POND BAY
NOMINAL NOT TO SCALE ON CENTER PLATE PLASTIC LAMINATE PLYWOOD PREFABRICATED PRESSURE TREATED POLYVINYL CHLORIDE ROOF DRAIN REFRIGERATOR REINFORCING REQUIRED REVERSED ROUGH OPENING SQUARE FEET SIMILAR SLAB ON GRADE SPECIFICATIONS STANDARD STEEL STRUCTURAL SUB FLOOR SUSPENDED TONGUE AND GROOVE TELEPHONE TEMPERATURE TOP OF SLAB TOP OF WALL TYPICAL UNLESS NOTED OTHERWISE VINYL COMPOSITION TILE VERTICAL VERIFY IN FIELD WASHER WATER HEATER WATERPROOF WITH WELDED WIRE FABRIC WALK-IN-CLOSET STAIN STEEL PAINTED
LIST OF ABBREVIATIONS
By executing the contract, the contractor represents that he has visited the site, familiarized himself with the local conditions, codes and landlord requirements under which the work is to be performed, and correlated his observations with the requirements of the Contract Documents. This shall be done prior to the bid. The intent of the Contract Documents is to include all items necessary for proper execution and completion of the work. The Contract Documents are complimentary, and what is required by one shall be as binding as if required by all. Work not covered in the Contract Documents will not be required unless it is consistent therewith and is reasonably inferable therefrom as being necessary to produce the intended results. Words and abbreviations which have well known technical or trade meanings are used in the Contract Documents in accordance with such meanings. The Drawings and Specifications are intended to be fully explanatory and supplementary. Moreover, should anything be shown, indicated, or specified on one and not the other, it shall be done.
CLUB HOUSE & HILLSIDE VILLA BUILDINGS F,G,H,J,K,L,M,N,P,R&ADA REVISION #9
Should either the drawings and the specifications, or any particular specification, and the General Conditions contradict each other in any point, or require clarification, the Contractor must call the same to the attention of the Architect, and his decision shall be obtained prior to the submission of bids - otherwise, the Architect's interpretation will govern the performance of the work and no allowance shall be made in behalf of the Contractor for error or negligence on his part in this connection. The Contractor shall bear all costs (including overtime, air frieght, etc.) due to his errors and/ or ommisions prior to bidding. Should any error or inconsistency appear in the drawings or specifications, the Contractor, before proceeding with work, must clearly bring the same to the attention of the Architect for proper adjustment, and in no case proceed with the work in uncertainty nor with insufficient drawings. The Contractor and each subcontractor shall be responsible for verification of all measurements at and in the proposed construction building or site or surroundings. No charge or compensation shall be allowed due to differences between actual dimensions and dimensions indicated on the drawings. Any such discrepancy in dimensions which may be found shall be submitted to the Architect. Contractor shall follow sizes in specifications or figures on drawings in preference to scale measurements and follow detail drawings in preference to general drawings, and follow actual field conditions. Where it is obvious that a drawing illustrates only a part of a given work, or of a number of items, the remainder shall be deemed repetitious and so constructed.
PARCELS 126,272,488D,488E,488F - ESTATE CHOCOLATE HOLE NO. 11 CRUZ BAY QUARTER - ST JOHN, US VIRGIN ISLANDS 8
PROJECT NAME SHEET # A0.00
TITLE COVER
# 9
CLUBHOUSE & HILLSIDE VILLA
ZONING = W-1 (CLUB HOUSE & HILLSIDE VILLA) THE FOLLOWING INFORMATION IS TAKEN FROM THE APPROVED CZM PERMIT CZJ-1-07(L) PARCELS
NO. 126 NO. 272 NO. 488D NO. 488E NO. 488F
7.61 LAND ACRES 3.86 LAND ACRES 1.75 LAND ACRES 0.58 LAND ACRES 0.58 LAND ACRES 14.32 LAND ACRES
DENSITY PERMITTED: 40 PERSONS PER ACRE x 11.47 (W-1 UNRESTRICTED) =459 PERSONS ACTUAL: 19 PERSONS PER ACRE =218 PERSONS NORTH ARROWS
DRAWING TITLE
DRAWING TITLE
0
SCALE
OCCUPANCY PERMITTED: 40% OF 14.32 ACRES = 5.73 ACRES ACTUAL: 8% OF 14.32 ACRES =1.18 ACRES LOT AREA MINIMUM: ACTUAL:
NORTH ROOM NAME KEY
SECTION CUT KEY
1
USABLE OPEN SPACE REQUIRED: 30% OF 14.32 ACRES = 4.3 ACRES ACTUAL: 55% OF 14.32 ACRES = 7.9 ACRES
SIM
Room name 101
A101
FRONT SETBACK PERMITTED: ACTUAL:
1
A3.02
25 FEET 830 FEET
X
SIDE SETBACK PERMITTED: ACTUAL:
DOOR KEY
DETAIL KEY
1
VICINITY MAP
LOT WIDTH MINIMUM 100 FEET ACTUAL (AT SMALLEST CROSSING) 300 FEET
WALL TYPE KEY
ELEVATION KEY
10,000 SQ.FT. 14.32 ACRES
SIM
REAR SETBACK PERMITTED: ACTUAL:
D
X
A101
HEIGHT PERMITTED: ACTUAL-MAXIMUM:
WINDOW KEY
COLUMN LINE GRID KEY
10 FEET 10 FEET 20 FEET 60 FEET 3 STORIES 2 STORIES
SITE
0 W
X CHANGE CLOUD AND REV. TAG
SPOT ELEVATION
1
FIRST FLOOR PLAN - BLDG. F, H, N & R SECOND FLOOR PLAN - BLDG. F, H, N & R FIRST FLOOR PLAN - BLDG. J, L, M, P & ADA UNITS ADA FIRST FLOOR PLAN - BLDG. J, L, M, P & ADA UNITS SECOND FLOOR PLAN - BLDG. J, L, M, P & ADA UNITS FIRST FLOOR PLAN - BLDG. G SECOND FLOOR PLAN - BLDG. G FIRST FLOOR PLAN - BLDG. K SECOND FLOOR PLAN - BLDG. K ROOF PLAN - BLDG. F, H, N & R ROOF PLAN - BLDG. J, L, M, P & ADA UNITS ROOF PLAN - BLDG. G ROOF PLAN - BLDG. K EXTERIOR ELEVATIONS - BLDG. F, H, N & R EXTERIOR ELEVATIONS - BLDG. F, H, N & R EXTERIOR ELEVATIONS - BLDG. J,L,M,P & ADA UNITS EXTERIOR ELEVATIONS - BLDG. J,L,M,P & ADA UNITS EXTERIOR ELEVATIONS - BLDG. G EXTERIOR ELEVATIONS - BLDG. G EXTERIOR ELEVATIONS - BLDG. K EXTERIOR ELEVATIONS - BLDG. K BUILDING SECTIONS - BLDG. F, H, N & R BUILDING SECTIONS - BLDG. F, H, N & R BUILDING SECTIONS - BLDG. J, L, M, P & ADA UNITS BUILDING SECTIONS - BLDG. G BUILDING SECTIONS - BLDG. K WALL SECTIONS -BLDG. F, H, N & R WALL SECTIONS -BLDG. F, H, N & R WALL SECTIONS -BLDG. F, H, N & R WALL SECTIONS -BLDG. J, L, M, P & ADA UNITS WALL SECTIONS -BLDG. J, L, M, P & ADA UNITS WALL SECTIONS -BLDG. J, L, M, P & ADA UNITS ARCHITECTURAL DETAILS ARCHITECTURAL DETAILS ARCHITECTURAL DETAILS - STANDARD DESIGN ARCHITECTURAL DETAILS - SHIPWRIGHT DESIGN - NOT USED ARCHITECTURAL DETAILS - TRADITIONAL DESIGN ARCHITECTURAL DETAILS - TRUSS DESIGN ENLARGED STAIR PLAN / SECTION
9
DATE 03.06.09 02.27.09 02.27.09 11.18.08 11.18.08 11.18.08 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 11.18.08 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 02.27.09 11.18.08 11.18.08 11.18.08 03.06.09 02.27.09 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08
STRUCTURAL BENCH MARK
ELEVATION CHANGE SYMBOL
1"
6
LOCATION MAPS OWNER:
X
CLUB HOUSE & HILL SIDE VILLA: (TYP FOR 32 UNITS) FLOOR AREA: INTERIOR: EXTERIOR: TOTAL:
Name Elevation
1,096 182 1,278 SF
CLG HEIGHT KEY
FIRST AMERICAN DEVELOPMENT TRAVIS DESIGN ASSOCIATION 200 CAUGHMAN FARM LANE GROUP / CARIB, LLC, USVI LLC LEXINGTON, SC 29072 5000 ESTATE ENIGHED PMB 245 ST JOHN VI 00830 TEL: (803) 358.0265 FAX: (803) 358.0266 TEL: (340) 776.7551 FAX: (340) 776.7552
BIOIMPACT, INC. PO BOX 132, KINGSHILL ST CROIX, VI 00851-1749
ARCHITECT:
CIVIL ENGINEER:
SURVEYOR:
SPRINGLINE ARCHITECTS, LLC. 6100 RED HOOK QTR. STE E2-1 ST THOMAS, VI 00802
AES CONSULTING ENGINEERS 5248 OLDE TOWN RD, STE 1 WILLIAMSBURG, VA 23188
MOSELEY & ASSOCIATES PO BOX 600140 ST THOMAS, VI 00801-6140
TEL: (757) 253.0040 FAX: (757) 220.0994
TEL: (340) 774.5310 FAX: (340) 776.4090
LANDSCAPE ARCHITECT:
MEP ENGINEER:
W.W.T. & R.O. PLANT:
SPRINGLINE ARCHITECTS, LLC. 6100 RED HOOK QTR. STE E2-1 ST THOMAS, VI 00802
PENINSULA ENGINEERING INC. 2016 ALDEN ROAD ORLANDO, FL 32803
SEVEN SEAS 6200 FRYDENHOJ SUITE 4 ST THOMAS, VI 00802
STORIES: 2 STORY EXTERIOR WALLS: CMU 1'-0" A.F.F.
ROOF: WOOD TRUSSES AND ALUMINUM ROOFING
TEL: (340) 777.2345 FAX: (340) 777.2346
ROOF AREA: N/A
NOTE KEY
ROOMS : BEDROOMS: 3 BATHROOMS: 4 OTHERS: 8 TOTAL WITH ELECTRICAL: 15 PLUMBING: KITCHEN SINK: 1 LAVATORIES: 5 TOILETS: 4 BATHTUBS: 1 SHOWERS: 3 DISHWASHER: 1 CLOTHES WASHER: 1
INTERIOR ELEVATION MARK
ROOF SLOPE/PITCH MARK
TEL: (340) 777.2345 FAX: (340) 777.2346
6 : 12 SLOPE 12 PITCH
6
9
PROJECT DATA
7
TEL: (407) 246.1688 FAX: (407) 246.1664
TEL: (340) 773.5881 FAX: (340) 773.5542
TEL: (340) 775.7607
INTERIOR DESIGNER:
ENVIRONMENTAL ENGINEER:
POOL DESIGNER:
HOWARD DESIGN GROUP 2801 FLORIDA AVE COCONUT GROVE, FL 33133
WILLIAMSBURG ENVIRONMENTAL GROUP, INC. 5209 CENTER STREET WILLIAMSBURG, VA 231188
AQUATIC CONSULTANTS, INC. 13145 SW 104 TERRACE MIAMI, FL 33186
TEL: (305) 446.4088 FAX: (305) 446.4428
LEGEND OF SYMBOLS
MARINE BIOLOGIST:
TEL: (757) 220.6869 FAX: (757) 229.4507
TEL: (305) 383.7266 FAX: (305) 386.1168
PROJECT DIRECTORY
4
S501 BUILDING K S001 S101 S102 S201 S202 S301 S401
FRAMING SECTIONS STRUCTURAL NOTES FOUNDATION PLAN FIRST FLOOR PLAN SECOND FLOOR FRAMING PLAN ROOF FRAMING PLAN FOUNDATION SECTIONS CMU DETAILS
S501
FRAMING SECTIONS
11.18.08 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08
SHEET #
TITLE
MECHANICAL BUILDING F, G, H, N & R M-1 MECHANICAL SPECIFICATIONS AND LEGEND M-2 MECHANICAL FIRST FLOOR PLAN M-3 MECHANICAL SECOND FLOOR PLAN M-4 MECHANICAL SCHEDULES AND DETAILS BUILDING J, L, M, & P M-1 MECHANICAL SPECIFICATIONS AND LEGEND M-2 MECHANICAL FIRST FLOOR PLAN M-3 MECHANICAL SECOND FLOOR PLAN M-4 MECHANICAL ADA FIRST FLOOR PLAN M-5 MECHANICAL SCHEDULES AND DETAILS BUILDING K M-1 MECHANICAL SPECIFICATIONS AND LEGEND M-2 MECHANICAL FIRST FLOOR PLAN M-3 MECHANICAL SECOND FLOOR PLAN M-4 MECHANICAL SCHEDULES AND DETAILS ELECTRICAL BUILDING F, G, H, N & R E-1 ELECTRICAL SPECIFICATIONS AND LEGEND PLAN E-2 ELECTRICAL FIRST FLOOR PLAN E-3 ELECTRICAL SECOND FLOOR PLAN E-4 ELECTRICAL POWER RISER PLAN BUILDING J, L, M, & P E-1 ELECTRICAL SPECIFICATIONS AND LEGEND PLAN E-2 ELECTRICAL FIRST FLOOR PLAN E-3 ELECTRICAL SECOND FLOOR PLAN E-4 ELECTRICAL ADA FIRST FLOOR PLAN E-5 ELECTRICAL POWER RISER PLAN BUILDING K E-1 ELECTRICAL SPECIFICATIONS AND LEGEND PLAN E-2 ELECTRICAL FIRST FLOOR PLAN E-3 ELECTRICAL SECOND FLOOR PLAN E-4 ELECTRICAL POWER RISER PLAN
3
#
DATE
9
09.12.08 09.12.08 09.12.08 03.06.09
9
09.12.08 09.12.08 09.12.08 03.06.09 03.06.09
9
09.12.08 09.12.08 09.12.08 03.06.09
9
9 9 9 9
9 9 9 9 9
9 9 9 9
PLUMBING BUILDING F, G, H, N & R P-1 PLUMBING SPECIFICATIONS AND LEGEND P-2 PLUMBING FOUNDATION FLOOR PLAN P-3 PLUMBING FIRST FLOOR PLAN P-4 PLUMBING SECOND FLOOR PLAN P-5 PLUMBING DETAILS BUILDING J, L, M, & P P-1 PLUMBING SPECIFICATIONS AND LEGEND P-2 PLUMBING FOUNDATION FLOOR PLAN P-3 PLUMBING FIRST FLOOR PLAN P-4 PLUMBING SECOND FLOOR PLAN P-5 PLUMBING ADA FIRST FLOOR PLAN P-6 PLUMBING DETAILS BUILDING K P-1 PLUMBING SPECIFICATIONS AND LEGEND P-2 PLUMBING FOUNDATION FLOOR PLAN P-3 PLUMBING FIRST FLOOR PLAN P-4 PLUMBING SECOND FLOOR PLAN P-5 PLUMBING DETAILS FIRE PROTECTION BUILDING F, G, H, N & R FP-1 FIRE PROTECTION SPECIFICATIONS AND DETAILS FP-2 FIRE PROTECTION FIRST FLOOR PLAN FP-3 FIRE PROTECTION SECOND FLOOR PLAN BUILDING J, L, M, & P FP-1 FIRE PROTECTION SPECIFICATIONS AND DETAILS FP-2 FIRE PROTECTION FIRST FLOOR PLAN FP-3 FIRE PROTECTION SECOND FLOOR PLAN FP-4 FIRE PROTECTION ADA FIRST FLOOR PLAN BUILDING K FP-1 FIRE PROTECTION SPECIFICATIONS AND DETAILS FP-2 FIRE PROTECTION FIRST FLOOR PLAN FP-3 FIRE PROTECTION SECOND FLOOR PLAN
03.06.09 03.06.09 03.06.09 03.06.09 03.06.09 03.06.09 03.06.09 03.06.09 03.06.09 03.06.09 03.06.09 03.06.09 03.06.09
09.12.08 09.12.08 09.12.08 09.12.08 09.12.08 09.12.08 09.12.08 09.12.08 09.12.08 09.12.08 09.12.08
9 8 7 6
03.06.09 02.27.09 11.18.08 09.18.08 09.04.08
OWNER REQUESTED CHANGE ELEVATION CHANGES ALTERNATE ELEVATIONS VE CONSTRUCTION DOCUMENTS
BASE SHEET
08.25.08 BASE SHEET-FURRED WALLS /COORD WINDOW OPENINGS 08.15.08 08.12.08 07.21.08 5 06.16.08 05.22.08 05.19.08 4 05.12.08 1 02.25.08 02.14.08 12.17.07 12.13.07 12.04.07 11.21.07 09.04.07 REV. DATE
BASE SHEET SLAB PENETRATION BASE SHEET CONSTRUCTION DOCUMENTS BLDG. PERMIT APPLICATION BLDG. MAT. CHANGE & COORD. REVISED BASE SHEETS BLDG DESIGNATION CORRECTION
CONSTRUCTION DOCUMENTS BID SET BASE SHEET BID SET PROGRESS 90% CD SET BLDG. PERMIT APPLICATION SUBMISSION
SPRINGLINE ARCHITECTS, L.L.C. 6100 RED HOOK QUARTERS, SUITE E2-1 ST. THOMAS, VI 00802 Tel. (340) 777-2345 www.springlinearchitects.com
CONSULTANT:
SEAL:
DRAWN BY: LMO REVIEWED BY:
09.12.08 09.12.08 09.12.08 09.12.08 09.12.08
09.12.08 09.12.08 09.12.08
MDH PROJECT MGR:
. U. S
ELEVATION MARK
STRUCTURAL ENGINEER:
5
11.18.08 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08
GENERAL NOTES
RED ARCH E T
VI
JNS
THERESA S. ROBERTS 466 - A
CT ITE
ZONING REQUIREMENTS
BUILDING F, G, H, N & R S001 STRUCTURAL NOTES S101 FOUNDATION PLAN BUILDING G, H, N, & R S101-F FOUNDATION PLAN BUILDING F S102-F FIRST FLOOR PLAN BUILDING F S102-G-N FIRST FLOOR PLAN BUILDING G & N S102-H-R FIRST FLOOR PLAN BUILDING H & R S201 SECOND FLOOR FRAMING PLAN BUILDING F, H & R S201G-N SECOND FLOOR FRAMING PLAN BUILDING G & N S202 ROOF FRAMING PLAN S301 FOUNDATION SECTIONS S401 CMU DETAILS S501 FRAMING SECTIONS BUILDING J, L, M, & P S001 STRUCTURAL NOTES S101 FOUNDATION PLAN S102 FIRST FLOOR PLAN S201 SECOND FLOOR FRAMING PLAN S202 ROOF FRAMING PLAN S301 FOUNDATION SECTIONS S401 CMU DETAILS
The Contractor is to assure that the placement of equipment is possible before construction of all interior partitions are completed.
2
ARCHITECTURAL A2.01 A2.02 A2.03 A2.03-ADA A2.04 A2.05 A2.06 A2.07 A2.08 A2.09 A2.10 A2.11 A2.12 A3.01 A3.02 A3.03 A3.04 A3.05 A3.06 A3.07 A3.08 A3.11 A3.12 A3.13 A3.14 A3.15 A4.01 A4.02 A4.03 A4.04 A4.05 A4.06 A4.11 A4.12 A4.13 A4.14 A4.15 A4.16 A4.17 A7.01
Contractor is to verify that all equipment (fixtures) are in accordance with plans and specifications. The Contractor is to report immediately by phone and within 24 hours in writing to the Architect, any and all equipment that is damaged, omitted, or not in accordance with plans and specifications.
S
NOM N.T.S. O.C. PL. PL.LAM. PLYWD PREFAB P.T. PVC R.D. REF REINF REQ'D REV R.O. SF SIM S.O.G. SPEC STD STL STRUCT SUB FL SUSP. T&G TEL TEMP T.O.S. T.O.W. TYP U.N.O. VCT VERT V.I.F. W WH WP W/ WWF W.I.C. S.S. PTD
ND
ABOVE AIR CONDITIONING ACOUSTICAL TILE ABOVE FINISHED FLOOR ALUMINUM AVERAGE BLOCKING CENTER LINE CONTROL JOINT CEILING CONCRETE MASONRY UNIT COLUMN CONCRETE CONTINUOUS CERAMIC TILE DRYER DETAIL DRINKING FOUNTAIN DOWNSPOUT DIAMETER EACH ELEVATION EQUAL ELECTRIC WATER COOLER EXTERIOR EXISTING FLOOR DRAIN GAUGE GALVANIZED GYPSUM WALLBOARD HORIZONTAL LAVATORY LINEAR FEET LAMINATED VENEER LUMBER MANUFACTURER MINIMUM MISCELLANEOUS MASONRY OPENING METAL NOT IN CONTRACT
REGIS
ABV A/C A.C.T. AFF ALUM AVG BLKG CL CJ CLG. CMU COL CONC CONT C.T. D DET DF DS DIA EA. EL/ELEV EQ EWC EXT EXT'G FD GA GALV GWB HORIZ LAV L.F. L.V.L. MFR MIN MISC M.O. MTL N.I.C.
RG IN ISLA
PROJECT:
POND BAY PARCELS 126, 272, 488D, 488E, 488F ESTATE CHOCOLATE HOLE NO. 11 CRUZ BAY QUARTER ST JOHN, US VIRGIN ISLANDS PROJECT ID: 050-07-1 OWNER:
09.12.08 09.12.08 09.12.08 09.12.08
FIRST AMERICAN DEVELOPMENT GROUP / CARIB, LLC, USVI LLC 5000 ESTATE ENIGHED PMB 245 ST JOHN VI 00830 BUILDING NAME:
09.12.08 09.12.08 09.12.08
CLUB HOUSE & HILL SIDE VILLA BLDG. F, G, H, J, K, L, M, N, P, R & ADA UNITS SHEET TITLE:
COVER
11.18.08 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08 11.18.08
SHEET NUMBER:
A0.00
SHEET INDEX
1
ALL INFORMATION CONTAINED HEREIN IS THE PROPERTY OF SPRINGLINE ARCHITECTS L.L.C. THE CONCEPTS, IDEAS, DESIGNS AND DETAILS AS SHOWN ON THE DOCUMENTS WERE CREATED, DEVELOPED, AND PRESENTED FOR USE ON THIS SPECIFIC PROJECT AND SHALL NOT BE REUSED FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN CONSENT OF SPRINGLINE ARCHITECTS L.L.C. THE OWNER SHALL BE PERMITTED TO RETAIN COPIES FOR INFORMATION AND REFERENCE PURPOSES ONLY.