fonta flora state trail master plan lake james to morganton
FONTA FLORA STATE TRAIL
PRODUCED BY:
PRODUCED FOR:
LAKE JAMES TO MORGANTON MASTER PLAN
DESTINATION BY DESIGN PLANNING, LLC 815 W. KING STREET, SUITE 2 BOONE, NORTH CAROLINA 28607 828.386.1866 WWW.DBDPLANNING.COM
ACKNOWLEDGMENTS BURKE COUNTY
CITY OF MORGANTON DEVELOP-
Jeffrey C. Brittain, PE, Chairman
MENT AND DESIGN SERVICES
Johnnie Carswell, Vice Chairman
Phillip Lookadoo, AICP, Director
Maynard M. Taylor, Commissioner
Mark Young, PE, City Engineer
Wayne F. Abele, Commissioner
Michael Berley, Project Designer
Scott Mulwee, Commissioner Bryan Steen, County Manager Scott Carpenter, AICP, Deputy County
FONTA FLORA BREWERY Todd Boera, Co-Owner and Head Brewer
Manager & Community Development
Mark Bennett, Co-Owner
Director
David Bennett, Co-Owner
Shane Prisby, Community Development Operations Manager NATIONAL PARK SERVICE John Slaughter, Group Superintendent, Southern Campaign of the American Revolution Parks Group Benjamin Richardson, Chief of Planning and Partnerships, Southern Campaign of the American Revolution Parks Group
TABLE OF CONTENTS INTRODUCTION & BACKGROUND
1
Purpose and Background………………………………………………………… 2
CHAPTER 3: TRAIL CHARACTER & DESIGN GUIDELINES
29
Previous Planning Efforts………………………………………………………… 3
Sustainable Trail Design………………………………………………………… 30
Vision Statement………………………………………………………………………… 4
Trail Construction…………………………………………………………………… 32
Trail Benefits……………………………………………………………………………… 5
Trail Types………………………………………………………………………………… 33
Plan Organization……………………………………………………………………… 6
Trail Profile……………………………………………………………………………… 36
CHAPTER 1: EXISTING CONDITIONS, ANALYSIS, & PRELIMINARY ALIGNMENTS
7
Study Area Description……………………………………………………………… 8
Trail Support Facilities…………………………………………………………… 38 Social Media Marketing…………………………………………………………… 41
CHAPTER 4: RECOMMENDATIONS
43
Study Area Major Features………………………………………………………… 9
Planning Sections Overview…………………………………………………… 44
Natural Environment……………………………………………………………… 10
Trail Section Recommendations…………………………………………… 46
Cultural Resources…………………………………………………………………… 12 Built Environment…………………………………………………………………… 13 Preliminary Route Alternatives: Map & Photo Series…………… 17
CHAPTER 2: LANDOWNER OUTREACH
25
CHAPTER 5: IMPLEMENTATION
69
Implementation Details by Section and Responsibility………… 70 Priority Implementation Areas and Responsibilities…………… 71 Trail Rubicon…………………………………………………………………………… 71
Identifying the Landowners…………………………………………………… 26
Trail Support Spectrum…………………………………………………………… 73
Landowner Workshop…………………………………………………………… 27
Trail Management…………………………………………………………………… 74
Trail Route Re-evaluation………………………………………………………… 28
APPENDIX I (A-1) Implementation Budget…………………………………………………… II (A2) Funding Sources……………………………………………………………… III
LIST OF MAPS Map 1: General Study Area………………………………………………………… 8 Map 2: Study Area 1 Site Analysis…………………………………………… 18 Map 3: Study Area 2 Site Analysis………………………………………… 20 Map 4: Study Area 3 Site Analysis………………………………………… 22 Map 5: Landowner Parcels……………………………………………………… 26 Map 6: Trail Route Re-Evaluation…………………………………………… 28 Map 7: Planning Sections ……………………………………………………… 44 Map 8: Planning Section 1……………………………………………………… 47 Map 9: Planning Section 2……………………………………………………… 59 Map 10: Planning Section 3…………………………………………………… 63 Map 11: Planning Section 4……………………………………………………… 65
LIST OF EXHIBITS EXHIBIT 1: Brewing Up Adventure………………………………………… 49 EXHIBIT 2: Canal Bridge………………………………………………………… 50 EXHIBIT 3: Canal Bridge Trailhead………………………………………… 52 EXHIBIT 5: Lake James Family Campground………………………… 54 EXHIBIT 5: N. Powerhouse Crossing……………………………………… 55 EXHIBIT 6: Bridgewater………………………………………………………… 56 EXHIBIT 7: Off the Road Again @ Powerhouse…………………… 60 EXHIBIT 8: Watermill River Access Enhancements……………… 62 EXHIBIT 9: Get Down with the Trail Town……………………………… 66
IN T R O D U C T I O N A N D B A C K G R OUN D THE EASTERN-MOST SEGMENT OF THE FONTA FLORA STATE TRAIL EXTENDS FROM LAKE JAMES TO MORGANTON.
This trail master plan serves as a road map for establishing the Fonta Flora State Trail from Lake James, in Burke County, to the City of Morganton.
IN THIS CHAPTER:
This chapter provides an overview of previous
A| PURPOSE AND BACKGROUND
planning efforts and their goals.
B| PREVIOUS PLANNING EFFORTS C| VISION STATEMENT D| TRAIL BENEFITS E| PLAN ORGANIZATION
1
PURPOSE & BACKGROUND The Fonta Flora State Trail finds its origins in the desires of Burke County citizens to increase quality of life for residents, provide a recreational amenity for visitors and the region’s diverse population, and provide public access to the area’s cultural and natural resources. In 2015, the North Carolina General Assembly approved legislation to establish the Fonta Flora State Trail. Upon completion, the proposed trail will extend from Asheville to Morganton connecting Marion, Old Fort, and Black Mountain.
complete Section 2 of the state trail. Also in 2017, Burke County opened a new trailhead featuring custom trail facilities and artistic signage. Additionally, a master plan is currently in development for Section 3 from Lake James to Marion.
Trail (OVNHT). Financial resources will be released from Duke Energy now that the Federal Energy Regulatory Commission has approved the company’s re-licensing to operate its hydroelectric power plants along the Catawba River.
Financial support from Duke Energy continues to advance the project with $1.1 million in grants committed to the development of the Fonta Flora State Trail and Overmountain Victory National Historic
This plan addresses Section 1 of the Fonta Flora State Trail from Lake James to Morganton. This section is unique in that it coincides with a segment of the OVNHT.
Burke County is a leading agency in the establishment of the Fonta Flora State Trail. Following the adoption of a master plan in 2016, the County partnered with the NC Division of State Parks and Duke Energy to complete 10 miles of trail in 2017. The County is now beginning construction on another 10 miles that will eventually encircle Lake James to
LEGISLATION WAS SIGNED INTO LAW BY GOVERNOR MCCRORY IN SUMMER 2015 THAT MAKES THE FONTA FLORA STATE TRAIL THE LATEST ADDITION TO NORTH CAROLINA’S STATE PARK SYSTEM. 2
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
PLANNING SECTIONS 1
MORGANTON >> LAKE JAMES
5
OLD FORT DEPOT >> BLACK MOUNTAIN DEPOT
2 3 4
LAKE JAMES
6
BLACK MOUNTAIN DEPOT >> WARREN WILSON COLLEGE
7
WARREN WILSON COLLEGE >> ASHEVILLE
LAKE JAMES >>MARION MARION >> OLD FORT DEPOT
PREVIOUS PLANNING EFFORTS Overmountain Victory National Historic Trail Master Plan (OVNHT): Lake James to Morganton In 2015, Burke County developed a comprehensive trail master plan for the OVNHT along the Catawba River corridor from Lake James to Morganton. The National Park Service provided financial assistance for plan development. The OVNHT overlaps with the southern portion of the FFST at Lake James and as the trail extends to Morganton. Portions of the trail systems at both Lake James and the Catawba River Greenway in Morganton are certified as part of the Overmountain Victory National Historic Trail. The OVNHT Lake James to Morganton Master Plan serves as the foundation of the Fonta Flora State Trail Lake James to Morganton Master Plan. ņ
keep the story alive
overmountain victory national historic trail master plan
LAKE JAMES
MORGANTON
SUMMER 2015
Fonta Flora State Trail Master Plan: Lake James Section The Fonta Flora State Trail Master Plan: Lake James Section was completed in 2016. The plan provided a major update to fonta flora state trail master plan lake james section the Lake James Loop Trail Master Plan published by Burke County in 2014. This section of the Fonta Flora State Trail will ultimately encircle Lake James with a continuous 30-mile stateof-the-art hiking and biking nature trail. As a state trail, the loop is now under the purview of the NC Division of Parks and Recreation as an official unit of the State Parks system. BURKE COUNTY, NC UPDATED SPRING, 2016
Lake James Loop Trail Master Plan Since 2005, the LAKE JAMES LOOP TRAIL Burke County PlanMASTER PLAN ning Department 2014 has led efforts to plan for and establish a loop trail around Lake James that would provide for a family and leisure trail experience while protecting the natural environment. LAKE JAMES LOOP TRAIL MASTER PLAN
In early 2013, the Burke County Community Development Director began a new planning effort to jumpstart the Loop Trail initiative and promoted the project to the top of the department’s priority list. In September 2013, a diverse stakeholder work group met to begin creating the Lake James Loop Trail Master Plan to serve as a guide for the development, management, and implementation of the trail. The Lake James Loop Trail Master Plan, published in 2014, outlined an easy to moderate 30 mile multiuse hiking and biking trail with a natural mineral soil surface. The plan recommended an average trail width of five feet wide and overall average grade of 5% or less.
INTRODUCTION AND BACKGROUND
3
VISION STATEMENT The Fonta Flora State Trail will provide pedestrians and bicyclists of all abilities a safe and legal route that will eventually extend from Morganton to Asheville. The trail will allow users to experience the natural diversity of the area, incorporate multiple access points and support facilities, create a community and regional asset that will provide for recreation opportunities for local residents and visitors, and promote tourism and low-cost economic development for Burke County and the surrounding region.
PLAN GOALS 1
Refined and Specific Trail Routes. Using the 2015 OVNHT Lake James to Morganton Master Plan as its foundation, this plan further refines the trail route to reflect new opportunities and re-engages landowners.
STATE TRAILS WHAT IS A STATE TRAIL? The State Parks Act (GS 113-44.9) defines the types of units in the NC State Parks System to include State Parks, State Natural Areas, State Recreation Areas, State Trails, State Rivers and State Lakes. Fonta Flora is a State Trail. The difference between a State Park and a State Trail is that a State Park is operated and managed by the Division of Parks and Recreation, but a State Trail represents a partnership among multiple agencies, landowners and local governments, working together to implement a shared vision. Working together on a connected State Trail is a way for communities to leverage their investments in trails to maximize the value for their citizens. Sections of a State Trail on state park property may be managed by the Division of Parks and Recreation, but sections of the trail that cross property controlled by others will continue to be built, maintained and managed by those other landowners. A State Trail is comprised of multiple connected sections, and each section of the trail is sponsored by a state or federal agency, local government, or landowner. Overall trail corridor planning and coordination are the responsibility of the Division of Parks and Recreation, but each section of the trail will be planned, built and managed in accordance with the needs and wishes of each local section sponsor. DPR will provide guidance, coordination and assistance for the multiple section sponsors whose individual and diverse sections link together to form the State Trail.
2
Landowner Outreach. Make a direct appeal to landowners identified
3
Trail Character. Develop designs and trail support facilities that incorporate both the OVNHT and FFST brands.
SECTION – A portion of the trail within the jurisdictional boundaries of a single agency or organization, who serves as the sponsor of that section.
4
Visual Plan. Create a visual plan that utilizes renderings and schematics to demonstrate trail character.,
SECTION SPONSOR – Any agency or organization that owns the land the trail utilizes and that enters into an agreement with the Division of Parks and Recreation to maintain their section of trail as a part of the State Trail. The section sponsor, in coordination with adjoining section sponsors, is responsible for the design, construction, maintenance and management of the trail within their section, including its location, appearance, surface, uses, and amenities. Section sponsors retain authority on lands under their jurisdiction. Section sponsors are encouraged to showcase places of natural, scenic, historic, and cultural significance; to feature the diversity of natural communities and landscapes in the state; and to consider the needs of both long and short distance trail users.
4
during the analysis and record their sentiment for providing a trail easement.
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
TRAIL BENEFITS
ECONOMIC There is no question that countless communities across America have experienced significant economic growth from a result of trail and greenway infrastructure. Below are a few examples of such impacts: Pedestrian and Bicycle Infrastructure: A National Study of Employment Impacts (2011) • Evaluated 58 separate projects in 11 cities • Multi-use trails (e.g., greenways) create 9.6 jobs per $1 million invested East Central Florida Regional Planning Council; Economic impact of Orange County trails (2013) • Little Econ Greenway (7.4 miles); West Orange (20 miles); and Cady Way Trails (7.2 miles) in Orange County, Florida • Supported 516 jobs and had an estimated positive economic impact of $42.6 million on the area • Nearby Downtown Winter Garden (pop. 37k) = $14.6M Revenues Year 3 Economic Impact of Swamp Rabbit Trail (2014) • Swamp Rabbit = 20 miles (Greenville, NC to Travelers Rest) • $6.7 Million Virginia Creeper Trail, Damascus, VA • 34 mile rail-trail • Direct economic impact approximately $3 million a year
HEALTH Trails and greenways provide an attractive, safe, and accessible low- or nocost place to walk, hike, jog, or bicycle. More parks and green spaces lead directly to more physical activity by citizens. This gives people of all ages an opportunity to incorporate exercise into their daily routines.
ENVIRONMENTAL Trails and greenways protect important habitat, improve water quality, and provide corridors for wildlife. By protecting land along rivers and streams, greenways help filter pollution caused by agricultural and road runoff. These areas can often serve as natural floodplains. Also, trails and greenways can serve as hands-on environmental classrooms.
EDUCATIONAL The Fonta Flora State Trail will provide for a variety of educational opportunities. A significant portion of the trail will pass through Lake James State Park, which will provide an educational experience about natural habitats and native flora and fauna from throughout the region. Since this trail coincides with portions of the Overmountain Victory National Historic Trail, users have the opportunity to learn about the Overmountain Men and their impact on the Revolutionary War. Other opportunities exist to learn about hydroelectric dams, bicycle safety, wilderness medicine, and search and rescue.
RECREATIONAL The recreational benefits offered by the Fonta Flora State Trail will complement existing opportunities found in the area at Lake James State Park, NCWRC Game Lands, Linville Gorge, Catawba River, and adjoining US Forest Service lands. The Fonta Flora State Trail will anchor a host of recreation offerings. Foremost, this trail offers the unique opportunity to separate automobiles from cyclists to circumnavigate the Lake, thereby creating a safe and scenic destination for cycling enthusiasts. This plan also calls for a new boat launch, camping and cabin facilities, fishing access areas, and over 25 miles of trails, boardwalks, and bridges. All of these additional recreational opportunities will be beneficial for personal, community, and business development.
TRANSPORTATION Trails and greenways serve as a crucial element within a regional multi-modal transportation system. These facilities provide efficient and safe connectors among civic, commercial, and residential land uses. The Fonta Flora State Trail will help create these connections and play a central role in establishing a regional trail network that will ultimately include the NC Mountains-to-Sea Trail, Overmountain Victory National Historic Trail, Upper Catawba River Trail, and other local connecting trails.
INTRODUCTION AND BACKGROUND
5
PLAN ORGANIZATION
START OF STUDY AREA @WHIPPOORWILL FARM
es
MAP 2
Trail
Lake James State Park
Loop
s Loop
Jam
Trai
l
Jame
Lake
Lake
Lake James State Park
OU S
ER
D
15
RH
NC 126
N
PO WE
Bridgewater Powerhouse
1
Lake James
1
14 13
Element Occurrence:
Lake James Family Campground
4 2 3
Lake James State Park
3
BE
NF
IE
LD
S
N LA
ND
IN
G
P
E
US
HO
ER
OW
16 12
RD
Element Occurrence:
RD
2
5 5
CHAPTER I.
10
10
11
3
Cataw
ba River CHAPTER 2.
10
5
CHAPTER 3. TRAIL CHARACTER AND DESIGN GUIDELINES
Old EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS Cata wba
LANDOWNER OUTREACH
This chapter provides a comprehensive overview and analysis of the opportunities and constraints found throughout the study area. The analysis begins with a brief description of the study area followed by a comprehensive discussion of the natural and built environments and their implications for trail suitability, trail design features, permitting, and costs. This chapter concludes with a map and photographic series that highlights a host of preliminary trail route alternatives.
Significant efforts were made to reach out to landowners where the preliminary analysis indicates that the trail is most suitable. This chapter describes the landowner outreach process and provides highlights from the landowner workshop meetings. k
ree
SECTION 1
FONTA FLORA BREWERY >> POWERHOUSE RD.
FONTA FLORA STATE TRAIL
FUTURE COVE BRIDGE
FUTURE TRAILHEAD AND VISITOR CENTER
LAKE
FONTA FLORA BREWERY AT HISTORIC WHIPPOORWILL DAIRY
EXISTING HOLLY DISCOVERY TRAILHEAD
D WAY
TY
UN L CO
70
E AT W
JAME
S ST
1 EXISTING OVNHT
E
ORE
SH
N LA
DU
2
ER
T AS NC
LA
ER
BRIDGEWATER RIVER ACCESS
W
H
N
CK LO
HEM
HOLLOW
NG DI
EL LAUR
LAKE JAMES FAMILY CAMPGROUND
BENF IELD
USE
HO
ER
SL
FUTURE BENFIELDS POCKET PARK
W PO
LA K
RAY’S DAIRY TRAILHEAD ER WAT
RK PA
IDGE
BR
ER
IEW EV
A RIV
B ATAW
PRIMITIVE CAMPING AT VISTA
3
VER
A RI CATAWB
FIELD NOTES
RECOMMENDATIONS TRAILS
TRAIL FEATURES
LANDOWNER SENTIMENT
PREFERRED TRAIL ROUTE COMPLETED FFST
FFST ON PROPOSED LOCAL TRAIL
#
TRAILHEAD
YES
ROAD CROSSING
NO
This chapter is organized according to four (4) planning sections. Each planning section description includes a map that identifies a preferred alignment. Each planning section further incorporates the analysis and design elements from the previous chapters along with a host of supporting renderings and design schematics. #
PROPOSED FFST ON EXISTING LOCAL TRAIL
MAJOR BRIDGE
POSITIVE
NO RESPONSE
PUBLIC LAND
EXISTING LOCAL TRAIL
PROPOSED LOCAL TRAIL
ALTERNATE TRAIL ROUTE
0
1/8
1/4
1/2 MI.
N
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
L EY BUM GAR
S
E
POINT
AND ING
OLD C
CHAPTER 4. 126
3
HOLIDAY
CON
ST
BENFIELD
CO TT
EXISTING CANOE PORTAGE TRAIL
LINVILLE DAM TRAILHEAD
RR E
1
E US O RH
AGE PARK
LAKE JAMES
2
EXISTING CANAL BRIDGE PUBLIC ACCESS AND TRAILHEAD
ARK
O LAK E F
CANAL BRIDGE
ATE P
NP OW
126
R O RF
LA FO K N E TA JA F M LO ES R LO A O P
7
TY
UN E CO
WEL MCDO
BURK
Muddy Creek Historic RR Bridge
yC
lk
rfo
No
8
9
RR
ed
ern
uth
So
OLLO
8
Re
Historic Bridge
5
6
This chapter is dedicated to visually defining the various trail types to be used throughout the corridor. Design concepts are provided for trail user orientation signage, mile markers, and other support facilities. Social Media is explored as a mechanism for trail promotion and marketing.
9
7
6
I LL
r
RW
Rive
WH IP PO
6
CK W O RT H
4
SLEEPY
Catawba River Dam and Truss Bridge
Bridgewater Fishing Access
10
Paddy Creek Dam
CHAPTER 5. IMPLEMENTATION This chapter summarizes details for each planning section and establishes responsibilities and priorities for trail implementation. Additionally, this chapter identifies focus areas for development that will serve as catalyst projects for completing the trail.
1
EXISTIN G C OND ITIO N S , A N A LYS I S , A N D P R E L I MIN A R Y A LIGN MEN T S THIS SECTION OF THE FONTA FLORA STATE IN THIS CHAPTER: The analysis begins with a brief description of the study area followed by a comprehensive
TRAIL HAS A SIGNIFICANT NATURAL AND CULTURAL HISTORY INCLUDING A SHARED ALIGNMENT WITH THE OVERMOUNTAIN VICTORY NATIONAL HISTORIC TRAIL.
discussion of the natural and built environments
and cultural resources and their implications for
A| STUDY AREA DESCRIPTION
trail suitability, design features, permitting, and
B| STUDY AREA MAJOR FEATURES
costs. This chapter concludes with a map and
C| NATURAL ENVIRONMENT
photographic series that highlights a host of
D| CULTURAL RESOURCES
preliminary trail route alternatives.
E| BUILT ENVIRONMENT F| PRELIMINARY ROUTE ALTERNATIVES: MAP & PHOTO SERIES
7
WA RR
R S RIVE JOHN
STUDY AREA
MAP 1: GENERAL STUDY AREA
STUDY AREA DESCRIPTION ORK
IOR F
FONTA FLORA COUNTY PARK
FONTA FLORA STATE TRAIL JOHNS RIVER GAMELANDS
126
PADDY CR
181
WILSON CR EEK
E CR
CANO EEK
EEK
LAKE JAMES STATE PARK TRAILS
CATAWBA RIVER GREENWAY
NCH DEE BRA
PEE
EXISTING OVNHT
126 FREEDOM TRAIL
LAKE JAMES
GLEN ALPINE MUDDY
CREEK
nancial support for the FFST and OVNHT.
a series of river access areas throughout the study area, serves as a foundation for the river’s recreation offerings. Land parcels become smaller as the corridor continues toward the City of Morganton before reaching the 3.8-mile Catawba River Greenway, which is officially designated as part of the Overmountain Victory National Historic Trail.
The planning corridor follows the Catawba River east, transitioning to a mix of large tracts of privately owned land and residential subdivisions. Located on
The FFST extends from the Catawba River Greenway to downtown Morganton via a future greenway connector planned by the City of Morganton.
RK
FO
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
EY
8
The Upper Catawba River Trail, which provides for IL
Y UNT E CO TY BURK OUN LL C OWE
MCD
THE LAKE JAMES TO MORGANTON FFST STUDY AREA IS ONE MILE WIDE AND EXTENDS APPROXIMATELY 20 MILES FROM THE FONTA FLORA BREWERY AT WHIPPOORWILL FARM TO DOWNTOWN MORGANTON.
S ITTLE
L Brewery at Whippoorwill Starting at the Fonta Flora Farm adjacent to Lake James State Park, the corridor extends east through large tracts of rural agricultural land primarily owned by two landowners: Duke Energy and Crescent Resources, which continue to part0 0.5 1 2 MI. 40 ner with Burke County to provide easements and fi-
SILVER CREEK
the south side of the Catawba River is Glen Alpine, a small municipality whose jurisdiction intersects with portions of the study area. BA
OLD CATAWBA RIVER
REEDY
CREEK
The Lake James to Morganton FFST study area is one BA RIVER and extends approximately 20 miles from CATAWwide mile 70 the Fonta Flora Brewery at Whippoorwill Farm on Highway 126 to Downtown Morganton. ILVER CREEK
MORGANTON
STUDY AREA MAJOR FEATURES LAKE JAMES
LAKE JAMES STATE PARK
Lake James is a large reservoir located in the foothills of Western North Carolina which straddles the border between Burke and McDowell Counties. This 6,812 acre impoundment was created between 1916 and 1923 to produce hydroelectric power for the small towns of Marion and Morganton. Low density zoning requirements help to ensure that areas around the lake will be carefully managed and developed. Lake James offers residents and visitors opportunities to boat, fish, swim, and participate in other water-based activities.
Lake James State Park is one of the most recent additions to the North Carolina State Parks system. It was established in 1987 by the North Carolina General Assembly when funds were appropriated for the purchase of 565 acres of land and the initial phase of facility development in McDowell County. In 2004, Lake James State Park acquired an additional 2,915 acre tract from Crescent Resources Inc. in Burke County. This purchase expanded the state park to six times its former size and protected more than 30 miles of shoreline. The state park offers opportunities for hiking, mountain biking, picnicking, nature observation, swimming, and canoeing. A section of the Fonta Flora State Trail that is currently under construction will meander through the park and provide trail users the opportunity to take advantage of traditional state park facilities and services.
Lake James contains 10.2 square miles of surface area and more than 150 miles of shoreline. The average depth of the Lake is 65 feet with a maximum recorded depth of 120 feet. At an elevation of approximately 1,200 feet, Lake James is located within the Catawba River basin.
OVERMOUNTAIN VICTORY NATIONAL HISTORIC TRAIL The Overmountain Victory National Historic Trail (OVNHT) is part of the National Park Service’s National Trails System. It recognizes the patriot militia from Virginia, Tenneessee, North Carolina, and South Carolina who crossed the Appalachian Mountains to fight and win at the Battle of Kings Mountain during the Revolutionary War in present-day South Carolina. The trail network consists of a 272-mile corridor, including a 70-mile branch from Elkin, North Carolina, that joins the main route at Morganton, North Carolina. Sixty-five miles of OVNHT are officially developed for public use, and development continues on the remaining sections. The official sections of the trail were established through agreements with landowners and land managers and often have overlapping designations. All officially certified segments are identified by signs displaying the trail logo (an Overmountain man in profile on a brown and white triangle) or a white triangular blaze. This master plan proposes a shared alignment of the FFST and OVNHT from Lake James to the Catawba River Greenway in Morganton, a certified segment of the OVNHT. Currently, 5.5 miles of OVNHT are certified in Burke County. Based on this master plan and the OVNHT companion plan for the same study area, approximately 20 new miles along the Catawba River could be completed. The OVNHT is a cooperative effort of the National Park Service, U.S. Forest Service, U.S. Army Corps of Engineers, Overmountain Victory Trail Association, local governments, local citizens’ associations, local historical societies, and the states of Virginia, Tennessee, North Carolina, and South Carolina.
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
9
NATURAL ENVIRONMENT STEEP SLOPES
WETLANDS AND HYDRIC SOILS
CATAWBA RIVER
Much of the corridor has gently rolling topography. The most challenging slopes are along the banks of the Catawba River near the Glen Alpine area and Lake James. The trail should be designed for grades under 5% slope when possible. Natural surface trails can vary up to 10% slope while maintaining sustainable design. Alignments proposed in this plan should be designed with these guidelines and may require a larger corridor to incorporate a more
The study area includes several wetland areas as identified on the National Wetland Inventory (NWI). According to NWI, there are likely smaller wetland areas within the study corridor that are not indicated within their inventory that could impact final trail alignments. Hydric soils in combination with wetland plant species and wetland hydrology are considered indicators of a wetland, which require costly permitting if impacted2.
The Catawba River (named after the Native American tribe that first settled on its banks) is a tributary of the Wateree River in the states of North and South Carolina. The river is approximately 220 miles long and is considered one of “America’s Most Endangered Rivers” by the American Rivers organization. The river includes a series of reservoirs for flood control and hydroelectricity and provides drinking water to millions of residents.
STREAMS, LAKES, AND PONDS
The headwaters of the Catawba River begin in the Blue Ridge Mountains in western McDowell County approximately 20 miles east of Asheville. The Catawba joins the Linville River and forms Lake James. The river then extends east and south, flowing through other impoundments near Morganton, Hickory, and Mooresville on its way to Lake Norman. From Lake Norman it flows south, passing west of Charlotte, before entering Lake Wylie, where it forms approximately ten miles of the border between North and South Carolina. The Catawba River continues through South Carolina before joining the Wateree River, which spills into the Atlantic Ocean.
gradual trail grade.
FLOODPLAINS Floodplain areas provide both an opportunity and constraint for trail development. Since traditional development is often not suitable within floodplain areas, private landowners may be more willing to provide access for public trails within these areas. Also, these scenic areas attract wildlife, which creates an engaging trail experience. Within this study area, much of the floodplain areas along the Catawba River corridor are ideal for greenway development.
The County, State, and Federal government regulate the many waterbodies found throughout the study area3. The Catawba River is the dominant waterway within this corridor. Canoe Creek, located to the west of Morganton, is a tributary of the Catawba that serves as a possible trail corridor.
Although development is regulated within the floodplain, greenways and trails are allowed and can be permitted. Sound trail engineering techniques are necessary to ensure trails can sustain flooding. To the extent possible, greenway alignments should be avoided within the floodway1. Avoid disturbance in the floodway. Avoid placement of structures or disturbance within the floodway. Floodways are regulated locally and by the Federal Emergency Management Agency (FEMA). Fill, structures (walls, kiosks, etc), and impervious services are discouraged. Any structures located within the floodway require a no-impact/no-rise certification through FEMA. These studies can vary on cost but can range from $2,500-$15,000 depending on complexity.
1
10
2
If wetlands are unavoidable, utilize elevated boardwalk systems. Boardwalks allow for travel over flat, poorly draining soils, standing water, and wetland features and have significantly less impact than other options. A section 404 (Clean Water Act) Permit may be required if the wetland is considered jurisdictional by the USACE. This means that the wetland is not isolated and part of a broader lake or water system. A small boardwalk for a non-isolated wetland with limited fill or dredging may qualify for a programmatic Nationwide Permit. Nationwide Permits are designed to streamline the permitting process for actions with limited disturbances. In addition to permitting, disturbances exceeding a tenth ( 0.1) of an acre would require mitigation which can increase project costs. Impacts under a tenth (0.1) of an acre do not trigger mitigation fees.
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
Maintain a 50-foot buffer from all waterways, particularly those regulated under the Catawba River Buffer Rules. The state requires a 50-foot buffer along the shorelines of Catawba River and associated lakes. Streams within the study area are identified by the State of North Carolina as having poor water quality and maintaining or improving an adequate vegetated buffer is crucial to improving the quality. Zone 1 of this buffer includes an undisturbed 30-foot buffer from top of bank in which trails are discouraged. Zone 2 is an additional 20-foot buffer. This zone allows for managed vegetation and trails and greenways. While trails are an allowable use within Zone 2, the NC Division of Water Quality requires a permit (through DWQ or designated local government). The applicant must show that disturbance has been minimized and no other alternatives exist.
3
RARE FLORA AND FAUNA The State Natural Heritage Program provides data identifying the state’s most sensitive environmental areas to be avoided; these areas are incorporated within the analysis map series at the end of this chapter. Rare flora and fauna species can also exist outside of these designated areas, which can alter final trail alignments prior to construction.
Species identified by the State Natural Heritage Program within this study area include:
Coordination with the U.S. Fish and Wildlife Service (USFWS) is an important aspect of the design process. Involving USFWS early on in the process can help avoid potential planning obstacles related to federally protected species. Additionally, permits2 like Section 401 and 404 will initiate the review of the State Natural Heritage Program database. If species are found within the project area, State or Federal requirements may dictate avoidance or mitigation.
C| Carolina Foothills Crayfish and Eastern Creekshell (see Map 3, found along the Catawba)
A| Dwarf-flowered Heartleaf (see Map 1, found on Duke Energy held lands) B| White Trillium (see Map 2, found in the larger Glen Alpine area)
D| Mountain Golden Heather plant (Lake James area) E| Peregrine Falcon (Lake James area) F| Bald Eagle (Lake James area)
THE NORTH AMERICAN BALD EAGLE FEATHER PROVIDES THE INSPIRATION FOR THE FONTA FLORA LOGO.
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
11
CULTURAL RESOURCES
NATIVE AMERICANS The Catawba River has served as a historic transportation route, cultural connector, and wildlife corridor throughout the area’s history. Early Native Americans in the area identified themselves as the Kawahcatawbas, “the people of the river”. The Catawba and Wateree Tribes used the river for transportation and traded with Spanish explorers at river outposts. The ruins of one of these outposts, Fort San Juan, have been located and excavated in close proximity to the Catawba River in Morganton. Based on Spanish records and archaeological findings, it appears that Fort San Juan was occupied in 1567 and 1568.
12
OVERMOUNTAIN MEN The Catawba River and its tributaries were also followed by Revolutionary War soldiers on their way to the Battle of Kings Mountain, SC in 1780. The Overmountain Victory National Historic Trail preserves and commemorates the route. The original Overmountain Victory National Historic Trail (OVNHT) route was identified by a National Parks Service research team. The team relied on the 1881 account of the march, which has been amended by local historians, descendants of battle participants, and other sources. As part of this congressionally designated trail, any officially certified portion of the OVNHT must lie within a one-mile corridor (half-mile on either side) of the historic route.
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
FONTA FLORA VILLAGE The impoundment of the Catawba River to form Lake James also marks another important moment in history. The local settlement of Fonta Flora, an African American sharecropping village, was flooded in 1916 by the Southern Power Company (predecessor to Duke Energy) to develop Lake James. This community included approximately 100 full-time residents; there are no known photographs or painted pictures of Fonta Flora before it was slowly covered by the rising waters of Lake James.
THE BUILT ENVIRONMENT The opportunities and constraints found within the built and human environment are critical for determining suitable trail locations and feasibility, ideal user experiences, construction costs, and necessary permits. This section highlights four (4) built environmental features and their implications for developing the Fonta Flora State Trail from Lake James to Morganton, including: 1) Land Use; 2) Existing Trails and Parks; 3) Utilities; and 4) Transportation.
LAND USE SNAPSHOT Western Section
Central Section
The City of Morganton
The western extent of the study area is typified by a rural wooded landscape with large tracts of land, many which are owned by Crescent Communities, Duke Energy, NC State Parks, and family trusts. Many of these large tracts are leased as tree and plant nurseries. The fertilization of these crops must be considered when providing for public trails.
The central section of the corridor exhibits a mix of large tracts and small tracts, many which serve second-home owners. Many of the large landowners have owned their property for multiple generations, while smaller tracts have been purchased for retirement or personal retreats. Through the course of landowner outreach, both of these groups described issues with trash and other problems with the general public and river users. This history serves as a barrier for obtaining trail easements.
The City of Morganton’s western edge is typified by single-family residential growth. Pockets of dense land development create a challenge for creating a public trail. The City has successfully acquired property for a greenway connector that will link the Catawba River Greenway to the central business district.
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
13
THE BUILT ENVIRONMENT EXISTING PARKS AND GREENWAYS Burke County and Morganton have a collection of parks and greenways that are ideal for trail connections. Some of these major assets include:
Fonta Flora State Trail: Lake James Loop Ten miles of the Fonta Flora State Trail were completed in 2017, and an additonal 10 miles are currently under construction. When complete, the trail will provide for a complete loop around Lake James.
Canal Bridge Public Access
Watermill River Access
NC Wildlife Resources Commission currently manages the Canal Bridge Public Access which is located near the western terminus of the study area. NCWRC also plans to establish the North Bend public river access at Powerhouse Rd., west of Glen Alpine. Both access areas will be important for trail connectivity.
This public fishing access area near Glen Alpine is owned by Burke County.
City of Morganton Parks and Greenways
OVNHT at Lake James State Park This state park is one of the most significant linkages in the planning corridor and western section of the study area. Two miles of certified OVNHT are located along Paddy Creek in the state park.
14
Bridgewater Fishing Access This public fishing access area and canoe launch is owned by Duke Power, which has plans to further improve the site.
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
The City has many parks and greenways to connect, such as the Catawba River Greenway, Freedom Park and Greenway, Catawba Meadows Park, Rocky Ford Access, and the Catawba River Soccer Complex.
UTILITIES The study area has a complex matrix of utilities that include transmission lines, utility towers, water lines, and sewer infrastructure. Both sewer and water lines are indicated on the subsequent map series. However, the maps do not include transmission lines. Locations where the potential trail alignment intersects with sewer or water lines have been indicated on the map and notes (i.e. Canoe Creek). Sewer lines are often compatible with trails since existing easements preclude development. However, the easement will often need to be modified to provide for a public trail.
to accommodate a trail alignment or accommodate a widened shoulder. These opportunities are shown on the Site Analysis Maps with corresponding opportunities and constraints notes. Norfolk Southern has an operational rail on the south side of the Catawba River. If this rail were to ever become abandoned, a significant opportunity would exist to establish a considerable section of trail. The right-of-way and adjacent lands were analyzed as a potential future route, as illustrated in the maps and notes.
TRANSPORTATION The study area analysis includes an extensive review of the existing transportation network including the North Carolina Department of Transportation (NCDOT) right-of-way (ROW), NCDOT plans, existing bike and pedestrian infrastructure (crosswalks, bike lanes, etc.), railways, and existing greenways. NCDOT’s right-of-way was analyzed for the ability CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
15
MAP AND PHOTO SERIES: PRELIMINARY TRAIL ROUTE ALTERNATIVES The map and photographic series, which spatially incorporates the natural and built environment analysis, highlights a host of preliminary trail route alternatives. These routes were further refined by local leaders to identify and engage landowners. This information will serve as an ongoing reference guide as alternative routes may need to be developed due to unforeseen barriers.
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
17
STUDY AREA 1: SITE ANALYSIS
Municipal Boundaries
Property Lines
Public Health Departments
Existing Trails
Schools
Historic Sites and Ditricts
Local District Center Point Study List (SL)
Schools National Register (NR) of Historic
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Places Site Site Gone Sensitive Cultural Resources
Transportation
National Register Historic District (NRHD)
Bike Route
NRHD Boundary
Roads/Interstates
Study List (SL)
Interstates
SL and Landmark SL and Determined Eligible (DOE)
Very High
Inactive Hazardous High Sites
Active & Inactive Landfills Hydrology
3
Lake James
Loop Trail
3
Moderate
BE
NF
LD
Unranked
Wetlands (NWI) Hydric Soils
Element Occurances Waterbodies Plant Streams
Lake James State Park
Ca 2
Floodway
Animal
100-Year Floodplain
Natural Community
500-Year Floodplain
LA
ND
IN
G
Exceptional
Moderate General
re
High
10
HW
DOC
AST
6 WY 12
H
Cata
RD
Quaker Meadows Cemetery, Circa 1767-1879
wba
EE R
OAD
6
26
Rive
Hydric Soils
r
34
31Historic Bridge
8
31
500-Year Floodplain
Ca
7
no
27
31
26
28
Lake James to Morganton Greenway Study
eC
re
ek 32
70
r
ve Ri
STUDY AREA 1
a wb
ta
Ca
Swan Pond (Easement: Historic Preservation Foundation)
TY
MAP 1
28
h
ut
So
RR
126
9 Muddy Creek Historic RR Bridge
NTY
LAKE JAMES STATE PARK
23
8
lk
rfo
No
n er
29
Freedom Park & Greenway
k
Floodway
126
35
ree
Element Occurrence: Carolina Foothills Crayfish, Eastern Creekshell
Flood Zones
Freedom High School
33
Catawba River Soc Complex &Greenway Loo
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN 25
30
Ca
9
7
Waterbodies Streams
36
6
5
100-Year Floodplain
10
37
10
Y1
Old
4 23
Unranked
11
ek
Hydrology
Wetlands (NWI)
38 Quaker Meadows House
30
29
126
U
Element Occurrence:
3
Natural Heritage Areas
Very High
PO
16 12
RD
RD
5
eC 5
Animal Assemblage
N
SE
5
no
Flood Zones
S
HO
ER
W
IE
General
Site Analysis Overmountain Victory National Historic Trail
18
SE N
Natural Heritage Areas
Exceptional
OUN LL C OWE
Sewer
Natural Community
Brownfields
U E CO
Waterlines
Catawba River Dam and Truss Bridge
Bridgewater Fishing Access
10
Paddy Creek Dam
2
Animal
MCD
Utilities
Animal Assemblage
K BUR
Local Roads State and County Roads State Roads
Sewer
4
Plant
Private
Lake James Family Campground
yC
Interstates
Active & Inactive Landfills
ed
Roads/Interstates
Waterlines
k
Re
NCDOT Bridge Locations Rail Roads
Local Roads State and County Roads State Roads
Utilities
Element Occurrence:
Inactive Hazardous Sites State Natural Heritage Data
State Natural Heritage Data
NCDOT Bridge Locations Rail Roads
Local District Center Point
14 13
39
ree
Brownfields
Municipal/County SL and Landmark Owned Properties SL and Determined Eligible (DOE)
Historic Sites and Ditricts
Bike Route
Lands
Lake James
1
Federal & State Ownership Element Occurances
NRHD Boundary
Colleges and Universities
Transportation
Fishing Access Parks
National Register Historic District (NRHD)
Public Libraries
1
Private Municipal/County Owned Properties
Proposed Trails
NR and Local Landmark Managed
Public Health Departments
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
Bridgewater Powerhouse
Federal & State Ownership
Golf Courses National Register (NR) of Historic Places Site
Hospitals
nC
SAINT MARYS CHURCH RD
Golf Courses
OVNHT 1/2-Mile Buffer Managed Lands
Colleges and Universities
Wil so
15
Proposed Trails
Hospitals
Public Libraries
Crescent Resources Properties
NR and Local Landmark
NC 126
OVNHT & Other Recreation Fishing Access Parks Overmountain Victory NH Trail
MAP 2
AD
Civic Landmarks
Duke Energy Properties Civic Landmarks
Lake James State Park
Crescent Resources Properties
Municipal Boundaries
Lake James State Park
BOST RO
County Boundary
MAP 3
Existing Trails
Property Lines Duke Energy Properties
20-Foot Contours
pT rail
MAP 2: STUDY AREA 1 SITE ANALYSIS
OVNHT 1/2-Mile Buffer
Loo
OU
OVNHT & Other Recreation Overmountain Victory NH Trail
20-Foot Contours County Boundary
es
RH
Constraints
am
WE
Opportunities
38
Constraints
38
Connectors
50
Opportunities
50 Connectors
MAP 2
Alignment ‘B’
eJ
PO
Alignment ‘A’
Alignment ‘B’
Lak
LEGEND
LEGEND Alignment ‘A’
START OF STUDY AREA @WHIPPOORWILL FARM
70
STUDY AREA 1: OPPORTUNITIES AND CONSTRAINTS Opportunities and Constraints: Lake James (Map 1) OPPORTUNITIES 1 2 3 4
5 6
7
7
8 9 10
11 12 13 14 15 16
Potential Trailhead and improvement area Maintained open meadow Routes utilize private dirt roads Connect to Lake James Family Campground and single-family residential development by paralleling Benfields Landing Road Potential amenable landowner Flat area with potential to use Norfolk Southern right-of-way (around 200-feet) or adjacent private lands for alignment Bridgewater Road could be an excellent connector route or a preferred alignment if one alignment section was determined unfeasible Bridgewater Road hosts a Bed and Breakfast and may have opportunity for greenway related commercial Area is relatively flat Utilize Muddy Creek Historic Rail Road Bridge Potential amenable landowner on north side— alignment could utilize or parallel Corpening Chapel Road Potential amenable landowner on north side— alignment could utilize or parallel Rays Dairy Avenue Alignment parallels private road Potential trailhead at Bridge Water Fishing Access Area Powerhouse Road bridge has ample deck width to allow for on-grade bridge crossing Potential connection to North Powerhouse Road and Lake James Loop Trail Powerhouse Road has 60-feet of right-of-way and is fairly flat through the rest of this area going east
CONSTRAINTS 1
2
3 4
5 6
7
8
9 10
Steep hillside may require greenway alignment to parallel Highway 126 until the crossing of Benfields Landing Road Hwy 126 Bridge has narrow shoulder with railing obstruction for several hundred feet—would likely require a bridge attachment Wetland/low lying area Area has stream crossing and significant fill slope from rail road bed and would require alignment to be in floodway or elevated on a structure At-grade road crossing on Bridgewater Road Bridgewater Road bridge has narrow shoulder and would need to have a bridge attachment or separate pedestrian bridge Rail-bed is on elevated dike and significant fill slope from rail road bed and would require alignment to be in floodway or elevated on a structure Large disturbance area (possible motor cross track) within and adjacent to Norfolk Southern right-ofway Tree farm Sensitive cultural resource areas
7
View of Bridgewater Road flat and steeper areas
14
Approach to Bridgewater Fishing Access Area on Powerhouse Road
5
View of Bridgewater Road and potential ongrade road and railroad crossing
14
View of decking over the Catawba River on Powerhouse Road
Rail dike
ern
uth So olk OW R
rf No
1
View of project terminus on Highway 26 with potential trailhead/enhancement area
10
View of Rays Dairy Avenue and potential onroad or parallel alignment
7
View of Norfolk Southern rail line constrained area
16
View of Riverview Apartments with sewer line easement shown at the right
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
19
MAP 1
LEGEND Alignment ‘A’
50
Opportunities
Alignment ‘B’
38
Constraints
MAP 2
no
STUDY AREA 2
MAP 1
LEGEND
Connectors
Ca
MAP 2
eC
MAP 3: STUDY AREA 2 SITE ANALYSIS
STUDY AREA 2: SITE ANALYSIS ree
k
126 OVNHT & Other Recreation Overmountain Victory NH Trail
20-Foot Contours
Alignment ‘A’
County Boundary
Municipal Boundaries
Alignment ‘B’
Property Lines
Connectors Crescent Resources Properties
Existing Trails
Opportunities
38
Constraints
Lake James
Fishing Access Parks Golf Courses
Civic Landmarks
Hospitals
OVNHT 1/2-Mile Buffer Proposed Trails
Duke Energy Properties
50
Managed Lands
20-Foot Contours
County Colleges and Universities
Boundary
Municipal Boundaries
Schools Historic Sites and Ditricts
Private Municipal/County Owned Properties
Property Lines
Brownfields Inactive Hazardous Sites
Proposed Trails
Active & Inactive Landfills
Fishing Access Parks Golf Courses
Crescent Resources National Register Historic District (NRHD)
Properties State Natural Heritage Data
Local District Center Point
Element Occurances Plant
Study List (SL)
Animal Assemblage
Civic Landmarks
Hospitals Departments
NR and Local Landmark
NCDOT Bridge Locations
Hydric Soils
Interstates
Streams
Boundary
Local District Center Local Roads State and County Roads Study List (SL) State Roads
Point
Waterlines
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
Sewer
Floodway 100-Year Floodplain
22
19
19
20 20
Glen Alpine Dump
Brownfields
21
18
Inactive Hazardous Sites
18
22
22
Catawba Ri 21
23
17 17
Swan Pond (Easement: Historic Preservation Foundation)
24
Animal Natural Heritage Areas
Exceptional
Moderate
Very High
General
High
Unranked
19 Glen Alpine Dump
Wetlands (NWI) 16
Hydric Soils 17
Waterbodies
15
Streams Flood Zones
Interstates
100-Year Floodplain 500-Year Floodplain
11
18
18
Catawba Riv
er
12
14 POW
26
17
ERH
OUS
25
17
E RD
27 Glen Alpine Elementary School
70
Re
MAP 2
18 13
11
Floodway
Local Roads State and County Roads State Roads
20
Glen 18 Alpine
Hydrology
Rail Roads
Site Analysis Overmountain Victory National Historic Trail FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
rn
the
ou
S folk
RR
Glen Alpine
r
No
k
ree
yC
ed
20
18
Natural Community
Roads/Interstates
Sewer
18
er
21
La
Animal Assemblage
500-Year Floodplain
NCDOT Bridge Locations
Waterlines
Catawba Riv
Catawba River Access Area
Private Municipal/County Owned Properties
Element Occurances Plant
Flood Zones
Bike Route
GREATER GLEN ALPINE
18
e
am
J ke
il
Tra
State Natural Heritage Data
Transportation
Utilities
op
o sL
Active & Inactive Landfills
SL and Landmark SL and Determined Eligible (DOE)
Utilities
Lake James
Federal & State Ownership
Animal
Waterbodies National Register Historic District (NRHD)
Rail Roads
Table Rock Middle School
Managed Lands
Natural Community Public Libraries SL, DOE, and Landmark Natural Heritage Areas DOE NRHD Colleges and Universities Moderate Exceptional Surveyed General Very High Surveyed in NRHDSchools Site Gone High Unranked Sites and Ditricts SensitiveHistoric Cultural Resources Hydrology Transportation National Register (NR) of Historic Places Site Wetlands (NWI)
Roads/Interstates NRHD
Element Occurrence: Sweet White Trillium
Existing Trails
Duke Energy Properties
Bike Route
19
OVNHT 1/2-Mile Buffer
NR and Local Landmark
SL and Landmark Public Health SL and Determined Eligible (DOE)
18
OVNHT & Other Recreation Overmountain Victory NH Trail
National Register (NR) of Historic Places Site
NRHD Boundary
il
Tra
Federal & State Ownership
Public Health Departments Public Libraries
op
Lo
a
eJ
k La
s me
Lenoir to Morganton Greenway Study
16
STUDY AREA 2: OPPORTUNITIES AND CONSTRAINTS Opportunities and Constraints: Greater Glen Alpine (Map 2) OPPORTUNITIES 17 18
18 19
20 21
22 23
24
25
26 27
Utilize 60-foot right-of-way (with 18-20-foot shoulder) on Powerhouse Road Potential for bridge underpass at low-flow periods— but on-grade crossing of Powerhouse Road may be more practical Bridge decking may accommodate a shoulder for on-grade crossing across the Catawba River Existing trail easement may allow for greenway accommodation in gated equestrian community— land bordering the Catawba River is owned by the club/community Potential amenable land owner Bridge clearance across the Catawba River would allow for a greenway underpass on either sides but lacks adequate shoulder on bridge deck for crossing the river Burke County’s Catawba River Access Area— potential trailhead location Subdivision platted but properties bordering river appear to be undeveloped and still owned by developer Watermill Glen Alpine Road/Turkey Tail Lane rightof-way has 60-foot right-of-way with approximately 30-feet of shoulder on the western side Downtown Glen Alpine hosts a commercial area that could serve greenway tourism including a bike shop, winery, and bed and breakfast Linville Street has an approximately 5-foot sidewalk through the majority of downtown Glen Alpine Powerhouse Road has 60-foot of right-of-way and relatively flat terrain into Glen Alpine
18
View of Powerhouse Road bridge over the Catawba River
CONSTRAINTS 11 12 13
14 15 16 17 18 19 20 21 22
Sensitive cultural resource area Homesite is close to Catawba River—alignment would need to navigate around it Bridge clearance may not be desirable for a greenway underpass and on-grade crossing may be necessary Tree farm Trust property Homesite located fairly close to Catawba River Sensitive cultural resource areas Wetland/low lying areas Trust property not likely to be amendable to a greenway Trust property Use of some private property in drainage would be needed for alignment This alignment may be less probable due to the intersection with several small privately held parcels
12
View of home site on the Catawba River that prevents an adjacent alignment on the south end
Club owned property
19
Gated equestrian community has commonly owned property on the riverfront
22
Burke County Catawba River Access area and potential trailhead
20
View from Catawba River Bridge—landowner on right of picture may be amenable
14
View of Watermill Glen Alpine Road right-of-way as a potential connector to Glen Alpine
21
View of Bridgewater Road and potential ongrade road and railroad crossing
16
Downtown Glen Alpine (with Norfolk Southern railroad line in the foreground)
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
21
38
Constraints
Connectors 20-Foot Contours County Boundary
50
Opportunities
38
Overmountain Victory NH Trail Constraints
OVNHT & Other Recreation
OVNHT 1/2-Mile Buffer
Municipal Boundaries
Existing Trails
Property Lines
Proposed Trails
Duke Energy Properties Civic Landmarks
Municipal Boundaries
Public Libraries
Proposed Trails
Brownfields Fishing Access Inactive Hazardous Sites Crescent Resources PropertiesNational Register (NR) of Historic Places Site Parks Active & Inactive Landfills NR and Local Landmark Civic Landmarks National Register Historic District (NRHD) Golf Courses State Natural Heritage Data NRHD Boundary
Public Health Departments
Study List (SL)
Public Libraries
SL and Landmark SL and Determined Eligible (DOE)
Local District Center Point
Managed Lands
Brownfields
Very High
General
High
Unranked
Active & Inactive HydricLandfills Soils
Local District Center Point Study List (SL)
Interstates Local Roads State and County Roads State Roads
Roads/Interstates
Interstates Local Roads State and County Roads State Roads Utilities
no
23
100-Year Floodplain
Animal Assemblage
500-Year Floodplain
EE R
OAD
Natural Heritage Areas
Moderate General
High
Unranked
126
re
no
31
26
29
HW
Y1
AST
126 25
Waterbodies
eC
re
ek
Floodway 100-Year Floodplain 500-Year Floodplain
MAP 3
Catawba River Soccer Complex &Greenway Loop
29
Collett St. Rec. Center & Martha Park
West Str Historic Dist 126
36 35
Morganton 34
OAD
31
30
70
31 126
23
JAM
28
Ca
D
OA
NR
OW EST
no
27
ek
Silver Cre
31
26
a
Swan Pond (Easement: Historic Preservation Foundation)
wb r
ve
END OF STUDY AREA
28
29
Freedom Park & Greenway Forest Hill Elementary School
eC
re
ek 32
Ri
Site Analysis Overmountain Victory National Historic Trail
Quaker Meadows Cemetery, Circa 1767-1879
33
EE R
Element Occurrence: Carolina Foothills Crayfish, Eastern Creekshell
Flood Zones
END OF STUDY AREA
Freedom High School
24
Streams
37
64
30
26 28
DOC HWY
181
Quaker Meadows House
Freedom Park & Greenway
32
23
Lenoir to Morganton Greenway Study
22
Ca
27
Swan Pond (Easement: Historic Preservation Foundation)
Hydric Soils
WEST MORGANTON
126
ek
Hydrology
Wetlands (NWI)
38
34 31
Element Occurrence: Carolina Foothills Crayfish, Eastern Creekshell
Avery Avenu Distr
ML King Park
126
35
31
eC
28
Animal Natural Community
36
ta
Sewer
Ca
Waterbodies
Element Occurances Flood Zones Floodway Plant
Exceptional
k
Quaker Meadows Golf Course
Ca
Waterlines
AST
126
r
NCDOT Bridge Locations Rail Roads
DOC HWY
ve Ri
Bike Route
26
ba
Transportation
Quaker Meadows Cemetery, Circa 1767-1879
Y1
23
State Natural Heritage Data
Very High
Gr
39
ree
Cascade Park HW
29
w ta
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
Sewer
30
Ca
Utilities SL and Landmark Waterlines SL and Determined Eligible (DOE)
ek
126
Streams
Roads/Interstates
37
re
Hydrology
Inactive Hazardous Sites Wetlands (NWI)
NRHD Boundary
eC
Animal
NR and Local Landmark
National Register Historic DistrictRail(NRHD) Roads
Quaker Meadows House
Private Natural Community Municipal/County Natural Heritage Areas Owned Properties Moderate Exceptional
National Register (NR) of Historic Places Site Transportation
NCDOT Bridge Locations
no
Element Occurances Plant
Federal & State Ownership Animal Assemblage
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources Bike Route
38
Ca
eenway
ay
Hospitals
Historic Sites and Ditricts
RO A
Federal & State Ownership
OVNHT 1/2-Mile Buffer Private
enw Catawba Gre
Schools Historic Sites and Ditricts
Colleges and Universities
Catawba
Park (NC State Easement)
Existing TrailsMunicipal/County Owned Properties
Colleges and Universities
Schools
nC
SAINT MARYS CHURCH RDCatawba Meadows
AD
Public Health Departments
Property Lines
Wil so
iver
ba R
w Cata
OVNHT & Other Recreation Managed Lands Overmountain Victory NH Trail
Hospitals
County Boundary
Duke Energy Properties
k
Fishing Access Parks Golf Courses
Crescent Resources Properties
20-Foot Contours
39
ree
2
Connectors
nC
AD
Alignment ‘B’
Wil so SAINT MARYS CHURCH RD
BOST RO
Alignment ‘A’
MAP 3
BOST RO
Alignment ‘B’
ST
Opportunities
BO
50
MAP 2MAP
LEGEND Alignment ‘A’
D
MAP 3 STUDY AREA 3
LEGEND
MAP 4: STUDY AREA 3 SITE ANALYSIS
STUDY AREA 3: SITE ANALYSIS
Freedom High School
33
Catawba River Soc Complex &Greenway Loo
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN 25
30
70
STUDY AREA 3: OPPORTUNITIES AND CONSTRAINTS Opportunities and Constraints: West Morganton (Map 3) OPPORTUNITIES 28 29 30
31 32 33 34 35
36 37 38 39
Historic farm (Swan Pond) Alignment could parallel Docastee Road Alignment could travel on-road on Elm Street and would need to travel through private property to access along the river Alignment overlaps with sewer lines/easements Canoe Creek bridge may accommodate a greenway underpass and separated pedestrian lane Connection could use some current path alignments through Freedom Park Intersection has planned signalization improvements Development is planned to link in sidewalk infrastructure and will link to the north side of Hwy 181 Connection to Quaker Meadows Cemetery—a historically significant OVT site Potential amenable landowner—property was historically a part of Quaker Meadows Connection to Quaker Meadows House—a historically significant OVT site Bost Road has significant 60-foot right-of-way and could serve as a connection to a neighboring subdivision
28
Swan Pond (a National Historic Register site) was settled just after the American Revolution
CONSTRAINTS 23 24
25 26 27
28
29 30
Alignment leaves OVT mile-buffer Topography is steep with a bluff that drops off behind buildings—alignment could need a switchback in this location Homesite close to the Catawba River would make an adjacent river alignment less likely Sensitive cultural resources area and trustee property Alignment on Cresthill Drive would need to be on-road or the construction of a 5-foot sidewalk— which is less than the recommended minimum 10foot path for a greenway in suburban/urban areas Access is restricted on the Morganton Water Plant but alignment is proposed around the perimeter and would require fencing (also a sensitive cultural resource area) Sensitive cultural resource area and wetlands Intersection of Saint Marys Church Road and Highway 181 is signalized but no crosswalks exist
29
A view of Docastee Road from Highway 126
24
30
25 Catawba River
30 24 25
Section where alignment would navigate away from the river
20
View of Cresthill Drive—a potential on-road or parallel alignment
28
View of Morganton Water Plant and its restricted access
22
14
16
View from Independence Boulevard bridge over Canoe Creek
Quaker Meadows Cemetery—revolutionary War grave sites and one of the oldest historic sites in Western NC
The McDowell House (Quaker Meadows)— historically significant through several eras
CHAPTER 1: Existing Conditions, Analysis, and Preliminary Alignments
23
2
L A N D O W N E R O U T R E A CH LANDOWNER OUTREACH AND ENGAGEMENT WAS A KEY COMPONENT OF THE PLANNING PROCESS.
The environmental analysis (Chapter 1) was critical to determine physically feasible locations for trail development. However, significant portions of these routes impact private property and require
THE ENGAGEMENT PROCESS A| IDENTIFYING THE LANDOWNERS B| LANDOWNER WORKSHOP C| TRAIL ROUTE RE-EVALUATION
landowner outreach to fully assess trail feasibility. This chapter highlights the good-faith effort to engage landowners throughout the planning process.
25
ED
FINA LE
RE
EZ
ED
R
DR
EB
BY
M SA
LA K
R KI
IDENTIFY THE LANDOWNERS MU D LL
RS
T DR
¬ ¬ 109
¬
!
! !
!
NL E
!
!
DR
!
!
104
LA NE
105
106
!
98
99
!
HO
COBB HOLLO W DR
101
¬ ¬ ¬¬ ¬ ¬ ¬ ¬ ¬ ¬ ¬ ¬ ¬ ¬ 107
!
ER
102
!
D
!
ER
!
!
!
US
¬ ¬
!
115
DR
RD
ER
H
RIV
RC
!
!
HU
!
LC
!
PA U
103
!
¬ 120
NT
!
114
SA I
¬
!
A mailing database was created that included all property owners impacted by the preliminary trail alignment(s).
110
!
113
T DR
¬
UB CL
¬ ¬ ¬ ¬ 112
DR
!
DR
SS
!
VE
NE
108
!
CO
ER
FORNEY ST
DY
IN V
!
S
111
N SA
E CRES
RE
!
UF BL
This effort builds upon previous landowner outreach efforts conducted in 2015 for the OVNHT Master Plan and incorporates additional preliminary alignments for landowner contact. E BE
HO
!
CH
ES
R FD
!
LANDOWNER DATABASE
SIL VE
Trail alternatives were developed based upon an environmental feasibility analysis (see Chapter 1).
OW
!
97
!
!
NP
CO
CAM
MAP 2
R
MAP 5: LANDOWNER PARCELS
FEASIBILITY ANALYSIS
IA D E LL
R
MAP 3
!
MG
!
!
! !
DR HEL T ON
DR
!
!
!
!
CA
94
RIV E
RIV
R SO U
ER
SH
91 ¬ 90 ¬ 93 ¬ 92 ¬ 89 ¬
AD
OW
RIVER BREEZE DR
.
!
T
SCOTT ST
DR O
O
D
DR
T
HE NN
DE LL W
HAMP ST
FOXFIRE DR
0.5
1 FE RN
DR
ST BE AV ER
ST N SO IL W GIB G BS JUL ST ON DO N ST
ES
!
!
ARNEY DR
N
N ST
IN
0 LIV AN
AI
E MAI
ST
P AL
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN SU L
M
T
AL LE N
ST
W
ST
SS
SURREY DR
CEMETERY ST
GROV ER
26
T PIT
OW
LINVILLE ST
ST
EA D
125
126
ED BOW MAN ST
!
!
82 ¬ IS DAV
ES
!
! !
87 ¬
ST
GE
!
ON
BRID
! !
Y ST
!
!
!
!
ED MUL L ST
!
¬ 127
!
ABE RNATH
!
!
E RD
! !
LAIL RD
124
!
!
HOUS
! !
DR
RIS
ES
!
PO WER !
!
R GA
CATAW BA ST
¬ ¬ ¬ !
PA RK
SE
!
123
PEA RIDGE ST
¬
!
!
122
N
NM
ORDERS DR
!
!
¬
ST
84 ¬
!
STEP 2: START A CONVERSATION WITH LANDOWNERS.
ND S T
!
D
!
L IL
R
!
! !
AV E
M
E
!
!
!
RD
ER AT W
N
!
!
!
PO LL A
ND R
PI AL
!
IS O
G
N LE
!
NL EY
! !
!
ST ER
8 ¬ 86 ¬
!
BU
! !
CO
!
AR
!
JA M
!
LA N
!
RD
!
! !
!
! !
! !
!
! !
!
!
!
!
!
!
!
128
88 ¬
!
NE R
!
!
!
¬
119
95
96
118
¬
121
!
130
100
117
!
¬
!
129
116
!
STEP 1: DETERMINE WHERE THE TRAIL IS FEASIBLE (CHAPTER 1). ¬¬
2 Miles
W
LANDOWNER WORKSHOP
• •
LANDOWNER INVITATION AND POSTCARD
• •
Formal invitations were sent to all landowners requesting their attendance at a special meeting. Landowners who were unable to attend could respond with a pre-stamped postcard indicating their level of interest in providing for the trail.
• • •
PRESENTATION
I am Familiar with the FFST Yes No Maybe I am familiar with the Overmountain Victory National Historic Trail Yes No Maybe I plan on attending the landowner workshop on February 27, 2018 Yes No Maybe I am interested in donating a corridor to accommodate the trail Yes No Maybe I am interested in selling a corridor to accommodate the trail Yes No Maybe I am interested in donating property to Burke County to accommodate the trail Yes No Maybe I am interested in selling an entire property at full market value to Burke County Yes No Maybe
this ipation in Your partic ant rt po edibly im survey is incr l! ai tr e th s of to the succes !! u! yo Thank Burke County Community Development PO Box 219 Morganton, NC 28680 LANDOWNER ID:________________
After signing in, the landowner workshop began with a presentation by Burke County staff that highlighted origins of the Fonta Flora Trail project, previous planning efforts, and trail progress and accomplishments.
MAP REVIEW Landowners were able to review preliminary maps and ask questions about their specific property and the associated trail alignment with Burke County planning staff and consultants.
SENTIMENT CARD The meeting concluded with landowners noting their level of willingness to provide a trail easement via the Landowner Interest Survey printed on the back of their invitation post card.
LANDOWNER WORKSHOP Morganton to Lake Section of the Fonta Flora State Trail & Overmountain Victory National Historic Trail! In partnership with the North Carolina Division of State Parks, Burke County is beginning to identify properties and routes for establishing the Lake James to Morganton section of the Fonta Flora State Trail (FFST). Designated as a State Trail in 2015, Fonta Flora is a public walking and biking trail that with eventually connect Morganton, Lake James, Marion, Old Fort, Black Mountain, and Asheville.
ON FEBRUARY 27, 2018, 20 LANDOWNERS ATTENDED THE LANDOWNER WORKSHOP AT THE BURKE COUNTY GOVERNMENT CENTER.
The Fonta Flora State Trail finds its origins in the desires of Burke County citizens to increase the quality of life enjoyed by residents, provide a destination-quality recreational amenity for visitors and the region’s diverse population, and provide public access to the area’s outstanding cultural and natural resources. The Lake James to Morganton section of the FFST is unique in that it shares a corridor with the Overmountain Victory National Historic Trail (OVNHT). It is the vision of the partner organizations, including the National Park Service, that a single trail can be developed that serves as both the FFST and OVNHT.
CHAPTER 2: LANDOWNER OUTREACH
27
TRAIL ROUTE RE-EVALUATION REVISE TRAIL ALIGNMENTS
A COMBINATION OF FACTORS, INCLUDING THE NATURAL ENVIRONMENT, THE BUILT ENVIRONMENT, AND LANDOWNER SENTIMENT, WERE USED TO DETERMINE THE PREFERRED TRAIL ALIGNMENT (CHAPTER 4).
28
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
MAP 6: TRAIL ROUTE RE-EVALUATION
“Landowner Sentiment” was helpful for determining the preferred alignment and was included as a component of the final map series (Chapter 4).
3
TRAIL C H A R A C T E R A N D D E S I G N GUIDELIN ES IN THIS CHAPTER: THIS CHAPTER PROVIDES DESIGN DETAILS FOR VARIOUS TRAIL TYPES AND TRAIL SUPPORT FACILITIES AND OFFERS INSIGHT FOR INCORPORATING SOCIAL MEDIA. This chapter describes specific trail construction
standards and trail types to ensure minimal maintenance and the best user experience.
and illustrates their transitions along the preferred
A| SUSTAINABLE TRAIL DESIGN & CONSTRUCTION
trail alignment.
B| TRAIL TYPES
A unique architectural and branding theme is
C| TRAIL PROFILE
presented for signage, wayfinding, and other
D| TRAIL SUPPORT FACILITIES
Additionally, this chapter defines three trail types
trail support facilities. This chapter concludes
with recommendations for using social media to market the trail.
E| SOCIAL MEDIA MARKETING
29
TRAIL CHARACTER SUSTAINABLE TRAIL DESIGN The trail must be designed and constructed to minimize erosion and ongoing maintenance, while providing for a leisure, family-oriented experience. The trail width will be approximately five-feet wide and allow for multiple users and emergency access from off-road vehicles. The overall average trail grade or steepness will be 5% or less. The trail will be slightly rolling with a gentle grade that follows the terrain contours. The trail will be slightly out-sloped, and meanders and undulates frequently to remove water from the trail surface and create interest. The trail corridor will remain as narrow as possible while still maintaining the required tread width.
1. THE HALF RULE A trail’s grade shouldn’t exceed half the grade of the hillside or sideslope that the trail traverses. If the grade does exceed half the sideslope, its considered a fall-line trail. Water will flow down a fall-line trail rather than run across it.
The trail design will utilize the five essential elements of sustainable trails as outlined in the International Mountain Bicycling Association’s (IMBA) publication “Trail Solutions.”
30
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
2. THE TEN PERCENT AVERAGE GUIDELINE An average trail grade of 10 percent or less is considered sustainable. This doesn’t mean that all trails should be kept under 10 percent, but the trail builder will need to limit the length of sections that exceed 10 percent.
THE FIVE ESSENTIAL ELEMENTS OF SUSTAINABLE TRAILS
3. MAXIMUM SUSTAINABLE TRAIL GRADES Maximum grade is the steepest portion of a trail that is more than approximately 10 feet in length. It’s critical to determine what the maximum allowable trail grade will be prior to beginning construction. Several factors should be considered when determining the maximum sustainable trail grade which include:
4. GRADE REVERSALS
5. OUTSLOPE
A grade reversal is a point where an ascending trail changes direction subtly for 10 to 50 linear feet before ascending again. This change in grade allows for water to exit the trail.
Outslopes allow water to sheet flow off the trail instead of channeling down its center.
• Half Rule • Soil Types • Rock • Annual Rainfall Amount • Grade Reversals • Type of Users • Number of Users • Difficulty Level
MAX
CHAPTER 3: Trail Character and Design Guidelines
31
TRAIL CHARACTER TRAIL CONSTRUCTION Members and associates of the Professional Trailbuilders Association (PTBA) should be preferred contractors for constructing the trail with mechanized equipment. These contractors have a thorough understanding of sustainable trail design and construction.
features will be finished to a smooth, stable surface. Any excess or disturbed soil outside the trail tread is evenly distributed and covered with leaves, organic debris, and other natural materials to aid in aesthetics and sedimentation and erosion control.
FULL BENCH CUT The trail will be constructed using a “full bench cut” in which the entire trail tread is built on solid ground.
Volunteers may also work with PTBA contractors in a “hybrid” manner. When utilizing this method, the contractor is responsible for the rough cut of the trail tread and volunteers complete the finish work. Burke County will be responsible for securing any required local, state, or federal permits for construction. The trail will be constructed using a “full bench cut” in which the entire trail tread is built on solid ground. A “partial bench cut” which is similar to “cut and fill” will only be utilized if a full bench cut is not feasible due to rock outcrops, slabs, or other natural features. A partial bench cut uses loose fill dirt to construct a portion of the trail treads. The fill dirt has a tendency to loosen over time and can then wash and erode. This issue is minimized when constructing a full bench cut. The trail bed will be shaped to leave an even, compacted, uniform surface free of indentations or protruding roots and stumps. The grading of the trail tread, back slope, and drainage
32
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
SOLID GROUND
Details from IMBA
TRAIL TYPES Five trail types are proposed along the preferred alignment. A specific trail type is proposed according to its surrounding environment, whether it is for safety along roadways or to enhance user experience.
TYPICAL GREENWAY 10’ PAVED ASPHALT
MILE MARKER FENCING TO MARK PRIVATE PROPERTY BOUNDARY
30’ PREFERRED BUFFER TO RIVER TO PROTECT WATER QUALITY
photo: discoverburkecounty.com THE CATAWBA RIVER GREENWAY INCORPORATES APPROXIMATELY FOUR MILES OF CERTIFIED OVERMOUNTAIN VICTORY NATIONAL HISTORIC TRAIL.
10’ PAVED ASPHALT
User Group: Multi-Use
Average Construction Cost: $80/ln. ft.
Material: Paved Asphalt
Preferred Easement Width: 50’
Preferred Width: 10’
Minimum Easement Width: 20’
CHAPTER 3: Trail Character and Design Guidelines
33
TRAIL CHARACTER TRAIL TYPES SHARED PATH
DUAL-USE TRAIL
20’ PAINTED ASPHALT
5’ NATURAL SURFACE
SHARROWS & PAINTING ON GROUND INDICATE SHARED PATH
20’ TWO-WAY TRAFFIC SHARED PATH
FENCE TO MARK PRIVATE PROPERTY
2' -3' CLEARED
5' NATURAL SURFACE
I
2' -3' CLEARED
User Group: Hikers, Cyclists, and Vehicles
Avg. Construction Cost: $15/ln. ft.
User Group: Hikers and Cyclists
Average Construction Cost: $12/ln. ft.
Material: Painted Asphalt
Preferred Easement Width: Existing road width
Material: Native Soils
Preferred Easement Width: 50’
Preferred Width: 5’
Minimum Easement Width: 10’
Preferred Width: 20’
34
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
NCDOT SIDE PATH
MULTI-USE TRAIL
8’ PAVED ASPHALT
8’ CRUSHED GRAVEL FINES
GUARD RAIL
2’-3’ SHOULDER
8’ PAVED ASPHALT
2’-3’ SHOULDER
User Group: Multi-Use
Average Construction Cost: $120/ln. ft.
User Group: Hikers, Cyclists, Equestrians
Average Construction Cost: $25/ln. ft.
Material: Paved asphalt
Preferred Easement Width: 25’
Material: Crushed Gravel Fines
Preferred Easement Width: 25’
Preferred Width: 8’
Minimum Easement Width: 25’
Preferred Width: 8’
Minimum Easement Width: 15’
Note: Trail to be approved in accordance with NCDOT encroachment agreement.
CHAPTER 3: Trail Character and Design Guidelines
35
TRAIL CHARACTER TRAIL TYPE PROFILE
T F IN
SO
INT
PO TRAIL TYPES NCDOT SIDE PATH
TA
FON
RT
STA
ST ERE
IN NHT
R FLO
E
LAK
ES JAM
OV
2.0
5’ NATURAL SURFACE
K
AR TE P
STA
AL
CAN
DG BRI
L ANA
AD
AI E TR
DG
BRI
Y
ERG
LHE
E
.2
8’ PAVED ASPHALT
DUAL USE TRAIL
RY
WE
RE AB
Y
AIR
ER
ENT
C
EN UKE
D LAN
OFF
D
SD AY’
RD.
R
T
EXI
MULTI-USE TRAIL
TYPICAL GREENWAY
.8
/E AND
L
T
EXI
RH WE
OUS
D. ER
ROW
ROW A
WB ATA C ER UB ENT ER CL RIV
PO
3.45
.1
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
BA AW T A T C UB EXI ER CL RIV
1.25 1.0
APPROX. DISTANCE IN MILES 36
RY
E E EN
DUK
8’ CRUSHED GRAVEL
10’ PAVED ASPHALT
R
NTE
2.2
2.7
US
RHO
E POW
D. ER
MATCHLINE
There are two (2) primary trail type transitions proposed along the preferred trail route, which extends approximately 20 miles. The Trail Type Profile identifies the transition location, along with associated length, for each trail type.
MATCHLINE
S
A WB ATA C ER UB ENT ER CL RIV
BA AW T A T C UB EXI ER CL RIV
1.25
N
STI
EXI
A GW
TER
L MIL
ER
RIV
ES ACC
OM
RC
B
AW
CAT
ER
IV AR
CE SOC
TON
X PLE
4.6
1.0 CATAWBA RIVER GREENWAY & DOWNTOWN CONNECTOR (3.0)
WN
TO WN
END
AN ORG
M
DO
*Final trail type will depend on specific environmental conditions and whether trail is located within NCDOT ROW or within a private trail easement.
APPROX. DISTANCE IN MILES CHAPTER 3: Trail Character and Design Guidelines
37
TRAIL SUPPORT FACILITIES OVERVIEW A unique architectural and branding theme is presented for trail support facilities presented on the following pages.
TRAILHEAD KIOSK
PICNIC SHELTER
TRAILHEAD MONUMENT
The kiosk will provide a trail map and other important information for trail users. This facility will be located at trailheads and pocket parks along the FFST.
The shelter design includes a timber frame structure. This architectural style, along with a cedar shingle roof, provides for a natural character conducive to the Lake James environment.
Large monuments will be located at major trailheads or pocket park facilities that provide access to the FFST. This monument should also provide for the name of the specific trailhead or pocket park.
38
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
VAULT TOILET
BREAKAWAY SIGN
MILEAGE POSTS
The vault toilet does not require a septic system, but must be pumped regularly. This facility will be provided for at the Fonta Flora County Park
The FFST shares a route with the Overmountain Victory National Historic Trail. The directional signage post will provide users with important trail information and is compliant with NCDOT standards.
Mileage posts not only provide distance information, but also serve as confidence markers that create a feeling of safety.
CHAPTER 3: Trail Character and Design Guidelines
39
SUPPORT FACILITIES TRAIL FEATURES & SITE FURNITURE Burke County is working in partnership with Oak Hill Iron and other local artisans to develop custom site furniture and other support facilities. These unique and custom elements will be provided for at Fonta Flora County Park, trailheads, pocket parks, and other locations where trail users can be served.
TRAILHEAD KIOSK
40
BICYCLE RACK
BENCHES
NCDOT BRIDGE DETAIL
TRAILHEAD MONUMENT
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
SOCIAL MEDIA: THE NEW WORD OF MOUTH Trail users should be encouraged to utilize social media to share their experiences with their “friends” and “followers.” Special signage along the trail will signal users to consider posting pictures of themselves or their group of friends as they walk or ride bikes along the trail. In addition, special props and features should be developed during the final design phase. After all, who can market this destination-quality trail better than trail users themselves? Lets take advantage of social media - the new word of mouth.
#FONTAFLORA The proposed official hashtag for the Fonta Flora State Trail is #fontaflora. The use of this hashtag will allow local tourism leaders to curate local photos and content that can be shared on website and re-posted through other social media platforms.
CROSS PROMOTE WITH OTHER NOTABLE HASHTAGS #trail2victory @NCParks #LakeJames #findyourpark
#FINDYOURPARK Find Your Park is the official centennial campaign of the National Park Service (NPS). The NPS is encouraging National Park enthusiasts to use the hashtag “findyourpark” when posting to social media. The OVNHT can help continue this campaign for years to come by encouraging the use of this hashtag at unique locations along the trail.
CHAPTER 3: Trail Character and Design Guidelines
41
4
R E C O MME N D AT I O N S THIS CHAPTER SERVES AS THE HEART OF THE TRAIL MASTER PLAN, PROVIDING SPECIFIC TRAIL ALIGNMENTS AND RECOMMENDATIONS.
Specific trail alignments and recommendations are provided for the FFST within four (4) planning sections. Trail
recommendations
are
supported
with
renderings that demonstrate trail character at
IN THIS CHAPTER: A| PLANNING SECTIONS OVERVIEW B| TRAIL SECTION RECOMMENDATIONS
specific locations.
43
IOR F
ORK
R S RIVE
WA RR
JOHN
PLANNING SECTIONS FONTA FLORA COUNTY PARK
LAKE JAMES LOOP
JOHNS RIVER GAMELANDS
126 181
WILSON CR EEK
4
EEK
E CR
CANO
LAKE JAMES STATE PARK TRAILS
1
3
2
CATAWBA RIVER GREENWAY
NCH DEE BRA
PEE
EEK
PADDY CR
The 20 mile study area from Lake James to Morganton is divided into four (4) planning sections. The geographic extent of each section includes a beginning and ending terminus that features a key asset or significant connectivity point for the trail. Many of the planning sections represent project areas that can be developed independently over time, providing a logical method for implementation as landowner willingness, funding, and other opportunities arise.
MAP 7: PLANNING SECTIONS
PLANNING SECTIONS
126
The planning sections include:
1
FREEDOM TRAIL
LAKE JAMES
GLEN ALPINE
FONTA FLORA BREWERY >> POWERHOUSE ROAD MUDDY
CREEK
FIELD NOTES
VER CREEK LE SIL LITT
TRAILS
BA
PREFERRED TRAIL ROUTE
Y
E IL
POWERHOUSE ROAD >> WATERMILL RIVER ACCESS
N
RK
CATAWBA RIVER GREENWAY >> DOWNTOWN MORGANTON
Y UNT E CO TY BURK OUN LL C OWE
WATERMILL RIVER ACCESS >> CATAWBA RIVER GREENWAY
FO
COMPLETED FFST
MCD
2 3 4
SILVER CREEK
70
REEDY
CREEK
OLD CATAWBA RIVER
CATAWBA RIVER
MORGANTON
FFST ON PROPOSED LOCAL TRAIL PROPOSED FFST ON EXISTING LOCAL TRAIL EXISTING LOCAL TRAIL PROPOSED LOCAL TRAIL
40
0
0.5
1
2 MI. ALTERNATE TRAIL ROUTE PUBLIC LANDS
THE 20 MILE STUDY AREA FROM LAKE JAMES TO MORGANTON IS DIVIDED INTO FOUR (4) PLANNING SECTIONS; THIS CHAPTER IS ORGANIZED ACCORDINGLY. 44
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
BRIDGE
POWERHOUSE RD.
1
E
I LL
ER
2
R
E ST CA
N LA
RN
BRIDGEWATER RIVER ACCESS
CK
LO
M
HE
SLEEP Y HOLL OW
NG DI
E
INT
L PO
RE LAU
LAKE JAMES FAMILY CAMPGROUND
RW
ORE
N LA
SH
S HOLIDAY
H
LAKE JAMES >> MORGANTON: BY THE NUMBERS E Y BU M GA
3
W
CO NL
ST
BENFIELD
EXISTING CANAL BRIDGE PUBLIC ACCESS AND TRAILHEAD
EXISTING CANOE PORTAGE TRAIL
LINVILLE DAM TRAILHEAD
RR E
1
CO TT
WH IP PO
2
E US O RH
AGE PARK
LAKE JAMES O LAK E F
CANAL BRIDGE
EACH PLANNING SECTION IS ANCHORED BY A MAP THAT HIGHLIGHTS PROPOSED TRAIL ROUTES AND FEATURES.
ARK
NP OW
126
ATE P
CK W O
EXISTING OVNHT
R O RF
LA FO K N E TA JA F M LO ES R LO A O P
S ST
OLLO
JAME
H
EXISTING HOLLY DISCOVERY TRAILHEAD
E AT W
RT
LAKE
D WAY
FUTURE TRAILHEAD AND VISITOR CENTER
DU
21.3 >> TRAIL MILES 20 >> SHARED OVNHT MILES FUTURE BENFIELDS PRIMITIVE POCKET PARK CAMPING 11 >> TRAILHEADS AT VISTA 3 7 >> ROAD CROSSINGS RAY’S DAIRY TRAILHEAD 5 >> MAJOR BRIDGES ABOUT THE PLANNING SECTION MAPS R E V I R A $2.3 M >> APPROX. COST These features include trailheads and crossings Each planning section is anchored by AC TAWBasBENF IELD
SL
LA K
NO RESPONSE Noted trail features include the physical infrastructure and facilities that support the proposed trail. These features are highlighted along the preferred N 1/2 MI. route and provide critical information for developing an estimate of probable cost for each section.
PUBLIC LAND
0
1/8
1/4
R ATE EW
K
R PA
MAJOR BRIDGE
IDG BR
ER
IEW EV
A RIV
B ATAW
OLD C
AND ING
a map that highlights proposed trail routes, trail features, and landowner sentiment. The proposed FIELD NOTES routes are identified as either preferred, alternate, TRAIL FEATURES LANDOWNER SENTIMENT or spur. These trail alignments are the result of extensive analysis, including environmental feasibility, TRAILHEAD YES landowner willingness, and insights provided by loNO # ROAD CROSSING cal government and local trail development leaders. POSITIVE #
E
US
HO
ER
W PO
sociated with either a road or water feature. Trailheads will provide for parking and trail user orientation. Road crossings indicate the need to provide for traffic calming measures and appropriate signage for both trail users and motorists. Major bridges indicate a significant stream or river crossing that requires a bridge greater than 20 feet in length.
QUICK FACTS Each planning section begins with a “quick facts” exhibit. This information includes the trail distance, trail type (see Chapter 3: Design Guidelines), and key features and assets associated with each section.
CHAPTER 4: Recommendations
45
SECTION 1
FONTA FLORA BREWERY >> POWERHOUSE ROAD PROPOSED TRAILS
VICINITY MAP WA
JOHN
IOR F
ORK
S RIVER
PLANNING SECTIONS FONTA FLORA COUNTY PARK
LAKE JAMES LOOP
JOHNS RIVER GAMELANDS
126 181
CANOE
LAKE JAMES STATE PARK TRAILS
WILSON CR EEK
K
CREE NCH DEE BRA
PEE
EK
PADDY CRE
CATAWBA RIVER GREENWAY
1
126 FREEDOM TRAIL
LAKE JAMES
MORGANTON
GLEN ALPINE SILVER CREEK
CREEK
MUDDY
70
REEDY
CREEK
FIELD NOTES
VER CREEK LE SIL
TRAILS
PREFERRED TRAIL ROUTE
EY
IL
LI
BA
OLD CATAWBA RIVER
CATAWBA RIVER
N
RK
FO
UNTY E CO TY BURK COUN WELL MCDO
COMPLETED FFST FFST ON PROPOSED LOCAL TRAIL PROPOSED FFST ON EXISTING LOCAL TRAIL EXISTING LOCAL TRAIL
40
0
0.5
1
2 MI.
PROPOSED LOCAL TRAIL ALTERNATE TRAIL ROUTE PUBLIC LANDS
FONTA FLORA BREWERY >> POWERHOUSE ROAD
TOTAL LENGTH: TRAIL TYPE:
7.0 MILES NCDOT SIDE PATH DUAL-USE TRAIL
ESTIMATED COST: $515,476 POINTS OF INTEREST: FONTA FLORA BREWERY
CANAL BRIDGE TRAILHEAD RAYS DAIRY TRAILHEAD BRIDGEWATER RIVER ACCESS LAKE JAMES FAMILY CAMPGROUND
46
This planning section extends 7.0 miles from the Fonta Flora Brewery at Whippoorwill Farm to Powerhouse Road. The Fonta Flora Farmhouse Brewery property provides a significant opportunity for a destination-quality trailhead. A short, paved spur trail, approximately 400 ft. long, will connect the brewery and trailhead to an existing segment of the OVNHT within Lake James State Park. This connection will require cooperation with a private landowner to cross an existing gravel driveway.
1
The OVNHT is not currently designed for dual-use and must be reconstructed and routed to provide for bicycles. This will require close cooperation with the NC Division of State Parks. Similarly, the OVNHT crossing at Hwy. 126 will require redesign to allow bicycles to achieve road grade and cross where sight lines are best. This can be achieved by utilizing an existing abandoned road bed with two to three moderate switchbacks. Currently, the OVNHT utilizes a set of stairs to achieve grade before continuing west through the 1780 Community. The trail will utilize the OVNHT for two miles before reaching Canal Bridge. The transition from the OVNHT to road grade at Canal Bridge presents a challenge and will likely require a boardwalk or bridge system. At Canal Bridge, the FFST utiliz-
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
es NCDOT right-of-way until it reaches additional state-owned land south of Benfields Landing Road; approximately 1,050 feet of NCDOT Side Path trail type will be required along Canal Bridge and Hwy. 126 before reaching additional state property. The FFST will meander through the state’s property for approximately 1.2 miles before reaching private property. The trail will extend along the south side of Hemlock Springs Rd. where county officials continue to work with landowners to secure trail easements. The trail then connects to Lake James Family Campground. From there, the trail will parallel the north side of Benfields Landing Road before reaching a scenic vista and beach at the future site of a pocket park.
2
From the pocket park, the natural surface trail continues east for a short distance before crossing N. Powerhouse Road to connect to the proposed trailhead on Rays Dairy Road. From there, The trail continues east to another vista that provides an opportunity for primitive camping.
PHOTOS:
(1) THE TRAIL CONNECTOR TO FONTA FLORA BREWERY WILL CROSS A PRIVATE DRIVEWAY. (2) EXISTING OVNHT WILL REQUIRE REDESIGN FOR BICYCLES.
FONTA FLORA STATE TRAIL
FUTURE COVE BRIDGE
S ST
ATE P
E
BENF IELD
HOLLO W SLEEPY
I LL
ER
2
RN
CK
LO
M
HE
BRIDGEWATER RIVER ACCESS
T AS NC
LA
DU
NG DI
POIN
ER
RW
ORE SH
N LA
REL
H
EY BUM GA
S
LAKE JAMES FAMILY CAMPGROUND
TE
LAU
E
US
HO
SL
B ATAW OLD C
126
3
HOLIDAY
W CO NL
ST BENFIELD
EXISTING CANAL BRIDGE PUBLIC ACCESS AND TRAILHEAD
EXISTING CANOE PORTAGE TRAIL
LINVILLE DAM TRAILHEAD
RR E
1
CO TT
WH IP PO
2
E US O RH
AGE PARK
O LAK E F
CANAL BRIDGE
LAKE JAMES
NP OW
126
CK W O
EXISTING OVNHT
ARK
OLLO
1
R O RF
LA FO K N E TA JA F M LO ES R LO A O P
JAME
H
EXISTING HOLLY DISCOVERY TRAILHEAD
E AT W
RT
LAKE
FONTA FLORA BREWERY AT HISTORIC WHIPPOORWILL DAIRY
D WAY
FUTURE TRAILHEAD AND VISITOR CENTER
MAP 8: PLANNING SECTION 1
SECTION 1
FONTA FLORA BREWERY >> POWERHOUSE RD.
AND ING
ER
FUTURE BENFIELDS POCKET PARK
W PO
PRIMITIVE CAMPING AT VISTA
3
RAY’S DAIRY TRAILHEAD
R ATE EW
RK PA
IDG
BR
IEW EV
ER A RIV
LA K
VER
RI AC TAWBA
FIELD NOTES TRAILS
TRAIL FEATURES
LANDOWNER SENTIMENT
PREFERRED TRAIL ROUTE TRAILHEAD
YES
#
ROAD CROSSING
NO
#
MAJOR BRIDGE
COMPLETED FFST FFST ON PROPOSED LOCAL TRAIL PROPOSED FFST ON EXISTING LOCAL TRAIL
POSITIVE NO RESPONSE
PUBLIC LAND
EXISTING LOCAL TRAIL PROPOSED LOCAL TRAIL ALTERNATE TRAIL ROUTE
0
1/8
1/4
1/2 MI.
N
CHAPTER 4: Recommendations
47
SECTION 1
FONTA FLORA BREWERY >> POWERHOUSE ROAD
The trail will utilize the existing Muddy Creek Bridge before connecting to the existing Bridgewater River Access, which is maintained by Duke Power and is programmed for further infrastructure improvements. At Bridgewater, the FFST: Lake James Loop branches east on the canoe portage trail to the Linville Dam Trailhead while the OVNHT and FFST continue east toward Morganton. This planning section ends where the trail leaves Powerhouse Road and connects to established trail easements that follow the Catawba River.
TRAIL FEATURES Trailheads This planning section includes five trailheads. The proposed trailhead located at Fonta Flora Brewery at Whippoorwill Farm serves as the western
terminus of the study area. The brewery occupies eight acres of the historic dairy farm property. The remaining 40 acres have been conserved in perpetuity through a partnership between Foothills Land Conservancy and the NC Division of State Parks who incorporated the property into Lake James State Park. The Holly Discovery Trailhead currently provides access to the Holly Discovery Trail and OVNHT within the State Park. Canal Bridge and Bridgewater Trailheads utilize existing public water access facilities owned by Duke Energy. Duke has plans to significantly enhance the Bridgewater site, providing for additional parking and an enhanced boat launch area. The fifth trailhead in this section is proposed on Rays Dairy Road.
Crossings Proposed within this section are three (3) road crossings and three (3) major bridges.
3 PHOTO:
(3) THE TRANSITION FROM EXISTING OVNHT TO ROAD GRADE AT CANAL BRIDGE MAY REQUIRE ADDITIONAL BRIDGES. (4) BRIDGEWATER RIVER ACCESS IS A SIGNIFICANT CONNECTION POINT.
48
bridges. Major Bridge #1 crosses Paddy Creek to connect the Holly Discovery Trail to the OVNHT in Lake James State Park. Major Bridges #2 and #3, utilize NCDOT bridges at Canal Bridge and the Powerhouse Road bridge located near the Bridgewater public river access. Both vehicular bridges will require appropriate treatments that alert motorists to possible trail users and distinguish the trail from the vehicular travel lane.
The primary route crosses Benfields Landing Road twice in this section. The first crossing occurs south of Canal Bridge where Benfields Landing intersects Hwy. 126. At the second crossing, the trail crosses to the north side of Benfields Landing Road at Lake James Family Campground. Crossing #3, is located a short distance east of the pocket park where the trail crosses N. Powerhouse Road near its intersection with Benfields Landing Road. These crossings should include design measures to slow vehicular traffic and notify motorists of the trail crossing. The three major bridge crossings utilize existing
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
4
EXHIBIT 1: BREWING UP ADVENTURE The Fonta Flora Brewery at Whippoorwill Farm provides an opportunity for a destination-quality trailhead. A short connector path will link the brewery to the FFST/OVNHT in Lake James State Park near Paddy’s Creek.
EXISTING
CHAPTER 4: Recommendations
49
50
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
EXHIBIT 2: CANAL BRIDGE Enhancements to the Canal Bridge could include green pavement markings along with the FFST land OVNHT logos. A short railing should be attached to the bridge’s wall to ensure trail user safety.
EXISTING
CHAPTER 4: Recommendations
51
EXHIBIT 3: CANAL BRIDGE TRAILHEAD Canal Bridge Trailhead is located just south of the bridge at the intersection of Highway 126 and Benfields Landing Road. A crossing at Highway 126 will provide connectivity to a trailhead with FFST and OVNHT information and a shelter.
EXISTING
52
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
CHAPTER 4: Recommendations
53
EXHIBIT 4: LAKE JAMES FAMILY CAMPGROUND The preferred alignment extends parallel to Benfields Landing Road and provides a direct connection to the Lake James Family Campground. This trail section will be notable to passing motorist and will create interest for those visiting the campground and Lake James area.
EXISTING
54
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
EXHIBIT 5: N. POWERHOUSE CROSSING East from Benfields Pocket Park the FFST will cross North Powerhouse Road. A traffic-calming study is suggested for this intersection. Potential improvements include green pavement treatment, FFST sign, and pedestrian-activated rapid flash beacons will signal motorists to reduce speeds and watch for trail users.
EXISTING
CHAPTER 4: Recommendations
55
EXHIBIT 6: BRIDGEWATER The bridge near Duke Energy’s Bridgewater River Access will serve as the third and final major NCDOT bridge crossing. A short railing should be attached to the bridge’s wall to ensure trail user safety. This section is also part of the OVNHT.
EXISTING
56
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
CHAPTER 4: Recommendations
57
SECTION 2
POWERHOUSE ROAD >> WATERMILL RIVER ACCESS
VICINITY MAP WA
ORK
LAKE JAMES LOOP
JOHNS RIVER GAMELANDS
126
CANOE
181
WILSON CR EE K
K
CREE
PADDY CRE
CATAWBA RIVER GREENWAY
NCH DEE BRA
PEE
EK
2
126 FREEDOM TRAIL
LAKE JAMES
MORGANTON
GLEN ALPINE SILVER CREEK
CREEK
MUDDY
70
REEDY
CREEK
FIELD NOTES
VER CREEK LE SIL
TRAILS
PREFERRED TRAIL ROUTE
EY
IL
LI
BA
OLD CATAWBA RIVER
CATAWBA RIVER
N
RK
FO
UNTY E CO TY BURK COUN WELL MCDO
COMPLETED FFST FFST ON PROPOSED LOCAL TRAIL PROPOSED FFST ON EXISTING LOCAL TRAIL EXISTING LOCAL TRAIL
40
0
0.5
1
2 MI.
PROPOSED LOCAL TRAIL ALTERNATE TRAIL ROUTE PUBLIC LANDS
POWERHOUSE ROAD >> WATERMILL RIVER ACCESS
TOTAL LENGTH: TRAIL TYPE:
The preferred route continues along the north side of the Catawba River after crossing Powerhouse Road near the North Bend Access: a planned NC Wildlife Resources River Access. From North Bend, the trail continues along the river utilizing Duke Energy property. The trail crosses St. Paul’s Church Road and will need to bridge the Catawba River to connect to secured trail easements within an equestrian community on the river’s south side. From there, the trail will continue along the south side and connect to the existing Watermill River Access. Trail type within the Catawba River Club should expand to a multi-use tread that can accom-
The first major road crossing exists at Powerhouse Road where an initial visual inspection revealed that the trail will likely require a surface crossing of the road rather than an underpass. However, during the design and engineering phase or with the development of the river access planned in this vicinity, an opportunity for a trail underpass should be further explored. The second crossing is at Saint Paul’s Church Road, a rural collector road that the trail will need to cross to reach the Catawba River. The final road crossing in this section is located at Watermill Bridge, which provides sufficient room to accommodate a trail underpass.
modate existing equestrian use.
The only necessary major bridge (#4) is centrally located within the planning section. This bridge will allow the trail to avoid landowners located on the north side of the Catawba River that are unwilling to provide trail easements, while accessing existing trail easements located on the south side of the river within the Catawba River Club residential subdivision.
TRAIL FEATURES
DUAL-USE TRAIL
Trailheads
MULTI-USE TRAIL
Two trailheads are proposed within this planning section. The first is proposed along the Catawba River at Powerhouse Road where NC Wildlife Resources will ultimately construct a river access area. This access should provide for an FFST and OVNHT informational map kiosk to welcome users. The second trailhead is proposed at the existing Watermill River Access. The trail will need to extend under the Watermill Bridge to connect with this access area, which could benefit from minor enhancements to organize parking and orient users to area recreation opportunities.
BEND RIVER ACCESS
WATERMILL RIVER ACCESS
58
There are three (3) road crossings and one (1) major bridge within this planning section.
5.7 MILES
ESTIMATED COST: $1,047,396.00 POINTS OF INTEREST: FUTURE NORTH
This planning section extends 5.7 miles from Powerhouse Road to Watermill River Access. S RIVER
IOR F
FONTA FLORA COUNTY PARK
LAKE JAMES STATE PARK TRAILS
Crossings
JOHN
PLANNING SECTIONS
PROPOSED TRAILS
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
N PS O M A
R
Y KS E
LE CO N
ALP INE
EN
COBB HOLLOW
ILL
GL
R VE RI
W AT ER M
CH
CH
LE
Y
BU
MB
AR
NE
BLU FF
RI VE R
U L’S
UR
BEND
UB CL
T
.P A
FO R
Y
H
ER
S
Y
4 V RI
5
PSE
L AU TP DS
OL
GIM MC
TABLE ROCK MIDDLE SCHOOL
KIR
NE
Y
126
PADDOCK
MAP 9: PLANNING SECTION 2
EFUL
PEAC
WATERMILL
KTH ORN TAV ERN
POWERHOUSE RD. >> WATERMILL RIVER ACCESS
BUC
SECTION 2
CAN N
H
RT DU CKW O
RD
ORDERS
PO
LLA
MCGALLIARD
E
T HI
RR
L
ISO
N
HEL TON LAI L
LA
JAM
BAL
W
POWE
RHOUSE
N
LE
ER
N LAIL
S LAIL
TU RK
AYE R
R
TE AS NC
WATERMILL RIVER ACCESS
ON
S
W HI PO
RW IL L
H O LLOW
CO N
6
EY
IL TA
S
G
V RI
LINDA WAY
RIVER BREEZE
GLEN ALPINE
FUTURE NORTH BEND ACCESS AREA FIELD NOTES
4
MAL ONE
Y
TRAILS
TRAIL FEATURES
LANDOWNER SENTIMENT
PREFERRED TRAIL ROUTE TRAILHEAD
YES
FFST ON PROPOSED LOCAL TRAIL
#
ROAD CROSSING
NO
PROPOSED FFST ON
#
MAJOR BRIDGE
COMPLETED FFST
POSITIVE
EXISTING LOCAL TRAIL
NO RESPONSE PUBLIC LAND
EXISTING LOCAL TRAIL PROPOSED LOCAL TRAIL ALTERNATE TRAIL ROUTE
0
1/8
1/4
1/2 MI.
N
CHAPTER 4: Recommendations
59
EXHIBIT 7: OFF THE ROAD AGAIN @ POWERHOUSE After paralleling Powerhouse Road for approximately one mile, the preferred route laves the roadside, extends south to the Catawba River, and takes advantage of trail easements provided by Duke Power.
EXISTING
60
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
EXHIBIT 8: WATERMILL RIVER ACCESS ENHANCEMENTS The existing Watermill River Access serves as an ideal location to organize and orient trail users. Future enhancements at this pocket park could include paved parking, a picnic shelter, and an information kiosk.
EXISTING
CHAPTER CHAPTER 4: 4 Recommendations Recommendations
61
SECTION 3
WATERMILL RIVER ACCESS >> CATAWBA RIVER GREENWAY PROPOSED TRAILS
VICINITY MAP WA
JOHN
IOR F
ORK
S RIVER
PLANNING SECTIONS FONTA FLORA COUNTY PARK
LAKE JAMES LOOP
JOHNS RIVER GAMELANDS
126 181
CANOE
LAKE JAMES STATE PARK TRAILS
WILSON CR EE K
K
CREE NCH DEE BRA
PEE
EK
PADDY CRE
3
CATAWBA RIVER GREENWAY
126 FREEDOM TRAIL
LAKE JAMES
MORGANTON
GLEN ALPINE SILVER CREEK
CREEK
MUDDY
70
REEDY
CREEK
FIELD NOTES
VER CREEK LE SIL
TRAILS
PREFERRED TRAIL ROUTE
EY
IL
LI
BA
OLD CATAWBA RIVER
CATAWBA RIVER
N
RK
FO
UNTY E CO TY BURK COUN WELL MCDO
COMPLETED FFST FFST ON PROPOSED LOCAL TRAIL PROPOSED FFST ON EXISTING LOCAL TRAIL EXISTING LOCAL TRAIL
40
0
0.5
1
2 MI.
PROPOSED LOCAL TRAIL ALTERNATE TRAIL ROUTE PUBLIC LANDS
WATERMILL RIVER ACCESS >> CATAWBA RIVER GREENWAY
TOTAL LENGTH: 4.6 MILES TRAIL TYPE: DUAL-USE TRAIL ESTIMATED COST: $145,728 POINTS OF INTEREST: WATERMILL RIVER ACCESS
This planning section extends 4.6 miles from Watermill River Access to the Catawba River Greenway and Soccer Complex. This section is recognized as the most challenging area within the study area in regards to feasibility for implementation and will require additional landowner outreach. There are significant landowner challenges on both the north and south side of the Catawba River. Therefore, a preferred route is not provided; only alternative routes are identified in order to avoid alienation of area landowners. Ideally, the trail would continue along the south side of the river from the Watermill River Access, crossing under Independence Boulevard, to the Catawba River Greenway and Soccer Complex, also located on the south side. However, development density and noted uninterested landowners represent significant challenges on the south side of the river. Along the north side of the river, the historic Swan Pond property would serve as a meaningful con-
TRAIL FEATURES Trailheads The trailheads proposed within this planning section currently exist at the Catawba River Soccer Complex and Freedom Park, which provides access to a certified section of OVNHT. Enhancements at these trailheads might involve incorporating trail signage and other trail features noted in Chapter 3.
6
CATAWBA RIVER SOCCER COMPLEX
nection as part of the NC Preservation Program. The Canoe Creek corridor also serves as an environmentally suitable location for a trail, but again, landowner challenges present a barrier.
FREEDOM PARK
PHOTOS:
5 62
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
(5) AN INFORMAL TRAIL EXISTS ALONG THE CATAWBA RIVER .AT THE RIVERSIDE GOLF AND RV PARK. (6) A FOOTPATH LINKS THE CATAWBA RIVER GREENWAY TO JUDGE’S RIVERSIDE RESTAURANT.
MAP 10: PLANNING SECTION 3
BOST
MULL
BRANSTROM
WILBURM NEWTON
NE BROO KSTO
B EAC M NT H O
CAMEL LIA G
WHISPERING PIN
ARDEN
JIM WALL
ND
EMORY WOOD
LA FORET
EEK
PO SW AN
EN
E
STEPHENS
ALPINE GL MI LL
RE
ALL MW
SA
W AM
NC EN
DE
EY GH AU NN
TT A
MI
LL
FREEDOM HIGH SCHOOL
IND
EP
SU
FREEDOM PARK
E
O CC M
6
TREE FARM
WATERMILL RIVER ACCESS
CATAWBA RIVER
JURISDICTION
TS
IN HE CALV
GLENDALE
NORMANDY
ELM
WHITLEY
YARD L U M B ER
RD
OL D
CATAWBA RIVER GREENWAY
ARK AIR P
T AR S
LE
SPRINGDA
Y
N CIT
O CARB
POPL
MORGANTON WTP S IGHT
E FO
RIVER
5
ENLE
ER V
RI
CITY OF MORGANTON
GRE
LD O
CATAW BA
RIVER BREEZE
NG
AY NW EE GR ER RIV
W AT ER
HARBINSON
TRUAX
AY CL
126
E CR
EN
LANE
126 181
WB A TA CA
DR
126
CANO
MCDOWELL HOUSE/ QUAKER MEADOWS
CH
TABLE ROCK MIDDLE SCHOOL
R HU ST MAR YS C
SECTION 3
WATERMILL RIVER ACCESS >> CATAWBA RIVER GREENWAY
FIELD NOTES TRAILS
TRAIL FEATURES
LANDOWNER SENTIMENT
PIT
PREFERRED TRAIL ROUTE
70
VD L BL
STRIA
INDU
TRAILHEAD
YES
#
ROAD CROSSING
NO
#
MAJOR BRIDGE
COMPLETED FFST FFST ON PROPOSED LOCAL TRAIL PROPOSED FFST ON EXISTING LOCAL TRAIL
POSITIVE NO RESPONSE
PUBLIC LAND
EXISTING LOCAL TRAIL PROPOSED LOCAL TRAIL ALTERNATE TRAIL ROUTE
0
1/8
1/4
1/2 MI.
N
CHAPTER 4: Recommendations
63
SECTION 4
CATAWBA RIVER GREENWAY >> DOWNTOWN MORGANTON PROPOSED TRAILS
VICINITY MAP WA
JOHN
IOR F
ORK
S RIVER
PLANNING SECTIONS
This planning section extends 4.0 miles from the Catawba River Greenway and Soccer Complex to Downtown Morganton.
FONTA FLORA COUNTY PARK
LAKE JAMES LOOP
JOHNS RIVER GAMELANDS
126 181
CANOE
LAKE JAMES STATE PARK TRAILS
WILSON CR EE K
4
K
CREE
PADDY CRE
CATAWBA RIVER GREENWAY
PEE
EK
NCH DEE BRA
126 FREEDOM TRAIL
LAKE JAMES
MORGANTON
GLEN ALPINE SILVER CREEK
CREEK
MUDDY
70
REEDY
CREEK
FIELD NOTES
VER CREEK LE SIL
TRAILS
PREFERRED TRAIL ROUTE
EY
IL
LI
BA
OLD CATAWBA RIVER
CATAWBA RIVER
N
RK
FO
UNTY E CO TY BURK COUN WELL MCDO
COMPLETED FFST FFST ON PROPOSED LOCAL TRAIL PROPOSED FFST ON EXISTING LOCAL TRAIL EXISTING LOCAL TRAIL
40
0
0.5
1
2 MI.
PROPOSED LOCAL TRAIL ALTERNATE TRAIL ROUTE PUBLIC LANDS
CATAWBA RIVER GREENWAY >> DOWNTOWN MORGANTON
TOTAL LENGTH: 4.0 MILES TRAIL TYPE: TYPICAL GREENWAY ESTIMATED COST: $623,260 POINTS OF INTEREST: CATAWBA RIVER SOCCER COMPLEX
CATAWBA MEADOWS PARK
DOWNTOWN MORGANTON
FONTA FLORA BREWERY
The FFST will utilize the Catawba River Greenway north for 1.5 miles. The greenway is a certified segment of the OVNHT. At the southern end of Catawba Meadows Park, the FFST and OVNHT will split. The OVNHT continues north along the river while the FFST extends east on a future greenway connector planned by the City of Morganton. The City has acquired the necessary parcels for the connector. Once complete, it will link the Catawba River Greenway to an existing greenway segment adjacent to North Green Street. The FFST terminates as the greenway transitions into a typical sidewalk in front of the Fonta Flora Brewery in downtown Morganton.
The only major bridge in this section is an existing greenway bridge over Silver Creek.
7
TRAIL FEATURES Trailheads Two existing trailheads are noted within this planning section. The River Village commercial center provides centrally-located greenway access. Trail users accessing the greenway from Catawba Meadows Park will travel south to the FFST.
Crossings This planning section features one (1) major road crossing and one (1) major bridge. A surface crossing will be necessary at Sanford Drive just south of Bouchelle Street. There, Mor-
64
ganton’s future greenway connector will cross from Catawba Meadows Park to the new Mountain View Elementary School and Morganton recreation and aquatic center. The Sanford Drive crossing will require treatment appropriate to signal motorists of trail users.
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
8 PHOTOS:
(7) THE CATAWBA RIVER GREENWAY IS A CERTIFIED SEGMENT OF THE OVNHT. (8) DOWNTOWN MORGANTON IS THE EASTERN TERMINUS OF THE FFST.
Y IT T
N TO
N
A
LT ER
G R O M
PL A N
F O R
R RRIO WA
IC D IS R
JU N O TI
IL
OA KS
N
ROCKY FORD ACCESS
N DE AR D RIVERSI
IL
LS
ID
5
KY
RO C YORK
UN
CO
CO
KI
EG
E
IN CALV
GLENDALE
NORMANDY
RD E FO
WHITLEY
CO E ES LD C H VA U RC W H H IT E
TRAIL FEATURES
TRAILHEAD
#
ROAD CROSSING
#
EN
MAJOR BRIDGE PUBLIC LAND
LANDOWNER SENTIMENT
YES
ST P A
RK
NO
ENLE
GRE
R ST
A POPL
LE SPRINGDA
ARK AIR P
G
EXISTING LOCAL TRAIL
D
G
RE
N
LL
WE S MORGANTON IGHT HE WTP
CO
G
S
N
W
ALTERNATE TRAIL ROUTE
N
TI N
EN
RD
ON
I
W
E
PROPOSED LOCAL TRAIL
R
S
Q
CO
D
IS DAV
DE
H
CATAWBA RIVER GREENWAY AND SOCCER COMPLEX
ROCK YFOR
SHERWOOD GLENW O O D
T
ET
CO LL
W OO
EXISTING LOCAL TRAIL
PROPOSED FFST ON
N KIN G RIVER VILLAGE E N T ERR AC COMMERCIAL WO N A NDE OD PE CENTER RS FFST EASTERN AR ON SO KI TERMINUS N N
WBA R IVER
FREEDOM HIGH SCHOOL
COMPLETED FFST
BRISTOL
EE
FREEDOM PARK
FFST ON PROPOSED LOCAL TRAIL
PARK
126 64
MORGANTON
RINK
LL
CATA
E DE NC EN EP
MI
POWE
EVANS
E BI N
IND
WALKER MOREHEAD
SU
TT A
PINE
UE
BRANSTROM
BOST
MULL
WILBURM NEWTON
JIM WALL
BROO KSTO
NE
HARBINSON
TRUAX BE
AC H MONT
LIA GARD EN CAMEL
ERVIN
PROPOSED GREENWAY
126 181
RK
W
S EN PH WHISPERING PIN E EMORY WOOD
FOX
PREFERRED TRAIL ROUTE
MIT
ST E
AL
ILLE LINV
AY
D
AN EX
O W S
RD FO OAK
SUM
CL
D
ER
VIEW
KIMBERLY
7
W AM
ALL MW
SA
EA
KIRK
M
TRAILS
E
EN
EE AST DOC
CAN OE CREE K
V LO
KINC AID
MCDOWELL CH HOUSE/ AR LE S QUAKER MEADOWS
TA TE
D
FIELD GWOO DONOTES
AB
BA W TA CA
D
FOR
CATAWBA RIVER GREENWAY & EXISTING OVNHT
LAUR EL HILL WILSON
S
CATAWBA MEADOWS PARK
CLA
RI S
EL
D
A
WOODSWAY
FAIT H
INE
MA
EK
H
RC
INE
O WO
HU
RL
R HA
GE
BE
ED
TIM
126 181
C YS AR
M ST
CAMELOT
PA VI RK VER EW LO RI ST LA N CO D RN ER BELVEDERE S
LAT IME R CLE AR WA TER W IND IN EK G CR E
SHERWOOD
KE GL A
SPRI N
FW
LY
OW L
RE
AL TE
V POL
W
CREEK
D
GC
SO N
O
AD
N NTI
W IL
TAYLOR
SH
EW O
HU
R
PROPOSED OVNHT
PL
NORTH
A
M
D
NC
M
A RIVER B W A CAT
FORK
NE
ER
CO U
VALLEY VIEW
WALTER JOHNSON MIDDLE
VI
FL
N
TE WA
FI
E
UF
BU
D RE
SH
JOHNS RIVER GAMELANDS
126 64
MAP 11: PLANNING SECTION 4
CATAWBA RIVER GREENWAY >> DOWNTOWN MORGANTON
C
SECTION 4
POSITIVE 0
1/4
1/2
1 MI.
NO RESPONSE
N
CHAPTER 4: Recommendations
65
66
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
EXHIBIT 9:
GET DOWN WITH THE TRAIL TOWN
Downtown Morganton is the eastern terminus of the Fonta Flora State Trail. The trail utilizes an existing greenway segment that enters the northwest end of downtown where N. Green Street and N. Sterling Street diverge. In the near future, the City of Morganton will update this section of greenway in conjunction with new development. Cyclists must cross to merge with the flow of traffic.
EXISTING
CHAPTER 4: Recommendations
67
5
I MP L E ME N TAT I O N THE CORE PURPOSE OF THIS CHAPTER IS TO HIGHLIGHT THE FOUR (4) IMPLEMENTATION SECTIONS, INCLUDING THE MAJOR STEPS NECESSARY FOR COMPLETING THE TRAIL. THIS CHAPTER POSITIONS FFST AND OVNHT STAKEHOLDERS FOR ACTION.
Burke County will initially serve as the lead agency to manage the development of the FFST, but will work in partnership with NC Division of State Parks, the National Park Service and OVNHT leaders, the City of Morganton, community stakeholders,
IN THIS CHAPTER: A| IMPLEMENTATION BY SECTION AND RESPONSIBILITIES
pertains to planning, construction, management,
B| PRIORITY IMPLEMENTATION AREAS AND RESPONSIBILITIES
and maintenance of the trail.
C| TRAIL RUBICON
volunteers, land managers, and landowners as it
D| TRAIL SUPPORT SPECTRUM E| TRAIL MANAGEMENT
69
TRAIL IMPLEMENTATION The table below provides key implementation information associated with each planning section. Key Challenges include a summary of the most difficult barriers for realizing each trail section. Many of these barriers include costly features or note the need to acquire trail easements from private landowners. Most importantly, this table assigns an Implementing Agency to each planning section.
IMPLEMENTATION DETAILS BY SECTION AND RESPONSIBILITY SECTION
DISTANCE
KEY CHALLENGES
ESTIMATED BUDGET
IMPLEMENTING AGENCY
SECTION 1 Fonta Flora Brewery to Powerhouse Rd.
7.0
Canal Bridge Crossing; NCDOT Side Paths along Benfields Landing Rd. and Powerhouse Rd; Benfields Landing Crossing; Muddy Creek Bridge Crossing; Securing Landowner Trail Easements
$515,476.00
Burke County
SECTION 2 Powerhouse Rd. to Watermill River Access
5.7
Securing Landowner Trail Easements; Catawba River Bridge; Watermill Glen Alpine Rd. Underpass
$1,047,396.00
Burke County
4.6
Securing Landowner Trail Easements
$145,728.00
Burke County, City of Morganton
4.0
Sanford Drive Crossing
$623,623.00
City of Morganton
SECTION 3 Watermill River Access to Catawba River Greenway SECTION 4 Catawba River Greenway to Downtown Morganton
ALL SECTIONS TOTAL
21.3
$2,331,860.00
* Estimated budget shown above pertains only to the completion of the preferred FFST route and does not include existing, constructed trail segments.
70
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
PRIORITY IMPLEMENTATION AREAS & RESPONSIBILITIES Burke County and Morganton must work in tandem to successfully realize the FFST. Trail implementation does not have to occur in a specific, linear order according to each planning section. In fact, the priority areas for implementation are merely suggestions and are in no way intended to hem creativity or necessary work in “lower” priority areas. Trail implementation is an art and requires the acumen to recognize and then seize opportunities, whether related to funding, landowner willingness, or politics. The table below supports a trail development strategy that prioritizes areas west of Watermill River Access (sections 1 and 2). If these were to be fully developed, this would likely provide the formula for “Trail Rubicon,” the point in which the public, elected officials, and partnership funding agencies recognize that connectivity and complete implementation is imminent. At this point significant momentum and synergy would propel forward the completion of the FFST and OVNHT from Lake James to Morganton.
TRAIL RUBICON: FINDING THE POINT OF NO RETURN Think snowball effect. Development of these trail sections will result in widespread support and a collective energy, beyond that of the community’s traditional trail support base. These sections represent the Trail Rubicon: the point at which completion of the FFST from Lake James to Morganton becomes imminent.
1. FONTA FLORA BREWERY TO POWERHOUSE ROAD 2. POWERHOUSE ROAD TO WATERMILL RIVER ACCESS
TRAIL RUBICON
PRIORITY IMPLEMENTATION AREAS AND RESPONSIBILITIES IMPLEMENTING AGENCY
PRIORITY ONE
PRIORITY TWO
Burke County
Section 1: Fonta Flora Brewery to Powerhouse Road
Section 2: Powerhouse Road to Watermill River Access
City of Morganton
Section 4: Greenway connector to Downtown
Section 4: Enhancements to Eastern Terminus
CHAPTER 5: IMPLEMENTATION
71
TRAIL IMPLEMENTATION Creating a destination-quality trail system requires a significant commitment from local governments, including staff time, the holding of land and trail easements, and the dedication of local funding. Local governments must evaluate the FFST in relationship to other priorities. However, a trail of this magnitude should be recognized as an economic development initiative that will provide a return on investment. Furthermore, each jurisdiction must not merely spend local funds, but instead must leverage their funds to obtain support from partnership funding agencies sympathetic to the creation of trails and the FFST. The “Trail Support Spectrum� illustrates the steps local governments can take to support trail development.
72
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
TRAIL SUPPORT SPECTRUM
5 4 3 2 1
CHAPTER 5: IMPLEMENTATION
73
TRAIL MANAGEMENT MAINTENANCE Trail maintenance is critical to provide for and sustain the trail users’ experience. Trail maintenance will primarily consist of ensuring that the trail corridor is trimmed of brush and vegetation and that the natural surface trail is de-bermed and clear of fallen debris. Volunteer training and participation is an important aspect of user group involvement. Burke County will explore trail building volunteer training with members of the Professional Trail Builders Association. Federal Recreational Trails Program (RTP) funding is often available for educational courses and may require matching funds. Burke County or a non-profit “Friends” group could sponsor these courses and provide the matching funds for interested volunteers. By training volunteers in this manner, it demonstrates a significant commitment by the participant and “Friends” group at great benefit to the landowners, land managers, and Burke County. An adequate level of law enforcement should be provided to help maintain a safe and secure trail environment. Trail users should also be educated and encouraged to understand and obey trail rules, respect other users, and respect adjoining properties.
TRAIL RULES WILL BE POSTED AT EACH TRAILHEAD.
74
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
TRAIL FUNDING
LEVERAGING FUNDS RELATED TO OTHER COMMUNITY GOALS
FERC RELICENSING
Burke County and its municipalities should also seek a combination of funding sources that include local, state, federal, and private money. Fortunately, the benefits of protected greenways are many and varied. This allows programs in Burke County to access money earmarked for a variety of purposes including water quality, hazard mitigation, recreation, alternate transportation, wildlife protection, community health, and economic development.
Constructing and maintaining the various sections of the FFST will require leveraging funds from both public and private entities. At this time, the largest funding contribution comes directly from Duke Energy, as a result of the Comprehensive Relicensing Agreements (CRA) for the Catawba-Wateree Project. Trail development funds are included in CRA 10.27.2.3 in the amount of $500,000 for construction of the FFST. Another $600,000 is included in CRA 10.27.4.3 for the OVNHT.
EVERYONE WORKING TOGETHER In addition to the contributions from Duke Energy, it will be necessary for Lake James State Park, NC Wildlife Resources Commission, NCDOT, NPS, Burke County, and others to contribute financial resources to this project. A conservative estimate to construct the entire FFST and its associated trailheads from Lake James to Morganton is approximately 1.75 million dollars.
LOCAL LEADERSHIP
Availability of funds targeted directly for trail use has decreased in recent years, so it is imperative that local governments work together to create multi-jurisdictional partnerships and to develop their own local sources of funding. These sources can then be used to leverage outside assistance. For the past two decades, a variety of funding has been used throughout North Carolina to support the planning, design, and construction of urban and rural bicycle and greenway projects. The largest single source of funding for these projects has come from the Surface Transportation Act; the North Carolina Department of Transportation manages and distributes the majority of federal funds that are derived from the Act to support the development of bicycle/trail development.
Implementing the recommendations of this plan will require a strong level of local support and commitment through a variety of local funding mechanisms. Perhaps most important is the addition of bicycle and greenway infrastructure as an item within the Burke County annual budget. These improvements should become a high priority and be supported through portions of the funding currently used for public safety, streets, parks and recreation, planning, community development, travel and tourism, and local bonds.
CHAPTER 5: IMPLEMENTATION
75
A
APPENDIX
I
(A-1) IMPLEMENTATION BUDGET SECTION 1- FONTA FLORA BREWERY TO POWERHOUSE ROAD
UNITS (LF)
UNIT COST
Dual Use Trail (5ft. Natural Surface) NCDOT Sidepath (8ft. Paved Path) Typical Greenway - Brewery Trailhead Spur (10ft. Paved Path) Road Crossings Major Bridges
35376 1056 400 3 2
$6 $120 $25 $5,500 $75,000 Total Section Cost
SECTION 2- POWERHOUSE ROAD TO WATERMILL RIVER ACCESS
UNITS
Dual Use Trail (5ft. Natural Surface) Multi-Use Path (8ft. Crushed Gravel Fines) Road Crossings Major Bridges
24816 5280 3 1
SECTION 3- WATERMILL RIVER ACCESS TO CATAWBA RIVER GREENWAY Dual Use Trail (5ft. Natural Surface) Road Crossings Major Bridges
UNITS
UNIT COST
24288 0 0
$6 N/A N/A
CATAWBA RIVER GREENWAY TO DOWNTOWN MORGANTON
Typical Greenway Connector (10ft. Paved Path) Road Crossings Major Bridges
UNITS
6864 1 0
$6 $25 $5,500 $750,000 Total Section Cost
$90 $5,500 N/A Total Section Cost
II
FONTA FLORA STATE TRAIL: LAKE JAMES TO MORGANTON MASTER PLAN
212,256.00 126,720.00 10,000.00 16,500.00 150,000.00 515,476.00 TOTAL COST
$ $ $ $ $
148,896.00 132,000.00 16,500.00 750,000.00 1,047,396.00 TOTAL COST
$
145,728.00 N/A N/A
$
145,728.00
UNIT COST
TOTAL * Does not include land acquisition, engineering, or design. * Does not include existing segments of trail or bridges on existing trails.
$ $ $ $ $ $
UNIT COST
Total Section Cost SECTION 4-
TOTAL COST
TOTAL COST
$ $ $
$
617,760.00 5,500.00 N/A 623,260.00
2,331,860.00
(A2) FUNDING SOURCES Partnership Funding Agency
Active Living/ BuiltEnvironment Implications
Maximum Amount
Matching Funds Required
Deadline
BUILD
Construction, provided easements are secured
N/A (min. $1 million)
$0 (for rural counties)
May (typical)
N/A
Not speciďŹ ed, but 20% is competitive
February 1st
N/A
50%
January 1st and June 1st
$100,000.00
25%
February 1st
All types of parks, trails, and recreation facilities
$500,000.00
50%
February 1st
Trails and Greenways
$10,000.00
20%
May 24th
Bike and Pedestrian Projectsboth engineering and construction
N/A (for major projects)
20% generally
N/A
Clean Water Management Trust Fund (www.cwmtf.net)
NC Water Resources (www.ncwater.org) Recreation Trails Program (ncparks.gov/About/grants/main.php) Parks and Recreation Trust Fund (ncparks.gov/About/grants/main.php) Bikes Belong Foundation
NCDOT Transportation Plan For Bike and Pedestrian Projects
Land acquisition: fee simple or easement. Must protect oodplain areas. Greenway trails and other park areas are allowed. River access areas or greenways along rivers All types of trails and greenways
CHAPTER A: APPENDIX
III