What is happening on site at Mt Eden

Page 1

WHAT'S HAPPENING

ON SITE 2019-2020 Between now and the end of 2020, there will be many different types of construction activities happening at the Link Alliance’s Mt Eden worksite to prepare for the start of the main station and tunnel construction.

Feel free to ask the Mt Eden Station team or contact us on mteden@linkalliance.co.nz if you have questions about specific activities you see here.

ST RI RA KO

STAGE 0 // SEPTEMBER 2019 – MARCH 2020 ER OW FL

ST RU RU

T

US A IK

K OC

ST

D

D HA

S

ST

N

DEMOLITION PHASE 1

TRUCKS ENTRY / EXIT

These diagrams highlight key activities that will start on site and some of the plant and equipment that will be introduced during the early works phase. It is important to note that the phases of work overlap and are not sequential. This means that different activities may occur at different times in different areas of the site.

AH NG

DEMOLITION PHASE 3

N TRAIN

TEMP SITE OFFICE

STATIO

N

MT

MT EDE

ED EN

RD

T

AS

UR

DEMOLITION PHASE 2

This diagram outlines the three phases of demolition for the CRL-owned buildings within the station construction area. Demolition will start in the area marked ‘Phase 1’ but it’s possible that Phase 2 and/or Phase 3 may start before all of Phase 1 is completed. You will see trucks and excavators on site. We will crush concrete on site to minimise noise disturbance and waste from demolition.

Before the end of 2019, we will realign Flower Street to accommodate the retaining wall for the future tunnel portal. Utility services around the Flower/Nikau Street intersection will also be relocated at this time. Our site office will be located at 97k Mt Eden Road.

PEDESTRIAN ENTRY / EXIT

T

IS

AR

IO N ER ST D I V ERS OW FL

R KO

S RU RU

TUNNEL PORTAL T

T

US A IK

N

STAGE 1 // JANUARY 2020 – JULY 2020 K OC

ST

D

D HA

S

TRUCKS ENTRY / EXIT

TEMP SITE OFFICE

STATIO

N

KEY

MT

N TRAIN

ED EN

RD

T

AS

UR

AH NG MT EDE

This stage of work involves the creation of the tunnel portal at the corner of Flower and Nikau Streets. This includes installing concrete bored piles of between 15 and 35 metres to retain the ground so that we can excavate to the level of the future CRL tunnels, which will start from here. We will also be progressively excavating to create stepped platforms for the piling rig to operate from.

During this stage, we will start drilling into basalt rock and undertaking controlled underground blasting to allow for the excavation of the cut and cover tunnels and the future CRL platform within the train station. Blasting has the benefit of avoiding prolonged and noisy rock-breaking activities.

SITE BOUNDARY BASALT BLASTING

T

IS

AR

IO N ER ST D I V ERS OW FL

R KO

S RU RU

SITE FACILITIES

TRUCKS ENTRY / EXIT

T

US A IK

T

PEDESTRIAN ENTRY / EXIT

N

TO WE

RC

STAGE 2 // APRIL 2020 – OCTOBER 2020 K OC

ST

While the portal works are continuing, we will start the bulk excavation of the trenches required for the future tunnels and platform. One of those trenches will be graded to act as a ramp for the tunnel boring machine (TBM).

D AD

SH

WATER RETENTION POND

RA

NE

ST RU E RU IDG BR

UR AH NG

MT EDE

SITE BOUNDARY

N TRAIN

BASALT BLASTING

RD ED EN

KEY

TEMP SITE OFFICE

STATIO

N

BULK EXCAVATION

MT

T

AS

SPOIL HANDLING AREA

SITE FACILITIES

We will start constructing an additional Mt Eden Road bridge (adjacent to the existing bridge), which the future CRL tunnels will run under, as well as a new road bridge

CIVIL WORKS

AR T

IS

T

TBM SET-UP AREA

ST

MINED EXCAVATION CIVIL WORKS

SH

N TRAIN

RC

RA

NE

WATER RETENTION POND

SPOIL HANDLING AREA

RD

RA

U AH NG

SITE FACILITIES

This phase will see completion of the bulk excavation and preparation for the set-up of the TBM. This includes the installation of the spoil enclosure and conveyor, workshops, water treatment plant and a storage area for pre-cast concrete tunnel segments.

D AD

STATIO

RETA N

I N I NG

WA LL

MT ED EN

TO WE

MT EDE

SITE BOUNDARY

ST

N

N

SPOIL HANDLING AREA

KEY

K OC

IO

US A IK

New on-site facilities will be established to accommodate a growing construction workforce. A spoil management area will also be established on site, along with a water retention/sedimentation pond. A tower crane will arrive on site to assist with construction.

STAGE 3 // JUNE 2020 – JANUARY 2021

ER ST DI V ERS OW FL

R KO

SITE OFFICE

ST

TRUCKS ENTRY / EXIT

RU RU

PEDESTRIAN ENTRY / EXIT

on Ruru Street to go over the future platform for the new CRL line.

We will also start mining the entrance of the tunnel portal to prepare the launch area for the TBM.

The construction team will move to the new site facilities, demolish the temporary office at 97k Mt Eden Road and start constructing the retaining wall next to the Western Line corridor. Construction of the foundations for the future Mt Eden Station building is expected to start at the end of 2020. The tunnel boring machine is expected to launch around the same time.