Warner Bros. hotel will be the world’s first Warner Bros. themed hotel, comprising 257 rooms over eight levels with a modern decor that celebrates the studio’s movies and television series
Provided these documents are in place and well-defined, and the fit-out is carried out in line with the base build, there shouldn't be any requirements to make any rectifications. However, with offices, we often see base build information specifying one occupant load. Then the interior design layout shows the future usage of the space, which exceeds the approved occupant load. This is often due to open communal spaces such as team assembly areas and cafeterias, where more employees gather in a particular space than anticipated, especially if the office is split over two floors with a central communal space. Similarly, with a mall fit-out, the information provided in the fire strategy is crucial. If, for example, an open space will house a gym, food court or general assembly area with a high occupant load, and the relevant metrics are not provided, there is the potential the project will run into delays and additional costs. In addition to high occupancy levels, interior designers must also take the materials used for finishings into consideration. While the majority of finishing materials comply with the relevant country codes, there are instances where this is not the case. If a selected material doesn't meet the code, it will not be granted civil defence approval. How does Tenable FEC use technology and 3D modelling to assist with projects?
Specific projects require us to take a performance-based design approach. For example, a project may include an atrium, and the design requires a smoke management system to protect the space. In this instance, we will run a 22 | CONSTRUCTION BUSINESS NEWS ME | AUGUST 2021
Computational Fluid Dynamics (CFD) analysis to ensure the available extract and supply air provides a tenable environment. There have also been projects where we have been brought on board at a later stage, only to find there were not be adequate staircases already in place post-construction. In this instance, we will run a CFD and an evacuation model to determine the time it will take for occupants to evacuate safely versus how long the area remained tenable. Provided the tenability time was longer than the evacuation time, the design is deemed safe. What are Tenable's objectives and goals for the next 12 months?
There has been a recent internal restructure to enable our growth and expansion plans for the next twelve months and beyond. We are seeing a variety of projects coming through both our Dubai and Muscat offices. These range from new hotel and residential projects and fit-out projects to data centres and healthcare facilities. Geographically, Saudi Arabia is a target growth market for us, and we are already engaged in elements of the key giga-projects such as The Red Sea Project's Coral Bloom, AMAALA, Diriyah Gate and NEOM. However, people are often quick to overlook the developments taking place in other parts of the Kingdom, and we are excited to be part of projects, ranging from Al Khobar down to Medina. Further afield and COVID-19 permitting, we aim to relaunch our London office in the coming months, which will enable us to work more freely on European projects. WWW.CBNME.COM