2 minute read

Information Technology Fund

Village and Neighborhood Initiatives

Downtown Implementation Plan Initiatives

City Council Goal – Growth Management and Comprehensive Planning

The project will provide for the systematic and ongoing implementation of short and long term strategies and initiatives specified in the adopted Downtown Master Plan. The funding request represents the continuation of a multi-year implementation strategy, the principle focus of which is to construct major development projects and implement effective management projects as outlined in the Downtown Master Plan.

FY 23 FY 24 FY 25 FY 26 FY 27 FY 28-32 Total $925,000 $875,000 $1,000,000 $1,000,000 $1,000,000 $9,000,000 $13,800,000

Operating Costs: The project will not have an operational impact on the City.

FY 2023 - 2032 CAPITAL IMPROVEMENTS PLAN DOWNTOWN IMPLEMENTATION PLAN INITIATIVES

November 15, 2021 FY 2022 / 2023 Proposed Budget Request

10 Year Total 2023-2032

5 Year Subtotal 2028-2032

5 Year Subtotal 2023-2027

2026-2027

2025-2026

2024-2025

2023-2024

2022-2023

Project

Community

FUTURE / PROPOSED DOWNTOWN IMPLEMENTATION PLAN PROJECTS (As identified in the Downtown Suffolk Master Plan, adopted June 2018) 3,000,000

2,000,000 1,350,000 1,500,000

1,000,000 400,000 350,000 5,000,000

5,000,000

1,000,000 1,350,000 500,000 400,000 350,000 -

500,000

500,000

Begin funding, strategy development, engineering

Main Street Streetscape -

and design in Years 4 -5; construction Years 5-10.

Major Development Projects 500,000

500,000

350,000 250,000

250,000 100,000

300,000 300,000

25,000

25,000

Begin funding, strategy development,

Festival/Events Venue and Market Hall -

engineering and design in Year 1; construction Years 2-3. Detailed surveys, Phase 1-2 environmental

Phoenix Bank Block -

assessments, parcel assembly, clear deeds/titles Years 1-2; engineering and ). Includes activities in support

See Note 1

design, and construction Years 6-10 ( of design and development of Carver Circle. Installation of integrated permanent

Downtown Wayfinding System -

wayfinding system including parking and key destinations.

Management Projects

Study potential locations for new gateways into

Gateway Improvements -

downtown on all the major corridors of entry; engineering and design Years 1-2 ; construction Years 3-4. To be determined based on future analysis of

Long-Term Opportunity Sites -

sites identified in Downtown Master Plan.

Combined Projects 2,200,000

1,000,000

1,200,000 500,000 500,000 200,000 - - 13,800,000

9,000,000

4,800,000

1,000,000

1,000,000

1,000,000

875,000

925,000

(To be determined)

Future Projects - TOTALS Note 1: This line item is supplemented by $500,000 in existing Village & Neighborhood funds.

_____________________________________________________________________________________ THIS PAGE INTENTIONALLY BLANK

Utility Fund

_____________________________________________________________________________________ THIS PAGE INTENTIONALLY BLANK

This article is from: