fonta flora state trail master plan lake james to marion
FONTA FLORA STATE TRAIL
PRODUCED BY:
PRODUCED FOR:
LAKE JAMES TO MARION MASTER PLAN
DESTINATION BY DESIGN PLANNING, LLC 136 FURMAN RD., SUITE 6 BOONE, NORTH CAROLINA 28607 828.386.1866 WWW.DBDPLANNING.COM
ACKNOWLEDGMENTS BURKE COUNTY
CITY OF MARION
Johnnie Carswell, Chairman
Steve Little, Mayor
Scott Mulwee, Vice Chairman
Billy Martin, Mayor Pro Tem
Maynard M. Taylor, Commissioner
Woody Ayes, Council Member
Wayne F. Abele, Commissioner
Juanita Doggett, Council Mebmer
Scott Mulwee, Commissioner
Ann Harkey, Council Member
Bryan Steen, County Manager
Don Ramsey, Council Member
Scott Carpenter, AICP, Deputy County
Bob Boyette, City Manager
Manager & Community Development Director Shane Prisby, Community Development Operations Manager NATIONAL PARK SERVICE John Slaughter, Group
Heather Cotton, AICP, Planning Director MCDOWELL COUNTY David N. Walker, Commissioner Tony G. Brown, Commissioner
Superintendent,
Barry McPeters, Commissioner
Southern Campaign of the American
Lynn Greene, Commissioner
Revolution Parks Group
Brenda M. Vaughn, Commissioner
Benjamin Richardson, Chief of Planning and Partnerships, Southern Campaign of the American Revolution Parks Group
DUKE ENERGY CAROLINAS Christy L. Churchill, RLA, LEED GA
TABLE OF CONTENTS INTRODUCTION & BACKGROUND
1
Trail Support Facilities…………………………………………………………… 34
Purpose and Background………………………………………………………… 2
Social Media Marketing…………………………………………………………… 37
Previous Planning Efforts………………………………………………………… 3 Vision Statement………………………………………………………………………… 4 Trail Benefits……………………………………………………………………………… 5 Plan Organization……………………………………………………………………… 6
CHAPTER 1: EXISTING CONDITIONS, ANALYSIS, & PRELIMINARY ALIGNMENTS
7
Study Area Description……………………………………………………………… 8 Study Area Major Features………………………………………………………… 9 Natural Environment……………………………………………………………… 10 Cultural Resources…………………………………………………………………… 12
CHAPTER 3: RECOMMENDATIONS
39
Planning Sections Overview…………………………………………………… 40 Trail Section Recommendations…………………………………………… 42
CHAPTER 4: IMPLEMENTATION
55
Implementation Details by Section and Responsibility………… 56 Priority Implementation Areas and Responsibilities…………… 57 Trail Rubicon…………………………………………………………………………… 57 Trail Support Spectrum…………………………………………………………… 59 Trail Management…………………………………………………………………… 60
Built Environment…………………………………………………………………… 13
APPENDIX I
Preliminary Route Alternatives: Map & Photo Series…………… 17
(A-1) Implementation Budget…………………………………………………… II
CHAPTER 2: TRAIL CHARACTER & DESIGN GUIDELINES
25
Sustainable Trail Design………………………………………………………… 26 Trail Construction…………………………………………………………………… 28 Trail Types………………………………………………………………………………… 29 Trail Profile……………………………………………………………………………… 32
(A-2) Funding Sources…………………………………………………………… III
LIST OF MAPS Map 1: General Study Area………………………………………………………… 8 Map 2: Study Area 1 Site Analysis…………………………………………… 18 Map 3: Study Area 2 Site Analysis………………………………………… 20 Map 4: Study Area 3 Site Analysis………………………………………… 22 Map 5: Planning Sections ……………………………………………………… 40 Map 6: Planning Section 1……………………………………………………… 44 Map 7: Planning Section 2……………………………………………………… 47 Map 8: Planning Section 3……………………………………………………… 51
LIST OF EXHIBITS EXHIBIT 1: Brewing Up Adventure………………………………………… 45 EXHIBIT 2: Black Bear and Beyond………………………………………… 48 EXHIBIT 3: FFST Trailhead @ Black Bear……………………………… 49 EXHIBIT 4: Bringing the Fonta Flora to Fleming…………………… 53 EXHIBIT 5: Isothermal Regional Bicycle Plan............................ 54
IN T R O D U C T I O N A N D B A C K G R OUN D THIS PLAN SERVES AS A ROAD MAP FOR ESTABLISHING A SECTION OF THE FONTA FLORA STATE TRAIL FROM LAKE JAMES TO MARION.
The Fonta Flora State Trail (FFST) will extend from Morganton to Asheville when completed. This trail master plan serves as a road map for establishing
IN THIS CHAPTER:
the Fonta Flora State Trail from Lake James, in
A| PURPOSE AND BACKGROUND
Burke County, to the City of Marion, in McDowell
B| PREVIOUS PLANNING EFFORTS
County. This chapter provides an overview of previous planning efforts and their goals.
C| VISION STATEMENT D| TRAIL BENEFITS E| PLAN ORGANIZATION
1
PURPOSE & BACKGROUND The Fonta Flora State Trail finds its origins in the desires of Burke County citizens to increase quality of life for residents, provide a recreational amenity for visitors and the region’s diverse population, and provide public access to the area’s cultural and natural resources. In 2015, the North Carolina General Assembly approved legislation to establish the Fonta Flora State Trail. Upon completion, the proposed trail will extend from Asheville to Morganton connecting Marion, Old Fort, and Black Mountain.
Also in 2017, Burke County opened a new trailhead featuring custom trail facilities and artistic signage. In 2018, the County spearheaded the development of a trail master plan for Section 1 from Lake James to Morganton Financial support from Duke Energy continues to advance the project with $1.1 million in grants committed to the development of the Fonta Flora State Trail and Overmountain Victory National
Historic Trail (OVNHT). Financial resources will be released from Duke Energy now that the Federal Energy Regulatory Commission has approved the company’s re-licensing to operate its hydroelectric power plants along the Catawba River. This plan addresses Section 3 of the Fonta Flora State Trail from Lake James to Marion. This section is unique in that portions of the FFST coincide with the OVNHT.
Burke County is a leading agency in the establishment of the Fonta Flora State Trail. Following the adoption of a master plan in 2016, the County partnered with the NC Division of State Parks and Duke Energy to complete 10 miles of trail in 2017. The County is now in the midst of constructing another 10 miles that will eventually encircle Lake James to complete Section 2 of the FFST.
LEGISLATION WAS SIGNED INTO LAW BY GOVERNOR MCCRORY IN SUMMER 2015 THAT MAKES THE FONTA FLORA STATE TRAIL THE LATEST ADDITION TO NORTH CAROLINA’S STATE PARK SYSTEM. 2
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
PLANNING SECTIONS 1
MORGANTON >> LAKE JAMES
5
OLD FORT DEPOT >> BLACK MOUNTAIN DEPOT
2 3 4
LAKE JAMES
6
BLACK MOUNTAIN DEPOT >> WARREN WILSON COLLEGE
7
WARREN WILSON COLLEGE >> ASHEVILLE
LAKE JAMES >>MARION MARION >> OLD FORT DEPOT
PREVIOUS PLANNING EFFORTS Fonta Flora State Trail: Lake James to Morganton
Fonta Flora State Trail Master Plan: Lake James Section
Lake James Loop Trail Master Plan
In 2018, Burke County developed a comprehensive trail master plan for the Section 1 of fonta flora state trail master plan lake james to morganton the FFST from Lake James to Morganton. This section of the FFST overlaps with the OVNHT on the south side of Lake James as the trail extends from the Fonta Flora Whippoorwill Brewery along the Catawba River to Morganton. Portions of the trail systems at both Lake James and the Catawba River Greenway in Morganton are certified as part of the Overmountain Victory National Historic Trail. The OVNHT Lake James to Morganton Master Plan serves as the foundation of the Fonta Flora State Trail Lake James to Morganton Master Plan.
The Fonta Flora State Trail Master Plan: Lake James Section was completed in 2016. The plan provided a major update to fonta flora state trail master plan lake james section the Lake James Loop Trail Master Plan published by Burke County in 2014. This section of the Fonta Flora State Trail will ultimately encircle Lake James with a continuous 30-mile state-of-the-art hiking and biking nature trail. As a state trail, the loop is now under the purview of the NC Division of Parks and Recreation as an official unit of the State Parks system.
In early 2013, the Burke County LAKE JAMES LOOP TRAIL Community MASTER MASTERPLAN PLAN Development Director began a new planning effort to jumpstart the Lake James Loop Trail initiative and promoted the project to the top of the department’s priority list.
BURKE COUNTY, NC UPDATED SPRING, 2016
LAKE JAMES LOOP TRAIL MASTER PLAN
The Lake James Loop Trail Master Plan, published in 2014, outlined an easy to moderate 30-mile multi-use hiking and biking trail with a natural mineral soil surface. The plan recommended an average trail width of five feet wide and overall average grade of 5% or less. Isothermal Regional Bicycle Plan The Isothermal Regional Bike Plan, published in 2018, includes detailed recommendations for connecting Downtown Marion to the Catawba River Greenway and McDowell House.
2018 IsothermalBikePlan.com
PREPARED FOR THE ISOTHERMAL PLANNING & DEVELOPMENT COMMISSION
PREPARED BY ALTA PLANNING + DESIGN
INTRODUCTION AND BACKGROUND
Photo by Richard Kennedy
3
VISION STATEMENT The Fonta Flora State Trail will provide pedestrians and bicyclists of all abilities a safe and legal route that will eventually extend from Morganton to Asheville. The trail will allow users to experience the natural diversity of the area, incorporate multiple access points and support facilities, create a community and regional asset that will provide for recreation opportunities for local residents and visitors, and promote tourism and low-cost economic development for Burke County, Marion and the surrounding region.
PLAN GOALS 1
Specific Trail Routes. Identify a specific and feasibile trail route from Lake James to Marion.
2
Trail Character. Develop designs and trail support facilities that
3
Visual Plan. Create a visual plan that utilizes renderings and schematics
incorporate both the OVNHT and FFST brands.
to demonstrate trail character.
STATE TRAILS WHAT IS A STATE TRAIL? The State Parks Act (GS 113-44.9) defines the types of units in the NC State Parks System to include State Parks, State Natural Areas, State Recreation Areas, State Trails, State Rivers and State Lakes. Fonta Flora is a State Trail. The difference between a State Park and a State Trail is that a State Park is operated and managed by the Division of Parks and Recreation, but a State Trail represents a partnership among multiple agencies, landowners and local governments, working together to implement a shared vision. Working together on a connected State Trail is a way for communities to leverage their investments in trails to maximize the value for their citizens. Sections of a State Trail on state park property may be managed by the Division of Parks and Recreation, but sections of the trail that cross property controlled by others will continue to be built, maintained and managed by those other landowners. A State Trail is comprised of multiple connected sections, and each section of the trail is sponsored by a state or federal agency, local government, or landowner. Overall trail corridor planning and coordination are the responsibility of the Division of Parks and Recreation, but each section of the trail will be planned, built and managed in accordance with the needs and wishes of each local section sponsor. DPR will provide guidance, coordination and assistance for the multiple section sponsors whose individual and diverse sections link together to form the State Trail. SECTION – A portion of the trail within the jurisdictional boundaries of a single agency or organization, who serves as the sponsor of that section. SECTION SPONSOR – Any agency or organization that owns the land the trail utilizes and that enters into an agreement with the Division of Parks and Recreation to maintain their section of trail as a part of the State Trail. The section sponsor, in coordination with adjoining section sponsors, is responsible for the design, construction, maintenance and management of the trail within their section, including its location, appearance, surface, uses, and amenities. Section sponsors retain authority on lands under their jurisdiction. Section sponsors are encouraged to showcase places of natural, scenic, historic, and cultural significance; to feature the diversity of natural communities and landscapes in the state; and to consider the needs of both long and short distance trail users.
4
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
TRAIL BENEFITS
ECONOMIC There is no question that countless communities across America have experienced significant economic growth from a result of trail and greenway infrastructure. Below are a few examples of such impacts: Pedestrian and Bicycle Infrastructure: A National Study of Employment Impacts (2011) • Evaluated 58 separate projects in 11 cities • Multi-use trails (e.g., greenways) create 9.6 jobs per $1 million invested East Central Florida Regional Planning Council; Economic impact of Orange County trails (2013) • Little Econ Greenway (7.4 miles); West Orange (20 miles); and Cady Way Trails (7.2 miles) in Orange County, Florida • Supported 516 jobs and had an estimated positive economic impact of $42.6 million on the area • Nearby Downtown Winter Garden (pop. 37k) = $14.6M Revenues Year 3 Economic Impact of Swamp Rabbit Trail (2014) • Swamp Rabbit = 20 miles (Greenville, NC to Travelers Rest) • $6.7 Million Virginia Creeper Trail, Damascus, VA • 34 mile rail-trail • Direct economic impact approximately $3 million a year
HEALTH Trails and greenways provide an attractive, safe, and accessible low- or nocost place to walk, hike, jog, or bicycle. More parks and green spaces lead directly to more physical activity by citizens. This gives people of all ages an opportunity to incorporate exercise into their daily routines.
ENVIRONMENTAL Trails and greenways protect important habitat, improve water quality, and provide corridors for wildlife. By protecting land along rivers and streams, greenways help filter pollution caused by agricultural and road runoff. These areas can often serve as natural floodplains. Also, trails and greenways can serve as hands-on environmental classrooms.
EDUCATIONAL The Fonta Flora State Trail will provide for a variety of educational opportunities. A significant portion of the trail will pass through Lake James State Park, which will provide an educational experience about natural habitats and native flora and fauna from throughout the region. Since this trail coincides with portions of the Overmountain Victory National Historic Trail, users have the opportunity to learn about the Overmountain Men and their impact on the Revolutionary War. Other opportunities exist to learn about hydroelectric dams, bicycle safety, wilderness medicine, and search and rescue.
RECREATIONAL The recreational benefits offered by the Fonta Flora State Trail will complement existing opportunities found in the area at Lake James State Park, NCWRC Game Lands, Linville Gorge, Catawba River, and adjoining US Forest Service lands. The Fonta Flora State Trail will anchor a host of recreation offerings. Foremost, this trail offers the unique opportunity to separate automobiles from cyclists to circumnavigate the Lake, thereby creating a safe and scenic destination for cycling enthusiasts. This plan also calls for a new boat launch, camping and cabin facilities, fishing access areas, and over 25 miles of trails, boardwalks, and bridges. All of these additional recreational opportunities will be beneficial for personal, community, and business development.
TRANSPORTATION Trails and greenways serve as a crucial element within a regional multi-modal transportation system. These facilities provide efficient and safe connectors among civic, commercial, and residential land uses. The Fonta Flora State Trail will help create these connections and play a central role in establishing a regional trail network that will ultimately include the NC Mountains-to-Sea Trail, Overmountain Victory National Historic Trail, Upper Catawba River Trail, and other local connecting trails.
INTRODUCTION AND BACKGROUND
5
ald
Mo
unt
a in
PLAN ORGANIZATION Cheyenne
Bear Cli
ff
POOL C RANDY 1/2 UND. INTEREST LAIL TERESA POOL 1/2 UND. INT.
1
ar
1
e
g Rid
6
d Ce
1553
2
t let
2 1
3
CHAPTER 2.
Bar t
EQUITY TRUST CO.,CUSTODIAN F/B/O DAVID R. MAJKA
taw
1 58 7
st
Ca
C abin B
ba 1552
er
Len
4 C h a ri o t
tz
5
luff
Riv
t
Amelia
8
re Fo
rk
River
Fo
F ork
ck
t
rth
CANNON RESOURCES LLC
w vie ke La
Riverview Fores
re
Bla
C
be
No
7a
rina Ma
3
ankins
G ra ys t
Black Bear Campground
4
5
a r Cliff
e on
od wo I d le
NC Wildlife Commission Pisgah Game Land Designated Nature Preserve
McDowell County
H
Bailey Creek
es
Lake Jam
Great Hill
CHAPTER 9 I.
Dales Cr eek
McGegers Branch
oint
iss elwe
no
Be
y
Ca n
ain P
Ed
Pisgah National Forest
n
in Iv unta Mo
nt Mou
Belvid ere
Bear Creek
B
Jo
Lake James
7
1550
sie
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS Na
ture
Wa lk
re mo
ba
w
ta
Ca
Lake James Landing
s tain ap
TRAIL CHARACTER AND DESIGN GUIDELINES
s amp hC
CHEYEN
58
8
Pier
Miles
Slope
0 - 30 > 30
LAKE JA M
BEAR
BLUFF
ES T
LI FF
LAKE JAMES
NA TU
RE
WA L
A
K
ORE M
FIELD NOTES PIER
SY C
BA RIVER
AW ORK CAT
W IE
CHAPTER 4.
HISTORIC OVNHT
CABIN
TRAILS
TRAIL FEATURES PREFERRED TRAIL ROUTE
YANC EY
GE
1587
RID
ST RE
ER V
V KE
BIG LEAGUE CAMP
RECOMMENDATIONS
FO
NORTH F
LA
AMELIA
LAKE JAMES LANDING
NE TO
S
TZ
A RIOT
R DA
A RIN MA
BLACK BEAR BOAT ACCESS/ FONTA FLORA AND OVNHT SHARED TRAILHEAD
K AC
N
LEN
CH
C
BLACK BEAR CAMPGROUND
BL
C
T RIVERVIEW FORES
K RI FOR
G RA YS
CE
D OO
B EA R
CR
L
LET RT BA H ANKI
CLIFF
LAKE RIDGE
LA KE
NE
Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped
SETTLEMENT RIDGE
PLANNED TRAILHEAD
COMPLETED FFST
IDE KS C
MM
CATAis organized according to three (3) planning sections. Each planning section This chapter WBA RIVER a map that identifies a preferred alignment. Each planning section description includes further incorporates the analysis and design elements from the previous chapters along N with a host of supporting renderings and design schematics. DO
SA
I LVIE
PROPOSED FFST ON EXISTING LOCAL TRAIL
W
H
HISTORIC OVNHT ROUTE
FO R
E
HIGH RI DG
G
VE HA
DEACON
ID
N
E
KE
6
STATE LAND
EXISTING LOCAL TRAIL
R
G
BEA CO N
HI
CAMP
EY
NC YA
SU
DUKE ENERGY PROPERTY
TS
0 1
15
H
AMPS HC IG
LA PARCELS OF KE GH HE I INTEREST AKE TL ES
ALTERNATE TRAIL ROUTE
FLOOD PLAIN
0
1/16 1/8
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
IMPLEMENTATION
IME
T FEDERAL LAND ER
FFST ON PROPOSED LOCAL TRAIL
LA
This chapter is dedicated to visually defining the various trail types to be used throughout the corridor. Design concepts are provided for trail user orientation signage, mile markers, and other support facilities. Social Media is explored as a mechanism for trail promotion and marketing.
ES
ID
CHAPTER 3.
ei
B E A R C R EE K
DUKE PROPERTY
ET
eH
PLANNED BRIDGE CROSSING
PARKING AND TRAILHEAD FOR OVNHT
HILL
BE R
L ak
s g ht
NHT NG OV
LOS T COVE
EXISTI
NC WILDLIFE COMMISSION GAME LANDS
PLANNED BRIDGE CROSSING
EW
A
st
ke
88
y
n ce
Ya
Deacon
n
gh Hi Ridge
NO
N
i dg e
CA N
INT
WEISS EL
GREAT
h Hig
n
ve
Ha
ap pe zio
La
e ersedg Wat
IN PO
IVY
ke
La
Rail Roads
Parcels
B ea co nR
BAILEY CREEK
IN
UNTA
TA
MO
UN
MO
ED
C
a i lv ie w
C
ide ks
PISGAH NATIONAL FOREST Do c
Hig
Camp
Fo re
AL DM
01
15
B
S
SECTION 2
BELV ID ER E
1 1780 Development Trails e Existing OVNHT ertim m OVT Commuter Sum Motor Route OVT Historic Route
Settlement Ridge
15
OU NT AIN
r
ve
Ri
Sy ca
This chapter provides a comprehensive overview and analysis of the opportunities and 10 constraints found throughout the study area. The analysis begins with a brief description BLACK BEAR BOAT ACCESS Camp Big League 10 >> BIG LEAGUE CAMP by a discussion of the natural and built environments and their of the study area followed 6 implications for trail suitability, trail design, permitting, and costs. This chapter concludes 8 9 VNHT HISTORIC Opreliminary with a map and photographic series that highlights 0 trail 0.25route 0.5 alternatives.
1/4 MI.
This chapter summarizes details for each planning section and establishes responsibilities and priorities for trail implementation. Additionally, this chapter identifies focus areas for development that will serve as catalyst projects for completing the trail.
1
EXISTIN G C OND ITIO N S , A N A LYS I S , A N D P R E L I MIN A R Y A LIGN MEN T S THIS SECTION OF THE FONTA FLORA STATE IN THIS CHAPTER: The analysis begins with a brief description of the study area followed by a comprehensive
TRAIL HAS A SIGNIFICANT NATURAL AND CULTURAL HISTORY.
discussion of the natural and built environments
and cultural resources and their implications for
A| STUDY AREA DESCRIPTION
trail suitability, design features, permitting, and
B| STUDY AREA MAJOR FEATURES
costs. This chapter concludes with a map and
C| NATURAL ENVIRONMENT
photographic series that highlights a host of
D| CULTURAL RESOURCES
preliminary trail route alternatives.
E| BUILT ENVIRONMENT F| PRELIMINARY ROUTE ALTERNATIVES: MAP & PHOTO SERIES
7
STUDY AREA DESCRIPTION
MAP 1: GENERAL STUDY AREA
TY UN CO
Y NT
LL
BIG LEAGUE CAMP
OU EC RK
A RIVER CATAWB
WE DO
BLACK BEAR BOAT ACCESS
The Lake James to Marion FFST study area extends approximately 20 miles from the Fonta Flora Brewery at Whippoorwill Farm on Highway 126 to the Catawba River Greenway in Marion.
BU
NC WILDLIFE COMMISSION GAME LANDS
MC
PISGAH NATIONAL FOREST
STUDY AREA
Starting at the Fonta Flora Brewery at Whippoorwill Farm adjacent to Lake James State Park, the corridor extends west on the north side of Lake James through the 1780 Community and continues into McDowell County through large wooded tracts.
BLACK BEAR CAMPGROUND
LAKE JAMES
FONTA FLORA BREWERY LAKE JAMES STATE PARK
LAKE JAMES LANDING
JOSEPH MCDOWELL HOUSE
The planning corridor continues southwest through rural, wooded privately-owned land to the mouth of the Catawba River at Lake James. Land parcels become smaller as the corridor continues toward the City of Marion before extending north to reach the 1.6-mile Joseph McDowell Catawba River Greenway.
70 221
MARION 70
70
40
THE LAKE JAMES TO MARION FFST STUDY AREA EXTENDS APPROXIMATELY 20 MILES FROM THE FONTA FLORA BREWERY AT WHIPPOORWILL FARM TO THE JOSEPH MCDOWELL CATAWBA RIVER GREENWAY.
8
The corridor includes Pisgah National Forest and NC Wildlife Resources Commission public lands as well as property held by Duke Energy which continues to partner with Burke County to provide easements and financial support for the FFST and OVNHT.
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
STUDY AREA MAJOR FEATURES LAKE JAMES
LAKE JAMES STATE PARK
Lake James is a large reservoir located in the foothills of Western North Carolina which straddles the border between Burke and McDowell Counties. This 6,812acre impoundment was created between 1916 and 1923 to produce hydroelectric power for the small towns of Marion and Morganton. Low density zoning requirements help to ensure that areas around the lake will be carefully managed and developed. Lake James offers residents and visitors opportunities to boat, fish, swim, and participate in other water-based activities.
Lake James State Park is one of the most recent additions to the North Carolina State Parks system. It was established in 1987 by the North Carolina General Assembly when funds were appropriated for the purchase of 565 acres of l a n d and the initial phase of facility development in McDowell County. In 2004, Lake James State Park acquired an additional 2,915 acre tract from Crescent Resources Inc. in Burke County. This purchase expanded the state park to six times its former size and protected more than 30 miles of shoreline. The state park offers opportunities for hiking, mountain biking, picnicking, nature observation, swimming, and canoeing. A section of the Fonta Flora State Trail that is currently under construction will meander through the park and provide trail users the opportunity to take advantage of traditional state park facilities and services.
Lake James contains 10.2 square miles of surface area and more than 150 miles of shoreline. The average depth of the Lake is 65 feet with a maximum recorded depth of 120 feet. At an elevation of approximately 1,200 feet, Lake James is located within the Catawba River basin.
OVERMOUNTAIN VICTORY NATIONAL HISTORIC TRAIL The Overmountain Victory National Historic Trail (OVNHT) is part of the National Park Service’s National Trails System. It recognizes the patriot militia from Virginia, Tenneessee, North Carolina, and South Carolina who crossed the Appalachian Mountains to fight and win at the Battle of Kings Mountain during the Revolutionary War in presentday South Carolina. The OVNHT is a cooperative effort of the National Park Service, U.S. Forest Service, U.S. Army Corps of Engineers, Overmountain Victory Trail Association, local governments, local citizens’ associations, local historical societies, and the states of Virginia, Tennessee, North Carolina, and South Carolina. The trail network consists of a 272-mile corridor, including a 70-mile branch from Elkin, North Carolina, that joins the main route at Morganton, North Carolina. Sixty-five miles of OVNHT are officially developed for public use, and development continues on the remaining sections. The official sections of the trail were established through agreements with landowners and land managers and often have overlapping designations. All officially certified segments are identified by signs displaying the trail logo (an Overmountain man in profile on a brown and white triangle) or a white triangular blaze. Portions of the FFST route proposed in this master plan share an alignment with the OVNHT. Currently, ~5.5 miles of OVNHT are certified in Burke and McDowell Counties; This includes an ~1.7-mile segment in the 1780 Community and an ~1-mile segment near Black Bear Creek on NC Wildlife Resources land.
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
9
NATURAL ENVIRONMENT STEEP SLOPES
WETLANDS AND HYDRIC SOILS
CATAWBA RIVER
Much of the corridor has gently rolling topography. The most challenging slopes are along the banks of the Catawba River, North Fork Catawba River, and shoreline of Lake James. The trail should be designed for grades under 5% slope when possible. Natural surface trails can vary up to 10% slope while maintaining sustainable design. Alignments proposed in this plan should be designed with these guidelines and may require a larger corridor to incorporate a more gradual trail grade.
The study area includes several wetland areas as identified on the National Wetland Inventory (NWI). According to NWI, there are likely smaller wetland areas within the study corridor that are not indicated within their inventory that could impact final trail alignments. Hydric soils in combination with wetland plant species and wetland hydrology are considered indicators of a wetland, which require costly permitting if impacted2.
The Catawba River (named after the Native American tribe that first settled on its banks) is a tributary of the Wateree River in the states of North and South Carolina. The river is approximately 220 miles long and is considered one of “America’s Most Endangered Rivers” by the American Rivers organization. The river includes a series of reservoirs for flood control and hydroelectricity and provides drinking water to millions of residents. The headwaters of the Catawba River begin in the Blue Ridge Mountains in western McDowell County approximately 20 miles east of Asheville. The Catawba joins the Linville River and forms Lake James. The river then extends east and south, flowing through other impoundments near Morganton, Hickory, and Mooresville on its way to Lake Norman. From Lake Norman it flows south, passing west of Charlotte, before entering Lake Wylie, where it forms approximately ten miles of the border between North and South Carolina. The Catawba River continues through South Carolina before joining the Wateree River, which spills into the Atlantic Ocean.
FLOODPLAINS Floodplain areas provide both an opportunity and constraint for trail development. Since traditional development is often not suitable within floodplain areas, private landowners may be more willing to provide access for public trails within these areas. Also, these scenic areas attract wildlife, which creates an engaging trail experience. Within this study area, much of the floodplain areas along the Catawba River corridor are ideal for trail development. Although development is regulated within the floodplain, greenways and trails are allowed and can be permitted. Sound trail engineering techniques are necessary to ensure trails can sustain flooding. To the extent possible, greenway alignments should be avoided within the floodway1
STREAMS, LAKES, AND PONDS The County, State, and Federal government regulate the many waterbodies found throughout the study area3. Lake James and the Catawba River are the dominant waterways within this corridor. .
.
Avoid disturbance in the floodway. Avoid placement of structures or disturbance within the floodway. Floodways are regulated locally and by the Federal Emergency Management Agency (FEMA). Fill, structures (walls, kiosks, etc), and impervious services are discouraged. Any structures located within the floodway require a no-impact/no-rise certification through FEMA. These studies can vary on cost but can range from $2,500-$15,000 depending on complexity.
1
10
If wetlands are unavoidable, utilize elevated boardwalk systems. Boardwalks allow for travel over flat, poorly draining soils, standing water, and wetland features and have significantly less impact than other options. A section 404 (Clean Water Act) Permit may be required if the wetland is considered jurisdictional by the USACE. This means that the wetland is not isolated and part of a broader lake or water system. A small boardwalk for a non-isolated wetland with limited fill or dredging may qualify for a programmatic Nationwide Permit. Nationwide Permits are designed to streamline the permitting process for actions with limited disturbances. In addition to permitting, disturbances exceeding a tenth ( 0.1) of an acre would require mitigation which can increase project costs. Impacts under a tenth (0.1) of an acre do not trigger mitigation fees.
2
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
Maintain a 50-foot buffer from all waterways, particularly those regulated under the Catawba River Buffer Rules. The state requires a 50-foot buffer along the shorelines of Catawba River and associated lakes. Streams within the study area are identified by the State of North Carolina as having poor water quality and maintaining or improving an adequate vegetated buffer is crucial to improving the quality. Zone 1 of this buffer includes an undisturbed 30-foot buffer from top of bank in which trails are discouraged. Zone 2 is an additional 20-foot buffer. This zone allows for managed vegetation and trails and greenways. While trails are an allowable use within Zone 2, the NC Division of Water Quality requires a permit (through DWQ or designated local government). The applicant must show that disturbance has been minimized and no other alternatives exist.
3
RARE FLORA AND FAUNA The State Natural Heritage Program provides data identifying the state’s most sensitive environmental areas to be avoided; these areas are incorporated within the analysis map series at the end of this chapter. Rare flora and fauna species can also exist outside of these designated areas, which can alter final trail alignments prior to construction. Coordination with the U.S. Fish and Wildlife Service (USFWS) is an important aspect of the design process. Involving USFWS early on in the process can help avoid potential planning obstacles related to federally protected species. Additionally, permits2 like Section 401 and 404 will initiate the review of the State Natural Heritage Program database. If species are found within the project area, State or Federal requirements may dictate avoidance or mitigation.
Species identified by the State Natural Heritage Program within this study area include:
A| Northern Long-eared Bat B| Carolina Northern Flying Squirrel C| Brook Floater (Catawba River, McDowell County) D| Mountain Golden Heather plant (Lake James area) E| Peregrine Falcon (Lake James area) F| Bald Eagle (Lake James area)
THE NORTH AMERICAN BALD EAGLE FEATHER PROVIDES THE INSPIRATION FOR THE FONTA FLORA LOGO.
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
11
CULTURAL RESOURCES
NATIVE AMERICANS The Catawba River has served as a historic transportation route, cultural connector, and wildlife corridor throughout the area’s history. Early Native Americans in the area identified themselves as the Kawahcatawbas, “the people of the river.” The Catawba and Wateree Tribes used the river for transportation and traded with Spanish explorers at river outposts.
12
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
OVERMOUNTAIN MEN The Catawba River and its tributaries were also followed by Revolutionary War soldiers on their way to the Battle of Kings Mountain, SC in 1780. The Overmountain Victory National Historic Trail preserves and commemorates the route. The original Overmountain Victory National Historic Trail (OVNHT) route was identified by a National Parks Service research team. The team relied on the 1881 account of the march, which has been amended by local historians, descendants of battle participants, and other sources. As part of this congressionally designated trail, any officially certified portion of the OVNHT must lie within a one-mile corridor (half-mile on either side) of the historic route.
THE BUILT ENVIRONMENT The opportunities and constraints found within the built and human environment are critical for determining suitable trail locations and feasibility, ideal user experiences, construction costs, and necessary permits. This section highlights four (4) built environmental features and their implications for developing the Fonta Flora State Trail from Lake James to Marion, including: 1) Land Use; 2) Existing Trails and Parks; 3) Utilities; and 4) Transportation.
LAND USE SNAPSHOT Eastern Section
Central Section
The City of Marion
The eastern extent of the study area is anchored by a large private residential development that has provided easements for the FFST and OVNHT. Beyond this private development, the study area is typified by a rural wooded landscape with large tracts of land that includes Pisgah National Forest land.
The central section of the corridor exhibits a mix of large tracts and small tracts. Several of the larger tracts are dedicated to public and private recreational uses including: NC Wildlife Resources Game Lands; Black Bear Campground; Black Bear boat access, provided by Duke Energy; and Big League Camp, a baseball training facility.
The City of Marion’s northeastern edge is typified by single-family residential growth. Private residential development and areas of steep terrain create a challenge for establishing a public trail connecting Lake James to the City. Marion and the McDowell Trails Association have successfully constructed 1.6 miles of the Joseph McDowell Catawba River Greenway which serves as the western terminus of the study area.
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
13
THE BUILT ENVIRONMENT EXISTING PARKS AND GREENWAYS Burke County, McDowell county and Marion have a collection of parks and greenways that are ideal for trail connections. Some of these major assets include:
Fonta Flora State Trail: Lake James Loop
OVNHT at the 1780 Community
OVNHT at NC WRC Game Lands
Ten miles of the Fonta Flora State Trail were completed in 2017, and an additional 10 miles are currently under construction. When complete, the trail will provide for a complete loop around Lake James.
The western terminus of the study area begins with a one-mile certified segment of the OVNHT that extends through the 1780 Community. The trail segment is an extension of the OVNHT in Lake James State Park. Previous FFST planning efforts provide recommendations for connectivity to a new trailhead at the nearby Fonta Flora Whippoorwill Brewery.
Approximately 2 miles of the OVNHT extends through NC Wildlife Resources Commission Game Lands near Black Bear Creek. Trail parking and access is located at a gravel lot on Lake James Road.
Joseph McDowell Catawba River Greenway OVNHT at Lake James State Park This state park is a significant linkage connecting FFST Sections 1, 2, and 3. Two miles of certified OVNHT are located along Paddy Creek in the state park.
14
Black Bear Boat Access This public boating access area is owned by Duke Energy, which has plans to further improve the site with camp sites and day-use amenities in partnership with McDowell County.
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
Named for local Revolutionary War hero and member of the Overmountain Men, Marion’s greenway extends for almost 2 miles along the Catawba River. The historic McDowell House serves as a trailhead for the greenway.
UTILITIES The study area has a complex matrix of utilities that include transmission lines, utility towers, water lines, and sewer infrastructure. Sewer lines are often compatible with trails since existing easements preclude development. However, the easement will often need to be modified to provide for a public trail.
TRANSPORTATION The study area analysis includes an extensive review of the existing transportation network including the North Carolina Department of Transportation (NCDOT) right-of-way (ROW), NCDOT plans, existing bike and pedestrian infrastructure (crosswalks, bike lanes, etc.), railways, and existing greenways. NCDOT’s right-of-way was analyzed for the ability to accommodate a trail alignment or accommodate a widened shoulder. These opportunities are shown on the Site Analysis Maps with corresponding opportunities and constraints notes. CSX operates the former Clinchfield rail line on the west side of the North Fork Catawba River. If this rail were to ever become abandoned, a significant opportunity would exist to establish a considerable section of trail. The right-of-way and adjacent lands were analyzed as a potential future route, as illustrated in the maps and notes.
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
15
MAP AND PHOTO SERIES: PRELIMINARY TRAIL ROUTE ALTERNATIVES The map and photographic series, which spatially incorporates the natural and built environment analysis, highlights a host of preliminary trail route alternatives. These routes were further refined by local leaders to identify and engage landowners. This information will serve as an ongoing reference guide as alternative routes may need to be developed due to unforeseen barriers.
Dales a in unt
Mo 8
Ridge
237 reek1
d dy
sC
Nadias
Dales Cre
ek
t es
id Dav Bud
h ig sR W Te n
i ll
ll y
Tr ee
g
Gu
Bi
Rock H
Be
y
8 58
15 88
Do c
Sy ca
Pier
Fo re
g Brid
e
Obeth
0 - 30 > 30
rk
Pa
Newton
1700 Samaha
d Rid
ge
wo o
1501
1500 Vine
Madison
172
o Neb
t
Hurs
Prim
rose
ch t Chur Baptis
1743
Me
15 14
Garden
h
3
Logan
Deacon
Ya
Victoria Victor y
ille ersv
Bak
Mon te
Virgin ia F o r s yt he
Habitat Ch urc
rto n No
C
1 58 7
y
Ya nc
n ce
Leo
Tu
Pa
Bailey Creek
Bear Creek
Bar t
01
Run
Deer po rt
n Jackso Victory
on te vi M
1552
e an eL Blu
1552
Ri ve rbe
15 Duk e
Air
Dee p Fo rest
ald
n
Cheyenne
n Can no
H
Fa
rm
Riverview
Wo od s
Dead End
Johns Creek nd
Cross C reek
Deep nice
Cr es
Branch Academy
Pulliam
Finley
1703
Faith
l owel McD
Clay
Seagle
n
Oak
d
ga
1 5 37 ell
Garden
ark Aza rial P le moa
Highlan
Madison
rk
Pa
36 15ple a M
ow McD
Academy
Slope
Wildlife Club
FFBrew
Martin
Logan
Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped
nd e La
ts
am
ei g h
ls Hil
0.5 Miles
eH
iew ev
ke
L ak
mp Ca nt Hu
1 3
's
G
k La
0.25
st
d
0n
Parcels
La
i dg e
oo
B ea co nR
ap pe zio
e ersedg Wat
gh Hi Ridge
C
Miles
nw
id cks Do
h Hig
i lv ie w 0 - 30 > 30
1 1780 Development Trails e Existing OVNHT ertim m OVT Commuter Sum Motor Route OVT Historic Route ide ks 0.25 0.5 Rail Roads
ve
0e
Slope a
n
ve
Ha
n
Lo
Ra
h Hig
ps Cam
2
if gR
ell pb C am
Ber
l
id le R
38 15
ve
Cardinal
Mor
y
Pulliam
ue
ge
tains Cap S
y
er
Main
1
Donah
n
Hul
OVT Commuter Motor Route OVT Historic Route re Rail Roads mo s camore tain SyParcels ap Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped
1281
126
t
e idg
or
Sh
we
B
Bo
6
4
23
t
in
Po
te1
et
ns
r
am Bre
dle
k ela n d
t it u
McDowell County
Fo
B
ns in I nta
e
idg
La
e
er
Bra
Mo u
rR
da
Jp Mills
ve
4
L ak
luff
Riv
221
er
ne
Ce
5
GRAY JAMES H 1/3int &JOSHUA E GRAY 1/3int & MELISSA B GRAY
na
ba
20
es
e on
3
rina Ma
ri Ma
taw
O rc h
Pr
es am
GOODMAN MICHAEL ALVIN
G ra ys t
t
Ca
12
ga h
s
Ott
Co
tt
P is
J
res
rk
sie
1432
iew ff V ra
es
1724
ot
refo
Ba
ek
Cre
Ca d
New
Chev
ilda
8
ria iste
26 a 17
olin
Car Mat
6
13
7 14
ey Yanc
Burgin
l
owel
McD
lroad
Clark
12
r
CourtR ai
State
2 1 5 Fort
11
bert
g in m g a nFt ole n 15 15
e Turn
Ellis
70
10
Ro
is
hard Ric
7th
C
Hillcrest
d
ne Way 1700
D
ain
M
HMcDowell ill
yth
Fors
5
Mo r
is Chr
l
av
La
INSET MAP
9
Fern
cent Cr e s
Schoo
5th
Oak
nwoo
Court
1700
ar mo rest La
F
Gree
M n rga
Mo
bi
ain
Dogwood e dg Ri Yanc ey
10
Fo
Fo
Jo
6
ke
n ti o ta an
Ove
6
t oun L a ke M
158 2
Bear Clif f
Cla
Burke County
W
nny Bu m
7
8
t
2 1
ck
rth
w vie ke La
i ew ev
i
in Ma
B r ow n
or
9
Bla
No
La k
1550
r
ve
ff
rto
1 22
Fort
le ap
Clay
n
rso
Ca
Ba
Marion
Howell
ell
0.5 Miles
ow McD
er rn rk Pa
Highland
it
vista
ia
nt
New
Summ
Ridg evi ew
Virginia
er is t
bert
Vine
y
W
ce
Ro
Marion
0.25 lle
Cardinal
TJ
r
st a Fern
rp
ff
Myrtle
2
Lake James 1780 Development Trails Lk James Existing OVNHT
Wa lk
Camp
rlook
ate
op
70
Hill
09
12
ri
n
inso
Rob
er
Sh
hard
09
12
Sh
Lena
0
A
G
Ric
ne
1212 Grove
1198 en Gre
r
ew
Rob
i ch
rs
1214
McDowell County Ridge
rest
n
Lono Dogwood
SEE INSET MAP
n inso
Ma
Sowe
70
ke y
p
m Ca
Pl
o Sh
g Brid
G il
lley Va
l
hn
ture
Settlement Ridge
ey
e ing
e Fo
rd Howa
rhil
10
0 - 30 > 30
Cov
od lwo ure La
W
inte
Jo
Res er vo ir
Va
Slope
3
nc h
k Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped
re
Bear Cli
G Black Bear Campgroundrayst o
ky
6
Su
7 Na
8 9
nc e e idg yR
7
1780 Development Trails Existing OVNHT OVT Commuter Motor Route o lli Route OVT Historic nE so Rail C a rRoads Parcels
Ya
4
11 9 d fi
5
Hill rd
221
00 A p p l etr e e
15
La ke
C abin B
Big League Camp
By
re e k en C ard
t
y nle Co by
ca
e nle
ee Nix Cr
G ol
M oo
1
Justice et
1 5 0 6G
29
12
School
in
Holly
1510
w Vie
1302
igh well H Do Mc
Ro
b Bo
Hawksview
t
asan
Phe
C h a ri o t
Lake 10 James
rs me
2
d ar
mer
n ta M ou
River
Big League Camp
10
Joseph McDowell House
Pal
Gr ee
b
taw
Ca
Park
4
C h a r i ot
ke Jame s La
F ork
Lake James Landing
1
Ri
Riv
8
z
1550
ta
Ca
sa
Fork River
Lake James Landing
5 So
a wb
4
dero
iv aR
a r Cliff
Black Bear Campground
EQUITY TRUST CO.,CUSTODIAN F/B/O DAVID R. MAJKA
Amelia
z
Pon
er
Riverbreeze Campground & RV
7
1 3
CANNON RESOURCES LLC
ba aw
ld
Joseph McDowell Historic Greenway
t let
t
t Ca
d
er
re
nn
Fly
Lent
tty
1
be
t
1587
2
ke
Riverview Forest Lent
Riverview Forest
Sco
226
La
3
ro en
Go
7a
C
d el rfi
kins
Han
1501
De e
d oo oll w Kn
ab ankinser e
C
Hills
1
6
5
6 8
4
5
3 tt rtle Ba
es
NC Wildlife Commission NC Wildlife Commission Pisgah Game Land Designated Pisgah Game Nature Land Preserve Designated POOL C RANDY 1/2 UND. INTEREST LAIL TERESA POOL 1/2 UND. INT. Nature Preserve
2
9
oc
R
McGegers Branch
2
155
McDowell County
1553
ery tch Ha
He ron
sh
Peach
Toms Creek
Villa ge
ue
7
Lake Jam
1553
He
4 Fi 155
Bl
ille
y
8
Great Hill
k mloc
inv
no
od wo I d le
iss elwe
L 51 15
Iv ain
LINVILLE VIEW LLC
Ca n
int
Ed
Pisgah National Forest
Pisgah National Forest
nt Mou Po ntain Mou
Belvid ere
Sh ort o
1238 C 105
Paddy Creek
Creek
ek re yC ile Ba
B
State
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
17
yC ile Ba
Dales
Ridge
as
Burke County
GOODMAN MICHAEL ALVIN
k ela n d
es
h ig sR W
Te n
Dav
126
1
Dona
hue
n
Rock H
Gu
Bi
g
ll y
Tr ee
we
e idg
l
y
Hul
2
Lo
camore SyParcels
nd e La
15 88
am
ls Hil
d
18
iew ev
0.5 Miles
k La
0.25
oo
0 ide cks o D
nw
0 - 30 > 30
ve
Slope
G
Ra
tains Cap
Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
Wildlife Club
mp Ca nt u H
1 3
FFBrew
's
n
Rail Roads
e
idg
le R
if gR
ell pb C am
Lk James
1780 Development Trails Existing OVNHT OVT Commuter Motor Route OVT Historic Route
1281
Bo
rt
4
n
Su
o Sh
t
in
Po
B
t se
6
McDowell County
F
23
na
10
e
or
te1
ri Ma
L ak
B
t it u
t
La
ns in I nta
4
Black Bear Campground
i ll
5
GRAY JAMES H 1/3int &JOSHUA E GRAY 1/3int & MELISSA B GRAY
id
3
Bud
ne
9
ar
Mo u
Gra ys to
Cl
ve
liff
2
6
J
Myrtle
er
Bear C
es
Nadia s
Pr
La ke
d dy
ga h
7
ky
P is
reserve
5
es am
8
7
Pa
R
oc
sC
e
8
6
reek1
Dee
vill Lin LINVILLE VIEW LLC
2 155
237
rest p Fo
51
Pisgah National Forest
iew ff V
15
MAP 2: STUDY AREA 1 SITE ANALYSIS
Sh ort o
5 1238 C 10
Paddy Creek
ek re
ion
Creek
STUDY AREA 1: SITE ANALYSIS
o Neb
g Brid
e
Obeth
STUDY AREA 1
STUDY AREA 1: OPPORTUNITIES AND CONSTRAINTS Opportunities
Constraints
1
Connect existing OVNHT
1
Existing OVNHT requires improvements
2
Connect to Fonta Flora Brewery Trailhead
2
Narrow road shoulder
3
Positive landowner at Campbell’s Trace
3
Possible road crossing at Lake James Road
4
Subdivision potentially willing to allow trail
4
Parcelization at lakeside private developments
5
Potential for lakeside trail
5
Private residential subdivisions
6
Potentially willing landowners
6
Narrow bridge over Bailey Creek
7
Large, undeveloped tracts of land
7
Lack of bicycle/pedestrian infrastructure at Bear Creek Marina & Campground
8
Connection to Pisgah National Forest Game Lands
8
Narrow bridge over Bear Creek
9
Connect to Black Bear Campground
10
Connect to Black Bear Boat Access
2
3
Positive landowner at Campbell’s Trace
10
The Fonta Flora Brewery at Whippoorwill Farm is a significant destination on the FFST
1
Existing OVNHT at Campbell’s Trace requires improvements
5
Private residential development presents a significant barrier to a trail alignment along the lake shore
The Black Bear Marina & Campground is an asset that could be linked to the FFST
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
19
a in
ald
Mo
unt
STUDY AREA 2: SITE ANALYSIS
Bailey Creek
Bear Creek
B
Pisgah National Forest
Ca n
ek
4
5
1
e
idg
rR
1552
luff
Lake James
7 Na
tur
y
8
a i lv ie w
STUDY AREA 2 FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
n
ve
Ha
gh Hi Ridge
C
B ea co nR
ap pe zio
0n
La
i dg e
0.25
e ersedg Wat
ke
La
Deacon
Ya
Camp
ide ks
1 1780 Development Trails e Existing OVNHT ertim m OVT Commuter Sum Motor Route OVT Historic Route Rail Roads
Parcels
h Hig
n ce
Hig
S
6
s amp hC
Do c
1
15 0
s tain
Settlement Ridge
Big League Camp
8 9
C
Sy ca
er
v Ri
10
ap
58
re mo
ba
aw
t Ca
eW alk
Fo re
1550
sie
Jo
5
r
tz
C h a ri o t
ive
R ba
Len
4
Pier
Bar t
1 58 7
t
taw
C abin B
Lake James Landing
10
rina Ma
res
Ca
Amelia
8
Fo
rk
River
Fo
F ork
ck
rth
CANNON RESOURCES LLC
t
w vie ke La
Riverview Forest
re
2 1
3
EQUITY TRUST CO.,CUSTODIAN F/B/O DAVID R. MAJKA Bla
C
be
t let
No
ankins
G ra ys t
da
1
6
Black Bear Campground
3 7a
Dales C re liff
Ce
2
McDowell County
H
Bear C
POOL C RANDY 1/2 UND. INTEREST LAIL TERESA POOL 1/2 UND. INT.
ill
a r Cliff
e on
od wo I d le
NC Wildlife Commission Pisgah Game Land Designated Nature Preserve
Great H
9
20
Be
es
Cheyenne
t
McGegers Branch
Poin
Lake Jam
1553
MAP 3: STUDY AREA 2 SITE ANALYSIS
Ivy
ntain
Ed
iss elwe
no
n
tain
un Mo Mou
Belvid ere
st
ke
L ak
0.5 Miles
eH
ei g h
ts
Slope
Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped 0 - 30 > 30
STUDY AREA 2: OPPORTUNITIES AND CONSTRAINTS Opportunities
Constraints
1
Connect to Black Bear Boat Access
1
Steep terrain
2
Future site improvements could include trailhead
2
North Fork Catawba River bridge crossing
3
Duke Energy property
3
Secluded private development
4
Existing OVNHT at Pisgah Gameland
5
4
Parcelization at lakeside private development
Opportunity for trail head at existing trail parking
6
Flat floodplain may be suitable for trailhead
7
Connect to Lake James Landing & RV Park
8
Connect to Cannon-Big League Camp at Hankins Rd.
9
Potential rail-with-trail
10
Opportunity for increased trail visibility at Big League Camp entrance
5
Narrow/steep shoulder would require elevated trail infrastructure
6
Small parcels with no easements
7
Rail-with-trail requires coordination with CSX
8
Elevated bridge would require significant fill to match grade
9
Narrow road shoulder around blind curve
10
Narrow shoulders on bridge
1
Control Point: Connection to Pisgah National Forest Gamelands Parking Area
4
Existing OVNHT and trail parking at Pisgah Game Land
8
Pinch point at CSX railroad overpass on Lake James Road
10
Narrow bridge
1
Opportunity to connect Black Bear Boat Access to nearby Bear Creek Marina
8
Connect to Cannon-Big League Camp at Hankins Road
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
21
ne La Blu e
1552
Can no
n
nd
Fa rm
Riverview
Johns Creek
Dead End
Wo od s Deep
Ber
C h a r i ot
ke Jame s La
1550
Ri ve rbe
1
tz
nice
Fork River
n
yn
i ew ev
Cross C reek
et Fl
Len
ke
er
lett
1587
2
rt Ba
La k
Jp Mills
C
d el rfi
La
3
Riverview Forest
1501
De e
tty
226
n
lde
Go
Riverbreeze Campground & RV
143
2
Pon
osa
Par
Leo
Ya nc
od
1500
Newton
Ri d
ge Vine
8
3
15 Madison
172
wo
1501
Victoria Victory
le ersv il
3
Logan
Branch Academy
Finley
Garden
urc h
Habitat Ch
rto n
No
Pulliam
1703
Tu
14
Bak
Mon te
he
Virgin ia F o r s yt
Victory
on te vi M
Cr es Garden
174
Run
Deer
on Jacks
Main
Madison
ll
owe
Academy
38 Prim
ch t Chur Baptis Faith McD
Seagle
n
t
Hurs
d
ga Mor
Oak
Martin
36 15ple a M
ll owe
Cardinal
Highlan
New
Clay
ey
Logan
15
ve
Me
e
rt po Air
12
20
O rc h
Br ad ley
am
Bre
Co
ark Aza rial P le moa 1 5 37 McD
tt
ter Ot
es
k
r Pa
r
1724
k
Ca d
g
in
m
e Turn
a1
8
t
6 g anFtole1n515
vy Che
tilda
Ma
726
ber
ark
tP
foo
re Ba
ree
hC
syt
For Ro
is
5
13
INSET MAP
d har
Fort
olin
Car
n
7 14
c Yan
Burgin
Clark
d
1
6
Ric
h 7t
C
roa
52
12
av
D
h
5t
Oak
Hillcrest
Fer
Mo r
is
11
u Mo
Dogwood e dg Ri Yanc ey
9
158 2
cent Cr e s
Chr
10
HMcDowell ill
CourtR ail
State
nny
l
8
in nta
ia er
Bu
Marion M
F
ll
owe
McD
1700
ne Way 1700
bi
7
ist
in
Ma
m
t
W
1 Ellis
Court
70
or
i
22
Ba
ain
d
nwoo
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
M n rga
Mo
Clay
C
B r ow n
e
l ap
ar mo rest La
vista
Schoo
Howell
well
n
o ars
Fort
o McD
Va
it
Summ
0.5 Miles
Vine
a
y
er rn rk Pa
New
0.25 lle
t
Highland
nt
Len
0
ber
Marion
e 1212 Grov
70
Virginia
Gree
ce
Ro
rp
L a ke
Ridg evi ew
ia
op
st a Fern
d har
09
12
Sh
S
Ric
i ch
ne
rri
he
Dogwood
SEE INSET MAP
son
in Rob Ma
rs
1214
Rob
Hill
09
12
er is t
70
ke y
rd
Sowe
son
in
W
G il
Cardinal
ff
to
r
hn
lley Va
ill
A
er
ng
Gi
rest
on Lon
Ove
Ridge
e Fo
k
rloo
ate
gew
Cov
Howa
Res er vo ir
erh
McDowell County
or
Brid
Jo
n ti o ta an l P
Sh
e idg yR
3
TJ
nc e
od lwo ure La
int
1198 n ee Gr
Hill rd
re
p
m
Ca
ey
By
W
10
0 - 30 > 30
t
reek Pisgah National Forest Municipal Foothills Conservancy State/Public Duke Power Big League Camp Large Undeveloped
M oo
nc h
1780 Development Trails Existing OVNHT OVT Commuter Motor Route lio OVT Historic El Route on s Rail Roads r Ca Parcels
rse
y nle Co by
7
d fi
me
re e k en C ard
Ro
at
bc
Bo
e nle
Nix C
G ol
Ya
4
11 9
t
san
221
00 A p p l etr e e
15
Holly
1510
1 5 0 6G
School
in
1
Justice
So
2
29
12
1302
igh well H Do Mc
n ta M ou
w Vie
er
a Phe
Lake James
k
Joseph McDowell House
Palm
Gr ee
Big League Camp
5
er
Riv
Hawksview
1
Ca
Duk
ba
taw
der
221
Joseph McDowell Historic Greenway
4
er
iv
aR
b taw
Pulliam
MAP 4: STUDY AREA 3 SITE ANALYSIS
ery tch Ha
Sco
d oo oll w Kn kins Han
ab
rod
d ar
22
sh
Peach
Toms Creek
Villa ge
He ron
Lake James Landing
Ca
Slope
Hills
ue
1553
Bl
4 Fi 155
STUDY AREA 3: SITE ANALYSIS lock
Hem
1700 Samaha
State
STUDY AREA 3
rose
STUDY AREA 3: OPPORTUNITIES AND CONSTRAINTS Opportunities
1
Constraints
Large undeveloped parcels provide connectivity to Justice Road
2
Catawba River corridor is ideal trail setting
3
Utilize Catawba River floodplain corridor
4
Large parcels on south side of Catawba River
5
Connect to Catawba River Greenway
6
Existing sidewalk begins at Oakwood Drive
7
Retrofit existing sidewalk into multi-use path
8
Existing sidewalk begins at Monte Vista Avenue
9
Wide right-of-way on Fleming Avenue
10
Connect to Marion Community Building
11 12
Connect to Marion Town Hall
13
Existing sidewalk on south side of N. Garden St.
14
Existing parking on Fort Street could provide trail parking
1
Catawba River crossing will require bridge
2
Narrow shoulders on Holly Street
3
Narrow shoulders on Airport Road
4 5 6
Narrow shoulders & high traffic volume on US 70
7
On-street parking along Fort St. utilizes available right of way
8
Steep slope along Court St.
1
Control Point: Connection to Yancey Rd.
School turn lane utilizes Fleming St. right-of way Steep slope along North Madison Street
School turn lane utilizes Fleming St. right-of way
Wide right-of-way on Fleming Street provides opportunity for a sidepath
4
Narrow shoulders & high traffic volume on US 70
5
Connect to Joseph McDowell Catawba River Greenway
12
Double-loaded sidewalks on New Street near Town Hall
Double-loaded sidewalks on New Street
5
9
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
23
2
TRAIL C H A R A C T E R A N D D E S I G N GUIDELIN ES IN THIS CHAPTER: THIS CHAPTER PROVIDES DESIGN DETAILS FOR VARIOUS TRAIL TYPES AND TRAIL SUPPORT FACILITIES AND OFFERS INSIGHT FOR INCORPORATING SOCIAL MEDIA. This chapter describes specific trail construction
standards and trail types to ensure minimal maintenance and the best user experience.
Additionally, this chapter defines three trail types and illustrates their transitions along the preferred
A| SUSTAINABLE TRAIL DESIGN & CONSTRUCTION
trail alignment.
B| TRAIL TYPES
A unique architectural and branding theme is
C| TRAIL PROFILE
presented for signage, wayfinding, and other
D| TRAIL SUPPORT FACILITIES
trail support facilities. This chapter concludes
with recommendations for using social media to market the trail.
E| SOCIAL MEDIA MARKETING
25
TRAIL CHARACTER SUSTAINABLE TRAIL DESIGN The trail must be designed and constructed to minimize erosion and ongoing maintenance, while providing for a leisure, family-oriented experience. The trail width will be approximately five-feet wide and allow for multiple users and emergency access from off-road vehicles. The overall average trail grade or steepness will be 5% or less. The trail will be slightly rolling with a gentle grade that follows the terrain contours. The trail will be slightly out-sloped, and meanders and undulates frequently to remove water from the trail surface and create interest. The trail corridor will remain as narrow as possible while still maintaining the required tread width. The trail design will utilize the five essential elements of sustainable trails as outlined in the International Mountain Bicycling Association’s (IMBA) publication “Trail Solutions.”
26
1. THE HALF RULE A trail’s grade shouldn’t exceed half the grade of the hillside or sideslope that the trail traverses. If the grade does exceed half the sideslope, its considered a fall-line trail. Water will flow down a fall-line trail rather than run across it.
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
2. THE TEN PERCENT AVERAGE GUIDELINE An average trail grade of 10 percent or less is considered sustainable. This doesn’t mean that all trails should be kept under 10 percent, but the trail builder will need to limit the length of sections that exceed 10 percent.
THE FIVE ESSENTIAL ELEMENTS OF SUSTAINABLE TRAILS
3. MAXIMUM SUSTAINABLE TRAIL GRADES Maximum grade is the steepest portion of a trail that is more than approximately 10 feet in length. It’s critical to determine what the maximum allowable trail grade will be prior to beginning construction. Several factors should be considered when determining the maximum sustainable trail grade which include:
4. GRADE REVERSALS
5. OUTSLOPE
A grade reversal is a point where an ascending trail changes direction subtly for 10 to 50 linear feet before ascending again. This change in grade allows for water to exit the trail.
Outslopes allow water to sheet flow off the trail instead of channeling down its center.
• Half Rule • Soil Types • Rock • Annual Rainfall Amount • Grade Reversals • Type of Users • Number of Users • Difficulty Level
MAX
CHAPTER 2: Trail Character and Design Guidelines
27
TRAIL CHARACTER TRAIL CONSTRUCTION Members and associates of the Professional Trailbuilders Association (PTBA) should be preferred contractors for constructing the trail with mechanized equipment. These contractors have a thorough understanding of sustainable trail design and construction.
Any excess or disturbed soil outside the trail tread is evenly distributed and covered with leaves, organic debris, and other natural materials to aid in aesthetics and sedimentation and erosion control.
FULL BENCH CUT The trail will be constructed using a “full bench cut” in which the entire trail tread is built on solid ground.
Volunteers may also work with PTBA contractors in a “hybrid” manner. When utilizing this method, the contractor is responsible for the rough cut of the trail tread and volunteers complete the finish work. Burke County will be responsible for securing any required local, state, or federal permits for construction. The trail will be constructed using a “full bench cut” in which the entire trail tread is built on solid ground. A “partial bench cut” which is similar to “cut and fill” will only be utilized if a full bench cut is not feasible due to rock outcrops, slabs, or other natural features. A partial bench cut uses loose fill dirt to construct a portion of the trail treads. The fill dirt has a tendency to loosen over time and can then wash and erode. This issue is minimized when constructing a full bench cut. The trail bed will be shaped to leave an even, compacted, uniform surface free of indentations or protruding roots and stumps. The grading of the trail tread, back slope, and drainage features will be finished to a smooth, stable surface.
28
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
SOLID GROUND
Details from IMBA
TRAIL TYPES Four trail types are proposed along the preferred alignment. A specific trail type is proposed according to its surrounding environment, whether it is for safety along roadways or to enhance user experience.
TYPICAL GREENWAY 10’ PAVED ASPHALT
TYPICAL GREENWAY 10’ PAVED ASPHALT
MILE MARKER FENCING TO MARK PRIVATE PROPERTY BOUNDARY
30’ PREFERRED BUFFER TO RIVER TO PROTECT WATER QUALITY
THE JOSEPH MCDOWELL CATAWBA RIVER GREENWAY EXTENDS FOR 2 MILES ALONG THE CATAWBA RIVER IN MARION.
10’ PAVED ASPHALT
User Group: Multi-Use
Average Construction Cost: $90/ln. ft.
Material: Paved Asphalt
Preferred Easement Width: 50’
Preferred Width: 10’
Minimum Easement Width: 20’
CHAPTER 2: Trail Character and Design Guidelines
29
TRAIL CHARACTER TRAIL TYPES NCDOT SIDEPATH
DUAL-USE TRAIL
8’ PAVED ASPHALT
5’ NATURAL SURFACE
3:1 MAX CROSS
GUARD RAIL
2’-3’ SHOULDER
8’ PAVED ASPHALT
2’-3’ CLEARED
2’-3’ SHOULDER
5’
5’ NATURAL SURFACE
2’-3’ CLEARED
User Group: Multi-Use
Average Construction Cost: $120/ln. ft.
User Group: Hikers and Cyclists
Average Construction Cost: $6/ln. ft.
Material: Paved asphalt
Preferred Easement Width: 25’
Material: Native Soils
Preferred Easement Width: 50’
Preferred Width: 8’
Minimum Easement Width: 25’
Preferred Width: 5’
Minimum Easement Width: 10’
Note: Trail to be approved in accordance with NCDOT encroachment agreement.
30
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
TOWN SIDE PATH 8’ CONCRETE
User Group: Multi-Use
Average Construction Cost: $90/ln. ft.
Material: Concrete
Preferred Easement Width: 25’ or in ROW
Preferred Width: 8’
Minimum Easement Width: 25’ or in ROW CHAPTER 2: Trail Character and Design Guidelines
31
TRAIL CHARACTER TRAIL TYPE PROFILE There are two (2) primary trail type transitions proposed along the preferred trail route, which extends approximately 20 miles. The Trail Type Profile identifies the transition location, along with associated length, for each trail type.
MATCHLINE
*Profile depicts one of three preferred route options*
APPROX. DISTANCE IN MILES 32
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
MATCHLINE
*Final trail type will depend on specific environmental conditions and whether trail is located within NCDOT ROW or within a private trail easement.
APPROX. DISTANCE IN MILES CHAPTER 2: Trail Character and Design Guidelines
33
TRAIL SUPPORT FACILITIES OVERVIEW A unique architectural and branding theme is presented for trail support facilities on the following pages.
TRAILHEAD KIOSK
PICNIC SHELTER
TRAILHEAD MONUMENT
The kiosk will provide a trail map and other important information for trail users. This facility will be located at trailheads and pocket parks along the FFST.
The shelter design includes a timber frame structure. This architectural style, along with a cedar shingle roof, provides for a natural character conducive to the Lake James environment.
Large monuments will be located at major trailheads or pocket park facilities that provide access to the FFST. This monument should also provide for the name of the specific trailhead or pocket park.
34
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
VAULT TOILET
BREAKAWAY SIGN: SHARED ROUTE
MILEAGE POST
The vault toilet does not require a septic system, but must be pumped regularly. This facility will be provided for at the Fonta Flora County Park
The FFST shares a route with the Overmountain Victory National Historic Trail. The directional signage post will provide users with important trail information and is compliant with NCDOT standards.
Mileage posts not only provide distance information, but also serve as confidence markers that create a feeling of safety.
CHAPTER 2: Trail Character and Design Guidelines
35
SUPPORT FACILITIES TRAIL FEATURES & SITE FURNITURE Burke County is working in partnership with Oak Hill Iron and other local artisans to develop custom site furniture and other support facilities. These unique and custom elements will be provided for at Fonta Flora County Park, trailheads, pocket parks, and other locations where trail users can be served.
TRAILHEAD KIOSK
36
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
BICYCLE RACK
BENCHES
NCDOT BRIDGE DETAIL
TRAILHEAD MONUMENT
SOCIAL MEDIA: THE NEW WORD OF MOUTH Trail users should be encouraged to utilize social media to share their experiences with their “friends” and “followers.” Special signage along the trail will signal users to consider posting pictures of themselves or their group of friends as they walk or ride bikes along the trail. In addition, special props and features should be developed during the final design phase. After all, who can market this destination-quality trail better than trail users themselves? Lets take advantage of social media - the new word of mouth.
#FONTAFLORA The proposed official hashtag for the Fonta Flora State Trail is #fontaflora.
Black Bear Trailhead, Lake James
The use of this hashtag will allow local tourism leaders to curate local photos and content that can be shared on website and re-posted through other social media platforms.
CROSS PROMOTE WITH OTHER NOTABLE HASHTAGS @NCParks #LakeJames #findyourpark #trail2victory
112 likes
dbdplanning
Great day for a ride on #fontaflora state trail! #lakejames #ncstatetrails
CHAPTER 2: Trail Character and Design Guidelines
37
3
R E C O MME N D AT I O N S THIS CHAPTER SERVES AS THE HEART OF THE TRAIL MASTER PLAN, PROVIDING SPECIFIC TRAIL ALIGNMENTS AND RECOMMENDATIONS.
Specific trail alignments and recommendations are provided for the FFST within three (3) planning sections. Trail
recommendations
are
supported
with
renderings that demonstrate trail character at
IN THIS CHAPTER: A| PLANNING SECTIONS OVERVIEW B| TRAIL SECTION RECOMMENDATIONS
specific locations.
39
PLANNING SECTIONS Y NT
NC WILDLIFE COMMISSION GAME LANDS
3
A RIVER CATAWB
BLACK BEAR BOAT ACCESS
BLACK BEAR CAMPGROUND
HISTORIC OVNHT BIG LEAGUE CAMP
LAKE JAMES LANDING
MAP 5: PLANNING SECTIONS
Y NT
U CO
1
LAKE JAMES
FONTA FLORA BREWERY LAKE JAMES STATE PARK
JOSEPH MCDOWELL HOUSE
70 221
BIG LEAGUE CAMP >> MCDOWELL HOUSE
OU EC
BLACK BEAR BOAT ACCESS >> BIG LEAGUE CAMP
LL
2 3
RK
FONTA FLORA BREWERY >> BLACK BEAR BOAT ACCESS
E OW
1
BU
The planning sections include:
PISGAH NATIONAL FOREST 2
PLANNING SECTIONS
D MC
The 20-mile study area from Lake James to Marion is divided into three (3) planning sections. The geographic extent of each section includes a beginning and ending terminus that features a key asset or significant connectivity point for the trail. Many of the planning sections represent project areas that can be developed independently over time, providing a logical method for implementation as landowner willingness, funding, and other opportunities arise.
MARION 70
THE 20-MILE STUDY AREA FROM LAKE JAMES TO MARION IS DIVIDED INTO THREE (3) PLANNING SECTIONS; THIS CHAPTER IS ORGANIZED ACCORDINGLY. 70
40
40
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
E UT
N
G
HISTORIC OVHT
H U L LY G
UL
LY
G
T
MP CA
LA
AND ME L GA
H U
N
N LO
GE
FONTA FLORA BREWERY/ SHARED TRAILHEAD WITH OVNHT
LAKE JAMES >> MARION: BY THE NUMBERS
ID
ER
L RIF
LL
E
EACH PLANNING SECTION IS ANCHORED BY A MAP THAT HIGHLIGHTS PROPOSED TRAIL ROUTES AND FEATURES.
ROCK HI
N
EE
AHU
TR
BI
DON
BO WE
126
E TRAC ’S CA M PB E LL
ILS TRA
TE
BUD
L BEL ’S MP CA
1281
DAV ID
ST RE
1780
W HI GS
D
TRACE
IN T PO ET S N
E L AN
ORT B B SH
L AK
IT ST IN IN TA
POCKET PARK
L A KE F O DGE RI
HI ST ORIC OVH
RIDGE LI
ES JAM
N MOU
E LA K
G RID OB NEB
E
LAKE JAMES STATE PARK
KE
V W IE
S HILL
OBETH
WILDLIFE CLUB
23.5 3 9 16 5 $6.25M
>>
TRAIL MILES
>>
SHARED OVNHT MILES
>> TRAILHEADS
ABOUT THE PLANNING SECTION MAPS Each planning section is anchored by a map that highlights proposed trail routes, trail features, and landowner sentiment. The proposed routes are identified as either preferred, alternate, or spur. These trail alignments are the result of extensive analysis, including environmental feasibility, landowner willingness, and insights provided by local government and local trail development leaders. Noted trail features include the physical infrastructure and facilities that support the proposed trail. These features are highlighted along the preferred route and provide critical information for developing an
estimate of probable cost for each section. These features include trailheads and crossings associated with either a road or water feature. Trailheads will provide for parking and trail user orientation. Road crossings indicate the need to provide for traffic calming measures and appropriate signage for both trail users and motorists. Major bridges indicate a significant stream or river crossing that requires a bridge greater than 20 feet in length.
>>
ROAD CROSSINGS
>>
MAJOR BRIDGES
>>
APPROX. COST
QUICK FACTS Each planning section begins with a “quick facts” exhibit. This information includes the trail distance, trail type (see Chapter 2: Design Guidelines), and key features and assets associated with each section.
CHAPTER 3: Recommendations
41
SECTION 1
FONTA FLORA BREWERY >> BLACK BEAR BOAT ACCESS PROPOSED TRAILS KE
UN CO
Y NT
LL
U CO
WE DO
MC
R BU
TY
PISGAH NATIONAL FOREST 2
PLANNING SECTI VICINITY MAPONS
1 NC WILDLIFE COMMISSION GAME LANDS
3
A RIVER CATAWB
BLACK BEAR BOAT ACCESS
BLACK BEAR CAMPGROUND
HISTORIC OVNHT BIG LEAGUE CAMP
LAKE JAMES LANDING
LAKE JAMES
FONTA FLORA BREWERY LAKE JAMES STATE PARK
JOSEPH MCDOWELL HOUSE
70 221
MARION 70
70
FONTA FLORA BREWERY BLACK BEAR BOAT ACCESS 40
TOTAL LENGTH: TRAIL TYPE
6.0 MILES NCDOT SIDEPATH TRAIL
DUAL-USE
ESTIMATED COST: POINTS OF INTEREST:
$362,530
FONTA FLORA BREWERY
POCKET PARK OVNHT TRAILHEAD BLACK BEAR CAMPGROUND
42
>>
This planning section extends approximately six (6) miles from the Fonta Flora Brewery at Whippoorwill Farm to Black Bear Boat Access on Lake James Road. The Fonta Flora Farmhouse Brewery property provides a significant opportunity for a destination-quality trailhead. A short spur trail, approximately 400 ft. long, will connect the brewery and trailhead to an existing segment of the OVNHT within Lake James State Park. The connector will require cooperation with a private landowner to cross an existing gravel driveway.
1
The OVNHT crosses Hwy. 126 just south of the Fonta Flora Brewery. After crossing Hwy. 126, a short NCDOT sidepath will connect to the one mile segment of certified OVNHT that extends through the 1780 Community at Campbell’s Trace. This segment of existing OVNHT may require reconstruction and resurfacing to a native-soil tread that provides an ideal experience for bicyclists and hikers. The trail segment extends through the 1780 Community to a pocket park near the lake shore. From the 1780 Community, easements secured by Burke County will allow the dual-use trail to continue north for approximately one mile to a planned trailhead on Lake James Road.
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
From the trailhead, the route extends south into McDowell County turning west across Lake James Road. The trail continues west through large, undeveloped rural tracts for 1.25 miles, crossing Linville Road and Dales Creek. After crossing Dales Creek, the trail enters Pisgah National Forest Land and extends for another 1.25 miles to Bailey Creek before turning south into the Pisgah Game Lands. The route connects to an existing trailhead for the OVNHT then crosses to the east side of Lake James Road, transitioning to an NCDOT sidepath that extends for approximately 375 ft. to the existing vehicular bridge over Bear Creek. The trail will use the bridge shoulder then continue as a paved sidepath for approximately 170 ft. before exiting NCDOT right-of-way to enter Black Bear Boat Access property and transitioning back to a natural surface dual-use trail. An alternate route south of Lake James Road extends through undeveloped tracts to connect to the Black Bear Campground.
2
PHOTOS:
(1) THE FONTA FLORA BREWERY AT WHIPOORWILL PROVIDES A UNIQUE TRAILHEAD OPPORTUNITY. (2) EXISTING OVNHT CROSSING AT HWY. 126 WILL REQUIRE REDESIGN FOR BICYCLES.
SECTION 1: FONTA FLORA BREWERY >> BLACK BEAR BOAT ACCESS TRAIL FEATURES Trailheads This planning section includes three (3) trailheads. The proposed trailhead located at Fonta Flora Brewery at Whippoorwill Farm serves as the eastern terminus of the study area. The brewery occupies eight acres of the historic dairy farm property while the remaining 40 acres have been conserved in perpetuity through a partnership between Foothills Land Conservancy and the NC Division of State Parks. Burke County has secured an easement for a trailhead on the east side of Lake James Road located north of the Burke-McDowell County line. The trail connects to an existing NC Wildlife
Resources trailhead for the OVNHT located on Lake James Road across from the entrance to Black Bear Boating Access. The trailhead provides a small gravel parking area adjacent to Bear Creek that will require driveway improvements and signage to provide visibility from Lake James Road.
Crossings Within this section there are four (4) significant road crossings and one (1) major bridge over Bailey Creek. The FFST crosses NC Highway 126 south of the Fonta Flora Brewery. This is an existing crossing for the OVNHT that will require redesign to allow
3 PHOTOS:
(3) EXISTING NC WILDLIFE RESOURCES TRAILHEAD FOR THE OVNHT LOCATED ON LAKE JAMES ROAD. (4) ENHANCEMENTS CONSISTENT WITH OTHER NCDOT BRIDGES UTILIZED BY THE FFST, SUCH AS BRIDGEWATER, SHOULD BE APPLIED TO THE BEAR CREEK BRIDGE. THESE INCLUDE: CHANGE IN PAVEMENT COLOR, RAILING, AND USE OFTHE FFST LOGO
4
bicycles to achieve road grade and cross the road where both trail users and vehicle drivers have a clear line of sight. This can be achieved by utilizing an existing abandoned road bed with two to three moderate switchbacks. Currently, the OVNHT utilizes a set of stairs to achieve grade before continuing west through the 1780 Community. The trail crosses Lake James Road twice in this planning section. The first crossing is located south of the planned trailhead. The second Lake James Road crossing occurs as the trail leaves the OVNHT trailhead to connect to Black Bear Boat Access. The route also crosses Linville Road between the Lake James Road Trailhead and the OVNHT Trailhead. These crossings should include design measures to slow vehicular traffic and notify motorists of the trail crossing. The trail crossing over Bailey Creek will require a significant bridge. A bridge will also be necessary to cross Dales Creek west of Linville Road. CHAPTER 3: Recommendations
43
1238
BU OU EC
C 105
RK SH OR T
DYS CREE K
PF OR EST
PA D
MYRTLE
PIS
GE IAS R ID
ES
GR AY S
TRAIL FEATURES PREFERRED TRAIL ROUTE
HISTORIC OVHT
PLANNED TRAILHEAD
H U L LY G
UL
LY
COMPLETED FFST
GE
FEDERAL LAND
LE
FFST ON PROPOSED LOCAL TRAIL
IF GR
DUKE ENERGY PROPERTY EXISTING LOCAL TRAIL
STATE LAND
N
PARCELS OF
15 ALTERNATE TRAIL ROUTE
LA KE
0
1/16 1/8
1/4 MI.
W IE
D
O
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN N
T
MP CA G RID OB NEB
E
V
S HILL
44
FLOOD PLAIN
SIDE CK
RAVENWOOD
TAINS CAP
AND ME L GA
INTEREST
HISTORIC OVNHT ROUTE
H U
EXISTING LOCAL TRAIL
WILDLIFE CLUB
FONTA FLORA BREWERY/ SHARED TRAILHEAD WITH OVNHT
RID
N LO
PROPOSED FFST ON
O RE
88
SYCAM
LL
TR
TRAILS
E TRAC ’S CA M PB E LL
N
FIELD NOTES
ROCK HI
W HI GS N
SU
EE
E
BO WE
G
1281
AHU
ILS
BI
DON
126
TRA
TE
ORT
L BEL ’S MP CA
1780
LAKE JAMES
IN T PO ET NS
ST RE
TRACE
BLACK BEAR BOAT ACCESS/ FONTA FLORA AND OVNHT SHARED TRAILHEAD
L A KE F O DGE RI
D
E UT
I
A
E L AN
B B SH
L AK
DAV ID
ES T KE LA
GE
POCKET PARK
IT ST IN IN TA
RID
CR
R DA
ES JAM
N MOU
NE TO
CE
E LA K
BUD
FF
R MA
N
HI ST ORIC OVH T
RIDGE
C
LI
FF
LI RC
A BE
BLACK BEAR CAMPGROUND
LINE
NAD
VE ER
AR BE
PARKING AND TRAILHEAD FOR OVNHT
AR AS
PR
MES E JA
CL
H GA
LA K
B E A R CR EE K EXISTING OVNHT
K CREE
E
DEE
Y NT
ILL NV LI
R OCKY
PLANNED BRIDGE CROSSING
Y PADD
F VIEW OF
Y
51
15
U CO
NT
LL
WE DO MC
DALES CREE K
FONTA FLORA BREWERY >> BLACK BEAR BOAT ACCESS
PISGAH NATIONAL FOREST
BAILEY CREEK
MAP 6: PLANNING SECTION 1
SECTION 1
OBETH
LAKE JAMES STATE PARK
EXHIBIT 1: BREWING UP ADVENTURE The Fonta Flora Brewery at Whippoorwill Farm provides an opportunity for a destination-quality trailhead. A short connector path will link the brewery to the FFST/OVNHT in Lake James State Park near Paddy’s Creek.
EXISTING
CHAPTER 3: Recommendations
45
SECTION 2
BLACK BEAR BOAT ACCESS >> BIG LEAGUE CAMP
KE
UN CO TY
NC WILDLIFE COMMISSION GAME LANDS
A RIVER CATAWB
BLACK BEAR BOAT ACCESS
BLACK BEAR CAMPGROUND
HISTORIC OVNHT BIG LEAGUE CAMP
LAKE JAMES LANDING
LAKE JAMES
FONTA FLORA BREWERY LAKE JAMES STATE PARK
JOSEPH MCDOWELL HOUSE
70 221
Trailheads
Y NT
LL
1
3
TRAIL FEATURES
This planning section extends six (6) miles from Black Bear Boat Access to Big League Camp.
U CO
WE DO
MC
VICINITY MAP
R BU
PISGAH NATIONAL FOREST 2
PLANNING SECTIONS
PROPOSED TRAILS
MARION 70
70
The preferred route extends through Duke Energy’s Black Bear Boat Access property. The route will connect to a planned internal trail system and new amenities to be designed and developed by McDowell County and Duke in the near future. The trail enters the Pisgah Game Lands and crosses Lake James Road to connect to an NC WRC trailhead on the north side of the road. The route then utilizes a former access road that extends northwest through the game lands for approximately one mile.
40
BLACK BEAR BOAT ACCESS >> BIG LEAGUE CAMP
TOTAL LENGTH: TRAIL TYPE: ESTIMATED COST: POINTS OF INTEREST
:
6.0 MILES DUAL-USE TRAIL $2,456,580 BLACK BEAR BOAT ACCESS PISGAH GAME LAND BIG LEAGUE CAMP
The route exits the game lands and continues west across the North Fork of the Catawba River. After crossing the river, the trail turns south and extends through large, forested tracts to Hankins Road at the north end of Big League Camp, a baseball and softball training facility that includes log cabin lodging. Two preferred routes are suggested through Big League Camp to allow for a direct connection to the camp’s main facilities or a more secluded route through the upper section of the property. Both preferred routes will cross an active section of the former Clinchfield rail line that is operated by CSX. The trail then extends west through the floodplain to the Catawba River and Yancey Road Bridge. An alternate route extends from the OVNHT trailhead and utilizes the existing OVNHT before turning southwest to a NC WRC trailhead. The CSX rail-line provides an alternative if the opportunity for a rail-trail or rail-with-trail becomes available in the future.
46
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
Three (3) trailheads are proposed within this planning section. The first trailhead is proposed at Black Bear Boat Access adjacent to the existing upper boat-trailer parking lot. See Exhibits 2 and 3 for details on the proposed and planned improvements to this site. The second trailhead is located at an existing NC WRC trailhead that provides access to Pisgah Game Lands on the north side of Lake James Road. The western-most trailhead is proposed on Hankins Road at the northern end of the Big League Camp property near the Hankins Northfork Volunteer Fire Department.
Crossings The preferred trail route will require three (3) road crossings, one (1) rail crossing, and one (1) major bridge. The first road crossing is located at Lake James Road as the trail connects to an existing Pisgah Game Lands trailhead. The second road crossing is at Hankins Road. The northern preferred location for crossing the CSX rail line could allow for a trail bridge spanning from ridge to ridge over the railroad corridor. The southern preferred crossing location should be evaluated for the feasibility of a tunnel underpass for the trail. After crossing the rail line, the western preferred route crosses Lentz Rd while the eastern route crosses Yancey Rd. A bridge is planned for the trail crossing over the North Fork of the Catawba River.
OU NT AIN
AL DM
SECTION 2 B
BLACK BEAR BOAT ACCESS >> BIG LEAGUE CAMP
BAILEY CREEK
U MO
HISTORIC OVNHT
IVY IN NTA
POIN
NO
N
AIN UNT MO
CA N
T
BLUFF
KE
LAKE JAMES
NA TU
A
K
ORE M
FIELD NOTES PIER
TRAILS
TRAIL FEATURES
DO EXISTING LOCAL TRAIL
BEA CO N
DUKE ENERGY PROPERTY STATE LAND
EXISTING LOCAL TRAIL
R
H
HISTORIC OVNHT ROUTE
ID G
E
E
KE
LA
HIGH RI DG
MM
SU
PROPOSED FFST ON
W
CAMP
N VE HA
IDE KS C
TS
I LVIE
FO R
YANC E
RIVER
SA
G
WBA
CAMPS GH HI
IME
T FEDERAL LAND ER
FFST ON PROPOSED LOCAL TRAIL
HI
Y
CE
N YA
CATA
PLANNED TRAILHEAD
COMPLETED FFST
DEACON
15
0 1
Y
PREFERRED TRAIL ROUTE
SETTLEMENT RIDGE
88
WA L
15
RE
LA HPARCELS OF KE IG E HE INTEREST LAK T ES
ALTERNATE TRAIL ROUTE
FLOOD PLAIN
CHAPTER 3: Recommendations 0
1/16 1/8
1/4 MI.
MAP 7: PLANNING SECTION 2
CR
LI FF
CABIN
SY C
1587
HISTORIC OVNHT
ST
ER AWBA RIV ORK CAT
W IE
BIG LEAGUE CAMP
RE
V KE
LAKE JAMES LANDING
FO
NORTH F
ER V
LA
AMELIA
A RIOT
NE TO
S
TZ
LEN
CH
GE
K AC
N
K RI FOR
G RA YS
A RIN MA
BLACK BEAR BOAT ACCESS/ FONTA FLORA AND OVNHT SHARED TRAILHEAD
BL
C
REST
RIVERVIEW FO
ET
LET RT BA H ANKI
C
BLACK BEAR CAMPGROUND
DUKE PROPERTY
BE R
LAKE RIDGE
RID
B EA R
CLIFF
R DA CE
D OO
PARKING AND TRAILHEAD FOR OVNHT
ES T
BEAR
LA
NE CHEYEN
B E A R C R EE K
HILL
A
LAKE JA M
ES
EW
L
GREAT
NC WILDLIFE COMMISSION GAME LANDS
PLANNED BRIDGE CROSSING
ID
E
EIS LW S DE
PLANNED BRIDGE CROSSING
NHT NG OV
LOS T COVE
EXISTI
BELV ID ER E
PISGAH NATIONAL FOREST
47
N
LEGEND
VICINITY MAP
ENTRANCE
PICNIC SITES
ENTRANCE INFORMATION AREA
CONNECTION TO OVNHT FUTURE RANGER / WELCOME
ROA
D
ENTRANCE GATE
FUTURE CABIN LOCATION EXISTING TRAIL / ROADBED
EXHIBIT 2:
OR INTERPRETATION STATION
FUTURE TRAIL CONNECTION
AD EA RO AR
EXISTING CONTOURS (5' INT.) EXISTING TREE STREAM CENTERLINE
C AC
ING IST EX
AC BL
KB
EA
R
FFST TRAILHEAD x
FUTURE MAINTENANCE YARD/ STORAGE AREA
26
-1
TO
SR
AD
ES
RO
SUBJECT
M
x
CONNECTION TO PLANNED TRAIL
POTENTIAL DRAIN FIELD AREA
BLACK BEAR AND BEYOND
Duke Energy has several new site amenities planned for completion in the next PROPERTY KE LA three years at the Black Bear Boat Access property. Planned improvements inN PE LAKE AK DR clude a day-use area with picnic sites overlooking Lake James, ADA-accessible JAMES fishing pier, and 37 campsites with fire rings, and bathhouse. McDowell County will partner with Duke in the design and development of these amenities and assume operation of the site once the enhancements are complete. The FFST will utilize a planned internal trail system that links these amenities. JA
S ES
DISTURBANCE BOUNDARY (11.3 ACRES)
LAKE / WATER EDGE
PRO
x
x
x
x
x
x
x
x
1
MES
HW Y22
E JA
TO
LAK
CAMP SITES
LAKEVIEW DR N
PROPOSED ROAD
x
EXISTING PARKING (ASPHALT) B
AD
RO
D
PLANTING ENHANCEMENT
A
A RO
EXISTING BOAT LAUNCH STREAM CROSSING
CONNECTION TO PLANNED TRAIL
POTENTIAL WELL LOCATION
VAULT TOILET, ADA PARKING, AND TRASH PAD
ADA CAMPSITES 4
DAY USE PICNIC SITE , TYP.
6
1
3
2
4
5
2
5
PICNIC SHELTER
6
12 3
11
DAY USE AREA
13
7
32
33 7
CAMPGROUND AREA
8
8
31
CAMPGROUND ROAD LOOP A
10 30
36
11
STORMWATER TREATMENT
35 10
Design Standard Notes:
12
ADA PARKING (4)
13 14
14
29
15
VAULT TOILET
GROUP CAMPSITE PICNIC SHELTER
28
BATH HOUSE
CONCRETE PATH
9 34
9
NATURAL PATH
37
16
PARKING & TRAILHEAD
CAMPGROUND ROAD LOOP B
27
STORMWATER TREATMENT
17
1.
2. 3.
Construction Notes for the General Co
1. 2.
3.
FFE 1310.5 see spots
FUTURE CABIN LOCATION, TYP.
26
4.
IMPROVE EXISTING TRAIL, TYP
18
5. 6. 7.
Black Bear Access Area, Lake James 6514 Lake James Road Marion, NC 28752 Latitude: 35.746326° N Longitude: -81.970221° W FERC Project No. 2232 Approximately 164 acres
48
DISTURBANCE BOUNDARY FONTA FLORA STATE TRAIL: LAKE JAMES (11.3 ACRES)TO MARION MASTER PLAN
ADA TRAIL
25
20
24
22
23
FISHING PIER (BY OTHERS)
Roads designed in accordance with N Secondary and Subdivision Roads (M Standards), 2010. Accessibility designed in accordance Accessible Design in accordance with Disabilities Act (ADA), 1990. If there is a discrepancy with the qua consult Landscape Architect for clari whichever quantity is greater.
8.
Burning is not permitted. Edge of Water at Time of Survey sho elevation may vary. Contractor shall be responsible for p building permits, labor, materials, a to perform the specified work. All aspects of work shall be perform applicable local, state, and federal r worker safety. All paving materials and workmansh with the latest edition of the State's Specifications for Roads and Struct Ground surface shall be shaped to p Contractor shall coordinate all site a Energy's Project Manager or designa Contractor shall be responsible for c storage and handling of all material All disturbed areas shall be stabilize following completion of land disturb more stringent soil stabilization guid local, county, state or federal agenc permit requirements then the more control and govern on the Project.
EXHIBIT 3: FFST TRAILHEAD @ BLACK BEAR A trailhead with new parking spaces designated for the FFST is proposed adjacent to the existing upper boat-trailer parking lot. The FFST trailhead and route through the property are subject to approval by the Federal Energy Regulatory Commission which oversees site improvements and programming for Duke Energy property. Duke has expressed support for the FFST and trailhead at Black Bear.
EXISTING
CHAPTER 3 Recommendations
49
SECTION 3
BIG LEAGUE CAMP >> MCDOWELL HOUSE PROPOSED TRAILS KE
UN CO
Y NT
LL
U CO
WE DO
MC
VICINITY MAP
This planning section presents three options for preferred routes that extend from Big League Camp to the McDowell House at the Catawba River Greenway.
R BU
TY
PISGAH NATIONAL FOREST 2
PLANNING SECTIONS
1 NC WILDLIFE COMMISSION GAME LANDS
3
A RIVER CATAWB
BLACK BEAR BOAT ACCESS
BLACK BEAR CAMPGROUND
HISTORIC OVNHT BIG LEAGUE CAMP
LAKE JAMES LANDING
LAKE JAMES
FONTA FLORA BREWERY LAKE JAMES STATE PARK
JOSEPH MCDOWELL HOUSE
70 221
MARION 70
70
40
BIG LEAGUE CAMP >> MCDOWELL HOUSE
TOTAL LENGTH: TRAIL TYPE:
11.5 MILES
NCDOT SIDEPATH DUAL-USE TRAIL TOWN SIDEPATH TYPICAL GREENWAY
ESTIMATED COST: POINTS OF INTEREST:
50
$3,435,580 DOWNTOWN MARION MCDOWELL HOUSE CATAWBA RIVER GREENWAY
the Fonta Flora to Fleming. Additionally, the City of Marion should partner with McDowell County Schools and Marion Elementary stakeholders to develop a circulation plan for the school that will provide for the FFST while also facilitating a safe and efficient flow of traffic in and around the site.
The northern preferred route extends north as a dual-use path on the east side of the Catawba River for a half mile before turning west to cross the river. The trail continues west on the south side of the river for approximately 2.75 miles through agricultural land then transitions to a typical greenway before crossing a Catawba River tributary. The route then crosses Hwy. 70 and extends 700 feet to connect to the Joseph McDowell Catawba River Greenway.
The preferred route will cross Garden Street and continue on the west side of the road, taking advantage of the wide, flat shoulder. The trail will then cross to the south side of New Street and continue west for one block to N. Main Street; The existing sidewalk on the south side of New Street should be expanded to an 8ft.-town sidepath to accommodate the trail.
The central preferred route crosses the Catawba River and extends as a sidepath along Yancey Road for approximately 2.2 miles to existing sidewalk in Marion. The existing sidewalk can be converted to a town sidepath that can accommodate both pedestrians and cyclists.
The preferred route crosses to the west side of N. Main Street and connects to the Marion Community Building and park. The trail continues north on Main Street. The existing sidewalk and grass verge can be expanded to a multi-use town sidepath that extends for approximately 450 feet.
The eastern preferred route crosses the Catawba River and extends south and west as a dual-use trail for three miles through forested tracts of land, including property owned by the City of Marion. The trail transitions to a town sidepath on the south side of Robert Street, adjacent to Marion Elementary School, then turns west to Fleming Avenue. At Fleming, the preferred route will continue south on the east side of the road to Garden Street. Applying a “road diet” to Fleming Ave. narrows the vehicle travel lanes to provide for the trail as a concrete town sidepath. See Exhibit 4: Bringing
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
At the end of the existing sidewalk, the trail transitions to an NCDOT multi-use sidepath that continues for two miles on the west side of N. Main St. to the Catawba River. The Isothermal Bicycle Plan, completed in 2018, recommends a road diet for this section of N. Main Street. According to the plan, approximately 12ft. of the 64-66ft. wide roadway can be converted to provide for a multi-use sidepath with at least a 3ft. wide physical buffer from vehicle lanes. At the Catawba River, the trail turns east and transitions to a greenway to connect to Marion’s existing greenway.
ON CAN N M FA R
DEAD END
OD S
W O
DEE
JOHNS CREEK D
BE N
REEK CROSS C
ER
JP MILLS
RI V NIC E BE R
D LD EN
RO GO
KE DU
LEO
UN DEE RR T OR
ON
RP
JACK S
AI
GE ID
1 537
CH
N
UR
PRIM
6
1724
SEAGLE
CHAPTER 3: Recommendations VY CHE
DA
TIL MA
172
NEWTON
INA
OL
ROS
URCH IST CH BAPT FAITH 174 3
HABITAT
BRANCH
ST
HUR
SAMAH A
51
MAP 8: PLANNING SECTION 3
D O EW O
RI DG
ME
FO R S YTHE
VIRG INIA
NO RT ON
A N TO
70
R CA
FINLEY
SHER
RI
T
K AR LP IA R MO
36 15
CEY
1703
OAKWOO D
E
GARDEN
FL
ON
MO RG
YAN
MADISON
H
GARDEN
38 15
M
RE
E OV SC
C
R PA
E CAD
LL
7T
PULL I AM
VICTORIA
MAIN
K
OT FO
BA
172 8
GAL OW BUN 20
OR C
12
Y
M
EA
CREEK H T Y FO R S
D 82
IN
HI
CLARK
R
IS CHR
OL
RO AD
TE STA
N AI NT
AV IS
A
RA IL
U E MO
15
Y
BI
SCHO
C
70
LA K
NN
M
H
ELL OW
NE WAY 1700
BA
M
5T
COURT
OAK
OOD ENW
MCD
1700
ND
O
M
HIGHLA
E PL N A RG
A
M
GRE
MARION
AR
M
LA
IEW
BU
IA
BROWN
ER RN U RK PA
Y CLA
FORT
VIRGINIA
R TE
NEW
G
RT
ELL OW
RS CA
ON
N
MCD
1/4 MI.SUMMIT
BE
M
L
IS W
N
EL
RO
IN
HIL
EY
SCENT RE
ZI
COMMUNITY BUILDING
A
LIS
V
10
1/16 A 1/8 L L EY
TA TEV I S FE R
ON
LEN
0
SH OP
EM IN G
RD
FLOOD PLAIN
IN E
N LONO DOGWOOD
VINE
ALTERNATE TRAIL ROUTE
BR
EST
HA
FOX FIELD GILBERT HISTORIC OVNHT ROUTE
GROVE PARCELS 1212OF 13 INTEREST 12
ER
FOR
RIC
H
ERS
STATE LAND
EXISTING LOCAL TRAIL
FL
IN ROB MA C
LLEY VA
SOW
PROPOSED FFST ON EXISTING LOCAL TRAIL 1214
T OT
FF
MARION PROPERTY
C YAN
D OO ELW UR LA
V
DUKE ENERGY PROPERTY
K
LOO
VER RIDGE O
R COV E
SON
R
ION AT NT
LAKE
O RT
E AT EW
BR AD LE
O
IDG
EK
ER
GR
K CREE N
PLA
SH
BR
E DEN C R AR 6G
W
NI X R SO
CARDINAL
TJ
Y RIDGE CE N
CH
143 2
R VE
DUKE PROPERTY
HILL
YA
70
FEDERAL LAND
NL EE
P
M
CA
RD
1 50
E OR
RES TRAILHEAD PLANNED
E E ON PROPOSED LOCAL TRAIL FFST
C11K9Y8 LU
RIVER AWBA
BY
T ES EE AP P LETR
W
VIE
1302
MO
Y
RID GE V
TRAIL FEATURES
OI
LAKE JAMES
ET
RS
CR RT
N AI NT
HOLLY
GH HI W IN TE YC RH RO IL SS L
PREFERRED TRAIL A ROUTE COMPLETED FFST
CH A RIOT LAK E J A M ES
CE
N YA
JUSTICE
FIELD NOTES
TRAILS
K RI FOR
EW VI KE
ME
PO
MO U
221
NLEY CO GO L D F I N CH
PH
CA
S
119 7
T
N SA EA
IN
TZ
SO
NECR ES PI T
OWELL HIGH CD M
Y
T
W
K
VER I R A B W A CAT
29
EL L
B RO
AT BC BO N SA EA PL
E VI
N
BIG LEAGUE CAMP
HARD
12
CD OW
A
LEN
E
CONLEY
M
R
H
RIVER BREEZE CAMPGROUND
MCDOWELL HOUSE
ME
FLY
LA
1501
RE T
NN
RIVERVIEW FOREST
G A
JOSEPH MCDOWELL HISTORICAL CATAWBA GREENWAY
BE
K CAT
C
A
EW
NK
LET RT BA
ERVI RIV
DID KATY
INS
HA
R JO MA PA L
D
Y
VIL L
T OT SC
226
TOMS CREEK
K
OO LLW NO
A
ON
RY HE TC
PEACH
P
E HE R
H
HILL S
LU
H FO R NORT
B
BIG LEAGUE CAMP >> MCDOWELL HOUSE
FISH
SECTION 3
K LOC
HEM
E
TRAIL FEATURES Trailheads This planning section includes three (3) trailheads. The eastern-most trailhead is proposed adjacent to Yancey Road near the Catawba River bridge. The trailhead could be constructed on either the southeast or northwest side of the Catawba River and Yancey Road, depending on the preferred route that is ultimately to be constructed. The Marion Community Building and existing parking lot is proposed as a centrally-located trailhead in downtown Marion. The existing Catawba River Greenway trailhead at the historic McDowell House serves as the western trailhead and terminus of this study area.
As the route extends north from downtown Marion towards the Catawba River, it will cross U.S. Highway 70. This crossing is located at a busy three-way intersection. A signalized crossing will be necessary to facilitate safe passage for trail users. The northern preferred route along the Catawba River will cross U.S. Highway 221 Business to connect to Marion’s existing greenway. Upon initial visual inspection, steep slopes along the river and lack of adequate vertical clearance do not allow for a trail under pass at the Catawba River bridge. Stop signs for trail-users and pedestrian-activated beacons and should be considered to provide for a surfacecrossing south of the Catawba River bridge. Other road crossings include Robert St., Fleming Avenue, Garden St., New St., Logan St., McDowell High School Road, and Peachtree St. as well as several driveway crossings on the west side of North Main Street. Installation of a stop sign for southbound traffic on Garden Street is recommended north of the Fleming Ave. intersection and trail crossing.
The northern preferred route will require two major bridges. A major bridge will be required to cross the Catawba River as the trail continues west. A second bridge will be necessary to cross a tributary of the Catawba River located approximately 250ft. east of Highway 221 Business. The southern preferred routes will both cross the Catawba River near Yancey Road. The existing Yancey Road bridge deck does not have sufficient width to provide for the trail and would have to be widened to safely accommodate a sidepath. Currently, NCDOT does not have plans to replace this bridge. Alternately, a separate bridge for the trail could be constructed across the river.
5 7
Crossings There are three (3) significant road crossings and three (3) major bridges in this planning section. The trail will cross N. Main Street at an existing crosswalk that extends from the south side of New Street in downtown Marion.
PHOTOS:
6 52
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
(5) MARION COMMUNITY BUILDING AND PARK PROVIDES OPPORTUNITY FOR DOWNTOWN TRAILHEAD. (6) THE HISTORIC MCDOWELL HOUSE SERVES AS A TRAIL HEAD FOR MARION’S EXISTING GREENWAY. (7) NARROW DECK ON THE YANCEY ROAD BRIDGE LIMITS ABILITY TO DEVELOP A TRAIL SIDEPATH.
EXHIBIT 4:
BRINGING THE FONTA FLORA TO FLEMING
A “road diet” on the east side of Fleming Avenue provides for the FFST as a concrete multi-use town sidepath. Fleming Avenue has sufficient pavement width to expand the existing sidewalk to an 8-10ft. wide path while maintaining 11 ft. wide lanes for vehicles.
EXISTING
PROPOSED ROAD DIET
PRECEDENT
PRECEDENT
CHAPTER 3: Recommendations
53
3 9
DOWNTOWN MARION TO CATAWBA RIVER GREENWAY - SEPARATED BICYCLE LANES Length: 2 miles
Potential ROW Needs:
EXHIBIT 5: ISOTHERMAL REGIONAL BICYCLE PLAN • None
Potential Partnerships:
• City of Marion • McDowell County The Isothermal Bicycle Plan, prepared • NCDOT for the Isothermal Planning & Jurisdictions: City ofRegional Marion, McDowell County Development Commission, oultines the• Downtown need forbusinesses alternative transportation • McDowell Trails Association Trip Generators: to connect the downtown area to existing andMarion proposed greenways • Businesses in north • infrastructure Downtown Marion North Carolina State Parks • near Peavine Trail the McDowell House. This existing• regional plan and the FFST provide • Duke Energy • Catawba River Greenway connectivity • unique McDowell High School opportunites that may bolster additional regional support. Estimated Construction Costs: • Businesses in north Marion • Fonta Flora State Trail • $ 560,000
Support in Other Plans:
• Marion Bicycle Plan (2016) • Isothermal Planning & Development Commission Trails Map (2014) • Fonta Flora State Trail Master Plan (Ongoing)
DESIGN OPTIONS & CONSIDERATIONS
Physically Separated (Two:D\ &\FOH 7UDFN Example (used for FRVW HVWLPDWH
Physically Separated Example
Visually Separated Example 62 | REGIONAL NETWORK
54
For design options and further detail, please see the Separated Bike Lane Planning and Design Guide at - https://www.fhwa.dot. gov/environment/bicycle_pedestrian/ publications/separated_bikelane_pdg/page07. cfm#chapter5_dir.
6HYHUDO FRQȴJXUDWLRQV DUH SRVVLEOH WR FUHDWH SK\VLFDO VHSDUDWLRQ IURP DXWRPRELOH WUDɝF These options should be explored during the design phase. See example graphics to the left from the Small Town and Rural Multimodal Network Design Guide. Further detail can be found at - http://ruraldesignguide.com/ physically-separated/separated-bike-lane.
While less ideal, construction of a bicycle lane ZLWK D SDLQWHG EXHU UDWKHU WKDQ D SK\VLFDO EXHU FDQ EH D VLJQLȴFDQW LPSURYHPHQW IRU bicycle and motorist safety and comfort, while still reserving space for constructing a physical EXHU LQ WKH IXWXUH )XUWKHU GHWDLO UHJDUGLQJ visually separated bike lanes can be found in the Small Town and Rural Multimodal Network Design Guide at http://ruraldesignguide.com/ visually-separated/bike-lane.
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
4
I MP L E ME N TAT I O N THE CORE PURPOSE OF THIS CHAPTER IS TO HIGHLIGHT THE THREE (3) IMPLEMENTATION SECTIONS, INCLUDING THE MAJOR STEPS NECESSARY FOR COMPLETING THE TRAIL. THIS CHAPTER POSITIONS FFST AND OVNHT STAKEHOLDERS FOR ACTION.
Burke County and the City of Marion will initially serve as lead agencies to manage the development of the FFST, but must work in partnership with McDowell County, the NC Division of State Parks, the National Park Service, Duke Energy,
IN THIS CHAPTER: A| IMPLEMENTATION BY SECTION AND RESPONSIBILITIES
plan, construct, and maintain the trail across
B| PRIORITY IMPLEMENTATION AREAS AND RESPONSIBILITIES
jurisdictional boundaries.
C| TRAIL RUBICON
community stakeholders, and landowners to
D| TRAIL SUPPORT SPECTRUM E| TRAIL MANAGEMENT
55
TRAIL IMPLEMENTATION The table below provides key implementation information associated with each planning section. Key Challenges include a summary of the most difficult barriers for realizing each trail section. Many of these barriers include costly features or note the need to acquire trail easements from private landowners. Most importantly, this table assigns an Implementing Agency to each planning section.
IMPLEMENTATION DETAILS BY SECTION AND RESPONSIBILITY SECTION SECTION 1 Fonta Flora Brewery to
DISTANCE
KEY CHALLENGES
ESTIMATED BUDGET
6.0
Securing Landowner Trail Easements; Bailey Creek Bridge; Lake James Road Crossing and NCDOT sidepath to Bear Creek Bridge.
$362,530.00
6.0
Securing Landowner Trail Easements; North Fork Catawba River Bridge; CSX Railroad crossing
$2,456,580.00
11.5
Catawba River Bridge; Hwy. 70 Crossing; Securing Landowner Trail Easements
$3,435,380.00
Black Bear Boat Access SECTION 2 Black Bear Boat Access to Big League Camp SECTION 3 Big League Camp to Joseph McDowell House
ALL SECTIONS TOTAL
23.5
$6,254,490.00
* Estimated budget shown above pertains only to the completion of the preferred FFST route and does not include existing, constructed trail segments.
56
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
IMPLEMENTING AGENCY Burke County, McDowell County, NPS
McDowell County
City of Marion; McDowell County
PRIORITY IMPLEMENTATION AREAS & RESPONSIBILITIES Burke County, Marion, McDowell County, and their partners must work in tandem to successfully realize the FFST. Trail implementation does not have to occur in a specific, linear order according to each planning section. In fact, the priority areas for implementation are merely suggestions and are in no way intended to hem creativity or necessary work in “lower” priority areas. Trail implementation is an art and requires the acumen to recognize and then seize opportunities, whether related to funding, landowner willingness, or politics. The table below supports a trail development strategy that prioritizes areas in Planning Sections 1 and 3. If these were to be fully developed, this would likely provide the formula for “Trail Rubicon,” the point in which the public, elected officials, and partnership funding agencies recognize that connectivity and complete implementation are imminent. At this point significant momentum and synergy would propel forward the completion of the FFST from Lake James to Marion.
TRAIL RUBICON: FINDING THE POINT OF NO RETURN Think snowball effect. Development of these trail sections will result in widespread support and a collective energy, beyond that of the community’s traditional trail support base. These sections represent the Trail Rubicon: the point at which completion of the FFST from Lake James to Marion becomes imminent.
1. FONTA FLORA BREWERY TO BLACK BEAR 2. DOWNTOWN MARION TO MCDOWELL HOUSE
TRAIL RUBICON PRIORITY IMPLEMENTATION AREAS AND RESPONSIBILITIES IMPLEMENTING AGENCY Burke County
City of Marion
McDowell County
PRIORITY ONE
PRIORITY TWO
Section 1: Re-design of OVNHT at Hwy. 126 and Hwy. 126 crossing
Section :1 Pocket Park to Lake James Road Trailhead
Section 3: N. Main Street road diet and multi-use side path from downtown to existing greenway
Section 3: Fleming Ave. road diet and multi-use town sidepath
Section 2: OVNHT Trailhead to Black Bear Boat Access
Section 1: Lake James Road Trailhead in Burke to OVNHT Trailhead at Pisgah Game Lands
CHAPTER 4: IMPLEMENTATION
57
TRAIL IMPLEMENTATION Creating a destination-quality trail system requires a significant commitment from local governments, including staff time, the holding of land and trail easements, and the dedication of local funding. Local governments must evaluate the FFST in relationship to other priorities. However, a trail of this magnitude should be recognized as an economic development initiative that will provide a return on investment. Furthermore, each jurisdiction must not merely spend local funds, but instead must leverage their funds to obtain support from partnership funding agencies sympathetic to the creation of trails and the FFST. The “Trail Support Spectrum� illustrates the steps local governments can take to support trail development.
58
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
TRAIL SUPPORT SPECTRUM
5 4 3 2 1
CHAPTER 4: IMPLEMENTATION
59
TRAIL MANAGEMENT MAINTENANCE Trail maintenance is critical to provide for and sustain the trail users’ experience. Trail maintenance will primarily consist of ensuring that the trail corridor is trimmed of brush and vegetation and that the natural surface trail is de-bermed and clear of fallen debris. Volunteer training and participation is an important aspect of user group involvement. Burke County and Marion should explore trail-building volunteer training with members of the Professional Trail Builders Association. Federal Recreational Trails Program (RTP) funding is often available for educational courses and may require matching funds. Local government partners or a non-profit “Friends” group could sponsor these courses and provide the matching funds for interested volunteers. By training volunteers in this manner, it demonstrates a significant commitment by the participant and “Friends” group at great benefit to the landowners, land managers, and FFST lead agencies. An adequate level of law enforcement should be provided to help maintain a safe and secure trail environment. Trail users should also be educated and encouraged to understand and obey trail rules, respect other users, and respect adjoining properties.
TRAIL RULES WILL BE POSTED AT EACH TRAILHEAD.
60
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
TRAIL FUNDING FERC RELICENSING Constructing and maintaining the various sections of the FFST will require leveraging funds from both public and private entities. At this time, the largest funding contribution to the FFST comes directly from Duke Energy, as a result of the Comprehensive Relicensing Agreements (CRA) for the Catawba-Wateree Project. Trail development funds are included in CRA 10.27.2.3 in the amount of $500,000 for construction of the FFST. Another $600,000 is included in CRA 10.27.4.3 for the OVNHT. These funds will implement trail segments within the Lake James Planning Section of the FFST.
EVERYONE WORKING TOGETHER In addition to the contributions from Duke Energy, it will be necessary for Lake James State Park, NC Wildlife Resources Commission, NCDOT, NPS, Burke County, the City of Marion, McDowell County, and others to contribute financial resources to this project. A conservative estimate to construct the entire FFST and its associated trailheads from NC 126 in Burke County (Fonta Flora Brewery) to Marion is approximately $6.25 million dollars.
LOCAL LEADERSHIP
LEVERAGING FUNDS RELATED TO OTHER COMMUNITY GOALS Lead trail agencies should also seek a combination of funding sources that include local, state, federal, and private money. Fortunately, the benefits of protected greenways are many and varied. This allows programs in Burke County, Marion, and McDowell County to access money earmarked for a variety of purposes including water quality, hazard mitigation, recreation, alternate transportation, wildlife protection, community health, and economic development. Availability of funds targeted directly for trail use has decreased in recent years, so it is imperative that local governments work together to create multi-jurisdictional partnerships and to develop their own local sources of funding. These sources can then be used to leverage outside assistance. For the past two decades, a variety of funding has been used throughout North Carolina to support the planning, design, and construction of urban and rural bicycle and greenway projects. The largest single source of funding for these projects has come from the Surface Transportation Assistance Act; the North Carolina Department of Transportation manages and distributes the majority of federal funds that are derived from the Act to support the development of bicycle/trail development.
Implementing the recommendations of this plan will require a strong level of local support and commitment through a variety of local funding mechanisms. Perhaps most important is the addition of bicycle and greenway infrastructure as an item within the annual budgets of Burke County, Marion, and McDowell County. These improvements should become a high priority and be supported through portions of the funding currently used for public safety, streets, parks and recreation, planning, community development, travel and tourism, and local bonds.
CHAPTER 4: IMPLEMENTATION
61
A
APPENDIX
I
(A-1) IMPLEMENTATION BUDGET SECTION 1- FONTA FLORA BREWERY TO BLACK BEAR BOAT ACCESS
Dual Use Trail (5ft. Natural Surface) NCDOT Sidepath (8ft. Paved Path)
UNITS (LF)
UNIT COST
$6 $120 $5,500 $90,000 $30,000 Total Section Cost
Major Road Crossings Major Bridge (Bailey Creek) Bear Creek Bridge Enhancements
25,855 545 4 1 1
SECTION 2- BLACK BEAR BOAT ACCESS TO BIG LEAGUE CAMP
UNITS
UNIT COST
Dual Use Trail (5ft. Natural Surface) Major Road Crossings Major Bridge (North Fork Catawba River Rail Crossing (Bridge/Overpass Option) Rail Crossing (Tunnel Option)
31,680 3 1 1 1
$5,500 $500,000 $750,000 $1,000,000
SECTION 3- BIG LEAGUE CAMP TO JOSEPH MCDOWELL HOUSE
UNITS
Dual Use Trail (5ft. Natural Surface) NCDOT Sidepath (8ft. paved path on Yancey Rd.)
34,980 11,616
NCDOT Sidepath (12ft. Paved Path w/3ft. physical buffer on N. Main St.)
10,560
$6
Total Section Cost $6 $120
Town Sidepath (8-10ft. Concrete on Yancey, Fleming, Garden, New, N. Main)
3900
Typical Greenway (10ft. Paved Path)
712
$90
3 2 1
II
FONTA FLORA STATE TRAIL: LAKE JAMES TO MARION MASTER PLAN
155,130.00 65,400.00 22,000.00 90,000.00 30,000.00 362,530.00 TOTAL COST
$ $ $ $ $ $
190,080.00 16,500.00 500,000.00 750,000.00 1,000,000.00 2,456,580.00 TOTAL COST
$ $
209,880.00 1,393,920.00
$
560,000
$ $
351,000 64,080.00
$5,500 $750,000 $90,000
$
16,500.00
$ $
750,000.00 90,000.00
Total Section Cost
$
3,435,380.00
$
6,254,490.00
TOTAL * Does not include land acquisition, engineering, or design. * Does not include existing segments of trail or bridges on existing trails. * Includes all preferred routes.
$ $ $ $ $ $
UNIT COST
$53 $90
Major Road Crossings Major Bridges (Catawba River) Major Bridge (Catawba River Tributary)
TOTAL COST
(A-2) FUNDING SOURCES Partnership Funding Agency
Active Living/ BuiltEnvironment Implications
Maximum Amount
Matching Funds Required
Deadline
BUILD
Construction, provided easements are secured
N/A (min. $1 million)
$0 (for rural counties)
May (typical)
N/A
Not speciďŹ ed, but 20% is competitive
February 1st
N/A
50%
January 1st and June 1st
$100,000.00
25%
February 1st
All types of parks, trails, and recreation facilities
$500,000.00
50%
February 1st
Trails and Greenways
$10,000.00
20%
May 24th
Bike and Pedestrian Projectsboth engineering and construction
N/A (for major projects)
20% generally
N/A
Clean Water Management Trust Fund (www.cwmtf.net)
NC Water Resources (www.ncwater.org) Recreation Trails Program (ncparks.gov/About/grants/main.php) Parks and Recreation Trust Fund (ncparks.gov/About/grants/main.php) Bikes Belong Foundation
NCDOT Transportation Plan For Bike and Pedestrian Projects
Land acquisition: fee simple or easement. Must protect oodplain areas. Greenway trails and other park areas are allowed. River access areas or greenways along rivers All types of trails and greenways
CHAPTER A: APPENDIX
III