Site layout

Page 1

T1B

WORKS

END

TG2

B T1B

WORKS

END

TG2

B

B

TG2

RD6 R/L

WORKS EN

D

T1A /T13 5

ON ROASIDE D

END

TG2

WORKS

B

T1B /T13

T1B

5

ON S ROA IDE D

5

ON ROASIDE D

T1B B

WORKS

TG2

END

B

END

TG2 B

TU3 2

TU3

B

SIT ACCE E SS

1

TZ2 L

WORKS

/T13

END

TG2

T1B

WORKS

R/L

TG2

B

ND

RD6

WORKS E

END

TG2 B

WORKS

T1B

TG2 B

RD6 R

T1B

/L B

WORKS E

ND

T1B

T1B

END

TG2 B

WORKS

TG2 B

WORKS B

END

ON S ROA IDE D

ORIGINAL IN COLOUR 1

INITIAL DRAWING

5

TG2

/T13

WORKS

END

ON S ROA IDE D

T1B

T1B

/T13

D.T.

A.Y.

Dave Tilton (Level 2/3 P, #48485, 15/04/2019)

16-07-17

Ashlee Morgan (Level 2/3 NP, #72796, 20/11/2016)

Connectus JV L17 AMP Building, 29 Customs St West Auckland, 1010

Auckland City Rail Link Enabling Works Contract 2

This drawing, the design and concept remain the property of Connectus Unauthorised reproduction of any part of this document is prohibited. This Traffic Management Drawing (with the associated Traffic Management Plan) must be utilised only at the location(s) it is associated and not without approval from the approving engineer and/or road controlling authority.

5

C2.1: CANOPY REMOVAL

ALBERT ST, CBD

L2LS LONG TERM CONTRAFLOW

PXJ-0778


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Site layout by City Rail Link Ltd - Issuu