City of Sumner Six Year Transportation Program 2014-2019
July 17, 2013 Public Hearing held at Council Meeting -July 15, 2013 Adopted by City Council on a vote of 6 to 1 passing on July 15, 2913, Resolution No: 1388
Public Works Department
Prepared by: Mike Dahlem, P.E.
By: Mike Dahlem
City Engineer TOTAL
PRIORITY
PROJECT
LOCATION
DESCRIPTION
COSTS
YEAR FUNDED PLANNING ROW/PERMIT
DESIGN
REMARKS CONSTRUCTION
SIX-YEAR ARTERIAL TRANSPORTATION PLAN
A-1
136th Ave. E. (Valentine)
A-2
Bridge Street Bridge Replacement
A-3
142nd Avenue East Overlay
24th St. to 16th St.
Bridge Street at White River
Improve road to minor urban arterial (truck route) standards with three lanes plus bike lanes for a total of 50 ft. width within a 72 ft. ROW. Project to be a joint project with the City of Pacific to County line.
Replace existing 220 foot span steel truss bridge.
From Tacoma Street Bridge to 24th Street Resurface roadway with a 4"overlay or rebuild with concrete.
Stewart Rd (8th St.) White River Bridge
Stewart Road at White River
This bridge would replace the existing 2-lane bridge. It will be two unequal length spans. The width will be 74 feet to accommodate 4 lanes, a sidewalk on one side and trail crossing on the other.
A-6
SR 410 ramp signals and channelization at Wahl Road. Main St. and 160th Ave. E.
At the interchange of SR 410 at 166th Ave. E. (Wahl Road) Main from 158th to 160th Ave. E.; 160th Ave. E from Main to 64th St. E.
Reconstruct West bound on and off ramps to tie into 64th Street East. Improve intersection at Main St. and 160th and improve and widen streets to minor arterial standards with bike paths and sidewalks
A-7
62nd St. from 166th Ave to 160th Ave E. From 166th Ave to 160th Ave E.
A-4
A-5
A-8 A-9
A-10
A-11
6-Yr. TIP 2014-2019
Construct 62nd St. from 166th Ave. E. to 160th Ave E. to arterial standards. Project to include signal at 166th Ave. E. and 62nd St. E. Closure and removal of E. Main St. at the Sumner-Tapps Highway East Main St. / 166th Intersection of E. Main St. and 166th Ave. intersection. The work includes removal of street section, embankment, Ave. Intersection Closure East. and culvert across Salmon Creek. 24th St. Bridge and 24th St. to 16th St.between west side of Complete corridor study. Construct bridge, connection to Golf Course corridor to E. Valley White River to East Valley Hwy. property and connection to East Valley Highway per results of study,
Traffic Avenue
Hwy. 162 / Valley Ave.
Thompson St/WB SR 410 Ramps to the Puyallup River Bridge
From City limits to North side of SR 410
Widen roadway and existing WSDOT overpass to 5-lanes. Restripe lanes and revise signal timing.
Construct additional lanes on SR 162 and reconstructing the SR 410/SR 162 interchange to a single point interchange.
Page 1
$6,800,000
Yes
2006
2009/2013
2009/2013
2014/2015
30% CERB Grant funded. STP Grant and LID for the remainder.
$12,000,000
Yes
2012
2014
2013/2014
2015/2016
Bridge is 80% funded by a Federal BRAC grant.
$1,900,000
No
2013
2014
2014
2015
Eligible for a Federal STP Preservation Grant
$14,000,000
Partial
2002
2015
2013/2014
2016/2017
$4,000,000
No
2013
2015
2014/2015
2016
$3,200,000
No
2013
2014
2014
2015
$3,500,000
Partial
2010
2015
2013/2015
2014/2016
$450,000
No
2013
2015
2014/2015
2016
$20,000,000
No
2013
2014/2016
2014/2015
2015/2017
$11,000,000
unknown
No
No
2015
2014
2017
2017
2016/2017
2016
County will contribute 71% of local share. Received $1.2 million Federal STP Grant for design portion of project. This is a WSDOT project on State hwy. There may be contribution from Sumner and other agencies. Candidate for STP Grant and developer contribution. Funding through LID and stormwater funds. Partially funded with stormwater funds or grants for stream rehabilitation. Portions may be funded by development.
2018
WSDOT lead. There may be contributions from Sumner and Puyallup.
2019
This is a WSDOT project on State hwy. There may be contribution from Sumner and other agencies.
7/17/2013
City of Sumner Six Year Transportation Program 2014-2019
July 17, 2013 Public Hearing held at Council Meeting -July 15, 2013 Adopted by City Council on a vote of 6 to 1 passing on July 15, 2913, Resolution No: 1388
Public Works Department
Prepared by: Mike Dahlem, P.E.
By: Mike Dahlem
City Engineer TOTAL
PRIORITY
PROJECT
LOCATION
DESCRIPTION
COSTS
Improve Elm St. to Collector St. standards with curb, gutter and sidewalks on each side. Work will include storm drainage facilities and utility replacement
YEAR
REMARKS
FUNDED PLANNING ROW/PERMIT
DESIGN
CONSTRUCTION
$2,359,400
partial by developers
2005
2008/2011
2007/2008
2009/2015
$185,000
Partial
2011
2012
2012
2013/2015
$2,700,000
partial by developers
2014
2016
2015
2017
COLLECTOR STREET PROGRAM
C-1
Elm St.
C-2
Parker Rd Improvements 62nd St. to Meade McCumber
C-3
Van Tassel (160th Ave. E.)
Elm St. to Main St.
Parker Road
From Main St. to 50th St. This will consist Reconstruction of existing road to Collector St. standards with curbs, of 3 to 5 projects. Developers will be gutters, sidewalks, and drainage utilities. Portions of this St. have been building 2 or 3 of these sections. completed by developer projects and sidewalk grants.
C-4
E. Valley Highway to 160th Ave. E.
The west half of this street needs to be rebuilt. Improve 160th Ave. E. to Collector St. standards with curb, gutter and sidewalks on each side. Portions may be completed as parts of development prior to this time.
$1,300,000
Partial
2008
2009/2013
Developers improve about 40% and remainder is unfunded. Portions built under sidewalk grant. A combination of developerbuilt, Street and Storm funds. A combination of developerbuilt, Street and storm funds and sidewalk grants.
2008/2013
2009/2015
ongoing
ongoing
2014/2019
ongoing
ongoing
2014/2019
Multi-year program @ $50,000/yr. to $100,000/yr Budgeted with Street Maintenance annually.
ongoing
ongoing
2014/2019
City Street Funds
2014/2019
$40,000 from city Funds
RECURRING ANNUAL PROGRAMS
N/A N/A N/A
Sidewalks
S-1
St. Overlay Program Sidewalk Replacement Program Neighborhood Traffic Control Program
City Wide City Wide Traffic calming area to be determined.
PEDESTRIAN PROJECTS Residential fill-ins and replacements Volunteer Program around town
Built by city crew and 50% grant from city Fill in gaps in sidewalks, provide repairs to existing ADA ramps, and replace ramps that do not meet current code. Continue on the educational components and install speed feed back signs at the elementary schools.
$25,000
Annual Budget Annual Budget Annual Budget
$80,000
Annual Budget
$100,000 $50,000
ongoing
$489,600 Not Funded
2010
2012
2012
2014/2019
Construct sidewalks and road improvements on Parker Road between Meade McCumber and 50th Street.
$1,400,000 Half Funded
2008
2012
20012/2013
2014
From the end of the 24th Street Bridge Trail to Sumner's south property line.
Extend from the existing 24th Street Bridge (pedestrian bridge) Trail, across the #9 Ditch to the south end of the City of Sumner's property.
$425,000
Partial
2008
2013
2013
2014/2016
Main St. to Puyallup St.
Completes trail through town.
$800,000
Not funded
2008
2015
2015
2016
Sidewalks
S-2
Safe Routes to School
Sidewalks
S-3
Parker Road from 50th Street to Meade Urban Sidewalk Program McCumber
Trails
T-4
Trails
T-5
24th Street Trail Connection Bridge Street to Fryar Ave.
6-Yr. TIP 2014-2019
Annual program to overlay and rebuild existing streets throughout the City with priorities to be set on an annual basis. Recommended annual funding level minimum of $50,000 The City will replace existing sidewalks as needed on City owned property. Modify residential streets to enhance pedestrian safety, slow traffic, and minimize cut-through.
Various locations within the City
Page 2
Continue to apply for Safe Routes to School Grants. Received a 50% Grant From TIB. Remaining funds from TIB, Safe-Routes or Non-Moterized Federal grants. Partialy funded through State RCO and Federal CMAQ funds Eligible for State RCO and Federal CMAQ grant funds
7/17/2013
MON
163RD AV E
WOOD AV
VALLEY AV BOCK AV
SUMNER AV
PARKER RD E
168TH AV E
170TH AV E 169TH AVCT E
175TH AV E
166TH AV E
166TH AV E
162ND AV E
PERRY AV SE
168TH AV E
YE
CT E
DR E
75TH ST E
76TH ST E
78TH ST E
ION EER
81S T
ST
E
171 S
SIDE
AV E
A11
RIVE R
166TH AV E
HW
170T H
DI
D
SR162 E ORTING HWY E
SO NR
147TH AV E 148TH AV E
72ND ST E
410 SR
T AV
RYAN AV
ALDER AV
LEWIS AV
BONNEY AV
ST AD IL RO 140TH AVCT E 141ST AV E
134TH AV E
GAULT ST RO BIN
E
33RD ST SE
160TH AV E
WRIGHT AV
PEASE AV
FRYAR AV
RA
TR AF FI C NA AV RR O W CHERRY AV ST KINCAID AV
AV N DE LI N
AI N M
170TH AV E
164TH AV E
162ND AVCT E
160TH AV E
E VALLEY HW YE
SR167 HWY S
127TH AV E
PERRY AV SE QUINCY AV SE
SE TA D R TEVI S
140TH AVCT E 140TH AV E
137TH AV E
136TH AV E
138TH AV E
142ND AV E
125TH A VCT
OLIVE AV SE
EAST VALLEY HWY E
BUTTE AV SE
VALENTINE AV SE
AV E 126TH 126TH AVCT E
E
C2
WILLOW ST
1
AV
AUTO LN
N RP
ER
A6
RAINIER ST
0 41
IN T
E
125TH AVCT E
DR
64TH ST E
SR
EP
25TH ST SE
E PS
AV E
A5
62ND STCT E
MEADE MCCUMBER RD E
W
80TH ST E
DR PPS AP ST
H 170T
A7
SILVER ST
VE TH A 146
E
A8
GARY ST
78TH ST E
51ST STCT E
63RD STCT E
DR
RD WY
PARK ST
VE RO RG VE RI
SHAW EER
Y
E
A10
NE
W
MAIN ST E
64TH ST E
ST
CT SR E 41 0H
C3
50TH ST E
MP
LINDEN LN
AV
H
ACADEMY ST
C1
RA
67 T
MAPLE ST
DR
RA STATE ST MP SR 410 RP N1 W
4T H
PION
MAIN ST
T
E
E
S AIN WM
T
W RIDGE DR E
48TH ST E
54TH STCT E 55TH ST E 56TH ST E
C4 S3
ST C
R
E
N
TD ES
N RD HOUSTO
R
16 SR P AM
N1
W
SR
S
IOF 1 67 C
P 7R
WASHINGTON ST
47TH STCT E
52ND ST E
EVERETT ST
MASON ST
E
A2
S PP TA
56TH ST E 56TH STCT E
EY A VE
16TH ST
ZEHNDER ST
DG RI
TE
T
55TH ST E
CT E
E
D
42ND STCT E 43RD STCT E
46TH ST E
ELM ST E
ST
PS
H UT
53RD STCT E
STCT E
46TH STCT E
HUBBARD ST 18TH ST ELM
NE M U S
P TA R-
Y HW
33 R
W TA
36TH ST E
4 4T H
C1
PUYALLUP ST
34TH ST E
SO
AV
45TH ST E
31ST ST E
163RD AVCT E
A
159TH AV E
M
E
S
C AV
VAL L
TA C O
T AV
27TH STCT E
E
E AV
P N1
32ND ST E
RO W to b e Va c a te d = 34 ,5 3 9 SF
S 171
E
RD
H 6T 15
7R
E
25TH STCT E
H AV
R1 6 PS
30TH STCT
3,000 T EFeet
TC 23RD S T 169
CA NY ON
29TH ST E
A3
1,500
E
RE ST
ยน
22ND ST E Scale: 23RD ST750 E 0 24TH ST E
DE
24TH ST E FO
5 T4 T 4
Plot Date: 6-27-13
SR
24TH ST E
D AGE R COTT
A9
E
RAM
E
SE
Note: Sidewalk Program #1, #2 and all Annual Programs are City Wide
20TH ST E
AVCT
N HWY
H 136T
67 SR1
H
S 55TH
AVCT E 131ST
6T 12
51ST S T
Trail Projects DR Truck Routes
E E
TAPP S
MA HO
SE
NT
LAKE
ST
MA
1N
W VALLEY HWY E
E 125TH AVCT E
D OL
E
RPN
Y HW
RD R
Collector Projects
QUINCY AV SE
EY
LL WE LD CA
50TH STCT E
D
E TS
SE
E S
40TH ST E
O O D
E
Arterial Projects
38TH ST E
EW
SE
WY S
E
L VAL
167 P SR RAM
ST WE
72 ND
T44 T
G
66TH ST S
Sidewalk Projects 16TH ST E
32ND ST E
ED
PL LEY WES
EEN
Y
S
W PK
1 RPN
S PP TA
SE 67TH ST
THOMAS AV
RGR
Legend
H 69T
A1
27TH STCT E
E AV S HAN NAT E WY S LLS
D HI LAN
EV E
8TH ST E
KE LA
9TH ST E
STEWART RD
AV SE ELIZABETH SE E TH L P ELIZAB
167 P SR RAM
STEWART RD SW
LAKE
E
A4
2ND ST E
Sumner 62ND LP S E 6-Year Transportation E S T S T 61S 62ND ST SE ImprovementPlan 63RD ST SE 2012 - 2017 AV SE ISAAC
BL VD
7 RPF1 S
VI TA
16 RAMP SR
JO
ROY RD SW ROY RD SE