b D’„ % '„
overmountain victory national historic trail master plan LENOIR
MORGANTON
SUMMER 2015
"The landowner is the only person that can actually give this gift for the rest of eternity."
– Judy Perry, caldwell county pathways
Overmountain Victory
National Historic Trail Master Plan LENOIR >> MORGANTON
Produced for US National Park Service Caldwell County Pathways, Inc.
Town of Gamewell
City of Lenoir
Burke County
Caldwell County
City of Morganton
PRODUCED by
Destination by Design Planning, LLC | 815 West King Street, Suite 2 | Boone, North Carolina 28607 | 828.386.1866 | www.DbDplanning.com
WITH ASSISTANCE FROM
Acknowledgments National Park Service John Slaughter, Group Superintendent, Southern Campaign of the American Revolution Parks Garrett Jackson, Overmountain Victory National Historic Trail
Caldwell County Pathways, Inc. Brandon Thompson, Chair John Dockery, Vice Chair Ashley McKinney, Secretary Judy Perry, Treasurer Cyndi Akins, Board Member
Darlene Bemy, Board Member
Barbara C. Pennell, Council Member
Maria Swanson, Board Member
Wilford Beane, Council Member
City of Lenoir Joseph L. Gibbons, Mayor
Brad Caldwell, Board Member Tony Deal, Board Member Sam Erwin, Board Member Bob Giduz, Board Member Taylor Gupton, Board Member Brandon Kanagy, Board Member Mike Kent, Board Member Mike McCall, Board Member Shawn Moore, Board Member Kelsey Pfaff, Board Member Merlin Perry, Board Member Susan Powers, Board Member Jan Pritchard, Board Member Rick Rash, Board Member Deborah Ashley Smith, Board Member Lori Starnes, Board Member Jenny Wheelock, Board Member Eddie Winkler, Board Member
Mike Kent, Council Member Mary L. Carter, Town Administrator
T.J. Rohr, Mayor Pro-Tem Kim Edmisten, City Councilwoman Todd Perdue, City Councilman Ike Perkins, City Councilman David Stevens, City Councilman Crissy Thomas, City Councilwoman Ben Willis, City Councilman
Camilla Armfield, Board Member Ron Beane, Board Member
Dan Kincaid, Council Member
Burke County Johnny Carswell, Chairman, Board of Commissioners Wayne Able, Vice Chair, Board of Commissioners Maynard Taylor, Member, Board of Commissioners Jack Carroll, Member, Board of Commissioners Jeff Brittain, Member, Board of Commissioners
Danny Gilbert, Assistant City Manager & Finance Director
Scott Carpenter, Deputy County Manager/Planning Director
Jenny Wheelock, Planning Director Charles Beck, Public Works & Engineering Director Taylor Gupton, Planner & GIS Specialist
Caldwell County Randy Church, Chairman, Board of Commissioners Jeff Branch, Vice Chair, Board of Commissioners Clay Bollinger, Member, Board of Commissioners Mike LaBrose, Member, Board of Commissioners Donnie Potter, Member, Board of Commissioners
City of Morganton Mel L. Cohen, Mayor John H. Cantrell, Jr., Mayor Pro-Tem Forrest A. Fleming, Councilman S. Sidney Simmons, Councilman Ronnie M. Thompson, Councilman Lee E. Anderson, AICP, Director of Development & Design Services Michael Berley, PLA, Project Designer
Stan Kiser, County Manager Kim Carter, Planning Technician
Town of Gamewell
Landowner Outreach Video Interviewees Senator Jim Broyhill John Slaughter, National Park Service
Hunter M. Crump, Mayor
Ben Griffin, Landowner
Johnny K. Lefever, Mayor Pro-Tem
Merlin and Judy Perry, Trail Enthusiasts
contents
Table of Contents
introduction 1 Background 2 Plan Goals
3
Planning Process
4
Plan Organization
5
Chapter 1: Existing Conditions, Analysis, and Preliminary Alignments Study Area Description
Signage and Wayfinding Social Media: The New Word of Mouth
chapter 4: recommendations
40 41
43
Planning Sections Overview
44
Trail Sections Recommendations
46
7 8
Chapter 5: implementation
81
The Natural Environment
10
Implementation Details by Section and Responsibility
82
The Built Environment
14
Priority Implementation Areas and Responsibilities
83
Map And Photo Series: Preliminary Trail Route Alternatives
19
Trail Support Spectrum
84
Chapter 2: landowner engagement
29
Appendix 85 (A1) Budget
86
31
(A2) Fact Sheet
87
Landowner Workshop
32
(A3) Landowner Letter
87
Trail Route Re-Evaluation
34
(A4) Landowner Interest Survey
88
(A5) Funding Sources
88
(A6) Public-Private Partnership Memo
89
Identifying the Landowners
30
Landowner Communications
Chapter 3: trail character & Design guidelines
35
Trail Types
36
Trail Types Profile
38
vii
contents
list of maps
List of Exhibits
Map 1: OVNHT Commemorative Motor Route
2
Exhibit 1: Johns River Game Lands
13
Map 2: General Study Area
8
Exhibit 2: Trail Type Profile
38
Map 3: Study Area 1 Site Analysis
20
Exhibit 3: Social Media: The New Word of Mouth
42
Map 4: Study Area 2 Site Analysis
22
Exhibit 4: Creekway Drive Crossing
48
Map 5: Study Area 3 Site Analysis
24
Exhibit 5: Main Street Crossing and Trailhead
49
Map 6: Study Area 4 Site Analysis
26
Exhibit 6: Get Down @ the Depot
52
Map 7: Landowner Database
30
Exhibit 7: Brewing Up Investment
53
Map 8: Landowner Sentiment
34
Exhibit 8: Highway 18 Crossing
56
Map 9: Planning Sections Overview
44
Exhibit 9: #trail2victory Bridge
57
Map 10: Planning Section 1
47
Exhibit 10: Southwest Blvd. Underpass
58
Map 11: Planning Section 2
51
Exhibit 11: Restore the Stream, Realize the Dream
59
Map 12: Planning Section 3
55
Exhibit 12: Highway 18 Side Path
63
Map 13: Planning Section 4
61
Exhibit 13: Workplace Wellness Campus
67
Map 14: Planning Section 5
65
Exhibit 14: Calico Road Underpass
71
Map 15: Planning Section 6
69
Exhibit 15: Highway 18/64 Underpass
78
Map 16: Planning Section 7
73
Exhibit 16: Grace Ridge Trailhead
79
Map 17: Planning Section 8
75
Exhibit 17: Implementation Details by Section and Responsibilities
82
Map 18: Planning Section 9
77
Exhibit 18: Trail Rubicon: Finding the Point of No Return
83
Exhibit 19: Priority Implementation Areas and Responsibilities
83
ix
introduction
the overmountain victory national historic trail is 330 miles in length and includes portions of virginia, tennessee, north carolina and south carolina. The trail commemorates the significance of the patriot militia that marched over the appalachian mountains to defeat the BRITISH-LED loyalist army at the battle of kings mountain on october 8, 1780.
This trail master plan SERVES AS A ROAD MAP FOR ESTABLISHING A seCtion of the overmountain victory national historic trail (ovnht) IN NORTH CAROLINA from the city of lenoir to the city of morganton.
introduction
background
map 1: ovnht commemorative motor route
Caldwell County Pathways: On a Mission The mission of Caldwell County Pathways, Inc. (CC Pathways) is “to develop, coordinate and promote non-motorized, multi-use pathways for the enhancement of the quality of life in Caldwell County.” For more than a decade this nonprofit organization, in conjunction with the City of Lenoir, has successfully realized a more than five-mile greenway trail network throughout the City. In addition, CC Pathways has helped spearhead the development of other trails throughout the county such as the Johns River Greenway and the Happy Valley Greenway. It has been a longstanding vision of this organization to develop a trail along the Lower Creek corridor that would ultimately connect the City of Lenoir greenway, Town of Gamewell, and City of Morganton Greenway.
The Ultimate Partnership In 2014, CC Pathways, in collaboration with the City of Lenoir, Town of Gamewell, and Caldwell County, successfully secured partnership funds from the National Park Service (NPS) to develop a comprehensive trail master plan for the Lower Creek corridor from Lenoir to Morganton. The NPS willingly provided funding for this trail initiative because it was along this corridor that the “Overmountain Men” marched from the mountains and foothills of Appalachia in 1780 on their way to the Battle of Kings Mountain where they defeated a British-led army to “turn the tide” of the Revolutionary War. It is expected that trail developed along this corridor with permanent protection measures in place (easements, fee simple, right of way, etc.) will be certified by the NPS as part of the Overmountain Victory National Historic Trail.
2
This plan's study area This trail section spans from Lenoir to Morganton. lenoir
lake james morganton
The Sister Plan This trail plan was developed in conjunction with another Overmountain Victory National Historic Trail Master Plan that explores the Catawba River corridor from Lake James to Morganton. Although two separate plans were developed, the planning process was combined for both planning efforts.
introduction
plan goals
a critical component of this plan was landowner outreach.
1 2 3
SPECIFIC TRAIL ROUTES.
Identify a specific and feasible trail route within a 1/2 mile of the known historic Overmountain Victory National Historic Trail as determined by NPS;
4
Support Other Community Goals. Identify op-
5
Social Media. Incorporate modern social me-
Landowner Outreach. Make a direct appeal to
landowners identified during the analysis and record their sentiments for providing a trail easement;
Visual Plan. Create a visual plan that provides
portunities to leverage trail development to further support other community goals, including economic development, historic preservation, public health, and environmental stewardship; and
dia marketing tools within the trail and signage infrastructure to promote the development of “user generated� marketing content.
renderings and schematics to demonstrate trail character;
3
introduction
planning process the trail project. After receiving comments from landowners, the preliminary trail routes were revised accordingly.
The consultant team met with local trail and government leaders to discuss general environmental constraints and opportunities for trail connectivity.
4. Plan Development | March – May 2015
Research | October – January 2015 The consultant team conducted a thorough site analysis of the study area and determined feasible trail route options. With the trail routes identified, a landowner contact list was developed.
5.
3. Landowner Outreach | February – March 2015
fact sheet
The consultant team worked in tandem with local leaders to develop a preferred trail alignment. Renderings and schematics were provided to visually support the trail recommendations.
FACT SHEET
A trail master planning effort is underway to help create a section of the Overmountain Victory National Historic Trail (OVT) that would connect from Lenoir to Morganton to Lake James!
BACKGROUND
2.
Direction Setting and Project Launch | September 2014
Thanks to grant support from the National Park Service, regional community organizations and local governments are working to establish a walking and leisure biking trail that connects the region and celebrates the trail walked by the Overmountain Men who won a major Revolutionary War battle at Kings Mountain in 1780. The trail planning process requires an analysis of the Lower Creek corridor in Caldwell County and the Catawba River corridor in Burke County. The trail is best suited in floodplain areas where development generally cannot occur and where there are meaningful connections to existing parks, civic buildings, and neighborhoods. After identifying feasible trail route options, there will be a major landowner outreach effort. Without the voluntary commitment from landowners, the trail will either be relocated or not constructed.
An educational video will be developed to help communicate the historical significance of the OVT, which will be made available online.
Final Plan Preparation | May – July 2015 Publish the Final Plan for review by the public and elected officials.
Landowners with property along an identified feasible trail route were invited to a special meeting to learn more about
THE PLANNING PROCESS
1.
www.OVTplan.com
1 Direction Setting and Project Launch
| September 2014 The consultant team will meet with local trail and government leaders to generally discuss environmental constraints and opportunities for trail connectivity.
2
Research | October – January 2015 The consultant team will conduct a thorough environmental assessment of the study area and determine feasible trail route options. With the trail routes identified, a landowner contact list will be developed.
3
Landowner Outreach | February – March 2015 Landowners with property along an identified feasible trail route will be invited to a special meeting to learn more about the trail project. After receiving comments from landowners, the preliminary trail routes will be updated.
4
Plan Development | March – May 2015 The consultant team will document the trail analysis and landowner comments. Recommendations will highlight alternative routes and the project’s overall feasibility for completion. A draft plan will be made available for public comment.
5
Final Plan Preparation | May – June 2015 The consultant team will publish a final plan that incorporates all public comments.
CONSULTANT CONTACT: Eric Woolridge, AICP Destination by Design Email: Eric@dbdplanning.com Phone: (828) 386-1866 Web: www.DbDplanning.com
A project fact sheet provided interested parties with background information and a project timeline.
•Physical Inventory •Physiographic Analysis •Natural Inventory •Points of Interest & Structures •Environmental •Infrastructure & Utilities •Video Development
•Public Meeting & Engagement •Landowner Outreach Workshops
MARCH - MAY ’15 •Design Alternatives •Wayfinding & Structural Elements •Branding S I G N A•Opinion G E C O N C of E P Probable T Cost •Route Feasibility •Landowner Follow-up
DRAFT PLAN, DESIGN CONCEPTS, COSTS
•Kick Off •Facilitating Planning Oversight Committee
FEB. - March ‘15 PUBLIC ENGAGEMENT & LANDOWNER OUTREACH
OCT. ‘14 - JAN. ’15 RESEARCH AND PRELIMINARY ANALYSIS
DIRECTION SETTING
SEPT. ‘14
CRAFTSMAN
PLACE YOUR VOTE HERE:
C A B
LD K
EL
R
W
U E
L
C
C
O
O
U N
7
MA
4
MA
P 4 1/2
P MA -M
i le
Bu
f fe
3
MA
P 2
MAP
1
Lenoir
r
Morganton
´ 0
P 5
Y
TY
MAP
T
8
N
9 M AP
U
MAP
1/
5
2 -M
i le
B
uf
fe
r
10
MA
P 6
20 Miles
OVERMOUNTAIN VICTORY NATIONAL HISTORIC TRAIL
OVT TRAIL MAP
Overmountain Victory
National Historic Trail Master Plan LEN
OIR
E JAM • MOR GANTON • LAKE
S
MAY-JULY ’15 FINAL DRAFT DEVELOPMENT
project timeline
•Funding •Implementation
untain Victory NH Trail
Area: Bristol Creek Wetlands (Ranking High)
Chesterfield School
1/2-Mile Buffer Trails
d Trails
Access
urses
37
50
introduction
& State Ownership
EA
39
Community
er C
41
ds (NWI)
Soils
ive
r
61
45 59
END OF STUDY AREA
This chapter provides a comprehensive overview and analysis of the opportunities and constraints found throughout the study area. The analysis begins with a brief description of the study area followed by a comprehensive discussion of the natural and built environments and their implications for trail suitability, trail design features, permitting, costs, etc. This chapter concludes with a map and photographic series that highlights a host of preliminary trail route alternatives.
PREFERRED TRAIL ROUTE
D
R T PL AN FI LT ER W AT ER
PL
WALTER JOHNSON MIDDLE
NT A
MAJOR BRIDGE
CITY OF MORGANT Pedestrian Crossing ON JURISDICTION
MINOR BRIDGE/ CULVERT
VALLEY VIEWVIEW ST VALLEY
LANDOWNER SENTIMENT YES
64
NO POSITIVE
18
NO RESPONSE
CA TA W BA
R 1E R1N1 42 C1O S0T00 LO4
RI
2
Chapter iv.
VE Greenway Easement Recorded On This Property RG RE 16Warrior Fork Bridge EN AY W
&
1
EX TE N O SI
N
46Large Floodplain (Abutments/rise)
400 0 1S5H 9A 31D1O SW HA L IN DO EW DRL IN
14Recommendations
E
BA AW T CA
Trailhead
' 22 & 15
Catawba Bridge Crossing
54 GRACE RIDGE RRETIREMENT IDGE SIDE COMMUNITY T ER
50
49
53 1 52 44 33111
ÂŻ
E HRIDGE DR NORTHRIDG NORT
IND Y EP SE EN(Public Land) Narrow51 Crossing RtoK Right of Way, Maintains Good Proximity to Corridor DE NC KI ET RL
1 44 44000000 1
Significant efforts were made to reach out to landowners where the preliminary analysis indicates that the trail is most suitable. This chapter describes the landowner outreach process and provides highlights from the landowner workshop meetings.
RIVER
VICT VO ICRTYO TRRYL
RS DD SO WO WEOROD RIV RIVER
N
EXISTING CATAWBA RIVER GREENWAY & ROCKY FORD ACCESS
RL RT IVE of the Better Crossing Spots (suspension?) Narrow Bend R One L AI TR ER Sewer Easement Parallels Most RofIVthe Extent of the Catawba River to Hwy 64 DR OD 48 47 O W H RC BI
DR
D
Landowner Engagement
2111 4000 14
TRAILHEAD
3
ee k
PROPO SE
Chapter Ii.
AV 1 AN21 LM142 S4E 000
PROPOSED LOCAL TRAIL
TRAIL FEATURES
On-grade Hwy 64 Crossing Not Ideal
Field
ORK
RD
4
EXISTING LOCAL TRAIL
IOR F
W ils W o n ils Cron eeC kr
4000141911 911 4000141
FILT
ER
R WAR
ER
Field
45
ROAD
D
CO RN
SPUR TRAIL
JOHNS Field RIVER GAME LANDS
CROSSINGS
TER WA
R BO ST
LO ST
ALTERNATE TRAIL ROUTE
This chapter is dedicated to visually defining the various trail types to be used throughout 23 the corridor. Also, design concepts are provided for trail user orientation signage, mile # markers, historic markers, and other trail support facilities. Social Media is explored as a # mechanism for trail#promotion and marketing. #
Hwy 64 Corridor Widening Project May Benefit a Parallel Greenway Alignment
LEN 2O0IR 60R 00D6 41 LE NO 1 IR
46
'
Trailhead
206 0 00 6 41 1
END OF STUDY AREA
Morganton Dump
Access Point
OA KR ID GE
ay Greenw a River
59
Catawb
Morganton
PPI4 EI0ED 0D0M M 1O4O N 2N 3T1T R 1D
KI RK
00
SE
Y
DR
0.15 0.15 V
EN RD0.3 0.3
EA
IN
Miles Miles
11 in in == 0.2 0.2 miles miles N
60
ek
Charter School
Cre
44 59
58
TRAILS
R
ng
Private- North American Ag. Preserve
Morganton Skeet & Trap Range
DE
C 43
47
CLU
Fork
Water Plant
S HN
w ata
Element Occurrence: Carolina Foothills Crayfish, Robust Redhorse
Trail Character and Design LEGEND Guidelines
JJooh hnns sRRiv iveer r
P O 64 O S NL ON 8-U O S I 1 RIS RR NC AAR HH
JO
ba
18/ 64
ve Ri
WarriorrFork Fork Warrio
r
57
11 23 14 00 40
43
5
SECTION 9
W Waarrrrio iorrFFo ork rk
40 00 14 36 11
sR
56
Walter Johnson Middle School
Chapter iii.
err vive RRi nss ER ohhn JJo IV
Existing Conditions, Analysis, John's River and Gamelands to Catawba River Greenway Preliminary Alignments JOHNS RIVER GAME LANDS CATAWBA RIVER GREENWAY
hn
James House
'
r/ ve Ri diss a o b h taw e R Ca Lak
20 2 0000 0000 6406 1141 1
Jo
nti
enway Study
48
Hu
e Analysis ain Victory storic Trail
Bellvue House
r rrio Wa
MAP 4
48 55
Element Occurrence: Notched Rainbow, Seagreen Darter
Burke County Landfill
L
ar Floodplain
O 40LODL 00 SDCS 14 HCO 9 3 HOO 11 LOT LR
Johns River Game Lands
ones
ay
ar Floodplain
&
Chapter I.
48
RD BERRY C ECE BERRY
odies
s
RD
d Zone
54
D RE OE OHR SHS
R
0
AR
42
r
Zone
1/4
VI NE
Dedication Zones me Lands)
R
ive sR
Unranked
reek
53
hn
General
Low
18/ 64
Jo
Moderate
48
52
Heritage Areas
onal
R A U DY
ST
IL E
Johns River Game Lands
Assemblage
BD
ritage Data t Occurances
1/ 2M
1/2 -M ILE
Hazardous Sites
& Inactive Landfills
gh
Plan Organization
ST
elds
EA
38
UD YA R
al/County Properties
1/2 MI.
NC NCOneMap, OneMap,NC NCCenter Center for for Geographic Geographic Information Information and andAnalysis, Analysis,NC NC 911 911Board Board
The final chapter is organized according to nine (9) planning sections. Each planning section description includes a map that identifies a preferred alignment. Each planning section further incorporates the analysis and design elements from the previous chapters along with a host of supporting renderings and design schematics.
5
introduction
6
Chapter 1 Existing Conditions, Analysis, and Preliminary Alignments
an overview and analysis of the opportunities and constraints found in the study area.
The analysis begins with a brief description of the study area followed by a comprehensive discussion of the natural and built environments and their
I n t h is c h ap t e r A. Study Area Description B. Natural Environment Analysis
implications for trail suitability, trail design features,
C. Human/Built Environment Analysis
permitting, costs, etc. This chapter concludes with a
D. Map and Photo Series: Preliminary Trail Route Al-
map and photographic series that highlights a host of preliminary trail route alternatives.
ternatives
chapter 1
MAP 2: GENERAL STUDY AREA
study area
General Study Area description: The Lenoir to Morganton OVNHT study area is one-mile wide and extends approximately 20-miles long from the heart of Caldwell County to the northern reaches of Burke County. The northern terminus begins in the City of Lenoir at the junction of Creekway Drive and the abandoned rail corridor. Before reaching the edge of historic downtown Lenoir, it travels along Lower Creek. The study area extends south along Lower Creek, Highway 18, and through the Town of Gamewell. Land uses south of Gamewell are typified by low density residential, agricultural, forested/undeveloped, and limited light industrial along Highway 18. Upon entering Burke County, the study area incorporates the Johns River Game Lands (3,893 acres), which is managed by NC Wildlife Resources. The southern terminus of the study area reaches the northern extent of the Catawba River Greenway, which includes a 3.8 mile section of designated Overmountain Victory National Historic Trail.
THE 20 MILE STUDY AREA begins on creekway drive in lenoir and ends at the rocky ford access in morganton. 8
E xX iI sS tT iI nN gG C oO nN dD iI tT iI oO nN sS , A nN aA lL yY sS iI sS , aA nN dD P rR eE lL iI m M iI nN aA rR yY A lL iI gG nN m M eE nN tT sS
analysis workflow alternate trail routes were determined based on an analysis of the natural and built environments.
SIT EN M N O R I V EN
T
EN M N O R I V EN
E A N A LY S IS
T 9
chapter 1
The Natural Environment The opportunities and constraints found within the natural environment are critical for identifying suitable trail locations and feasibility, quality user experiences, and determining construction costs and necessary permits. This section explores the implications of the study area’s natural environment for establishing the Overmountain Victory National Historic Trail from Lenoir to Morganton and includes five (5) parts: 1) Floodplains; 2) Wetlands and Hydric Soils; 3) Streams, Lakes, and Ponds; 4) Steep Slopes; and 5) Rare Flora and Fauna.
along Antioch Road, Caldwell County
10
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
“Much of the floodplain areas along the Lower Creek corridor are ideal for greenway development.” Floodpl ains
Wetl ands and Hydric Soils
Streams, Lakes, and Ponds
Floodplain areas are often suitable for trail development. Since traditional development is often not conducive to floodplain areas, private landowners are often more willing to provide access for public trails within these corridors. Also, these scenic areas often attract wildlife, which creates an engaging trail experience. Within this study area, much of the floodplain areas along the Lower Creek corridor are ideal for greenway development.
The study area includes several wetland areas as identified on the National Wetland Inventory (NWI). According to NWI, there are likely smaller wetland areas within the study area that are not indicated within their inventory which could impact final trail alignments. Wetland indicators include hydric soils in combination with wetland plant species and wetland hydrology that if impacted, could require costly permitting for these trail sections².
The county, state, and federal government regulate the many waterbodies found throughout the study area³. Lower Creek, Johns River, the Catawba River, and their tributaries include some of most important waterways found within the study area; there are permitting implications for crossing and bridging these water bodies⁴.
Although development is regulated within the floodplain, greenways and trails are allowed and can be permitted. Sound trail engineering techniques are necessary to ensure trails can sustain flooding. To the extent possible, greenway alignments should be avoided within the floodway1.
2. If wetlands are unavoidable, utilize elevated boardwalk systems. Boardwalks allow for travel over flat, poorly draining soils, standing water, and wetland features and have significantly less impact than other options. A section 404 (Clean Water Act) Permit may be required if the wetland is considered jurisdictional by the USACE. This means that the wetland is not isolated and part of a broader lake or water system. A small boardwalk for a non-isolated wetland with limited fill or dredging may qualify for a programmatic Nationwide Permit. Nationwide Permits are designed to streamline the permitting process for actions with limited disturbances. In addition to permitting, disturbances exceeding a tenth ( 0.1) of an acre would require mitigation which can increase project costs. Impacts under a tenth (0.1) of an acre do not trigger mitigation fees.
3. Maintain a 50-foot buffer from all waterways, particularly those regulated under the Catawba River Buffer Rules. The state requires a 50-foot buffer along the shorelines of Catawba River and associated lakes. Streams within the study area are identified by the State of North Carolina as having poor water quality and maintaining or improving an adequate vegetated buffer is crucial to improving the quality. Zone 1 of this buffer includes an undisturbed 30-foot buffer from top of bank in which trails are discouraged. Zone 2 is an additional 20-foot buffer. This zone allows for managed vegetation and trails and greenways. While trails are an allowable use within Zone 2, the NC Division of Water Quality requires a permit (through DWQ or designated local government). The applicant must show that disturbance has been minimized and no other alternatives exist. 4. Plan for permits related to waterway Impacts. Federal 401/404 Certifications will likely be required in cases where any stream or waterway alterations occur. These alterations would be most likely in conjunction with bridge improvements or addition of structures near waterways. Triggers for the permit include disturbance to the stream bed, banks, damming of the waterway, or placement of material within the waterway (i.e. culverts/pipes).
1. Avoid disturbance in the floodway. Avoid placement of structures or disturbance within the floodway. Floodways are regulated locally and by the Federal Emergency Management Agency (FEMA). Fill, structures (walls, kiosks, etc), and impervious services are discouraged. Any structures located within the floodway require a no-impact/no-rise certification through FEMA. These studies can vary on cost but can range from $2,500-$15,000 depending on complexity.
11
chapter 1
Steep Slopes
Rare Flora and Fauna
Much of the study area includes gently rolling topography and thus avoids impacting steep slopes. The most challenging slopes are found within the Johns River Game Lands. The trail should be designed for grades under 5% slope if possible. Natural surface trails can vary up to 10% slope. Alignments proposed in this study should be designed with these guidelines and may require a larger corridor to incorporate a more gradual trail grade.
The State Natural Heritage Program provides data identifying the state’s most sensitive environmental areas to be avoided; these areas are incorporated within the analysis map series at the end of this chapter. Also, rare flora and fauna species can also exist outside of these designated areas, which can alter final trail alignments prior to construction. Species identified by the State Natural Heritage Program within this study area as of January 2015 include: A. Sticky Bog Ashpodel (Lower Creek and tributaries) B. Carolina Foothills Crayfish (Celia Creek, Lower Creek areas in Gamewell, and in the Catawba River) C. Bog Turtle (Bristol Creek and Johns River Game Lands) D. Notched Rainbow Seagreen Darter (Warrior Creek)
photo by others
12
Of special note is the Bristol Creek Wetlands Natural Heritage Area, which is located on both Johns River Game Lands and private land. This site is noted as having some of the most outstanding ecological resources in the state. Coordination with the U.S. Fish and Wildlife (USFWS) is an important aspect of the design process. Involving USFWS early on in the process can help avoid obstacles related to federally protected species. Additionally, permits like Section 401 and 404 (see Wetlands and Hydric Soils section, page 5) will initiate the review of the State Natural Heritage Program database. If species are found within the project area, State or Federal requirements may dictate avoidance or mitigation.
Exhibit 1: Johns River Gamelands
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
johns river game lands
T
he Johns River Game Lands comprises 3,893 acres in northern Burke County and is managed by the North Carolina Wildlife Resources Commission. This public land, which includes the Bristol Creek Wetlands Natural Heritage Area, is renowned for having some of the most outstanding ecological resources in the state.
Within this planning process, the N.C. Wildlife Resources Commission expressed a willingness to consider the creation of a section of the Overmountain Victory National Historic Trail through the Johns River Game Lands provided some general guidelines are met: 1. Avoid areas that are actively managed like habitat improvement areas and open meadows (indicated on maps and notes). 2. Avoid the primary and buffered Natural Heritage Dedica-
3. Paralleling roads like Highway 18/64 and Johns River Loop is recommended. 4. Avoid areas listed in the State Natural Heritage Area program.
tion zones. The buffered areas are slightly less critical for avoidance.
13
chapter 1
The Built Environment The opportunities and constraints found within the built and human environment are critical for determining suitable trail locations and feasibility, ideal user experiences, construction costs, and necessary permits. This section highlights five (5) built environmental features and their implications for developing the Overmountain Victory National Historic Trail from Lenoir to Morganton, including: 1) Land Use; 2) Existing Trails and Parks; 3) Utilities; 4) Transportation; and 5) Historic Resources.
photo by others
14
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
land use snapshot
“The City of Lenoir has made significant strides in the past 10 years to revitalize its historic downtown core and would be well-served by an Accessible public greenway trail." The City of Lenoir
The Town of Gamewell
Gamewell Town Hall Gamewell is a rural community with an unconsolidated commercial corridor along Highway 18/64. There are multiple large tracks of land occupied by tree farms and wholesale nurseries along Lower Creek. Gamewell’s Town Hall and its new park are ideal for trail connectivity.
Lower Creek
photo by others
The study area begins in the City of Lenoir, a historic community located in the foothills of the Blue Ridge Mountains that serves as the county seat. The City has made significant strides in the past 10 years to revitalize its historic downtown core. The City’s downtown is comprised of a mix of land uses, including commercial, civic, and residential, and would be well-served by an accessible public greenway trail. The City is heavily influenced by a tradition of furniture manufacturing. The land uses immediately adjacent to downtown includes both antiquated and more modern warehouse facilities, many which connect to an aban-
Historic Downtown Lenoir doned rail line that is ideal for trail development. The rail line was abandoned in 2008 when Google constructed a data center located on Highway 18 and adjacent to the study area. Some of the more historic warehouses along the abandoned rail line are vacant and a public greenway could further assist with revitalization efforts. Downtown Lenoir includes a variety of dense and historic neighborhoods, some which serve low income populations and would be particularly well-served by a greenway system connecting to other neighborhoods and commercial areas.
Lower Creek near the Town of Gamewell The southern portion of the study corridor from Gamewell to Morganton is the most rural and includes large tracts of private forested land, wetlands, and the Johns River Game Lands. Low-density rural development exists mostly along major roads, while extensive farming activities take place along Lower Creek.
15
chapter 1
existing parks and greenways Town of Gamewell Park
“Caldwell County, Lenoir, Gamewell, and Morganton have a collection of parks and greenways that are ideal for trail connections. �
Lenoir Greenway
Caldwell County Government Center
photo: Caldwell County Pathways
The Lenoir Greenway extends more than a total of five miles. According to existing Lenoir greenway plans, the OVNHT trail will intersect with the Lenoir Greenway near the Google Data Center.
16
The Town of Gamewell has created a major park facility near their town hall along Highway 18. In addition to traditional recreation amenities, such a playground and basketball court, this park also includes a paved walking path along its perimeter. The Gamewell walking path is a natural connectivity point for the planned OVNHT.
Catawba River Greenway and Rocky Ford Access
photo: discoverburkecounty.com
Caldwell County constructed a workplace wellness walking loop at the government center along Highway 18. This walking loop is within the OVNHT study area and serves as a natural trail connectivity point.
The northern terminus of the Catawba River Greenway, which is certified as part of the OVNHT, is located at Rocky Ford Access. This pocket park serves as the southern terminus of the Lenoir to Morganton study area.
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
utilities
Transportation
Sewer Lines Along Lower Creek The study area has a complex matrix of utilities that include transmission lines, utility towers, water lines, and sewer infrastructure. Both sewer and water lines are indicated on the subsequent map series. Locations where the potential trail alignment intersect with sewer or water lines have been indicated on the map and notes. Sewer lines are often compatible with trails since existing easements preclude development. However, these easements often need to be modified to allow for a public trail. Lenoir has an extensive network of sewer and water lines extending into Gamewell. Sewer lines travel parallel with Lower Creek and could be an optimal trail location. Sewer lines terminate on the north side of Rocky Road.
Highway 18/64 ROW The study area analysis included an extensive review of the existing transportation network including the North Carolina Department of Transportation (NCDOT) rightof-way (ROW), NCDOT plans, existing bike and pedestrian infrastructure (crosswalks, bike lanes, etc.), railways, and existing greenways. NCDOT’s right-of-way was analyzed for its ability to accommodate a separate side path or a widened shoulder. These opportunities are shown on the Site Analysis Maps with corresponding opportunities and constraints notes.
Abandoned Rail in Lenoir A 2.7 mile section of abandoned rail through the heart of Lenoir provides a significant opportunity for trail implementation. The City of Lenoir and Caldwell County Pathways are pursuing an official declaration of rail abandonment that will authorize the City to utilize this ROW for trail development. Additional segments of abandoned spur tracks, which once connected to active industrial operations, present unique opportunities for trail connectivity and are shown on the subsequent map series and associated notes.
17
chapter 1
historIC rESOURCES
“the OVNHT should link, preserve, and interpret historic and cultural sites along its route."
Fort Crider Historic Marker, City of Lenoir The Overmountain Victory National Historic Trail Route
Sensitive Cultural Resource Areas
Historic Sites and Landscape
The original Overmountain Victory National Historic Trail (OVNHT) route was identified by a National Parks Service research team. The team relied on the 1881 reenactment account of the march, which has been amended by local historians, descendants of battle participants, and other sources. As part of this congressionally designated trail, any officially designated portion of the OVNHT must lie within a one-mile corridor (half-mile on either side) of the historic route.
Culturally sensitive resource areas have been mapped utilizing data from the NC State Historic Preservation Office (SHPO). The majority of these areas occur along the waterways of Lower Creek, Johns River, and Warrior Fork. These areas should be avoided to the extent possible to ensure the preservation of historic resources.
SHPO oversees a large database of historic sites and resources. All resources, including those related to the OVNHT, are included within the subsequent analysis map series. These resources include information from SHPO surveys as well as a list of sites related to the National Register of Historic Places (which the National Park Service oversees but individual states manage). The most critical sites include those listed on the National Register (NR) or determined eligible (DOE) as they have further protection under Section 106 of the National Historic Preservation Act . The National Park Service has emphasized that to the extent possible, this plan should link, preserve, and interpret national and cultural resources.
18
Waterbodies Streams
Waterlines
ST
CR EE KW
Hydric Soils
Local Roads State and County Roads Utilities
WE
Sewer
E AV
15
Flood Zones
Floodway 100-Year Floodplain 500-Year Floodplain
West Lenoir Elementary
Unity Park & Community Gardens
Caldwell Memorial Hospital
Davenport Elementary
16
18/
k
ree
rC
we
Lo
Lenoir Golf Course
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS 17 Southern Railway
ck Za
Lenoir High School/Fort Crider
Freight Station
18
sF
ork
ABIN
GTO
Brownfield (NACCO Materials)
Alignment ‘B’
MAP 2area 2 study
Opportunities
50
Public Health Departments
Federal & State Ownership Private Municipal/County Owned Properties
Active & Inactive Landfills
NRHD Boundary Study List (SL)
Natural Community
High
Unranked
Gamewell
Wetlands (NWI)
Sewer
Gamewell
21
22
k ree rC
NC Ecosystem Enhancement Easement
we
23
Lo
25
S. LENOIR/ GAMEWELL
MAP 2 Tuttle State
Forest Site Analysis Overmountain Victory National Historic Trail
23
2 studyMAParea 2
43
Gamewell
18/ 64
MAP 3
26
27
Lenoir to Morganton Greenway Study
k ee Cr lia Ce
LD
Element Occurrence: Carolina Foothills Crayfish
AY M
LL
R BU
WE
PL
E
BE
AC
TY
UN
UN
CO
CO
KE
OR
H
r we
44
k
ee
Cr
Lo
RD
TY
28
The map and photographic series, which spatially incorBrownfields
NR and Local Landmark
18
42
SloanThroneburg Farm
Private Municipal/County Owned Properties
ek
37
38
Hazardous Sites
National Register (NR) of Historic Places Site
re
39
18/ 64
CA
Colleges and Universities
Schools
sC
24
Managed Lands
Historic Sites and Ditricts
er
Gamewell Elementary School
500-Year Floodplain
MAP 3area 3 study
Federal & State Ownership
Lenoir Water Plant
19
Floodway
Existing Trails
Public Libraries
40
100-Year Floodplain
Fishing Access Parks Golf Courses
Public Health Departments
Lenoir
Flood Zones
Proposed Trails
Hospitals
321
Gamewell Middle School
41
Waterbodies
OVNHT 1/2-Mile Buffer
Property Lines Duke & Crescent Properties
2 studyMAP area 2
Streams
OVNHT & Other Recreation Overmountain Victory NH Trail
Municipal Boundaries
20
Hydric Soils
Waterlines
LEGEND
Civic Landmarks
36
32
Buffered Zone
Utilities
County Boundary
General
Hydrology
Interstates State Roads Local Roads State and County Roads
20-Foot Contours
Moderate
Primary Zone
NCDOT Bridge Locations Rail Roads Roads/Interstates
Connectors
Exceptional Very High
Natural Heritage Dedication Zones (Johns River Game Lands)
Bike Route
Constraints
Alternative ‘A’ Has Two Options (Hwy 18/64 Vs.Lower Creek)
Natural Heritage Areas
Transportation
Opportunities
22
Caldwell Caldwell County County Animal Animal Shelter Shelter
Animal
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
38
Gamewell Town Hall
Animal Assemblage
SL and Landmark SL and Determined Eligible (DOE)
50
ill
17
State Natural Heritage Data Element Occurances Plant
Local District Center Point
TH Broyhill Walking Park Start of Inactive Rail
Furniture Factory
M
Park Trail
Inactive Hazardous Sites
National Register Historic District (NRHD)
Google Data Center
35
Town of
34 Gamewell
Brownfields
NR and Local Landmark
Alignment ‘B’
16
Hazardous Sites
National Register (NR) of Historic Places Site
k
ee
e ow
West Caldwell High School
Managed Lands
Colleges and Universities Schools
23 24 25 26
20
L
Public Libraries
Historic Sites and Ditricts
21
Lenoir Mulberry Recreation Center
18/ 64
19
8
r rC
14 30
Fishing Access Parks Golf Courses
Hospitals
13
Lenoir Mall
29
31
32
Proposed Trails
Civic Landmarks
9
27
28
33
Existing Trails
Property Lines Duke & Crescent Properties
Alignment ‘A’
15
OVNHT 1/2-Mile Buffer
Municipal Boundaries
10
Caldwell County Health Department Caldwell County Health Department 13 12
Lenoir to Morganton Greenway Study
OVNHT & Other Recreation Overmountain Victory NH Trail
20-Foot Contours County Boundary
AR
H
11
18/ 64
reek
Connectors
map and photo series: preliminary trail route alternatives
Army National Guard
Site Analysis Overmountain Victory National Historic Trail
Element Occurrence: Sticky Bog Asphodel
Constraints
38
1 study1MAP area 1 MAP
don C
Alignment ‘A’
LENOIR
Abing
LEGEND
Blair Fork
R
PE
Mary’s Grove
VIRGINIA ST
13 E AV
ek Cre
N RD
45
Inactive Hazardous Sites
National Register Historic District (NRHD)
Active & Inactive Landfills
NRHD Boundary
29
State Natural Heritage Data Element Occurances Plant
Local District Center Point Study List (SL)
porates the natural and built environment analysis, highAnimal Assemblage
SL and Landmark SL and Determined Eligible (DOE)
Animal
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
18/ 64
Natural Community
Natural Heritage Areas
Exceptional
Moderate
Very High
General
High
Unranked
30
30
Transportation
HARTLAND RD
lights a host of preliminary trail route alternatives. These Natural Heritage Dedication Zones (Johns River Game Lands)
Bike Route
Primary Zone
NCDOT Bridge Locations
Wh
SN
IPE
SS
T
routes were further refined by localMillleaders to identify Cre Wetlands (NWI)
ee
ek
Hydric Soils
Waterbodies
Utilities
er
Interstates State Roads Local Roads State and County Roads
Cr
Hydrology
Lo w
Roads/Interstates
k
ite
Buffered Zone
Rail Roads
and engage landowners. This information will serve as Streams
Waterlines
Flood Zones
Sewer
Floodway
CA
45
LD
100-Year Floodplain
500-Year Floodplain
Natural Heritage Area: Bristol Creek Wetlands (Ranking High)
l Creek Bristo
an ongoing reference guide as alternative routes may Element Occurrence: Bog Turtle
BU R
31
W
EL
L
KE
AN
TIO
46
18/ 64
CO
UN
CO
TY
UN
32 CH
TY
RD
need to be developed due to unforeseen barriers. 35
38
Constraints
study area 4
36
Element Occurrence: Bog Turtle 48 Natural Heritage Area: Bristol Creek Wetlands (Ranking High)
Connectors
NR and Local Landmark National Register Historic District (NRHD) NRHD Boundary Local District Center Point Study List (SL) SL and Landmark SL and Determined Eligible (DOE)
Inactive Hazardous Sites Active & Inactive Landfills State Natural Heritage Data Element Occurances Plant
Animal Natural Community Natural Heritage Areas
Moderate General
High
Unranked
50 39
37
MAP 4 R
EA
38
48
52
41
Low
er C
18/ 64
53
i
sR
Exceptional Very High
Natural Heritage Dedication Zones
Lenoir to Morganton Greenway Study
Johns River Game Lands
Animal Assemblage
hn
Transportation
Brownfields
Jo
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
Hazardous Sites
RD
DY
National Register (NR) of Historic Places Site
UD YA R
Schools Historic Sites and Ditricts
CH
TIO
AN
37
ST U
Private Municipal/County Owned Properties
EA
Federal & State Ownership
Colleges and Universities
Johns River Game Lands
A
Managed Lands
Public Libraries
MAP 3
Site Analysis Overmountain Victory National Historic Trail
Chesterfield Chesterfield School School
IL E
Fishing Access Parks Golf Courses
40
-M
Public Health Departments
Existing Trails Proposed Trails
51
BURKE/ CALDWELL LINE
ST
Hospitals
OVNHT 1/2-Mile Buffer
47
ILE
Property Lines Duke & Crescent Properties Civic Landmarks
OVNHT & Other Recreation Overmountain Victory NH Trail
-M
Municipal Boundaries
1/2
20-Foot Contours County Boundary
Foothills Regional Airport
k
49 37
Cr ee
Alignment ‘B’
MAP 3 study area 3
MAP 4
DR
er
Opportunities
1/2
50
HAVEN
Lo w
LEGEND Alignment ‘A’
GREEN
33
34
reek
19
chapter 1 MAP 1 1 study area Valmeade School
4
Very High
Existing Trails High
PublicRoads/Interstates Health Departments
Wetlands&(NWI) Federal State Ownership
Colleges and Universities
Hydric Pr ivateSoils
Waterlines
NRHD Boundary
Inactive Hazardous Sites 100-Year Floodplain
Active & Inactive Landfills 500-Year Floodplain
Study List (SL)
General
High
Unranked
NCDOT Bridge Locations
Primary Zone
Rail Roads
Buffered Zone
Roads/Interstates
11
D
Brownfield (NACCO Materials)
13
R
PE
Mary’s Grove
E AV
Blair Fork
Natural Heritage Dedication Zones (Johns River Game Lands)
NR
AR
H
Hydrology
Brownfield (Bus Coating)
Streams
Google Data Center
20
10
Flood Zones
9
27
11
13
KW AY D
MAP 1
Site Analysis 100-Year Floodplain Overmountain Victory 500-Year Floodplain National Historic Trail
23 24 25 26
ST
WE
22
Caldwell County Animal Shelter
Caldwell County Health Department
E AV
15
8
Floodway
West Lenoir Elementary
Lenoir to Morganton Greenway Study
Lenoir Downtown Historic District
Start of Inactive Rail
Unity Park & Community Gardens
2 2 studyMAP area Davenport Elementary
Caldwell Memorial Hospital
16
18/
w
Lo
k
ree
C er
321
Lenoir Golf Course
17 Southern Railway
cks
Za
Lenoir High School/Fort Crider
Freight Station
18
GTO
rk
D
13
Lenoir
Lenoir Mulberry Recreation Center
k
Brownfield (NACCO
e Cre
NR
ST
ABIN
Fo
20
MAP 3: STUDY AREA 1 SITE ANALYSIS
TH Broyhill Walking Park
EE
Waterbodies
Lenoir Grammar School
Center
CR
Hydric Soils
19 21
12 Lenoir Mall
18/ 64
R
Wetlands (NWI)
LENOIR
14 13 7
Lenoir
JE Broyhill Lenoir Mulberry Park & Belleview Recreation Cemetery
ek
Very High
GTO
Cre
Moderate
rk
Exceptional
ABIN
10
Fo
Natural Heritage Areas
Bike Route
Lenoir High School/Fort Crider
9
Freight Station
Lo
Lenoir Golf Course
18
Animal Natural Community
Transportation
17 Southern Railway
w
Center
k
ree
C er
cks
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
ir F
Bla
8
321
Hospital
AREA
SL and Landmark SL and Determined Eligible (DOE)
Animal Assemblage
VIRGINIA ST
Local District Center Point
West Lenoir Elementary
16
Davenport Elementary
ork
King Community 18/
Za
State Natural Heritage Data Element Occurances Plant
Unity Park & Community Gardens
TUDY ILE S
National Register Historic District (NRHD)
15
Flood Zones
Brownfields Floodway
Martin Luther
Williams Lenoir Caldwell MiddleMemorial School
ounty RR
NR and Local Landmark
Hazardous Sites
1/2-M
Sewer
Sewer
CR
Streams
National Register (NR) of Historic Places Site
7 Downtown Lenoir Historic District
VE TA
S
WE
EE
Municipal/County Waterbodies Owned Properties
6
T. Henry Wilson Park
6
Caldwell C
State Roads Local Roads Schools State and County Roads Utilities Historic Sites and Ditricts
R
Managed Lands Hydrology
PublicInterstates Libraries
Lenoir Grammar School
5
5
R
Brownfield (Bus Coating)
3
CRE
Rail Roads
2
EKW AY D
Parks Primary Zone Golf Courses Buffered Zone
NCDOT Bridge Locations Hospitals
Waterlines
12
(Johns River Game Lands) Fishing Access
Bike Route Civic Landmarks
Utilities
14 13 7
Unranked
Proposed Trails Natural Heritage Dedication Zones
Cemetery
y
OVNHT 1/2-Mile Buffer General
Lenoir
2 2 11 JE Broyhill3 Park 4 & Belleview 1
wa
OVNHT &Natural Other Recreation Heritage Areas Overmountain Victory NH Trail Moderate Exceptional
Property Lines Transportation Duke & Crescent Properties
1
START OF STUDY AREA
en
Natural Community
4
10
RD
re
Animal
1/2-MILE STUDY AREA
SL, DOE, and Landmark DOE NRHD 20-Foot Contours Surveyed Surveyed in NRHD County Boundary Site Gone Municipal Boundaries Sensitive Cultural Resources
Valmeade School
9
VA LW AY
Animal Assemblage
AREA
SLConnectors and Landmark SL and Determined Eligible (DOE)
G
Study List (SL)
B
ir
Opportunities
no
Local District Center Alignment ‘B’Point
Interstates State Roads Local Roads State and County Roads
R
Active & Inactive Landfills
Lenoir Rotary Soccer Complex
Le
50
State Natural Heritage Data Occurances Constraints 38 Element Plant
321
Creek
‘A’
ork
F lair
KW AY D
Alignment NRHD Boundary
Inactive Hazardous Sites
TUDY ILE S
National Register Historic District (NRHD)
MAP 1
Brownfields
Martin Luther King Community Center
8
unty RR
NR and Local Landmark
1/2-M
LEGEND
National Register (NR) of Historic Places Site
Hazardous Sites
Williams Lenoir Middle School
Zacks
Schools Historic Sites and Ditricts
7
y
Private Municipal/County Owned Properties
enwa
Federal & State Ownership
Colleges and Universities
Caldwell Co
Public Libraries
6 6
CRE
Managed Lands
oir Gre
Public Health Departments
EKW AY D
Hospitals
Fork
ANALYSIS Fishing Access Parks Golf Courses
Civic Landmarks
5
5
T. Henry Wilson Park
G re en wa y
2
Proposed Trails
3
Le no ir
Existing Trails
Property Lines Duke & Crescent Properties
3 4
1
OVNHT 1/2-Mile Buffer
Municipal Boundaries
2
2
Creek Len
20-Foot Contours
County Boundary
1
START OF STUDY AREA
OVNHT & Other Recreation Overmountain Victory NH Trail
Fork
RD
Zacks
VA LW AY
enwa
Constraints
Connectors
ir Gre
Opportunities
38
Leno
50
Alignment ‘B’
y
SITE Alignment ‘A’
Lenoir Rotary Soccer Complex
1/2-MILE STUDY AREA
study
ArEA 1 LEGEND
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
Study area Opportunities 1 OPPORTUNITIES & cONSTRAINTS and Constraints: Lenoir (Map 1) OPPORTUNITIES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
16
17 18 19 20 21 22 23 24 25 26 27
Start of study area and potential trailhead Main street crossing—high public visibility Potential to extend road pavement and accommodate greenway on Valmead Street Connect to Valmead School—which may eventually be converted to apartments Factory may be amenable to using back side of lot Utilize abandoned rail line starting near Advent Circle Apartment complex connection Connect into sidewalk Potential trailhead—at crossroads (Vance and Willow Streets) Utilize undeveloped drainages in cemetery Utilize JE Broyhill Park pathways Utilize existing sidewalk on Main Street for several blocks to connect JE Broyhill Park Utilize existing sidewalk for connector Connect to Housing Authority Apartments (Vance Street Apartments) Connect to Fort Crider (OVT historic site), the OVT memorial plaque, and Old Lenoir High School/current day apartments Conversion of use of vacant warehouse buildings surrounding greenway has great economic development potential Southern Railway Freight Station—potential to convert to a farmers market Connect to existing loop path at Unity Park and Community Gardens Discussions have occurred with NCDOT about placing a pedestrian refuge island at this intersection Abandoned railroad bridge Utilize abandoned rail spur Utilize potential power line easement Bridge may have adequate shoulder to accommodate a greenway Four-way traffic signal in place but no crosswalks Abandoned rail line which Lenoir hopes to rehabilitate Connection to walking loop at Bernhardt Industries Opportunity to build trail into future development
CONSTRAINTS Steep cross slope Main street crossing Hazel Lee Street appears to have little right-of-way, making sidewalk or a trail more difficult Rail in this section can’t be used Bridge crossing necessary—unstable creek Dump site/car cemetery No sidewalk for short section of connector Bridge has limited shoulder Brownfield may cause some issues if ground disturbance occurs Ponded/wetland area Major road crossing of Hwy 18/64 and Southwest Boulevard is currently very unsuitable for pedestrian crossing
1 2 3 4 5 6 7 8 9 10 11
3
View of potential right-of-way use on Valmead Street
10
View of Belleview Cemetery where low points could be utilized for the greenway
1
View of vacant lot—potential trailhead
9
View of potential for trailhead—looking south at crossroads of Vance and Willow Streets
15
View of Lenoir High School Apartments and the historic site of Fort Crider
4
Rail in this section can not be used as factory is currently operational
9
View of potential for trailhead—looking north at crossroads of Vance and Willow Streets
17
Southern Railway Freight Station—a proposed location for a farmers market
21
Constraints
Connectors
ANALYSIS County Boundary
NCDOT Bridge Locations
Public Health Departments Public Libraries
Roads/Interstates
Managed Lands
Colleges and Universities
Waterlines
National Register (NR) of Historic Places Site
500-Year Floodplain Active & Inactive Landfills
Natural Heritage Areas
Utilities
Waterlines Sewer
Moderate
Very High
General
High
Unranked
14 13 7
Streams
Site Analysis Overmountain Victory 500-Year Floodplain National Historic Trail
ree k
ST
WE
43
15
MAParea 3 study 3
West Lenoir Elementary
Unity Park & Community Gardens
Davenport Elementary
Caldwell Memorial Hospital
16
ek
re rC
we
Lo
Lenoir Golf Course
17 Southern Railway
Lenoir High School/Fort Crider
Freight Station
cks
18
GTO
rk
D
13
Lenoir
Lenoir Mulberry Recreation Center
ek
Brownfield (NACCO Materials)
Cre
NR
IA ST
ABIN
Fo
22
18/
Za
Lenoir to Morganton Greenway Study
Lenoir Grammar School
E AV
Floodway
100-Year Floodplain
12
Lenoir
Lenoir Downtown Historic District
23
Flood Zones
321
NC Ecosystem Enhancement Easement
23
KW AY D
MAP 2
R
25
Wetlands (NWI)
Waterbodies
we rC
Brownfield (Bus Coating)
Martin Luther King Community Center
JE Broyhill Park & Belleview Cemetery
Lo
Buffered Zone Hydrology
Hydric Soils
11
42
Primary Zone
8
Gamewell 10
22
Natural Heritage Dedication Zones (Johns River Game Lands)
Williams Lenoir Middle School
9
21
Natural Community Exceptional
ork
38 18/ 64
Animal
S. LENOIR/ GAMEWELL
7
ir F
Bla
EE
Interstates State Roads Local Roads State and County Roads
24
Animal Assemblage
Rail Roads Roads/Interstates
39
State Natural Heritage Data Element Occurances Plant
NCDOT Bridge Locations
6 6
19
Gamewell Elementary School
Floodway
100-Year Inactive Hazardous Sites Floodplain
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources Bike Route
41
Flood Zones
Brownfields
SL and Landmark SL and Determined Eligible (DOE)
Transportation
40
5
18
5
unty RR
Study List (SL)
20
Gamewell Middle School
AREA TUDY ILE S
Local District Center Point
Gamewell
1/2-M
NRHD Boundary
37
Streams
Hazardous Sites
National Register Historic District (NRHD)
2
32
Hydric Soils Private Municipal/County Waterbodies Owned Properties
Sewer
NR and Local Landmark
Hydrology
36
Caldwell Co
Historic Sites and Ditricts Utilities
Buffered Zone
Federal & State Ownership Wetlands (NWI)
Interstates State Roads Local Roads State and County Roads
Schools
Unranked
Natural Heritage Dedication Zones Fishing Access (Johns River Game Lands) Parks Primary Zone Golf Courses
Bike Route Rail Roads
General
High
T. Henry Wilson Park
y
Transportation
Hospitals
Very High
3
CR
Civic Landmarks
Existing Trails Proposed Trails
3 4
1
ek
wa
Property Lines Duke & Crescent Properties
Moderate
2
2
re
en
Municipal Boundaries
OVNHT 1/2-Mile Buffer Exceptional
Alternative ‘A’ Has Two Options (Hwy 18/64 Vs.Lower Creek)
Lenoir Water Plant
1
START OF STUDY AREA
Animal
& Other RecreationNatural Community Overmountain Victory NHHeritage Trail Areas Natural
sC
Le
20-Foot Contours
RD
4
CRE
SL, DOE, and Landmark OVNHT DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
Gamewell Town Hall
er
1/2-MILE STUDY AREA
Animal Assemblage
SL and Landmark SL and Determined Eligible (DOE)
County Boundary
VA LW AY
Valmeade 17 School
R
Study List (SL)
ill
Lenoir Rotary Soccer Complex
re
Element Occurances Plant
EKW AY D
Local District Center Point
Connectors
Active & Inactive Landfills
Constraints State Natural Heritage Data
38
M
Park Trail
OpportunitiesInactive Hazardous Sites
50
35
Town of
34 Gamewell
Brownfields
National Register Historic District (NRHD) NRHD Boundary
MAP 1
Hazardous Sites
G
National Register (NR) of Historic Places Site
ir
LEGEND
Historic Sites and Ditricts
no
Private Municipal/County Owned Properties
Furniture Factory
16
ir Gre
Federal & State Ownership
Colleges and Universities
NR and Local Landmark
West Caldwell High School
Managed Lands
Lenoir
w
Lo
Public Libraries
ek
re
C er
Leno
Public Health Departments
Alignment ‘B’
30
Fishing Access Parks Golf Courses
Hospitals
12 29
14
Proposed Trails
Civic Landmarks
13
31
32
Caldwell County Animal Shelter
28
33
Existing Trails
Property Lines Duke & Crescent Properties
Alignment ‘A’
15
OVNHT 1/2-Mile Buffer
Municipal Boundaries
18/ 64
Caldwell County Health Department
OVNHT & Other Recreation Overmountain Victory NH Trail
20-Foot Contours
Schools
Army National Guard
Creek
38
Element Occurrence: Sticky Bog Asphodel
Fork
Alignment ‘B’
study 2 MAParea 2
Zacks
Opportunities
y
50
enwa
Alignment ‘A’
1 1 studyMAP area
Creek
SITE LEGEND
don Abing
study
ArEA 2
MAP 4: STUDY AREA 2 SITE ANALYSIS
chapter 1
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
study area 2 OPPORTUNITIES & cONSTRAINTS Opportunities and Constraints: South Lenoir/Gamewell (Map 2) OPPORTUNITIES 28 29 30 31 32
33 34 35 36 37 38 39 40 41 42 43
Utilize existing path and power-lines Potential use of abandoned rail bridge Abandoned rail spur Connect to exist loop trail on Caldwell County property Hwy 18/64 has significant right-of-way— approximately 150-feet total with a 42-foot wide shoulder Potential amenable landowner Connect to existing loop trail around Gamewell Park Graded dirt path exists in this area Begin of overlapping alignment with sewer line/ easement Driving range—potential partner End of sewer line/easement Signalized stop light with no crosswalks Connect to existing loop trail and schools Calico Road has a significant 80-foot right-of-way with water and sewer easements Calico Road has wooded, undeveloped corridor in this area with a 75-foot right-of-way Calico Road averages a 65-foot right-of-way and would serve many surrounding houses which lack pedestrian and bicycle infrastructure
29
View of potential use of abandoned rail bridge with Lower Creek in the Background
34
View of Gamewell Park
38
View from Rocky Road of ending of sewer line/easement
31
View of existing loop trail on Caldwell County property
37
View from Hwy 18/64 of driving range
24
View from Hwy 18/64 and Calico Road intersection
32
View of Hwy 18/64 looking north
42
View of wooded area on Calico Road
43
View of wooded area on Calico Road traveling south of Hwy 18/64
CONSTRAINTS 12 13 14 15 16 17 18 19 20 21
22 23 24 25
Destabilized reach of stream Tributary crossing is likely required Significant creek crossing Right-of-way has steep conditions in some areas Tree farm Quarry—conflicting land use Segment unlikely due to uninterested landowner Wetland/low lying area Alignment would leave OVT one-mile buffer here NC Ecosystem Enhancement Program Easement prohibits use of the easement (shown in green) bordering Lower Creek—verification needed to establish if easement has been finalized Home very close to creek—prohibiting greenway access on north side of creek Tree farm on both sides of Lower Creek Potentially dangerous intersection unless redesigned Intersection is non-signalized and would not be an appropriate crossing unless intersection is redesigned and signalized
23
chapter 1
Alignment ‘B’
38
Constraints
Connectors
MAParea 3 study 3
26
Proposed Trails
Managed Lands
Hazardous Sites
Inactive Hazardous Sites
Colleges and Universities
Waterlines Sewer
Historic Sites and Ditricts
National Register (NR) of Historic Places Site
Study List (SL)
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources Transportation
Brownfields
NCDOT Bridge Locations
Active & Inactive Landfills State Natural Heritage Data Element Occurances Plant
Animal Assemblage
Natural Heritage Area: Bristol Creek Wetlands (Ranking High)
Animal Natural Community Natural Heritage Areas
Exceptional
Moderate
Very High
General
High
Unranked
re 49 37 36
47
Primary Zone
Waterbodies
Streams
Site Analysis Floodway 100-Year Floodplain Overmountain Victory 500-Year Floodplain National Historic Trail
Brownfield (Bus Coating) R
MAP 3
48
KW AY D
Hydric Soils
Bl32a
AN
Chesterfield School
Flood Zones
CH
8
Martin Luther King CA Community LDCenter W EL
L
BU R
KE
14 13 7
Johns River Game Lands
UN
TY
UN
TY
Lenoir
DR HAVEN
11
12
JE Broyhill Park & Belleview Cemetery
Foothills Lenoir Grammar School Regional Airport
ST
E AV H
OC
I NT
RD
A
Unity Park & Community Gardens
Davenport Elementary
Caldwell Memorial Hospital
16
18/
ek
re rC
we
Lo
Lenoir Golf Course
17 Southern Railway
Za
Lenoir High School/Fort Crider
Freight Station
cks
18
GTO
rk
D
13
Lenoir
Lenoir Mulberry Recreation Center
ek
Brownfield (NACCO Materials)
Cre
NR
IA ST
ABIN
Fo
24
CO
CO
Lenoir Downtown Historic District WE
West Lenoir Elementary
321
RD
GREEN
33
15
Lenoir to Morganton Greenway Study
Williams Lenoir Middle School
10
37
4 studyMAParea 4
en
TIO
9
EE
BURKE/ CALDWELL LINE
rk
o ir F
CR
Wetlands (NWI)
31
re
rC we 35
34
Hydrology
Interstates State Roads Local Roads State and County Roads
7
46 18/ 64
Buffered Zone
Rail Roads Roads/Interstates
Sewer
500-Year Floodplain
Inactive Hazardous Sites
Natural Heritage Dedication Zones (Johns River Game Lands)
Bike Route
6
T. Henry Wilson Park
6
45
Element Occurrence: Bog Turtle
5
5
100-Year Floodplain
k l Cree
SL and Landmark SL and Determined Eligible (DOE)
Streams Private Flood Zones Municipal/County Owned PropertiesFloodway
Hazardous Sites
3
unty RR
Local District Center Point
ll C ree k
Bristo
NRHD Boundary
T
Mi
AREA TUDY ILE S
National Register Historic District (NRHD)
2
SS
1/2-M
NR and Local Landmark
Hydric Soils
Waterbodies Federal & State Ownership
3 4
Caldwell Co
Schools
Managed Lands
ite
IPE
Lo
Interstates Public Health Departments State Roads Local Roads Public Libraries State and County Roads Utilities
Wh
Fishing Access Buffered Zone Parks Hydrology Golf Courses Wetlands (NWI)
SN
ek
Roads/Interstates
Hospitals
Primary Zone
2
2 1
re
Rail Roads
Civic Landmarks
Existing Trails (Johns River Game Lands) Proposed Trails
1
ekR
Natural Heritage Dedication Zones
Bike Route Property Lines NCDOT Bridge Locations Duke & Crescent Properties
30
4 30
18/ 64 START OF STUDY AREA
RD
HARTLAND RD
OVNHT 1/2-Mile Buffer
Municipal Boundaries Transportation
Valmeade School
1/2-MILE STUDY AREA
20-Foot Contours
Waterlines
VA LW AY
Animal
SL, DOE, and Landmark Natural Community DOE NRHD Natural Heritage Areas Surveyed Moderate Exceptional Surveyed in NRHD OVNHT & Other Recreation Site Gone General Very NH HighTrail Overmountain Victory Sensitive Cultural Resources High Unranked
County Boundary
Utilities
Plant Animal Assemblage
y
Constraints
Lenoir Rotary Soccer Complex
wa
38
SL and Landmark SL and Determined Eligible (DOE)
29
G
State Natural Heritage Data Opportunities Element Occurances
45
ir
50
28
rC
Connectors
Active & Inactive Landfills
we
Lo
RD
Lo we
Alignment ‘B’
Study List (SL)
H
MAP 1
Brownfields
National Register Historic District (NRHD)
AC
no
LEGEND
NR and Local Landmark
BE
Le
National Register (NR) of Historic Places Site
E
y
Historic Sites and Ditricts
OR
EKW AY D
Schools
SloanThroneburg Farm
r rC
enwa
Private Municipal/County Owned Properties
k
ee
44
ir Gre
Federal & State Ownership
Colleges and Universities
AY M
Leno
Public Libraries
Element Occurrence: Carolina Foothills Crayfish
PL
CRE
Public Health Departments
TY UN CO LL Y NT WE LD OU EC RK BU
Hospitals
CA
Fishing Access Parks Golf Courses
Civic Landmarks
Local District Center Point
aC ree
Existing Trails
Property Lines Duke & Crescent Properties
Alignment ‘A’
k
ANALYSIS
OVNHT 1/2-Mile Buffer
Municipal Boundaries
Gamewell
18/ 64
OVNHT & Other Recreation Overmountain Victory NH Trail
20-Foot Contours
County Boundary
NRHD Boundary
2 2 studyMAP area
Tuttle State Forest
27
MAP 5: STUDY AREA 3 SITE ANALYSIS
Opportunities
Creek
50
Fork
Alignment ‘A’
Zacks
SITE LEGEND
Ce li
study
ArEA 3
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
study area 3 and OPPORTUNITIES & cONSTRAINTS Opportunities Constraints: Burke/Caldwell County Line (Map 3) OPPORTUNITIES 44 45 45 46
47 48 49
Potential amenable landowner—Duke Energy property Significant bridge span on Calico Road over Lower Creek may allow for a greenway underpass Significant bridge span on Antioch Road over Lower Creek may allow for a greenway underpass Excellent opportunities for habitat conservation if some portions of private lands were acquired fee simple—portions of these lands are likely undevelopable because of wetlands Official access and parking for Game Lands located at end of Putnam Street Alignment navigates drainages with less impact to sensitive natural resources Official access and parking for Game Lands on a turnout off of Hwy 18/64
44
View of potential pedestrian underpass crossing at Calico Road
35
View of Putnam Road
44
View of potential pedestrian underpass crossing at Antioch Road (looking east)
47
View of terminus of Putnam Street at official parking/access area for Johns River Game Lands
37
View of bridge over Bristol Creek on Hwy 18/64
CONSTRAINTS 26 27 28 29 30 31
32 33
34 35
36
37
Greenway unlikely in this area due to very narrow private parcels and home sites close to the creek Wetlands Sensitive cultural resource area Structures are located close to Lower Creek, making a southern alignment less viable Beginning of significant wetland areas on both sides of Lower Creek that continues through to Johns River Area of northwest side of Lower Creek is low lying and has standing water as identified in the field and via aerial analysis Area appears to be significantly disturbed based on aerial analysis Bridge crossing (~80-foot span) would be required and possibly an associated boardwalk system—the NC Wildlife Resource Commission has asked that the trail avoid their property in this area due to sensitive habitat and popularity with hunters There is significant site disturbance on this property based on aerial analysis This alignment would require a 1,600-foot section of on-road use along Lower Creek Avenue and Putnam Street—both low-traffic neighborhood streets Alignment travels through a Significant Natural Heritage, Bog Turtle habitat, and wetlands to avoid using the interior of Johns River Game Lands Bridge or boardwalk likely required (Hwy 18/64 bridge crossing for Bristol Creek could only be used to cross if a bridge attachment was used)
37
View of Bristol Creek Wetland Natural Heritage Area—looking from the bridge
Antioch Road 18/ 64
r ek we Cre o L Wetland and Floodplain Area
46 30
Area south of Antioch Road has excellent conservation opportunities but significant areas of wetlands could be impacted
Wetland and Floodplain Area
49
Official access and parking for Game Lands on a turnout off of Hwy 18/64
25
chapter 1
Alignment ‘A’
50
Opportunities
Alignment ‘B’
38
Constraints
3 studyMAP area 3
MAParea 4 study 4
ANALYSIS Property Lines Duke & Crescent Properties
Proposed Trails Fishing Access Parks Golf Courses
National Register (NR) of Historic Places Site
Animal Assemblage
55
Element Occurrence: Notched Rainbow, Seagreen Darter
Bellvue House
Animal
James House
56
Natural Community Exceptional
Moderate
Very High
General
High
Unranked
Walter Johnson Middle School
18/ 64
44 59 Charter School
61
CR
Morganton
Flood Zones
Site Analysis Overmountain Victory 500-Year Floodplain National Historic Trail
Floodway
59
ENDOFOFSTUDY STUDY AREA END AREA
Lenoir to Morganton Greenway Study
b taw
END OF STUDY AREA
46
VE TA
ES
W
15
45 59
West Lenoir Elementary
EA DY U ST E IL M 2-
ir
r
ve
i aR
Ca
EE
MAP 4
58
12
Lenoir
JE Broyhill Element Occurrence: Carolina Foothills Park & Belleview Crayfish, Robust Redhorse Cemetery Lenoir Grammar School
Water Plant
Unity Park & Community Gardens
Morganton Skeet & Trap Lenoir DowntownRange
Historic District
ek
Private- North American Ag. Preserve
Burke County Landfill
r
43
Brownfield 47 (Bus Coating)
100-Year Floodplain
60
Morganton Caldwell Dump
Davenport Elementary
18/
Memorial Hospital
16
ek
re rC
we
Lo
Lenoir Golf Course
17 Southern Railway
Za
Lenoir High School/Fort Crider
Freight Station
cks
18
GTO
rk
D
13
Lenoir
Lenoir Mulberry Recreation Center
ek
Brownfield (NACCO Materials)
Cre
NR
IA ST
ABIN
Fo
26
1/
y wa en G
re
11 14 13 7
321
ive
Cre
Streams
sR
ng
Waterbodies
hn
nti
Wetlands (NWI)
Hydric Soils
9
10
57
Fork
Hydrology
JOHNS RIVER GAME LAND
Jo
48
King Community Johns River Center 8 Game Lands
Hu
Buffered Zone
ior
Rail Roads
rk Fo
48
Martin Luther
Williams Lenoir Middle School
43
Natural Heritage Dedication Zones (Johns River Game Lands)
Primary Zone
R A
ir
Bla
Natural Heritage Areas
NCDOT Bridge Locations
Waterlines
Le
Active & Inactive Landfills State Natural Heritage Data Element Occurances Plant
rr Wa
SL, DOE, and Landmark DOE NRHD Surveyed Surveyed in NRHD Site Gone Sensitive Cultural Resources
Inactive Hazardous 500-Year Sites Floodplain
R
SL and Landmark SL and Determined Eligible (DOE)
100-Year Floodplain
KW AY D
Study List (SL)
Floodway
eenway
Local District Center Point
Brownfields
7
unty RR
NRHD Boundary
Hazardous Sites
6
reek
T. Henry Wilson Park
6
48
AREA TUDY ILE S
National Register Historic District (NRHD)
Waterbodies Private Municipal/County Streams Owned Properties Flood Zones
1/2-M
NR and Local Landmark
Federal & State Ownership Hydric Soils
River Gr
Sewer
54
er C
Creek
Waterlines
Historic Sites and Ditricts
Wetlands (NWI)
5
Caldwell Co
Utilities
Hydrology
Catawba
Colleges and Universities
Buffered Zone
3
5
Low
Zacks
Local Roads State and County Roads
Managed Lands
42
EKW AY D
Public Health Departments Interstates State Roads Public Libraries
Primary Zone
3 4
CRE
Roads/Interstates
Fishing Access Parks Golf Courses
2
41 2
r
NCDOT Bridge Locations
532
1
ive
(Johns River Game Lands)
18/ 64
1
START OF STUDY AREA
sR
Natural Heritage Dedication Zones Proposed Trails
Rail Roads
Hospitals
RD
4 1/2-MILE STUDY AREA
Animal
48
Valmeade School
52
no
Animal Assemblage
Johns River Game Lands
hn
Civic Landmarks
Utilities
VA LW AY
Existing Trails
Property Lines Transportation Duke & Crescent PropertiesBike Route
Interstates State Roads Local Roads State and County Roads
1/2
State Natural Heritage Data Element Occurances Plant
Jo
Municipal Boundaries
Roads/Interstates
Active & Inactive Landfills
y
Constraints
SL, DOE, and Landmark Natural Community DOE NRHD OVNHT & Other Recreation Natural Heritage Areas Surveyed Moderate Exceptional Overmountain Victory NH Trail Surveyed in NRHD Site Gone General Very High OVNHT 1/2-Mile Buffer Sensitive Cultural Resources High Unranked
20-Foot Contours
Bike Route
Opportunities
38
SL and Landmark SL and Determined Eligible (DOE)
County Boundary
Transportation
50
Lenoir Rotary Soccer Complex
enwa
Local District Center Point
NRHD Boundary
Inactive Hazardous Sites
Leno
Alignment ‘B’
38
R
National Register Historic District (NRHD)
EA
Brownfields
NR and Local Landmark
Alignment ‘A’
MAP 1
Hazardous Sites
ILE
National Register (NR) of Historic Places Site
39
-M
LEGEND
Historic Sites and Ditricts
UD YA R
Private Municipal/County Owned Properties
ST
Federal & State Ownership
Colleges and Universities Schools
37
50
Managed Lands
Public Libraries
ir Gre
Public Health Departments
Schools
Chesterfield School
Existing Trails
Civic Landmarks
Connectors
40
OVNHT 1/2-Mile Buffer
Municipal Boundaries
Study List (SL)
51
OVNHT & Other Recreation Overmountain Victory NH Trail
20-Foot Contours
County Boundary
Hospitals
Sewer
Element Occurrence: Bog Turtle Natural Heritage Area: Bristol Creek Wetlands (Ranking High)
Connectors
MAP 6: STUDY AREA 4 SITE ANALYSIS
SITE LEGEND
Fork
study
ArEA 4
r/ ve ss i R di ba ho w a t eR Ca Lak
EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS
study area 4 OPPORTUNITIES & Lands cONSTRAINTS Opportunities and Constraints: Johns River Game (Map 4) OPPORTUNITIES 50
51 52 53
54
54 55
56 57 58 59 60
61
Crossing of Highway 18/64 could utilize box culverts (boxes approximately 15x9-foot) as a greenway highway underpass Alignment travels through Middleton Place neighborhood and an undeveloped drainage Opportunity to parallel Johns River Loop Road—a lightly-traveled road Current Johns River Game Land trailhead/parking area could potentially be utilized as a greenway trailhead Pedestrian bridge could be attached in the hydraulic shadow (downstream side) of current bridge to potentially lessen flood-study requirements Ample bridge clearance for greenway underpass (see related constraint #42) TDOT has proposed widening and improvements to Highway 18/64 which could incorporate in a greenway—total right-of-way is around 105-feet and northern shoulder is around 42-feet Great views of historic James House and farm Utilize edge of property on Walter Johnson Middle School—may require fencing on school property Greenway easement already recorded where proposed (green) trail is shown Potential narrow crossing Use of sewer easement that parallels the Catawba River to Highway 18/64 (starting at Riverview Apartments) City of Morganton owned property with sewer line
CONSTRAINTS 38 39 40 41 42
43 44 45 46 47
This alignment only has an on-grade road crossing option for Highway 18/64 and is not desirable Sensitive cultural resource area Alignment leaves OVT buffer temporarily Large wetland and sensitive cultural resource area— one of the most scenic views in the study area Logs jammed high up in the bridge abutments indicate recent high-water flood events indicating that a bridge pedestrian underpass could be under several feet of water Alternatives leave OVT buffer Large floodplain and wetlands may require a large bridge span Quarry adjacent to proposed alignment Sensitive cultural resource area Sensitive cultural resource area as well as significant floodplain area
50
View of potential pedestrian underpass crossing under Highway 18/64
52
View of Johns River Loop Road—with potential for parallel greenway alignment
54
View of Johns River Game Lands boat launch and bridge
51
View of undeveloped drainage in Middleton Place neighborhood
41
Large wetland adjacent to Johns River—very scenic but has sensitive resources
57
View of Walter Johnson Middle School and potential use of edge of property for alignment
38
View of Highway 18/64 (looking north)— where an on-grade crossing could occur
42
View of Johns River bridge over Hwy 18/64— images show past flooding and bridge shoulders
60
View of Riverview Apartments in Morganton (sewer easement shown at the right)
27
chapter 1
28
Chapter 2 landowner engagement
Landowner outreach and engagement was a key component of the planning process.
The environmental analysis (Chapter 1) was critical to determine physically feasible locations for trail development. However, significant portions of these routes impact private property and require landowner outreach to fully assess trail feasibility. This chapter highlights the good-faith effort to engage landowners
T h e en ga gemen t Process Identifying the Landowners Landowner Communications Landowner Workshop
throughout the planning process. Trail Route Re-evaluation
23 ¬
!
chapter 2
O
!
!
!
identify the landowners
!
!
P
!
24 ¬
!
P
!
!
O
! !
O
!
25 ¬
Feasibility Analysis
G
!
MAP 7: Landowner Database
!
26 ¬ 27 ¬ 2 8 2 9 ¬ ¬ 31 ¬ 30 ¬ 32 ¬ 3 3 ¬ 3 4 ¬ ¬ 35
Trail alternatives were developed based upon an environmental feasibility analysis (see Chapter 1).
!
!
!
!
Landowner Database
!
!
A mailing database was created that included all property owners impacted by the preliminary trail alignment(s).
S
C
M
!
R
!
E
!
!
!
36 ¬ ! !
!
37 ¬ 38 ¬ 40 ¬ !
!
!
39 ¬
!
!
The tra
!
step 1: determine where the trail is feasible (CHAPTER 1).
!
¬
!
41
!
42 ¬
!
43 ¬
!
!
!
44 ¬
!
45 ¬
!
!
step 2: START A CONVERSATION WITH LANDOWNERS.
! !
!
!
46 ¬
!
52 ¬
!
50 ¬
!
!
51 ¬
! !
49 ¬
47 ¬
! !
!
!
!
!
!
!
!
!
! !
54 ¬ 53 ¬ 5 5 ¬ 57 56 ¬ ¬ 58 ¬ !
!
!
!
! !
!
!
60 ¬ 61 ¬
!
! !
!
!
!
! !
30
59 ¬
48 ¬ 0
0.5
1
2 Miles
I
!
! !
landowner engagement video production
landowner invitation
Date: February 16, 2015
landowner communications
[Insert Landowner Name and Address
Re: Trail Planning Meeting for Landowners Dear [Insert Landowner Name]: Thanks to grant support from the National Park Service, regional community organizations and local government leaders, a plan is being developed for establishing a walking and leisure biking trail to connect from Lenoir to Morganton to Lake James. This trail celebrates the walk made by the Overmountain Men who won a major Revolutionary War battle at Kings Mountain in 1780. Since November 2014, the planning team has been working to identify a feasible route to construct the trail. As part of this analysis, your property has been identified as a potential location for a trail section. Without a voluntary commitment from landowners, this important trail will either be relocated or not constructed. We would like to invite you and other landowners to discuss this project during a special meeting that will take place at [insert time and location]. An informational video can be found on the web at: www.OVTplan.com. Also, enclosed is a project Fact Sheet that further describes the project. Please RSVP if you plan to attend the meeting by sending an email or calling using the contact information below. Thank you.
Sincerely,
A custom video, specifically produced for landowners, highlighted the story of the Overmountain Victory National Historic Trail and included a request for landowner participation. Web Portal The project website, OVNHTplan.com, provides information about the planning process and features the landowner outreach video.
Eric Woolridge Consultant Project Manager Destination by Design Planning Phone: 828.386.1866 Email: eric@DbDplanning.com
Destination by Design Planning 815 W. King Street, NC 28607
web portal
Video Production
Landowner Invitation Formal letters were sent to all landowners directing them to the website and requesting their attendance at a special meeting.
31
chapter 2
landowner workshop Video Showing After signing in, the landowner workshop began with a viewing of the custom video. Focus Group Focus groups were organized according to various geographic areas throughout the study area. Landowners were able to ask questions about their specific property and the associated trail alignment. Sentiment Card The meeting concluded with landowners noting their level in Victor y Overmounta of willingness to provide a trail easement via the yLandowner rve Interest Su Landowner Interest Survey. __________ __________ __________ r Plan ic Trail Maste ES
al Histor Nation L E NO I R
in Victor y Overmounta il Master Plan
ic Tra National Histor L E NO
LAK IR • MOR GANTON •
Landowner
E JA
M
ES
rvey Interest Su
___
__
_________
____
__________
__ er ________
Phone Numb
_
__________
________ __________
______
Email ______
___
________ __________
__________
__ __________
public viding for the interest for pro your level of Please share ) ow trail. (check bel e ted at this tim Ο Not interes r discussions welcome furthe and ted interes Ο Somewhat ted Ο Very interes
32
JAM
_____ __________
__________
__________
__________
___
__________
__________
__________
__ Address____
__________
__________
__________
__ Address____
KE
____
Name ______
______
__________
__________
________ Name ______
• MORGANTON • LA
___
__________
__________
__ er ________
Phone Numb
__
__________
Email ______
_____
________ __________
public viding for the interest for pro your level of Please share ow) trail. (check bel e ted at this tim Ο Not interes cussions me further dis ted and welco res inte hat Ο Somew ted Ο Very interes
landowner engagement
on march 10, 2015, 23 landowners attended the landowner workshop at the caldwell county government center. A similar landowner meeting was held for the Lake James to Morganton sister OVNHT plan in Burke County on March 5, 2015. The photos seen here are from both events.
33
chapter 2 90
18
K CREE ASY
321
R U
EK
LENOIR ER
W LO
N
DO
G IN AB
“Landowner Sentiment” was helpful for determining the preferred alignment and was included as a component of the final map series (Chapter 4).
SPA IN HO
Revise Trail Alignments
K EE R C
EE CR K
SC
LO W
CA
SO UT HW
LER
ER
CR
EE
K
GAMEWELL MIL
LD WE LL BU CO RK UN EC TY OU NT Y
RE
EK
321 64
HN
JO
including the natural 181
LEGEND
IVE
SR R
environment, the built
PREFERRED OVT ROUTE
W AR
RI
were used to determine
PROPOSED TRAIL
LANDOWNER SENTIMENT JOHNS RIVER GAME LANDS
YES NO
WIL
CR
E
N
POSITIVE NO RESPONSE
EK
MORGANTON
34
EXISTING TRAIL
RIDOR OR C
RHODHISS LAKE
SO
N
FO
RK
the preferred trail alignment (chapter 4).
OR
1/2
landowner sentiment,
M IL E
environment, and
E CR
EST BLVD
18
a combination of factors,
Map 8: Landowner Sentiment
trail route re-evaluation
GRE
0
1
2
4 MI.
trail character and design guidelines
Chapter 3 trail character & design guidelines
This chapter provides design details for various trail types and signage and offers insight for incorporating social media.
Between Lenoir and Morganton exists a diverse natural and built environment. Specific trail types must be applied throughout the corridor to ensure minimal maintenance and the best user experience.
I n t h is c h a pt er
This chapter defines six trail types and illustrates their transitions along the preferred trail alignment as fully described in the subsequent chapter.
C. Signage and Wayfinding
A. Trail Types B. Trail Profile D. Social Media Marketing
A specific theme is presented for signage, wayfinding, and trail support facilities. This chapter concludes with recommendations for using social media to market the trail and its history.
35
chapter 3
trail types
s
ix trail types are proposed along the preferred alignment. A specific trail type is proposed according to its surrounding environment, whether it's located within a rural or urban area, and the opportunity to create a meaningful user experience.
MILE MARKER FENCING TO MARK PRIVATE PROPERTY BOUNDARY
3’ SHOULDER
30’ PREFERRED BUFFER TO RIVER TO PROTECT WATER QUALITY
10’ PAVED ASPHALT
3’ NATURAL
8’ PAVED
2’ SHOULDER
10’ NATURAL SURFACE RAIL TRAIL
2’ STRIP
3’ SHOULDER
2’ SHOULDER
20% SLO
TRAIL LONGITUDINAL SLOPE SHOULD BE NO GREATER THAN 1/2 OF HILLSIDE SLOPE,
TOTAL RAIL BED APPROX. 16’ WIDE
rail trail
typical greenway
dual tread
10' natural surface
10' paved asphalt
8' paved asphalt & 3' natural surface
User Group: Multi-use
User Group: Multi-use
User Group: Multi-use
Material: Natural surface of crushed gravel fines
Material: Paved Asphalt
Preferred Width: 10'
Preferred Width: 10'
Material: Paved asphalt & natural surface of crushed gravel fines
Average Construction Cost: $40/ln. ft.
Average Construction Cost: $90/ln. ft.
Preferred Easement Width: Former Rail ROW
Preferred Easement Width: 50'
Minimum Easement Width: Former Rail ROW
Minimum Easement Width: 20'
Preferred Width: 8' paved & 3' natural surface Average Construction Cost: $80/ln. ft. Preferred Easement Width: 50' Minimum Easement Width: 25' *Note: The 3' natural surface could deviate from the paved trail, requiring a separate trail easement.
36
PE
trail character and design guidelines
GUARD RAIL
2’-3’ SHOULDER
3:1 MAX CROSS
8’ PAVED ASPHALT
2’-3’ SHOULDER
2’-3’ CLEARED
8’ 5’ NATURAL SURFACE
2’-3’ CLEARED
ncdot side path
dual-use path
wetland trail
8' paved asphalt
8' natural surface
boardwalk or geosynthetic
User Group: Multi-use
User Group: Hikers and Bikers
User Group: Hikers
Material: Paved asphalt
Material: Crushed gravel fines
Preferred Width: 8'
Preferred Width: 5'
Material: Wooden boardwalk or geosynthetic (crushed gravel fines placed in honeycomb structure)
Average Construction Cost: $120/ln. ft.
Average Construction Cost: $60/ln. ft.
Preferred Easement Width: 25'
Preferred Easement Width: 50'
Minimum Easement Width: 25'
Minimum Easement Width: 10'
Note: Trail to be approved in accordance with NCDOT encroachment agreement.
Preferred Width: 8' Average Construction Cost: $140/ln. ft. Preferred Easement Width: 50' Minimum Easement Width: 25'
37
chapter 3
trail type profile
t
here are nine (9) trail type transitions proposed along the preferred trail route, which extends approximately 20 miles. The Trail Type Profile identifies the transition location, along with associated length, for each trail type.
EAD D @ H L I A s A iit on FORK TR D TRAILHE s LAIR OSE n a r OSED B F PROP t l i PROP TH O a r t RT I. NOR STA 1/8 M
TYPICAL GREENWAY
10 FT. PAVED ASHPALT
RAIL TRAIL
10 FT. NATURAL SURFACE
DUAL TREAD
8 FT. ASPHALT, 3 FT. NATURAL SURFACE
NCDOT SIDE PATH
8 FT. PAVED ASPHALT
ST TRE
LE
DGE I R B
@H
AY W H IG
R 18 C
NG. I S OS
N
ER ENT
1 AY W H HIG
. OW R 4 8/6
EXI
T
6 18/ Y WA H G HI
. OW R 4
CE N E FLU N O C
2.6 1.8
4.8 1 0.7
2 0.3
WETLAND TRAIL
2.2
DUAL-USE PATH
8’ NATURAL SURFACE
existing trails
38
0.05 mile section @ Catawba gov. center
2
0.2 mile section @ gamewell park
N
0.5
BOARDWALK OR GEOSYNTHETIC
1
O
A USB H F
KA E E R DC
matchline
trail types
RD. T EN ADV
approx. distance in miles
N
ENC U L F CO N
EO
US FH
KA E E R DC
O DL
K REE C R WE
BAN
E
HN O J R NTE
ER
IV SR
ELA M GA
ND S B AW T A DC E S O
DGE I R RB
E
IV AR
P
PRO
R RG E V I AR B W ATA CCESS C ING ORD A T S EXI CKY F END @ RO
AY W N EE
EXHIBIT 2: TRAIL TYPE PROFILE
trail character and design guidelines
matchline
1.4
2.2 5.5
approx. distance in miles 39
chapter 3
signage and wayfinding
t
he OVNHT signage family provides for a modern rustic theme and incorporates materials consisting of metal, rock, and concrete. The signage family serves as a template and can be altered and further refined depending on local preferences and specific site needs and opportunities.
Trailhead
Trailhead
Monument Sign
40
Trailhead ID
Break-away sign for use along NCDOT Roads
M
trail character and design guidelines
Trailhead
way sign e along T Roads
Map Kiosk
Spur Trail ID to Historical Site
Confidence Marker 41
chapter 3
social media: THE NEW WORD OF MOUTH #Trail2Victory
EXHIBIT 3:SOCIAL MEDIA
t
rail users should be encouraged to utilize social media to share their experiences with their "friends" and "followers." Special signage along the trail will signal users to consider posting pictures of themselves or their friend group as the walk or ride bikes along the trail. In addition, special props and features should be developed during the final design phase. After all, who can market this destination-quality trail better than the trail users themselves? Let's take advantage of social media -- the new word of mouth.
The proposed official hashtag for the OVNHT is "Trail2Victory." The use of this hashtag will allow local tourism leaders to curate local photos and content that can be shared on websites and re-posted through other social media platforms.
#findyourpark
lenoir, nc
Find Your Park is the official centennial campaign of the National Park Service (NPS). The NPS is encouraging National Park enthusiasts to use the hashtag "findyourpark" when posting to social media. The OVNHT can help continue this campaign for years to come by encouraging the use of this hashtag at unique locations along the trail.
"Find Your Park" is the official centennial campaign of the National Park Service (NPS). The NPS is encouraging National Park enthusiasts to use the hashtag "findyourpark" when posting to social media.
42
trail users should be encouraged to utilize social media to share their experiences with their "friends" and "followers."
56 likes Amazing bridge on the #trail2victory here in @visitlenoir. #findyourpark #lenoirnc
Chapter 4 recommendations
This chapter serves as the heart of the Lenoir to morganton OVNHT master plan.
I n t h is c h a pt er A. About the Planning Section Maps B. Planning Section Descriptions
chapter 4 ASY GRE
90
18
1 2
GD IN
AB
SPA IN HO
K CREE
321
R U
CR
K EE K
LENOIR
EE
ER
64
CR
W LO
ON
3
E CR EK
4
GAMEWELL MIL
LD WE LL BU CO RK UN EC TY OU NT Y
LO W
CA
SO UT HW
LER
ER
CR
EE
K
5
SC
RE
MAP 9: PLANNING SECTIONS
planning sections
EST BLVD
EK
321
6 64 18
7
planning SECTIONS: The 20 mile
RI
OR
1/2
W AR
M IL E
R
IVE
SR
HN
JO
8
FO
9
RK
RIDOR OR C
JOHNS RIVER GAMELANDS
RHODHISS LAKE
181
WIL
CR
E
SO
N
EK
MORGANTON
study area from Lenoir to Morganton is divided into nine (9) planning sections. The geographic extent of each section includes a beginning and ending terminus that features a key asset or significant connectivity point for the trail. Many of the planning sections represent project areas that can be developed independently over time, providing a logical method for implementation as landowner willingness, funding, and other opportunities arise.
THE 20 MILE STUDY AREA FROM LENOIR TO MORGANTON IS DIVIDED INTO NINE (9) PLANNING SECTIONS; THIS CHAPTER IS ORGANIZED ACCORDINGLY. 44
FI W AT ER
TER WA
E FILT
R
PL
WALTER JOHNSON MIDDLE
NT A
#
CITY OF MORGAN Pedestrian CrossingTON JURISDICTION
VALLEY VIEWVIEW ST VALLEY
#
MAJOR BRIDGE
#
MINOR BRIDGE/ CULVERT
LANDOWNER SENTIMENT
Field
3
FORK RIOR WAR
POSITIVE
18
each planning section is
NO RESPONSE
2
anchored by a map that 14
Catawba Bridge Crossing
54
DR
OA KR ID GE
KI RK
00
SE
Y
landowner sentiment.
DR
0.15 0.15
IN
V
EN RD0.3 0.3
EA
Miles Miles
11 in in == 0.2 0.2 miles miles
R
Each planning section is anchored by a map that highlights proposed trail routes, trail features, and landowner sentiment. The proposed routes are identified as either preferred, alternate, or spur. These trail alignments are the result of extensive analysis, including environmental feasibility, landowner willingness, and insights provided by local government and local trail development leaders.
Noted trail features include the physical infrastructure and facilities that support the proposed trail. These features are highlighted along the preferred route and provide critical information for developing an estimate of probable cost for each section. These features include trailheads and crossings associated with either a road or water feature. Trailheads will provide
1/4
1/2 MI.
NC NCOneMap, OneMap,NC NCCenter Center for for Geographic Geographic Information Information and andAnalysis, Analysis,NC NC 911 911Board Board
for parking and trail user orientation. Road crossings indicate the need to provide for traffic calming measures and appropriate signage for both trail users and motorists. Major bridges indicate a significant stream or river crossing that requires a bridge greater than 20 feet in length. A minor bridge/culvert demonstrates the need to hcross a relatively small stream; at this broad level of planning, it remains uncertain whether a small bridge or culvert is necessary.
quick facts Each planning section begins with a “quick facts” exhibit. This information includes the trail distance, vicinity map trail type (see Chapter 4: Design Guidelines), and key features and assets associated with each section. Also, blair fork trailhead an Estimate of main street trailhead Probable Cost is provided, for total length: trail type: which further Estimated Cost: details are propoints of interest: vided in the appendix. 90
1
2
3
CA
LD W BU ELL RK E C COUN 6 OU T NT Y Y
7
5
4
18
321
LENOIR
64
GAMEWELL
321
64
18
8
E
about the pl anning section maps
0
OR C
RIDOR
M IL
D RE OE OHR SHS
1/2
52111 14444331 44000000 1
¯
DR NORTHRID THRIDGEGE NOR
IND Y EP SE EN(Public Land) Narrow51 Crossing RtoK Right of Way, Maintains Good Proximity to Corridor DE NC KI ET RL
53
routes, trail features, and N
GRACE RIDGE RRETIREMENT IDGE SIDE COMMUNITY T ER
i
VICT VO ICRTYO TRRYL
& 15
49
DE
O SI
' 22
EXISTING CATAWBA RIVER GREENWAY & ROCKY FORD ACCESS
50
highlights proposed trail
AR
N
Trailhead
RIVER
RD
E
BA W A T CA
RL RT IVE of the Better Crossing Spots (suspension?) Narrow Bend R One L AI TR ER V Sewer Easement Parallels Most RofI the Extent of the Catawba River to Hwy 64 DR OD 48 47 O W H RC BI
VI NE
TE EX
N
46Large Floodplain (Abutments/rise)
400 0 1S5H 9A 31D1O SW HA L ID NO EW DRL IN
CLU
AY W
&
1
R
16
BD
VE Greenway Easement Recorded On This Property RG Warrior Fork Bridge RE EN
LEN 2O0I6R 0R 00D6 41 LE NO 1 IR
RI
NO
206 0 00 6 41 1
AT AW BA
recommendations
YES
64
9
JOHNS RIVER GAME LANDS
181
LENOIR >> MORGANTON: by the numbers
20 11 23 15 54 $16.8M
>>
TRAIL MILES
>>
trailheads
MORGANTON
1.0 mile
Rail Trail
$873,820.00
>> >>
road crossings
>> >>
minor bridges/ culverts
major bridges
Blair Fork Trailhead
Valmead Basic School Temporary Trailhead
Main Street Trailhead
APPROX. cost
45
chapter 4
section 1 90
1
vicinity map
2 3
CA
LD W BU ELL RK E C COUN 6 OU T NT Y Y
7
5
4
18 321
LENOIR
GAMEWELL 321
64 18
64
Proposed Trails From the north, the preferred trail route, which extends approximately 1.0 mile, begins at the proposed Blair Fork Trailhead, which takes advantage of property expected to be deeded to Caldwell County Pathways, Inc. The route then continues south along Creekway Drive before extending to the east and reaching the abandoned railway and the proposed Advent Trailhead. The trail remains on the abandoned railway until reaching the proposed Main Street Trailhead and southern terminus of the planning section.
1/2
M IL E
8
9
RIDOR OR C
JOHNS RIVER GAME LANDS
181
MORGANTON
blair fork trailhead main street trailhead total length: trail type(s):
1.0 miles
Rail Trail
Estimated Cost:
Typical Greenway
$873,820
points of interest:
Blair Fork Trailhead
Creekway Drive Crossing
Valmead Basic School
Advent Trailhead
Main Street Trailhead
An alternate route is proposed to extend to the north and then east of the Thomasville Furniture Plant before reaching the abandoned railway. The abandoned railway through this facility would be ideal for trail development, but has been deemed unfeasible as long as the plant operates in its current manner. It will be difficult to meet ADA requirements along the Elizabeth Street section of this route. Also proposed is a spur trail to link the Blair Fork Trailhead to Valmead School.
01
trail users. While the Blair Fork property is expected to be deeded to Caldwell County Pathways, Inc., the Main Street Trailhead is noted more generally. Because of the abandoned 02 railway’s intersection with Main Street, this location will naturally attract trail users.
The Advent Trailhead serves a unique purpose: to provide a terminus should the trail north of this proposed trailhead not be developed at the time of opening the abandoned railway to trail users. The most challenging area of this planning section includes the area from Blair Fork Trailhead to 03 Advent Trailhead; this trail section does not utilize the abandoned railway. For this reason, various trail easements and two bridges must be developed. This portion of trail could take significant time and expense to implement, thus creating the need for another trailhead along Advent Road should this entire planning section not be developed within a single project.
Trail Features This planning section includes three (3) trailheads, two (2) major bridges, and five (5) road crossings.
photos: (1) The preferred route will not be able to utilize the portion of abandoned rail that runs directly through
Trailheads The proposed Blair Fork and Main Street Trailheads serve as the northern and southern terminus of the planning section, respectively. Each of these trailheads will provide for parking and signage to inform and organize
46
Thomasville Furniture. (2) This vacant property could be used as the future location of Blair Fork Trailhead. (3) The Advent Trailhead is proposed south of Thomasville Furniture.
PARK UN
HO PE
ADVENT TRAILHEAD
NT
ANCE
LL
#
MAJOR BRIDGE
#
MINOR BRIDGE/ CULVERT
W0O O
¯
NO
DS
WA Y
0.125
0.25 Miles
EN
POSITIVE
SH
AR
ND
Y FIN F LEINL Y E
R
MAIN STREET TRAILHEAD V
RAAN NKK IN IN
6
ROAD
YES
FO FO LKLK
W
D AL C LD IE EF
W AK
S
NW
#
LANDOWNER SENTIMENT
NEWA
IN
ST
ON
CROSSINGS
ELL IS
W
N
STOWALL STO NE
1/4 MI.
AI
ELYEY NOLN COC
1/8
T EC
1/16
P OS PR
NE
LA
N
O
M
TC
EE
CR
TRAILHEAD
WIL
IR
LA
HERRY WILD C HE RRY DC
OW
K
E
IV
DR AY W K
M
E E RE RE ETNET N PIN PI HAVE EN CE HAV PEA CE A AY PE GRGRAY
AD
ME
PEA
0
EK
O
NH
WO TRAIL FEATURES OD
HARRINGTON
RE
AI SP
W
PROPOSED LOCAL TRAIL
E VI
RE
C UR
N TO NG ON RLI NGT
AARLI HARRINGTON
L
LA
G A RGE
IE
ST
N REREN AR AR W W
GL EN
EA
5
W LD
A C
EA ST V
EXISTING LOCAL TRAIL
LI
VE AD
AD VE
L EL
L
EL
SPUR TRAIL
N
4
ALTERNATE TRAIL ROUTE
OR
PLA AZA ZA
PREFERRED TRAIL ROUTE
EH
AN
AN
NT
PEN NLLE Y EY
TRAILS
HL OL LO LOW WA AYY
SE
M
M
PL
LEGEND
GR G REE EN EN HAH VAEV NEN
W RI
RI
MA
LE LE
ER
ER
M
2 3
CED
AR R
CH BR AN G LO N
£ ¤
2 IN S TN
M
LLL ELE W W NN
NE
PE RK
COOP
RY
CCAL ALVA VAR Y NSSEET T
S UN SU
H HA A
ZEEL Z L LL E EEE
CLL C AARR KK
MAIN
N TIO DIC RIS JU YO CIT
HEDDEN
LAURE RELL
LA
N
321
LAU
T N T O N M MO EDED PI PI
OW
POWELL
WEAVER
H RRTTH NOO DDN OLOL
1
HEDDEN
AD
TRAIL TRANSITIONS FROM 10’ PAVED ASPHALT TO 10’ NATURAL SURFACE RAIL TRAIL
OXW O O OOD D
T MMEELO AA CC LOT
WEAVE R
FL
EN
OIR
VAVLAL MMEEA A DD
321
LL
THOMASVILLE FURNITURE
WEW XFROR X FEO DD VIL VIL LA LA GGEE
WE
1
BBO XW
PEA K
ME
VE COOPERATI ERATIVE
G RE G RE EN ENV ALL VA LL EY EY
D TO WO OD O
PO RPO TW R
C
VA LW AY
PO
CLIN INE E
MAP 10: PLANNING SECTION 1
OLINAA
CCAAR RO LIN
H
ET
AB
LIZ
AB E E TH EL IZ
BLAIRS FORK
O CK
AK
BLAIRS FORK
GR
EBEL
CHHRO ROSA SARO RO
WIN
TO
VALMEAD BASIC SCHOOL
LET
BLO
NUW
BLAIR FORK TRAILHEAD
CL
LA LA UR UR A A
K
D
NUWAY AY
BLV AAI L RWA FOY RK
OC
OO
R SCA
MAIN STREET TRAILHEAD
GR
LW VA
EBEL
BLAIR FORK TRAILHEAD
BLO WIN
RK CLA
SID YSI DEE W AY WA
SECTION 1
JJA ASSP PE ER R
recommendations
ON
1 in = 0.1 miles
NO RESPONSE
L ITA
P OS
H 911 Board NC OneMap, NC Center for Geographic Information and Analysis, NC
47
chapter 4
TRAILHEAD
B L A I R F O R K
creekway drive gateway existing
48
e
xplore opportunities to repurpose the existing railroad signaling infrastructure to notify motorists of the trail crossing while creating a bold gateway entrance. The crossing will be enhanced by providing a pedestrian activated rapid flash beacon and refuge island.
Exhibit 4: Creekway Drive Crossing
make a statement @
recommendations Crossings
There are six (6) road crossings. The Creekway Drive crossing (#1) is the most significant and crosses five traffic lanes (See Exhibit 1: Creekway Drive Gateway). Cross04 ings #2-#5 are all minor roads that access Lenoir neighborhoods. Crossing #6 at Main Street will be highly visible and can function as gateway to downtown (See Exhibit 2: Main Street Crossing).
Exhibit 5: Main Street Crossing and Trailhead
This planning section notes two (2) major bridge crossings. Bridge #1 crosses Blair Fork and Bridge #2 crosses Long Branch. Both of these bridges are north of the proposed Advent Trailhead and could ultimately be avoided provided access is ever achieved through Thomasville Furniture.
main street crossing and trailhead existing
05
T
he Main Street crossing serves as an opportunity to improve the aesthetic image of the surrounding neighborhood, a goal identified within the North Main Street Small Area Plan developed by the Lenoir Planning and Community Development Department.
photos: (4) Several minor road crossings will be required through Lenoir neighborhoods. (5) Significant erosion was observed along Long Branch where a major bridge will be required.
49
chapter 4
section 2 90
1
vicinity map
18 321
2 3
CA
LD W BU ELL RK E C COUN 6 OU T NT Y Y
7
5
4
LENOIR
64
GAMEWELL 321
64 18
8 1/ 2M
IL
IDOR
9
ORR EC
JOHNS RIVER GAME LANDS
181
MORGANTON
main street trailhead unity park total length: trail type: Estimated Cost: points of interest:
Main Street Trailhead
Downtown Lenoir
Fort Crider
Proposed Arts District
Unity Park & Community Gardens
1.5 Miles Rail Trail
Proposed Trails From the north, the preferred trail route, which extends approximately 1.5 miles, begins at the Main Street Trailhead, skirts the edge of downtown Lenoir, and ends at Unity Park. The trail utilizes the abandoned railway throughout the entire length of the planning section. A spur trail – which primarily utilizes the city’s existing sidewalk network – is proposed through the heart of Downtown Lenoir 06 and to connect the historic Fort Crider marker .
Trail Features Trailheads This planning section begins at the proposed Main Street Trailhead discussed in the previous section. The other trailhead identified within this section, Unity Park, cur-
rently provides for parking and serves as a community garden and public open space area. Crossings There are six (6) road crossings identified within this section. Crossing #6 at Main Street is highlighted in the previous section (See Exhibit 2: Main Street 08 Crossing, page 49). Crossings #7-#11 highlight trail intersections with primarily local roads. College Avenue (Crossing #11) does serve a relatively high volume of traffic and will require significant design atten09 tion to ensure trail user and motorist safety. This intersection is also adjacent to the old train depot, which is a central component of the proposed “arts district.”
$361,440
photos: (6) Fort Crider, located at the former Lenoir High
School, served as a campground for militiamen on September 29, 1780. (7) Unity Park currently provides for parking, community garden space, and is an important asset worthy of connection. (8 & 9) Several crossings (#9-11) are located close to the proposed Arts District.
07 50
recommendations
LK
VAIDEN
OIR
IN
MAP 11: PLANNING SECTION 2
N ND E LI
EK RE KC OR
ZA CK SF
O
L
TRAILS PREFERRED TRAIL ROUTE
MEADOW ALTERNATE TRAIL ROUTE
EXISTING LOCAL TRAIL PROPOSED LOCAL TRAIL
TRAIL FEATURES IVE
TRAILHEAD
OL
K
R PA
VIE
IN TA
UN W
IEW
STV
OD WO
NT KE
EAST SPRUCE
HIGHLAND
HIGH
SIMS
FO
VANCE
LI N
K
PROSPECT
BOR
LEGEND
D
LEN
DS
O
O W
O
E OV
MO
RD HOWA
IFT
T
GR
WE D
REA LTY
GS
IN
RD
VIRGINIA
IT A
ENIN COR P
KW AY EE CR
EK RE RC OU INH
HO SP
G
N TO W HA RP ER
SPA
EN
O RW
LL
E
ID
IT
O
N
ILL VE DA
IN MA
KN O
BR
THR
OR
NP
O WO GE
BROOKDALE
P
SPUR TRAIL
T
ED
EL
FAIRVIEW
N TO
N
EN
ER
HI
Y RR
YH OR CT RE
BE
LL
MU
L
SO N
ND
E
L DA
DD
LA
KES
ICE
AL
K
IL
W
PR
SM
ND
O
W
Y NE
IS
ST A
A DL
O
L
TH NA
R
AL EW
ER AB
ON ST
RO
N
ES TB
R
EW
FIE
O WO
Y WA DS OO W
A
WIL
IGH
WR
PROGRAMMED TRAIL WILL CONNECT TO EXISTING GREENWAY @ LENOIR PENNTON MULBERRY REC. CENTER
NN JE
FO
K
D UN
ER
W DO
SH W
HL
RY DA
CHAP
PROPOSED ARTS DISTRICT
UNITY PARK TRAILHEAD
K
A AC ES
LM
L CO
RM
10
O
PA
GE LE
FO
9
O
PER HAR
CH
UN
R
HA
UR
BO
OW LL
R PE
RE UR
HO
N AI SP
TO
GE
CH
UM
W
WI
L CO
N
Z LUT
AD BR
OO CR
T ES
1/2 MI.
S
BU
M LU CO
WN DO
OT
E
RY KO
C HI
R EB 1/4
LL CO
T ES
FORT CRIDER
11
GE LE
EGE
1/8
LOW ILL
DEP
T
GH
L AL BE
PL
TO
G ED
0
MA
RD
NGT ON
LI
PLE
A
N
ABI
E
NC
E RR
LENOIR E
H AS
EL
MA
RI
C KY
HA
E POP
LB PO WE L
E
R RPE
BR
KIR
E ST
LAR
POP
R
N
LL
OSA
MIM
TON FUL
YES HA
W
D O O W E ER PL A M
L
LA POP
O ST
BEA
IRVIEW
ARD CKY
BRI
D OO INW
H
D OO KW
SH
LY OL
CH BEA
NORTH FA
F
R
TIE
ND RAY
ING
EL
RI
SPR
GA RL A
IS
N
LL
U
IO
M
W
M
ICT
AR
ER
EL
HE
R
FO
8
RR
ISD
N TI
N RO
IN
UR
M
W ER
RJ
S
OI
O EL
B GA
H
LE
EN
AR
CH
FL
DY
L IL
HA
YO
S
N QUEE
T ES
RID
CIT
D
SCROGGS
EN
RT
O
H
GL
O
O
RO
PECT PROS
ST RE
AY ADW BRO
B
7
TA U
O RT
ER ST FO
ER NT CE
LC IL H
G
HW O
N BI
FINLEY
N
N
N
S
RSO
FINLEY
HEALA
RE E K
PAT TE
HARTLEY
E AG ST
AN ERM
N
6
MAIN
P
TH R
S
IN
K ER
TC
N
O
CIA
EN
L VA
RA NK
D W AK EF IEL
O
HOO DS C
N
EEK
LD
DS C R
O
HOO
W BRO
IR
LA
M
E RE ET EN PIN AV EH AC
K
N NLE
PE
PEA
CR
CONLEY
SECTION 2 MAIN STREET TRAILHEAD UNITY PARK
NE
LI EST
MAIN STREET TRAILHEAD
N TO AN
RG
MO
R WE LO
CROSSINGS
#
ROAD
#
MAJOR BRIDGE
#
MINOR BRIDGE/ CULVERT
LANDOWNER SENTIMENT YES
K
EE
CR
NO POSITIVE NO RESPONSE
R
EE
GR
51
Exhibit 6: Get Down @ the Depot
chapter 4
Get down @ the Depot existing
52
T
he old rail depot could serve as a public market space and catalyst for revitalizing this former industrial area of Lenoir.
1780 BREWERY
Exhibit 7: Brewing Up Investment
recommendations
brewing up investment existing
N
orth Carolina’s new public-private partnership (P-3) laws could be employed to attract specific investments that align with City of Lenoir revitalization goals (see Appendix A6: Public-Private Partnership).
53
chapter 4
section 3 90
1
vicinity map
18 321
2 3
CA
5
LD W BU ELL RK E C COUN 6 OU T NT Y Y
4
LENOIR
64
GAMEWELL 321
64 18
7
Proposed Trails From the north, the preferred trail route, which extends approximately 2.4 total miles, begins at Unity Park and continues along the abandoned railway before crossing Highway 18. From here, the trail will utilize the former railroad trestle bridge before reaching the Lenoir sewer easements that extend to Fairview Drive along the south side of Lower Creek. The trail type for this section will include a multi-use paved trail with a natural surface side path.
8 1/ 2M
IL
IDOR
ORR EC
JOHNS RIVER GAME LANDS
9 181
MORGANTON
unity park Caldwell county gov. center total length: trail type:
2.4 Miles
Dual Tred
Estimated Cost:
Rail Trail
From Fairview Drive to the Southwest Boulevard underpass at Complex Street, the trail will take advantage of another abandoned section of railway. Immediately after 10 crossing Complex Street, the trail route continues slightly north after passing a dramatically unstable section of Lower Creek that is in need of stream restoration (See Exhibit 11: Restore the Stream, Realize the Dream, page 59). This planning section concludes at the Caldwell County Government Center workplace walking loop.
$1,215,3000
points of interest:
Unity Park & Community Gardens
Highway 18 Crossing & Signage
Trail Features
#Trail2Victory Bridge
Trailheads
Southwest Blvd. Underpass
Lower Creek Revitalization and Observation Deck
Caldwell County Government Center
Trailheads are proposed at Unity Park and the Caldwell County Government Center, both areas which currently provide significant public parking.
Crossings Proposed within this section are four (4) road crossings, three (3) major bridges, and five (5) minor bridges/culverts.
The Highway 18 crossing is significant not only in regards to vehicular traffic, but also for trail visibility and branding (see Exhibit 8: Highway 18 Crossing, page 56). Virginia Street and Fairview Drive serve as collector roads and as such will require appropriate pedestrian detectors for motorists. The Complex Street crossing must appropriately manage large truck traffic accessing the Broyhill Furniture Plant.
From the north, the first bridge located in the planning section (#3) is the abandoned railroad trestle bridge to be repurposed for the trail. The trestle bridge also provides a location for connecting Lenoir’s programmed Lower Creek trail that extends from the north via the Google Data Center. A new pedestrian bridge is proposed on the west side of the existing vehicular bridge at the Fairview Road Crossing. The last major bridge (#5) in this section, which crosses Greasy Creek, is located on property owned by Caldwell County.
photos: (10) The preferred trail route will utilize Lenoir sewer easements along the southern side of Lower Creek. (11) The
11
Caldwell County Government center has an existing walking loop and will provide for significant trailhead parking.
54
4400 0000 1144 2255 1133 4000193313
VIRGINIA 50000905133 VIRGINIA 500009051 VIRGINIA
LLEET TO O
MAP 12: PLANNING SECTION 3
K EE
OVERLOOK OVERLOOK ERLOOK OV
CR N W
TOWN CREE TOK
ee k Cr To wn
SPAINH SP OUR CR ASp INain Hho O EE U ur R CrC eeR k EEKK
4400 0000 1133 0000 1133
E LLE
S
EX M PL CO
PREFERRED TRAIL ROUTE ALTERNATE TRAIL ROUTE
EXISTING LOCAL TRAIL PROPOSED LOCAL TRAIL
TRAILHEAD CROSSINGS
#
ROAD
#
MAJOR BRIDGE
#
MINOR BRIDGE/ CULVERT
HHAA WK W K 0
1/16
1/8
1/4 MI.
N
YES
¯
0
NO
0.125
0.25 Miles
POSITIVE
1 in = 0.1 NO RESPONSE
miles
OV ERLO OK
N COON ALLC FFA
RRE ED D
IICC EEIN CNE HHNOOH UOURUR R
G
R
Y
OLODLD MM OORRG GA N NTTO ONN
BU
IS
R
R
W LO Existing Rail Track
A
ER
FURNITURE INDUSTRIES
H
EXK PLEE M R CO C
LEGEND
LANDOWNER SENTIMENT
5 Lower Creek-Tributary Crossing #11 BROYHILL AYR AR NN OIO SISI VVI
OVT TRAIL TO CONNECT WITH EXISTING WALKING LOOP
Significant Creek Crossing
DD AALL ERR 3 ME 31 EEM 93 VD01 BL00 T 4 ES HW
36 6
UT STO
35 7
CENTER
TRAILS
4000 11 4513
15 Potential Bridge to Use?
Trailhead
16
IEW IRV FA
Tributary Crossing Needed Pedestrian Crossing 5 De-Stabilized Reach of Stream
H AR R IS BU R G
TRAIL FEATURES
ES
M EL
EL V I E V W IE W
PROPOSED TRAIL ROUTE TO FOLLOW ABANDONED RAIL
3
PROPOSED TRAIL ROUTE TO FOLLOW SEWER EASEMENT
14
HW UT
M
HHO
37
k ree
SPUR TRAIL
Existing Path/Powerlines
4
EN AV H N LY
EEK R CR GOOGLE DATA Readapted Trussle Bridge
2 39
SO
3 41 06 00 0 20
R
40
rC we Lo
Pedestrian Crossing
13Pedestrian Crossing
Abandoned Rail Trestle (Lenoir Hopes to Rehabilitate) End of Powerlines
4
12
3 451
FAIRVALUE SHOPPING CENTER
DUAL TREAD TRAIL TRANSITIONS TO 8’ PAVED ASPHALT TRAIL IN R.O.W.
EERR OVV OO
LVD
TO N G AN BERNHARDT MOR FURNITURE Ponded/Wetland Area Begin of Powerlines WORKPLACE Four-way Signal- No crosswalks 1 FITNESS TRAIL
38 3
PROGRAMMED TRAIL WILL CONNECT TO EXISTING GREENWAY @ LENOIR MULBERRY REC. CENTER
18
WE Utilize Existing Rail Spur LO
ON B GANT
Pedestrian Crossing
U
50 00 09 03 13 64
BERNHARDT FURNITURE
OR NM
18
CALDWELL COUNTY GOVERNMENT CENTER
TRAIL TRAINSITIONS FROM 10’ NATURAL SURFACE RAIL TRAIL TO DUAL TREAD
FOOD LION SHOPPING CENTER
Ponded/Wetland Area
R
EE NDD UUN
11 000 4IA GIN
64
C
N WN OOW D D R
R EEER RE GGR
VIR
L
SIS VVI LY CLY
CAROLINA PRIME
W W EW VIIIEE V RV AIIR FFA
NN RRN R BA BAA EDB RD D REE R
A
E ELLLLE SE OS RO R
EN
N EN EE RE GR G
GRE
EK RE Y CrR EkEK REAS C C ee
G reSaY A sy GREG
M EMM HEE H CH YYC OOLLLY PPO P RI
RO
SS GS G ING NNIIN NNN JEN JJEE
D
IN D U ST LENOIR IR N INDUSTRIAL IAU D PARK LS T
A BR
HA
K K OK OO RO R O BR EEB B E GG ED D G ED E
R PE RR E A RHP
T SSTT S RREEE CCR C
D RD O ORR FO KFF CCKK ROOC RRO W W AATT SS OO NN
Powerline easement
NNXX LY LY
IR NOOIR EN TT LLE WWEESS
RR OOC CKK W WE ELLL L
D RD OR DFFO D AD RA OR BR B DF
13 0513 1405 0014 4000 40
RAAA R R M MAA A AM TA TT
CCKKK AC BBAA UTTT OOUU O
MO OOO RR EE
UNITY PARK TRAILHEAD
RD
FO
AD BR
Z UTTZ LLU
CALDWELL COUNTY GOVERNMENT CENTER
1133 1100 1133 0000 4400
UNITY PARK
S
BU
M LU CO
Y REALT
SECTION 3
Unity Park UNITY PARK to County Gov't Building TO COUNTY GOV'T
ABINGTON
EL C H AP
40 00 13 09 13
BROOKDAL E
recommendations
NC OneMap, NC Center for Geographic Information and Analysis, NC 911 Board
55
Exhibit 8: Highway 18 Crossing
chapter 4
highway 18 crossing existing
56
t
he Highway 18 Crossing will be enhanced by providing a pedestrian activated rapid flash beacon and refuge island. This crossing provides a link to the historic trestle bridge (page right), which serves as the southern terminus of the rail trail.
Exhibit 9: #trailtovictory Bridge
recommendations
#Trail2victory bridge existing existing
n
otable features must be developed along the trail that are both functional and attractive. Trail users will be explicitly encouraged to use social media to share photos using #Trail2Victory.
lenoir, nc
56 likes Amazing bridge on the #trail2victory here in @visitlenoir. #findyourpark #lenoirnc
57
Exhibit 10: Southwest Blvd. Underpass
chapter 4
southwest blvd. underpass existing
t
he Complex St. crossing and Southwest Blvd. underpass provides for a unique environment that can help further define the trail's character. A spur trail from this location will provide users an opportunity to learn about the proposed Lower Creek stream restoration project (page right).
58
Exhibit 11: Restore the Stream, Realize the Dream
recommendations
#TRAILTOVICOTRYK #FINDYOURPARK
restore the stream, realize the dream existing
A
section of Lower Creek, located southwest of Complex Street, is unstable, providing an opportunity for stream restoration and environmental education. Such enhancements provide an opportunity to leverage grant funds from a variety of sources. The result: a destination-quality experience.
59
chapter 4
section 4 90
1
vicinity map
2 3
CA
LD W BU ELL RK E C COUN 6 OU T NT Y Y
7
5
18 321
LENOIR
64
4 GAMEWELL 321
Trail Features
IL
IDOR
1/ 2M
The only road crossing is located at Old Morganton Road, which provides vehicular access into a local neighborhood and the Caldwell County Government Center.
18
ORR EC
JOHNS RIVER GAME LANDS
181
MORGANTON
Caldwell county gov. center gamewell park total length: trail type:
0.9 Miles
Existing Gamewell Park Asphalt
Trail
Estimated Cost:
The preferred trail route extends approximately 0.9 miles and connects the workplace walking loop at the Caldwell County Government Center to the Gamewell Park walking loop. Due to landowner issues and other environmental challenges, local trail and government leaders wanted to establish this trail section along Highway 18. Local officials will work with NCDOT to secure an approriate encroachment agreement for the trail section.
Proposed within this section is one (1) road crossing and five (5) minor bridges/culverts.
64
8
9
Proposed Trails
Trailheads Trailheads are proposed at the Caldwell County Government Center and Gamewell Park, both which currently provide sufficient public parking. Crossings
NCDOT Side Path
13
$489,020
points of interest:
Caldwell County Government
Center
Gamewell Park
12
photos: (12 & 13) Proposed trailheads at Caldwell County Government Center and Gamewell Park have existing public parking lots.
60
recommendations
MM EELL VVIE EW W (42-Ft. of Shoulder) Pedestrian Crossing Hwy 64 Has Signficant ROW: Approx. 150-Ft. of IROW
'
#
16
ROW Has Steeply Sloped Conditions In Some Areas
OLLD O D MO OLM RG DO R GAN MO RGA TTO AN O NT N ON N
64
ek
36
35
Significant Creek Crossing
6
5 &
Lower Creek-Tributary Crossing #11
OVT TRAIL TO CONNECT WITH EXISTING WALKING LOOP
M
O
RG A N
TO
N
Existing Rail Track
34
8
BROYHILL FURNITURE INDUSTRIES
33
Cr E Ke
Tree Farm
9
LEGEND
ER OW ECRRE LCoEK we R Er
413
BBBRR U RU USSSH H HYYY
TRAILS PREFERRED TRAIL ROUTE
LO LW
4000 140
XEXX EE PLLL M PP O MM CCCOO
BBEEEE C BC EH EH RAANN CEE HRE R AN DDD EE RSSOO ERR NN SON
AA INAGD BB IN O GbD ingO dN oNn C CrR C eE R eEkEEK K
18
7
Trailhead Connect To Existing Path Loop
CONNECT TO EXISTING GAMEWELL PARK TRAIL LOOP
W
ALTERNATE TRAIL ROUTE
IE
GGRR AANN GRDD AVNVI I EWW DEV
SPUR TRAIL EXISTING LOCAL TRAIL
ERS CREEK LLlers MIMil Creek
PROPOSED LOCAL TRAIL
Existing Graded Path
TRAIL FEATURES
1032
TRAILHEAD
Connect To Existing Path Loop CROSSINGS
18
& 6
'
MAJOR BRIDGE
#
MINOR BRIDGE/ CULVERT
¯
LANDOWNER SENTIMENT
B BR RO OA AD DLLA AN ND D Quarry
1/16
1/8
1/4 MI.
0 0 13 49 11 00 40
0
YES
N
Trailhead
Lower Creek-Tributary Crossing #10
17 #Pedestrian Crossing
#
NO POSITIVE
0.075 0.075
1 in = 0.1 NO RESPONSE
miles 1 in = 0.1 miles
JJA AC CO OB B
0.15 Miles 0.15 Miles
451 3
64
ROAD
VVI I RRGG ININ IAIA
GAMEWELL PARK
#
400 0 11
713 42 01 400
MMOO RRGG AANN TTOO NN
WE ST CAL T CALDW ELELL WE ST CALDW L DW ELL WES
MAP 13: PLANNING SECTION 4
GAMEWELL PARK
13 64 00 0 0 20
ek
CALDWELL COUNTY GOV. CENTER
DUAL TREAD TRAILE RR VE TRANSITIONS TO OOV8’ PAVED ASPHALT HHOO TRAIL IN R.O.W.
CALDWELL COUNTY GOVERNMENT CENTER
GRGR EAEA SY SY Gr C CeaRR sE yECE ErK eK
MELVIEW
SECTION 4
County Gov't Center Gov't Center totoJohn's RiverPark Gamelands Gamewell
#
R
E OV
HO
NC OneMap, NC Center for Geographic Information and Analysis, NC 911 Board
61
chapter 4
14 photos: (14) The trail will connect to Caldwell County's existing walking loop. (15) The proposed trail will leave the existing walking loop and parallel the Caldwell County Government Center's driveway. (16) A constructed wetland manages stormwater from the Caldwell County Government Center's parking lot. (17) After following Highway 18/64, the preferred trail route will connect into Gamewell Park via a sewer easement.
15 62
16
17
Exhibit 12: Highway 18 Side Path
recommendations
TRAILHEAD
highway 18 side path existing
t
he trail will utilize a portion of the NCDOT right-ofway to connect the Caldwell County Government Center to Gamewell Park.
63
chapter 4
section 5 90
1
vicinity map
18 321
2 3
CA
LD W BU ELL RK E C COUN 6 OU T NT Y Y
7
5
4
LENOIR
64
GAMEWELL 321
64 18
Proposed Trails
Crossings
The preferred trail route extends approximately 1.6 miles throughout this planning section and connects the Gamewell Park walking loop to Rocky Road. Due to landowner issues and other environmental challenges along Abingdon Creek, the trail will need to extend along Highway 18 south of Gamewell Park before turning back toward Lower Creek. The trail continues along the west side of Lower Creek before reaching Rocky Road and McCreary Modern Furniture Plant.
Proposed within this section are two (2) road crossings, four (4) major bridges, and two (2) minor bridges/culverts.
1/ 2M
IL
8
9
IDOR ORR EC
JOHNS RIVER GAME LANDS
181
MORGANTON
gamewell park rocky road intersection total length: trail type:
1. 6 Miles
Dual Tread
Estimated Cost: points of interest:
$985,700 Gamewell Park
Proposed Workplace Wellness
Campus
Gamewell Elementary School
Gamewell Middle School
NCDOT Side Path
A spur trail is recommended to extend east from the preferred trail near Rocky Road to provide connectivity to Gamewell Middle School.
Trail Features
The first road crossing is located at Old Morganton Road just south of Gamewell Park and Town Hall. The crossing will need to be appropriately sited to 19 protect trail users from motorist turning off of Highway 18. The final road crossing is located at the southern end of the planning section at Rocky Road. This crossing will also link the two McCreary Modern furniture manufacturing plants and the proposed workplace wellness campus.
Trailheads Gamewell Park serves as the only trailhead within this planning section. However, there are other opportunities for trailhead locations that should be explored with landowners within the vicinity of Rocky Road, including several churches and McCreary Modern.
From the north, the first major bridge (#6) will be constructed over Abingdon Creek on the north side of the existing vehicular bridge located between Gamewell Park and Town Hall on Old Morganton Road. The three additional major bridges (#7, #8, #9) all cross tributaries to Lower Creek.
photos: (18) Several churches in the area could provide an opportunity to create trailheads. (19) The crossing at Old Morganton Road will need to be appropriately sited to protect trail users from motorists turning off of Highway 18.
18 64
recommendations TO
N N TO N
A
G
G AN R
O R
O
M
M
LIIN NSS
ROCKY
29
13
3 Home Close to Creek 441 0 11 400
A
VVIIRRGG V IIN IN IRG IN AIIA
LE N O IR A M JU EW RI EL SD L IC JU TI O RI N SD IC TI O N
EK RE
EKC
ILL L HT S
DDU ULLAT AO DU TOW WNN H LA HEEIG TO WN IGHHTS TS HE IG
40 00 11 45 13M MMI ILLI LLLLEE ERRRH HIH LILL
400 0 12 9 01 3
HHA AW WKKS SBBIL ILLL
THIHLI LLILL L
TU TUUTT H
4000124313
RUU MM PPP M CCCR RU
#
ROAD
#
MAJOR BRIDGE
Y RRRY
EER # ABB
A HININ CCH
91 31 3
SEE CAAS IRIRC A T A SST
¯
MINOR BRIDGE/ CULVERT
LANDOWNER SENTIMENT
LEE EPPY LYOHHO WOL LLLO OW W
' #18
MAP 14: PLANNING SECTION 5
O LD
213
EXISTING LOCAL TRAIL
R
40 00 12 73 SSW 13 SW WE EEEEET TTB BBRR RIIAA IARR
Trailhead
HHO OLL
LLU UKKE E KKI DID DD
SP NCER SPEEN CER
191 4000
CROSSINGS
Y
HO
L
RRE EGG IN0INA A
YES
400 0 19 2 91 NO3
00
A CCCA BEEC RREEB
OOPPA A LL
SPUR TRAIL
TRAILHEAD
N ILLYY N NDDI CCIIN
O IC AL CCCA O ICO ALLIC
CCOO FFFF EEYY
A
20 00 00 64 13
WE
Lower Creek-Small Tributary Crossing #7
MCCREARY MODERN
MCCREARY MODERN
EROC OC KK
TRAIL FEATURES 400 01
End of Sewer Easements Pedestrian Crossing
WW W AARAR RD D DGG GRRR EEEEEE N NN
713 TA TABL ALTERNATE TRAIL ROUTE BL ER TA OCK BL ER
PROPOSED LOCAL TRAIL
SLES ESLPE
30
DDUULLAA HO HOLLLLOO W W
PREFERRED TRAIL ROUTE
4000 128
LO
1131
E TLLELE TTTT U U U T TT
Lo R we C r CR reE ekEK
CR
EE
K
Wetlands
ER
CCLAY LAY 3 421
HTS HEIGHTS NCERRHEIG SPENCE SPE
13 4000 1430
N
4000 142313
Wetlands/Low Lying Area
Lower Creek-Tributary Crossing #8
Greenway Could Not Utilize Easement
ERR ENNCCE SSPPE
ABbIN in G AgdBoDO nINN C GC re DR ek OEN
HHO O OLLL LLLA AAR RR 4000 11 90 13
& 8
LO W
CCO OC LLO MO IIN LSL N MROG SIN S A RGN ATNO TNO N
EYYST SSITN TIENI NE E
IV IVIE VEY
ND HARTTLLAAND
G
IICE CENNHO HOUR UR
TTO OW WNH NHO OUUS SEE
9 &
Signalized Stop Light (No Crosswalk)
NDHAR
HARTLA
T KKEENNT KENT
LEGEND
18
12
GAMEWELL ELEMENTARY
KPotentially E HO Dangerous Intersection For Pedestrians Unless Redesigned USE T CLAY A P
0 11 400
MEESS JJAAM
W LO
E RR ATHHE DF AT A N DF GGRRA N
N A KLAW WN O OA KLA
SMO
TORR ENCE
RNE RR CCO ORNE
TS HE IGHHTS K ORYY HE IG HHIC ICK OR
13 25 13 00 0 4
F O
TRAILS
GAMEWELL Calico O Rd. and Water Easements) L Has Signficant ROW (80' With Sewer MIDDLE HO C S 40 L 00 EL 13 W 78 ME 13 A G 40 00 R11O4 C31K3 Y
RREEDDCCLIF LIFFF
ER
N W TO
E CR
KKEE NNTT VVI IE EWW
F
Driving Range-Potential Partners GAMEWELL DRIVING RANGE
EW Alignment Would A MExist Mile OVT Buffer Connect to Existing Path
F E AF KLLE A OOAAK
HIGHLA ND HIGHHIGHLA LAND S ND
EK
O
64
0 4S E LL
G
TY
CI
BBRR OOA ADD LALA NNDD
H RC H HU RC T C HU TISST C BBAAPP TI
G GRRO OG GAANN
N SSOOONN AATTTS WW WA
13L 9 8O 0 1H3O 0C
LLEEF FTT T TUUR RNN WWA ALL N NUU GAME MEWE WELL LL GA TT
NN TNO TOO N AANNT GGA RRRG O OO MM DM LDD L O OO
WWAW ARARR RRE RE N E NN
BRO AD LA
Lower Creek-Tributary Crossing #9
&7
13 20 13 00 40
DDEEE S IIID INNGGSS RNNIIN N R OO R M MMO LS HHIIILLLLLSS LLAA H N L I RRO O OLL AR CCOO C E AL HDADALLEE CHD CH BRIRC BBIIR
ERR KLLE IN K WWIN LE
R
GA GAME MECR CROF OFTT
40 00 13 19 13 8’ PAVED ASPHALT TRAIL TRANSITIONS TO DUAL TREAD
Begin of Parallel With Sewer Easements
E LL CCAARRDDW WE LL RRRO OO KYY CC C K KY
K
N
L IL
32 11 3 4000 1
IN
Trailhead
Quarry NTO 6 &A' G O R Lower Creek-Tributary Crossing #10 M OLD Pedestrian Crossing #17
H
ROCKY RD. INTERSECTION SSPPE E AAR RSS
W
GAMEWELL PARK
KIKIN N C C A AI ID D H H IL IL L L
ID A C
CCH HAAN NCCE E
IN K
13 80 13 00 40
GAMEWELL PARK
SS HHEEE E LY LY
Existing Graded Path
32
O LD
SECTION 5
GAMEWELL PARK Gamewell Park SS HH EE L EE Y LY TO ROCKY to Rocky Rd.RD
HOLL INS
SU SUMM MMER EROW OW
Connect To Existing Path Loop
PPA ARRK KEER R
400 0 13 8 71 3
MMCCCCAARRTH THYY
13 49 11 00 40 ND
CH CHURRCH FLATT CHU EEAASSTT FLA
TANKKHIL HILLL TAN
1/8
BBRRAAN0.15 NCCH 0.15 H
POSITIVE
0.3 0.3 Miles Miles
E INE= PIN ERESPONSE NE1 1Pin in 0.2miles miles NO = 0.2 LLOON 1/4
1/2 MI. NCOneMap, OneMap,NC NCCenter Centerfor forGeographic GeographicInformation Informationand andAnalysis, Analysis,NC NC911 911Board Board NC
&
65
chapter 4
20
photos: (20) Portions of Lower Creek are severely eroded and in need of restoration. (21) McCreary Modern has a substantial amount of open space surrounding their facilities that could be used to create a workplace wellness campus. (22) Portions of this proposed section of trail would follow a sewer easement.
21 66
22
to l el ew m a g ry ta en em el
fence
Exhibit 13: Workplace Wellness Campus
ur sp
pr ef er re d
northern loop
tr ai lr ou te
recommendations
crosswalk
ro cky rd.
0
1/16
1/8
1/4 mi.
southern loop
workplace wellness campus
a
walking track at McCreary Modern would not only serve as a workplace wellness opportunity, but also provides a hub for targeting trail connectivity over time.
67
chapter 4
section 6 90
1
vicinity map
2 3
CA
LD W BU ELL RK E C COUN 6 OU T NT Y Y
7
5
18 321
LENOIR
64
4 GAMEWELL 321
64 18
8 1/ 2M
IL
IDOR
9
ORR EC
Proposed Trails The preferred trail route extends approximately 2.6 miles from Rocky Road to Calico Road. Landowners within this section were well represented at the public workshop; most of those in attendance expressed their disinterest in the trail except for a single landowner in the southern area of the planning section. The route remains on the west side of Lower Creek before reaching a proposed pedestrian bridge located approximately midway along the planning section. From here, the trail continues on the east side of Lower Creek and underneath Calico Road (see Exhibit 14: Calico Road Underpass, page 71).
Only a single major bridge is proposed over Lower Creek and is located midway along this section. The bridge allows for the trail to avoid some environmental challenges, but primarily provides for an alignment that does not impact landowners that have expressed their unwillingness to provide a trail easement.
JOHNS RIVER GAME LANDS
181
MORGANTON
Trail Features Trailheads
rocky road intersection calico road total length: trail type: Estimated Cost: points of interest:
A trailhead is proposed on property located on the southeast corner of Lower Creek and Calico Road. The trailhead will serve as an extension of the Calico Road underpass and create a hub for targeting trail connectivity over time.
23
2.6 Miles Dual Tread $1,619,240 Lower Creek
Crossings Proposed within this section are one (1) road crossing, one (1) major bridge, and twelve (12) minor bridges/culverts. The only road crossing is located at Calico Road where there is ample room to locate the trail under the existing bridge.
photos: (23) A bridge will be required over Lower Creek.
68
recommendations
0 11 400
KINCAID
28 AUTUMNWOOD 15 Lower Creek Tributary Crossing16 #5 27
GRASSY MEADOWS
NT AI
N
LI
CO
Lower Creek Tributary Crossing #3
19 & 26
ER
E
TRAILHEAD
'
BE
25
DS
CANDY
T ET
CANDY
DFRIE ELAD S M
A M RE
IC O
CA
O LIC
W IIEEW
RN
D
CA L
13 42 11 00 40
BU
M
23 24
FI EL
N TO AN
25
O
RG
22
V V TTIC JESS JE AA MM
House Very Close to Creek
21 26
23
24
#
ROAD
#
MAJOR BRIDGE
#
MINOR BRIDGE/ CULVERT
¯
LANDOWNER SENTIMENT
O AEMOE
EV
Signficant Bridge Span Would Allow For A Greenway Underpas Calico Road Bridge Underpass
19 &
K OK ROO NBBRO A N EV A
CM CA
22
H
PROPOSED LOCAL TRAIL
CROSSINGS
TOWNSEN D ND TOWNSE
OR
EXISTING LOCAL TRAIL
21 &
W LO
CA L
IC O
CA
L
PI
IA
ERR
TA L
AAE
EK
SPUR TRAIL
TRAIL FEATURES
Lower Creek Tributary Crossing #2
E CR
ALTERNATE TRAIL ROUTE
CRACIR GM AI OU G N M TA O IN U
ST R
U
EH N PI
Hus
18 &
Trailhead
AC
N
PREFERRED TRAIL ROUTE
Lower Creek Tributary Crossing #4
20
PL
AY M
BERRY
QUAL
AY PL
MO 40RE 00 B 13E 31AC 13H
T LE EYY
O NT A413 G R 6 O 00 M00 20
N
PI
SO OU S UTTHHYA AR RD D
TRAILS
Wetlands
CA
RT R L
HA
HA
ba n d
Cr e ek
N O LT
N
N
VD BL
ON LT
LHT EO
HE
HE
T RS
U
EH
HILL
LEGEND
FO X
R
LE R
LE CC
LAWS LAWS
& 10 & Greenway Alignment Unlikely Due to Parceled Out Creek
ER LLLE EEL
EL MO
CCIR IRCC LE
FOX #2 Greenway Could Serve Many Residents Who Have No Sidewalks Lower Creek Bridge Crossing17
TE TTE LLO OVVEET
3 51 14 1 00 40
CCA ANNT TELMO
Calico Rd ROW Averages 65-Ft. In This Section
PIN EEB BU UR RR R
ES
YES NO
0 0
1/8
1/4
1/2 MI.
POSITIVE
0.2
NO RESPONSE
SHAW 1 in = 0.2 GOmiles
0.4 Miles K
TE
NN RITI AT MR KA KNM NA FRAFR
CAL ICO
RAR NASN O SO MMC CAA RRDW WEEL LLL
Tree Farm
18/64
PIN
JO N
Tree Farm
K
A Pedestrian Crossin D CIntersection Not Signalized- Could Be Significantly Dangerous As18 RE EK KINCAID
SU S UNNSSEE TT
H Y PY EP EE LE L S S
MIC ICK AM
AN
MIL
ek
&
Lower Creek-Tributary Crossing #614
KI
SB
W
W LO LO OL OL H
3 981
HU
Cre
LLUUKE KE KKI ID DD D SPENCER
LEE WAY
K EE C
AN
A
R
R
k C eeA CErLI a i el C
DI
BBEE NNFFI IEELLD D
CC
C
64
Home Close to Creek
BE
SI
Calico Rd. Has Significant ROW (76-Ft.) Wooded Corridor
K EE
L
OB
CKK YY
A
A 4000 132513
OP OP AAL
40 00 11 44 13
R ROOC
IN
I EL
H
FEEY Y
29 13
EG
13 26 13 00 40
C
AL A TRLT R A A H
FFF
GGRR EEEEN N
R
HEIGHTS SPENCER SPENCER HEIGHTS
D NDN
CCO
4000142 313
RDD
RE
ER
S
SPE NC
WN
GT O
CK
Greenway Could Not Utilize Easement
WW AAR
N
KIN
R
CE PE N
ILY
CALICO RD.
AU
ND CI
M
WIL LIS
ROCKY RD.
E
O
Y STO R
DAVE MAR CIS
AN
C HU RockyHNRd. RCH to Calico Rd.
'# 18
Low er
BE
SECTION 6 LITT L EJ
4000124313 Pedestrian Crossing Trailhead End of Sewer Easements
ND
HARTL A
ES JA M
MAP 15: PLANNING SECTION 6
&
NC OneMap, NC Center for Geographic Information and Analysis, NC 911 Board
69
Calico Road Intersection
chapter 4
24
General vicinity of proposed trailhead
photos: (24) Lower Creek maintains a healthy vegetative buffer near the Calico Road crossing. (25) A trailhead is proposed on property located on the southwest corner of the Lower Creek and Calico Road intersection.
25 70
Exhibit 14: Calico Road Underpass
recommendations
calico road underpass existing
s
ufficient space exists under the existing bridge at Calico Road to provide for a multi-use trail underpass. This trail underpass will connect to a proposed trailhead located south of Calico Road.
71
chapter 4
section 7 90
1
vicinity map
2 3
CA
LD W BU ELL RK E C COUN 6 OU T NT Y Y
7
5
18 321
LENOIR
4 GAMEWELL 321
64 18
This planning section explores the Lower Creek corridor from Calico Road to the state-owned Johns River Game Lands located in Burke County; the preferred trail route extends approximately 3.1 miles. From the Calico Road trailhead, the trail remains on the east side and continues over Antioch Road before reaching a significant wetland. Just north of the wetland a major bridge is proposed, transitioning the trail to the west side of Lower Creek before reaching the Johns River Game Lands. A viewing platform is proposed along the trail with vistas of the wetland area.
27
IDOR ORR EC
1/ 2M
IL
8
64
Proposed Trails
JOHNS RIVER GAME LANDS
9 181
MORGANTON
Trail Features calico road johns river game lands
Trailheads A trailhead is proposed at the end of Putnam Road where a trail spur will connect users to the main trail.
total length: trail type:
Dual Tread
Crossings
Wetland Trail
Proposed within this sec26 tion are one (1) road crossing, one (1) major bridge, and nine (9) minor bridges/ culverts.
Estimated Cost:
3.1 Miles
$1,711,080
points of interest:
Lower Creek
Significant Wetlands
The trail will need to cross over Antioch Road. Unlike the bridge at Calico Road, there is not sufficient room under the bridge at Antioch Road to provide for the trail.
28
photo: (26) The Johns River Game Lands access at Putnam Road is currently overgrown. (27) The preferred trail route
Only a single major bridge is proposed over Lower Creek and is located just north of the significant wetland area.
72
would cross over Antioch Road near the Lower Creek Bridge. (28) A bridge is proposed on Lower Creek north of a significant wetland area.
recommendations
22
26 25
23
BU
N ER
O IC
L CA
S LD
IE
R CO
MF
EA
DR
DALTON
IEW
T ET
RN
IC V
TOWNSEND
24
CANDY
N BIG HOR
EST MAJ
HU
19
OK
RO
B AN EV
MAP 16: PLANNING SECTION 7
AC H
TO WN SEN DF AR M
EE
BE
CR
E
JOHNS RIVER GAMELANDS
SB AN D
OR
K
AY M
ER
W LO
EO CAM
CALICO RD.
CA LIC O
SECTION 7
PL
K
EE
CR
ACE SIX GR
SN HA
LLY
BU
RT ON
18
ER
CRE
EK
29
ILL
AN
CH
NARROW WAY
K
D
30
RE
EK
C OFFEY LOWER CRE
TRAIL FEATURES
PIT
TRAILHEAD CROSSINGS
GREEN
PUTNAM
HAVEN
11
#
ROAD
#
MAJOR BRIDGE
#
MINOR BRIDGE/ CULVERT
LANDOWNER SENTIMENT
32
33
JOHNS RIVER GAMELANDS
YES
EY FF CO
31
PROPOSED WETLAND OBSERVATION DECK
FR
N
JO
IS TO L
PROPOSED LOCAL TRAIL
D
EL
FI
LOW E
RC
REE
EIGH
BR
SPUR TRAIL EXISTING LOCAL TRAIL
CAMA R
HN
ALTERNATE TRAIL ROUTE
K AC TR CE D O RA O GW
20
PREFERRED TRAIL ROUTE
DO
ND
LA
RT
H
TRAILS
SIGNIFICANT WETLANDS
TIO
IT
HEMLOCK
LEGEND
SW I
NK
SM
HA
28
NS
STO L
TIM
S
BU R
BRI
27
64
IPE
NO POSITIVE NO RESPONSE
0
1/8
1/4
1/2 MI.
73
chapter 4
section 8 90
1
vicinity map
2 3
CA
LD W BU ELL RK E C COUN 6 OU T NT Y Y
7
5
18 321
LENOIR
64
4 321
64 18
IL
IDOR
1/ 2M
Throughout the planning process, the consultant team worked directly with the North Carolina Wildlife Resource Commission, the agency responsible for managing the Johns River Game Lands, to determine a feasible trail route through this unique public land (for more information about the Johns River Game Land, see page 13).
GAMEWELL
8
9
Proposed Trails
ORR EC
JOHNS RIVER GAME LANDS
181
MORGANTON
The preferred route continues along the west side of Lower Creek before bridging Bristol Creek just north of its confluence with Lower Creek. After meandering through the Game Land and crossing Duckworth Road, the trail connects to the existing Johns River Canoe Access. From here, the trail will need to cross both the Johns River and ultimately the Catawba River.
Crossings Proposed within this section are one (1) road crossing, three (3) major bridges, and twelve (12) minor bridges/ culverts.
The only road crossing (#21) is located along Duckworth Road, which is a local road that provides access to an enclave of private property that is surrounded by public land.
Major bridge crossing #12 will span Bristol Creek just north of its confluence with Lower Creek. Crossing #13 and 14 will cross the Johns River and Catawba River, respectively.
johns river game lands
Trail Features total length: trail type:
5.5 Miles
Wetland Trail Possible
Estimated Cost: points of interest:
$3,879,940 Johns River Game Lands
Proposed Observation Deck
Dual-Use Path
Trailheads A formal trailhead is proposed at the current Johns River Game Lands’ access located on Highway 18/64. A spur trail will connect the trailhead to the main trail.
30
Johns River Trailhead & River Access
photo: ( 29) A formal trailhead is proposed at the current Johns River Game Lands' access point located on Highway 18/64. (30) The existing Johns River Game Lands River access can serve as major trailhead. However, a significant bridge will be required to cross the Johns River here.
29 74
&
Johns Johns River River Game Game Lands Lands
Road r e c o m m e n d a t i oAntioch ns Antioch Road Int In
T
#
JVIN E ARDEN
&
'22
CI
14
OAKRID GE DR
D
OIR R
LEN
&
MAP 17: PLANNING SECTION 8
JOHN T R C UMPRD JOHN T CRUMP
ran ch
EY
SMO K
ee k Cr Sm ok y
IOC HR AN D TIO CH
AN T
D
Ju mp ing B
PREFERRED TRAIL ROUTE
SPUR TRAIL EXISTING LOCAL TRAIL
IDGE RD
CATAW BA RIVER
O Culvert RLERTY (Abutments/rise) 46 Large TFloodplain Large Floodplain (Abutments/rise) R RIV Bend One of the Better Crossing Spots (suspension?) Narrow 11 E VNarrow Bend One of the Better Crossing Spots (suspension?) I R Sewer Easement Parallels Most of the Extent of the Catawba River to Hwy 64 Culvert Culvert 47 48 Trailhead 50 049 0 1/4 1/2 KICulvert ROCKY FORD Trailhead 0S1R K4S3 311 KI4R0K E4Y E 11 Catawba Bridge Crossing ACCESS 144 Y 0 0 D Catawba Bridge Crossing R 40
re ek
RD
VINE ARDEN RD
F
ON NT A G R O
TION RISDIC JU
Huntin g C
2060006411
206 IR 0006411 O
Warrior Fork Bridge Fork Bridge 16Warrior
M
TRAILS
TRAILHEAD
CROSSINGS
Field Field
Culvert
LEGEND
40 4000 0015 1501 0111 11HUFFMAN BR
P HA HR4A R0R0I S0RO 1I4SN 3O6LO N 11 O LOP O
400 0 14 9 31 1 RD
T PL AN
WALTER JOHNSON MIDDLE 33
Pedestrian Crossing Pedestrian Crossing VALLEVIEW Y VIEW VALLEY ST
K 11 RD RE15 SMOKEY ECREEK C00 15 40
PROPOSED LOCAL TRAIL
ve r
LEN
1R 11E R2N 14 C0O ST00 LO 4 40 00 14 21 11
Ri
40 00 15 15 11
TRAIL FEATURES
23
FI L LTTE ERR W AT ER
R
Jo hn s
Field Field
JOHNS RIVER GAME LANDS
On-grade Hwy Hwy 64 64 Crossing Crossing Not Not Ideal Ideal On-grade Hwy 64 64 Corridor Corridor Widening Widening Project Project May May Benefit Benefit aa Parallel Parallel Greenway Greenway Alignment Alignment Hwy
22
PROPOSED CATAWBA RIVER GREENWAY EXTENSION
R
Warrior Fork
VE
E WAT
FI
Field Field
AR K
44000 0002 2220 0991 111
RI
OL TRL OOL SCHO LD SCH OOLD
PL
Field Field
D
ALTERNATE TRAIL ROUTE
44
'
4544
T AN
DUC 400 KW 0 1O 50R5TH 11 ST
S
HN
T1 D N 3T1 R 4O2N M 1O 0D0M P4IIE0ED P
OR FORK WARRIWarr ior Fork
40 Trailhead 0Access Access PointTrailhead 01 Point 42 31 1
55
43
40OO 0L0DL A 1D 51M A 3H 1M1ER HES RTSR T D 40 00 15 13 11
re ek
Lo we rC
CKW
OR TH 77 DR 4 Trailhead 6 Trailhead 42 Johns River Bridge Crossing S Johns River Bridge Crossing U Pedestrain Bridge Attachment, or, Built in Hydraulic Shadow 18 Bridge Should Provide Pedestrain Ample Overhead (see BridgeClearance Attachment, or,Constraint) Built C in Hydraulic Shadow 6 N 6
&'
PR
L
DU
MA MRAS RHST HR
iver
JO
ORTH W CK41 DU 11 150041 0015 4000 40
88
41
Significant Wetlands Wetlands Significant
13
NY
RA R G AG SD SD AL A E LE R
HA HA RT RLTA LN ADN RD D
311 4000 143
SIGNIFICANT WETLANDS
O
R
RADER CIR 4000150311 RAD ER CIR
35
400 0 22 0 61 1 IRON CIR
D P RP AR K P RPUM MC
14 14 34 13 13
ES T LL LLEEC E T ES REUC MRPUM
D
12
&
OBSERVATION DECK
CRU
FARMINGTON LN
AM S
CL A RK E
JAY
NS RI JO VE HN R RD S RI VE R
JO H
33
Y N O TH ANANTH
36
Saddlecreek Bridge 37Saddlecreek Bridge
1RD 2Y1 50E E F1F 0O0 O FF 40C C FR FR
'
K
OL D
11 &
21
Potential Trailhead Trailhead Potential
ns R Joh
E ID LV BE
E
DER
ELVI
B LN
18
12 12
Span Span Utlizes Utlizes Box Box Culverts Culverts Which Which May May Be Be Usable Usable For For A A Greenway Greenway Underpass Underpass 11 11 10 1038 Significant ROW (Approx. 50-Ft. of ROW Shoulder 39 On-grade Hwy Hwy 64 64 Crossing Crossing Not Not Desirable Desirable On-grade 3 411 9 000 14 4 9 P O 40 L1OP O R 1 O E 4 L 3 V R1IR4 SI0V0E HN4R0 S JO N H O J Improved Parking Parking Pull-off Pull-off Improved
BEN BENT TW OD L N WOOOD
RE
64
11 33 14 00 40
THOM JJTH OM AS ASRD
4000 143011
Area/Neighborhood Area/Neighborhood Has Has Potential Potential Open Open Space Space to to Accomodate Accomodate Greenway Greenway Area Area Outside Outside of of OVT OVT Mile-Buffer Mile-Buffer
EE CR OL reek IST ol C BR Brist
JOHNS RIVER GAME LANDS
OL D
44000 000114 422661 111
RD
111 3551 11443 0 00 44000
20 00 00 2064 0011 00 64 11
SECTION 8
River John's RiverGamelands
11 1569 AM 00TN 40PU
18 HILLSBORO DR 18 Significant Amount of Properties Here May Not Be Developable Due to Wetland Constraints CH IO Significant HILLHAVAmount AA EN CIR of Properties Here May Not Be Developable Due to Wetland Constraints CHCH NT AN 11 N OIO IT T 15884411 AV K E E 44000000 15 R K On-Road Section R CCREE E Requires Short OWW ER LLO HEMLOCK TRL Requires Short On-Road Section 1 11 2 31 22E1N6 0 0R AV BR 0 22 Crossing #1 EN40DH 0 Lower Creek Bridge HAV EEN GR 0 4Bridge Crossing GREEN ISS Lower Creek #1 TTOO Signficant Site Site Disturbance Disturbance On On This This Property Property LLT Signficant PAP RL NC Wildlife Wildlife Resource Resource Commission Commission requests requests this this area area be be avoided NC XA HX ILBridge HI and/or Boardwalk Bridge Likely Required Unless Hwy 64 Required Bridge Used wildlife Platform 17 LL and/or Boardwalk Likely Unless HwyViewing 64 Bridge Used 17 31 L R D wildlife Viewing Platform 16 Wetland and and Natural Natural Heritage Heritage Area Area Trailhead 16 Wetland Trailhead 32 PROPOSED 11 143 0 15 15 WETLAND Y 4000
PUT N
4C0IR 00C 1L4E 4D 91R 1
1.0 MI.
N
#
ROAD
#
MAJOR BRIDGE
#
MINOR BRIDGE/ CULVERT
ÂŻ
LANDOWNER SENTIMENT YES
00
NO
0.35 0.35
POSITIVE
0.7 0.7 Miles Miles
1 in = 0.4 miles miles 11
1 in = 0.4 NO RESPONSE
1 211 151 2 00 5 40000 1 D 4 R RST AM HE NC Information NCOneMap, OneMap,NC NCCenter Center for for Geographic Geographic Information and andAnalysis, Analysis,NC NC 911 911Board Board
75
chapter 4
section 9 90
1
vicinity map
18 321
2 3
CA
LD W BU ELL RK E C COUN 6 OU T NT Y Y
7
5
LENOIR
64
4 GAMEWELL 321
64 18
8 1/ 2M
IL
IDOR
9
ORR EC
JOHNS RIVER GAME LANDS
Proposed Trails This planning section spans a relatively short distance, covering only 1.4 miles of trail from the proposed bridge over the Catawba River to the existing Rocky Ford Access, which serves as the northern terminus of Morganton’s Catawba River Greenway. From the Johns River Game Lands and the proposed bridge over the Catawba River (#13), the preferred trail route connects to an apartment complex on the river’s south side and continues west before reaching a proposed underpass at Highway 18/64 and the Catawba River Greenway, which is also certified as part of the Overmountain Victory National Historic Trail.
tion is located at Highway 18/64 where there is sufficient clearance for a multi-use trail under the bridge. This underpass will connect directly to the Rocky Ford Access.
The two major bridge crossings, #15 and #16, cross the Catawba River and Warrior Fork, respectively. These crossings will provide mean- 31 ingful connections (ie. Walter Johnson Middle School) and take advantage of existing trail easements, but are not mandatory for implementing the preferred route.
181
MORGANTON
johns river game lands catawba river greenway total length: trail type:
1.4 Miles Typical Greenway
From the Rocky Ford Access, a spur trail takes advantage of trail easements existing on the west side of the Catawba River. However, this trail segment will require a major bridge crossing (#15) over the Catawba River. Another bridge crossing (#16) over Warrior Fork would provide access to Walter Johnson Middle School.
Trail Features
Estimated Cost: points of interest:
$5,669,720
Trailheads
Johns River Game Lands
Proposed Observation Deck
Johns River Trailhead & River
The Rocky Fork Access currently serves as a trailhead for the northern terminus of the Catawba River Greenway. Also, according to the National Park Service, this site is the preferred location for the headquarters of the Overmountain Victory Trail National Historic Trail.
Access
32
Crossings Proposed within this section are one (1) road crossing, two (2) major bridges, and eight (8) minor bridges/culverts.
photo: (31) A major bridge crossing (#14) will be required over the Catawba River. (32) The preferred trail route would follow a sewer easement on the southern side of the Catawba River.
The only road crossing (#22) within this planning sec-
76
recommendations
TRAILS
40 00 14 36 11
L
HN
O 40LODL 00 SDCS 14 HCO 9 3 HOO 11 LOT LR
LEGEND err vive RRi nss ER ohhn JJo IV
PREFERRED TRAIL ROUTE
S
CATAWBA RIVER GREENWAY
JJooh hnns sRRi viveer r
P O 64 LO S U NN O SO 18IIS RR NC R AR HHA
JO
R
Access Point
'
RD BERRY C ECE BERRY
ALTERNATE TRAIL ROUTE SPUR TRAIL
20 2 0000 0000 6406 1141 1
Warrior riorFork Fork War
PPI4 EI0ED 0D0M M 1O4O N 2N 3T1T R 1D
Trailhead
Field
45
4
JOHNS Field RIVER GAME LANDS
EXISTING LOCAL TRAIL PROPOSED LOCAL TRAIL
TRAIL FEATURES TRAILHEAD
23On-grade Hwy 64 Crossing Not Ideal
R
D
Hwy 64 Corridor Widening Project May Benefit a Parallel Greenway Alignment
W AT ER
FI LT ER
PL AN
T
CROSSINGS
E ILT
R
VALLEY VIEWVIEW ST VALLEY
ROAD
#
MAJOR BRIDGE
#
MINOR BRIDGE/ CULVERT
LANDOWNER SENTIMENT YES
64 3
NO
TE
E
N O SI
206 0 00 6 41 1
BA W TA A C
Trailhead
N
EXISTING CATAWBA RIVER GREENWAY & ROCKY FORD ACCESS
' 22 & 15
Catawba Bridge Crossing
54 GRACE RIDGE RRETIREMENT IDGE SIDE COMMUNITY T ER
RIVER 50
49
VICT VO ICRTYO TRRYL
RS DD SO WO WEOROD RIV RIVER
AV 1 AN21 LM142 S4E 000 42 111 4000 1
52111 14444331 44000000 1
¯
E DR IDGE NORTHR THRIDG NOR
IND Y EP SE EN(Public Land) Narrow51 Crossing RtoK Right of Way, Maintains Good Proximity to Corridor DE I NC K ET RL
53
DR
OA KR ID GE
EX
N
14
RL RT IVE of the Better Crossing Spots (suspension?) Narrow Bend R One L AI TR ER V Sewer Easement Parallels Most RofI the Extent of the Catawba River to Hwy 64 DR OD 48 47 O HW RC I B
KI RK
00
SE
Y
DR
0.15 0.15
IN
V
EN RD0.3 0.3
EA
Miles Miles
11 in in == 0.2 0.2 miles miles N
1
46Large Floodplain (Abutments/rise)
400 0 1S5H 9A 31D1O SW HA L ID NO EW DRL IN
DE
AY W
&
RD
VE Greenway Easement Recorded On This Property RG RE 16Warrior Fork Bridge EN
DR RE OE OHR S H S
0
AR
RI
R
R 1E R1N1 42 C1O S0T00 LO4
CA TA W BA
2
BD
D
CLU
PROPO SE
LEN 2O0I6R 0R 00D6 41 LE NO 1 IR
RD
NO RESPONSE
ORK
ER
POSITIVE
18
IOR F
CO RN
W ils W o n ils Cron eeC k re ek
R WAR
LO ST
#
CITY OF MORGA Pedestrian Crossing NTON JURISDICTION
Field
D
4000141911 41911 40001
R BO ST
F TER WA
WALTER JOHNSON MIDDLE
NT A PL
#
1/4
VI NE
JOHNS RIVER GAME LANDS
11 23 14 00 40
John's River Gamelands to Catawba River Greenway
MAP 18: PLANNING SECTION 9
5
SECTION 9
W Waarrio riorrFo Forrkk
1/2 MI.
NC NCOneMap, OneMap,NC NCCenter Center for for Geographic Geographic Information Information and andAnalysis, Analysis,NC NC 911 911Board Board
77
exhibit 15: highway 18/64 underpass
chapter 4
highway 18/64 underpass existing
78
t
he 18/64 underpass in Morganton is critical for connecting the existing Rock Ford Access/Catawba River Greenway with the Johns River Game Lands.
o wa r r i
r fork
CONCEPTUAL DESIGN PROVIDED BY CITY OF MORGANTON
EXHIBIT 16: GRACE RIDGE TRAILHEAD
recommendations
location of existing rocky ford access
hi gh ay w 18
w ta Ca
/6 4
ba ri
grace ridge retirement community
ve r
grace ridge trailhead
a
a
new OVT trailhead is proposed along new Highway 18/64 adjacent to the Grace Ridge Retirement OVNHT trailhead is proposed along Highway 18/64 Comadjacent munity. A spur trail will connect the parking area toRidge the proposed OVT along the Catawba River. to the Grace Retirement Community. A spur trail will connect the parking area to the proposed OVNHT along the Catawba River.
79
chapter 4
80
Chapter 5 implementation
To construct the OVNHT from lenoir to morganton will be no small task, but with time, perseverance, and a little luck, there is no doubt that a destination-quality trail is
This chapter aims to summarize details regarding
within grasp.
ensues.
each Planning Section and establish responsibilities and priorities for trail implementation. Furthermore, this chapter describes the “Trail Rubicon,� or the focus areas that when developed, result in a perception that the complete trail is imminent and widespread support
I n t h is c h a pt er A. Implementation by Section and Responsibilities B. Priority Implementation Areas and Responsibilities C. Trail Rubicon D. Trail Support Spectrum
chapter 5
implementation Implementation BY SECTION AND RESPONSIBILITY The table below provides key implementation information associated with each planning section. Key Challenges include a summary of the most difficult barriers for realizing each trail section. Many of these barriers include costly features or note the need to acquire trail easements from private landowners. Most importantly, this table assigns an Implementing Agency to each planning section.
Section
Estimated Budget
Distance
Key Challenges
SECTION 1- Blair Fork Trailhead to Main Street Trailhead
1
Crossing Creekway Dr.; NCDOT Encroachment; Main St. Crossing; 2 Bridges; Securing Rail Trail Easement
SECTION 2- Main St. Trailhead to Unity Park
1.5
Securing Rail Trail Easement
$361,440.00
SECTION 3- Unity Park to Caldwell County Government Center
2.4
Hwy 18/64 Crossing; Repurposing Trestle Bridge; Pedestrian Bridge @ Fairview Rd.; Landowner Trail Easements; SW BLVD Underpass; Greasy Creek Bridge
$1,215,300.00
$873,820.00
SECTION 4- Caldwell Gov. Center to Gamewell Park
0.9
NCDOT Encroachment; 2 Road Crossings
$489,020.00
SECTION 5- Gamewell Park to Rocky Rd. Intersection
1.6
Major Bridge; NCDOT Encroachment; Landowner Trail Easements
$985,700.00
SECTION 6- Rocky Rd. Intersection to Calico Rd. Intersection
2.6
Calico Road Underpass; Landowner Trail Easements
$1,619,240.00
SECTION 7-Calico Rd. Intersection to Johns River Game Lands
3.1
Landowner Trail Easements; Wetland Areas
$1,711,080.00
SECTION 8- Johns River Game Lands
5.5
NC Wildlife Approvals; 2 Major Bridges
$3,879,940.00
1.4
Major Bridge; NCDOT Underpass Encroachment at Hwy 18/64
$5,669,720.00 $16,805,260.00
SECTION 9- Johns River Game Lands to Catawba River Greenway
ALL SECTIONS TOTAL
Implementation Details: According to Planning Section The table
82 below provides key implementation information associated with each planning section. Key Challenges provides a summary of the most difficult barriers for realizing each trail section. Many of these barriers
20
Implementing Agency
City of Lenoir; Caldwell County Pathways City of Lenoir; Caldwell County Pathways City of Lenoir; Caldwell County Pathways; Caldwell County Caldwell County Pathways; Caldwell County; Town of Gamewell Caldwell County Pathways; Caldwell County; Town of Gamewell Caldwell County Pathways; Caldwell County; Town of Gamewell Caldwell County Pathways; Caldwell County Burke County City of Morganton
EXHIBIT 17: IMPLEMENTATION DETAILS BY SECTION AND RESPONSIBILITY
implementation details by section and responsibility
implementation
Priority Implementation Areas & responsibilities Caldwell County Pathways and each local government entity must work in tandem to successfully realize the OVNHT. Trail implementation does not have to occur in a specific, linear order according to each planning section. In fact, the priority areas for implementation are merely suggestions and are in no way intended to hem creativity or necessary work in "lower" priority areas. Trail implementation is an art and requires the acumen to recognize and then seize opportunities, whether related to funding, landowner willingness, politics, etc.
T
hink snowball effect. Which sections of the trail need to be developed before there is widespread support and a collective energy, beyond that of the community's traditional trail support base, to ensure that the OVNHT is complete? These trail section or focus areas represent the Trail Rubicon. Between Lenoir and Morganton, there are three areas:
EXHIBIT 18: TRAIL RUBICON
trail rubicon: finding the point of no return
1. lenoir rail TRAIL 2. Caldwell county government center to gamewell town hall 3. Johns River gamelands & catawba river greenway
trail Rubicon
PRIORITY implementation AREAS and responsibilities Implementing Agency City of Lenoir Caldwell County Pathways Town of Gamewell Burke County City of Morganton
Priority One
Priority Two
Section 3b: Trestle Bridge to Caldwell Government Center Section 4: Caldwell Government Center Section 3b: Trestle Bridge to Caldwell Government to Gamewell Park Center Section 4: Caldwell Government Center Sections 5, 6: Gamewell Park to Calico Road to Gamewell Park Section 8: Johns River Game Lands Section 7: Calico Road to John River Gamelands Section 9: Catawba River Greenway N/A Connector Rail Trail (Sections 1,2,3)
EXHIBIT 19: PRIORITY IMPLEMENTATION AREAS
The table below supports a trail development strategy that prioritizes areas located to the north (rail trail), central (Caldwell County Government Center to Gamewell Park), and south (Johns River Gamelands and Catawba River Greenway Connector). If these three areas were to be fully developed, this would likely provide the formula for "Trail Rubicon," the point in which the public, elected officials, and grant making agencies recognize that connectivity and complete implementation is imminent. At this point significant momentum and synergy would likely propel forward the completion of the OVNHT from Lenoir to Morganton.
83
chapter 5
trail support spectrum Creating a destination-quality trail system requires a significant commitment from local governments, including staff time, the holding of land and trail easements, and the dedication of local funding.
spend local funds, but instead must leverage their funds to obtain support from grant-making agencies sympathetic to the creation of trails and the OVNHT.
The “Trail Support Spectrum� illustrates the steps local governments can take to support trail development.
Each local government must evaluate the OVNHT in relationship to its other priorities. However, a trail of this magnitude should be recognized as an economic development initiative that will provide a return on investment. Furthermore, each jurisdiction must not merely
5 4 3 2 1 84
EXHIBIT 19: TRAIL SUPPORT SPECTRUM
TRAIL SUPPORT SPECTRUM
APPENDIX
APPENDIX
(A1) BUDGET SECTION 1- Blair Fork Trailhead to Main Street Trailhead Blair Fork Trailhead Advent Trailhead Main Street Trailhead Typical Greenway (10 ft. Paved Asphalt) Rail Trail (10 ft. Natural Surface) Creekway Drive Road Crossing Other Road Crossings Major Bridges Minor Bridge/ Culvert
SECTION 2- N. Main to Unity Park Unity Park Trailhead Rail Trail (10 ft. Natural Surface) Road Crossings Major Bridges Minor Bridge/ Culvert
Units
Unit Cost
Total Cost
1 1 1 2640 3168 1 5 2 0
$132,000.00 $45,000.00 $75,000.00 $90.00 $40.00 $80,000.00 $5,500.00 $75,000.00 $0.00
$132,000.00 $45,000.00 $75,000.00 $237,600.00 $126,720.00 $80,000.00 $27,500.00 $150,000.00 $0.00
Units 1 6336 6 0 0
Total Cost Unit Cost $75,000.00 $40.00 $5,500.00 $0.00 $0.00
Total Cost SECTION 3- Unity Park to Caldwell County Government Center Caldwell County Gov. Center Trailhead Rail Trail (10 ft. Natural Surface) Dual Tread (8 ft. Asphalt, 3 ft. Natural Surface) Highway 18 Road Crossing Other Road Crossings Major Bridges Minor Bridge/ Culvert
Gamewell Trailhead NCDOT Side Path (8 ft. Paved Asphalt) Road Crossings Major Bridges Minor Bridge/ Culvert
Trailhead NCDOT Side Path (8 ft. Paved Asphalt) Dual Tread (8 ft. Asphalt, 3 ft. Natural Surface) Road Crossings Major Bridge @ Old Morganton Road Other Major Bridges Minor Bridge/ Culvert
Total Cost
1 3168 8976 1 3 3 3
$40,000.00 $40.00 $80.00 $65,000.00 $5,500.00 $75,000.00 $8,000.00
$40,000.00 $126,720.00 $718,080.00 $65,000.00 $16,500.00 $225,000.00 $24,000.00
Trailhead Dual Tread (8 ft. Asphalt, 3 ft. Natural Surface) Calico Rd. Underpass (Road Crossing) Major Bridge Minor Bridge/ Culvert
Unit Cost
Total Cost
1 3696 1 0 5
$0.00 $120.00 $5,500.00 $0.00 $8,000.00
$0.00 $443,520.00 $5,500.00 $0.00 $40,000.00
$489,020.00
Units
Unit Cost
Total Cost
0 1584 6864 1 1 3 2
$0.00 $120.00 $80.00 $5,500.00 $75,000.00 $50,000.00 $8,000.00
$0.00 $190,080.00 $549,120.00 $5,500.00 $75,000.00 $150,000.00 $16,000.00
$985,700.00
Units
Unit Cost
Total Cost
0 13728 1 1 12
$0.00 $80.00 $350,000.00 $75,000.00 $8,000.00
$0.00 $1,098,240.00 $350,000.00 $75,000.00 $96,000.00
Total Cost
86
$1,215,300.00
Units
Total Cost SECTION 6- Rocky Rd. Intersection to Calico Rd. Intersection
$361,440.00
Unit Cost
Total Cost SECTION 5- Gamewell Park to Rocky Rd. Intersection
$75,000.00 $253,440.00 $33,000.00 $0.00 $0.00
Units
Total Cost SECTION 4- Caldwell Gov. Center to Gamewell Park
$873,820.00 Total Cost
$1,619,240.00
SECTION 7-Calico Rd. Intersection to Johns River Gamelands Calico Trailhead Dual Tread (8 ft. Asphalt, 3 ft. Natural Surface) Wetland Trail (Boardwalk or Geosynthetic) Antioch Road Crossing Major Bridge Minor Bridge/ Culvert
SECTION 8- Johns River Gamelands Putnam Trailhead John River Access Trailhead (existing) Dual-Use Path (8 ft. Natural Surface) Johns River Bridge Minor Bridge/ Culvert
Units
Unit Cost
Total Cost
1 6864 6864 1 0 12
$95,000.00 $80.00 $140.00 $10,000.00 $0.00 $8,000.00
$95,000.00 $549,120.00 $960,960.00 $10,000.00 $0.00 $96,000.00
Units
Total Cost Unit Cost $40,000.00
$1,711,080.00 Total Cost
1 1 27456 1 16
$7,500.00 $60.00 * $250,000.00 $8,000.00
Total Cost SECTION 9- Johns River Gamelands to Catawba River Greenway Rocky Fork Trailhead John River Access Trailhead (existing) Typical Greenway (10 ft. Paved Asphalt) 18/64 Underpass (Road Crossing) Catawba River Bridge Minor Bridge/ Culvert
$3,879,940.00
Units
Unit Cost
Total Cost
1 1 7392 1 1 8
$125,000.00
$125,000.00 $7,500.00 $665,280.00 $200,000.00 $350,000.00 $64,000.00
$7,500.00 $90.00 $200,000.00 $350,000.00 $8,000.00
Total Cost ALL SECTIONS TOTAL *This trail type typically cost approximately $20 per linear foot. However, this estimate accounts for adverse environmental conditions found throughout sections of the Johns River Gamelands.
$40,000.00 $7,500.00 $1,647,360.00 $250,000.00 $128,000.00
$5,669,720.00 $16,805,260.00
APPENDIX
(A2) FACT SHEET
(A3) LANDOWNER LETTER
Date: February 16, 2015
FACT SHEET
[Insert Landowner Name and Address Re: Trail Planning Meeting for Landowners
BACKGROUND
A trail master planning effort is underway to help create a section of the Overmountain Victory National Historic Trail (OVT) that would connect from Lenoir to Morganton to Lake James!
Dear [Insert Landowner Name]: Thanks to grant support from the National Park Service, regional community organizations and local government leaders, a plan is being developed for establishing a walking and leisure biking trail to connect from Lenoir to Morganton to Lake James.
Thanks to grant support from the National Park Service, regional community organizations and local governments are working to establish a walking and leisure biking trail that connects the region and celebrates the trail walked by the Overmountain Men who won a major Revolutionary War battle at Kings Mountain in 1780.
This trail celebrates the walk made by the Overmountain Men who won a major Revolutionary War battle at Kings Mountain in 1780.
The trail planning process requires an analysis of the Lower Creek corridor in Caldwell County and the Catawba River corridor in Burke County. The trail is best suited in floodplain areas where development generally cannot occur and where there are meaningful connections to existing parks, civic buildings, and neighborhoods. After identifying feasible trail route options, there will be a major landowner outreach effort. Without the voluntary commitment from landowners, the trail will either be relocated or not constructed.
THE PLANNING PROCESS
An educational video will be developed to help communicate the historical significance of the OVT, which will be made available online.
www.OVTplan.com
1 Direction Setting and Project Launch
| September 2014 The consultant team will meet with local trail and government leaders to generally discuss environmental constraints and opportunities for trail connectivity.
2
Research | October – January 2015 The consultant team will conduct a thorough environmental assessment of the study area and determine feasible trail route options. With the trail routes identified, a landowner contact list will be developed.
3
Landowner Outreach | February – March 2015 Landowners with property along an identified feasible trail route will be invited to a special meeting to learn more about the trail project. After receiving comments from landowners, the preliminary trail routes will be updated.
4
Plan Development | March – May 2015 The consultant team will document the trail analysis and landowner comments. Recommendations will highlight alternative routes and the project’s overall feasibility for completion. A draft plan will be made available for public comment.
5
Final Plan Preparation | May – June 2015 The consultant team will publish a final plan that incorporates all public comments.
Since November 2014, the planning team has been working to identify a feasible route to construct the trail. As part of this analysis, your property has been identified as a potential location for a trail section. Without a voluntary commitment from landowners, this important trail will either be relocated or not constructed. We would like to invite you and other landowners to discuss this project during a special meeting that will take place at [insert time and location]. An informational video can be found on the web at: www.OVTplan.com. Also, enclosed is a project Fact Sheet that further describes the project. Please RSVP if you plan to attend the meeting by sending an email or calling using the contact information below. Thank you.
Sincerely,
Eric Woolridge Consultant Project Manager Destination by Design Planning Phone: 828.386.1866 Email: eric@DbDplanning.com
CONSULTANT CONTACT: Eric Woolridge, AICP Destination by Design Email: Eric@dbdplanning.com Phone: (828) 386-1866 Web: www.DbDplanning.com
Destination by Design Planning 815 W. King Street, NC 28607
87
APPENDIX
(A4) landowner interest survey
(A5) funding sources
Note: The completed Landowner Interest Surveys were provided to local government leaders.
Grant Agency
TIGER
Overmountain Victory
National Historic Trail Master Plan LE N
OIR
ES JAM • MO RGANTON • LAKE
Landowner Interest Survey Name ________________________________________
88
Active Living/ BuiltEnvironment Implications Construction provided all easements are secure.
Maximum Grant Amount
Matching Funds Required
Grant Deadlines
N/A (min. $1 million)
$0 (for rural counties
May (typical)
Not specified, but 20% is competitive
February 1st
N/A
50%
January 1st and June 1st
$100,000.00
25%
February 1st
$500,000.00
50%
February 1st
$10,000.00
20%
May 24th
N/A (for major projects)
20% generally
N/A
Land Acquisition: Fee Simple or Overmountain Victory
Based on 6/2015 discussion w/ staff, a LE N $750K / multi‐year floodplain areas. Greenway ES OIR JAM (www.cwmff.net) • MO RGANTON • LAKE trails and other park areas are application would be welcome. allowed.
Easement. Must protect National Historic Trail Master Plan Clean Water Management Trust Fund
River access areas or greenways along rivers Landowner Interest Survey All types of trails and Recreation Trails Program (ncparks.gov/About/grants/main.php) greenways All types of parks, trails, and and Recreation Trust Fund Name Parks ________________________________________ (ncparks.gov/About/grants/main.php) recreation facilities NC Water Resources (www.ncwater.org)
Address_______________________________________
Address_______________________________________
_____________________________________________
_____________________________________________ Bike and Pedestrian Projects‐
Bikes Belong Foundation
Trails and Greenways
NCDOT Transportation Plan For Bike and Pedestrian Projects
both engineering and _________________________________ construction
Phone Number _________________________________
Phone Number
Email _________________________________________
Email _________________________________________
Please share your level of interest for providing for the public trail. (check below)
Please share your level of interest for providing for the public trail. (check below)
Ο Not interested at this time
Ο Not interested at this time
Ο Somewhat interested and welcome further discussions
Ο Somewhat interested and welcome further discussions
Ο Very interested
Ο Very interested
APPENDIX
(A6) public-private partnership Memo
MEMO To:
DbD Clientele
From:
Eric Woolridge, Principal
Date:
February 1st, 2015
Re:
Public-Private Partnership
Due to increasing interest among our clients for information regarding the new P3 legislation, we have compiled the following overview.
Introduction Public-Private Partnerships, commonly referred to as P3s, are contractual agreements between public and private entities that provide for significant entities in the delivery and financing of public buildings and infrastructure projects. Under a P3 agreement, the private entity assumes the project’s financing and is entitled to either the revenue generated from project activities or performance-based government payments. Public-Private Partnerships enable public entities to undertake projects which they might otherwise postpone or ignore due to lack of funds. P3 projects also create a vast number of jobs, and dramatically accelerate project completion when compared to traditional Design-Bid-Build projects. There are several different types of P3 delivery options; however, the most common P3 system is a Design-Build-Finance-Operate-Maintain (DBFOM) transaction.
North Carolina Background on P3 Law and Process of Current Law Historically in North Carolina, local municipalities and state agencies required approval from the State Building Commission to engage in any type of procurement for construction other than traditional procurement methods such as separate-prime bidding, single-prime bidding, dual bidding, and construction management at risk contracts. See G.S. § 143-128(a1) & § 143-128(9). On August 23, 2013, Governor Pat McCrory of North Carolina signed into law HB 857, which empowered these entities to engage in alternative delivery methods, such as design-builds and public-private partnerships. As a result, North Carolina amended G.S. § 143-128, thus allowing local government and state agencies to use P3s and design-build contracts to construct a wide range of projects. Although unsolicited proposals are not contemplated under the statute, public entities may still pursue alternative procurement vehicles subject to the stringent criteria set forth in the new statutory framework. See, e.g., § 143-128.1A. (establishing criteria regarding design-build contracts); § 143-128.1B (establishing criteria for design-build bridging); § 143-128.1C. (establishing criteria for P3s). This new framework creates a mechanism whereby the government entity must also submit a detailed report explaining why it chose the alternative delivery system over traditional procurement methods. Despite the criteria and reporting requirements contained therein, this new law recognizes that that North Carolina is “not wholly satisfied by existing procurement methods” for the design, construction, improvement, renovation and expansion of public buildings. This new enabling legislation therefore provides opportunities for government entities to become more creative in their approach.
Overview of Key Points of New Legislation •
A “government entity” is defined as “[e]very officer, board, department, commission, or commissions charged with responsibility of preparation of specifications or awarding or entering into contracts for the erection, construction, alteration, or repair of any buildings for the State or for any county, municipality, or other public body.” § 143-128.1B (a)(6). However, this new law is not meant to affect the existing statutes, regulations, or practices for projects administered by the North Carolina Department of Transportation, nor is it meant to apply to any contract between the University of North Carolina or one of its constituent institutions. It is also not meant to apply to a private, nonprofit corporation established under Part 2B of Article 1 of Chapter 116 of the General Statutes.
•
A P3 project is defined as: “A capital improvement project undertaken for the benefit of a governmental entity and a private developer pursuant to a development contract that includes construction of a public facility or other improvements, including paving, grading, utilities, infrastructure, reconstruction, or repair, and may include both public and private facilities.” § 143-128.1C(a)(8) (emphasis added).
•
Government entities can now to engage in P3 work if it is determined that there is “a critical need for a capital improvement project,” and in such a case, the entity “may acquire, construct, own, lease as lessor or lessee, and operate or participate in the acquisition, construction, ownership, leasing, and operation of a public private project, or of specific facilities within such a project, including the making of loans and grants from funds available to the governmental entity for these purposes.” §143-128.1C(b).
•
In order to engage in such P3 delivery systems, the government entity will determine the scope of what facilities should be built according to the P3 model, and the form in which developers can apply to win such work. The entity must advertise a notice of interested private developers to submit qualifications in a newspaper having circulation in the county where the entity is located. §143-128.1C(h).
•
The private developer is chosen based upon qualifications such as evidence of financial stability (exclusive of “trade secrets”), experience with similar projects, explanation of the proposed project team, a statement of availability to undertake the project and a projected timeline for completion, and any other information required by the government entity. § 143-64.31(h) & (i).
•
Small business entities and resident companies are favored and even given preference under this framework. See § 143-128.1C(e) & § 14364.31(a1)
Source: UNC School of Government 815 W. King Street | Boone, NC | 2 8 6 0 7 | 8 2 8 .3 8 6 .1 8 6 6
89
keep the story alive