Real Estate & Construction Review - New England Success Stories 2009

Page 1

building of america S u c c e ss S t o r i e s

TEAM MEMBERS

New England Edition www.constructionreviews.com

volume 1

2009 Edition

The Resource for Real Estate & Construction Decision Makers


letter Jamie Rawcliffe, photo courtesy of Dale-Murrary.com

from the editor

At Construction Communications, we have dedicated ourselves to serving construction decisionmakers for more than a decade. Through the Real Estate & Construction Review series of publications we have profiled the most unique, challenging and successful new construction and renovation projects throughout the United States. Through the words of owners, developers, architects, contractors, consultants and more, these projects were brought to life in case studies designed to help owners learn from one another’s successes. This publication, the Building of America Success Stories, was created to focus on new technologies, processes and more than can further aid owners in successful construction projects in the future. Consultants, associations, contractors and designers have contributed articles that highlight topics such as integrated project delivery, public private partnerships, and Leadership in Energy and Environmental Design (LEED®). Other topics that are addressed include creative site solutions and innovative use of commonplace materials to achieve stunning design effects for less. Additionally, the publication profiles subcontractors, vendors, suppliers and manufacturers that have played a role in some of New England’s top projects. All the companies involved have been referred for their reliability and were qualified by the general contractor or architect that hired them for a Building of America awarded project. Each of the companies and/or products featured has a unique story to tell about how they can help owners in the New England area. Sincerely, Jamie Rawcliffe Senior Editor

SUCCESS STORIES NEW ENGLAND EDITION Construction Communications (877) 945-4700 CEO Dale Jaslove

ext. 127

President Lance Kamin

ext. 120

Manager of Operations Stacey Nathanson

ext. 125

Editors Amy Pagett Jamie Rawcliffe Assistant Editor Pamela Barnes Art Director Chris Schramm Account Executives Shelly Byarski Dawn DeAngelo Susan Hunsinger Sheila Kamin Project Coordinator Julie Zulch

ext. 129­­­­ ext. 113 ext. 112 586-329-3243 586-218-7139 228-522-0400 ext. 143 ext. 115

Administrative Staff Lori Bagley ext. 142 Janet Bankey ext. 121 Jennifer Barth Wendi Schlacht ext. 108 Anne Seebaldt­ ext. 130 Joan Mallires ext. 110 Publishing Construction Communications 24445 Northwestern Highway, Suite 218 Southfield, MI 48075 Phone: 248-945-4700 Fax: 248-945-4701 www.constructionreviews.com email: editorial@constructionreviews.com The Real Estate & Construction Review is designed to provide accurate and authoritative information in regard to the subject matter covered. The publishers have taken all reasonable steps to verify the accuracy and completeness of information contained in the Real Estate & Construction Review. The publishers may not, however, be held responsible for any inaccuracies or omission of information in any article appearing in the Real Estate & Construction Review. Entire contents copyright 2009 b­­­­­y Construction Communications. All rights re­served. Reproduction or use of editorial content in any manner without written permission is strictly prohibited.


First LEED®-certified fire rescue station in Florida emphasizes the county’s new green building initiatives In Alachua County, Fla., the board

paired with a thermal comfort system

of county commissioners uses the

that will keep everyone more comfort-

best practices when exercising con-

able and at the same time save 20 per-

cepts associated with “green” build-

cent energy. Additionally, 43.5 percent

ings and sustainability. The county’s

of the materials used on the project are

facilities management division has

regional materials, stimulating the local

also been very active in the sustain-

economy and reducing the need to Photos courtesy of Takumi Sullivan

ability and energy-conservation move-

transport materials from far away, and

ment, endorsing the involvement of

language was added in the request

the new station cost $1.8 million

more than 63 percent of the project’s

its employees in various professional

for proposals (RFP) for architecture

to construct and will house two

waste was recycled and diverted from

trade organizations, including the U.S.

and engineering services and construc-

rescue units, #10 and #11, as well as the

landfills. The project was completed

Green Building Council (USGBC) and

tion management services requiring

District 5 Chief.

on time and within budget; the grand

the Construction Owners Association

bidders to have certified LEED® profes-

Bryan Schneider, Capital Projects

opening was held on January 27, 2009.

of America (COAA). Participation in

sionals on staff who understand sus-

Coordinator for Alachua County, said,

In all, the station is a true effort on

local and national organizations keeps

tainable design and construction and

“It was an exciting challenge to take

the part of the board of county com-

employees abreast of state-of-the-art

the LEED® program.

(a previously drawn) non-LEED®-

missioners, the department of public

technologies, industry trends, energy

In keeping with this new direction,

rated project and adapt it to LEED®

safety, and the facilities management

relations and cost-saving opportunities

the county’s new Fire Rescue Station

specifications and standards, still

division to blast Alachua County to

as well as the impact of regional and

10 in East Gainesville is the first LEED®-

remaining within the previous budget

the forefront regarding sustainability,

national changes in the construction

certified fire station in the county,

and timeline.”

water conservation and energy-saving

market on county government.

as well as the entire state of Florida,

Some of the station’s most outstand-

measures. It will not only comply with

In early 2000, the commission passed

earning a gold rating under the LEED®

ing aspects are its sustainable features,

the board’s energy reduction and water

an energy reduction resolution requir-

program. Originally designed back in

including the use of materials with a

conservation policy, but it will also be

ing a 33 percent reduction in energy

early 2000, the project was expected

low emission of volatile organic com-

a genuine success at environmental

and water use. This led the county to

to take 13 months, but was delayed

pounds (VOC) to improve indoor air

stewardship, reducing the county’s car-

develop a countywide energy reso-

due to funding issues. The county later

quality, which makes for a better work

bon footprint.

lution policy. Since then, the county

acquired project funding within the

environment; a solar hot water storage

Alachua County Facilities Manager

has adopted a strategy of designing

bond process. After acquiring the nec-

system for the heating of potable water

Charlie Jackson said, “Building green

and building green buildings that con-

essary funds, the county commission

that saves 70 percent energy; an under-

makes good business sense, as it reduc-

form to the ratings specified under

directed the design team to revise the

ground cistern for rain water reclama-

es operating cost over the life of the

the USGBC’s Leadership in Energy and

plans, ensuring that the project would

tion of up to 60,000 gallons per year;

building and ultimately provides the

Environmental Design (LEED®) pro-

qualify as a green building and meet the

solar tubes for passive lighting, which

county with another high performing

gram. According to the directives of the

LEED® certification standards. February

combined with the building’s windows

and sustainable building.” n

Alachua County Commission, all new

26, 2008 marked the groundbreak-

will provide the facility with daylight

county buildings will be designed and

ing ceremony for Fire Rescue Station

saturation to 75 percent of indoor spac-

— Charlie Ray Jackson is the Alachua

built to meet green standards; so, a new

10. Encompassing 5,521 square feet,

es; and a highly efficient HVAC system

County Facilities Manager.

www.constructionreviews.com

new england


America Needs Successful Construction — And Critical New Tools Can Help Underlying all the debate and

Luchetti has been a recent guest on

anticipation about economic stimu-

the CMAA Radio series of programs,

lus legislation and infrastructure

as well as a panelist in a session

investment is a simple proposition:

on P3s at the association’s 2008

America is going to need to execute

national conference.

a lot of successful construction proj-

“The financial crisis is going to

ects, of all sizes and types, in the

drive this process,” Luchetti says.

years ahead.

“I wish it were not true, I wish it

Meeting this need, though, will

did not happen this way. The crisis

involve more than simply identify-

causes people to be more focused

ing and funding projects that can

on improvement. Every penny mat-

be started quickly. Throughout the

ters in an environment where you

congressional debate there was

are in such financial difficulty.”

an emphasis on transparency and

The upside from P3s, Luchetti

accountability in spending stimulus

says, is the opportunity to save 15 to

money — and indeed, the construc-

30 percent over the life of a project,

tion industry itself has long recog-

from design to ongoing operations.

nized its own inefficiency and lack of

“If you look across the entirety of the

productivity improvements.

economy and say to yourself, ‘I can

New tools are being devel-

save 15 to 30 percent over the life

oped to address these shortcom-

cycle of the asset’….it’s a good thing

ings. Members of the Construction

for the economy and a good thing

Management Association of America

for society,” he says. “It makes us

(CMAA), including both owners of

more competitive globally, it makes

construction programs and provid-

the economy function better and it

ers of construction management

makes everything work in a more

services, are at the forefront of the

efficient way.”

effort to improve and apply these new techniques.

The great majority of these savings, Luchetti explains, are realized early in the program life cycle,

Public Private Partnerships

through streamlined design, site

A prime example is Public Private

development, financing and other

Partnerships, or P3s. In a P3, a private

arrangements. If a careful analysis

investor provides money to build,

indicates that savings of at least this

improve or operate an asset used

much aren’t likely, the P3 venture

by the public — perhaps a high-

should not go forward.

way, a bridge or a port — in return for the profits derived from the

Major improvements in construc-

ber of high-profile P3s have already

tion processes and outcomes are also

been executed, and some others,

promised by an initiative known as

including new High Occupancy Toll

Integrated Project Delivery (IPD).

(HOT) lanes on the Capital Beltway

new england

CMAA’s

College

of

Fellows,

encircling Washington, D.C., are

a group of approximately 40 of

getting started.

America’s

most

respected

construction/program

According to Peter Luchetti,

Integrated Project Delivery

asset’s ongoing cash flow. A num-

seasoned

and

founder of Table Rock Capital,

managers, is working on a White

the nation’s financial crisis will

Paper on IPD, a working draft of

lead to increased interest in P3s.

which has been posted on CMAA’s

building of america success stories


website. The project is being led by

increase if everybody helps every-

Chuck Thomsen, FAIA, FCMAA, and

body else.

has involved the efforts of a number of other experts nationwide.

A no-blame working environment to constrain litigation, solve

“The inspiring vision of IPD,” the

problems quickly, eliminate energy

White Paper says, “is that of a seam-

spent on CYA activities and remove

less project team, not partitioned by

barriers to communication.

economic self-interest or contractual

Design

assistance

to

bring

silos of responsibility, but a collection

knowledge of cost and construction

of companies with a mutual respon-

technology from principal subcon-

sibility to help one another meet

sultants, subcontractors and manu-

an owner’s goals. To support that

facturers into the design decision-

vision, owners, AEs, CMs and their

making process.

lawyers are crafting contract terms

Reducing the specter of litigation

intended to align the interests of the

promotes true collaboration by mak-

key project team with the project

ing project participants more willing

mission, increase efficiency, reduce

to exchange information openly and

waste and make better buildings.”

work together for the good of the

IPD can be implemented in

project. It will also accelerate adop-

many ways, meeting the unique

tion of lean construction techniques

needs of individual projects and

because the entire team will stand

teams. In general, however, IPD has

to benefit from improvements and

these features:

savings in all areas.

A legal relationship for the IPD

“The result will be better build-

Core Team that provides a sense of

ings, faster, for less,” the IPD White

belonging to the same organization,

Paper says.

eases barriers to communication,

Leading efforts like IPD, and

removes many of the troublesome

promoting more effective uses of

legal hindrances to BIM and PMIS

innovations such as Public Private

and potentiates the use of lean con-

Partnerships, are among the values

struction processes.

professional construction and pro-

A management committee that

gram managers offer owners across

improves leadership, transparency,

all project types and sizes. These

coordination and communication for

values will be critical in getting opti-

the IPD Core Team and the owner.

mum results from the large amount

An incentive pool for meeting project goals to be shared by the IPD Core Team that has the potential to

www.constructionreviews.com

of new spending now on America’s horizon. n — Article provided by CMAA

For more information: The CMAA Radio interview with Peter Luchetti is accessible through www.cmaanet.org The

IPD

White

Paper

is

available

for

download

online

at

http://cmaanet.org/files/shared/IPD_White_Paper_1.pdf An audio CD of highlights of the P3 panel discussion at CMAA’s national conference is available from the CMAA online bookstore http://cmaanet.org/cmaa-bookstore

new england


Brimmer and May School

Project Team Construction Manager: Richard White Sons, Inc. (Auburndale, MA) Architect: Imai Keller Moore Architects (Watertown, MA) Owner’s Project Manager:

School finds a unique expansion solution despite site constraints and limited land The Brimmer and May School in

Skanska USA Building (Boston, MA)

Chestnut Hill, Mass., a private sec-

Structural Engineer: LeMessurier

ondary school, was faced with the

Consultants (Cambridge, MA)

dilemma of requiring additional

Geotechnical Engineer: Haley & Aldrich (Boston, MA)

academic spaces for an expanding

Civil Engineer/Sports/Landscape:

student body but having various

Geller DeVellis (Wellesley, MA)

challenges to overcome in order to

MEP/FP Engineer: TMP Consulting Engineers (Boston, MA)

expand. The campus is located on a limited amount of land, which was already being utilized by the existing buildings, parking and athletic fields. The school is situated in a heavily populated residential neighborhood with neighbors who are resistant to change. Brimmer and May was also restricted by zoning and resistant to undertaking the variance process. Photos courtesy of Edward Jacoby

The narrow property had deep

new england

front and rear setbacks with the

would be to construct the addition

structed below street level, near-

Massachusetts Bay Transportation

below grade.

by neighbors were afforded the

Authority subway on the north

After researching the zoning

unobstructed views that vertical

side of the property, heavily trav-

restrictions and surveying the land

construction would have marred.

eled Middlesex Road on the south,

directly adjacent to the existing

This option also provided the abil-

the

the

Chase Building, it was determined

ity to forego any zoning variance

east and playing fields on the

that this solution would be ideal

proceedings.

west. With a virtually unbuild-

and would essentially resolve the

improvements on-grade would

able campus, the project team

many challenges that the school

complete the project with an

concluded that the only option

faced. With a new building con-

appealing landscape.

existing

building

on

Additionally,

site

building of america success stories


With an expansion solution in

cleaning, truck delivery routes,

to safely handle the curiosity from

Responding to the site chal-

place, the team was faced with

schedule, work hours, and con-

the student body, the site fencing

lenges to construct the addition

carrying out the construction pro-

struction fencing and gates.

provided viewing areas set at dif-

below grade ensured the suc-

cess on an occupied campus with

In conjunction with the school,

ferent heights to allow children to

cess of this project with regard to

neighbors nearby. It was clear from

the team scheduled neighbor-

see into the site and become famil-

the neighbors and zoning. The

the beginning that an elaborate site

hood meetings with question and

iar with the work. Involving the

project team and the owner

plan would need to be in place to

answer sessions throughout the

entire student body in construction

worked collaboratively to mini-

safely direct construction site traf-

project to keep all the stakeholders

even took the form of mount-

mize

fic on the K-12 campus, work with

informed of the process and the

ing student-created construction

an occupied campus in a resi-

neighbors, minimize disruptions

schedule. On occasion, changes

murals to the site fencing.

dential neighborhood. The subter-

and meet schedule demands.

were negotiated related to work

The new, below-grade addition,

ranean location of the building

building

operations

on

A construction mitigation com-

times or truck traffic routes, which

constructed of cast-in-place con-

has afforded reduced Btu/h loads

mittee was established that was

benefitted the working relationship

crete, provides 11,400 square feet

and minimized equipment size

composed of representatives from

with the neighbors.

of music and science classrooms and

to operate the building. From

Brimmer and May, the owner’s

The location of the construction

library spaces. The 3,100-square-

the street level, the landscaped

project manager, the architect,

site gates and pick-up and drop-

foot, open-air courtyard provides a

open space is not only pleasing to

the construction manager and the

off of all students occurred on

gathering space for classes or social

pedestrian traffic, but also retained

neighborhood. Some of the con-

Middlesex Road, which was adja-

events, but also provides light and

the unobstructed view for the

cerns that were addressed included

cent to the work zone. This prox-

air to the new academic spaces.

neighborhood. n

the safety of students and fac-

imity to students was handled very

The rebuilt natural grass athletic

— Carolyn Ragusa is the director

ulty, parking restrictions for site

strictly with the timing of deliver-

field partially extends above the

of marketing for Richard White

personnel, hosing down trucks to

ies scheduled around the school’s

subterranean classroom space, cre-

Sons, Inc. She can be reached at

minimize dust, noise levels, street

activities and class hours. In order

ating a green roof.

617-332-9500 ext. 330.

Photo courtesy of Edward Jacoby

www.constructionreviews.com

new england


Folly Hill Meadows Apartments: New Clubhouse Commonplace materials backed by innovative ideas lead to stunning solutions

Photo courtesy of Keitard Yoshioka

The Folly Hill Clubhouse at the Folly

of community for the entire develop-

be completely opened to the envi-

not intended for wall use. They are a

Hill Meadows Apartments in Beverly,

ment and that is used to entice renters

ronment by using prefabricated door

prefinished and anodized industrial

Mass., is a shining example of how to

to lease apartments.

panels fitted with bolts. Increasing the

product that is a standard material

greatly improve the built environment

Reusing existing materials saves the

connection to the exterior environ-

on a metal smith’s palette, but that

at minimal cost by using common-

cost and trouble of diverting waste to

ment through these methods greatly

was used in a new and elegant way

place materials in innovative and exu-

a landfill. There are simple methods

increases the quality of the space. The

at Folly Hill.

berant ways. The developer wanted a

to work with what you already have.

entrance was also relocated so that

Likewise, the railing separating the

transcendent yet economical design

At Folly Hill, the architects reused the

the designers could take advantage of

plush lower media seating from the

to increase leasing sales and draw

high ceiling, making it more attractive

an existing skylight.

upper stone seating area was made

people to the development.

by painting the pipes the same color.

By using lower-cost industrial

custom from a kit of industrial parts

On a tight budget, Innovative

Through this practice, the builders

materials and cutting them down, the

that were cut down and assembled.

Collaborations, Inc. and Thrive utilized

were able to avoid the cost of buying

builders were able to use simple build-

The materials used were tubular

economical materials in unexpected

a typical unattractive acoustic tile sus-

ing methods to build custom details at

aluminum

new ways to impart a rich, inviting

pended ceiling.

and

angles,

translu-

a very low cost. Buying atypical build-

cent resin panels, and maple. The

feel to the clubhouse. At minimal cost

Similarly, reusing existing openings,

ing materials in bulk and cutting them

aluminum members were bought

through value engineering, the space

such as garage doors, can save costs

down saved a great deal of money on

in large quantity and cut down for

was transformed from a rundown

and present dramatic results. At Folly

the project, and gives the entire space

the project. By building this railing

maintenance garage to a stunning

Hill, a large garage door opening was

a unique feel. For example, the alumi-

up from scratch, the designers were

gathering place that creates a sense

transformed into a glass wall that can

num panels on the media wall were

able to produce a new unique

new england

building of america success stories


railing at 20 percent of the cost of a

pillar fireplace was custom designed

standard railing.

and built around a simple low-cost,

The angled red walls that flank the

double-sided propane fireplace. With

metal media wall were simply attached

this strategy, both the upper stone

to already existing walls that were in

seating area and the lower plush seat-

great disrepair and in need of refinish-

ing area can take advantage of the

ing. The new walls, made from pre-

fireplace’s ambiance. By framing walls

finished birch plywood with maroon

around the propane fireplace and

stain, provide a much more alluring

attaching concrete tiles that give the

and durable material than standard

appearance of real stone, the fireplace

sheetrock walls. Additionally, because

is given additional power and sub-

they come prefinished, workers were

stance. To give it further importance,

able to save on wall finishing costs

the lighting and the dramatic media

such as painting. Generally only used

wall were directly aligned with it.

for industrial purposes, the brightly

In the end, the enhanced space

colored panels also lend a dramatic

created a clubhouse that has had a

feel and cause the central element of

strong impact on sales of apartment

the space, the fireplace, to pop. Bold

units and has brought in revenue. This

use of color and texture proved to be

project demonstrates that it doesn’t

inexpensive strategies that define and

take a huge budget or high-end mate-

enhance the space.

rials, just an innovative spirit. n

As the focal point of the club-

— Meghan Dufresne works for

house, the fireplace was given great

Innovative

weight at minimal cost. This stone

617-695-3777.

Collaborations,

Inc.,

Photos courtesy of Keitard Yoshioka

www.constructionreviews.com

new england


What is LEED® and Why Should I Care? Approximately 12 years ago, a non-

mately 10 percent of all commercial

profit organization by the name of the

construction starts are expected to be

U.S. Green Building Council (USGBC)

green buildings by 2010.

developed the building rating sys-

Energy conservation is one of

tem known as Leadership in Energy

the most important concepts in the

and Environmental Design (LEED®).

LEED® building model. LEED® identi-

This rating system evaluates new and

fies the area of “optimized energy

renovated buildings on their sustain-

performance” as one of the primary

ability, energy efficiency and environ-

energy-related sections in its building

mental impact. LEED addresses an

rating system. Another area of energy

array of different building types and

conservation, which is rarely associ-

emphasizes state-of-the-art strate-

ated with building construction, is the

gies for sustainable site development,

reduction of fuel consumption related

water savings, energy efficiency,

to the transportation and harvest-

materials and resources selection, and

ing of building materials. The LEED®

indoor environmental quality. There

process encourages project teams to

are many advantages to building an

purchase building materials harvested

environmentally friendly and ener-

and produced locally, thus reducing

gy-efficient building in accordance

the production of greenhouse gases.

®

with the LEED® program. Some of

A

LEED® Accredited Professional

these benefits include reduced energy

(AP) is designated in the LEED® com-

costs, healthier work environments,

munity by demonstrating a thor-

reduced water and sewage costs, and

ough understanding of all aspects

an overall reduction in the building’s

of the LEED® process. This certifica-

carbon footprint.

tion includes a full understanding

LEED is a practical rating tool for

of sustainable sites, water efficiency,

green building design and construc-

energy and atmosphere, materials

tion that provides immediate and

and resources, indoor environmental

measurable results for building own-

quality, and innovation and design

ers and occupants through reducing

process. A LEED AP must pass a rigor-

energy consumption and improv-

ous test demonstrating proficiency in

ing the environmental quality in the

all of these areas. Adding a LEED AP

building as well as the surrounding

to your project development plans

®

areas. There are four levels of LEED

helps reduce and overcome much of

certification, ranging from certified

the complexity associated with the

to silver, gold and platinum. Each

LEED® green building rating system.

level requires an increased number of

In the past eight years, approximately

points, gained through achieving a

70,000 individuals from around the

greater level of energy efficiency and

world have obtained their designa-

improved environmental quality. The

tion as a LEED AP, helping to create

higher the level of LEED® certification

a greater number of environmentally

a building attains, the greater the

friendly work sites and greener build-

degree of return on investment for

ing construction.

the building owner.

— Wayne Seward, CEA, LEED AP, is the

®

There is a growing trend toward

founder and owner of Bear Technologys

®

constructing LEED -certified buildings

in Carlsbad, California, a company

as evidenced by the fact that there are

that specializes in Title 24 and energy

LEED®-certified projects in all 50 states

compliance documentation and con-

and in 69 countries. Identified in the

sulting for residential and commercial

McGraw Hill Green Building Smart

buildings. Seward can be reached

Market Report of 2006, approxi-

at 760-635-2327.

10

new england

building of america success stories





CSI

Group of Companies







Extensive damage to surrounding window area revealed

Installers carefully measure damage and prepare opening for a new JELD-WEN window

Technology assists in making the right calls during comprehensive assessments

IRG www.irgroup.us









Best R-Value Per Inch

3.8

2.1-3.1”

3.6

Resists Air Flow

Yes – Dense Packed

No – Air Filter

Yes

Fills without Gaps or Voids

Yes – Dense Packed

No – Has Gaps & Voids

No – Has Voids

Least Sound Transmission (STC) 41

38*

37

Smoke When Burned** (SDI)

None

50

400

Functions as a Fire Block

Yes

No – Melts

No – Hydrophobic

Moisture Protection

Yes – Hygroscopic

No – Hydrophobic

No – Hydrophobic

Deters Mold and Pests

Yes – Has Borates

No

No

Outgasses After Installation

No

Yes

Yes – Isocyanates

Recycled Content

82%+

Up to 25%

None

Embodied Energy

750 btu/lb

12,000 btu/lb

>30,000 btu/lb




Each regional edition of the Real Estate & Construction Review, including the ShortList, can now be viewed online at our website. You can get there two ways. Just go to www.constructionreviews.com and click on the

button

or go to the regional editions directly at www.constructionreviews.com/regional_ed/index.html. Our online editions allow users to view any or all of a particular magazine. Referred companies that participate in the magazine not only benefit from increased visibility, they also have direct links The Southern California Edition of The Real Estate & Construction Review

from our website to theirs. This allows readers to access the top companies in the nation with a simple touch of a button. Because the companies listed in the Real Estate & Construction Review and the ShortList were referred for their world-class work, our readers can feel confident using this tool. Users also have access to a comprehensive database of the nation’s top subcontractors, vendors and suppliers. Shared by approximately 15,000 cost estimators, project managers and building owners in more than 40 states across the country, this tool features each region’s most qualified and reliable subcontractors and vendors as submitted by the general contractors and construction managers that worked with them. Only companies that have been qualified by a project manager and worked on a top 50 new construction or renovation project in their region may post a pre-qualification form on our website.


24445 Northwestern Hwy. Ste. 218 • Southfield, MI 48075 • 248-945-4700 • fax: 248-945-4701 • www.constructionreviews.com