PRIMARY SCHOOL FACILITY CONDITIONS
BUILDING ENVELOPE IMPROVEMENTS
PS-BE-1 Priority 1 – Replace Roof on 1999 1st Grade Addition and Multipurpose Room Addition
• Removal of old roof systems & wet insulation / deteriorated wood blocking.
• Polyisocyanurate insulation layers. R-30 with a minimum positive slope of 1/8" per foot to ensure proper drainage.
• Recovery insulation board to accept new roof system & provide a stop gap against thermal bridging from insulation fasteners.
• Multiply modified built-up roof system with gravel surfacing. Provides a "severe hail" rating.
• Pre-finished sheet metal copings & counterflashing at all perimeters and projections to protect against damage and UV degradation.
•
PS-BE-2 Priority 2 – Replace 1999 and 2001 Built Up Roofs Serving Office Area, Kitchen and Pre-K Wing
• Removal of old roof systems & wet insulation / deteriorated wood blocking.
• Polyisocyanurate insulation layers. R-30 with a minimum positive slope of 1/8" per foot to ensure proper drainage.
• Recovery insulation board to accept new roof system & provide a stop gap against thermal bridging from insulation fasteners.
• Multiply modified built-up roof system with gravel surfacing. Provides a "severe hail" rating.
• Pre-finished sheet metal copings & counterflashing at all perimeters and projections to protect against damage and UV degradation.
PS-BE-1&2 Benefits
• Extend life of building
• Reduce energy cost
• Reduce leaks
• Reduce operating and maintenance expenses
BUILDING ENVELOPE IMPROVEMENTS
Install Through-Wall flashing at Steel Lintels, Remove Corrosion From Structural Steel Lintels and Coat with Corrosion Inhibiting Paint, Install Sheet Metal Fashing with Drip Edge Where Necessary Within the Next 3 Years
Through-wall flashing was not originally present at window, door, and other openings. However, drip edge flashing appeared to have been added at a few locations. Exposed steel lintels at many locations are forming pack rust. Through-wall flashings are not present on these lintels. Lintels over and adjacent to window openings in brick cladding are corroded. Pack rust formation can apply pressure on the brick cladding and cause deterioration of the cladding. Corrosion also results in the loss of section of the steel lintels, which reduces strength and stiffness of the steel lintels. This condition warrants repair to prevent further damage to embedded steel and brick cladding, and to prevent water entry into and through the exterior walls.
The exposed steel should be cleaned, corrosion removed and coated with a corrosion inhibiting paint to minimize future corrosion/ deterioration. Install through-wall flashing at existing steel lintels. Install sheet metal flashing with drip edge where necessary.
PRIMARY SCHOOL FACILITY CONDITIONS
BUILDING ENVELOPE IMPROVEMENTS
PS-BE-3 Install Through-Wall Flashing at Steel Lintels, Remove Corrosion from Structural Steel Lintels and Coat with Corrosion Inhibiting Paint, Install Sheet Metal Flashing with Drip Edge Where Necessary Within the Next 3 Years.
• Install through-wall flashing
• Clean and paint steel lintels
• Install sheet metal flashing with drip edge where needed
PS-BE-3 Benefits
• Extend life of building
• Reduce leaks
• Reduce operating and maintenance expenses
BUILDING ENVELOPE IMPROVEMENTS
Repoint Mortar Joints and Replace Cracked/Spalled Brick, Repair Bricks at Steel Bolts and Anchors
In general, the brick masonry façade appears to be in good condition for its age.
Cracked mortar joints between the brick units were noted at several locations and vertical cracking was observed in isolated areas. Cracked, spalled, and broken bricks were also observed. Localized mortar deterioration and isolated brick cracking/spalling is present. These conditions are generally attributable to long term exposure to the elements. Vertical cracks located at corners are likely attributable to a lack of control joints on the façade. Step cracking in the brick facade is likely due to differential settlement.
Mortar is missing at one corner of brick full height. The joint with missing mortar full-height was likely cut for an expansion joint, but no sealant was installed.
General maintenance of brick cladding, including tuckpointing and replacement of damaged brick, is not needed at this time. However, a brick maintenance project to repoint deteriorated mortar joints and replace cracked/spalled brick should be planned in approximately 4 to 6 years.
Steel rods and plates are protruding from the façade at a few locations. The brick surrounding these rods and plates has rust stains and the brick has spalled. The unfinished steel rod and plate corroded due to being exposed to the elements. Although some brick may have broken during the original installation, the majority of the brick damage at lintels is due to moisture intrusion/condensation through the bolt penetrations and the freeze/thaw cycle cracking and spalling the brick.
The purpose of this steel should be investigated further to determine whether they can be removed or if they require protection while repairing the adjacent brick. If abandoned, remove and repair brick masonry. If in use, determine if thermal transfer is occurring and eliminate thermal transfer during the brick repairs.
BUILDING ENVELOPE IMPROVEMENTS
PRIMARY SCHOOL FACILITY CONDITIONS
PS-BE-4 Repoint Mortar Joints and Replace Cracked/Spalled Brick, Repair Bricks at Steel Bolts and Anchors
• Replace brick (approximately 400)
• Repoint 2500 square feet
• Investigate the steel rod and plate to determine if needed
• If abandoned, remove and repair brick
• If in use, eliminate thermal transfer during brick repair
PS-BE-4 Benefits
• Extend life of building
• Reduce operating and maintenance expenses
BUILDING ENVELOPE IMPROVEMENTS
Replace Sealant at Doors, Windows, and Control Joints
Exterior sealant at windows, doors, corners, and other areas of the façade is in poor condition. Weathering, splitting, debonding, and cracking of sealant was observed throughout the façade.
Exterior sealants deteriorate as a result of exposure to UV light, moisture, and temperature cycles. Sealants typically have a lifespan of 8-12 years depending on material, material quality, and application/configuration.
Based on observed conditions, it appears that the sealants on the building have reached or exceeded their useful life.
Sealants are an important component of the exterior building envelope and in many cases are the first line of defense in preventing water entry into and through exterior walls. Deteriorated sealants greatly increase the potential for water entry.
Replace all window and door perimeter, control joint, and penetration sealant at the building façade, as well as any miscellaneous sealants present. These repairs should be completed in the next 0-3 years.
PRIMARY SCHOOL FACILITY CONDITIONS
BUILDING ENVELOPE IMPROVEMENTS
PS-BE-5 Replace Sealant at Doors, Windows, and Control Joints
• Replace sealant (approximately 6,000 LF)
PS-BE-5 Benefits
• Extend life of building
• Reduce operating and maintenance expenses
BUILDING ENVELOPE IMPROVEMENTS
Replace Three (3) Sets of Exterior Double Doors and Nine (9) Single Exterior Doors in the Next Three Years.
PRIMARY SCHOOL FACILITY CONDITIONS
The hollow metal swing doors are corroded at the bottom of the door frames. The door and door frame corrosion are due to water ponding against the building. The weatherstripping has failed at the perimeter of the garage doors. We recommend replacing the indicated exterior doors, including the hardware and locks. Re-key all the door locks to comply with the Districtwide Schlage standard.
PRIMARY
PRIMARY SCHOOL FACILITY CONDITIONS
BUILDING ENVELOPE IMPROVEMENTS
PS-BE-6 Replace Three (3) Exterior Double Doors and Nine (9) Single Doors Including Hardware and Locks. Re-Key all Door Locks to Comply with District Wide Schlage Standard
• Replace exterior doors and frames including hardware and locks
• Replace weatherstripping on garage doors
• Re-key all locks to district wide Schlage standard
PS-BE-6 Benefits
• Increase life of structure
• Prevent further deterioration of building
• Improve safety
PRIMARY SCHOOL FACILITY CONDITIONS
MECHANICAL AND PLUMBING
Update Building Automation System to Include Cooler and Freezer Temperatures and Alarms
The Chisago Lakes Primary School building automation system is in good shape and all hardware and software are current.
However, the existing cooler and freezer do not have temperature monitoring or alarms. Nexus recommends adding temperature monitoring and alarms to the cooler and freezer.
The benefits of this controls improvement include improved equipment control and monitoring.
MECHANICAL AND PLUMBING
PS-ME-1 Update Building Automation System to Include Cooler and Freezer Temperatures and Alarms
• Provide new controls for cooler and freezer
• Integrate new existing controls into platform
• Provide all programming required for this improvement
PS-ME-1 Benefits
• Easy to use, modernized system control updates
• Improved building monitoring and maintenance troubleshooting
• Reduced maintenance
MECHANICAL AND PLUMBING
Replace Seven (7) R-22 RTUs and One (1) 2005 Kitchen MAU
There are several rooftop and make-up air handling units serving the Chisago Lakes Primary School that are becoming maintenance problems for the District. These units are listed below.
• 2003 AAON RTU-3 that serves classrooms. This rooftop air handling unit currently has DX cooling and downstream hot water variable air volume (VAV) boxes.
• 2003 AAON RTU-4 that serves classrooms. This rooftop air handling unit currently has DX cooling and downstream hot water variable air volume (VAV) boxes.
• 2003 AAON RTU-5 that serves classrooms. This rooftop air handling unit currently has DX cooling and downstream hot water variable air volume (VAV) boxes.
• 2003 AAON RTU-6 that serves classrooms. This rooftop air handling unit currently has DX cooling and downstream hot water variable air volume (VAV) boxes.
• 2004 AAON RTU-7 that serves the Media Center. This rooftop air handling unit is a single zone unit with DX cooling and hot water heating coils.
• 2005 AAON RTU-8 that serves classrooms. This rooftop air handling unit currently has DX cooling and downstream hot water variable air volume (VAV) boxes.
• 2005 AAON RTU-9 that serves classrooms. This rooftop air handling unit currently has DX cooling and downstream hot water variable air volume (VAV) boxes.
• 2005 AAON Kitchen make-up air handling unit (MAU). This rooftop makeup air handling unit is a single zone unit with DX cooling and gas heating coils.
Nexus recommends replacing the eight (8) rooftop and make-up air handling units one for one with new double wall rooftop air handling units with hot water heating and DX dehumidification. The new rooftop air handling units would come with code compliant filtration, hot water heating coils, chilled water dehumidification coils, access sections, and supply fans with variable speed drives (VSDs).
The benefits of this HVAC improvement include increased system life expectancy, improved DDC scheduling, improved ventilation, increased energy savings, improved occupant comfort, and an improved learning and working environment.
PRIMARY SCHOOL FACILITY CONDITIONS
MECHANICAL AND PLUMBING
PS-ME-2 Rooftop and Make-Up Air Handling Unit Replacements
• Remove existing rooftop and make-up air handling units, piping, and controls
• Provide new double wall rooftop air handling units with hot water heating and DX dehumidification
• Extended new hot water and refrigerant piping to air handling units as required
• Provide variable speed drives for the supply and relief fans
• Provide all roofing and sealing work as required
• Provide DDC controls, sequencing, and programming
• Provide all associated general construction and electrical work as required
PS-ME-2 Benefits
• Upgraded HVAC infrastructure
• Increased ventilation for improved indoor air quality
• Improved temperature control
• Improved occupant comfort
• Reduced maintenance
• Improved learning/work environment
MECHANICAL AND PLUMBING
Add Dehumidification and Powered Relief to Gym Air Handling Unit
The Primary School Gym is currently being served by a 2021 air handling unit (AHU) with hot water heating but no means of dehumidification.
The lack of dehumidification results in higher humidity levels and occupant discomfort in the gym. The gym is also unable to meet the American Society of Heating and Refrigeration Engineer’s (ASHRAE) Thermal Environmental Conditions for Human Occupancy Standard 55. This ASHRAE design standard specifies the combinations of personal and indoor thermal environmental requirements necessary to achieve an occupant comfort satisfaction rate of 80% or greater. These indoor environmental requirements include temperature, thermal radiation, humidity, and air speed.
Nexus recommends adding a new DX dehumidification coil to the air handling unit to allow for dehumidification of the code required ventilation air to the gym. The coil would be mated with a new air-cooled condensing unit (ACCU) and refrigerant piping would be extended to the air handling unit as required.
Nexus also recommends adding powered relief to the gym in lieu of gravity relief. Powered relief systems provide enhanced control, efficiency, and adaptability compared to traditional gravity relief systems, contributing to better overall performance and operational benefits in air handling units.
The benefits of these upgrades include improved equipment scheduling, improved ventilation, increased energy savings, improved occupant comfort, and an improved learning and working environment.
PRIMARY SCHOOL FACILITY CONDITIONS
MECHANICAL AND PLUMBING
PS-ME-3 Add Dehumidification and Powered Relief to Gym Air Handling Unit
• Provide new DX dehumidification coil with mated air-cooled condensing unit
• Extend new refrigerant piping to air handling unit as required
• Install new powered relief fan for gym
• Provide DDC controls, sequencing, and programming
• Provide all associated general construction and electrical work as required
PS-ME-3 Benefits
• Upgraded HVAC infrastructure
• Improved temperature control
• Improved occupant comfort
• Reduced maintenance
• Improved learning/work environment
MECHANICAL AND PLUMBING
Replace 2005 R-22 ACCU Serving Multi-Purpose Room and Associated Coils and Add Ventilation to Maintenance Office
The existing 2005 condensing unit serving the multi-purpose air handling unit is starting to corrode and deteriorate. This 20-year-old condensing unit is still utilizing R-22 refrigerant which has become obsolete and far less efficient than today’s systems.
Nexus recommends replacing this old inefficient air-cooled condensing unit and the mated DX dehumidification coil with a new air-cooled condensing unit and associated DX dehumidification coil with American Society of Heating and Refrigeration Engineer’s (ASHRAE) code compliant refrigerant that is more energy efficient and environmentally friendly. New refrigerant piping would be installed as required for the new refrigerant.
The Maintenance Office 125 currently has no ventilation, which does not meet the current code for ASHRAE 62.1 Ventilation for Acceptable Indoor Air Quality. This code provides the minimum outside air ventilation rates that are required in the breathing zone for specific spaces.
Nexus recommends adding ventilation to the maintenance office from an adjacent air handling unit to bring in the code required ventilation air.
Benefits of these improvements include reduced maintenance, improved system operation, and increased occupant comfort.
MECHANICAL AND PLUMBING
PS-ME-4 Replace 2005 R-22 ACCU Serving Multi-Purpose Room and Associated Coils and Add Ventilation to Maintenance Office
• Provide new DX dehumidification coil with mated air-cooled condensing unit
• Extend new refrigerant piping to air handling unit as required
• Install new exhaust fan system for boiler room
• Provide DDC controls, sequencing, and programming
• Provide all associated general construction and electrical work as required
PS-ME-4 Benefits
• Upgraded HVAC infrastructure
• Improved temperature control
• Improved occupant comfort
• Reduced maintenance
• Improved learning/work environment
MECHANICAL AND PLUMBING
Replace Eight (8) Exhaust Fans
There are several rooftop exhaust fans serving the building that have exceeded their recommended service life and are in need of replacement.
Nexus recommends replacing some of these fans when major work is taking place so the best pricing can be obtained from the contractors. Nexus has budgeted for the replacement of eight (8) existing exhaust fans for the school. Nexus will work along with the District on the priority of which ones want to be replaced.
Fans will be a direct replacement to the original size/capacity but will have premium efficiency motors installed to increase energy savings. The fan size/capacity may be reduced if engineering can justify where over ventilation is occurring.
The benefits of this HVAC improvement will result in increased energy savings, improved flow and reduced maintenance for exhaust fans, and reduced leaks from seals.
PRIMARY SCHOOL FACILITY CONDITIONS
MECHANICAL AND PLUMBING
PS-ME-5 Replace Eight (8) Exhaust Fans
• Replace rooftop exhaust fans with new exhaust fans with associated ductwork
• Provide all roofing and sealing work as required
• Provide DDC controls, sequencing, and programming
• Provide all associated general construction and electrical work as required
PS-ME-5 Benefits
• Upgraded exhaust system infrastructure
• Improved temperature control
• Improved occupant comfort
• Reduced maintenance
• Improved work environment
MECHANICAL AND PLUMBING
Replace One (1) Non-ADA Wash Fountain, Three (3) Non-ADA Drinking Fountains, Add Domestic Hot Water to Twenty (20) Sinks that are Cold Only, and Replace Ten (10) Flush Valves in Toilet Rooms
There are several plumbing devices that are starting to increase in maintenance/non-ADA compliant and should be replaced. See below for this equipment.
• Non-ADA Wash Fountain (Qty 1)
• Non-ADA Drinking Fountains (Qty 3)
• Flush Valve Replacements in Toilet Rooms (Qty 10)
Nexus recommends replacing these existing plumbing fixtures one for one with new fixtures. Plumbing piping would be modified as required for the new fixtures.
Replacing these plumbing fixtures would provide reduced water consumption, reduced maintenance, and extended life expectancy of the plumbing system.
Nexus also recommends adding hot water to the sinks that are currently cold water only (Qty 20) and adding two (2) demand domestic hot water recirculation pumps for the rooms in the 1965 area of the building that have trouble getting hot water in an appropriate amount of time.
Benefits of this work would be reduced maintenance, improved water quality, and improved domestic hot water system.
MECHANICAL AND PLUMBING
PS-ME-6 Replace One (1) Non-ADA Wash Fountain, Three (3) Non-ADA Drinking Fountains, Add Domestic Hot Water to Twenty (20) Sinks that are Cold Only, and Replace Ten (10) Flush Valves in Toilet Rooms
• Demo existing wash station, drinking fountains, and flush valves
• Provide and install new fixtures one for one
• Modify existing plumbing piping as required for new fixtures
• Provide associated general and electrical construction
• Extend new hot water piping to sinks that are currently cold water only
• Provide and install new demand hot water recirculating pumps and piping for areas with current hot water issues
• Provide associated general and electrical construction work as required
PS-ME-6 Benefits
• Improved occupant comfort
• Improved plumbing fixture operation
• Increased equipment life
• Reduced maintenance
MECHANICAL AND PLUMBING
Fix Domestic Cold-Water Crossover Feeding and Replace Leaky Valves Located in Tunnel (Option 7A)
The existing valves and hangers for the domestic water piping in the tunnel have corroded and are starting to fail. This is causing the pipes to not be properly supported and failed valves are causing cold-water crossover/back feeding issues with the hot water system.
Nexus recommends replacing all the valves and hangers in the tunnel with new valves and hangers to ensure proper piping support and prevent cold and hot water crossover.
Replacing these valves and hangers would provide reduced water consumption, reduced maintenance, and extended life expectancy of the plumbing system.
Demo Domestic Piping in Tunnel Including Valves, Install New Domestic Water Piping (Option 7B)
The existing valves and hangers for the domestic water piping in the tunnel have corroded and are starting to fail. This is causing the pipes to not be properly supported and failed valves are causing cold-water crossover/back feeding issues with the hot water system.
Nexus recommends removing all the domestic water piping in the tunnels and installing a new overhead domestic water system throughout the building.
Replacing these valves and hangers would provide reduced water consumption, reduced maintenance, and extended life expectancy of the plumbing system.
MECHANICAL AND PLUMBING
PS-ME-7A Fix Domestic Cold-Water Crossover Feeding and Replace Leaky Valves Located in Tunnel
• Demo existing valves and hangers in tunnel
• Provide and install new valves and hangers as required
• Modify existing plumbing piping as needed
• Provide associated general construction
PS-ME-7A Benefits
• Improved plumbing fixture operation
• Increased equipment life
• Reduced maintenance
PS-ME-7B Demo Domestic Piping in Tunnel Including Valves, Install New Domestic Water Piping
• Demo existing piping, valves, and hangers in tunnel
• Provide and install new domestic water system overhead
• Modify existing plumbing piping as needed
• Provide associated general construction
PS-ME-7B Benefits
• Improved plumbing fixture operation
• Increased equipment life
• Reduced maintenance
PRIMARY SCHOOL FACILITY CONDITIONS
ELECTRICAL, TECHNOLOGY AND SAFETY SYSTEMS
Install 5 Additional Security Cameras and 12 Additional Clocks to Existing Systems. Repair Fire Alarm Interface with HVAC System.
Security System Upgrades
Security cameras are approximately 5-6 years old. Although they still have 3-4 years left of their useful life, there are areas that need better camera coverage for better security.
Clock System Upgrades
The existing clock system is a newer system consisting of wireless clocks that synchronize. However, there are 12 locations where older clocks still remain. These clocks should be replaced to match the newer system so all the clocks in the building synchronize together.
Fire Alarm System Upgrades
The existing fire alarm system is a Notifier system with voice evacuation and was recently installed. However, there is an issue with the system as it relates to interface with the HVAC system. This issue needs to be corrected.
ELECTRICAL, TECHNOLOGY, AND SAFETY SYSTEMS
PS-ES-4 Install 5 Additional Security Cameras and 12 Additional Clocks to Existing Systems. Repair Fire Alarm Interface with HVAC Systems
• Correct alarm code issues with fire alarm system
• Add 5 additional security cameras where coverage is lacking
• Add 12 clocks to existing system
PS-ES-4 Benefits
• Protection and improved reliability
• Improved safety
• Enhance security
PRIMARY SCHOOL FACILITY CONDITIONS
ELECTRICAL, TECHNOLOGY AND SAFETY SYSTEMS
Replace Non-Working Sound System in Multi-Purpose Room
The existing sound system in the Multi-Purpose Room is not working and should be replaced. It is recommended that the system be replaced and tied in with the paging system.
ELECTRICAL, TECHNOLOGY, AND SAFETY SYSTEMS
PS-ES-5 Replace Non-Working Sound System in Multi-Purpose Room
• Replace audio system in multi-purpose room
• Add 5 additional security cameras where coverage is lacking
• Add 12 clocks to existing system
PS-ES-5 Benefits
• Protection and improved reliability
• Improved safety
ELECTRICAL, TECHNOLOGY AND SAFETY SYSTEMS
Install New Burglar Alarm Systems with 10 Motion Sensors and Two Keypads.
PRIMARY SCHOOL FACILITY CONDITIONS
A burglar alarm system is also needed to enhance the security of the building. It is recommended that a burglar alarm system be installed.
ELECTRICAL, TECHNOLOGY, AND SAFETY SYSTEMS
PS-ES-6 Install New Burglar Alarm Systems with 10 Motion Sensors and Two Keypads
• Install new burglar alarm
• Install 10 motion sensors
• Install 2 keypads
PS-ES-6 Benefits
• Protection and improved reliability
• Improved safety
INTERIOR FINISHES AND ADA
High Priority Ceilings and Flooring
The Primary school building overall has been maintained very well, however, there are a few high priority interior finishes needs that should be addressed in the next 0-6 years. Replace ACT ceilings and repaint exposed structures as they have reached the end of their useful life and are showing stains and damage. The carpet in a few areas of the building is also showing wear and tear. Replace the old VCT in corridors with new rubber tiles as part of a District wide standardization. The resilient flooring is showing scratches and stains. Replace VCT flooring with a flooring material that requires less maintenance, such as an LVT.
INTERIOR FINISHES AND ADA
PS-IA-1 High Priority Ceiling Upgrades
• Replace ACT ceiling as noted on the plans in 0-6 years
• Repaint rooms with exposed structures
PS-IA-2 High Priority Flooring Upgrades
• Replace carpet in media center with new carpet tiles
• Replace VCT in corridors with rubber tiles
• Replace VCT and resilient flooring with LVT in areas marked on the plans
PS-IA-1 & 2 Benefits
• Improved building aesthetics
• Extending the life of the interior materials
• Reduced maintenance costs
PRIMARY SCHOOL FACILITY CONDITIONS
INTERIOR FINISHES AND ADA
Low Priority Flooring and Ceilings
The low priority needs to be addressed in the next 7-10 years would include. The ceilings in the four 1st grade classrooms and the adjoining corridor should be replaced. The remaining resilient flooring in the classrooms should be updated with a flooring material that requires less maintenance, such as an LVT.
INTERIOR FINISHES AND ADA
PS-IA-5 Low Priority Ceiling Upgrades
• Replace ACT ceiling as noted on the plans in 0-6 years
• Repaint rooms with exposed structures
PS-IA-6 Low Priority Flooring Upgrades
• Replace VCT in corridors with rubber tiles
• Replace VCT and resilient flooring with LVT in areas marked on the plans
PS-IA-5 & 6 Benefits
• Improved building aesthetics
• Extending the life of the interior materials
• Reduced maintenance costs
CEILINGS
FLOORING
PRIMARY SCHOOL FACILITY CONDITIONS
INTERIOR FINISHES AND ADA
Casework needs
The casework in the classrooms is in need of upgrading. It is showing signs of damage and is not meeting the needs of the users. All of the identified casework should be replaced in the next 6 years.
INTERIOR FINISHES AND ADA
PS-IA-3
High Priority Casework
• Replace existing casework with new upgraded casework
PS-IA-3 Benefits
• Improved building aesthetics
• Extending the life of the interior materials
• Reduced maintenance costs
Casework
PRIMARY SCHOOL FACILITY CONDITIONS
INTERIOR FINISHES AND ADA
High Priority Door Replacement, Hardware and Locks. Re-Key All Door Locks to Comply with District-Wide Schlage Standard.
The majority of the interior door hardware needs to be replaced in the next 3 years. There are also a few doors that need replacement including the hardware. All of the door’s locks need to be re-keyed to comply with the District-Wide Schlage standard.
INTERIOR FINISHES AND ADA
PS-IA-4 High Priority Door Replacement, Hardware, and Locks
• Replace hardware on 23 doors
• Replace 21 single doors and hardware
• Replace 2 double doors
PS-IA-4 Benefits
• Improved building aesthetics
• Extending the life of the interior materials
• Improved functionality of building
Doors & Hardware
SITE IMPROVEMENTS
Add New North Parking and Relocate Walkway and Fencing
The ECFE/pre-K wing does not have a way for parents to drop off/pick up the small children. The new parking lot with 16 stalls and a sidewalk directly to the separate entry will improve access. The relocated fence will also improve the safe walking route to school.
SITE IMPROVEMENTS
PS-SI-1 Add New North Parking and Relocate Walkway and Fencing
• New asphalt parking lot with cub and gutter
• New fencing
• Move ECFE entry to door 16
PS-SI-1 Benefits
• Improved building access
• Separate parent loop for ECFE
• Improved walking path for students
SITE IMPROVEMENTS
Remove and Replace Pavement of the Hard Playground on East & West Sides of Building. Improve Drainage with New Catch Basin.
During the site visit it was observed that the asphalt on the east and west hard play areas had a lot of cracking with signs of previous crack sealing. The east hard play area does not drain properly causing safety issues including ice formation. Both the east and west hard play surfaces need to be removed and replaced with new asphalt. A new catch basin should be added to improve drainage of the east area.
SITE IMPROVEMENTS
PS-SI-2 East Playground
• Remove and replace asphalt pavement
• Fine grading/soil correction
• Add catch basin and pipe
• Remove and replace sections of play curb and play mulch for drainage improvement
PS-SI-3 West Playground
• Remove and replace asphalt pavement
• Fine grading/soil correction
PS-SI-2 & 3 Benefits
• Safer play area
• Improved drainage
PRIMARY SCHOOL FACILITY CONDITIONS
East Playground
West Playground
East Playground
SITE IMPROVEMENTS
Remove and Repair North Loop Driveway, Parking Lot, and South Parking
The North parking lot aesthetically is poor because of numerous patches during previous projects, but the pavement is also starting to fail. Lot could benefit from regrading to improve drainage. With storm sewer possibly extended over to the east play area it may now be possible to extend it further to the north parking and add catch basin(s). The south parking lot and drive also had a few areas where pavement was failing. Some areas of curb and sidewalk throughout the site have cracks and large chips.
SITE IMPROVEMENTS
PS-SI-4 North loop driveway and parking lot
• Remove and replace asphalt
• Concrete pavement spot replacements
• Curb and gutter spot replacements
• Minimal fine grading/ soil correction
PS-SI-5 South parking lot
• Remove and replace asphalt pavement
• Concrete pavement spot replacements
• Curb and gutter spot replacements
• Fine grading/soil correction
PS-SI-4 & 5 Benefits
• Increased safety
• Decreased maintenance issues
• Improves facility aesthetics
PRIMARY
SITE IMPROVEMENTS
East and West Playground Equipment, new curbing and top dress wood chips