Shenandoah STEM Facility - Book

Page 1

Noah Schacher, Danielle Nelson, Amanda VanBuren, Jose Cano, Claire Hiles DSGN 410: Fall 2018


SITE

HIGH SCHOOL

MIDDLE SCHOOL

Maker Space Mechanics + Robotics Administation + Science N

0

50

100

200

500

N

0

10

20

40

100




Scale: 1” 1” = = 55’ Scale: 55’


Administration

PRESENTATION

SCIENCE LAB SCIENCE LAB

SCIENCE PREP

CONFERENCE COMM

OPEN OFFICES RECEP TION

BREAK ROOM

ELEC

Scale: 1” = 30’


Science Labs

PRESENTATION

SCIENCE LAB SCIENCE LAB

SCIENCE PREP

CONFERENCE COMM

OPEN OFFICES RECEP TION

BREAK ROOM

ELEC

Scale: 1” = 30’


innovation Hub WOOD SHOP

WOOD SHOP STORAGE

TECH LAB

MAKER SPACE MEDIA CENTER

ELEC

COMM

TECH LAB

HUDDLE INNOVATION HUB HUDDLE

Scale: 1” = 55’


Maker Space WOOD SHOP

WOOD SHOP STORAGE

TECH LAB

MAKER SPACE MEDIA CENTER

ELEC

COMM

TECH LAB

HUDDLE INNOVATION HUB HUDDLE

Scale: 1” = 55’


Mechanics + Robotics MAIN MECHANICAL

COMM

FABRICATION

ELEC

MECHANICS ROBOTICS PRESENTATION + ARENA

Scale: 1” = 55’

Scale: 1” = 75’


Community Member / Teacher High Schooler B

A

Section A: 1” = 35’

Section B: 1” = 35’

Middle Schooler


Materials Exterior MAterials

Program Space Type

Actual

Programmed

Dif ference

Maker Space

Interior MAterials

Maker Space Innovation Hub Huddle 3 Huddle 4 Tech Lab 1 Tech Lab 2 Media Center Wood Shop Wood Shop Storage Marker Space Total: Mechanics / Robotics Robotics Presentation / Arena Fabrication Fabrication Storage Mechanics Mechanics / Robotics Total:

1274 1838 433 354 537 500 781 1199 534 7450

1250 1875 450 450 500 500 705 1500 450 7680

(+24) (-37) (-17) (-96) (+37) 0 (+76) (-301) (+84)

1370 1370 1246 156 2984 7126

1125 1250 1500 300 3000 7175

(+254) (+120) (-254) (-144) (-16)

Science / Administration Reception Presentation Presentation Storage Science Lab 1 Science Lab 2 Science Prep Open Of fice Conference Breakroom Greenhouse Science / Administration Total:

506 718 100 612 610 294 514 245 264 675 4538

180 500 350 625 625 300 300 250 250 675 4055

(+326) (+218) (-250) (-13) (-15) (-6) (+214) (-5) (+14) 0

Programed vs Actual analysis: Maker Space

Mechanics

Sciences


Structure 42” Concrete Retaining Wall 3” Metal Decking

Occupant Load Space Type

Sq. Ft.

Load Factor

Total Occupants

Innovation Hub Maker Space Presentation / Arena Presentation Assembly Total

1838 1274 1370 718

7 7 7 7

262 182 195 102 741

Mechanics Fabrication Robotics Wood Shop Media Center Green House Tech Lab 1 Tech Lab 2 Science Lab 1 Science Lab 2 Huddle 3 Huddle 4 Conference Education Total

2984 1246 1370 1199 781 675 537 500 612 610 433 354 245

50 50 50 50 50 50 20 20 20 20 20 20 20

59 24 27 23 15 13 26 25 30 30 21 17 12 322

Open Of fices Reception Break Room Administration Total

514 506 264

50 20 15

10 25 17 52

Wood Shop Storage Fabrication Storage Presentation Storage Science Prep Custodial Storage Total

534 156 100 294 367

300 300 300 300 300

1 0 0 0 1 2

300 304 807 1888

300 300 300 50

1 1 2 37 41 1158

Assembly

6” Earth/Grass 3” Concrete Topping 4’ Web Truss

Education 1’ Steel Column

Concrete Footing

Business

Storage

Core Communication Electrical Mechanical Restrooms Core Total Total Occupant Load:


Codes Water Closets Space Type

Totals:

Total Occupants

Male

Female

Water Closets

741 322 52 2 41

125 50 25 -

65 50 25 -

9 7 3 19

Assembly Education Business Storage Core

Lavetries Total Lavetries 3 200 7 50 2 40 12

Egress: Exit Doors Space Type Largest Assembly Innovation Hub Maker Space Total Sq. Ft.

Sq. Ft.

Load Factor

Total Occupants

1838 1274 Total Sq. Ft. 3112

7 7 Load Factor (A/7)(.2)

262 182 Total Inches 89 3

Total Number of Doors Required:

Egress: Exit Doors Access Max Travel Distance (Sprinkled)

Space Type Education Assembly Business

Longest Travel Distance: 237ft

250ft 250ft 300ft