A DAY IN THE LIFE OF CLAYCO



A DAY IN THE LIFE OF CLAYCO 2017

1


2


WE ASKED EVERY MEMBER OF OUR 2,000+ PERSON FAMILY TO TAKE A SNAPSHOT. WE RECEIVED MORE THAN WE COULD EVER HOPE FOR. RENDERINGS, SKETCHES, WEBCAM IMAGES, AND FAVORITE PHOTOS POURED IN FROM ACROSS NORTH AMERICA AND BEYOND. THIS IS THE RESULT.

3


RICHMOND’S CHANGING SKYLINE Clayco teamed with Richmond-based Hourigan Construction, providing design-build services for Dominion Energy’s new corporate headquarters in downtown Richmond.

4


5


ICONIC TRANSFORMATION Clayco, in partnership with Turner Construction Company, is overseeing the reimagining and transformation of Chicago’s iconic Willis Tower for the Equity Office team. 6


7


8


EVERLY ON THE LOOP Mr. Jackson is a World War II veteran and has lived in The Delmar Loop his entire life. At first his jobsite visits were occasional, but towards the end of the project, Mr. Jackson stopped in almost daily, and the Clayco team gifted him his own hardhat and safety vest for his 93rd birthday. 9


CRG DEVELOPMENT The Milwaukee & Armitage Apartments at 1980 Milwaukee Street, just south of Logan Square in Chicago, will include 140 units and 20 parking spaces. 10


WIND RESISTANT The OG&E Metro Hardening project in Oklahoma City houses primary and back-up power and cooling for their existing data center and is built to withstand tornado/hurricane winds.

11


365 DAYS INCIDENT FREE The Dow XPS jobsite in Idaho went over 365 days without an OSHA Recordable Incident. 12


13


14


AWARD WINNING Forum Studio’s planning group took home four ASLA St. Louis Chapter Awards for Design.

15


16


17


NUCLEAR POWER Concrete Strategies poured 21,000 cubic yards of cast-in-place concrete as well as 330,000 square feet of vertical architectural Class A cast-in-place concrete walls for Caddell Construction to build a new nuclear power training facility for the United States Navy in Goose Creek, South Carolina.

18


AROUND THE CLOCK Concrete Strategies works non-stop to meet their clients’ deadlines. They often start before dawn, and sometimes pour concrete into the night to get the sites ready for the next day of construction. 19


H

W L

I

V

Q

U

A

L

CLAYCO I

C

S

E

F

O

C

I

T

U

S A

Y

S

E

T

F

Y

T

E

E

A

E

F

S

20

RK SA

O

F

WORK SAFE, LIVE SAFE - 24/7 This initiative enhances the firm’s already successful program by empowering everyone to make a difference. We want every worker to be safe – at work, beyond work, and in our homes. In addition, each jobsite employee was given a challenge coin printed with the new safety mantra and safety values.


21


STRETCH & FLEX Clayco’s Senior Vice President and General Counsel, Carmen Hernandez, joins in the daily work-specific stretches that help our employees increase their overall flexibility and range-of-motion.

22


23


OVER 10 MILLION SQUARE FEET of distribution facilities have been built or are under construction in Kansas as part of the Inland Port Warehouse Complex.

24


25


MENTORING MATTERS As part of Forum Studio’s outreach into the local community, members of the planning group acted as mentors for high school students in a landscape design competition. Frank Hu’s group from St. Mary’s High School took first place and got a chance to meet Jackie Joyner-Kersee! Bob Clark (right) speaking to a group of students from City Incite, a non-profit that focuses on engaging at-risk high school students and re-engaging “opportunity youth” between the ages of 16-24.

26


27


LIVING AT THE EDGE Featuring a fitness center, lounge, cafĂŠ, study areas and a secured private parking garage, living at The Edge at Cleveland State University will make off-campus housing feel like part of the campus.

28


29


30 MILLION SQUARE FEET Clayco has built TEN facilities for Amazon across the United States with THREE more currently under construction in California (below), Ohio and Maryland.

30


31


CENTENE CALL CENTER This 105,000 square-foot, multi-level call center in Farmington, Missouri will also include an adjacent day care facility for employees.

32


AMAZING DATA. AMAZING INSIGHTS. MU/DAI facilitated an impromptu design sprint with the Miller Family Heart & Vascular Institute at the Cleveland Clinic. 33


STATE-OF-THE-ART MEDICINE Once complete, the Cook County Central Campus Health Center will provide medical oncology, infusion, dental, general medicine, oral health, dermatology, ophthalmology, and other specialty out-patient services. In addition to five levels of administrative and professional office space, there is also a new emergency drive and access road realignments.

34


35


36


GIVING BACK Giving their time and talents, Construction Career Development Initiative (CCDI) connects youth in underserved communities with career opportunities in construction. Recently, CCDI hosted its 2nd Annual Bowling Night for our mentors and students (above). Darius Wherry, a graduate of North Tech High School, was awarded a “Build Our Future Scholarship� and is now attending Missouri Western State University, where he is studying Civil Engineering (left).

37


CENTER OF CAMPUS The Washington University School of Medicine in St. Louis and BJC HealthCare teamed with Clayco to build their new 12-story office building at the heart of the growing medical campus in the Central West End. The Mid Campus Center (MCC) consolidated medical offices that were housed at the Barnes-Jewish Center for Outpatient Health and the Washington University Medical Center campus community. 38


39


40


ART & SCIENCE OF CURTAINWALL Ventana designs, supplies, and installs high performing curtain wall faรงade systems. By working closely with the design team, Ventana ensures a competitively priced faรงade that is water and air tight and allows for optimal thermal control of the interior space.

41


CARBON FIBERS The new 670,370-square-foot facility is three-quarters of a mile long. Toray Carbon Fibers is a major supplier of advanced materials to the aerospace industry. 42


COLLABORATION Alone we are smart, together we are brilliant. 43


44


TOTAL ECLIPSE On August 21st, the St. Louis office was in the path of TOTALITY and for 1 minute and 32 seconds witnessed a total eclipse.

45


46


LOGISTICAL PROXIMITY With close proximity to the Norfolk Southern rail line and Rickenbacker International Airport in Columbus, Ohio, the one-million-square-foot Ashville Pike development will provide access to major distribution and supply routes within the region.

47


48


ST. LOUIS COLLEGE OF PHARMACY Forum Studio designed this 7-story, 193,000-square-foot building, built by Paric Corporation. They worked with Ventana, who supplied and installed 40,000 square feet of exterior curtain wall. Concrete Strategies also provided the flatwork, tilt-up and precast concrete.

49


50


NATIONAL PRIDE Clayco was proud to salute the arrival of the The traveling Vietnam Veterans Memorial Wall replica at our 310 Innovation Boulevard project site in State College, PA. The rolling thunder escort was a powerful display as it paraded through Innovation Park. 51


GROWING ST. LOUIS Bob Clark and The Honorable Lyda Krewson, City of St. Louis Mayor, are discussing aspirational regional plans.

52


OFFICE WITH A VIEW In a joint venture with TW Constructors, Clayco built a 210,000-square-foot corporate headquarters for World Wide Technology on the lake at Westport Plaza in St. Louis. The sixstory building features a unitized curtain wall with structurally glazed granite tile on the lower levels and houses over 1,000 World Wide Technology employees. 53


54


ARE YOU READY FOR SOME FOOTBALL? Clayco and Turner are building a 107,000-square-foot Football Performance Center adjacent to the Memorial Stadium at the University of Illinois at Urbana-Champaign. The new facility will house football conference rooms, sports medicine areas, physical training areas as well as football operations.

55


56


EASY & AFFORDABLE America’s neighborhood general store is growing all over North America! Clayco is breaking ground on a fifth facility for Dollar General in Longview, Texas while finishing one in Amsterdam, New York and Atlanta.

57


TECHNOLOGY TEAM IMPROVEMENTS Forum Studio completed the workplace strategy and tenant improvements for Enterprise Holdings’ IT team, which enhances their collaborative and mobile work style.

58


STYLE & COMFORT Clayco built this original 300,000-square-foot warehouse, then constructed the 300,000-square-foot addition in 1997 and most recently completed another 300,000-square-foot addition for Soft Surroundings, a comfort clothing line for women, headquartered in Mexico, Missouri.

59


WORLD LEADER IN AVIATION PRODUCTS In business since 1905, the Continental Motor’s new 278,000-squarefoot manufacturing facility in Mobile, Alabama will produce many different types of aviation products.

60


CONTROL CENTER Clayco is currently building a 22,790-square-foot mission critical control center for OG&E in Oklahoma City.

61


Parking

Shepherdess Sculpture

Concert Lawn

Reestablished Woodland

Accessible Walk

Allerton Mansion

ber Rd

Entry Drop-off

Old Tim

Grand Drive

Carriage walk

Gate House

Accessible Parking

PRECONSTRUCTION EFFORTS Clayco is currently in the preconstruction phase of David J. And Debra C. Rathje Allerton Park Entry at The Allerton Mansion University Grand Driveof Illinois at Urbana-Champaign. Monticello, Illinois

NORTH

PREPARED FOR:

SCALE: 1”=20’

0’

10’

20’

40’

ISSUE DATE: September 20, 2017 All drawings are preliminary and subject to change. © 2017 Hitchcock Design Group

62

IN ASSOCIATION WITH:


63


64


RESEARCH & DEVELOPMENT Pfizer, Inc., one of the world’s premier innovative biopharmaceutical companies, hired the integrated CRG/Clayco/Forum team + EwingCole team to develop, design and build their world class BioPlace facility in Chesterfield, Missouri. The 294,000-square-foot building reflects Pfizer’s highest standards for excellence, quality, safety and value.

65


UPLIFT DATA PARTNERS helps Clayco track the progress on job sites by providing weekly drone photos and videos, as well as utility linework overlays. The overlays are crucial for a project, like the example shown above, which have complex chemical drainage and storage utilities built into the design.

66


PEOPLE are at the heart of what Uplift Data Partners is all about. It’s our people that make the difference and are the core of our business and culture. 67


PARTNERSHIP With HOK as the architect, Clayco was proud to partner with Alberici and S.M. Wilson on BJC HealthCare’s Phase I of the Campus Renewal Project, which modernized and expanded one of the largest healthcare campuses in the nation.

68


PHARMACEUTICAL PLANNING This 432,000-square-foot facility for Bausch + Lomb includes a 38-foot clear height, temperature controlled warehouse, an ESFR sprinkler system, 42 loading docks and 101 trailer spaces.

69


BRANDED BUILDINGS CRG is now introducing “THE CUBE” across North America. Coming soon to a town near you!

THE CUBE at NorthPark Distribution Center | St. Louis, MO

70

THE CUBE at NorthPort Commerce Center | Savannah, GA


THE CUBE at Locust Grove Distribution Center (Phase I) | Locust Grove, GA

THE CUBE at Bridgeport Mega-Site (Phase I) | Atlanta, GA

71


CENTENE CENTRE Campus expansion underway. 72


73


EARLE HALL was the first building completed for the Pennsylvania State University East Halls Development project, which will continue through 2022.

74


75


BUILDING INDUSTRIAL PARKS With one facility completed in June of 2017, Clayco currently has two buildings under construction in Wilkes-Barre, Pennsylvania for NorthPoint Development.

76


77


78


HIGHER EDUCATION Clayco recently completed The Hive Residence Hall Complex for The Savannah College of Art and Design (SCAD) and is starting on a new project for SCAD on their Atlanta Campus (left). 79


CULTURAL EXPERIENCE Clayco participated in its first ever Hindu Groundbreaking rituals for the TVS - Sundaram-Clayton Limited distribution center in South Carolina.

80


81


MANUFACTURING EXPERTISE Gestamp’s 280,000-square-foot automotive stamping facility in Alabama (above) and San-J International’s 60,000-square-foot manufacturing plant addition in Richmond, Virginia (right) are both state-of-the-art manufacturing facilities.

82


83


84


85


INCREASING JOBS The new Kohl’s 937,000-square-foot distribution center in Plainfield, Indiana brought 900 new jobs to the area. 86


87


REVIVING MAPLEWOOD Being built by Holland Construction Services, Forum Studio is the architect of the Sunnen Station Apartments which will feature a swimming pool, sun deck, barbeque patio, a sport court, and a gated parking lot. This is one of the first new apartment complexes to be built in Maplewood, Missouri in several years. 88


89


90


“I feel like I’m paving the way for others... Not just women asking me about construction, but men twice my age are coming to me for guidance on how to get in the industry and what to do.” KORI JAMISON, CLAYCO, JOURNEYMAN CARPENTER Cook County Central Campus Health Center, Chicago, IL

91


92


93


94


TRAINING EFFECTS The Clayco gym underwent a much needed renovation this past spring.

95


SUCCESS DEPENDS ON WORKING AS ONE TEAM For almost three years Clayco has worked alongside DLA+ Architecture & Interior Design, Mackey Mitchell Architects (MMA), and Forum Studio’s landscape team to dramatically transform East Halls, a large residence hall campus at The Pennsylvania State University.

96


97


SHAW INDUSTRIES Developed by CRG, this 1,000,000-square-foot build-to-suit warehouse will be used to store flooring materials manufactured in Georgia and exported all over the world through the Port of Savannah. 98


99


OWNER TOUR The Midwest Team at CVS Health took a tour of their new distribution center going up in the Kansas City area. 100


101


SPORTS HISTORY Clayco partnered with Turner Construction Company to complete a $150 million renovation and expansion to save the historic State Farm Arena at the University of Illinois at Urbana-Champaign.

102


103


INDUSTRY LEADER This new 160,000-square-foot food processing and storage facility in Opelika, Alabama, will help Golden State Foods continue as an industry recognized leader in efficiency and quality service.

104


105


WELL TRAVELED ROAD Crossroads 55 is a 1,110,000-square-foot distribution facility near the Crossroads of America, Interstate 80 and 55, which are the two most traveled roads in the country.

106


View from North-West

UP-SCALE HOUSING Developed by CRG and designed with the medical professional and student in mind, the Fort Worth Apartments will feature an array of amenities including a 415 poolHEMPHILL and deckSTREET area with fire pits, kitchen and multiple grilling CO-DEVELOPER stations, a fitness center, club lounge and business center. FORTH WORTH, TX

107


108


109


BEYOND COCOA Developed by Prologis, this 750,000-square-foot refrigerated facility for Lindt Swiss Chocolate in Tracy, California will use the finest cocoa and premium ingredients from world renowned growing regions in their chocolate.

110


CHARITABLE TRADITIONS Team Clayco rides and supports Pedal the Cause because we all have seen what cancer does and we’ve seen victories and defeats along the way. Since 2011, Team Clayco has raised $355,940 for cancer research directly benefiting Siteman Cancer Center and St. Louis Children’s Hospital.

111


112


FOSTERING CREATIVITY The Siebel Center for Design at the University of Illinois at Urbana-Champaign will provide a new means of channeling students’ passion and creativity with a culture of multi-disciplinary education and student-led problem solving.

113


CURRENT PROJECT LOCATOR MAP 01. LINDT SWISS CHOCOLATE PRODUCTION FACILITY Tracy, CA (pg. 110)

02. AMAZON AR SORT FULFILLMENT CENTER Fresno, CA (pg. 30)

03. JET AVIATION-VAN NUYS AIRPORT Los Angeles, CA (pg. 92)

04. DOW XPS PACIFIC NORTHWEST MANUFACTURING FACILITY Burley, ID (pg. 12)

05. FORT WORTH APARTMENTS Fort Worth, TX (pg. 107)

06. DOLLAR GENERAL DISTRIBUTIONWAREHOUSE Longview, TX (pg. 56)

07. OG&E MISSION CRITICAL CONTROL CENTER Oklahoma City, OK (pg. 61)

08. OG&E METRO HARDENING Oklahoma City, OK (pg. 11)

09. AMAZON NON-SORT FACILITY Edgerton, KS (pg. 30)

10. INLAND PORT WAREHOUSE COMPLEX Edgerton, KS (pg. 24)

11. AMAZON AR SORT FULFILLMENT CENTER Kansas City, KS (pg. 30)

12. CVS HEALTH MIDWEST DISTRIBUTION CENTER Kansas City, KS (pg. 100)

13. SOFT SURROUNDINGS WAREHOUSE Mexico, MO (pg. 59)

14. CENTENE CALL CENTER Farmington, MO (pg. 32)

15. EVERLY ON THE LOOP St. Louis, MO (pg. 8)

16. WASHINGTON UNIVERSITY IN

ST. LOUIS/BJC MID-CAMPUS CENTER St. Louis, MO (pg. 38)

114

17. BJC HEALTHCARE CAMPUS RENEWAL PROJECT St. Louis, MO (pg. 68)

18. THE CUBE AT NORTHPARK DISTRIBUTION CENTER St. Louis, MO (pg. 70)

19. ST. LOUIS COLLEGE OF PHARMACY St. Louis, MO (pg. 48)

31. WILLIS TOWER TRANSFORMATION Chicago, IL (pg. 6)

32. COOK COUNTY CENTRAL CAMPUS HEALTH CENTER Chicago, IL (pg. 34)

33. MILWAUKEE & ARMITAGE APARTMENTS Chicago, IL (pg. 10)

20. WORLD WIDE TECHNOLOGY

34. CROSSROADS 55 DISTRIBUTION

21. ENTERPRISE HOLDINGS WORKPLACE

35. DOLLAR GENERAL DISTRIBUTION

22. DELMAR GARDENS OFFICE BUILDING

36. AMAZON AR SORT FULFILLMENT

CORPORATE HEADQUARTERS St. Louis, MO (pg. 53) STRATEGY & TI St. Louis, MO (pg. 58)

Chesterfield, MO (pg. 99)

23. PFIZER BIOPLACE Chesterfield, MO (pg. 64)

24. SUNNEN STATION APARTMENTS Maplewood, MO (pg. 88)

25. CENTENE CENTRE Clayton, MO (pg. 72)

26. ALLERTON PARK ENTRY AT

UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN Urbana-Champaign, IL (pg. 62)

27. FOOTBALL PERFORMANCE CENTER AT UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN Urbana-Champaign, IL (pg. 55)

28. STATE FARM ARENA RENOVATION AT UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN Urbana-Champaign, IL (pg. 102)

29. SIEBEL DESIGN CENTER AT

UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN Urbana-Champaign, IL (pg. 113)

30. AMAZON AR SORT FULFILLMENT CENTER Monee, IL (pg. 30)

FACILITY Channahon, IL (pg. 106) CENTER Janesville, WI (pg. 56) CENTER Kenosha, WI (pg. 30)

37. AMAZON SORTATION FACILITY Kenosha, WI (pg. 30)

38. KOHL’S DISTRIBUTION CENTER Plainfield, IN (pg. 86)

39. AMAZON SORT FULFILLMENT CENTER Jeffersonville, IN (pg.30)

40. AMAZON NON-SORT FACILITY Cleveland, TN (pg. 30)

41. CONTINENTAL MOTOR’S

MANUFACTURING FACILITY Mobile, AL (pg. 60)

42. GESTAMP AUTOMOTIVE PRODUCTION FACILITY McCalla, AL (pg. 82)

43. GOLDEN STATE FOODS Opelika, AL (pg. 104)

44. ASHVILLE PIKE 1 SPECULATIVE WAREHOUSE Lockbourne, OH (pg. 46)

45. AMAZON AR SORT FULFILLMENT CENTER Etna, OH (pg. 30)


04

66 36 35 37 30-34

01 02 09 10

11 12

13

15-25

2629

46 47

61 62

39

58

14

40

07 08

65

44 45

38

03

63 64

55 56

59 60

57

48-50 42 05

51 43

52-54

06 41

46. THE EDGE AT CLEVELAND STATE UNIVERSITY Cleveland, OH (pg. 28)

47. AMAZON AR SORT FULFILLMENT CENTER North Randall, OH (pg. 30)

48. THE CUBE AT BRIDGEPORT MEGA-SITE (PHASE 1) Atlanta, GA (pg. 70)

49. SAVANNAH COLLEGE OF ART

AND DESIGN RESIDENCE HALLS ATLANTA Atlanta, GA (pg. 78)

50. DOLLAR GENERAL DISTRIBUTION CENTER Atlanta, GA (pg. 56)

51. THE CUBE AT LOCUST GROVE

DISTRIBUTION CENTER (PHASE 1) Locust Grove, GA (pg. 70)

52. THE HIVE RESIDENCE HALL COMPLEX AT SAVANNAH COLLEGE OF ART AND DESIGN Savannah, GA (pg. 79)

53. THE CUBE AT NORTHPORT COMMERCE CENTER Savannah, GA (pg. 70)

54. SHAW INDUSTRIES WAREHOUSE Port Wentworth, GA (pg. 98)

55. TORAY AEROSPACE MANUFACTURING PLANT Spartanburg County, SC (pg. 42)

56. BAUSCH + LOMB PHARMACEUTICAL WAREHOUSE Greenville, SC (pg. 69)

57. TVS-SUNDARAM-CLAYTON LIMITED DISTRIBUTION CENTER Columbia, SC (pg. 80)

58. AMAZON NON-SORT FACILITY Dinwiddie, VA (pg. 30)

59. DOMINION ENERGY CORPORATE HEADQUARTERS Richmond, VA (pg. 4)

60. SAN-J INTERNATIONAL

MANUFACTURING PLANT Richmond, VA (pg. 83)

61. 310 INNOVATION BOULEVARD State College, PA (pg. 51)

62. PENN STATE EAST HALLS

DEVELOPMENT State College, PA (pg. 74, 96)

63. NORTHPOINT DEVELOPMENT Wilkes-Barre, PA (pg. 76)

64. CHEWY.COM PET FOOD FULFILLMENT CENTER Luzerne County, PA (pg. 105)

65. AMAZON AR SORT FULFILLMENT CENTER Robbinsville, NJ (pg. 30)

66. DOLLAR GENERAL DISTRIBUTIONWAREHOUSE Amsterdam, NY (pg. 56)

115


A DAY IN THE LIFE OF CLAYCO claycorp.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.