budget

Page 1

Budget 5 star films Name:………………………………………… Date:………………………………………….

UNIT 112 oscar close London SE39PX

Production Title:…………………………

Materials

Cost

Total

Production equipment required Cameras

£45.00 per day/£175.00 a week

£175 £190

Lights

£50.00 each per day/£190.00 a week

Hazard tape

£2.52 to buy

extension leads

£15.10 per week

mics

£100.00 per day

Backdrops

£60-120 for a 5 day rent

tape

£4.75 to buy for th ree 60 min tapes

Tripod/stabilizer

£25.00 per day

dolly/track

£80.00 per week

extra battery

£12.97 to buy

Sound Engineer / Mic person

£250.00 per day

camera operator

£175.00 per day

Director

£450.00 a day

runner

£100.00 per day

Actors Man One

£434.00 per “booking”

Woman Two

£385.00 per “booking”

extras

£210.00 “per booking”

Transport requirements Car for Kit

£235.00 per week

Car for peeps

£153.67 per week per car

Props/scenery Location costs

£100.00 per day

refreshments

£20.00 per day

£700 £140

Post-production requirements Editing Suit

£785.00 per week

£785

£2.52 £15.10 £700 £90 £4.75 £175 £80 £12.97 £1750 £1225 £3150 £700

£434 £385 £210 £235 £307.3 4


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
budget by Danny O'connor - Issuu