Ops Talk Magazine Spring 2018

Page 60

Addressing limited classroom spaces with

portable classroom relocations

Thinkspace Architecture Planning Interior Design has been working on portable relocation projects on more than 75 different school sites to help address the lack of available classroom spaces in various school districts.

R

ecently, class sizes were reduced in B.C., creating a shortage of classroom space in many schools across the province. School District #36 (Surrey) is one example of a district that is working towards accommodating a growing

student population; currently they are experiencing a population growth rate of 10,000 new residents annually. This, in addition to reduced class sizes, means that classroom space is at a premium. The Surrey School District is not alone in this problem, and in the last year, Thinkspace Architecture Planning Interior Design has been working on portable relocation

The portable classroom can be connected independently to site services or connect to the existing school, depending on what capacity is available.

projects on more than 75 different school sites to help address the lack of available classroom spaces in various school dis-

• Fire protection – We have encountered many challenges

tricts.

with BCBC limiting distances, fire access routes, and fire

Portable classrooms may not be ideal, but they are impor-

hydrants. Limiting distances restrict where a portable class-

tant as they offer a relatively quick solution to providing more classroom spaces rather than holding classes in a gymnasium or library. Our experience over the years has allowed us to identify many challenges that may present themselves during preparation of permit documents for a portable class-

room can be placed on site, as well as dictating fire ratings and construction materials; sometimes the ideal location is not permitted. Additionally, oftentimes the portables cannot be placed close enough to a fire access lane or fire hydrant, so new access lanes and hydrants need to be provided.

room relocation. Often, the most difficult part of a portable

• Zoning regulations – locating a portable on an existing site

relocation is choosing the best placement on site while con-

means that all current zoning regulations must be met. The

forming to current building code and zoning regulations.

most common problem this presents is regarding vehicle

These challenges include:

parking and setbacks. We have found in many cases that

60

Ops Talk • Spring 2018


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.