KAISER PERMANENTE - MV
Gas Line Fire Rated Enclosure
LATE PROJECT ADDITION OF FIRE RATED SEPARATION BETWEEN THE GENERATOR YARD AND GAS LINE REQUIRED FOR CERTIFICATE OF OCCUPANCY.
Automatic Door Opener Coordination
COORDINATING THE PLACEMENT AND RELOCATION OF NEW AND ADDITIONAL ADO PUSH PLATES WITH THE CLIENT TO MEET THE END USER’S NEEDS.
WATERPROOFING & PARAPET REVISIONS
THE ORIGINAL APPROVED DETAILS WENT THROUGH EXTENSIVE COORDINATION TO ENSURE THE WATERPROOFING ASSEMBLY WORKED PERFECTLY PRIOR TO THE START OF INSTALLATION.
FINISH UPDATES IN RESPONSE TO RFI’S
COORDINATED MULTIPLE RFIS REGARDING INTERIOR FINISHES INCLUDING: FRP, TILE, WALL PROTECTION BUMPER GUARDS, LOBBY TERRAZZO FLOORING WHERE SEISMIC JOINT OCCURS, LINOLEUM SELF COVE BASE AROUND FLOOR PATTERNS.
Commercial Master Plans
DESIGNING PRELIMINARY MASTER PLAN FOR CLIENT RETENTION AND VICTORVILLE CITY PLANNING DEPARTMENT REVIEW.
Redlands Historic Report
CO-AUTHORING A RECORD REPORT FOR A HISTORIC RANCH STYLE HOME IN REDLANDS INCLUDING A WRITTEN HISTORY, SITE PLAN, ARCHITECTURAL
ANALYSIS, AS WELL AS CREATING A PHOTOGRAPHIC RECORD. THIS
MEDICAL TI PROJECTS (HCAI)
INCLUDING ASSISTING WITH SUBMITTING AN EMERGENCY SHOWER ROOM RENOVATION PROJECT TO HCAI INCLUDING: DRAFTING THE AS BUILT DRAWINGS, COORDINATING THE TIO WITH THE CONSULTANTS AND IOR, AND CREATING INTERIOR PLANS AND ELEVATIONS.