1 minute read

4.3.5_END APPLIED FORCE

When several units are connected, the force is transferred between all units and causes a spreading in the overall system. Although force becomes distributed across the system, the bending of the wood is highest near the actual location of the applied force.

fig. 62 - plan view

Advertisement

This article is from: