2018 Fall Studio

Page 1

CLARISSA STEIER

I SEEK TO BOTH IMPROVE THE WORLD AND ENJOY THE WORLD


CAPPA PROJECT TYPE: HIGHER ED. SOFTWARE: revit and photoshop overview: NEW ARCHITECTURE BUILDING TO FACILITATE 3,000 STUDENTS. THIS PROJECT AIMS TO CREATE A SCHOOL THAT WOULD ACT AS A SOCIAL CONDENSER. TO ENCOURAGE STUDENTS FROM DIFFERENT SCHOOLS TO INTERACT WITH ONE ANOTHER BY OFFERING A CENTRAL COURTYARD WHERE VARIOUS ACTIVITIES AND GATHERINGS CAN TAKE PLACE.



CAPPA

studies



---

04 A117

01 A117

CAPPA L1 02 A117


CAPPA L2



TOP OF PARAPET 55' - 6"

ROOF 52' - 0"

MOTORIZED ROLLER SHADES RECESSED WITHIN FLOOR SLAB

WINDOW WALL SYSTEM

L4 - STUDIO SPACE 39' - 0"

TWO-WAY FLOOR SLAB CANTILEVERED. THIS SLAB IS IS SLOPED TO ALLOW FOR A THINNER EDGE WHILE STILL BEING GRAVITY BEARING.

16" x 16" STRUCTURAL COLUMN AT EXISTING COLUMN GRID

CUR

L3 - STUDIO SPACE 26' - 0"

TW 1/4" PUR

6" A ANG OF RED

L2 - TERRACE 13' - 0"

TWO-WAY FLOOR SLAB CANTILEVERED. THIS SLAB IS IS SLOPED TO ALLOW FOR A THINNER EDGE WHILE STILL BEING GRAVITY BEARING. WOOD LINEAR PLANK CEILING FOR SOUND ABSORPTION AT ENTRY. WILL PROVIDE AN NRC VALUE UP TO 0.50.

ENTRY INTO A DOUBLE VOLUME LIBRARY

L1 - LIBRARY 0' - 0" REPLACE SOIL WITH GRAVEL AT NEW RETAINING WALL

6" L ADJ

STC SOU

MA PRO SUR

LOA 4'X8 VER

MA FRO

CANTILEVERED RETAINING WALL

CHILLED WATER PUMP TO SERVE THE BUILDING. AT THE BASEMENT, SEVERAL PUMPS PUSH CHILLED WATER THROUGH THE BUILDING TO SERVICE THE VAV BOXES IN EACH OF THE ROOMS

DRAIN

POU EAR

SOU SEA SOU

L0 -13' - 0"

STR

ENLARGED SECTION - ENTRY


CAPPA L3


CAPPA L4



L4 - STUDIO SPACE 39' - 0"

L3 - STUDIO SPACE 26' - 0"

IS

IS

T

VAV

CURTAIN WALL SYSTEM

TWO-WAY FLOOR SLAB SLOPING AT 1/4" PER FOOT FOR DRAINAGE PURPOSES.

L2 - TERRACE 13' - 0"

6" ACOUSTICAL WOOD CEILING. ANGLED AS SUCH FOR ACOUSTICS OF THE SPACE. THIS IS INTENDED TO REDUCE REVERB IN THE SPACE.

6" LED CAN LIGHT FIXTURES WITH ADJUSTABLE HEAD. STC20 ACOUSTICAL CURTAINS FOR SOUND ABSORPTION

MOTORIZED SHADES SERVE AS SOLAR SHADING DEVICE AND PROJECTION SURFACE

AVG. REVERB TIME AT MID FREQ. TO NOT EXCEED > 1.2s, or < 0.7s.

L1 - LIBRARY 0' - 0" MAINTAIN CLEAR SIGHT LINES FROM PROJECTION ROOM TO PROJECTION SURFACE

LOAD BEARING WALL FORMED WITH 4'X8' FORMWORK ARRANGED VERTICALLY

WINDOW WALL SYSTEM

MAINTAIN COMFORTABLE SIGHTLINES FROM SPEAKER TO AUDIENCE

L0 -13' - 0" POURED CONCRETE STEPS TO BE EARTH SUPPORTED SOUND ABSORBING MATERIAL IN THE SEATS TO AVOID FOCUSING OF THE SOUND

L -1 -20' - 0"

STRUCTURAL PIER

2

ENLARGED SECTION - AUDITORIUM 1/4" = 1'-0"

4" SAND WITH 6 MIL POLY VAPOR BARRIER EXPANSION JOINT

1/4" SLOPE PER FOOT










CAPPA

final



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.