OVNHT: Rutherfordton to Chesnee Trail Master Plan

Page 1

overmountain victory national historic trail master plan RUTHERFORDTON

CHESNEE

WINTER 2020


"THIS TRAIL IS A REAL TREASURE TO OUR STATE, COUNTY, AND PEOPLE. WE WANT TO MAKE SURE THAT THIS STORY IS TOLD AND MAINTAINED OVER THE YEARS.”

~ AMBROSE MILLS, POLK COUNTY ECONOMIC & TOURISM DEVELOPMENT COMMISSION


RUTHERFORDTON >> CHESNEE

PRODUCED FOR US National Park Service Overmountain Victory Trail Association Rutherford County, NC

Spartanburg County, SC Town of Rutherfordton, NC Tryon International Equestrian

Polk County, NC

Center RHI Legacy Foundation

PRODUCED BY

Destination by Design Planning, LLC | 136 Furman Road, Suite 6 | Boone, North Carolina 28607 | 828.386.1866 | www.DbDplanning.com FACEBOOK

INSTAGRAM

YOUTUBE

@dbdplanning

@destination_by_design

@dbdplanning



ACKNOWLEDGMENTS NATIONAL PARK SERVICE John Slaughter, Group Superintendent, Southern Campaign of the American Revolution Parks Group

OVERMOUNTAIN VICTORY TRAIL ASSOCIATION Ben Richardson, Chief of Planning and Partnerships, Southern Campaign of the American Revolution Parks Group

PROJECT OVERSIGHT COMMITTEE Cole Alverson, County Administrator, Spartanburg County Doug Barrick, Town Manager, Town of Rutherfordton Chivous Bradley, Historian, Rutherford County Don Cason, Executive Director, Rutherford County Tourism Development Authority Aubrey Clay, Project Manager, Rutherford County Planning Sherry Dull, Senior Transportation Planner, Spartanburg Area Transportation Study Ben Farmer, Project Manager, Isothermal Planning and Development Commission Steve Garrison, County Manager, Rutherford County Terry Hines, Executive Director, RHI Legacy Foundation Becki Hood, City Administrator, City of Chesnee Bryant Lindsey, Board Member, Overmountain Victory Trail Association

Steve Lockett, Director of Economic, Community, and Workforce Development, Isothermal Planning and Development Commission Kathryn McMahon, Director of Community Engagement, Tryon International Equestrian Center Jill Miracle, Community Impact Director, RHI Legacy Foundation Caroline Parris, Transportation Planner, Spartanburg Area Transportation Study D. Marche Pittman, County Manager, Polk County Clark Poole, Director, Rutherford County Chamber of Commerce Stephanie Rzonca, Community Development Director, Town of Rutherfordton Danny Searcy, Planning Director, Rutherford County Jerry Stensland, President, Rutherford Outdoor Coalition & Director, Polk County Parks and Recreation Tom Vaughan, Treasurer, Overmountain Victory Trail Association

TOWN OF RUTHERFORDTON

David Down, President

Joe Epley, Board Member

Jimmy Dancy, Mayor

Terry D. Cobb, Council Member

RG Absher, Vice President

John Garrou, Board Member

Henry C. Giles, Jr., Council Member

Stanley L. Clements, Council Member

Tom Vaughan, Treasurer

Don Hopping, Board Member

Christy Bare, Council Member

Leigh Anne Hunter Surber, Secretary

Garrett Jackson, Board Member

Mark Anthony, Board Member

Brad Knight, Board Member

Donna Atkins, Board Member

Ronnie Lail, Board Member

Joella Johnson Barbour, Board Member

Bryant Lindsey, Board Member

Chivous Bradley, Board Member

Carson Sailor, Board Member

Camille Chidiac, Board Member

Mel McKay, Board Member

Max Cash, Mayor

Doug Pye, Council Member

Bruce Mahaffey, Mayor Pro-tem

Verhonda Crawford, Council Member

Becki Hood, City Manager

Robert Johnson, Council Member

ISOTHERMAL PLANNING AND DEVELOPMENT COMMISSION

Tony DeVault, Board Member

RUTHERFORD COUNTY, NC

Scott Dadson, Executive Director

Leon Humphrey, Mayor

Eddie Holland, Commissioner

Steve Garrison, County Manager

Michael Benfield, Commissioner

Bryan King, Commissioner

Alan Toney, Commissioner

Greg Lovelace, Commissioner

RHI LEGACY FOUNDATION Terry Hines, Executive Director

Jill Miracle, Community Impact Director

TRYON INTERNATIONAL EQUESTRIAN CENTER

POLK COUNTY, NC D. Marche Pittman, County Manager

Ray Gasperson, Commissioner

Tommy Melton, Commissioner, Chairman

Paul Beiler, Commissioner Jake Johnson, Commissioner

Myron Yoder, Commissioner

Katherine McMahon, Director of Community Engagement

LANDOWNER OUTREACH VIDEO INTERVIEWEES Senator Jim Broyhill Superintendent John Slaughter, National Park Service

SPARTANBURG COUNTY, SC Cole Alverson, Spartanburg County Administrator

David Britt, Councilman

A. Manning Lynch, Council Chairman

Bob Walker, Councilman

Michael Brown, Councilman

Roger Allen Nutt, Councilman

Jack A. Mabry, Councilman

CITY OF CHESNEE

Whitney Farr, Councilman

Ambrose Mills, Chair, Polk County Economic & Tourism Development Commission Jerry Stensland, Director, Polk County Parks and Recreation & President, Rutherford Outdoor Coalition Albert Mossburg, MD, Community Member

Chivous Bradley, Historian, Rutherford County, NC & Boardmember, OVTA Jack Mabry, Council Member, Spartanburg County, SC Terry Cash, Landowner



TABLE OF CONTENTS INTRODUCTION 1

CHAPTER 4: RECOMMENDATIONS

39

Background 2

Planning Sections Overview

40

Plan Goals

3

Trail Section Recommendations

42

Planning Process

4

Plan Organization

5

CHAPTER 1: EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS Study Area Description

CHAPTER 5: IMPLEMENTATION

63

Implementation Details by Planning Section

64

7

Implementation Focus Areas

65

8

Trail Type Profile

66

The Natural Environment

10

Trail Support Spectrum

68

The Built Environment

14

Economic Impact Analysis

69

Map And Photo Series: Preliminary Trail Route Alternatives

19

APPENDIX 71 CHAPTER 2: LANDOWNER ENGAGEMENT

27

(A1) Budget

72

Identifying the Landowners

28

(A2) Landowner Invitation

74

Landowner Communications

29

(A3) Landowner Interest Survey

74

Landowner Workshop

30

(A4) Funding Sources

75

Trail Route Re-Evaluation

32

(A5) NC S.L. 2019-20 HB 532

76

(A6) The National Trails System Act

79

CHAPTER 3: TRAIL CHARACTER & DESIGN GUIDELINES

33

Trail Types

34

Signage and Wayfinding

36

Social Media: The New Word of Mouth

38

vii


viii


LIST OF MAPS

LIST OF EXHIBITS

Map 1: OVNHT Planning Areas

2

Exhibit 1: Bradley Nature Preserve

13

Map 2: General Study Area

8

Exhibit 2: Social Media: The New Word of Mouth

38

Exhibit 3: Kiwanis Park Master Plan

44

Map 4: Study Area 2 Site Analysis 22

Exhibit 4: Trail to Victory Council Ring @ Kiwanis Park

45

Map 5: Study Area 3 Site Analysis

24

Exhibit 5: Monfredo One-Way Conversion

47

Map 6: Landowner Map Sample

28

Exhibit 6: Grays Road River Access and Trailhead

50

Map 7: Landowner Sentiment

32

Exhibit 7: Trailhead @ Bradley Nature Preserve

Map 8: Planning Sections Overview

40

Exhibit 8: Overmountain Vineyards 55

Map 9: Planning Section 1

43

Exhibit 9: SC-11 Sidepath 60

Map 10: Purple Martin Connection

46

Exhibit 10: CADA Park 61

Map 11: Planning Section 2

49

Exhibit 11: Planning Section Implementation Matrix 64

Map 12: Planning Section 3

53

Exhibit 12: Focus Area Implementation Matrix 65

Map 13: Tryon Equestrian Center

54

Exhibit 13: Trail Type Profile 66

Map 14: Planning Section 4

57

Exhibit 14: Trail Support Spectrum

68

Map 15: Planning Section 5

59

Exhibit 15: Economic Impact Analysis

69

Map 16: Implementation Focus Areas

65

Map 17: Economic Impact Market

69

Map 3: Study Area 1 Site Analysis

20

51

ix



INTRODUCTION

The Overmountain Victory National Historic Trail is APPROXIMATELY 270 miles in length and is located in portions of Virginia, Tennessee, North Carolina, and South Carolina. The Trail commemorates the significance of the patriot militia that marched from the Appalachian Mountains and their foothills to defeat the British-led loyalist army at the Battle of Kings Mountain on October 7, 1780.

This Trail Master Plan serves as a road map for establishing a section of the Overmountain Victory National Historic Trail (OVNHT) From Rutherfordton, NC to Chesnee, SC.


BACKGROUND This project is part of ongoing efforts by the National Park Service (NPS) to develop regional trail master plans in order to strengthen multi-jurisdictional partnerships and engage landowners to expand and connect the growing network of certified OVNHT segments throughout Virginia, Tennessee, and North and South Carolina.

VA

Abingdon

THIS PLAN'S STUDY AREA 1

In 2019, the National Park Service, Town of Rutherfordton, Tryon International Equestrian Center, RHI Legacy Foundation, and Rutherford, Polk, and Spartanburg Counties partnered to fund a comprehensive master plan for the OVNHT from Rutherfordton, NC to Chesnee, SC. It is expected that trails developed along recommended routes within the plan study area will be eligible for certification by the NPS as part of the official Overmountain Victory National Historic Trail non-motorized route.

MAP 1: OVNHT PLANNING AREAS

ABINGDON TO ELIZABETHTON

This plan's study area examines

TN

incorporates 29 miles of trail

Section 9 of the OVNHT and corridor from Rutherfordton, NC to Chesnee, SC.

Elizabethton

NC

26

ELKIN TO W KERR SCOTT RESERVOIR W Kerr Scott Reservoir

ELIZABETHTON TO SPRUCE PINE

2

6

STATE TRAIL DESIGNATION In June of 2019, NC Governor Roy Cooper signed S.L. 2019-20 into law, authorizing the Overmountain Victory Trail as a designated State Trail within the NC State Parks system. The North Carolina Trails System Act (GS 143B- 135.90) defines a State Trail as a linear corridor on land or water, separated from vehicular traffic, providing public access for non-motorized recreation or transportation. As units of the NC State Parks system, State Trails are distinguished from other regional and local trails, by offering opportunities for regional connectivity and public access. While a State Park is operated and managed by the NC Division of Parks and Recreation (NCDPR), a State Trail is comprised of multiple trail sections that are sponsored by state or federal agencies, local governments, non-profit organizations, and landowners. NCDPR provides guidance, coordination, and assistance for the section sponsors. The sponsors build, maintain, and manage their section of the trail deciding on location, design, surface, permitted uses, and amenities.

2

Elkin

5

This trail plan was developed This trail study area from Ruthin conjunction withspans another erfordton, NC to Victory Chesnee, SC. Overmountain National

W KERR SCOTT RESERVOIR TO LENOIR

Historic Trail master plan that extends from Spruce Pine, NC to Lake James.

Lenoir

Spruce Pine

3

SPRUCE PINE TO LAKE JAMES

LAKE JAMES TO MORGANTON

7

4

THE SISTER PLAN THE SISTER PLAN

LENOIR TO MORGANTON

COMPLETED MASTER PLANS

Morganton 40

Lake James

This trail plan was developed in the same spirit as five other

40

77

8

MORGANTON TO RUTHERFORDTON

OVNHT Master Plans completed from 2015 - 2018: Abingdon to

N

Elizabethton (Section 1); Lake James to Morganton (Section 4); Elkin to W. Kerr Scott Reservoir (Section 5); Lenoir to Morganton

Rutherfordton

(Section 7); and Chesnee to Kings 26

9

SC

RUTHERFORDTON TO CHESNEE Chesnee

Mountain (Section 10). The NPS 85

is working to develop similar

CHESNEE TO KINGS MOUNTAIN 10

Kings Mountain National Military Park

plans for all areas included within the congressionally-designated OVNHT corridor. 77


INTRODUCTION

PLAN GOALS

LANDOWNER OUTREACH IS A CRITICAL COMPONENT OF THE OVNHT PLANNING PROCESS.

1 2 3

Specific Trail Routes.

Identify a specific and feasible trail route within or near the known historic corridor of the Overmountain Victory Trail as determined by NPS.

Landowner Outreach.

Make a direct appeal to landowners identified during the analysis phase and record their sentiments for providing a trail easement.

4

Support Other Community Goals. To the extent

5

Social Media.

possible, identify opportunities to leverage the trail to further other community goals, including economic development, historic preservation, public health, and environmental stewardship. Incorporate modern social media marketing tools within the trail and signage infrastructure to promote the development of “user generated� marketing content.

Visual Plan.

Create a visual plan that provides renderings and schematics to demonstrate trail character.

3


PLANNING PROCESS 1.

3.

Direction Setting and Project Launch | May 2019 The consultant team met with local trail and government leaders to generally discuss environmental constraints and opportunities for trail connectivity.

4.

2. Research | May-August 2019

The consultant team conducted a thorough site analysis of the study area and determined feasible trail route options. With the trail routes identified, a landowner contact list was developed.

5.

Landowner Outreach | August-September 2019 Landowners with property along an identified feasible trail route were invited to a special meeting to learn more about the trail project. After receiving comments from landowners, the preferred trail route was revised accordingly. Plan Development | October-December 2019 The consultant team worked in tandem with local leaders to develop a preferred trail alignment. Renderings and schematics were provided to visually support the trail recommendations. Final Plan Preparation | December-March 2020 The final plan is published for review by stakeholders, elected officials, and the public.

project timeline

dy

Opening

s

42

l

go

34

n

1135

11

y Wa ne Ho

ol

ss rne Wi lde BRO AD

RIV

ER

11 26

Sta

ce y

01 11

1112

Bluesky

ide

• Public Meeting & Engagement • Landowner Outreach Workshops

OCT. - DEC. ’19 • Design Alternatives • Wayfinding & Structural Elements • Branding • Opinion of Probable Cost • Route Feasibility • Landowner Follow-up

DEC. ‘19 - MARCH ’20 FINAL DRAFT DEVELOPMENT

PUBLIC ENGAGEMENT & LANDOWNER OUTREACH 95 21

port Heli

2190

McAbee

in

JJ

y

1356

rra Mu Mc

dd

EK

e Cu Le

S CRE SON HEN

1356

1

ood

ee

136

8

95 11

er op Ho

nd Po le s Ly

on ag

1359

1004

ek C re en re G

Adkin

11

Ford Poors

s Ca pp

4 114

Riverside

1352

W

GREEN CREEK

M

Skipper

ea W

ith

hn

Sm

Jo

Stewart

xe

to n mp y Ha

en

ad

A ld

Br

ta

tio

n

Moss

an Pl

N CREEK CLEGHOR

5 114

ose

oy Tr

13 71

rk yla

Sk ire

r ve

1326

1538

Web ber

cE

M at Ho th rn e ew

nt

e ro on M

152 1 5

153

1132

ro w Ar

Co

Union

6 115

46

t Ell iot

1332 McDade

Greenway

Aster

s y Pl ain nd Sa 20

m ru

ville

1304

e

sn

Collins

owbr ook

Lin

58

ty

13

un

Mead

60

W

Kn

Fires

Co

13

Bla ckw

he

22

C

15

43

1131

LYLES LAKE

3

n

n

Jo hn

34 13

er rn Tu

15

11

29 13

Moor

e

Ambr

Buck Branc h 1335

MOUNTAIN CREEK

ls al cF

ps on Sim

13 24

White Tail

l Ow ot Ho i mb Ba op dr al W it h Sm

on pi am

l

Ch

ai G

gh

Hu

nd

ER

er

02

1133

130

La

RIV

30

K

1340

63

s

ia

ai

13

11

J

m

111

S CREE

ia

es 42

r

DILL

ill

Creek

Green

13

ne

Dewitt Owens

ill

or

27

M

C

11

en

k

er

shoe

ll

13

rM

ill

Horse

be

el

7

p

ue

ho

W

219

is

en

te

1139

To ol

kle

Hopp

Moonlight

K S ol

13

41

H es

GRE

1362

ld

13

28

fie

iry

TTS CREEK JARRE

uc

1106

ys

B

11

ni

e Da

d

ne

s

Bl

n

Pe

ow

an

Ho Bes

tso

ne

38

50

1148

Isl

Grays Creek Church

Wa

Pi

13

11

Shiloh

CREEK

ins

Big Gum

EN

71

nch

G BRA

Bi g

bb

1

Do

22

GRAYS

Jim

g Bra LON

ge

rry

e

Lon

t

ed

or

21

Holla Sunset

H

e

6

ne

r Ri dg

219

1213

r

NCH

Clegh orn Mill Holly Forest Weeks 11 11 43 41 am th C ha

hn

nt

15 36

er

B el

S to

ion

Che

221

Airlie

Plantatio n

Un

Ri ve Wil d

Jo

1339

37

11

by

1

Bab

Butc her

EEK

CR LES

AR

CH

74

oll

Boyd D ar

Lib

12

ey

Cr

9

ER RIV

47

t am

A rt

M ou

Ivie

os

y

114

D

11 n

es

10

13

EK

e

t

L CRE

ll

6

155

Cres

MIL

ttl

Field

rm k Fa

Li

Burgandy

EK CRE

n

r Cr

Oa

kwe

9

ES

n Ru

mp

Plan tatio

1005

7

ain unt wba Cata

d Blac

7

n Kn

WHITE OAK CREEK

8

Floy

9

an

36

GH

bu

ttm

Brooksto ne

HU

Day

Ra

Pi

13

LAKE SANDY PLAINS

24

9

15

5

136

y

Ca

OVERMOUNTAIN VINEYARDS

Hill

Lake Sandy Plains

err

ycl e

Woo

32

ds

w

Overhi ll

13

llo

26

ldb

Tric

in

Ho

74

S yc

4

ite

W

s

15

Wi

ir

lin

d

2

ve

Larsen

1333

e

Zio n King

RUTHERFORD COUNTY

POLK COUNTY

6

TRYON EQUESTRIAN CENTER PROPERTIES

ek

Fa

dg

ol

3

5

Wh

O ak le

C

3

R

74

Ridge

de

1149

r Coxe Ridge

y

Front

rmo

te ill

1331

4

Ove

hi Ar

B

OA

Moo re ms and

13 26

EK E CRE

W

Cre

erbr ook

Va lle

2

Ri

Abra

74

HIN

al

ian

1

w ny Vie

tr

Ind

Timb

tin

74

n Will Gree

152 5

M ar

2

der Pon BRADLEY NATURE PRESERVE/ ALEXANDERS FORD

ge

N RIVE

an MAC

en

eh

R id

GREE

s

Sh

a

R

Hid

Deerview Babe

7

Sun

C hn

1

BR

119

Pe

ch

tkin

k Jo

l

an e Br

White side

P ol 1330

132

Do

ce

23

1528

pe

13

Pri

70 Wa

ha

Ro y 13

Gray's

C

on

Misery Ridge

zy

us

K EE CR

ps

La

Bidd

ck

an

d Ro

M

AT

HE

Re

55

25

2194

1317

n

11

13

W

1322 om

53

il

Th

11

Wre

ta

R

• Natural Inventory • Points of Interest & Structures • Environmental • Infrastructure & Utilities • Video Development R 1149

1367

R ed 108

A

4

• Physical Inventory • Physiographic Analysis

RESEARCH AND PRELIMINARY ANALYSIS

• Kick Off • Facilitating Planning Oversight Committee

AUG. - SEPT. ‘19

DRAFT PLAN, DESIGN CONCEPTS, COSTS

MAY - AUG. ‘19

M

DIRECTION SETTING & PROJECT LAUNCH

MAY ‘19

• Funding • Implementation


INTRODUCTION

PLAN ORGANIZATION Chapter I.

Chapter II.

Chapter III.

Existing Conditions, Analysis, and Preliminary Alignments

Landowner Engagement

Trail character & Design guidelines

VICINITY MAP

MILE MARKER FENCING TO MARK PRIVATE PROPERTY BOUNDARY

Significant efforts were made to reach out to landowners where the preliminary analysis (results from Chapter I) indicate that the trail is most suitable. This chapter outlines the process and results of landowner outreach, including a map illustrating landowner sentiment.

e

EE K CR RS E HO E

Stage

LIT TL

n to erf ord th Ru Fike

Cash

Lee

Georgia

239 LeeLe e 516

Florida

Cash Bond

Ohio

North Carolina

464

ia

rn

Kentucky

239 239 Georgia

fo

Nevada

1534 Parris

Texas

206

Texas

549

Utah

Sheeree Ez ell

McDonald Farms

Tata

Kingston Ridge

Ca li

Court

0 Fo rd 10 Isla nd

Lockland

Ma rg ate Ke en ey

Lake

Ivey Creekbend

Henderson

s

W oo

ds

n

ield

e Vanc

od

ce

nio

Ho

an

U

Sh

t ur Co

221V

514

Fa r

m

3 10

Main

Shed Cr eek

ke

ge

Rid

4

10

rg

ge

bu Moss ee Cart

lie

GREENES LAKE

K

S CREE CUDD

id

C

Br

h

ris Fis

rd fo of Sw

ll

am

ad he

Tuscany

Dawn

de Wad

p

Rav encr est P ar

er Ov

83 5

1

La

en

Alab ama

gs

Farm

MILES

0.5

Pinecrest

Ju

mp

Rid

Ca

in

rtin

W all

0

Front

Avita

Gre

k

c nA

e idd

H

Redline

C

re e

Peach

Ma

Minnow

tts

rne

M

Red Line

Ho

lly

ky

res

3 10

Clement

ry

n so

er

Tur

R oc

ra Lib

nd

He

m key Far

y wa en

Gre

Bu

irk

Bain

s

ason

K

yd Lo

ANCH RD BR

ll

s

r lte

Sa

Hi den Gar

l 187

s

Willingham

Arledge

p ho Bis

Picken

d Pa rk

ge

land

CH

Ligon

e

Club

Rid

rlan

Country

gle

on gt

xin Le

Rich

N RA

Pruitt

1516

on

CHESNEE Manning

ek

PROPOSED ROUTE FROMCre e rs CHESNEE TO KINGS MTN. Ho PLANNING SECTION Dill

1771 468

469

Vassey

221

ton mp Ha Georgia

Red lin

er alk W

es

Hin

Ea

ard

Ove

102

Rich

Camp

LB

n Labor

Y FO ROCK

oo

Sch

ree

ht Peac

hu

ng

pri

rS

Ledford

187

er Ru Walk

13

Saluda

CADA PARK TRAILHEAD

ar

d Ce

12

Greenwood

Laurens

EL

gs

eld

lp

55

e ke

187 Fairfield

Burrs

This chapter provides a summary of implementation priorities organized by planning section and focus area. Chapter 5 concludes with an economic impact analysis. Su

Lo we

ld

fie

ir Fa

Saluda

EZ

rin fo rd

10Oconee 11 ero

Sp Le d

Bonner

Ch

ek

y le

o Co

n

oe

idge

re

Farfield

te r

e Joyc

rso

9

ick

C st Lo

215

ith

Sm

Pa in

er ch ea Pr Fairfi

8

l Wal

Raytown

de

rson

rass Townsel

Tre e

7

Shamrock

itty

Tw

11

Ande

11

Tank Hill

ic Scen

is Br

Parr

n

Ca

Hamr

Pruitt Farm

ell tr

eetg Sw

et

De vo n Fa lco n

iew

Pe ach

Horsesh

othills

kee Fo

Chero

rn

t

An

Hic

ks

Pin

or e im at t lL Bil Do we ll Mc

on

Farm Ba

ord Crawf

N

ebak er

Smithv

6 Pruitt

Stud

ers

38

Red Barn Divide

y ne

Kin

515

Fall

h ia m re Je

nd

5

73

5

t

692

He

s

bin

b Ro

an

978

Gro ve

Hil

l

Farm

berry

Black

il La

BRA NCH

Sanders

s

Adam

72

Mahaffe y Cooley

OW OOD ARR

Cypress Cove

Rabbit Moffitt

EK CRE

4

Ple

The fourth chapter breaks the study area into five (5) planning sections. Each planning section includes a map that displays a preferred alignment. Each planning section further incorporates the analysis and design elements from the previous chapters along with a host of supporting renderings and design schematics.

le y

Mc

idge

we Lo

ns

Burke

Coo ley R

wis Le

as

He

cle Cir

ry Montgome

CK

bee

McA

nch

Bra

ris

ar

CHESNEE

POLK COUNTY

Thompson

ood ow Arr

Cooley Springs School

s

3

H

BU

STATE LINE

Franciscan

S.C.

Implementation

ig

Hicks Grove

gg

186

Buff

Folk

6 13

Cra

TY UN CO TY KEE UN ERO CO CH RG BU AN RT SPA

Chapter V. ru

McSwain

N.C.

Ru

n

2

SECTION 5

Jack McKinney

n so ud H

er

lls

Turner

De

Kno

1

Brad ley

s

na

Jo

Strawberry

Sc

Recommendations

Jess Lam b

la Is Big

C oo

le y

ill

Airport

Gr

Pond View

z re Pe

bs

nd

m

State Line

Chapter IV.

This chapter is dedicated to visually defining the various trail types 30’ PREFERRED BUFFER TO RIVER TO 10’ PAVED ASPHALT PROTECTused WATER QUALITY to be throughout the corridor. Also, design concepts are provided for all types of trail user orientation signage, mile markers, historic markers, and other trail support facilities.

La

This chapter provides a comprehensive overview and analysis of the opportunities and constraints found throughout the study area. The analysis begins with a brief description of the study area followed by a comprehensive discussion of the natural and built environments and their implications for trail suitability, permitting, and costs. This chapter concludes with a map and photographic series that highlights a host of preliminary trail route alternatives.

Blue Daw

n

5


6


CHAPTER 1 EXISTING CONDITIONS, ANALYSIS, AND PRELIMINARY ALIGNMENTS

this chapter features An OVERVIEW AND ANALYSIS OF THE OPPORTUNITIES AND CONSTRAINTS FOUND throughout THE STUDY AREA.

The analysis begins with a brief description of the study area followed by a comprehensive discussion of the natural and built environments and their implications for trail suitability, trail design features, permitting, and costs. This chapter concludes with a map and photographic series that highlights a host of preliminary trail route alternatives.

IN T H IS C H A PT ER A. Study Area Description B. Natural Environment Analysis C. Human/Built Environment Analysis D. Map and Photo Series: Preliminary Trail Route Alternatives


CE D CR EE

RE EK

RE EK

CA NE C

CO VE C

74 64

STUDY AREA CREE K

ALT

ROBE RSON

MOUNTAIN CREEK

HE C AT

UT LN A W

MAP 2: GENERAL STUDY AREA

RUTHERFORDTON HOLLAN DS C

YS

RE

CR EE K

EK

K EE CR

THERMAL BELT RAIL TRAIL ALT LE

GREEN RI

221

P MA

V

GENERAL STUDY AREA DESCRIPTION:

E

R

EE K

ALT

74

EG

HO

RN

CR

108

SE CO N

CL

BRADLEY NATURE PRESERVE

74

D

D OA BR

RIVER

EXISTING OVNHT

ER

221

W

N

HI

T E OA K C R

K EE

RUTHERFORD COUNTY

CHESNEE

BIG IS

POLK COUNTY OV N HT HISTORI C

CO RR ID

RD ISLAND FO

D O O W H O NC R R A A BR

LEGEND

N.C. S.C.

D

RD

FO

N

LA

IS

TRAILS FEDERAL LAND

PROPOSED GREENWAY

STATE LAND

EXISTING GREENWAY

OVNHT HISTORIC CORRIDOR

0

1

2

11

RAILROAD

11

GE RID PA R R I S B

EXISTING CERTIFIED OVNHT

CADA PARK

CHESNEE

221

CHEROKEE COUNTY ALT

221 COWPENS NATIONAL BATTLEFIELD

SPARTANBURG COUNTY BU

CK

the study area includes approximately 3.1 miles of existing ovnht located in downtown rutherfordton , at the bradley nature preserve , and within overmountain vineyards .

K

The 29-mile study area begins at the Thermal belt rail trail, north of downtown rutherfordton, NC and ends at cada park in downtown

221

CR

EE

8

the study area extends approximately 29 miles from the thermal belt rail trail at u . s . hwy 64 in rutherfordton , nc to cada park in chesnee , sc . the corridor extends southwest from the thermal belt rail trail and downtown rutherfordton along nc hwy 108, turning south toward bradley nature preserve and tryon international equestrian center . the corridor turns southeast at chesnee highway to continue to downtown C hesnee . T he corridor traverses l arge undeveloped tracts of l and in southwest R utherford C ounty and northeast polk county . small developed parcels line the corridor near rutherfordton , along chesnee highway , and in chesnee . the study area ’ s topography consists l argely of rolling foothills throughout .

O R

BS M LL LA RI G

9

MILES

A IETT

ENR

IS H

R HAR

LAND

EXISTING OVNHT

E HIGH

RIV

OVERMOUNTAIN VINEYARDS

CHAS

D OA

FLOYDS CREE K

BR

COXE

in accordance with the ovnht comprehensive management pl an , the rutherfordton , nc to chesnee , sc study area is anchored by the one - mile wide historic corridor . the corridor spans a half mile on either side of what is known to be the historic route of the overmountain men . this pl anning corridor was determined to allow for changes in the historic route based on prevailing research , as well as to allow for a continuous adjusted route in response to constraints of the modern built environment .

110

chesnee, SC.


CHAPTER 1

ANALYSIS WORKFLOW ALTERNATE TRAIL ROUTES WERE DETERMINED BASED ON AN ANALYSIS OF THE NATURAL AND BUILT ENVIRONMENTS.

SIT EN M N O R I V EN

T

EN M N O R I V EN

E A N A LY S IS

T 9


THE NATURAL ENVIRONMENT The opportunities and constraints found within the natural environment are critical for determining suitable trail locations and feasibility, ideal user experiences, construction costs, and necessary permits. This section explores the implications of the study area’s natural environment for establishing the Overmountain Victory National Historic Trail from Rutherfordton, NC to Chesnee, SC and includes five (5) parts: 1) Floodplains; 2) Wetlands and Hydric Soils; 3) Rivers, Streams, and Lakes; 4) Steep Slopes; and 5) Rare Flora and Fauna.

S

10


CHAPTER 1 4

“Portions of floodplain areas along THE BROAD AND GREEN RIVERs are ideal for TRAIL development.”

FLOODPL AINS

WETLANDS AND HYDRIC SOILS

STREAMS, LAKES, AND PONDS

Floodplain areas provide both an opportunity and constraint for trail development. Since traditional development is not suitable within floodplain areas, private landowners are often more willing to provide access for public trails within these locations. Also, these scenic areas often attract wildlife, which creates an engaging trail experience. Within the study area, much of the floodplain areas along the Green and Broad River corridors are ideal for trail development.

The study area includes several wetland areas as identified on the National Wetland Inventory (NWI). According to NWI, there are likely smaller wetland areas within the study corridor that are not indicated within their inventory that could impact final trail alignments2. Hydric soils in combination with wetland plant species and wetland hydrology are considered indicators of a wetland, which require costly permitting if impacted.

The County, State3, and Federal4 governments regulate the many water bodies found throughout the study area. The Broad River, Green River and their tributaries Cleghorn Creek, White Oak Creek, and Mountain Creek are some of the most important waterways found within the study area; there are permitting implications for crossing and bridging these water bodies.

2

Although development is regulated within the floodplain, greenways and trails are allowed and can be permitted. Sound trail engineering techniques are necessary to ensure trails can sustain flooding. To the extent possible, greenway alignments should be avoided within the floodway1.

If wetlands are unavoidable, utilize elevated boardwalk systems. Boardwalks allow for travel over flat, poorly draining soils, standing water, and wetland features and have significantly less impact than other options. A section 404 (Clean Water Act) Permit may be required if the wetland is considered jurisdictional by the USACE. This means that the wetland is not isolated and part of a broader lake or water system. A small boardwalk for a non-isolated wetland with limited fill or dredging may qualify for a programmatic Nationwide Permit. Nationwide Permits are designed to streamline the permitting process for actions with limited disturbances. In addition to permitting, disturbances exceeding a tenth (0.1) of an acre would require mitigation which can increase project costs. Impacts under a tenth (0.1) of an acre do not trigger mitigation fees.

3

Maintain a 30-45 foot buffer from all waterways, especially those regulated as impaired waterways under the SC Department of Health and Environmental Control’s Buffer Zone Guidance. Streams

within the study area are identified by the State of South Carolina as having poor water quality and maintaining or improving an adequate vegetated buffer is crucial to improving the quality. A 45 foot natural buffer must be maintained along the banks of impaired streams, including Peoples Creek and Cherokee Creek. This buffer zone allows for managed vegetation and trails and greenways. Trails are an allowable use out outside of the buffer zone, the SC Department of Health and Environmental Control may require a permit in which the applicant must show that disturbance has been minimized. 4 Plan for permits related to waterway Impacts. Federal 401/404 Certifications will likely be required in cases where any stream or waterway alterations occur. These alterations would be most likely in conjunction with bridge improvements or addition of structures near waterways. Triggers for the permit include disturbance to the stream bed, banks, damming of the waterway, or placement of material within the waterway (i.e. culverts/pipes).

Avoid disturbance in the floodway. Avoid placement of structures or disturbance within the

1

floodway. Floodways are regulated locally and by the Federal Emergency Management Agency (FEMA). Fill, structures (walls, kiosks, etc), and impervious surfaces are discouraged. Any structures located within the floodway require a no-impact/no-rise certification through FEMA. These studies can vary on cost but can range from $2,500-$15,000 depending on complexity.

11


STEEP SLOPES

RARE FLORA AND FAUNA

Topography of the study area is characterized by the rolling hills of the southern Blue Ridge foothills throughout Rutherford, Polk, and Spartanburg Counties. Trail type and design will transition with the varying terrain. Where possible, the trail should provide for grades under 5 percent. Natural surface trails can vary up to a 10 percent slope. Proposed trail alignments may require a wider trail corridor to ensure that a more gradual trail grade can be achieved through switchbacks.

The North Carolina Natural Heritage Program and South Carolina Department of Natural Resources (SCDNR) Office of Environmental Programs provide data identifying each states' most sensitive environmental areas. Rare flora and fauna species can also exist outside of these designated areas, which can alter final trail alignments prior to construction. As of July 2019, eight (8) rare species were identified within this study area by the North Carolina Natural Heritage Program and SCDNR Office of Environmental Programs: 1. Superb Jewelwing; 2. Sharphead Darter; 3. Olive Darter; 4. Carolina Quillback; 5. Ocellated Darner; 6. Gray's Lily; 7. Roan Sedge; and 8. Drummond Moss.

Coordination with the North Carolina Natural Heritage Program, SCDNR Office of Environmental Programs, and the U.S. Fish and Wildlife Service (USFWS) is an important aspect of the design process. Involving USFWS early on in the process can help avoid potential planning obstacles related to federally protected species. Additionally, permits like Section 401 and 404 (described previously in the Wetland and Streams sections) will initiate the review of the State Natural Heritage Program database. If species are found within the project area, State or Federal requirements may dictate avoidance or mitigation.

SUPERB JEWELWING Photo by Dennis Doucet

12


EXHIBIT 1: BRADLEY NATURE PRESERVE

CHAPTER 1

BRADLEY NATURE PRESERVE AT ALEXANDER'S FORD QUICK FACTS: Size: 162.52 acres Miles of Certified OVNHT: 1.1

T

he Bradley Nature Preserve at Alexander’s Ford is a 162.52-acre nature preserve located in northeastern Polk County along the Green River. The preserve features interpretive signage, picnic areas, a parking area, and a 1.1-mile designated section of the OVNHT. The Preserve is located at Alexander’s Ford, which is registered on the National Register of HIstoric Places. The Ford was utilized by the Overmountain Men to cross the Green River on their march to the Battle of Kings Mountain.

13


THE BUILT ENVIRONMENT The opportunities and constraints found within the built and human environment are critical for determining suitable and feasible trail locations, ideal user experiences, construction costs, and necessary permits. This section highlights five (5) built environmental features and their implications for developing the OVNHT from Rutherfordton to Chesnee, including: 1) Land Use; 2) Existing Trails and Parks; 3) Utilities; 4) Transportation; and 5) Historic Resources.

14


CHAPTER 1

LAND USE SNAPSHOT

“The Town of Rutherfordton and City of Chesnee, as well as the Bradley Nature Preserve and Tryon international Equestrian Center serve as critical anchor points for trail development.”

Overmountain Vineyards Overmountain Vineyards is a 70-acre vineyard with a tasting room, two luxury villas, outdoor pavilions, and one mile of designated OVNHT. The vineyard offers daily tours, and the vineyard tasting room is open year-round.

Photo by others

Town of Rutherfordton

Tryon International Equestrian Center

City of Chesnee

The Town of Rutherfordton (pop. 4,213) serves as the county seat of Rutherford County and the northern terminus of this plan’s study area. Founded in 1787, the town served as a major commercial and political hub for western North Carolina and the Blue Ridge Foothills from the late 1700’s to the mid-1800’s. Rutherfordton is home to ten sites listed on the National Register of Historic Places, including the Bechtler Mint Site. The Town features a walkable downtown core, a one-mile segment of OVNHT-designated trail, and is located just south of the Overmountain Men’s Gilbert Town encampment site.

The Tryon International Equestrian Center (TIEC) is a premier Equestrian Lifestyle Destination facility located in Polk County. The 1,400-acre site features thirteen arenas for horse shows, four restaurants, and a variety of shopping and lodging opportunities. A significant portion of TIEC property lies within the study area corridor.

The City of Chesnee (pop. 868) serves as the southern terminus of the study area. Chesnee is a rural town situated just south of the NC/SC state line at the crossroads of US Highway 221 and the Cherokee Foothills Scenic Byway (SC Highway 11). The walkable downtown is comprised of three blocks of historic one and two-story commercial buildings. Single family neighborhoods abut downtown to the north, east, and west. South of downtown, the US Hwy 221 commercial corridor is characterized by national chain stores and fast food restaurants.

15


EXISTING PARKS AND TRAILS

THE STUDY AREA boasts a collection of parks, trails, and recreation destinations that are ideal connections for the ovnht.

Kiwanis Park

Crestview Park

Kiwanis Park is a 5.3-acre passive park located in downtown Rutherfordton, NC. Though Kiwanis Park currently has few facilities, redevelopment per the park's 2018 master plan will include several new facilities, including a dog park, entryway plaza, and connectivity with the Purple Martin Greenway and OVNHT. As a green space anchoring Rutherfordton’s downtown core, Kiwanis Park is a significant destination within this study area.

Crestview Park is a 26-acre park featuring three little league baseball fields, one tee ball field, one senior league field, one multi-purpose field, four tennis courts, two basketball courts, two playgrounds, a 1/3-mile walking trail, picnic shelter, and parking area. The park connects to the Purple Martin Greenway via a sidewalk path.

Thermal Belt Rail Trail

Purple Martin Greenway

Rutherfordton Golf Course

The Thermal Belt Rail Trail (TBRT) is a 13.5-mile rail trail that extends from Gilkey, NC to Forest City, NC. The TBRT connects the communities of Ruth, Rutherfordton, Spindale, and Forest City and serves as a significant recreation and tourism asset in Rutherford County. The rail trail's intersection with the OVNHT at U.S. Hwy 64 serves as the northern study area terminus for this plan.

The Purple Martin Greenway is a 1.4-mile asphalt greenway trail in Rutherfordton. The trail connects to Crestview Park via sidewalk and will eventually connect to Kiwanis Park and the Thermal Belt Rail Trail. The majority of the trail lies within the historic OVNHT corridor.

The Rutherfordton Golf Course is located southwest of downtown Rutherfordton and abuts the Rutherford Regional Hospital. Existing paths, as well as redevelopment of the property could provide an opportunity for OVNHT facilities.

SOME OF THESE MAJOR ASSETS INCLUDE:

PHOTO BY OTHERS

16


CHAPTER 1

TRANSPORTATION The analysis of the study area includes a review of the North Carolina, South Carolina, and County Departments of Transportation (DOT) right-of-way (ROW), DOT plans, local bicycle and pedestrian infrastructure and plans, and railways. DOT right-of-way was analyzed to determine where there could be opportunities for developing OVNHT side paths. These areas are shown on the Site Analysis Maps with corresponding opportunities and constraints notes. Grays Road River Access

CADA Park

Grays Road River Access is located at the intersection of the Broad River and Grays Road in southwestern Rutherford County. The river access is managed by the North Carolina Department of Wildlife Resources and includes a small parking area and stepped access to the river. The access will serve as a trailhead along the proposed Broad River Greenway and is a key connection node along the OVNHT.

CADA Park is located in downtown Chesnee, SC and serves as the southern terminus for the plan study area. The park features a small pavilion, 0.2-mile walking loop, OVNHT kiosk, and parking area.

Significant sections of the study area are typified by rural roads with limited opportunities for DOT side-path development. This, combined with the lack of a consistent waterway and riparian area within the corridor present significant barriers to trail development.

UTILITIES The incorporated towns located within the study area maintain a complex matrix of water and sewer infrastructure which, in many instances, are held in fee simple ownership by a public agency or have easements that can be modified to provide for trail development. The analysis of the study area includes a review of public infrastructure and associated easements.

Bradley Nature Preserve at Alexander's Ford The Bradley Nature Preserve at Alexander's Ford is a 162-acre nature preserve located in northeastern Polk County. The Preserve contains approximately 1.1 miles of designated OVNHT as well as a parking area, picnic area, and interpretive signage.

“Rural Road networks and the lack of a consistent waterway within the study area present significant barriers to trail development.� 17


HISTORIC RESOURCES

“THE OVNHT SHOULD LINK, PRESERVE, AND INTERPRET HISTORIC AND CULTURAL SITES ALONG ITS ROUTE.” THE BRADLEY NATURE PRESERVE AT ALEXANDER'S FORD IS MANAGED BY POLK COUNTY. THE SITE FEATURES 1.1 MILES OF CERTIFIED TRAIL. AT THE PRESERVE, VISITORS CAN VIEW ALEXANDER'S FORD, WHICH IS REGISTERED ON THE NATIONAL REGISTER OF HISTORIC PLACES. The Overmountain Victory National Historic Trail Route and Corridor The Overmountain Victory National Historic Trail route was identified by a National Park Service research team. The team relied on the 1881 account of the march, which has been amended by local historians, descendants of battle participants, and other sources. As part of this congressionally-designated trail, officially designated portions of the OVNHT must lie within or very near the one-mile corridor (half-mile on either side) of the historic route.

18

Historic Sites and Landscape The North Carolina and South Carolina State Historic Preservation Offices (SHPO) oversee a large database of historic sites and resources. Many resources, including those related to the OVNHT, are included within the subsequent analysis map series. These resources include information from SHPO as well as sites related to the National Register of Historic Places (which the National Park Service oversees, but is managed by individual States). The most critical sites include those listed on the National Register (NR) or determined eligible (DOE) as they have further protection under Section 106 of the National Historic Preservation Act. The National Park Service has emphasized that historic/cultural resources should be linked, preserved, and interpreted as part of this study and subsequent trail development. Specific resources that directly relate to the

history of the OVNHT are noted on the subsequent maps and include: A. B. C. D. E. F.

Downtown Rutherfordton Historic District Trinity Lutheran Church Rutherford County Courthouse Carrier Houses St. Luke’s Chapel Alexander’s Ford

Sensitive Cultural Resources and Permitting: Any construction funded or permitted by the federal government will trigger a project review by SHPO of any resources covered under Section 106 (National Historic Preservation Act). These resources could include human remains, burial sites, archeology sites, and historic sites. If it is found that the action of trail construction could potentially adversely affect cultural resources, the SHPO will work with the related Federal Agency to eliminate or minimize the effect. 6 Historic Sites and Permitting: In general, a greenway would have no effect or a complimentary relationship to preservation of these sites, but may require SHPO coordination in circumstances like alterations to historic bridges or whole properties. If federal funds or permitting is required, the SHPO will review this database and analyze for any adverse impacts. 5


mp

6

rk

154

Pa ll Ba

da le Sp in

47

rk

15

Ki ng

Pa

ar C ed

H

CASE BRANC

e

rk

R ic n

Galax

Pine

2186 1589

Pa a ll

Co wa

15 91

ky

E

Km

ar t

Hyde r

84 21

ie l D an

id R

Marsha

2187

Ho B ur lli ns Bu rgi n w el l

e

46 15

Go od

Ne E Ca lif va da lm or ni a

Oa k Nebra ska Court land

P le as th er an t fo rd Ru

Ken tuc

22 46

22 54

2199

22 49 ua

21

fe y G uf

Jo sh

2243

Debby

95

e Da iry

y e rr

in

g

01 22

Cr ow 90 21

Cobra

ill rr Ha e ll

s

K CREE

T

ON

W

s in nk Je

G

RICH ARDS

4 11 2

1125

11 06

mb

nd

La

Is la

111 3

Fa rm

0 10 rd Fo

nd

EE K

la

CR E RS HO E

Cash

Nevada 1534 464

Sta ge

Fike

Ohio 464

206

Texas

A la ba

239

Li ne Re d

Front

e ll

r Wal ke

239 51 6

549

Saluda Ez

p m Ca sh

LIT

TL

692

d la n Lak e

Fi

ma

Is

ck

a te rg

t en

em Cl

gs in id

Pickens

er ry Bl ac kb Thom pson

Fa ll

Ma

Lo

22 1

7

e

is

18

CH ARR

Bill Lattim ore

Ivey Par ris Brid ge

Arledge

od Ho

on

CUDDS CREEK

dg

rs

ta

3

R

bl

OW OO D BR AN

il La

72

ms A da

Jo na

s

1110

11 08 J e

ss

B ig

Mahaf fey Coole y C re ek Lo st

op sh Bi

962 uf

f

Melb a

er

4

10

Avi

221

on

iv

51

ni

R

468

469 Manning

r

U

B ri

de

H

da Ce n lc o Fa n p to am

3

ead

rr

An

Whispe ring Ston eway

Sh Railr oad

el

v Hu n tl in e y ey Wy om in g Oh io O

rm 219 0

Fa

L it

tl e

Stew art

McAbee 11 3

4

on yW ag

ne Ho

ess d e rn en Sp rin gs Hi dd

fit t bi t M of R ab

186 ey

J o ll

we

4

rt

e rh

43

Burrs

10

Ov

Far m

t

Tur key

10 6

d

u it

rn e

tt s

Pa

on

Bu

CHESNEE

Fairfi eld

e

ou

n

ov

Green Lake

u rR

5

Ri ch lan

lk e

Gr

C

r

7

Wa

18 7

Ho lly

M as or d

Farfie ld

ie ld

d

Le df

te

ee

18

in

9

Oc on ee

7 8

ok

Pa

Townsel

Pr

Bent River

h io

L 03 aur

22

oo

d

el H ill

gw Do on gt in E ll

95

21

y

se

Ro

He lip

or t

s Ad kin

1132

W il

e un 1 t y1 0 L1in Co

11 0 1 ek

re

C

Airport

y Jo lle 25 1

Jo lly rd Fo on nn Ca

5

H

Lo

B

22 1

15 36

Det er

rn he ut

e

So

Lev i

an

rd

Fo rd Po ors

er op Ho

Mu Mc Lee Cud d L e e

1356 1355

1354

Caro

Ray Blackle y

rd

l

CH

Barnwell

La ur

d ie a ll A

22 1 Ma in

Jo

Ste war t

or t He lip

5 11 9

rr a

y

13 56

dd Cu

K HEN

1353 da Ra

131

1349

Sandy Springs

46 13

Jolle y 1366

Fo

el

692

e

ANC L BR

ey

2197

to n

Openi ng 2

11 4

ps Cap

11 4 4 nd Po le s on 1359 EE CR NS SO

9

1356

1 136

13 61

a Bro oks

Me liss

s

tr

be

er

in

an

cA

Ch

il k

tt

C

11

M

6

Hend erso n

W

ne

ge

4

102

9

73

ks

y

EL

Fr al

ec

Hi lls ide Me rid ian Mi tc he ll

1166

an m ee Fr

05 10 xe Co

Ha dy B ra

n de

Moss

Al P la

Ly

1352

ag W

k

G

1117

ery

R id

n s le

EZ

ir

He

n

e

l

Mon tgom

le y

H ic

Bu rke

so

id

15 11

s Kn oll t es

er

Pr

Joyce s

r kC

nd

y

s

Oa

He

M

ri

AN BR

er

ar

RD

st

lk

FO

Fo

Fo

s

Par ks

ia

1114

6

tgr as

Haw k Nes t

9

Sw ee

in

Hayes Lk

nd

Y CK RO

Sunset Ridge

0 11

fo rd

dd

Zs ig mo

1112

Cr aw

Pu

or

e

Ri dg e

1 111

on

ER RIV

ps

D OA

om

3

BR

1345

135

k Cr

ee

Cr en re

en re

G

1004

Skipp er

ee

Skipp er

it h

em

EEK

K

Joh

78

M

et

CR YDS FLO

EE

Th

inn ey Jac k McK

CR

nS m

1004

Mc

1538

1326

1326 Coxe

Web be

r

ew

tth Ma r ve ea

De

on Tr y

11 53

Bonair e EK RE C

RN

O

H LE G C

114 5

n io nt

at

CREEK CLEGHO RN

Rive rside GREEN CREEK

Aster e t ir En

e rn Ho

W

an

an 111 6 Hog

hn

ns

Line

LS

Jo

22 Su

2179

Pe tit

r

137

1

Greenway

e ro on M

15 21

15 35

h

1121

lle

nd

DIL

Co llin svi

74

Ne w Ho pe

xe Co

Union

Uni on

MOUNTAIN CREEK

11 45

Tr o

y McD ade

rk y la

Sk

in s yP la nd Sa

20

1201

ge lR id Tr ai

R 1149

ow A rr

6 11 4

tt

os e

Am br

e Mo or

34 13 r ne Tu r

15

m ru nd

la

EEK

La

1369

a en as W

nn

Five Oak s

Vio let O

p it nd Sa s S im

3 11 9

115 6

6 29

13 n

pso S im

1332

E ll io

Bu ck Bra nc h i

11 5

l Ow ot Ho mb Ba

13 35

Re

11 70

s 11 71 12

d Red woo

F ly

S im ve Da

11 78

11 74

en

or

G re

Ta yl

04

ven Ha

in s tc h JH u

ls al cF M

132

4

White Tail

op dr al

W ith Sm

ak

EK

04

O

CRE

n

u rc

22 41

er

FLOYDS

Ch

w

op

p io

Lo

am

C IC ICC

l

21 89

rd

ro

21 59

y

n ca

rv

de

Je rse

Ch

2188

21 69 Ca

G ap

ai

on

Pine y Ridg e

k

dy

G

l on ia n C ol r H or te Wal

nt

ro o

W in

gh

Mapp

la

Frank lin

B

2250

Hu

er

he rs

l

e tt

So ut

n ie

db

nn

21 92

F ly

Pe

Le

Godfr ey

nb

it h

S CR

V

5

S-42-98 6

e

Rap id

t

ide

ce

id

re s

113 5

Joy

Fa

or

5

rs

rd e

W

DILL

ar

Fa rm

df

Fa irf

83

ve

e

2194

li e

38

p

Le

ld fi e

Shiel ds

97 8 Lo we

y Ri

2185

74

sh oe

13

3

m

G ra

Ga

A ir

Ho rse

w

Ca

42

ol

ic

C al e

J

ak

2191

o ll

JJ

Coo

t in

en

Kn

H

ar

Clement

Sc

21 97

Vie

a in

M

il ls

ho

th

ov

r

ir y

w cS

Sc

1 ee 1 Fo o

dy

J

nd

Pr uit t

21 5

8

ok

D

te

a eD

7

Po

55

er

Main

d

ut

ow

2 11

ens Dew itt Ow

M

tt

16

Ch

Cr

11 06

2

B

le r

K

221

d

111 8

w is

ya

w

r

Fairg roun

nd

SPARTANBURG COUNTY

969

EE

Main

0

Mi st y

11 04

RUTHERFORD COUNTY

Le

W

La

te

CR

in

h

e

ED

22 72

Is la

K EE

Fox

dg

OB

Pi no

Fo

Far msi

Du

10

Mi lle r We ath ers

EEK

CR

it Sm

B ri

M ill s

ke

M il

Missou ri

2 11

k ie

La

W il

ow

W

EY

POLK COUNTY

s

t

in b

Te d

in

en

42

Pac ole

Ra

a

Poor s Ford

ns

y BlBluesk ue sk y

3

wk

ek

ik

R

er

N

0 11 er

Ha

re

ill RIVE

11 5

113 3

IN

ee

C

M H PA CO

ik en

113 1

Robbin s

RT

e

21 96

EK

NO

LET

0

CK

c h tr

r

and

Tillerson

le

ce

F ir

TS CR

p

Pea

Af ric a

8 65

M ill

B ig JARRET

ho

1305

ill

Lit tle

Flo rid

vi lle

ON

11 05 ll

H

l

ea

il rH

B

Gra ssl

da

la n

ru

Ea s tw or oo Waddell n d Young Ar iz Hi lls on a ide H am ilt on r

1122 Du nc

ri

n

nd Ce

od

2193

RIV

G

K

vi

ill

la s

or

bs

s

el

A Wilson

ip

Ri ce

RE

m

g g in

M

55

pe in g

C

rk

r ne

3 11

SC

1112

an

3

BUCK CREE

8 Tu l

te

He

NS

La

134

Sco

Princ e

1351

Wo

ER

HE

Tim

1350

1

ge

y

Ro

1 Johnson

22

ed

x

ss

2

il l

1553

Sp

H

nn Ta 13 43

gh

CREEK

gy

1148

l To o

k le

M

Sa

ir fo

K

Co

M

Ai rli e

e uc

e ll

Fa

McDow ell

REE

RC BEA

N.C. S.C.

M

ill

OA D

er

ne e

Pi ne

Greer

Po p la M

o re

Ec

SPINDALE

o lo

BR

L

d

4

13 57

Ch es

on

HOLLANDS

1139

Ho pp

11

e L inil a c

d

134

GR

CR

g

2 11 2 6 S ta c 6S ta c e y ey

ty

58

w oo

K

EE

N EE

w oo

ee

1

er

1304

un

13

0

k

Co

36

ow br oo

a ti

Pa rk

s

nch

Fir es

03

Me ad

B la ck

sn 42

6 01

B la ck

he

22

C

15

43

dy

on ys

LYLES LAKE

13 58

in

13

st

13

13

2

Pa rt

71

BR AN

Shi loh

3

4 13

gB ra

NG

130

42

Poors Ford

13

B id

y

ne

s

B es

eb

Cr ee k

an

13 40

21 Lon

is

1340

6

1213

B

s

po

2200

CH

Moon light

m

si

ta

15

ia

is

en

to

LO

ER

63

Gr ee n

219

lt

RIV

13

41

ill

ds Ed

2194

Bi dd

in s

8

W

in

r

Grays Creek Church

2 11

n

rv

E lm

rs

St

Be

ri n

r

ge

er

Ba be

u

w th

221

r r Ho lla Bu tc he Suns et

B lu

le

K

02

Du ke

C le

3

ec

id

74

B ab 11 49

Ho

n So

13

M

se

n te

So

y

Kno ll

He EN

r

Re

on

Hu

o ll

GRE

en

de

D av

RUTHERFORD COUNTY

Big Gum

e ill

gt

s

on

dr

y

e os

s

St

oo

ls e

bb

ts o

13

un

Ke

Do

in

ap t G Ro s

Pa rk

na l

15 44

ll a

STONECUTT

y

GRAYS CRE

J im

ov

11 51

ry

e

ve

v is 1 5 9

ER CREEK

G ra

221

W

Jonas Sims

or

oo

it h

Th

Cle gh est orn Mi Hol ly For ll We eks 3 11 11 4 m 41 ha at h C

ge

tw

2

re ek tC ew ge vi

r

R id

Augus ta

5 11

B en

d

Plan tatio n

be

L

AR

es

oo Sm

hn

C

Da

Da

223 1

R

Wa

ne

38

od

a rw

Jo

Ea

on

wo

B ri mp

nK n

lt Ye

ok

il l

11 91

Ca

de

74

B ro

H

m To

Ba

m

136 2

d

227 1

ne Sk yli

k

EK

hn

Pi

l fie

h

RUTH

RUTHERFORD-SPINDALE CENTRAL MIDDLE SCHOOL Po we Ox r fo rd

r

rk

4 il

le

s

ee

RE

Jo

37

R id

Pa

5

ua

nc

F la

1548

n

1543

W

ut

y

Cr

Ly

m

Sp

West

B

Iv s

11 49

io n

ca

te

1

ds

er nn w Ta tv ie es

t

Ma ry ch

Cox

Hidd en

t

133 9

11 13

ar

Boyd D a

by

un

36

B ir

Q

C ES

CH

er

Ar

12

15

rd

11 53

9

Un

R iv

C h er

es

7

L ib

Ivie

ys

3

Cr

re s

w

11 4

ER RIV

7

Cr

110 3

EK

t

RE

6

7

155

Cr es

LC

Burgand y

K

EE

CR

n

Fi el d

MIL

ES

Mo

nR u

a rm kF

36

GH

t le

bu

w el l

Broo ksto ne

HU

L it

Day

Ra

ttm

d B la ck

13

24

Pi

9

9

LAKE SANDY PLAINS

8

Fl oy

ne

d

en le

WHITE OAK CREEK

5

13 69

Lake Sandy Plains

y

an

11 4 tio n

W il d

OVERMOUNTAIN VINEYARDS

H il l

W

Ov erh ill

32

yc le

w

d oo

13

ds

Tr ic

in

ll o

Oa

W

Ho

4

oo

lD

k uc

1

EK

Sy

it e

1333

ir

ok

Pl an ta

1005

in u n ta ba rm o w Ca ta

Larsen

Wh

Fa

rb ro

26

e rr

74

6

O ve

ek

15

db

2

5

mp

RUTHERFORD COUNTY

er

6

k

W il

3

R iv

132

Oa Ti m be

Ca

Ki ng

POLK COUNTY

K

e

s

3

TRYON EQUESTRIAN CENTER PROPERTIES

e

lin

1331

74

EE

h it dg

ol

e

4

E CR

W

C re

D

or d Mo m s an

Rid ge

gw

re

114 9

r Coxe Ridge

ER

D RIV

BROA

y

Fro nt

2

VER

Ab ra

74

HIN

al

ia n

A O

e

74

BR

dg

ie w ny V

tr le

C

e Va ll

wa

H id

Deerview Ba be

Martin

an MAC

en

In d

Ar

ill

1

N RI

C

eh

r t in

2

s

Sh

Ma

11 9

d er Pon BRADLEY NATURE PRESERVE/ ALEXANDERS FORD

Sun

lk

hn

Ri

w

Pleasant Hill

Zi on

GREE

tk in

a

ee n W ill Gr

15 25

B

dv ie

5

l

e

Po 1528

pe

Pe

nch

Wh ite sid

ra eB

23

ce

Jo

1330

y 's

13 27

Do

13

P ri

70 Wa

ha

Roy

13

1 Gra

1155

C

on

Ar ro

Gray's

us

L

y az

e Mise ry Ridg

EK

E CR

an

AT

ps

5 11

ck M

HE

W

om

15

The map and photographic series, which spatially incorporates the natural and built environment analysis, highlights a host of preliminary trail route alternatives. These routes were further refined by local leaders to identify and engage landowners. This information will serve as an ongoing reference guide as alternative routes may need to be developed due to unforeseen barriers.

o dR

3

l

Th

R

12

Re

Ed

le

5 11

ai

R

D RI

R 1149

dt 25

rm

Th ist

Do

u ir

w

6 E2d

ay

ir fo

R id

t

Gr an

119 4

136 7

Re

13 22

MAP AND PHOTO SERIES: PRELIMINARY TRAIL ROUTE ALTERNATIVES

A

13

Fa

1

2

ST. LUKE’S CHAPEL

Fa irw

Fa

ch

er se

OA

13 17

n

on

en

ld

Ch ur

Re

db ud

So m

1210 t

tu

Ca rdi

sides e n White

e

ie rn

ff y

BR

VE

Wre

rs

6

11

108

Ca

ac

yf ho

Hi ll

9

Sq

Ho

et

JJ Gu

11 54

on

RUTHERFORD COUNTY COURTHOUSECo ur t 2nd e P in P a Ch ar lot rk te p le d o La M a n fr e ne 221 Mo Exe cut ive

7 ne

Forest Trail

kes

F ir

sa nt

10

7

5

An

e

ve La

lo w

h ug

ag

Co

r it

ek il an W

t

ce

dm

Au

Ba ll

Pe ak

Hig h

s

A ll

la Che stnu

H

P ie

8

3

r

11 62

He

re

Pl ea

E th

le

La

Wisteria

rC C

11 60

G re

TRINITY LUTHERAN Collett CHURCH

CARRIER 4th 3rd HOUSE

1165

4

ng

THERMAL BELT RAIL TRAIL

Oak Gr

6 11

4

c il

Grayson

KIWANIS PARK

C

1

M il

10 8

n ou

4

RUTHERFORDTON

6 11

il le

d il

6 11

n g to h in le r M il

120 5

1163

Cre ek

CREEK

M

Conn er

is e

as

5

ff o

ra d

W

17 ce 1

Da

Pa

na

tone

3

Pinelog

Ma ple

MAPLE

ro li

Peb bles

Ca

By rd

Yo u

64

Mountain

d

11 7

w oo

ek

8 119 7

Pi nk

CREEK

re yC

la Lo ve CC

z La

6 11

Chu rch

2

Jus tice

s Gap 117

MOUNTAIN

Coo per

152 0

6

ss 1177

116 9

7 11

Mo

Chisho lm

Hill

CHAPTER 1

C ar

Greenes Lk

te e

19


6

Pa ll Ba

47 15

rk Pa

CH

CASE BR AN

k

Ri

218 6 1589

Pine

Gala x

218 7

an Cow 1 159

ky

E

Km

art

Hy de r

21 l nie

6 224

4

2249

225

hua

ak

Crow

la

OVNHT 1 Mile Historic Corridor nd

Existing Trail Proposed Trail Existing Trail

Managed Lands 21 79

22 n Su

se

78

tM

em

R DS C

90

1

or

ia

l

FLOY

21

224

er OVNHT and other Recreation

O

e

p

Federal; State; Local Government

e

Historic Landmark Site

Line

EEK

rli

r

2197

2159

rv

e D a ir y

6

w

Jos

Guf

F a rm s id

Constraint

ro

84

2199

22 43

21

95

De bb y

fey

Ca

Cobra

S te w ar t

rm

rt

Fa

ipo

tle

Hel

Lit

ith

Da

Marsha

y se Ro

ce

ar lP al

B

Ne E Cal vada lm ifor nia

K e n tu c

Ru

g

in id R

an

rd

Jo

rk

154

dale Spin

g Kin

ar

de Goo

46

01 22

Ple a the sant rfo rd

io Oak Ne br as ka Co ur tla nd

Oh

o hi O

on gt lin El

15

y ey

ing

Wy

ntl

Hu

gw Do

om

d oo

De

vi

ne

22 Hill rel Lau

74

221 Main

05 10 xe Co EK RE C RN O

Ced

ry er

R ai lr oa d

Levi

d lie al A

Ho B u r l l i n s B u r g in wel l

e ec

Re

Sh

D e te r rn he ut

H il ls id e M e r id ia n Mitc hell

an m ee Fr

11 5 3

Wh isp eri ng St on ew ay

6 22 1 153

el

Tr y

L 03 aur

on

1166

New H ope

Bo na ire

1201

lR idg e Tr a i

t

So

a en as W

nn Fly

Vio le t O

pi nd s

Sa

13 69

H il l 04 12

d Redwoo

11 7 0

11 7 1

ms Si ve Da

F iv e O ak s

11 7 4

Ta y l

Gre

or

en

11 7 8

STUDY ven

Ha

m

W

LEGEND

ey

H

n

Ga

LE G

rde

Pi ne y R id ge

k

dy

C

Ga

o bro

Jers

Un io n

R a p id

Floodzone

1

2185

74

21 91

t

Win

11 4 5

res

nca Hydrography rd Ch urc h

Ai

be

er

oak

Opportunity

le evil

4 00

221

op

ns

219

Mai n

Fa ir gr ou nd

J

Lo

R 1149

Fo

Po or s Fo rd

21 94

dy

Ric

2272

2188

le

rs

C IC ICC

He

M il le r We a t he

9

22 00

to

te

You ng Ham ilto n

218

is

K n o ll

Bab

a

Pin

n

Ed

rt

21 93

22 50

hw

po

Wa dde ll

ona

al oni n Col r Hor lte Wa

F lo r id

yn

Si

id e

Du

11 4 9

Ariz

ers

3

d

r

Fl

r

11 9

oo

Fi

Fr an kl in

ins

w

Mi ss ou ri

outh

te

ut

ds

ven

Pa

gy

ce

on

ne

2S

ut

So

in

Bid

11 5 6

rn

lo

15 53

ru

nt

tch

ho

st

K

Ma pp

Ea

H il ls

ec

ge rs nte Hu Da

Sp

la

JH u

Pine

Greer

219

d un

r

eg

o Ec

B

EEK

te

Cl

dla

et

o Wo

DS CREE

db

on

HOLLAN

9

ati

s

SPINDALE

216

rv

k

Le

g

4

Go df re y

se

l Pa r

e

s

on

id

MAP 3: STUDY AREA 1 SITE ANALYSIS

ov rin

e

er

11 9 1

RUTHERFORD COUNTY H id d e n

lla

St

dr

Ba

Mar tin

AD BRO

R

E RIV

9 11 4

Plea sant Hill

D

in

1 11 5

s

Duk

al

Po pla Da vis 159 M r 3 ill Elm or e

2231

y

Gr

1155

' ay

d

ay

12 rrow

ov

Re

on

UT STONEC

Th

lse

mp

ER

oo

221

Gr

Ke

Ca

RIV

C

gt

Da

TER CR

oo

Jo na s Si ms

s

tw

ine

ith

W

ek

rd

es

2

hn

Au gu st a

5 11

Jo

Sm

s

154

W

od Cox

n

d

k

to

oo

ill

l Ye

kw

Skyl

ve

RUTHERFORD-SPINDALE CENTRAL MIDDLE SCHOOL Po we Ox r fo rd

74

Bal

Park

C a r d in

Ea

oo

4

ap t G Ro Fla s

1548

n

RUTH

Br

ee

5

H

2271

m

Sp

We st

rk

tu

1543

n

Pa

il

le

s

ua

Ly

h nc

Au

Al

ds

Peak

H ig h

s

s n W hi te si de

e

Cr

C h u rc h

h

ac

rc

Gr

Q

Mary

ree

r

n kle

Bi

ar

le

c

G

ut

su

3

B

y

De

wo

BR

OA D

el

1

m To

11

2

6 2

d

1

er nn w Ta t v i e es

Iv

e T h is tl

6

rr

oo

re tC

F

m ar

wa

3 11 5

on

Ed

iew

rs

y ne

Ben

iew

ndv

7

Ca

ui

gw

iar

t

Gra

11 9 4

10

5

Do

Br

erse

gev

ch

Som

1210 t

Cr

t

bud

Rid

9

n Red

on

w Ed

way

es

or

ffy

m

Oa k

RUTHERFORD COUNTY COURTHOUSEC o u r t 2nd e n i P C P h arlot ark te ple do La Ma nfre ne 221 Mo E x e c u ti ve

ST. LUKE’S CHAPEL

Fair

or

th

hur ill C nt H

JJ Gu

Sq

Ho

re

11 5 4

ne

Fo re st Tr ail

Fi

s ake

ed

7

irf

e

ve

ag

Co il n ha W

L low

gh

An

Fa

Hu

Pi

ut

ce

11 6 2

4

cil

n to ng hi ler Mil

ld C h e s tn

rit

k

He

ee

asa

Et

3

r

64

ng

THERMAL BELT RAIL TRAIL

TRINITY LUTHERAN Coll ett CHURCH

CARRIER 3HOUS r d 4 tEh

116 5

8

ie

Cr

Ple

11 6 0

un

as

yf

er

108

Co

lle

La

Wis teria

ill

l

A

20

11

la

1

M

C on ne r

KIWANIS PARK

C

6 11

Mi

Gra yso n

W

5

di

to n e

7 11

ffo

11

64

RUTHERFORDTON

C re e k

CREEK

P e b b le s

lace

Da

1205

1163

Pine log

M a p le

ise

od

3

rad

kwo

11 7

Byrd

ANALYSIS MAPLE

Ca

rol

Pa ina

64

Moun tain

11 9 7

Pin

CREEK MOUNTAIN

e Lov CC

C zy

k ree

68 11

1520

6

G a p 11 7

Ch ish olm

2

SITE

La

C o o p e rs

11 6 9

s s 1177

J u s ti c e

AREA 1 7 11

Mo

Yo u


CHAPTER 1

STUDY AREA 1 OPPORTUNITIES & CONSTRAINTS OPPORTUNITIES

CONSTRAINTS

1

Existing sidewalk along Maple St.

1

Narrow road corridor along Monfredo Street

2

Hospital connectivity opportunity

2

3

Existing Purple Martin Greenway

Tight private parcelization between Crestview Park and golf course

4

Existing sidewalk

3

High speed/heavy traffic along Tryon Rd.

5

Existing park trail

4

Tight private parcelization

6

Riparian corridor through neighborhood

5

Tight private parcelization

7

Possible golf course redevelopment

6

Narrow bridge crossing of Broad River on Gray’s Rd.

8

Wide roadside - side path possible

7

Narrow bridge crossing of Broad River on Tryon Rd.

9

Large undeveloped parcels

10

Large mostly undeveloped parcels at Riverbend Farms

11

Connection to existing river access at Gray’s Rd.

12

Large parcels and riparian corridor along Broad River

3

Existing Purple Martin Greenway provides easy alignment option that would lead the OVNHT out of downtown Rutherfordton

1

Narrow road corridor and numerous private property driveway cuts make trail alignment along Monfredo St. difficult

5

Existing path through Crestview Park could connect to Purple Martin, allowing OVNHT to re-enter historic corridor

6

Narrow bridge on Grays Rd. makes crossing the Broad River challenging

8

Wide roadside along portions of Tryon Rd. make sidepath feasible

7

Narrow bridge on Tryon Rd. makes crossing the Broad River challenging

21


95 21

Op en ing

ton mp yH a ad Br

s

F o rd

A d k in

2

McAbee

11 4

P o o rs

ps

5

4

yW ag

11 3

er op Ho

on

11 9

1132

Cap

ne

JJ

Ho

id e

s

y

nes

eC ud Le

der

Wil

Mc

11 3 5

F ir e s

Mu

rra

1356

13 59 NS

ON SC RE EK

d 1 136

tac

ey

Existing Trail

Proposed Trail

Managed Lands

1 11 0 135 6

re G

2190

S te w ar t

port

Mo ss 11 4 4 nd Po

les Ly on ag

1004

k ee Cr

HE

Sk ipp er

13 26

1538 nS mit

h

en

od

ee

kwo

sn

Joh

W

GREEN CRE EK

As ter

e tir En Mc

er We b b

tth r ve ea W hn

Jo

Heli

xe Co n de Al

n tio ta

EEK

Ri ve rs id e

rk yla

e rn

ew

Ho

Ma

1521

6S

e

v il le

11 2

RIV

ER

Hydrography Blac

he

22

C

15

C o ll in s

1352

1

Greenway

e ro on M

an

RN CR CLEGHO

Tr o

y

M cD ad e

137

Sk

ns yP lai nd Sa 20 15

11 4 5

ott Elli

ose

Ambr

e Moor 34 13 r ne Tu r

Pl

6 11 4

29 13

n

133 2

pso Sim

Buck B ra n c h

m ru

5

OA D

Lin

153

ok

l

K REE

o w b ro

ol

OVNHT 1 Mile Historic Corridor

BR

Constraint

ty

58

13 04

un

13

in

Kn

OVNHT and other Recreation

Opportunity

Co

60

W

dy

LS C DIL

nd

11 3 1

11 33

J

La

U ni on

11 5 6

l

Ow

ot

Ho

i mb Ba

1335 on pi am

MOUNTAIN CREEK

row Ar

ls

al

cF

M

132

4

White Tail

op dr al

W ith Sm Ch

l ai G

gh

Hu

el ni

7

0

LEGEND

3

13

Mead

219

STUDY

y

Pe

air eD

3 11

LYLES LAKE

130

MAP 4: STUDY AREA 2 SITE ANALYSIS

ow

R

shoe

134 0

Cr

s

an

in

43

ill

w en s D ew it t O

m

si

ta

13

r

7

ll

ia

te 13

ne

111 8

H o rs e

be

ill

C re e k

42

or

pper

2 11

p

ue

ho

G re e n

rk

C

IVE

63

1

1 34

M

11 39

l To o

kle

is

W

1

uc

Ho

Mo on lig ht

n

K

NR

13

38

8

le

02

M

er

11 0 6

ys

B

Bl 2 11

So

13

en

ill

s

r te

1148

K

B

ne

ess

S h il o h

CREE

Ho

ins

He

EE

0

d

Gra ys Cre ek Ch urc h

Big Gum

GR

22 CH

ETTS

bb

n

13

219 4 RA N

an

Do

11 5

GB

JARR

Jim

nch

Isl

e

gB ra

71

LO N

Big

or

tso

11

ne

A ir li e

lt

ge

m

Ar

1

Be

Lon

GRAYS CREE

Wa

Pi

21

ed

rry

hn

37

d

l fie

121 3

ll a r er Ho B u tc h Su ns et

C le g h re s t o rn M il H o ll y F o l We e k s 3 4 11 11 m 41 ha at Ch

ge

6

H

Rid

219

e

ca

1362

by

un

36

Che

er

Jo

1339

Lib

12

15

AR

CH

er

Boyd D a

K

EE

Ivie

LE

221

on

Wild

st

CR

6

13

Bab

St

ion

re rC

LL

10

7

155

t

MI

36

Bur gan dy

K EE

CR

Mo

n

Cres F ie ld

arm kF

13

well

9

ES

e nR u

in unta ba w Cata

Oa

32

9

GH

ttl bu

ttm

9

d Bl ack

Br oo ks to ne

HU

Da y

Ra

Floy

K

EE

R SC

74

oll

11 49

WHITE OAK CREEK

8

136

24

Pi

an

7

Riv

OVERMOUNTAIN VINEYARDS

Hill

15

LAKE SANDY PLAINS

5

cle

Lak e San dy Plai ns

y

l O v e rh il

13

ds

y Tr i c

in

od

26

err

W

l

4

ite

ok

15

ldb

ve

Lars en

1333

ir

Ho

low

Wo

Li

22

erbro

Fa

s

Ri

ek

Wh

k

Tim b

a t io n

ey

K

7

rmo

Cre

P la n t

11 4

100 5

Sy

Ove

ian

74

6

TRYON EQUESTRIAN CENTER PROPERTIES

e

lin

2

mp

RUTHERFORD COUNTY

POLK COUNTY

K

Oa

ol

3

5

EE

te

C

dg

3

ER

6

74

RIV

132

CR

hi Wi

ill

le

1331

4

Ca

Zion K in g

Un

oore and M rams

EN

Ab

INE

al W

Ind

Ar

2

R id g e F ro n t

nK n

Deervi ew Babe r

Co xe Rid ge

y

de

Pl an ta tio n

BRADLEY NATURE PRESERVE/ ALEXANDERS FORD

74

reen W il l G

1525

B

le Va l

e

74

9 11 4

1

iew ny V

tr

CH MA

en

e

ER V RI

der

GRE

C

h nS

n ha

Hid

7

Sun

lk

s

D

id e

Po 1528

dg

A O BR

n

ch

W h it e s

ran eB

23

ce

tkin

h Jo

133 0

Do

13

Pri

70 Wa

Pon

Ri

rti

Roy

13

a

Ma

2 11 9

132

ANALYSIS Pe

1

os

y

5

l

on

pe

L

ha

ps

Gra y's

C

om

y az

us

K

Th

ge M is er y R id

EE CR

an

AT

R

5 11

HE W

d Re

k

M

c Ro

R

B id d

l

25

3

ai

1322 A

13

5 11

dt

1317

n

SITE 108

R 11 49

Re

1367

AREA 2 Wr e

Floodzone 1112

Federal; State; Local Government Historic Landmark Site y Blu esk


CHAPTER 1

STUDY AREA 2 OPPORTUNITIES & CONSTRAINTS OPPORTUNITIES

CONSTRAINTS

1

Connection to Bradley Nature Preserve at Alexander’s Ford and existing OVNHT

1

Road crossing and private parcels

Highway 74 underpass potential

2

Gated private development

2

Stream culvert may provide underpass

3

Underpass is a private road to gated community

3 4

Tryon International Equestrian Center facilites and cross country trail area connection

4

HWY 74 bridge crossing narrow with mulitple ramps and high traffic

5

5

HWY 74 crossing options limited (4 lanes)

Overmountain Vineyards connection and existing OVNHT

6

Gated private community development

6

Wide road/possible sidepath along S Greenway Rd.

7

Tight private parcelization

7

Large mostly undeveloped parcels

8

Tight private parcelization

9

Tight parcelization and numerous driveway cuts along Sandy Plains Road

10

Long Incline/steep topography

11

Road corridor alternative is outside corridor

12

Tight parcelization and numerous driveway cuts along South NC HWY 9

1

The Bradley Nature Preserve provides over a mile of existing OVNHT and a connection to a historic site

3

The HWY 74 underpass opportunity on River Crest Parkway is private road leading to a gated private development

2

HWY 74 underpass potential on River Crest Parkway

4

HWY 74 bridge crossing near Tryon Equestrian Center is outside historic corridor, has multiple high traffic ramps, and a narrow bridge width

5

A trail alignment south of Tryon Equestrian Center could connect to Overmountain Vineyards and OVNHT loop trail

10

Trail alignment along Mcdade Rd. must climb long steep grade

23


ill

rr

Ha

s

W

ell

CRE EK

G

T

DSO N

La ss

0 10 rd Fo

nd

EE

K

la

CR E RS HO LE TT LI

206

Picke ns

Cas h

Ohi o 464 Nev ada 153 4 464

er Wa l k

Fi ke

549

L in e Red

Alab

ama

Salud a

l Texas

el

Ez

p m Ca

S ta g e

692

d Lo

La ke

sh

239 516

Is

lan ck

ate Ma

rg Fi

239

Th om ps on

F a ll

Bil l La ttim ore

t en

em Cl

gs in id R

Fro nt

berry B la c k

CH RO WO O AR

111 3

Farm

221

7

DB

La

Ivey P ar ri s B ri d g e

Arledge

od Ho

on rs

18

RA N

il

Jona

s

111 0

11 0 8 J e 72

ms Ada

t Cr eek Los

op sh Bi bl er iv R

de

EEK

e

An

HAR

mb

an Isl g Bi

ley

Jol 96 2 uf

f

M el ba

RIC

4 11 2

11 25 11 0 6 d

J o ll y rd Fo on nn Ca

we

Bent River

s

gs en S p r in H id d

bit M offit t Rab

Ma ha ffe y Co ole y

251

186

Joll

Caro

Ray Bla ckl ey

rd Fo s in ilk W

Lo ey Fral

Barnw ell

CUDDS CR

dg

er

3

ta

10

Bri

st

in

ne Li ty un Co

re

C

ey

Airport

135 5

1354

ek

San dy Spr ing s

13 53 r da Ra

131

1349

11 0 1

1361

46 13 Jo lle y

1366 e id Pr

on

y

ni

Av i

rt

4

ou

51

221

C

468

469 Mann ing

r

Gr ee n La ke

ead

Fo

da Ce n lco Fa on t p m Ha

U

M

nk

Le e C ud d

1356

s

a B ro o k

M e li s s

9

P a rk s

4

3

H aw k N es t

Bur rs

10

erh

Sunset Ridge

Je

9 135

k ee Cr en re G

13 45

MAP 5: STUDY AREA 3 SITE ANALYSIS

in dd

e

111 4

Pu

ov

er y

Ov 43

e

10 6

nd

R id g e

EK CRE

R ic h la

tt

tts

ee

ui

rne

ok

Pr

Bu

F a rm

is

n aso

rr

M ford

Tu rk e y

Pa

e

ie ld

d

Led

n

H o ll y

id

u rR

5

CHESNEE

Fa irf iel d

H

rs

W

e alk

C AN BR

ve

r

87

187

Ocone

7 8

CH

F a ir f

Fa rfi eld

9

AN BR

eld

te

Townsel

69 2

e

L EL EZ

1

in

be

er

Pa

RD

y

Ri

YDS FLO

5

cA

102

t

6

Gr

ey

Ch

an

11

l

M

He nd er so n

C

l re

nsl

c

ks

M on tg om

tt

4

FO

Gra

Lowe

or

B u rk e

n

ne

ge

Hi

He

so

Rid

Y CK RO

e n Federal; State; Local Government ic

Historic Landmark Site

s

O

er

ar

ley

5

S-4 2-9 86

24

Sc

ri

ce

lls

ar

Joy

hi

42

df

irfi

Sh ie ld s

Floodzone Clement

Managed Lands

Le

Fa

5

ot

Proposed Trail

15 11

s K n o ll t es Cr ak

nd

38

83

1 ee 1 Fo

lk

73

p

8

ok

Cale

978

m

er

Main

Ca

Existing Trail

tin

OVNHT 1 Mile Historic Corridor

ar

Ch

16

Hydrography

K

ol

aw LConstraint

ond

He

3

M

EE

ho

r

CR

Sc

te

ED

6

Fo

Coo

e

OVNHT and other Recreation OB

R VE RI

13

55

idg

Opportunity

Hayes Lk

9

s

r

0 11

tg r a s

969

lle

Z s ig m

1112

ford

Mi

on

H

B

215

Mills

Sw

ain

r eB

LEGEND ke

lki

La

ew

Fox

tt

ow

Wi

inb

Vi

F a rm

ya

Ra

W

t

iken

nd

P ru it t

42

P a c o le

Mill

ps

Swee

ER

om

Craw

RIV

Jo yc es

te

s

en

ET

Mc

in

ik

HP AC OL

SPARTANBURG COUNTY

Po

Ro bb ins

RT

3

Peti

RUTHERFORD COUNTY

wk

ek

ill NO

2

Ha

re

M

Tillerson

2 11

ANALYSIS

s

ree

C

8

1117

SITE

1 111

wi

cht

r

nd

65

Th

M is t y

POLK COUNTY

4 11 0

Le

Pea

ea

G ra s s la

d

B

nd Ce

A fr ic a

K EE

ll

ill

la gs

L it tl e

V

h

11 0 5

ri

H

pe

din

Ri

ar

ll Hi

Te d

it Sm

G

n

ill

CR

er

bs

vi

13 05

el

EEK

ns

M

ip

m

3

m

ggi

BUCK CR

8

A Wi lso n

55

sky

EY

3

0 11

La

134

Sco

Pr inc e

K

13 50

Blue

N

EE

John son

an

Ti

1351

EK

g an 111 6 H o

RE

in n ey Ja ck M cK

SC

IN

CR

Co

M

ON

CK

y

Ro

1

Tu l

NS

D OA BR

23

ss

ox

Sa

irf

AR

N.C. S.C.

HE

M

Fa

Mc Do we ll

er nn Ta 134

nee

ey

EK RE

od

4

1357

Ches

tac

C LS DIL

C

6S

ac

1358

kwo

N

EE

GR

134 BE

1

2 54

11 2

Blac

1

K

E RE

STUDY

1004

Sk ipp er

60

Lil

13 26 Co xe

13

n

1121

42

1122 D u n c a

03

13

AREA 3

13

0

Po or s Fo rd

134

Ca

rtee

Greenes Lk


CHAPTER 1

STUDY AREA 3 OPPORTUNITIES & CONSTRAINTS OPPORTUNITIES

CONSTRAINTS

1

Large mostly undeveloped parcels

1

2

Large mostly undeveloped parcels

Tight parcelization and numerous driveway cuts along Chesnee Hwy

3

Large mostly undeveloped parcels

2

Tight parcelization and numerous driveway cuts along Chesnee Hwy

4

Existing sidewalk and very wide road/road diet potential

3

Tight parcelization and numerous driveway cuts along Lambs Grill Rd.

5

Existing sidewalk

4

6

CADA park connection

Tight parcelization and numerous driveway cuts along Arrowood Branch Rd.

5

Narrow road and private properties

6

Narrow road and private properties

7

Tight parcelization on both sides of W. Cherokee St.

8

Existing sidewalk ends

9

Tight parcelization and numerous driveway cuts on W. Oconee St.

10

Railroad crossing

4

Existing sidewalk and very wide road on Alabama Ave provides an opportunity for a road diet

4

Arrowood Branch Rd. narrows further near NC/SC border and has private property and numerous driveway cuts on both sides

6

CADA Park serves as the terminus for this planning section; it also connects this section of trail to the Chesnee/King’s Mtn. planning section

10

The railroad near CADA park must be crossed

25



CHAPTER 2 LANDOWNER ENGAGEMENT

LANDOWNER OUTREACH AND ENGAGEMENT are KEY Components OF THE OVNHT PLANNING PROCESS.

The environmental analysis (Chapter 1) was critical for determining physically feasible areas for trail development. However, significant portions of these routes impact private property and require landowner outreach to fully assess trail feasibility. This chapter highlights a good-faith effort to engage landowners throughout the planning process.

T H E EN GA GEMEN T PROCESS Identifying the Landowners Landowner Communications Landowner Workshop Trail Route Re-evaluation


Ga

Wash ingto n

To m s

h or n

h e ll

C le g

ia n

M it c

hell Mitc

ch

Ly n

an

Ha rd in

li

ed

Hodge

al A

n tto

M a in

s a rd

ls il

Ed w

H st re

1153

Pa

to n

Fairwa y

Fo

M e r id

ls id e e H il an

C on

Sm

it

h Gr

ay

e

Pl

er

12 0 1

s

h es s

ta

nt

Dutc

us

Hu

ug

ea

A

sa

nt

Tre

hn

S Jo a i nt Jo rd hn an

e ac Gr

Woodb riar

H il ls id

Ridgecr est ry N or

r is

Club House

N ew H o pe Bon aire

bi Ve r

fy uf G J J

e

ll

e

S k y li n

R u ss e

Jo

2

s

il R idg

Co tta ge

115

od

Tr a

r

Bra ss

a

ni

let Vi o

t

le

es

ut

cr

r

y

ge

l w ie Hal

e rr

ne

s

id

tv

yb

La

ne

es

Ba

rk

B

Mi lle r Cr ee k Co ve

Pa

ri

R

n Ta

Hu tch ing s

o

1

H

ar

l se

ill

di

n

y 05

1191 10

m To

h ut

Ca

ve r

S o 74

m p

29

b

Ke

3

H

dR i

ed

rt

115

s

nt

115

sa

oa

Wo

ds

Bo

28

Br

er

ch

Sim

ar

28

28

nfr

ill

try

w

e T h is tl

STEP 2: START A CONVERSATION WITH LANDOWNERS.

H

un

Ed

as

ea

MILE-WIDE HISTORIC CORRIDOR

m Ca Bee

Jo n

27

Pl

28

il

k

k

iew

26

ee

ee

ev

93

v iew

11

Cr

Cr

dg

G ra n d

25

h

Woodrid ge

nt

25

28

rc

Cox

et

Be

it

ua

rk

Co

e

s

dp

er s

Ri

S

28

im

n Sa

So m

rys

Mo

Co u

d

Bi

od

or

24

Q Ma

wo

tm

STEP 1: DETERMINE WHERE THE TRAIL IS FEASIBLE (CHAPTER 1)

bu d

u

iar

igh

4

Red

ys

Br

Br

119

22

ne

rt

oo

1154

23

A n d e rs

le ck

ple

ew

22

Pa

dl

21

en

in

20

Ho

rd

l

s

o yF

12

K

n tha

d

y

E

W

D

Iv

0

w illo

ke

el

oo

Fo res t Tra il

19

La

rr

w

e

Ma

Cr

lia

u

Ga rre tt

og

10

d

no

Co

il nc

ui

17

4

an

ag 16

Sq

13

18

Co nn er

JH

D

t

M 1 08

itt

ea

11

e

ne

dl

gh

Tw

al

Hu

es

ag

11 6 2

1

oo

8

or

rit

on

4

An

irf

He

Tr y

W

ce

Fa

Yelton g to n

1210

t

RUTHERFORDTON 9

We ll in

on

Az

Wi ste ria

La

7

m

Pin

ta

2

ed

Co u

5t h 4th 4 th 3rd 2nd 2nd 1 st

ar

119 9

d

2

6

Pi

3rd

7th

H

el

d

pi

3

fi

1165

64

Hen

12

od

sE n

ey

7th 6th

6th

r iel

s

os

61

5

RUTHERFORD COUNTY h u tc

Ga b

re st

11

14

ins

e

H

O

ay

3

14

116

op

R id g ec

C C Lovelace

g

wo

lo

Red

ne

l

5

hu rc h t H il l C

di

Pi

ffo

P le as an

Da

60

Cl

r

ek

11

od

C re e k

lle

le C re

11

Mi

Map

M a p le

rri

H

ew

Wa s h in g to n Ce n t ra l M a in

e

1166

Jo

5

Ril

1163

Cemet ary

4

0

04

75

Landowner Database. A mailing database was created that included all property owners within the preliminary trail alignment(s).

w

in

d

22

29

29

Un ion

k ee Cr

R

rn

ar

un

ho

le

11

9

49

11 4 5

M a rt in

R

114

Bab

OVNHT: Chesnee to Rutherfordton

eg

C

Cl

Mountain Creek

5

dy

Gray's

ow

38

5 11

34

Arr

33

Bid

32

34

11 56

Priority Landowner Outreach: Map 1 ro

ad

Ri

ve

Water Bodies

Federal Ownership

Existing OVT

State Ownership

OVT Historic Corridor-Mile Wide

Rivers and Streams 100 Year FloodH i d d en Kn Town Boundaries oll NC/SC State Line

Railroads

County Lines

Purple Martin Greenway

r

Deerview

Priority Landowner Outreach Existing Isothermal Rail Trail

er

37

Legend:

Miller Knoll

ox e

30

34

28

6

Bu

Wo

Broad

on

m

Fi ve O ak s

11

Feasibility Analysis. Trail alternatives were developed based upon an environmental feasibility analysis.

ils

11

rd Ga

en

W

ee

Ran chw ay

en

12

N

v Ha

Car neg ie

11 78

Bu nk er

IDENTIFY THE LANDOWNERS

d

Gray son

ood

x

Gre

en

P in k w

3

wo o

r

Tayl or

d

Ale

117

Fe r n

lle

By r

a

Mi

C

W

te

ow

zy

k

se

al MAP 6: LANDOWNER l aMAP SAMPLE Fr h

ad

La

re e

ro

P

di

B la n

Me

1174

Ca

a lin

a ar

Pebblestone

n o ll ood K

Fl

S o u rw

Tryon Equestrian Properties

Local Government Ownership Private


CHAPTER 2

LANDOWNER COMMUNICATIONS Video Production. A custom video, specifically produced for landowners, highlighted the story of the Overmountain Victory National Historic Trail and made an appeal for landowner participation. Web Portal. The project website, www.OVTplan.com, provides information about the planning process and features the landowner outreach video. Landowner Invitation. Formal invitations were sent to all landowners included in the landowner database directing them to the website and requesting their attendance at a special meeting.

LANDOWNER INVITATON

WEB PORTAL

Dear Landowner: The Overmountain Victory Trail Association has partnered with the National Park Service and local government leaders to explore the opportunity to create a public walking and biking trail that will connect Rutherfordton, North Carolina to Chesnee, South Carolina. This trail will celebrate the march of the Overmountain Men who won a major Revolutionary War battle in 1780 at Kings Mountain, South Carolina. The patriot victory is considered a turning point in the war that resulted in American independence. The trail will help preserve this history. The project planning team has been working to identify areas where the trail would be feasible. A broad study area, as shown on the enclosed map, was evaluated for potential routes. After months of analysis, your property has been identified as being located within or near the historic Overmountain corridor where the trail could potentially be constructed. Without the voluntary willingness of landowners, the trail route will either be relocated or not constructed. Please visit the project website, www.OVTplan.com, to learn more and view the project video. You are invited to discuss this project with representatives from the National Park Service and trail planners during one of two special landowner meetings: Wednesday, October 2, 2019 at 6:00 pm Cowpens National Battlefield 4001 Chesnee Hwy Gaffney, SC 29341

Thursday, October 3, 2019 at 6:00 pm Rutherford County Office Building 289 North Main Street Rutherfordton, NC 28139

If you plan to attend the meeting, or if you cannot attend but would like to discuss the project and your potential interest in providing for the trail on your property, please let us know by using the contact information below. Thank you. On behalf of, Overmountain Victory Trail Planning Committee RSVP Email: info@OVTplan.com Phone: 828.386.1866

County Commissioners Bryan A. King, Chairman Eddie Holland Alan Toney, Vice Chairman Greg Lovelace Michael Benfield

Steve Garrison, County Manager Hazel S. Haynes, Clerk to the Board Richard Williams, County Attorney

VIDEO PRODUCTION

29


LANDOWNER WORKSHOP Video Screening. After signing in, the landowner workshop began with a viewing of the custom video. Focus Groups. Various focus groups were set up around the room in which landowners could ask questions about their specific property and the associated trail alignment. Sentiment Card. Before landowners left, they were encouraged to fill out a landowner sentiment card describing their level of interest for providing for the trail.

Follow up Contact. DbD staff continued to follow-up with landowners throughout development of the plan document, and adjusted plan recommendations accordingly.

30


CHAPTER 2

Outreach efforts included engaging approximately 12 landowners by phone, email, or in person at the October 2nd AND 3rd LANDOWNER WORKSHOPS HELD AT Cowpens National Battlefield and the Rutherford County Administrative Building.

31


TRAIL ROUTE RE-EVALUATION

Revise Trail Alignments. “Landowner Sentiment” was helpful in determining the preferred alignment and is included as a component of the final map series (Chapter 4).

RUTHERFORDTON BR

OA D

RIV

ER

MAP 7: LANDOWNER SENTIMENT

GREEN

RIVER

74 74 221 74 74

74

A COMBINATION OF FACTORS INCLUDING THE NATURAL ENVIRONMENT, THE BUILT ENVIRONMENT, AND LANDOWNER SENTIMENT WERE USED TO DETERMINE THE PREFERRED TRAIL ALIGNMENT (CHAPTER 4).

221

RUTHERFORD COUNTY

BR

OA D

N.C. S.C.

RIV

ER

POLK COUNTY

SPARTANBURG COUNTY

CHESNEE

32


CHAPTER 3 TRAIL CHARACTER & DESIGN GUIDELINES

THIS CHAPTER PROVIDES DESIGN DETAILS FOR VARIOUS TRAIL TYPES and SIGNAGE, AND ALSO OFFERS INSIGHTS FOR INCORPORATING SOCIAL MEDIA.

Between Rutherfordton and Chesnee exist a diverse natural and built environment. Specific trail types must be applied throughout the corridor to ensure minimal maintenance and the best user experience.

IN T H IS C H A PT ER

This Chapter defines five trail types and describes their tread features and general specifications for construction.

C. Social Media Marketing

A specific theme is presented for signage, wayfinding, and trail support facilities. Previous OVNHT Master Plans recommend identical trail branding to provide uniformity and recognition throughout the trail corridor.

A. Trail Types B. Signage and Wayfinding


TRAIL TYPES

F

ive primary trail types are proposed along the preferred alignment. A specific trail type is proposed according to its surrounding environment, location in a rural or urban area, and the opportunity to create a meaningful and unique user experience.

MILE MARKER FENCING TO MARK PRIVATE PROPERTY BOUNDARY

GUARD RAIL

2’-3’ SHOULDER

30’ PREFERRED BUFFER TO RIVER TO PROTECT WATER QUALITY

8’ PAVED ASPHALT

10’ PAVED ASPHALT

2’-3’ SHOULDER

DOT SIDE PATH

TOWN SIDEPATH

TYPICAL GREENWAY

8’ PAVED ASPHALT

10' CONCRETE

10’ PAVED ASPHALT

User Group: Multi-use

User Group: Multi-use

User Group: Multi-use

Material: Paved Asphalt

Material: Concrete

Material: Paved Asphalt

Preferred Width: 8’

Preferred Width: 10'

Preferred Width: 10’

Average Construction Cost: $120/ln. ft.

Average Construction Cost: $90-$100/ln. ft.

Average Construction Cost: $90/ln. ft.

Preferred Easement Width: 25’

Preferred Easement Width: 25' or within public right-of-way

Preferred Easement Width: 50’

Minimum Easement Width: 25’

Minimum Easement Width: 25' or within public right-of-way

Minimum Easement Width: 20’

*Note: Trail to be approved in accordance with NCDOT, SCDOT, or County DOT encroachment agreement.

34


CHAPTER 3

TRAIL CHARACTER

T

he OVNHT will provide a linear trail system of different walking, biking, and equestrian trail types that link key community and historical assets along the trail's historic corridor. Two short sections of trail within Rutherfordton are proposed to utilize existing transportation infrastructure with some modifications.

3:1 MAX CROSS

2’-3’ CLEARED

3:1 MAX CROSS

8’ 5’ C RNATURAL USHED G R A VSURFACE EL FINES

2’-3’ CLEARED

2’-3’ CLEARED

5’

3 - 5’ NATURAL SURFACE

Sharrows along a short section of trail in Rutherfordton will provide 2’-3’ CLEARED

DUAL-USE PATH

NATURAL SURFACE

8’ CRUSHED GRAVEL FINES

3-6’ NATURAL TREAD

User Group: Hikers and Equestrians/Cyclists

User Group: Hikers and Mountain Bikers

Material: Crushed Gravel Fines

Material: Native Soil

for shared vehicular and cyclist use on low traffic roads.

6-

Preferred Width: 8’

Preferred Width: 3’ - 6'

Average Construction Cost: $60/ln. ft.

Average Construction Cost: $10/ln. ft.

Preferred Easement Width: 50’

Preferred Easement Width: 25’

Minimum Easement Width: 10’

Minimum Easement Width: 10’ A one-way and pedestrian/cyclist lane conversion is proposed along a brief section of Monfredo St. to provide for the trail along a narrow road corridor.

35


SIGNAGE AND WAYFINDING

T

he OVNHT signage family provides for a modern-rustic theme and incorporates materials consisting of metal, rock, and concrete. The signage family serves as a template and can be altered and refined depending on local preferences and specific site needs. Signage marking the physical trail is required to include the official OVNHT logo of the NPS.

Monument Sign

36

Trailhead ID

Break-away sign for use along DOT roads


CHAPTER 3

37


T

rail users should be encouraged to utilize social media to share their experiences with their friends and “followers”. Special signage along the trail will signal users to consider posting pictures of themselves or their friend groups as they walk or ride bikes along the trail. In addition, special photo opportunities and features should be developed during the final design phase. After all, who better to market this destination-quality trail than the users themselves? Take advantage of social media – the new word of mouth.

“FIND YOUR PARK” IS THE OFFICIAL CENTENNIAL CAMPAIGN OF THE NATIONAL PARK SERVICE. THE NPS IS ENCOURAGING NATIONAL PARK ENTHUSIASTS TO USE THE HASHTAG #FINDYOURPARK WHEN POSTING TO SOCIAL MEDIA.

38

#TRAIL2VICTORY The proposed official hashtag for the OVNHT is #trail2victory. The use of this hashtag will allow local tourism leaders to curate local photography and content that can be shared on websites and re-posted through other social media platforms.

#FINDYOURPARK

Polk County, NC

“Find your park” is the official centennial campaign of the National Park Service. The NPS is encouraging national park enthusiasts to use the hashtag #findyourpark when posting to social media. The OVNHT can help continue this campaign for years to come by encouraging the use of this hashtag at unique locations along the trail.

TRAIL USERS SHOULD BE ENCOURAGED TO UTILIZE SOCIAL MEDIA TO SHARE THEIR EXPERIENCES WITH THEIR FRIENDS AND “FOLLOWERS”.

101 likes

dbdplanning

great day on the #trail2victory at the Bradley Nature Preserve! #findyourpark #polkcounty #wnc

EXHIBIT 2: SOCIAL MEDIA: THE NEW WORD OF MOUTH

SOCIAL MEDIA: THE NEW WORD OF MOUTH


CHAPTER 4 RECOMMENDATIONS

THIS CHAPTER SERVES AS THE HEART OF THE Rutherfordton TO Chesnee OVNHT MASTER PLAN.

IN T H IS C H A PT ER A. Overview of Planning Section Maps B. Planning Section Descriptions


PLANNING SECTIONS

MAP 8: PLANNING SECTIONS OVERVIEW

1

RUTHERFORDTON

PLANNING SECTIONS T he 29- mile study area from R utherfordton to C hesnee is divided into five (5) planning sections . T he geographic

74

2

74 221 74 74 mile-wide historic corridor

74

3

extent of each section includes a beginning and ending terminus that features a key asset or significant connectivity point for the trail . E ach planning section includes project areas that can be developed independently over time , providing a logical method for implementation as landowner willingness , funding , and other opportunities arise .

221

RUTHERFORD COUNTY

The study area from

4 N.C. S.C.

Rutherfordton to Chesnee is divided

POLK COUNTY

SPARTANBURG COUNTY

5

into Five (5) planning sections; this chapter is organized

CHESNEE

40

accordingly.


bb

n

e ton les

Edw ards

ton

Tom

s

Washi ng

yM tn Ch err

Arnett

Levi

Sugarhill

Park Lan e Clegh orn

Co wa n

Cent ral

Cowa n

Taylor s

Mitc hell

Hillsid e

Merid

ill lH La ure

EE CR

Hardin

Hodge

N al li

ed

CL EG HO R

C

K

al la ha n

Ly nc h

rris Henr y No

Club House

A Pa tto n

New Hope Bonaire

Gr ac e

Ve rb

inia

Vio let

Ba yb err y

Tw ist ed

y

Ne

ed

ge

Rid

Tr ail

Main

s

od Wo try

ll

Russe

d

R

oo rw

ud

Redb

iew ev idg

ia Br

K

Each planning section is anchored by a map that highlights proposed trail routes, trail features, and landowner sentiment. The proposed routes are identified as either preferred-historic, alternate, or existing local. These trail alignments are the result of extensive analysis, including environmental feasibility, landowner willingness, and insights provided by the National Park Service, local government and local trail-development leaders. le

n Cou

The National Trails System Act states that “a designated trail should generally accurately follow the historic route, but may deviate somewhat on occasion of necessity to avoid difficult routing through subsequent development, or to provide route variations offering a more pleasurable recreational experience.” In accordance with this directive, the trail is planned as close as possible and practicable within the one-mile Historic Corridor. Where trail construction is not feasible within the Historic Corridor, the NPS may recognize routes outside the corridor as preferred alignments. Such routes are planned for the greatest public benefit and enjoyment, as well as to promote tourism, economic development and rural prosperity. The NPS refers to routes outside the Historic Corridor as alternate routes to the historic route. In some locations, the preferred routes identified in this chapter are located outside of the Historic Corridor. Such routes can be marked and signed the same as routes within the Historic Corridor, but must provide on-site interpretation that indicates the known historic trail location and provides justification for construction of the trail outside of the Historic Corridor. 5

National Trails System Act, Section 5(b), Part 11(a). The NTSA provides regulations for the management of National Historic Trails.

Fair

mon

t

El lin gt on

Woodbriar

d oo w dle

ge

ys

l

Rid

ia

Skyline

Mar

uff JJG

ore

EE

CR

i

n

Ho

Kin

on

le

su ey

Hil

21

tm gh Bri

m

oll

Kn

rs

il ua

1

rn ho

sim

y

74

h

EACH PLANNING SECTION IS ANCHORED BY A MAP THAT HIGHLIGHTS PROPOSED TRAIL ROUTES, TRAIL FEATURES, AND LANDOWNER SENTIMENT.

Q

s

et Fir

IN TA UN MO

Pe r

r er

Paxt on Nicholas

rk

trial Pa Indus

Gar den

de

ABOUT THE PLANNING SECTION MAPS

el ur

La

r

An

Cottage

n Unio

y Iv

n

Charlotte

le

De

Ch

t Bu

re l

ll

uir

ALT

221

tte arlo

ut

So

Ha

a oli

Sq

iew tv es Cr

k

n

r

Pa r

ills

dro

d

ne

st H

en

n Ta

a

od

gw oo

ith

Sm

ck

ake

Et

Fo re

od

Do

ale

20

an

m

ee Fr

Hardin

Az

Rh

st fore

n

ge

ir Fa

Yelto rita

Forest Trail

L low Wil

n ha

oo W

d

Recrea tion

Executive

221

Ch

way

n ag M

on lingt Wel

t

et rr

Ga

dla

Fair

Rid

cil

nd

sty Fro Blanton

Wisteria

h

g Hu

se

un Co

16ty Ford

it Tw

1

Ra ve nw oo

14

l

17

Mo

ita sp Ho

d

ra ss

le

4 13

o

ed nfr

10Map 11 12 15

is

o Wo

18 B

on Try

RUTHERFORD REGIONAL TRAILHEAD

rr Ha

n lly Pe

Chestnut

9

Westview

Anne

ge

n

io at rv

r

e

Pin

Della

19 La ce

He

ian

ch Br an isw old Gr

log

d

7 6 5

2nd

an

e Pin

N CREEK MOUNTAI

En

8

t

Branch

4th

1st

Cour

nd

dla

oo W

h She

n Zion

le

Ob

n Zion

Saint Joh

eld

N

ey

RUTHERFORDTON

Piedmont

ds

Southern

Ridg ecre st

5th

3rd

Ril

Wo o

Shotwell

Elm

rris

ll Co

3 7th

6th

5th

Bu

Saint Joh

Cla yfi

O

ce

e op H ew N

KIWANIS PARK TRAILHEAD

CHAPTER 4

ett

ll Co et

Cedar

Five Oaks

J

d

er nk

Ma ple Cre e

ng

Bu

Tayl or

Brow ni

oe

MILES

Mil

Re e

Maplewood

Bro okst one

Ga rd en G

Ranchway

k

nk w oo

rth

No

e ac

all W

en

Gre

en All

r

Pi

x Ale

1

Oak

ce Gra

ere

0.5

Oak

221 Cemetary

Sch

0

2

Broad

s ark Sp

Byrd

ler Mil

1

Grayson

on

ils W

es ev Re

at e

w ado Me

Green

li ro

Ca

Noted trail features include the physical infrastructure and facilities that support the proposed trail. These features are highlighted along the preferred routes and provide critical information for developing an estimate of probable cost for each section. These features include trailheads and crossings associated with either a road or water feature. Trailheads will provide for parking and trail user orientation. Road crossings indicate the need to provide for traffic calming measures and appropriate signage for both trail users and motorists. Major bridges indicate a significant stream or river crossing that requires a bridge greater than 20 feet in length. A minor bridge/ culvert demonstrates the need to cross a relatively small stream; at this broad level of planning, it remains uncertain whether a small bridge or culvert is necessary. Cov in

gton

QUICK FACTS

Thunder

Each planning section begins with a “quick facts” exhibit. This information includes the trail distance, trail type, and key features and assets associated with each section. Also, an estimate of probable cost is noted; see the appendix for further details. Reported numbers for length and cost include all preferred routes in the planning section. VICINITY MAP 1

RUTHERFORDTON

74

2

74 221 74 74 mile-wide historic corridor

74

3

221

RUTHERFORD COUNTY

4 N.C.

POLK COUNTY

S.C.

5

SPARTANBURG COUNTY

CHESNEE

BY THE NUMBERS

THERMAL BELT RAIL TRAIL MOUNTAIN CREEK

RUTHERFORDTON >> CHESNEE

EXISTING TRAIL:

1.0 MILES

PROPOSED TRAIL:

5.4 MILES

TRAIL TYPE:

DOT SIDEPATH

TYPICAL GREENWAY

NATURAL SURFACE

3.1

>>

EXISTING TRAIL MILES

36.2

>>

PROPOSED TRAIL MILES

7

>> TRAILHEADS

54

>>

ROAD CROSSINGS

ESTIMATED COST:

3

>>

MAJOR BRIDGES

POINTS OF INTEREST:

KIWANIS PARK DOWNTOWN RUTHERFORDTON

5

>>

MINOR BRIDGES/CULVERTS

PURPLE MARTIN GREENWAY

>>

APPROXIMATE COST

CRESTVIEW PARK

RUTHERFORDTON GOLF COURSE

$8.1 M

$ 2,492,600

41


SECTION 1 VICINITY MAP 1

RUTHERFORDTON

74

2

74 221 74 74 mile-wide historic corridor

74

3

221

RUTHERFORD COUNTY

4 N.C. S.C.

POLK COUNTY

5

SPARTANBURG COUNTY

CHESNEE

THERMAL BELT RAIL TRAIL MOUNTAIN CREEK EXISTING TRAIL:

1.0 MILES

PROPOSED TRAIL:

6.3 MILES

TRAIL TYPE:

TYPICAL GREENWAY

TOWN SIDEPATH

DOT SIDEPATH

NATURAL SURFACE

ESTIMATED COST: $3,043,460

42

POINTS OF INTEREST:

THERMAL BELT RAIL TRAIL

KIWANIS PARK

DOWNTOWN RUTHERFORDTON

PURPLE MARTIN GREENWAY

RUTHERFORDTON GOLF COURSE

PROPOSED TRAILS The preferred historic route in Section 1 extends for approximately 7.3 miles from the Thermal Belt Rail Trail to Mountain Creek. From the Thermal Belt Rail Trail, the route extends westward along the NCDOT proposed US Hwy 64 realignment to Deter Street. The trail turns south on Deter Street and follows unopened road right-of-way as a typical greenway to the crossing of Southern Street. The route continues southward along Cleghorn Creek to connect to Kiwanis Park. From Kiwanis Park, the route follows the Purple Martin Greenway to Court Street. There are two preferred routes that connect the Purple Martin Greenway to the Rutherford Regional Medical Center. The northern preferred route travels west along Court Street as a town sidepath. The trail follows South Mitchell Avenue for a short distance before turning west on Pine Street. The route continues with Ridgecrest Street south and crosses Maple and Ridgecrest Streets to access Rutherford Regional Medical Center. The southern preferred route continues south on the Purple Martin Greenway from the Court Street intersection. The trail turns west onto an unopened road right of way and extends to US Hwy 221. The route follows US Hwy 221 as a town sidepath and continues northwest on Harris Street as on-street sharrows. At the intersection of Monfredo and Harris Streets the trail will continue west on Monfredo as a one-way road and pedestrian/cyclist lane conversion to Rutherford Regional Medical Center. An alternate connection to Monfredo Street is provided by extending west from the Purple Martin Greenway along Charlotte Street to Maple Street. The trail continues as a typical greenway across Rutherford Regional Medical Center and the Rutherfordton Golf Course properties. An alternate connection to the Rutherfordton Golf Course extends along the Purple Martin Greenway to Skyline Drive. The alternate route follows existing sidewalks and paths at Crestview Park to connect to Edwards Road, then traverses overland to connect to the golf course property.

From the Rutherfordton Golf Course, the route continues along Tryon Road to Union Road as a DOT Sidepath for 0.72 miles. The route traverses overland as a natural surface trail between Union and J.J. Gully Roads and continues south to connect to Mountain Creek.

TRAIL FEATURES This planning section includes three (3) trailheads, one (1) major bridge, one (1) minor bridge, and twenty-one (21) road crossings.

TRAILHEADS The northern terminus of this planning section is located at the Thermal Belt Rail Trail. The existing Railroad Avenue Trailhead can provide access to both the TBRT and OVNHT. Another trailhead is proposed at Kiwanis Park. The 2018 Kiwanis Park Master Plan provides for enhanced facilities, improved parking, and a OVNHT council ring. A proposed trailhead at the Rutherford Regional Medical Center or Rutherfordton Golf Course could provide access to the trail for hospital employees and guests. CROSSINGS This planning section includes one (1) major bridge and one (1) minor bridge. The major bridge crosses a tributary within the Rutherfordton Golf Course property. A minor bridge is required to cross a small tributary near JJ Guffy Road. This planning section includes twenty-one (21) road crossings. Crossing #1 will be included in the NCDOT US-221 Bypass project. Crossing #2 is at Southern Road within Rutherfordton. Crossings #3, #4, and #12 occur along a section of the Purple Martin Greenway that is currently under construction or completed. Crossings #5-11 are located throughout downtown and neighboring residential areas. Crossing #14 is at US-221. Crossings #15-16 are access roads to Rutherford Regional Medical Center. Crossings #17-21 are located on or just south of Tryon Road. These crossings serve to accommodate landowner sentiment and avoid tight parcelization.


CHAPTER 4

y

Frad y

rds

tn

Co wa n

err Ch

Levi

Cleg

horn

ne

Cow an

l Cent ra

Park La

Sugarhill

gton

Tom s

Mitc

Merid

Taylo rs

ian

Wash in

hell

e Hillsid

CR

La

EE

ure

K

Ly n

N OR CL EG H

Hardin

Hodge

lH

ill

ch

n ha la al

l

d A al lie

74

h

Pa tto n

Edw a

MAP 9: PLANNING SECTION 1

Southern

ecre st Ridg

is Norr

C

Gr ac e

Henry

Club House

New Hope

Bonaire

Arnett

e H op ew N

Five Oaks

a ini Ve rb

yM

rd e Ga

ch Br an d isw ol Gr

t Vio le

Re ec e

oks ton e

nG

Bro

at e

Maplewood

ol

Kn

y

ry

err

er

rk rial Pa

Indust

ia

Cottage

rs

le

m m Pe rs i

ge

Main s

ood ry W

ll

Russe

od wo

ore

K

EE

CR

tm

igh

N

w vie ge

Rid

iar

Br

I TA

Br

UN

bud Red

gt on

ont

El

Ba yb

e

d

st ed

Fair m

lin

Tw i

e

Woodbriar

ll

oo w le

uffy

Tr ai lR id

Hi

ys

JJG

Skylin

il

Mar

ua

21

su ey

n Ho

nd Ki

1

rn ho

dg

r Paxto Nich olas n

Q

s

t re

Ri

is

rr

Ha

el ur

La

Gar den

de

Fi

MO

on

Ha rd

a W as

en

nn Fly

Ranchway

ree k Ma ple C Tay lor

n le Al

Charlotte

tle Hardin

ll Ha

An

221

te ot

arl

Ch

ut

So

iew

n Unio

y Iv

n

ALT

Bu Ch

r

De

ith

Sm

Recre ation

Executive

221

ne

ui

rr el

tv es Cr

k

n

d

ck

ake

Et

dro

m

ee Fr

n Ta

lia

Sq

Forest Trail

wL llo Wi

n ha

Pa r

ills

d

no

e rr

en

gw oo

l

Do

ag

tt

ty os ton Fr Blan

20

a

e

Fo res tH

od

an

ale

Az

ag

od

st

rit

Rh

M

gton

in Well

il

nc

d

an

dl

oo W

Ra ve nw oo

14

T

Fair way

d

Ri

rd Fo 16 ty wit

1

ore irf Fa

gh

Hu

Yelto n

o

Mo

ita

17

13

ed nfr

le

10Map 11 12 15

Anne

ge

u Co

Ga

ra ss

19 La ce

e

s Ob

18 B

4

e

sp Ho

Chestnut

Wisteria

n

Della

d

r

n

o Try

RUTHERFORD REGIONAL TRAILHEAD

o Wo

d

Westview

yn

ll Pe

K

IN CREE el

7 6 5

Pin

9

s ark Sp

g

d

C

2nd

han

elo

En

1st

8ourt

Branch

4th

She

Pin

MOUNTA

ds

lle

io at rv

hn Zion

hn Zion

d

an

dl

oo W

Elm

Saint Jo

Saint Jo

Piedmont

He

ey

RUTHERFORDTON Wo o

et

5th

3rd

ett

ll Co Shotwell

7th

rth

No

ce

la al W

ll Co

Cedar

er nk

rris

n

ee Gr

3

6th

es ev Re

Bu

KIWANIS PARK TRAILHEAD

5th

MILES

ay fi

N

ce

e

Jo

d

Bu

Cl

O

Oak

Gra

r

nk w oo

ning

Ril

Mi

Oak

221 Cemetary

Brow

Pi

x Ale

1

2

Broad

on

ils W

ler Mil

ere

0.5

Deter

im s

Grayson

Sch

0

d

w ado

Byrd

RAILROAD AVENUE TRAILHEAD (TBRT)

Carnegie

ne sto

Me

Green

1

Woods

ble

in

l ro Ca

d woo Fern

Shady

Railroa

ise

ad ar aP

d

MOUNTAIN CREEK

b Pe

THERMAL BELT RAIL TRAIL

74 ood Fernw

o wo rn Fe

od K

rwo

Sou

noll

u

Mo

ALT tice Jus

Da ve S

kor y

1

Church

Hic

n

i nta

g Lon Rock

e lv

NORTHERN TERMINUS OF PLANNING SECTION AT TBRT

l

ril

G

rp

Si

Floyd

olm ish Ch

Coop

Hill

SECTION 1

ers Gap

te la

Ne

ed

le

Cov ing

ton

Thunder

nt Cou

43


KIWANIS PARK MASTER PLAN

T

EXHIBIT 3: KIWANIS PARK MASTER PLAN

he 2019 Kiwanis Park Master Plan serves as a guide for the redevelopment of Kiwanis Park in downtown Rutherfordton, NC. The park is located along downtown Rutherfordton’s northern gateway as well as the planned Purple Martin Greenway. The plan outlines park improvements including an adventure playground, dog park, pavilion, improved entrance plaza, and the Trail to Victory Council Ring.

44

KIWANIS PARK MASTER PLAN

RUTHERFORDTON, NC

»

WINTER 2019

DEVELOPED IN ACCORDANCE WITH NORTH CAROLINA PARKS AND RECREATION TRUST FUND STANDARDS

Revised Conceptual Masterplan of Kiwanis Park Rutherfordton, NC

November 27, 2018

Scale: 1" = 90' - 0"


EXHIBIT 4: TRAIL TO VICTORY COUNCIL RING

CHAPTER 4

TRAIL TO VICTORY COUNCIL RING @ KIWANIS PARK

T

he existing Kiwanis Park Master Plan provides for the OVNHT Trail to Victory Council Ring. The council ring will be constructed of stone benches encircling a large OVNHT plaque and is designed to provide an opportunity for storytelling and educational gatherings. The park’s close proximity to downtown Rutherfordton, as well as planned enhancements, position it as a key destination along this section of the OVNHT.

45


m

t

Harper

Tom s

8

10

Levi

11

ed nfr

Mo

221

tte lo

ar

Ch

74

No

rris

p Ma

e

Club House

o

le

8 9

Cow an

Taylo rs

ton

n

o Try

116 3

He nry

10

utive

is

s

rr

Exec

HOSPITAL

H

C

M

15

14ord

ty

F

K ch

m

Hardin

N OR EG H

n

220 3

221

n Ta

Edw a

d

1000

ew Pa tto

ll

n

Ha

Sq

ui

rr el

De

y Iv

n Gardenia

PURPLE MARTIN GREENWAY

Cottage

Anders

Sourwood

TOWN BOUNDARIES

Woodbriar

e

ill

lH

Skylin

ai

Qu

Partridge

le

ck

ysu ne

Ho

ill

rel H

C

Industri

Lau

lie al

i tv es Cr

500

1153

gw oo

h

ut

So

k

Do

71 22

r Pa

rds

ndron

A

st

e for

d

r

a

ne

ale

Az

ir Fa

al Park

CRESTVIEW PARK

Rhodode

PURPLE MARTIN CONNECTION Paxt o

Hardin

Si

m

ps

on

to n an Bl

Hodge

ma

l

Fr ee

s

ol

Th o

CL

Kn

an

ce

Main

ry

er

Anne

0

Ch

ty os Fr

Gra

d

an

dl

oo W

Fair way

ills

r

Ly n

C

tle

1

Fo res tH

EE

Bu

al

RUTHERFORDTON GOLF COURSE PROPERTY

CR

la

ha

Bonaire

it Tw

n

cG

l

in

12

ita

13

sp Ho

ni

Ha

Club Hous

RUTHERFORD REGIONAL TRAILHEAD

FEET

46

Centr al

Mitc hell

otte

on

e

MAP 10: PURPLE MARTIN CONNECTION

Charl

id lls Hi

Della

RUTHERFORDTON ne

ed

Recre ation

Cleg horn

Pi

1210

1

ood enw Rav

S u ga rhill

Westview

Pin

2nd

Park La

White Oak

Lo

Trade

7

e

f

ea

l ng

Was hing

ian Merid ope New H

1164

d

1166

N En

3 2

1st

an

ds

4

6

Ridgecrest

Wo o

Court

h She

5

onnecting the existing Purple Martin Greenway to the Rutherfordton Golf Course Property will serve to link two significant town-owned recreation assets and expand trail opportunities within the downtown Rutherfordton area. Two alignments are proposed. The northern alignment extends west from the Purple Martin along Court St., Mitchell Ave., Pine St., and S Ridgecrest St. to connect to the Rutherford Hospital property. The southern alignment exits the Purple Martin south of Harris Street and utilizes Harris St. and a proposed one-way along Monfredo St. to connect to the golf course. An alternate route is provided along Charlotte and Monfredo Streets, as well as the Purple Martin Greenway and Crestview Park walking path.


EXHIBIT 5: MONFREDO ONE-WAY

CHAPTER 4

EXISTING

MONFREDO STREET ONE-WAY CONVERSION

A

s the trail departs from its co-alignment with the Purple Martin Greenway and approaches the Rutherfordton Golf Course Property, a proposed one-way conversion along Monfredo Street would allow trail users safe passage from downtown Rutherfordton. Half of the existing two-way street would be converted into a pedestrian and cyclist-only lane, delineated by road bump dividers and an OVNHT painted path.

47


SECTION 2 VICINITY MAP 1

RUTHERFORDTON

74

2

74 221 74 74 mile-wide historic corridor

74

3

221

RUTHERFORD COUNTY

4 N.C.

POLK COUNTY SPARTANBURG COUNTY

S.C.

5

CHESNEE

MOUNTAIN CREEK HWY 74 EXISTING TRAIL:

1.1 MILES

PROPOSED TRAIL:

6 MILES

TRAIL TYPE:

NATURAL SURFACE

DUAL USE PATH

ESTIMATED COST: $1,002,940 POINTS OF INTEREST:

BROAD RIVER

GRAY'S ROAD RIVER ACCESS

BRADLEY NATURE PRESERVE AT ALEXANDER'S FORD

PROPOSED TRAILS

TRAIL FEATURES

The preferred route in Section 2 extends for approximately 7.1 miles from Mountain Creek to US Hwy 74. From Mountain Creek, the preferred route traverses overland as a natural surface trail to Pleasant Hill Road. The trail briefly aligns along side Pleasant Hill Road and continues westward along Gray's Road for XX miles to the Broad River.

This planning section includes two (2) trailheads, two (2) major bridges, and five (5) road crossings.

From the Broad River, in addition to the preferred route to connect to the Bradley Nature Preserve, two alternative routes are proposed. The preferred route briefly continues southward along the Broad River before reconnecting to Gray's Road. It continues along Gray's Rd. as a natural surface trail, briefly follows Grays Chapel Church Road, and connects with the existing OVNHT at Bradley Nature Preserve. The eastern alternate route diverges from the preferred route at the Grays Road River Access, briefly following the Broad River southeast and downstream as a natural surface trail before traversing overland to connect to Grays Chapel Road and the Bradley Nature Preserve. The western alternative diverges at the Grays Road River Access to continue west and south along the Broad River as a natural surface trail before traversing overland to connect to the Bradley Nature Preserve. At the Bradley Nature Preserve, the route follows an existing 1.1mile section of designated OVNHT to Alexander’s Ford at the Green River. The dual-use path traverses briefly overland before continuing along the Green River to an existing underpass of Highway 74.

TRAILHEADS Improvements to the existing Grays Road River Access are proposed to incorporate OVNHT facilities, including signage, mapping, and parking area enhancements as shown on p. 50.

02

The existing trailhead at Bradley Nature Preserve serves as this planning section’s second trailhead. Improvements are also proposed at this trailhead, including a kiosk and trail markers as shown on p. 51.

CROSSINGS The preferred route requires two (2) major bridges in this planning section. The first is located at Mountain Creek. The second is located on the Green River at Alexander’s Ford. Five (5) road crossings are located within this planning section. Crossings #1-2 are located at Pleasant Hill and Gray's Roads, respectively. Pedestrian enhancements will be required along the existing Gray's Road bridge to cross the Broad River. Crossings #3-4 are located at Gray's Road and Grays Chapel Church Road to allow access to the Bradley Nature Preserve. Crossing #5 is proposed at the existing underpass on private property beneath US Hwy 74 along the west bank of the Green River. Continued landowner engagement will be required to utilize this underpass.

PHOTOS: (1) Existing natural surface trail at Bradley Nature Preserve. (2) Improvements are proposed at the existing Gray's Road River Access to establish an

01 48

OVNHT trailhead.


CHAPTER 4 ng s tch i Hu

e idg Tra il R

Tre as ure

ch hur ill C

ud

b Red

un Co

D OA

BR

e Lin ty

RI

ar rF ve Ri

ll

Be

Si m s

n ee Gr

GREEN RIVER

1

Be

ck y

ill tH an

m

s ea Pl

el

ch

Ra

Gr an d

R

Sa nd pi t

VE

vel Big Le Ginger

Grandview

1

vi ew

HIGHWAY 74

MAP 11: PLANNING SECTION 2

ce ra rT ve Ri

MOUNTAIN CREEK

JJG

nt H

V S Dalton

uffy

asa Ple

SECTION 2

Pass

r nne Co

Victory

e

Thistl

2 GRAY’S ROAD TRAILHEAD r

y

nt Li ne

M

k

rR

un

Bab

49

Re d

ea

11

n

er

lC

Misery Ridge hap

el

T EA As

EEK N CR CLE GHO R

OA D BR

ree k hC

de r Po n

En

d

tt lio

r ve

e

dg

Ri

ill

ras

nH

n Ke

t es Cr

lto

M er ill

Cox e

e

d ysi

ntr

u Co

ge

Ca

Rid

ge

Ri

saf

5

Coxe

r ve Ri

74

hary

Rid

K

EE

Pea

CR

an

w Vie ny

E IN

heh

74

El

or e

Sa

Mo

Zac

nd

Etha n

sa

Sun

CH MA

n lco Fa

Carson Cove

on

ion

m ps

ion

Un

Si

tat

e

s

lan

ra m

nS

ore

gP

Ab

Joh

Mo

Kin

idg

s

M

ile

idge

Cross R

COUNTY

R nt

in

w

od

Wa tkin

D

Fro

Go

kins Wat

OU NT Y

p

Ge

m Ca

e

Be

RF O

R

e

2

on

Zi

E

ALEXANDERS FORD

w ie rV

PO L K C

1

bo

K

h ranc

0.5

y le

l Va

Ar

EE

MILES

B Doe

0

H RUT

CR

Buck Branch

es ic

Pr

R

H

W

us C

RIV E

Man

vie w

BRADLEY NATURE PRESERVE TRAILHEAD

Riv er

y

z La

h rc

hu

Horse Pa th

r Taylo

Cl

pe

ha

tso

er

Martin

Ro c

sC ay Gr

b Ro

R

3 4

Gray's

Union

ow Arr

u Co

N ls

al cF

MOUNTAIN CREEK

le

w Fo

Dov Wr e en

49


EXHIBIT 6: GRAY'S ROAD RIVER ACCESS

EXISTING

GRAYS ROAD RIVER ACCESS AND TRAILHEAD

50

T

he preferred route continues south from Rutherfordton to connect with the existing Grays Road River Access along the Broad River. Willing landowners and existing improvement plans for the river access present significant development opportunities for this connection node. OVNHT trail markers and signage will create a sense of place at this trailhead.


EXHIBIT 7: TRAILHEAD @ BRADLEY NATURE PRESERVE

CHAPTER 4

TRAILHEAD @ BRADLEY NATURE PRESERVE

I

mprovements to the existing trailhead at the Bradley Nature Preserve at Alexander’s Ford will enhance the user experience along this section of trail. Proposed OVNHT trail markers and signage will enhance the trail’s presence and serve to tell the story of this important landmark along the trail.

51


SECTION 3 VICINITY MAP 1

RUTHERFORDTON

74

2

74 221 74 74 mile-wide historic corridor

74

3

4

S.C.

The preferred route in Section 3 extends for approximately 10.1 miles from US Hwy 74 to Green Creek. A short section of the route leaves the historic corridor in order to utilize the existing underpass of US Hwy 74 on the western bank of the Green River. The dual-use path continues overland to connect to Coxe Road. The preferred route aligns with Coxe Road and Sandy Plains Road as a dual use trail for XX miles to connect to the existing certified trail at Overmountain Vineyards.

221

RUTHERFORD COUNTY

N.C.

PROPOSED TRAILS

POLK COUNTY SPARTANBURG COUNTY

5

CHESNEE

HWY 74 GREEN CREEK EXISTING TRAIL:

1 MILE

PROPOSED TRAIL:

9.1 MILES

TRAIL TYPE:

DUAL USE PATH

NATURAL SURFACE

Two alternate routes are also proposed to connect to Overmountain Vineyards. The first diverges from the preferred route north of the intersection of Coxe and Sandy Plains Roads. The alternate trail continues westward and overland as a natural surface trail. Southeast of Meadow Crest Road, the alternate route turns north to reconnect with the preferred route. A spur from the alternate route continues westward, outside of the historic corridor, to connect to the southern boundary of the Overmountain Vineyards. From Overmountain Vineyards, the trail continues west, briefly aligning with Mill Creek before traversing overland as a natural surface trail to connect to McDade Road. The preferred route continues southwest to connect to Horne Road.

surface trail. An alternative route is proposed, continuing along NC-9.

TRAIL FEATURES This planning section includes one (1) trailhead, two (2) minor bridges, and seven (7) road crossings. Trailheads A trailhead is proposed at Tryon International Equestrian Center along Sandy Plains Road across from Overmountain Vineyards. Crossings Two (2) minor bridges are required for this planning section. The first crosses Mill Creek, west of Greenway Road. The second is located at Marys Branch, east of John Smith Road. This planning section includes seven (7) road crossings. Crossing #1 is located at the intersection of Pea Ridge and Coxe Roads. Crossing #2 is located on Sandy Plains Road and is required to access Overmountain Vineyards, across from the Tryon International Equestrian Center. Crossings #3-5 and #7 occur at rural roads. Crossing #6 occurs at NC-9. Pedestrian enhancements will be required to securely cross this 2-lane rural highway.

The trail aligns briefly with Horne Road and NC-9. From NC-9, east of Matthew Road, the route continues overland as a natural

ESTIMATED COST: $1,498,550 POINTS OF INTEREST:

TRYON INTERNATIONAL EQUESTRIAN CENTER

OVERMOUNTAIN VINEYARDS

02 PHOTOS: (1) A crossing is required at Sandy Plains Road to connect Tryon International Equestrian Center to Overmountain Vineyards. (2) An underpass

01 52

presents an opportunity to cross Hwy 74.


Unio Ca

lto

Sycam ore

ak O

k

Larsen

Bridge

lai yP

N

m

bl

in

g

Ca

do w

Ra

Cr es t

Hill

Troy

r ne Tu r

2

n Vi

ea

e or

e Tricycl

Hugh Champion

Mo

Overhill

d ar ey

i zz po

M

s

TRYON EQUESTRIAN CENTER TRAILHEAD

nd

Medford

Sa

ind W

k

White Oak Farm

rbr oo

ns

ir Fa

be

TY

N

Tim

wba Cata

kton Stoc

Deep Hollow

1

n tso Wa

Cr ee

k

an

Cr ee

di

hn Jo

ain unt rmo Ove

W In

MAP 12: PLANNING SECTION 3

te

hi

rs

ill

a Pl

Ar th u

Ali ce Gr ee

K CREEK

WHITE OA

i at

nt

TRYON EQUESTRIAN CENTER

yH

Ambro se

W ind

U CO D THr ERF OR TY RKUen Mille COU N POLK

on

en

re Will G

ER

V RI

n

R

GREEN CREEK

ill

VE

HWY 74

nH

RI

74

River Ridge

D OA BR

Countryside

Coxe

GREEN RIVER

rop Wa ld

st

EN

ith

Cre

E GR

74

K EE

Sm

Riv er

w Vie ny Sun

an

CR

C

heh

ge Rid

IN E

ch hur

nS

Pea

CH MA

SECTION 3

lah

Beu

Joh

n

CHAPTER 4

d

oo W

EK ld fie ne Pi

ew

ur ch

Poors Ford

r Skippe

r Web be John Smith

Ch

Ph

ili

p

Mea

dow

He

nd

er

so

n

bro

ok

St ra w

be

rr

y

ou nt n ai

Gree

ds

Jo

iel

hn

W ea ve r

Good Earth

GR rn

Ho

Ma tth

Coll insv ille

tir e

e

nro Mo est

Eag le N

En

e

Do wn p ru St ir

adow s

k

e re

nC

ee Gr

9

ve r

s

M

n Me

ian

tes

by

Lib

7

an

6

Ri

1

ery Brew

m

nF

d ea St

le

tt

Li

Gr ee

land

e Cop

0.5

Bubbling Spring

rt

5

M

MILES

Ar

e lb

Burgandy

Field

s

ide

0

Burgundy

un

m

Green Creek

s

Gi

ey Turk Wild

K

EE nR

W ill

eks

on

st Cre

n

n

Aster

K EE CR

CR bu

lar

m ru nd La

LL

ES

Cre

Mas

Ivie

Gr ee

le

ia

1

Burgundy

So

MI

GH

HU

Pine Meadows

Brookstone

Day

Ra

er

ill

n Ke

RE

Hill

B yd Flo

Breezy

ok

Greenway

an m tt Pi

LAKE SANDY PLAINS

ll kwe

lac

bro

st We

k

ert P age

4

NC

sh

A

McDade

3

Dairy

EE

n ly

Phillips

Sky

le

Al

Herb

's

tt

Clarkson

y Plains Lake Sand

n

ge Frm

Cr ow

s

te r

en

rp

Ca

pso

Thunder Rd

Li

dy

hom

an

M

ry T

eld

Hen

yfi Ma

l

ie

n Pe

Riverside

OVERMOUNTAIN VINEYARDS

H

Mc

w lo ol

2

53


115 6

bo Ar

1331

on

Zi

w ie rV

EK RE C

BRADLEY NATURE PRESERVE

114

6

114 7

gP

lan

RIV ER

Kin

tat

ion

BR

r de Po n

1145

d

Ambro se

s ur th

ech wo o Be ge

ER

Y

yP

d ar ey

nd

R Fo ambling Cre ek re st Ri dg e

i zz po

n Vi

Ca

130 2

do w

Cr es t

Sa

ea

1336

cy ar Se

McDade

K

REE

LC

MIL

1339

Riverside

ob

B

OVERMOUNTAIN VINEYARDS

Ph ill ip s

D ai

ry

M

White Oak Farm

lain

Bridge

s

1326

ba

Tricycle Hill

RIV

Y NT

52 13

Cataw

ne r

d

Ar

1332

EN

COU RFORD HE

GRE

2

RUT T LK CO UN PO

in

unta

Tu r

id

er

ill

on

rmo

Ove

34

sa

M

s at W

P

Troy

3 Moore

13

n Ke

hn

Jo

ah Jir

TRYON EQUESTRIAN CENTER TRAILHEAD

Overhill

1369

ill

h va ho

e

ak O

kton Stoc

Medford

s

ind W

MAP 13: TRYON EQUESTRIAN CENTER

sR

t es Cr

nH

fra

r ve

Je

d ysi

ntr

u Co

ill

Larsen

ir Fa

54

on

ti ta

te hi W

Pa rk

lto

5

n la

e

dg

Ri

Ri

ge

yH

Ca 100

TRYON EQUESTRIAN CENTER

r ve

Ri

Sa

y

tt lio

har

Coxe

1

EK

RE

SC

RLE

A CH

74

El

Zac

an

ER

RIV

1332

En

re

m

s

Eth

EN

Si

ile

Sycam o

ps

on

in

w

ion

od

M

idge

w Vie ny

74

Rid

K

EE

an

Pea

CR

heh

WHITE OAK CREEK

al

n

Ridge

Cross R

Sun

E

IN nS

Pe d

tatio

Un

Front

Go

GRE

Carson Cove

Abrams and Moore

Joh

1333

Plan

OA D

29

13

ll Va

e Ge

CLE GHO

p

e

Be

1

26

W ind

RN

m Ca

ey

13

CH MA

n lco Fa

30

13

N

EK

T EA H

Riv e

W

e

CRE

hap

1149

Union

rv iew

T

us C

r

BR

l he Tryon International Equestrian Center (TIEC) serves as a significant destination along the preferred OVNHT route. TIEC’s proximity to other assets such as the Overmountain Vineyards and the existing trail Pri ce s system within the Center’s property highlight a significant trail development opportunity. A dual-use path trail type to the north of the Equestrian Center will allow for equestrian use of the OVNHT to the Bradley Nature Preserve.

Deerview

CREEK OAD RIVER

Man

e Bab

TAIN MOUN

27 13

zy

La

Martin

Misery Ridge

TRYON INTERNATIONAL EQUESTRIAN CENTER


EXHIBIT 8: OVERMOUNTAIN VINEYARDS

CHAPTER 4

OVERMOUNTAIN VINEYARDS QUICK FACTS: Location: Polk County, NC Size: 70 acres

T

he Overmountain Vineyards is a 70-acre vineyard that contains 1 mile of certified OVNHT. The vineyard features a tasting room as well as two luxury villas and outdoor pavilions. With close proximity to the Tryon International Equestrian Center, daily tours offered in the spring, summer, and fall, and a tasting room open year-round, the vineyards serve as a key destination and connection node along the trail.

Miles of Certified OVNHT: 1Signature Feature: 55


SECTION 4 VICINITY MAP 1

RUTHERFORDTON

74

2

74 221 74 74 mile-wide historic corridor

74

3

221

RUTHERFORD COUNTY

4 N.C. S.C.

POLK COUNTY SPARTANBURG COUNTY

5

PROPOSED TRAILS

TRAIL FEATURES

The preferred route in Section 4 extends for 7.6 miles from Bear Creek to the NC-SC state line. From Bear Creek, the preferred route traverses overland as a natural surface trail before connecting to Airport Road. The route briefly aligns with Airport Road before continuing overland to connect to Chesnee Highway west of Ted Smith Road.

This planning section includes two (2) minor bridges and eight (8) road crossings.

An alternate route follows NC-9 and Chesnee Highway before rejoining the preferred route on Chesnee Highway. Tight parcelization and a narrow road corridor present significant development challenges to this alternate route.

CROSSINGS Two minor bridge crossings are located within this planning section. The first bridge is located at Bear Creek. The second crosses a tributary of Bear Creek. After the preferred route crosses NC-9 at crossing #1, the trail crosses seven rural roads (crossings #2-8) as it traverses overland to connect to the NC/SC State Line.

The preferred route continues along Chesnee Highway and Lambs Grill Road as a natural surface trail to the NC-SC State Line.

CHESNEE

GREEN CREEK NC/SC STATE LINE PROPOSED TRAIL:

7.6 MILES

TRAIL TYPE:

NATURAL SURFACE

ESTIMATED COST: $557,600 POINTS OF INTEREST:

GREEN CREEK

NC/SC STATE LINE

02 PHOTOS: (1) Rural roads with narrow rights-of-way present significant development challenges in this section. (2) Large agricultural parcels, coupled with a continued landowner engagement strategy, provide an opportunity for trail

01 56

development outside of the roadway corridor.


ok Meadowbro

K EE CR S ON

HE

NS

Poors Ford

k

e re

nC

Poplar Cree

ee Gr

k

Coxe

St ra w

be

rr

Ph

He

nd

y

OA D

Sta cey

ers

Cu

n

Le e Blayn

CR

K

Lin ty ks

Blac

a Broo

Co un

kwo od

ss ra

r Tanne

eg

u Bl

Y

Meliss

NE

Radar

k

Ove

k

7

Sandy Springs

ril G

8

ley Jol

g Bi C oo le y

Caro

186

1 251

idge 9

nd

ela

p Co

Wooden Br

MILES

ge

McSwain

s wi Le

0.5

rid

s

0

is B

Turner

gg

k

Strawberry

Par r

ru

Cr ee

SPARTANBURG COUNTY

Sc

ar

ee htr

Be

c Pea

ill

M

Pond View

n

State Line

Poors Ford

ip

Mahaffe y Coole y

55

Tu l

so

er

Mae Mill

Parks

ud

Leonard

H

rd

131

adfo

Rabbit Moffit

t

Is la

nd

l

Scoggins

bs

Vera

h

mit

S Ted

m La

A Wilson

REEK

Airport

BUCK C

l

Way Hom e

Hicks

rcre e

Johnson

Mis ty

Bu

ck

Jolley

6

Cr ee

ill nH lvi Me

5

Shytle

Hil

Claude Gilbert

K

EE

on

CR

McDowell

IN

CK

er

Prince

BEAR CREEK

n

Ti m

4

lvin

Red R

k

ee Cr

3

Me

956

pso

M

y Sass

Ro a

ohns

Rainbow

hom

nee

n

Tom J

e Pag

VT

Ches

ery

Jim

cC

n

urs

2

M

ai

x Fairfo

eN Miz

2

az

n

9

p To

a Fag

1

Hidden Spring

e

GR

s

es

EE

N EE

1

N

o ers

on

9

RIV

ER

dd

ilip

BR

s end Rigg H

POLK COUNTY

r

Skippe

s

Libby

Mc

ld

STATE LINE

re

G

y rra

ie

an

Sh

dm ea St

GREEN CREEK

ee Cr

Mc

land

e Cop

ry we Bre

s Bubbling Spring

En tir e

en

MAP 14: PLANNING SECTION 4

k

Ar

Mu

SECTION 4 n

ia

s te

Pond Lyles

e

id ks

ee Cr

RUTHERFORD COUNTY

CHAPTER 4

57


SECTION 5 VICINITY MAP 1

RUTHERFORDTON

74

2

74 221 74 74 mile-wide historic corridor

74

3

221

RUTHERFORD COUNTY

4 N.C. S.C.

POLK COUNTY SPARTANBURG COUNTY

5

CHESNEE

NC/SC STATE LINE CHESNEE PROPOSED TRAIL:

7.2 MILES

TRAIL TYPE:

NATURAL SURFACE

DOT SIDEPATH

TOWN SIDEPATH

PROPOSED TRAILS The preferred route in Section 5 extends for 7.2 miles from the NC-SC state line to CADA Park in Chesnee. From the NC-SC state line, the preferred route follows Parris Bridge Road, as a natural surface trail, to its intersection with Scruggs Road. The trail then continues overland to reconnect with Parris Bridge Road. The trail follows Parris Bridge Road south to Harris Road before continuing overland to connect to Cherokee Foothills Scenic Hwy. An alternate route diverges from the overland trail west of Island Ford Road to connect to Cherokee Foothills Scenic Hwy on the western side of Island Ford Road. The preferred route aligns with Cherokee Foothills Scenic Hwy as a DOT sidepath to connect to Oconee Road. The preferred route continues as a DOT sidepath along Oconee Road to connect to Alabama Avenue. The preferred route follows Alabama Avenue south as a town sidepath before turning west to connect to CADA Park.

TRAIL FEATURES This planning section includes one (1) trailhead and thirteen (13) road crossings. TRAILHEADS A trailhead is proposed at CADA Park. The park’s proximity to Chesnee’s downtown business district and existing on-street parking provide an opportunity for trailhead development. Enhancements should include OVNHT signage and trail markers to establish a sense of place and awareness of the trail. CROSSINGS Crossings #1-5 occur at rural roads as the preferred route connects overland to the Cherokee Foothills Scenic Highway. Crossings #6-8 traverse the Cherokee Foothills Scenic Highway to accommodate landowner interest and avoid small parcelization. Crossings #9-11 traverse Oconee Street. Crossings #12-13 traverse side streets along Alabama Avenue in downtown Chesnee.

Two alternate routes also connect Oconee Road to CADA Park. One continues southeast on Cherokee Street. The other turns south on North Carolina Avenue to connect to CADA Park.

ESTIMATED COST: $1,934,410 POINTS OF INTEREST:

CADA PARK

DOWNTOWN CHESNEE

02 PHOTOS: (1) CADA Park will provide trailhead access from downtown Chesnee. (2) North of downtown

01 58

Chesnee, Alabama Ave. has a wide road width.


CHAPTER 4

rov e

Hic ks G

MAP 15: PLANNING SECTION 5

K EE CR E

fo rd to n er th Ru

Cash

Fa r

Court

Cash

Bon

m

res Ac

ak e

Parris

Kentucky

239 239 Georgia

ds

Gr ee nL

Alab ama

d

Lee

239 LeeL ee 5 16

Florida

Front

Red Line

Stage

HO TT

Fike Georgia

464

a

ni

Nevada

LI

McDonald Farms 206

Ohio

549

lif or

Ca

Shed C reek

en

dd Hi

Pinecrest

W oo

EK

S CRE CUDD

GREENES LAKE

e lie dg Ju Ri rd fo of Sw

Peach

1534

Texas

s ng Ri di

North Carolina

Texas Utah

Sheeree

l Ez el

lly Ho

Clement

Redline

Creekbend

Henderson

ds iel Sh

Tata

Kingston Ridge

Lockland

ne y

rg ate

Ke e

Lake

Ivey

Ma

Willingham

Arledge

op sh Bi dP ark

d

ce Van

Ho o

ce

3 10

187

t

Ligon

Avita

g sbur Mos tee r a C

ur Co

rlan

s

C

an

4

51

3 10

sh

ris Fi

Picken

Ove

e

dg

am

res P t a r

Club

Ri

Manning

221V

on ni

p

Rav enc

Country

e

Tuscany

ell

ge

83 5

1

469

ek

lon

CHESNEE

Dawn d Wad

221

U

l

0.5

gl

k

H

Ea

re e

id Br

W al

0

1516

y rar

C

Farm

MILES

tts

1771 468

Lib

ky

ad he

Ledford

R oc

er Ov

M

irk

n to ng

p n aso

K

on

am nC

Minnow

rne

Bu

55

Farm

Vassey

PROPOSED ROUTE FROMCre e rs CHESNEE TO KINGS MTN. Ho PLANNING SECTION Dil

Main

s er nd

H

e Gr

rti

l

Su

Lo we

He

Bain

Turkey

s ine

ton mp Ha Georgia

ine

yd Lo

C RAN RD B

Pruitt

13

Re dl

r ke

al W

y wa en

Ma

u ph

land

H

O KY F

Hill

rs

lte Sa

den Gar

l

tree

h Peac

rS

Rich

NC RA

ROC

oo Sch

eld

fo rd

gs

LB

e Walk

p

r Cam

n abo r Ru L

EL

gs

irfi

in pr

xi Le

187

EZ

rin

Sp rso

n

Le d

c ea Pr Fa

ld

12

Laurens

CADA PARK TRAILHEAD

Burrs

ar

d Ce

Greenwood

Saluda

ard

187 Fairfield

fie

ir Fa

Saluda

Rich

y le

o Co de

102

k

Farfield

Raytown

An

10Oconee 11 ee ok er

e re

ll Wa

nt er

ce Joy

Bonner

Ch

ge

rick

C st Lo

215

ith

Sm

Pa i

r he

9

Tank Hill

ss Townsel

8

e

7

Horsesho

hT ree

Shamrock

ty

it Tw

Brid

Ham

rm

Pruitt Fa

n

Ca

11

ford

l el tr

gra eet Sw

t

Fa lco n

LE

n

othil

Craw

et

11

A

Sm

nic ls Sce

o kee F

Chero

rn

De vo n

Pe ac

ker

RS

0 Fo rd 10 d an Isl

Do we ll Mc

so

Farm Ba

ris Par

N

eba

ithview

6 Red Barn Divide

Stu d

er

5

73

5

Pruitt

692

nd

s

38

978

Hi

or e La tt im ll Bi e

He

nt

n

ne

h ia re m Je

idg

bin

b Ro

rso nde

ll

Farm

Burke

ey

nn

Ki

515

ARR OW OOD

Mahaffe y

berry

Jack McKinney

BRA NCH

72

Cooley

K

Cypress Cove

Rabbit Moffitt

ey R

sa

we Lo

le y

cle Cir

Montgomery

Coo l

s

ea

ns

Mc

4

wi Le

Pl

He

TY UN CO TY KEE UN ERO CO CH RG BU AN RT SPA

H

ee Ab

s

ri

ar

Mc

3

nch

BU CK CRE E

6

CHESNEE

POLK COUNTY

Thompson

Cooley Springs School

S.C.

13

STATE LINE

Franciscan

Bra

Buff

k Fol

ood ow Arr

dley

Sanders

s gg

186 Bra

SECTION 5 Hicks Grove

ru

Ada ms

Sc

2

McSwain

N.C.

n

olls Kn

1

Turner

Ru

La il

er

Fall

De

Black

Jess L

le y C oo ud so n H

Strawberry

Cr aig

Pi

amb

Is Bi g

Airport

l ril

Pond View

z re Pe

G bs

la n

d

m La

State Line

s

na

Jo

4

10

Blue Da wn

59


EXHIBIT 9: SC-11 SIDEPATH

EXISTING

SC-11 SIDEPATH

60

A

DOT-sidepath is proposed along SC-11 west of Chesnee. Signage and trail markers signify the trail’s presence, while a grass swale will provide a safety buffer from vehicular traffic on the road. Fencing is provided to clearly delineate the extent of the trail easement.


EXHIBIT 10: CADA PARK

CHAPTER 4

The OVNHT kiosk at CADA Park, constructed in December of 2019, serves as a trail hub for downtown Chesnee.

CADA PARK QUICK FACTS: Location: Chesnee, SC Size: 1.4 acres

C

ADA Park is an 1.4-acre park located in downtown Chesnee, SC, and serves as the southern terminus of this study area and the western terminus of the Chesnee to Kings Mountain section of the OVNHT. The park features a picnic shelter, 0.2-mile walking path, and parking area. Located steps from the central Chesnee business district, the park serves as the downtown’s largest greenspace and a key connectivity node.

61


62


CHAPTER 5 IMPLEMENTATION

CONSTRUCTION OF THE OVNHT FROM Rutherfordton TO Chesnee WILL BE NO SMALL TASK. BUT WITH TIME, PERSEVERANCE, AND A LITTLE LUCK, THERE IS NO DOUBT THAT A DESTINATIONQUALITY TRAIL IS WITHIN GRASP.

This chapter summarizes details regarding each Planning Section and establishes responsibilities and implementation priorities by focus area. The chapter concludes with an economic impact analysis that evaluates potential benefits of completing the OVNHT from Rutherfordton to Chesnee.

IN T H IS C H A PT ER A. Implementation by Section and Responsibilities B. Implementation Priorities by Focus Area C. Trail Support Spectrum D. Economic Impact Analysis


IMPLEMENTATION DETAILS BY PLANNING SECTION The table below provides an overall summary of key information associated with each planning section. Key opportunities provide valuable insight that may assist in determining priorities within each section. Key challenges include costly trail features or the need to acquire trail easements from private landowners. Most importantly, this table identifies key partners that must actively work in concert to fully implement plan recommendations.

EXHIBIT 11: PLANNING SECTION IMPLEMENTATION MATRIX

IMPLEMENTATION DETAILS BY SECTON AND RESPONSIBILITY Section

SECTION 1 - Thermal Belt Rail Trail to

Mountain Creek

Distance

6.3

Key Opportunities

Thermal Belt Rail Trail; Purple Martin Greenway; Kiwanis Park; Rutherfordton Golf Course Connection Willing Landowners Along Gray's Road; Existing Certified

SECTION 2 - Mountain Creek to Hwy 74

7.2

SECTION 3 - Hwy 74 to Green Creek

9.1

SECTION 4 - Green Creek to State Line

7.6

Large Parcels of Undeveloped Land

SECTION 5 - State Line to Chesnee

7.2

Positive Landowners; CADA Park

ALL SECTIONS TOTAL

OVNHT and Trailhead Development in Bradley Nature Preserve Tryon Equestrian Center; Overmountain Vinyards; Existing Underpass on US Hwy 74

37.5

*Estimated budget shown above does not include existing completed sections of trail or proposed trailheads.

64

Key Challenges

Estimated Budget

US Hwy 221 Crossing; Major Bridge over Tributary to Cleghorn Creek; Numerous Road Crossings; Securing

$3,043,460

Landowner Trail Easements

Implementing Partners

Town of Rutherfordton; Rutherford County

Securing Landowner Trail Easements

$1,002,940

Rutherford County; Polk County

Securing Landowner Trail Easements

$1,498,550

Polk County

$557,600

Polk County; Rutherford County

$1,934,410

Spartanburg County; City of Chesnee

Large Parcels of Agricultural Land; Securing Landowner Trail Easements

DOT Sidepath along Busy Road; Numerous Road Crossings; Securing Landowner Trail Easements

$8,036,960


CHAPTER 5

WHERE TO START: IMPLEMENTATION PRIORITIES BY FOCUS AREA

221

2.Gray’s river access to 74 Bradley Nature Preserve

3.Bradley Nature preserve to TIEC

RUTHERFORD COUNTY

221

4.TIEC to Overmountain Vineyards

This plan recommends approximately 36.2 new trail miles, crosses five political jurisdictions, and requires participation from multiple land managers. For this reason, implementation partners must focus their limited capacity, including time and money, to begin advancing plan implementation. The Implementation Focus Areas Map illustrates recommended trail development focus areas within the broader context of the study corridor. These focus areas prioritize trail development that connects 74 existing trail segments or is located on lands that are already managed by a public entity. Four suggested focus areas are presented to help partners target their efforts: 1) Purple Martin Greenway to Rutherfordton Golf Course; 2) Tryon Equestrian Center (TIEC) to Overmountain Vineyards; 3) 74 Gray's River Access to Bradley Nature Preserve; and 4) Bradley Nature Preserve to TIEC. Continued landowner engagement will be required for the preferred route from Overmountain Vineyards south to Chesnee. Tight parcelization and narrow road rights-of-way present significant trail development challenges. Each government entity must work in tandem and with partners to successfully realize the complete OVNHT. Trail implementation does not have to occur in a specific, linear order according to each planning section. In fact, the priority areas for implementation are merely suggestions and are in no way intended to limit creativity or work in "lower" priority areas. Trail implementation is an art and requires the acumen to recognize and seize opportunities, whether related to funding, landowner willingness, or politics. Focus Area 1: Purple Martin Greenway to Rutherfordton Golf Course Town Sidepath Typical Greenway Rutherfordton Hospital Trailhead

Focus Area 2: Gray's River Access to Bradley Nature Preserve

POLK COUNTY

SPARTANBURG COUNTY

N.C. S.C.

Natural Surface Gray's Road Trailhead Bradley Nature Preserve Trailhead

Focus Area 3: Bradley Nature Preserve to TIEC Dual Use Path

Focus Area 4: TIEC to Overmountain Vineyards Dual Use Path TIEC Trailhead

CHESNEE

Units

Unit Cost

7648 $100 3907 $90 1 $25,000 Total Section Cost Units

Total Cost $ $ $ $

Unit Cost

Total Cost

11830 $10 1 $15,000 1 $15,000 Total Section Cost Units Unit Cost

$ $

18197 $60 Total Section Cost

$ $

Units

$

118,300.00 15,000.00 15000 118,300.00 Total Cost

Unit Cost

1,091,820.00 1,091,820.00 Total Cost

9717 $60 $ 1 $25,000 $ Total Section Cost $

Total

764,800.00 351,630.00 25,000.00 25,000.00

583,020.00 25,000.00 608,020.00

$ 1,843,140.00

* Includes all Preferred and Historical-Preferred Routes. Does not include existing segments of OVNHT, nor land acquisition, engineering, or design costs. Final trail type will depend on specific environmental conditions and whether trail is located within public ROW or within a private trail easement.

EXHIBIT 12: FOCUS AREA IMPLEMENTATION MATRIX

74 1.Purple Martin Greenway to Rutherfordton Golf Course

MAP 16: IMPLEMENTATION FOCUS AREAS

RUTHERFORDTON

65


TRAIL TYPE PROFILE There are eleven (11) trail type transitions proposed along the preferred trail route, which extends approximately 38 miles. The Trail Type Profile identifies the transition location, along with associated length, for each trail type. Each focus area is also noted on the graphic below.

B: NC HWY 108 @ RUTHERFORDTON GOLF COURSE

A: NORTHERN TERMINUS: THERMAL BELT RAIL TRAIL

:N A

TYPICAL GREENWAY

NCDOT SIDEPATH

8 FT. PAVED ASPHALT

NATURAL SURFACE TRAIL 3-6 FT. NATURAL TREAD

DUAL USE PATH

trail types

TOWN SIDEPATH

10 FT. CONCRETE

0.76

0.74

FY

JJ

E RV

S RD

E ES

E UR

RO

G

C:

A BR

EY

PR

AT

S

IN

FO

RM

VE :O

D

IN

TA

UN

O S RM RD E A V O EY N S I T V XI

UN

O

L

A

VI

TA

D

N

A EX

’ ER

A EY

N

RD

N

L

D

UF

E

1.25

0.44

0.24

0.45 0.72

1.25

5.34

FOCUS AREA 1

1.03

CONT.

5.29

8' CRUSHED GRAVEL FINES

FOCUS AREA 2

2 MILES

4 MILES

6 MILES

8 MILES

10 MILES

FOCUS AREA 3

12 MILES

14 MILES

approximate distance in miles 66

D: OVERMOUNTAIN VINEYARDS

E

L

S S L TRAI UR O C N RAI LF O 4 O T 7 L G N TI AL BE HWY O I T S M .& * RD N : THER ER ST NWAY L ERFO OF) A US DET EE PITA UTH TH R T ERMIN N OF TIN GERT D HOS 8 @ R (SOU D A

IL RN T ECTIO E MARSTRERFOR WY 10 ROAD A THE ERS PL RT HE C H LER R T OR INT PUR COU RUT B: N MIL

10 FT. PAVED ASPHALT

C: BRADLEY NATURE PRESERVE

*THIS GRAPHIC REPRESENTS THE PREFERRED ROUTE’S ALIGNMENT ALONG COURT ST. AND S. RIDGECREST STREET. A SECOND PREFERRED ALIGNMENT IS PROPOSED ALONG THE EXISTING PURPLE MARTIN GREENWAY, HARRIS, AND MONFREDO STREETS.

FOCUS AREA 4

16 MILES

18 MILES

20 MILES


CHAPTER 5

Existing Trails EXHIBIT 13: TRAIL TYPE PROFILE

EXISTING TRAILS ARE MARKED ORANGE

N

IO

E: OCONEE ST./ALABAMA AVE. INTERSECTION

F: SOUTHERN TERMINUS: CADA PARK

IC

LS

LA

E

CH

EE

N

E:

CO

O

A

M

BA

FO

RO

.

S

TS O

E

R

N CE

L HI

KE

Y HW

F:

CT SE

./A ST

RN

E AV

TE

IN

DA

RK

PA

A :C

US

IN

RM

TE

HE

UT

SO

TOWN SIDEPATH

0.81

10 FT. CONCRETE

NCDOT SIDEPATH

1.83

8 FT. PAVED ASPHALT

NATURAL SURFACE TRAIL

17.81

3-6 FT. NATURAL TREAD

DUAL USE PATH

trail types

TYPICAL GREENWAY

10 FT. PAVED ASPHALT

8' CRUSHED GRAVEL FINES

20 MILES

22 MILES

24 MILES

26 MILES

28 MILES

30 MILES

32 MILES

34 MILES

36 MILES

38 MILES

40 MILES

approximate distance in miles 67


TRAIL SUPPORT SPECTRUM Creating a destination-quality trail system requires a significant commitment from local governments, including staff time, the holding of land and trail easements, and the dedication of local funding. Each local government must evaluate the OVNHT in relationship to other commitments. However, a trail of this magnitude should be recognized as an economic development initiative that will provide a return on investment. Furthermore, each jurisdiction must not merely

spend local funds, but instead must leverage their funds to obtain support from grant agencies sympathetic to the creation of trails and the OVNHT. This particular section of the OVNHT enjoys support from many partners. Working together, local trail organizations and governments can have a far greater influence in convincing funding agencies of the merits of the trail, than when acting alone. The “Trail Support Spectrum� illustrates the steps local governments can take to support trail development in their jurisdictions.

5 4 3 2 1 68

EXHIBIT 14: TRAIL SUPPORT SPECTRUM

TRAIL SUPPORT SPECTRUM


CHAPTER 5

Visitor and economic impact estimates were calculated using data from trail-use and spending studies of the Blue Ridge National Heritage Area, Virginia Creeper Trail, and the State of North Carolina. A 60-mile-radius (1.5-hour driving distance) trade area and estimated 33% of North Carolinians who use trails, was used to determine a potential market population of 792,628. A 3% and 5% market penetration rate were then used to determine low and high annual user estimates. A conservative day-trip visitor spending estimate of $30 per day per visitor (Blue Ridge National Heritage Area Study) was then applied to annual user estimates to calculate the trail’s economic impact. The trail will also offer health benefits to the local population by increasing physical activity which will result in lower rates of obesity, diabetes, and premature deaths for an annual total health benefit of approximately $2.1 million (ITRE, 2019). Annual health benefits were calculated using trail studies of the American Tobacco Trail and Brevard Greenway and the World Health Organization’s Health Equity Assessment Toolkit (ITRE, 2019). Studies have also shown that amenities such as greenways and trails benefit quality of life, job retention, and attraction.

EXHIBIT 15: ECONOMIC IMPACT ANALYSIS

Once completed, the OVNHT from Rutherfordton to Chesnee will greatly benefit surrounding communities’ economies, health and wellbeing, and quality of life. The trail is expected to attract between 23,700-39,600 users each year with a projected economic annual impact of $713,365-$1.1 million in visitor spending.

MAP 17: ECONOMIC IMPACT MARKET

ECONOMIC IMPACT ANALYSIS

69


70


APPENDIX


(A1) BUDGET Units (LF)

Unit Cost

Typical Greenway Town Sidepath DOT Sidepath Natural Surface Road Crossings (Surface) Major Bridges Minor Bridges/Culverts

14542 8892 3825 5948 24 1 1

SECTION 2- Mountain Creek to Hwy 74

Units

$90 $100 $120 $10 $8,000 $90,000 $45,000 Total Section Cost Unit Cost

$ 1,308,780.00 $ 889,200.00 $ 459,000.00 $ 59,480.00 $ 192,000.00 $ 90,000.00 $ 45,000.00 $ 3,043,460.00 Total Cost

Natural Surface Dual Use Road Crossings (Surface) Major Bridges

22224 9345 5 2

SECTION 3- Hwy 74 to Green Creek

Units

$10 $60 $8,000 $90,000 Total Section Cost Unit Cost

$ 222,240.00 $ 560,700.00 $ 40,000.00 $ 180,000.00 $ 1,002,940.00 Total Cost

Dual Use Natural Surface Minor Bridges/Culverts Road Crossings (Surface)

18569 29441 2 7

SECTION 4- Green Creek to State Line

Units

$60 $10 $45,000 $8,000 Total Section Cost Unit Cost

$ 1,114,140.00 $ 294,410.00 $ 90,000.00 $ 56,000.00 $ 1,498,550.00 Total Cost

Natural Surface Road Crossings (Surface) Minor Bridges/Culverts

40360 8 2

$10 $8,000 $45,000

SECTION 5- State Line to Chesnee

Units

Unit Cost

$ 403,600.00 $ 64,000.00 $ 90,000.00 $ 557,600.00 Total Cost

Natural Surface DOT Sidepath Town Sidepath Road Crossings (Surface)

24211 9665 4285 13

$10 $120 $100 $8,000 Total Section Cost

SECTION 1- Thermal Belt Rail Trail to Mountain Creek

72

Total

Total Cost

$ $ $ $ $

$

242,110.00 1,159,800.00 428,500.00 104,000.00 1,934,410.00

8,036,960.00


Natural Surface Road Crossings (Surface) Minor Bridges/Culverts

40360 8 2

$10 $8,000 $45,000

SECTION 5- State Line to Chesnee

Units

Unit Cost

Natural Surface DOT Sidepath Town Sidepath Road Crossings (Surface)

24211 9665 4285 13

$10 $120 $100 $8,000 Total Section Cost

Total

$ 403,600.00 A P P E64,000.00 NDIX $ $ 90,000.00 $ 557,600.00 Total Cost $ $ $ $ $

$

242,110.00 1,159,800.00 428,500.00 104,000.00 1,934,410.00

8,036,960.00

* Includes all Preferred and Historical-Preferred Routes * Does not include land acquisition, engineering, or design * Final trail type will depend on specific environmental conditions and whether trail is located within public ROW or within a private trail easement. * Does not include existing segments of OVNHT

73


(A3) LANDOWNER INTEREST SURVEY

(A2) LANDOWNER INVITATION

Dear Landowner: The Overmountain Victory Trail Association has partnered with the National Park Service and local government leaders to explore the opportunity to create a public walking and biking trail that will connect Rutherfordton, North Carolina to Chesnee, South Carolina. This trail will celebrate the march of the Overmountain Men who won a major Revolutionary War battle in 1780 at Kings Mountain, South Carolina. The patriot victory is considered a turning point in the war that resulted in American independence. The trail will help preserve this history. The project planning team has been working to identify areas where the trail would be feasible. A broad study area, as shown on the enclosed map, was evaluated for potential routes. After months of analysis, your property has been identified as being located within or near the historic Overmountain corridor where the trail could potentially be constructed. Without the voluntary willingness of landowners, the trail route will either be relocated or not constructed. Please visit the project website, www.OVTplan.com, to learn more and view the project video. You are invited to discuss this project with representatives from the National Park Service and trail planners during one of two special landowner meetings: Wednesday, October 2, 2019 at 6:00 pm Cowpens National Battlefield 4001 Chesnee Hwy Gaffney, SC 29341

Thursday, October 3, 2019 at 6:00 pm Rutherford County Office Building 289 North Main Street Rutherfordton, NC 28139

If you plan to attend the meeting, or if you cannot attend but would like to discuss the project and your potential interest in providing for the trail on your property, please let us know by using the contact information below. Thank you.

Landowne

Name ________________________________________

Name ______________

Address_______________________________________

Address_____________

_____________________________________________

___________________

Phone Number _________________________________

Phone Number _______

Email _________________________________________

Email _______________

Parcel Number(s) on Map____________________________

Parcel Number(s) on Map________________

Please share your level of interest for providing for the public trail. (check below)

Please share your level of trail. (check below)

On behalf of,

Ο Not interested at this time

Ο Not interested at th

Overmountain Victory Trail Planning Committee

Ο Somewhat interested and welcome further discussions

Ο Somewhat intereste

RSVP Email: info@OVTplan.com Phone: 828.386.1866

Ο Very interested

Ο Very interested

County Commissioners Bryan A. King, Chairman Eddie Holland Alan Toney, Vice Chairman Greg Lovelace Michael Benfield

74

Landowner Interest Survey

Steve Garrison, County Manager Hazel S. Haynes, Clerk to the Board Richard Williams, County Attorney


APPENDIX

(A4) FUNDING SOURCES NORTH CAROLINA Partnership Funding Agency

Active Living/Built-Environment Implications

Matching Funds Required

Deadlines

Clean Water Management Trust Fund (CWMTF) (www.cwmtf.net)

Land Acquisition: Fee Simple or Easement. Must protect floodplain areas. Greenway trails are allowed.

Based on 6/2015 discussion Not specified but with staff, a $750K multi-year 20% is application would be welcome. competitive.

February 1st

NC Water Resources (NCWR) (www.ncwater.org)

River access areas or greenways along rivers

N/A

50%

January 1st and June 1st

Recreational Trails Program (RTP)

All types of trails and greenways.

$100,000.00

25%

February 1st

Parks and Recreation Trust Fund (PARTF)

All types of parks, trails, and recreation facilities

$500,000.00

50%

April

People for Bikes Community Grant

Trails and Greenways

$10,000.00

20%%

May 24th

NCDOT Transportation Plan For Bike and Pedestrian Projects

Bike and Pedestrian Projects-both engineering and construction

N/A (for major projects)

20% generally

N/A

Partnership Funding Agency

Active Living/Built-Environment Implications

Maximum Amount

Matching Funds Required

Deadlines

BUILD

Construction provided all easements are secure

N/A (min. $1 million)

$0 (for designated rural areas)

May (Typical)

Land & Water Conservation Fund (scprt.com/grants)

Land Acquisition: Fee Simple or Easement. Must be adjacent to existing LWCF land.

$250,000.00

50%%

May 2nd

Recreational Trails Program (RTP)

All types of trails and greenways.

$100,000.00

25%

February 1st

Parks and Recreation Development Fund (scprt.com/grants)

Public recreation facilities or enhancements. Does not include land acquisition

N/A (non-competitive reimbursable)

20%%

10th of each month

People for Bikes Community Grant

Trails and Greenways

$10,000.00

20%%

May 24th

Approximately $10,000

N/A

August 30th

Maximum Amount

SOUTH CAROLINA

International Mountain Biking Association Maintain and improve the sustainability of local trails and MTB community (imba.com/resources/grants)

75


(A5) NC S.L. 2019-20 HB 532 GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2019 SESSION LAW 2019-20 HOUSE BILL 532 AN ACT TO AUTHORIZE THE OVERMOUNTAIN VICTORY STATE TRAIL; TO AUTHORIZE THE WILDERNESS GATEWAY STATE TRAIL; AND TO MAKE VARIOUS CHANGES TO THE STATE PARKS ACT AND THE NORTH CAROLINA TRAILS SYSTEM ACT. The General Assembly of North Carolina enacts: AUTHORIZE THE OVERMOUNTAIN VICTORY STATE TRAIL SECTION 1.(a) The General Assembly finds that the routes used by the patriot militias of North Carolina, South Carolina, Virginia, and the areas west of the Blue Ridge Mountains that later became the State of Tennessee in the military campaigns of the Revolutionary War leading to the Battle of Kings Mountain in 1780 are a vital part of the history and heritage of the State as well as the entire United States. The General Assembly also finds that this vital role is demonstrated by the creation of the Overmountain Victory National Historic Trail in 1980 by the federal government. The General Assembly further finds that the contributions of a significant existing network of federal, State, local, and private partners over the last four decades in the identification, preservation, and education of the public about the Overmountain Victory National Historic Trail have provided the State with a historical and recreational resource of statewide significance for historic reenactors, hikers, bikers, and other outdoor cultural and recreational activities, and that including such a trail in the State Trails System as a State trail would be beneficial to the people of North Carolina and further the development of North Carolina as "The Great Trails State." SECTION 1.(b) The General Assembly authorizes the Department of Natural and Cultural Resources to add the route identified by the National Park Service as the Overmountain Victory National Historic Trail in the counties of Avery, Mitchell, McDowell, Burke, Rutherford, Polk, Caldwell, Wilkes, and Surry to the State Parks System as a State trail, as provided in G.S. 143B-135.54(b). Subject to the provisions of 16 U.S.C. § 1246, the Department shall support, promote, encourage, and facilitate the establishment of trail segments on State parklands and on lands of other federal, State, local, and private landowners. On segments of the Overmountain Victory State Trail that cross property controlled by agencies or owners other than the Department's Division of Parks and Recreation, the laws, rules, and policies of those agencies or owners shall govern the use of the property. The requirement of G.S. 143B-135.54(b) that additions be accompanied by adequate appropriations for land acquisition, development, and operations shall not apply to the authorization set forth in this section; provided, however, that the State may receive donations of appropriate land and may purchase other needed lands for the Overmountain Victory State Trail with existing funds in the Clean Water Management Trust Fund, the Parks and Recreation Trust Fund, the federal Land and Water Conservation Fund, and other available sources of funding. AUTHORIZE THE WILDERNESS GATEWAY STATE TRAIL SECTION 2.(a) The General Assembly authorizes the Department of Natural and Cultural Resources to add the Wilderness Gateway Trail to the State Parks System as a State trail,

76

*H532-v-4*

as provided in G.S. 143B-135.54(b). The Department shall support, promote, encourage, and facilitate the establishment of trail segments on State parklands and on lands of other federal, State, local, and private landowners. On segments of the Wilderness Gateway State Trail that cross property controlled by agencies or owners other than the Department's Division of Parks and Recreation, the laws, rules, and policies of those agencies or owners shall govern the use of the property. The requirement of G.S. 143B-135.54(b) that additions be accompanied by adequate appropriations for land acquisition, development, and operations shall not apply to the authorization set forth in this section; provided, however, that the State may receive donations of appropriate land and may purchase other needed lands for the Wilderness Gateway State Trail with existing funds in the Clean Water Management Trust Fund, the Parks and Recreation Trust Fund, the federal Land and Water Conservation Fund, and other available sources of funding. SECTION 2.(b) The Division of Parks and Recreation of the Department of Natural and Cultural Resources shall study the feasibility of connecting the Town of Valdese, the City of Hickory, the Overmountain Victory State Trail, natural areas located within Burke and Catawba counties, as well as other communities and places of interest to the Wilderness Gateway State Trail. In conducting this study, the Division shall specifically consider improving access across and from Interstate 40 to the northeastern and western portions of South Mountains State Park. The Division shall report its findings and recommendations to the Environmental Review Commission and the Joint Legislative Oversight Committee on Agriculture and Natural and Economic Resources no later than December 1, 2019. STATE PARKS ACT AND NORTH CAROLINA TRAILS SYSTEM ACT TECHNICAL, CLARIFYING, AND CONFORMING CHANGES SECTION 3.(a) G.S. 143B-135.43 reads as rewritten: "§ 143B-135.43. Control of Mount Mitchell Park and other parks in the North Carolina State Parks System. The Department shall have responsibility for: (1) the control and management of Mount Mitchell Park and of any other parks which have been or may be acquired by the State as part of the North Carolina State Parks System.System and (2) the planning and coordination of State trails, which are components of the State Parks System, authorized by the General Assembly pursuant to G.S. 143B-135.54(b)." SECTION 3.(b) G.S. 143B-135.92 reads as rewritten: "§ 143B-135.92. Declaration of policy and purpose. (a) In order to provide for the ever-increasing outdoor recreation needs of an expanded population and in order to promote public access to, travel within, and enjoyment and appreciation of the outdoor, natural and remote areas of the State, trails should be established in natural, scenic areas of the State, and in and near urban areas. (b) The purpose of this Part is to provide the means for attaining these objectives by instituting a State system of scenic and recreation trails, Trails System, coordinated with and complemented by existing and future local trail segments or systems, and by prescribing the methods by which, and standards according to which, components may be added to the State trails system.Trails System." SECTION 3.(c) G.S. 143B-135.94 reads as rewritten: "§ 143B-135.94. Definitions. … (5) "State trails system" Trails System" means the trails system established in this Part or pursuant to the State Parks Act, Part 32 of this Article, and including all trails and trail segments, together with their rights-of-way, added by any of the procedures described in this Part or Part 32 of this Article. (6) "Trail" means: Page 2

Session Law 2019-20

House Bill 532


APPENDIX

a. b.

c. d.

Park trail. – A trail designated and managed as a unit of the North Carolina State Parks System under Part 32 of this Article. Designated trail. – A trail designated by the Secretary pursuant to this Part as a component of the State trails system and that is managed by another governmental agency or by a corporation listed with the Secretary of State. A State scenic trail, State recreation trail, or State connecting trail under G.S. 143B-135.96 when the intended primary use of the trail is to serve as a park trail or designated trail. Any other trail that is open to the public and that the owner, lessee, occupant, or person otherwise in control of the land on which the trail is located allows to be used as a trail without compensation, including a trail that is not designated by the Secretary as a component of the State trails system.means a linear corridor on land or water, protected from motor vehicles, providing public access for recreation or transportation.

…." SECTION 3.(d) G.S. 143B-135.96 reads as rewritten: "§ 143B-135.96. Composition of State trails system.Trails System. The State trails system Trails System shall be composed of designated: (1) State scenic trails, which are defined as extended trails so located as to provide maximum potential for the appreciation of natural areas and for the conservation and enjoyment of the significant scenic, historic, natural, ecological, geological or cultural qualities of the areas through which such trails may pass. (2) State recreation trails, which are defined as trails planned principally for recreational value and may include trails for foot travel, horseback, nonmotorized bicycles, nonmotorized water vehicles, and two-wheel- and four-wheel-drive motorized vehicles. More than one of the aforesaid types of travel may be permitted on a single trail in the discretion of the Secretary. (3) Connecting or side trails, which will provide additional points of public access to State recreation or State scenic trails or which will provide connections between such trails. State trails, which are components of the State Parks System, authorized by the General Assembly pursuant to G.S. 143B-135.54(b), and planned and coordinated by the Department." SECTION 3.(e) G.S. 143B-135.104 reads as rewritten: "§ 143B-135.104. Location of trails. The process of locating routes of designated trails to be added to the system shall be as follows: For State scenic trails, the Secretary or a designee, after consulting with the Committee, shall recommend a route. For State recreation trails and for connecting or side trails, the Secretary or a designee, after consulting with the Committee, shall select the route. The Secretary may provide technical assistance to political subdivisions or private, nonprofit organizations that develop, construct, or maintain designated trails or other public trails that complement the State trails system.When a route shall traverse land within the jurisdiction of a governmental unit or political subdivision, the Department shall consult with such unit or such subdivision prior to its final determination of the location of the route. The selected route shall be compatible with preservation or enhancement of the environment it traverses. Reasonable effort shall be made to minimize any adverse effects upon adjacent landowners and users. Notice of the selected route shall be published by the Department in a newspaper of general circulation in the area in which the trail is located, Department, together with appropriate maps and descriptions to be House Bill 532

Session Law 2019-20

Page 3

conspicuously posted at the appropriate courthouse. online and at the proposed trail location. Such publication shall be prior to the designation of the trail by the Secretary." SECTION 3.(f) G.S. 143B-135.108 reads as rewritten: "§ 143B-135.108. Trails within parks; conflict of laws.laws; State trails on property of others. Any component of the System that is or shall become a part of any State park, recreation area, wildlife management area, or similar area shall be subject to the provisions of this Part as well as any other laws under which the other areas are administered, and in the case of conflict between the provisions the more restrictive provisions shall apply. On segments of any State trail that cross property controlled by agencies or owners other than the Department's Division of Parks and Recreation, the laws, rules, and policies of those agencies or owners shall govern the use of the property." SECTION 3.(g) G.S. 143B-135.116 reads as rewritten: "§ 143B-135.116. Incorporation in National Trails System. Nothing in this Part shall preclude a component of the State Trails System from becoming a part of the National Trails System. System, or a component of the National Trails System from becoming a part of the State Trails System. The Secretary shall coordinate the State Trails System with the National Trails System and is directed to encourage and assist any federal studies for inclusion of North Carolina trails in the National Trails System. The Department may enter into written cooperative agreements for joint federal-State administration of a North Carolina component of the National Trails System, provided such agreements for administration of land uses are not less restrictive than those set forth in this Part." TRANSFER AUTHORITY TO ADMINISTER THE LAND AND WATER CONSERVATION FUND FROM THE DEPARTMENT OF ENVIRONMENTAL QUALITY TO THE DEPARTMENT OF NATURAL AND CULTURAL RESOURCES SECTION 4.(a) Subsections (a) and (d) of G.S. 143-323 are recodified as subsections (b) and (c) of a new statute, G.S. 143B-50.1, to be entitled "Additional powers and duties of the Department regarding recreation." SECTION 4.(b) G.S. 143-320(3) is repealed. SECTION 4.(c) G.S. 143B-50.1, as recodified by subsection (a) of this section, reads as rewritten: "§ 143B-50.1. Additional powers and duties of the Department regarding recreation. (a) Definition. – As used in this section, "recreation" means those interests that are diversionary in character and that aid in promoting entertainment, pleasure, relaxation, instruction, and other physical, mental, and cultural developments and experiences of a leisure nature, and includes all governmental, private nonprofit, and commercial recreation forms of the recreation field and includes parks, conservation, recreation travel, the use of natural resources, wilderness, and high density recreation types and the variety of recreation interests in areas and programs which are incorporated in this range. (b) Recreation. – The Department of Environmental Quality shall have the following powers and duties with respect to recreation: (1) To study and appraise the recreation needs of the State and to assemble and disseminate information relative to recreation. (2) To cooperate in the promotion and organization of local recreation systems for counties, municipalities, and other political subdivisions of the State, to aid them in the administration, finance, planning, personnel, coordination and cooperation of recreation organizations and programs. (3) To aid in recruiting, training, and placing recreation workers, and to promote recreation institutes and conferences. (4) To establish and promote recreation standards. Page 4

Session Law 2019-20

House Bill 532

77


(A5) NC S.L. 2019-20 HB 532 (5)

To cooperate with appropriate State, federal, and local agencies and private membership groups and commercial recreation interests in the promotion of recreation opportunities, and to represent the State in recreation conferences, study groups, and other matters of recreation concern. (6) To accept gifts, devises, and endowments. The funds, if given as an endowment, shall be invested in securities designated by the donor, or if there is no such designation, in securities in which the State sinking fund may be invested. All such gifts and devises and all proceeds from such invested endowments shall be used for carrying out the purposes for which they were made. (7) To advise agencies, departments, organizations and groups in the planning, application and use of federal and State funds which are assigned or administered by the State for recreation programs and services on land and water recreation areas and on which the State renders advisory or other recreation services or upon which the State exercises control. (8) To act jointly, when advisable, with any other State, local or federal agency, institution, private individual or group in order to better carry out the Department's objectives and responsibilities. (c) Federal Assistance. – The Department, with the approval of the Governor, may apply for and accept grants from the federal government and its agencies and from any foundation, corporation, association, or individual, and may comply with the terms, conditions, and limitations of the grant, in order to accomplish any of the purposes of the Department. Grant funds shall be expended pursuant to the Executive Budget Act.State Budget Act. The Director of the Department's Division of Parks and Recreation shall be designated as having the authority and responsibility to accept and administer funding through the federal Land and Water Conservation Fund or any successor fund established for similar purposes, and the Secretary may designate additional personnel to assist the Director in the responsibilities imposed by this subsection." EFFECTIVE DATE SECTION 5. This act is effective when it becomes law. In the General Assembly read three times and ratified this the 29th day of May, 2019. s/ Philip E. Berger President Pro Tempore of the Senate s/ Tim Moore Speaker of the House of Representatives s/ Roy Cooper Governor Approved 11:28 a.m. this 3rd day of June, 2019

78 House Bill 532

Session Law 2019-20

Page 5


APPENDIX

(A6) THE NATIONAL TRAILS SYSTEM ACT THE NATIONAL TRAILS SYSTEM ACT (P.L. 90-543, as amended through P.L. 116-9, March 12, 2019) (as found in United States Code, Vol. 16, Sections 1241-1251)

AN ACT To establish a national trails system, and for other purposes. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SHORT TITLE SECTION 1. [16USC1241] This Act may be cited as the "National Trails System Act".

STATEMENT OF POLICY SEC. 2. [16USC1241] (a) In order to provide for the ever-increasing outdoor recreation needs of an expanding population and in order to promote the preservation of, public access to, travel within, and enjoyment and appreciation of the open-air, outdoor areas and historic resources of the Nation, trails should be established (i) primarily, near the urban areas of the Nation, and (ii) secondarily, within scenic areas and along historic travel routes of the Nation which are often more remotely located. (b) The purpose of this Act is to provide the means for attaining these objectives by instituting a national system of recreation, scenic and historic trails, by designating the Appalachian Trail and the Pacific Crest Trail as the initial components of that system, and by prescribing the methods by which, and standards according to which, additional components may be added to the system. (c) The Congress recognizes the valuable contributions that volunteers and private, nonprofit trail groups have made to the development and maintenance of the Nation's trails. In recognition of these contributions, it is further the purpose of this Act to encourage and assist volunteer citizen involvement in the planning, development, maintenance, and management, where appropriate, of trails.

NATIONAL TRAILS SYSTEM SEC. 3. [16USC1242] (a) The national system of trails shall be composed of the following: (1) National recreation trails, established as provided in section 4 of this Act, which will provide a variety of outdoor recreation uses in or reasonably accessible to urban areas. 1

(2) National scenic trails, established as provided in section 5 of this Act, which will be extended trails so located as to provide for maximum outdoor recreation potential and for the conservation and enjoyment of the nationally significant scenic, historic, natural, or cultural qualities of the areas through which such trails may pass. National scenic trails may be located so as to represent desert, marsh, grassland, mountain, canyon, river, forest, and other areas, as well as landforms which exhibit significant characteristics of the physiographic regions of the Nation. (3) National historic trails, established as provided in section 5 of this Act, which will be extended trails which follow as closely as possible and practicable the original trails or routes of travel of national historic significance. Designation of such trails or routes shall be continuous, but the established or developed trail, and the acquisition thereof, need not be continuous onsite. National historic trails shall have as their purpose the identification and protection of the historic route and its historic remnants and artifacts for public use and enjoyment. Only those selected land and water based components of a historic trail which are on federally owned lands and which meet the national historic trail criteria established in this Act are included as Federal protection components of a national historic trail. The appropriate Secretary may certify other lands as protected segments of an historic trail upon application from State or local governmental agencies or private interests involved if such segments meet the national historic trail criteria established in this Act and such criteria supplementary thereto as the appropriate Secretary may prescribe, and are administered by such agencies or interests without expense to the United States. (4) Connecting or side trails, established as provided in section 6 of this Act, which will provide additional points of public access to national recreation, national scenic or national historic trails or which will provide connections between such trails. The Secretary of the Interior and the Secretary of Agriculture, in consultation with appropriate governmental agencies and public and private organizations, shall establish a uniform marker for the national trails system. (b) For purposes of this section, the term “extended trails� means trails or trail segments which total at least one hundred miles in length, except that historic trails of less than one hundred miles may be designated as extended trails. While it is desirable that extended trails be continuous, studies of such trails may conclude that it is feasible to propose one or more trail segments which, in the aggregate, constitute at least one hundred miles in length.

NATIONAL RECREATION TRAILS SEC. 4. [16USC1243] (a) The Secretary of the Interior, or the Secretary of Agriculture where lands administered by him are involved, may establish and designate national recreation trails, with the consent of the Federal agency, State, or political subdivision having jurisdiction over the lands involved, upon finding that -(i ) such trails are reasonably accessible to urban areas, and, or (ii) such trails meet the criteria established in this Act and such supplementary criteria as he may prescribe.

2

79


(A6) THE NATIONAL TRAIL SYSTEM ACT (b) As provided in this section, trails within park, forest, and other recreation areas administered by the Secretary of the Interior or the Secretary of Agriculture or in other federally administered areas may be established and designated as "National Recreation Trails" by the appropriate Secretary and, when no Federal land acquisition is involved -(i) trails in or reasonably accessible to urban areas may be designated as "National Recreation Trails" by the appropriate Secretary with the consent of the States, their political subdivisions, or other appropriate administering agencies; (ii) trails within park, forest, and other recreation areas owned or administered by States may be designated as "National Recreation Trails" by the appropriate Secretary with the consent of the State; and (iii) trails on privately owned lands may be designated “National Recreation Trails” by the appropriate Secretary with the written consent of the owner of the property involved.

NATIONAL SCENIC AND NATIONAL HISTORIC TRAILS SEC. 5. [16USC1244] (a) National scenic and national historic trails shall be authorized and designated only by Act of Congress. There are hereby established the following National Scenic and National Historic Trails: (1) The Appalachian National Scenic Trail, a trail of approximately two thousand miles extending generally along the Appalachian Mountains from Mount Katahdin, Maine, to Springer Mountain, Georgia. Insofar as practicable, the right-of-way for such trail shall comprise the trail depicted on the maps identified as "Nationwide System of Trails, Proposed Appalachian Trail, NST-AT-101-May 1967", which shall be on file and available for public inspection in the office of the Director of the National Park Service. Where practicable, such rights-of-way shall include lands protected for it under agreements in effect as of the date of enactment of this Act, to which Federal agencies and States were parties. The Appalachian Trail shall be administered primarily as a footpath by the Secretary of the Interior, in consultation with the Secretary of Agriculture. (2) The Pacific Crest National Scenic Trail, a trail of approximately two thousand three hundred fifty miles, extending from the Mexican-California border northward generally along the mountain ranges of the west coast States to the Canadian-Washington border near Lake Ross, following the route as generally depicted on the map, identified as "Nationwide System of Trails, Proposed Pacific Crest Trail, NST-PC-103-May 1967" which shall be on file and available for public inspection in the office of the Chief of the Forest Service. The Pacific Crest Trail shall be administered by the Secretary of Agriculture, in consultation with the Secretary of the Interior. (3) The Oregon National Historic Trail, a route of approximately two thousand miles extending from near Independence, Missouri, to the vicinity of Portland, Oregon, following a route as depicted on maps identified as “Primary Route of the Oregon Trail 1841-1848”, in the Department of the Interior's Oregon Trail study report dated April 1977, and which shall be on file and available for public inspection in the office of the Director of the National Park Service. The trail shall be administered by the Secretary of the Interior. No land or interest in land outside the exterior boundaries of any federally administered

80

3

area may be acquired by the Federal Government for the trail except with the consent of the owner of the land or interest in land. The authority of the Federal Government to acquire fee title under this paragraph shall be limited to an average of not more than 1/4 mile on either side of the trail. (4) The Mormon Pioneer National Historic Trail, a route of approximately one thousand three hundred miles extending from Nauvoo, Illinois, to Salt Lake City, Utah, following the primary historical route of the Mormon Trail as generally depicted on a map, identified as, “Mormon Trail Vicinity Map, figure 2” in the Department of the Interior Mormon Trail study report dated March 1977, and which shall be on file and available for public inspection in the office of the Director, National Park Service, Washington, D.C. The trail shall be administered by the Secretary of the Interior. No land or interest in land outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the trail except with the consent of the owner of the land or interest in land. The authority of the Federal Government to acquire fee title under this paragraph shall be limited to an average of not more than 1/4 mile on either side of the trail. (5) The Continental Divide National Scenic Trail, a trail of approximately thirty-one hundred miles, extending from the Montana-Canada border to the New Mexico-Mexico border, following the approximate route depicted on the map, identified as “Proposed Continental Divide National Scenic Trail” in the Department of the Interior Continental Divide Trail study report dated March 1977 and which shall be on file and available for public inspection in the office of the Chief, Forest Service, Washington, D.C. The Continental Divide National Scenic Trail shall be administered by the Secretary of Agriculture in consultation with the Secretary of the Interior. Notwithstanding the provisions of section 7(c), the use of motorized vehicles on roads which will be designated segments of the Continental Divide National Scenic Trail shall be permitted in accordance with regulations prescribed by the appropriate Secretary. No land or interest in land outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the trail except with the consent of the owner of the land or interest in land. The authority of the Federal Government to acquire fee title under this paragraph shall be limited to an average of not more than 1/4 mile on either side of the trail. (6) The Lewis and Clark National Historic Trail, a trail of approximately 4,900 miles, extending from the Ohio River in Pittsburgh, Pennsylvania, to the mouth of the Columbia River in Oregon, following the outbound and inbound routes of the Lewis and Clark Expedition depicted on the map entitled ‘Lewis and Clark National Historic Trail Authorized Trail Including Proposed Eastern Legacy Extension’, dated April 2018, and numbered 648/143721. The map shall be on file and available for public inspection in the office of the Director, National Park Service, Washington, D.C. The trail shall be administered by the Secretary of the Interior. No land or interest in land outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the trail except with the consent of the owner of the land or interest in land. The authority of the Federal Government to acquire fee title under this paragraph shall be limited to an average of not more than 1/4 mile on either side of the trail. (7) The Iditarod National Historic Trail, a route of approximately two thousand miles extending from Seward, Alaska, to Nome, Alaska, following the routes as depicted on maps identified as 'Seward-Nome Trail', in the Department of the Interior's study report entitled 'The Iditarod Trail (Seward-Nome Route) and other Alaskan Gold Rush Trails' dated September 1977. The map shall be on file and available for public inspection in the office of the Director, National Park Service, Washington, D.C. The trail shall be administered by the Secretary of the Interior. No land or interest in land outside the exterior boundaries of any federally administered area may be acquired by the Federal Government 4


APPENDIX

for the trail except with the consent of the owner of the land or interest in land. The authority of the Federal Government to acquire fee title under this paragraph shall be limited to an average of not more than 1/4 mile on either side of the trail. (8) The North Country National Scenic Trail, a trail of approximately 4,600miles, extending from the Appalachian Trail in Vermont to the vicinity of Lake Sakakawea in North Dakota, following the approximate route depicted on the map identified ‘North Country National Scenic Trail, Authorized Route’, dated February 2014, and numbered 649/116870. The map shall be on file and available for public inspection in the office of the Director, National Park Service, Washington, District of Columbia. The trail shall be administered by the Secretary of the Interior. No land or interest in land outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the trail except with the consent of the owner of the land or interest in land. (9) The Overmountain Victory National Historic Trail, a system totaling approximately two hundred seventy-two miles of trail with routes from the mustering point near Abingdon, Virginia, to Sycamore Shoals (near Elizabethton, Tennessee); from Sycamore Shoals to Quaker Meadows (near Morganton, North Carolina); from the mustering point in Surry County, North Carolina, to Quaker Meadows; and from Quaker Meadows to Kings Mountain, South Carolina, as depicted on the map identified as Map 3--Historic Features--1780 in the draft study report entitled 'Overmountain Victory Trail' dated December 1979. The map shall be on file and available for public inspection in the Office of the Director, National Park Service, Washington, District of Columbia. The trail shall be administered by the Secretary of the Interior. (10) The Ice Age National Scenic Trail, a trail of approximately one thousand miles, extending from Door County, Wisconsin, to Interstate Park in Saint Croix County, Wisconsin, generally following the route described in "On the Trail of the Ice Age--A Hiker's and Biker's Guide to Wisconsin's Ice Age National Scientific Reserve and Trail", by Henry S. Reuss, Member of Congress, dated 1980. The guide and maps shall be on file and available for public inspection in the Office of the Director, National Park Service, Washington, District of Columbia. Overall administration of the trail shall be the responsibility of the Secretary of the Interior pursuant to section 5(d) of this Act. The State of Wisconsin, in consultation with the Secretary of the Interior, may, subject to the approval of the Secretary, prepare a plan for the management of the trail which shall be deemed to meet the requirements of section 5(e) of this Act. Notwithstanding the provisions of section 7(c), snowmobile use may be permitted on segments of the Ice Age National Scenic Trail where deemed appropriate by the Secretary and the managing authority responsible for the segment. No land or interest in land outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the trail except with the consent of the owner of the land or interest in land.

(12) The Natchez Trace National Scenic Trail, a trail system of approximately six hundred and ninety-four miles extending from Nashville, Tennessee, to Natchez, Mississippi, as depicted on the map entitled “Concept Plan, Natchez Trace Trails Study” in “The Natchez Trace”, a report prepared by the Department of the Interior and dated August 1979. The map shall be on file and available for public inspection in the office of the Director of the National Park Service, Department of the Interior, Washington, District of Columbia. The trail shall be administered by the Secretary of the Interior. (13) The Florida National Scenic Trail, a route of approximately thirteen hundred miles extending through the State of Florida as generally depicted in “The Florida Trail”, a national scenic trail study draft report prepared by the Department of the Interior and dated February 1980. The report shall be on file and available for public inspection in the office of the Chief of the Forest Service, Washington, District of Columbia. No lands or interests therein outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the Florida Trail except with the consent of the owner thereof. The Secretary of Agriculture may designate lands outside of federally administered areas as segments of the trail, only upon application from the States or local governmental agencies involved, if such segments meet the criteria established in this Act and are administered by such agencies without expense to the United States. The trail shall be administered by the Secretary of Agriculture. (14) The Nez Perce National Historic Trail, a route of approximately eleven hundred and seventy miles extending from the vicinity of Wallowa Lake, Oregon, to Bear Paw Mountain, Montana, as generally depicted in “Nez Perce (Nee-Me-Poo) Trail Study Report” prepared by the Department of Agriculture and dated March 1982. The report shall be on file and available for public inspection in the Office of the Chief of the Forest Service, Washington, District of Columbia. The trail shall be administered by the Secretary of Agriculture. So that significant route segments and sites recognized as associated with the Nez Perce Trail may be distinguished by suitable markers, the Secretary of Agriculture is authorized to accept the donation of suitable markers for placement at appropriate locations. Any such markers associated with the Nez Perce Trail which are to be located on lands administered by any other department or agency of the United States may be placed on such lands only with the concurrence of the head of such department or agency. No land or interest in land outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the trail except with the consent of the owner of the land or interest in land. The authority of the Federal Government to acquire fee title under this paragraph shall be limited to an average of not more than 1/4 mile on either side of the trail.

(11) The Potomac Heritage National Scenic Trail, a corridor of approximately seven hundred and four miles following the route as generally depicted on the map identified as 'National Trails System, Proposed Potomac Heritage Trail' in 'The Potomac Heritage Trail', a report prepared by the Department of the Interior and dated December 1974, except that no designation of the trail shall be made in the State of West Virginia. The map shall be on file and available for public inspection in the office of the Director of the National Park Service, Washington, District of Columbia. The trail shall initially consist of only those segments of the corridor located within the exterior boundaries of federally administered areas. The trail shall be administered by the Secretary of the Interior. No land or interest in land outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the trail except with the consent of the owner of the land or interest in land.

(15) The Santa Fe National Historic Trail, a trail of approximately 950 miles from a point near Old Franklin, Missouri, through Kansas, Oklahoma, and Colorado to Santa Fe, New Mexico, as generally depicted on a map entitled "The Santa Fe Trail" contained in the Final Report of the Secretary of the Interior pursuant to subsection (b) of this section, dated July 1976. The map shall be on file and available for public inspection in the office of the Director of the National Park Service, Washington, District of Columbia. The trail shall be administered by the Secretary of the Interior. No lands or interests therein outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the Santa Fe Trail except with the consent of the owner thereof. Before acquiring any easement or entering into any cooperative agreement with a private landowner with respect to the trail, the Secretary shall notify the landowner of the potential liability, if any, for injury to the public resulting from physical conditions which may be on the landowner's land. The United States shall not be held liable by reason of such notice or failure to provide such notice to the landowner. So that significant route segments and sites recognized as associated with the Santa Fe Trail may be distinguished by suitable

5

6

81


(A6) THE NATIONAL TRAIL SYSTEM ACT markers, the Secretary of the Interior is authorized to accept the donation of suitable markers for placement at appropriate locations. (16)(A) The Trail of Tears National Historic Trail, a trail consisting of water routes and overland routes traveled by the Cherokee Nation during its removal from ancestral lands in the East to Oklahoma during 1838 and 1839, generally located within the corridor described through portions of Georgia, North Carolina, Alabama, Tennessee, Kentucky, Illinois, Missouri, Arkansas, and Oklahoma in the final report of the Secretary of the Interior prepared pursuant to subsection (b) of this section entitled "Trail of Tears" and dated June 1986. Maps depicting the corridor shall be on file and available for public inspection in the Office of the National Park Service, Department of the Interior. The trail shall be administered by the Secretary of the Interior. No lands or interests therein outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the Trail of Tears except with the consent of the owner thereof. (B) In carrying out his responsibilities pursuant to sections 5(f) and 7(c) of this Act, the Secretary of the Interior shall give careful consideration to the establishment of appropriate interpretive sites for the Trail of Tears in the vicinity of Hopkinsville, Kentucky, Fort Smith, Arkansas, Trail of Tears State Park, Missouri, and Tahlequah, Oklahoma. (C) In addition to the areas otherwise designated under this paragraph, the following routes and land components by which the Cherokee Nation was removed to Oklahoma are components of the Trail of Tears National Historic Trail, as generally described in the environmentally preferred alternative of the November 2007 Feasibility Study Amendment and Environmental Assessment for Trail of Tears National Historic Trail: (i) The Benge and Bell routes. (ii) The land components of the designated water routes in Alabama, Arkansas, Oklahoma, and Tennessee. (iii) The routes from the collection forts in Alabama, Georgia, North Carolina, and Tennessee to the emigration depots. (iv) The related campgrounds located along the routes and land components described in clauses (i) through (iii). (D) The Secretary may accept donations for the Trail from private, nonprofit, or tribal organizations. No lands or interests in lands outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the Trail of Tears National Historic Trail except with the consent of the owner thereof. (17) The Juan Bautista de Anza National Historic Trail, a trail comprising the overland route traveled by Captain Juan Bautista de Anza of Spain during the years 1775 and 1776 from Sonora, Mexico, to the vicinity of San Francisco, California, as generally described in the report of the Department of Interior prepared pursuant to the subsection (b) entitled 'Juan Bautista de Anza National Trail Study, Feasibility Study and Environmental Assessment' and dated August, 1986. A map generally depicting the trail shall be on file and available for public inspection in the Office of the Director of the National Park Service, Washington, District of Columbia. The trail shall be administered by the Secretary of Interior. No lands or interest therein outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for the Juan Bautista de Anza National Historic Trail without the consent of the owner thereof. In implementing this paragraph, the Secretary shall encourage volunteer

82

7

trail groups to participate in the development and maintenance of the trail. (18) The California National Historic Trail, a route of approximately five thousand seven hundred miles, including all routes and cutoffs, extending from Independence and Saint Joseph, Missouri, and Council Bluffs, Iowa, to various points in California and Oregon, as generally described in the report of the Department of the Interior prepared pursuant to subsection (b) of this section entitled "California and Pony Express Trails, Eligibility/Feasibility Study/Environmental Assessment" and dated September 1987. A map generally depicting the route shall be on file and available for public inspection in the Office of the National Park Service, Department of the Interior. The trail shall be administered by the Secretary of the Interior. No lands or interests therein outside the exterior boundaries of any federally administered area may be acquired by the United States for the California National Historic Trail except with the consent of the owner thereof. (19) The Pony Express National Historic Trail, a route of approximately one thousand nine hundred miles, including the original route and subsequent route changes, extending from Saint Joseph, Missouri, to Sacramento, California, as generally described in the report of the Department of the Interior prepared pursuant to subsection (b) of this section entitled "California and Pony Express Trails, Eligibility/Feasibility Study/Environmental Assessment" and dated September 1987. A map generally depicting the route shall be on file and available for public inspection in the Office of the National Park Service, Department of the Interior. The trail shall be administered by the Secretary of the Interior. No lands or interests therein outside the exterior boundaries of any federally administered area may be acquired by the United States for the Pony Express National Historic Trail except with the consent of the owner thereof. [Related language from P.L. 102-328, section 2: The Secretary of the Interior (hereinafter referred to as the Secretary) shall undertake a study of the land and water route used to carry mail from Sacramento to San Francisco, California, to determine the feasibility and suitability of designation of such route as a component of the Pony Express National Historic Trail designated by section 1 of this Act. Upon completion of the study, if the Secretary determines such a route is a feasible and suitable addition to the Pony Express National Historic Trail, the Secretary shall designate the route as a component of the Pony Express National Historic Trail. The Secretary shall publish notice of such designation in the Federal Register and shall submit the study along with his findings to the Committee on Interior and Insular Affairs of the United States House of Representatives and the Committee on Energy and Natural Resources of the United States Senate.] (20) The Selma to Montgomery National Historic Trail, consisting of 54 miles of city streets and United States Highway 80 from Brown Chapel A.M.E. Church in Selma to the State Capitol Building in Montgomery, Alabama, traveled by voting rights advocates during March 1965 to dramatize the need for voting rights legislation, as generally described in the report to the Secretary of the Interior prepared pursuant to subsection (b) of this section entitled "Selma to Montgomery" and dated April, 1993. Maps depicting the route shall be on file and available for public inspection in the Office of the National Park Service, Department of the Interior. The trail shall be administered in accordance with this Act, including section 7(h). The Secretary of the Interior, acting through the National Park Service, which shall be the lead Federal agency, shall cooperate with other Federal, State and local authorities to preserve historic sites along the route, including (but not limited to) the Edmund Pettus Bridge and the Brown Chapel A.M.E. Church. (21) El Camino Real de tierra adentro – 8


APPENDIX

(A) El Camino Real de Tierra Adentro (the Royal Road of the Interior) National Historic Trail, a 404 mile long trail from Rio Grande near El Paso, Texas to San Juan Pueblo, New Mexico, as generally depicted on the maps entitled “United States Route: El Camino Real de Tierra Adentro,” contained in the report prepared pursuant to subsection (b) entitled “National Historic Trail Feasibility Study and Environmental Assessment: El Camino Real de Tierra Adentro, Texas-New Mexico,” dated March 1997. (B) MAP - A map generally depicting the trail shall be on file and available for public inspection in the Office of the National Park Service, Department of the Interior. (C) ADMINISTRATION - The Trail shall be administered by the Secretary of the Interior. (D) LAND ACQUISTION - No lands or interests therein outside the exterior boundaries of any federally administered area may be acquired by the Federal Government for El Camino Real de Tierra Adentro except with the consent of the owner thereof. (E) VOLUNTEER GROUPS; CONSULTATION - The Secretary of the Interior shall -(i) encourage volunteer groups to participate in the development and maintenance of the trail; and (ii) consult with other affected Federal, State, local governmental, and tribal agencies in the administration of the trail. (F) COORDINATION OF ACTIVITIES -The Secretary of the Interior may coordinate with United States and Mexican public and non-governmental organizations, academic institutions, and in consultation with the Secretary of State, the government of Mexico and its political subdivisions, for the purpose of exchanging trail information and research, fostering trail preservation and education programs, providing technical assistance, and working to establish an international historic trail with complementary preservation and education programs in each nation. (22) Ala Kahakai National Historic Trail -(A) IN GENERAL - The Ala Kahakai National Historic Trail (the Trail by the Sea), a 175 mile long trail extending from ‘Upola Point on the north tip of Hawaii Island down the west coast of the Island around Ka Lae to the east boundary of Hawaii Volcanoes National Park at the ancient shoreline temple known as “Waha’ula,” as generally depicted on the map entitled “Ala Kahakai Trail,” contained in the report prepared pursuant to subsection (b) entitled “Ala Kahakai National Trail Study and Environmental Impact Statement,” dated January, 1998. (B) MAP - A map generally depicting the trail shall be on file and available for public inspection in the Office of the National Park Service, Department of the Interior. (C) ADMINISTRATION - The trail shall be administered by the Secretary of the Interior. (D) LAND ACQUISTION - No land or interest in land outside the exterior boundaries of any federally administered area may be acquired by the United States for the trail except with the consent of the owner of the land or interest in land. 9

(E) PUBLIC PARTICIPATION; CONSULTATION - The Secretary of the Interior shall(i) encourage communities and owners of land along the trail, native Hawaiians, and volunteer trail groups to participate in the planning, development, and maintenance of the trail; and (ii) consult with affected Federal, State, and local agencies, native Hawaiian groups, and landowners in the administration of the trail. (23) Old Spanish National Historic Trail (A) IN GENERAL – The Old Spanish National Historic Trail, an approximately 2,700 mile long trail extending from Santa Fe, New Mexico, to Los Angeles, California, that served as a major trade route between 1829 and 1848, as generally depicted on the maps numbered 1 through 9, as contained in the report entitled ‘Old Spanish Trail National Historic Trail Feasibility Study,’ dated July 2001, including the Armijo Route, Northern Route, North Branch, and Mojave Road. (B) MAP – A map generally depicting the trail shall be on file and available for public inspection in the appropriate offices of the Department of the Interior. (C ) ADMINISTRATION – The trail shall be administered by the Secretary of the Interior (referred to in this paragraph as the ‘Secretary’). (D) LAND ACQUISITION – The United States shall not acquire for the trail any land or interest in land outside the exterior boundary of any federally-managed area without the consent of the owner of the land or interest in land. (E) CONSULTATION – The Secretary shall consult with other Federal, State, local, and tribal agencies in the administration of the trail. (F) ADDITIONAL ROUTES – The Secretary may designate additional routes to the trail if (i) the additional routes were included in the Old Spanish Trail National Historic Trail Feasibility Study, but were not recommended for designation as a national historic trail; and (ii) the Secretary determines that the additional routes were used for trade and commerce between 1829 and 1848. (24) El Camino Real De Los Tejas National Historic Trail (A) IN GENERAL - El Camino Real de los Tejas (the Royal Road to the Tejas) National Historic Trail, a combination of historic routes (including the Old San Antonio Road) totaling approximately 2,580 miles, extending from the Rio Grande near Eagle Pass and Laredo, Texas, to Natchitoches, Louisiana, as generally depicted on the map entitled `El Camino Real de los Tejas' contained in the report entitled `National Historic Trail Feasibility Study and Environmental Assessment: El Camino Real de los Tejas, TexasLouisiana', dated July 1998. (B) MAP - A map generally depicting the trail shall be on file and available for public inspection in the appropriate offices of the National Park Service. 10

83


(A6) THE NATIONAL TRAIL SYSTEM ACT (C) ADMINISTRATION (i) The Secretary of the Interior (referred to in this paragraph as `the Secretary') shall administer the trail. (ii) The Secretary shall administer those portions of the trail on non-Federal land only with the consent of the owner of such land and when such trail portion qualifies for certification as an officially established component of the trail, consistent with section 3(a)(3). An owner's approval of a certification agreement shall satisfy the consent requirement. A certification agreement may be terminated at any time. (iii) The designation of the trail does not authorize any person to enter private property without the consent of the owner. (D) CONSULTATION - The Secretary shall consult with appropriate State and local agencies in the planning and development of the trail. (E) COORDINATION OF ACTIVITIES - The Secretary may coordinate with United States and Mexican public and nongovernmental organizations, academic institutions, and, in consultation with the Secretary of State, the Government of Mexico and its political subdivisions, for the purpose of exchanging trail information and research, fostering trail preservation and educational programs, providing technical assistance, and working to establish an international historic trail with complementary preservation and education programs in each nation. (F) LAND ACQUISITION- The United States shall not acquire for the trail any land or interest in land outside the exterior boundary of any federally-administered area without the consent of the owner of the land or interest in land. (25) Captain John Smith Chesapeake National Historic Trail (A) IN GENERAL- The Captain John Smith Chesapeake National Historic Trail, a series of water routes extending approximately 3,000 miles along the Chesapeake Bay and the tributaries of the Chesapeake Bay in the States of Virginia, Maryland, and Delaware, and in the District of Columbia, that traces the 1607-1609 voyages of Captain John Smith to chart the land and waterways of the Chesapeake Bay, as generally depicted on the map entitled Captain John Smith Chesapeake National Historic Trail Map MD, VA, DE, and DC, numbered P-16/8000 (CAJO), and dated May 2006. (B) MAP- The map referred to in subparagraph (A) shall be on file and available for public inspection in the appropriate offices of the National Park Service. (C) ADMINISTRATION- The trail shall be administered by the Secretary of the Interior(i) in coordination with-(I) the Chesapeake Bay Gateways and Watertrails Network authorized under the Chesapeake Bay Initiative Act of 1998 (16 U.S.C. 461 note; 112 Stat. 2961); and (II) the Chesapeake Bay Program authorized under section 117 of the Federal Water Pollution Control Act (33 U.S.C. 1267); and (ii) in consultation with--

84

11

(I) other Federal, State, tribal, regional, and local agencies; and (II) the private sector. (D) LAND ACQUISITION- The United States shall not acquire for the trail any land or interest in land outside the exterior boundary of any federally-managed area without the consent of the owner of the land or interest in land. (26) Star-Spangled Banner National Historic Trail(A) IN GENERAL- The Star-Spangled Banner National Historic Trail, a trail consisting of water and overland routes totaling approximately 290 miles, extending from Tangier Island, Virginia, through southern Maryland, the District of Columbia, and northern Virginia, in the Chesapeake Bay, Patuxent River, Potomac River, and north to the Patapsco River, and Baltimore, Maryland, commemorating the Chesapeake Campaign of the War of 1812 (including the British invasion of Washington, District of Columbia, and its associated feints, and the Battle of Baltimore in summer 1814), as generally depicted on the map titled `Star-Spangled Banner National Historic Trail', numbered T02/80,000, and dated June 2007. (B) MAP- The map referred to in subparagraph (A) shall be maintained on file and available for public inspection in the appropriate offices of the National Park Service. (C) ADMINISTRATION- Subject to subparagraph (E)(ii), the trail shall be administered by the Secretary of the Interior. (D) LAND ACQUISITION- No land or interest in land outside the exterior boundaries of any federally administered area may be acquired by the United States for the trail except with the consent of the owner of the land or interest in land. (E) PUBLIC PARTICIPATION- The Secretary of the Interior shall-(i) encourage communities, owners of land along the trail, and volunteer trail groups to participate in the planning, development, and maintenance of the trail; and (ii) consult with other affected landowners and Federal, State, and local agencies in the administration of the trail. (F) INTERPRETATION AND ASSISTANCE- Subject to the availability of appropriations, the Secretary of the Interior may provide, to State and local governments and nonprofit organizations, interpretive programs and services and technical assistance for use in-(i) carrying out preservation and development of the trail; and (ii) providing education relating to the War of 1812 along the trail. (27) ARIZONA NATIONAL SCENIC TRAIL(A) IN GENERAL- The Arizona National Scenic Trail, extending approximately 807 miles across the State of Arizona from the U.S.-Mexico international border to the Arizona-Utah border, as generally depicted on the map entitled `Arizona National Scenic Trail' and dated December 5, 2007, to be administered by the Secretary of Agriculture, in consultation with the Secretary of the Interior and appropriate State, tribal, and local governmental agencies. 12


APPENDIX

(B) AVAILABILITY OF MAP- The map shall be on file and available for public inspection in appropriate offices of the Forest Service. (28) NEW ENGLAND NATIONAL SCENIC TRAIL- The New England National Scenic Trail, a continuous trail extending approximately 220 miles from the border of New Hampshire in the town of Royalston, Massachusetts to Long Island Sound in the town of Guilford, Connecticut, as generally depicted on the map titled `New England National Scenic Trail Proposed Route', numbered T06/80,000, and dated October 2007. The map shall be on file and available for public inspection in the appropriate offices of the National Park Service. The Secretary of the Interior, in consultation with appropriate Federal, State, tribal, regional, and local agencies, and other organizations, shall administer the trail after considering the recommendations of the report titled the `Metacomet Monadnock Mattabesset Trail System National Scenic Trail Feasibility Study and Environmental Assessment', prepared by the National Park Service, and dated Spring 2006. The United States shall not acquire for the trail any land or interest in land without the consent of the owner. (b) Management- The Secretary of the Interior (referred to in this section as the `Secretary') shall consider the actions outlined in the Trail Management Blueprint described in the report titled the `Metacomet Monadnock Mattabesett Trail System National Scenic Trail Feasibility Study and Environmental Assessment', prepared by the National Park Service, and dated Spring 2006, as the framework for management and administration of the New England National Scenic Trail. Additional or more detailed plans for administration, management, protection, access, maintenance, or development of the trail may be developed consistent with the Trail Management Blueprint, and as approved by the Secretary. (c) Cooperative Agreements- The Secretary is authorized to enter into cooperative agreements with the Commonwealth of Massachusetts (and its political subdivisions), the State of Connecticut (and its political subdivisions), and other regional, local, and private organizations deemed necessary and desirable to accomplish cooperative trail administrative, management, and protection objectives consistent with the Trail Management Blueprint. An agreement under this subsection may include provisions for limited financial assistance to encourage participation in the planning, acquisition, protection, operation, development, or maintenance of the trail. (d) Additional Trail Segments- Pursuant to section 6 of the National Trails System Act (16 U.S.C. 1245), the Secretary is encouraged to work with the State of New Hampshire and appropriate local and private organizations to include that portion of the MetacometMonadnock Trail in New Hampshire (which lies between Royalston, Massachusetts and Jaffrey, New Hampshire) as a component of the New England National Scenic Trail. Inclusion of this segment, as well as other potential side or connecting trails, is contingent upon written application to the Secretary by appropriate State and local jurisdictions and a finding by the Secretary that trail management and administration is consistent with the Trail Management Blueprint. (29) WASHINGTON-ROCHAMBEAU REVOLUTIONARY ROUTE NATIONAL HISTORIC TRAIL(A) IN GENERAL - The Washington-Rochambeau Revolutionary Route National Historic Trail, a corridor of approximately 600 miles following the route taken by the 13

armies of General George Washington and Count Rochambeau between Newport, Rhode Island, and Yorktown, Virginia, in 1781 and 1782, as generally depicted on the map entitled `WASHINGTON-ROCHAMBEAU REVOLUTIONARY ROUTE NATIONAL HISTORIC TRAIL', numbered T01/80,001, and dated June 2007. (B) MAP - The map referred to in subparagraph (A) shall be on file and available for public inspection in the appropriate offices of the National Park Service. (C) ADMINISTRATION- The trail shall be administered by the Secretary of the Interior, in consultation with-(i) other Federal, State, tribal, regional, and local agencies; and (ii) the private sector. (D) LAND ACQUISITION- The United States shall not acquire for the trail any land or interest in land outside the exterior boundary of any federally-managed area without the consent of the owner of the land or interest in land. (30) PACIFIC NORTHWEST NATIONAL SCENIC TRAIL(A) IN GENERAL- The Pacific Northwest National Scenic Trail, a trail of approximately 1,200 miles, extending from the Continental Divide in Glacier National Park, Montana, to the Pacific Ocean Coast in Olympic National Park, Washington, following the route depicted on the map entitled `Pacific Northwest National Scenic Trail: Proposed Trail', numbered T12/80,000, and dated February 2008 (referred to in this paragraph as the `map'). (B) AVAILABILITY OF MAP- The map shall be on file and available for public inspection in the appropriate offices of the Forest Service. (C) ADMINISTRATION- The Pacific Northwest National Scenic Trail shall be administered by the Secretary of Agriculture. (D) LAND ACQUISITION- The United States shall not acquire for the Pacific Northwest National Scenic Trail any land or interest in land outside the exterior boundary of any federally-managed area without the consent of the owner of the land or interest in land. (b) The Secretary of the Interior, through the agency most likely to administer such trail, and the Secretary of Agriculture where lands administered by him are involved, shall make such additional studies as are herein or may hereafter be authorized by the Congress for the purpose of determining the feasibility and desirability of designating other trails as national scenic or national historic trails. Such studies shall be made in consultation with the heads of other Federal agencies administering lands through which such additional proposed trails would pass and in cooperation with interested interstate, State, and local governmental agencies, public and private organizations, and landowners and land users concerned. The feasibility of designating a trail shall be determined on the basis of an evaluation of whether or not it is physically possible to develop a trail along a route being studied, and whether the development of a trail would be financially feasible. The studies listed in subsection (c) of this section shall be completed and submitted to the Congress, with recommendations as to the suitability of trail designation, not later than three complete fiscal years from the date of enactment of their addition to this subsection, or from 14

85


(A6) THE NATIONAL TRAIL SYSTEM ACT the date of enactment of this sentence, whichever is later. Such studies, when submitted, shall be printed as a House or Senate document, and shall include, but not be limited to: (1) the proposed route of such trail (including maps and illustrations); (2) the areas adjacent to such trails, to be utilized for scenic, historic, natural, cultural, or developmental purposes; (3) the characteristics which, in the judgment of the appropriate Secretary, make the proposed trail worthy of designation as a national scenic or national historic trail; and in the case of national historic trails the report shall include the recommendation of the Secretary of the Interior's National Park System Advisory Board as to the national historic significance based on the criteria developed under the Historic Sites Act of 1935 (49 Stat. 666; 16 U.S.C. 461); (4) the current status of land ownership and current and potential use along the designated route; (5) the estimated cost of acquisition of lands or interest in lands, if any; (6) the plans for developing and maintaining the trail and the cost thereof;

(B) It must be of national significance with respect to any of several broad facets of American history, such as trade and commerce, exploration, migration and settlement, or military campaigns. To qualify as nationally significant, historic use of the trail must have had a far reaching effect on broad patterns of American culture. Trails significant in the history of native Americans may be included. (C) It must have significant potential for public recreational use or historical interest based on historic interpretation and appreciation. The potential for such use is generally greater along roadless segments developed as historic trails and at historic sites associated with the trail. The presence of recreation potential not related to historic appreciation is not sufficient justification for designation under this category. (c) The following routes shall be studied in accordance with the objectives outlined in subsection (b) of this section.

(7) the proposed Federal administering agency (which, in the case of a national scenic trail wholly or substantially within a national forest, shall be the Department of Agriculture);

(1) Continental Divide Trail, a three-thousand-one-hundred-mile trail extending from near the Mexican border in southwestern New Mexico northward generally along the Continental Divide to the Canadian border in Glacier National Park.

(8) the extent to which a State or its political subdivisions and public and private organizations might reasonably be expected to participate in acquiring the necessary lands and in the administration thereof;

(2) Potomac Heritage Trail, an eight-hundred-and-twenty-five-mile trail extending generally from the mouth of the Potomac River to its sources in Pennsylvania and West Virginia including the one-hundred- and- seventy-mile Chesapeake and Ohio Canal towpath.

(9) the relative uses of the lands involved, including: the number of anticipated visitor-days for the entire length of, as well as for segments of, such trail; the number of months which such trail, or segments thereof, will be open for recreation purposes; the economic and social benefits which might accrue from alternate land uses; and the estimated man-years of civilian employment and expenditures expected for the purposes of maintenance, supervision, and regulation of such trail;

(3) Old Cattle Trails of the Southwest from the vicinity of San Antonio, Texas, approximately eight hundred miles through Oklahoma via Baxter Springs and Chetopa, Kansas, to Fort Scott, Kansas, including the Chisholm Trail, from the vicinity of San Antonio or Cuero, Texas, approximately eight hundred miles north through Oklahoma to Abilene, Kansas.

(10) the anticipated impact of public outdoor recreation use on the preservation of a proposed national historic trail and its related historic and archeological features and settings, including the measures proposed to ensure evaluation and preservation of the values that contribute to their national historic significance; and (11) To qualify for designation as a national historic trail, a trail must meet all three of the following criteria: (A) It must be a trail or route established by historic use and must be historically significant as a result of that use. The route need not currently exist as a discernible trail to qualify, but its location must be sufficiently known to permit evaluation of public recreation and historical interest potential. A designated trail should generally accurately follow the historic route, but may deviate somewhat on occasion of necessity to avoid difficult routing through subsequent development, or to provide some route variations offering a more pleasurable recreational experience. Such deviations shall be so noted on site. Trail segments no longer possible to travel by trail due to subsequent development

86

as motorized transportation routes may be designated and marked onsite as segments which link to the historic trail.

15

(4) Lewis and Clark Trail, from Wood River, Illinois, to the Pacific Ocean in Oregon, following both the outbound and inbound routes of the Lewis and Clark Expedition. (5) Natchez Trace, from Nashville, Tennessee, approximately six hundred miles to Natchez, Mississippi. (6) North Country Trail, from the Appalachian Trail in Vermont, approximately three thousand two hundred miles through the States of New York, Pennsylvania, Ohio, Michigan, Wisconsin, and Minnesota, to the Lewis and Clark Trail in North Dakota. (7) Kittanning Trail from Shirleysburg in Huntingdon County to Kittanning, Armstrong County, Pennsylvania. (8) Oregon Trail, from Independence, Missouri, approximately two thousand miles to near Fort Vancouver, Washington. (9) Santa Fe Trail, from Independence, Missouri, approximately eight hundred miles to Santa Fe, 16


APPENDIX

New Mexico. (10) Long Trail extending two hundred and fifty-five miles from the Massachusetts border northward through Vermont to the Canadian border. (11) Mormon Trail, extending from Nauvoo, Illinois, to Salt Lake City, Utah, through the States of Iowa, Nebraska, and Wyoming. (12) Gold Rush Trails in Alaska. (13) Mormon Battalion Trail, extending two thousand miles from Mount Pisgah, Iowa, through Kansas, Colorado, New Mexico, and Arizona to Los Angeles, California. (14) El Camino Real from St. Augustine to San Mateo, Florida, approximately 20 miles along the southern boundary of the St. Johns River from Fort Caroline National Memorial to the St. August National Park Monument. (15) Bartram Trail, extending through the States of Georgia, North Carolina, South Carolina, Alabama, Florida, Louisiana, Mississippi, and Tennessee. (16) Daniel Boone Trail, extending from the vicinity of Statesville, North Carolina, to Fort Boonesborough State Park, Kentucky. (17) Desert Trail, extending from the Canadian border through parts of Idaho, Washington, Oregon, Nevada, California, and Arizona, to the Mexican border. (18) Dominguez-Escalante Trail, extending approximately two thousand miles along the route of the 1776 expedition led by Father Francisco Atanasio Dominguez and Father Silvestre Velez de Escalante, originating in Santa Fe, New Mexico; proceeding northwest along the San Juan, Dolores, Gunnison, and White Rivers in Colorado, thence westerly to Utah Lake; thence southward to Arizona and returning to Santa Fe. (19) Florida Trail, extending north from Everglade National Park, including the Big Cypress Swamp, the Kissimmee Prairie, the Withlacoochee State Forest, Ocala National Forest, Osceola National Forest, and Black Water River State Forest, said completed trail to be approximately one thousand three hundred miles along, of which over four hundred miles of trail have already been built. (20) Indian Nations Trail, extending from the Red River in Oklahoma approximately two hundred miles northward through the former Indian nations to the Oklahoma-Kansas boundary line. (21) Nez Perce Trail extending from the vicinity of Wallowa Lake, Oregon, to Bear Paw Mountain, Montana. (22) Pacific Northwest Trail, extending approximately one thousand miles from the Continental Divide in Glacier National Park, Montana, to the Pacific Ocean beach of Olympic National Park, Washington, by way of -(A) Flathead National Forest and Kootenai National Forest in the State of Montana; 17

(B) Kaniksu National Forest in the State of Idaho; and (C) Colville National Forest, Okanogan National Forest, Pasayten Wilderness Area, Ross Lake National Recreation Area, North Cascades National Park, Mount Baker, the Skagit River, Deception Pass, Whidbey Island, Olympic National Forest, and Olympic National Park in the State of Washington. (23) Overmountain Victory Trail, extending from the vicinity of Elizabethton, Tennessee, to Kings Mountain National Military Park, South Carolina. (24) Juan Bautista de Anza Trail, following the overland route taken by Juan Bautista de Anza in connection with his travels from the United Mexican States to San Francisco, California. (25) Trail of Tears, including the associated forts and specifically, Fort Mitchell, Alabama, and historic properties, extending from the vicinity of Murphy, North Carolina, through Georgia, Alabama, Tennessee, Kentucky, Illinois, Missouri, and Arkansas, to the vicinity of Tahlequah, Oklahoma. (26) Illinois Trail, extending from the Lewis and Clark Trail at Wood River, Illinois to the Chicago Portage National Historic Site, generally following the Illinois River and the Illinois and Michigan Canal. (27) Jedediah Smith Trail, to include the routes of the explorations led by Jedediah Smith – (A) during the period 1826-1827, extending from the Idaho-Wyoming border, through the Great Salt Lake, Sevier, Virgin, and Colorado River Valleys, and the Mojave Desert, to the San Gabriel Mission, California; thence through the Tehachapi Mountains, San Joaquin and Stanislaus River Valleys, Ebbetts Pass, Walker River Valley, Bald Mount, Mount Grafton, and Great Salt Lake to Bear Lake, Utah; and (B) during 1828, extending from the Sacramento and Trinity River valleys along the Pacific coastline, through the Smith and Willamette River Valleys to the Fort Vancouver National Historic Site, Washington, on the Columbia River. (28) General Crook Trail, extending from Prescott, Arizona, across the Mogollon Rim to Fort Apache. (29) Beale Wagon Road, within the Kaibab and Cononino National Forests in Arizona; Provided, such study may be prepared in conjunction with ongoing planning processes for these National Forests to be completed before 1990. (30) Pony Express Trail, extending from Saint Joseph, Missouri, through Kansas, Nebraska, Colorado, Wyoming, Utah, Nevada, to Sacramento, California, as indicated on a map labeled "Potential Pony Express Trail", dated October 1983 and the California Trail extending from the vicinity of Omaha, Nebraska, and Saint Joseph, Missouri, to various points in California, as indicated on a map labeled "Potential California Trail" and dated August 1, 1983. Notwithstanding subsection (b) of this section, the study under this paragraph shall be completed and submitted to the Congress no later than the end of two complete fiscal years beginning after 18

87


(A6) THE NATIONAL TRAIL SYSTEM ACT the date of the enactment of this paragraph. Such study shall be separated into two portions, one relating to the Pony Express Trail and one relating to the California Trail. (31) De Soto Trail, the approximate route taken by the expedition of the Spanish explorer Hernado de Soto in 1539, extending through portions of the States of Florida, Georgia, South Carolina, North Carolina, Tennessee, Alabama, Mississippi, to the area of Little Rock, Arkansas, on to Texas and Louisiana, and any other States which may have been crossed by the expedition. The study under this paragraph shall be prepared in accordance with subsection (b) of this section, except that it shall be completed and submitted to the Congress with recommendations as to the trail's suitability for designation not later than one calendar year after the date of enactment of this paragraph. (32) Coronado Trail, the approximate route taken by the expedition of the Spanish explorer Francisco Vasquez de Coronado between 1540 and 1542, extending through portions of the States of Arizona, New Mexico, Texas, Oklahoma, and Kansas. The study under this paragraph shall be prepared in accordance with subsection (b) of this section. In conducting the study under this paragraph, the Secretary shall provide for (A) the review of all original Spanish documentation on the Coronado Trail, (B) the continuing search for new primary documentation on the trail, and (C) the examination of all information on the archeological sites along the trail. (33) The route from Selma to Montgomery, Alabama traveled by people in a march dramatizing the need for voting rights legislation, in March 1965, includes Sylvan South Street, Water Avenue, the Edmund Pettus Bridge, and Highway 80. The study under this paragraph shall be prepared in accordance with subsection (b) of this section, except that it shall be completed and submitted to the Congress with recommendations as to the trail's suitability for designation not later than 1 year after the enactment of this paragraph. (34) American Discovery Trail, extending from Pt. Reyes, California, across the United States through Nevada, Utah, Colorado, Kansas, Nebraska, Missouri, Iowa, Indiana, Illinois, Ohio, West Virginia, Maryland, and the District of Columbia, to Cape Henlopen State Park, Delaware; to include in the central United States a northern route through Colorado, Nebraska, Iowa, Illinois, and Indiana and a southern route through Colorado, Kansas, Missouri, Illinois, and Indiana. (35) Ala Kahakai Trail in the State of Hawaii, an ancient Hawaiian trail on the island of Hawaii extending from the northern tip of the Island of Hawaii approximately 175 miles along the western and southern coasts to the northern boundary of Hawaii Volcanoes National Park. (36)

(A) El Camino Real de Tierra Adentro, the approximately 1,800 mile route extending from Mexico City, Mexico, across the international border at El Paso, Texas, to Santa Fe, New Mexico. (B) The study shall (i) examine changing routes within the general corridor; (ii) examine major connecting branch routes; and (iii) give due consideration to alternative name designations. (C) The Secretary of the Interior is authorized to work in cooperation with the Government of Mexico (including, but not limited to providing technical assistance) to determine the suitability and feasibility of establishing an international historic route

88

19

along the El Camino Real de Tierra Adentro. (37)

(A) El Camino Real Para Los Texas, the approximate series of routes from Saltillo, Monclova, and Guerrero, Mexico across Texas through San Antonio and Nacogdoches, to the vicinity of Los Adaes, Louisiana, together with the evolving routes later known as the San Antonio Road. (B) The study shall (i) examine the changing roads within the historic corridor; (ii) examine the major connecting branch routes; (iii) determine the individual or combined suitability and feasibility of routes for potential national historic trail designation; (iv) consider the preservation heritage plan developed by the Texas Department of Transportation entitled "A Texas Legacy: The Old San Antonio Road and the Caminos Reales", dated January, 1991; and (v) make recommendations concerning the suitability and feasibility of establishing an international historical park where the trail crosses the United States-Mexico border at Maverick County, Texas, and Guerrero, Mexico. (C) The Secretary of the Interior is authorized to work in cooperation with the government of Mexico (including, but not limited to providing technical assistance) to determine the suitability and feasibility of establishing an international historic trail along the El Camino Real Para Los Texas. (D) The study shall be undertaken in consultation with the Louisiana Department of Transportation and Development and the Texas Department of Transportation. (E) The study shall consider alternative name designations for the trail. (F) The study shall be completed no later than two years after the date funds are made available for the study.

(38) The Old Spanish Trail, beginning in Santa Fe, New Mexico, proceeding through Colorado and Utah, and ending in Los Angeles, California, and the Northern Branch of the Old Spanish Trail, beginning near Espanola, New Mexico, proceeding through Colorado, and ending near Crescent Junction, Utah. (39) The Great Western Scenic Trail, a system of trails to accommodate a variety of travel users in a corridor of approximately 3,100 miles in length extending from the Arizona-Mexico border to the Idaho-Montana-Canada border, following the approximate route depicted on the map identified as 'Great Western Trail Corridor, 1988,' which shall be on file and available for public inspection in the Office of the Chief of the Forest Service, United States Department of Agriculture. The trail study shall be conducted by the Secretary of Agriculture, in consultation with the Secretary of the Interior, in accordance with subsection (b) and shall include – (A) the current status of land ownership and current and potential use along the designatedroute;

20


APPENDIX

(B) the estimated cost of acquisition of lands or interests in lands, if any; and (C) an examination of the appropriateness of motorized trail use along the trail. (40) Star Spangled Banner National Historic Trail – (A) IN GENERAL – The Star Spangled Banner National Historic Trail,tracing the War of 1812 route from the arrival of the British fleet in the Patuxent River in Calvert County and St. Mary’s County, Maryland, the landing of the British forces at Benedict, the sinking of the Chesapeake Flotilla at Pig Point, the American defeat at the Battle of Bladensburg, the siege of the Nation’s Capital, Washington, District of Columbia (including the burning of the United States Capitol and the White House), the British naval dispersions in the upper Chesapeake Bay leading to the Battle of Caulk’s Field in Kent County, Maryland, the route of the American troops from Washington through Georgetown, the Maryland counties of Montgomery, Howard, and Baltimore, and the City of Baltimore Maryland, to the Battle of North Point, and the ultimate victory of the Americans at Fort McHenry on September 14, 1814. (B) AFFECTED AREAS – The trail crosses eight counties within the boundaries of the State of Maryland, the City of Baltimore, Maryland, and Washington, District of Columbia. (C ) COORDINATION WITH OTHER CONGRESSIONALLY MANDATED ACTIVITIES – The study under this paragraph shall be undertaken in coordination with the study authorized under section 603 of the Omnibus Parks and Public Lands Management Act of 1996 (16 U.S.C. 1a-5 note; 110 Stat. 4172) and the Chesapeake Bay Gateways and Watertrails Network authorized under the Chesapeake Bay Initiative Act of 1998 (16 U.S.C. 461 note; 112 Stat. 2961). Such coordination shall extend to any research needed to complete the studies and any findings and implementation actions that result from the studies and shall use available resources to the greatest extent possible to avoid unnecessary duplication of effort. (D) DEADLINE FOR STUDY – Not later than 2 years after funds are made available fore the study under this paragraph, the study shall be completed and transmitted with final recommendations to the Committee on Resources in the House of Representatives and the Committee on Energy and Natural Resources in the Senate. (41) Metacomet-Monadnock-Mattabesett Trail – The Metacomet-Monadnock-Mattabesett Trail, a system of trails and potential trails extending southward approximately 180 miles through Massachusetts on the Metacomet-Monadnock Trail, across central Connecticut on the Metacomet Trail, and ending at Long Island Sound. (42) The Long Walk, a series of routes which the Navajo and Mescalero Apache Indian tribes were forced to walk beginning in the fall of 1863 as a result of their removal by the United States Government from their ancestral lands, generally located within a corridor extending through portions of Canyon de Chelley, Arizona, and Albuquerque, Canyon Blanco, Anton Chico, Canyon Piedra Pintado, and Fort Sumner, New Mexico.

21

(43)

(A) The Captain John Smith Chesapeake National Historic Watertrail, a series of routes extending approximately 3,000 miles along the Chesapeake Bay and the tributaries of the Chesapeake Bay in the States of Virginia, Maryland, Pennsylvania, and Delaware and the District of Columbia that traces Captain John Smith's voyages charting the land and waterways of the Chesapeake Bay and the tributaries of the Chesapeake Bay. (B) The study shall be conducted in consultation with Federal, State, regional, and local agencies and representatives of the private sector, including the entities responsible for administering-(i) the Chesapeake Bay Gateways and Watertrails Network authorized under the Chesapeake Bay Initiative Act of 1998 (16 U.S.C. 461 note; title V of Public Law 105-312); and (ii) the Chesapeake Bay Program authorized under section 117 of the Federal Water Pollution Control Act (33 U.S.C. 1267). (C) The study shall include an extensive analysis of the potential impacts the designation of the trail as a national historic watertrail is likely to have on land and water, including docks and piers, along the proposed route or bordering the study route that is privately owned at the time the study is conducted.

(44) Chisholm Trail (A) IN GENERAL- The Chisholm Trail (also known as the `Abilene Trail'), from the vicinity of San Antonio, Texas, segments from the vicinity of Cuero, Texas, to Ft. Worth, Texas, Duncan, Oklahoma, alternate segments used through Oklahoma, to Enid, Oklahoma, Caldwell, Kansas, Wichita, Kansas, Abilene, Kansas, and commonly used segments running to alternative Kansas destinations. (B) REQUIREMENT- In conducting the study required under this paragraph, the Secretary of the Interior shall identify the point at which the trail originated south of San Antonio, Texas. (45) Great Western Trail (A) IN GENERAL- The Great Western Trail (also known as the `Dodge City Trail'), from the vicinity of San Antonio, Texas, north-by-northwest through the vicinities of Kerrville and Menard, Texas, north-by-northeast through the vicinities of Coleman and Albany, Texas, north through the vicinity of Vernon, Texas, to Doan's Crossing, Texas, northward through or near the vicinities of Altus, Lone Wolf, Canute, Vici, and May, Oklahoma, north through Kansas to Dodge City, and north through Nebraska to Ogallala. (B) REQUIREMENT- In conducting the study required under this paragraph, the Secretary of the Interior shall identify the point at which the trail originated south of San Antonio, Texas. (46) Pike National Historic Trail. – The Pike National Historic Trail, a series of routes extending approximately 3,664 miles, which follows the route taken by Lt. Zebulon Montgomery Pike during the 1806 – 1807 Pike expedition that began in Fort Bellefontaine, Missouri, extended through portions of the States of Kansas, Nebraska, Colorado, New Mexico, and Texas, and ended in Natchitoches, Louisiana.

22

89


(A6) THE NATIONAL TRAIL SYSTEM ACT (d) The Secretary charged with the administration of each respective trail shall, within one year of the date of the addition of any national scenic or national historic trail to the system, and within sixty days of the enactment of this sentence for the Appalachian and Pacific Crest National Scenic Trails, establish an advisory council for each such trail, each of which councils shall expire ten years from the date of its establishment, except that the Advisory Council established for the Iditarod Historic Trail shall expire twenty years from the date of its establishment. If the appropriate Secretary is unable to establish such an advisory council because of the lack of adequate public interest, the Secretary shall so advise the appropriate committees of the Congress. The appropriate Secretary shall consult with such council from time to time with respect to matters relating to the trail, including the selection of rights-of-way, standards for the erection and maintenance of markers along the trail, and the administration of the trail. The members of each advisory council, which shall not exceed thirty-five in number, shall serve for a term of two years and without compensation as such, but the Secretary may pay, upon vouchers signed by the chairman of the council, the expenses reasonably incurred by the council and its members in carrying out their responsibilities under this section. Members of each council shall be appointed by the appropriate Secretary as follows: (1) the head of each Federal department or independent agency administering lands through which the trail route passes, or his designee; (2) a member appointed to represent each State through which the trail passes, and such appointments shall be made from recommendations of the Governors of such States; (3) one or more members appointed to represent private organizations, including corporate and individual landowners and land users, which in the opinion of the Secretary, have an established and recognized interest in the trail, and such appointments shall be made from recommendations of the heads of such organizations: Provided, That the Appalachian Trail Conference shall be represented by a sufficient number of persons to represent the various sections of the country through which the Appalachian Trail passes; and (4) the Secretary shall designate one member to be chairman and shall fill vacancies in the same manner as the original appointment. (e) Within two complete fiscal years of the date of enactment of legislation designating a national scenic trail, except for the Continental Divide National Scenic Trail and the North Country National Scenic Trail, as part of the system, and within two complete fiscal years of the date of enactment of this subsection for the Pacific Crest and Appalachian Trails, the responsible Secretary shall, after full consultation with affected Federal land managing agencies, the Governors of the affected States, the relevant advisory council established pursuant to section 5(d), and the Appalachian Trail Conference in the case of the Appalachian Trail, submit to the Committee on Interior and Insular Affairs of the House of Representatives and the Committee on Energy and Natural Resources of the Senate, a comprehensive plan for the acquisition, management, development, and use of the trail, including but not limited to, the following items: (1) specific objectives and practices to be observed in the management of the trail, including the identification of all significant natural, historical, and cultural resources to be preserved (along with high potential historic sites and high potential route segments in the case of national historic

90

23

trails), details of any anticipated cooperative agreements to be consummated with other entities, and an identified carrying capacity of the trail and a plan for its implementation; (2) an acquisition or protection plan, by fiscal year for all lands to be acquired by fee title or lesser interest, along with detailed explanation of anticipated necessary cooperative agreements for any lands not to be acquired; and (3) general and site-specific development plans including anticipated costs. (f) Within two complete fiscal years of the date of enactment of legislation designating a national historic trail or the Continental Divide National Scenic Trail or the North Country National Scenic Trail as part of the system, the responsible Secretary shall, after full consultation with affected Federal land managing agencies, the Governors of the affected States, and the relevant Advisory Council established pursuant to section 5(d) of this Act, submit to the Committee on Interior and Insular Affairs of the House of Representatives and the Committee on Energy and Natural Resources of the Senate, a comprehensive plan for the management, and use of the trail, including but not limited to, the following items: (1) specific objectives and practices to be observed in the management of the trail, including the identification of all significant natural, historical, and cultural resources to be preserved, details of any anticipated cooperative agreements to be consummated with State and local government agencies or private interests, and for national scenic or national historic trails an identified carrying capacity of the trail and a plan for its implementation; (2) the process to be followed by the appropriate Secretary to implement the marking requirements established in section 7(c) of this Act; (3) a protection plan for any high potential historic sites or high potential route segments; and (4) general and site-specific development plans, including anticipated costs. (g) Revision of Feasibility and Suitability Studies of Existing National Historic Trails(1) DEFINITIONS- In this subsection: (A) ROUTE- The term `route' includes a trail segment commonly known as a cutoff. (B) SHARED ROUTE- The term `shared route' means a route that was a segment of more than 1 historic trail, including a route shared with an existing national historic trail. (2) REQUIREMENTS FOR REVISION(A) IN GENERAL- The Secretary of the Interior shall revise the feasibility and suitability studies for certain national trails for consideration of possible additions to the trails. (B) STUDY REQUIREMENTS AND OBJECTIVES- The study requirements and objectives specified in subsection (b) shall apply to a study required by this subsection.

24


APPENDIX

(C) COMPLETION AND SUBMISSION OF STUDY- A study listed in this subsection shall be completed and submitted to Congress not later than 3 complete fiscal years from the date funds are made available for the study. (3) OREGON NATIONAL HISTORIC TRAIL(A) STUDY REQUIRED- The Secretary of the Interior shall undertake a study of the routes of the Oregon Trail listed in subparagraph (B) and generally depicted on the map entitled `Western Emigrant Trails 1830/1870' and dated 1991/1993, and of such other routes of the Oregon Trail that the Secretary considers appropriate, to determine the feasibility and suitability of designation of 1 or more of the routes as components of the Oregon National Historic Trail. (B) COVERED ROUTES- The routes to be studied under subparagraph (A) shall include the following: (i) Whitman Mission route. (ii) Upper Columbia River. (iii) Cowlitz River route. (iv) Meek cutoff. (v) Free Emigrant Road. (vi) North Alternate Oregon Trail. (vii) Goodale's cutoff. (viii) North Side alternate route. (ix) Cutoff to Barlow road. (x) Naches Pass Trail. (4) PONY EXPRESS NATIONAL HISTORIC TRAIL- The Secretary of the Interior shall undertake a study of the approximately 20-mile southern alternative route of the Pony Express Trail from Wathena, Kansas, to Troy, Kansas, and such other routes of the Pony Express Trail that the Secretary considers appropriate, to determine the feasibility and suitability of designation of 1 or more of the routes as components of the Pony Express National Historic Trail. (5) CALIFORNIA NATIONAL HISTORIC TRAIL(A) STUDY REQUIRED- The Secretary of the Interior shall undertake a study of the Missouri Valley, central, and western routes of the California Trail listed in subparagraph (B) and generally depicted on the map entitled `Western Emigrant Trails 1830/1870' and dated 1991/1993, and of such other and shared Missouri Valley, central, and western routes that the Secretary considers appropriate, to determine the feasibility and suitability of designation of 1 or more of the routes as components of the California National Historic Trail. (B) COVERED ROUTES- The routes to be studied under subparagraph (A) shall include the following: (i) MISSOURI VALLEY ROUTES(I) Blue Mills-Independence Road. (II) Westport Landing Road. (III) Westport-Lawrence Road. (IV) Fort Leavenworth-Blue River route. (V) Road to Amazonia. (VI) Union Ferry Route. 25

(VII) Old Wyoming-Nebraska City cutoff. (VIII) Lower Plattsmouth Route. (IX) Lower Bellevue Route. (X) Woodbury cutoff. (XI) Blue Ridge cutoff. (XII) Westport Road. (XIII) Gum Springs-Fort Leavenworth route. (XIV) Atchison/Independence Creek routes. (XV) Fort Leavenworth-Kansas River route. (XVI) Nebraska City cutoff routes. (XVII) Minersville-Nebraska City Road. (XVIII) Upper Plattsmouth route. (XIX) Upper Bellevue route. (ii) CENTRAL ROUTES(I) Cherokee Trail, including splits. (II) Weber Canyon route of Hastings cutoff. (III) Bishop Creek cutoff. (IV) McAuley cutoff. (V) Diamond Springs cutoff. (VI) Secret Pass. (VII) Greenhorn cutoff. (VIII) Central Overland Trail. (iii) WESTERN ROUTES(I) Bidwell-Bartleson route. (II) Georgetown/Dagget Pass Trail. (III) Big Trees Road. (IV) Grizzly Flat cutoff. (V) Nevada City Road. (VI) Yreka Trail. (VII) Henness Pass route. (VIII) Johnson cutoff. (IX) Luther Pass Trail. (X) Volcano Road. (XI) Sacramento-Coloma Wagon Road. (XII) Burnett cutoff. (XIII) Placer County Road to Auburn. (6) MORMON PIONEER NATIONAL HISTORIC TRAIL(A) STUDY REQUIRED- The Secretary of the Interior shall undertake a study of the routes of the Mormon Pioneer Trail listed in subparagraph (B) and generally depicted in the map entitled `Western Emigrant Trails 1830/1870' and dated 1991/1993, and of such other routes of the Mormon Pioneer Trail that the Secretary considers appropriate, to determine the feasibility and suitability of designation of 1 or more of the routes as components of the Mormon Pioneer National Historic Trail. (B) COVERED ROUTES- The routes to be studied under subparagraph (A) shall include the following: 26

91


(A6) THE NATIONAL TRAIL SYSTEM ACT

(i) 1846 Subsequent routes A and B (Lucas and Clarke Counties, Iowa). (ii) 1856-57 Handcart route (Iowa City to Council Bluffs). (iii) Keokuk route (Iowa). (iv) 1847 Alternative Elkhorn and Loup River Crossings in Nebraska. (v) Fort Leavenworth Road; Ox Bow route and alternates in Kansas and Missouri (Oregon and California Trail routes used by Mormon emigrants). (vi) 1850 Golden Pass Road in Utah.

(7) SHARED CALIFORNIA AND OREGON TRAIL ROUTES(A) STUDY REQUIRED- The Secretary of the Interior shall undertake a study of the shared routes of the California Trail and Oregon Trail listed in subparagraph (B) and generally depicted on the map entitled `Western Emigrant Trails 1830/1870' and dated 1991/1993, and of such other shared routes that the Secretary considers appropriate, to determine the feasibility and suitability of designation of 1 or more of the routes as shared components of the California National Historic Trail and the Oregon National Historic Trail. (B) COVERED ROUTES- The routes to be studied under subparagraph (A) shall include the following: (i) St. Joe Road. (ii) Council Bluffs Road. (iii) Sublette cutoff. (iv) Applegate route. (v) Old Fort Kearny Road (Oxbow Trail). (vi) Childs cutoff. (vii) Raft River to Applegate.

CONNECTING AND SIDE TRAILS SEC. 6. [16USC1245] Connecting or side trails within park, forest, and other recreation areas administered by the Secretary of the Interior or Secretary of Agriculture may be established, designated, and marked by the appropriate Secretary as components of a national recreation, national scenic or national historic trail. When no Federal land acquisition is involved, connecting or side trails may be located across lands administered by interstate, State, or local governmental agencies with their consent, or, where the appropriate Secretary deems necessary or desirable, on privately owned lands with the consent of the landowners. Applications for approval and designation of connecting and side trails on non-Federal lands shall be submitted to the appropriate Secretary.

ADMINISTRATION AND DEVELOPMENT SEC. 7. [16USC1246] (a) (1) (A) The Secretary charged with the overall administration of a trail pursuant to section 5(a) shall, in administering and managing the trail, consult with the heads of all other affected State and Federal agencies. Nothing contained in this Act shall be deemed to transfer among Federal agencies any management responsibilities established under any other law for federally administered lands which are components of the National Trails System. Any transfer of management

92

27

responsibilities may be carried out between the Secretary of the Interior and the Secretary of Agriculture only as provided under subparagraph (B). (B) The Secretary charged with the overall administration of any trail pursuant to section 5(a) may transfer management of any specified trail segment of such trail to the other appropriate Secretary pursuant to a joint memorandum of agreement containing such terms and conditions as the Secretaries consider most appropriate to accomplish the purposes of this Act. During any period in which management responsibilities for any trail segment are transferred under such an agreement, the management of any such segment shall be subject to the laws, rules, and regulations of the Secretary provided with the management authority under the agreement except to such extent as the agreement may otherwise expressly provide. (2) Pursuant to section 5(a), the appropriate Secretary shall select the rights-of-way for national scenic and national historic trails and shall publish notice thereof of the availability of appropriate maps or descriptions in the Federal Register; Provided, That in selecting the rights-of-way full consideration shall be given to minimizing the adverse effects upon the adjacent landowner or user and his operation. Development and management of each segment of the National Trails System shall be designed to harmonize with and complement any established multiple-use plans for the specific area in order to insure continued maximum benefits from the land. The location and width of such rights-of-way across Federal lands under the jurisdiction of another Federal agency shall be by agreement between the head of that agency and the appropriate Secretary. In selecting rights-of-way for trail purposes, the Secretary shall obtain the advice and assistance of the States, local governments, private organizations, and landowners and land users concerned. (b) After publication of notice of the availability of appropriate maps or descriptions in the Federal Register, the Secretary charged with the administration of a national scenic or national historic trail may relocate segments of a national scenic or national historic trail right-of-way with the concurrence of the head of the Federal agency having jurisdiction over the lands involved, upon a determination that: (I) Such a relocation is necessary to preserve the purposes for which the trail was established, or (ii) the relocation is necessary to promote a sound land management program in accordance with established multiple-use principles: Provided, That a substantial relocation of the rights-of-way for such trail shall be by Act of Congress. (c) National scenic or national historic trails may contain campsites, shelters, and related-public-use facilities. Other uses along the trail, which will not substantially interfere with the nature and purposes of the trail, may be permitted by the Secretary charged with the administration of the trail. Reasonable efforts shall be made to provide sufficient access opportunities to such trails and, to the extent practicable, efforts shall be made to avoid activities incompatible with the purposes for which such trails were established. The use of motorized vehicles by the general public along any national scenic trail shall be prohibited and nothing in this Act shall be construed as authorizing the use of motorized vehicles within the natural and historical areas of the national park system, the national wildlife refuge system, the national wilderness preservation system where they are presently prohibited or on other Federal lands where trails are designated as being closed to such use by the appropriate Secretary: Provided, That the Secretary charged with the administration of such trail shall establish regulations which shall authorize the use of motorized vehicles when, in his judgment, such vehicles are necessary to meet emergencies or to enable adjacent landowners or land users to have reasonable access to their lands or timber rights: Provided further, That private lands included in the national recreation, national scenic, or national historic trails by cooperative agreement of a landowner shall not preclude such owner from using 28


APPENDIX

motorized vehicles on or across such trails or adjacent lands from time to time in accordance with regulations to be established by the appropriate Secretary. Where a national historic trail follows existing public roads, developed rights-of-way or waterways, and similar features of man's nonhistorically related development, approximating the original location of a historic route, such segments may be marked to facilitate retracement of the historic route, and where a national historic trail parallels an existing public road, such road may be marked to commemorate the historic route. Other uses along the historic trails and the Continental Divide National Scenic Trail, which will not substantially interfere with the nature and purposes of the trail, and which, at the time of designation, are allowed by administrative regulations, including the use of motorized vehicles, shall be permitted by the Secretary charged with administration of the trail. The Secretary of the Interior and the Secretary of Agriculture, in consultation with appropriate governmental agencies and public and private organizations, shall establish a uniform marker, including thereon an appropriate and distinctive symbol for each national recreation, national scenic, and national historic trail. Where the trails cross lands administered by Federal agencies such markers shall be erected at appropriate points along the trails and maintained by the Federal agency administering the trail in accordance with standards established by the appropriate Secretary and where the trails cross non-Federal lands, in accordance with written cooperative agreements, the appropriate Secretary shall provide such uniform markers to cooperating agencies and shall require such agencies to erect and maintain them in accordance with the standards established. The appropriate Secretary may also provide for trail interpretation sites, which shall be located at historic sites along the route of any national scenic or national historic trail, in order to present information to the public about the trail, at the lowest possible cost, with emphasis on the portion of the trail passing through the State in which the site is located. Wherever possible, the sites shall be maintained by a State agency under a cooperative agreement between the appropriate Secretary and the State agency. (d) Within the exterior boundaries of areas under their administration that are included in the right-of-way selected for a national recreation, national scenic, or national historic trail, the heads of Federal agencies may use lands for trail purposes and may acquire lands or interests in lands by written cooperative agreement, donation, purchase with donated or appropriated funds or exchange. (e) Where the lands included in a national scenic or national historic trail right-of-way are outside of the exterior boundaries of federally administered areas, the Secretary charged with the administration of such trail shall encourage the States or local governments involved (1) to enter into written cooperative agreements with landowners, private organizations, and individuals to provide the necessary trail right-of-way, or (2) to acquire such lands or interests therein to be utilized as segments of the national scenic or national historic trail: Provided, That if the State or local governments fail to enter into such written cooperative agreements or to acquire such lands or interests therein after notice of the selection of the right-of-way is published, the appropriate Secretary, may (i) enter into such agreements with landowners, States, local governments, private organizations, and individuals for the use of lands for trail purposes, or (ii) acquire private lands or interests therein by donation, purchase with donated or appropriated funds or exchange in accordance with the provisions of subsection (f) of this section: Provided further, That the appropriate Secretary may acquire lands or interests therein from local governments or governmental corporations with the consent of such entities. The lands involved in such rights-of-way should be acquired in fee, if other methods of public control are not sufficient to assure their use for the purpose for which they are acquired: Provided, That if the Secretary charged with the administration of such trail permanently relocates the right-of-way and disposes of all title or interest in the land, the original owner, or his heirs or assigns, shall be offered, by notice given at the former owner's last known address, the right of first refusal at the fair market price. (f)

(1) The Secretary of the Interior, in the exercise of his exchange authority, may accept title to any 29

non-Federal property within the right-of-way and in exchange therefor he may convey to the grantor of such property any federally owned property under his jurisdiction which is located in the State wherein such property is located and which he classifies as suitable for exchange or other disposal. The values of the properties so exchanged either shall be approximately equal, or if they are not approximately equal the values shall be equalized by the payment of cash to the grantor or to the Secretary as the circumstances require. The Secretary of Agriculture, in the exercise of his exchange authority, may utilize authorities and procedures available to him in connection with exchanges of national forest lands. (2) In acquiring lands or interests therein for a National Scenic or Historic Trail, the appropriate Secretary may, with consent of a landowner, acquire whole tracts notwithstanding that parts of such tracts may lie outside the area of trail acquisition. In furtherance of the purposes of this act, lands so acquired outside the area of trail acquisition may be exchanged for any non-Federal lands or interests therein within the trail right-of-way, or disposed of in accordance with such procedures or regulations as the appropriate Secretary shall prescribe, including: (i) provisions for conveyance of such acquired lands or interests therein at not less than fair market value to the highest bidder, and (ii) provisions for allowing the last owners of record a right to purchase said acquired lands or interests therein upon payment or agreement to pay an amount equal to the highest bid price. For lands designated for exchange or disposal, the appropriate Secretary may convey these lands with any reservations or covenants deemed desirable to further the purposes of this Act. The proceeds from any disposal shall be credited to the appropriation bearing the costs of land acquisition for the affected trail. (g) The appropriate Secretary may utilize condemnation proceedings without the consent of the owner to acquire private lands or interests, therein pursuant to this section only in cases where, in his judgment, all reasonable efforts to acquire such lands or interest therein by negotiation have failed, and in such cases he shall acquire only such title as, in his judgment, is reasonably necessary to provide passage across such lands: Provided, That condemnation proceedings may not be utilized to acquire fee title or lesser interests to more than an average of one hundred and twenty-five acres per mile. Money appropriated for Federal purposes from the land and water conservation fund shall, without prejudice to appropriations from other sources, be available to Federal departments for the acquisition of lands or interests in lands for the purposes of this Act. For national historic trails, direct Federal acquisition for trail purposes shall be limited to those areas indicated by the study report or by the comprehensive plan as high potential route segments or high potential historic sites. Except for designated protected components of the trail, no land or site located along a designated national historic trail or along the Continental Divide National Scenic Trail shall be subject to the provisions of section 4(f) of the Department of Transportation Act (49 U.S.C. 1653(f)) unless such land or site is deemed to be of historical significance under appropriate historical site criteria such as those for the National Register of Historic Places. (h)

(1) The Secretary charged with the administration of a national recreation, national scenic, or national historic trail shall provide for the development and maintenance of such trails within federally administered areas, and shall cooperate with and encourage the States to operate, develop, and maintain portions of such trails which are located outside the boundaries of federally administered areas. When deemed to be in the public interest, such Secretary may enter written cooperative agreements with the States or their political subdivisions, landowners, private organizations, or individuals to operate, develop, and maintain any portion of such a trail either within or outside a federally administered area. Such agreements may include provisions for limited financial assistance to encourage participation in the acquisition, protection, operation, development, or maintenance of such trails, provisions providing volunteer in the park or 30

93


(A6) THE NATIONAL TRAIL SYSTEM ACT volunteer in the forest status (in accordance with the Volunteers in the Parks Act of 1969 and the Volunteers in the Forests Act of 1972) to individuals, private organizations, or landowners participating in such activities, or provisions of both types. The appropriate Secretary shall also initiate consultations with affected States and their political subdivisions to encourage – (A) the development and implementation by such entities of appropriate measures to protect private landowners from trespass resulting from trail use and from unreasonable personal liability and property damage caused by trail use, and (B) the development and implementation by such entities of provisions for land practices compatible with the purposes of this Act, for property within or adjacent to trail rights-of-way. After consulting with States and their political subdivisions under the preceding sentence, the Secretary may provide assistance to such entities under appropriate cooperative agreements in the manner provided by this subsection. (2) Whenever the Secretary of the Interior makes any conveyance of land under any of the public land laws, he may reserve a right-of-way for trails to the extent he deems necessary to carry out the purposes of this Act. (i) The appropriate Secretary, with the concurrence of the heads of any other Federal agencies administering lands through which a national recreation, national scenic, or national historic trail passes, and after consultation with the States, local governments, and organizations concerned, may issue regulations, which may be revised from time to time, governing the use, protection, management, development, and administration of trails of the national trails system. In order to maintain good conduct on and along the trails located within federally administered areas and to provide for the proper government and protection of such trails, the Secretary of the Interior and the Secretary of Agriculture shall prescribe and publish such uniform regulations as they deem necessary and any person who violates such regulations shall be guilty of a misdemeanor, and may be punished by a fine of not more $500 or by imprisonment not exceeding six months, or by both such fine and imprisonment. The Secretary responsible for the administration of any segment of any component of the National Trails System (as determined in a manner consistent with subsection (a)(1) of this section) may also utilize authorities related to units of the national park system or the national forest system, as the case may be, in carrying out his administrative responsibilities for such component. (j) Potential trail uses allowed on designated components of the national trails system may include, but are not limited to, the following: bicycling, cross-country skiing, day hiking, equestrian activities, jogging or similar fitness activities, trail biking, overnight and long-distance backpacking, snowmobiling, and surface water and underwater activities. Vehicles which may be permitted on certain trails may include, but need not be limited to, motorcycles, bicycles, four-wheel drive or all-terrain off-road vehicles. In addition, trail access for handicapped individuals may be provided. The provisions of this subsection shall not supersede any other provisions of this Act or other Federal laws, or any State or local laws. (k) For the conservation purpose of preserving or enhancing the recreational, scenic, natural, or historical values of components of the national trails system, and environs thereof as determined by the appropriate Secretary, landowners are authorized to donate or otherwise convey qualified real property interests to qualified organizations consistent with section 170(h)(3) of the Internal Revenue Code of 1954, including, but not limited to, right-of-way, open space, scenic, or conservation easements, without regard to any limitation on the nature of the estate or interest otherwise transferable within the jurisdiction where the land is located. The conveyance of any such interest in land in accordance with this subsection shall be

94

31

deemed to further a Federal conservation policy and yield a significant public benefit for purposes of section 6 of Public Law 96-541.

STATE AND METROPOLITAN AREA TRAILS SEC. 8. [16USC1247] (a) The Secretary of the Interior is directed to encourage States to consider, in their comprehensive statewide outdoor recreation plans and proposals for financial assistance for State and local projects submitted pursuant to the Land and Water Conservation Fund Act, needs and opportunities for establishing park, forest, and other recreation and historic trails on lands owned or administered by States, and recreation and historic trails on lands in or near urban areas. The Secretary is also directed to encourage States to consider, in their comprehensive statewide historic preservation plans and proposals for financial assistance for State, local, and private projects submitted pursuant to the Act of October 15, 1966 (80 Stat. 915), as amended, needs and opportunities for establishing historic trails. He is further directed in accordance with the authority contained in the Act of May 28, 1963 (77 Stat. 49), to encourage States, political subdivisions, and private interests, including nonprofit organizations, to establish such trails. (b) The Secretary of Housing and Urban Development is directed, in administering the program of comprehensive urban planning and assistance under section 701 of the Housing Act of 1954, to encourage the planning of recreation trails in connection with the recreation and transportation planning for metropolitan and other urban areas. He is further directed, in administering the urban open space program under title VII of the Housing Act of 1961, to encourage such recreation trails. (c) The Secretary of Agriculture is directed, in accordance with authority vested in him, to encourage States and local agencies and private interests to establish such trails. (d) The Secretary of Transportation, the Chairman of the Interstate Commerce Commission, and the Secretary of the Interior, in administering the Railroad Revitalization and Regulatory Reform Act of 1976, shall encourage State and local agencies and private interests to establish appropriate trails using the provisions of such programs. Consistent with the purposes of that Act, and in furtherance of the national policy to preserve established railroad rights-of-way for future reactivation of rail service, to protect rail transportation corridors, and to encourage energy efficient transportation use, in the case of interim use of any established railroad rights-of-way pursuant to donation, transfer, lease, sale, or otherwise in a manner consistent with the National Trails System Act, if such interim use is subject to restoration or reconstruction for railroad purposes, such interim use shall not be treated, for purposes of any law or rule of law, as an abandonment of the use of such rights-of-way for railroad purposes. If a State, political subdivision, or qualified private organization is prepared to assume full responsibility for management of such rights-of-way and for any legal liability arising out of such transfer or use, and for the payment of any and all taxes that may be levied or assessed against such rights-of-way, then the Commission shall impose such terms and conditions as a requirement of any transfer or conveyance for interim use in a manner consistent with this Act, and shall not permit abandonment or discontinuance inconsistent or disruptive of such use. (e) Such trails may be designated and suitably marked as parts of the nationwide system of trails by the States, their political subdivisions, or other appropriate administering agencies with the approval of the Secretary of the Interior.

32


APPENDIX

RIGHTS-OF-WAY AND OTHER PROPERTIES

Upon receipt of such an application, the Secretary shall publish a notice concerning such application in a newspaper of general circulation in the area where the relevant portion is located. Such release and quitclaim shall be on the following conditions:

SEC. 9. [16USC1248] (a) The Secretary of the Interior or the Secretary of Agriculture as the case may be, may grant easements and rights-of-way upon, over, under, across, or along any component of the national trails system in accordance with the laws applicable to the national park system and the national forest system, respectively: Provided, That any conditions contained in such easements and rights-of-way shall be related to the policy and purposes of this Act.

(A) If such unit or entity attempts to sell, convey, or otherwise transfer such right, title, or interest or attempts to permit the use of any part of such portion for any purpose incompatible with its use for public recreation, then any and all right, title, and interest released and quitclaimed by the Secretary pursuant to this subsection shall revert to the United States.

(b) The Department of Defense, the Department of Transportation, the Interstate Commerce Commission, the Federal Communications Commission, the Federal Power Commission, and other Federal agencies having jurisdiction or control over or information concerning the use, abandonment, or disposition of roadways, utility rights-of-way, or other properties which may be suitable for the purpose of improving or expanding the national trails system shall cooperate with the Secretary of the Interior and the Secretary of Agriculture in order to assure, to the extent practicable, that any such properties having values suitable for trail purposes may be made available for such use.

(B) Such unit or entity shall assume full responsibility and hold the United States harmless for any legal liability which might arise with respect to the transfer, possession, use, release, or quitclaim of such right-of-way.

(c) Commencing upon the date of enactment of this subsection, any and all right, title, interest, and estate of the United States in all rights-of-way of the type described in the Act of March 8, 1922 (43 U.S.C. 912), shall remain in the United States upon the abandonment or forfeiture of such rights-of-way, or portions thereof, except to the extent that any such right-of-way, or portion thereof, is embraced within a public highway no later than one year after a determination of abandonment or forfeiture, as provided under such Act. (d)

(1) All rights-of-way, or portions thereof, retained by the United States pursuant to subsection (c) which are located within the boundaries of a conservation system unit or a National Forest shall be added to and incorporated within such unit or National Forest and managed in accordance with applicable provisions of law, including this Act. (2) All such retained rights-of-way, or portions thereof, which are located outside the boundaries of a conservation system unit or a National Forest but adjacent to or contiguous with any portion of the public lands shall be managed pursuant to the Federal Land Policy and Management Act of 1976 and other applicable law, including this section. (3) All such retained rights-of-way, or portions thereof, which are located outside the boundaries of a conservation system unit or National Forest which the Secretary of the Interior determines suitable for use as a public recreational trail or other recreational purposes shall be managed by the Secretary for such uses, as well as for such other uses as the Secretary determines to be appropriate pursuant to applicable laws, as long as such uses do not preclude trail use.

(e)

(1) The Secretary of the Interior is authorized where appropriate to release and quitclaim to a unit of government or to another entity meeting the requirements of this subsection any and all right, title, and interest in the surface estate of any portion of any right-of-way to the extent any such right, title, and interest was retained by the United States pursuant to subsection (c), if such portion is not located within the boundaries of any conservation system unit or National Forest. Such release and quitclaim shall be made only in response to an application therefor by a unit of State or local government or another entity which the Secretary of the Interior determines to be legally and financially qualified to manage the relevant portion for public recreational purposes. 33

(C) Notwithstanding any other provision of law, the United States shall be under no duty to inspect such portion prior to such release and quitclaim, and shall incur no legal liability with respect to any hazard or any unsafe condition existing on such portion at the time of such release and quitclaim. (2) The Secretary is authorized to sell any portion of a right-of-way retained by the United States pursuant to subsection (c) located outside the boundaries of a conservation system unit or National Forest if any such portion is -(A) not adjacent to or contiguous with any portion of the public lands; or (B) determined by the Secretary, pursuant to the disposal criteria established by section 203 of the Federal Land Policy and Management Act of 1976, to be suitable for sale. Prior to conducting any such sale, the Secretary shall take appropriate steps to afford a unit of State or local government or any other entity an opportunity to seek to obtain such portion pursuant to paragraph (1) of this subsection. (3) All proceeds from sales of such retained rights of way shall be deposited into the Treasury of the United States and credited to the Land and Water Conservation Fund as provided in section 2 of the Land and Water Conservation Fund Act of 1965. (4) The Secretary of the Interior shall annually report to the Congress the total proceeds from sales under paragraph (2) during the preceding fiscal year. Such report shall be included in the President's annual budget submitted to the Congress. (f) As used in this section -(1) The term "conservation system unit" has the same meaning given such term in the Alaska National Interest Lands Conservation Act (Public Law 96-487; 94 Stat. 2371 et seq.), except that such term shall also include units outside Alaska. (2) The term "public lands" has the same meaning given such term in the Federal Land Policy and Management Act of 1976.

34

95


(A6) THE NATIONAL TRAIL SYSTEM ACT throughout the Nation. AUTHORIZATION OF APPROPRIATIONS SEC. 10. [16USC1249] (a) (1) There are hereby authorized to be appropriated for the acquisition of lands or interests in lands not more than $5,000,000 for the Appalachian National Scenic Trail and not more than $500,000 for the Pacific Crest National Scenic Trail. From the appropriations authorized for fiscal year 1979 and succeeding fiscal years pursuant to the Land and Water Conservation Fund Act (78 Stat. 897), as amended, not more than the following amounts may be expended for the acquisition of lands and interests in lands authorized to be acquired pursuant to the provisions of this Act: for the Appalachian National Scenic Trail, not to exceed $30,000,000 for fiscal year 1979, $30,000,000 for fiscal year 1980, and $30,000,000 for fiscal year 1981, except that the difference between the foregoing amounts and the actual appropriations in any one fiscal year shall be available for appropriation in subsequent fiscal years. (2) It is the express intent of the Congress that the Secretary should substantially complete the land acquisition program necessary to insure the protection of the Appalachian Trail within three complete fiscal years following the date of enactment of this sentence. (b) For the purposes of Public Law 95-42 (91 Stat. 211), the lands and interests therein acquired pursuant to this section shall be deemed to qualify for funding under the provisions of section 1, clause 2, of said Act. (c) Authorization of Appropriations(1) IN GENERAL- Except as otherwise provided in this Act, there are authorized to be appropriated such sums as are necessary to implement the provisions of this Act relating to the trails designated by section 5(a). (2) NATCHEZ TRACE NATIONAL SCENIC TRAIL(A) IN GENERAL- With respect to the Natchez Trace National Scenic Trail (referred to in this paragraph as the `trail') designated by section 5(a)(12)— (i) not more than $500,000 shall be appropriated for the acquisition of land or interests in land for the trail; and (ii) not more than $2,000,000 shall be appropriated for the development of the trail. (B) PARTICIPATION BY VOLUNTEER TRAIL GROUPS- The administering agency for the trail shall encourage volunteer trail groups to participate in the development of the trail.

VOLUNTEER TRAILS ASSISTANCE SEC. 11. [16USC1250] (a) (1) In addition to the cooperative agreement and other authorities contained in this Act, the Secretary of the Interior, the Secretary of Agriculture, and the head of any Federal agency administering Federal lands, are authorized to encourage volunteers and volunteer organizations to plan, develop, maintain, and manage, where appropriate, trails

96

35

(2) Wherever appropriate in furtherance of the purposes of this Act, the Secretaries are authorized and encouraged to utilize the Volunteers in the Parks Act of 1969, the Volunteers in the Forests Act of 1972, and section 6 of the Land and Water Conservation Fund Act of 1965 (relating to the development of Statewide Comprehensive Outdoor Recreation Plans). (b) Each Secretary or the head of any Federal land managing agency, may assist volunteers and volunteers organizations in planning, developing, maintaining, and managing trails. Volunteer work may include, but need not be limited to— (1) planning, developing, maintaining, or managing (A) trails which are components of the national trails system, or (B) trails which, if so developed and maintained, could qualify for designation as components of the national trails system; or (2) operating programs to organize and supervise volunteer trail building efforts with respect to the trails referred to in paragraph (1), conducting trail-related research projects, or providing education and training to volunteers on methods of trails planning, construction, and maintenance. (c) The appropriate Secretary or the head of any Federal land managing agency may utilize and to make available Federal facilities, equipment, tools, and technical assistance to volunteers and volunteer organizations, subject to such limitations and restrictions as the appropriate Secretary or the head of any Federal land managing agency deems necessary or desirable.

DEFINITIONS SEC. 12. [16USC1251] As used in this Act: (1) The term "high potential historic sites" means those historic sites related to the route, or sites in close proximity thereto, which provide opportunity to interpret the historic significance of the trail during the period of its major use. Criteria for consideration as high potential sites include historic significance, presence of visible historic remnants, scenic quality, and relative freedom from intrusion. (2) The term "high potential route segments" means those segments of a trail which would afford high quality recreation experience in a portion of the route having greater than average scenic values or affording an opportunity to vicariously share the experience of the original users of a historic route. (3) The term "State" means each of the several States of the United States, the District of Columbia, the Commonwealth of Puerto Rico, the Virgin Islands, Guam, American Samoa, the Trust Territory of the Pacific Islands, the Northern Mariana Islands, and any other territory or possession of the United States. (4) The term "without expense to the United States" means that no funds may be expended by 36


APPENDIX

Federal agencies for the development of trail related facilities or for the acquisition of lands or interest in lands outside the exterior boundaries of Federal areas. For the purposes of the preceding sentence, amounts made available to any State or political subdivision under the Land and Water Conservation Fund Act of 1965 or any other provision of law shall not be treated as an expense to the United States.

END

37

97


98


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.