David zhengli v3 2017

Page 1


David Li Architect

Master of Architecture, The University of Melbourne, Australia Bachelor of Industrial Design, Zhengzhou Univerisy, China

Tel: 61 424 038 108 Email: davidzhengli@hotmail.com


CONTENT

1

CONTENT

Architecture Portfolio

DESIGN & VISUALISATION Maggie Cancer Center Design_2017 Pink Porosity (Silver Factory)_2017 Tooradin Airport Design_2016 CAZ Tower, 216 Latrobe St_2016

2 4 8 12

CONSTRUCTION & MODELLING Tooradin Airport Model_2016 CAZ Tower Model_2016

14 16

CONSTRUCTION DOCUMENTATION CAD Documentation_2016 CAD Documentation_2015

18 22


Maggie Cancer Center Design Melbourne

Concept Statement:

According to cancer patient’s emotional statues, the concept is to design a place of non place. Try to give cancer patient different feeling when they recieve chemo therapy and radio therapy. A large garden is designed in the center to generate a cosy micro nature environment.Every functional blcoks are shifted to form the “lady rooms” where has the fabulous views towards outside. Meanwhile the mini gardens surrounding the lady room to keep it private.

Studio Leader Dr Dominic Hozler

CONTENT

2


CONTENT

3


PINK POROSITY

Storefront of Silver Factory (Andy Warhol) The idea of this store front is to encourage everyone engage with the design of the storefront and each factory person will have their own private and independent gallery to exhibit their works this is inspired by andy warhole’s 15minutes The architectural composition is to put the solid pink box in the center surrounded by extruded glass boxes which can be extruded to form the facade of the storefront according to designers needs. Factory people design the facade through the extruded glass boxes which are independent small gallery too. People will enter the semi-public long ,dark narrow, corridor to watch andy’s films, finally they will arrive the private pink solid box in the center which is the theaterett the free access entrances, semipublic corridor and the private pink theaterette forms the porosity of pink in terms of visiting sequence during that process visitors will experiencing from bright glass galleries to dark quiet film corridor, then gather at the center-theaterette. This is a storefront which connects the public to the factory, it will give people different visiting experiences both hironzontally and vertically as well as let people use their sensories to feel the design of this storefront.

Studio Leader Rennie Liffen Virginia Mannering

Š 2016

CONTENT

4


CONTENT

5


CONTENT

6


CONTENT

7


The Serpentine Airport Design Tooradin Airport design

Concept Statement:

The “Concealing and Revealing” derives from the experience I visited Great Ocean Road which is the most beautiful landscape in Melbourne. The landscape reveals itself differently after you turn over the cliff. Your vision is regulated by those curved contours. I adopt the curved shape to create the Concealing and Revealing atmosphere. Then I introduce eight glass atriums to introduce sunlight into the building as well as give people different visal experience. The curvered speration line between airside and landside also provides different spaces for people to have coffee with his friends within “one space”. The extruded Lounge boxes are not only used to offer additonal services including children play grounds and VIP lounges, but also form part of the facade facing air side. All these features try to create the concealing and revealing experience. Encourage people to explore the building to find out their own favourite spot.

Studio Leader Peter Hogg

© 2016

CONTENT

8


CONTENT

9


1 Elevated Drop Off 2 Main Public Departure Hall 3 Check In 4 Security Control 5 Restaurant/Commercial Space 6 Departure Waiting Area 7 VIP Lounge 8 Children Playroom 9 Bathrooms 10 Offices 11 Services 12 Train Station Exit/Entrance

N

0M

CONTENT

10

60

120

150M


CONTENT

11


CAZ Tower Project The intention of this project is to design a new high rise office building which is functional, efficient and aesthetic.

Supervisor Giorgio Marfella Jamie Mccutcheon

Applied construction University of Melbourne School of Design

Š 2016

CONTENT

12


1.1 STACKING STRATEGY

Author

Student ID

Gexi Ji

719649

CONTENT

13

A1.1 Stacking: Plans and Section A1.2 Stacking: Model and 3D Views/Diagrams

5

4 6.00

6 4.50

7 4.50

8 4.50

9 4.50

10 4.50

11 4.50

12 4.50

13 4.50

14 4.50

15 4.50

16

6.00

A

6 4.50

7 4.50

8 4.50

9 4.50

10 4.50

11 4.50

12 4.50

13 4.50

14 4.50

15 4.50

16 6.00

3.75

3.75

A

B 3.75

3.75

B

C 3.75

3.75

C

D 3.75

3.75

D

E 3.75

3.75

E

F 3.75

3.75

F

G 3.75

3.75

G

H

H

ATRIUM

3.75

3.75 I 3.75

3.75

I

J 3.75

3.75

J

K 3.75

3.75

K

L 3.75

3.75

L

M 3.75

3.75

M

N 3.75

3.75

N

O

O

01 A1.1

LOW RISE FLOOR PLAN 1:500 @ A2

5

4 6.00

6 4.50

02 A1.1

7 4.50

8 4.50

9 4.50

A

10 4.50

11 4.50

12 4.50

13 4.50

14 4.50

15 4.50

16

MIDDLE RISE FLOOR PLAN 1:500 @ A2

5

4

6.00

6.00

6 4.50

7 4.50

8 4.50

9 4.50

10 4.50

11 4.50

12 4.50

13 4.50

3.75

3.75

A

B

3.75

3.75

B

C

3.75

3.75

C

D

3.75

3.75

D

E

3.75

3.75

E

3.75

ATRIUM

G

F

ATRIUM

3.75

F

3.75

3.75

G

H

ATRIUM

3.75

3.75

H

I

3.75

3.75

I

J

3.75

3.75

J

K

3.75

3.75

K

L

3.75

3.75

L

M

3.75

3.75

M

N

3.75

3.75

N

O

03 A1.1

1.1.1 DESIGN CONCEPT

5

4

6.00

O

HIGH RISE FLOOR PLAN 1:500 @ A2

04 A1.1

SKY RISE FLOOR PLAN 1:500 @ A2

14 4.50

15 4.50

16 6.00


Tooradin Airport 1:500 Lasercut Model Supervisor Peter Hogg

The University of Melbourne Faculty of Architecture Building and Planning Melbourne School of Design

Š 2016

14

MODELING


MODELING

15


CAZ Tower 1:500 Lasercut Model

Intersection of Latrobe St and Exhibition St

Supervisor Giorgio Marfella Jamie Mccutcheon

236 Latrobe St Tower Design The University of Melbourne Faculty of Architecture Building and Planning Melbourne School of Design

© 2015

16

MODELING


MODELING

17


A2.1 Structure: Plans and Sections A2.2 Structure: Model and 3D Diagrams 1

2

3

4

5

6

7

8

9

10 11 12 13 14 15

16

22.15m

RL 271.95

CROWN

8.00m

RL 249.8

110.15m

RL 233.8 RL 229.8 RL 221.8 RL 217.8 RL 213.8 RL 209.8 RL 205.8 RL 201.8 RL 197.8 RL 193.8 RL 189.8 RL 185.8 RL 181.8 RL 177.8 RL 173.8 RL 169.8 RL 165.8 RL 161.8

48.00m 40.00m

4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m

RL 149.8 RL 145.8 RL 141.8 RL 137.8 RL 133.8 RL 129.8 RL 125.8 RL 121.8 RL 117.8 RL 113.8 RL 109.8 RL 105.8 RL 101.8 RL 97.8 RL 93.8 RL 89.8 RL 85.8 RL 81.8

48.00m

MECHANICAL FLOOR

RL 77.8 RL 73.8 RL 65.8

4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m

05 A2.1

MECHANICAL FLOOR

RL 153.8

RL 61.8 RL 57.8 RL 53.8 RL 49.8

PODIUM

RL 45.8 RL 41.8 RL 37.8 RL 33.8

8.00m

The University of Melbourne Faculty of Architecture Building and Planning Melbourne School of Design

MECHANICAL FLOOR

RL 225.8

8.00m

Supervisor Giorgio Marfella

CORE

RL 237.8

8.00m

CAD Drawings

4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m4.00m

CONSTRUCTION DOCUMENTATION

RL 241.8

GROUND LEVEL RL 25.8

OVERALL SECTION 1:1000 @ A2

OVERALL STRUCTURAL CONFIGURATION

TRUSS ROOF OUTRIGGER

© 2015

BELT TRUSS

CONCRETE BAND BEAM

CONCRETE COLUMN

LATERAL LOADS RESISTING SYSTEM

18

CONSTRUCTION DOCUMENTATION

CONCRETE EDGE BEAM

CONCRETE BAND BEAM

CONCRETE COLUMN

LIGHT WEIGHT BRACING FOR ROOFTOP STRUCTURE

CONCRETE EDGE BEAM

STEEL COLUMN

CONCRETE COLUMN

CONCRETE EDGE BEAM


CONSTRUCTION DOCUMENTATION

A4.1 Lobby Faรงade: General Arrangement

19

A SIGNORINO BLUESTONE 1000 X 1000

A5.1 Lobby Faรงade: Details GLAZING CURTAIN WALL EMBEDDED ATTACHMENT SEALANT

FITTING STEEL COLUMN RADIUS = 400

GLAZING CURTAIN WALL

GLAZING CURTAIN WALL STAINLESS STEEL CABLE

CABLE SIGNORINO

STAINLESS STEEL CABLE

500 X 500

CABLE MULLION SYSTEM

STAINLESS STEEL CLEVIS

CURTAINWALL WALL POINT CURTAIN POINTFIXING FIXING

03 A5.1

03 A5.1

AUTOMATIC SLIDING DOOR FOR DISABLED ACCESS, EMERGENCY EGRESS AND AFTER HOURS USE

STAINLESS STEEL CLEVIS PIN

1:5 @ A2

1:5 @ A2

AUTOMATIC REVOLVING DOOR STAINLESS STEEL TONGUE

CURTAIN WALL 1500 X 2000

SIGNORINO BLUESTONE SEALANT WATERPROOFING MEMBRANE

SIGNORINO

BACKER ROD

GLAZING CURTAIN WALL EMBEDDED ATTACHMENT GUTTER

THREADED ROD

SIGNORINO BLUESTONE

SEALANT

WATERPROOFING MEMBRANE

SIGNORINO

BACKER ROD

PACKING

SPACE FRAME TOP LATERAL CHORD

ENTRANCE MAT NUT

AL. OBLIQUE STRUTS

WASHER

EXTERIOR

ALU CHANNEL PACKER

FACADE CONNECTOR

INTERIOR

01 A5.1

01

STEEL PLATE

BOTTOM OF CURTAIN WALL FIXING SYSTEM

02

BOTTOM OF CURTAIN WALL FIXING SYSTEM 1:5 @ A2 1:5 @ A2

02 A5.1 A5.1

A5.1

BOTTOM OF CABLE FIXING SYSTEM

04

BOTTOM OF CABLE FIXING SYSTEM 1:5 @ A2

04

AA5.1 5.1

1:5 @ A2

GLAZING ROOF AND SPACE FRAME FIXING GLAZING ROOF AND SPACE FRAME FIXING 1:5 @ A2

1:5 @ A2

GLAZING CURTAIN WALL

01 PARTIAL LOBBY PLAN PARTIAL LOBBY PLAN 1:50 @ A2 A4.1 1:50 @ A2

WHITE ALUMINIUM FACADE

A

01 A4.1

SPACE FRAME SYSTEM

SPACE FRAME SYSTEM

STEEL PLATE

GLASS ROOF 1500 X 1500

GUTTER

LOAD DISTRIBUTION PLATE

SPACE FRAME BOTTOM CHORD

PACKING

FITTING

ATTACHMENT PAD

NUTS NUTS

CURTAIN WALL

GUTTER

BOLTS

STAINLESS STEEL CHANNEL FLATTENED CHORD SECTION STAINLESS STEEL TURNBUCKLE

BOLT HOLES TRANSVERSE SHOULDER

ATTACHMENT PLATE

VERTICAL STRUT

STAINLESS STEEL EYE NOBLE

FACADE CONNECTOR

NUT

STRUTS LONGITUDINAL CHORD

FACADE CONNECTOR WHITE ALUMINIUM FACADE

OBLIQUE STRUT

FITTING

STAINLESS STEEL CABLE LONGITUDINAL CHORD

CABLE STEEL COLUMN RADIUS = 400

CONCRETE COLUMN 800 X 800

CURTAIN WALL 1500 X 2000

ATTACHMENT PAD

BOLTS

UPPER LOAD DISTRIBUTION PLATE MIDDLE LOAD DISTRIBUTION PLATE

BOLTS ATTACHMENT PLATE

LATERAL CHORD

LATERAL CHORD

AUTOMATIC REVOLVING DOOR 2400mm

SIGNORINO BLUESTONE 1000 X 1000

3D SKETCH OF SPACE FRAME SYSTEM

SIGNORINO

3D SKETCH OF SPACE FRAME SYSTEM

500 X 500

05 05 A5.1

A5.1

CABLE MULLION HEAD CABLE MULLION HEAD

1:5 @ A2 1:5 @ A2

ANCHOR BOX

02

02 A4.1

1500mm

PARTIAL LOBBY SECTION A

PARTIAL LOBBY SECTION A 1:50 @ A2

A4.1 1:50 @ A2

06

RUBBERBOND BONDING ADHESIVE

WHITE ALUMINIUM FACADE

04

CURTAIN WALL 1500 X 2000

2000mm

LEAF GRATE CLAMPING RING

WATER CUT OFF MASTIC

RUBBERBOND DECKING ADHESIVE RUBBERBOND FLEECEBACK EPDM

05 03

FITTING

2000mm

THERMAL INSULATION

06 PARTIAL LOBBY PERSPECTIVE VIEW

PARTIAL LOBBY PERSPECTIVE VIEW

03

PARTIAL LOBBY ELEVATION

A4.1

03 A4.1

1:50 @ A2

PARTIAL LOBBY ELEVATION 1:50 @ A2

06 A5.1

A5.1

OUTLET BODY

VAPOUR CONTROL LAYER STRUCTURAL DECKING

01 02

GLAZING ROOF DRAIN GLAZING ROOF DRAIN

1:5 @ A21:5 @ A2

DETAIL DRAWING REFERENCE


A4.2 Typical Floor: General Arrangement

A5.2 Typical Floor: Details

PERSPECTIVE DIAGRAM

01 A4.2

20

SECTION 1:50 @ A2

02 A4.2

ELEVATION 1:50 @ A2

03 A4.2

PLAN 1:50 @ A2

CONSTRUCTION DOCUMENTATION

01 A5.2

MECHANICAL FLOOR SECTION 1:10 @ A2

03 A5.2

TYPICAL OFFICE FLOOR SECTION 1:10 @ A2

02 A5.2

FLOOR BRACKET CONNECTION PLAN 1:2 @ A2


CONSTRUCTION DOCUMENTATION

A5.3 Parapet: Details

A4.3 Parapet: General Arrangement

6MM ALUCOBOND ALUMINUM COMPOSITE PANEL WHITE

6MM ALUCOBOND ALUMINUM COMPOSITE PANEL WHITE

STEEL TUBE 250X150X6MM 02 A5.3

R1200

SILICON SEALANT

SILICON SEALANT BRACKET 120X40X5MM

01 A4.3

BALCONY OF CROWN LEVEL

Overall BMU Track Diagram

01 A5.3

Decorative Facade Section Detail 1:5

50mm

02 A4.3

200mm

02 A5.3

50mm

Decorative Facade Section Detail 1:1

ALUMINIUM COMPOSITE PANEL CAPPING 3MM WHITE FINISH

Partial Plan of Crown 1:50

TIMBER PACKING SILICON SEALANT

SILICON SEALANT

04 A5.3

ALUMINIUM COMPOSITE SPANDREL PANEL 4MM WHITE

ALUMINIUM COMPOSITE PANEL 4MM WHITE

Spider Section Detail 1:5

ORIGINAL TENSION TRUSS GRID

TOP HAT 03 A5.3

165

TCN NODE, 12MM OFFSET HOLE Ø32MM COMPRESSION SPAR

MIG GLAZING FIXING SPANDREL PANELS

STRUCTURE FOR EXTERNAL FACADE

LIQUD WATERPROOFING MEMBRANE

2570

220

ROD Ø25MM

THERMAL INSULATION WEARING SLAB

03 A5.3

2000

CONCRETE FINISH

STEEL TUBE 250X150X6MM

40MM BLUESTONE 2MM MORTAR WEARING SLAB LIQUID WATERPROOFING MEMBRANE

6MM ALUCOBOND ALUMINUM COMPOSITE PANEL WHITE

2000

1930

03 A4.3

Partial Elevation of Crown 1:50

50MM CONCRETE FINISH

T BRACKETS 200x100x10MM M16 AGA NUT

RIGID GRID PEDESTAL

50MM CONCRETE FINISH

CONCRETE FLOOR SLAB THERMAL INSULATION

165

990

THERMAL INSULATION

600X600 RAISED ACCESS FLOOR

2MM MORTAR

160

CONCRETE FLOOR SLAB TRE TIE ROD FORK M25

40MM BLUESTONE

LIQUID WATERPROOFING MEMBRANE

STRUCTURE FOR EXTERNAL FACADE

600X600 RAISED ACCESS FLOOR

TIE ROD Ø25mm

04 A5.3

WEARING SLAB

1400

ORIGINAL TENSION TRUSS GRID

Retaining wall Section Detail 1:5

LIQUID WATERPROOFING MEMBRANE

SPANDREL PANELS

MIG THREADED ROD TRE TIE ROD PORK, MIG, M25

1400

VISION PANELS

6MM

ALUMINUM COMPOSITE PANEL 4MM WHITE 01 A5.3

MECHANICAL FLOOR 04 A4.3

Partial Section of Crown 1:50

MECHANICAL FLOOR 05 A5.3

Crown Floor Section Detail 1:5

21


CONSTRUCTION DOCUMENTATION CAD Drawings

Supervisor Giorgio Marfella David O’ Brien George Stavrias James Neil

The University of Melbourne Faculty of Architecture Building and Planning Melbourne School of Design

© 2014

22

CONSTRUCTION DOCUMENTATION


CONSTRUCTION DOCUMENTATION

23


24

CONSTRUCTION DOCUMENTATION


CONSTRUCTION DOCUMENTATION

25


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.