Room Schedule - B7 Platform Plan North
N1
NoR (SUBSURFACE DESIGN
8380
8400
5950
4630
5700
N5
N4
N3
N2
PC
EXTENT OF WORKS KRD
PB
ATION )
ACTIVE PLATFORM START
13440
1
2
4102
4102
01
N6
ATION )
... | DRG | 2162
NoR (SUBSURFACE DESIGN
Room No 107 113 114 116 200 215 216 250 291 440 460 464 466 477 495 508 520 526 544
PLATFORM EDGE TACTILE INDICATORS
CRL UP
END OF PLATFORM GATE
P1
cL TRACK
700 701
476
SEATS
ACCESS HATCH
115 PLATFORM 1 SOUTH BOUND FFL 33743
SEATS
HELP POINT
544
2000
526 526 526 526
DRAFT RELIEF OVER
LIN
701 TVS OVER
495
440
700
UP
NC
215
20420
441
SEATS
REFUGE x4
ACCESS HATCH
ACCESS HATCH
LOWER CONCOURSE FFL 33743
SEATS
477
467
508 LINE OF WALER OV
P2
105
HELP POINT
250
PROFILE OF FUTURE ESCALATORS (STAGE 03)
ER
4000 CLEAR
TVS CONNECTING ADIT TO PLATFORM
PROFILE OF FUTURE ESCALATORS (STAGE 03)
EMERGENCY EGRESS SCISSOR STAIR
SEATS
B7 - PLATFORM LANDING FFL 33743
482
109
4101
LIFT 3
107
111
OUTLINE OF PILE FOUNDATION OVER REFER TO STRUCTURAL DOCUMENTS
112
114
VARIES
7650
ACCESS HATCH TO SUMP BELOW PLATFORM LEVEL VERTICAL TVS FAN
460 1450
216
3000
OUTLINE OF PILE FOUNDATION OVER REFER TO STRUCTURAL DOCUMENTS
526 UP
E OF WALER OVER
6400
CAT LADDER TO ACCESS UNDER PLATFORM LEVEL
526 526
ENCLOSED SPACE
VERTICAL TVS FAN
CONNECTING ADITS TO PLATFORM REFER TO STRUCTURAL DOCUMENTS
520
REFUGE x2
- STAGE 1
TVS OVER
251
2
526
4000 CLEAR
4101
526
526
4000 CLEAR
1
4000 CLEAR
464
NB
ACCESS HATCH
14 m² 12 m²
113
TVS CONNECTING ADIT TO PLATFORM
NA
SEATS
Area 109 m² 25 m² 41 m² 616 m² 62 m² 16 m² 16 m² 16 m² 9 m² 2 m² 7 m² 9 m² 4 m² 26 m² 14 m² 2 m² 9 m² 22 m² 256 m²
FALL 1:100
HELP POINT
FALL 1:100
ACCESS HATCH
466 291 EXTENT OF HANDRAIL ON EMERGENCY WALKWAY WITHIN STATION SHOWN DASHED
FALL 1:100
CRL UP
Room LOWER CONCOURSE PLATFORM ADIT PLATFORM ADIT PLATFORM CIRCULATION/CORRIDOR FIRE EGRESS STAIR FIRE EGRESS STAIR LOBBY STATION PLATFORM STORE ELECTRICAL CPBDS COMMS SPLICE COMMS NODE COMMS SPLICE (UP) SIGNALLING EQUIP ROOM TUNNEL SERVICES LV FAN COIL UNIT (FCU) PRESSURISATION RISER MEP RISERS DRAFT RELIEF AND TUNNEL VENT PLENUM SUMP SUMP PUMP ACCESS ROOM
110
END OF PLATFORM GATE
116
SEATS ACCESS HATCH
PLATFORM 2 NORTH BOUND FFL 33743
SEATS
HELP POINT
FALL 1:100
SEATS
ACCESS HATCH
FALL 1:100
HELP POINT
FALL 1:100
4000 CLEAR
EXTENT OF HANDRAIL ON EMERGENCY WALKWAY WITHIN STATION SHOWN DASHED
ACCESS HATCH
CRL DOWN cL TRACK
P3 NoR (SUBSURFACE DESIGN ATION )
16240
CRL DOWN
EXTENT OF WORKS KRD
TACTILE INDICATORS
PA
ACTIVE PLATFORM START
11450
PLATFORM EDGE
PD PE NoR (SUBSURF AC
E DESIGNATI
PF
ON )
Filename: C:\Revit\CRL_KRD_ARC_000_MD3_STATION_R15_VE2_JHR.rvt
01
... | DRG | 2162
ROOM COLOUR LEGEND
Office:
BOH BUILDING SERVICES
Plot Date: 5/07/2016 7:16:06 a.m.
PUBLIC TVS/OTE
ISSUE FOR AT REVIEW 0
2.5
5
7.5
10
CLIENT
12.5m
N
SCALE 1:250 AT A1 SCALE 1:500 AT A3
REV 3 2 D C 0. B 1. 1 0. A
DATE 04-07-16 07-04-16 04-04-16 14-03-16 05-02-16 31-12-14 19-12-14
REVISION DETAILS VE2 ISSUED FOR AT REVIEW VALUE ENGINEERING 2 CHANGES REFERENCE DESIGN VE2 ISSUED FOR VERIFICATION REVIEW ISSUE FOR COORDINATION VE2 DESSIGN FREEZE - ISSUE FOR A.T. REVIEW ISSUE FOR A.T. REVIEW ISSUED FOR VERIFICATION REVIEW
APPROVAL C. JACK C. JACK C. JACK C. JACK C. JACK C. RITTER C. RITTER
SIZE
1 : 250
A1
DRAWN
20mm
40
60
80
100
200
300
400
KARANGAHAPE STATION VE2 PITT STREET, AUCKLAND CBD B7 - PLATFORM PLAN NORTH
PROJECT APPROVED
Jasmax/Grimshaw
DATE
DESIGNED
04-07-16
TITLE
Eduardo Velásquez / James Raimon CHECKED
Liam Wythes
Chris Jack
ORIGINAL SIZE 0
SCALE
500
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
CRL
KRD
ARC
000
DRG
2161
700
REVISION
3 800