INTERACTIVE HYBRID FSFSSF SFSFSFFS SF FSFSFSSF FS SFSFSFFS SF FSFSFSSF SFSF FSFS
content campus as a garden - James Barker
produced by lerone smalls and chen fang, clemson university all rights reserved.
site analysis concept sun stuty site plan floor plan mechanical system structure rendering
1 4 6 9 10 14 16 18
content campus as a garden - James Barker
produced by lerone smalls and chen fang, clemson university all rights reserved.
site analysis concept sun stuty site plan floor plan mechanical system structure rendering
1 4 6 9 10 14 16 18
Establish a community that will seamlessly
N
SiTE photo
1
context map
Establish a community that will seamlessly
N
SiTE photo
1
context map
TEMPERATURE
SOLAR ORIENTATION
Y-beach
JAN
east
12hrs
west
Lightsey Bridge
OCT
1hr
APR
Armory
SOLAR ORIENTATION
TEMPERATURE
SOLAR PATH
ANNUAL WINDS NORTH
30mph
Old Stone Church
hours
18mph
>200 6mph
WEST
EAST
<20
SOUTH
SOLAR PATH Facilities
Roads
Lamaster pond
old trees 2
Train Track
new landscape
new trees
Grand grass
Research facilities
recreations
ANNUAL WINDS
places of worships 3
bus stop
food market
TEMPERATURE
SOLAR ORIENTATION
Y-beach
JAN
east
12hrs
west
Lightsey Bridge
OCT
1hr
APR
Armory
SOLAR ORIENTATION
TEMPERATURE
SOLAR PATH
ANNUAL WINDS NORTH
30mph
Old Stone Church
hours
18mph
>200 6mph
WEST
EAST
<20
SOUTH
SOLAR PATH Facilities
Roads
Lamaster pond
old trees 2
Train Track
new landscape
new trees
Grand grass
Research facilities
recreations
ANNUAL WINDS
places of worships 3
bus stop
food market
concept
countour
orientation
foot print
entrance
roads
pedestrian
retaining walls
conceptual drawing WOODLAND
WOODLAND
COMMUNITY
concept diagram
4
collage
5
concept
countour
orientation
foot print
entrance
roads
pedestrian
retaining walls
conceptual drawing WOODLAND
WOODLAND
COMMUNITY
concept diagram
4
collage
5
Sun strategy west
8 am
10 am
12 pm
2 pm
4 pm
8 am
10 am
12 pm
2 pm
4 pm
Spring
summer
fall
winter Sun strategy south Spring
street view
summer
fall
winter
6
7
Sun strategy west
8 am
10 am
12 pm
2 pm
4 pm
8 am
10 am
12 pm
2 pm
4 pm
Spring
summer
fall
winter Sun strategy south Spring
street view
summer
fall
winter
6
7
DN
236.25
units map
8
9
DN
236.25
units map
8
9
REF.
DW
DN
REF.
UP
DW
DW REF.
51 STUDIO & ADA UNITS levels 1 bedrooms 1 bathrooms 1 terrace 0 inrerior sq feet 400 exterior sq feet 400 total sq feet 800
REF.
DW
36 two-bedroom UNITS levels 2 bedrooms 2 bathrooms 1.5 terrace 1 inrerior sq feet 800 exterior sq feet 200 total sq feet 1000 10
11
REF.
DW
DN
REF.
UP
DW
DW REF.
51 STUDIO & ADA UNITS levels 1 bedrooms 1 bathrooms 1 terrace 0 inrerior sq feet 400 exterior sq feet 400 total sq feet 800
REF.
DW
36 two-bedroom UNITS levels 2 bedrooms 2 bathrooms 1.5 terrace 1 inrerior sq feet 800 exterior sq feet 200 total sq feet 1000 10
11
family units
DN
DN
DN
second Floor
38
third Floor
four-bedroom UNITS
levels
3 bedrooms 4 bathrooms 2.5 terrace 2 1200 exterior sq feet 400 total sq feet 1600
UP
DN
DW
UP
REF.
REF.
DW
inrerior sq feet
ground Floor
second Floor
12
REF.
UP
DW
20 family units levels 2 bedrooms 3 bathrooms 2.5 terrace 1 inrerior sq feet 1200 exterior sq feet 200 total sq feet 1400
ground Floor
13
family units
DN
DN
DN
second Floor
38
third Floor
four-bedroom UNITS
levels
3 bedrooms 4 bathrooms 2.5 terrace 2 1200 exterior sq feet 400 total sq feet 1600
UP
DN
DW
UP
REF.
REF.
DW
inrerior sq feet
ground Floor
second Floor
12
REF.
UP
DW
20 family units levels 2 bedrooms 3 bathrooms 2.5 terrace 1 inrerior sq feet 1200 exterior sq feet 200 total sq feet 1400
ground Floor
13
Mechanical system perspective Outgoing Air
Fresh Air
Fresh Air Outgoing Air
Outgoing Air
Fresh Fresh Air Air
FreshFresh Air Air
Fresh Air
Mechanical system plan
zehnder comfofond system
14
15
Fresh FreshAir Air
Mechanical system perspective Outgoing Air
Fresh Air
Fresh Air Outgoing Air
Outgoing Air
Fresh Fresh Air Air
FreshFresh Air Air
Fresh Air
Mechanical system plan
zehnder comfofond system
14
15
Fresh FreshAir Air
facade section detail
[a] Roof Construction 1// EPDM layer 2// SSTL flashing 3// 2.5” Rigid Insulation 4// 8” Cross Laminated Timber
[b] floor Construction 5// 6” Cross Laminated Timber 6// 13” Service Space 7// Suspended Ceiling System 8// Sound Attenuation Layer 9// 5/8”G.w.b horizontally hung
[c] Facade Construction 10// heartwood pine 11// heartwood pine 12// battens 13// waterproof membrane 14// rigid iso insulation 15// 4”cross laminated timber
[d] Foundation Construction 16// 6” Monolithic slab 17// rigid insulation 18// gravel 19// 1’2 footing
1 3 4 2
[e] Below Grade Construction 20// gravel 21// drainage pipe 22// sheet waterproofing membrane
[A] parapet Construction 1// SSTL Parapet Cap 2// SSTL flashing 3// CLT 4” Vert. panel 4// perforated metal screen
[b] Rain Screen Construction 5// perforated metal screen 6// Alum. top hinged outswing window 7// metal screen Support strut 8// Waterproof Membrane 9// sstl flashing 10// sloped rigid insulation 11// intermittent stl tube 20” o.c.
1
[c] roof terrace Construction 12// 3” Pavers 13// Drainage grate 14// sloped rigid insulation 15// 6” clt panels-5 layers 16// drop ceiling
2
3
rainscreen detail
[d] Demising wall Construction 17// 5/8” g.w.b 18// 1/2” sound attenuation panel 19// 4”clt panel-3 layers
4
+.8
+.8
24 20
roof drain detail 5 6 7 8
ROOF SYSTEM
ABOVE FLOORS Dead and live loads
9 10 11
5 6789
12 13 14 15 16
LOAD & SHEAR WALLS
facade plan detail
17 18 19
FOUNDATION Dead and live loads
16
16 17 18 19
20 2122
00
FF -.8
00FF
17
facade section detail
[a] Roof Construction 1// EPDM layer 2// SSTL flashing 3// 2.5” Rigid Insulation 4// 8” Cross Laminated Timber
[b] floor Construction 5// 6” Cross Laminated Timber 6// 13” Service Space 7// Suspended Ceiling System 8// Sound Attenuation Layer 9// 5/8”G.w.b horizontally hung
[c] Facade Construction 10// heartwood pine 11// heartwood pine 12// battens 13// waterproof membrane 14// rigid iso insulation 15// 4”cross laminated timber
[d] Foundation Construction 16// 6” Monolithic slab 17// rigid insulation 18// gravel 19// 1’2 footing
1 3 4 2
[e] Below Grade Construction 20// gravel 21// drainage pipe 22// sheet waterproofing membrane
[A] parapet Construction 1// SSTL Parapet Cap 2// SSTL flashing 3// CLT 4” Vert. panel 4// perforated metal screen
[b] Rain Screen Construction 5// perforated metal screen 6// Alum. top hinged outswing window 7// metal screen Support strut 8// Waterproof Membrane 9// sstl flashing 10// sloped rigid insulation 11// intermittent stl tube 20” o.c.
1
[c] roof terrace Construction 12// 3” Pavers 13// Drainage grate 14// sloped rigid insulation 15// 6” clt panels-5 layers 16// drop ceiling
2
3
rainscreen detail
[d] Demising wall Construction 17// 5/8” g.w.b 18// 1/2” sound attenuation panel 19// 4”clt panel-3 layers
4
+.8
+.8
24 20
roof drain detail 5 6 7 8
ROOF SYSTEM
ABOVE FLOORS Dead and live loads
9 10 11
5 6789
12 13 14 15 16
LOAD & SHEAR WALLS
facade plan detail
17 18 19
FOUNDATION Dead and live loads
16
16 17 18 19
20 2122
00
FF -.8
00FF
17
View from pond
view of meadow 18
19
View from pond
view of meadow 18
19
20
view of terrace
21
20
view of terrace
21