Room Schedule - B7 Platform Plan South
PG
1
Room No 105 106 108 109 110 111 112 115 200 224 225 240 260 401 441 461 463 465 467 475 496 505 520 524 540
1
NoR (SUBSURFACE DESIGNATION )
1
4103
4104
ACTIVE PLATFORM START
EXTENT OF WORKS KRD
... | DRG | 2161
01
4105
NoR (SUBSURFACE DESIGNATION )
PLATFORM EDGE TACTILE INDICATORS
CRL UP
CRL UP
P1 SEATS
HELP POINT
ACCESS HATCH SEATS
ACCESS HATCH SEATS
HELP POINT
702
4000 CLEAR
111
P2
HELP POINT
105
3500 CLEAR
540 OUTLINE OF PILE FOUNDATION OVER REFER TO STRUCTURAL DOCUMENTS
ESC 7
ACCESS HATCH
108 ESC 8
LOWER CONCOURSE
200
ESC 9
SEATS
ACCESS HATCH
CONNECTING ADIT TO PLATFORM (PASSENGERS AND TVS EXTRACTION) REFER TO STRUCTURAL DOCUMENTS
467
463
PROFILE OF FUTURE ESCALATORS (STAGE 03)
PROJECTION CONNECTING ADIT TO MERCURY LANE STATION ACCESS
465
ESCALATOR PIT UNDER
200 524
INTERVENTION STAIR/LOBBY/LIFT
524
496 520
260
524
LIFT 2
702 REFUGE x2
'CAT LADDER' TO ACCESS UNDER PLATFORM LEVEL
524
OUTLINE OF PILE FOUNDATION REFER TO STRUCTURAL DOCUMENTS
200
225 SEATS
SEATS ACCESS HATCH
B7 - PLATFORM SOUTH FFL 33743
505 SEATS ACCESS HATCH
P3
HELP POINT
SB
ACCESS HATCH TO SUMP BELOW PLATFORM
106
224
3660 CLEAR
ACCESS HATCH
HELP POINT
FALL 1:100
HELP POINT
FALL 1:100
SEATS
EMERGENCY EGRESS SCISSOR STAIR FALL 1:100
116
SA
EXTENT OF HANDRAIL ON EMERGENCY WALKWAY WITHIN STATION SHOWN DASHED
1 LIFT
475
5550
4000 CLEAR
2880
240 4000 CLEAR
° .72 85
4.28°
VARIES
CONNECTING ADITS TO PLATFORM REFER TO STRUCTURAL DOCUMENTS
110
112
PLATFORM 2 NORTHBOUND FFL 33743
8 m²
MEP CONNECTION TO NORTHBOUND PLATFORM REFER TO MEP DOCUMENTS
441
ACCESS HATCH
Area 221 m² 66 m² 93 m² 41 m² 67 m² 42 m² 66 m² 598 m² 15 m² 20 m² 16 m² 15 m² 14 m² 102 m² 7 m² 5 m² 9 m² 18 m² 7 m² 5 m² 7 m² 3 m² 4 m² 23 m² 124 m²
540
109
PROFILE OF FUTURE ESCALATORS (STAGE 03)
SEATS
EXTENT OF HANDRAIL ON EMERGENCY WALKWAY WITHIN STATION SHOWN DASHED
461
END OF PLATFORM GATE
4000 CLEAR
20420
SEATS
HELP POINT
3000
ACCESS HATCH
FALL 1:100
ACCESS HATCH
115 PLATFORM 1 SOUTHBOUND FFL 33743
FALL 1:100
FALL 1:100
cL TRACK
Room LOWER CONCOURSE LOWER CONCOURSE PLATFORM ADIT PLATFORM ADIT PLATFORM ADIT PLATFORM ADIT PLATFORM ADIT PLATFORM CIRCULATION/CORRIDOR FIRE EGRESS STAIR FIRE EGRESS STAIR FIRE INTERVENTION STAIR LOBBY OHLE ROOM ELECTRICAL CPBDS COMMS SPLICE COMMS SPLICE CPBD COMMS NODE COMMS ROOM FUTURE PSD EQUIPMENT ROOM TUNNEL SERVICES LV FUTURE COOLING RISER PRESSURISATION RISER MEP RISERS DRAFT RELIEF AND TUNNEL VENT PLENUM SUMP ACEESS & CONTROL
ACCESS HATCH
SC
ACCESS
CRL DOWN CRL DOWN
9010
cL TRACK
TACTILE INDICATORS OTE SHAFT OVER
11450
END OF PLATFORM GATE
PLATFORM EDGE
401
SD
540 5690
TVS SHAFT OVER
NoR (SUBSURFACE DESIGNATION )
PE
PF
SE EXTENT OF WORKS KRD
NoR (SUBSURFACE DESIGNATION )
OUTLINE OF PILE FOUNDATION OVER REFER TO STRUCTURAL DOCUMENTS
Filename: C:\Revit\CRL_KRD_ARC_000_MD3_STATION_R15_VE2_JHR.rvt
... | DRG | 2161
01
ACTIVE PLATFORM START
8380
S1
6440
S2
4780
S3
S4
ROOM COLOUR LEGEND
Office:
BOH BUILDING SERVICES
Plot Date: 7/04/2016 2:00:46 p.m.
PUBLIC TVS/OTE
ISSUE FOR AT REVIEW N
CLIENT
0
1
2
3
4
5m
REV 2 D C B 1 A
DATE 07-04-16 04-04-16 14-03-16 05-02-16 31-12-14 19-12-14
REVISION DETAILS VALUE ENGINEERING 2 CHANGES REFERENCE DESIGN VE2 ISSUED FOR VERIFICATION REVIEW ISSUE FOR COORDINATION VE2 DESSIGN FREEZE - ISSUE FOR A.T. REVIEW ISSUE FOR A.T. REVIEW ISSUED FOR VERIFICATION REVIEW
APPROVAL C. JACK C. JACK C. JACK C. JACK C. RITTER C. RITTER
40
60
80
100
1 : 250
A1
DRAWN
PRELIMINARY
200
300
400
AUCKLAND CITY RAIL LINK
PROJECT
NOT FOR CONSTRUCTION
KARANGAHAPE STATION VE2 - PITT STREET, AUCKLAND CBD B7 - PLATFORM PLAN SOUTH
APPROVED
Jasmax/Grimshaw
DATE
DESIGNED
08/04/2016
TITLE
Eduardo Velásquez Liam Wythes
Chris Jack
ORIGINAL SIZE 20mm
SIZE
CHECKED
SCALE 1:100 AT A1 SCALE 1:200 AT A3 0
SCALE
500
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
CRL
KRD
ARC
000
DRG
2162
700
REVISION
2 800