PG
1
1
4103
CRL UP
EXTENT OF WORKS KRD
1
... | DRG | 2163
01
4105
4104
PROJECTION LINE OF EASTERN TUNNEL BELOW
BELOW PLATFORM SERVICES
CRL UP
P1 ACCESS HATCH OVER ACCESS HATCH OVER
ACCESS HATCH OVER
20420
ACCESS HATCH OVER
PROFILE OF FUTURE ESCALATORS (STAGE 03) OUTLINE OF PILE FOUNDATION OVER REFER TO STRUCTURAL DOCUMENTS
ESC 7
P2
ESC 8 ACCESS HATCH OVER
ESC 9
ACCESS HATCH OVER PROFILE OF FUTURE ESCALATORS (STAGE 03)
PROJECTION CONNECTING ADIT TO MERCURY LANE STATION ACCESS ESCALATOR PIT
4.28°
VARIES
CONNECTING ADITS TO PLATFORM REFER TO STRUCTURAL DOCUMENTS
2880
SA SB
ACCESS HATCH OVER
5550
ACCESS HATCH OVER TO SUMP INDICATIVE SUMP LOCATION LIFT PIT ACCESS HATCH OVER ACCESS HATCH OVER
P3
SC
BELOW PLATFORM SERVICES
CRL DOWN
CRL DOWN
9010
ACCESS HATCH OVER
PROJECTION LINE OF WESTERN TUNNEL BELOW
11450
5690
SD
SE
PF EXTENT OF WORKS KRD
NoR (SUBSURFACE DESIGNATION )
OUTLINE OF PILE FOUNDATION OVER REFER TO STRUCTURAL DOCUMENTS
... | DRG | 2163
01
Filename: C:\Revit\CRL_KRD_ARC_000_MD3_STATION_R15_VE2_JHR.rvt
PE
8380
S2
4780
S3
S4
Plot Date: 5/07/2016 7:17:09 a.m.
Office:
S1
6440
ISSUE FOR AT REVIEW 0
1
2
3
4
CLIENT
5m
SCALE 1:100 AT A1 SCALE 1:200 AT A3
REV DATE REVISION DETAILS 2 04-07-16 VE2 ISSUED FOR AT REVIEW 1 07-04-16 VALUE ENGINEERING 2 CHANGES REFERENCE DESIGN
APPROVAL C. JACK C. JACK
SCALE
SIZE
1 : 250
A1
DRAWN
APPROVED
Jasmax/Grimshaw
N
KARANGAHAPE STATION VE2 PITT STREET, AUCKLAND CBD B8 - SUB-PLATFORM PLAN SOUTH
PROJECT
DATE
DESIGNED
04-07-16
TITLE
Eduardo Velásquez / James Raimon CHECKED
0
Liam Wythes
Chris Jack
ORIGINAL SIZE 20mm
40
60
80
100
200
300
400
500
DOCUMENT 600
PROJECT
ZONE
DISCIPLINE
ELEMENT
TYPE
SHEET
CRL
KRD
ARC
000
DRG
2164
700
REVISION
2 800