Fonta Flora State Trail Master Plan - Lake James to Marion

Page 1

fonta flora state trail master plan lake james to marion



FONTA FLORA STATE TRAIL

PRODUCED BY:

PRODUCED FOR:

LAKE JAMES TO MARION MASTER PLAN

DESTINATION BY DESIGN PLANNING, LLC 136 FURMAN RD., SUITE 6 BOONE, NORTH CAROLINA 28607 828.386.1866 WWW.DBDPLANNING.COM



ACKNOWLEDGMENTS BURKE COUNTY

CITY OF MARION

Johnnie Carswell, Chairman

Steve Little, Mayor

Scott Mulwee, Vice Chairman

Billy Martin, Mayor Pro Tem

Maynard M. Taylor, Commissioner

Woody Ayes, Council Member

Wayne F. Abele, Commissioner

Juanita Doggett, Council Mebmer

Scott Mulwee, Commissioner

Ann Harkey, Council Member

Bryan Steen, County Manager

Don Ramsey, Council Member

Scott Carpenter, AICP, Deputy County

Bob Boyette, City Manager

Manager & Community Development Director Shane Prisby, Community Development Operations Manager NATIONAL PARK SERVICE John Slaughter, Group

Heather Cotton, AICP, Planning Director MCDOWELL COUNTY David N. Walker, Commissioner Tony G. Brown, Commissioner

Superintendent,

Barry McPeters, Commissioner

Southern Campaign of the American

Lynn Greene, Commissioner

Revolution Parks Group

Brenda M. Vaughn, Commissioner

Benjamin Richardson, Chief of Planning and Partnerships, Southern Campaign of the American Revolution Parks Group

DUKE ENERGY CAROLINAS Christy L. Churchill, RLA, LEED GA



TABLE OF CONTENTS INTRODUCTION & BACKGROUND

1

Trail Support Facilities…………………………………………………………… 34

Purpose and Background………………………………………………………… 2

Social Media Marketing…………………………………………………………… 37

Previous Planning Efforts………………………………………………………… 3 Vision Statement………………………………………………………………………… 4 Trail Benefits……………………………………………………………………………… 5 Plan Organization……………………………………………………………………… 6

CHAPTER 1: EXISTING CONDITIONS, ANALYSIS, & PRELIMINARY ALIGNMENTS

7

Study Area Description……………………………………………………………… 8 Study Area Major Features………………………………………………………… 9 Natural Environment……………………………………………………………… 10 Cultural Resources…………………………………………………………………… 12

CHAPTER 3: RECOMMENDATIONS

39

Planning Sections Overview…………………………………………………… 40 Trail Section Recommendations…………………………………………… 42

CHAPTER 4: IMPLEMENTATION

55

Implementation Details by Section and Responsibility………… 56 Priority Implementation Areas and Responsibilities…………… 57 Trail Rubicon…………………………………………………………………………… 57 Trail Support Spectrum…………………………………………………………… 59 Trail Management…………………………………………………………………… 60

Built Environment…………………………………………………………………… 13

APPENDIX I

Preliminary Route Alternatives: Map & Photo Series…………… 17

(A-1) Implementation Budget…………………………………………………… II

CHAPTER 2: TRAIL CHARACTER & DESIGN GUIDELINES

25

Sustainable Trail Design………………………………………………………… 26 Trail Construction…………………………………………………………………… 28 Trail Types………………………………………………………………………………… 29 Trail Profile……………………………………………………………………………… 32

(A-2) Funding Sources…………………………………………………………… III


LIST OF MAPS Map 1: General Study Area………………………………………………………… 8 Map 2: Study Area 1 Site Analysis…………………………………………… 18 Map 3: Study Area 2 Site Analysis………………………………………… 20 Map 4: Study Area 3 Site Analysis………………………………………… 22 Map 5: Planning Sections ……………………………………………………… 40 Map 6: Planning Section 1……………………………………………………… 44 Map 7: Planning Section 2……………………………………………………… 47 Map 8: Planning Section 3……………………………………………………… 51


LIST OF EXHIBITS EXHIBIT 1: Brewing Up Adventure………………………………………… 45 EXHIBIT 2: Black Bear and Beyond………………………………………… 48 EXHIBIT 3: FFST Trailhead @ Black Bear……………………………… 49 EXHIBIT 4: Bringing the Fonta Flora to Fleming…………………… 53 EXHIBIT 5: Isothermal Regional Bicycle Plan............................ 54



IN T R O D U C T I O N A N D B A C K G R OUN D THIS PLAN SERVES AS A ROAD MAP FOR ESTABLISHING A SECTION OF THE FONTA FLORA STATE TRAIL FROM LAKE JAMES TO MARION.

The Fonta Flora State Trail (FFST) will extend from Morganton to Asheville when completed. This trail master plan serves as a road map for establishing

IN THIS CHAPTER:

the Fonta Flora State Trail from Lake James, in

A| PURPOSE AND BACKGROUND

Burke County, to the City of Marion, in McDowell

B| PREVIOUS PLANNING EFFORTS

County. This chapter provides an overview of previous planning efforts and their goals.

C| VISION STATEMENT D| TRAIL BENEFITS E| PLAN ORGANIZATION

1


PURPOSE & BACKGROUND The Fonta Flora State Trail finds its origins in the desires of Burke County citizens to increase quality of life for residents, provide a recreational amenity for visitors and the region’s diverse population, and provide public access to the area’s cultural and natural resources. In 2015, the North Carolina General Assembly approved legislation to establish the Fonta Flora State Trail. Upon completion, the proposed trail will extend from Asheville to Morganton connecting Marion, Old Fort, and Black Mountain.

Also in 2017, Burke County opened a new trailhead featuring custom trail facilities and artistic signage. In 2018, the County spearheaded the development of a trail master plan for Section 1 from Lake James to Morganton Financial support from Duke Energy continues to advance the project with $1.1 million in grants committed to the development of the Fonta Flora State Trail and Overmountain Victory National

Historic Trail (OVNHT). Financial resources will be released from Duke Energy now that the Federal Energy Regulatory Commission has approved the company’s re-licensing to operate its hydroelectric power plants along the Catawba River. This plan addresses Section 3 of the Fonta Flora State Trail from Lake James to Marion. This section is unique in that portions of the FFST coincide with the OVNHT.

Burke County is a leading agency in the establishment of the Fonta Flora State Trail. Following the adoption of a master plan in 2016, the County partnered with the NC Division of State Parks and Duke Energy to complete 10 miles of trail in 2017. The County is now in the midst of constructing another 10 miles that will eventually encircle Lake James to complete Section 2 of the FFST.

LEGISLATION WAS SIGNED INTO LAW BY GOVERNOR MCCRORY IN SUMMER 2015 THAT MAKES THE FONTA FLORA STATE TRAIL THE LATEST ADDITION TO NORTH CAROLINA’S STATE PARK SYSTEM. 2

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

PLANNING SECTIONS 1

MORGANTON >> LAKE JAMES

5

OLD FORT DEPOT >> BLACK MOUNTAIN DEPOT

2 3 4

LAKE JAMES

6

BLACK MOUNTAIN DEPOT >> WARREN WILSON COLLEGE

7

WARREN WILSON COLLEGE >> ASHEVILLE

LAKE JAMES >>MARION MARION >> OLD FORT DEPOT


PREVIOUS PLANNING EFFORTS Fonta Flora State Trail: Lake James to Morganton

Fonta Flora State Trail Master Plan: Lake James Section

Lake James Loop Trail Master Plan

In 2018, Burke County developed a comprehensive trail master plan for the Section 1 of fonta flora state trail master plan lake james to morganton the FFST from Lake James to Morganton. This section of the FFST overlaps with the OVNHT on the south side of Lake James as the trail extends from the Fonta Flora Whippoorwill Brewery along the Catawba River to Morganton. Portions of the trail systems at both Lake James and the Catawba River Greenway in Morganton are certified as part of the Overmountain Victory National Historic Trail. The OVNHT Lake James to Morganton Master Plan serves as the foundation of the Fonta Flora State Trail Lake James to Morganton Master Plan.

The Fonta Flora State Trail Master Plan: Lake James Section was completed in 2016. The plan provided a major update to fonta flora state trail master plan lake james section the Lake James Loop Trail Master Plan published by Burke County in 2014. This section of the Fonta Flora State Trail will ultimately encircle Lake James with a continuous 30-mile state-of-the-art hiking and biking nature trail. As a state trail, the loop is now under the purview of the NC Division of Parks and Recreation as an official unit of the State Parks system.

In early 2013, the Burke County LAKE JAMES LOOP TRAIL Community MASTER MASTERPLAN PLAN Development Director began a new planning effort to jumpstart the Lake James Loop Trail initiative and promoted the project to the top of the department’s priority list.

BURKE COUNTY, NC UPDATED SPRING, 2016

LAKE JAMES LOOP TRAIL MASTER PLAN

The Lake James Loop Trail Master Plan, published in 2014, outlined an easy to moderate 30-mile multi-use hiking and biking trail with a natural mineral soil surface. The plan recommended an average trail width of five feet wide and overall average grade of 5% or less. Isothermal Regional Bicycle Plan The Isothermal Regional Bike Plan, published in 2018, includes detailed recommendations for connecting Downtown Marion to the Catawba River Greenway and McDowell House.

2018 IsothermalBikePlan.com

PREPARED FOR THE ISOTHERMAL PLANNING & DEVELOPMENT COMMISSION

PREPARED BY ALTA PLANNING + DESIGN

INTRODUCTION AND BACKGROUND

Photo by Richard Kennedy

3


VISION STATEMENT The Fonta Flora State Trail will provide pedestrians and bicyclists of all abilities a safe and legal route that will eventually extend from Morganton to Asheville. The trail will allow users to experience the natural diversity of the area, incorporate multiple access points and support facilities, create a community and regional asset that will provide for recreation opportunities for local residents and visitors, and promote tourism and low-cost economic development for Burke County, Marion and the surrounding region.

PLAN GOALS 1

Specific Trail Routes. Identify a specific and feasibile trail route from Lake James to Marion.

2

Trail Character. Develop designs and trail support facilities that

3

Visual Plan. Create a visual plan that utilizes renderings and schematics

incorporate both the OVNHT and FFST brands.

to demonstrate trail character.

STATE TRAILS WHAT IS A STATE TRAIL? The State Parks Act (GS 113-44.9) defines the types of units in the NC State Parks System to include State Parks, State Natural Areas, State Recreation Areas, State Trails, State Rivers and State Lakes. Fonta Flora is a State Trail. The difference between a State Park and a State Trail is that a State Park is operated and managed by the Division of Parks and Recreation, but a State Trail represents a partnership among multiple agencies, landowners and local governments, working together to implement a shared vision. Working together on a connected State Trail is a way for communities to leverage their investments in trails to maximize the value for their citizens. Sections of a State Trail on state park property may be managed by the Division of Parks and Recreation, but sections of the trail that cross property controlled by others will continue to be built, maintained and managed by those other landowners. A State Trail is comprised of multiple connected sections, and each section of the trail is sponsored by a state or federal agency, local government, or landowner. Overall trail corridor planning and coordination are the responsibility of the Division of Parks and Recreation, but each section of the trail will be planned, built and managed in accordance with the needs and wishes of each local section sponsor. DPR will provide guidance, coordination and assistance for the multiple section sponsors whose individual and diverse sections link together to form the State Trail. SECTION – A portion of the trail within the jurisdictional boundaries of a single agency or organization, who serves as the sponsor of that section. SECTION SPONSOR – Any agency or organization that owns the land the trail utilizes and that enters into an agreement with the Division of Parks and Recreation to maintain their section of trail as a part of the State Trail. The section sponsor, in coordination with adjoining section sponsors, is responsible for the design, construction, maintenance and management of the trail within their section, including its location, appearance, surface, uses, and amenities. Section sponsors retain authority on lands under their jurisdiction. Section sponsors are encouraged to showcase places of natural, scenic, historic, and cultural significance; to feature the diversity of natural communities and landscapes in the state; and to consider the needs of both long and short distance trail users.

4

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN


TRAIL BENEFITS

ECONOMIC There is no question that countless communities across America have experienced significant economic growth from a result of trail and greenway infrastructure. Below are a few examples of such impacts: Pedestrian and Bicycle Infrastructure: A National Study of Employment Impacts (2011) • Evaluated 58 separate projects in 11 cities • Multi-use trails (e.g., greenways) create 9.6 jobs per $1 million invested East Central Florida Regional Planning Council; Economic impact of Orange County trails (2013) • Little Econ Greenway (7.4 miles); West Orange (20 miles); and Cady Way Trails (7.2 miles) in Orange County, Florida • Supported 516 jobs and had an estimated positive economic impact of $42.6 million on the area • Nearby Downtown Winter Garden (pop. 37k) = $14.6M Revenues Year 3 Economic Impact of Swamp Rabbit Trail (2014) • Swamp Rabbit = 20 miles (Greenville, NC to Travelers Rest) • $6.7 Million Virginia Creeper Trail, Damascus, VA • 34 mile rail-trail • Direct economic impact approximately $3 million a year

HEALTH Trails and greenways provide an attractive, safe, and accessible low- or nocost place to walk, hike, jog, or bicycle. More parks and green spaces lead directly to more physical activity by citizens. This gives people of all ages an opportunity to incorporate exercise into their daily routines.

ENVIRONMENTAL Trails and greenways protect important habitat, improve water quality, and provide corridors for wildlife. By protecting land along rivers and streams, greenways help filter pollution caused by agricultural and road runoff. These areas can often serve as natural floodplains. Also, trails and greenways can serve as hands-on environmental classrooms.

EDUCATIONAL The Fonta Flora State Trail will provide for a variety of educational opportunities. A significant portion of the trail will pass through Lake James State Park, which will provide an educational experience about natural habitats and native flora and fauna from throughout the region. Since this trail coincides with portions of the Overmountain Victory National Historic Trail, users have the opportunity to learn about the Overmountain Men and their impact on the Revolutionary War. Other opportunities exist to learn about hydroelectric dams, bicycle safety, wilderness medicine, and search and rescue.

RECREATIONAL The recreational benefits offered by the Fonta Flora State Trail will complement existing opportunities found in the area at Lake James State Park, NCWRC Game Lands, Linville Gorge, Catawba River, and adjoining US Forest Service lands. The Fonta Flora State Trail will anchor a host of recreation offerings. Foremost, this trail offers the unique opportunity to separate automobiles from cyclists to circumnavigate the Lake, thereby creating a safe and scenic destination for cycling enthusiasts. This plan also calls for a new boat launch, camping and cabin facilities, fishing access areas, and over 25 miles of trails, boardwalks, and bridges. All of these additional recreational opportunities will be beneficial for personal, community, and business development.

TRANSPORTATION Trails and greenways serve as a crucial element within a regional multi-modal transportation system. These facilities provide efficient and safe connectors among civic, commercial, and residential land uses. The Fonta Flora State Trail will help create these connections and play a central role in establishing a regional trail network that will ultimately include the NC Mountains-to-Sea Trail, Overmountain Victory National Historic Trail, Upper Catawba River Trail, and other local connecting trails.

INTRODUCTION AND BACKGROUND

5


ald

Mo

unt

a in

PLAN ORGANIZATION Cheyenne

Bear Cli

ff

POOL C RANDY 1/2 UND. INTEREST LAIL TERESA POOL 1/2 UND. INT.

1

ar

1

e

g Rid

6

d Ce

1553

2

t let

2 1

3

CHAPTER 2.

Bar t

EQUITY TRUST CO.,CUSTODIAN F/B/O DAVID R. MAJKA

taw

1 58 7

st

Ca

C abin B

ba 1552

er

Len

4 C h a ri o t

tz

5

luff

Riv

t

Amelia

8

re Fo

rk

River

Fo

F ork

ck

t

rth

CANNON RESOURCES LLC

w vie ke La

Riverview Fores

re

Bla

C

be

No

7a

rina Ma

3

ankins

G ra ys t

Black Bear Campground

4

5

a r Cliff

e on

od wo I d le

NC Wildlife Commission Pisgah Game Land Designated Nature Preserve

McDowell County

H

Bailey Creek

es

Lake Jam

Great Hill

CHAPTER 9 I.

Dales Cr eek

McGegers Branch

oint

iss elwe

no

Be

y

Ca n

ain P

Ed

Pisgah National Forest

n

in Iv unta Mo

nt Mou

Belvid ere

Bear Creek

B

Jo

Lake James

7

1550

sie

EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS Na

ture

Wa lk

re mo

ba

w

ta

Ca

Lake James Landing

s tain ap

TRAIL CHARACTER AND DESIGN GUIDELINES

s amp hC

CHEYEN

58

8

Pier

Miles

Slope

0 - 30 > 30

LAKE JA M

BEAR

BLUFF

ES T

LI FF

LAKE JAMES

NA TU

RE

WA L

A

K

ORE M

FIELD NOTES PIER

SY C

BA RIVER

AW ORK CAT

W IE

CHAPTER 4.

HISTORIC OVNHT

CABIN

TRAILS

TRAIL FEATURES PREFERRED TRAIL ROUTE

YANC EY

GE

1587

RID

ST RE

ER V

V KE

BIG LEAGUE CAMP

RECOMMENDATIONS

FO

NORTH F

LA

AMELIA

LAKE JAMES LANDING

NE TO

S

TZ

A RIOT

R DA

A RIN MA

BLACK BEAR BOAT ACCESS/ FONTA FLORA AND OVNHT SHARED TRAILHEAD

K AC

N

LEN

CH

C

BLACK BEAR CAMPGROUND

BL

C

T RIVERVIEW FORES

K RI FOR

G RA YS

CE

D OO

B EA R

CR

L

LET RT BA H ANKI

CLIFF

LAKE RIDGE

LA KE

NE

Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped

SETTLEMENT RIDGE

PLANNED TRAILHEAD

COMPLETED FFST

IDE KS C

MM

CATAis organized according to three (3) planning sections. Each planning section This chapter WBA RIVER a map that identifies a preferred alignment. Each planning section description includes further incorporates the analysis and design elements from the previous chapters along N with a host of supporting renderings and design schematics. DO

SA

I LVIE

PROPOSED FFST ON EXISTING LOCAL TRAIL

W

H

HISTORIC OVNHT ROUTE

FO R

E

HIGH RI DG

G

VE HA

DEACON

ID

N

E

KE

6

STATE LAND

EXISTING LOCAL TRAIL

R

G

BEA CO N

HI

CAMP

EY

NC YA

SU

DUKE ENERGY PROPERTY

TS

0 1

15

H

AMPS HC IG

LA PARCELS OF KE GH HE I INTEREST AKE TL ES

ALTERNATE TRAIL ROUTE

FLOOD PLAIN

0

1/16 1/8

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

IMPLEMENTATION

IME

T FEDERAL LAND ER

FFST ON PROPOSED LOCAL TRAIL

LA

This chapter is dedicated to visually defining the various trail types to be used throughout the corridor. Design concepts are provided for trail user orientation signage, mile markers, and other support facilities. Social Media is explored as a mechanism for trail promotion and marketing.

ES

ID

CHAPTER 3.

ei

B E A R C R EE K

DUKE PROPERTY

ET

eH

PLANNED BRIDGE CROSSING

PARKING AND TRAILHEAD FOR OVNHT

HILL

BE R

L ak

s g ht

NHT NG OV

LOS T COVE

EXISTI

NC WILDLIFE COMMISSION GAME LANDS

PLANNED BRIDGE CROSSING

EW

A

st

ke

88

y

n ce

Ya

Deacon

n

gh Hi Ridge

NO

N

i dg e

CA N

INT

WEISS EL

GREAT

h Hig

n

ve

Ha

ap pe zio

La

e ersedg Wat

IN PO

IVY

ke

La

Rail Roads

Parcels

B ea co nR

BAILEY CREEK

IN

UNTA

TA

MO

UN

MO

ED

C

a i lv ie w

C

ide ks

PISGAH NATIONAL FOREST Do c

Hig

Camp

Fo re

AL DM

01

15

B

S

SECTION 2

BELV ID ER E

1 1780 Development Trails e Existing OVNHT ertim m OVT Commuter Sum Motor Route OVT Historic Route

Settlement Ridge

15

OU NT AIN

r

ve

Ri

Sy ca

This chapter provides a comprehensive overview and analysis of the opportunities and 10 constraints found throughout the study area. The analysis begins with a brief description BLACK BEAR BOAT ACCESS Camp Big League 10 >> BIG LEAGUE CAMP by a discussion of the natural and built environments and their of the study area followed 6 implications for trail suitability, trail design, permitting, and costs. This chapter concludes 8 9 VNHT HISTORIC Opreliminary with a map and photographic series that highlights 0 trail 0.25route 0.5 alternatives.

1/4 MI.

This chapter summarizes details for each planning section and establishes responsibilities and priorities for trail implementation. Additionally, this chapter identifies focus areas for development that will serve as catalyst projects for completing the trail.


1

EXISTIN G C OND ITIO N S , A N A LYS I S , A N D P R E L I MIN A R Y A LIGN MEN T S THIS SECTION OF THE FONTA FLORA STATE IN THIS CHAPTER: The analysis begins with a brief description of the study area followed by a comprehensive

TRAIL HAS A SIGNIFICANT NATURAL AND CULTURAL HISTORY.

discussion of the natural and built environments

and cultural resources and their implications for

A| STUDY AREA DESCRIPTION

trail suitability, design features, permitting, and

B| STUDY AREA MAJOR FEATURES

costs. This chapter concludes with a map and

C| NATURAL ENVIRONMENT

photographic series that highlights a host of

D| CULTURAL RESOURCES

preliminary trail route alternatives.

E| BUILT ENVIRONMENT F| PRELIMINARY ROUTE ALTERNATIVES: MAP & PHOTO SERIES

7


STUDY AREA DESCRIPTION

MAP 1: GENERAL STUDY AREA

TY UN CO

Y NT

LL

BIG LEAGUE CAMP

OU EC RK

A RIVER CATAWB

WE DO

BLACK BEAR BOAT ACCESS

The Lake James to Marion FFST study area extends approximately 20 miles from the Fonta Flora Brewery at Whippoorwill Farm on Highway 126 to the Catawba River Greenway in Marion.

BU

NC WILDLIFE COMMISSION GAME LANDS

MC

PISGAH NATIONAL FOREST

STUDY AREA

Starting at the Fonta Flora Brewery at Whippoorwill Farm adjacent to Lake James State Park, the corridor extends west on the north side of Lake James through the 1780 Community and continues into McDowell County through large wooded tracts.

BLACK BEAR CAMPGROUND

LAKE JAMES

FONTA FLORA BREWERY LAKE JAMES STATE PARK

LAKE JAMES LANDING

JOSEPH MCDOWELL HOUSE

The planning corridor continues southwest through rural, wooded privately-owned land to the mouth of the Catawba River at Lake James. Land parcels become smaller as the corridor continues toward the City of Marion before extending north to reach the 1.6-mile Joseph McDowell Catawba River Greenway.

70 221

MARION 70

70

40

THE LAKE JAMES TO MARION FFST STUDY AREA EXTENDS APPROXIMATELY 20 MILES FROM THE FONTA FLORA BREWERY AT WHIPPOORWILL FARM TO THE JOSEPH MCDOWELL CATAWBA RIVER GREENWAY.

8

The corridor includes Pisgah National Forest and NC Wildlife Resources Commission public lands as well as property held by Duke Energy which continues to partner with Burke County to provide easements and financial support for the FFST and OVNHT.

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN


STUDY AREA MAJOR FEATURES LAKE JAMES

LAKE JAMES STATE PARK

Lake James is a large reservoir located in the foothills of Western North Carolina which straddles the border between Burke and McDowell Counties. This 6,812acre impoundment was created between 1916 and 1923 to produce hydroelectric power for the small towns of Marion and Morganton. Low density zoning requirements help to ensure that areas around the lake will be carefully managed and developed. Lake James offers residents and visitors opportunities to boat, fish, swim, and participate in other water-based activities.

Lake James State Park is one of the most recent additions to the North Carolina State Parks system. It was established in 1987 by the North Carolina General Assembly when funds were appropriated for the purchase of 565 acres of l a n d and the initial phase of facility development in McDowell County. In 2004, Lake James State Park acquired an additional 2,915 acre tract from Crescent Resources Inc. in Burke County. This purchase expanded the state park to six times its former size and protected more than 30 miles of shoreline. The state park offers opportunities for hiking, mountain biking, picnicking, nature observation, swimming, and canoeing. A section of the Fonta Flora State Trail that is currently under construction will meander through the park and provide trail users the opportunity to take advantage of traditional state park facilities and services.

Lake James contains 10.2 square miles of surface area and more than 150 miles of shoreline. The average depth of the Lake is 65 feet with a maximum recorded depth of 120 feet. At an elevation of approximately 1,200 feet, Lake James is located within the Catawba River basin.

OVERMOUNTAIN VICTORY NATIONAL HISTORIC TRAIL The Overmountain Victory National Historic Trail (OVNHT) is part of the National Park Service’s National Trails System. It recognizes the patriot militia from Virginia, Tenneessee, North Carolina, and South Carolina who crossed the Appalachian Mountains to fight and win at the Battle of Kings Mountain during the Revolutionary War in presentday South Carolina. The OVNHT is a cooperative effort of the National Park Service, U.S. Forest Service, U.S. Army Corps of Engineers, Overmountain Victory Trail Association, local governments, local citizens’ associations, local historical societies, and the states of Virginia, Tennessee, North Carolina, and South Carolina. The trail network consists of a 272-mile corridor, including a 70-mile branch from Elkin, North Carolina, that joins the main route at Morganton, North Carolina. Sixty-five miles of OVNHT are officially developed for public use, and development continues on the remaining sections. The official sections of the trail were established through agreements with landowners and land managers and often have overlapping designations. All officially certified segments are identified by signs displaying the trail logo (an Overmountain man in profile on a brown and white triangle) or a white triangular blaze. Portions of the FFST route proposed in this master plan share an alignment with the OVNHT. Currently, ~5.5 miles of OVNHT are certified in Burke and McDowell Counties; This includes an ~1.7-mile segment in the 1780 Community and an ~1-mile segment near Black Bear Creek on NC Wildlife Resources land.

CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments

9


NATURAL ENVIRONMENT STEEP SLOPES

WETLANDS AND HYDRIC SOILS

CATAWBA RIVER

Much of the corridor has gently rolling topography. The most challenging slopes are along the banks of the Catawba River, North Fork Catawba River, and shoreline of Lake James. The trail should be designed for grades under 5% slope when possible. Natural surface trails can vary up to 10% slope while maintaining sustainable design. Alignments proposed in this plan should be designed with these guidelines and may require a larger corridor to incorporate a more gradual trail grade.

The study area includes several wetland areas as identified on the National Wetland Inventory (NWI). According to NWI, there are likely smaller wetland areas within the study corridor that are not indicated within their inventory that could impact final trail alignments. Hydric soils in combination with wetland plant species and wetland hydrology are considered indicators of a wetland, which require costly permitting if impacted2.

The Catawba River (named after the Native American tribe that first settled on its banks) is a tributary of the Wateree River in the states of North and South Carolina. The river is approximately 220 miles long and is considered one of “America’s Most Endangered Rivers” by the American Rivers organization. The river includes a series of reservoirs for flood control and hydroelectricity and provides drinking water to millions of residents. The headwaters of the Catawba River begin in the Blue Ridge Mountains in western McDowell County approximately 20 miles east of Asheville. The Catawba joins the Linville River and forms Lake James. The river then extends east and south, flowing through other impoundments near Morganton, Hickory, and Mooresville on its way to Lake Norman. From Lake Norman it flows south, passing west of Charlotte, before entering Lake Wylie, where it forms approximately ten miles of the border between North and South Carolina. The Catawba River continues through South Carolina before joining the Wateree River, which spills into the Atlantic Ocean.

FLOODPLAINS Floodplain areas provide both an opportunity and constraint for trail development. Since traditional development is often not suitable within floodplain areas, private landowners may be more willing to provide access for public trails within these areas. Also, these scenic areas attract wildlife, which creates an engaging trail experience. Within this study area, much of the floodplain areas along the Catawba River corridor are ideal for trail development. Although development is regulated within the floodplain, greenways and trails are allowed and can be permitted. Sound trail engineering techniques are necessary to ensure trails can sustain flooding. To the extent possible, greenway alignments should be avoided within the floodway1

STREAMS, LAKES, AND PONDS The County, State, and Federal government regulate the many waterbodies found throughout the study area3. Lake James and the Catawba River are the dominant waterways within this corridor. .

.

Avoid disturbance in the floodway. Avoid placement of structures or disturbance within the floodway. Floodways are regulated locally and by the Federal Emergency Management Agency (FEMA). Fill, structures (walls, kiosks, etc), and impervious services are discouraged. Any structures located within the floodway require a no-impact/no-rise certification through FEMA. These studies can vary on cost but can range from $2,500-$15,000 depending on complexity.

1

10

If wetlands are unavoidable, utilize elevated boardwalk systems. Boardwalks allow for travel over flat, poorly draining soils, standing water, and wetland features and have significantly less impact than other options. A section 404 (Clean Water Act) Permit may be required if the wetland is considered jurisdictional by the USACE. This means that the wetland is not isolated and part of a broader lake or water system. A small boardwalk for a non-isolated wetland with limited fill or dredging may qualify for a programmatic Nationwide Permit. Nationwide Permits are designed to streamline the permitting process for actions with limited disturbances. In addition to permitting, disturbances exceeding a tenth ( 0.1) of an acre would require mitigation which can increase project costs. Impacts under a tenth (0.1) of an acre do not trigger mitigation fees.

2

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

Maintain a 50-foot buffer from all waterways, particularly those regulated under the Catawba River Buffer Rules. The state requires a 50-foot buffer along the shorelines of Catawba River and associated lakes. Streams within the study area are identified by the State of North Carolina as having poor water quality and maintaining or improving an adequate vegetated buffer is crucial to improving the quality. Zone 1 of this buffer includes an undisturbed 30-foot buffer from top of bank in which trails are discouraged. Zone 2 is an additional 20-foot buffer. This zone allows for managed vegetation and trails and greenways. While trails are an allowable use within Zone 2, the NC Division of Water Quality requires a permit (through DWQ or designated local government). The applicant must show that disturbance has been minimized and no other alternatives exist.

3


RARE FLORA AND FAUNA The State Natural Heritage Program provides data identifying the state’s most sensitive environmental areas to be avoided; these areas are incorporated within the analysis map series at the end of this chapter. Rare flora and fauna species can also exist outside of these designated areas, which can alter final trail alignments prior to construction. Coordination with the U.S. Fish and Wildlife Service (USFWS) is an important aspect of the design process. Involving USFWS early on in the process can help avoid potential planning obstacles related to federally protected species. Additionally, permits2 like Section 401 and 404 will initiate the review of the State Natural Heritage Program database. If species are found within the project area, State or Federal requirements may dictate avoidance or mitigation.

Species identified by the State Natural Heritage Program within this study area include:

A| Northern Long-eared Bat B| Carolina Northern Flying Squirrel C| Brook Floater (Catawba River, McDowell County) D| Mountain Golden Heather plant (Lake James area) E| Peregrine Falcon (Lake James area) F| Bald Eagle (Lake James area)

THE NORTH AMERICAN BALD EAGLE FEATHER PROVIDES THE INSPIRATION FOR THE FONTA FLORA LOGO.

CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments

11


CULTURAL RESOURCES

NATIVE AMERICANS The Catawba River has served as a historic transportation route, cultural connector, and wildlife corridor throughout the area’s history. Early Native Americans in the area identified themselves as the Kawahcatawbas, “the people of the river.” The Catawba and Wateree Tribes used the river for transportation and traded with Spanish explorers at river outposts.

12

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

OVERMOUNTAIN MEN The Catawba River and its tributaries were also followed by Revolutionary War soldiers on their way to the Battle of Kings Mountain, SC in 1780. The Overmountain Victory National Historic Trail preserves and commemorates the route. The original Overmountain Victory National Historic Trail (OVNHT) route was identified by a National Parks Service research team. The team relied on the 1881 account of the march, which has been amended by local historians, descendants of battle participants, and other sources. As part of this congressionally designated trail, any officially certified portion of the OVNHT must lie within a one-mile corridor (half-mile on either side) of the historic route.


THE BUILT ENVIRONMENT The opportunities and constraints found within the built and human environment are critical for determining suitable trail locations and feasibility, ideal user experiences, construction costs, and necessary permits. This section highlights four (4) built environmental features and their implications for developing the Fonta Flora State Trail from Lake James to Marion, including: 1) Land Use; 2) Existing Trails and Parks; 3) Utilities; and 4) Transportation.

LAND USE SNAPSHOT Eastern Section

Central Section

The City of Marion

The eastern extent of the study area is anchored by a large private residential development that has provided easements for the FFST and OVNHT. Beyond this private development, the study area is typified by a rural wooded landscape with large tracts of land that includes Pisgah National Forest land.

The central section of the corridor exhibits a mix of large tracts and small tracts. Several of the larger tracts are dedicated to public and private recreational uses including: NC Wildlife Resources Game Lands; Black Bear Campground; Black Bear boat access, provided by Duke Energy; and Big League Camp, a baseball training facility.

The City of Marion’s northeastern edge is typified by single-family residential growth. Private residential development and areas of steep terrain create a challenge for establishing a public trail connecting Lake James to the City. Marion and the McDowell Trails Association have successfully constructed 1.6 miles of the Joseph McDowell Catawba River Greenway which serves as the western terminus of the study area.

CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments

13


THE BUILT ENVIRONMENT EXISTING PARKS AND GREENWAYS Burke County, McDowell county and Marion have a collection of parks and greenways that are ideal for trail connections. Some of these major assets include:

Fonta Flora State Trail: Lake James Loop

OVNHT at the 1780 Community

OVNHT at NC WRC Game Lands

Ten miles of the Fonta Flora State Trail were completed in 2017, and an additional 10 miles are currently under construction. When complete, the trail will provide for a complete loop around Lake James.

The western terminus of the study area begins with a one-mile certified segment of the OVNHT that extends through the 1780 Community. The trail segment is an extension of the OVNHT in Lake James State Park. Previous FFST planning efforts provide recommendations for connectivity to a new trailhead at the nearby Fonta Flora Whippoorwill Brewery.

Approximately 2 miles of the OVNHT extends through NC Wildlife Resources Commission Game Lands near Black Bear Creek. Trail parking and access is located at a gravel lot on Lake James Road.

Joseph McDowell Catawba River Greenway OVNHT at Lake James State Park This state park is a significant linkage connecting FFST Sections 1, 2, and 3. Two miles of certified OVNHT are located along Paddy Creek in the state park.

14

Black Bear Boat Access This public boating access area is owned by Duke Energy, which has plans to further improve the site with camp sites and day-use amenities in partnership with McDowell County.

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

Named for local Revolutionary War hero and member of the Overmountain Men, Marion’s greenway extends for almost 2 miles along the Catawba River. The historic McDowell House serves as a trailhead for the greenway.


UTILITIES The study area has a complex matrix of utilities that include transmission lines, utility towers, water lines, and sewer infrastructure. Sewer lines are often compatible with trails since existing easements preclude development. However, the easement will often need to be modified to provide for a public trail.

TRANSPORTATION The study area analysis includes an extensive review of the existing transportation network including the North Carolina Department of Transportation (NCDOT) right-of-way (ROW), NCDOT plans, existing bike and pedestrian infrastructure (crosswalks, bike lanes, etc.), railways, and existing greenways. NCDOT’s right-of-way was analyzed for the ability to accommodate a trail alignment or accommodate a widened shoulder. These opportunities are shown on the Site Analysis Maps with corresponding opportunities and constraints notes. CSX operates the former Clinchfield rail line on the west side of the North Fork Catawba River. If this rail were to ever become abandoned, a significant opportunity would exist to establish a considerable section of trail. The right-of-way and adjacent lands were analyzed as a potential future route, as illustrated in the maps and notes.

CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments

15



MAP AND PHOTO SERIES: PRELIMINARY TRAIL ROUTE ALTERNATIVES The map and photographic series, which spatially incorporates the natural and built environment analysis, highlights a host of preliminary trail route alternatives. These routes were further refined by local leaders to identify and engage landowners. This information will serve as an ongoing reference guide as alternative routes may need to be developed due to unforeseen barriers.

Dales a in unt

Mo 8

Ridge

237 reek1

d dy

sC

Nadias

Dales Cre

ek

t es

id Dav Bud

h ig sR W Te n

i ll

ll y

Tr ee

g

Gu

Bi

Rock H

Be

y

8 58

15 88

Do c

Sy ca

Pier

Fo re

g Brid

e

Obeth

0 - 30 > 30

rk

Pa

Newton

1700 Samaha

d Rid

ge

wo o

1501

1500 Vine

Madison

172

o Neb

t

Hurs

Prim

rose

ch t Chur Baptis

1743

Me

15 14

Garden

h

3

Logan

Deacon

Ya

Victoria Victor y

ille ersv

Bak

Mon te

Virgin ia F o r s yt he

Habitat Ch urc

rto n No

C

1 58 7

y

Ya nc

n ce

Leo

Tu

Pa

Bailey Creek

Bear Creek

Bar t

01

Run

Deer po rt

n Jackso Victory

on te vi M

1552

e an eL Blu

1552

Ri ve rbe

15 Duk e

Air

Dee p Fo rest

ald

n

Cheyenne

n Can no

H

Fa

rm

Riverview

Wo od s

Dead End

Johns Creek nd

Cross C reek

Deep nice

Cr es

Branch Academy

Pulliam

Finley

1703

Faith

l owel McD

Clay

Seagle

n

Oak

d

ga

1 5 37 ell

Garden

ark Aza rial P le moa

Highlan

Madison

rk

Pa

36 15ple a M

ow McD

Academy

Slope

Wildlife Club

FFBrew

Martin

Logan

Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped

nd e La

ts

am

ei g h

ls Hil

0.5 Miles

eH

iew ev

ke

L ak

mp Ca nt Hu

1 3

's

G

k La

0.25

st

d

0n

Parcels

La

i dg e

oo

B ea co nR

ap pe zio

e ersedg Wat

gh Hi Ridge

C

Miles

nw

id cks Do

h Hig

i lv ie w 0 - 30 > 30

1 1780 Development Trails e Existing OVNHT ertim m OVT Commuter Sum Motor Route OVT Historic Route ide ks 0.25 0.5 Rail Roads

ve

0e

Slope a

n

ve

Ha

n

Lo

Ra

h Hig

ps Cam

2

if gR

ell pb C am

Ber

l

id le R

38 15

ve

Cardinal

Mor

y

Pulliam

ue

ge

tains Cap S

y

er

Main

1

Donah

n

Hul

OVT Commuter Motor Route OVT Historic Route re Rail Roads mo s camore tain SyParcels ap Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped

1281

126

t

e idg

or

Sh

we

B

Bo

6

4

23

t

in

Po

te1

et

ns

r

am Bre

dle

k ela n d

t it u

McDowell County

Fo

B

ns in I nta

e

idg

La

e

er

Bra

Mo u

rR

da

Jp Mills

ve

4

L ak

luff

Riv

221

er

ne

Ce

5

GRAY JAMES H 1/3int &JOSHUA E GRAY 1/3int & MELISSA B GRAY

na

ba

20

es

e on

3

rina Ma

ri Ma

taw

O rc h

Pr

es am

GOODMAN MICHAEL ALVIN

G ra ys t

t

Ca

12

ga h

s

Ott

Co

tt

P is

J

res

rk

sie

1432

iew ff V ra

es

1724

ot

refo

Ba

ek

Cre

Ca d

New

Chev

ilda

8

ria iste

26 a 17

olin

Car Mat

6

13

7 14

ey Yanc

Burgin

l

owel

McD

lroad

Clark

12

r

CourtR ai

State

2 1 5 Fort

11

bert

g in m g a nFt ole n 15 15

e Turn

Ellis

70

10

Ro

is

hard Ric

7th

C

Hillcrest

d

ne Way 1700

D

ain

M

HMcDowell ill

yth

Fors

5

Mo r

is Chr

l

av

La

INSET MAP

9

Fern

cent Cr e s

Schoo

5th

Oak

nwoo

Court

1700

ar mo rest La

F

Gree

M n rga

Mo

bi

ain

Dogwood e dg Ri Yanc ey

10

Fo

Fo

Jo

6

ke

n ti o ta an

Ove

6

t oun L a ke M

158 2

Bear Clif f

Cla

Burke County

W

nny Bu m

7

8

t

2 1

ck

rth

w vie ke La

i ew ev

i

in Ma

B r ow n

or

9

Bla

No

La k

1550

r

ve

ff

rto

1 22

Fort

le ap

Clay

n

rso

Ca

Ba

Marion

Howell

ell

0.5 Miles

ow McD

er rn rk Pa

Highland

it

vista

ia

nt

New

Summ

Ridg evi ew

Virginia

er is t

bert

Vine

y

W

ce

Ro

Marion

0.25 lle

Cardinal

TJ

r

st a Fern

rp

ff

Myrtle

2

Lake James 1780 Development Trails Lk James Existing OVNHT

Wa lk

Camp

rlook

ate

op

70

Hill

09

12

ri

n

inso

Rob

er

Sh

hard

09

12

Sh

Lena

0

A

G

Ric

ne

1212 Grove

1198 en Gre

r

ew

Rob

i ch

rs

1214

McDowell County Ridge

rest

n

Lono Dogwood

SEE INSET MAP

n inso

Ma

Sowe

70

ke y

p

m Ca

Pl

o Sh

g Brid

G il

lley Va

l

hn

ture

Settlement Ridge

ey

e ing

e Fo

rd Howa

rhil

10

0 - 30 > 30

Cov

od lwo ure La

W

inte

Jo

Res er vo ir

Va

Slope

3

nc h

k Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped

re

Bear Cli

G Black Bear Campgroundrayst o

ky

6

Su

7 Na

8 9

nc e e idg yR

7

1780 Development Trails Existing OVNHT OVT Commuter Motor Route o lli Route OVT Historic nE so Rail C a rRoads Parcels

Ya

4

11 9 d fi

5

Hill rd

221

00 A p p l etr e e

15

La ke

C abin B

Big League Camp

By

re e k en C ard

t

y nle Co by

ca

e nle

ee Nix Cr

G ol

M oo

1

Justice et

1 5 0 6G

29

12

School

in

Holly

1510

w Vie

1302

igh well H Do Mc

Ro

b Bo

Hawksview

t

asan

Phe

C h a ri o t

Lake 10 James

rs me

2

d ar

mer

n ta M ou

River

Big League Camp

10

Joseph McDowell House

Pal

Gr ee

b

taw

Ca

Park

4

C h a r i ot

ke Jame s La

F ork

Lake James Landing

1

Ri

Riv

8

z

1550

ta

Ca

sa

Fork River

Lake James Landing

5 So

a wb

4

dero

iv aR

a r Cliff

Black Bear Campground

EQUITY TRUST CO.,CUSTODIAN F/B/O DAVID R. MAJKA

Amelia

z

Pon

er

Riverbreeze Campground & RV

7

1 3

CANNON RESOURCES LLC

ba aw

ld

Joseph McDowell Historic Greenway

t let

t

t Ca

d

er

re

nn

Fly

Lent

tty

1

be

t

1587

2

ke

Riverview Forest Lent

Riverview Forest

Sco

226

La

3

ro en

Go

7a

C

d el rfi

kins

Han

1501

De e

d oo oll w Kn

ab ankinser e

C

Hills

1

6

5

6 8

4

5

3 tt rtle Ba

es

NC Wildlife Commission NC Wildlife Commission Pisgah Game Land Designated Pisgah Game Nature Land Preserve Designated POOL C RANDY 1/2 UND. INTEREST LAIL TERESA POOL 1/2 UND. INT. Nature Preserve

2

9

oc

R

McGegers Branch

2

155

McDowell County

1553

ery tch Ha

He ron

sh

Peach

Toms Creek

Villa ge

ue

7

Lake Jam

1553

He

4 Fi 155

Bl

ille

y

8

Great Hill

k mloc

inv

no

od wo I d le

iss elwe

L 51 15

Iv ain

LINVILLE VIEW LLC

Ca n

int

Ed

Pisgah National Forest

Pisgah National Forest

nt Mou Po ntain Mou

Belvid ere

Sh ort o

1238 C 105

Paddy Creek

Creek

ek re yC ile Ba

B

State

CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments

17


yC ile Ba

Dales

Ridge

as

Burke County

GOODMAN MICHAEL ALVIN

k ela n d

es

h ig sR W

Te n

Dav

126

1

Dona

hue

n

Rock H

Gu

Bi

g

ll y

Tr ee

we

e idg

l

y

Hul

2

Lo

camore SyParcels

nd e La

15 88

am

ls Hil

d

18

iew ev

0.5 Miles

k La

0.25

oo

0 ide cks o D

nw

0 - 30 > 30

ve

Slope

G

Ra

tains Cap

Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

Wildlife Club

mp Ca nt u H

1 3

FFBrew

's

n

Rail Roads

e

idg

le R

if gR

ell pb C am

Lk James

1780 Development Trails Existing OVNHT OVT Commuter Motor Route OVT Historic Route

1281

Bo

rt

4

n

Su

o Sh

t

in

Po

B

t se

6

McDowell County

F

23

na

10

e

or

te1

ri Ma

L ak

B

t it u

t

La

ns in I nta

4

Black Bear Campground

i ll

5

GRAY JAMES H 1/3int &JOSHUA E GRAY 1/3int & MELISSA B GRAY

id

3

Bud

ne

9

ar

Mo u

Gra ys to

Cl

ve

liff

2

6

J

Myrtle

er

Bear C

es

Nadia s

Pr

La ke

d dy

ga h

7

ky

P is

reserve

5

es am

8

7

Pa

R

oc

sC

e

8

6

reek1

Dee

vill Lin LINVILLE VIEW LLC

2 155

237

rest p Fo

51

Pisgah National Forest

iew ff V

15

MAP 2: STUDY AREA 1 SITE ANALYSIS

Sh ort o

5 1238 C 10

Paddy Creek

ek re

ion

Creek

STUDY AREA 1: SITE ANALYSIS

o Neb

g Brid

e

Obeth

STUDY AREA 1


STUDY AREA 1: OPPORTUNITIES AND CONSTRAINTS Opportunities

Constraints

1

Connect existing OVNHT

1

Existing OVNHT requires improvements

2

Connect to Fonta Flora Brewery Trailhead

2

Narrow road shoulder

3

Positive landowner at Campbell’s Trace

3

Possible road crossing at Lake James Road

4

Subdivision potentially willing to allow trail

4

Parcelization at lakeside private developments

5

Potential for lakeside trail

5

Private residential subdivisions

6

Potentially willing landowners

6

Narrow bridge over Bailey Creek

7

Large, undeveloped tracts of land

7

Lack of bicycle/pedestrian infrastructure at Bear Creek Marina & Campground

8

Connection to Pisgah National Forest Game Lands

8

Narrow bridge over Bear Creek

9

Connect to Black Bear Campground

10

Connect to Black Bear Boat Access

2

3

Positive landowner at Campbell’s Trace

10

The Fonta Flora Brewery at Whippoorwill Farm is a significant destination on the FFST

1

Existing OVNHT at Campbell’s Trace requires improvements

5

Private residential development presents a significant barrier to a trail alignment along the lake shore

The Black Bear Marina & Campground is an asset that could be linked to the FFST

CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments

19


a in

ald

Mo

unt

STUDY AREA 2: SITE ANALYSIS

Bailey Creek

Bear Creek

B

Pisgah National Forest

Ca n

ek

4

5

1

e

idg

rR

1552

luff

Lake James

7 Na

tur

y

8

a i lv ie w

STUDY AREA 2 FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

n

ve

Ha

gh Hi Ridge

C

B ea co nR

ap pe zio

0n

La

i dg e

0.25

e ersedg Wat

ke

La

Deacon

Ya

Camp

ide ks

1 1780 Development Trails e Existing OVNHT ertim m OVT Commuter Sum Motor Route OVT Historic Route Rail Roads

Parcels

h Hig

n ce

Hig

S

6

s amp hC

Do c

1

15 0

s tain

Settlement Ridge

Big League Camp

8 9

C

Sy ca

er

v Ri

10

ap

58

re mo

ba

aw

t Ca

eW alk

Fo re

1550

sie

Jo

5

r

tz

C h a ri o t

ive

R ba

Len

4

Pier

Bar t

1 58 7

t

taw

C abin B

Lake James Landing

10

rina Ma

res

Ca

Amelia

8

Fo

rk

River

Fo

F ork

ck

rth

CANNON RESOURCES LLC

t

w vie ke La

Riverview Forest

re

2 1

3

EQUITY TRUST CO.,CUSTODIAN F/B/O DAVID R. MAJKA Bla

C

be

t let

No

ankins

G ra ys t

da

1

6

Black Bear Campground

3 7a

Dales C re liff

Ce

2

McDowell County

H

Bear C

POOL C RANDY 1/2 UND. INTEREST LAIL TERESA POOL 1/2 UND. INT.

ill

a r Cliff

e on

od wo I d le

NC Wildlife Commission Pisgah Game Land Designated Nature Preserve

Great H

9

20

Be

es

Cheyenne

t

McGegers Branch

Poin

Lake Jam

1553

MAP 3: STUDY AREA 2 SITE ANALYSIS

Ivy

ntain

Ed

iss elwe

no

n

tain

un Mo Mou

Belvid ere

st

ke

L ak

0.5 Miles

eH

ei g h

ts

Slope

Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped 0 - 30 > 30


STUDY AREA 2: OPPORTUNITIES AND CONSTRAINTS Opportunities

Constraints

1

Connect to Black Bear Boat Access

1

Steep terrain

2

Future site improvements could include trailhead

2

North Fork Catawba River bridge crossing

3

Duke Energy property

3

Secluded private development

4

Existing OVNHT at Pisgah Gameland

5

4

Parcelization at lakeside private development

Opportunity for trail head at existing trail parking

6

Flat floodplain may be suitable for trailhead

7

Connect to Lake James Landing & RV Park

8

Connect to Cannon-Big League Camp at Hankins Rd.

9

Potential rail-with-trail

10

Opportunity for increased trail visibility at Big League Camp entrance

5

Narrow/steep shoulder would require elevated trail infrastructure

6

Small parcels with no easements

7

Rail-with-trail requires coordination with CSX

8

Elevated bridge would require significant fill to match grade

9

Narrow road shoulder around blind curve

10

Narrow shoulders on bridge

1

Control Point: Connection to Pisgah National Forest Gamelands Parking Area

4

Existing OVNHT and trail parking at Pisgah Game Land

8

Pinch point at CSX railroad overpass on Lake James Road

10

Narrow bridge

1

Opportunity to connect Black Bear Boat Access to nearby Bear Creek Marina

8

Connect to Cannon-Big League Camp at Hankins Road

CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments

21


ne La Blu e

1552

Can no

n

nd

Fa rm

Riverview

Johns Creek

Dead End

Wo od s Deep

Ber

C h a r i ot

ke Jame s La

1550

Ri ve rbe

1

tz

nice

Fork River

n

yn

i ew ev

Cross C reek

et Fl

Len

ke

er

lett

1587

2

rt Ba

La k

Jp Mills

C

d el rfi

La

3

Riverview Forest

1501

De e

tty

226

n

lde

Go

Riverbreeze Campground & RV

143

2

Pon

osa

Par

Leo

Ya nc

od

1500

Newton

Ri d

ge Vine

8

3

15 Madison

172

wo

1501

Victoria Victory

le ersv il

3

Logan

Branch Academy

Finley

Garden

urc h

Habitat Ch

rto n

No

Pulliam

1703

Tu

14

Bak

Mon te

he

Virgin ia F o r s yt

Victory

on te vi M

Cr es Garden

174

Run

Deer

on Jacks

Main

Madison

ll

owe

Academy

38 Prim

ch t Chur Baptis Faith McD

Seagle

n

t

Hurs

d

ga Mor

Oak

Martin

36 15ple a M

ll owe

Cardinal

Highlan

New

Clay

ey

Logan

15

ve

Me

e

rt po Air

12

20

O rc h

Br ad ley

am

Bre

Co

ark Aza rial P le moa 1 5 37 McD

tt

ter Ot

es

k

r Pa

r

1724

k

Ca d

g

in

m

e Turn

a1

8

t

6 g anFtole1n515

vy Che

tilda

Ma

726

ber

ark

tP

foo

re Ba

ree

hC

syt

For Ro

is

5

13

INSET MAP

d har

Fort

olin

Car

n

7 14

c Yan

Burgin

Clark

d

1

6

Ric

h 7t

C

roa

52

12

av

D

h

5t

Oak

Hillcrest

Fer

Mo r

is

11

u Mo

Dogwood e dg Ri Yanc ey

9

158 2

cent Cr e s

Chr

10

HMcDowell ill

CourtR ail

State

nny

l

8

in nta

ia er

Bu

Marion M

F

ll

owe

McD

1700

ne Way 1700

bi

7

ist

in

Ma

m

t

W

1 Ellis

Court

70

or

i

22

Ba

ain

d

nwoo

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

M n rga

Mo

Clay

C

B r ow n

e

l ap

ar mo rest La

vista

Schoo

Howell

well

n

o ars

Fort

o McD

Va

it

Summ

0.5 Miles

Vine

a

y

er rn rk Pa

New

0.25 lle

t

Highland

nt

Len

0

ber

Marion

e 1212 Grov

70

Virginia

Gree

ce

Ro

rp

L a ke

Ridg evi ew

ia

op

st a Fern

d har

09

12

Sh

S

Ric

i ch

ne

rri

he

Dogwood

SEE INSET MAP

son

in Rob Ma

rs

1214

Rob

Hill

09

12

er is t

70

ke y

rd

Sowe

son

in

W

G il

Cardinal

ff

to

r

hn

lley Va

ill

A

er

ng

Gi

rest

on Lon

Ove

Ridge

e Fo

k

rloo

ate

gew

Cov

Howa

Res er vo ir

erh

McDowell County

or

Brid

Jo

n ti o ta an l P

Sh

e idg yR

3

TJ

nc e

od lwo ure La

int

1198 n ee Gr

Hill rd

re

p

m

Ca

ey

By

W

10

0 - 30 > 30

t

reek Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped

M oo

nc h

1780 Development Trails Existing OVNHT OVT Commuter Motor Route lio OVT Historic El Route on s Rail Roads r Ca Parcels

rse

y nle Co by

7

d fi

me

re e k en C ard

Ro

at

bc

Bo

e nle

Nix C

G ol

Ya

4

11 9

t

san

221

00 A p p l etr e e

15

Holly

1510

1 5 0 6G

School

in

1

Justice

So

2

29

12

1302

igh well H Do Mc

n ta M ou

w Vie

er

a Phe

Lake James

k

Joseph McDowell House

Palm

Gr ee

Big League Camp

5

er

Riv

Hawksview

1

Ca

Duk

ba

taw

der

221

Joseph McDowell Historic Greenway

4

er

iv

aR

b taw

Pulliam

MAP 4: STUDY AREA 3 SITE ANALYSIS

ery tch Ha

Sco

d oo oll w Kn kins Han

ab

rod

d ar

22

sh

Peach

Toms Creek

Villa ge

He ron

Lake James Landing

Ca

Slope

Hills

ue

1553

Bl

4 Fi 155

STUDY AREA 3: SITE ANALYSIS lock

Hem

1700 Samaha

State

STUDY AREA 3

rose


STUDY AREA 3: OPPORTUNITIES AND CONSTRAINTS Opportunities

1

Constraints

Large undeveloped parcels provide connectivity to Justice Road

2

Catawba River corridor is ideal trail setting

3

Utilize Catawba River floodplain corridor

4

Large parcels on south side of Catawba River

5

Connect to Catawba River Greenway

6

Existing sidewalk begins at Oakwood Drive

7

Retrofit existing sidewalk into multi-use path

8

Existing sidewalk begins at Monte Vista Avenue

9

Wide right-of-way on Fleming Avenue

10

Connect to Marion Community Building

11 12

Connect to Marion Town Hall

13

Existing sidewalk on south side of N. Garden St.

14

Existing parking on Fort Street could provide trail parking

1

Catawba River crossing will require bridge

2

Narrow shoulders on Holly Street

3

Narrow shoulders on Airport Road

4 5 6

Narrow shoulders & high traffic volume on US 70

7

On-street parking along Fort St. utilizes available right of way

8

Steep slope along Court St.

1

Control Point: Connection to Yancey Rd.

School turn lane utilizes Fleming St. right-of way Steep slope along North Madison Street

School turn lane utilizes Fleming St. right-of way

Wide right-of-way on Fleming Street provides opportunity for a sidepath

4

Narrow shoulders & high traffic volume on US 70

5

Connect to Joseph McDowell Catawba River Greenway

12

Double-loaded sidewalks on New Street near Town Hall

Double-loaded sidewalks on New Street

5

9

CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments

23



2

TRAIL C H A R A C T E R A N D D E S I G N GUIDELIN ES IN THIS CHAPTER: THIS CHAPTER PROVIDES DESIGN DETAILS FOR VARIOUS TRAIL TYPES AND TRAIL SUPPORT FACILITIES AND OFFERS INSIGHT FOR INCORPORATING SOCIAL MEDIA. This chapter describes specific trail construction

standards and trail types to ensure minimal maintenance and the best user experience.

Additionally, this chapter defines three trail types and illustrates their transitions along the preferred

A| SUSTAINABLE TRAIL DESIGN & CONSTRUCTION

trail alignment.

B| TRAIL TYPES

A unique architectural and branding theme is

C| TRAIL PROFILE

presented for signage, wayfinding, and other

D| TRAIL SUPPORT FACILITIES

trail support facilities. This chapter concludes

with recommendations for using social media to market the trail.

E| SOCIAL MEDIA MARKETING

25


TRAIL CHARACTER SUSTAINABLE TRAIL DESIGN The trail must be designed and constructed to minimize erosion and ongoing maintenance, while providing for a leisure, family-oriented experience. The trail width will be approximately five-feet wide and allow for multiple users and emergency access from off-road vehicles. The overall average trail grade or steepness will be 5% or less. The trail will be slightly rolling with a gentle grade that follows the terrain contours. The trail will be slightly out-sloped, and meanders and undulates frequently to remove water from the trail surface and create interest. The trail corridor will remain as narrow as possible while still maintaining the required tread width. The trail design will utilize the five essential elements of sustainable trails as outlined in the International Mountain Bicycling Association’s (IMBA) publication “Trail Solutions.”

26

1. THE HALF RULE A trail’s grade shouldn’t exceed half the grade of the hillside or sideslope that the trail traverses. If the grade does exceed half the sideslope, its considered a fall-line trail. Water will flow down a fall-line trail rather than run across it.

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

2. THE TEN PERCENT AVERAGE GUIDELINE An average trail grade of 10 percent or less is considered sustainable. This doesn’t mean that all trails should be kept under 10 percent, but the trail builder will need to limit the length of sections that exceed 10 percent.


THE FIVE ESSENTIAL ELEMENTS OF SUSTAINABLE TRAILS

3. MAXIMUM SUSTAINABLE TRAIL GRADES Maximum grade is the steepest portion of a trail that is more than approximately 10 feet in length. It’s critical to determine what the maximum allowable trail grade will be prior to beginning construction. Several factors should be considered when determining the maximum sustainable trail grade which include:

4. GRADE REVERSALS

5. OUTSLOPE

A grade reversal is a point where an ascending trail changes direction subtly for 10 to 50 linear feet before ascending again. This change in grade allows for water to exit the trail.

Outslopes allow water to sheet flow off the trail instead of channeling down its center.

• Half Rule • Soil Types • Rock • Annual Rainfall Amount • Grade Reversals • Type of Users • Number of Users • Difficulty Level

MAX

CHAPTER 2: Trail Character and Design Guidelines

27


TRAIL CHARACTER TRAIL CONSTRUCTION Members and associates of the Professional Trailbuilders Association (PTBA) should be preferred contractors for constructing the trail with mechanized equipment. These contractors have a thorough understanding of sustainable trail design and construction.

Any excess or disturbed soil outside the trail tread is evenly distributed and covered with leaves, organic debris, and other natural materials to aid in aesthetics and sedimentation and erosion control.

FULL BENCH CUT The trail will be constructed using a “full bench cut” in which the entire trail tread is built on solid ground.

Volunteers may also work with PTBA contractors in a “hybrid” manner. When utilizing this method, the contractor is responsible for the rough cut of the trail tread and volunteers complete the finish work. Burke County will be responsible for securing any required local, state, or federal permits for construction. The trail will be constructed using a “full bench cut” in which the entire trail tread is built on solid ground. A “partial bench cut” which is similar to “cut and fill” will only be utilized if a full bench cut is not feasible due to rock outcrops, slabs, or other natural features. A partial bench cut uses loose fill dirt to construct a portion of the trail treads. The fill dirt has a tendency to loosen over time and can then wash and erode. This issue is minimized when constructing a full bench cut. The trail bed will be shaped to leave an even, compacted, uniform surface free of indentations or protruding roots and stumps. The grading of the trail tread, back slope, and drainage features will be finished to a smooth, stable surface.

28

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

SOLID GROUND

Details from IMBA


TRAIL TYPES Four trail types are proposed along the preferred alignment. A specific trail type is proposed according to its surrounding environment, whether it is for safety along roadways or to enhance user experience.

TYPICAL GREENWAY 10’ PAVED ASPHALT

TYPICAL GREENWAY 10’ PAVED ASPHALT

MILE MARKER FENCING TO MARK PRIVATE PROPERTY BOUNDARY

30’ PREFERRED BUFFER TO RIVER TO PROTECT WATER QUALITY

THE JOSEPH MCDOWELL CATAWBA RIVER GREENWAY EXTENDS FOR 2 MILES ALONG THE CATAWBA RIVER IN MARION.

10’ PAVED ASPHALT

User Group: Multi-Use

Average Construction Cost: $90/ln. ft.

Material: Paved Asphalt

Preferred Easement Width: 50’

Preferred Width: 10’

Minimum Easement Width: 20’

CHAPTER 2: Trail Character and Design Guidelines

29


TRAIL CHARACTER TRAIL TYPES NCDOT SIDEPATH

DUAL-USE TRAIL

8’ PAVED ASPHALT

5’ NATURAL SURFACE

3:1 MAX CROSS

GUARD RAIL

2’-3’ SHOULDER

8’ PAVED ASPHALT

2’-3’ CLEARED

2’-3’ SHOULDER

5’

5’ NATURAL SURFACE

2’-3’ CLEARED

User Group: Multi-Use

Average Construction Cost: $120/ln. ft.

User Group: Hikers and Cyclists

Average Construction Cost: $6/ln. ft.

Material: Paved asphalt

Preferred Easement Width: 25’

Material: Native Soils

Preferred Easement Width: 50’

Preferred Width: 8’

Minimum Easement Width: 25’

Preferred Width: 5’

Minimum Easement Width: 10’

Note: Trail to be approved in accordance with NCDOT encroachment agreement.

30

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN


TOWN SIDE PATH 8’ CONCRETE

User Group: Multi-Use

Average Construction Cost: $90/ln. ft.

Material: Concrete

Preferred Easement Width: 25’ or in ROW

Preferred Width: 8’

Minimum Easement Width: 25’ or in ROW CHAPTER 2: Trail Character and Design Guidelines

31


TRAIL CHARACTER TRAIL TYPE PROFILE There are two (2) primary trail type transitions proposed along the preferred trail route, which extends approximately 20 miles. The Trail Type Profile identifies the transition location, along with associated length, for each trail type.

MATCHLINE

*Profile depicts one of three preferred route options*

APPROX. DISTANCE IN MILES 32

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN


MATCHLINE

*Final trail type will depend on specific environmental conditions and whether trail is located within NCDOT ROW or within a private trail easement.

APPROX. DISTANCE IN MILES CHAPTER 2: Trail Character and Design Guidelines

33


TRAIL SUPPORT FACILITIES OVERVIEW A unique architectural and branding theme is presented for trail support facilities on the following pages.

TRAILHEAD KIOSK

PICNIC SHELTER

TRAILHEAD MONUMENT

The kiosk will provide a trail map and other important information for trail users. This facility will be located at trailheads and pocket parks along the FFST.

The shelter design includes a timber frame structure. This architectural style, along with a cedar shingle roof, provides for a natural character conducive to the Lake James environment.

Large monuments will be located at major trailheads or pocket park facilities that provide access to the FFST. This monument should also provide for the name of the specific trailhead or pocket park.

34

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN


VAULT TOILET

BREAKAWAY SIGN: SHARED ROUTE

MILEAGE POST

The vault toilet does not require a septic system, but must be pumped regularly. This facility will be provided for at the Fonta Flora County Park

The FFST shares a route with the Overmountain Victory National Historic Trail. The directional signage post will provide users with important trail information and is compliant with NCDOT standards.

Mileage posts not only provide distance information, but also serve as confidence markers that create a feeling of safety.

CHAPTER 2: Trail Character and Design Guidelines

35


SUPPORT FACILITIES TRAIL FEATURES & SITE FURNITURE Burke County is working in partnership with Oak Hill Iron and other local artisans to develop custom site furniture and other support facilities. These unique and custom elements will be provided for at Fonta Flora County Park, trailheads, pocket parks, and other locations where trail users can be served.

TRAILHEAD KIOSK

36

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

BICYCLE RACK

BENCHES

NCDOT BRIDGE DETAIL

TRAILHEAD MONUMENT


SOCIAL MEDIA: THE NEW WORD OF MOUTH Trail users should be encouraged to utilize social media to share their experiences with their “friends” and “followers.” Special signage along the trail will signal users to consider posting pictures of themselves or their group of friends as they walk or ride bikes along the trail. In addition, special props and features should be developed during the final design phase. After all, who can market this destination-quality trail better than trail users themselves? Lets take advantage of social media - the new word of mouth.

#FONTAFLORA The proposed official hashtag for the Fonta Flora State Trail is #fontaflora.

Black Bear Trailhead, Lake James

The use of this hashtag will allow local tourism leaders to curate local photos and content that can be shared on website and re-posted through other social media platforms.

CROSS PROMOTE WITH OTHER NOTABLE HASHTAGS @NCParks #LakeJames #findyourpark #trail2victory

112 likes

dbdplanning

Great day for a ride on #fontaflora state trail! #lakejames #ncstatetrails

CHAPTER 2: Trail Character and Design Guidelines

37



3

R E C O MME N D AT I O N S THIS CHAPTER SERVES AS THE HEART OF THE TRAIL MASTER PLAN, PROVIDING SPECIFIC TRAIL ALIGNMENTS AND RECOMMENDATIONS.

Specific trail alignments and recommendations are provided for the FFST within three (3) planning sections. Trail

recommendations

are

supported

with

renderings that demonstrate trail character at

IN THIS CHAPTER: A| PLANNING SECTIONS OVERVIEW B| TRAIL SECTION RECOMMENDATIONS

specific locations.

39


PLANNING SECTIONS Y NT

NC WILDLIFE COMMISSION GAME LANDS

3

A RIVER CATAWB

BLACK BEAR BOAT ACCESS

BLACK BEAR CAMPGROUND

HISTORIC OVNHT BIG LEAGUE CAMP

LAKE JAMES LANDING

MAP 5: PLANNING SECTIONS

Y NT

U CO

1

LAKE JAMES

FONTA FLORA BREWERY LAKE JAMES STATE PARK

JOSEPH MCDOWELL HOUSE

70 221

BIG LEAGUE CAMP >> MCDOWELL HOUSE

OU EC

BLACK BEAR BOAT ACCESS >> BIG LEAGUE CAMP

LL

2 3

RK

FONTA FLORA BREWERY >> BLACK BEAR BOAT ACCESS

E OW

1

BU

The planning sections include:

PISGAH NATIONAL FOREST 2

PLANNING SECTIONS

D MC

The 20-mile study area from Lake James to Marion is divided into three (3) planning sections. The geographic extent of each section includes a beginning and ending terminus that features a key asset or significant connectivity point for the trail. Many of the planning sections represent project areas that can be developed independently over time, providing a logical method for implementation as landowner willingness, funding, and other opportunities arise.

MARION 70

THE 20-MILE STUDY AREA FROM LAKE JAMES TO MARION IS DIVIDED INTO THREE (3) PLANNING SECTIONS; THIS CHAPTER IS ORGANIZED ACCORDINGLY. 70

40

40

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN


E UT

N

G

HISTORIC OVHT

H U L LY G

UL

LY

G

T

MP CA

LA

AND ME L GA

H U

N

N LO

GE

FONTA FLORA BREWERY/ SHARED TRAILHEAD WITH OVNHT

LAKE JAMES >> MARION: BY THE NUMBERS

ID

ER

L RIF

LL

E

EACH PLANNING SECTION IS ANCHORED BY A MAP THAT HIGHLIGHTS PROPOSED TRAIL ROUTES AND FEATURES.

ROCK HI

N

EE

AHU

TR

BI

DON

BO WE

126

E TRAC ’S CA M PB E LL

ILS TRA

TE

BUD

L BEL ’S MP CA

1281

DAV ID

ST RE

1780

W HI GS

D

TRACE

IN T PO ET S N

E L AN

ORT B B SH

L AK

IT ST IN IN TA

POCKET PARK

L A KE F O DGE RI

HI ST ORIC OVH

RIDGE LI

ES JAM

N MOU

E LA K

G RID OB NEB

E

LAKE JAMES STATE PARK

KE

V W IE

S HILL

OBETH

WILDLIFE CLUB

23.5 3 9 16 5 $6.25M

>>

TRAIL MILES

>>

SHARED OVNHT MILES

>> TRAILHEADS

ABOUT THE PLANNING SECTION MAPS Each planning section is anchored by a map that highlights proposed trail routes, trail features, and landowner sentiment. The proposed routes are identified as either preferred, alternate, or spur. These trail alignments are the result of extensive analysis, including environmental feasibility, landowner willingness, and insights provided by local government and local trail development leaders. Noted trail features include the physical infrastructure and facilities that support the proposed trail. These features are highlighted along the preferred route and provide critical information for developing an

estimate of probable cost for each section. These features include trailheads and crossings associated with either a road or water feature. Trailheads will provide for parking and trail user orientation. Road crossings indicate the need to provide for traffic calming measures and appropriate signage for both trail users and motorists. Major bridges indicate a significant stream or river crossing that requires a bridge greater than 20 feet in length.

>>

ROAD CROSSINGS

>>

MAJOR BRIDGES

>>

APPROX. COST

QUICK FACTS Each planning section begins with a “quick facts” exhibit. This information includes the trail distance, trail type (see Chapter 2: Design Guidelines), and key features and assets associated with each section.

CHAPTER 3: Recommendations

41


SECTION 1

FONTA FLORA BREWERY >> BLACK BEAR BOAT ACCESS PROPOSED TRAILS KE

UN CO

Y NT

LL

U CO

WE DO

MC

R BU

TY

PISGAH NATIONAL FOREST 2

PLANNING SECTI VICINITY MAPONS

1 NC WILDLIFE COMMISSION GAME LANDS

3

A RIVER CATAWB

BLACK BEAR BOAT ACCESS

BLACK BEAR CAMPGROUND

HISTORIC OVNHT BIG LEAGUE CAMP

LAKE JAMES LANDING

LAKE JAMES

FONTA FLORA BREWERY LAKE JAMES STATE PARK

JOSEPH MCDOWELL HOUSE

70 221

MARION 70

70

FONTA FLORA BREWERY BLACK BEAR BOAT ACCESS 40

TOTAL LENGTH: TRAIL TYPE

6.0 MILES NCDOT SIDEPATH TRAIL

DUAL-USE

ESTIMATED COST: POINTS OF INTEREST:

$362,530

FONTA FLORA BREWERY

POCKET PARK OVNHT TRAILHEAD BLACK BEAR CAMPGROUND

42

>>

This planning section extends approximately six (6) miles from the Fonta Flora Brewery at Whippoorwill Farm to Black Bear Boat Access on Lake James Road. The Fonta Flora Farmhouse Brewery property provides a significant opportunity for a destination-quality trailhead. A short spur trail, approximately 400 ft. long, will connect the brewery and trailhead to an existing segment of the OVNHT within Lake James State Park. The connector will require cooperation with a private landowner to cross an existing gravel driveway.

1

The OVNHT crosses Hwy. 126 just south of the Fonta Flora Brewery. After crossing Hwy. 126, a short NCDOT sidepath will connect to the one mile segment of certified OVNHT that extends through the 1780 Community at Campbell’s Trace. This segment of existing OVNHT may require reconstruction and resurfacing to a native-soil tread that provides an ideal experience for bicyclists and hikers. The trail segment extends through the 1780 Community to a pocket park near the lake shore. From the 1780 Community, easements secured by Burke County will allow the dual-use trail to continue north for approximately one mile to a planned trailhead on Lake James Road.

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

From the trailhead, the route extends south into McDowell County turning west across Lake James Road. The trail continues west through large, undeveloped rural tracts for 1.25 miles, crossing Linville Road and Dales Creek. After crossing Dales Creek, the trail enters Pisgah National Forest Land and extends for another 1.25 miles to Bailey Creek before turning south into the Pisgah Game Lands. The route connects to an existing trailhead for the OVNHT then crosses to the east side of Lake James Road, transitioning to an NCDOT sidepath that extends for approximately 375 ft. to the existing vehicular bridge over Bear Creek. The trail will use the bridge shoulder then continue as a paved sidepath for approximately 170 ft. before exiting NCDOT right-of-way to enter Black Bear Boat Access property and transitioning back to a natural surface dual-use trail. An alternate route south of Lake James Road extends through undeveloped tracts to connect to the Black Bear Campground.

2

PHOTOS:

(1) THE FONTA FLORA BREWERY AT WHIPOORWILL PROVIDES A UNIQUE TRAILHEAD OPPORTUNITY. (2) EXISTING OVNHT CROSSING AT HWY. 126 WILL REQUIRE REDESIGN FOR BICYCLES.


SECTION 1: FONTA FLORA BREWERY >> BLACK BEAR BOAT ACCESS TRAIL FEATURES Trailheads This planning section includes three (3) trailheads. The proposed trailhead located at Fonta Flora Brewery at Whippoorwill Farm serves as the eastern terminus of the study area. The brewery occupies eight acres of the historic dairy farm property while the remaining 40 acres have been conserved in perpetuity through a partnership between Foothills Land Conservancy and the NC Division of State Parks. Burke County has secured an easement for a trailhead on the east side of Lake James Road located north of the Burke-McDowell County line. The trail connects to an existing NC Wildlife

Resources trailhead for the OVNHT located on Lake James Road across from the entrance to Black Bear Boating Access. The trailhead provides a small gravel parking area adjacent to Bear Creek that will require driveway improvements and signage to provide visibility from Lake James Road.

Crossings Within this section there are four (4) significant road crossings and one (1) major bridge over Bailey Creek. The FFST crosses NC Highway 126 south of the Fonta Flora Brewery. This is an existing crossing for the OVNHT that will require redesign to allow

3 PHOTOS:

(3) EXISTING NC WILDLIFE RESOURCES TRAILHEAD FOR THE OVNHT LOCATED ON LAKE JAMES ROAD. (4) ENHANCEMENTS CONSISTENT WITH OTHER NCDOT BRIDGES UTILIZED BY THE FFST, SUCH AS BRIDGEWATER, SHOULD BE APPLIED TO THE BEAR CREEK BRIDGE. THESE INCLUDE: CHANGE IN PAVEMENT COLOR, RAILING, AND USE OFTHE FFST LOGO

4

bicycles to achieve road grade and cross the road where both trail users and vehicle drivers have a clear line of sight. This can be achieved by utilizing an existing abandoned road bed with two to three moderate switchbacks. Currently, the OVNHT utilizes a set of stairs to achieve grade before continuing west through the 1780 Community. The trail crosses Lake James Road twice in this planning section. The first crossing is located south of the planned trailhead. The second Lake James Road crossing occurs as the trail leaves the OVNHT trailhead to connect to Black Bear Boat Access. The route also crosses Linville Road between the Lake James Road Trailhead and the OVNHT Trailhead. These crossings should include design measures to slow vehicular traffic and notify motorists of the trail crossing. The trail crossing over Bailey Creek will require a significant bridge. A bridge will also be necessary to cross Dales Creek west of Linville Road. CHAPTER 3: Recommendations

43


1238

BU OU EC

C 105

RK SH OR T

DYS CREE K

PF OR EST

PA D

MYRTLE

PIS

GE IAS R ID

ES

GR AY S

TRAIL FEATURES PREFERRED TRAIL ROUTE

HISTORIC OVHT

PLANNED TRAILHEAD

H U L LY G

UL

LY

COMPLETED FFST

GE

FEDERAL LAND

LE

FFST ON PROPOSED LOCAL TRAIL

IF GR

DUKE ENERGY PROPERTY EXISTING LOCAL TRAIL

STATE LAND

N

PARCELS OF

15 ALTERNATE TRAIL ROUTE

LA KE

0

1/16 1/8

1/4 MI.

W IE

D

O

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN N

T

MP CA G RID OB NEB

E

V

S HILL

44

FLOOD PLAIN

SIDE CK

RAVENWOOD

TAINS CAP

AND ME L GA

INTEREST

HISTORIC OVNHT ROUTE

H U

EXISTING LOCAL TRAIL

WILDLIFE CLUB

FONTA FLORA BREWERY/ SHARED TRAILHEAD WITH OVNHT

RID

N LO

PROPOSED FFST ON

O RE

88

SYCAM

LL

TR

TRAILS

E TRAC ’S CA M PB E LL

N

FIELD NOTES

ROCK HI

W HI GS N

SU

EE

E

BO WE

G

1281

AHU

ILS

BI

DON

126

TRA

TE

ORT

L BEL ’S MP CA

1780

LAKE JAMES

IN T PO ET NS

ST RE

TRACE

BLACK BEAR BOAT ACCESS/ FONTA FLORA AND OVNHT SHARED TRAILHEAD

L A KE F O DGE RI

D

E UT

I

A

E L AN

B B SH

L AK

DAV ID

ES T KE LA

GE

POCKET PARK

IT ST IN IN TA

RID

CR

R DA

ES JAM

N MOU

NE TO

CE

E LA K

BUD

FF

R MA

N

HI ST ORIC OVH T

RIDGE

C

LI

FF

LI RC

A BE

BLACK BEAR CAMPGROUND

LINE

NAD

VE ER

AR BE

PARKING AND TRAILHEAD FOR OVNHT

AR AS

PR

MES E JA

CL

H GA

LA K

B E A R CR EE K EXISTING OVNHT

K CREE

E

DEE

Y NT

ILL NV LI

R OCKY

PLANNED BRIDGE CROSSING

Y PADD

F VIEW OF

Y

51

15

U CO

NT

LL

WE DO MC

DALES CREE K

FONTA FLORA BREWERY >> BLACK BEAR BOAT ACCESS

PISGAH NATIONAL FOREST

BAILEY CREEK

MAP 6: PLANNING SECTION 1

SECTION 1

OBETH

LAKE JAMES STATE PARK


EXHIBIT 1: BREWING UP ADVENTURE The Fonta Flora Brewery at Whippoorwill Farm provides an opportunity for a destination-quality trailhead. A short connector path will link the brewery to the FFST/OVNHT in Lake James State Park near Paddy’s Creek.

EXISTING

CHAPTER 3: Recommendations

45


SECTION 2

BLACK BEAR BOAT ACCESS >> BIG LEAGUE CAMP

KE

UN CO TY

NC WILDLIFE COMMISSION GAME LANDS

A RIVER CATAWB

BLACK BEAR BOAT ACCESS

BLACK BEAR CAMPGROUND

HISTORIC OVNHT BIG LEAGUE CAMP

LAKE JAMES LANDING

LAKE JAMES

FONTA FLORA BREWERY LAKE JAMES STATE PARK

JOSEPH MCDOWELL HOUSE

70 221

Trailheads

Y NT

LL

1

3

TRAIL FEATURES

This planning section extends six (6) miles from Black Bear Boat Access to Big League Camp.

U CO

WE DO

MC

VICINITY MAP

R BU

PISGAH NATIONAL FOREST 2

PLANNING SECTIONS

PROPOSED TRAILS

MARION 70

70

The preferred route extends through Duke Energy’s Black Bear Boat Access property. The route will connect to a planned internal trail system and new amenities to be designed and developed by McDowell County and Duke in the near future. The trail enters the Pisgah Game Lands and crosses Lake James Road to connect to an NC WRC trailhead on the north side of the road. The route then utilizes a former access road that extends northwest through the game lands for approximately one mile.

40

BLACK BEAR BOAT ACCESS >> BIG LEAGUE CAMP

TOTAL LENGTH: TRAIL TYPE: ESTIMATED COST: POINTS OF INTEREST

:

6.0 MILES DUAL-USE TRAIL $2,456,580 BLACK BEAR BOAT ACCESS PISGAH GAME LAND BIG LEAGUE CAMP

The route exits the game lands and continues west across the North Fork of the Catawba River. After crossing the river, the trail turns south and extends through large, forested tracts to Hankins Road at the north end of Big League Camp, a baseball and softball training facility that includes log cabin lodging. Two preferred routes are suggested through Big League Camp to allow for a direct connection to the camp’s main facilities or a more secluded route through the upper section of the property. Both preferred routes will cross an active section of the former Clinchfield rail line that is operated by CSX. The trail then extends west through the floodplain to the Catawba River and Yancey Road Bridge. An alternate route extends from the OVNHT trailhead and utilizes the existing OVNHT before turning southwest to a NC WRC trailhead. The CSX rail-line provides an alternative if the opportunity for a rail-trail or rail-with-trail becomes available in the future.

46

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

Three (3) trailheads are proposed within this planning section. The first trailhead is proposed at Black Bear Boat Access adjacent to the existing upper boat-trailer parking lot. See Exhibits 2 and 3 for details on the proposed and planned improvements to this site. The second trailhead is located at an existing NC WRC trailhead that provides access to Pisgah Game Lands on the north side of Lake James Road. The western-most trailhead is proposed on Hankins Road at the northern end of the Big League Camp property near the Hankins Northfork Volunteer Fire Department.

Crossings The preferred trail route will require three (3) road crossings, one (1) rail crossing, and one (1) major bridge. The first road crossing is located at Lake James Road as the trail connects to an existing Pisgah Game Lands trailhead. The second road crossing is at Hankins Road. The northern preferred location for crossing the CSX rail line could allow for a trail bridge spanning from ridge to ridge over the railroad corridor. The southern preferred crossing location should be evaluated for the feasibility of a tunnel underpass for the trail. After crossing the rail line, the western preferred route crosses Lentz Rd while the eastern route crosses Yancey Rd. A bridge is planned for the trail crossing over the North Fork of the Catawba River.


OU NT AIN

AL DM

SECTION 2 B

BLACK BEAR BOAT ACCESS >> BIG LEAGUE CAMP

BAILEY CREEK

U MO

HISTORIC OVNHT

IVY IN NTA

POIN

NO

N

AIN UNT MO

CA N

T

BLUFF

KE

LAKE JAMES

NA TU

A

K

ORE M

FIELD NOTES PIER

TRAILS

TRAIL FEATURES

DO EXISTING LOCAL TRAIL

BEA CO N

DUKE ENERGY PROPERTY STATE LAND

EXISTING LOCAL TRAIL

R

H

HISTORIC OVNHT ROUTE

ID G

E

E

KE

LA

HIGH RI DG

MM

SU

PROPOSED FFST ON

W

CAMP

N VE HA

IDE KS C

TS

I LVIE

FO R

YANC E

RIVER

SA

G

WBA

CAMPS GH HI

IME

T FEDERAL LAND ER

FFST ON PROPOSED LOCAL TRAIL

HI

Y

CE

N YA

CATA

PLANNED TRAILHEAD

COMPLETED FFST

DEACON

15

0 1

Y

PREFERRED TRAIL ROUTE

SETTLEMENT RIDGE

88

WA L

15

RE

LA HPARCELS OF KE IG E HE INTEREST LAK T ES

ALTERNATE TRAIL ROUTE

FLOOD PLAIN

CHAPTER 3: Recommendations 0

1/16 1/8

1/4 MI.

MAP 7: PLANNING SECTION 2

CR

LI FF

CABIN

SY C

1587

HISTORIC OVNHT

ST

ER AWBA RIV ORK CAT

W IE

BIG LEAGUE CAMP

RE

V KE

LAKE JAMES LANDING

FO

NORTH F

ER V

LA

AMELIA

A RIOT

NE TO

S

TZ

LEN

CH

GE

K AC

N

K RI FOR

G RA YS

A RIN MA

BLACK BEAR BOAT ACCESS/ FONTA FLORA AND OVNHT SHARED TRAILHEAD

BL

C

REST

RIVERVIEW FO

ET

LET RT BA H ANKI

C

BLACK BEAR CAMPGROUND

DUKE PROPERTY

BE R

LAKE RIDGE

RID

B EA R

CLIFF

R DA CE

D OO

PARKING AND TRAILHEAD FOR OVNHT

ES T

BEAR

LA

NE CHEYEN

B E A R C R EE K

HILL

A

LAKE JA M

ES

EW

L

GREAT

NC WILDLIFE COMMISSION GAME LANDS

PLANNED BRIDGE CROSSING

ID

E

EIS LW S DE

PLANNED BRIDGE CROSSING

NHT NG OV

LOS T COVE

EXISTI

BELV ID ER E

PISGAH NATIONAL FOREST

47

N


LEGEND

VICINITY MAP

ENTRANCE

PICNIC SITES

ENTRANCE INFORMATION AREA

CONNECTION TO OVNHT FUTURE RANGER / WELCOME

ROA

D

ENTRANCE GATE

FUTURE CABIN LOCATION EXISTING TRAIL / ROADBED

EXHIBIT 2:

OR INTERPRETATION STATION

FUTURE TRAIL CONNECTION

AD EA RO AR

EXISTING CONTOURS (5' INT.) EXISTING TREE STREAM CENTERLINE

C AC

ING IST EX

AC BL

KB

EA

R

FFST TRAILHEAD x

FUTURE MAINTENANCE YARD/ STORAGE AREA

26

-1

TO

SR

AD

ES

RO

SUBJECT

M

x

CONNECTION TO PLANNED TRAIL

POTENTIAL DRAIN FIELD AREA

BLACK BEAR AND BEYOND

Duke Energy has several new site amenities planned for completion in the next PROPERTY KE LA three years at the Black Bear Boat Access property. Planned improvements inN PE LAKE AK DR clude a day-use area with picnic sites overlooking Lake James, ADA-accessible JAMES fishing pier, and 37 campsites with fire rings, and bathhouse. McDowell County will partner with Duke in the design and development of these amenities and assume operation of the site once the enhancements are complete. The FFST will utilize a planned internal trail system that links these amenities. JA

S ES

DISTURBANCE BOUNDARY (11.3 ACRES)

LAKE / WATER EDGE

PRO

x

x

x

x

x

x

x

x

1

MES

HW Y22

E JA

TO

LAK

CAMP SITES

LAKEVIEW DR N

PROPOSED ROAD

x

EXISTING PARKING (ASPHALT) B

AD

RO

D

PLANTING ENHANCEMENT

A

A RO

EXISTING BOAT LAUNCH STREAM CROSSING

CONNECTION TO PLANNED TRAIL

POTENTIAL WELL LOCATION

VAULT TOILET, ADA PARKING, AND TRASH PAD

ADA CAMPSITES 4

DAY USE PICNIC SITE , TYP.

6

1

3

2

4

5

2

5

PICNIC SHELTER

6

12 3

11

DAY USE AREA

13

7

32

33 7

CAMPGROUND AREA

8

8

31

CAMPGROUND ROAD LOOP A

10 30

36

11

STORMWATER TREATMENT

35 10

Design Standard Notes:

12

ADA PARKING (4)

13 14

14

29

15

VAULT TOILET

GROUP CAMPSITE PICNIC SHELTER

28

BATH HOUSE

CONCRETE PATH

9 34

9

NATURAL PATH

37

16

PARKING & TRAILHEAD

CAMPGROUND ROAD LOOP B

27

STORMWATER TREATMENT

17

1.

2. 3.

Construction Notes for the General Co

1. 2.

3.

FFE 1310.5 see spots

FUTURE CABIN LOCATION, TYP.

26

4.

IMPROVE EXISTING TRAIL, TYP

18

5. 6. 7.

Black Bear Access Area, Lake James 6514 Lake James Road Marion, NC 28752 Latitude: 35.746326° N Longitude: -81.970221° W FERC Project No. 2232 Approximately 164 acres

48

DISTURBANCE BOUNDARY FONTA FLORA STATE TRAIL: LAKE JAMES (11.3 ACRES)TO MARION MASTER PLAN

ADA TRAIL

25

20

24

22

23

FISHING PIER (BY OTHERS)

Roads designed in accordance with N Secondary and Subdivision Roads (M Standards), 2010. Accessibility designed in accordance Accessible Design in accordance with Disabilities Act (ADA), 1990. If there is a discrepancy with the qua consult Landscape Architect for clari whichever quantity is greater.

8.

Burning is not permitted. Edge of Water at Time of Survey sho elevation may vary. Contractor shall be responsible for p building permits, labor, materials, a to perform the specified work. All aspects of work shall be perform applicable local, state, and federal r worker safety. All paving materials and workmansh with the latest edition of the State's Specifications for Roads and Struct Ground surface shall be shaped to p Contractor shall coordinate all site a Energy's Project Manager or designa Contractor shall be responsible for c storage and handling of all material All disturbed areas shall be stabilize following completion of land disturb more stringent soil stabilization guid local, county, state or federal agenc permit requirements then the more control and govern on the Project.


EXHIBIT 3: FFST TRAILHEAD @ BLACK BEAR A trailhead with new parking spaces designated for the FFST is proposed adjacent to the existing upper boat-trailer parking lot. The FFST trailhead and route through the property are subject to approval by the Federal Energy Regulatory Commission which oversees site improvements and programming for Duke Energy property. Duke has expressed support for the FFST and trailhead at Black Bear.

EXISTING

CHAPTER 3 Recommendations

49


SECTION 3

BIG LEAGUE CAMP >> MCDOWELL HOUSE PROPOSED TRAILS KE

UN CO

Y NT

LL

U CO

WE DO

MC

VICINITY MAP

This planning section presents three options for preferred routes that extend from Big League Camp to the McDowell House at the Catawba River Greenway.

R BU

TY

PISGAH NATIONAL FOREST 2

PLANNING SECTIONS

1 NC WILDLIFE COMMISSION GAME LANDS

3

A RIVER CATAWB

BLACK BEAR BOAT ACCESS

BLACK BEAR CAMPGROUND

HISTORIC OVNHT BIG LEAGUE CAMP

LAKE JAMES LANDING

LAKE JAMES

FONTA FLORA BREWERY LAKE JAMES STATE PARK

JOSEPH MCDOWELL HOUSE

70 221

MARION 70

70

40

BIG LEAGUE CAMP >> MCDOWELL HOUSE

TOTAL LENGTH: TRAIL TYPE:

11.5 MILES

NCDOT SIDEPATH DUAL-USE TRAIL TOWN SIDEPATH TYPICAL GREENWAY

ESTIMATED COST: POINTS OF INTEREST:

50

$3,435,580 DOWNTOWN MARION MCDOWELL HOUSE CATAWBA RIVER GREENWAY

the Fonta Flora to Fleming. Additionally, the City of Marion should partner with McDowell County Schools and Marion Elementary stakeholders to develop a circulation plan for the school that will provide for the FFST while also facilitating a safe and efficient flow of traffic in and around the site.

The northern preferred route extends north as a dual-use path on the east side of the Catawba River for a half mile before turning west to cross the river. The trail continues west on the south side of the river for approximately 2.75 miles through agricultural land then transitions to a typical greenway before crossing a Catawba River tributary. The route then crosses Hwy. 70 and extends 700 feet to connect to the Joseph McDowell Catawba River Greenway.

The preferred route will cross Garden Street and continue on the west side of the road, taking advantage of the wide, flat shoulder. The trail will then cross to the south side of New Street and continue west for one block to N. Main Street; The existing sidewalk on the south side of New Street should be expanded to an 8ft.-town sidepath to accommodate the trail.

The central preferred route crosses the Catawba River and extends as a sidepath along Yancey Road for approximately 2.2 miles to existing sidewalk in Marion. The existing sidewalk can be converted to a town sidepath that can accommodate both pedestrians and cyclists.

The preferred route crosses to the west side of N. Main Street and connects to the Marion Community Building and park. The trail continues north on Main Street. The existing sidewalk and grass verge can be expanded to a multi-use town sidepath that extends for approximately 450 feet.

The eastern preferred route crosses the Catawba River and extends south and west as a dual-use trail for three miles through forested tracts of land, including property owned by the City of Marion. The trail transitions to a town sidepath on the south side of Robert Street, adjacent to Marion Elementary School, then turns west to Fleming Avenue. At Fleming, the preferred route will continue south on the east side of the road to Garden Street. Applying a “road diet” to Fleming Ave. narrows the vehicle travel lanes to provide for the trail as a concrete town sidepath. See Exhibit 4: Bringing

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

At the end of the existing sidewalk, the trail transitions to an NCDOT multi-use sidepath that continues for two miles on the west side of N. Main St. to the Catawba River. The Isothermal Bicycle Plan, completed in 2018, recommends a road diet for this section of N. Main Street. According to the plan, approximately 12ft. of the 64-66ft. wide roadway can be converted to provide for a multi-use sidepath with at least a 3ft. wide physical buffer from vehicle lanes. At the Catawba River, the trail turns east and transitions to a greenway to connect to Marion’s existing greenway.


ON CAN N M FA R

DEAD END

OD S

W O

DEE

JOHNS CREEK D

BE N

REEK CROSS C

ER

JP MILLS

RI V NIC E BE R

D LD EN

RO GO

KE DU

LEO

UN DEE RR T OR

ON

RP

JACK S

AI

GE ID

1 537

CH

N

UR

PRIM

6

1724

SEAGLE

CHAPTER 3: Recommendations VY CHE

DA

TIL MA

172

NEWTON

INA

OL

ROS

URCH IST CH BAPT FAITH 174 3

HABITAT

BRANCH

ST

HUR

SAMAH A

51

MAP 8: PLANNING SECTION 3

D O EW O

RI DG

ME

FO R S YTHE

VIRG INIA

NO RT ON

A N TO

70

R CA

FINLEY

SHER

RI

T

K AR LP IA R MO

36 15

CEY

1703

OAKWOO D

E

GARDEN

FL

ON

MO RG

YAN

MADISON

H

GARDEN

38 15

M

RE

E OV SC

C

R PA

E CAD

LL

7T

PULL I AM

VICTORIA

MAIN

K

OT FO

BA

172 8

GAL OW BUN 20

OR C

12

Y

M

EA

CREEK H T Y FO R S

D 82

IN

HI

CLARK

R

IS CHR

OL

RO AD

TE STA

N AI NT

AV IS

A

RA IL

U E MO

15

Y

BI

SCHO

C

70

LA K

NN

M

H

ELL OW

NE WAY 1700

BA

M

5T

COURT

OAK

OOD ENW

MCD

1700

ND

O

M

HIGHLA

E PL N A RG

A

M

GRE

MARION

AR

M

LA

IEW

BU

IA

BROWN

ER RN U RK PA

Y CLA

FORT

VIRGINIA

R TE

NEW

G

RT

ELL OW

RS CA

ON

N

MCD

1/4 MI.SUMMIT

BE

M

L

IS W

N

EL

RO

IN

HIL

EY

SCENT RE

ZI

COMMUNITY BUILDING

A

LIS

V

10

1/16 A 1/8 L L EY

TA TEV I S FE R

ON

LEN

0

SH OP

EM IN G

RD

FLOOD PLAIN

IN E

N LONO DOGWOOD

VINE

ALTERNATE TRAIL ROUTE

BR

EST

HA

FOX FIELD GILBERT HISTORIC OVNHT ROUTE

GROVE PARCELS 1212OF 13 INTEREST 12

ER

FOR

RIC

H

ERS

STATE LAND

EXISTING LOCAL TRAIL

FL

IN ROB MA C

LLEY VA

SOW

PROPOSED FFST ON EXISTING LOCAL TRAIL 1214

T OT

FF

MARION PROPERTY

C YAN

D OO ELW UR LA

V

DUKE ENERGY PROPERTY

K

LOO

VER RIDGE O

R COV E

SON

R

ION AT NT

LAKE

O RT

E AT EW

BR AD LE

O

IDG

EK

ER

GR

K CREE N

PLA

SH

BR

E DEN C R AR 6G

W

NI X R SO

CARDINAL

TJ

Y RIDGE CE N

CH

143 2

R VE

DUKE PROPERTY

HILL

YA

70

FEDERAL LAND

NL EE

P

M

CA

RD

1 50

E OR

RES TRAILHEAD PLANNED

E E ON PROPOSED LOCAL TRAIL FFST

C11K9Y8 LU

RIVER AWBA

BY

T ES EE AP P LETR

W

VIE

1302

MO

Y

RID GE V

TRAIL FEATURES

OI

LAKE JAMES

ET

RS

CR RT

N AI NT

HOLLY

GH HI W IN TE YC RH RO IL SS L

PREFERRED TRAIL A ROUTE COMPLETED FFST

CH A RIOT LAK E J A M ES

CE

N YA

JUSTICE

FIELD NOTES

TRAILS

K RI FOR

EW VI KE

ME

PO

MO U

221

NLEY CO GO L D F I N CH

PH

CA

S

119 7

T

N SA EA

IN

TZ

SO

NECR ES PI T

OWELL HIGH CD M

Y

T

W

K

VER I R A B W A CAT

29

EL L

B RO

AT BC BO N SA EA PL

E VI

N

BIG LEAGUE CAMP

HARD

12

CD OW

A

LEN

E

CONLEY

M

R

H

RIVER BREEZE CAMPGROUND

MCDOWELL HOUSE

ME

FLY

LA

1501

RE T

NN

RIVERVIEW FOREST

G A

JOSEPH MCDOWELL HISTORICAL CATAWBA GREENWAY

BE

K CAT

C

A

EW

NK

LET RT BA

ERVI RIV

DID KATY

INS

HA

R JO MA PA L

D

Y

VIL L

T OT SC

226

TOMS CREEK

K

OO LLW NO

A

ON

RY HE TC

PEACH

P

E HE R

H

HILL S

LU

H FO R NORT

B

BIG LEAGUE CAMP >> MCDOWELL HOUSE

FISH

SECTION 3

K LOC

HEM

E


TRAIL FEATURES Trailheads This planning section includes three (3) trailheads. The eastern-most trailhead is proposed adjacent to Yancey Road near the Catawba River bridge. The trailhead could be constructed on either the southeast or northwest side of the Catawba River and Yancey Road, depending on the preferred route that is ultimately to be constructed. The Marion Community Building and existing parking lot is proposed as a centrally-located trailhead in downtown Marion. The existing Catawba River Greenway trailhead at the historic McDowell House serves as the western trailhead and terminus of this study area.

As the route extends north from downtown Marion towards the Catawba River, it will cross U.S. Highway 70. This crossing is located at a busy three-way intersection. A signalized crossing will be necessary to facilitate safe passage for trail users. The northern preferred route along the Catawba River will cross U.S. Highway 221 Business to connect to Marion’s existing greenway. Upon initial visual inspection, steep slopes along the river and lack of adequate vertical clearance do not allow for a trail under pass at the Catawba River bridge. Stop signs for trail-users and pedestrian-activated beacons and should be considered to provide for a surfacecrossing south of the Catawba River bridge. Other road crossings include Robert St., Fleming Avenue, Garden St., New St., Logan St., McDowell High School Road, and Peachtree St. as well as several driveway crossings on the west side of North Main Street. Installation of a stop sign for southbound traffic on Garden Street is recommended north of the Fleming Ave. intersection and trail crossing.

The northern preferred route will require two major bridges. A major bridge will be required to cross the Catawba River as the trail continues west. A second bridge will be necessary to cross a tributary of the Catawba River located approximately 250ft. east of Highway 221 Business. The southern preferred routes will both cross the Catawba River near Yancey Road. The existing Yancey Road bridge deck does not have sufficient width to provide for the trail and would have to be widened to safely accommodate a sidepath. Currently, NCDOT does not have plans to replace this bridge. Alternately, a separate bridge for the trail could be constructed across the river.

5 7

Crossings There are three (3) significant road crossings and three (3) major bridges in this planning section. The trail will cross N. Main Street at an existing crosswalk that extends from the south side of New Street in downtown Marion.

PHOTOS:

6 52

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

(5) MARION COMMUNITY BUILDING AND PARK PROVIDES OPPORTUNITY FOR DOWNTOWN TRAILHEAD. (6) THE HISTORIC MCDOWELL HOUSE SERVES AS A TRAIL HEAD FOR MARION’S EXISTING GREENWAY. (7) NARROW DECK ON THE YANCEY ROAD BRIDGE LIMITS ABILITY TO DEVELOP A TRAIL SIDEPATH.


EXHIBIT 4:

BRINGING THE FONTA FLORA TO FLEMING

A “road diet” on the east side of Fleming Avenue provides for the FFST as a concrete multi-use town sidepath. Fleming Avenue has sufficient pavement width to expand the existing sidewalk to an 8-10ft. wide path while maintaining 11 ft. wide lanes for vehicles.

EXISTING

PROPOSED ROAD DIET

PRECEDENT

PRECEDENT

CHAPTER 3: Recommendations

53


3 9

DOWNTOWN MARION TO CATAWBA RIVER GREENWAY - SEPARATED BICYCLE LANES Length: 2 miles

Potential ROW Needs:

EXHIBIT 5: ISOTHERMAL REGIONAL BICYCLE PLAN • None

Potential Partnerships:

• City of Marion • McDowell County The Isothermal Bicycle Plan, prepared • NCDOT for the Isothermal Planning & Jurisdictions: City ofRegional Marion, McDowell County Development Commission, oultines the• Downtown need forbusinesses alternative transportation • McDowell Trails Association Trip Generators: to connect the downtown area to existing andMarion proposed greenways • Businesses in north • infrastructure Downtown Marion North Carolina State Parks • near Peavine Trail the McDowell House. This existing• regional plan and the FFST provide • Duke Energy • Catawba River Greenway connectivity • unique McDowell High School opportunites that may bolster additional regional support. Estimated Construction Costs: • Businesses in north Marion • Fonta Flora State Trail • $ 560,000

Support in Other Plans:

• Marion Bicycle Plan (2016) • Isothermal Planning & Development Commission Trails Map (2014) • Fonta Flora State Trail Master Plan (Ongoing)

DESIGN OPTIONS & CONSIDERATIONS

Physically Separated (Two:D\ &\FOH 7UDFN Example (used for FRVW HVWLPDWH

Physically Separated Example

Visually Separated Example 62 | REGIONAL NETWORK

54

For design options and further detail, please see the Separated Bike Lane Planning and Design Guide at - https://www.fhwa.dot. gov/environment/bicycle_pedestrian/ publications/separated_bikelane_pdg/page07. cfm#chapter5_dir.

6HYHUDO FRQȴJXUDWLRQV DUH SRVVLEOH WR FUHDWH SK\VLFDO VHSDUDWLRQ IURP DXWRPRELOH WUDɝF These options should be explored during the design phase. See example graphics to the left from the Small Town and Rural Multimodal Network Design Guide. Further detail can be found at - http://ruraldesignguide.com/ physically-separated/separated-bike-lane.

While less ideal, construction of a bicycle lane ZLWK D SDLQWHG EX΍HU UDWKHU WKDQ D SK\VLFDO EX΍HU FDQ EH D VLJQLȴFDQW LPSURYHPHQW IRU bicycle and motorist safety and comfort, while still reserving space for constructing a physical EX΍HU LQ WKH IXWXUH )XUWKHU GHWDLO UHJDUGLQJ visually separated bike lanes can be found in the Small Town and Rural Multimodal Network Design Guide at http://ruraldesignguide.com/ visually-separated/bike-lane.

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN


4

I MP L E ME N TAT I O N THE CORE PURPOSE OF THIS CHAPTER IS TO HIGHLIGHT THE THREE (3) IMPLEMENTATION SECTIONS, INCLUDING THE MAJOR STEPS NECESSARY FOR COMPLETING THE TRAIL. THIS CHAPTER POSITIONS FFST AND OVNHT STAKEHOLDERS FOR ACTION.

Burke County and the City of Marion will initially serve as lead agencies to manage the development of the FFST, but must work in partnership with McDowell County, the NC Division of State Parks, the National Park Service, Duke Energy,

IN THIS CHAPTER: A| IMPLEMENTATION BY SECTION AND RESPONSIBILITIES

plan, construct, and maintain the trail across

B| PRIORITY IMPLEMENTATION AREAS AND RESPONSIBILITIES

jurisdictional boundaries.

C| TRAIL RUBICON

community stakeholders, and landowners to

D| TRAIL SUPPORT SPECTRUM E| TRAIL MANAGEMENT

55


TRAIL IMPLEMENTATION The table below provides key implementation information associated with each planning section. Key Challenges include a summary of the most difficult barriers for realizing each trail section. Many of these barriers include costly features or note the need to acquire trail easements from private landowners. Most importantly, this table assigns an Implementing Agency to each planning section.

IMPLEMENTATION DETAILS BY SECTION AND RESPONSIBILITY SECTION SECTION 1 Fonta Flora Brewery to

DISTANCE

KEY CHALLENGES

ESTIMATED BUDGET

6.0

Securing Landowner Trail Easements; Bailey Creek Bridge; Lake James Road Crossing and NCDOT sidepath to Bear Creek Bridge.

$362,530.00

6.0

Securing Landowner Trail Easements; North Fork Catawba River Bridge; CSX Railroad crossing

$2,456,580.00

11.5

Catawba River Bridge; Hwy. 70 Crossing; Securing Landowner Trail Easements

$3,435,380.00

Black Bear Boat Access SECTION 2 Black Bear Boat Access to Big League Camp SECTION 3 Big League Camp to Joseph McDowell House

ALL SECTIONS TOTAL

23.5

$6,254,490.00

* Estimated budget shown above pertains only to the completion of the preferred FFST route and does not include existing, constructed trail segments.

56

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

IMPLEMENTING AGENCY Burke County, McDowell County, NPS

McDowell County

City of Marion; McDowell County


PRIORITY IMPLEMENTATION AREAS & RESPONSIBILITIES Burke County, Marion, McDowell County, and their partners must work in tandem to successfully realize the FFST. Trail implementation does not have to occur in a specific, linear order according to each planning section. In fact, the priority areas for implementation are merely suggestions and are in no way intended to hem creativity or necessary work in “lower” priority areas. Trail implementation is an art and requires the acumen to recognize and then seize opportunities, whether related to funding, landowner willingness, or politics. The table below supports a trail development strategy that prioritizes areas in Planning Sections 1 and 3. If these were to be fully developed, this would likely provide the formula for “Trail Rubicon,” the point in which the public, elected officials, and partnership funding agencies recognize that connectivity and complete implementation are imminent. At this point significant momentum and synergy would propel forward the completion of the FFST from Lake James to Marion.

TRAIL RUBICON: FINDING THE POINT OF NO RETURN Think snowball effect. Development of these trail sections will result in widespread support and a collective energy, beyond that of the community’s traditional trail support base. These sections represent the Trail Rubicon: the point at which completion of the FFST from Lake James to Marion becomes imminent.

1. FONTA FLORA BREWERY TO BLACK BEAR 2. DOWNTOWN MARION TO MCDOWELL HOUSE

TRAIL RUBICON PRIORITY IMPLEMENTATION AREAS AND RESPONSIBILITIES IMPLEMENTING AGENCY Burke County

City of Marion

McDowell County

PRIORITY ONE

PRIORITY TWO

Section 1: Re-design of OVNHT at Hwy. 126 and Hwy. 126 crossing

Section :1 Pocket Park to Lake James Road Trailhead

Section 3: N. Main Street road diet and multi-use side path from downtown to existing greenway

Section 3: Fleming Ave. road diet and multi-use town sidepath

Section 2: OVNHT Trailhead to Black Bear Boat Access

Section 1: Lake James Road Trailhead in Burke to OVNHT Trailhead at Pisgah Game Lands

CHAPTER 4: IMPLEMENTATION

57


TRAIL IMPLEMENTATION Creating a destination-quality trail system requires a significant commitment from local governments, including staff time, the holding of land and trail easements, and the dedication of local funding. Local governments must evaluate the FFST in relationship to other priorities. However, a trail of this magnitude should be recognized as an economic development initiative that will provide a return on investment. Furthermore, each jurisdiction must not merely spend local funds, but instead must leverage their funds to obtain support from partnership funding agencies sympathetic to the creation of trails and the FFST. The “Trail Support Spectrum� illustrates the steps local governments can take to support trail development.

58

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN


TRAIL SUPPORT SPECTRUM

5 4 3 2 1

CHAPTER 4: IMPLEMENTATION

59


TRAIL MANAGEMENT MAINTENANCE Trail maintenance is critical to provide for and sustain the trail users’ experience. Trail maintenance will primarily consist of ensuring that the trail corridor is trimmed of brush and vegetation and that the natural surface trail is de-bermed and clear of fallen debris. Volunteer training and participation is an important aspect of user group involvement. Burke County and Marion should explore trail-building volunteer training with members of the Professional Trail Builders Association. Federal Recreational Trails Program (RTP) funding is often available for educational courses and may require matching funds. Local government partners or a non-profit “Friends” group could sponsor these courses and provide the matching funds for interested volunteers. By training volunteers in this manner, it demonstrates a significant commitment by the participant and “Friends” group at great benefit to the landowners, land managers, and FFST lead agencies. An adequate level of law enforcement should be provided to help maintain a safe and secure trail environment. Trail users should also be educated and encouraged to understand and obey trail rules, respect other users, and respect adjoining properties.

TRAIL RULES WILL BE POSTED AT EACH TRAILHEAD.

60

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN


TRAIL FUNDING FERC RELICENSING Constructing and maintaining the various sections of the FFST will require leveraging funds from both public and private entities. At this time, the largest funding contribution to the FFST comes directly from Duke Energy, as a result of the Comprehensive Relicensing Agreements (CRA) for the Catawba-Wateree Project. Trail development funds are included in CRA 10.27.2.3 in the amount of $500,000 for construction of the FFST. Another $600,000 is included in CRA 10.27.4.3 for the OVNHT. These funds will implement trail segments within the Lake James Planning Section of the FFST.

EVERYONE WORKING TOGETHER In addition to the contributions from Duke Energy, it will be necessary for Lake James State Park, NC Wildlife Resources Commission, NCDOT, NPS, Burke County, the City of Marion, McDowell County, and others to contribute financial resources to this project. A conservative estimate to construct the entire FFST and its associated trailheads from NC 126 in Burke County (Fonta Flora Brewery) to Marion is approximately $6.25 million dollars.

LOCAL LEADERSHIP

LEVERAGING FUNDS RELATED TO OTHER COMMUNITY GOALS Lead trail agencies should also seek a combination of funding sources that include local, state, federal, and private money. Fortunately, the benefits of protected greenways are many and varied. This allows programs in Burke County, Marion, and McDowell County to access money earmarked for a variety of purposes including water quality, hazard mitigation, recreation, alternate transportation, wildlife protection, community health, and economic development. Availability of funds targeted directly for trail use has decreased in recent years, so it is imperative that local governments work together to create multi-jurisdictional partnerships and to develop their own local sources of funding. These sources can then be used to leverage outside assistance. For the past two decades, a variety of funding has been used throughout North Carolina to support the planning, design, and construction of urban and rural bicycle and greenway projects. The largest single source of funding for these projects has come from the Surface Transportation Assistance Act; the North Carolina Department of Transportation manages and distributes the majority of federal funds that are derived from the Act to support the development of bicycle/trail development.

Implementing the recommendations of this plan will require a strong level of local support and commitment through a variety of local funding mechanisms. Perhaps most important is the addition of bicycle and greenway infrastructure as an item within the annual budgets of Burke County, Marion, and McDowell County. These improvements should become a high priority and be supported through portions of the funding currently used for public safety, streets, parks and recreation, planning, community development, travel and tourism, and local bonds.

CHAPTER 4: IMPLEMENTATION

61



A

APPENDIX

I


(A-1) IMPLEMENTATION BUDGET SECTION 1- FONTA FLORA BREWERY TO BLACK BEAR BOAT ACCESS

Dual Use Trail (5ft. Natural Surface) NCDOT Sidepath (8ft. Paved Path)

UNITS (LF)

UNIT COST

$6 $120 $5,500 $90,000 $30,000 Total Section Cost

Major Road Crossings Major Bridge (Bailey Creek) Bear Creek Bridge Enhancements

25,855 545 4 1 1

SECTION 2- BLACK BEAR BOAT ACCESS TO BIG LEAGUE CAMP

UNITS

UNIT COST

Dual Use Trail (5ft. Natural Surface) Major Road Crossings Major Bridge (North Fork Catawba River Rail Crossing (Bridge/Overpass Option) Rail Crossing (Tunnel Option)

31,680 3 1 1 1

$5,500 $500,000 $750,000 $1,000,000

SECTION 3- BIG LEAGUE CAMP TO JOSEPH MCDOWELL HOUSE

UNITS

Dual Use Trail (5ft. Natural Surface) NCDOT Sidepath (8ft. paved path on Yancey Rd.)

34,980 11,616

NCDOT Sidepath (12ft. Paved Path w/3ft. physical buffer on N. Main St.)

10,560

$6

Total Section Cost $6 $120

Town Sidepath (8-10ft. Concrete on Yancey, Fleming, Garden, New, N. Main)

3900

Typical Greenway (10ft. Paved Path)

712

$90

3 2 1

II

FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN

155,130.00 65,400.00 22,000.00 90,000.00 30,000.00 362,530.00 TOTAL COST

$ $ $ $ $ $

190,080.00 16,500.00 500,000.00 750,000.00 1,000,000.00 2,456,580.00 TOTAL COST

$ $

209,880.00 1,393,920.00

$

560,000

$ $

351,000 64,080.00

$5,500 $750,000 $90,000

$

16,500.00

$ $

750,000.00 90,000.00

Total Section Cost

$

3,435,380.00

$

6,254,490.00

TOTAL * Does not include land acquisition, engineering, or design. * Does not include existing segments of trail or bridges on existing trails. * Includes all preferred routes.

$ $ $ $ $ $

UNIT COST

$53 $90

Major Road Crossings Major Bridges (Catawba River) Major Bridge (Catawba River Tributary)

TOTAL COST


(A-2) FUNDING SOURCES Partnership Funding Agency

Active Living/ BuiltEnvironment Implications

Maximum Amount

Matching Funds Required

Deadline

BUILD

Construction, provided easements are secured

N/A (min. $1 million)

$0 (for rural counties)

May (typical)

N/A

Not speciďŹ ed, but 20% is competitive

February 1st

N/A

50%

January 1st and June 1st

$100,000.00

25%

February 1st

All types of parks, trails, and recreation facilities

$500,000.00

50%

February 1st

Trails and Greenways

$10,000.00

20%

May 24th

Bike and Pedestrian Projectsboth engineering and construction

N/A (for major projects)

20% generally

N/A

Clean Water Management Trust Fund (www.cwmtf.net)

NC Water Resources (www.ncwater.org) Recreation Trails Program (ncparks.gov/About/grants/main.php) Parks and Recreation Trust Fund (ncparks.gov/About/grants/main.php) Bikes Belong Foundation

NCDOT Transportation Plan For Bike and Pedestrian Projects

Land acquisition: fee simple or easement. Must protect oodplain areas. Greenway trails and other park areas are allowed. River access areas or greenways along rivers All types of trails and greenways

CHAPTER A: APPENDIX