T1B
WORKS
END
TG2
B T1B
WORKS
END
TG2
B
B
TG2
RD6 R/L
WORKS EN
D
T1A /T13 5
ON ROASIDE D
END
TG2
WORKS
B
T1B /T13
T1B
5
ON S ROA IDE D
5
ON ROASIDE D
T1B B
WORKS
TG2
END
B
END
TG2 B
TU3 2
TU3
B
SIT ACCE E SS
1
TZ2 L
WORKS
/T13
END
TG2
T1B
WORKS
R/L
TG2
B
ND
RD6
WORKS E
END
TG2 B
WORKS
T1B
TG2 B
RD6 R
T1B
/L B
WORKS E
ND
T1B
T1B
END
TG2 B
WORKS
TG2 B
WORKS B
END
ON S ROA IDE D
ORIGINAL IN COLOUR 1
INITIAL DRAWING
5
TG2
/T13
WORKS
END
ON S ROA IDE D
T1B
T1B
/T13
D.T.
A.Y.
Dave Tilton (Level 2/3 P, #48485, 15/04/2019)
16-07-17
Ashlee Morgan (Level 2/3 NP, #72796, 20/11/2016)
Connectus JV L17 AMP Building, 29 Customs St West Auckland, 1010
Auckland City Rail Link Enabling Works Contract 2
This drawing, the design and concept remain the property of Connectus Unauthorised reproduction of any part of this document is prohibited. This Traffic Management Drawing (with the associated Traffic Management Plan) must be utilised only at the location(s) it is associated and not without approval from the approving engineer and/or road controlling authority.
5
C2.1: CANOPY REMOVAL
ALBERT ST, CBD
L2LS LONG TERM CONTRAFLOW
PXJ-0778