utility 0
Taxation (431,900)
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 I4 - $136k PRELIMINARY
Justification: Budget is requested to deploy and upgrade cyber security infrastructure, the City's phone system, and call center platforms. New equipment will be purchased to manage IoT (Internet of Things) networks.
Expected Completion: Dec 2024 Strategic Direction: Digital Transformation - Digital tools make it easier to do business with the City Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 136,500
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (136,500)
PAGE 300
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Information Services Capital
Title:
Fibre Optic Service Line
Priority: 1 10 Yr Cap Plan Ref: 2024 I4 - $50k
New
PRELIMINARY
Justification: Budget is requested for the installation of fibre optic service lines for new customers. New customers will cover all costs associated with the installation.
Expected Completion: Dec 2024 Strategic Direction: Active Financial Management - Increase non-tax revenues to minimize the reliance on taxes Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 50,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com (50,000)
Utility 0
Taxation 0
PAGE 301
2024 FINANCIAL PLAN
CITY OF KELOWNA
REAL ESTATE & PARKING CAPITAL LED BY: DIVISIONAL DIRECTOR, PARTNERSHIPS & INVESTMENTS The Real Estate & Parking Capital infrastructure group is made up of four sections: L1 – General Land Annual allocation for the purchase of land for general purposes. This may allow for acquiring properties at less than fair market value, creating land assembly opportunities, creating a revenue generating land bank and providing trade potential. L2 ‐ Road and Sidewalk Land Acquisition To fund the purchase of land required for the widening of roads to accommodate road improvements and/or sidewalks. L3 ‐ Parking Infrastructure Funding to renew parking infrastructure and to invest in efficient parking management technology. L4 ‐ Strategic Land Redevelopment Funding to redevelop City owned land to improve public benefit and encourage economic development.
2024 Program The 2024 priority one budget investment for Real Estate & Parking totals $3.1M, representing 2.2% of the total 2024 capital program. The table below lists the individual capital budget requests and the expected future budget commitments in the following four years related to the 2024 projects as projected in the Council endorsed 10‐Year Capital Plan. Changes to future year budgets may occur as part of the 10‐Year Capital Plan update that is completed each year.
$ thousands General Land, Acquisition Road & Sidewalk, Land Acquisition Parking Equipment and Facilities Downtown Parkades-Major Maintenance Electric Vehicle Infrastructure and Strategic Initiatives Strategic Land Servicing Requirements Total priority 1 requests
L1 L2 L3 L3 L3 L4
2024 2,107 143 291 205 150 250 3,146
2025
2026 0 0 0 0 0 0 0
2027 0 0 0 0 0 0 0
2028 0 0 0 0 0 0 0
Project Total 0 2,107 0 143 0 291 0 205 0 150 0 250 0 3,146
PAGE 302
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - General Fund Page Type Description Real Estate & Parking Capital - Priority 1 304 New General Land, Acquisition
304
New
L1 - General Land Road & Sidewalk, Land Acquisition L2 - Road and Sidewalk Land Acquisition
305 305
Renew Renew
Parking Equipment and Facilities Downtown Parkades-Major Maintenance
306
New
Electric Vehicle Infrastructure and Strategic Initiatives L3 - Parking Infrastructure 306 New Strategic Land Servicing Requirements L4 - Strategic Land Redevelopment Cost Center Total
Cost
Reserve
Borrow
Grant
Other
Utility
Taxation
2,107,400 2,107,400 142,600 142,600
(1,000,000) (1,000,000) 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
(1,107,400) (1,107,400) (142,600) (142,600)
291,000 205,000
(291,000) (205,000)
0 0
0 0
0 0
0 0
0 0
150,000
(150,000)
0
0
0
0
0
646,000 250,000 250,000 3,146,000
(646,000) (250,000) (250,000) (1,896,000)
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 (1,250,000)
PAGE 303
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Real Estate and Parking Capital
Title:
General Land, Acquisition
New
Priority: 1 10 Yr Cap Plan Ref: 2024 L1 - $2.1M
PRELIMINARY
Justification: Budget is requested to purchase land that meets the characteristics and parameters identified in the City of Kelowna's Land Strategy. Potential considerations in the purchase of specific lands include: facilitating land assemblies of strategic value to the City, creating a revenue-generating land bank, and enhancing the City's ability to revitalize and redevelop areas within our community. The City has successfully acquired strategic lands to facilitate a number of unique initiatives in recent years, including the Innovation Centre, Interior Health Authority, Ella site, and Central Green. Given the ability of land to meet the ever-increasing complex challenges of our community, it is imperative that the City continue to capitalize on opportunities as they come available.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost Reserve 2,107,400 (1,000,000)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Real Estate and Parking Capital
Title:
Road & Sidewalk, Land Acquisition
Dev/Com 0
Utility 0
Taxation (1,107,400) New
Priority: 1 10 Yr Cap Plan Ref: 2024 L2 - $142k
PRELIMINARY
Justification: As documented by the Infrastructure Division, budget is requested to fund the acquisition of land necessary for the widening of roads and the expansion of the City's sidewalk network. Budget will also be used to fund road widenings in excess of the 20-meter width that is a requirement of the development approval process. Acquisitions are targeted toward key missing connections in the City's existing road and sidewalk network and will be focused on the City's core.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 142,600
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (142,600)
PAGE 304
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Real Estate and Parking Capital
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 L3 - $291k
Title:
Parking Equipment and Facilities
PRELIMINARY
Justification: Budget is requested to renew parking infrastructure and invest in efficient parking management by replacing equipment that has reached its end of life or to allow for expansion into new areas. Ongoing renewal of parking pay stations/meters, enforcement equipment, servers, asphalt maintenance and security cameras are included.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 291,000
Reserve (291,000)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Real Estate and Parking Capital
Title:
Downtown Parkades-Major Maintenance
Dev/Com 0
Utility 0
Taxation 0
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 L3 - $150k PRELIMINARY
Justification: Budget is requested to complete preventative maintenance items necessary to ensure maximum life expectancy of City owned parkades. Extensive flashing repair/replacement work is required at the Library and Chapman Parkades to improve waterproofing of these facilities. The total amount is $55k higher than anticipated in the 10-year capital plan as planned work from 2022 could not be completed as bids received were higher than available budget.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 205,000
Reserve (205,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 305
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Real Estate and Parking Capital
Title:
Electric Vehicle Infrastructure and Strategic Initiatives
Priority: 1 10 Yr Cap Plan Ref: 2024 L3 - $150k
New
PRELIMINARY
Justification: Budget is requested to continue expanding the number of electric vehicle charging stations in City owned parking lots and parkade facilities. This may include an increase in the quantity of Level 1 & 2 chargers in existing facilities or the addition of new locations as identified in the electric vehicle infrastructure gap analysis. Staff will continue to pursue partnership and grant opportunities to maximize the value of these funds.
Expected Completion: Dec 2024 Strategic Direction: Climate & Environment - Reduce corporate and community GHG emissions Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost 150,000
Reserve (150,000)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Real Estate and Parking Capital
Title:
Strategic Land Servicing Requirements
Dev/Com 0
Utility 0
Taxation 0
Priority: 1 10 Yr Cap Plan Ref: 2024 L4 - $250k
New
PRELIMINARY
Justification: The mandate of the Strategic Land Development department is to identify future strategic land assemblies, add value to real property dispositions and realize corporate objectives and the Official Community Plan through creative real estate strategies. Budget is requested to fund several projects and properties that have been identified as having the potential to return social, economic, environmental and cultural benefits to the City.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 250,000
Reserve (250,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 306
2024 FINANCIAL PLAN
CITY OF KELOWNA
BUILDING CAPITAL LED BY: DIVISIONAL DIRECTOR, PARTNERSHIPS & INVESTMENTS The buildings capital infrastructure group is made up of seven sections. B1 – Parks and Recreation Buildings An allocation for the development of new Parks and Recreation buildings as well as the redevelopment and expansion of existing ones in various locations throughout the City to keep pace with the increasing demand due to population growth and emerging trends. This category includes Parks Administration, Parks washrooms, field houses, arenas and pools. B2 ‐ Community and Cultural Buildings An allocation for the development of new community and cultural buildings as well as the redevelopment, renewal and expansion of existing ones. This category includes the theaters, libraries, senior centres, community halls, art gallery, museums and the RCA. B3 ‐ Civic/Protective Service Buildings Funding to support renewal, replacement and cost of new Protective Services buildings which include firehalls, police stations and City Hall. B4 ‐ Transportation and Public Works Buildings Funding to support renewal, replacement and new construction of new Transportation and Public Works Buildings throughout the City to keep pace increasing demand due to population growth and emerging trends. This category includes Public Works Yard, parkades, cemetery and WWTF administration. B5 ‐ Heritage Buildings Funding for the restoration of City‐owned heritage buildings. B6 ‐ Capital Opportunities and Partnerships Funding for special projects including partnerships with the School District on community space as part of new school construction as well as funding to allow for capital projects that were not envisioned during the plan development, including partnerships. B7 ‐ Building Renewal, Rehabilitation & Infrastructure Upgrades An allocation for major repairs or replacement of existing building infrastructure such as roofs, windows, mechanical systems, lighting, electrical and water services, hazardous material abatement, and other major maintenance items.
PAGE 307
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Program The 2024 priority one budget investment for Building Capital totals $20.2M, representing 14.4% of the total 2024 capital program. The table below lists the individual capital budget requests and the expected future budget commitments in the following four years related to the 2024 projects as projected in the Council endorsed 10‐Year Capital Plan. Changes to future year budgets may occur as part of the 10‐Year Capital Plan update that is completed each year.
$ thousands Building Stronger Kelowna - Parkinson Rec Centre Redevelopment Building Stronger Kelowna - Community Activity Centres North Glenmore Fire Hall (Stn #5) - Construction Capital Opportunities & Partnership Fund Critical & Core Building Infrastructure Renewal (Level 3) Facility Energy Modernization Renewal Kelowna Community Theatre - Equipment Improvements Total priority 1 requests Community Activity Centres, Child Care Capital Opportunities & Partnership Fund Critical & Core Building Infrastructure Renewal (Level 1 & 2) Total priority 2 requests
B1 B2 B3 B6 B7 B7 B7 B2 B6 B7
2024 9,000 1,800 3,000 500 5,000 250 695 20,245 2,015 500 7,720 10,235
2025 72,000 14,400 5,230 0 0 0 0 91,630 10,080 0 0 10,080
2026 63,000 12,600 5,230 0 0 0 0 80,830 8,060 0 0 8,060
2027 36,000 7,200 0 0 0 0 0 43,200 0 0 0 0
2028
Project Total 0 180,000 0 36,000 0 13,460 0 500 0 5,000 0 250 0 695 0 235,905 0 20,155 0 500 0 7,720 0 28,375
PAGE 308
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - General Fund Page Type Description Buildings Capital - Priority 1 310 Renew Building Stronger Kelowna - Parkinson Rec Centre Redevelopment B1 - Parks and Recreation Buildings 310 Growth Building Stronger Kelowna - Community Activity Centres B2 - Community and Cultural Buildings 311 Growth North Glenmore Fire Hall (Stn #5) - Construction B3 - Civic/Protective Service Buildings Capital Opportunities & Partnership Fund B6 - Capital Opportunities and Partnerships 312 Renew Critical & Core Building Infrastructure Renewal (Level 3) 312 Renew Facility Energy Modernization Renewal 313 Renew Kelowna Community Theatre - Equipment Improvements B7 - Renewal, Rehabilitation & Infra. Cost Center Total 311
New
Cost
Reserve
Borrow
Grant
Other
Utility
Taxation
9,000,000
(6,922,000)
(2,078,000)
0
0
0
0
9,000,000 1,800,000
(6,922,000) 0
(2,078,000) (1,800,000)
0 0
0 0
0 0
0 0
1,800,000 3,000,000
0 (3,000,000)
(1,800,000) 0
0 0
0 0
0 0
0 0
3,000,000 500,000 500,000 5,000,000
(3,000,000) 0 0 (1,935,600)
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 (500,000) (500,000) (3,064,400)
250,000 695,000
(250,000) (695,000)
0 0
0 0
0 0
0 0
0 0
5,945,000 (2,880,600) 20,245,000 (12,802,600)
0 (3,878,000)
0 0
0 0
0 0
(3,064,400) (3,564,400)
PAGE 309
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Building Capital
Title:
Building Stronger Kelowna - Parkinson Rec Centre Redevelopment
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 B1 - $180M PRELIMINARY
Justification: Budget is requested for the redevelopment of the Parkinson Recreation Centre. This is a multi-year project, with budget estimated at $180M. Contractual commitments made in 2024 will be based on this budget plus $72M budget in 2025, $63M budget in 2026, and $36M in 2027.
Expected Completion: Jun 2027 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost Reserve 9,000,000 (6,922,000)
Borrow (2,078,000)
Fed/Prov 0
Dev/Com 0
Utility 0
Department: Cost Center:
Capital Projects Building Capital
Title:
Building Stronger Kelowna - Community Activity Centres
Taxation 0
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 B2 - $3.6M PRELIMINARY
Justification: Budget is requested for the public consultation, design and construction of activity centres of both Mission and Glenmore Recreation Parks to compliment the two existing actvity centres at Rutland and Parkinson. Some Active Living & Culture programs are most effectively delivered through a distributed model of community activity centres. The design for both will be coordinated with current design work for both projects. This is a multi-year project, total budget estimated at $36M. Contractural commitments made in 2024 will be based on this budget plus $14.4M budget in 2025, $12.6M budget in 2026, and $7.2M in 2027.
Expected Completion: Jul 2027 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 1,800,000
Reserve 0
Borrow (1,800,000)
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 310
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Building Capital
Title:
North Glenmore Fire Hall (Stn #5) - Construction
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 B3 - $3M PRELIMINARY
Justification: Budget for the design of a new firehall was identified in 2023, however the original identified site subsequently proved to be unsuitable. A revised site has been identified for a new fire hall to serve North Glenmore and areas of our City further north. Budget is requested for the construction of this fire hall as a priority to maintain adequate fire coverage for this part of the City. This is a multi-year project, total budget estimated at $13.46m. Contractual commitments made in 2024 will be based on this budget plus $5.23M budget in 2025, and $5.23M budget in 2026.
Expected Completion: Dec 2026 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost Reserve 3,000,000 (3,000,000)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Building Capital
Title:
Capital Opportunities & Partnership Fund
Dev/Com 0
Utility 0
Taxation 0
Priority: 1 10 Yr Cap Plan Ref: 2024 B6 - $500k
New
PRELIMINARY
Justification: The City receives multiple unsolicited proposals for partnerships each year, often from community, sports or special interest groups. The focus of the Capital Opportunities and Partnership Fund is to leverage City funds through these partnerships, to achieve a much greater gain in community benefit that in most cases represents a significant multiplier of our investment. Budget is requested to fund both anticipated partnerships for the upcoming year as well as any high value grants or other unknown opportunities that may arise. Partnership agreements are vetted by staff and presented to Council for approval. This is a multi-year program. There is an equivalent budget request of $500k for the Parks cost center.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 500,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (500,000)
PAGE 311
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Building Capital
Title:
Critical & Core Building Infrastructure Renewal (Level 3)
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 B7 - $5M PRELIMINARY
Justification: Budget is requested to fund the renewal of various end of life building system and improvement projects to meet service level 3. Service level three achieves: fire and life safety matters, heating systems reliability, and structural and roof integrity. Renewal work has been identified through condition assessments, energy studies, and accommodation studies. This is a multi-year program, including subsequent budget requests associated with some of the items identified.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost Reserve 5,000,000 (1,935,600)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Building Capital
Title:
Facility Energy Modernization Renewal
Dev/Com 0
Utility 0
Taxation (3,064,400)
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 B7 - $250k PRELIMINARY
Justification: In support of Council priorities to reduce greenhouse gas (GHG) emissions and energy consumption, budget is requested to fund efforts to reduce energy use within City owned facilities. Work includes various energy loss retrofits and ability to leverage rebate and grant opportunities. This work will keep buildings operational while lowering operating costs over the life of the facilities.
Expected Completion: Dec 2024 Strategic Direction: Climate & Environment - Reduce corporate and community GHG emissions Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 250,000
Reserve (250,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 312
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Building Capital
Title:
Kelowna Community Theatre - Equipment Improvements
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 B7 - $695k PRELIMINARY
Justification: Budget is requested for the replacement of fixtures and equipment at the Kelowna Community Theatre. These replacements include audio/visual equipment, drape panels, fire safety curtain on the mainstage, risers, chairs in the Black Box Theatre, and external signage. These purchases align with the capital improvement fee long term Capital Plan for equipment replacement.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 695,000
Reserve (695,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 313
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - General Fund Type Description Building Capital - Priority 2 Growth Community Activity Centres, Child Care Construction B2 - Community and Cultural Buildings Growth Capital Opportunities & Partnership Fund B6 - Capital Opportunities and Partnerships Renew Critical & Core Building Infrastructure Renewal (Renewal Service Level 1 & 2) B7 - Renewal, Rehabilitation & Infra. Cost Center Total
Cost
Reserve
Borrow
Grant
Other
Utility
Taxation
2,015,400
0
0
(2,015,400)
0
0
0
2,015,400 500,000
0 0
0 0
(2,015,400) 0
0 0
0 0
0 (500,000)
500,000
0
0
0
0
0
(500,000)
7,720,000
0
0
0
0
0
(7,720,000)
7,720,000 10,235,400
0 0
0 0
0 (2,015,400)
0 0
0 0
(7,720,000) (8,220,000)
PAGE 314
2024 FINANCIAL PLAN
CITY OF KELOWNA
PARKS CAPITAL LED BY: DIVISIONAL DIRECTOR, PARTNERSHIPS & INVESTMENTS The parks capital infrastructure group is made up of ten sections. P1 – DCC Parkland Acquisition Park acquisition program based on the residential growth in the City for the purchase of parkland (Neighbourhood, Community, Recreation and City‐wide level parks) under the Development Cost Charge program (DCC). Funding is primarily allocated from developer revenue with general taxation covering both the assist factor and infill/conversion units and Land Use Contracts not required to pay DCC's. P2 ‐ Natural Area Parkland Acquisition Park acquisition program for the purchase of Natural Areas not attributed to the DCC program. P3 ‐ Neighbourhood Park Development An allocation to cover the development of neighbourhood level parks including off‐site costs related to park development, but does not include buildings. P4 ‐ Community Park Development An allocation to cover the development of community level parks including off‐site costs related to park development, but does not include buildings. P5 ‐ Recreation Park Development An allocation to cover the development of recreation level parks including off‐site costs related to park development, but does not include buildings. P6 ‐ City‐wide Park Development An allocation to cover the development of city‐wide level parks including off‐site costs related to park development, but does not include buildings. P7 ‐ Linear/Natural Area Park Development An allocation to cover the development of natural areas and linear parks/trails. P8 ‐ Park Renewal, Rehabilitation & Infrastructure Upgrades An allocation for major repairs or replacement of existing park infrastructure such as sidewalks, hard‐surfaced trails, parking lots, sport courts, lighting, electrical and water services, irrigation, fencing, bridges and other major structures. P9 ‐ Capital Opportunities Partnership An allocation for various strategic investments into the park and open space system as well as funding to allow for capital projects that were not envisioned during the plan development, including partnerships. P10 ‐ Urban Streetscape and Urban Centres Development and Renewal An allocation for urban centre improvements, enhanced streetscapes and walkways, and other urban spaces that are not defined parks.
PAGE 315
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Program The 2024 priority one budget investment for Parks Capital totals $27.8M, representing 19.9% of the total 2024 capital program. The table below lists the individual capital budget requests and the expected future budget commitments in the following four years related to the 2024 projects as projected in the Council endorsed 10‐Year Capital Plan. Changes to future year budgets may occur as part of the 10‐Year Capital Plan update that is completed each year.
$ thousands DCC Parkland Acquisition Art Walk Furniture and Paver Surfaces Replacement Urban Centers Beautification Initiative Burne Park Building Stronger Kelowna - Parkinson Rec Park Field Realignment Building Stronger Kelowna - Rutland Recreation Field Realignment Elks Stadium Batter's Eye Glenmore Recreation Park - Phases 4, 5 Mission Recreation - Youth Park, Plaza, & Trail System City Park - Improvements, Waterfront Promenade Phase 3 Manhattan Point Park DCC Knox Mountain Park - Improvements Irrigation Renewal Park Infrastructure Renewal Kelowna Memorial Cemetery - Improvements Capital Opportunities & Partnership Fund Total priority 1 requests Capital Opportunities & Partnership Fund Total priority 2 requests
P1 P1 P1 P3 P5 P5 P5 P5 P5 P6 P6 P7 P8 P8 P8 P9 P9
2024 18,387 130 150 2,739 2,062 450 50 1,200 216 400 100 403 709 218 137 500 27,849 500 500
2025
2026
2027
0 0 0 0 16,500 4,050 0 7,800 3,100 2,500 0 0 0 0 0 0 33,950 0 0
0 0 0 0 14,400 0 0 7,800 0 0 0 0 0 0 0 0 22,200 0 0
0 0 0 0 8,200 0 0 0 0 0 0 0 0 0 0 0 8,200 0 0
2028
Project Total 0 18,387 0 130 0 150 0 2,739 0 41,162 0 4,500 0 50 0 16,800 0 3,316 0 2,900 0 100 0 403 0 709 0 218 0 137 0 500 0 92,199 0 500 0 500
PAGE 316
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Parks - General Fund Page Type Description Parks Capital - Priority 1 318 Growth DCC Parkland Acquisition P1 - DCC Parkland Acquisition 318 Growth Burne Park P3 - Neighbourhood Park Development
18,386,600 (18,386,600) 18,386,600 (18,386,600) 2,738,500 (1,708,900) 2,738,500 (1,708,900)
319
2,062,000
319 320 320 321
321 322 322
Growth Building Stronger Kelowna - Parkinson Rec Park Field Realignment Growth Building Stronger Kelowna - Rutland Recreation Field Realignment Renew Elks Stadium Batter's Eye Growth Glenmore Recreation Park - Phases 4, 5 Growth Mission Recreation - Youth Park, Plaza, & Trail System P5 - Recreation Park Development Renew City Park - Improvements, Waterfront Promenade Phase 3 Growth Manhattan Point Park DCC P6 - City-wide Park Development Renew Knox Mountain Park - Improvements P7 - Linear/Natural Area Park Development
323 323 324
Renew New New
324
New
Irrigation Renewal Park Infrastructure Renewal Kelowna Memorial Cemetery Improvements P8 - Renewal, Rehabilitation & Infra Capital Opportunities & Partnership Fund
P9 - Capital Opportunities Partnership Art Walk Furniture and Paver Surfaces Replacement 325 New Urban Centers Beautification Initiative P10 - Urban Streetscape, Centres Dev, Renewal Cost Center Total
325
Renew
Cost
Reserve
Borrow
Grant
Other
Utility
Taxation
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 O&M 0 (1,029,600) O & M (1,029,600)
(1,031,000)
(1,031,000)
0
0
0
0
450,000
0
(450,000)
0
0
0
0
50,000 1,200,000 215,500
(50,000) (1,200,000) (127,900)
0 0 0
0 0 0
0 0 0
0 0 0
0 0 O&M (87,600)
3,977,500 400,000
(2,408,900) 0
(1,481,000) 0
0 0
0 0
0 0
(87,600) (400,000)
100,000 500,000 402,700 402,700
(21,400) (21,400) 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
(78,600) (478,600) (402,700) O & M (402,700)
708,500 218,000 137,000
0 (163,500) (137,000)
0 0 0
0 0 0
0 0 0
0 0 0
(708,500) (54,500) O & M 0
1,063,500 500,000
(300,500) 0
0 0
0 0
0 0
0 0
(763,000) (500,000)
500,000 130,000
0 0
0 0
0 0
0 0
0 0
(500,000) (130,000)
150,000 280,000
0 0
0 0
0 0
0 0
0 0
(150,000) O & M (280,000)
27,848,800 (22,826,300)
(1,481,000)
0
0
0
(3,541,500)
*O & M denotes capital request has operating & maintenance impacts included in the request
PAGE 317
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Parks Capital
Title:
DCC Parkland Acquisition
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 P1 - $19.4M PRELIMINARY
Justification: Budget is requested for the acquisition of land to be used for neighbourhood, community, city-wide, recreation and linear type parks. This is in accordance with the 20-Year Servicing Plan and Development Cost Charges (DCC) reserve funding availability. This is a multi-year program.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Asset Cost Reserve 18,386,600 (18,386,600)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
Revenue 0 0 0
Utility 0 0 0
Operating Impact: DCC Parkland Acquisition 2024 2025 2026
Cost 59,000 69,000 69,000
Reserve 0 0 0
Department: Cost Center:
Capital Projects Parks Capital
Title:
Burne Park
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Taxation (59,000) (69,000) (69,000)
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 P3 - $2.7M PRELIMINARY
Justification: The creation of a neighbourhood park on Burne Ave adjacent to Mill Creek has been a long-term goal for the City, and properties have been acquired over many years. A design budget of $279k was assigned for 2023. Budget is now requested for the construction of Burne Park, which has been identified as the next priority within the DCC neighbourhood park program. Construction will be coordinated with the Mill Creek Linear Park design and flood mitigation works. Total project budget is $3.0M. Expected Completion: Jun 2025 Strategic Direction: Other - Supports Base Business Asset Cost Reserve 2,738,500 (1,708,900)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (1,029,600)
Operating Impact: Burne Park 2024 2025 2026
Cost 0 29,700 52,800
Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation 0 (29,700) (52,800)
PAGE 318
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Parks Capital
Title:
Building Stronger Kelowna - Parkinson Rec Park Field Realignment
Growth Priority: 1 10 Yr Cap Plan Ref: Not included P5 PRELIMINARY
Justification: Budget is requested to optimize Parkinson Recreation Park to include high-quality outdoor amenities, realign sports fields in a north-south orientation to enhance the City's ability to host competition, and to stay attuned to trends and best practices in the recreation sector. This project is essential for ensuring a superior user experience, fostering community well-being, and remaining competitive in a dynamic recreational landscape. This is a multi-year project, with budget estimated at $41.2M. Contractual commitments made in 2024 will be based on this budget plus $16.5M budget in 2025, $14.4M budget in 2026, and $8.2M in 2027.
Expected Completion: Jun 2027 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost Reserve 2,062,000 (1,031,000)
Borrow (1,031,000)
Fed/Prov 0
Dev/Com 0
Utility 0
Department: Cost Center:
Capital Projects Parks Capital
Title:
Building Stronger Kelowna - Rutland Recreation Field Realignment
Taxation 0
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 P5 - $450k PRELIMINARY
Justification: Our current city inventory of multi-use fields is heavily subscribed and at capacity. A proposed realignment of the fields and other amenities will create an additional field, and add an artificial turf field. Budget is requested for the public consultation and design. A budget request for the construction of this field realignment and artificial turf field will be brought forward in 2025. Design is anticipated to be completed in 2024, and construction in 2025. The grass field would come into use in 2027 after a one-year growing season. This is a multi-year project, total budget estimated at $4.5M. Contractual commitments made in 2024 will be based on this budget plus $4.05M budget in 2025.
Expected Completion: Jan 2027 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 450,000
Reserve 0
Borrow (450,000)
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 319
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Parks Capital
Title:
Elks Stadium Batter's Eye
Renew Priority: 1 10 Yr Cap Plan Ref: Not included P5 PRELIMINARY
Justification: Elks Stadium is Kelowna's premier baseball facility, home to several local teams including the Kelowna Falcons, Okanagan College Coyotes and Okanagan Athletics. According to team officials, the speed of balls being pitched, combined with reflections from the sun coming off of the downtown skyline has made it increasingly difficult for hitters to see and react to balls coming towards them. A split-second reaction can be the difference between getting hit by a pitch or not. Budget is requested to install a batter's eye, a solid-colored area beyond center field that is a visual backdrop directly in the line of sight of a baseball batter, while facing the pitcher and awaiting a pitch. This allows the batter to see the pitched ball against a sharply contrasted and uncluttered background to increase the safety of the hitter behind the plate. Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 50,000
Reserve (50,000)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Parks Capital
Title:
Glenmore Recreation Park - Phases 4, 5
Dev/Com 0
Utility 0
Taxation 0
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 P5 - $1.2M PRELIMINARY
Justification: Glenmore Recreation Park is the primary park project in the Parks Development DCC program, and will be constructed over multiple phases. The park also serves as an important community park space serving North Glenmore. The artificial turf field will be prioritized, to offset the disruption from forthcoming fields construction at Parkinson Recreation Park. $550k budget was approved in 2022, and $6.8M in 2023. Contractual commitments made in 2024 will be based on this budget plus $7.8M budget in 2025 and $7.8M budget in 2026. The total budget from 2022 is $24.1M Expected Completion: Jun 2025 Strategic Direction: Other - Supports Base Business Asset Cost Reserve 1,200,000 (1,200,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
Revenue 0 0 0
Utility 0 0 0
Operating Impact: Glenmore Recreation Park - Phases 4, 5 2024 2025 2026
Cost 0 3,800 20,600
Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Taxation 0 (3,800) (20,600)
PAGE 320
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Parks Capital
Title:
Mission Recreation - Youth Park, Plaza, & Trail System
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 P5 - $215k PRELIMINARY
Justification: The Mission Recreation Park master plan identifies a central plaza, youth park, children's play as the heart and focal point of the park connected to the rest of the park with an enhanced trail system. Budget is requested for the design of these elements, which will be coordinated with the concurrent design of the adjacent activity center. Design work will be completed in 2024. This is a multi-year project, total budget estimated at $3.3M. Contractual commitments will be based on this budget plus $3.1M budget in 2025.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 215,500
Reserve (127,900)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Department: Cost Center:
Capital Projects Parks Capital
Title:
City Park - Improvements, Waterfront Promenade Phase 3
Taxation (87,600)
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 P6 - $400k PRELIMINARY
Justification: Phase 2 of the City Park promenade renewal was completed in 2022. Budget is requested for the design of the final section from the Cold Sands washroom to the Sails. The intent is to also improve safety in this congested portion of the park by separating pedestrians and cyclists, where possible. The detailed design can only commence once approval has been received from the Province, but is currently anticipated to be completed ready for tender in Q1 2025. This is a multi-year project, total budget estimated at $2.9M. Contractual commitments will be based on this budget plus $2.5M budget in 2025.
Expected Completion: Mar 2025 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 400,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (400,000)
PAGE 321
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Parks Capital
Title:
Manhattan Point Park DCC
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 P6 - $207k PRELIMINARY
Justification: The pier, wharf and retaining walls at Manhattan Point were all badly damaged during the 2017 flooding, however they were ineligible for Provincial assistance funding. The park has been closed for safety reasons ever since. The pier and wharf were assessed as being beyond reasonable repair. Budget is requested for the public consultation and design of the new park and replacement pier. Design is anticipated to be complete in 2024, and a subsequent budget request for construction funding will be submitted in 2025, subject to receiving Provincial approvals.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 100,000
Reserve (21,400)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Parks Capital
Title:
Knox Mountain Park - Improvements
Dev/Com 0
Utility 0
Taxation (78,600)
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 P7 - $318k PRELIMINARY
Justification: Knox Mountain Park continues to be one of the City's most popular parks, however it is a delicate ecosystem and the increasing numbers of users puts a heavy strain on the existing park infrastructure. The updated Knox Mountain Park Management Plan was endorsed by Council in 2022. Reflecting the heavy and increasing demands on the park, the update includes a ten-year development plan covering both capital and operational items. Budget is requested for traffic and accessibility improvements at the first lookout, new and replacement signage, and replacement of crib stairs. This is a multi-year program with capital budget requests identified each year. Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Asset Cost 402,700
Reserve 0
Borrow 0
Fed/Prov 0
Operating Impact: Knox Mountain Park - Improvements Cost Reserve Borrow Grant 2024 33,500 0 0 0 2025 42,500 0 0 0 2026 43,500 0 0 0
Dev/Com 0 Other 0 0 0
Utility 0
Taxation (402,700)
Revenue 0 0 0
Utility 0 0 0
Taxation (33,500) (42,500) (43,500) PAGE 322
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Parks Capital
Title:
Irrigation Renewal
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 P8 - $708k PRELIMINARY
Justification: Based on irrigation system audits, the life expectancy of the system, and the City's assessment criteria, budget is requested for the replacement of the entire irrigation systems at East Kelowna Ball Field and Ben Lee Park as well as continuing upgrade of irrigation controllers.
Expected Completion: Nov 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 708,500
Reserve 0
Borrow 0
Department: Cost Center:
Capital Projects Parks Capital
Title:
Park Infrastructure Renewal
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (708,500)
Priority: 1 10 Yr Cap Plan Ref: 2024 P8 - $218k
New
PRELIMINARY
Justification: Budget is requested to further phase out older receptacles with high efficiency units in Stuart Park, Waterfront Park, Ben Lee Park and Rutland Rec Park. Parks Services manages over 1,200 waste receptacles throughout City parks. Data analytics from smart waste sensors report waste collection in many parks is required over five times per day in peak season due to low-capacity units. In 2023, staff installed 24 high efficiency waste receptacles in City Park, replacing 60+ smaller units. The high efficiency units had a cost avoidance, allowing funds to be used to supplement increased maintenance in downtown parks. Budget is also requested for other infrastructure upgrades within parks, playgrounds, and pathways. Expected Completion: Mar 2024 Strategic Direction: Other - Supports Base Business Asset Cost Reserve Borrow Fed/Prov Dev/Com 218,000 (163,500) 0 0 0 Operating Impact: Park Infrastructure Renewal Cost Reserve Borrow Grant Other 2024 4,900 0 0 0 0 2025 10,000 0 0 0 0 2026 10,000 0 0 0 0
Utility 0
Taxation (54,500)
Revenue 0 0 0
Utility 0 0 0
Taxation (4,900) (10,000) (10,000)
PAGE 323
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Parks Capital
Title:
Kelowna Memorial Cemetery - Improvements
Priority: 1 10 Yr Cap Plan Ref: 2024 P8 - $145k
New
PRELIMINARY
Justification: Budget is requested for improvements at the Kelowna Memorial Cemetery. - Including research, masterplan, and marketing plan for sustainable interment protocol for new and existing sections of cemetery; - Mountain scattering trail expansion with additional monument opportunities; - Wayfinding Ph 1, signage coordinated with online mapping; and - Scattering garden additional bronze plaques.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 137,000
Reserve (137,000)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Parks Capital
Title:
Capital Opportunities & Partnership Fund
Dev/Com 0
Utility 0
Taxation 0
Priority: 1 10 Yr Cap Plan Ref: 2024 P9 - $500k
New
PRELIMINARY
Justification: The City receives multiple unsolicited proposals for partnerships each year, often from community, sports or special interest groups. The focus of the Capital Opportunities and Partnership Fund is to leverage City funds through these partnerships, to achieve a much greater gain in community benefit that in most cases represents a significant multiplier of our investment. Budget is requested to fund both anticipated partnerships for the upcoming year as well as any high value grants or other unknown opportunities that may arise. Partnership agreements are vetted by staff and presented to Council for approval. This is a multi-year program. There is an equivalent budget request of $500k for the Buildings cost centre.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 500,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (500,000)
PAGE 324
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Parks Capital
Title:
Art Walk Furniture and Paver Surfaces Replacement
Renew Priority: 1 10 Yr Cap Plan Ref: Not included P10 PRELIMINARY
Justification: Budget is requested for components that are crucial for the enhancement of the art walk. This includes the replacement of furniture (garbage cans, benches and bollards) and the replacement of paver surfaces with new concrete. These items will reinforce the City's dedication to enhancing the art walk experience and promote Kelowna's downtown core as a vibrant cultural hub.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 130,000
Reserve 0
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Parks Capital
Title:
Urban Centres Beautification Initiative
Dev/Com 0
Utility 0
Taxation (130,000)
New Priority: 1 10 Yr Cap Plan Ref: Not included P10 PRELIMINARY
Justification: Budget is requested to beautify the urban center areas of Kelowna. The work includes: 1) conversion to low voltage seasonal tree lighting upgrade along Bernard Ave; 2) renewal of seasonal decorations; 3) removal and replacement of deteriorating garbage cans; 4) purchase of additional hanging baskets and flower planters and 5) replacement of cultural and seasonal banners.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Asset Cost 150,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (150,000)
Operating Impact: Urban Centers Beautification Initiative 2024 2025 2026
Cost 38,200 32,200 32,200
Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (38,200) (32,200) (32,200)
PAGE 325
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - General Fund Type Description Parks Capital - Priority 2 New Capital Opportunities & Partnership Fund P9 - Capital Opportunities Partnership Cost Center Total
Cost
Reserve
Borrow
Grant
Other
Utility
Taxation
500,000
0
0
0
0
0
(500,000)
500,000 500,000
0 0
0 0
0 0
0 0
0 0
(500,000) (500,000)
PAGE 326
2024 FINANCIAL PLAN
CITY OF KELOWNA
VEHICLE & MOBILE EQUIPMENT CAPITAL LED BY: GENERAL MANAGER, INFRASTURCTURE The vehicles & equipment capital infrastructure group is made up of two sections. V1 – Additional Vehicles / Equipment This budget supports the addition of new vehicles and equipment to the corporate fleet in response to increased service demand from population growth or additional services. V2 ‐ Vehicle / Equipment Renewal As part of the City's vehicle replacement program, vehicles at the end of their service life cycles are replaced using funds from the equipment replacement reserve. Cars and light trucks have an average design life of 10 years.
2024 Program The 2024 priority one budget investment for Vehicles & Equipment Capital totals $7.3M, representing 5.2% of the total 2024 capital program. The table below lists the individual capital budget requests and the expected future budget commitments in the following four years related to the 2024 projects as projected in the Council endorsed 10‐Year Capital Plan. Changes to future year budgets may occur as part of the 10‐Year Capital Plan update that is completed each year.
$ thousands Growth Vehicles Vehicle/Equipment Renewal Total priority 1 requests
V1 V2
2024 2,327 4,990 7,317
2025
2026 0 0 0
2027 0 0 0
2028 0 0 0
Project Total 0 2,327 0 4,990 0 7,317
PAGE 327
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - General Fund Page Type
Description
Vehicles Capital - Priority 1 Growth 329 Growth V1 - Additional Vehicles / Equipment Vehicles Vehicle/Equipment Renewal 329 Renew V2 - Vehicle / Equipment Renewal Cost Center Total
Cost
Reserve
2,327,000 2,327,000 4,990,000 4,990,000 7,317,000
(2,085,900) (2,085,900) (4,990,000) (4,990,000) (7,075,900)
Borrow
Grant 0 0 0 0 0
Other 0 0 0 0 0
Utility 0 0 0 0 0
(241,100) (241,100) 0 0 (241,100)
Taxation 0 O&M 0 0 0 0
PAGE 328
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Vehicle & Mobile Equipment
Title:
Growth Vehicles
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 V1 - $996k PRELIMINARY
Justification: Budget is requested for additional equipment to support increased expectations for service and maintenance, growth, and regulatory requirements. Zero emission vehicles will be selected where viable/possible.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Asset Cost Reserve 2,327,000 (2,085,900)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (241,100)
Taxation 0
Revenue 0 0 0
Utility (8,400) (16,800) (16,800)
Operating Impact: Growth Vehicles 2024 2025 2026
Cost 233,100 466,200 466,200
Reserve (8,400) (16,800) (16,800)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Taxation (216,300) (432,600) (432,600)
Department: Cost Center:
Capital Projects Vehicle & Mobile Equipment
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 V2 - $3.5M
Title:
Vehicle/Equipment Renewal
PRELIMINARY
Justification: Budget is requested for the replacement of 37 units to support and maintain services delivered by various city departments. Unit replacement considers equipment type, seasonal use and equipment condition. Internal rental rates contribute to the equipment replacement reserve throughout the course of the vehicle/equipment service life. Electric of Zero Emission Vehicles will be selected where viable/possible.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost Reserve 4,990,000 (4,990,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 329
2024 FINANCIAL PLAN
CITY OF KELOWNA
TRANSPORTATION CAPITAL LED BY: GENERAL MANAGER, INFRASTURCTURE The transportation capital infrastructure group is made up of nine sections. T1 – DCC Roads Allocation for design, land and construction costs associated with DCC Road projects. T2 ‐ DCC Roads ‐ Active Transportation Allocation for design, land and construction costs associated with DCC Active Transportation projects. General taxation to cover 77.7% Assist. T3 ‐ Non‐DCC Roads Infrastructure upgrades which are not part of the 20 Year Servicing Plan and Financing Strategy (collectors and local roads) and City initiated projects to upgrade streets to full urban standards including drainage, fillet paving, sidewalks and landscaped boulevards. T4 ‐ Transportation System Renewal Allocation for overlay and other processes, including micro asphalting, for rehabilitation of City roads. Also includes renewal of curb and gutter, bike paths, retaining walls, handrails and stairways. T5 ‐ Bicycle Network Allocation for bike network system additions and improvements. T6 ‐ Sidewalk Network Allocation required to complete the Non‐DCC portion of the sidewalk network. T7 ‐ Safety and Operational Improvements Allocation to cover field reviews and capital improvements for safety improvements or to improve operational efficiency. This will include projects such as left turn bays, traffic control changes, safety barriers, signs, markings, handicap access improvements and retrofit medians. T8 ‐ Traffic Control Infrastructure This program is for construction of new traffic signal control infrastructure that is not part of the DCC program. This includes new traffic signals and pedestrian activated traffic signals, installation of new communication for the traffic signals system and where new development occurs install conduit for future traffic signals. Program also includes renewal of existing traffic signals. T9 ‐ Transit Facilities Construction of new and renewal of existing transit facilities, bus pullouts and shelters.
PAGE 330
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Program The 2024 priority one budget investment for Transportation Capital totals $20.2M, representing 14.4% of the total 2024 capital program. The table below lists the individual capital budget requests and the expected future budget commitments in the following four years related to the 2024 projects as projected in the Council endorsed 10‐Year Capital Plan. Changes to future year budgets may occur as part of the 10‐Year Capital Plan update that is completed each year.
$ thousands Building Stronger Kelowna - Transportation Upgrades McCulloch Area DCC (KLO/Hall/Spiers) Major Intersection Capacity Improvements DCC Burtch 3 DCC (Glenmore - Springfield), RD Road Safety Improvements DCC Traffic Signals and Roundabouts DCC Lakeshore 5 DCC (Richter - Cook), RD Stewart 3 DCC (Crawford-Swamp), Road Gordon 1 DCC (Frost - South Perimeter) Frost DCC (Killdeer - Chute Lake) Rail Trail to Greenway DCC, ATC Abbott DCC (Rose - Gyro), ATC Bertram 1 DCC (Sutherland - Cawston), ATC Lakeshore 3 DCC (Lexington - Old Meadows), ATC Local Street Urbanization Program Roadway Urbanization KLO Rd Mission Creek Bridge Replacement Transportation System Renewal Road Renewal Program Bicycle Network Improvement Program Neighbourhood Bikeway Program Pedestrian Network Safety and Operational Improvements Rutland Park & Ride, Mobility Hub, Operations Facility Transit - Bus Stop and Amenity Improvements Rutland Network Restructure - Infrastructure Transit - Land Acquisition YLW Transit Hub Total priority 1 requests
T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T2 T2 T2 T2 T3 T3 T4 T4 T4 T5 T5 T6 T7 T9 T9 T9 T9 T9
2024 1,038 465 240 436 500 750 300 930 200 437 3,950 75 544 130 180 350 1,224 1,242 4,929 500 120 460 474 380 150 105 45 45 20,199
2025 8,300 5,686 0 424 0 0 300 0 0 4,843 0 775 1,620 0 0 0 10,050 0 0 0 0 0 0 0 0 0 0 0 31,997
2026 7,300 0 0 1,466 0 0 2,300 0 0 0 0 260 6,869 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 18,294
2027 4,200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,200
2028
Project Total 0 20,838 0 6,151 0 240 0 2,326 0 500 0 750 0 2,900 0 930 0 200 0 5,280 0 3,950 0 1,110 0 9,032 0 130 0 180 0 350 0 11,274 0 1,242 0 4,929 0 500 0 120 0 460 0 474 0 380 0 150 0 105 0 45 0 145 0 74,691
PAGE 331
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - General Fund Page Type Description Transportation Capital - Priority 1 333 Growth Building Stronger Kelowna Transportation Upgrades 333 Growth McCulloch Area DCC (KLO/Hall/Spiers)
Cost
Reserve
Borrow
Grant
Other
Utility
Taxation
1,038,000
(485,000)
(553,000)
0
0
0
0
465,000
(353,400)
0
0
0
0
(111,600)
240,000
(126,100)
0
0
0
0
(113,900)
436,300
(318,900)
0
0
0
0
(117,400)
335 335
Growth Major Intersection Capacity Improvements DCC Growth Burtch 3 DCC (Glenmore - Springfield), RD Growth Road Safety Improvements DCC Growth Traffic Signals and Roundabouts DCC
500,000 750,000
(456,000) (696,000)
0 0
0 0
0 0
0 0
(44,000) (54,000) O & M
336
Growth Lakeshore 5 DCC (Richter - Cook), RD
300,000
(214,400)
0
0
(30,000)
0
(55,600)
336
Growth Stewart 3 DCC (Crawford-Swamp), Road Growth Gordon 1 DCC (Frost - South Perimeter)
930,000
(820,000)
0
0
0
0
(110,000)
200,000
(200,000)
0
0
0
0
0
Growth Frost DCC (Killdeer - Chute Lake) T1 - DCC Roads Growth Rail Trail to Greenway DCC, ATC Growth Abbott DCC (Rose - Gyro), ATC Growth Bertram 1 DCC (Sutherland - Cawston), ATC Growth Lakeshore 3 DCC (Lexington - Old Meadows), ATC T2 - DCC Roads - Active Transportation
437,400 5,296,700 3,950,000 75,000 543,700
(437,400) (4,107,200) (3,717,400) (26,200) (535,900)
0 (553,000) 0 0 0
0 0 0 0 0
0 (30,000) 0 0 (6,900)
0 0 0 0 0
0 (606,500) (232,600) O & M (48,800) (900)
130,000
(95,600)
0
0
(4,000)
0
(30,400)
4,698,700
(4,375,100)
0
0
(10,900)
0
(312,700) (90,000) O & M 0 O&M (90,000) 0
334 334
337 337 338 338 339 339
Growth Local Street Urbanization Program Growth Roadway Urbanization T3 - Non-DCC Roads Renew KLO Rd Mission Creek Bridge Replacement Renew Transportation System Renewal Renew Road Renewal Program T4 - Transportation System Renewal
180,000 350,000 530,000 1,224,100
(90,000) 0 (90,000) (1,224,100)
0 0 0 0
0 0 0 0
0 (350,000) (350,000) 0
0 0 0 0
1,241,900 4,928,900 7,394,900
(725,000) (4,189,200) (6,138,300)
0 0 0
0 0 0
0 0 0
0 0 0
342
Growth Bicycle Network Improvement Program
500,000
(250,000)
0
0
0
0
(250,000) O & M
343
Growth Neighbourhood Bikeway Program T5 - Bicycle Network Growth Pedestrian Network T6 - Sidewalk Network Renew Safety and Operational Improvements
120,000 620,000 460,000 460,000 474,000
0 (250,000) (230,000) (230,000) (135,000)
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
(120,000) (370,000) (230,000) O & M (230,000) (339,000) O & M
T7 - Safety and Operational Improvements 344 Growth Rutland Park & Ride, Mobility Hub, Operations Facility 345 Growth Transit - Bus Stop and Amenity Improvements 345 Growth Rutland Network Restructure Infrastructure 346 Growth Transit - Land Acquisition 346 Growth YLW Transit Hub T9 - Transit Facilities Cost Center Total
474,000
(135,000)
0
0
0
0
(339,000)
380,000
(35,000)
0
0
0
0
(345,000) O & M
150,000
(75,000)
0
0
0
0
(75,000) O & M
105,000
(41,300)
0
0
0
0
(63,700)
45,000 (45,000) 45,000 (25,000) 725,000 (221,300) 20,199,300 (15,546,900)
0 0 0 (553,000)
0 0 0 0
0 0 0 (390,900)
0 0 0 0
0 (20,000) (503,700) (3,708,500)
340 340 341 341 342
343 344
(516,900) (739,700) (1,256,600)
*O & M denotes capital request has operating & maintenance impacts included in the request
PAGE 332
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Building Stronger Kelowna - Transportation Upgrades
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 B1 - $62M PRELIMINARY
Justification: The Parkinson Recreation Centre and Park is located in an area of the City that experiences high transportation impacts. The redevelopment of Parkinson Recreation Centre and Park provides an opportunity to improve the transportation network through thoughtful upgrades to infrastructure like the surrounding roads, alternative transportation corridors, and public transportation systems. This work will promote multimodal transportation thereby reducing the GHG emissions created by users accessing this site. This is a multi-year project, with budget estimated at $20.8M. Contractual commitments made in 2024 will be based on this budget plus $8.3M budget in 2025, $7.3M budget in 2026, and $4.2M in 2027.
Expected Completion: Jun 2027 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 1,038,000
Reserve (485,000)
Borrow (553,000)
Fed/Prov 0
Department: Cost Center:
Capital Projects Transportation Capital
Title:
McCulloch Area DCC (KLO/Hall/Spiers)
Dev/Com 0
Utility 0
Taxation 0
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T1 - $465k PRELIMINARY
Justification: The KLO bridge over Mission Creek is at the end of its service life. This project will upgrade approaches to the bridge including intersection improvements. Budget for 2024 is requested to complete the design, update cost estimates, undertake major utility relocates, and prework to support the replacement of the bridge in 2025. A separate budget request for major construction will be made in 2025. This project is coordinated with the KLO Rd Mission Creek Bridge Replacement project.
Expected Completion: Dec 2026 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 465,000
Reserve (353,400)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (111,600)
PAGE 333
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Major Intersection Capacity Improvements DCC
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T1 - $240k PRELIMINARY
Justification: Budget is requested for the major intersection capacity improvements DCC program, which aims to expand vehicle capacity at key arterial intersections that have network-level impacts and are experiencing traffic growth due to development. Budget will advance pre-construction work for the Springfield and Dilworth intersection project, including completing design and advancing land acquisition. Option evaluation at other priority locations for the program will also be initiated. As traffic volumes grow, and intersections reach capacity, safety issues can also arise. In many cases, the capacity improvements will be coordinated with safety improvements.
Expected Completion: Dec 2025 Strategic Direction: Transportation - Capacity and traffic flow is enhanced on major road corridors Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 240,000
Reserve (126,100)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Burtch 3 DCC (Glenmore - Springfield), RD
Dev/Com 0
Utility 0
Taxation (113,900)
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T1 - $436k PRELIMINARY
Justification: Budget is requested to advance design for the Burtch 3 DCC Project between Glenmore and to the south of Harvey. The Burtch 3 project is identified in the Transportation Master Plan and includes upgrades and widening to Bernard, Burtch, and intersections at Bernard/Glenmore, Bernard/Burtch, Burtch/Lawrence, and Burtch/Harvey. Active transportation improvements are also included in the project scope. Future timing of detailed design and construction will be coordinated with the redevelopment of the Parkinson Recreation Centre. Future budget requests will supplement funding from the Building Stronger Kelowna program.
Expected Completion: Dec 2025 Strategic Direction: Transportation - Capacity and traffic flow is enhanced on major road corridors Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 436,300
Reserve (318,900)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (117,400)
PAGE 334
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Road Safety Improvements DCC
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T1 - $500k PRELIMINARY
Justification: Budget is requested for the road safety improvements DCC program. This program aims to address safety issues at arterial road intersections that are experiencing safety performance issues related to growth in traffic volume and other road users. Budget will advance work at the intersection of Springfield/ Dilworth/ Benvoulin, including advancing design and early land acquisition. At Springfield/ Dilworth/ Benvoulin funding for safety and capacity improvements will be combined to address issues concurrently. In addition, an evaluation of priority locations will be undertaken to develop a listing of potential future projects.
Expected Completion: Dec 2025 Strategic Direction: Transportation - Traffic safety management is increasing Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 500,000
Reserve (456,000)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Traffic Signals and Roundabouts DCC
Dev/Com 0
Utility 0
Taxation (44,000)
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T1 - $1.9M PRELIMINARY
Justification: Budget is requested for this ongoing program to construct traffic signals or roundabouts at major road intersections that require traffic control. This budget will be used to complete design, acquire land and construct a traffic signal at Rio Dr and Clifton Rd. This site meets national warrants for a traffic signal, has seen traffic volume growth due to development in Wilden and North Clifton areas and receives service requests for improved pedestrian crossings of Clifton Rd. A roundabout was considered at this location but is not likely to be recommended due to land and regrading impacts. Construction is projected to be complete mid 2025. Expected Completion: Jun 2025 Strategic Direction: Transportation - Capacity and traffic flow is enhanced on major road corridors Asset Cost 750,000
Reserve (696,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (54,000)
Revenue 0 0 0
Utility 0 0 0
Operating Impact: Traffic Signals and Roundabouts DCC 2024 2025 2026
Cost 6,100 22,900 22,900
Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Taxation (6,100) (22,900) (22,900) PAGE 335
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Lakeshore 5 DCC (Richter - Cook), RD
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T1 - $300k PRELIMINARY
Justification: Budget is requested for the lakeshore 5 DCC project between Swordy Rd and Barrera Rd. This work will advance opportunities to coordinate street improvements with upcoming utility replacements. This budget will be used to advance design and initiate land acquisition. The timing of future construction will be coordinated with utilities.
Expected Completion: Dec 2024 Strategic Direction: Transportation - More trips by alternative transportation modes Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 300,000
Reserve (214,400)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Stewart 3 DCC (Crawford-Swamp), Road
Dev/Com (30,000)
Utility 0
Taxation (55,600)
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T1 - $4.9M PRELIMINARY
Justification: Supplemental budget is requested to construct alignment, intersection, and cross-section improvements along Stewart Rd W (north of Saucier Rd), at the intersection of Stewart Rd W and Bedford Rd, Bedford Rd between Stewart Rd W and DeHart roads, and the intersection of DeHart/Casorso/Bedford roads. Construction costs reflect updated designs and cost estimates completed in 2023. Construction completion is anticipated in mid-2025, dependent on land acquisition and ALR approvals.
Expected Completion: Jul 2025 Strategic Direction: Transportation - Capacity and traffic flow is enhanced on major road corridors Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 930,000
Reserve (820,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (110,000)
PAGE 336
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Gordon 1 DCC (Frost - South Perimeter)
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T1 - $200k PRELIMINARY
Justification: Budget is requested to complete the final pavement lift on Gordon Dr from Frost Rd to Ponds Ave. When Gordon Dr was originally constructed the top layer of pavement was deferred to reduce the impact of utility cuts and road tie-ins. With the opening of South Perimeter Way the top lift of asphalt is now required to support arterial traffic.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 200,000
Reserve (200,000)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Frost DCC (Killdeer - Chute Lake)
Dev/Com 0
Utility 0
Taxation 0
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T1 - $437k PRELIMINARY
Justification: Budget is requested to complete detailed design and start land negotiations for the Frost Rd extension from Killdeer Rd eastward towards Chute Lake Rd including a new controlled intersection (roundabout) at Frost/Chute Lake/Okaview. This will provide a major road connection between Chute Lake Rd and Gordon Dr, connecting the Kettle Valley and Ponds neighbourhoods. In 2023 preliminary design and intersection options evaluation was completed. Detailed design and land acquisition will support future construction requests.
Expected Completion: Dec 2024 Strategic Direction: Transportation - Capacity and traffic flow is enhanced on major road corridors Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 437,400
Reserve (437,400)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 337
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Rail Trail to Greenway DCC, ATC
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T2 - $4.0M PRELIMINARY
Justification: Budget is requested for the construction of the rail trail to greenway Active Transportation Corridor (ATC) on Leckie Rd. This project will fill a gap in the all-ages and abilities bicycling network, linking the Okanagan Rail Trail with the Mission Creek Greenway. The ATC crosses Highway 97 and will require Ministry of Transportation Infrastructure approval. Improved access from Springfield to the Mission Creek Greenway will be coordinated with the Regional District of Central Okanagan. Expected Completion: Dec 2024 Strategic Direction: Transportation - More trips by alternative transportation modes Asset Cost Reserve 3,950,000 (3,717,400)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (232,600)
Revenue 0 0 0
Utility 0 0 0
Operating Impact: Rail Trail to Greenway DCC, ATC 2024 2025 2026
Cost 7,700 28,000 28,000
Reserve 0 0 0
Borrow 0 0 0
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Abbott DCC (Rose - Gyro), ATC
Grant 0 0 0
Other 0 0 0
Taxation (7,700) (28,000) (28,000)
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T2 - $850k PRELIMINARY
Justification: Budget is requested to advance the Abbott ATC between Meikle Rd and Gyro Beach Park. Delivery of this segment of the Abbott ATC will be lead by the development at 3340 Lakeshore Rd. Development requirements include the construction of protected bike lanes between Gyro Beach Park and just south of Meikle Rd. Adjacent sidewalk will be constructed by the developer concurrently but funded by the City. This funding will support completion and review of the developer's design and land acquisitions. Construction funding will be requested under a separate future request. Construction timing is dependent on development scheduling but is anticipated in 2025.
Expected Completion: Dec 2025 Strategic Direction: Transportation - More trips by alternative transportation modes Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 75,000
Reserve (26,200)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (48,800)
PAGE 338
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Bertram 1 DCC (Sutherland - Cawston), ATC
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T2 - $543k PRELIMINARY
Justification: Budget is requested to undertake detailed design for the Bertram Active Transportation Corridor (ATC) north-south through downtown from the Cawston to the Sutherland ATC. The Bertram ATC was identified in the 2040 Transportation Master Plan as a new protected bike lane connection through downtown to support continued growth & development - including the new UBCO campus. The route will link downtown to surrounding ATC facilities including the Okanagan Rail Trail, Cawston, Leon/Lawrence (future), the Bertram Multiuse Overpass and Sutherland. This project will inform current and future development applications and future budget requests for construction. This process will include stakeholder consultation.
Expected Completion: Dec 2025 Strategic Direction: Transportation - More trips by alternative transportation modes Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 543,700
Reserve (535,900)
Borrow 0
Fed/Prov 0
Dev/Com (6,900)
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Lakeshore 3 DCC (Lexington - Old Meadows), ATC
Utility 0
Taxation (900)
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T2 - $130k PRELIMINARY
Justification: Budget is required for the preliminary design of the Lakeshore 3 (Lexington Dr to Old Meadows Rd) Active Transportation Corridor (ATC). Preliminary design and updated cost estimates will be used to inform and update the 10Year Capital Plan. Construction of the Lakeshore 3 ATC is currently planned for 2028/29, however, the preliminary design will assess if quick build/interim improvements are viable over the shorter term.
Expected Completion: Dec 2024 Strategic Direction: Transportation - More trips by alternative transportation modes Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 130,000
Reserve (95,600)
Borrow 0
Fed/Prov 0
Dev/Com (4,000)
Utility 0
Taxation (30,400)
PAGE 339
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Local Street Urbanization Program
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T3 - $400k PRELIMINARY
Justification: Budget is requested to advance the Morrison Ave local street urbanization pilot project in 2024 and complete design for Glenwood Ave. Redevelopment is occurring in core area neighbourhoods and is expected to accelerate under the current Official Community Plan creating a higher demand on local streets for walking, biking, parking and driving. This pilot will help confirm construction approach, costs, and resources to urbanize local streets in core area neighbourhoods. This supplemental budget will be combined with carryover from 2023 and deferred revenue from fronting parcels. Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Asset Cost 180,000
Reserve (90,000)
Borrow 0
Fed/Prov 0
Operating Impact: Local Street Urbanization Program Cost Reserve Borrow Grant 2024 800 0 0 0 2025 1,500 0 0 0 2026 1,500 0 0 0
Dev/Com 0 Other 0 0 0
Utility 0
Taxation (90,000)
Revenue 0 0 0
Utility 0 0 0
Taxation (800) (1,500) (1,500)
Department: Cost Center:
Capital Projects Transportation Capital
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T3 - $350k
Title:
Roadway Urbanization
PRELIMINARY
Justification: Budget is requested to deliver roadway urbanization projects in conjunction with the Offsite and Oversize Program. This program funds infrastructure extensions or fills gaps in street elements in coordination with nearby development.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Asset Cost 350,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com (350,000)
Utility 0
Taxation 0
Revenue 0 0 0
Utility 0 0 0
Operating Impact: Roadway Urbanization 2024 2025 2026
Cost 600 1,200 1,200
Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Taxation (600) (1,200) (1,200)
PAGE 340
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
KLO Rd Mission Creek Bridge Replacement
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 T4 - $1.2M PRELIMINARY
Justification: The KLO bridge over Mission Creek is at the end of its service life. This project will replace the existing bridge, accommodate the Mission Creek Greenway under the west abutment, accommodate updated flood levels and improve the safety of road approaches. Budget is requested to complete design, update cost estimates, undertake major utility relocates, and prework to support the replacement of the bridge in 2025. A separate budget request for bridge replacement construction will be made in 2025. This project is coordinated with the McCulloch Area DCC project.
Expected Completion: Dec 2026 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost Reserve 1,224,100 (1,224,100)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Transportation System Renewal
Dev/Com 0
Utility 0
Taxation 0
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 T4 - $1.2M PRELIMINARY
Justification: Budget is requested for the annual renewal program to replace existing transportation system equipment and infrastructure based on condition inspections and asset management plans. Lifecycle repairs and replacements ensure reliable and safe operation for travelers. Renewals included in this request are consistent with the Council endorsed 10Year Capital Plan and include: the Bridge Rehabilitation and Renewal Program, the Sidewalk & Bikeway Renewal Program, the Street Lighting Renewal Program, and the Traffic Signals and Communications Renewal Program.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 1,241,900
Reserve (725,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (516,900)
PAGE 341
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 T4 - $4.0M
Title:
Road Renewal Program
PRELIMINARY
Justification: Budget is requested for this annual program that maintains the paved surface of the City's streets. Pavement renewal locations are prioritized by pavement condition, street function and traffic loading. While most projects involve removing then repaving the top surface of the roadway, strategies to extend the pavement life are also used, such as crack sealing and micro-surfacing. An increase in renewal funding in 2024 will offset lower projected funding next year. Pavement renewal is coordinated with other capital and development projects to maximize pavement life.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost Reserve 4,928,900 (4,189,200)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Bicycle Network Improvement Program
Dev/Com 0
Utility 0
Taxation (739,700)
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T5 - $500k PRELIMINARY
Justification: Budget is requested for this annual program to complete the design and construction of bike lanes to fill in gaps in the supporting cycling network as identified in the Pedestrian & Bicycle Master Plan (PBMP). The bike lane programs typically implement painted bike lanes; however, may consider small-scale cycling projects which improve rider safety and comfort. One of the planned projects for 2024 is the supporting infrastructure for the renewed DeHart Park and bike lanes on Lanfranco (Pandosy to Richter). Expected Completion: Dec 2024 Strategic Direction: Transportation - More trips by alternative transportation modes Asset Cost 500,000
Reserve (250,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (250,000)
Operating Impact: Bicycle Network Improvement Program 2024 2025 2026
Cost 1,700 3,500 3,500
Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (1,700) (3,500) (3,500) PAGE 342
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Neighbourhood Bikeway Program
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T5 - $80k PRELIMINARY
Justification: Budget is requested to advance a neighbourhood bikeway pilot project. Neighbourhood bikeways can provide lowercost alternatives to protected bike lanes on major roads. They are generally located on quieter streets and typically include wayfinding signage, traffic calming to manage traffic speeds and volumes, and upgraded crossings at major roads. This pilot follows the completion of a neighbourhood bikeways study in 2023. In 2024 requested budget will complete design and cost estimates for the Rutland Neighbourhood bikeway.
Expected Completion: Dec 2025 Strategic Direction: Transportation - More trips by alternative transportation modes Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 120,000
Reserve 0
Borrow 0
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Pedestrian Network
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (120,000)
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T6 - $460k PRELIMINARY
Justification: Budget is requested for the annual program to upgrade existing and add new crosswalks and sidewalks. Improvements to crosswalks and sidewalks make walking a more viable, comfortable and safer travel option. Improvements include installation of pedestrian-activated warning flashers, median refuge islands, curb extensions, road markings/signage, lighting. This program also funds construction of new sidewalks to fill gaps in the walking network including new sidewalk segments as identified through the Safe Routes for Schools Program. Expected Completion: Dec 2025 Strategic Direction: Transportation - Traffic safety management is increasing Asset Cost 460,000
Reserve (230,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (230,000)
Revenue 0 0 0
Utility 0 0 0
Operating Impact: Pedestrian Network 2024 2025 2026
Cost 9,300 11,800 11,800
Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Taxation (9,300) (11,800) (11,800)
PAGE 343
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Safety and Operational Improvements
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 T7 - $474k PRELIMINARY
Justification: Budget is requested for the Safety and Operational Improvements in a variety of project types as presented in 10-Year Capital Plan. Intelligent Transportation Systems projects include the update and coordination of signal operations for a number of City signals adjacent to Highway 97. The Neighbourhood Traffic Calming program responds to citizen's requests to improve safety and quality of life by moderating speeding and short-cutting on local neighbourhood streets. The Road Safety Partnerships with ICBC's Road Safety Improvement Program improves road safety performance at locations identified through intersection safety screening, service requests and operational reviews. Expected Completion: Dec 2025 Strategic Direction: Transportation - Capacity and traffic flow is enhanced on major road corridors Asset Cost 474,000
Reserve (135,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (339,000)
Revenue 0 0 0
Utility 0 0 0
Operating Impact: Safety and Operational Improvements 2024 2025 2026
Cost 4,500 9,000 9,000
Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Taxation (4,500) (9,000) (9,000)
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T9 - $380K
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Rutland Park & Ride, Mobility Hub, Operations Facility
PRELIMINARY
Justification: Supplemental budget is requested to design and construct improvements at the Rutland transit exchange. Proposed improvements include an additional transit bay, shelter, operator washroom, secure bicycle parking & micro-mobility area, sidewalk tie-ins, and potential park-and-ride spaces. These changes will support future transit service from the Rutland Transit Restructuring Plan and advance the development of the Rutland Urban Centre. Costs for this project will be shared between the City (20%) and BC Transit / Federal ICIP grant program (80%). This budget request funds the City's share. Following grant confirmation, detailed design will start followed by construction planned for 2025. Expected Completion: Dec 2025 Strategic Direction: Transportation - More trips by alternative transportation modes Asset Cost 380,000
Reserve (35,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Operating Impact: Rutland Park & Ride, Mobility Hub, Operations Facility Cost Reserve Borrow Grant Other 2024 0 0 0 0 0 2025 800 0 0 0 0 2026 1,700 0 0 0 0
Utility 0 Revenue 0 0 0
Taxation (345,000) Utility 0 0 0
Taxation 0 (800) (1,700) PAGE 344
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Transit - Bus Stop and Amenity Improvements
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T9 - $150k PRELIMINARY
Justification: Budget is requested for this ongoing program to address capacity, accessibility, safety and other needs at transit stops and, to provide new stops associated with expanded or restructured transit services or in coordination with development.
Expected Completion: Dec 2025 Strategic Direction: Transportation - More trips by alternative transportation modes Asset Cost 150,000
Reserve (75,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (75,000)
Revenue 0 0 0
Utility 0 0 0
Operating Impact: Transit - Bus Stop and Amenity Improvements Cost 500 1,000 1,000
2024 2025 2026
Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Taxation (500) (1,000) (1,000)
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T9 - $105k
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Rutland Network Restructure - Infrastructure
PRELIMINARY
Justification: Budget is requested to upgrade transit stops/infrastructure at several locations in Rutland. This multiyear project will upgrade transit stops in Rutland to reflect the outcomes of the 2023 Rutland Local Area Transit Plan. Improvements will be rolled out incrementally - coordinated with transit route changes. This initial year of the project will focus on design, with construction planned over the next five years through future budget requests.
Expected Completion: Dec 2024 Strategic Direction: Transportation - Capacity and traffic flow is enhanced on major road corridors Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 105,000
Reserve (41,300)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (63,700)
PAGE 345
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Transit - Land Acquisition
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T9 - $45k PRELIMINARY
Justification: Budget is requested for this ongoing program to initiate design and assess and address property impacts of transit stops associated with expanded or restructured transit services or in coordination with development.
Expected Completion: Dec 2025 Strategic Direction: Transportation - More trips by alternative transportation modes Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 45,000
Reserve (45,000)
Borrow 0
Department: Cost Center:
Capital Projects Transportation Capital
Title:
YLW Transit Hub
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 T9 - $45k PRELIMINARY
Justification: Budget is requested to continue the development of a concept for a transit hub at Kelowna International Airport. Development of a transit hub at YLW could support better transit access to the airport and surrounding employment centres. As air travel volumes rebound demand for better access to the airport is expected to grow. Development of a hub concept would strengthen the project's chances of accessing potential future senior government transit funding. Concept design of a transit hub concept is expected to occur over 2024/25.
Expected Completion: Dec 2025 Strategic Direction: Transportation - More trips by alternative transportation modes Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 45,000
Reserve (25,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (20,000)
PAGE 346
2024 FINANCIAL PLAN
CITY OF KELOWNA
WASTEWATER CAPITAL LED BY: GENERAL MANAGER, INFRASTURCTURE The wastewater capital infrastructure group is made up of six sections. WW1 – DCC Pipes (Mains) New wastewater mains to support growth. WW2 ‐ DCC Lift Stations New wastewater lift stations to support growth. WW3 ‐ DCC Wastewater Treatment Facilities New wastewater treatment facilities to support growth. WW4 ‐ DCC Oversize The City's share of costs to oversize wastewater infrastructure and to do work in excess of the developer's own needs. WW5 ‐ Network and Facility Renewal Renewal of existing wastewater mains, lift stations and existing treatment facilities that have reached the end of their service life. WW6 ‐ Network and Facility Improvements Collection and facility improvements to meet current standards. Contributed assets that are needed to support development and are funded from development.
2024 Program The 2024 priority one budget investment for Wastewater Capital totals $20.7M, representing 14.8% of the total 2024 capital program. The table below lists the individual capital budget requests and the expected future budget commitments in the following four years related to the 2024 projects as projected in the Council endorsed 10‐Year Capital Plan. Changes to future year budgets may occur as part of the 10‐Year Capital Plan update that is completed each year.
$ thousands Glenmore Connection - Glenmore Rd from Cross Rd to Scenic Rd Byrns Baron Trunk Phase 2 Lakeshore Trunk - (Cook - Gyro) Water St Lift Station Gyro Lift Station Offsite & Oversize - Wastewater WWTF Fermenter & Centrifuge Replacement Burtch Trunk Lift Station Renewal Renewal - Wastewater Mains and Facilities Commonage - Renewal Projects Belcarra Sewer Connection Area Emerging Issues Total priority 1 requests
WW1 WW1 WW1 WW2 WW2 WW4 WW5 WW5 WW5 WW5 WW5 WW6 WW6
2024 5,703 1,060 500 4,000 288 200 2,000 1,250 1,040 4,210 170 128 140 20,688
2025
2026
2027
0 3,179 0 0 2,787 0 0 1,000 0 0 0 1,152 0 8,118
0 3,179 0 0 0 0 0 0 0 0 0 0 0 3,179
0 3,179 2,607 0 0 0 0 0 0 0 0 0 0 5,786
2028 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Project Total 5,703 10,596 3,107 4,000 3,075 200 2,000 2,250 1,040 4,210 170 1,280 140 37,771
PAGE 347
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - Wastewater Fund Page Type Description Wastewater Capital - Priority 1 349 Growth Glenmore Connection - Glenmore Rd from Cross Rd to Scenic Rd 349 Growth Byrns Baron Trunk Phase 2 350 Growth Lakeshore Trunk - (Cook - Gyro) WW1 - DCC Pipes (Mains) 350 New Water St Lift Station 351 Growth Gyro Lift Station WW2 - DCC Lift Stations 351 New Offsite & Oversize - Wastewater WW4 - DCC Oversize 352 Renew WWTF Fermenter & Centrifuge Replacement 352 Renew Burtch Trunk 353 Renew Lift Station Renewal 353 Renew Renewal - Wastewater mains and facilities 354 Renew Commonage - Renewal Projects WW5 - Network and Facility Renewal 354 New Belcarra Sewer Connection Area 355 New Emerging Issues WW6 - Network and Facility Improvements Cost Center Total
Cost
Reserve
Borrow
Grant
Other
Utility
Taxation
5,703,100
(5,172,700)
0
0
0
(530,400)
0
1,059,600 500,000 7,262,700 4,000,000 287,600 4,287,600 200,000 200,000 2,000,000
(880,500) (320,100) (6,373,300) (4,000,000) (254,200) (4,254,200) (100,000) (100,000) 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
(179,100) (179,900) (889,400) 0 (33,400) (33,400) (100,000) (100,000) (2,000,000)
0 0 0 0 0 0 0 0 0
1,250,000 1,040,000 4,210,000
0 0 0
0 0 0
0 0 0
0 0 0
(1,250,000) (1,040,000) (4,210,000)
0 0 0
170,000 8,670,000
0 0
0 0
0 0
(56,100) (56,100)
(113,900) (8,613,900)
0 0
128,000 140,000 268,000
(128,000) 0 (128,000)
0 0 0
0 0 0
0 0 0
0 (140,000) (140,000)
0 0 0
20,688,300 (10,855,500)
0
0
(56,100)
(9,776,700)
0
PAGE 348
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Glenmore Connection - Glenmore Rd from Cross Rd to Scenic Rd
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 WW1 - $5.7M PRELIMINARY
Justification: Budget is requested to install 1,480m of 525mm trunk main from Snowsell St to Cross Rd. This DCC project is required to service anticipated growth in the North Glenmore area and make progress on completing connections from McKinley Beach, Wilden and areas further north.
Expected Completion: Dec 2025 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost Reserve 5,703,100 (5,172,700)
Borrow 0
Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Byrns Baron Trunk Phase 2
Fed/Prov 0
Dev/Com 0
Utility (530,400) Growth Priority: 1 10 Yr Cap Plan Ref: 2024 WW1 - $1.1M PRELIMINARY
Justification: Budget is requested to install 1,300m of 1050mm and 1200mm diameter trunk main sewer along Burtch Rd (at Byrns Rd) and connect to the existing 1200mm trunk main stubbed off at Raymer Av and Gordon Dr. This work completes this DCC project.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 1,059,600
Reserve (880,500)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (179,100) PAGE 349
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Lakeshore Trunk - (Cook - Gyro)
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 WW1 - $500k PRELIMINARY
Justification: Budget is requested to complete sanitary sewer upgrades along the Hiawatha Development frontage. The Lakeshore sewer upgrade detailed design is currently underway for the section between Cook Rd to the Gyro Lift Station. Work will be coordinated with the transportation department and development.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 500,000
Reserve (320,100)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (179,900)
Department: Cost Center:
Capital Projects Wastewater Capital
New Priority: 1 10 Yr Cap Plan Ref: 2024 WW2 - $4M
Title:
Water St Lift Station
PRELIMINARY
Justification: Budget is requested for the remaining funding to build a new Water Street Lift Station. This is a scope upgrade to the original DCC project estimate for a retrofit. After a detailed assessment, due to capacity, operational, and safety issues, along with the expected financials, it was determined that the downtown core would be better served by installing an entirely new lift station. The new station will fit on the existing site, but will be setback further from Mill Creek. The existing facility will remain operational until commissioning of the new station is complete.
Expected Completion: Dec 2025 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost Reserve 4,000,000 (4,000,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0 PAGE 350
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Gyro Lift Station
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 WW2 - $287k PRELIMINARY
Justification: Budget is requested for detailed design of required upgrades at the gyro lift station. The scope of work will focus on building rehabilitation, pump upgrades, installation of third pump, and the addition of a new odour control room.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 287,600
Reserve (254,200)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Offsite & Oversize - Wastewater
Dev/Com 0
Utility (33,400) New Priority: 1 10 Yr Cap Plan Ref: 2024 WW4 - $200k PRELIMINARY
Justification: Budget is requested for the City's annual share of costs to oversize sewer utilities and work in excess of the developer's own needs as a result of City requirements.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 200,000
Reserve (100,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (100,000) PAGE 351
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Wastewater Capital
Title:
WWTF Fermenter & Centrifuge Replacement
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 WW5 - $2M PRELIMINARY
Justification: Budget is requested to address equipment renewal needs at the Wastewater Treatment Facility (WWTF). Work will focus on the required replacement of the fermenter and the centrifuge.
Expected Completion: Dec 2025 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 2,000,000
Reserve 0
Borrow 0
Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Burtch Trunk
Fed/Prov 0
Dev/Com 0
Utility (2,000,000) Renew Priority: 1 10 Yr Cap Plan Ref: 2024 WW5 - $1.25M PRELIMINARY
Justification: Budget is requested to continue the lining and repair work for the Burtch Sanitary Trunk. In 2023, Phase 1 lined the trunk along Burtch Rd from Byrns Rd to Sutherland Ave. This project, Phase 2, will line the trunk from the northside of Highway 97 within the Parkinson Rec Centre property, across the highway to Sutherland Ave at Burtch Rd. This phase includes a significant required flow bypass.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 1,250,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (1,250,000) PAGE 352
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Wastewater Capital
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 WW5 - $1M
Title:
Lift Station Renewal
PRELIMINARY
Justification: Budget is required for the capital requirements in 2024 for the sanitary lift station asset renewal program. Works in 2024 will focus primarily on renewal of the Farris (lower Mission) and Cassiar (Dilworth) lift stations. The works will include replacement of key mechanical, electrical and structural components of each facility, assuring seamless operation to route wastewater uphill to the City's gravity transmission mains. Each location will also be reviewed for additional backup power generation needs.
Expected Completion: Dec 2025 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 1,040,000
Reserve 0
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Renewal - Wastewater Mains and Facilities
Dev/Com 0
Utility (1,040,000) Renew Priority: 1 10 Yr Cap Plan Ref: 2024 WW5 - $4.2M PRELIMINARY
Justification: Budget is requested for annual infrastructure renewal to ensure levels of service are maintained and growth anticipated in core areas is accommodated. The work includes: planning and design of the Highland South Service Area north of Bernard Ave; the replacement of 400m of collector sewer main along the lane east of Richter St, upstream of the Birch Lift Station; and replacement of 370m of aging sewer main along Coronation Ave between Ethel St and Richter St to be coordinated the water utility renewal project to replace 100mm cast iron watermain. The remaining budget will be used to replace 46m of wood stave sewer main and 90m of asbestos cement sewer main along Ellis St near Rosemead Ave.
Expected Completion: May 2025 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 4,210,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (4,210,000) PAGE 353
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Commonage - Renewal Projects
Renew Priority: 1 10 Yr Cap Plan Ref: Not included WW5 PRELIMINARY
Justification: Budget is requested for ongoing infrastructure renewal at the Regional Biosolids Composting Facility. In 2024 the budget will be used to replace failing asphalt that is needed to maintain the site's impermeable working surface. This project is funded 1/3 by the City of Vernon.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 170,000
Reserve 0
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Belcarra Sewer Connection Area
Dev/Com (56,100)
Utility (113,900) New Priority: 1 10 Yr Cap Plan Ref: 2024 WW6 - $128k PRELIMINARY
Justification: Budget is requested for detailed design of the Belcarra Sewer Connection Area to connect 42 lots connected to a dry sewer system and 19 lots with no fronting sewer. The Belcarra Sewer Connection Area is a high-priority sewer connection area in Kettle Valley. This project is part of the City's updated Sanitary Sewer Connection Area Program. Project costs will be recovered by a mix of latecomers (dry sewer lots) and Septic Removal Specified Area charges.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 128,000
Reserve (128,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0 PAGE 354
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Emerging Issues
New Priority: 1 10 Yr Cap Plan Ref: 2024 WW6 - $140k PRELIMINARY
Justification: Budget is requested to address unplanned scope that may arise as coordination with development and other capital cost centre projects (Water, Transportation, etc.).
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 140,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (140,000)
PAGE 355
2024 FINANCIAL PLAN
CITY OF KELOWNA
STORM DRAINAGE CAPITAL LED BY: GENERAL MANAGER, INFRASTURCTURE The storm drainage capital infrastructure group is made up of three sections. D1 – Hydraulic Upgrading Program Estimated expenditures to cover hydraulic improvements to the storm drainage system. This non‐exhaustive list of hydraulic capacity projects are selected based on grant availability, contributing area, support by studies, analyses, and/or reoccurring operational issues. Flood protection projects are also included in this category. D2 ‐ Storm Drainage Quality Program This program includes stormwater quality projects that reduce urban and agricultural stormwater pollution throughout the City. Projects are selected based on contemporary water quality monitoring, higher risk subcatchments, and provincial outfall water quality targets. The 2040 Official Community Plan and the draft Area Based Water Management Plan identify relatively high risks and many opportunities for addressing stormwater quality in the City. These projects ultimately support the City's drinking water filtration deferral strategy supported by Interior Health. This category is expected to evolve regularly based on lessons learned, completed projects, and increases to stormwater quality levels of service. D3 ‐ Storm Water Renewal This program provides for the renewal and replacement of pipes, outfalls, pump stations, treatment facilities, and stormwater ponds.
2024 Program The 2024 priority one budget investment for Storm Drainage Capital totals $8.0M, representing 5.7% of the total 2024 capital program. The table below lists the individual capital budget requests and the expected future budget commitments in the following four years related to the 2024 projects as projected in the Council endorsed 10‐Year Capital Plan. Changes to future year budgets may occur as part of the 10‐Year Capital Plan update that is completed each year.
$ thousands Mill Creek Flood Protection Frost and Frazer Lake Stormwater Improvements Containment Devices Linear Asset Renewal Projects Total priority 1 requests
D1 D1 D2 D3
2024 6,701 750 349 220 8,020
2025 7,382 0 0 0 7,382
2026 8,371 0 0 0 8,371
2027 1,538 0 0 0 1,538
2028
Project Total 0 23,992 0 750 0 349 0 220 0 25,311
PAGE 356
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - General Fund Page Type Description Storm Drainage Capital - Priority 1 358 New Mill Creek Flood Protection 358 Renew Frost and Frazer Lake Stormwater Improvements D1 - Hydraulic Upgrading Program 359 Growth Containment Devices D2 - Storm Drainage Quality Program 359 Renew
Linear Asset Renewal Projects D3 - Storm Water Renewal Cost Center Total
Cost
Reserve
Borrow
Grant
Other
Utility
Taxation
6,701,000 750,000
(4,020,600) 0
0 0
(2,680,400) 0
0 0
0 0
0 (750,000)
7,451,000 349,100 349,100
(4,020,600) 0 0
0 0 0
(2,680,400) 0 0
0 0 0
0 0 0
(750,000) (349,100) (349,100)
220,000 220,000 8,020,100
0 0 (4,020,600)
0 0 0
0 0 (2,680,400)
0 0 0
0 0 0
(220,000) (220,000) (1,319,100)
PAGE 357
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Storm Drainage Capital
Title:
Mill Creek Flood Protection
New
Priority: 1 10 Yr Cap Plan Ref: 2024 D1 - $6.7M
PRELIMINARY
Justification: Budget is requested to continue the seven year program that feeds a number of flood protection sub-projects. The 2024 request is consistent with long term grant scheduling, the 10 Year Capital Plan and priorities to fully access the $22M of the Disaster Mitigation and Adaptation Fund (DMAF) federal grant. The sub-projects in development for 2024 include completion of outlet works for the diversion to Mission Creek, purchase of debris removal machinery, creek improvements at Parkinson Recreation Park, older crossing removals, and continued airport and industrial corridor investigations. The program considers a balanced approach for localized flows, flood protection, water quality improvements, and enhanced fish spawning.
Expected Completion: Dec 2027 Strategic Direction: Climate & Environment - Enhanced climate emergency planning and response programs Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost Reserve 6,701,000 (4,020,600)
Borrow 0
Fed/Prov (2,680,400)
Dev/Com 0
Department: Cost Center:
Capital Projects Storm Drainage Capital
Title:
Frost and Frazer Lake Stormwater Improvements
Utility 0
Taxation 0
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 D1 - $750k PRELIMINARY
Justification: Budget is requested to design and construct storm network upgrades along Killdeer Road and Frost Road. The project addresses known local drainage issues along the existing and future alignment of Frost Road; and increases the storm system capacity to safely convey minor flows from the new Frazer Lake Dam outlet. The renewal components of this project will be funded in part by the Linear Stormwater Asset Renewal budget.
Expected Completion: Jun 2025 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 750,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (750,000)
PAGE 358
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Storm Drainage Capital
Title:
Containment Devices
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 D2 - $349k PRELIMINARY
Justification: Budget is required for a concept design and location for a replacement Vac-Truck effluent dewatering facility. The scope includes a strategic plan for managing hydro-excavated waste while assuring poor quality water is managed. These facilities are important to for the safe dewatering and disposal of hydro-excavated materials from the City's stormwater separators, catch basins, general construction and the wastewater system.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 349,100
Reserve 0
Borrow 0
Department: Cost Center:
Capital Projects Storm Drainage Capital
Title:
Linear Asset Renewal Projects
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (349,100)
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 D3 - $220k PRELIMINARY
Justification: Budget is requested to support the annual replacement of storm drainage mains, pump stations, and treatment facilities. A number of stormwater mains are approaching the end of service life and will require renewal in order to continue providing a standard level of service. The projects identified for replacement in 2024 will supplement the renewal component of the Frost and Frazer Lake Stormwater Improvement Project, renew the functionality of the Southridge stormwater pond system by adding an overflow and decommissioning the existing telemetry-based system, replacing the aging culverts under Findlay Rd downstream of Chichester Wetland, and funding minor elements of the Miscellaneous Drainage Program.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 220,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation (220,000)
PAGE 359
2024 FINANCIAL PLAN
CITY OF KELOWNA
WATER CAPITAL LED BY: GENERAL MANAGER, INFRASTURCTURE The water capital infrastructure group is made up of eight sections. W1 – DCC Pipes (Mains) New water mains to accommodate growth. W2 ‐ DCC Booster Stations & PRVs New booster stations &PRV's to accommodate growth. W3 ‐ DCC Water Treatment New treatment capacity accommodate growth.
and
facilities
to
W4 ‐ DCC Reservoirs & Filling Stations New reservoirs and filling stations to accommodate growth. W5 ‐ DCC Offsite & Oversize The City's share of costs to oversize water infrastructure and to do work in excess of the developer's own needs. W6 ‐ Network and Facility Renewal Renewal of existing water mains, booster stations, PRVs, water treatment systems, reservoirs and filling stations that has reached the end of its service life. W7 ‐ Network and Facility Improvements Network and facility improvements to meet current standards. Contributed assets and water meters that are needed to support development and are funded from development. W8 ‐ Irrigation Network Improvements Network and Facility Improvements to meet current standards. Fire protection, upper watershed infrastructure, well stations and transmission mains are all included in this irrigation network.
PAGE 360
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Program The 2024 priority one budget investment for Water Capital totals $8.6M, representing 6.2% of the total 2024 capital program. The table below lists the individual capital budget requests and the expected future budget commitments in the following four years related to the 2024 projects as projected in the Council endorsed 10‐Year Capital Plan. Changes to future year budgets may occur as part of the 10‐Year Capital Plan update that is completed each year.
$ thousands Royal View Transmission Main Upgrades Summit Reservoir DCC Offsite & Oversize - Water Water Network and Facility Renewal Water Meter Replacement Program Eldorado Pump Station Chlorine Conversion Bulk Fill Station UV Treatment Systems Control Upgrade Poplar Pump Station Electrical Upgrade Existing Fireflow Upgrades and Infill Development Improvements Water Meter - New Installations Hydrants Irrigation Mainline Renewal PRV Upgrades - Non Potable Total priority 1 requests
W1 W4 W5 W6 W6 W7 W7 W7 W7 W7 W7 W8 W8 W8
2024 733 1,900 200 1,400 800 200 100 500 100 1,000 150 45 1,000 500 8,628
2025 6,659 0 0 0 0 0 0 0 0 0 0 0 0 0 6,659
2026
2027 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2028 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Project Total 7,392 1,900 200 1,400 800 200 100 500 100 1,000 150 45 1,000 500 15,287
PAGE 361
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - Water Fund Page Type Description Water Capital - Priority 1 363 Growth Royal View Transmission Main Upgrades
Cost
Reserve
733,100
(427,200)
0
0
0
(305,900)
0
W1 - DCC Pipes (Mains) 363 Growth Summit Reservoir DCC W4 - DCC Reservoirs & Filling Stations
733,100 1,900,000 1,900,000
(427,200) (551,000) (551,000)
0 0 0
0 0 0
0 0 0
(305,900) (1,349,000) (1,349,000)
0 0 0
364 New
200,000 200,000 1,400,000
(100,000) (100,000) 0
0 0 0
0 0 0
0 0 0
(100,000) (100,000) (1,400,000)
0 0 0
800,000
0
0
0
0
(800,000)
0
2,200,000 200,000
0 (200,000)
0 0
0 0
0 0
(2,200,000) 0
0 0
366 New 366 Renew
W6 - Network and Facility Renewal Eldorado Pump Station Chlorine Conversion Bulk Fill Station UV Treatment Systems Control Upgrade
100,000 500,000
(100,000) (500,000)
0 0
0 0
0 0
0 0
0 0
367 Renew
Poplar Pump Station Electrical Upgrade
100,000
(100,000)
0
0
0
0
0
367 Renew
Existing Fireflow Upgrades and Infill Development Improvements Water Meter - New Installations W7 - Network and Facility Improvements Irrigation Mainline Renewal PRV Upgrades - Non Potable Hydrants W8 - Irrigation Network Improvements
1,000,000
0
0
0
0
(1,000,000)
0
150,000 2,050,000
0 (900,000)
0 0
0 0
(150,000) (150,000)
0 (1,000,000)
0 0
1,000,000 500,000 45,000 1,545,000
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
(1,000,000) (500,000) (45,000) (1,545,000)
0 0 0 0
8,628,100
(1,978,200)
0
0
(150,000)
(6,499,900)
0
364 Renew
Offsite & Oversize - Water W5 - DCC Offsite & Oversize Water Network and Facility Renewal
365 Renew
Water Meter Replacement Program
365 Renew
368 New
368 Renew 369 New 369 New
Cost Center Total
Borrow
Grant
Other
Utility
Taxation
PAGE 362
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Water Capital
Title:
Royal View Transmission Main Upgrades
Growth Priority: 1 10 Yr Cap Plan Ref: 2025 W1 - $12.3M PRELIMINARY
Justification: Budget is requested for the final design of the Royal View transmission main and the conceptual design of the Knox Mountain transmission main. The two projects are part of a larger transmission requirement for water from the Poplar Point intake and disinfection facility towards Dilworth Mountain. The Knox Mountain Transmission main construction is planned for 2028. This work is critical to mitigate future servicing issues associated with growth.
Expected Completion: Nov 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 733,100
Reserve (427,200)
Borrow 0
Department: Cost Center:
Capital Projects Water Capital
Title:
Summit Reservoir DCC
Fed/Prov 0
Dev/Com 0
Utility (305,900) Growth Priority: 1 10 Yr Cap Plan Ref: 2024 W4 - $1.9M PRELIMINARY
Justification: Budget is requested for construction of a new cell at the Summit Reservoir to accommodate the anticipated development growth in the areas serviced by this existing reservoir. The scope includes increasing the level of service for fire flow to meet Bylaw 7900 requirements for commercial and multi-family buildings within the 525m pressure zone.
Expected Completion: Jun 2025 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 1,900,000
Reserve (551,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (1,349,000) PAGE 363
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Water Capital
Title:
Offsite & Oversize - Water
New Priority: 1 10 Yr Cap Plan Ref: 2024 W5 - $200k PRELIMINARY
Justification: Budget is requested for the City's annual share of costs to oversize/extend water infrastructure in excess of the developer's own needs as a result of City requirements. Every year the City partners with the development community to oversize/extend water infrastructure to accommodate future projected development. This saves construction costs and disruption by not having to upsize/extend infrastructure in the future when development occurs. The current 10Year Capital Plan amount will accommodate several downtown replacement projects along with infill and RU7 zoning changes impacting future fire flow needs.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 200,000
Reserve (100,000)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Water Capital
Title:
Water Network and Facility Renewal
Dev/Com 0
Utility (100,000) Renew Priority: 1 10 Yr Cap Plan Ref: 2024 W6 - $1.4M PRELIMINARY
Justification: Budget is requested for watermain and facility renewal projects throughout the city. Identified projects include the replacement of aging cast iron watermain on Raymer Ave to Mappin Court; completion of ultraviolet disinfection treatment system upgrades at multiple city pump stations; and the replacement of aging 150mm cast iron main on Glenwood Av and Stockwell Av in coordination with infill development.
Expected Completion: Jun 2025 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 1,400,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (1,400,000) PAGE 364
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Water Capital
Title:
Water Meter Replacement Program
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 W6 - $800k PRELIMINARY
Justification: Budget is requested to replace existing water meters with new modernized units in the City. The meter replacement program started in 2020, and targets replacement of all meters in the City with new metering technology that improves measurement, informs individual owners of water use, and improves administration of City billing and servicing. The City uses this budget for the purchase, acquisition and installation of meters and their communications end points.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 800,000
Reserve 0
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Water Capital
Title:
Eldorado Pump Station Chlorine Conversion
Dev/Com 0
Utility (800,000) Renew Priority: 1 10 Yr Cap Plan Ref: Not included W7 PRELIMINARY
Justification: Budget is requested to upgrade the chlorine gas application at Eldorado Pump Station. The existing configuration is based on an aging 1970s system inherited from an improvement district. This chlorine station will be portable to facilitate the implementation of future chlorine upgrades at other stations.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost 200,000
Reserve (200,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0 PAGE 365
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Water Capital
New Priority: 1 10 Yr Cap Plan Ref: Not included W7
Title:
Bulk Fill Station
PRELIMINARY
Justification: Budget is requested to install a bulk water fill station in the south end of the City to supply City water trucks, street sweepers and City contractors. This project includes installation of a water service, power supply and road access. The selected location is on southbound Lakeshore Rd where ample right of way is available to safely accommodate a tractor-trailer pull-out, in proximity to both a catch basin and power pole, and is located on a truck route.
Expected Completion: Jun 2024 Strategic Direction: Other - Supports Base Business Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost 100,000
Reserve (100,000)
Borrow 0
Fed/Prov 0
Department: Cost Center:
Capital Projects Water Capital
Title:
UV Treatment Systems Control Upgrade
Dev/Com 0
Utility 0 Renew Priority: 1 10 Yr Cap Plan Ref: Not included W7 PRELIMINARY
Justification: Budget is requested for the installation of UV isolation control measures to protect the potable water distribution system in the event of a UV bulb failure. This will provide additional safety assurance of the City's drinking water supply.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost 500,000
Reserve (500,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0 PAGE 366
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Water Capital
Title:
Poplar Pump Station Electrical Upgrade
Renew Priority: 1 10 Yr Cap Plan Ref: Not included W7 PRELIMINARY
Justification: Budget is requested to update the electrical systems in the Poplar Point Pump Station to maintain an adequate level of service to the city's largest pressure zone, 419, as well as other upper pressure zones.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost 100,000
Reserve (100,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Department: Cost Center:
Capital Projects Water Capital
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 W7 - $1M
Title:
Existing Fireflow Upgrades and Infill Development Improvements
PRELIMINARY
Justification: Budget is requested for necessary network upgrades to undersized and aging watermains to improve fire flows within existing residential areas where increased density is proposed. Coronation Ave and Buck Rd areas will be the focus in 2024.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 1,000,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (1,000,000) PAGE 367
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Water Capital
Title:
Water Meter - New Installations
New Priority: 1 10 Yr Cap Plan Ref: 2024 W7 - $150k PRELIMINARY
Justification: Budget is requested for the annual requirement for the installation of new water meters for new development within the City of Kelowna's water utility. The City is responsible to supply and install all water meters purchased by developers as part of their site requirements.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 150,000
Reserve 0
Borrow 0
Department: Cost Center:
Capital Projects Water Capital
Title:
Irrigation Mainline Renewal
Fed/Prov 0
Dev/Com (150,000)
Utility 0 Renew Priority: 1 10 Yr Cap Plan Ref: 2024 W8 - $1M PRELIMINARY
Justification: Budget is requested to increase capacity and improve adequate raw water supply and fire protection in sections of the non-potable distribution system in southeast Kelowna. Mainline renewal will focus on stabilizing the 1050mm steel transmission main east of Gallaghers, including adding new air valves and upgrading the Jaud Road connection to improve fire flow coverage.
Expected Completion: Dec 2024 Strategic Direction: Agriculture - Increased engagement and support for the agricultural industry Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 1,000,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (1,000,000) PAGE 368
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Water Capital
Title:
PRV Upgrades - Non Potable
New Priority: 1 10 Yr Cap Plan Ref: 2024 W8 - $500k PRELIMINARY
Justification: Budget is requested to upgrade two pressure reducing valves (PRV) on the non-potable water system that services agricultural properties. This work will include upgrades to mechanical components, entrance safety conditions and operability. In 2024, the City will focus on the two PRV's at McClain Rd and the design for the facility at Reekie Rd.
Expected Completion: Dec 2024 Strategic Direction: Agriculture - Increased engagement and support for the agricultural industry Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 500,000
Reserve 0
Department: Cost Center:
Capital Projects Water Capital
Title:
Hydrants
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (500,000) New
Priority: 1 10 Yr Cap Plan Ref: 2024 W8 - $45k
PRELIMINARY
Justification: Budget is requested for hydrant installation throughout the City that focuses on infill areas within core areas where insufficient residential needs exist. This typically represents two hydrant installations per year.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 45,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (45,000) PAGE 369
2024 FINANCIAL PLAN
CITY OF KELOWNA
SOLID WASTE CAPITAL LED BY: GENERAL MANAGER, INFRASTURCTURE The solid waste capital infrastructure group is made up of nine sections. SW1 – Equipment Funding for new equipment and replacement of existing equipment. SW2 ‐ Site Improvement Funding for site improvements like buildings, roads, landscaping and fencing. SW3 ‐ Gas Management Required for design, installation and extension of gas management system and utilization of gas to energy. SW4 ‐ Leachate Management Required for installation and extension of leachate collection, treatment, recirculation network and pump facilities. SW5 ‐ Drainage & Groundwater Management Funding for design and installation of surface and groundwater systems, piping, storage and pump stations. SW6 ‐ Recycling & Waste Management Facilities and infrastructure to support waste management and recycling including composting, waste separation and diversion, last chance mercantile, and curbside bins. SW7 ‐ Landfill Area Development Required for planning, design and development of areas for filling to maximize available space. SW8 ‐ Closure & Reclamation Required for design and construction of final cover system and closure infrastructure and reclamation of disturbed areas to natural state. SW9 ‐ Solid Waste Renewal Renewal and replacement of site infrastructure and equipment.
PAGE 370
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Program The 2024 priority one budget investment for Solid Waste Capital totals $12.5M, representing 8.9% of the total 2024 capital program. The table below lists the individual capital budget requests and the expected future budget commitments in the following four years related to the 2024 projects as projected in the Council endorsed 10‐Year Capital Plan. Changes to future year budgets may occur as part of the 10‐Year Capital Plan update that is completed each year.
$ thousands Automated Collection Curbside Carts Landfill Liner and Lift Station Design and Construction - Area 3 General Site Works and Investigations Landfill Gas & Leachate Recirculation Laterals Landfill - East Gas Subheader Connections Stormwater Bypass System Stockpiles and Reprocessing Areas Relocation Progressive Closure Total priority 1 requests
SW1 SW2 SW2 SW3 SW3 SW5 SW7 SW8
2024 450 8,600 100 550 450 250 1,800 250 12,450
2025 0 2,000 0 0 0 4,650 3,800 800 11,250
2026
2027 0 0 0 0 0 0 0 0 0
0 2,500 0 0 0 500 0 2,000 5,000
Project 2028 Total 0 450 850 13,950 0 100 0 550 0 450 2,900 8,300 0 5,600 0 3,050 3,750 32,450
PAGE 371
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - General Fund Page Type Description Solid Waste Capital - Priority 1 373 Growth Automated Collection Curbside Carts SW1 - Equipment 373 Growth Landfill Liner and Lift Station Design and Construction - Area 3 374 Growth General Site Works and Investigations SW2 - Site Improvement 374 Growth Landfill Gas & Leachate Recirculation Laterals 375 Growth Landfill - East Gas Subheader Connections SW3 - Gas Management 375 Growth Stormwater Bypass System SW5 - Drainage & Groundwater Management 376 Growth Stockpiles and Reprocessing Areas Relocation SW7 - Landfill Area Development 376 Growth Progressive Closure SW8 - Closure & Reclamation Cost Center Total
Cost
Reserve
Borrow
Grant
Other
Utility
Taxation
450,000 450,000 8,600,000
(450,000) (450,000) (8,600,000)
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
100,000 8,700,000 550,000
(100,000) (8,700,000) (550,000)
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
450,000
(450,000)
0
0
0
0
0
1,000,000 250,000 250,000
(1,000,000) (250,000) (250,000)
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
1,800,000
(1,800,000)
0
0
0
0
0
1,800,000 (1,800,000) 250,000 (250,000) 250,000 (250,000) 12,450,000 (12,450,000)
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
PAGE 372
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Automated Collection Curbside Carts
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 SW1 - $350k PRELIMINARY
Justification: Budget is requested to purchase new curbside carts. This request is part of the City of Kelowna's curbside refuse, recycling and yard waste program. These new receptacles are necessary to address residential growth and the need for larger recycling and yard waste receptacles. This keeps an inventory of carts to renew end of life carts and maintain customer service.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 450,000
Reserve (450,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Landfill Liner and Lift Station Design and Construction – Area 3
Taxation 0
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 SW2 - $8.6M PRELIMINARY
Justification: Budget is requested for the installation of impermeable liner and associated leachate management infrastructure in the northeast corner of the site referred to as Area 3. This scope and schedule is consistent with the Design, Operations and Closure Plan. The work will include a new lift station and force main that will connect to the existing leachate management system.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost Reserve 8,600,000 (8,600,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 373
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
General Site Works and Investigations
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 SW2 - $100k PRELIMINARY
Justification: Budget is required for a number of smaller consulting projects required for compliance with the BC Landfill Guidelines and associate Regulations.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 100,000
Reserve (100,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Landfill Gas & Leachate Recirculation Laterals
Utility 0
Taxation 0
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 SW3 - $550k PRELIMINARY
Justification: Budget is requested for the landfill gas laterals and leachate recirculation systems. This annual program installs landfill gas capture as required by Regulation in areas of the landfill that were filled with waste in the previous year.
Expected Completion: Dec 2024 Strategic Direction: Climate & Environment - Reduce corporate and community GHG emissions Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 550,000
Reserve (550,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 374
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Landfill - East Gas Subheader Connections
Growth Priority: 1 10 Yr Cap Plan Ref: Not included SW3 PRELIMINARY
Justification: Budget is requested to address an emerging issue regarding excessive greenhouse gas emissions in one section of the landfill. To ensure landfill gas collection requirements are met an immediate expansion of the collection system is required. This will increase landfill gas collection efficiency and minimize potential for surface emissions of greenhouse gases.
Expected Completion: Dec 2024 Strategic Direction: Climate & Environment - Reduce corporate and community GHG emissions Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost 450,000
Reserve (450,000)
Borrow 0
Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Stormwater Bypass System
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 SW5 - $250k PRELIMINARY
Justification: Budget is requested to complete detailed design of the first phase of the surface water bypass from John Hindle Drive to Brandt's Creek. The detailed design will lead to construction of the first phase of the bypass in 2025.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 250,000
Reserve (250,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 375
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Stockpiles and Reprocessing Areas Relocation
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 SW7 - $1.8M PRELIMINARY
Justification: Budget is requested to continue to move material receiving and processing areas from Area 3 to a receiving area being constructed west of the entrance. The work includes additional phases of construction of the receiving area and intersection improvements for traffic flow to support compost process as per the approved Landfill Design, Operations and Closure Plan. The secondary ASP compost pads will be phased in over the next decade as capacity expansion is required.
Expected Completion: Jan 2027 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost Reserve 1,800,000 (1,800,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
Department: Cost Center:
Capital Projects Solid Waste Capital
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 SW8 - $250k
Title:
Progressive Closure
PRELIMINARY
Justification: Budget is required to initiate final design work and preparation for progressive closure of completed sub-areas of the landfill. Northern side slopes are reaching their final elevation and final cover is required to be installed. The closure activities consist of minor civil works and final cover preparations.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 250,000
Reserve (250,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 376
2024 FINANCIAL PLAN
CITY OF KELOWNA
AIRPORT CAPITAL LED BY: AIRPORT CHIEF EXECUTIVE OFFICER The airport capital infrastructure group is made up of four sections. A1 – Airside Funding for East Lands roads and servicing, stormwater infrastructure, and other small capital projects. A2 ‐ Groundside Funding for Airport roadways, hotel and parking development, rental car quick turnaround facility, land purchases, West Lands roads and servicing, and other small capital projects. A3 ‐ Terminal Funding for Airport terminal building renovations, technology, bridge upgrades, and other small capital projects. A4 – Airport Improvement Fee Funding for the terminal expansion, Apron 1 South expansion, combined operations building, airside pavement rehabilitation, runway end safety area, airside equipment, and other capital projects.
2024 Program The 2024 priority one budget investment for Airport Capital totals $9.8M, representing 7.0% of the total 2024 capital program. The table below lists the individual capital budget requests and the expected future budget commitments in the following four years related to the 2024 projects as projected in the Council endorsed 10‐Year Capital Plan. Changes to future year budgets may occur as part of the 10‐Year Capital Plan update that is completed each year.
$ thousands Security System Upgrades Small Capital Projects Groundside Infrastructure and Equipment Mill Creek Realignment Airport Air Terminal Building Capital Replacement & Improvement Carbon Neutral Initiatives Airport Soaring Beyond 2.5 Million Passengers AIF Program Total priority 1 requests
A1 A1 A2 A2 A3 A3 A4
2024 245 180 1,185 215 1,665 870 5,445 9,805
2025 0 0 0 0 2,270 0 1,140 3,410
2026
2027 0 0 0 0 0 0 0 0
2028 0 0 0 0 0 0 0 0
Project Total 0 245 0 180 0 1,185 0 215 0 3,935 0 870 0 6,585 0 13,215
PAGE 377
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - Airport Fund Page Type
Description
Cost
Reserve
Airport Capital - Priority 1 379 Renew Security System Upgrades 245,000 (245,000) 379 Renew Small Capital Projects 180,000 (180,000) A1 - Airside 425,000 (425,000) 380 Growth Groundside Infrastructure and Equipment1,185,000 (1,185,000) 380 Growth Mill Creek Realignment 215,000 (215,000) A2 - Groundside 1,400,000 (1,400,000) 381 Renew Airport Air Terminal Building Capital Replacement 1,665,000 & Improvement (1,665,000) 381 Renew Carbon Neutral Initiatives 870,000 (870,000) A3 - Terminal 2,535,000 (2,535,000) 382 Growth Airport Soaring Beyond 2.5 Million Passengers 5,445,000 AIF Program (5,445,000) A4 - Growth 5,445,000 (5,445,000) Cost Center Total 9,805,000 (9,805,000)
Borrow
Grant 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0
Utility 0 0 0 0 0 0 0 0 0 0 0 0
Taxation 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
PAGE 378
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Airport Capital
Title:
Security System Upgrades
Renew Priority: 1 10 Yr Cap Plan Ref: Not included A1 PRELIMINARY
Justification: Budget is requested for security system upgrades to the Airside CCTV system to improve wildlife management and the lifecycle replacement of the Terminal building panel and control board.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost 245,000
Reserve (245,000)
Borrow 0
Department: Cost Center:
Capital Projects Airport Capital
Title:
Small Capital Projects
Fed/Prov 0
Dev/Com 0
Utility 0 Renew Priority: 1 10 Yr Cap Plan Ref: 2024 A1 - $187k PRELIMINARY
Justification: Budget is requested for smaller capital projects that need to be implemented expeditiously. Historically, Airport Small Capital has been used to fund projects such as the replacement of the external defibrillator, boardroom audio visual equipment, and fuel monitoring systems.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost 180,000
Reserve (180,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0 PAGE 379
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Airport Capital
Title:
Groundside Infrastructure and Equipment
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 A2 - $152k PRELIMINARY
Justification: Budget is requested for upgrades and additions to Groundside infrastructure and equipment, mainly consisting of the design and/or construction of the relocation of the ready lot, short-term parking lot access and shuttles, taxis and buses, and the addition of a temporary parking lot, which are enabling works for the hotel.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost Reserve 1,185,000 (1,185,000)
Borrow 0
Department: Cost Center:
Capital Projects Airport Capital
Title:
Mill Creek Realignment
Fed/Prov 0
Dev/Com 0
Utility 0 Growth Priority: 1 10 Yr Cap Plan Ref: Not included A2 PRELIMINARY
Justification: Budget is requested for design related to Mill Creek at the Airport, as part of the City of Kelowna's Mill Creek Flooding Mitigation plan.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 215,000
Reserve (215,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0 PAGE 380
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Airport Capital
Title:
Airport Air Terminal Building Capital Replacement & Improvement
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 A3 - $452k PRELIMINARY
Justification: The air terminal building (ATB) capital replacements and improvements project consists of modifications to the ATB and the equipment within it to improve the operations of the Airport. These improvements include design of the inbound and outbound oversized baggage areas and building monitoring systems, the replacement of air handling units, fan coils and roof top units, and the adoption of new technology.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost Reserve 1,665,000 (1,665,000)
Borrow 0
Department: Cost Center:
Capital Projects Airport Capital
Title:
Carbon Neutral Initiatives
Fed/Prov 0
Dev/Com 0
Utility 0 Renew Priority: 1 10 Yr Cap Plan Ref: 2024 A3 - $117k PRELIMINARY
Justification: Budget is requested for carbon neutral initiatives at the Airport, which are aligned with the Airport's goal of being carbon neutral by 2030, including phase 2 of the Airport's conversion from HID to LED lighting in the terminal building.
Expected Completion: Dec 2024 Strategic Direction: Climate & Environment - Reduce corporate and community GHG emissions Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost 870,000
Reserve (870,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0 PAGE 381
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Airport Capital
Title:
Airport Soaring Beyond 2.5 Million Passengers AIF Program
Growth Priority: 1 10 Yr Cap Plan Ref: 2024 A4 - $2.66M PRELIMINARY
Justification: The Airport is requesting budget to design, construct and make purchases for certain aspects of the Soaring Beyond 2.5 million Passengers AIF Program including airside pavement rehabilitation of Taxiway Charlie and Taxiway Delta, the construction of a connection between Apron 1 and Taxiway Delta, the rehabilitation design for Taxiway Echo, and associated airside pavement areas, and the purchase of airside equipment (light electric vehicle, loader, and wheel loader flail).
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost Reserve 5,445,000 (5,445,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
PAGE 382
2024 FINANCIAL PLAN
CITY OF KELOWNA
FIRE EQUIPMENT CAPITAL LED BY: DIVISIONAL DIRECTOR, CORPORATE & PROTECTIVE SERVICES The storm drainage capital infrastructure group is made up of three sections. F1 – Vehicle / Equipment Renewal As part of the Fire Departments vehicle/equipment replacement program, vehicles and equipment at the end of their service life cycles are replaced using funds from the Fire Departments equipment replacement reserve. F2 ‐ Additional Vehicles / Equipment This budget supports the addition of new vehicles and equipment to the Fire Department in response to increased service demand from population growth. F3 ‐ Communications Systems To provide for radio system improvements or replacement, including dispatch requirements.
2024 Program The 2024 priority one budget investment for Fire Capital totals $631k, representing 0.5% of the total 2024 capital program. The table below lists the individual capital budget requests and the expected future budget commitments in the following four years related to the 2024 projects as projected in the Council endorsed 10‐Year Capital Plan. Changes to future year budgets may occur as part of the 10‐Year Capital Plan update that is completed each year.
$ thousands Self-Contained Breathing Apparatus & Cylinders Fire Sprinkler Protection Unit Digital Fire Training System - Additional Screen Fire Department Management Software Replacement Total priority 1 requests
F2 F2 F2 F3
2024 155 200 26 250 631
2025
2026 0 0 0 0 0
2027 0 0 0 0 0
2028 0 0 0 0 0
Project Total 0 155 0 200 0 26 0 250 0 631
PAGE 383
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Preliminary Budget Summary - General Fund Page Type Description Fire Capital - Priority 1 385 Renew Self-Contained Breathing Apparatus & Cylinders 385 New Fire Sprinkler Protection Unit 386 New Digital Fire Training System - Additional Screen F2 - Additional Vehicles / Equipment 386 Renew Fire Department Management Software Replacement F3 - Communications Systems Cost Center Total
Cost
Reserve
Borrow
Grant
Other
Utility
Taxation
154,500
(154,500)
0
0
0
0
0
200,000 26,100
(200,000) (26,100)
0 0
0 0
0 0
0 0
0 0
380,600 250,000
(380,600) (250,000)
0 0
0 0
0 0
0 0
0 0
250,000 630,600
(250,000) (630,600)
0 0
0 0
0 0
0 0
0 0
PAGE 384
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Fire Capital
Title:
Self-Contained Breathing Apparatus & Cylinders
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 F2 - $154k PRELIMINARY
Justification: Budget is requested for the replacement of six sets of Self-Contained Breathing Apparatus (SCBA), eight packs and 15 air cylinders. The Fire department has developed a long-term replacement strategy to ensure SCBA units are replaced as they reach the end of useful life.
Expected Completion: Mar 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 154,500
Reserve (154,500)
Borrow 0
Department: Cost Center:
Capital Projects Fire Capital
Title:
Fire Sprinkler Protection Unit
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
New Priority: 1 10 Yr Cap Plan Ref: Not included F2 - $0 PRELIMINARY
Justification: Budget is requested to purchase a trailer and equipment to set up a Type 2 Sprinkler Protection Unit (SPU). This will ensure the equipment needed is secured within the community. These units provide immediate protection in advance of a wildland urban interface (WUI) fire. A type 2 SPU is designed to protect approximately 25 homes. In the past, the Fire Department has hosted a provincial SPU during the summer months. This unit may be deployed elsewhere, if needed, thus eliminating immediate access to the equipment.
Expected Completion: Dec 2024 Strategic Direction: Other - Supports Base Business Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost 200,000
Reserve (200,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 385
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Fire Capital
Title:
Digital Fire Training System - Additional Screen
New
Priority: 1 10 Yr Cap Plan Ref: 2024 F2 - $25k
PRELIMINARY
Justification: Budget is requested for additional screens for the ATTACK Digital Fire Training System (DFTS). The ATTACK DFTS combines digital flames, sound and smoke to create a range of fire conditions that respond directly to hose line application with water or laser in areas that would be water sensitive. The DFTS allows training of new recruits in a safe environment by greatly reducing the exposure to heat and harmful carcinogens during training exercises for all fire suppression and training branch personnel. Further, there is a decreased environmental impact as this system drastically decreases the need for real live fires for training purposes.
Expected Completion: Jun 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 26,100
Reserve (26,100)
Borrow 0
Fed/Prov 0
Dev/Com 0
Department: Cost Center:
Capital Projects Fire Capital
Title:
Fire Department Management Software Replacement
Utility 0
Taxation 0
Renew Priority: 1 10 Yr Cap Plan Ref: 2024 F3 - $250k PRELIMINARY
Justification: Budget is requested to facilitate a department wide implementation of a new mobile record management system (RMS) for fire inspections and a fire data management (FDM) system. The current system is being discontinued and will no longer be supported. Responders in the field need timely, accurate access to maps and critical data related to emergency incidents and buildings.
Expected Completion: Jun 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 250,000
Reserve (250,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
PAGE 386
FINANCIAL PLAN Kelowna, BC Canada Carryover Budget
2024 Volume 2
2024 FINANCIAL PLAN
CITY OF KELOWNA
Report to Council Date:
March 18, 2024
To:
Council
From:
City Manager
Subject:
2024 Financial Plan – Carryover Budget - Volume 2
Department: Financial Planning
Recommendation: THAT the 2024 Financial Plan be increased by $8,774,400 for operating carryover projects and $269,930,200 for capital carryover projects as summarized in the 2024 Financial Plan – Carryover Budget – Volume 2. Purpose: To present the 2024 Financial Plan – Carryover Budget - Volume 2 to Council for approval and inclusion into the 2024 Financial Plan. Background: The operating and capital projects listed in the 2024 Financial Plan – Carryover Budget – Volume 2 represents projects that were not completed in 2023 or were originally planned to be completed over multiple years. These projects were previously approved by Council, and therefore do not add to the taxation demand for 2024. Funding sources for these projects include reserves, debt, utility, and other contributions, including grants. Corporate financial policy and guidelines were established in 2021 to provide a consistent framework for an incomplete operating and/or capital project budget to be considered for carryover into the following budget year, where funding is available. This policy applies to all operating and capital budget items whose underspending in a budget year is a result of timing, scope change, or is a multi-year undertaking and is requiring a carryover to the following budget year in order to complete the project. This underspending, if not carried forward into the following budget year, would not allow for the completion of the project and the lapsed funding would flow into the City’s annual surplus. To be eligible for budget carryover a request must be justified and meet one of the following criteria: • Design Option: A one-time operating or capital project that is waiting for a design decision or is being re-scoped due to a change in circumstances. • External Event: A one-time operating or capital project that is delayed due to an unanticipated external event.
PAGE 388
2024 FINANCIAL PLAN
• • • • • •
CITY OF KELOWNA
Multi-Year: A one-time operating or capital project that is planned over multiple years and has been identified as such in the original budget request. Scheduling: A one-time operating or capital project that is delayed due to internal scheduling conflicts. Awaiting Grant Information: A one-time operating or capital project that is on hold pending grant approval. Program: An operating or capital project that is part of a larger annual program that has a list of projects that exceed the annual budget. Council Approved: An operating project with a base budget that has been approved by Council to be used as funding for a project on a one-time basis. Policy: An operating project with a base budget that has a Council-endorsed policy to support a carryover.
For 2024, the carryover criteria External Event makes up for 29% of the overall carryover counts. This is largely due to supply chain issues and pending decisions from outside stakeholders, which slowed the progress on many projects in 2023. With respect to the remainder of the projects, 23% were previously approved as multiyear, 22% are projects which were delayed due to internal scheduling challenges, 13% for continued annual programming, 12% caused by design delays, and 1% are Council approved or have a policy that direct the carryover of remaining budget. A detailed discussion of projects included in this volume is not planned. Should Council have questions regarding any specific carryover and would like it discussed at the March 18, 2024, meeting, please advise the City Manager in advance and he will arrange for a division representative to attend the Council meeting. Considerations applicable to this report: Financial/Budgetary Considerations: A consolidated 2024-2028 Five-Year Financial Plan will be brought to Council for adoption by bylaw at Final Budget on April 22, 2024. This will precede adoption of the 2024 property tax bylaw, in accordance with Section 165 of the Community Charter. Considerations not applicable to this report: Legal/Statutory Authority: Legal/Statutory Procedural Requirements: Existing Policy: External Agency/Public Comments: Communications Comments: Submitted by: Melanie Antunes, CPA, Financial Planning Manager Approved for inclusion:
J. Sass, CPA, CA Director Financial Services
Attachment: 1: 2024 Financial Plan – Carryover Budget - Volume 2 2: 2024 Financial Plan – Carryover Budget - Volume 2 Presentation
PAGE 389
2024 FINANCIAL PLAN
CITY OF KELOWNA
CARRYOVER BUDGET The Carryover budget volume represents the incomplete projects, due to various reasons, from the 2023 budget year. These incomplete projects are being requested for carryover to 2024 with the intention of completion, or continuation in the case of multiple year projects. The total value of the 2024 Carryover volume is $278.7M, increasing the 2024 operating program by $8.8M and capital program by $269.9M with no effect on taxation as these projects were previously approved by Council.
CARRYOVER REQUEST THREE-YEAR COMPARISON ($ millions) The overall Carryover value has increased from 2023 most notably in the capital requests. The majority of the increase can be attributed to the Airport Improvement Program, Rutland Centre Sewer Connection Project, Highway 97 Pedestrian Overpass project as well as DeHart Park (DCC). The table below splits the last three years of carryovers between operating and capital.
Total Carryover Operating Capital
2024 $279 $9 = 3% $270 = 97%
2023 $237 $19 = 8% $218 = 92%
2022 $177 $10 = 6% $167 = 94%
CARRYOVER PROJECTS BY REASON TYPE There are several reasons why operating and capital projects are requested to be carried over. Corporate financial policy requires all budget carryover requests to meet one of the following criteria.
External Event A one-time operating or capital project which is delayed due to an unanticipated external event, the event was beyond City control and includes an expectation the project is to continue in the next year with a completion date. The most significant of 2024 External Event requests was the Fire Communications Equipment Renewal at $2.8M.
Design Option A one-time operating or capital project which is waiting for a design decision or is being re-scoped due to a change in circumstances. 2024 carryover projects with the Design Option reason code include Stewart 3 DCC (CrawfordSwamp), Road at $3.9M, Beaver Lake Service Area Wastewater Utility Upgrades at $921k, and Brandt's Creek Tradewaste Treatment Plant (BCTTP) Transformer Replacement at $552k.
PAGE 390
2024 FINANCIAL PLAN
CITY OF KELOWNA
Multi-Year A one-time operating or capital project that is planned to be completed over multiple years and has been identified as such in the original budget request. 2024 carryover projects with the Multi-Year reason code category include Soaring Beyond 2.5 Million Passengers AIF Program at $123.1M, Rutland Centre (SCA 22) Sewer Connection Project at $14.2M, Hwy 97 Pedestrian Overpass at $10.9M and DeHart Park (DCC) at $10.1M.
Scheduling Demands A one-time operating or capital project that is delayed due to internal scheduling conflicts. 2024 carryover projects with the Scheduling Demands reason code category include Equipment and Vehicle Replacement at $5.5M, Landfill Liner Design and Construction at $1.5M, and Poplar Point to Dilworth Mountain Transmission Upgrade Design at $750k.
Awaiting Grant Information A one-time operating or capital project that is on hold pending grant approval. 2024 carryover projects on hold due to grant funding approval include Electric Vehicle Infrastructure and Strategic Initiatives at $310k.
Program An operating or capital project that is part of a larger annual program that has a list of projects that exceed the annual budget. 2024 carryover projects with the Program reason code category include General Building Infrastructure Renewal Program at $5.5M, Dam Repair Program at $3.5M, Renewal - Wastewater Mains and Facilities at $2.5M.
Council Approved An operating project with a base budget that has been approved by Council to be used as funding for a project on a one-time basis. 2024 carryover projects with the Council Approved reason code category include Citizen Survey at 15k.
Policy An operating project with a base budget that has a Council endorsed policy to support a carryover. 2024 carryover projects with the Policy reason code category include Event Support Policy at $316k, and Community Grant Policy at $289k. The graph below displays the carryover reason types by percentage of total number of carryover requests for 2024. The External Event carryover category makes up the greatest proportion of requests. This is largely due to supply chain issues and weather-related events delaying projects. Multi -Year was the second most common reason for carryover requests, which is due to many projects require longer than one year to complete especially for larger capital projects.
External Event 29% Multi-Year 23% Scheduling Demands 22% Program 13% Design Option 12% Council Approved or Policy 1%
Total Requests: 269
PAGE 391
2024 FINANCIAL PLAN
CITY OF KELOWNA
SUMMARY OF MULTI-YEAR REQUESTS The details of multi-year carryover requests are not presented in the Financial Plan as they were identified as multiyear projects when the original request was approved by Council. Multi-year operating and capital projects requested for carryover in 2024 are summarized in the tables below.
Project Amount
Funding Source
Original Budget Year
Expected Completion
Healthy Housing Strategy
70,400
RESERVE
2022
2024
Indigenous Harm Reduction Health Canada Grant
66,600
FED/PROV
2023
2024
Kelowna Food Innovation Project
55,000
FED/RESE
2023
2024
Partnerships & Research
13,100
RESERVE
2015
2024
Urban Center Planning and OCP Implementation
147,600
FED/PROV
2023
2024
Operating Multi-Year Projects
Community Development Total
352,700
Building Safer Communities Grant
441,700
FED/PROV
2022
2026
Community Safety Plan Implementation
145,100
RESERVE
2021
2027
Overnight Sheltering
513,800
RESERVE
2021
2024
Community Safety & Bylaw Total
1,100,600
2040 Infrastructure Plan Consulting Support
92,200
RECO/RES/UTIL
2022
2024
4690 Hwy 97 Agricultural Considerations
472,600
RESERVE
2022
2024
858 Ellis Street Shelter
247,500
RESERVE
2022
2024
Asset Management Consulting Support
21,000
RECO/RES/UTIL
2023
2024
Cook Road Boat Launch - Provincial Approvals
72,600
RESE/REVE
2022
2024
Emergency Shelters Project
64,300
RESERVE
2023
2024
Parkinson Rec Centre/SD23 Partnership
41,400
RESERVE
2020
2024
Professional Consulting for Health & Wellness Strategies
3,000
RESERVE
2023
2024
Unit4 Implement Timesheets and Absences Modules
48,500
RESERVE
2023
2024
Enabling Services Total
1,063,100
Fire Communications Equipment Renewal Project
88,200
FED/PROV
2023
2025
KFD Scheduling Software
12,800
RESERVE
2023
2024
RESERVE
2023
2024
RESE/UTIL
2020
2025
RESERVE
2020
2024
Fire Safety Total Apple Race Series
101,000 41,500
Sport & Recreation Total Area Based Water Management Plan
361,500
Stormwater & Flood Protection Total Transit Maintenance Facility Phase 2
361,500 102,200
Transit Total Total multi-year operating projects
41,500
102,200 3,122,600
PAGE 392
2024 FINANCIAL PLAN
CITY OF KELOWNA
Capital Multi-Year Projects
Project Amount
Funding Source
10YCP Ref
Original Budget Year
Expected Completion
Apple Bowl Improvements
250,000
RESERVE
B1
2023
2025
City Hall – Human Resources Offices Renovations City Hall Improvement - Council and Storage Renovation
49,100
RESERVE
B3
2023
2024
15,100
RESERVE
B3
2023
2024
Island Stage Rejuvenation Mission Recreation Park, Capital News Centre Expansion Parkinson Recreation Centre - Building Replacement Design
1,249,800
RES/GRANT
B1
2023
2025
774,800
RESERVE
B1
2022
2025
1,967,100
RESERVE
B1
2021
2025
Building Capital Total
4,305,900
1450 Steele Rd Park Development Costs
198,600
RESERVE
P10
2023
2024
City Park, Phase 2 - Design & Construction
829,000
RESERVE
P6
2019
2024
DeHart Park (DCC)
10,140,100
RESERVE
P4
2022
2024
Glenmore Recreation Park (DCC) - Phase 3
6,972,300
RESERVE
P5
2022
2024
Kelowna's Newest Waterfront Park (DCC) - Phase 2
151,300
RESERVE
P6
2023
2024
Kerry Park - Future Phases (DCC)
454,700
RESERVE
P6
2021
2024
Mill Creek Linear Park
1,532,000
RESERVE
P7
2022
2024
Mission Recreation - Softball Diamonds (DCC)
2,634,500
RESERVE
P5
2021
2024
Parks Capital Total
22,912,500
Bertram 1 DCC (Sutherland - Cawston), ATC
189,200
RESERVE
T2
2023
2024
Bluebird Beach Safety Improvements
120,000
RESERVE
T5
2023
2024
Clement 2 DCC (Spall - Hwy33) Design
1,171,500
RES/GRANT
T2
2022
2024
Dilworth DCC Active Transportation Corridor
104,600
RESERVE
T2
2016
2024
Glenmore 4 DCC (Kane - South Yates), ATC
773,800
RESERVE
T2
2023
2024
10,928,600
RESERVE
T6
2020
2024
KLO Rd Mission Creek Bridge Replacement
159,600
RESERVE
T4
2020
2026
Local Street Urbanization Program
483,300
RESERVE
T3
2023
2024
Richter 1 DCC (Sutherland - KLO) Rutland Park & Ride, Mobility Hub, Operations facility
200,000
RESERVE
T1
2022
2024
275,900
RESERVE
T9
2022
2024
Sutherland 3 DCC (Mill Creek - Spall)
1,615,600
RESERVE
T1
2023
2024
RESERVE
SW2
2023
2024
RES/GRANT
D1
2019
2027
32,700
RESERVE
F3
2023
2024
2,450,000
RESERVE
F1
2022
2024
Hwy 97 Pedestrian Overpass
Transportation Capital Total Wildfire Recovery - Landfill
16,022,100 1,400,000
Solid Waste Capital Mill Creek Flood Protection
1,400,000 6,750,400
Storm Drainage Capital Total Dispatch ROIP Equipment Fire Vehicle and Equipment Renewal Fire Capital
6,750,400
2,482,700
PAGE 393
2024 FINANCIAL PLAN
CITY OF KELOWNA
Capital Multi-Year Projects Continued Airport - Hotel Development Soaring Beyond 2.5 Million Passengers AIF Program Airport Capital Total Kelowna Water Integration Planning & Design Royal View Transmission Mainline - Knox to Gordon Water Meter Replacement Program Water Capital Total Burtch Trunk Lakeshore Trunk - (Swordy - Barrera) Rutland Centre (SCA 22) Sewer Connection Project Wastewater Treatment Odour Control Media Replacement Water St Lift Station Wastewater Capital Total Total multi-year capital projects
Funding Source
10YCP Ref
Original Budget Year
Expected Completion
4,508,200
RESERVE
A2
2022
2024
123,063,700
RES/GRANT
A4
2020
2033
300,000
RESERVE
W7
2023
2024
562,800
RESERVE
W1
2023
2026
812,900
RESERVE
W6
2023
2027
2,366,600
RESERVE
WW5
2022
2024
193,000
RESERVE
WW1
2023
2024
14,245,300
RES/GRANT/UTIL
WW6
2022
2026
821,100
RESERVE
WW6
2023
2024
2,859,100
RESERVE
WW2
2022
2026
Project Amount
127,571,900
1,675,700
20,485,100 203,606,300
SUMMARY OF PROGRAM REQUESTS The details of carryover requests related to specific programs are not presented in the Financial Plan as they are part of a larger annual program consisting of projects that exceed annual budget and will continue indefinitely. The 2024 operating and capital programs requested for carryover are summarized below.
Operating Program Projects
Project Amount
Funding Source
Housing Reserve Fund
328,000
RESERVE
Regional Air Quality
261,500
FED/RES/REV
Community Development Total Facility Condition Assessments
51,700 Enabling Service Total
Dam Safety Reviews
RESERVE
51,700 39,000
Water Utility Total Total program operating requests
589,500
RESERVE
39,000 680,200
PAGE 394
2024 FINANCIAL PLAN
CITY OF KELOWNA
Project Amount
Funding Source
10Y Capital Plan Ref
Capital Opportunities & Partnership Program
945,100
RESERVE
B6
Facility Energy Modernization Renewal
72,500
RESERVE
B7
5,540,300
RESERVE
B7
54,800
RESERVE
P7
350,500
RESERVE
P1
Capital Program Projects
General Building Infrastructure Renewal Program Building Capital Total Knox Mountain Park - Improvements Parkland Acquisition Parks Capital Total
6,557,900
405,300
Active Transportation Corridor
632,300
RESERVE
T5
Bridge Rehabilitation
327,900
RESERVE
T4
Crosswalk Safety - Signals and Flashers
11,900
RESERVE
T7
Deferred Revenue Projects
1,354,500
RES/OTH
T3
Highway Median & Ditches
750,000
RESERVE
T3
Major Intersection Capacity Improvements DCC
115,900
RESERVE
T1
Road Safety Improvements DCC
89,900
RESERVE
T1
Roads Resurfacing
598,800
RESERVE
T4
Safe Routes to School Program
68,100
RESERVE
T7
Sidewalk and Bikeway Renewal
65,500
RESERVE
T4
Sidewalk Network Expansion
619,700
RESERVE
T6
Street Light Renewal
127,100
RESERVE
T4
Traffic Calming
173,000
RESERVE
T7
1,003,900
RESERVE
T8
231,700
RESERVE
T9
Traffic Signals and Roundabouts DCC Transit - Land Acquisition Transportation Capital Total
6,170,200
Landfill Gas & Leachate Recirculation Laterals
59,700
RESERVE
SW3
Stockpiles and Reprocessing Areas Relocation
1,412,600
RESERVE
SW7
Solid Waste Capital Total
1,472,300
Containment Devices
21,700
RESERVE
D2
Stormwater Pond Asset Renewal Program
162,900
RESERVE
D3
3,511,200
RES/GRANT
W8
Fireflow Upgrades
88,500
RESERVE
W7
Offsite & Oversize - Water
540,500
RESERVE
W5
Water Network and Facility Renewal
608,000
RESERVE
W6
120,000
RESERVE
W7
Storm Drainage Capital Total Dam Repair Program
Water Supply Major Equipment Renewal Program Water Capital Total
184,600
4,868,200
Renewal - Wastewater Mains and Facilities
2,457,600
RESERVE
WW5
Wastewater Lift Station Renewal
604,000
RESERVE
WW5
Wastewater Capital Total Total program capital projects
3,061,600 22,720,100
PAGE 395
OPERATING BUDGET
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Carryover Budget Summary - All Funds Page Description Community Safety & Bylaw 401 Communications Safety Initiatives 401 Supportive Housing Community Inclusion (CPTED) Community Safety Plan ~ Overnight Sheltering ~ Building Safer Communities Grant ~ Service Area Total Fire Safety 402 Kelowna Fire Department Master Plan Fire Communications Equipment ~ Renewal Project KFD Scheduling Software ~ Service Area Total Wastewater Utility 402 Commonage Odour Management Plan Update 403 Burtch Sewer Condition Assessment Service Area Total Stormwater & Flood Protection 403 Hill Spring Dam Study 404 North End Industrial Area Servicing OBWB Snow Storage Location Risk ~ Assessment 404 Stormwater Basin Plan - Central Area 405 Stormwater Utility Business Case and Implementation Plan Area Based Water Management Plan ~ Service Area Total Water Utility 405 Emergency Response Plan Update Water 406 Long Meadow Reservoir Dam Decommissioning 406 Water Operations Supply Projects 2023 407 Flow Monitoring, Hydrology and Climate Change - Water 407 Irrigation Model and Data Management 408 Pressure Reducing Valve Condition Assessment 408 Water Integration Planning Dam Safety Reviews ~ Service Area Total
Amount
Reserve
Borrow
Grant
Revenue
Utility Reason
18,700 24,000
(18,700) (24,000)
0 0
0 0
0 0
0 SCHED 0 SCHED
145,100 513,800 441,700 1,143,300
(145,100) (513,800) 0 (701,600)
0 0 0 0
0 0 (441,700) (441,700)
0 0 0 0
0 MULTIYEAR 0 MULTIYEAR 0 MULTIYEAR 0
150,000 88,200
(150,000) 0
0 0
0 (88,200)
0 0
0 EXT EVENT 0 MULTIYEAR
12,800 251,000
(12,800) (162,800)
0 0
0 (88,200)
0 0
0 MULTIYEAR 0
43,000
(28,500)
0
0
(14,500)
0 EXT EVENT
72,700 115,700
(72,700) (101,200)
0 0
0 0
0 (14,500)
0 EXT EVENT 0
75,000 41,600 8,900
(75,000) 0 0
0 0 0
0 0 (8,900)
0 0 0
0 EXT EVENT (41,600) SCHED 0 DESIGNOPT
178,900 34,700
(178,900) (34,700)
0 0
0 0
0 0
0 SCHED 0 SCHED
361,500 700,600
(88,700) (377,300)
0 0
0 (8,900)
0 0
(272,800) MULTIYEAR (314,400)
22,400
(22,400)
0
0
0
0 EXT EVENT
110,000
(110,000)
0
0
0
0 EXT EVENT
34,400
(34,400)
0
0
0
0 EXT EVENT
45,000
(45,000)
0
0
0
0 EXT EVENT
20,000
(20,000)
0
0
0
0 EXT EVENT
50,000
(50,000)
0
0
0
0 EXT EVENT
116,100 39,000 436,900
(52,700) (39,000) (373,500)
0 0 0
0 0 0
0 0 0
(63,400) SCHED 0 PROGRAM (63,400)
PAGE 397
2024 FINANCIAL PLAN
Solid Waste & Landfill 409 Landfill - Design, Operations and Closure Plan update 409 Landfill - Sliver Fill and Area 3 Landfill Gas Final Design 410 Landfill Waste Reduction - Evaluation of Building Deconstruction
Service Area Total Transportation 410 Okanagan Rail Trail Operational Activities 411 Website Development and Hosting 411 Safety and Operations, Investigation 412 Bicycle Map and Wayfinding Program 412 413
Downtown Transportation Review Low Carbon Transportation: Neighbourhood Bikeway Program
413 Pandosy Richter Study 414 Transportation Safety Strategy Service Area Total Transit 414 415 415 ~
ICIP Joint Study Project Orchard Park Exchange Rutland Transit Exchange Refurbishment Transit Maintenance Facility Phase 2
Service Area Total Parks 416 416
CRI Firesmart Community Funding Hwy 97 & McCurdy Rd Tree Planting
Service Area Total Sport & Recreation 417 Apple Bowl - Event Services Kiosk/Ticket Booth 417 Event Support Policy Island Stage - Planning & Design ~ Memorial Arena - Event Hosting Audit ~ Apple Race Series ~ Service Area Total
Arts & Culture 418 Community Grant Policy 418 Indigenous Community Engagement Framework 419 Partnership - Syilx Arts and Culture Service Area Total
CITY OF KELOWNA
146,800
(146,800)
0
0
0
0 EXT EVENT
18,000
(18,000)
0
0
0
0 SCHED
23,800
(23,800)
0
0
0
0 SCHED
188,600
(188,600)
0
0
0
0
22,900
(22,900)
0
0
0
0 EXT EVENT
30,000 37,200 15,000
(25,800) (37,200) (15,000)
0 0 0
0 0 0
(4,200) 0 0
0 EXT EVENT 0 SCHED 0 SCHED
100,000 38,800
(100,000) (38,800)
0 0
0 0
0 0
0 SCHED 0 SCHED
188,400 80,000 512,300
(188,400) (80,000) (508,100)
0 0 0
0 0 0
0 0 (4,200)
0 SCHED 0 SCHED 0
68,100 135,700 50,000
(68,100) (135,700) (50,000)
0 0 0
0 0 0
0 0 0
0 DESIGNOPT 0 EXT EVENT 0 SCHED
102,200
(102,200)
0
0
0
0 MULTIYEAR
356,000
(356,000)
0
0
0
0
114,900 75,500
0 (75,500)
0 0
(114,900) 0
0 0
0 EXT EVENT 0 SCHED
190,400
(75,500)
0
(114,900)
0
0
22,100
(22,100)
0
0
0
0 EXT EVENT
315,800 8,200 10,000
(315,800) (8,200) (10,000)
0 0 0
0 0 0
0 0 0
0 BASE POL 0 DESIGNOPT 0 EXT EVENT
41,500 397,600
(41,500) (397,600)
0 0
0 0
0 0
0 MULTIYEAR 0
288,900 67,700
(288,900) (67,700)
0 0
0 0
0 0
0 BASE POL 0 DESIGNOPT
11,600
(11,600)
0
0
0
0 EXT EVENT
368,200
(368,200)
0
0
0
0
PAGE 398
2024 FINANCIAL PLAN
Community Development 419 North End Area Plan 420 Extreme Cold Weather Planning 420 PEOPLE Peer Navigators Capacity Building: Health Canada Grant Climate Action Plan Climate and Environment Review Recommendations 422 Community Climate Action Implementation Heritage Strategy ~ Infill Housing Development Approvals ~ Programs Regional Air Quality ~ Urban Center Planning and OCP ~ Implementation Healthy Housing Strategy ~ Housing Reserve Fund ~ Indigenous Harm Reduction Health ~ Canada Grant Kelowna Food Innovation Project ~ Partnerships & Research ~ Service Area Total
421 421
Parking 422 Curb Space Management Strategy Development 423 Parking Strategy - Capri-Landmark Area Plan Development Service Area Total
CITY OF KELOWNA
84,200 30,000 71,000
(22,900) 0 0
0 0 0
(61,300) (30,000) (71,000)
0 0 0
0 EXT EVENT 0 EXT EVENT 0 EXT EVENT
121,400 269,900
(121,400) (269,900)
0 0
0 0
0 0
0 SCHED 0 SCHED
211,100
(211,100)
0
0
0
0 SCHED
1,100 5,400
(1,100) 0
0 0
0 (5,400)
0 0
0 SCHED 0 EXT EVENT
261,500 147,600
(149,800) 0
0 0
(10,600) (147,600)
(101,100) 0
0 PROGRAM 0 MULTIYEAR
70,400 328,000 66,600
(70,400) (328,000) 0
0 0 0
0 0 (66,600)
0 0 0
0 MULTIYEAR 0 PROGRAM 0 MULTIYEAR
55,000 13,100 1,736,300
(5,000) (13,100) (1,192,700)
0 0 0
(50,000) 0 (442,500)
0 0 (101,100)
0 MULTIYEAR 0 MULTIYEAR 0
40,000
(40,000)
0
0
0
0 SCHED
16,800
(16,800)
0
0
0
0 EXT EVENT
56,800
(56,800)
0
0
0
0
Partnerships Office 423 Creative Hub - Phase 2 Implementation Service Area Total
82,800
(82,800)
0
0
0
0 EXT EVENT
82,800
(82,800)
0
0
0
0
Governance & Leadership Wellness Gym Reno ~ Service Area Total
5,800 5,800
(5,800) (5,800)
0 0
0 0
0 0
0 SCHED 0
21,000
(21,000)
0
0
0
0 EXT EVENT
Financial Planning System and Process Review Enhancement of Corporate Purchasing Card Program Social Disorder & Employee Safety Committee Diversity, Equity, and Inclusion Strategic Plan Rick Hanson Building Improvements
146,500
(146,500)
0
0
0
0 DESIGNOPT
26,800
(26,800)
0
0
0
0 DESIGNOPT
27,200
(27,200)
0
0
0
0 DESIGNOPT
29,500
(29,500)
0
0
0
0 SCHED
68,000
(37,700)
0
(30,300)
0
0 EXT EVENT
Operational Assessment of Municipal Boating Facilities - Ph II
75,000
(75,000)
0
0
0
0 EXT EVENT
Enabling Services 424 Provision of Shelter Services Op miza on of Physical Loca ons 424 425 425 426 426
427
PAGE 399
2024 FINANCIAL PLAN
CITY OF KELOWNA
19,300
(19,300)
0
0
0
0 EXT EVENT
428 428
H2O Adventure Fitness Centre Operating Model Review Building Master Plan Community Health Centre Public Art
249,400 19,000
(249,400) (9,400)
0 0
0 0
0 (9,600)
0 SCHED 0 EXT EVENT
429 429
Future Buildings Planning Water Integration Long-Range Plan
62,900 183,400
(62,900) 0
0 0
0 0
0 0
87,300
(80,000)
0
0
0
(7,300) EXT EVENT
50,000 26,000
(50,000) 0
0 0
0 0
0 0
0 SCHED (26,000) SCHED
15,000 7,000
(15,000) (7,000)
0 0
0 0
0 0
0 BASE C APP 0 SCHED
4,000
(4,000)
0
0
0
0 SCHED
92,200
(57,700)
0
0
0
(34,500) MULTIYEAR
472,600
(472,600)
0
0
0
0 MULTIYEAR
247,500 21,000
(247,500) (12,900)
0 0
0 0
0 0
0 MULTIYEAR (8,100) MULTIYEAR
48,500
(48,500)
0
0
0
0 MULTIYEAR
72,600
(22,600)
0
0
(50,000)
0 MULTIYEAR
64,300 51,700 41,400
(64,300) (51,700) (41,400)
0 0 0
0 0 0
0 0 0
0 MULTIYEAR 0 PROGRAM 0 MULTIYEAR
3,000
(3,000)
0
0
0
0 MULTIYEAR
2,232,100
(1,882,900)
0
(30,300)
(59,600)
(259,300)
8,774,400
(6,831,400)
0
(1,126,500)
(179,400)
(637,100)
427
20 Year Servicing Plan and DCC Bylaw Update 430 Capital Planning Process Review 431 Kelowna Integrated Water Asset Management 431 Citizen Survey Partnerships & Investments Strategic ~ Plan Unit 4 Business World Approval ~ Workflow 2040 Infrastructure Plan Consulting ~ Support 4690 Hwy 97 Agricultural ~ Considerations 858 Ellis Street Shelter ~ Asset Management Consulting ~ Support Unit4 Implement Timesheets and ~ Absences Modules Cook Road Boat Launch - Provincial ~ Approvals Emergency Shelters Project ~ Facility Condition Assessments ~ Parkinson Rec Centre/SD23 ~ Partnership Professional Consulting for Health & ~ Wellness Strategies Service Area Total
430
Total Operating
0 SCHED (183,400) SCHED
~ denotes request details not included in carryover volume
PAGE 400
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Community Safety & Bylaw
Title:
Communications Safety Initiatives
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Due to staff changes, the restabilization of the Community Safety Services Branch and the introduction of a few other safetyrelated initiatives, the execution of the community safety communications plan was delayed. Initiatives to be completed in 2024 include business community engagement, community stories and an opportunity for collaborative campaigns with community safety parners such as the RCMP. Carryover request is to complete the work set forth in the 2023 strategy that was delayed due to internal staff changes. Staff are now in place and ready to continue the work. Expected completion is end of 2024 Q2.
2023 Budget:
28,700
2023 Expenditures: Carryover Requested:
10,000
Strategic Direction:
2024
Expected Completion: Jun 2024
18,700 Crime & Safety - Residents feel safe
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
18,700
(18,700)
0
0
0
0
0
Service Area:
Community Safety & Bylaw
Priority: 1
Title:
Supportive Housing Community Inclusion (CPTED)
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Due to the revamping of a Crime Prevention Through Environmental Design (CPTED) Training program through an external company in late 2022 with a launch date of 2023, a carryover is requested for the CPTED training and other initiatives. The CPTED program helps to support new housing facilities openings through assessment and recommendations. No new facilities were opened in 2023 due to internal staff changes. Staff are now in place and the initiative is expected to be delivered in 2024 after a scope change and sourcing new options for delivery and accreditation methods.
2023 Budget:
25,000
2023 Expenditures: Carryover Requested:
1,000
Strategic Direction:
2024
Expected Completion: Dec 2024
24,000 Crime & Safety - Decrease business break & enters, thefts
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
24,000
(24,000)
0
0
0
0
0
PAGE 401
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Fire Safety
Title:
Kelowna Fire Department Master Plan
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: A budget carryover is requested to develop a comprehensive Master Plan for the Kelowna Fire Department (KFD), which will support the KFD Strategic Plan and build towards a comprehensive set of metrics to manage growth. A KFD Master Plan reviews all aspect of the fire department, providing comparisons to comparable communities and relevant standards. Using comprehensive data and analysis, it provides a benchmark for the department to build for the future. The Master Plan will provide information used to evaluate the long-term staffing plan on a continuous basis. Staff was unavailable to complete work in 2023 due to the extreme wildfire season.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Jun 2024
150,000 0 150,000
Digital Transformation - Data is used to inform decision making
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
150,000
(150,000)
0
0
0
0
0
Service Area:
Wastewater Utility
Priority: 1
Title:
Commonage Odour Management Plan Update
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is requested for the Odour Management Plan Update which is a Ministry of Environment Permit Requirement. This Plan will be completed in 2024. It must follow an odour monitoring system renewal, which was impacted by supply chain issues in previous years and could not be completed in 2023.The cost is shared with the City of Vernon and the City's Wastewater Utility.
2023 Budget:
44,100
2023 Expenditures: Carryover Requested:
1,100
Strategic Direction:
2024
Expected Completion: Oct 2024
43,000 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
43,000
(28,500)
0
0
0
(14,500)
0
PAGE 402
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Wastewater Utility
Title:
Burtch Sewer Condition Assessment
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is requested to continue the condition assessment program on an existing concrete mainline along Burtch Road. This project faced delays due to challenges in obtaining a suitable contractor as this is a complicated area for construction and testing. The overall project construction component will start in 2024. This operational component is required for staff to track bypass flows, provide a testing plan and assure condition testing on a variety of components that cross both Highway 97, Sutherland Ave and Springfield.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
72,700 0 72,700 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
72,700
(72,700)
0
0
0
0
0
Service Area:
Stormwater & Flood Protection
Title:
Hill Spring Dam Study
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is required for the Hill Spring Dam Study. The dam was identified for further analysis by the Provincial Dam Safety Officer. The officer emphasized the importance of improving the maintenance of Hill Spring Dam and the associated structures located in the Upper Mission. The dam was acquired by the City as an asset through the development process, and a new storage license is required from the Province before completing further upgrades. The work was deferred by operations due to time spent by staff managing geotechnical issues at Turtle Lake.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
75,000 0 75,000
Climate & Environment - Protect and restore natural areas
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
75,000
(75,000)
0
0
0
0
0
PAGE 403
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Stormwater & Flood Protection
Title:
North End Industrial Area Servicing Plan
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested to continue utility planning for additional servicing and coordination of water and wastewater needs in the Jim Bailey Industrial area. The project was delayed due to availability of staff resources directed to other projects. The designs and work are on-going, and additional work will be required for Okanagan Indian Band lands, Lake Country, and new development growth. Agreements are now developed between the parties, and further planning, engagement, legal studies and consultant work is ongoing.
2023 Budget:
56,800
2023 Expenditures: Carryover Requested:
15,200
Strategic Direction:
2024
Expected Completion: Dec 2024
41,600 Affordable Housing - Improved housing supply meets community needs
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
41,600
0
0
0
0
0
(41,600)
Service Area:
Stormwater & Flood Protection
Priority: 1
Title:
Stormwater Basin Plan - Central Area
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested for this ongoing project which was delayed due to availability of staff resources. The consulting contract was awarded to Urban Systems and the work is expected to be completed by the end of 2024. The work involves determining stormwater flow patterns toward Okanagan Lake through modernized modeling. The results support urban development efforts and assure that localized flood is avoided.
2023 Budget:
200,000
2023 Expenditures: Carryover Requested:
21,100
Strategic Direction:
2024
Expected Completion: Dec 2024
178,900 Climate & Environment - Include climate impact lens in City decision making
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
178,900
(178,900)
0
0
0
0
0
PAGE 404
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Stormwater & Flood Protection
Title:
Stormwater Utility Business Case and Implementation Plan
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested for this ongoing project. The remaining budget for this Phase 1 is to be carried over into Phase 2 works where additional budget was added for 2024. This project was delayed due to availability of staff resources. This work examines, in detail, the stormwater utility function at the City, and the potential establishment of a Stormwater utility. The project involves internal department participation, with additional consulting contracts expected during this period.
2023 Budget:
100,000
2023 Expenditures: Carryover Requested:
65,300
Strategic Direction:
Expected Completion: Dec 2024
34,700 Active Financial Management - Increase non-tax revenues to minimize the reliance on taxes
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
2024
34,700
(34,700)
0
0
0
0
0
Service Area:
Water Utility
Title:
Emergency Response Plan Update - Water
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is requested to complete consulting services for the Dam Emergency Plan (DEP) template and plans for the McCulloch reservoir dams. Consultant's work was unable to complete by year end 2023, but will be complete in Q1 of 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Mar 2024
22,400 0 22,400
Climate & Environment - Enhanced climate emergency planning and response programs
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
22,400
(22,400)
0
0
0
0
0
PAGE 405
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Water Utility
Title:
Long Meadow Reservoir Dam Decommissioning
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: The Long Meadow Reservoir is no longer a viable water storage reservoir for the non-potable water system. The reservoir was removed from service by South East Kelowna Irrigation District (SEKID) well before the system was transferred to the City. This carryover request is to properly decommission the reservoir's three dams and reduce ongoing liability to the City once we have received the consultant's report.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
110,000 0 110,000 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
110,000
(110,000)
0
0
0
0
0
Service Area:
Water Utility
Priority: 1
Title:
Water Operations Supply Projects 2023
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is requested for the water operations supply projects not completed in 2023. The replacement of the Dilworth Altitude valve, which has reached the end of its useful life, was delayed due to delivery of parts. The Grainger Reservoir construction project design work is in the preliminary design phase.
2023 Budget:
42,900
2023 Expenditures: Carryover Requested:
8,500
Strategic Direction:
2024
Expected Completion: Mar 2024
34,400 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
34,400
(34,400)
0
0
0
0
0
PAGE 406
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Water Utility
Title:
Flow Monitoring, Hydrology and Climate Change - Water
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is requested to continue several initiatives to measure, compile and analyze data collected at the City. This budget, combined with funding from stormwater assists in analyzing non-potable reservoir levels, irrigation consumption, urban consumption and impacts from potential climate change. The Water Utility portion supports hydrology studies, flow measurement, data acquisition, and other items necessary for effective data and communication at the City. A consultant has been engaged and and awaiting completion of their work in 2024.
2023 Budget:
Expected Completion: Dec 2024
45,000
2023 Expenditures: Carryover Requested: Strategic Direction:
0 45,000
Climate & Environment - Enhanced climate emergency planning and response programs
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
2024
45,000
(45,000)
0
0
0
0
0
Service Area:
Water Utility
Title:
Irrigation Model and Data Management
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is requested to continue the update of the non-potable system water model. The model is being revised using updated asset information underway in 2023, water meter calibration and potable project completion documentation. The 10 year financial plan will be updated using results from this modelling. The work has been assigned to a consultant, and awaiting completion of their work in 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
20,000 0 20,000
Digital Transformation - Data is used to inform decision making
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
20,000
(20,000)
0
0
0
0
0
PAGE 407
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Water Utility
Title:
Pressure Reducing Valve Condition Assessment
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is required for this program to assess the lifecycle and condition of pressure reducing valves (PRV) in the water utility. Operations staff continue to address repair needs and prioritization started in 2022. A consultant has been engaged and awaiting completion of their work in 2024.
2023 Budget:
Expected Completion: Dec 2024
50,000
2023 Expenditures: Carryover Requested: Strategic Direction:
0 50,000 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
2024
50,000
(50,000)
0
0
0
0
0
Service Area:
Water Utility
Title:
Water Integration Planning
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested to continue this ongoing program as part of the overall Kelowna Water Integration Plan, Water Security Plan and Royal View Transmission mainline capacity determination. The project has been scoped, and consultant selection is ongoing. This program will look at future interconnection options with local improvement districts to improve supply and water quality resiliency.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
125,400 9,300 116,100
Digital Transformation - Data is used to inform decision making
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
116,100
(52,700)
0
0
0
0
(63,400)
PAGE 408
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Solid Waste & Landfill
Title:
Landfill - Design, Operations and Closure Plan update
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is requested to complete the 2023 update to the Glenmore Landfill Design, Operations and Closure Plan (DOCP). The DOCP is required by permit to be updated every 5 years and in order to bring the site into full compliance with the permit and landfill guidelines, additional supplemental studies are also required. These include a Groundwater Impact Assessment, Hydrogeological and Hydrology Report, and an updated Geotechnical Survey. This work will be completed prior to the end of 2023 with billing expected to carry over to 2024. The remaining leachate pre-treatment study is scheduled to be completed in Q2 of 2024.
2023 Budget:
600,000
2023 Expenditures: Carryover Requested:
453,200
Strategic Direction:
2024
Expected Completion: Jun 2024
146,800 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
146,800
(146,800)
0
0
0
0
0
Service Area:
Solid Waste & Landfill
Priority: 1
Title:
Landfill - Sliver Fill and Area 3 Landfill Gas Final Design
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested to complete the detailed design for filling operations and re-alignment of existing landfill infrastructure. The project could not be completed due to limited staff capacity. With the site now operating at full staffing levels, this work should be completed in Q2 of 2024 with construction completed by early 2025.
2023 Budget:
21,300
2023 Expenditures: Carryover Requested:
3,300
Strategic Direction:
2024
Expected Completion: Jun 2024
18,000 Active Financial Management - Increase non-tax revenues to minimize the reliance on taxes
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
18,000
(18,000)
0
0
0
0
0
PAGE 409
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Solid Waste & Landfill
Title:
Landfill Waste Reduction - Evaluation of Building Deconstruction
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested to complete the evaluation of the building deconstruction project. Site works which were delayed due to staffing, have now been completed, and the remaining consulting and reporting is scheduled to be completed and invoiced in Q1 of 2024.
2023 Budget:
50,000
2023 Expenditures: Carryover Requested:
26,200
Strategic Direction:
2024
Expected Completion: Mar 2024
23,800 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
23,800
(23,800)
0
0
0
0
0
Service Area:
Transportation
Priority: 1
Title:
Okanagan Rail Trail Operational Activities
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is requested to complete the missing rail-trail connection from Old Vernon Rd to the boundary of Lake Country near Beaver Lake Road, through Okanagan Indian Band (OKIB) lands. Project was not complete in 2023 as coordinating with numerous stakeholders (OKIB and Friends of the Rail Trail) proved to be more time consuming than planned. There is a portion of the rail trail on OKIB lands and the City cannot complete this project until an agreement with OKIB is reached. Work on improved trail etiquette signage is underway and anticipated to be complete in 2024.
2023 Budget:
28,900
2023 Expenditures: Carryover Requested:
6,000
Strategic Direction:
2024
Expected Completion: Dec 2024
22,900 Transportation - More trips by alternative transportation modes
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
22,900
(22,900)
0
0
0
0
0
PAGE 410
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Transportation
Title:
Website Development and Hosting
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Funds to update Smarttrips website - delayed in 2023 due to the RDCO delay in completing the STPCO transition. Anticipate update to occur in 2024, with completion by Q4 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
30,000 0 30,000
Transportation - More trips by alternative transportation modes
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
30,000
(25,800)
0
0
0
(4,200)
0
Service Area:
Transportation
Priority: 1
Title:
Safety and Operations, Investigation
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested to finish the Congestion Data, Analytics and Monitoring assignment. This study was initiated to help identify priority locations for the Major Intersection capacity program by updating Congestion data collection and analysis as completed for the Transportation Master plan. In 2023 work plan, Data collection framework, consultant, and the necessary data servicers have been prepared. In 2024 data collection will be completed and a temporal dashboard to accommodate additional analysis delivered to the City. Project was not completed in 2023 due to staffing shortages. The expected completion of the study is Q4 2024. Study results will inform the City's understanding of change in congestion and intersection priorities for future improvements.
2023 Budget:
77,800
2023 Expenditures: Carryover Requested:
40,600
Strategic Direction:
2024
Expected Completion: Dec 2024
37,200 Transportation - Traffic safety management is increasing
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
37,200
(37,200)
0
0
0
0
0
PAGE 411
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Transportation
Title:
Bicycle Map and Wayfinding Program
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover full remaining amount of $15k. The bicycle map portion of this budget was completed in 2023 ($15k), but due to staffing shortages project was not completed. Work is underway on the wayfinding component of the budget and the funds will be needed for signs and updated guidance in 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
15,000 0 15,000
Transportation - More trips by alternative transportation modes
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
15,000
(15,000)
0
0
0
0
0
Service Area:
Transportation
Priority: 1
Title:
Downtown Transportation Review
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested to implement this review of the downtown core including intersection controls, crosswalks, secure bike parking, sidewalks, bicycle network, shared mobility, and transit amenities. This review will support future major transportation infrastructure projects, due to staffing shortages the review was not completed in 2023, but with consulting support the review is expected to be complete by 2025-03-01.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Mar 2025
100,000 0 100,000
Transportation - More trips by alternative transportation modes
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
100,000
(100,000)
0
0
0
0
0
PAGE 412
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Transportation
Title:
Low Carbon Transportation: Neighbourhood Bikeway Program
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested for City communications and engagement in 2024 for this program. More community engagement is required as identified by the consultant for the success of the project. The project is delayed in 2023 due to internal scheduling challenge which now has been solved. Expected completion Q3 2024.
2023 Budget:
109,400
2023 Expenditures: 2023 Budget Not Required: Carryover Requested:
46,600 24,000 38,800
Strategic Direction:
2024
Expected Completion: Sep 2024
Transportation - More trips by alternative transportation modes
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
38,800
(38,800)
0
0
0
0
0
Service Area:
Transportation
Priority: 1
Title:
Pandosy Richter Study
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested for this multi-year project recently put under purchase order and commenced in Q4 2023. Project was not complete in 2023 due to staffing shortages. Anticipated completion date is Q2 2025.
2023 Budget:
200,000
2023 Expenditures: Carryover Requested:
11,600
Strategic Direction:
2024
Expected Completion: Jun 2025
188,400 Transportation - More trips by alternative transportation modes
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
188,400
(188,400)
0
0
0
0
0
PAGE 413
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Transportation
Title:
Transportation Safety Strategy
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Project funds have been committed under purchase order and will commence in Q1 2024. Project was not complete in 2023 due to staffing shortages. Anticipated completion is Q1 2025.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Mar 2025
80,000 0 80,000
Transportation - Traffic safety management is increasing
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
80,000
(80,000)
0
0
0
0
0
Service Area:
Transit
Priority: 1
Title:
ICIP Joint Study Project
Reason: Design Option ONE-TIME CARRYOVER
Justification: Carryover is requested to complete preliminary design of Mission Rec Exchange initiated in 2023 which built upon an early concept design. This work will be completed in Q1, 2024 and is being cost-shared with BC Transit. Thereafter, the projects moves to detail design funded via ICIP grant. Carry over will also support further planning and design for the future YLW transit hub which will be integrated with a multitude of other site projects. This next stage of design is in preparation for future grant opportunities.
2023 Budget:
71,500
2023 Expenditures: Carryover Requested:
3,400
Strategic Direction:
2024
Expected Completion: Dec 2024
68,100 Transportation - More trips by alternative transportation modes
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
68,100
(68,100)
0
0
0
0
0
PAGE 414
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Transit
Title:
Orchard Park Exchange
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: This planning study was not advanced in 2023 as resources were focused on exchanges projects submitted for ICIP grant funding. Due to the complex nature of this project such as potential private property impacts, planning is anticipated to take several months and extend into 2025. Orchard Park Exchange has reached its capacity and is a priority renewal project. This project will build upon options developed to date and consider further options to expand the exchange and reduce delays for buses entering and exiting the site while integrating with adjacent properties.
2023 Budget:
Expected Completion: Dec 2025
135,700
2023 Expenditures: Carryover Requested: Strategic Direction:
0 135,700
Transportation - More trips by alternative transportation modes
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
2024
135,700
(135,700)
0
0
0
0
0
Service Area:
Transit
Title:
Rutland Transit Exchange Refurbishment
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: This request is to support refurbishment of Phase I artwork panels. Work intended for 2023 was held back due to occur in conjunction with Phase II of Rutland exchange. Work to occur in 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
50,000 0 50,000
Transportation - More trips by alternative transportation modes
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
50,000
(50,000)
0
0
0
0
0
PAGE 415
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Parks
Title:
CRI Firesmart Community Funding
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover requested to bring in funding related to CRI Grant to support wildfire initiatives. Grant received in 2023 for $180,410 of which actual spend amounted to $65K. Balance moved over to 2024 as these grants can be completed in multi year phases. Work was not able to be complete due to ongoing fires.
2023 Budget:
180,400
2023 Expenditures: Carryover Requested:
65,500
Strategic Direction:
2024
Expected Completion: Jun 2024
114,900 Climate & Environment - Protect and restore natural areas
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
114,900
0
0
(114,900)
0
0
0
Service Area:
Parks
Priority: 1
Title:
Hwy 97 & McCurdy Rd Tree Planting
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: In 2023, the Parks Urban Forestry team was unable to secure contractors for the Hwy 97 Tree Planting & Black Mountain Tree Planting projects. The team is committed to ensuring that this work is completed by Q4 of 2024 to meet the needs of the community.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
75,500 0 75,500
Climate & Environment - Include climate impact lens in City decision making
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
75,500
(75,500)
0
0
0
0
0
PAGE 416
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Sport & Recreation
Title:
Apple Bowl - Event Services Kiosk/Ticket Booth
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Project was delayed due to permitting requirements and sourcing challenges. All sourcing, permitting and installation plans are now in place and work is scheduled for the spring with completion Q2, 2024.
2023 Budget:
50,000
2023 Expenditures: Carryover Requested:
27,900
Strategic Direction:
2024
Expected Completion: Jun 2024
22,100 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
22,100
(22,100)
0
0
0
0
0
Service Area:
Sport & Recreation
Title:
Event Support Policy
Priority: 1
Reason: Policy ONE-TIME CARRYOVER
Justification: Per the Event Support Policy No. 381, funds not expended in a focus area in any given year will be automatically carried over and retained for use in the same focus area in the subsequent year.
2023 Budget:
736,600
2023 Expenditures: Carryover Requested:
420,800
Strategic Direction:
2024
Expected Completion: Dec 2024
315,800 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
315,800
(315,800)
0
0
0
0
0
PAGE 417
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Arts & Culture
Title:
Community Grant Policy
Priority: 1
Reason: Policy ONE-TIME CARRYOVER
Justification: Per the Community Grant Policy No. 380, funds not expended in a focus area in any given year will be automatically carried over and retained for use in the same focus area in the subsequent year.
2023 Budget:
752,000
2023 Expenditures: Carryover Requested:
463,100
Strategic Direction:
2024
Expected Completion: Dec 2024
288,900 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
288,900
(288,900)
0
0
0
0
0
Service Area:
Arts & Culture
Priority: 1
Title:
Indigenous Community Engagement Framework
Reason: Design Option ONE-TIME CARRYOVER
Justification: With the guidance of project partners, the Indigenous Community Engagement Framework project has shifted priority toward the development and execution of a Memorandum of Understanding with Westbank First Nations and the development of a Commitment to Reconciliation. This will establish the foundation for future engagement activities. Carryover is requested to support the engagement required for successful internal and external reconciliation work.
2023 Budget:
82,700
2023 Expenditures: Carryover Requested:
15,000
Strategic Direction:
2024
Expected Completion: Dec 2024
67,700 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
67,700
(67,700)
0
0
0
0
0
PAGE 418
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Arts & Culture
Title:
Partnership - Syilx Arts and Culture
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Relationship development with Indigenous partners has continued to evolve and has therefore caused delays with project completion in 2023. Community conversations have taken place with additional activities anticipated in 2024. A framework for the co-development of a training program rooted in local syilx/ Okanagan experience has been outlined and the approach is being confirmed with project partners. Carryover is requested to support the development of the program through Q4 2024.
2023 Budget:
18,800
2023 Expenditures: Carryover Requested:
7,200
Strategic Direction:
2024
Expected Completion: Dec 2024
11,600 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
11,600
(11,600)
0
0
0
0
0
Service Area:
Community Development
Title:
North End Area Plan
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is requested for the North End Area Plan which is a multi-year project and is expected to be completed in spring, 2024. The project is vast and complex and requires further technical analysis and coordination with the Mill Site Area Redevelopment Plan application. Significant delays were incurred this year due to wildfire events, public engagement delays, and required coordination with an external developer on the Mill Site application analysis.
2023 Budget:
294,500
2023 Expenditures: Carryover Requested:
210,300
Strategic Direction:
2024
Expected Completion: Apr 2024
84,200 Affordable Housing - Improved housing supply meets community needs
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
84,200
(22,900)
0
(61,300)
0
0
0
PAGE 419
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Community Development
Title:
Extreme Cold Weather Planning
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is requested as consultant procurement was delayed in 2023. The consultant is sourced and anticipated completion of the plan is Q2, 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Jun 2024
30,000 0 30,000 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
30,000
0
0
(30,000)
0
0
0
Service Area:
Community Development
Priority: 1
Title:
PEOPLE Peer Navigators Capacity Building: Health Canada Grant
Reason: External Event ONE-TIME CARRYOVER
Justification: The City was awarded an unanticipated extension to the multi-year Health Canada Grant with disbursements until March 2024. The grant supports the development and implementation of the Peer Navigator Capacity Building Program. Carryover is requested for grant revenues and contracted services payment.
2023 Budget:
300,000
2023 Expenditures: Carryover Requested:
229,000
Strategic Direction:
2024
Expected Completion: Mar 2024
71,000 Homelessness - Fewer people living on streets with mental health and/or addictions
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
71,000
0
0
(71,000)
0
0
0
PAGE 420
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Community Development
Title:
Climate Action Plan
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested to fund the development of the Climate Resilient Kelowna Strategy, which was delayed because of internal staffing changes and key staff involvement in the emergency operations centre during the August wildfires. It is expected the strategy will be complete in early Q2 2024. Additionally, the budget includes funding for municipal heat pump and electric vehicle charging top up rebates, which are multi year projects with external ongoing funding. Therefore, the City's contribution amount will be exhausted when enough rebates have been issued.
2023 Budget:
266,100
2023 Expenditures: Carryover Requested:
144,700
Strategic Direction:
2024
Expected Completion: Dec 2024
121,400 Climate & Environment - Reduce corporate and community GHG emissions
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
121,400
(121,400)
0
0
0
0
0
Service Area:
Community Development
Priority: 1
Title:
Climate and Environment Review Recommendations
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: This work order (Climate and Environment Review Recommendations) covers multiple projects that were recommended to advance Council's Climate/Environment priority. Some projects have been completed (e.g. LiDAR supplement, Construction & Demolition Debris Study), some are in progress (e.g. Resilient roof space options analysis, climate lens tool), and others will be initiated in 2024 (e.g. strategy to monitor sensitive ecosystems, resources for resident climate action). Some of these initiatives were delayed because of internal staffing changes (i.e. creation of a new department responsible for oversight of the projects/programs) and external events such as staff involvement with the EOC during August wildfires. Some projects are also contingent on the completion of the Climate Resilient Kelowna Strategy, which is delayed by a few months. 2023 Budget:
390,000
2023 Expenditures: Carryover Requested:
120,100
Strategic Direction:
2024
Expected Completion: Dec 2024
269,900 Climate & Environment - Enhanced climate emergency planning and response programs
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
269,900
(269,900)
0
0
0
0
0
PAGE 421
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Community Development
Title:
Community Climate Action Implementation
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Budget covers multiple initiatives that address Council's priority of reducing GHG emissions. Some initiatives were completed in 2023 (e.g. update community GHG emissions inventory), some are in progress (e.g. support Energy Step Code compliance and capacity building; Better Homes BC municipal top up program) and some will be initiated in 2024 (e.g. energy concierge pilot, public EV charging electrical feasibility assessment). Some of these initiatives were delayed because of internal staffing changes (i.e. creation of a new department responsible for oversight of the projects/programs) and external events such as staff involvement wit the EOC during August wildfires. Some projects are also contingent on the completion of the Climate Resilient Kelowna Strategy, which is delayed by a few months. 2023 Budget:
240,000
2023 Expenditures: Carryover Requested:
28,900
Strategic Direction:
Expected Completion: Dec 2024
211,100 Climate & Environment - Reduce corporate and community GHG emissions
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
2024
211,100
(211,100)
0
0
0
0
0
Service Area:
Parking
Title:
Curb Space Management Strategy - Development
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested to allow for development of a curb space management strategy. Staff were unable to launch this project in 2023 due to internal resource limitations. This strategy will support the effective management of curb space to support mobility and access for people and goods, particularly within town centres. In recent years, demands for this space has continued to grow and broaden to accommodate new forms of mobility that require access.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Mar 2025
40,000 0 40,000
Transportation - More trips by alternative transportation modes
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
40,000
(40,000)
0
0
0
0
0
PAGE 422
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Parking
Title:
Parking Strategy - Capri-Landmark Area Plan Development
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover of this budget will allow development of the Capri-Landmark area plan to continue in 2024. The Citywide Parking Strategy identified Capri-Landmark as a neighborhood that requires a detailed Parking Management Area Plan to deal with current and emerging/future issues. The initial collection of occupancy data began in fall 2020, however the project was slowed due to pandemic impacts on parking demand.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Jun 2025
16,800 0 16,800
Transportation - More trips by alternative transportation modes
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
16,800
(16,800)
0
0
0
0
0
Service Area:
Partnerships Office
Priority: 1
Title:
Creative Hub - Phase 2 - Implementation
Reason: External Event ONE-TIME CARRYOVER
Justification: Throughout 2023, future occupants of the Creative Hub continued their Phase two feasibility work on governance, fund development, and sustainability. This was led by a third-party consultant. This component of the work continues to progress into 2024 and is leveraged with a grant from the BC Arts Council. The detailed design and Class C costing of the fit-out component of the project has been delayed while the Development Permit Process is resolved.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
82,800 0 82,800 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
82,800
(82,800)
0
0
0
0
0
PAGE 423
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Title:
Provision of Shelter Services - Optimization of Physical Locations
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: The City continues to engage in dialogues with different organizations and community groups to enhance the efficiency of shelter service delivery in a coordinated and strategic fashion. A request for carryover is made to sustain expenditures related to consulting and project management. This enables staff to explore various models for shelter sites and conduct a comprehensive review of how current shelter resources can be allocated to best address the needs of our community. The City continues to explore land acquisition opportunities to relocate shelter services in our community. In 2023 the City engaged in strategic negotiations with three separate land owners - some of which required additional budget for development feasibility.
2023 Budget:
38,100
2023 Expenditures: Carryover Requested:
17,100
Strategic Direction:
2024
Expected Completion: Dec 2024
21,000 Homelessness - Fewer people living on streets with mental health and/or addictions
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
21,000
(21,000)
0
0
0
0
0
Service Area:
Enabling Services
Priority: 1
Title:
Financial Planning System and Process Review
Reason: Design Option ONE-TIME CARRYOVER
Justification: Carryover is requested to continue budget process and system improvements. The review to replace the current excel and legacy based budget system with a robust financial planning software product was delayed in 2023 as the budget process and presentation were re-designed to include a move towards service-based budgeting. The project is now moving forward with a new financial planning system anticipated for 2025.
2023 Budget:
183,800
2023 Expenditures: Carryover Requested:
37,300
Strategic Direction:
2024
Expected Completion: Dec 2025
146,500 Active Financial Management - Enhance the budget process to be more proactive and agile
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
146,500
(146,500)
0
0
0
0
0
PAGE 424
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Title:
Enhancement of Corporate Purchasing Card Program
Priority: 1
Reason: Design Option ONE-TIME CARRYOVER
Justification: Carryover is requested for ongoing improvements to the Corporate Purchasing Card Program. This project was substantially complete in 2023 but further work needs to be done to improve upon processes and ensure the program is kept efficient. A Consultant was engaged near end of 2023 to undertake this work and it will complete early in 2024
2023 Budget:
39,500
2023 Expenditures: Carryover Requested:
12,700
Strategic Direction:
2024
Expected Completion: Dec 2024
26,800 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
26,800
(26,800)
0
0
0
0
0
Service Area:
Enabling Services
Priority: 1
Title:
Social Disorder & Employee Safety Committee
Reason: Design Option ONE-TIME CARRYOVER
Justification: The funds for the Social Disorder project are being carried over to action additional solutions that were gathered during the project's engagement phases to improve safety measures for frontline workers.
2023 Budget:
61,500
2023 Expenditures: Carryover Requested:
34,300
Strategic Direction:
2024
Expected Completion: Dec 2024
27,200 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
27,200
(27,200)
0
0
0
0
0
PAGE 425
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Title:
Diversity, Equity, and Inclusion Strategic Plan
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: The Diversity, Equity and Inclusion (DEI) strategic plan was initially approved through 2022 preliminary budget. There were 15 DEI actions identified for completion in 2023; due to resourcing 11 are in progress with two not yet started. A carryover is requested to complete the remaining items in 2024.
2023 Budget:
40,000
2023 Expenditures: Carryover Requested:
10,500
Strategic Direction:
2024
Expected Completion: Dec 2024
29,500 Our People - Employees in all positions have more opportunities to improve their leadership
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
29,500
(29,500)
0
0
0
0
0
Service Area:
Enabling Services
Priority: 1
Title:
Rick Hanson Building Improvements
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is requested to complete the improvements for the Okanagan Heritage Museum and Parkinson Activity Center which is funded by the Rick Hansen Grant. The redesign and contract work will be completed in Q1, 2024. There were some delays with the contract work as a result of weather.
2023 Budget:
111,900
2023 Expenditures: Carryover Requested:
43,900
Strategic Direction:
2024
Expected Completion: Mar 2024
68,000 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
68,000
(37,700)
0
(30,300)
0
0
0
PAGE 426
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Title:
Operational Assessment of Municipal Boating Facilities - Ph II
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: Managing the City's three primary boat launch facilities (Cook Rd, Water St, and Sutherland Park) has become progressively challenging due to the growing marine traffic on Okanagan Lake. The project's commencement in late summer/fall of 2021 involved initial tasks such as data collection, issue identification, and preliminary consultations with launch users. The Phase I report from third-party consultants was finalized in 2023, leading to the rescheduling of Phase II to 2024. The increasing demands on the facilities necessitate effective operation and management strategies to address the evolving challenges posed by heightened marine activity.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
75,000 0 75,000 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
75,000
(75,000)
0
0
0
0
0
Service Area:
Enabling Services
Priority: 1
Title:
H2O Adventure Fitness Centre Operating Model Review
Reason: External Event ONE-TIME CARRYOVER
Justification: The current management and operating agreement for H2O is set to expire December 2023. Based on the value for money review completed in 2022, a new agreement is being explored with the current operator. Project delays occurred in 2023 due to negotiating details and staff turnover. Carryover is requested to complete the next phase and will involve consulting support in the negotiation process with anticipated completion Q1, 2024.
2023 Budget:
45,500
2023 Expenditures: Carryover Requested:
26,200
Strategic Direction:
2024
Expected Completion: Mar 2024
19,300 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
19,300
(19,300)
0
0
0
0
0
PAGE 427
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Title:
Building Master Plan
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested for consultancy work in association with the Strategic Facilities Masterplan. Preparatory precedent studies have been completed and building condition assessments continue. Staff are now in place and work will proceed in Q1 2024 and should be completed by Q4 2025.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2025
250,000 600 249,400 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
249,400
(249,400)
0
0
0
0
0
Service Area:
Enabling Services
Priority: 1
Title:
Community Health Centre Public Art
Reason: External Event ONE-TIME CARRYOVER
Justification: Carryover is requested to cover the legal fees for the associated statutory right of way which remains outstanding pending finalization from the external partner.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
19,000 0 19,000 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
19,000
(9,400)
0
0
0
(9,600)
0
PAGE 428
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Title:
Future Buildings Planning
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested to fund on-going preparatory building studies and condition assessments in support of the forthcoming Strategic Facilities Masterplan to commence in 2024. The work was not completed in 2023 due to insufficient staff resources. Staff are now in place and the Masterplan is progressing.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Jun 2025
62,900 0 62,900 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
62,900
(62,900)
0
0
0
0
0
Service Area:
Enabling Services
Priority: 1
Title:
Water Integration Long-Range Plan
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested to be used in conjunction with the overall Kelowna Water Integration Plan budget to complete a number of water capital planning consultant studies to complete the Water Integration Plan. The work was not completed in 2023 as staff focused on the Water Security Plan. The City will continue working with the Improvement Districts and working on the final plans through 2024 with completion anticipated for Q2 2025.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Jun 2025
183,400 0 183,400
Digital Transformation - Data is used to inform decision making
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
183,400
0
0
0
0
0
(183,400)
PAGE 429
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Title:
20 Year Servicing Plan and DCC Bylaw Update
Priority: 1
Reason: External Event ONE-TIME CARRYOVER
Justification: The updated Development Cost Charges Bylaw and 20-Year Servicing Plan was adopted by Council in 2022. An update is planned for 2024 to respond to construction inflation pressures and recently introduced legislation. These carryover funds from the previous update will be used for consulting support. This work was not completed in 2023 as staff were awaiting DCC legislative changes that were adopted by the Province in December, 2023.
2023 Budget:
100,700
2023 Expenditures: Carryover Requested:
13,400
Strategic Direction:
2024
Expected Completion: Dec 2024
87,300 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
87,300
(80,000)
0
0
0
0
(7,300)
Service Area:
Enabling Services
Priority: 1
Title:
Capital Planning Process Review
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: An ongoing Value for Money Audit (VFM) is expected to be completed in Q1 of 2024 that will include recommendations for capital planning and delivery processes to increase the City's infrastructure delivery capacity. This budget will be used to support the recommended improvements. The work was not completed in 2023 so work would align with the recommendation from the VFM audit.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
50,000 0 50,000 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
50,000
(50,000)
0
0
0
0
0
PAGE 430
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Title:
Kelowna Integrated Water Asset Management
Priority: 1
Reason: Scheduling Demands ONE-TIME CARRYOVER
Justification: Carryover is requested to continue collecting and updating the asset information. The work was not completed in 2023 due to staffing challenges and priorities being shifted. A consultant has been retained and there is a commitment against the remaining funds to be completed in 2024. The remaining budget will be used to complete the outstanding inventories and support more informed decision-making.
2023 Budget:
34,600
2023 Expenditures: 2023 Budget Not Required: Carryover Requested:
0 8,600 26,000
Strategic Direction:
2024
Expected Completion: Dec 2024
Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
26,000
0
0
0
0
0
(26,000)
Priority: 1
Reason: Council Approved ONE-TIME
Service Area:
Enabling Services
Title:
Citizen Survey
CARRYOVER
Justification: A Council Resolution R904/17/11/06 directed staff to conduct the 2018 Citizen Survey in Fall 2018 to coincide with the new four-year Council term and that subsequent surveys be scheduled every two years. These funds will contribute to ongoing funding in 2024 to complete the project and support data-driven decision making for council priorities.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
2024
Expected Completion: Dec 2024
15,000 0 15,000 Other - Supports Base Business
Amount
Reserve
Borrow
Grant
Other
Revenue
Utility
15,000
(15,000)
0
0
0
0
0
PAGE 431
CAPITAL BUDGET
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Carryover Budget Capital Budget Summary Page Type
Description
Real Estate & Parking Capital 439 Renew Property Acquisition - 1951 Cross Road L1 - General Land Downtown Parkades - Major Maintenance 439 Renew 440 New
Electric Vehicle Infrastructure and Strategic Initiatives 440 Renew Parking Equipment and Facilities L3 - Parking Infrastructure Cost Center Total
Building Capital ~ Growth ~ 441 ~ ~
Renew Renew Renew Renew
441 Renew 442 Renew ~
Growth
442 Renew 443 Renew 443 Growth 444 Growth ~ Renew
444 Renew
~
Renew
445 Renew ~
Renew
~
Renew
445 Renew 446 Renew
Mission Recreation Park, Capital News Centre - Expansion Apple Bowl Improvements H2O Boiler Replacement Island Stage Rejuvenation Parkinson Recreation Centre - Building Replacement Design Rotary Beach Park Washroom B1 - Parks and Recreation Buildings Library Chiller and Boiler Replacement B2 - Community and Cultural Buildings City Hall - Human Resources Offices Renovations City Hall - Envelope Renewal, Study and Design City Hall - Level 1 Meeting Room Suite North Glenmore Fire hall No.5 - Design Rutland Community Policing Office City Hall Improvement - Council and Storage Renovation B3 - Civic/Protective Service Buildings City Yards - Female Changeroom Upgrades B4 - Transportation and Public Works Buildings Capital Opportunities & Partnership Program B6 - Capital Opportunities and Partnerships Building Systems Automation & Performance Optimization Facility Energy Modernization Renewal General Building Infrastructure Renewal Program Kelowna Community Theatre Improvements Kelowna Community Theatre Renewal
446 Renew 447 Renew
Water Street Boat Launch Renewal Yards Chemical Storage B7 - Renewal, Rehabilitation & Infra. Cost Center Total
Parks Capital ~ Renew
Parkland Acquisition
Amount
Reserve
Borrow
Grant
Other
Utility Reason
58,500 58,500 285,800
(58,500) (58,500) (285,800)
0 0 0
0 0 0
0 0 0
0 EXT EVENT 0 0 EXT EVENT
310,000
(310,000)
0
0
0
0 WAITGRANT
194,100 789,900 848,400
(194,100) (789,900) (848,400)
0 0 0
0 0 0
0 0 0
0 EXT EVENT 0 0
774,800
(774,800)
0
0
0
0 MULTIYEAR
250,000 244,700 1,249,800 1,967,100
(250,000) (244,700) (250,000) (1,967,100)
0 0 0 0
0 0 (999,800) 0
0 0 0 0
0 MULTIYEAR 0 EXT EVENT 0 MULTIYEAR 0 MULTIYEAR
40,400 4,526,800 18,700 18,700 49,100
(40,400) (3,527,000) (18,700) (18,700) (49,100)
0 0 0 0 0
0 (999,800) 0 0 0
0 0 0 0 0
0 SCHED 0 0 DESIGNOPT 0 0 MULTIYEAR
120,700
(120,700)
0
0
0
0 SCHED
129,100 823,300
(129,100) (823,300)
0 0
0 0
0 0
0 EXT EVENT 0 EXT EVENT
95,200 15,100
(95,200) (15,100)
0 0
0 0
0 0
0 SCHED 0 MULTIYEAR
1,232,500 52,300
(1,232,500) (52,300)
0 0
0 0
0 0
0 0 SCHED
52,300
(52,300)
0
0
0
0
945,100
(945,100)
0
0
0
0 PROGRAM
945,100
(945,100)
0
0
0
0
25,900
(25,900)
0
0
0
0 EXT EVENT
72,500
(72,500)
0
0
0
0 PROGRAM
5,540,300
(5,540,300)
0
0
0
0 PROGRAM
39,700
(39,700)
0
0
0
0 EXT EVENT
53,800
(53,800)
0
0
0
0 EXT EVENT
546,000 209,900 6,488,100 13,263,500
(546,000) (209,900) (6,488,100) (12,263,700)
0 0 0 0
0 0 0 (999,800)
0 0 0 0
0 EXT EVENT 0 DESIGNOPT 0 0
350,500
(350,500)
0
0
0
0 PROGRAM
PAGE 433
2024 FINANCIAL PLAN
CITY OF KELOWNA
P1 - DCC Parkland Acquisition Ballou Park (DCC) Burne Park (DCC) - Design Tower Ranch Park #1 (DCC) P3 - Neighbourhood Park Development
350,500 17,400 116,000 61,800 195,200
(350,500) (17,400) (116,000) (61,800) (195,200)
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 EXT EVENT 0 EXT EVENT 0 EXT EVENT 0
DeHart Park (DCC) Kelowna's Newest Waterfront Park (DCC) Phase 1 Strathcona Park P4 - Community Park Development Glenmore Recreation Park (DCC) - Phase 3
10,140,100 1,908,800
(10,140,100) (1,856,000)
0 0
0 (52,800)
0 0
0 MULTIYEAR 0 EXT EVENT
21,900 12,070,800 6,972,300
(21,900) (12,018,000) (6,972,300)
0 0 0
0 (52,800) 0
0 0 0
0 EXT EVENT 0 0 MULTIYEAR
Mission Recreation - Softball Diamonds (DCC) P5 - Recreation Park Development City Park - Improvements, Waterfront Promenade Phase 3 City Park, Phase 2 - Design & Construction
2,634,500
(2,634,500)
0
0
0
0 MULTIYEAR
9,606,800 129,000
(9,606,800) (129,000)
0 0
0 0
0 0
0 0 EXT EVENT
829,000
(829,000)
0
0
0
0 MULTIYEAR
151,300
(151,300)
0
0
0
0 MULTIYEAR
454,700 1,564,000 1,532,000 54,800 197,400
(454,700) (1,564,000) (1,532,000) (54,800) (197,400)
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 MULTIYEAR 0 0 MULTIYEAR 0 PROGRAM 0 EXT EVENT
P7 - Linear/Natural Area Park Development Modular park washroom unit Park Infrastructure Renewal Sport Courts/Water Parks/Skate Parks Renewal & Replacements P8 - Renewal, Rehabilitation & Infra 1450 Steele Rd Park Development Costs
1,784,200
(1,784,200)
0
0
0
0
59,200 49,400 127,000
(59,200) (49,400) (127,000)
0 0 0
0 0 0
0 0 0
0 DESIGNOPT 0 SCHED 0 SCHED
235,600 198,600
(235,600) (198,600)
0 0
0 0
0 0
0 0 MULTIYEAR
Art Walk - Extension from Doyle to Queensway P10 - Urban Streetscape, Centres Dev, Renewal Cost Center Total
1,031,500
(1,031,500)
0
0
0
0 EXT EVENT
1,230,100
(1,230,100)
0
0
0
0
27,037,200
(26,984,400)
0
(52,800)
0
0
Transportation Capital 453 Growth Benvoulin Turn Lanes DCC (Casorso - KLO)
39,900
(39,900)
0
0
0
0 SCHED
447 Renew 448 Renew 448 Renew
~ Growth 449 Renew 449 Renew ~
Growth
~
Renew
450 Renew ~
Renew
~
Renew
~
Renew
~ New ~ Renew 450 Renew
451 Growth 451 Renew 452 Renew
~
Renew
Kelowna's Newest Waterfront Park (DCC) Phase 2 Kerry Park - Future Phases (DCC) P6 - City-wide Park Development Mill Creek Linear Park Knox Mountain Park - Improvements Shoreline Restoration - Flood Damage
452 Renew
453 Growth
Burtch 3 DCC (Glenmore - Springfield)
223,000
(223,000)
0
0
0
0 DESIGNOPT
454 Growth
Casorso 1 Roundabouts (Swamp Benvoulin) Commonwealth Rd (Hwy 97 - Jim Bailey)
49,000
(49,000)
0
0
0
0 SCHED
465,800
(465,800)
0
0
0
0 SCHED
307,900 1,769,400
(307,900) (1,769,400)
0 0
0 0
0 0
0 DESIGNOPT 0 EXT EVENT
46,900
(46,900)
0
0
0
0 DESIGNOPT
454 Growth 455 Growth 455 Growth 456 Growth ~
Frost 1 DCC (Killdeer - Chute Lake) Hollywood 7 (Sexsmith - Appaloosa) Improvements Lakeshore 5 DCC (Swordy - Barrera), Road
115,900
(115,900)
0
0
0
0 PROGRAM
456 Growth
Major Intersection Capacity Improvements DCC McCulloch Area DCC (KLO/Hall/Spiers)
335,800
(335,800)
0
0
0
0 DESIGNOPT
~ ~
Richter 1 DCC (Sutherland - KLO) Road Safety Improvements DCC
200,000 89,900
(200,000) (89,900)
0 0
0 0
0 0
0 MULTIYEAR 0 PROGRAM
Growth
Growth Growth
PAGE 434
2024 FINANCIAL PLAN
CITY OF KELOWNA
457 Growth
Stewart 3 DCC (Crawford-Swamp), Road
3,931,300
(3,931,300)
0
0
0
0 DESIGNOPT
~
Sutherland 3 DCC (Mill Creek - Spall) T1 - DCC Roads Abbott DCC (Cedar - Gyro), ATC Bertram 1 DCC (Sutherland - Cawston), ATC Casorso 3 DCC Clement 2 DCC (Spall - Hwy33) Design Dilworth DCC Active Transportation Corridor Ethel 6 AT (Clement - Cawston) Glenmore 3 DCC (Clement - High) AT Glenmore 4 DCC (Kane - South Yates), ATC
1,615,600 9,190,400 214,000 189,200
(1,615,600) (9,190,400) (214,000) (189,200)
0 0 0 0
0 0 0 0
0 0 0 0
0 MULTIYEAR 0 0 DESIGNOPT 0 MULTIYEAR
539,200 1,171,500 104,600
(539,200) (571,500) (104,600)
0 0 0
0 (600,000) 0
0 0 0
0 EXT EVENT 0 MULTIYEAR 0 MULTIYEAR
83,900 31,200 773,800
(83,900) (31,200) (773,800)
0 0 0
0 0 0
0 0 0
0 SCHED 0 DESIGNOPT 0 MULTIYEAR
25,000
(25,000)
0
0
0
0 SCHED
139,800
(139,800)
0
0
0
0 SCHED
460 Growth 461 Growth
Houghton 1 DCC (Nickel - Rails with Trails), ATC Houghton 2 DCC (Hollywood Rd - Rutland Rd), ATC Rails with Trails to Greenway ATC Sutherland 1 DCC (Gordon - Burtch), ATC
11,900 1,616,300
(11,900) (1,616,300)
0 0
0 0
0 0
0 DESIGNOPT 0 EXT EVENT
461 Growth
Sutherland 2 DCC (Lake - Gordon), ATC
977,600
(977,600)
0
0
0
0 EXT EVENT
T2 - DCC Roads - Active Transportation
5,878,000
(5,278,000)
0
(600,000)
0
0
Local Street Urbanization Program City of Kelowna Highway Signage Deferred Revenue Projects Highway Median & Ditches T3 - Non-DCC Roads Bridge Rehabilitation KLO Rd Mission Creek Bridge Replacement
483,300 94,000 1,354,500 750,000 2,681,800 327,900 159,600
(483,300) 0 (207,900) (750,000) (1,441,200) (327,900) (159,600)
0 0 0 0 0 0 0
0 (94,000) 0 0 (94,000) 0 0
0 0 (1,146,600) 0 (1,146,600) 0 0
0 MULTIYEAR 0 SCHED 0 PROGRAM 0 PROGRAM 0 0 PROGRAM 0 MULTIYEAR
Roads Resurfacing Sidewalk and Bikeway Renewal Street Light Renewal T4 - Transportation System Renewal Abbott DCC (Rose Ave - Cedar Ave) Protected Bike Lane Project Hwy 97 Right Turn Lane to Pandosy Active Transportation Corridor Bluebird Beach Safety Improvements Okanagan Rail Trail T5 - Bicycle Network Hwy 97 Pedestrian Overpass Sidewalk Network Expansion T6 - Sidewalk Network Crosswalk Safety - Signals and Flashers
598,800 65,500 127,100 1,278,900 167,300
(598,800) (65,500) (127,100) (1,278,900) (167,300)
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 PROGRAM 0 PROGRAM 0 PROGRAM 0 0 SCHED
412,600 632,300 120,000 99,900 1,432,100 10,928,600 619,700 11,548,300 11,900
(412,600) (632,300) (120,000) (5,100) (1,337,300) (10,928,600) (619,700) (11,548,300) (11,900)
0 0 0 0 0 0 0 0 0
0 0 0 (94,800) (94,800) 0 0 0 0
0 0 0 0 0 0 0 0 0
0 EXT EVENT 0 PROGRAM 0 MULTIYEAR 0 EXT EVENT 0 0 MULTIYEAR 0 PROGRAM 0 0 PROGRAM
68,100 173,000 114,800 367,800
(68,100) (173,000) (114,800) (367,800)
0 0 0 0
0 0 0 0
0 0 0 0
0 PROGRAM 0 PROGRAM 0 SCHED 0
1,003,900 1,003,900 1,225,100
(1,003,900) (1,003,900) (245,000)
0 0 0
0 0 0
0 0 (980,100)
0 PROGRAM 0 0 EXT EVENT
275,900
(275,900)
0
0
0
0 MULTIYEAR
231,700 1,732,700 35,113,900
(231,700) (752,600) (32,198,400)
0 0 0
0 0 (788,800)
0 (980,100) (2,126,700)
0 PROGRAM 0 0
Growth
457 Growth ~ Growth 458 Growth ~ Growth ~ Growth 458 Growth 459 Growth ~ Growth 459 Growth 460 Growth
~ 462 ~ ~
Growth Renew Renew Renew
~ ~
Renew Renew
~ ~ ~
Renew Renew Renew
462 Growth 463 ~ ~ 463
Growth New New New
~ ~
Growth New
~
New
~ New ~ New 464 New
Safe Routes to School Program Traffic Calming Traffic Signal - Spall at Springfield T7 - Safety and Operational Improvements ~ Growth Traffic Signals and Roundabouts DCC T8 - Traffic Control Infrastructure 464 Growth Okanagan College Exchange Capacity Expansion ~ Growth Rutland Park & Ride, Mobility Hub, Operations facility ~ Transit - Land Acquisition New T9 - Transit Facilities Cost Center Total
PAGE 435
2024 FINANCIAL PLAN
CITY OF KELOWNA
Solid Waste Capital 465 New Electrical Supply Upgrades 465 Growth General Site Works and Investigations
1,378,400 321,100
(1,378,400) (321,100)
0 0
0 0
0 0
0 EXT EVENT 0 SCHED
33,800
(33,800)
0
0
0
0 EXT EVENT
1,469,700
(1,469,700)
0
0
0
0 SCHED
Landfill Site Preparation Wildfire Recovery - Landfill SW2 - Site Improvement Landfill Gas & Leachate Recirculation Laterals SW3 - Gas Management Odour Control and Leachate Treatment
1,550,000 1,400,000 6,153,000 59,700
(1,550,000) (1,400,000) (6,153,000) (59,700)
0 0 0 0
0 0 0 0
0 0 0 0
0 EXT EVENT 0 MULTIYEAR 0 0 PROGRAM
59,700 99,700
(59,700) (99,700)
0 0
0 0
0 0
0 0 EXT EVENT
SW4 - Leachate Management Surface Water Bypass Wet Well Relocation SW5 - Drainage & Groundwater Management Commonage Pavement Repairs SW6 - Recycling & Waste Management
99,700 394,700 444,500 839,200
(99,700) (394,700) (444,500) (839,200)
0 0 0 0
0 0 0 0
0 0 0 0
0 0 DESIGNOPT 0 SCHED 0
43,400 43,400
0 0
0 0
0 0
(28,600) (28,600)
Stockpiles and Reprocessing Areas Relocation 469 New Mechanical Shop Expansion - Equipment Storage Bay SW7 - Landfill Area Development Cost Center Total
1,412,600
(1,412,600)
0
0
0
0 PROGRAM
395,200
(395,200)
0
0
0
0 DESIGNOPT
1,807,800 9,002,800
(1,807,800) (8,959,400)
0 0
0 0
0 (28,600)
6,750,400 236,000
(4,025,900) (213,600)
0 0
(2,724,500) 0
0 0
0 MULTIYEAR (22,400) DESIGNOPT
6,986,400 21,700 21,700 204,100
(4,239,500) (21,700) (21,700) (179,100)
0 0 0 0
(2,724,500) 0 0 0
0 0 0 0
(22,400) 0 PROGRAM 0 (25,000) SCHED
162,900
(162,900)
0
0
0
0 PROGRAM
367,000 7,375,100
(342,000) (4,603,200)
0 0
0 (2,724,500)
0 0
(25,000) (47,400)
11,200 126,200
(7,400) (126,200)
0 0
0 0
0 0
(3,800) SCHED 0 EXT EVENT
37,800
(37,800)
0
0
0
0 SCHED
29,800
(29,800)
0
0
0
0 EXT EVENT
124,800
(124,800)
0
0
0
0 SCHED
378,600
(378,600)
0
0
0
0 EXT EVENT
513,400
(513,400)
0
0
0
0 DESIGNOPT
1,221,800 622,100 622,100 1,843,900
(1,218,000) (622,100) (622,100) (1,840,100)
0 0 0 0
0 0 0 0
0 0 0 0
(3,800) 0 EXT EVENT 0 (3,800)
466 New 466 New 467 Growth ~ Renew ~
Growth
467 New
468 Renew 468 Renew
469 Growth
~
Landfill - Electric Equipment Charging Station Landfill Liner Design and Construction
Growth
Storm Drainage Capital Mill Creek Flood Protec on ~ New 470 Renew Knox Mountain Geotechnical Engineering D1 - Hydraulic Upgrading Program ~ Containment Devices New D2 - Storm Drainage Quality Program 470 Renew Storm Drainage Asset Renewal Projects ~
Stormwater Pond Asset Renewal Program D3 - Storm Water Renewal Cost Center Total Renew
Information Services Capital 471 Renew Asset Management System 471 Renew Major Systems Projects - Bylaw Request System 472 Renew Major Systems Projects - Corporate Initiatives 472 Renew Major Systems Projects - Land Management System 473 Renew Major Systems Projects - Website Compliance 473 Renew Major Systems Projects - Planning and Permitting 474 New Records and Information Management System I3 - Major System Projects 474 New Network as a Service I4 - Communications Systems Cost Center Total
(14,800) SCHED (14,800)
0 (14,800)
PAGE 436
2024 FINANCIAL PLAN
CITY OF KELOWNA
Vehicle & Mobile Equipment Capital 475 Renew Equipment and Vehicle Replacement V2 - Vehicle / Equipment Renewal Cost Center Total Fire Capital ~ Renew ~ Renew 475 Renew
5,464,300 5,464,300 5,464,300
(5,277,700) (5,277,700) (5,277,700)
0 0 0
(12,000) (12,000) (12,000)
0 0 0
Fire Vehicle and Equipment Renewal F1 - Vehicle / Equipment Renewal Dispatch ROIP Equipment Fire Communications Equipment Renewal
2,450,000 2,450,000 32,700 2,810,000
(2,450,000) (2,450,000) (32,700) 0
0 0 0 0
0 0 0 (2,810,000)
0 0 0 0
0 MULTIYEAR 0 0 MULTIYEAR 0 EXT EVENT
F3 - Communications Systems
2,842,700 5,292,700
(32,700) (2,482,700)
0 0
(2,810,000) (2,810,000)
0 0
0 0
Airport - Ski Racks Airport - Taxiway and Utilities Construction Airport Airside Land Development A1 - Airside Airport - Hotel Development A2 - Groundside Airport - Carbon Neutral Initiatives Airport - Combined Operations Building Refurbishment Airport - Common Use Counter Expansion
11,800 390,000
(11,800) (390,000)
0 0
0 0
0 0
0 EXT EVENT 0 DESIGNOPT
46,000 447,800 4,508,200 4,508,200 6,200 440,000
(46,000) (447,800) (4,508,200) (4,508,200) (6,200) (440,000)
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 EXT EVENT 0 0 MULTIYEAR 0 0 EXT EVENT 0 SCHED
510,000
(510,000)
0
0
0
0 DESIGNOPT
975,000
(975,000)
0
0
0
0 EXT EVENT
13,600 (13,600) 200,800 (200,800) 2,145,600 (2,145,600) 123,063,700 (116,270,100)
0 0 0 0
0 0 0 (6,793,600)
0 0 0 0
0 EXT EVENT 0 EXT EVENT 0 0 MULTIYEAR
Cost Center Total Airport Capital 476 Renew 476 New 477 Growth ~
Growth
~ Growth 477 Renew 478 Renew 478 Renew
Airport Air Terminal Building Capital Replacement and Improvement 479 Renew Airport Small Capital Projects 479 Renew Airport Technology Replacements A3 - Terminal ~ Growth Soaring Beyond 2.5 Million Passengers AIF Program ~ Airport - Arrivals carousels capacity Renew upgrades and belts 480 Renew Airport Passenger Boarding Bridge Upgrades A4 - AIF Cost Center Total Water Capital 480 Growth ~
New
481 New 481 Renew ~ ~
Renew Renew
482 Renew 482 483 483 484 ~ ~
Growth Growth New Growth Renew Renew
Poplar Point to Dilworth Mountain Transmission Upgrade Design Royal View Transmission Mainline - Knox to Gordon W1 - DCC Pipes (Mains) Summit Reservoir DCC W4 - DCC Reservoirs & Filling Stations Skyline PS - Station Upgrade Safety Issues Water Meter Replacement Program Water Network and Facility Renewal W6 - Network and Facility Renewal Chemical Storage Tank Replacement Kettle Valley UV Facility Kettle Valley Reservoir Upgrade Osprey Ave Water Main Replacement Snow Runoff Hydrology South End Water Upgrades Fireflow Upgrades Kelowna Water Integration Planning & Design
(174,600) SCHED (174,600) (174,600)
8,900
(8,900)
0
0
0
0 DESIGNOPT
183,200
(183,200)
0
0
0
0 EXT EVENT
123,255,800 (116,462,200) 130,357,400 (123,563,800)
0 0
(6,793,600) (6,793,600)
0 0
0 0
749,500
(749,500)
0
0
0
0 SCHED
562,800
(562,800)
0
0
0
0 MULTIYEAR
1,312,300 149,800 149,800 125,000
(1,312,300) (149,800) (149,800) (125,000)
0 0 0 0
0 0 0 0
0 0 0 0
0 0 DESIGNOPT 0 0 EXT EVENT
812,900 608,000 1,545,900 12,700
(812,900) (608,000) (1,545,900) (12,700)
0 0 0 0
0 0 0 0
0 0 0 0
0 MULTIYEAR 0 PROGRAM 0 0 EXT EVENT
59,800 16,200 50,000 58,600 88,500 300,000
(59,800) (16,200) (50,000) (58,600) (88,500) (300,000)
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 EXT EVENT 0 EXT EVENT 0 EXT EVENT 0 EXT EVENT 0 PROGRAM 0 MULTIYEAR
PAGE 437
2024 FINANCIAL PLAN
~
CITY OF KELOWNA
Water Supply Major Equipment Renewal Program W7 - Network and Facility Improvements
120,000
(120,000)
0
0
0
0 PROGRAM
705,800
(705,800)
0
0
0
0
Irrigation System Upgrades Non Potable System Capital Plan Pressure Reducing Valve Upgrades Dam Repair Program W8 - Irrigation Network Improvements
16,800 146,900 490,800 3,511,200 4,165,700
(16,800) (146,900) (490,800) (519,700) (1,174,200)
0 0 0 0 0
0 0 0 (2,991,500) (2,991,500)
0 0 0 0 0
0 SCHED 0 DESIGNOPT 0 DESIGNOPT 0 PROGRAM 0
Offsite & Oversize - Water WW5 - Network and Facility Renewal Cost Center Total
540,500 540,500 8,420,000
(540,500) (540,500) (5,428,500)
0 0 0
0 0 (2,991,500)
0 0 0
0 PROGRAM 0 0
169,500
(169,500)
0
0
0
0 DESIGNOPT
193,000 362,500 2,859,100 2,859,100 360,100
(193,000) (362,500) (2,859,100) (2,859,100) (360,100)
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 MULTIYEAR 0 0 MULTIYEAR 0 0 DESIGNOPT
360,100
(360,100)
0
0
0
0
551,600 2,366,600 2,457,600
(116,600) (2,366,600) (2,457,600)
0 0 0
0 0 0
(435,000) 0 0
0 DESIGNOPT 0 MULTIYEAR 0 PROGRAM
211,300 604,000 6,191,100
(211,300) (604,000) (5,756,100)
0 0 0
0 0 0
0 0 (435,000)
0 SCHED 0 PROGRAM 0
Rutland Centre (SCA 22) Sewer Connec on Project Air Filtration Commonage Mix Building
14,245,300
(6,995,300)
0
(4,850,000)
0
(2,400,000) MULTIYEAR
108,300
(72,100)
0
0
(36,200)
0 DESIGNOPT
Beaver Lake Service Area Wastewater Wastewater Treatment Odour Control Media Replacement Rose Ave Lift Station Odour Control System
920,900 821,100
(920,900) (821,100)
0 0
0 0
0 0
0 DESIGNOPT 0 MULTIYEAR
42,600
(42,600)
0
0
0
0 EXT EVENT
16,138,200
(8,852,000)
0
(4,850,000)
(36,200)
(2,400,000)
25,911,000
(18,189,800)
0
(4,850,000)
(471,200)
(2,400,000)
269,930,200 (242,640,100)
0
(22,023,000)
(2,626,500)
(2,640,600)
Renew
484 485 485 ~
Renew New Renew Renew
~
Growth
Wastewater Capital 486 Growth Glenmore Connection - Glenmore Rd from Cross Rd to Scenic Rd ~ Growth Lakeshore Trunk - (Swordy - Barrera) WW1 - DCC Pipes (Mains) ~ Water St Li Sta on Renew WW2 - DCC Lift Stations Biosolids Management Site Development 486 Renew and Preliminary Design
487 New ~ Renew ~ Renew 487 Renew ~ Renew
~
Growth
488 New 488 New ~ New 489 Renew
WW3 - DCC Wastewater Treatment Facilities BCTTP Transformer Replacement Burtch Trunk Renewal - Wastewater Mains and Facili es Sewer Li Sta on SCADA Integra on Wastewater Lift Station Renewal WW5 - Network and Facility Renewal
WW6 - Network and Facility Improvements
Cost Center Total Total ~ denotes request details not included in carryover volume
PAGE 438
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Real Estate and Parking Capital
Title:
Property Acquisition - 1951 Cross Road
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included L1 CARRYOVER
Justification: Requesting carryover for costs related to demolition, initially part of acquisition expenses. Due to the housing shortage, the on-site home intended for demolition was retained for residential rental in 2023. Demolition will proceed in 2024 in line with the timing associated with the redevelopment of the site.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 58,500
58,500 0 58,500
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (58,500)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Real Estate and Parking Capital
Title:
Downtown Parkades - Major Maintenance
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included L3 CARRYOVER
Justification: Requesting carryover for the continuum of ongoing facility renewal projects in 2024, hindered by budget constraints and contractor availability (resourcing). Carryover budget is essential for maximizing asset life expectancy, work at Chapman and Library Parkades involves building envelope, waterproofing, coating, and snow chute feasibility.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 285,800
439,400 153,600 285,800
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (285,800)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 439
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Real Estate and Parking Capital
Title:
Electric Vehicle Infrastructure and Strategic Initiatives
Priority: 1 Reason: Awaiting Grant 10 Yr Cap Plan Ref: Not included L3 CARRYOVER
Justification: Carryover of this budget is requested, firstly to secure the City share of funding in support of a 2022 grant application for installation of several Level 2 charging stations and required infrastructure, a decision on this grant is believed to be imminent. Secondly, complete public EV charging station installation projects currently being evaluated or under construction, such as the Pandosy Parking Lot in South Pandosy. Lastly, some stations/equipment ordered have not yet been received due to lengthy lead times from the supplier.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 310,000
457,500 147,500 310,000
Expected Completion: Dec 2024
Climate & Environment - Reduce corporate and community GHG emissions Reserve (310,000)
Borrow
Fed/Prov
Dev/Com
Utility
Department: Cost Center:
Capital Projects Real Estate and Parking Capital
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included L3
Title:
Parking Equipment and Facilities
CARRYOVER
Justification: Carryover is requested to support the ongoing renewal of parking infrastructure by replacing equipment that has reached end of life. This includes the renewal of parking meters, pay stations, enforcement equipment, and security cameras. This budget was not fully utilized in 2023 due to delays in obtaining equipment from vendors, caused by changes in technology.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 194,100
470,200 276,100 194,100
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (194,100)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 440
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Building Capital
Title:
H2O Boiler Replacement
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included B1 CARRYOVER
Justification: A carryover is requested to complete the replacement of a boiler at the H2O facility. These boilers provide heat to the pools, heat to the building HVAC system and are critical to the facility. Work was delayed as a result of back ordered equipment. Project has been awarded and construction will take place in early 2024. Anticipated completion Q2 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 244,700
294,900 50,200 244,700
Expected Completion: Jun 2024
Other - Supports Base Business Reserve (244,700)
Borrow
Department: Cost Center:
Capital Projects Building Capital
Title:
Rotary Beach Park Washroom
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: 2023 B1 - $911K CARRYOVER
Justification: A carryover is requested for the design of a new washroom and change rooms at Rotary Beach Park. Design work has been delayed because of staff shortages, with most of the resources being dedicated to the Building a Stronger Kelowna portfolio and other more urgent priorities. Staff are now in place and this work will start in Q1 2024 and is expected to be completed by Q3.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 40,400
42,200 1,800 40,400
Expected Completion: Sep 2024
Other - Supports Base Business Reserve (40,400)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 441
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Building Capital
Title:
Library Chiller and Boiler Replacement
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included B2 CARRYOVER
Justification: The Library chiller and boiler upgrades were substantially complete in Q4 of 2021. Ongoing optimization through a consulting assignment of the control systems is underway to integrate the new heating and cooling equipment with the facility. City staff and consultants are required to see the systems in place, function and cycle a number of times to complete the work based on seasonal cycles. Anticipated completion Q2 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 18,700
19,000 300 18,700
Expected Completion: Jun 2024
Other - Supports Base Business Reserve (18,700)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Building Capital
Title:
City Hall - Envelope Renewal, Study and Design
Dev/Com
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included B3 CARRYOVER
Justification: City Hall is one of the highest energy users within the municipal buildings portfolio. Carryover is requested to continue the design development for the envelope and energy improvements at City Hall. Design work did not proceed in 2023 as intended due to vacant staff positions remaining unfilled. This work has the potential to yield substantial energy savings in the future, and reduce both cost and greenhouse gas emission reductions. The work is in preparation for the Envelope Renewal construction project identified in the ten-year Capital plan for 2025 & 2026.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 120,700
120,800 100 120,700
Expected Completion: Sep 2026
Other - Supports Base Business Reserve (120,700)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 442
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Building Capital
Title:
City Hall - Level 1 Meeting Room Suite
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: 2021 B3 - $4.685M CARRYOVER
Justification: Carryover is requested to honour ongoing relationship building with First Nations elders. In the spirit of reconciliation and recognizing the living history of our region, the new meeting room suite at City Hall are proposed to be given First Nations names, with artwork and decor to honour these names. This project requires close collaboration with First Nations Communities, but was delayed due to personal circumstances for the key participants. The work is currently in the design stage, and expected to be complete by Q3 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 129,100
135,000 5,900 129,100
Expected Completion: Sep 2024
Other - Supports Base Business Reserve (129,100)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Building Capital
Title:
North Glenmore Fire hall No.5 - Design
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: 2023 B3 - $866k CARRYOVER
Justification: A carryover is requested to complete the design work for the North Glenmore Fire Hall 5 in order to maintain adequate fire coverage for the area. Misinformation on the ALR designation of the original selected site created a delay until a revised site was identified. Additional budget for construction is identified in 2024, 2025 & 2026.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 823,300
866,600 43,300 823,300
Expected Completion: Dec 2026
Crime & Safety - Public safety resources keep pace with growth Reserve (823,300)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 443
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Building Capital
Title:
Rutland Community Policing Office Expansion - Design
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: 2023 B3 - $95k CARRYOVER
Justification: A carryover is requested for the scoping and design of the expansion of the Rutland Community Policing Office. Design work has not proceeded due to lack of staff resources, with the majority of resources being focused on the Building a Stronger Kelowna portfolio and other higher priorities. Staff are now in place and this work will proceed in Q1 2024 and should be completed by Q4 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 95,200
95,200 0 95,200
Expected Completion: Dec 2024
Crime & Safety - Public safety resources keep pace with growth Reserve (95,200)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Building Capital
Title:
City Yards - Female Changeroom Upgrades
Dev/Com
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included B4 CARRYOVER
Justification: A carryover is requested to complete the remodel of the overcrowded female changeroom facilities at the City Yards facility due to an increase in female staff. Unforeseen emergency work delayed the project, but the majority of the work will be completed before year end, with minor work carrying into Q1 of 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 52,300
130,000 77,700 52,300
Expected Completion: Jan 2024
Other - Supports Base Business Reserve (52,300)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 444
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Building Capital
Title:
Building Systems Automation & Performance Optimization
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included B7 CARRYOVER
Justification: Carryover is requested to complete the replacement of obsolete building control systems, sensors and monitors to allow for further analysis into building performance and energy monitoring. The project was delayed in 2023 due to supplier delays and resource challenges. Equipment is on order and installation is scheduled.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 25,900
40,100 14,200 25,900
Expected Completion: Dec 2024
Climate & Environment - Reduce corporate and community GHG emissions Reserve (25,900)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Building Capital
Title:
Kelowna Community Theatre Improvements
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included B7 CARRYOVER
Justification: Carryover is requested to complete the improvement projects enhancing operations at the Kelowna Community Theatre (KCT). Delays in the project were due to the performance schedule at KCT and supply issues for the products required. Final items include replacement of the stage deck and the replacement of the stage drape.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 39,700
92,000 52,300 39,700
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (39,700)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 445
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Building Capital
Title:
Kelowna Community Theatre Renewal
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included B7 CARRYOVER
Justification: A carryover is requested to replace existing rooftop mechanical units. The project has been delayed as equipment is backordered due to supply chain issues with delivery and install expected in Q2 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 53,800
53,900 100 53,800
Expected Completion: Jun 2024
Other - Supports Base Business Reserve (53,800)
Borrow
Department: Cost Center:
Capital Projects Building Capital
Title:
Water Street Boat Launch Renewal
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included B7 CARRYOVER
Justification: Budget is requested to replace existing docks at the Water Street Boat Launch, which have been identified as being at the end of their lifecycle, as well as to install a staging and moorage arm at the end of the northern most launch dock. The work could not be completed in 2023 as there was a delay in the procurement process.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 546,000
575,000 29,000 546,000
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (546,000)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 446
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Building Capital
Title:
Yards Chemical Storage
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included B7 CARRYOVER
Justification: A carryover is requested for the purchase and installation of a new chemical storage facility. Changing requirements has resulted in a re-design. New solutions have been identified and are in procurement. Installation to take place early 2024. Anticipated completion is Q2 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 209,900
297,600 87,700 209,900
Expected Completion: Sep 2024
Other - Supports Base Business Reserve (209,900)
Department: Cost Center:
Capital Projects Parks Capital
Title:
Ballou Park (DCC)
Borrow
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included P3 CARRYOVER
Justification: Carryover is requested to close out the final construction, including the warranty period of Ballou Park and connection to Knox Mountain Park. The completion date has been impacted by long delivery lead times and weather.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 17,400
401,700 384,300 17,400
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (17,400)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 447
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Parks Capital
Title:
Burne Park (DCC) - Design
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: 2023 P3 CARRYOVER
Justification: A carryover is requested to complete the Class D conceptual design as well as the demolition of the buildings situated on the park land. There has been a delay in the final conceptual design comments. The park construction budget was approved in 2024, with a completion date of Q2 2025.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 116,000
279,200 163,200 116,000
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (116,000)
Borrow
Department: Cost Center:
Capital Projects Parks Capital
Title:
Tower Ranch Park #1 (DCC)
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included P3 CARRYOVER
Justification: A carryover is requested to complete the construction of the Tower Ranch Park. A delay in receiving required irrigation components prior to the end of 2023 forced a change in substantial completion date to March 31, 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 61,800
463,900 402,100 61,800
Expected Completion: Mar 2024
Other - Supports Base Business Reserve (61,800)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 448
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Parks Capital
Title:
Kelowna's Newest Waterfront Park (DCC) - Phase 1
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included P4 CARRYOVER
Justification: Phase 1 onsite work is complete, with offsite frontage deferred and to be coordinated with Kelowna Paddle Centre building. The design and construction of the new facility will be funded by the Kelowna Paddle Centre. This is a multiyear project with completion dependent on design and funding progress made by our partner, and currently proposed to start construction in September 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 1,908,800
4,234,100 2,325,300 1,908,800
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (1,856,000)
Borrow
Fed/Prov (52,800)
Dev/Com
Utility
Department: Cost Center:
Capital Projects Parks Capital
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included P4
Title:
Strathcona Park
CARRYOVER
Justification: Riparian compensation planting was a requirement of the Environmental Development Permit issue for recent upgrades / development of Strathcona Beach Park. The planting was scheduled to follow the gravel pathway construction in Q3 of 2023, but was unable to be complete due to unfavorable weather.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 21,900
103,400 81,500 21,900
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (21,900)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 449
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Parks Capital
Title:
City Park - Improvements, Waterfront Promenade Phase 3
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: 2021 P6 - $200k CARRYOVER
Justification: Carryover is requested for the design of the Waterfront Promenade phase 3, pending receiving permitting approval from the Province. This work is to improve the promenade walkway from the sails to the Cenotaph and add a boardwalk to minimize conflicts between cyclists and pedestrians. Subject to permit approvals the work will be completed for tender by Q4 2024, and a subsequent budget request for the construction costs will be made.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 129,000
197,100 68,100 129,000
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (129,000)
Borrow
Department: Cost Center:
Capital Projects Parks Capital
Title:
Shoreline Restoration - Flood Damage
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included P7 CARRYOVER
Justification: A carryover is requested to complete the construction of shoreline restoration work for Okanagan Lake waterfront parks that were damaged by the 2017 and 2018 floods. There has been a delay in the project due to pending Provincial permitting approvals.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 197,400
400,500 203,100 197,400
Expected Completion: Dec 2024
Climate & Environment - Protect and restore natural areas Reserve (197,400)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 450
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Parks Capital
Title:
Modular park washroom unit
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included P8 CARRYOVER
Justification: Unanticipated high costs for installation have prevented the use of this unit at Mission Recreation Park. Carryover is requested in order to install the washroom unit at another high demand location as identified in the original request. The unit will be installed as part of the next phase of Glenmore Recreation Park. Cost savings are expected to be realized through the reduction of renting and maintaining the blue portable toilets.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 59,200
162,000 102,800 59,200
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (59,200)
Borrow
Department: Cost Center:
Capital Projects Parks Capital
Title:
Park Infrastructure Renewal
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included P8 CARRYOVER
Justification: Glenmore Road North Greenspace was created with the construction of Glenmore Road North but has never had a water supply. New water supply was installed by City forces in Q4 to service the park space. The proposed community garden is scheduled for construction in Q1/Q2 2024. There was a delay in completion due to internal scheduling conflicts.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 49,400
70,000 20,600 49,400
Expected Completion: Jun 2024
Other - Supports Base Business Reserve (49,400)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 451
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Parks Capital
Title:
Sport Courts/Water Parks/Skate Parks Renewal & Replacements
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included P8 CARRYOVER
Justification: A carryover is requested to complete the remainder of the work at Kinsmen Park, which includes installation of playground equipment and surfacing. Additionally, the budget will be used to complete the permitting and replacement of water features at the Ben Lee Spray Park. For Kinsmen Park, scheduling of the preliminary site preparation and irrigation modifications not possible until fall, pushing installation of playground equipment to Spring 2024. For Ben Lee Park, staffing changes and permit application to Interior Health delayed construction to Spring 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 127,000
301,400 174,400 127,000
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (127,000)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Parks Capital
Title:
Art Walk - Extension from Doyle to Queensway
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included P10 CARRYOVER
Justification: Carryover is requested to conclude design work on the section of Art Walk from Doyle Ave to Queensway. Design was delayed in 2023 pending resolution of the 350 Doyle site, and coordination with the design of the Art Walk in that section. It is unclear when the 350 Doyle site will proceed.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 1,031,500
1,034,900 3,400 1,031,500
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (1,031,500)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 452
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Benvoulin Turn Lanes DCC (Casorso - KLO)
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included T1 CARRYOVER
Justification: Carryover is requested to complete concept design for the Benvoulin Rd corridor from KLO Rd to Casorso Rd. The Transportation Master Plan (TMP) recommended widening Benvoulin Rd from 2 to 3 lanes to accommodate left-turn lanes, maximize capacity and maintain safety while providing access. These improvements were recommended to moderate the impacts of traffic growth from the Upper Mission. This project will undertake traffic engineering, develop a concept design, update cost estimates and update property impacts. It will be completed concurrently with similar work on the Casorso roundabouts and their approaches. Due to staff resource limitations work on this project started in the second half of 2023. A road safety review and projections of future traffic volumes are currently underway with projected project completion in Q3 of 2024. 2023 Budget: 50,000 2023 Expenditures: 10,100 Carryover Requested: 39,900 Strategic Direction: Amount 39,900
Expected Completion: Dec 2024
Transportation - More trips by alternative transportation modes Reserve (39,900)
Borrow
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Burtch 3 DCC (Glenmore - Springfield)
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included T1 CARRYOVER
Justification: Budget is requested to advance design for the Burtch 3 DCC Project between the intersections of Bernard/Glenmore and Burtch/Harvey. The Burtch 3 project is identified in the Transportation Master Plan and includes upgrades and widening to Bernard, Burtch, and intersections at Bernard/Glenmore, Bernard/Burtch, Burtch/Lawrence, and Burtch/Harvey. Active transportation improvements are also included in the project scope. Preliminary design is currently underway and will continue into the first half of 2024. Future timing of detailed design and construction will be coordinated with the redevelopment of the Parkinson Recreation Centre. Future budget requests will supplement funding from the Building Stronger Kelowna program. 2023 Budget: 300,000 2023 Expenditures: 77,000 Carryover Requested: 223,000 Strategic Direction: Amount 223,000
Expected Completion: Dec 2024
Transportation - Capacity and traffic flow is enhanced on major road corridors Reserve (223,000)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 453
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Casorso 1 Roundabouts (Swamp - Benvoulin)
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included T1 CARRYOVER
Justification: Carryover is requested to complete concept design for improvements to the Casorso Roundabouts and approaches. The Transportation Master Plan (TMP) recommended upgrading the roundabouts to maximize capacity over the existing Casorso bridge. These improvements were recommended to moderate the impacts of traffic growth from the Upper Mission. This project will undertake traffic engineering, develop a concept design, update cost estimates and property impacts. It will be completed concurrently with similar work on the Benvoulin Corridor to the north. Due to staff resource limitations work on this project started in the second half of 2023. An in-service road safety review and projections of future traffic volumes are currently underway with projected project completion in Q3 of 2024. Expected Completion: Dec 2024 2023 Budget: 50,000 2023 Expenditures: 1,000 Carryover Requested: 49,000 Strategic Direction: Amount 49,000
Transportation - Capacity and traffic flow is enhanced on major road corridors Reserve (49,000)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Commonwealth Rd (Hwy 97 - Jim Bailey)
Dev/Com
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included T1 CARRYOVER
Justification: Carryover is requested to complete preliminary design and costing for upgrades of Commonwealth Road, serving both residential and industrial traffic, between Hwy 97 and Jim Bailey Road. This project is part of the MOU between the OKIB, the DoLC and the CoK. In 2023 the project team developed an engagement plan and traffic volume projections. Engagement and coordination with OKIB, MOTI and DoLC are ongoing. The project was delayed as it took longer than anticipated to engage with multiple groups to start design. In 2024, with stakeholder feedback, design options will be developed for engagement. Preliminary design is anticipated by the end of 2024, depending on engagement timelines. 2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 465,800
537,700 71,900 465,800
Expected Completion: Dec 2024
Transportation - Capacity and traffic flow is enhanced on major road corridors Reserve (465,800)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 454
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Frost 1 DCC (Killdeer - Chute Lake)
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included T1 CARRYOVER
Justification: Carryover is requested to complete detailed design and cost estimates for the Frost 1 DCC project. This project will extend Frost Rd from Killdeer Rd westward towards Chute Lake Rd (350m) and develop a roundabout at the intersection of Frost / Chute Lake. This will provide a new major road connection between Chute Lake Rd and Gordon Dr, connecting the Kettle Valley and Ponds neighbourhoods. In 2023 preliminary design and scope change was completed, and detailed design and land acquisition are currently underway and will continue into 2024. A future budget request for construction is anticipated in 2025. 2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 307,900
433,500 125,600 307,900
Expected Completion: Dec 2024
Transportation - Capacity and traffic flow is enhanced on major road corridors Reserve (307,900)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Hollywood 7 (Sexsmith - Appaloosa) Improvements
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included T1 CARRYOVER
Justification: Carryover is requested to fund land acquisition for the Hollywood 7 DCC (Sexsmith to John Hindle Drive) project. The Hollywood DCC project will develop a new arterial road from Sexsmith Rd to John Hindle Dr and provide improved access to Academy Hill, adjacent industrial areas and the future transit maintenance facility. A preliminary design for the project was completed several years ago and is guiding land acquisitions. Real estate discussions for a significant parcel advanced through 2023 and a purchase agreement is expected in Q1 of 2024. This project was delayed due to the negotiations over land taking longer than expected. This carryover will fund this acquisition. 2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 1,769,400
1,772,900 3,500 1,769,400
Expected Completion: Mar 2024
Transportation - Capacity and traffic flow is enhanced on major road corridors Reserve (1,769,400)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 455
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Lakeshore 5 DCC (Swordy - Barrera), Road
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included T1 CARRYOVER
Justification: Carryover is requested for design of the Lakeshore 5 DCC Project between Swordy Road and Cook Road. This design project is exploring opportunities to coordinate street improvements with upcoming utility replacements and development. Depending on the outcomes from the design phase, a budget request for construction in coordination with utility works may follow in 2025.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 46,900
105,000 58,100 46,900
Expected Completion: Dec 2024
Transportation - Capacity and traffic flow is enhanced on major road corridors Reserve (46,900)
Borrow
Department: Cost Center:
Capital Projects Transportation Capital
Title:
McCulloch Area DCC (KLO/Hall/Spiers)
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included T1 CARRYOVER
Justification: The KLO bridge over Mission Creek is approaching the end of its service life. Carryover funding is requested to continue design and the acquisition of lands necessary to construct the replacement bridge, roundabout and approaches. Detailed design and land acquisition will be completed by Q4 of 2024 in anticipation of the bridge's replacement in 2025. The McCulloch DCC and KLO Bridge Replacement projects will be delivered concurrently.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 335,800
644,400 308,600 335,800
Expected Completion: Oct 2026
Other - Supports Base Business Reserve (335,800)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 456
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Stewart 3 DCC (Crawford-Swamp), Road
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included T1 CARRYOVER
Justification: In 2023 the Stewart Road West DCC project worked through options development, completed preliminary design and is now working through detailed design. The project was delayed as staff/consultants were considering different design options and potential land acquisitions. Carryover is requested to complete the detailed design, update project costs and advance land acquisitions. Construction timing will depend on land acquisition and Agricultural Land Commission approval timelines.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 3,931,300
4,063,600 132,300 3,931,300
Expected Completion: Dec 2025
Transportation - Capacity and traffic flow is enhanced on major road corridors Reserve (3,931,300)
Borrow
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Abbott DCC (Cedar - Gyro), ATC
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included T2 CARRYOVER
Justification: In 2023 the City completed an options review for the Abbott ATC between Cedar and south to the end of Meikle. This work is currently under review in consideration of next steps. Carryover budget for 2024 will complete preliminary design for this segment. The Abbott ATC protected bike lanes between Meikle and Gyro Beach Park are to be constructed by developer with funding for concurrent sidewalk construction from the City. The City is awaiting updated designs to support land acquisition and future construction. Carryover will fund a series of small land acquisitions and corner roundings in 2024. Construction is anticipated in 2025 but is dependent on development timelines. 2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 214,000
250,000 36,000 214,000
Expected Completion: Dec 2024
Transportation - More trips by alternative transportation modes Reserve (214,000)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 457
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Casorso 3 DCC
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included T2 CARRYOVER
Justification: The project was substantially completed in Nov 2023. Carryover is requested to cover costs related to the one-year maintenance period and items that were not completed in 2023 due to weather (Line painting). This section fills a major network gap by linking existing active transportation facilities to the north and south and improving access between Downtown, Pandosy Village, Okanagan College, KSS and Casorso Elementary.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 539,200
4,186,700 3,647,500 539,200
Expected Completion: Dec 2024
Transportation - More trips by alternative transportation modes Reserve (539,200)
Borrow
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Ethel 6 AT (Clement - Cawston)
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included T2 CARRYOVER
Justification: Carryover is requested to complete the design for the northmost phase of the Ethel Active Transportation Corridor (ATC) between Cawston Ave and the Okanagan Rail Trail. In 2023, design options were evaluated to support stakeholder engagement. In 2023 the project was delayed due to staffing availability. Design will be advanced in 2024 with expected completion by Q3. Results from this design process will inform the 10-Year Capital Plan and future budget requests for construction.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 83,900
100,400 16,500 83,900
Expected Completion: Dec 2024
Transportation - More trips by alternative transportation modes Reserve (83,900)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 458
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Glenmore 3 DCC (Clement - High) AT
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included T2 CARRYOVER
Justification: Carryover is requested to define an alignment and develop a concept design and cost estimates for the Glenmore 3 Active Transportation Corridor (ATC). The Glenmore ATC seeks to establish an all ages and abilities cycling connection between the Glenmore Valley and the Okanagan Rail Trail. In 2023, an alignment routing study, incorporating multiple account evaluation results, stakeholder and community input was completed. In the first half of 2024, a concept design and costing will be developed for the alignment. These results will inform updates to the 10-year capital plan and future design and construction requests. 2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 31,200
94,900 63,700 31,200
Expected Completion: Dec 2024
Transportation - More trips by alternative transportation modes Reserve (31,200)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Houghton 1 DCC (Nickel - Rails with Trails), ATC
Dev/Com
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included T2 CARRYOVER
Justification: This project has passed its 1 year Maintenance period in Q4 of 2023 however carryover is requested to better establish some landscaping, wayfinding signage, creek restoration and minor costs related to the 1-year Maintenance inspection. This project will be completed by Q2 of 2024.
2023 Budget: 2023 Expenditures: 2023 Budget Not Required: Carryover Requested: Strategic Direction: Amount 25,000
349,200 100,500 223,700 25,000
Expected Completion: Dec 2024
Transportation - More trips by alternative transportation modes Reserve (25,000)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 459
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Houghton 2 DCC (Hollywood Rd - Rutland Rd), ATC
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included T2 CARRYOVER
Justification: This multi-year project has been in construction for the duration of 2023. Construction began in Q2 of 2023 and was substantially complete in Q4 of 2023. Carryover is requested to address final elements of the project in Q1 of 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 139,800
4,157,500 4,017,700 139,800
Expected Completion: Dec 2024
Transportation - More trips by alternative transportation modes Reserve (139,800)
Borrow
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Rails with Trails to Greenway ATC
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included T2 CARRYOVER
Justification: Carryover is requested to complete the detailed design for the Rail Trail to Greenway ATC along Leckie Road from Dilworth Rd to Highway 97. The project was delayed due to staff/consultants tried a number of design options. The concept design was completed in the fall of 2023 and the detailed design is in progress, to be completed in Q1 2024. Construction of the ATC is planned for 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 11,900
119,600 107,700 11,900
Expected Completion: Dec 2024
Transportation - More trips by alternative transportation modes Reserve (11,900)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 460
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Sutherland 1 DCC (Gordon - Burtch), ATC
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included T2 CARRYOVER
Justification: Carryover is requested to continue construction of the Sutherland ATC from Ethel to Burtch. This work is under contract, with construction starting in Q3 of 2023 and scheduled to be complete by Q3 2024. Work was delayed as the City explored opportunities to coordinate work within the broader development. It was determined to complete work independently. Funding will also facilitate land acquisition for the ultimate configuration of Sutherland 1 ATC from Gordon to Burtch. These acquisitions will facilitate the construction of ultimate improvements required with the redevelopment of the Capri Mall. 2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 1,616,300
2,497,400 881,100 1,616,300
Expected Completion: Dec 2024
Transportation - More trips by alternative transportation modes Reserve (1,616,300)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Sutherland 2 DCC (Lake - Gordon), ATC
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included T2 CARRYOVER
Justification: Carryover is requested to complete the construction of the Sutherland 2 Active Transportation Corridor (ATC) between Ethel and Gordon. This project, in conjunction with Sutherland 1, fills a major east-west gap in the active transportation network between existing facilities at Sutherland/Ethel and Sutherland/Burtch. This project is under contract expected completion by Q3 2024. Work was delayed as the City explored opportunities to coordinate work within the broader development. A portion of the Sutherland ATC fronts the Capri Mall, a future redevelopment site with significant utility and ATC upgrade requirements. Where works overlap with future development requirements interim materials have been used where feasible. 2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 977,600
978,500 900 977,600
Expected Completion: Dec 2024
Transportation - More trips by alternative transportation modes Reserve (977,600)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 461
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
City of Kelowna Highway Signage
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included T3 CARRYOVER
Justification: Carryover is requested for a City entrance signage strategy in 2024 for all primary entrances to the City. Once this strategy is approved, it will be followed with a subsequent budget request for the design and construction for a replacement of the northern City signage removed during the Highway 97 6-laning project. This strategy work was delayed due to scheduling demands with higher priority projects in 2023.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 94,000
99,800 5,800 94,000
Expected Completion: Dec 2024
Other - Supports Base Business Reserve
Borrow
Fed/Prov (94,000)
Dev/Com
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Abbott DCC (Rose Ave - Cedar Ave) Protected Bike Lane Project
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included T5 - $2021 CARRYOVER
Justification: This project is substantially complete however the one-year maintenance period will extend into Aug 2024 and some minor repair and consultant costs are expected. A post-opening assessment of the pilot project was completed in 2023. Assessment recommendations are being reviewed and may result in minor adjustments/costs in 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 167,300
427,300 260,000 167,300
Expected Completion: Dec 2024
Transportation - More trips by alternative transportation modes Reserve (167,300)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 462
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Hwy 97 Right Turn Lane to Pandosy
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included T5 CARRYOVER
Justification: Carryover is requested to construct an eastbound right turn lane to improve traffic flow from Highway 97 onto Pandosy Street. This project is a Ministry of Transportation and Infrastructure (MoTI) condition for the City, tied to the approval of development in the area. Design is complete and the project was tendered, but did not receive any compliant submissions. Construction with city crews is now planned with completion by the end of 2024 Q2.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 412,600
442,000 29,400 412,600
Expected Completion: Jun 2024
Transportation - Capacity and traffic flow is enhanced on major road corridors Reserve (412,600)
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Okanagan Rail Trail
Borrow
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included T5 CARRYOVER
Justification: Carryover is requested to complete the missing Okanagan Rail Trail connection from Old Vernon Rd to the boundary of Lake Country near Beaver Lake Road, through Okanagan Indian Band (OKIB) lands. The design is complete and the project is ready for Request For Proposal (RFP) tender. Completion of this project has been delayed due to the land transfer process between the Federal Government and OKIB. Construction could proceed in 2024 dependent on the conclusion of the land transfer process.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 99,900
155,300 55,400 99,900
Expected Completion: Dec 2024
Transportation - More trips by alternative transportation modes Reserve (5,100)
Borrow
Fed/Prov (94,800)
Dev/Com
Utility
PAGE 463
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Transportation Capital
Title:
Traffic Signal - Spall at Springfield
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included T7 CARRYOVER
Justification: Some additional design and planning for improvements were completed in 2023; however, due to staff resources and construction crew availability, the project was not able to be scheduled for construction in 2023. Carryover is requested for the construction of the roadway and median changes by Q3 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 114,800
121,500 6,700 114,800
Expected Completion: Dec 2024
Transportation - More trips by alternative transportation modes Reserve (114,800)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Transportation Capital
Title:
Okanagan College Exchange Capacity Expansion
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included T9 CARRYOVER
Justification: Carryover is requested for this multi-year project to complete detailed design (2024) and construction (2025) for capacity and operational improvements at the Okanagan College transit exchange. Total costs for this project are being shared between the City and BC Transit with grant funding provided through the Investing in Canada Infrastructure Program (ICIP). A grant application was successful in 2023. Carryover is required to fund the City's share of costs due upon substantial completion.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 1,225,100
1,240,000 14,900 1,225,100
Expected Completion: Dec 2025
Transportation - More trips by alternative transportation modes Reserve (245,000)
Borrow
Fed/Prov
Dev/Com (980,100)
Utility
PAGE 464
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Electrical Supply Upgrades
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: 2023 SW2 - $2M CARRYOVER
Justification: Carryover is requested for the upgrading and installation of power supply as part of the stockpile relocation and ongoing operations. The project delayed due to supply chain delays and is now expected to be completed in Q3 2024. This expanded electrical capacity allowance included for EV charging of mobile and heavy equipment, and is consistent with the City Green Fleet Policy and Community Climate Action Plan.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 1,378,400
2,000,000 621,600 1,378,400
Expected Completion: Sep 2024
Other - Supports Base Business Reserve (1,378,400)
Borrow
Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
General Site Works and Investigations
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included SW2 CARRYOVER
Justification: Carryover is requested due to limited staffing and onboarding of new personnel, selected portions of this work was started. This project includes a number of smaller consulting projects required to complete tasks to ensure compliance with the BC Landfill Guidelines and associate Regulations.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 321,100
330,900 9,800 321,100
Expected Completion: Mar 2024
Other - Supports Base Business Reserve (321,100)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 465
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Landfill - Electric Equipment Charging Station
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: 2023 SW2 - $2M CARRYOVER
Justification: Carryover is requested to install EV charging infrastructure at the Glenmore Landfill transfer station for the use of City vehicles and equipment. This is consistent with the Green Fleet Policy and will support the Electric Compact Loader that has been received in 2024. Charging stations would be installed, with the capacity to add future charging stations as the City expands EV fleet at the landfill. Electrical panel and Kiosk delivery was delayed by manufacturer to December, pushing completion of the project to 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 33,800
85,000 51,200 33,800
Expected Completion: Mar 2024
Climate & Environment - Reduce corporate and community GHG emissions Reserve (33,800)
Borrow
Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Landfill Liner Design and Construction
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: 2023 SW2 - $1.5M CARRYOVER
Justification: Carry over requested for multi-year project. Design was completed in 2023 and some construction started. Project was delayed due to timing of available resources. Construction now to be completed Q2 2025.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 1,469,700
1,500,000 30,300 1,469,700
Expected Completion: Jun 2025
Other - Supports Base Business Reserve (1,469,700)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 466
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Landfill Site Preparation
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included SW2 CARRYOVER
Justification: Carryover is requested to continue landfill site preparations. The project was delayed due to seasonal timing and availability of specific contractors. Rock generated from blasting in 2022 needed to be transferred offsite of the landfill and took time to arrange suitable areas to receive the rock. Contract in place for earthworks in 2023/2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 1,550,000
2,286,700 736,700 1,550,000
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (1,550,000)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Odour Control and Leachate Treatment
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: 2023 SW4 - $100K CARRYOVER
Justification: Carryover is requested for completion of the preliminary study in advance of a design for the leachate treatment system to be installed in the near future. Project was delayed due to capacity of contractor. The updated landfill leachate treatment study will be completed in Q3 of 2024, and this study will dictate the needs for the odour controls to be installed.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 99,700
100,000 300 99,700
Expected Completion: Sep 2024
Other - Supports Base Business Reserve (99,700)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 467
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Surface Water Bypass
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included SW5 CARRYOVER
Justification: Carryover is requested to continue design and permitting of the Glenmore Landfill Surface Water Bypass system. The project took longer than expected due to complexity in design stage. The license applications and design are ongoing, and studies continue Robert Lake to mitigate potential flooding in this water basin. The work is well underway, and the final product will lead into new budget for 2024 to complete the final design and consideration for new construction in 2025.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 394,700
530,000 135,300 394,700
Expected Completion: Dec 2024
Climate & Environment - Protect and restore natural areas Reserve (394,700)
Borrow
Fed/Prov
Dev/Com
Utility
Department: Cost Center:
Capital Projects Solid Waste Capital
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included SW5
Title:
Wet Well Relocation
CARRYOVER
Justification: Carryover is requested to relocate an existing wet well at the Glenmore Landfill. Materials were procured in 2023 but staff were not available to complete construction until Q1 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 444,500
600,000 155,500 444,500
Expected Completion: Sep 2024
Other - Supports Base Business Reserve (444,500)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 468
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Commonage Pavement Repairs
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included SW6 CARRYOVER
Justification: Carryover is requested as this multi-year project to repair large sections of asphalt while keeping operations going was delayed due to staff availability and operational access.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 43,400
109,100 65,700 43,400
Expected Completion: Dec 2024
Other - Supports Base Business Reserve
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Mechanical Shop Expansion - Equipment Storage Bay
Dev/Com (28,600)
Utility (14,800)
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: 2024 SW7 CARRYOVER
Justification: Carryover is requested for the second of three phases in the construction of the mechanic shop. The equipment storage bay is required to store landfill equipment and storage for equipment for general repairs. This is a building extension to the shop which is covered but open to the elements. The project will be delivered under a 3rd party design-build contract. Phase 1 of this project was delayed and so phase 2 was scheduled for 2024. Phase 1 is now complete, and the project can proceed.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 395,200
400,000 4,800 395,200
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (395,200)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 469
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Storm Drainage Capital
Title:
Knox Mountain Geotechnical Engineering
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included D1 CARRYOVER
Justification: Carryover is requested to complete the seeding and plantings required on the newly stabilized slope completed in 2023. If was felt due to the geotechnical nature of the project, it was best to allow for a full growing season to review and assess where additional restoration measures were needed.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 236,000
3,820,200 3,584,200 236,000
Expected Completion: Dec 2024
Climate & Environment - Protect and restore natural areas Reserve (213,600)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Storm Drainage Capital
Title:
Storm Drainage Asset Renewal Projects
Dev/Com
Utility (22,400)
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included D3 CARRYOVER
Justification: Carryover is requested for this budget item to complete drainage projects connected with operations capital renewal projects and initiate design of the Frost and Frazer Lake Stormwater Improvements Project. Coordination with Development is ongoing, and uncertainties in estimates and timelines persist until final agreements are reached with developers. Negotiations are currently in progress. The Brandt's Creek lining sub-project completed in 2023 also requires carryover to pay final invoices for record drawings and complete warranty period inspections. 2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 204,100
427,400 223,300 204,100
Expected Completion: Dec 2024
Climate & Environment - Protect and restore natural areas Reserve (179,100)
Borrow
Fed/Prov
Dev/Com
Utility (25,000)
PAGE 470
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Information Services Capital
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included I3
Title:
Asset Management System
CARRYOVER
Justification: Carryover is requested for some final cleanup items for this multi-year project for the Corporate Asset Management System. The core implementation was completed in 2023 but few cleanup items were left outstanding due to internal staffing constraints.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 11,200
52,300 41,100 11,200
Expected Completion: Dec 2024
Digital Transformation - Digital tools make it easier to do business with the City Reserve (7,400)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Information Services Capital
Title:
Major Systems Projects - Bylaw Request System
Dev/Com
Utility (3,800)
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included I3 CARRYOVER
Justification: In order to capitalize on a shared platform, the Bylaw Request System replacement and the Kelowna Fire Department replacement systems were executed together. The vendor selection process was delayed by the 2023 fire season, but now that the computer aided design vendor has been selected the project can continue with the selection of a compatible shared record management system and implementation.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 126,200
150,000 23,800 126,200
Expected Completion: Dec 2024
Digital Transformation - Digital tools make it easier to do business with the City Reserve (126,200)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 471
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Information Services Capital
Title:
Major Systems Projects - Corporate Initiatives
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included I3 CARRYOVER
Justification: Carryover is requested to complete the remaining AI chatbot initiatives that support corporate initiatives that were started at the end of 2023 but were delayed due to internal scheduling, and are scheduled to conclude in Q1 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 37,800
220,000 182,200 37,800
Expected Completion: Mar 2024
Digital Transformation - Digital tools make it easier to do business with the City Reserve (37,800)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Information Services Capital
Title:
Major Systems Projects - Land Management System
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included I3 CARRYOVER
Justification: The Land Management system is a complex system that provides the foundation for all property related information across the City. Carefully considering dependencies with related applications so as to prevent data loss and/or service outages along with reduced vendor availability have delayed this work in 2022 and 2023. In 2024, the new Land Management System requires a final round of robust testing and deployment to our production environment.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 29,800
78,600 48,800 29,800
Expected Completion: Jun 2024
Digital Transformation - Digital tools make it easier to do business with the City Reserve (29,800)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 472
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Information Services Capital
Title:
Major Systems Projects - Website Compliance
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included I3 CARRYOVER
Justification: Information Services is upgrading the City's website, scheduled to be completed in Q4 2024. A carryover is required due to competing priorities and a change in the provider's update cycle that prevented the complete cleanup of website data.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 124,800
160,000 35,200 124,800
Expected Completion: Dec 2024
Digital Transformation - Digital tools make it easier to do business with the City Reserve (124,800)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Information Services Capital
Title:
Major Systems Projects – Planning and Permitting
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included I3 CARRYOVER
Justification: This is a multi-year project to replace the legacy planning and permitting systems. While the project was scheduled to be completed at the end of 2023, vendor resourcing has delayed the completion date. This project is in progress and is now scheduled to be completed by Q4 of 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 378,600
750,300 371,700 378,600
Expected Completion: Dec 2024
Digital Transformation - Digital tools make it easier to do business with the City Reserve (378,600)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 473
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Information Services Capital
Title:
Records and Information Management System
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included I3 CARRYOVER
Justification: Carryover is requested for this multi-year project that reviews the electronic records needs of the City. Phases 1 through 4 have been completed and work will continue in 2024 to complete phases 5 and 6 of the implementation of the electronic records management system for the City. The scope of the project changed due to the constant evolving world of artificial intelligence (AI). Anticipated completion is mid 2025.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction:
513,400 0 513,400
Expected Completion: Jun 2025
Digital Transformation - Digital tools make it easier to do business with the City
Amount 513,400
Reserve (513,400)
Borrow
Department: Cost Center:
Capital Projects Information Services Capital
Title:
Network as a Service
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included I4 CARRYOVER
Justification: The City is working on updating all City IT infrastructure and systems due to end of life of current system and increasing complexity, number of upgrades, extensive training requirements and cyber threats. This multi-year initiative includes all implementation, deployment and ongoing upgrades and security patches. Hardware supply issues resulted in product not being delivered until the final quarter of 2023. This project will continue into 2024 with the implementation of the delivered hardware.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 622,100
1,621,200 999,100 622,100
Expected Completion: Dec 2024
Digital Transformation - Digital tools make it easier to do business with the City Reserve (622,100)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 474
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Vehicle & Mobile Equipment
Title:
Equipment and Vehicle Replacement
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included V2 CARRYOVER
Justification: Carryover is requested for both equipment and vehicles that were approved and ordered in 2023 but will be invoiced and delivered in 2024. These were delayed for various reasons including internal scheduling, vendor availability, and review of design options.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 5,464,300
5,679,500 215,200 5,464,300
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (5,277,700)
Borrow
Fed/Prov (12,000)
Department: Cost Center:
Capital Projects Fire Capital
Title:
Fire Communications Equipment Renewal
Dev/Com
Utility (174,600)
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: 2023 F3 - $634000 CARRYOVER
Justification: The Union of BC Municipalities provided multi-year grant funding for the Next Generation 9-1-1 (NG 9-1-1) project to the City of Kelowna in the amount of $3,045,000. The funding will support all costs related to the mandatory transition to NG 9-1-1 technology by 2025. The provincial government delayed the date to 2025 as Canadian Radio-television and Telecommunications (CRTC) requirements were not finalized.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 2,810,000
2,810,000 0 2,810,000
Expected Completion: Mar 2025
Other - Supports Base Business Reserve
Borrow
Fed/Prov (2,810,000)
Dev/Com
Utility
PAGE 475
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Airport Capital
Title:
Airport - Ski Racks
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: 2023 A1 CARRYOVER
Justification: Ski rack equipment was ordered in 2023, however, the supplier was unable to build and deliver the ski racks before the end of the year. A carryover is requested to allow for delivery and the project to be completed in the first quarter of 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 11,800
20,000 8,200 11,800
Expected Completion: Mar 2024
Other - Supports Base Business Reserve (11,800)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Airport Capital
Title:
Airport - Taxiway and Utilities Construction
Dev/Com
Utility
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: 2023 A1 CARRYOVER
Justification: Negotiations are on-going for the sublease of land in the northeast corner of the Airport. A carryover is requested to complete construction of the taxiway and utilities in 2024, subsequent to the completion of negotiations.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 390,000
390,000 0 390,000
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (390,000)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 476
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Airport Capital
Title:
Airport Airside Land Development
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included A1 CARRYOVER
Justification: This project commenced in mid-2023 but has been delayed due to missing information from a potential lessee vital to the completion of the design. Design work will be completed in 2024 and construction to commence upon approval of a development permit. A carryover is requested so this project can be completed and a development permit obtained in 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 46,000
50,000 4,000 46,000
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (46,000)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Airport Capital
Title:
Airport - Combined Operations Building Refurbishment
Dev/Com
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: A3 CARRYOVER
Justification: A carryover is being requested to ensure timing is aligned for the design of the refurbishment for the existing Combined Operations Building with the design and construction of the new Combined Operations Building.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 440,000
440,000 0 440,000
Expected Completion: Dec 2025
Other - Supports Base Business Reserve (440,000)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 477
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Airport Capital
Title:
Airport - Common Use Counter Expansion
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: 2023 A3 CARRYOVER
Justification: A carryover is requested for the completion of the common use counter expansion in 2024. This project was delayed to ensure the location aligned with the air terminal building expansion.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 510,000
510,000 0 510,000
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (510,000)
Borrow
Fed/Prov
Dev/Com
Department: Cost Center:
Capital Projects Airport Capital
Title:
Airport Air Terminal Building Capital Replacement and Improvement
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included A3 CARRYOVER
Justification: A carryover is requested to allow for the completion of the air distribution system and the public announcement (PA) system, light emitting diode (LED) Lighting upgrades, and delivery of office and boardroom furniture in 2024. These projects were not completed in 2023 due to a shift in projects to align with the Airport's goal to be carbon neutral by 2030, contractor capacity constraints, competing priorities, and supply chain issues.
2023 Budget: 2023 Expenditures: 2023 Budget Not Required: Carryover Requested: Strategic Direction: Amount 975,000
2,152,000 655,800 521,200 975,000
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (975,000)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 478
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Airport Capital
Title:
Airport Small Capital Projects
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included A3 CARRYOVER
Justification: One small capital purchase was identified at the end of 2023, but was not able to be delivered and installed prior to the end of the year. A carryover is requested to complete the project in the first quarter of 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 13,600
15,300 1,700 13,600
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (13,600)
Borrow
Department: Cost Center:
Capital Projects Airport Capital
Title:
Airport Technology Replacements
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included A3 CARRYOVER
Justification: This project has been mainly delayed due to external supplier capacity constraints. A carryover is requested so this project can be completed in 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 200,800
520,000 319,200 200,800
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (200,800)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 479
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Airport Capital
Title:
Airport Passenger Boarding Bridge Upgrades
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: 2023 A4 CARRYOVER
Justification: Due to supply chain issues the project could not be completed prior to winter peak and the project was deferred to help avoid potential operational issues. The necessary parts were received in 2023, however, the contractor could not complete the installation prior to winter peak times. A carryover is requested so this project can be completed in 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 183,200
338,400 155,200 183,200
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (183,200)
Borrow
Fed/Prov
Dev/Com
Department: Cost Center:
Capital Projects Water Capital
Title:
Poplar Point to Dilworth Mountain Transmission Upgrade Design
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included W1 CARRYOVER
Justification: Carryover is requested for the planning and preliminary design of the water supply improvements required to service growth in the Kelowna area. This project was delayed as efforts were re-resourced to establishing the vision of work in the Water Security Planning process and siting discussions for a future filtration plant. This work, as well as planning for the Kelowna Water Integration Plan started in Q4 2023. This is the first stage of identifying alignments and operations between Poplar Point to Dilworth Reservoir. The work will lead to detailed phasing of large transmission works.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 749,500
793,100 43,600 749,500
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (749,500)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 480
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Water Capital
Title:
Summit Reservoir DCC
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: 2023 W4 - $231K CARRYOVER
Justification: Carryover is requested to continue the planning and design of a new reservoir cell for Summit Reservoir supporting the 525 metre pressure zone on Dilworth Mountain. This work will supplement the 2024 capital budget that constructs the additional cell. The new reservoir will provide the additional fire flow capacity for larger density developments in the area and support anticipated growth. Recent changes to City zoning may change growth expectations within the area serviced. The consultant is reviewing the final design and constructability with the contractor for future phasing expectations. 2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 149,800
231,000 81,200 149,800
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (149,800)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Water Capital
Title:
Skyline PS - Station Upgrade Safety Issues
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included W6 CARRYOVER
Justification: Substantial completion of the project including landscaping was achieved in 2022. Due to the seasonality and demand of the pump station, carryover is requested to complete this installation on the new pump assembly and condition of the existing pumping equipment.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 125,000
319,500 194,500 125,000
Expected Completion: Mar 2024
Other - Supports Base Business Reserve (125,000)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 481
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Water Capital
Title:
Chemical Storage Tank Replacement - Kettle Valley UV Facility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included W7 CARRYOVER
Justification: Carryover is requested due to Supply chain and engineering support availability which has delayed completion. Construction materials, supplies, and engineering consultant support costs to be expensed in 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 12,700
20,100 7,400 12,700
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (12,700)
Borrow
Department: Cost Center:
Capital Projects Water Capital
Title:
Kettle Valley Reservoir Upgrade
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included W7 CARRYOVER
Justification: Carryover is required to complete reservoir mixing models of the cells. The water demand from June to September is what gets analyzed and modeled for design options by an external consultant. Additional condition assessment work was required to determine the full scope of work required to address the reservoir performance items. Once the City was able to provide the demand data, the consultant was unable to complete the analysis and provide design options within budget year timeframe.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 59,800
95,300 35,500 59,800
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (59,800)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 482
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Water Capital
Title:
Osprey Ave Water Main Replacement
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included W7 CARRYOVER
Justification: Carryover is requested to complete the construction of the Osprey Avenue waterworks. The project consists of upgrading the watermain along Osprey Avenue while the sewer project is being constructed as this neighbourhood was approved for intensification. The Water Utility has funded 50 per cent of the project to reflect the advancing of the renewal project, while the remaining 50 percent will be recovered, from development, through future latecomer fees. Waiting for completion of post construction task and maintenance period, and as-built drawings.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 16,200
300,000 283,800 16,200
Expected Completion: Jun 2024
Other - Supports Base Business Reserve (16,200)
Department: Cost Center:
Capital Projects Water Capital
Title:
Snow Runoff Hydrology
Borrow
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included W7 CARRYOVER
Justification: Carryover is requested as work was impacted by resource allocations and permitting issues encountered by the Province, who will supply and install the snow pillow unit. The Province has identified a more suitable location. The Province expects to install this unit by end of Q3 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 50,000
50,000 0 50,000
Expected Completion: Sep 2024
Climate & Environment - Enhanced climate emergency planning and response programs Reserve (50,000)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 483
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Water Capital
Title:
South End Water Upgrades
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included W7 CARRYOVER
Justification: Carryover is requested for this multi-year project to the City's south end water system related to the integration of South East Kelowna Irrigation District and South Okanagan Mission Irrigation District. A contract commitment is underway to install additional pump and electrical elements at both Stellar Pump Station and Jean Road Pump Station. The delays in the installation involve longer that anticipated delivery times for new equipment.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 58,600
290,400 231,800 58,600
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (58,600)
Borrow
Department: Cost Center:
Capital Projects Water Capital
Title:
Irrigation System Upgrades
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included W8 CARRYOVER
Justification: Carryover is requested as work was delayed due to budget challenges and staff availability. It is expected that engineering consultant support, internal staff, construction material, supplies and repair parts will all be available in 2024. Project is for improved safe access to below ground chambers containing non potable system pressure reducing valves.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 16,800
132,800 116,000 16,800
Expected Completion: Mar 2024
Other - Supports Base Business Reserve (16,800)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 484
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Water Capital
Title:
Non Potable System Capital Plan
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: 2023 W8 - $200K CARRYOVER
Justification: Carryover is requested for the non-potable (irrigation) network in Southeast Kelowna which requires a master plan to address renewal needs and priorities for the next 20 years. A thorough condition assessment of the linear network to assess liability and develop a renewal plan is in development. The plan will also include an implementation plan for dam repair needs noted in the dam safety plans currently being delivered in 2023. Work is currently being assessed by a consultant with completion expected in 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 146,900
200,000 53,100 146,900
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (146,900)
Borrow
Department: Cost Center:
Capital Projects Water Capital
Title:
Pressure Reducing Valve Upgrades
Fed/Prov
Dev/Com
Utility
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included W8 CARRYOVER
Justification: Project is currently in the design phase and has been delayed by the complexity of the assignment and available resources. Carryover is requested for engineering consultant support, construction support, material & supplies, and parts.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 490,800
688,500 197,700 490,800
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (490,800)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 485
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Glenmore Connection - Glenmore Rd from Cross Rd to Scenic Rd
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included WW1 CARRYOVER
Justification: Carryover is requested to continue the design and tendering of the project. The design is now at 50% Design review milestone. The project has been phased due to scope size and the complication of ultimate transportation corridor design review. Design will continue into 2024 for both Phases. The projected completion date is the end of 2025.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 169,500
296,900 127,400 169,500
Expected Completion: Dec 2025
Other - Supports Base Business Reserve (169,500)
Borrow
Fed/Prov
Dev/Com
Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Biosolids Management Site Development and Preliminary Design
Utility
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included WW3 CARRYOVER
Justification: Carryover is requested to finalize the Phase I conceptual work for the digester site requirements. This project was held due to the diversion of biosolids in 2021 which reduced pressure to develop the digestor. The work continues on the application to the Agricultural Land Commission (ALC) for both a digestion facility and future Wastewater Treatment Facility. Much of this work has been initiated, and a full ALC exclusion is expected in 2025.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 360,100
434,200 74,100 360,100
Expected Completion: Dec 2025
Other - Supports Base Business Reserve (360,100)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 486
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Wastewater Capital
Title:
BCTTP Transformer Replacement
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included WW5 CARRYOVER
Justification: Carryover is requested due to design phase delays due to cost challenges. The support funding has been secured from industry partners. Replacement equipment has been scheduled for delivery in Q1 2024. The Brandt's Creek Tradewaste Treatment Plant (BCTTP) project is expected to be completed Q3 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 551,600
580,000 28,400 551,600
Expected Completion: Mar 2025
Other - Supports Base Business Reserve (116,600)
Borrow
Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Sewer Lift Station SCADA Integration
Fed/Prov
Dev/Com (435,000)
Utility
Priority: 1 Reason: Scheduling Demands 10 Yr Cap Plan Ref: Not included WW5 CARRYOVER
Justification: Carryover is requested to continue the overhaul of Supervisory Control and Data Acquisition (SCADA) works for City's existing sanitary lift stations. The work has been completed on the SCADA system at the wastewater plant, and now the lift stations SCADA systems are to be connected and updated. This project has had delays due to low staffing resources. The project is progressing with a revised completion planned for Q1 2025.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 211,300
211,300 0 211,300
Expected Completion: Mar 2025
Other - Supports Base Business Reserve (211,300)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 487
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Air Filtration Commonage Mix Building
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included WW6 CARRYOVER
Justification: Carryover is requested to complete this project to address the air quality concerns for staff working within the mix building. The completed air filtration system will improve air quality by increasing fresh air from outside and filtering the exhaust air from the building. The system is being designed to reduced mold concentrations in air and combustible dust. Recent modifications to scope causing delay were permit requirements to minimize odour emissions into the environment.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 108,300
110,000 1,700 108,300
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (72,100)
Borrow
Fed/Prov
Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Beaver Lake Service Area Wastewater Utility Upgrades
Dev/Com (36,200)
Utility
Priority: 1 Reason: Design Option 10 Yr Cap Plan Ref: Not included WW6 CARRYOVER
Justification: Carryover is requested to complete the design and construction of the lift station upgrades at McCarthy Rd. to allow collection and pumping of treated effluent from the District of Lake Country to the City wastewater treatment process. The project is under construction in late 2023, including a gravity main extension and lift station upgrades for the effluent interconnect. The lift station design is at 50% milestone with construction to start in Q2 2024. Enough construction has been completed to date to allow some collection from Lake Country.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 920,900
1,300,000 379,100 920,900
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (920,900)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 488
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Wastewater Capital
Title:
Rose Ave Lift Station Odour Control System
Priority: 1 Reason: External Event 10 Yr Cap Plan Ref: Not included WW6 CARRYOVER
Justification: Carryover is required to complete the installation of equipment to improve air quality at the Rose Ave lift station control facility. The project was delayed due to material shortges in 2023. The project still has commitments remaining, and installation of equipment will continue in 2024.
2023 Budget: 2023 Expenditures: Carryover Requested: Strategic Direction: Amount 42,600
50,000 7,400 42,600
Expected Completion: Dec 2024
Other - Supports Base Business Reserve (42,600)
Borrow
Fed/Prov
Dev/Com
Utility
PAGE 489
FINANCIAL PLAN Kelowna, BC Canada Final Budget - Volume 3
2024
2024 FINANCIAL PLAN
CITY OF KELOWNA
Report to Council Date:
May 6, 2024
To:
Council
From:
City Manager
Subject:
2024 Financial Plan – Final Budget Volume
Department: Financial Planning
Recommendation: THAT COUNCIL adopts the 2024-2028 Financial Plan; AND THAT Council approves the formulation of 2024 Property Tax Rates that will raise the required funds in 2024, from General Taxation, in the amount of $191,220,490 resulting in an average net property owner impact of 4.72 per cent; AND THAT Bylaw No. 12639 being the 2024-2028 Five-Year Financial Plan, 2024 be advanced for reading consideration; AND THAT Bylaw No. 12640 being the Tax Structure Bylaw, 2024 be advanced for reading consideration; AND THAT Bylaw No. 12641 being the Annual Tax Rates Bylaw, 2024 be advanced for reading consideration; AND THAT Bylaw No. 12642 being the DCC Reserve Fund Expenditure Bylaw, 2024 be advanced for reading consideration; AND THAT Bylaw No. 12643 being the Sale of City Owned Land Reserve Fund Expenditure Bylaw, 2024 be advanced for reading consideration. AND THAT Bylaw No. 12644 being the Density Bonusing for Public Amenities and Streetscape Reserve Fund Expenditure Bylaw, 2024 be advanced for reading consideration; AND FURTHER THAT Bylaw No. 12645 being the Septic Removal Specified Area Reserve Fund Expenditure Bylaw, 2024 be advanced for reading consideration.
Purpose: To present the 2024 Final Budget Volume submissions, the 2024-2028 Financial Plan and related bylaws to Council for their consideration and approval.
PAGE 491
2024 FINANCIAL PLAN
CITY OF KELOWNA
Background: Council approved the 2024 Financial Plan – Preliminary volume on December 7, 2023 and the addition of the 2024 Financial Plan – Carryover Budget volume on March 18, 2024. The 2024 Financial Plan Final Budget volume includes emergent, legislated or Council directed requests. The three volumes provide the 2024 portion of the 2024-2028 Five Year Financial Plan. Depending on the nature of the item being considered within Final Budget, the adjustments could cause the final tax demand to increase or decrease. The City of Kelowna’s strong financial management and clear budgeting practices continue to allow the delivery of essential services residents expect while maintaining, expanding, and building infrastructure that makes Kelowna a great place to live. The 2024 Final Budget as proposed, reflects a net municipal property tax increase of 4.72 per cent, a 0.3 per cent decrease to the Preliminary Budget tax requirement approved in December 2023, of 4.75 per cent. The largest Final Budget request affecting taxation can be attributed to the Council Initiatives request which is offset by an increase in new construction revenue. Information about the requested changes is included in the attached 2024 Final Budget Volume. A tax rate of 4.72 per cent means the owner of a residential property with an average assessed value of $982,950 will pay $2,484 which is an increase of $112 from the prior year for the municipal portion of their property taxes. Considerations applicable to this report: Legal/Statutory Authority: In Section 165 of the Community Charter regarding Financial Plans, adoption of a 5 Year Financial Plan bylaw is required prior to the annual property tax bylaw. Under the Annual Property Tax Bylaw Section 197 of the Community Charter, Council must establish tax rates by bylaw after adoption of the financial plan but before May 15th. Considerations not applicable to this report: Legal/Statutory Procedural Requirements: Existing Policy: Financial/Budgetary Considerations: External Agency/Public Comments: Communications Comments: Submitted by: M. Antunes, CPA Financial Planning Manager Approved for inclusion: J. Sass, CA, CPA Director of Financial Services Attachment: 1: 2024 Financial Plan – Final Budget Volume 2. 2024-2028 Five-Year Financial Plan 3: 2024 Financial Plan Presentation
PAGE 492
2024 FINANCIAL PLAN
CITY OF KELOWNA
FINANCIAL SUMMARIES The 2024 Final Budget Volume includes requests that are emergent, required by legislation or have been directed by City Council. This volume is consolidated with the first two volumes, 2024 Preliminary Volume and the 2024 Carryover Volume, to create the 2024 Financial Plan and the 2024-2028 Five-Year Financial Plan. The 2024 Financial Plan results in a Final Tax Demand of $191.2M. This represents an increase of $1.2M relative to the 2024 Preliminary Financial Plan, and an increase of $1.3M of taxation revenue from new construction. The impact to the average property owner is 4.72 per cent.
FINAL BUDGET SUMMARIES Analysis of tax demand ($ thousands) The 2023 final tax demand was $176.6M and had a 3.78 per cent net property owner impact. The final 2024 taxation demand has increased by 8.26 per cent over 2023 for a total gross tax demand increase of $14.6M.
Taxation demand New construction tax revenue Net property owner impact Municipal impact Public Safety Levy impact
2023
176,624 (3,200) 3.78% 2.78% 1.00%
2024
191,220 (6,260) 4.72% 3.72% 1.00%
Change
14,596 (3,060)
% change
8.26% 0.94%
Note: Totals may not add due to rounding
The tax demand established at Preliminary Budget was $190.0M. The estimated new construction revenue was $5.0M, based on BC Assessment preliminary roll information, resulting in a 4.75 per cent net property owner impact. Final Budget requests for net general fund operating and capital expenditures of $1.2M have increased the total tax demand to $191.2M. Final new construction revenues, based on the revised assessment roll, increased by $1.3M to $6.3M, reducing the net property owner impact to 4.72 per cent.
2024 Taxation demand New construction tax revenue Net property owner impact Municipal impact Public Safety Levy impact
Preliminary
189,996 (4,980) 4.75% 3.75% 1.00%
Final
191,220 (6,260) 4.72% 3.72% 1.00%
Change
1,224 (1,280)
% change
0.64% 25.70% (0.03%) (0.03%) 0.00%
Note: Totals may not add due to rounding
PAGE 493
2024 FINANCIAL PLAN
CITY OF KELOWNA
Analysis of total revenues The total revenue budget is $854.9M with $439.4M from operating sources and $415.5M from capital sources. The tables below summarize the total operating and capital revenue by fund, including the prior year’s carryover amounts, and the same revenue information by revenue source.
Revenues by Fund ($ thousands)
Operating
Capital
General
340,514
208,997
Airport
62,759
143,112
Wastewater
17,315
46,799
Water
18,858
16,548
439,446
415,457
General 65% Airport 24% Wastewater 7% Water 4% Total $854.9M
854,903
Total Note: Totals may not add due to rounding
Revenues by Sources ($ thousands)
191,220 4,441 178,948 44,672 66,209 369,413
Thousands
Property tax Parcel tax Fees and charges Grant Other revenue Transfer from reserve
$400,000
Total 854,903 Note: Totals may not add due to rounding
Revenue by sources
$300,000 $200,000 $100,000 $0
Property tax Parcel tax
Actual 2022
Fees and charges
Grant
Revised 2023
Other revenue
Final 2024
Transfer from reserve
PAGE 494
2024 FINANCIAL PLAN
CITY OF KELOWNA
Analysis of total expenditures The total expenditure budget requirement is $854.9M with $439.4M for operating needs and $415.5M for the 2024 capital program. The tables below summarize the total operating and capital expenditures by fund, including the prior year’s carryover amounts, and the same total operating and capital expenditure information by expenditure type.
Expenditures by Fund ($ thousands)
Operating
Capital
General
340,514
208,997
Airport
62,759
143,112
Wastewater
17,315
46,799
Water
18,858
16,548
439,446
415,457
General 65% Airport 24% Wastewater 7% Water 4% Total $854.9M
854,903
Total Note: Totals may not add due to rounding
Expenditures by Types ($ thousands)
128,980 115,931 109,946 11,180 415,457 73,408
Thousands
Salaries and wages Material and other Contract services Debt service Capital expenditure Transfer to reserve
$400,000
Total 854,903 Note: Totals may not add due to rounding
Expenditure by type
$300,000 $200,000 $100,000 $0
Salaries and Material wages and other Actual 2022
Contract services
Debt service
Revised 2023
Capital Transfer to expenditure reserve
Final 2024
PAGE 495
2024 FINANCIAL PLAN
CITY OF KELOWNA
Use of tax dollar by service area The table below highlights the cost by service area and the resulting total municipal taxes for the average residential property in Kelowna for 2024. Note the municipal portion of taxes does not include amounts collected on behalf of other taxing authorities or applicable business improvement areas such as: Regional District of Central Okanagan, BC Assessment, Okanagan Regional Library, Minister of Finance – School Tax, Downtown Kelowna Business Improvement Area or Uptown Rutland Business Improvement Area. The average assessed value of a residential property is $982,950 in 2024, as obtained from BC Assessment. The service area with the highest cost in operating is Police Services & RCMP, at 27.6 per cent, followed by the Enabling Services at 19.5 per cent and Fire Safety at 13.8 per cent. On the capital side, Building Capital, Parks Capital and Transportation Capital are in the top three costs all at 1.9 per cent.
$ Cost
2024%
2023%
Operating Arts & Culture Community Development Community Safety & Bylaw Development Planning Development Services Enabling Services Fire Safety Governance & Leadership Parking Parks Police Services & RCMP Sport & Recreation Stormwater & Flood Protection Transit Transportation Operating sub-total
36.59 46.29 80.90 22.65 (79.12) 485.14 341.79 60.36 (14.94) 154.80 684.51 135.72 27.30 118.72 186.00 2,296.31
1.5% 1.9% 3.3% 0.9% (3.2%) 19.5% 13.8% 2.4% (0.6%) 6.2% 27.6% 5.5% 1.1% 4.8% 7.5% 92.4%
1.5% 1.7% 2.8% 0.9% (2.2%) 19.6% 12.9% 2.1% (0.1%) 6.2% 27.3% 5.4% 1.1% 4.4% 7.4% 91%
Capital Building Information Services Parks Real Estate & Parking Storm Drainage Transportation Capital sub-total Total Municipal portion of taxes
46.31 14.07 46.01 16.24 17.14 48.18 187.94 2,484.25
1.9% 0.6% 1.9% 0.7% 0.7% 1.9% 7.6% 100%
1.6% 0.4% 3.4% 0.6% 0.6% 1.9% 9% 100%
$
Based on the 2024 average residential property assessed property value of $982,950 Note: Totals may not add due to rounding
PAGE 496
2024 FINANCIAL PLAN
CITY OF KELOWNA
Ongoing budget impacts Below is a projection of the next five years net property owner impacts using the best information available at the time of preparation for the Final Budget volume. As with any planning exercise, the level of certainty and detail is most appropriately found in the current year. For the years after 2024, budgets have been adjusted for current one-time projects, changes in operating budgets from previously approved requests, new capital projects included in the Council endorsed 10-Year Capital Plan, 2023-2032 (10YCP), growth and/or inflationary rates, and other key assumptions. Although this forward looking information is based on what is believed to be reasonable assumptions, there can be no assurance that this information will prove to be accurate as actual results and future events could differ materially from the anticipated information contained in this forecast. Specific assumptions in the preparation of the years 2025-2028 included in the forecasted increases below: • Growth rates of 1.59 per cent for 2025 and 1.47 per cent per year for 2026-2028. • Inflation rates of 2 per cent for most operating expenses and certain revenues, rate increase to 3.6 per cent in 2025 for materials expense. • MFA amortization schedules and estimated rates are used as a basis for projected principal and interest where applicable. • Approval to borrow for all priority one capital projects funded through debt as presented in the Council endorsed 10-Year Capital Plan, 2023-2032. • There is no change in current service levels except as provided for in the capital program. • Reserve funding is used for one-time operating and capital programs to reduce the requirement for increased taxation. Additional details on all assumptions are provided in the Five-Year Financial Plan (2024-2028). $ thousands 2024 2025 2026 2027 General revenues (17,820) (18,751) (19,670) (21,613) Net operating budget 194,574 206,112 218,315 233,252
2028 (22,088) 246,184
14,467 191,220
15,983 203,343
17,479 216,214
19,050 230,689
20,707 244,803
(6,260)
(3,790)
(3,739)
(3,927)
(4,141)
3.72% 1.00%
3.36% 1.00%
3.45% 1.00%
3.92% 1.00%
3.32% 1.00%
Net property owner impact 4.72% Note: Totals may not add due to rounding
4.36%
4.45%
4.92%
4.32%
Pay-as-you-go capital Taxation demand New construction tax revenue Municipal Impact Public Safety Levy Impact
For the City’s Five-Year forecast for all funds revenues and expenditures for 2024-2028 and detailed service area information see the Five-Year Financial Plan section of the 2024 Financial Plan.
PAGE 497
OPERATING BUDGET
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Requests Final Budget Summary - All Funds Page Description Type Community Safety & Bylaw 500 Enhance Community Safety Plan: Kelowna Alternative Response Team Service Area Total
Governance & Leadership 500 Enhance Council Initiatives Service Area Total Enabling Services 501 Maintain
Transmission of Taxes - BIA's and Other Governments 501 Maintain FortisBC Operating Fee 502 Enhance Insurance Premiums - Inflationary Increase Service Area Total
Total Operating
Cat.
Amount
Reserve
Borrow
Grant
Revenue
Utility
Taxation
OG
250,000
(250,000)
0
0
0
0
0
250,000
(250,000)
0
0
0
0
0
OG
700,000 700,000
0 0
0 0
0 0
0 0
0 0
(700,000) (700,000)
OT
152,948,200
0
0
0 (152,948,200)
0
0
OG OG
0 130,000
0 0
0 0
0 0
394,100 0
0 0
(394,100) (130,000)
153,078,200
0
0
0 (152,554,100)
0
(524,100)
154,028,200
(250,000)
0
0 (152,554,100)
0
(1,224,100)
PAGE 499
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Community Safety & Bylaw
Enhance
Priority: 1
ON-GOING Title:
Community Safety Plan: Kelowna Alternative Response Team
FINAL
Justification: As part of the 2024 Preliminary Budget deliberations, Council asked that the Community Safety Plan Action 1.2: Kelowna Alternative Response Team request be brought back as part of Final Budget. This $1.1 million program will enable an alternative, community-based mobile unit response to (police) calls involving people in crisis. Used in other municipalities, this trauma and culturally informed model has shown to be cost-effective and has resulted in reduced police calls and involvement. Budget of $250k is requested in 2024 to allow City staff to engage in partnership discussions, increasing to $500k in 2025 ongoing as the City's commitment to the program. Staff will return to Council before the 2025 Preliminary Budget if the partnerships opportunities are unsuccessful. Strategic Direction: 2024 2025 2026 Service Area:
Cost 250,000 500,000 500,000
Crime & Safety - Residents feel safe Reserve (250,000) 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Governance & Leadership
Utility 0 0 0
Taxation 0 (500,000) (500,000) Enhance
Priority: 1
ON-GOING Title:
Council Initiatives
FINAL
Justification: Kelowna City Council is committed to working closely with residents, community partners and other levels of government to bring positive change. Council initiatives funding approved in 2023 allowed for the expansion of the Social Development mandate to provide enhanced strategic leadership in addressing homelessness, funding to purchase and operate an additional Sweeper/Scrubbing Unit increasing garbage service levels throughout the City, and grant funding to support the Uptown Rutland Business Association's On-Call pilot project. Additional budget is requested to enable City Council to continue to promote and finance various initiatives that will contribute to positive change in our community.
Strategic Direction: 2024 2025 2026
Cost 700,000 700,000 700,000
Crime & Safety - Public safety resources keep pace with growth Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (700,000) (700,000) (700,000)
PAGE 500
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Maintain
Priority: 1
ONE-TIME Title:
Transmission of Taxes - BIA's and Other Governments
FINAL
Justification: To establish the receipt and disbursement of taxes to Business Improvement Areas (BIA) and other governments: Regional District of Central Okanagan (RDCO) ($16,371,300); RDCO SIR Land Levy ($810,900); RDCO SIR Parcel Tax ($267,600); BC Assessment Authority ($3,009,500); School Tax ($103,195,500 - Estimate); Additional School Tax ($4,324,800); Kelowna Downtown BIA ($1,263,700); Uptown Rutland BIA ($233,700); Regional Hospital ($15,611,800); and Okanagan Regional Library ($7,859,400). The total amount to be collected for all other taxing authorities is $152,948,200.
Strategic Direction: Cost 2024 152,948,200 Service Area:
Other - Supports Base Business Reserve 0
Borrow 0
Grant 0
Other Revenue 0 (152,948,200)
Enabling Services
Utility 0
Taxation 0 Maintain
Priority: 1
ON-GOING Title:
FortisBC Operating Fee
FINAL
Justification: This request is to adjust the franchise fee revenue due from FortisBC down to $2,024,361 from the 2024 Preliminary budget amount of $2,418,450. The fee is based on 3 per cent of the gross revenue for the provision and distribution of all gas consumed within the City of Kelowna during the 2023 calendar year.
Strategic Direction: 2024 2025 2026
Cost 0 0 0
Active Financial Management - Increase non-tax revenues to minimize the reliance on taxes Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 394,100 394,100 394,100
Utility 0 0 0
Taxation (394,100) (394,100) (394,100)
PAGE 501
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Operating Request Details Service Area:
Enabling Services
Enhance
Priority: 1
ON-GOING Title:
Insurance Premiums - Inflationary Increase
FINAL
Justification: Insurance Premiums continue to rise; the Insurance Bureau of Canada reported an average annual increase in insurance premiums rates across all sectors was 9.6 per cent in 2020 and continues to rise annually. Inflation of construction costs increase the value of insured assets, which in turn puts upward pressure on premium costs. Budget is requested for an annual budget increase of 7.6 per cent for 2024 and 2025 to align with the current trend of rising costs while maintaining sufficient and dependable coverage.
Strategic Direction: 2024 2025 2026
Cost 130,000 260,000 260,000
Other - Supports Base Business Reserve 0 0 0
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Revenue 0 0 0
Utility 0 0 0
Taxation (130,000) (260,000) (260,000)
PAGE 502
CAPITAL BUDGET
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Requests Final Budget Capital Budget Summary Page Type
Description
Solid Waste Capital 505 Renew Landfill - Flare Replacement SW3 - Gas Management Cost Center Total Airport Capital 506 Growth
Airport - Aircraft Rescue and Fire Fighting Response Vehicle A4 - AIF
Cost Center Total Wastewater Capital 506 Renew WWTF Equipment Repair WW3 - DCC Wastewater Treatment Facilities Cost Center Total Total
Amount
Reserve
Borrow
Grant
Other
Utility
Taxation
750,000 750,000 750,000
(750,000) (750,000) (750,000)
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
2,950,000
(2,950,000)
0
0
0
0
0
2,950,000 2,950,000
(2,950,000) (2,950,000)
0 0
0 0
0 0
0 0
0 0
200,000 200,000
0 0
0 0
0 0
0 0
(200,000) (200,000)
0 0
200,000
0
0
0
0
(200,000)
0
3,900,000
(3,700,000)
0
0
0
(200,000)
0
O&M
PAGE 504
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Solid Waste Capital
Title:
Landfill - Flare Replacement
Renew Priority: 1 10 Yr Cap Plan Ref: 2026 SW3 - $$3.5M FINAL
Justification: Budget is requested for replacement of the landfill gas flare at the Glenmore Landfill. Initially scheduled for 2026, staff is requesting to expedite this project for procurement in 2024 and construction in 2025 due to challenges in finding replacement parts and servicing for the existing flare. With current long lead times for flare manufacturing components, this budget request is to allow for the purchasing and deposit for the flare component to ensure construction can be completed in 2025. This is a multi-year project, total budget estimated at $3.5M and the final design is being completed in 2024. Contractual commitments will be based on this budget plus $2.75M budget in 2025.
Expected Completion: Dec 2025 Strategic Direction: Climate & Environment - Reduce corporate and community GHG emissions Operating Impact: There are operation and maintenance budget impacts and are included below Asset Cost 750,000
Reserve (750,000)
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility 0
Taxation 0
Revenue 0 0 0
Utility 0 0 0
Operating Impact: Landfill - Flare Replacement - Service and Support 2024 2025 2026
Cost 0 0 100,000
Reserve 0 0 (100,000)
Borrow 0 0 0
Grant 0 0 0
Other 0 0 0
Taxation 0 0 0
PAGE 505
2024 FINANCIAL PLAN
CITY OF KELOWNA
2024 Capital Request Details Department: Cost Center:
Capital Projects Airport Capital
Title:
Airport - Aircraft Rescue and Fire Fighting Response Vehicle
Growth Priority: 1 10 Yr Cap Plan Ref: Not included A4 FINAL
Justification: Federal regulations dictate emergency response categorization based on the size and number of aircraft that land at an airport in the preceding 12 months. With the Airport fully recovered from the impact of the COVID-19 pandemic in 2023, surpassing its 2019 pre-pandemic passenger numbers, and the corresponding growth in the number of large aircraft movements at the airport, the Airport is required to increase Aircraft Fire Fighting from the current Category 6 response to a Category 7 response. As a result, there is an emergent need for one additional Aircraft Rescue and Fire Fighting response vehicle to ensure the Airport is able to provide continuous emergency response at the required Category 7 level as passenger numbers and air service to and from the region continue to grow.
Expected Completion: Dec 2025 Strategic Direction: Other - Supports Base Business Operating Impact: Minimal operation and maintenance impact accommodated within an existing operating budget Asset Cost Reserve 2,950,000 (2,950,000)
Borrow 0
Department: Cost Center:
Capital Projects Wastewater Capital
Title:
WWTF Equipment Repair
Fed/Prov 0
Dev/Com 0
Utility 0 Renew Priority: 1 10 Yr Cap Plan Ref: Not included WW3 FINAL
Justification: Budget is requested for the repair of equipment at the Wastewater Treatment Facility (WWTF). The WWTF operates two centrifuges that remove water from wastewater solids, and the larger primary unit is undergoing repairs with parts delayed due to availability and shipping arriving slowly from Italy. The smaller backup centrifuge is running extended hours to meet process needs, during a recent inspection, it was found that this centrifuge has mechanical issues that will eventually lead to equipment failure and is in need of urgent repair.
Expected Completion: Sep 2024 Strategic Direction: Other - Supports Base Business Operating Impact: There are no operation and maintenance budget impacts associated with this request Asset Cost 200,000
Reserve 0
Borrow 0
Fed/Prov 0
Dev/Com 0
Utility (200,000) PAGE 506
FINANCIAL PLAN Kelowna, BC Canada Five-Year Financial Plan 2024-2028
2024
2024 FINANCIAL PLAN
CITY OF KELOWNA
FINANCIAL PLAN The City of Kelowna has developed a comprehensive Financial Plan providing a five‐year summary of general revenues, operating expenditures, and capital expenditures to help guide the City throughout the next five years. The format of the plan keeps the General Fund separate from the Utility Funds to clearly identify taxation requirements for the five‐year period. Over the past year there has been a significant economic change that has led to increased inflation, interest rate pressures, supply chain disruptions and labour shortages which have impacted the City of Kelowna’s Financial Plan. Strategic decision making is the key to strong financial management to govern economic challenges and will require attention to reposition priorities, seek out cost saving opportunities and find new ways to generate revenue. The priority is to continue to deliver on our promise to the community and organizations by keeping the tax rate stable, addressing social issues, supporting affordable housing and improving transportation programs. The Financial Plan attempts to provide a ‘snapshot’ of the future using current standards and service levels. The City is committed to delivering programs, services and infrastructure in a manner that respects the community vision identified through Imagine Kelowna. The community input received through Imagine Kelowna, the availability of funding from other sources (Federal, Provincial, and Community), the Official Community Plan, ,- Year Servicing Plan, the ,-/- Infrastructure Plan and the 0-‐Year Capital Plan, all affect the programs included in the future years of the plan. The Council endorsed 0-‐Year Capital Plan, ,-,/‐,-/,, and the ,-/Infrastructure Plan, have provided a guideline for future capital through to ,-/- in this Financial Plan. The Financial Plan is intended to provide guidance and information upon which to base current and future expenditure decisions. It will aid in the understanding of the City’s financial position and financing capabilities over the next five years. The development of the Financial Plan follows the ,-,1 budget process which includes: • Preliminary Budget – approved by Council December 6, ,-,/ • Carryover Requests – approved by Council March 09, ,-,1 • Final Budget – approved by Council on May 6, ,-,1 Although most of this plan is devoted to the Preliminary Budget details, the changes made by Council at Preliminary, Carryover, and Final Budget, together, provide the ,-,1 portion of the Financial Plan. For the years after ,-,1, the operating budget is adjusted for current one‐time projects, approved prior year changes in operating requirements, new capital projects included in the Council endorsed 0-‐Year Capital Plan, growth and/or inflation factors depending on the nature of the revenue or expenditure, and other key assumptions. As with any planning exercise, the level of certainty and detail is most appropriately found in the current year. Future year assumptions are required to forecast general revenues, incremental operating expenditures to support new capital, debt servicing and ongoing departmental revenues and expenditures.
PAGE 508
2024 FINANCIAL PLAN
CITY OF KELOWNA
Assumptions used in the preparation of the years ,-,= to ,-,9 in the Financial Plan projections include: • An inflation rate of , per cent for most of the operating costs and for some revenues. The Bank of Canada aims to keep inflation at the , per cent midpoint of an inflation‐control target range of / per cent or less. • A growth rate of 0.=> per cent per year for ,-,= and 0.16 per cent per year for ,-,?‐,-,9 per the Official Community Plan was used for various revenues and expenditures and for incremental taxation revenue. Growth rates for the utilities are based on servicing expectations over the next five years which may include existing residential or commercial units. • MFA amortization schedules and estimated rates are used as a basis for projected principal and interest where applicable. • Approval to borrow for all priority one capital projects funded through debt as presented in the Council endorsed 0-‐Year Capital Plan, ,-,/‐,-/,. • There is no change in current service levels except as provided for in the capital program. • Reserve funding is used for one‐time operating and capital programs to reduce the requirement for increased taxation. The Financial Plan summary can be found on page =01 and is used in the Financial Plan bylaw. The final column of the Financial Plan, years ,-,> to ,-/0, is included at the request of the Ministry of Municipal Affairs and Housing for information to support the City of Kelowna’s ,- Year Servicing Plan.
REVENUE SOURCES & TRENDS SUMMARY The City defines financial strength and stability as “the ability to acquire and manage a portfolio of financial and physical assets that meet the current and future needs of our community.” The City uses strategies set out in this document to guide decision‐ making within the City to help to realize this goal and, ultimately, the vision for Kelowna. While some of these strategies focus on a particular component of the financial balance – revenues and costs – they are all interrelated and work together to provide a broad framework for managing the City’s overall finances.
PAGE 509
2024 FINANCIAL PLAN
CITY OF KELOWNA
Taxation The City strives to ensure property taxes are sufficient to meet the community’s short and long‐term needs. Taxation is a major revenue source in the General Fund and accounts for ,, per cent of the ,-,/ Financial Plan’s total revenue estimate of D9=1.>M. Kelowna continues to be below the average taxes paid by property owners in British Columbia. Historical tax rate increases from ,-,- to ,-,1 is shown in the graph below beside the projected increases for ,-,= to ,-,9. Future year increases are estimated using projected growth, average inflation, annualization of budget requests previously approved by Council, capital projects included in the Council endorsed 0-‐Year Capital Plan, debt changes, and other key assumptions.
Net Property Owner Impact 2020 - 2028
Net Property Owner Impact % Increase
6.00% 4.92%
5.00%
4.72% 4.04%
4.00%
3.94%
4.36%
4.45%
2025
2026
4.32%
3.78%
3.00% 2.05% 2.00%
1.00%
0.00% 2020
2021
2022
2023
2024
2027
2028
Years Note: Rates presented in the graph above for years 2025 to 2028 have not been approved by Council and are subject to change.
The forecasted increases for ,-,= to ,-,9 assumes approval to borrow for all priority one capital projects funded through debt as presented in the Council endorsed 0-‐Year Capital Plan, ,-,/‐,-/, (0-YCP). Although the 0-YCP presents full project budgets in one year, debt impacts have been split over the expected construction years to match required cash flow and to spread the debt repayment impacts. Included in this plan with a significant impact are the Parkinson Recreation Centre Replacement and the Capital News Centre – Expansion projects. Parcel Taxes Parcel taxes are taxes levied through bylaw on the unit, frontage or area of a property that receive a specific service. The majority of the D1.1M in the ,-,1 Financial Plan parcel tax budget is made up of Water Utility parcel taxes and Sewer Specified Area debt recoveries.
Fees & Charges General fund Fees and charges are another way that the City of Kelowna raises revenues and is currently the third largest source of revenue for the general fund at ,0 per cent. Fees and charges are useful because those that benefit from a service bear the cost of it. The City’s objective is to ensure user fees and charges are sufficient to meet the City’s needs.
PAGE 510
2024 FINANCIAL PLAN
CITY OF KELOWNA
General fund fees & charges revenues can be attributed to several service areas: •
• • •
•
•
•
•
Development Planning and Development Services generate revenue in the form of development, subdivision, permit and inspection fees along with other service revenues. Most future fees and charges revenue in these service areas are estimated using growth projections alone as there is a direct relationship between development revenue and community growth. Solid Waste and Landfill which generates the largest proportion of revenue from fees and charges through landfill tipping fees and waste collection charges. Parking generates revenues though parking fees throughout the City. Transit generates a large proportion of fees and charges through the transit service offered throughout the City. Future transit revenues are factored for growth to reflect the expected increase in service demand due to community growth. Sport and Recreation and Arts and Culture generate revenue from a wide variety of services including facility rentals and sales revenues along with program revenue and recreation facility use revenues. Estimates of future fees and charges revenue generation are factored for inflation and growth to recognize the expected increase in service demand due to community growth as well as recovery for program costs increases. Community Safety, Police Services and RCMP and Fire Safety service areas generate revenue through Bylaw fines, Police Services such as criminal record checks, and the sale of Fire Dispatch Services to other municipalities and regional districts within the Province. Estimates of future fees and charges for these areas are factored for inflation. Enabling Services generates revenues in rental fees from properties owned by the City. Future revenues have been factored by inflation alone as there is little anticipated growth in the inventory of these real estate assets. Thie service area also collects recovery revenue from customers. Additionally, Fleet Services is mapped to fees and charges through internal equipment charges but is a recovery revenue from other service areas. Parks revenue is collected through cemetery fees and recovery revenue. Estimates of future fees and charges revenue generation are factored for inflation.
Airport and Utility funds The Kelowna International Airport (YLW) is the largest municipally owned and operated airport in Canada. YLW operates on a financially self‐sufficient basis generating all funding required for services and infrastructure from several sources including airport improvement fees, landing & terminal fees, and parking fees. Passenger numbers for the Airport are expected to increase to ,.0M in ,-,1. The City of Kelowna operates two utility funds: the Water Utility and the Wastewater Utility. • •
The Water Utility Includes in the ,-,1 Financial Plan a budgeted ? per cent rate increase for water rates, ? per cent for the Water Quality Enhancement Fee. The Wastewater Utility operates citywide. The ,-,1 Financial Plan budgeted a / per cent rate increase for wastewater rates. Future growth potential is limited by infrastructure cost and the availability of Provincial capital support funding. Future local service areas have been identified and the number of sewer customers and amount of revenue generated is scheduled to increase slightly over the next five years. Future revenue estimates are factored for both growth and inflation.
PAGE 511
2024 FINANCIAL PLAN
CITY OF KELOWNA
Borrowing Proceeds Debt is a common tool that municipalities use to finance capital expenditures over the medium and long term. Debt is viewed as a fair way of financing a project since those who are paying the principal and interest charges are benefitting from the service. The City strives to ensure debt financing is used strategically to maintain the City’s financial strength and stability. Future projects that are planned to be funded through borrowing as indicated in the Council endorsed 0-‐Year Capital Plan, ,-,1‐,-/, include: • ,-,1‐,-,6: Building Stronger Kelowna (Parkinson Rec Centre Replacement) • ,-,1: Network as a Service • ,-,=‐,-,?: City Hall Envelope Renewal • ,-,=‐,-,?: North Glenmore Fire Hall • ,-,=‐,-,?: North Glenmore Recreation – Future Phases • ,-,=: Manhattan Point Park • ,-,=: Mission Recreation ‐ Youth Park, Plaza, & Trail System • ,-,=‐,-,?: Burtch Rd Active transportation corridor and Road • ,-,=: KLO Rd Mission Creek Bridge Replacement • ,-,=‐,-,6: Critical & Core Building Infrastructure Renewal • ,-,?: Irrigation Renewal • ,-,6‐,-,>: Lakeshore Rd Active transportation corridor • ,-,9‐,-,>: Capital News Centre
Reserves and Surplus Reserves Saving money for future projects and unexpected expenditures is an important planning consideration for the City of Kelowna. Reserves provide a financial mechanism for saving money to finance all or part of future infrastructure, equipment, and other requirements. Reserve funds can also provide a degree of financial stability, by reducing reliance on indebtedness to finance capital projects and acquisitions, or flexibility to leverage opportunities as they arise. This funding source is mainly used in the capital program for major works. A balance must be maintained between expenditure levels and reserve replenishment to ensure the sustainability of this funding source. The ,-/- Infrastructure Plan relies on surplus funds being contributed to reserve on an annual basis. Reserve funding requirements vary significantly depending on the annual capital programs. In the ,-,1 Financial Plan, it is the largest source of funding at 1/ per cent largely due to the addition of carryover budgets which are funded through reserves. Surplus Surplus funds generated in the General Fund, as well as the Utility Funds of Water and Wastewater, are contributed to the accumulated surplus annually. The Council adopted Principles & Strategies for Financial Strength and Stability document includes a strategy that restricts the use of these funds to emergencies such as fires and floods.
Other sources General revenues General revenues include revenues not associated directly with any one City division or service. Examples of this revenue include investment interest, penalties on taxes and utility accounts, traffic fine revenue sharing and 0% payment in lieu of taxes for private utilities. These revenues are anticipated to increase by growth and/or inflation in the coming years. Over the next five years, total general revenues are anticipated to increase by approximately 0.? per cent annually ,-,= to ,-,9. Government grants and contributions Grants are a useful tool in a municipality’s financial toolbox and can be used strategically to offset costs to taxpayers and ratepayers. However, a reliance on grants to fund capital projects and services will undermine a community’s ability to attain financial strength and stability. Grants in ,-,1 help to fund = per cent of the City’s overall budget. The City’s objective is to pragmatically leverage grant opportunities.
PAGE 512
2024 FINANCIAL PLAN
CITY OF KELOWNA
Significant grants in ,-,1 include the transit partnership with the Province of British Columbia which provides funding for conventional transit and custom transit costs, and the Disaster Mitigation and Adaptation Fund grant for Mill creek flood repair. Gaming revenues are expected to increase by / per cent throughout ,-,1. This revenue is included in the RCMP budget to be applied against police costs. The City continues to receive funding from the Canada Community‐Building Fund, formerly the federal Gas Tax Fund. This fund provides predictable, long‐term and stable funding for investment in infrastructure and capacity building projects to local governments in British Columbia. In ,-,1, the City of Kelowna expects to receive D?.?M. The City of Kelowna will continue to apply for Federal and Provincial Grants during the year. Successful grants will be added to the ,-,1 Financial Plan through the budget amendment process.
Summary of revenue sources (- thousands) The following graph summaries the City's revenue sources by type. The years ,-,- to ,-,/ are based on actual amounts received. Years ,-,1 to ,-,9 are forecasted values calculated using the assumptions discussed above. 900,000,000 800,000,000
Fees and charges 700,000,000 600,000,000
Other sources
500,000,000
Property/parcel taxes 400,000,000 300,000,000
Reserves and surplus
200,000,000
Debenture/borrowing
100,000,000 2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
Note: Reserve funding totals in the chart above are higher in ,-,1 due to carry‐over projects.
PAGE 513
2024 FINANCIAL PLAN
CITY OF KELOWNA
Five-Year Financial Plan Summaries Financial Plan 2024-2028
2024
2025
2026
2027
2028
2029-2031
191,220,490 7,859,400 4,440,697 178,947,925 4,522,400 98,499,082 485,489,994
203,343,357 8,016,588 3,450,288 185,894,676 71,928,262 161,931,710 634,564,881
216,124,348 8,176,920 3,290,286 196,314,029 24,680,540 140,624,333 589,210,457
230,689,351 8,340,458 2,944,479 204,029,869 11,421,775 113,384,030 570,809,962
244,802,502 8,507,267 2,711,096 212,399,148 16,806,499 85,439,508 570,666,020
786,564,674 26,035,639 7,883,485 688,368,989 25,875,982 225,580,497 1,760,309,266
2,489,948 61,375,400 305,547,770 369,413,118
1,289,098 57,634,139 119,650,706 178,573,943
6,115,713 52,938,672 100,298,759 159,353,144
7,629,335 66,663,479 95,870,859 170,163,674
6,143,430 65,428,683 75,249,984 146,822,097
18,519,832 140,205,159 257,737,446 416,462,437
Total Revenues
854,903,112
813,138,824
748,563,601
740,973,636
717,488,117
2,176,771,703
Expenditures Municipal Debt Debt Interest Debt Principal Capital Expenditures Other Municipal Purposes Arts & Culture
4,956,085 7,149,119 415,457,000
5,315,399 7,258,284 357,466,503
11,005,460 8,954,238 272,670,553
15,739,605 10,373,849 248,886,362
17,969,307 10,258,477 206,263,477
63,420,320 36,787,913 519,091,611
Revenue Property Value Tax Library Requisition Parcel Taxes Fees and Charges Borrowing Proceeds Other Sources Transfer between Funds Reserve Funds DCC Funds Surplus/Reserve Accounts
4,273,737
4,282,458
4,489,454
4,645,033
4,806,007
15,440,657
Community Development
6,002,914
4,793,625
5,150,805
5,209,788
5,382,430
17,243,174
Community Safety & Bylaw
7,853,956
7,650,957
7,902,278
8,183,981
8,467,965
27,232,983
Development Planning
2,713,940
2,599,523
2,687,924
2,779,287
2,873,820
9,222,032
Development Services
6,532,198
7,043,599
7,288,306
7,541,210
7,802,890
25,071,139
Enabling Services
73,464,907
75,380,138
79,266,450
83,399,969
87,762,191
290,811,350
Fire Safety
28,176,552
29,074,292
29,933,760
30,971,906
32,046,076
102,962,498
Governance & Leadership
4,716,757
4,540,408
4,698,150
4,861,176
5,029,858
16,161,228
Parking
4,993,679
4,655,296
4,749,895
4,846,916
4,946,474
15,463,232
Parks
13,402,113
14,280,247
14,825,843
15,339,239
15,870,450
50,986,163
Partnerships Office
1,405,389
1,236,025
1,278,966
1,100,246
1,138,424
3,657,827
Police Services & RCMP
59,394,604
61,498,220
63,634,014
65,841,357
68,125,286
218,885,725
Solid Waste & Landfill
17,080,505
17,294,887
16,831,025
17,314,117
17,813,287
56,603,919
Sport & Recreation
14,858,167
15,289,370
15,752,317
16,266,208
16,822,777
52,637,145
Stormwater & Flood Protection
3,369,341
2,809,749
2,896,693
2,976,454
3,068,875
9,792,654
Transit
31,871,916
31,712,016
32,800,301
33,925,048
35,088,823
112,660,004
Transportation
17,025,537
17,476,533
18,090,049
18,657,774
19,305,199
62,028,728
Wastewater
15,554,826
15,832,141
15,519,908
15,787,332
16,063,682
49,943,013
Water Airport
14,065,368 27,176,085 781,494,695
13,003,895 27,726,778 728,220,343
12,829,942 28,855,121 662,111,453
13,046,487 30,541,836 658,235,180
13,270,324 31,576,677 631,752,776
36,733,688 100,472,340 1,893,309,343
31,623,581 0 41,784,836 73,408,417
32,305,990 0 52,612,491 84,918,481
33,735,918 0 52,716,230 86,452,149
34,877,386 0 47,861,069 82,738,455
36,090,325 0 49,645,017 85,735,342
115,392,541 0 168,069,820 283,462,361
854,903,112
813,138,824
748,563,601
740,973,636
717,488,117
2,176,771,703
Transfers between Funds Reserve Funds DCC Funds Surplus/Reserve Accounts
Total Expenditures Note: Totals may not add due to rounding.
PAGE 514
2024 FINANCIAL PLAN
CITY OF KELOWNA
General Fund Tax Impact Summary
New construction tax revenue
2024 (17,819,889) 0 194,573,679 14,466,700 0 191,220,490 0 (6,260,000)
2025 (18,751,487) 0 206,111,844 15,983,000 0 203,343,357 0 (3,790,000)
2026 (19,669,998) 0 218,315,346 17,479,000 0 216,124,348 0 (3,739,000)
Municipal Impact Public Safety Levy Impact Net property owner impact
3.72% 1.00% 4.72%
3.36% 1.00% 4.36%
2024
General revenues Net operating budget Pay-as-you-go capital Taxation demand
3.45% 1.00% 4.45%
2027 (21,612,820) 0 233,252,171 19,050,000 0 230,689,351 0 (3,927,000) 0.00% 0.00% 3.92% 1.00% 4.92%
2028 (22,088,304) 0 246,183,806 20,707,000 0 244,802,502 0 (4,141,000) 0.00% 0.00% 3.32% 1.00% 4.32%
2025
2026
2027
2028
3,100 3,100
3,100 3,100
3,100 3,100
3,100 3,100
3,100 3,100
2,024,350 2,024,350
2,097,024 2,097,024
2,169,878 2,169,878
2,245,173 2,245,173
2,323,081 2,323,081
10,557,391 225,000 1,900,000 110,000 (2,054,000) 49,000 10,787,391
11,225,254 228,578 1,930,210 111,749 (2,054,000) 49,000 11,490,791
11,883,116 231,942 1,958,620 113,394 (2,054,000) 49,000 12,182,072
13,557,797 235,352 1,987,412 115,061 (2,054,000) 49,000 13,890,622
13,757,097 238,812 2,016,627 116,752 (2,054,000) 49,000 14,124,288
40,000 34,000 954,443 (310,000) 718,443
41,436 34,000 975,768 (321,129) 730,075
42,876 34,000 996,866 (332,286) 741,456
44,364 34,000 1,018,891 (343,816) 753,439
45,903 34,000 1,041,925 (355,746) 766,082
150,438
153,447
156,516
159,646
162,839
502,469 1,650,553 419,082 143,000 (1,258,826) 1,456,278
512,518 1,676,797 427,464 143,000 (1,258,826) 1,500,953
522,769 1,701,477 436,013 143,000 (1,258,826) 1,544,433
533,224 1,726,489 444,733 143,000 (1,258,826) 1,588,620
543,888 1,751,868 453,628 143,000 (1,258,826) 1,633,558
2,679,889
2,776,097
2,872,543
2,972,220
3,075,356
General Revenue Licences Dog Licences Franchise fee Fortis Gas Interest & penalties Interest on Investments Tax Arrears & Delinquent Penalties on Taxes Penalties Utility Accounts Interest on Performance deposits Interest on Accounts Receivable Miscellaneous revenues Work Order Administration Local Improvement Prepayments Discounts Earned & Misc Risk to Roll Federal contributions Grants in Lieu of Taxes Provincial contributions Grants in Lieu of Taxes Traffic Fine Revenue Sharing Climate Action Rev Incentive Certificate of Recognition Rebate Appropriation to Reserves Taxes - private utilities 1% in Lieu of Taxes Total General Revenues Property taxation Total General Revenue & taxation Note: Totals may not add due to rounding.
17,819,889
18,751,487
19,669,998
21,612,820
22,088,304
191,220,490 209,040,379
203,343,357 222,094,844
216,124,348 235,794,346
230,689,351 252,302,171
244,802,502 266,890,806
PAGE 515
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating Summary - General Fund Revenues/Expenditures by Year 2024
2025
2026
2027
2028
Revenue Library Requisition Parcel Tax Fees and Charges Sales of Service User Fees Other Revenue Interest Grants Services to Other Governments Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus
(7,859,400) (136,547) (80,920,115) (66,249,339) (14,670,776) (43,836,170) (4,118,660) (19,728,200) (9,199,025) (10,790,285) (13,188,470) (2,489,948) (795,400) (9,903,122)
(8,016,588) (136,547) (83,281,036) (68,114,881) (15,166,155) (42,113,196) (4,266,520) (18,709,805) (9,232,549) (9,904,322) (6,682,355) (1,289,098) (823,955) (4,569,302)
(8,176,920) (136,547) (85,889,063) (70,213,535) (15,675,528) (42,164,803) (4,414,746) (19,085,201) (9,503,696) (9,161,160) (11,467,931) (6,115,713) (852,580) (4,499,638)
(8,340,458) (136,547) (88,486,044) (72,295,059) (16,190,985) (43,055,997) (4,567,938) (19,366,906) (9,783,018) (9,338,135) (12,791,492) (7,629,335) (882,165) (4,279,992)
(8,507,267) (136,547) (91,098,049) (74,441,716) (16,656,333) (44,070,362) (4,726,445) (19,754,245) (10,071,023) (9,518,649) (11,485,987) (6,143,430) (912,776) (4,429,781)
Total Revenue
(145,940,702)
(140,229,722)
(147,835,264)
(152,810,538)
(155,298,212)
Expenditures Salaries and Wages Internal Equipment Material and Other Contract Services Debt Interest Debt Principal Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus
109,614,261 9,147,802 66,302,431 107,310,682 3,666,890 4,180,072 4,761,036 4,761,036 0 35,531,207 31,066,291 0 4,464,916
114,052,882 9,073,018 61,922,835 111,823,972 4,105,957 4,404,651 4,744,636 4,744,636 0 36,213,616 31,748,700 0 4,464,916
120,001,620 9,350,640 63,481,764 115,647,055 10,115,657 7,035,694 3,809,636 3,809,636 0 36,708,544 33,178,628 0 3,529,916
125,920,143 9,621,150 64,916,210 119,600,065 15,126,162 9,219,332 3,809,636 3,809,636 0 37,850,012 34,320,096 0 3,529,916
132,372,586 9,899,966 66,561,853 123,714,546 16,754,728 9,305,753 3,809,636 3,809,636 0 39,062,951 35,533,035 0 3,529,916
Total Expenditures
340,514,381
346,341,566
366,150,611
386,062,710
401,482,019
Net Operating Expenditures Note: Totals may not add due to rounding.
194,573,679
206,111,844
218,315,346
233,252,171
246,183,806
PAGE 516
2024 FINANCIAL PLAN
CITY OF KELOWNA
General Fund - operating summary by service 2024 Net Operating Expenditure 60,000,000 50,000,000 40,000,000 30,000,000 20,000,000 10,000,000 0 (10,000,000)
Net Operating Expenditure by Year
Arts & Culture Community Development Community Safety & Bylaw Development Services Development Planning Enabling Services Fire Safety Governance & Leadership Parking Parks Partnerships Office Police Services & RCMP Solid Waste & Landfill Sport & Recreation Stormwater & Flood Protection Transit Transportation Total Net Operating Expenditures Note: Totals may not add due to rounding.
2024 2,816,187 3,562,714 6,226,929 (6,090,414) 1,743,480 55,162,662 26,308,798 4,645,957 (1,150,000) 11,915,371 940,689 52,688,648 (200,000) 10,446,831 2,101,041 9,137,989 14,316,797 194,573,679
2025 2,999,416 4,097,130 7,118,825 (6,034,815) 1,802,302 58,229,764 27,031,517 4,504,078 (1,150,000) 14,166,593 767,809 54,647,989 (200,000) 11,417,932 3,005,070 8,919,382 14,788,852 206,111,844
2026 3,085,856 4,440,188 7,373,452 (6,051,281) 1,861,269 64,898,374 27,780,214 4,660,464 (1,150,000) 14,662,396 804,169 56,637,026 (200,000) 11,726,424 3,108,356 9,443,499 15,234,940 218,315,346
2027 3,206,902 4,584,761 7,636,648 (6,064,774) 1,922,212 74,131,693 28,704,016 4,822,106 (1,150,000) 15,124,377 841,787 58,694,365 (200,000) 12,105,737 3,214,785 9,989,167 15,688,389 233,252,171
2028 3,332,652 4,744,700 7,909,017 (6,074,819) 1,985,269 81,152,366 29,660,027 4,989,376 (1,150,000) 15,602,441 873,010 60,824,942 (200,000) 12,497,249 3,324,207 10,558,187 16,155,182 246,183,806
PAGE 517
2024 FINANCIAL PLAN
CITY OF KELOWNA
Arts & Culture Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax
0
0
0
0
0
(1,577,250)
(1,606,092)
(1,726,648)
(1,761,181)
(1,796,405)
(1,154,500)
(1,177,335)
(1,278,912)
(1,304,490)
(1,330,580)
(422,750)
(428,757)
(447,736)
(456,691)
(465,825)
Other Revenue
0
0
0
0
0
Interest
0
0
0
0
0
Fees and Charges Sales of Service User Fees
Grants
0
0
0
0
0
Services to Other Governments
0
0
0
0
0
Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges
0
0
0
0
0
(200,300)
3,050
3,050
3,050
3,050
0
0
0
0
0
0
0
0
0
0
(200,300)
3,050
3,050
3,050
3,050
(1,777,550)
(1,603,042)
(1,723,598)
(1,758,131)
(1,793,355)
Salaries and Wages
1,426,947
1,480,443
1,569,392
1,623,850
1,680,198
Internal Equipment
13,400
13,668
13,941
14,220
14,504
Accumulated Surplus Total Revenue Expenditures
Material and Other
968,390
860,848
890,756
921,665
953,647
Contract Services
1,865,000
1,927,499
2,015,365
2,085,298
2,157,658
Debt Interest
0
0
0
0
0
Debt Principal
0
0
0
0
0
Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
320,000
320,000
320,000
320,000
320,000
Special (Stat Reserve) Funds
0
0
0
0
0
Development Cost Charges
0
0
0
0
0
Accumulated Surplus
320,000
320,000
320,000
320,000
320,000
Total Expenditures
4,593,737
4,602,458
4,809,454
4,965,033
5,126,007
Net Operating Expenditures
2,816,187
2,999,416
3,085,856
3,206,902
3,332,652
Note: Totals may not add due to rounding.
PAGE 518
2024 FINANCIAL PLAN
CITY OF KELOWNA
Community Development Revenues and Expenditures by Year
2024
2025
2026
2027
2028
0
0
0
0
0
(10,000)
(10,200)
(10,404)
(10,612)
(10,824)
(10,000)
(10,200)
(10,404)
(10,612)
(10,824)
0
0
0
0
0
(987,500)
(673,373)
(686,841)
(600,579)
(612,590)
Revenue Parcel Tax Fees and Charges Sales of Service User Fees Other Revenue Interest
0
0
0
0
0
Grants
(542,500)
(357,683)
(364,837)
(272,134)
(277,577)
Services to Other Governments
(266,700)
(136,986)
(139,726)
(142,521)
(145,371)
Interdepartment Transfer
(178,300)
(178,704)
(182,278)
(185,924)
(189,642)
Transfers from Funds
(1,742,700)
(323,692)
(334,939)
(346,561)
(358,587)
Special (Stat Reserve) Funds
(70,400)
25,898
26,797
27,727
28,689
Development Cost Charges
0
0
0
0
0
(1,672,300)
(349,590)
(361,736)
(374,288)
(387,276)
(2,740,200)
(1,007,265)
(1,032,184)
(957,752)
(982,001)
Accumulated Surplus Total Revenue Expenditures Salaries and Wages
2,247,256
2,332,801
2,611,718
2,590,645
2,680,541
Internal Equipment
1,000
1,036
1,072
1,109
1,147
Material and Other
3,229,323
2,061,020
2,133,373
2,207,401
2,283,998
Contract Services
420,835
293,668
299,542
305,533
311,644
Debt Interest
0
0
0
0
0
Debt Principal
0
0
0
0
0
104,500
105,100
105,100
105,100
105,100
104,500
105,100
105,100
105,100
105,100
0
0
0
0
0
300,000
310,770
321,567
332,725
344,271
Special (Stat Reserve) Funds
300,000
310,770
321,567
332,725
344,271
Development Cost Charges
0
0
0
0
0
Accumulated Surplus
0
0
0
0
0
Total Expenditures
6,302,914
5,104,395
5,472,372
5,542,513
5,726,701
Net Operating Expenditures
3,562,714
4,097,130
4,440,188
4,584,761
4,744,700
Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds
Note: Totals may not add due to rounding.
PAGE 519
2024 FINANCIAL PLAN
CITY OF KELOWNA
Community Safety & Bylaw Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax
0
0
0
0
0
(233,727)
(242,118)
(250,529)
(259,222)
(268,217)
Sales of Service
(164,600)
(170,509)
(176,433)
(182,555)
(188,890)
User Fees
(69,127)
(71,609)
(74,096)
(76,667)
(79,327)
(441,700)
(138,414)
(141,182)
(144,006)
(146,886)
Fees and Charges
Other Revenue Interest
0
0
0
0
0
Grants
(441,700)
(138,414)
(141,182)
(144,006)
(146,886)
Services to Other Governments
0
0
0
0
0
Interdepartment Transfer
0
0
0
0
0
(951,600)
(151,600)
(151,600)
(151,600)
(151,600)
(300,000)
(70,600)
(70,600)
(70,600)
(70,600)
Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus Total Revenue
0
0
0
0
0
(651,600)
(81,000)
(81,000)
(81,000)
(81,000)
(1,627,027)
(532,132)
(543,311)
(554,828)
(566,703)
Expenditures Salaries and Wages
5,376,586
5,685,523
5,883,047
6,087,189
6,298,414
Internal Equipment
162,846
208,730
215,981
223,476
231,231
Material and Other
2,242,287
1,681,874
1,740,305
1,800,694
1,863,178
Contract Services
72,237
74,830
77,430
80,117
82,897
Debt Interest
0
0
0
0
0
Debt Principal
0
0
0
0
0
Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Special (Stat Reserve) Funds
0
0
0
0
0
Development Cost Charges
0
0
0
0
0
Accumulated Surplus
0
0
0
0
0
Total Expenditures
7,853,956
7,650,957
7,916,763
8,191,476
8,475,720
Net Operating Expenditures
6,226,929
7,118,825
7,373,452
7,636,648
7,909,017
Note: Totals may not add due to rounding.
PAGE 520
2024 FINANCIAL PLAN
CITY OF KELOWNA
Development Services Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax Fees and Charges Sales of Service User Fees Other Revenue
0
0
0
0
0
(12,602,612)
(13,058,664)
(13,319,837)
(13,586,234)
(13,857,959)
(12,602,612)
(13,058,664)
(13,319,837)
(13,586,234)
(13,857,959)
0
0
0
0
0
0
0
0
0
0
Interest
0
0
0
0
0
Grants
0
0
0
0
0
Services to Other Governments
0
0
0
0
0
Interdepartment Transfer
0
0
0
0
0
(20,000)
(19,750)
(19,750)
(19,750)
(19,750)
0
0
0
0
0
Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus Total Revenue
0
0
0
0
0
(20,000)
(19,750)
(19,750)
(19,750)
(19,750)
(12,622,612)
(13,078,414)
(13,339,587)
(13,605,984)
(13,877,709)
Expenditures Salaries and Wages
5,756,070
6,169,893
6,384,245
6,605,778
6,834,998
Internal Equipment
121,487
125,848
130,221
134,740
139,415
Material and Other
592,266
683,244
706,981
731,513
756,897
Contract Services
62,375
64,614
66,859
69,179
71,580
Debt Interest
0
0
0
0
0
Debt Principal
0
0
0
0
0
Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Special (Stat Reserve) Funds
0
0
0
0
0
Development Cost Charges
0
0
0
0
0
Accumulated Surplus
0
0
0
0
0
Total Expenditures
6,532,198
7,043,599
7,288,306
7,541,210
7,802,890
Net Operating Expenditures
(6,090,414)
(6,034,815)
(6,051,281)
(6,064,774)
(6,074,819)
Note: Totals may not add due to rounding.
PAGE 521
2024 FINANCIAL PLAN
CITY OF KELOWNA
Development Planning Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax Fees and Charges Sales of Service User Fees Other Revenue
0
0
0
0
0
(817,860)
(847,221)
(876,655)
(907,075)
(938,551)
(817,860)
(847,221)
(876,655)
(907,075)
(938,551)
0
0
0
0
0
0
0
0
0
0
Interest
0
0
0
0
0
Grants
0
0
0
0
0
Services to Other Governments
0
0
0
0
0
Interdepartment Transfer
0
0
0
0
0
(152,600)
50,000
50,000
50,000
50,000
0
0
0
0
0
Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus Total Revenue
0
0
0
0
0
(152,600)
50,000
50,000
50,000
50,000
(970,460)
(797,221)
(826,655)
(857,075)
(888,551)
Expenditures Salaries and Wages
2,497,150
2,413,181
2,497,019
2,583,666
2,673,319
Internal Equipment
0
0
0
0
0
Material and Other
161,790
131,342
135,905
140,621
145,501
Contract Services
0
0
0
0
0
Debt Interest
0
0
0
0
0
Debt Principal Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds
0
0
0
0
0
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
55,000
0
0
0
0
0
0
0
0
0
0
Special (Stat Reserve) Funds
0
0
0
0
0
Development Cost Charges
0
0
0
0
0
Accumulated Surplus
0
0
0
0
0
Total Expenditures
2,713,940
2,599,523
2,687,924
2,779,287
2,873,820
Net Operating Expenditures
1,743,480
1,802,302
1,861,269
1,922,212
1,985,269
Note: Totals may not add due to rounding.
PAGE 522
2024 FINANCIAL PLAN
CITY OF KELOWNA
Enabling Services Revenues and Expenditures by Year
2024
2025
2026
2027
2028
(7,859,400)
(8,016,588)
(8,176,920)
(8,340,458)
(8,507,267)
(136,547)
(136,547)
(136,547)
(136,547)
(136,547)
(13,670,216)
(14,160,106)
(14,649,705)
(15,155,706)
(15,611,746)
(8,395,388)
(8,698,336)
(9,000,530)
(9,312,848)
(9,636,004)
0
0
0
0
0
(5,274,828)
(5,461,770)
(5,649,175)
(5,842,858)
(5,975,742)
Other Revenue
(18,273,917)
(17,995,401)
(17,570,900)
(18,076,463)
(18,597,486)
Interest
(4,118,660)
(4,266,520)
(4,414,746)
(4,567,938)
(4,726,445)
Grants
(135,300)
(248,754)
(254,929)
(260,028)
(265,229)
Other
0
0
0
0
0
Services to Other Governments
(5,664,123)
(5,867,465)
(6,071,310)
(6,281,984)
(6,499,969)
Interdepartment Transfer
(8,355,834)
(7,612,662)
(6,829,915)
(6,966,513)
(7,105,843)
0
0
0
0
0
(5,672,140)
(5,419,840)
(10,168,658)
(11,771,260)
(10,427,422)
Special (Stat Reserve) Funds
(1,675,218)
(1,362,766)
(6,190,280)
(7,704,832)
(6,219,889)
Development Cost Charges
(795,400)
(823,955)
(852,580)
(882,165)
(912,776)
(3,201,522)
(3,233,119)
(3,125,798)
(3,184,263)
(3,294,757)
(45,612,220)
(45,728,482)
(50,702,730)
(53,480,434)
(53,280,468)
Salaries and Wages
29,511,361
30,797,498
33,746,111
36,953,766
40,319,077
Internal Equipment
613,637
341,126
347,948
354,907
362,005
Material and Other
38,885,038
39,200,047
39,983,965
40,735,720
41,552,582
Revenue Library Requisition Parcel Tax Fees and Charges Sales of Service Other User Fees
Interfund Transfer Transfers from Funds
Accumulated Surplus Total Revenue Expenditures
Contract Services
4,083,458
4,670,054
4,817,013
4,984,163
5,157,114
Debt Interest
3,666,890
4,105,957
10,115,657
15,126,162
16,754,728
Debt Principal
4,180,072
4,404,651
7,035,694
9,219,332
9,305,753
371,413
371,413
371,413
371,413
371,413
371,413
371,413
371,413
371,413
371,413
0
0
0
0
0
19,463,013
20,067,501
19,183,303
19,866,665
20,610,163
Special (Stat Reserve) Funds
17,728,823
18,333,311
18,384,113
19,067,475
19,810,973
Development Cost Charges
0
0
0
0
0
1,734,190
1,734,190
799,190
799,190
799,190
Total Expenditures
100,774,882
103,958,247
115,601,104
127,612,128
134,432,835
Net Operating Expenditures
55,162,662
58,229,764
64,898,374
74,131,693
81,152,366
Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds
Accumulated Surplus
Note: Totals may not add due to rounding.
PAGE 523
2024 FINANCIAL PLAN
CITY OF KELOWNA
Fire Safety Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax Fees and Charges Sales of Service
0
0
0
0
0
(2,795,029)
(2,895,370)
(2,995,961)
(3,099,921)
(3,207,489)
(679,447)
(703,839)
(728,292)
(753,564)
(779,713)
(2,115,582)
(2,191,531)
(2,267,669)
(2,346,357)
(2,427,776)
Other Revenue
(496,110)
(508,990)
(519,170)
(529,554)
(540,145)
Interest
0
0
0
0
0
Grants
(52,200)
(56,202)
(57,326)
(58,473)
(59,642)
Services to Other Governments
(443,910)
(452,788)
(461,844)
(471,081)
(480,503)
0
0
0
0
0
(162,800)
25,400
25,400
25,400
25,400
0
0
0
0
0
User Fees
Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges
0
0
0
0
0
(162,800)
25,400
25,400
25,400
25,400
(3,453,939)
(3,378,960)
(3,489,731)
(3,604,075)
(3,722,234)
Salaries and Wages
26,065,146
26,821,881
27,603,652
28,561,499
29,552,583
Internal Equipment
190,243
195,519
202,312
209,332
216,596
Material and Other
1,698,926
1,827,251
1,890,733
1,956,341
2,024,226
Contract Services
206,237
213,641
221,063
228,734
236,671
Debt Interest
0
0
0
0
0
Debt Principal
0
0
0
0
0
16,000
16,000
16,000
16,000
16,000
16,000
16,000
16,000
16,000
16,000
0
0
0
0
0
1,586,185
1,336,185
1,336,185
1,336,185
1,336,185
Special (Stat Reserve) Funds
1,150,000
900,000
900,000
900,000
900,000
Development Cost Charges
0
0
0
0
0
436,185
436,185
436,185
436,185
436,185
Total Expenditures
29,762,737
30,410,477
31,269,945
32,308,091
33,382,261
Net Operating Expenditures
26,308,798
27,031,517
27,780,214
28,704,016
29,660,027
Accumulated Surplus Total Revenue Expenditures
Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds
Accumulated Surplus
Note: Totals may not add due to rounding.
PAGE 524
2024 FINANCIAL PLAN
CITY OF KELOWNA
Governance & Leadership Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax
0
0
0
0
0
(10,000)
(10,230)
(10,464)
(10,704)
(10,949)
Sales of Service
(1,900)
(1,968)
(2,037)
(2,108)
(2,181)
User Fees
(8,100)
(8,262)
(8,427)
(8,596)
(8,768)
(55,000)
(56,100)
(57,222)
(58,366)
(59,533)
Fees and Charges
Other Revenue Interest
0
0
0
0
0
Grants
0
0
0
0
0
Services to Other Governments Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus Total Revenue
0
0
0
0
0
(55,000)
(56,100)
(57,222)
(58,366)
(59,533)
(5,800)
30,000
30,000
30,000
30,000
0
0
0
0
0
0
0
0
0
0
(5,800)
30,000
30,000
30,000
30,000
(70,800)
(36,330)
(37,686)
(39,070)
(40,482)
Expenditures Salaries and Wages
2,618,306
2,818,586
2,916,509
3,017,712
3,122,426
Internal Equipment
-
0
0
0
0
Material and Other
1,656,561
1,264,068
1,307,984
1,353,371
1,400,333
Contract Services
441,890
457,754
473,657
490,093
507,099
Debt Interest
0
0
0
0
0
Debt Principal
0
0
0
0
0
Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Special (Stat Reserve) Funds
0
0
0
0
0
Development Cost Charges
0
0
0
0
0
Accumulated Surplus
0
0
0
0
0
Total Expenditures
4,716,757
4,540,408
4,698,150
4,861,176
5,029,858
Net Operating Expenditures
4,645,957
4,504,078
4,660,464
4,822,106
4,989,376
Note: Totals may not add due to rounding.
PAGE 525
2024 FINANCIAL PLAN
CITY OF KELOWNA
Parking Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax Fees and Charges Sales of Service User Fees Other Revenue
0
0
0
0
0
(8,500,368)
(8,670,375)
(8,843,783)
(9,020,658)
(9,201,071)
(8,469,308)
(8,638,694)
(8,811,468)
(8,987,697)
(9,167,451)
(31,060)
(31,681)
(32,315)
(32,961)
(33,620)
(10,350)
(10,557)
(10,768)
(10,983)
(11,203)
Interest
0
0
0
0
0
Grants
0
0
0
0
0
Services to Other Governments Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds
0
0
0
0
0
(10,350)
(10,557)
(10,768)
(10,983)
(11,203)
(116,800)
69,000
69,000
69,000
69,000
(116,800)
69,000
69,000
69,000
69,000
Development Cost Charges
0
0
0
0
0
Accumulated Surplus
0
0
0
0
0
(8,627,518)
(8,611,932)
(8,785,551)
(8,962,641)
(9,143,274)
Total Revenue Expenditures Salaries and Wages
1,104,608
1,131,004
1,170,297
1,210,906
1,252,924
Internal Equipment
54,952
56,051
57,172
58,315
59,481
Material and Other
1,078,195
672,379
685,826
699,543
713,534
Contract Services
1,996,924
2,036,862
2,077,600
2,119,152
2,161,535
Debt Interest
0
0
0
0
0
Debt Principal
0
0
0
0
0
759,000
759,000
759,000
759,000
759,000
759,000
759,000
759,000
759,000
759,000
0
0
0
0
0
2,483,839
2,806,636
2,885,656
2,965,725
3,046,800
Special (Stat Reserve) Funds
2,183,839
2,506,636
2,585,656
2,665,725
2,746,800
Development Cost Charges
0
0
0
0
0
300,000
300,000
300,000
300,000
300,000
Total Expenditures
7,477,518
7,461,932
7,635,551
7,812,641
7,993,274
Net Operating Expenditures
(1,150,000)
(1,150,000)
(1,150,000)
(1,150,000)
(1,150,000)
Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds
Accumulated Surplus
Note: Totals may not add due to rounding.
PAGE 526
2024 FINANCIAL PLAN
CITY OF KELOWNA
Parks Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax Fees and Charges Sales of Service User Fees Other Revenue
0
0
0
0
0
(1,285,585)
(1,331,738)
(1,378,004)
(1,425,821)
(1,475,297)
(1,233,585)
(1,277,871)
(1,322,266)
(1,368,149)
(1,415,624)
(52,000)
(53,867)
(55,738)
(57,672)
(59,673)
(334,634)
(176,393)
(179,920)
(183,518)
(187,189)
Interest
0
0
0
0
0
Grants
(114,900)
47,736
48,691
49,665
50,658
Services to Other Governments Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus Total Revenue
0
0
0
0
0
(219,734)
(224,129)
(228,611)
(233,183)
(237,847)
(275,630)
985,370
985,370
985,370
985,370
(81,630)
(51,630)
(51,630)
(51,630)
(51,630)
0
0
0
0
0
(194,000)
1,037,000
1,037,000
1,037,000
1,037,000
(1,895,849)
(522,761)
(572,554)
(623,969)
(677,116)
Expenditures Salaries and Wages
4,842,879
5,062,991
5,252,179
5,434,430
5,623,005
Internal Equipment
1,353,480
1,354,004
1,411,120
1,460,086
1,510,751
Material and Other
1,378,357
1,387,595
1,453,328
1,503,758
1,555,938
Contract Services
5,796,825
6,445,085
6,678,644
6,910,393
7,150,184
Debt Interest
0
0
0
0
0
Debt Principal
0
0
0
0
0
30,572
30,572
30,572
30,572
30,572
30,572
30,572
30,572
30,572
30,572
0
0
0
0
0
409,107
409,107
409,107
409,107
409,107
Special (Stat Reserve) Funds
364,500
364,500
364,500
364,500
364,500
Development Cost Charges
0
0
0
0
0
44,607
44,607
44,607
44,607
44,607
Total Expenditures
13,811,220
14,689,354
15,234,950
15,748,346
16,279,557
Net Operating Expenditures
11,915,371
14,166,593
14,662,396
15,124,377
15,602,441
Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds
Accumulated Surplus
Note: Totals may not add due to rounding.
PAGE 527
2024 FINANCIAL PLAN
CITY OF KELOWNA
Partnerships Office Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax Fees and Charges Sales of Service User Fees Other Revenue
0
0
0
0
0
(103,500)
(107,216)
(110,941)
(114,790)
(118,774)
(100,000)
(103,590)
(107,189)
(110,908)
(114,757)
(3,500)
(3,626)
(3,752)
(3,882)
(4,017)
(140,000)
(142,800)
(145,656)
(148,569)
(151,540)
Interest
0
0
0
0
0
Grants
0
0
0
0
0
Services to Other Governments Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges
0
0
0
0
0
(140,000)
(142,800)
(145,656)
(148,569)
(151,540)
(221,200)
(218,200)
(218,200)
4,900
4,900
0
0
0
0
0
0
0
0
0
0
(221,200)
(218,200)
(218,200)
4,900
4,900
(464,700)
(468,216)
(474,797)
(258,459)
(265,414)
Salaries and Wages
905,599
835,349
864,370
723,864
748,982
Internal Equipment
0
0
0
0
0
Material and Other
499,790
400,676
414,596
376,382
389,442
Contract Services
0
0
0
0
0
Debt Interest
0
0
0
0
0
Accumulated Surplus Total Revenue Expenditures
Debt Principal
0
0
0
0
0
Internal Allocations
0
0
0
0
0
Interdepartment Transfer
0
0
0
0
0
Interfund Transfer
0
0
0
0
0
0
0
0
0
0
Transfer to Funds Special (Stat Reserve) Funds
0
0
0
0
0
Development Cost Charges
0
0
0
0
0
Accumulated Surplus Total Expenditures Net Operating Expenditures
0
0
0
0
0
1,405,389
1,236,025
1,278,966
1,100,246
1,138,424
940,689
767,809
804,169
841,787
873,010
Note: Totals may not add due to rounding.
PAGE 528
2024 FINANCIAL PLAN
CITY OF KELOWNA
Police Services & RCMP Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax
0
0
0
0
0
(638,674)
(661,603)
(684,587)
(708,342)
(732,922)
Sales of Service
(567,174)
(587,536)
(607,947)
(629,043)
(650,871)
User Fees
(71,500)
(74,067)
(76,640)
(79,299)
(82,051)
(6,067,282)
(6,188,628)
(6,312,401)
(6,438,650)
(6,567,422)
Fees and Charges
Other Revenue Interest
0
0
0
0
0
Grants
(4,302,800)
(4,388,856)
(4,476,633)
(4,566,166)
(4,657,489)
Services to Other Governments
(1,522,192)
(1,552,636)
(1,583,689)
(1,615,363)
(1,647,670)
(242,290)
(247,136)
(252,079)
(257,121)
(262,263)
0
0
0
0
0
0
0
0
0
0
Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges
0
0
0
0
0
Accumulated Surplus
0
0
0
0
0
(6,705,956)
(6,850,231)
(6,996,988)
(7,146,992)
(7,300,344)
Salaries and Wages
7,464,973
7,907,308
8,182,020
8,465,936
8,759,704
Internal Equipment
26,020
26,540
27,071
27,612
28,164
Total Revenue Expenditures
Material and Other
538,444
319,621
330,725
342,201
354,075
Contract Services
51,354,817
53,234,401
55,083,848
56,995,258
58,972,993
Debt Interest
0
0
0
0
0
Debt Principal
0
0
0
0
0
RCMP CONTRACT
0
0
0
0
0
Internal Allocations
10,350
10,350
10,350
10,350
10,350
10,350
10,350
10,350
10,350
10,350
0
0
0
0
0
Interdepartment Transfer Interfund Transfer Transfer to Funds Special (Stat Reserve) Funds
0
0
0
0
0
0
0
0
0
0
Development Cost Charges
0
0
0
0
0
Accumulated Surplus
0
0
0
0
0
Total Expenditures
59,394,604
61,498,220
63,634,014
65,841,357
68,125,286
Net Operating Expenditures
52,688,648
54,647,989
56,637,026
58,694,365
60,824,942
Note: Totals may not add due to rounding.
PAGE 529
2024 FINANCIAL PLAN
CITY OF KELOWNA
Solid Waste & Landfill Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax
0
0
0
0
0
(24,818,000)
(25,708,966)
(26,602,137)
(27,525,231)
(28,480,356)
Sales of Service
(20,366,000)
(21,097,139)
(21,830,088)
(22,587,592)
(23,371,381)
User Fees
(4,452,000)
(4,611,827)
(4,772,049)
(4,937,639)
(5,108,975)
(1,557,618)
(1,588,770)
(1,620,546)
(1,652,957)
(1,686,016)
Fees and Charges
Other Revenue Interest
0
0
0
0
0
Grants
0
0
0
0
0
(1,050,000)
(1,071,000)
(1,092,420)
(1,114,268)
(1,136,553)
(507,618)
(517,770)
(528,126)
(538,689)
(549,463)
(211,200)
101,000
101,000
101,000
101,000
(211,200)
101,000
101,000
101,000
101,000
Services to Other Governments Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges
0
0
0
0
0
Accumulated Surplus
0
0
0
0
0
(26,586,818)
(27,196,736)
(28,121,683)
(29,077,188)
(30,065,372)
Total Revenue Expenditures Salaries and Wages
3,390,077
3,511,781
3,633,786
3,759,878
3,890,346
Internal Equipment
2,283,300
2,288,166
2,333,929
2,380,608
2,428,220
Material and Other
2,218,036
2,096,077
2,172,114
2,247,486
2,325,474
Contract Services
6,316,754
6,543,525
6,770,858
7,005,807
7,248,909
Debt Interest
0
0
0
0
0
Debt Principal
0
0
0
0
0
Internal Allocations Interdepartment Transfer Interfund Transfer
2,872,338
2,855,338
1,920,338
1,920,338
1,920,338
2,872,338
2,855,338
1,920,338
1,920,338
1,920,338
0
0
0
0
0
9,306,313
9,701,849
11,090,658
11,563,071
12,052,085
Special (Stat Reserve) Funds
9,306,313
9,701,849
11,090,658
11,563,071
12,052,085
Development Cost Charges
0
0
0
0
0
Accumulated Surplus
0
0
0
0
0
Total Expenditures
26,386,818
26,996,736
27,921,683
28,877,188
29,865,372
Net Operating Expenditures
(200,000)
(200,000)
(200,000)
(200,000)
(200,000)
Transfer to Funds
Note: Totals may not add due to rounding.
PAGE 530
2024 FINANCIAL PLAN
CITY OF KELOWNA
Stormwater & Flood Protection Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax Fees and Charges Sales of Service User Fees Other Revenue
0
0
0
0
0
(1,200)
(1,243)
(1,286)
(1,331)
(1,377)
(1,200)
(1,243)
(1,286)
(1,331)
(1,377)
0
0
0
0
0
(499,800)
506,864
523,249
539,962
557,009
Interest
0
0
0
0
0
Grants
(8,900)
819,264
835,649
852,362
869,409
Services to Other Governments Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus Total Revenue
0
0
0
0
0
(490,900)
(312,400)
(312,400)
(312,400)
(312,400)
(767,300)
(310,300)
(310,300)
(300,300)
(300,300)
(34,700)
0
0
0
0
0
0
0
0
0
(732,600)
(310,300)
(310,300)
(300,300)
(300,300)
(1,268,300)
195,321
211,663
238,331
255,332
Expenditures Salaries and Wages
1,171,132
1,213,176
1,255,323
1,298,883
1,343,954
Internal Equipment
351,499
358,529
365,700
373,014
380,474
Material and Other
1,616,710
1,083,044
1,120,670
1,149,557
1,189,447
Contract Services
75,000
0
0
0
0
0
0
0
0
0
Debt Interest Debt Principal Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds
0
0
0
0
0
155,000
155,000
155,000
155,000
155,000
155,000
155,000
155,000
155,000
155,000
0
0
0
0
0
0
0
0
0
0
Special (Stat Reserve) Funds
0
0
0
0
0
Development Cost Charges
0
0
0
0
0
Accumulated Surplus
0
0
0
0
0
Total Expenditures
3,369,341
2,809,749
2,896,693
2,976,454
3,068,875
Net Operating Expenditures
2,101,041
3,005,070
3,108,356
3,214,785
3,324,207
Note: Totals may not add due to rounding.
PAGE 531
2024 FINANCIAL PLAN
CITY OF KELOWNA
Sport & Recreation Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax Fees and Charges
0
0
0
0
0
(4,400,290)
(4,335,303)
(4,485,919)
(4,641,581)
(4,802,643)
Sales of Service
(3,317,940)
(3,214,097)
(3,325,760)
(3,441,164)
(3,560,572)
User Fees
(1,082,350)
(1,121,206)
(1,160,159)
(1,200,417)
(1,242,071)
Other Revenue
(188,200)
(191,964)
(195,803)
(199,719)
(203,714)
Interest
0
0
0
0
0
Grants
(110,000)
(112,200)
(114,444)
(116,733)
(119,068)
Services to Other Governments Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges
0
0
0
0
0
(78,200)
(79,764)
(81,359)
(82,986)
(84,646)
(675,800)
(197,125)
(197,125)
(172,125)
(172,125)
0
0
0
0
0
0
0
0
0
0
(675,800)
(197,125)
(197,125)
(172,125)
(172,125)
(5,264,290)
(4,724,392)
(4,878,847)
(5,013,425)
(5,178,482)
Salaries and Wages
7,213,465
7,841,271
8,119,370
8,401,112
8,692,631
Internal Equipment
681,055
509,281
524,773
535,268
545,973
Accumulated Surplus Total Revenue Expenditures
Material and Other
3,981,970
3,827,019
3,931,034
4,067,441
4,208,581
Contract Services
2,981,677
3,111,799
3,177,140
3,262,387
3,375,592
Debt Interest
0
0
0
0
0
Debt Principal
0
0
0
0
0
Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
852,954
852,954
852,954
852,954
852,954
Special (Stat Reserve) Funds
0
0
0
0
0
Development Cost Charges
0
0
0
0
0
Accumulated Surplus
852,954
852,954
852,954
852,954
852,954
Total Expenditures
15,711,121
16,142,324
16,605,271
17,119,162
17,675,731
Net Operating Expenditures
10,446,831
11,417,932
11,726,424
12,105,737
12,497,249
Note: Totals may not add due to rounding.
PAGE 532
2024 FINANCIAL PLAN
CITY OF KELOWNA
Transit Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax Fees and Charges Sales of Service User Fees Other Revenue
0
0
0
0
0
(8,017,907)
(8,265,956)
(8,544,261)
(8,831,760)
(9,129,103)
(7,582,025)
(7,823,143)
(8,094,931)
(8,375,825)
(8,666,466)
(435,882)
(442,813)
(449,330)
(455,935)
(462,637)
(14,012,900)
(14,293,158)
(14,579,021)
(14,870,601)
(15,168,013)
Interest
0
0
0
0
0
Grants
(14,012,900)
(14,293,158)
(14,579,021)
(14,870,601)
(15,168,013)
Services to Other Governments
0
0
0
0
0
Interdepartment Transfer
0
0
0
0
0
(1,010,100)
(540,500)
(540,500)
(540,500)
(540,500)
0
0
0
0
0
Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges
0
0
0
0
0
(1,010,100)
(540,500)
(540,500)
(540,500)
(540,500)
(23,040,907)
(23,099,614)
(23,663,782)
(24,242,861)
(24,837,616)
Salaries and Wages
54,100
(932)
(965)
(998)
(1,033)
Internal Equipment
0
0
0
0
0
Accumulated Surplus Total Revenue Expenditures
Material and Other
566,300
(567,466)
(587,181)
(607,556)
(628,638)
Contract Services
30,864,653
31,893,551
33,001,584
34,146,739
35,331,631
Debt Interest
0
0
0
0
0
Debt Principal
0
0
0
0
0
386,863
386,863
386,863
386,863
386,863
386,863
386,863
386,863
386,863
386,863
0
0
0
0
0
306,980
306,980
306,980
306,980
306,980
Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds Special (Stat Reserve) Funds
0
0
0
0
0
Development Cost Charges
0
0
0
0
0
Accumulated Surplus
306,980
306,980
306,980
306,980
306,980
Total Expenditures
32,178,896
32,018,996
33,107,281
34,232,028
35,395,803
Net Operating Expenditures
9,137,989
8,919,382
9,443,499
9,989,167
10,558,187
Note: Totals may not add due to rounding.
PAGE 533
2024 FINANCIAL PLAN
CITY OF KELOWNA
Transportation Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax
0
0
0
0
0
(1,437,897)
(1,368,635)
(1,397,942)
(1,425,875)
(1,454,366)
Sales of Service
(785,800)
(703,496)
(719,500)
(733,864)
(748,515)
User Fees
(652,097)
(665,139)
(678,442)
(692,011)
(705,851)
Other Revenue
(771,159)
(655,512)
(668,622)
(681,994)
(695,634)
Interest
0
0
0
0
0
Grants
(7,000)
18,462
18,831
19,208
19,592
Services to Other Governments
(252,100)
(151,674)
(154,707)
(157,801)
(160,957)
Interdepartment Transfer
(512,059)
(522,300)
(532,746)
(543,401)
(554,269)
(1,002,500)
(765,168)
(790,679)
(758,116)
(784,423)
0
0
0
0
0
Fees and Charges
Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus Total Revenue
0
0
0
0
0
(1,002,500)
(765,168)
(790,679)
(758,116)
(784,423)
(3,211,556)
(2,789,315)
(2,857,243)
(2,865,985)
(2,934,423)
Expenditures Salaries and Wages
7,968,606
8,031,128
8,313,547
8,602,027
8,900,517
Internal Equipment
3,294,883
3,594,520
3,719,400
3,848,463
3,982,005
Material and Other
4,990,048
4,994,196
5,170,650
5,290,072
5,473,638
Contract Services
949,039
772,000
856,689
886,452
917,212
Debt Interest
0
0
0
0
0
Debt Principal
0
0
0
0
0
Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds Special (Stat Reserve) Funds Development Cost Charges
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
502,816
101,634
2,134
(103,400)
(215,594)
32,816
(368,366)
(467,866)
(573,400)
(685,594)
0
0
0
0
0
470,000
470,000
470,000
470,000
470,000
Total Expenditures
17,528,353
17,578,167
18,092,183
18,554,374
19,089,605
Net Operating Expenditures
14,316,797
14,788,852
15,234,940
15,688,389
16,155,182
Accumulated Surplus
Note: Totals may not add due to rounding.
PAGE 534
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating Summary - Airport & Utility Funds Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax
(4,304,150)
(3,313,741)
(3,153,739)
(2,807,932)
(2,574,549)
Fees and Charges
(96,000,360)
(100,513,516)
(108,251,988)
(113,295,551)
(118,974,918)
Sales of Service
(93,417,810)
(100,366,086)
(108,104,558)
(113,147,172)
(118,825,571)
User Fees
(2,582,550)
(147,430)
(147,430)
(148,379)
(149,347)
Other Revenue
(5,996,473)
(16,248,194)
(5,325,342)
(7,361,926)
(6,517,156)
Interest
(1,295,942)
(386,978)
(1,430,267)
(1,482,431)
(1,540,715)
Grants
(2,527,839)
(13,076,785)
(1,100,830)
(3,042,602)
(2,095,621)
Other
0
(673,643)
(683,546)
(693,594)
(703,790)
(1,200,065)
(1,170,461)
(1,169,372)
(1,201,972)
(1,235,703)
(9,107,348)
(8,515,678)
(5,955,453)
(6,526,606)
(7,370,728)
Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds
0
0
0
0
0
Development Cost Charges
0
0
0
0
0
(9,107,348)
(8,515,678)
(5,955,453)
(6,526,606)
(7,370,728)
(115,408,331)
(128,591,129)
(122,686,523)
(129,992,015)
(135,437,350)
Salaries and Wages
19,366,095
20,207,049
20,796,311
21,466,968
22,200,842
Internal Equipment
2,009,517
1,957,754
1,957,754
1,996,909
2,036,847
Material and Other
26,301,053
18,662,035
17,978,382
19,049,726
19,320,395
Contract Services Debt Interest Debt Principal Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus
2,635,240 1,289,195 2,969,047 6,484,374 5,829,473 654,901 37,877,210 557,290 0 37,319,920
9,909,540 1,209,442 2,853,633 5,826,436 2,657,712 3,168,724 48,704,865 557,290 0 48,147,575
10,037,592 889,803 1,918,544 6,434,932 2,657,712 3,777,220 49,743,604 557,290 0 49,186,314
10,191,031 613,443 1,154,518 6,671,021 2,657,712 4,013,309 44,888,443 557,290 0 44,331,153
10,416,763 1,214,579 952,724 6,935,836 2,657,712 4,278,124 46,672,391 557,290 0 46,115,101
Total Expenditures
98,931,731
109,330,755
109,756,923
106,032,059
109,750,377
Net Operating Expenditures
(16,476,600)
(19,260,374)
(12,929,600)
(23,959,956)
(25,686,973)
Accumulated Surplus Total Revenue Expenditures
Note: Totals may not add due to rounding. 2024 Operating revenues by Airport & Utility funds
2024 Operating expenditure by Airport & Utility funds
Airport 54%
Airport 63%
Wastewater 24%
Wastewater 18%
Water 22%
Water 19%
Total: $115.4M
Total: $93.6M
PAGE 535
2024 FINANCIAL PLAN
CITY OF KELOWNA
Airport Fund Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Parcel Tax Fees and Charges Sales of Service User Fees Other Revenue Interest Grants Other Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus
0 (51,851,260) (49,315,210) (2,536,050) (3,273,860) (908,360) (2,365,500) 0 0 (7,634,148) 0 0 (7,634,148)
0 (58,246,524) (58,246,524) 0 (12,988,245) (73,800) (12,914,445) 0 0 (3,250,387) 0 0 (3,250,387)
0 (63,375,304) (63,375,304) 0 (1,063,296) (75,645) (987,651) 0 0 (5,691,430) 0 0 (5,691,430)
0 (65,637,119) (65,637,119) 0 (3,113,642) (77,536) (3,036,106) 0 0 (4,910,894) 0 0 (4,910,894)
0 (68,351,869) (68,351,869) 0 (2,168,600) (79,475) (2,089,125) 0 0 (4,101,050) 0 0 (4,101,050)
Total Revenue
(62,759,268)
(74,485,156)
(70,130,031)
(73,661,655)
(74,621,518)
Expenditures Salaries and Wages Internal Equipment Material and Other Contract Services
7,973,935 48,550 15,420,186 1,709,830
8,371,000 0 7,739,840 8,951,115
8,933,000 0 7,566,735 9,082,067
9,192,000 0 8,638,079 9,202,349
9,499,932 0 8,908,748 9,393,774
Debt Interest Debt Principal
584,250 1,905,408
584,250 1,897,191
332,500 1,266,101
112,000 706,064
0 8,220
Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus
2,023,584 1,872,584 151,000 33,093,525 0 0 33,093,525
2,664,823 0 2,664,823 44,276,937 0 0 44,276,937
3,273,319 0 3,273,319 39,676,309 0 0 39,676,309
3,509,408 0 3,509,408 42,301,754 0 0 42,301,754
3,774,223 0 3,774,223 43,036,621 0 0 43,036,621
Total Expenditures
62,759,268
74,485,156
70,130,031
73,661,655
74,621,518
0
0
0
0
0
Surplus/(Deficit) (Included Above) 25,459,377 41,026,550 Note: Totals may not add due to rounding. The Surplus/(Deficit) is the overall surplus/(deficit) budgeted for the fund during the year.
33,984,879
37,390,861
38,935,571
Revenue
Net Operating Expenditures
PAGE 536
2024 FINANCIAL PLAN
CITY OF KELOWNA
Wastewater Fund Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax Fees and Charges Sales of Service User Fees Other Revenue Interest Grants Other Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus
(1,278,305) (23,433,000) (23,433,000) 0 (2,371,023) (328,082) (162,339) 0 (907,975) (209,000) 0 0 (209,000)
(987,869) (23,048,000) (22,948,000) (100,000) (2,295,970) (252,732) (162,340) 0 (940,571) (376,999) 0 0 (376,999)
(802,162) (24,224,093) (24,124,093) (100,000) (3,287,275) (1,293,287) (113,179) 0 (939,482) (264,023) 0 0 (264,023)
(430,273) (25,463,864) (25,363,864) (100,000) (3,262,564) (1,342,659) (6,496) 0 (972,082) (1,615,712) 0 0 (1,615,712)
(170,424) (26,770,993) (26,670,993) (100,000) (3,351,725) (1,398,089) (6,496) 0 (1,005,813) (3,269,678) 0 0 (3,269,678)
Total Revenue
(27,291,328)
(26,708,838)
(28,577,553)
(30,772,413)
(33,562,820)
Expenditures Salaries and Wages Internal Equipment Material and Other Contract Services
6,053,502 1,176,700 5,445,280 734,910
6,284,186 1,200,234 5,728,025 739,539
6,276,906 1,200,234 5,424,580 738,031
6,494,715 1,224,239 5,424,580 763,641
6,720,082 1,248,724 5,424,580 790,139
Debt Interest Debt Principal Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus
320,071 705,925 2,144,434 1,926,434 218,000 733,806 557,290 0 176,516
240,848 599,439 1,880,157 1,662,157 218,000 578,988 557,290 0 21,698
172,958 295,440 1,880,157 1,662,157 218,000 3,214,646 557,290 0 2,657,356
117,098 91,450 1,880,157 1,662,157 218,000 557,290 557,290 0 0
830,234 587,501 1,880,157 1,662,157 218,000 557,290 557,290 0 0
Total Expenditures
17,314,628
17,251,416
19,202,953
16,553,171
18,038,707
Net Operating Expenditures
(9,976,700)
(9,457,422)
(9,374,600)
(14,219,242)
(15,524,113)
154,818
2,074,452
2,328,980
(3,102,484)
(4,945,975)
Surplus/(Deficit) (Included Above) Note: Totals may not add due to rounding.
The Net Operating Expenditures total is the amount of funding required for capital expenditures in the specific year. The Surplus/(Deficit) is the overall surplus/(deficit) budgeted for the fund during the year.
PAGE 537
2024 FINANCIAL PLAN
CITY OF KELOWNA
Water Fund Revenues and Expenditures by Year
2024
2025
2026
2027
2028
Revenue Parcel Tax Fees and Charges Sales of Service User Fees Other Revenue Interest Grants Other Interdepartment Transfer Transfers from Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus
(3,025,845) (20,716,100) (20,669,600) (46,500) (351,590) (59,500) 0 0 (292,090) (1,264,200) 0 0 (1,264,200)
(2,325,872) (19,218,992) (19,171,562) (47,430) (963,979) (60,446) 0 (673,643) (229,890) (4,888,292) 0 0 (4,888,292)
(2,351,577) (20,652,591) (20,605,161) (47,430) (974,771) (61,335) 0 (683,546) (229,890) 0 0 0 0
(2,377,659) (22,194,568) (22,146,189) (48,379) (985,720) (62,236) 0 (693,594) (229,890) 0 0 0 0
(2,404,125) (23,852,056) (23,802,709) (49,347) (996,831) (63,151) 0 (703,790) (229,890) 0 0 0 0
Total Revenue
(25,357,735)
(27,397,135)
(23,978,939)
(25,557,947)
(27,253,012)
Expenditures Salaries and Wages Internal Equipment Material and Other Contract Services
5,338,658 784,267 5,435,587 190,500
5,551,863 757,520 5,194,170 218,886
5,586,405 757,520 4,987,067 217,494
5,780,253 772,670 4,987,067 225,041
5,980,828 788,123 4,987,067 232,850
Debt Interest Debt Principal Internal Allocations Interdepartment Transfer Interfund Transfer Transfer to Funds Special (Stat Reserve) Funds Development Cost Charges Accumulated Surplus
384,874 357,714 2,316,356 2,030,455 285,901 4,049,879 0 0 4,049,879
384,345 357,003 1,281,456 995,555 285,901 3,848,940 0 0 3,848,940
384,345 357,003 1,281,456 995,555 285,901 6,852,649 0 0 6,852,649
384,345 357,003 1,281,456 995,555 285,901 2,029,399 0 0 2,029,399
384,345 357,003 1,281,456 995,555 285,901 3,078,480 0 0 3,078,480
Total Expenditures
18,857,835
17,594,183
20,423,939
15,817,234
17,090,152
Net Operating Expenditures
(6,499,900)
(9,802,952)
(3,555,000)
(9,740,713)
(10,162,860)
200,939
(4,381,948)
3,235,271
(1,292,383)
(355,467)
Surplus/(Deficit) (Included Above) Note: Totals may not add due to rounding.
The Net Operating Expenditures total is the amount of funding required for capital expenditures in the specific year. The Surplus/(Deficit) is the overall surplus/(deficit) budgeted for the fund during the year.
PAGE 538
2024 FINANCIAL PLAN
CITY OF KELOWNA
Capital Summary - General Fund Cost Centre 300 301 302 304 305 306 308 310 311
Real Estate & Parking Buildings Parks Transportation Solid Waste Storm Drainage Information Services Vehicle & Mobile Equipment Fire
2024
2025
2026
2027
2028
3,994,400 35,523,900 54,886,000 55,313,200 22,202,800 15,395,200 2,977,100 12,781,300 5,923,300 208,997,200
4,824,418 112,829,910 65,151,641 44,750,700 14,810,000 7,842,190 1,147,175 5,167,400 525,850 257,049,284
7,333,750 101,958,820 49,540,535 38,913,143 3,560,000 8,749,687 998,617 5,279,000 334,800 216,668,352
3,070,786 47,700,000 40,494,425 50,691,004 6,510,000 2,432,023 794,024 5,177,800 2,642,100 159,512,162
3,214,218 29,486,920 19,825,917 48,220,780 6,385,000 2,479,001 898,541 5,358,600 1,067,200 116,936,177
14,466,700 125,330,000 48,126,900 5,912,000 12,083,700 2,596,200 481,700 208,997,200
15,983,000 65,262,699 41,858,789 32,928,262 16,532,876 83,440,957 1,042,700 257,049,283
17,479,000 45,824,082 39,936,849 24,680,540 15,694,214 72,107,168 946,500 216,668,353
19,050,000 38,582,290 45,338,104 11,421,775 1,031,333 43,451,560 637,100 159,512,162
20,707,000 26,560,928 37,332,583 16,806,499 0 14,939,867 589,300 116,936,177
Funding Sources: General Taxation Surplus/Reserves Development Cost Charges Debenture/Borrowing Federal/Provincial Funding* Dev/Comm/Other Contributions Utility Revenue Total Five-Year Capital Program
959,163,175
* 10-Year Capital Plan only includes confirmed Federal and Provincial Funding Note: Totals may not add due to rounding.
General Fund Capital Funding 2024 to 2028 The below graph summarizes the overall capital plan funding over the next five years.
Surplus/Reserves 31% Dev/Comm/Other Contributions 22% Development Cost Charges 22% Debenture/Borrowing 10% General Taxation 9% Federal/Provincial Funding 5% Utility Revenue 1%
Total = $959.2M
PAGE 539
2024 FINANCIAL PLAN
CITY OF KELOWNA
Capital Funding Summary by Cost Centre General Fund 2024 to 2028 - Taxation
35,000,000
30,000,000
25,000,000
20,000,000
15,000,000
10,000,000
5,000,000
0
Real Estate & Parking
Buildings
Cost Centre
Parks
Transportation
Storm Drainage
Information Services
Vehicle & Mobile Equipment
Total $
%
General Fund Taxation
%
300
Real Estate & Parking
22,437,572
2
6,217,172
7
301
Buildings
327,499,550
34
14,886,535
17
302
Parks
229,898,518
24
24,529,210
28
304
Transportation
237,888,827
25
30,021,979
34
305
Solid Waste
53,467,800
6
0
0
306
Storm Drainage
36,898,101
4
6,425,356
7
308
Information Services
6,815,457
1
4,721,557
6
310
Vehicle & Mobile Equipment
33,764,100
4
883,892
1
311
Fire
10,493,250
1
0
0
959,163,175
100.0
87,685,700
100
Total Five-Year Program Note: Totals may not add due to rounding.
PAGE 540
2024 FINANCIAL PLAN
CITY OF KELOWNA
Real Estate & Parking Capital Plan No. Plan Description L1 General Land Annual allocation for the purchase of land for general purposes. This may allow for acquiring properties at less than fair market value, creating land assembly opportunities, creating a revenue generating land bank and providing trade potential. L2 L3 L4
Road and Sidewalk Land Acquisition To fund the purchase of land required for the widening of roads to accommodate road improvements and/or sidewalks. Parking Infrastructure Funding to renew parking infrastructure and to invest in efficient parking management technology. Strategic Land Redevelopment Funding to redevelop City owned land to improve public benefit and encourage economic development.
Plan No. Plan Description L1 General Land L2 Road and Sidewalk Land Acquisition L3 Parking Infrastructure L4 Strategic Land Redevelopment
Funding Sources General Taxation Surplus/Reserves Development Cost Charges Debenture/Borrowing Federal/Provincial Funding Dev/Comm/Other Contributions Utility Revenue
2024 2,165,900 142,600 1,435,900 250,000 3,994,400
2025 2,416,552 127,866 2,030,000 250,000 4,824,418
2026 2,363,162 68,588 4,652,000 250,000 7,333,750
2027 2,446,578 51,208 323,000 250,000 3,070,786
2028 Five-Year Total 2,450,426 11,842,618 62,792 453,054 451,000 8,891,900 250,000 1,250,000 3,214,218 22,437,572
1,250,000 2,744,400 0 0 0 0 0 3,994,400
1,289,418 3,280,000 0 0 0 255,000 0 4,824,418
1,176,750 5,902,000 0 0 0 255,000 0 7,333,750
1,242,786 1,573,000 0 0 0 255,000 0 3,070,786
1,258,218 1,701,000 0 0 0 255,000 0 3,214,218
6,217,172 15,200,400 0 0 0 1,020,000 0 22,437,572
Note: Totals may not add due to rounding.
PAGE 541
2024 FINANCIAL PLAN
CITY OF KELOWNA
Building Capital Plan No. Plan Description B1 Parks and Recreation Buildings An allocation for the development of new Parks and Recreation buildings as well as the redevelopment and expansion of existing ones in various locations throughout the City to keep pace with the increasing demand due to population growth and emerging trends. This category includes Parks Administration, Parks washrooms, field houses, arenas and pools. B2 Community and Cultural Buildings An allocation for the development of new community and cultural buildings as well as the redevelopment, renewal and expansion of existing ones. This category includes the theaters, libraries, senior centres, community halls, art gallery, museums and the RCA. B3
Civic/Protective Service Buildings Funding to support renewal, replacement and cost of new Protective Services buildings which include firehalls, police stations and City Hall.
B4
Transportation and Public Works Buildings Funding to support renewal, replacement and new construction of new Transportation and Public Works Buildings throughout the City to keep pace increasing demand due to population growth and emerging trends. This category includes Public Works Yard, parkades, cemetery and WWTF administration. Heritage Buildings
B5
Funding for the restoration of City-owned heritage buildings. B6
Capital Opportunities and Partnerships Funding for special projects including partnerships with the School District on community space as part of new school construction as well as funding to allow for capital projects that were not envisioned during the plan development, including partnerships.
B7
Building Renewal, Rehabilitation & Infrastructure Upgrades An allocation for major repairs or replacement of existing building infrastructure such as roofs, windows, mechanical systems, lighting, electrical and water services, hazardous material abatement, and other major maintenance items.
Plan No. Plan Description B1 Parks and Recreation Buildings B2 Community and Cultural Buildings B3 Civic/Protective Service Buildings B4 Transportation and Public Works Buildings B5 Heritage Buildings B6 Capital Opportunities and Partnerships B7 Building Renewal, Rehab. & Infra. Upgrades
Funding Sources General Taxation Surplus/Reserves Development Cost Charges Debenture/Borrowing Federal/Provincial Funding Dev/Comm/Other Contributions Utility Revenue
2024 13,526,800 3,834,100 4,232,500 52,300 0 1,445,100 12,433,100 35,523,900
2025 72,750,000 24,980,000 11,349,910 0 0 1,000,000 2,750,000 112,829,910
2026 66,198,910 20,660,000 11,349,910 0 0 1,000,000 2,750,000 101,958,820
2027 36,750,000 7,200,000 0 0 0 1,000,000 2,750,000 47,700,000
2028 Five-Year Total 25,736,920 214,962,630 0 56,674,100 0 26,932,320 0 52,300 0 0 1,000,000 5,445,100 2,750,000 23,433,100 29,486,920 327,499,550
3,564,400 25,066,300 0 3,878,000 3,015,200 0 0 35,523,900
2,105,439 6,546,891 0 8,107,580 13,580,000 82,490,000 0 112,829,910
2,826,537 6,587,849 0 9,884,434 12,346,000 70,314,000 0 101,958,820
2,172,828 2,902,937 0 424,235 416,000 41,784,000 0 47,700,000
4,217,330 2,188,860 0 11,540,365 0 11,540,365 0 29,486,920
14,886,535 43,292,836 0 33,834,614 29,357,200 206,128,365 0 327,499,550
Note: Totals may not add due to rounding.
PAGE 542
2024 FINANCIAL PLAN
CITY OF KELOWNA
Parks Capital Plan No. Plan Description P1
P2
DCC Parkland Acquisition Park acquisition program based on the residential growth in the City for the purchase of parkland (Neighbourhood, Community, Recreation and City-wide level parks) under the Development Cost Charge program (DCC). Funding is primarily allocated from developer revenue with general taxation covering both the assist factor and infill/conversion units and Land Use Contracts not required to pay DCC's. Natural Area Parkland Acquisition Park acquisition program for the purchase of Natural Areas not attributed to the DCC program.
P3
Neighbourhood Park Development An allocation to cover the development of neighbourhood level parks including off-site costs related to park development, but does not include buildings.
P4
Community Park Development An allocation to cover the development of community level parks including off-site costs related to park development, but does not include buildings.
P5
Recreation Park Development An allocation to cover the development of recreation level parks including off-site costs related to park development, but does not include buildings.
P6
City-wide Park Development An allocation to cover the development of city-wide level parks including off-site costs related to park development, but does not include buildings.
P7
Linear/Natural Area Park Development An allocation to cover the development of natural areas and linear parks/trails.
P8
Park Renewal, Rehabilitation & Infrastructure Upgrades An allocation for major repairs or replacement of existing park infrastructure such as sidewalks, hard-surfaced trails, parking lots, sport courts, lighting, electrical and water services, irrigation, fencing, bridges and other major structures.
P9
Capital Opportunities Partnership An allocation for various strategic investments into the park and open space system as well as funding to allow for capital projects that were not envisioned during the plan development, including partnerships.
P10
Urban Streetscape and Urban Centres Development and Renewal An allocation for urban centre improvements, enhanced streetscapes and walkways, and other urban spaces that are not defined parks.
Plan No. Plan Description P1 DCC Parkland Acquisition P2 Natural Area Parkland Acquisition P3 Neighbourhood Park Development P4 Community Park Development P5 Recreation Park Development P6 City-wide Park Development P7 Linear/Natural Area Park Development P8 Park Renew., Rehab. & Upgrades P9 Capital Opportunities Partnership P10 Urban Streetsc. and Centres Dev & Renew
2024 18,737,100 0 2,933,700 12,070,800 13,584,300 2,064,000 2,186,900 1,299,100 500,000 1,510,100 54,886,000
2025 19,460,557 0 201,622 0 31,393,221 10,194,860 1,816,681 1,584,700 500,000 0 65,151,641
2026 19,460,577 0 2,016,120 0 22,220,800 3,837,944 232,034 1,273,060 500,000 0 49,540,535
2027 13,570,120 0 2,016,120 0 8,249,000 12,724,891 232,034 3,202,260 500,000 0 40,494,425
2028 Five-Year Total 13,570,120 84,798,474 750,000 750,000 2,016,120 9,183,682 0 12,070,800 0 75,447,321 0 28,821,695 1,773,857 6,241,506 1,215,820 8,574,940 500,000 2,500,000 0 1,510,100 19,825,917 229,898,518
3,541,500 15,929,600 33,881,100 1,481,000 52,800 0 0 54,886,000
4,287,374 15,432,340 29,400,952 16,030,974 0 0 0 65,151,640
4,529,560 10,260,086 24,788,935 9,961,955 0 0 0 49,540,536
7,405,505 8,129,786 20,300,848 4,125,000 0 533,286 0 40,494,425
4,765,270 113,682 14,946,965 0 0 0 0 19,825,917
Funding Sources General Taxation Surplus/Reserves Development Cost Charges Debenture/Borrowing Federal/Provincial Funding Dev/Comm/Other Contributions Utility Revenue
24,529,210 49,865,493 123,318,800 31,598,929 52,800 533,286 0 229,898,518
Note: Totals may not add due to rounding.
PAGE 543
2024 FINANCIAL PLAN
CITY OF KELOWNA
Transportation Capital Plan No. Plan Description T1
DCC Roads Allocation for design, land and construction costs associated with DCC Road projects.
T2
DCC Roads - Active Transportation Allocation for design, land and construction costs associated with DCC Active Transportation projects. General taxation to cover 77.7% assist. Non-DCC Roads
T3
T4
T5 T6 T7
T8
T9
Infrastructure upgrades which are not part of the 20 Year Servicing Plan and Financing Strategy (collectors and local roads) and City initiated projects to upgrade streets to full urban standards including drainage, fillet paving, sidewalks and landscaped boulevards. Transportation System Renewal Allocation for overlay and other processes, including micro asphalting, for rehabilitation of City roads. Also includes renewal of curb and gutter, bike paths, retaining walls, handrails and stairways. Bicycle Network Allocation for bike network system additions and improvements. Sidewalk Network Allocation required to complete the Non-DCC portion of the sidewalk network. Safety and Operational Improvements Allocation to cover field reviews and capital improvements for safety improvements or to improve operational efficiency. This will include projects such as left turn bays, traffic control changes, safety barriers, signs, markings, handicap access improvements and retrofit medians. Traffic Control Infrastructure This program is for construction of new traffic signal control infrastructure that is not part of the DCC program. This includes new traffic signals and pedestrian activated traffic signals, installation of new communication for the traffic signals system and where new development occurs install conduit for future traffic signals. Program also includes renewal of existing traffic signals. Transit Facilities Construction of new and renewal of existing transit facilities, bus pullouts and shelters.
Plan No. Plan Description T1 T2 T3 T4 T5 T6 T7 T8 T9
Development Cost Charge Roads DCC Roads - Active Transportation Non-DCC Roads Transportation System Renewal Bicycle Network Sidewalk Network Safety and Operational Improvements Traffic Control Infrastructure Transit Facilities
Funding Sources General Taxation Surplus/Reserves Development Cost Charges Debenture/Borrowing Federal/Provincial Funding Dev/Comm/Other Contributions Utility Revenue
2024 14,487,100 10,576,700 3,211,800 8,673,800 2,052,100 12,008,300 841,800 1,003,900 2,457,700 55,313,200
2025 23,262,981 2,741,000 750,000 15,234,719 550,000 495,000 438,000 0 1,279,000 44,750,700
2026 19,233,000 8,948,680 830,000 6,596,463 1,580,000 495,000 502,000 0 728,000 38,913,143
2027 33,017,666 6,196,273 550,000 7,841,065 910,000 845,000 452,000 0 879,000 50,691,004
2028 Five-Year Total 25,344,084 115,344,831 10,378,951 38,841,604 550,000 5,891,800 9,089,245 47,435,292 818,000 5,910,100 930,000 14,773,300 562,000 2,795,800 0 1,003,900 548,500 5,892,200 48,220,780 237,888,827
3,708,500 33,499,500 14,245,800 553,000 788,800 2,517,600 0 55,313,200
4,616,041 18,431,954 12,267,040 8,789,708 0 645,957 0 44,750,700
6,922,819 11,359,294 14,308,711 4,834,151 0 1,488,168 0 38,913,143
6,421,518 12,045,416 24,522,256 6,872,540 0 829,274 0 50,691,004
8,353,100 10,367,176 21,139,868 5,266,134 0 3,094,502 0 48,220,780
30,021,979 85,703,339 86,483,675 26,315,533 788,800 8,575,501 0 237,888,827
Note: Totals may not add due to rounding.
PAGE 544
2024 FINANCIAL PLAN
CITY OF KELOWNA
Solid Waste Capital Plan No. Plan Description SW1 Equipment Funding for new equipment and replacement of existing equipment. SW2 Site Improvement Funding for site improvements like buildings, roads, landscaping and fencing. SW3 Gas Management Required for design, installation and extension of gas management system and utilization of gas to energy. SW4 Leachate Management Required for installation and extension of leachate collection, treatment, recirculation network and pump facilities. SW5 Drainage & Groundwater Management Funding for design and installation of surface and groundwater systems, piping, storage and pump stations. SW6 Recycling & Waste Management Facilities and infrastructure to support waste management and recycling including composting, waste separation and diversion, last and curbside bins. SW7 chance Landfillmercantile, Area Development SW8 SW9
Required for planning, design and development of areas for filling to maximize available space. Closure & Reclamation Required for design and construction of final cover system and closure infrastructure and reclamation of disturbed areas to natural state. Solid Waste Renewal Renewal and replacement of site infrastructure and equipment.
Plan No. Plan Description SW1 Equipment SW2 Site Improvement SW3 Gas Management SW4 Leachate Management SW5 Drainage & Groundwater Management SW6 Recycling & Waste Management SW7 Landfill Area Development SW8 Closure & Reclamation SW9 Solid Waste Renewal
Funding Sources General Taxation Surplus/Reserves Development Cost Charges Debenture/Borrowing Federal/Provincial Funding Dev/Comm/Other Contributions Utility Revenue
2024 450,000 14,853,000 1,809,700 99,700 1,089,200 43,400 3,607,800 250,000 0 22,202,800
2025 600,000 2,100,000 550,000 1,350,000 4,900,000 0 4,050,000 800,000 460,000 14,810,000
2026 650,000 100,000 550,000 0 0 300,000 0 0 1,960,000 3,560,000
2027 400,000 2,600,000 550,000 0 500,000 0 0 2,000,000 460,000 6,510,000
2028 Five-Year Total 400,000 2,500,000 1,075,000 20,728,000 1,350,000 4,809,700 200,000 1,649,700 2,900,000 9,389,200 0 343,400 0 7,657,800 0 3,050,000 460,000 3,340,000 6,385,000 53,467,800
0 22,159,400 0 0 0 28,600 14,800 22,202,800
0 14,810,000 0 0 0 0 0 14,810,000
0 3,560,000 0 0 0 0 0 3,560,000
0 6,510,000 0 0 0 0 0 6,510,000
0 6,385,000 0 0 0 0 0 6,385,000
0 53,424,400 0 0 0 28,600 14,800 53,467,800
Note: Totals may not add due to rounding.
PAGE 545
2024 FINANCIAL PLAN
CITY OF KELOWNA
Storm Drainage Capital Plan No. Plan Description Hydraulic Upgrading Program D1 Estimated expenditures to cover hydraulic improvements to the storm drainage system. This non-exhaustive list of hydraulic capacity projects are selected based on grant availability, contributing area, support by studies, analyses, and/or reoccurring operational issues. Flood protection projects are also included in this category. D2
D3
Storm Drainage Quality Program This program includes stormwater quality projects that reduce urban and agricultural stormwater pollution throughout the City. Projects are selected based on contemporary water quality monitoring, higher risk subcatchments, and provincial outfall water quality targets. The 2040 Official Community Plan and the draft Area Based Water Management Plan identify relatively high risks and many opportunities for addressing stormwater quality in the City. These projects ultimately support the City's drinking water filtration deferral strategy supported by Interior Health. This category is expected to evolve regularly based on lessons learned, completed projects, and increases to stormwater quality levels of service. Storm Water Renewal This program provides for the renewal and replacement of pipes, outfalls, pump stations, treatment facilities, and stormwater ponds.
Plan No. Plan Description D1 Hydraulic Upgrading Program D2 Storm Drainage Quality Program Storm Water Renewal D3
Funding sources General Taxation Surplus/Reserves Development Cost Charges Debenture/Borrowing Federal/Provincial Funding Dev/Comm/Other Contributions Utility Revenue
2024 14,437,400 370,800 587,000 15,395,200
2025 7,382,190 120,000 340,000 7,842,190
2026 8,370,535 0 379,152 8,749,687
2027 1,738,333 0 693,690 2,432,023
2028 Five-Year Total 450,000 32,378,458 390,000 880,800 1,639,001 3,638,843 2,479,001 36,898,101
1,319,100 8,623,800 0 0 5,404,900 0 47,400 15,395,200
2,381,598 2,316,919 190,797 0 2,952,876 0 0 7,842,190
857,974 3,704,296 839,203 0 3,348,214 0 0 8,749,687
837,683 464,007 515,000 0 615,333 0 0 2,432,023
1,029,001 204,250 1,245,750 0 0 0 0 2,479,001
6,425,356 15,313,272 2,790,750 0 12,321,323 0 47,400 36,898,101
Note: Totals may not add due to rounding.
PAGE 546
2024 FINANCIAL PLAN
CITY OF KELOWNA
Information Services Capital Plan No. Plan Description I1 Front Office Equipment Information Services have been utilizing a 5 year replacement cycle for desktop equipment which includes computers, printers, monitors, scanners and software. It also includes work group equipment such as large format plotters and copiers. I2
Server & Data Storage To provide equipment and software in City Hall data centre to support the various systems in place for staff and includes equipment for the Fire Hall data centre. Included are servers, disk storage, tape backups and the related software.
I3
Major System Projects Major systems projects include Class Registration Software Replacement and Online Platform Redevelopment. Communications Systems To provide a networking environment that interconnects the various places and spaces used by City staff, this budget will support the expansion of the City's fibre optic ring which will reduce need for leased communication lines. Network components that have reached the end of their serviceable life will also be replaced.
I4
Plan No. Plan Description I1 Front Office Equipment I2 Server & Data Storage I3 Major System Projects I4 Communications Systems
Funding Sources General Taxation Surplus/Reserves Development Cost Charges Debenture/Borrowing Federal/Provincial Funding Dev/Comm/Other Contributions Utility Revenue
2024 454,800 60,000 1,653,700 808,600 2,977,100
2025 612,108 53,330 170,655 311,082 1,147,175
2026 345,309 289,180 258,517 105,611 998,617
2027 320,568 126,251 150,726 196,479 794,024
2028 Five-Year Total 494,771 2,227,556 48,665 577,426 155,728 2,389,326 199,377 1,621,149 898,541 6,815,457
1,083,200 1,840,100 0 0 0 50,000 3,800 2,977,100
1,097,175 0 0 0 0 50,000 0 1,147,175
948,617 0 0 0 0 50,000 0 998,617
744,024 0 0 0 0 50,000 0 794,024
848,541 0 0 0 0 50,000 0 898,541
4,721,557 1,840,100 0 0 0 250,000 3,800 6,815,457
Note: Totals may not add due to rounding.
PAGE 547
2024 FINANCIAL PLAN
CITY OF KELOWNA
Vehicle & Mobile Equipment Capital Plan V1
Plan Description Additional Vehicles / Equipment This budget supports the addition of new vehicles and equipment to the corporate fleet in response to increased service demand from population growth or additional services.
V2
Vehicle / Equipment Renewal As part of the City's vehicle replacement program, vehicles at the end of their service life cycles are replaced using funds from the equipment replacement reserve. Cars and light trucks have an average design life of 10 years.
Plan No. Plan Description V1 Additional Vehicles / Equipment V2 Vehicle / Equipment Renewal
Funding Sources General Taxation Surplus/Reserves Development Cost Charges Debenture/Borrowing Federal/Provincial Funding Dev/Comm/Other Contributions Utility Revenue
2024 2,327,000 10,454,300 12,781,300
2025 1,257,400 3,910,000 5,167,400
2026 1,179,000 4,100,000 5,279,000
2027 887,800 4,290,000 5,177,800
2028 Five-Year Total 858,600 6,509,800 4,500,000 27,254,300 5,358,600 33,764,100
0 12,353,600 0 0 12,000 0 415,700 12,781,300
205,955 3,918,745 0 0 0 0 1,042,700 5,167,400
216,743 4,115,757 0 0 0 0 946,500 5,279,000
225,655 4,315,045 0 0 0 0 637,100 5,177,800
235,539 4,533,761 0 0 0 0 589,300 5,358,600
883,892 29,236,908 0 0 12,000 0 3,631,300 33,764,100
Note: Totals may not add due to rounding.
PAGE 548
2024 FINANCIAL PLAN
CITY OF KELOWNA
Fire Capital Plan No. Plan Description F1 Vehicle / Equipment Renewal As part of the Fire Departments vehicle/equipment replacement program, vehicles and equipment at the end of their service life cycles are replaced using funds from the Fire Departments equipment replacement reserve. F2 Additional Vehicles / Equipment This budget supports the addition of new vehicles and equipment to the Fire Department in response to increased service demand from population growth. F3 Communications Systems To provide for radio system improvements or replacement, including dispatch requirements. Plan No. Plan Description F1 Vehicle / Equipment Renewal F2 Additional Vehicles / Equipment F3 Communications Systems
Funding Sources General Taxation Surplus/Reserves Development Cost Charges Debenture/Borrowing Federal/Provincial Funding Dev/Comm/Other Contributions Utility Revenue
2024 2,450,000 380,600 3,092,700 5,923,300
2025 0 170,550 355,300 525,850
2026 45,200 80,900 208,700 334,800
2027 1,960,900 106,200 575,000 2,642,100
2028 Five-Year Total 313,500 4,769,600 115,300 853,550 638,400 4,870,100 1,067,200 10,493,250
0 3,113,300 0 0 2,810,000 0 0 5,923,300
0 525,850 0 0 0 0 0 525,850
0 334,800 0 0 0 0 0 334,800
0 2,642,100 0 0 0 0 0 2,642,100
0 1,067,200 0 0 0 0 0 1,067,200
0 7,683,250 0 0 2,810,000 0 0 10,493,250
Note: Totals may not add due to rounding.
PAGE 549
2024 FINANCIAL PLAN
CITY OF KELOWNA
Capital Summary - Airport & Utility Funds Cost Centre 312 Airport 313 Water 314 Wastewater
Funding Sources: Water Utility Operating Wastewater Utility Operating Reserves/Surplus Development Cost Charges Debenture Borrowing Federal/Provincial Contributions Dev/Comm/Other Contributions
2024
2025
2026
2027
2028
143,112,400 16,548,100 46,799,300 206,459,800
60,675,300 21,728,000 18,013,920 100,417,220
32,602,100 8,445,000 14,955,100 56,002,200
44,147,400 16,645,000 28,581,800 89,374,200
36,483,700 24,745,000 28,098,600 89,327,300
6,499,900 9,976,700 163,222,900 11,447,900 0 14,635,100 677,300 206,459,800
9,802,952 9,457,422 27,675,300 9,003,546 39,000,000 2,000,000 3,478,000 100,417,220
3,555,000 9,374,600 32,085,300 6,940,500 0 516,800 3,530,000 56,002,200
9,740,713 14,219,242 43,443,000 19,116,845 0 2,704,400 150,000 89,374,200
10,162,860 15,524,113 36,483,700 27,006,627 0 0 150,000 89,327,300 541,580,720
Total Five-Year Capital Program * 10-Year Capital Plan only includes confirmed Federal and Provincial Funding Note: Totals may not add due to rounding.
Utility Funds Capital Funding 2024 to 2028 The below graph summarizes the overall capital plan funding over the next five years.
Reserves/Surplus 56% Development Cost Charges 14% Wastewater Utility Operating 11% Water Utility Operating 7% Debenture Borrowing 7% Federal/Provincial Contributions 4% Dev/Comm/Other Contributions 1%
Total = $541.6M
PAGE 550
2024 FINANCIAL PLAN
CITY OF KELOWNA
Airport Capital Plan No. Plan Description A1 Airside Funding for East Lands roads and servicing, stormwater infrastructure, and other small capital projects. A2
A3 A4
Groundside Funding for Airport roadways, hotel and parking development, rental car quick turnaround facility, land purchases, West Lands roads and servicing, and other small capital projects. Terminal Funding for Airport terminal building renovations, technology, bridge upgrades, and other small capital projects. Airport Improvement Fees Funding for the terminal expansion, Apron 1 South expansion, combined operations building, airside pavement rehabilitation, runway end safety area, airside equipment, and other capital projects.
Plan No. Plan Description A1 Airside A2 Groundside A3 Terminal A4 Airport Improvement Fees
Funding Sources: General Taxation Surplus/Reserves Development Cost Charges Debenture/Borrowing Federal/Provincial Funding Dev/Comm/Other Contributions Utility Revenue
2024 872,800 5,908,200 4,680,600 131,650,800 143,112,400
2025 748,400 1,173,000 716,300 58,037,600 60,675,300
2026 820,500 13,568,900 1,217,400 16,995,300 32,602,100
2027 2,440,800 16,630,800 757,600 24,318,200 44,147,400
2028 Five-Year Total 189,500 5,072,000 3,267,600 40,548,500 815,200 8,187,100 32,211,400 263,213,300 36,483,700 317,020,900
0 136,318,800 0 0 6,793,600 0 0 143,112,400
0 19,675,300 0 39,000,000 2,000,000 0 0 60,675,300
0 32,085,300 0 0 516,800 0 0 32,602,100
0 41,443,000 0 0 2,704,400 0 0 44,147,400
0 36,483,700 0 0 0 0 0 36,483,700
0 266,006,100 0 39,000,000 12,014,800 0 0 317,020,900
Note: Totals may not add due to rounding.
PAGE 551
2024 FINANCIAL PLAN
CITY OF KELOWNA
Water Capital Plan No. Plan Description W1 DCC Pipes (Mains) New water mains to accommodate growth. W2 DCC Booster Stations & PRVs New booster stations &PRV's to accommodate growth. W3 DCC Water Treatment New treatment capacity and facilities to accommodate growth. W4 DCC Reservoirs & Filling Stations New reservoirs and filling stations to accommodate growth. W5 DCC Offsite & Oversize The City's share of costs to oversize water infrastructure and to do work in excess of the developer's own needs. W6 Network and Facility Renewal
W7
Renewal of existing water mains, booster stations, PRVs, water treatment systems, reservoirs and filling stations that has reached the end of its service life. Network and Facility Improvements
W8
Network and facility improvements to meet current standards. Contributed assets and water meters that are needed to support development and are funded from development. Irrigation Network Improvements Network and Facility Improvements to meet current standards. Fire protection, upper watershed infrastructure, well stations and transmission mains are all included in this irrigation network.
Plan No. Plan Description W1 DCC Pipes (Mains) W2 DCC Booster Stations & PRVs W3 DCC Water Treatment W4 DCC Reservoirs & Filling Stations W5 DCC Offsite & Oversize W6 Network and Facility Renewal W7 Network and Facility Improvements W8 Irrigation Network Improvements
Funding Sources General Taxation Surplus/Reserves Development Cost Charges Debenture/Borrowing Federal/Provincial Funding Dev/Comm/Other Contributions Utility Revenue
2024 2,045,400 0 0 2,049,800 740,500 3,745,900 2,255,800 5,710,700 16,548,100
2025 7,392,000 0 0 0 200,000 3,750,000 9,141,000 1,245,000 21,728,000
2026 2,500,000 0 0 2,300,000 200,000 1,750,000 1,150,000 545,000 8,445,000
2027 4,650,000 2,700,000 0 0 200,000 5,000,000 3,150,000 945,000 16,645,000
2028 Five-Year Total 7,700,000 24,287,400 0 2,700,000 0 0 10,000,000 14,349,800 200,000 1,540,500 2,750,000 16,995,900 1,150,000 16,846,800 2,945,000 11,390,700 24,745,000 88,111,100
0 4,511,500 2,395,200 0 2,991,500 150,000 6,499,900 16,548,100
0 8,000,000 3,775,048 0 0 150,000 9,802,952 21,728,000
0 0 2,440,000 0 0 2,450,000 3,555,000 8,445,000
0 2,000,000 4,754,287 0 0 150,000 9,740,713 16,645,000
0 0 14,432,140 0 0 150,000 10,162,860 24,745,000
0 14,511,500 27,796,675 0 2,991,500 3,050,000 39,761,425 88,111,100
Note: Totals may not add due to rounding.
PAGE 552
2024 FINANCIAL PLAN
CITY OF KELOWNA
Wastewater Capital Plan No. Plan Description WW1 DCC Pipes (Mains) New wastewater mains to support growth. WW2 DCC Lift Stations New wastewater lift stations to support growth. WW3 DCC Wastewater Treatment Facilities New wastewater treatment facilities to support growth. WW4 DCC Oversize The City's share of costs to oversize wastewater infrastructure and to do work in excess of the developer's own needs. WW5 Network and Facility Renewal Renewal of existing wastewater mains, lift stations and existing treatment facilities that have reached the end of their service life. WW6 Network and Facility Improvements Collection and facility improvements to meet current standards. Contributed assets that are needed to support development and are funded from development. Plan No. Plan Description WW1 DCC Pipes (Mains) WW2 DCC Lift Stations WW3 DCC Wastewater Treatment Facilities WW4 DCC Oversize WW5 Network and Facility Renewal WW6 Network and Facility Improvements
Funding Sources: General Taxation Surplus/Reserves Development Cost Charges Debenture/Borrowing Federal/Provincial Funding Dev/Comm/Other Contributions Utility Revenue
2024 7,625,200 7,146,700 560,100 200,000 14,861,100 16,406,200 46,799,300
2025 5,234,800 2,787,120 0 200,000 6,880,000 2,912,000 18,013,920
2026 5,975,100 0 0 200,000 7,560,000 1,220,000 14,955,100
2027 6,081,800 0 14,320,000 200,000 7,840,000 140,000 28,581,800
2028 Five-Year Total 6,878,600 31,795,500 0 9,933,820 12,760,000 27,640,100 200,000 1,000,000 8,120,000 45,261,100 140,000 20,818,200 28,098,600 136,448,720
0 22,392,600 9,052,700 0 4,850,000 527,300 9,976,700 46,799,300
0 0 5,228,498 0 0 3,328,000 9,457,422 18,013,920
0 0 4,500,500 0 0 1,080,000 9,374,600 14,955,100
0 0 14,362,558 0 0 0 14,219,242 28,581,800
0 0 12,574,487 0 0 0 15,524,113 28,098,600
0 22,392,600 45,718,743 0 4,850,000 4,935,300 58,552,077 136,448,720
Note: Totals may not add due to rounding.
PAGE 553
2024 FINANCIAL PLAN
v
CITY OF KELOWNA
APPENDIX
2024 FINANCIAL PLAN
CITY OF KELOWNA
APPENDIX SUPPLEMENTAL INFORMATION 41% prioritize
Citizen Survey Results
building new infrastructure
The Citizen Survey is conducted to determine how satisfied the public is with municipal programs and services, and to learn what citizens’ service priorities are. Responses are weighted by age, gender and citywide distribution to accurately reflect Kelowna’s population. Results are benchmarked against other local governments. Insights gained by this research help us make important decisions regarding planning, budgeting and service improvements. Ipsos has conducted the Citizen Survey for the City in 2022, 2020, 2018, 2017, 2015 and 2012.
55% prioritize renewing existing infrastructure
Citizens’ top three priorities for investment are addressing social issues, encouraging a diverse supply of housing, and traffic flow management. While all evaluated services are important to citizens, the services most important to our residents in 2022 include: Drinking Water Quality Fire Services
Full results can be found at kelowna.ca.
Community Cleanliness Road Maintenance Police Services
The latest Citizen Survey reports that: • • • • • •
90% of citizens have a good quality of life 80% of citizens are satisfied with the overall level and quality of City services 80% of citizens agree that the City is inclusive and accepting of all 81% of citizens feel safe in the community 81% of citizens were satisfied with the customer service they received 75% of citizens believe they receive good value for their tax dollars
Important issues for citizens include addressing social issues such as homelessness (57%), transportation (23%) and crime (12%).
Areas of strength amongst City services include drinking water quality for City Water Utility customers, fire and police services, bike lanes, pedestrian sidewalks, parks and sports fields and community cleanliness. Areas of improvement identified are road maintenance and snow removal, traffic flow management, city growth management, addressing climate change and public transit. Citizens were also asked if they would prefer tax increases over service reductions: Increase taxes to enhance services
28%
Increase taxes to maintain services
25%
Reduce services to maintain tax rate
24%
Reduce services to reduce taxes
12%
PAGE II
2024 FINANCIAL PLAN
CITY OF KELOWNA
2040 OFFICIAL COMMUNITY PLAN
Our Kelowna as we Grow Kelowna is one of Canada’s fastest growing cities, with another 45,000 citizens expected by 2040. This growth will bring both opportunities and challenges that require us to plan strategically to ensure Kelowna remains prosperous, vibrant and resilient in the years to come. Our city’s approach to growth will be shaped by the recently adopted 2040 Official Community Plan (OCP), a guiding document which sets a strategic course for the next two decades. An OCP provides a decision-making framework for Council with policies and objectives aimed at growth management and issues related to housing, transportation, infrastructure, parks, economic development, and the natural and social environment. The 2040 OCP also strives to bring our community’s Imagine Kelowna vision of an equitable, inclusive, sustainable city to life. This will mean making smart choices about how and where we grow, protecting our environment, making meaningful progress towards Reconciliation, and ensuring that everybody who lives here can make a living, find suitable housing, and get around easily and safely. Building on the goals laid out in Imagine Kelowna, the Plan contains the following 10 Pillars:
The 2040 OCP includes updated land uses, mapping and policies to reflect these Pillars and clearly signal where development will be prioritized and supported with infrastructure and amenities. Now that the Plan has been adopted, putting it into action will require several key implementation actions throughout its lifespan. A comprehensive implementation table is being used to guide the timing and resourcing of OCP implementation actions, with due recognition of available budget and other work planning considerations.
PAGE III
2024 FINANCIAL PLAN
CITY OF KELOWNA
2022 COMMUNITY TRENDS REPORT
A changing Kelowna: findings from the 2021 census Each year the Community Trends Report explores themes that have far reaching roots and local impacts. The purpose of the annual Community Trends Report is to explore ideas, generate discussion, and consider a range of ways that the City could respond to emerging and pressing topics. The Community Trends Report does not make recommendations and does not establish preferred policy directions, but rather provides context about complex topics and their potential impacts on Kelowna. Previous reports have looked at topics such as new mobility technologies, the sharing economy, climate change, the infrastructure debt, housing, and pandemic impacts. This current Community Trends Report takes a slightly different approach, exploring some of the ways that our City has changed over the past 20 years. Looking to the past shows us how much Kelowna has evolved in a relatively short period of time. It also gives us a glimpse into how our community might continue to change in the future. Additionally, the 2022 Community Trends Report provides commentary on how these changes impact and are impacted by activities that are currently underway in Kelowna. The 2022 Community Trends Report explores change in Kelowna primarily through census data. Specifically, data from Statistics Canada’s most recent census of population, conducted in 2021, is examined and compared to census data from the past 20 years. Through this analysis, five themes have emerged:
1. Kelowna’s population is growing fast and it’s getting younger. 2. The Indigenous population in Kelowna is growing even faster. 3. Immigration is driving population growth and increasing population diversity. 4. The types of jobs that Kelowna residents are working is changing, and incomes are going up – but not equally. 5. Kelowna is seeing smaller households, more renters, and more multiple dwelling units.
PAGE IV
2024 FINANCIAL PLAN
CITY OF KELOWNA
STATISTICS Top 10 corporate taxpayers 2023
2022
Rank
Business (owner) name
Type of property
Rank
Business (owner) name
Type of property
1 2 3 4 5 6 7 8 9 10
FortisBC Inc Orchard Park Shopping Centre Al Stober Construction Ltd DHL No 48 Holdings Ltd McIntosh Properties Ltd Aqua Resort Ltd RG Properties Ltd 4231 Investment Ltd Victor Projects Ltd Dilworth Shopping Centre Ltd
Electrical Utility Shopping Mall Commercial Building Multiple Types Shopping Mall Multiple Types Shopping Mall Multiple Types Multiple Types Shopping Mall
1 2 3 4 5 6 7 8 9 10
Al Stober Construction Ltd Commercial Building FortisBC Inc Electrical Utility Orchard Park Shopping Centre Shopping Mall McIntosh Properties Ltd Shopping Mall Victor Projects Ltd Shopping Mall Inland Natural Gas Co Ltd Gas Utility Midwest Ventures Ltd Multiple Types Callahan Construction Company Ltd Multiple Types Jabs Constructions Ltd Multiple Types 3752 Investments Ltd Multiple Types
Tax comparison analysis – 2022 & 2023 2022 1,958,300
2023 2,302,400
Difference 344,100
Change 17.57%
12,827
13,312
485
3.79%
6,893
7,031
138
2.00%
996 1,012 540 203 22,470
1,137 1,076 551 222 23,329
142 64 11 19 859
14.24% 6.35% 2.11% 9.40% 3.82%
Residential Assessed value
2022 888,420
2023 1,009,350
Difference 120,930
Change 13.61%
Municipal General Tax Levy Public Safety Levy
2,286 2,286
2,350 23 2,373
64 23 86
2.78% 1.00% 3.78%
181
181
0
0.00%
1,049 -770 279
1,070 -770 300
21 0 21
2.00% 23.58%
184 187 96 31 3,245
204 193 98 34 3,382
19 5 2 3 137
10.39% 2.77% 2.12% 9.38% 4.21%
Business Assessed value Municipal General Tax Levy School General Tax Levy Other Taxing Jurisdictions Regional District Levy Hospital Levy Library Levy BC Assessment Levy Total Tax Levy
Other Municipal User Fees Garbage Collection/Waste Reduction School General Tax Levy Homeowner Grant Other Taxing Jurisdictions Regional District Levy Hospital Levy Library Levy BC Assessment Total Tax Levy
PAGE V
2024 FINANCIAL PLAN
CITY OF KELOWNA
Local Economy The City of Kelowna is the largest city in the Central Okanagan. It borders the beautiful Okanagan Lake and has the best of rural and urban lifestyles packed into one unique city. With a diverse economy supported by quality post-secondary institutions, Kelowna has become the main marketing and distribution centre of the Okanagan Valley. Kelowna also has a thriving arts and culture scene combined with all the outdoor activities that make the Central Okanagan a must-see tourism destination, as well as a popular place to live. Settled in 1879 and incorporated in 1905, Kelowna is known for its agriculture and forestry roots and has grown into a modern city.
Doing Business in the Community Development Incentives The City of Kelowna offers several developer incentives to encourage alignment with the City’s strategic priorities for urban development. Tax incentives are available for development in City Centre and Rutland Urban Centres, and grants and tax incentives are available to promote the development of purpose-built rental housing throughout Kelowna. Further information regarding development incentives in Kelowna may be found Kelowna.ca/homes & buildings/developers/developer incentives Commercial Land The major commercial areas within Kelowna are the downtown, Highway 97, and Mission / South Pandosy districts. Kelowna’s 2040 Official Community Plan | City of Kelowna projects the need for 193,100 square metres of retail commercial space between 2021 and 2040. We also anticipate the need for 119,450 square metres of office space over the same period. The OCP emphasizes land re-use and densification over continued expansion into greenfield areas. Industrial Land There are 1,466 acres of existing zoned industrial land within Kelowna’s boundaries. Kelowna has also identified 1,867 acres of land designated for future industrial development in the 2040 Official Community Plan | City of Kelowna. Industrial vacancy rates are currently low, and the market is active and dynamic.
For more information on the local economy, visit www.investkelowna.com. Source: Economic development | City of Kelowna
PAGE VI
2024 FINANCIAL PLAN
CITY OF KELOWNA
Business licences
*The City of Kelowna stopped issuing secondary suite licences in 2017. The business licence stats are measured December 1st to December 1st due to business licence rollover.
Access to markets Kelowna’s central location provides the city with access to key markets, as well as their population base. Distance (km) to Kelowna from: Vancouver – 457 Seattle – 579 Calgary – 612 Portland – 826 Saskatoon – 1,233 Salt Lake City – 1,614 San Francisco – 1,872 Winnipeg – 1,970 Los Angeles – 2,494 Denver – 3,215
PAGE VII
2024 FINANCIAL PLAN
CITY OF KELOWNA
Kelowna Weather
January February March April May June July August September October November December Highest Temperature per year
4.4
22.7 25.1 31.2 37.1 34.7 27.3 18.1 15.2 10.0
Historic Temperatures (oC) Recorded Highs 2015 2016 2017 7.1 12.8 13.8 19.3 20.3 25.8 27.4 29.5 28.4 31.8 38.7 35.7 32.8 37.6 35.7 33.9 37.8 33.5 34.0 28.7 35.6 19.5 12.5 14.3 16.6 11.9 6.1
36.3
36.6
37.1
38.7
35.7
Jan 13 2014
Feb 27 2016
Mar 31 2016
Apr 29 2023
12.0
13.8
20.3
27.6
2012 -20.5 -5.7
2013 -3.4
2014 -15.6 -21.3 -7.4 -4.0 -2.8 2.6 8.9
2012 8.1 10.4 13.5 25.8
2013
34.7 36.3 27.7 20.7 15.4 11.9
36.6
17.6 22.6 30.3
30.7
2014 12.0 9.9
2018 5.8
25.4 31.9 33.3 36.8 36.8
2019 8.7 17.1 17.5 30.5 33.9 36.1
2020 7.5 9.6 14.1 19.1 27.5 34.6 37.7 31.5 22.7
2021 6.1 12.3 24.6 29.5 44.6 38.9 36.7 27.2
2022 11.2 12.2 14.6
2023 8.6 7.6
38.8 35.3 34.2 25.3
27.6 32.2 33.6 36.3 38.3 29.5 17.9
17.1 14.0 9.6
17.6 11.9
35.6
36.8
36.1
37.7
44.6
38.8
38.3
May 19 2023
Jun 29 2021
Jul 01 2021
Aug 15 2023
Sep 02 2017
Oct 03 2022
Nov 08 2016
Dec 01 2021
32.2
44.6
38.9
38.3
35.6
25.3
16.6
18.0
2018 -13.4 -20.7 -8.0
2019 -10.2 -20.9 -20.0 -4.0 1.5 5.1 6.4 6.3
2020 -22.3
2021 -12.8 -21.0 -9.5 -6.7 -1.9 0.9
2022 -24.7 -14.6
2023 -14.9
3.6 -0.4
7.3 0.1
Record highs by month
January February March April May June July August September October November December Lowest Temperature per year Record lows by month
-3.7 -2.7 0.4 6.2 3.6 2.0 -5.7 -9.5 -11.6
-3.9 -12.6 -18.3
-19.4 -17.6
Recorded Lows 2016 2017 -19.4 -24.8 -21.6 -7.5 -8.6 -3.8 -4.4 -0.8 0.9 1.3 3.1 0.9 4.1 7.2 5.7 6.4 4.6 6.9 5.2 -1.3 3.3 0.3 -3.8 0.9 -14.6 -14.5 -18.0 -24.1 -19.9
-20.5
-18.3
-21.3
-18.0
-24.1
-24.8
-20.7
-20.9
-22.3
-21.0
-24.7
-14.9
Jan 12 2017 -24.8
Feb 8 2017 21.6
Mar 4 2019 -20.0
Apr 2 2020 -9.9
May 1 2013 -3.9
Jun 7 2012 0.4
Jul 13 2020 3.8
Aug 28 2010 2.4
Sep 27 2015 -1.3
Oct 11 2009 -11.6
Nov 23 2010 -21.0
Dec 22 2022 -32.8
-7.9 -4.8 -3.9 4.8 5.9 5.8
-1.2
2015
2.1 6.3 7.9 2.5 -4.1 -7.8
-12.2 -9.9 1.5 3.8 5.3 2.7
-10.9 -11.4
-7.4 0.2
-7.2 -6.9 3.1 5.9 5.4 -6.3
-6.9
PAGE VIII
2024 FINANCIAL PLAN
January February March April May June July August September October November December Total Recorded Precipitation per year Record Daily Precipitation by month
CITY OF KELOWNA
2012 6.3 19.6 15.4 36.9
Historic Precipitation (mm) 2015 2016 2017 8.1 19.8 5.0 6.5 4.0 25.9 1.5 6.0 16.5 26.3 19.6 26.1 27.7 25.5 8.5 20.9 23.4 8.9 1.7 40.4 8.6 21.4 11.4 4.6 15.5
32.7 16.4 9.8
36.3 11.7
2014 11.1 4.4 14.5 27.4 19.3 25.3 5.8 2.9 23.5 3.4 23.5 14.6
159.8
239.5
290.7
183.5
96.5
174.7
119.2
125.3
108.0
149.2
149.2
149.2
Jan 04
Feb 28 2022 11.9
Mar 13 2013 9.5
Apr 26 2018 19.6
May 17 2016 22.7
Jun 20 2018 23.4
Jul 22 2013 10.9
Aug 2 2014 16.8
Sep 16 2013 17.9
Oct 22 2021 16.5
Nov 2 2010 18.7
Dec 31 2019 16.8
66.1 28.5
8.8
2013 9.7 5.1 14.4 17.4 40.3 57.6 4.9 17.4 55.2
2018 7.3 10.9 10.7 8.5 22.1 8.2
2019 7.8
2020 18.9
2.3 16.6 15.1 13.8 8.2
5.6 3.9 1.2 8.5 26.6 13.1 28.0 9.4 14.7 36.5
7.7 8.0 57.4 31.4 15.7 10.1
2021 4.9 2.0 1.4 8.6
20.8 12.4 18.0
2022 15.2 13.1 9.5 2.9 16.3 31.8 8.7 6.3
2023 1.9
3.3
4.5 7.8 6.6 3.9
Source: Government of Canada: Station Results - Almanac Averages and Extremes; Kelowna 15-year data.
PAGE IX
2024 FINANCIAL PLAN
CITY OF KELOWNA
GLOSSARY Accrual basis of accounting | A method of accounting in which transactions are recognized at the time they are incurred, as opposed to when cash is received or spent. Accumulated surplus | The balance in a fund that represents the cumulative excess in revenues over expenditures. This term also refers to reserve accounts. Activities | Details how Council, Corporate and Divisional priorities lead the work done at the divisional level; activities are work plans to be accomplished in the current year. Alternative approval process | To provide electors the opportunity to seek a vote on a particular matter being proposed by Council. Approval is obtained if fewer than 10% of eligible electors in the area submit elector response forms (formerly known as counter-petition process). Amortization | Is the gradual reduction of debt by means of equal periodic payments sufficient to meet current interest and liquidate the debt at maturity. Appropriation | Term used to refer to the setting aside of monies into a reserve account or fund. Balanced budget | Budgeted expenditures and transfers to funds are equal to budgeted revenues and transfers from funds. Base budget | The initial budget that provides for the existing levels of service in the current year. Capital assets | Is a long‐term asset that is not purchased or sold in the normal course of business. Generally, it includes fixed assets. Capital expenditures | Expenditures of a non‐operating or maintenance nature, such as costs to acquire equipment, land, buildings and costs associated with new infrastructure or improvements to existing infrastructure. Capital lease | Is a lease obligation that has to be capitalized on the balance sheet. Cost centre | Within the City’s reporting structure a cost center refers to a specific director, manager, supervisor or division (see Department/Division/Branch). Conditional grants | Grants (e.g. Federal and Provincial Government) that are dependent on annual approval and potentially limited in how they may be expended. Debenture | A form of long-term corporate debt that is not secured by the pledge of specific assets. Debt service | The amount of interest and payments due annually on long term debt. Deficit | An excess of expenditure over revenue. A loss in business operations. Division/Department/Branch | Part of the City’s organization structure. Divisions are the highest level grouping; departments are sections under the division and branches are sections under department. (i.e. Division – Financial Services; Department – Financial Planning; Branch – Budget). Depreciation | Accounting method used to allocate the cost of a tangible or physical asset over its useful life. Development Cost Charges (DCCs) | Monies collected from land developers to offset some of the infrastructure expenditures required to service new development. Charges are intended to facilitate development by providing a method to finance capital projects related to water, sewer, drainage, roads and parkland acquisition.
PAGE X
2024 FINANCIAL PLAN
CITY OF KELOWNA
Expenditure | The payment of cash on the transfer of property or services for the purpose of acquiring an asset, service or settling a loss. Expenditure reduction | A request to reduce an existing expenditure level. Fees and charges | A source of revenue generated by the activities, works or facilities undertaken or provided by or on behalf of the City. Financial Plan | Section 165 of the Community Charter requires that a municipality must have a financial plan that is adopted annually, by bylaw, before the annual property tax bylaw is adopted. The financial plan may be amended by bylaw at any time and is for a period of 5 years. The financial plan identifies the revenue sources and the proposed expenditures to be incurred to meet the outlined objectives. Franchise fee | A charge made to a privately owned utility for the ongoing use of City property. Full Time Equivalents (FTEs) | A conversion measure to express all staffing (temporary, part‐time, etc.) in terms of a common fulltime denominator. Fund | A fiscal entity with revenues and expenses which are segregated for the purpose of carrying out a specific activity. The City has four main funds: general, water, wastewater, and airport. There are also various statutory reserve funds. General Fund | This fund is used to account for general operations and activities and includes most city departments except the enterprise funds of water, wastewater, and airport. The departmental activities in the general fund are funded wholly or in part by property taxes. General revenue | Refers to the revenues which are not specifically attributable to or generated by any particular department within the City’s reporting structure. Grants‐in‐lieu | Properties within a municipality that are owned by the Federal or Provincial governments are exempt from taxation. The City may receive a grant‐in‐lieu in place of a tax levy. Infrastructure | Facilities and improvements such as buildings, roads, sidewalks, storm drainage, waterworks, sanitary sewer systems. Internal control | Include policies and procedures that pertain to the maintenance of accurate and reasonably detailed records. Internal equipment revenue | Revenue generated from a charge against current operations for the use of a City vehicle or equipment. The charge is similar for a class of vehicles and is based on full recovery plus inflation. Local Government Act (LGA) | Provincial legislation that provides authority for municipal expenditure and revenue collection. Some sections of the LGA have been replaced by the Community Charter. Modified accrual basis | Modified accrual accounting recognizes revenues when they become available and measurable and with a few exceptions, recognizes expenditures when liabilities are incurred. Official Community Plan (OCP) | A City bylaw that defines policies for land use and development. Operating expenses | The cost for personnel, internal equipment, materials, contract services and transfers required for a department to function.
PAGE XI
2024 FINANCIAL PLAN
CITY OF KELOWNA
Operating request | A request for operating budget that is required to provide a new service or expand an existing service beyond the current funding level. Operating revenue | Funds that the City receives as income to pay for ongoing operations. It includes such items as taxes, fees and charges from specific services, interest earnings, and grant revenues. Pay‐as‐you‐go Capital | Capital expenditures that are financed from current year taxation revenues. Parcel tax | A tax imposed on the basis of a single amount for each parcel, the taxable area of the parcel, or the taxable frontage of a parcel. Property taxation | The process by which the City obtains the required funds to pay for the General Fund Operating and Capital expenditures of any given year not funded from another source. This is provided by a levy on each property of various classes within the municipality. Reserve account | Part of the Accumulated Surplus that has been earmarked for future operating or capital expenditures. Reserve Fund (statutory reserves) | A reserve fund is established by Council by bylaw for a specified purpose that is within the powers of the municipality within the powers of the LGA or another Act. Revenue | Sources of income financing the operations of the City. Tradewaste Treatment Facility (TWTF) | Wastewater treatment facility run by the City but charged back to specific commercial users. UPASS | A program where students pay a fee per semester that lets them use their student card as a bus pass. Utility | The City owns two utilities: water, and wastewater. The airport is also treated like a separate utility. These utilities pay for themselves through a separate revenue structure specific to each one that pays for their respective operating costs, debt servicing costs and capital projects not funded from other sources. Working capital | The excess of current assets over current liabilities.
PAGE XII
2024 FINANCIAL PLAN
CITY OF KELOWNA
ACRONYMS & ABBREVIATIONS AHLAS
Affordable Housing Land Acquisition Strategy FOI
Freedom of Information
AI
Artificial Intelligence
FTE
Full‐time Equivalent
AIF
Airport Improvement Fee
GAAP
Generally Accepted Accounting Principles
ALC
Active Living & Culture
GFOA
Government Finance Officers Association
ALR
Agricultural Land Reserve
GHG
Greenhouse Gas
AMCP
Asset Management and Capital Planning
GIS
Geographical Information Systems
AMS
Asset Management System
HAP
Heritage Application Permit
ASQ
Airport Service Quality
HR
Human Resources
ATC
Active Transportation Corridor
HVAC
Heating, Ventilation and Air Conditioning
BCA
BC Assessment
IAFF
International Association of Fire Fighters
BP
Building Permit
ICBC
Insurance Corporation of British Columbia
C&E
Climate and Environment
ICG
International Children’s Games
C.C.
Community Charter
ICIP
Investing in Canada Infrastructure Program
CAC
Child Advocacy Centre
IHA
Interior Health Authority
CCTV
Closed‐circuit television
IK
Imagine Kelowna
CLS
Corporate Land System
IoT
Internet of Things
CMHA
Canadian Mental Health Association
IS
Information Services
COJHS
Central Okanagan Journey Home Society
ITIL
Information Technology Infrastructure Library
COK
City of Kelowna
KCT
Kelowna Community Theatre
COVID-19
Coronavirus Disease 2019
KFD
Kelowna Fire Department
CPIC
Canadian Police Information Centre
KMMFA
Kelowna Major Men’s Fastball Association
CPO
Community Policing Office
KPI
Key Performance Indicators
CPTED
KSS
Kelowna Secondary School
LAS
Local Area Service
LiDAR
Light Detection and Ranging
CSP
Crime Prevention through Environmental Design Canadian Radio-television and Telecommunications Corporate Strategy and Performance
LOA
Lease and Operating Agreement
CUPE
Canadian Union of Public Employees
MBL
Multiple Bottom Line
CWME
MEP
Major Events Program
MFA
Municipal Finance Authority
DAR
Capital Works Machinery & Equipment – statutory reserve fund Development Application Review
MoTI
Ministry of Transportation and Infrastructure
DCC
Development Cost Charge
MOU
Memorandum of Understanding
DKA
Downtown Kelowna Association
MUP
Multi-Use Path
DMAF
Disaster Mitigation Adaptation Fund
NA
Neighbourhood Associations
DMAF
Disaster Mitigation and Adaption Fund
NG911
Next Generation 911 compliant equipment
DOCP
Design Operation and Closure Plan
NPS
Net Promoter Score
DVP
Development Variance Permit
NRCan
Natural Resources Canada
EOC
Emergency Operating Centre
OC
Okanagan College
ESS
Emergency Support Services
OCP
Official Community Plan
EV
Electric Vehicle
ORT
Okanagan Rail Trail
FCA
Facility Condition Assessment
PAC
Performing Arts Centre
CRTC
PAGE XIII
2024 FINANCIAL PLAN
CITY OF KELOWNA
PAWS
Pre‐Authorized Withdrawal System
VFD
Variable Frequency Drive
PBMP
Pedestrian & Bicycle Master Plan
WQA
Water Quality Advisory
PBMP
Pedestrian and Bicycle Master Plan
WWTF
Wastewater Treatment Facility
PCARD
Purchasing Card
YLW
Kelowna International Airport
PEOPLE PRC
Paid Employment Opportunities for People with Lived Experiences Parkinson Recreation Centre
PRV
Pressure Reducing Valve
PSAB
Public Sector Accounting Board
PSAS
Public Sector Accounting Standards
Q1
First Quarter
Q2
Second Quarter
Q3
Third Quarter
Q4
Fourth Quarter
RCMP
Royal Canadian Mounted Police
RDCO
Regional District of the Central Okanagan
RFI
Request for Information
RFP
Request for Proposal
RIM
Records & Information Management
ROI
Return on Investment
RRFB
Rectangular Rapid Flashing Beacons
S4L
Sport For Life
SCA
Sewer Connection Area
SCADA
Supervisory Control and Data Acquisition
SCBA
Self Contained Breathing Apparatus
SD23
School District No. 23
SEK
Southeast Kelowna
SEKID
Southeast Kelowna Irrigation District
SMART SMOR
Specific, Measurable, Achievable, Relevant, Timely Strategic Management Owned Report
SOMID
South Okanagan Mission Irrigation District
STPCO TCA
Sustainable Transportation Partnership of the Central Okanagan Tangible Capital Assets
TMP
Transportation Master Plan
TWTF
Trade Waste Treatment Facility
UBCM
Union of British Columbia Municipalities
UBCO
University of British Columbia – Okanagan
URBA
Uptown Rutland Business Association
UTV
Utility Vehicle
PAGE XIV
2024 FINANCIAL PLAN